Page 1

___________________________________________________________________
To:  Finance, Resources and Customer Services Policy Board
On:  3 April 2025
___________________________________________________________________
Report by: The Director of Finance and Resources and the Director of
Environment, Housing and Infrastructure
___________________________________________________________________
Heading: Contract Authorisation Report for: Development of Site C1, Dargavel
(RC-CPU-24-023)
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to seek the approval of the Finance,
Resources and Customer Services Policy Board to award a Works
Contract for Development of Site C1, Dargavel (RC-CPU-24-023) to
John McGeady Limited. 
1.2 The recommendation to award the Contract follows a procurement
exercise conducted in accordance with the Council’s Standing Orders
Relating to Contracts 1 January 2024 for a below Regulated (Works)
Contract using the Quick Quote Procedure. 
1.3 A Contract Strategy was approved by the Interim Strategic Category
Manager and the Head of Property Services on 20 January 2025.
___________________________________________________________________ 
2. Recommendations
It is recommended that the Finance, Resources and Customer Services
Policy Board:

Page 2

2.1 Authorises the Head of Corporate Governance to award a Works
Contract in the form of a SBCC Design & Build Contract for use in
Scotland (2016 Edition) as amended by the Employer’s Amendments in
respect of Development of Site C1, Dargavel (RC-CPU-24-023) to John
McGeady Limited.
2.2 Authorises the total Contract Sum of £473,790.89 excluding VAT.
2.3 Authorises a contingency spend of £47,379.09 which equates to 10%
of the Contract Sum.
2.4 Authorises a total Approved Contract Value of £521,169.98 which is the
total of the Contract Sum plus the contingency spend.
2.5 Note that the Date of Possession of the Site is anticipated to be 28 April
2025 with the Date of Completion is anticipated to be 21 July 2025. The
actual dates will be confirmed in the Council’s Letter of Acceptance to
John McGeady Limited.
_________________________________________________________
3. Background
3.1  Renfrewshire Council requires a competent and suitably qualified
contractor to design and build a new car and bus park facility to be able
to drop off and pick up pupils safely away from the public road. The
Contracts works include groundworks, drainage, road surfacing and
line marking. Other components of the Contract include installation of
street lighting and CCTV infrastructure, guardrails, fencing to match
pre-existing fences with corresponding gates within and soft
landscaping.
3.2  A Quick Quote procurement process was utilised for this Contract.  To
initiate this procurement process seven organisations were invited to
participate in the Quick Quote.  The tender documentation was published
on Public Contracts Scotland – Tender portal on Monday 27 January
2025 with the tender documentation available for downloading from the
PCS-Tender portal from this date.  
.3.3 By the closing date set for the return of electronic Quotation
Responses, 5pm on 17 February 2025, two organisations submitted a
tender response, two organisations did not respond, and three
organisations declined to respond due to the Quick Quote timescales. 
CPU issued a feedback request to the organisations that did not submit
a tender response; however, no feedback has been provided to date.

Page 3

3.4 In accordance with the Council’s Standing Orders Relating to Contracts
1 January 2024, Bidders were required to complete a Single
Procurement Document (SPD) to be submitted with their quotation
response.  The two quotation responses were evaluated against a pre-
determined set of criteria in the form of the SPD by representatives
from the following Council Services: Property Services, the Corporate
Procurement Unit, Corporate Risk and Corporate Health & Safety.  
3.5 The two quotation responses received complied with the minimum
selection criteria of the SPD.  The two quotation responses were each
evaluated against the Award Criteria which were based on a weighting
of 60.00% Price and 40.00% Quality.  
3.6  The scores relative to the Award Criteria for each of the quotation
responses are noted below:
Company Price
(60%)
Quality
(40%) Total (100%)
John McGeady
Limited 60.00% 25.00% 85.00%
City Gate Construction
(Scotland) Limited 52.61% 30.00% 82.61% 
3.7 The evaluation of quotation responses received identified that the
submission by John McGeady Limited was the most economically
advantageous tender.
3.8 The form of contract is SBCC Design & Build Contract for use in
Scotland (2016 Edition) as amended by the Employer’s Amendments.
3.9 The costs for this Contract will be met from the Capital – General
Services Budget.
3.10 Community Benefits were requested as part of the procurement
process and John McGeady Limited confirmed that the following
Community Benefits would be made available to the Council for this
Contract: 
___________________________________________________________________
Community Benefit Description  No of People
/ Activity
Industry Awareness Events 
• Schools
• Invest in Renfrewshire – Employability
• Further Education
2
Business advice/support to a local SME /Social
Enterprise/ Voluntary organisation
1

Page 4

Implications of the Report
1. Financial - Financial and Economic Standing have been assessed as
part of the tender selection criteria – which John McGeady Limited met.
The cost of up to £521,169.98 excluding VAT for the Contract period
will be met through the Capital – General Services budget. 
2. HR & Organisational Development - None directly arising from this
report. 
3. Community/Council Planning –  
Our Renfrewshire is thriving 
• Making sure the infrastructure is in place to support growth in
local economy and population (such as housing, transport and
schools) 
Place 
• Adopting a 'placeshaping' approach to developing our
communities - working together to maximise our collective
impact and influence across economic, social, physical, cultural
and environmental policies and practices 
• Delivering those strong universal services we all receive, and all
rely on - like safe roads, clean and well-lit streets, efficient waste
and recycling - making Renfrewshire a great place to live 
Economy 
• Improving lives and securing wellbeing through a stronger,
inclusive and sustainable economy, being creative, imaginative
and linking opportunities to enhance the benefits for
Renfrewshire. 
Living Our Values 
• Ensuring Renfrewshire Council delivers Best Value for our
citizens and customers, that we are a well governed, effective
organisation. 
4. Legal - The Procurement of this Contract was conducted as a below
Regulated (Works) Quick Quote Procurement Procedure in accordance
with the Council’s Standing Orders Relating to Contracts 1 January
2024.

Page 5

5. Property/Assets – This will provide a new car and bus park facility on
Site C1 at Dargavel Primary School, which will allow pupils to be safely
dropped off and picked up. Including the installation of street lighting
and CCTV infrastructure, guardrails, fencing and soft landscaping. 
6. Information Technology - None directly arising from this report. 
7.  Equality & Human Rights - None directly arising from this report. 
8. Health & Safety – John McGeady Limited Health and Safety
Submission was evaluated by the Council’s Corporate Health & Safety
team and meet the minimum requirements regarding health & safety.   
9. Procurement – The procurement procedure outlined within this report
ensures that the Council meets its statutory requirements in respect of
procurement procedures, efficiency and modern government.
10. Risk – John McGeady Limited was evaluated by the Council’s Risk
team and meet the Council’s minimum requirements.
11. Privacy Impact - None directly arising from this report.
12. Climate Risk – The level of impact associated with the Development of
Site C1, Dargavel has been assessed using the Scottish Government
Sustainability Test and are considered to be high risk. In order to
mitigate these risks the Contractor will:
• implement waste management plans to reduce, reuse and
recycle construction waste
• be registered to dispose of the waste themselves or appoint a
sub-contractor that is registered and licensed to dispose of the
waste.
13. Children’s Rights –This report demonstrates compliance with Article 3
(best interest of child) of the United Nations Convention on the Rights
of the Child. This will provide a new car and bus park facility to be able
to drop off and pick up pupils safely away from the public road.
14. Cosla Policy Position – None directly arising from this report.
_______________________________________________________
List of Background Papers
None
___________________________________________________________________
Author:           Stuart McLean, Procurement Adviser,
stuart.mclean@renfrewshire.gov.uk