___________________________________________________________________
To:  Finance, Resources and Customer Services Policy Board
On:  10 September 2026
___________________________________________________________________
Report by: The Director of Finance and Resources and the Director of
Environment, Housing and Infrastructure
___________________________________________________________________
Heading: Contract Authorisation Report for Framework Agreement for Roads
Related Maintenance Works (reference RC-CPU-24-335)
___________________________________________________________________
1. Summary
1.1 The purpose or this report is to seek the approval of the Finance,
Resources and Customer Services Policy Board to award a Framework
Agreement with a number of suitably qualified and experienced
Suppliers for roads related maintenance works.   
1.2 The procurement procedure for this Works Framework Agreement was
conducted as an Open Procedure in accordance with the Public
Contracts (Scotland) Regulations 2015, as amended, and the
Renfrewshire Council’s Standing Orders Relating to Contracts for an
over Government Procurement Agreement (GPA) Threshold Works
Framework Agreement. 
1.3 A Contract Strategy was approved by the Head of Climate, Public
Protection and Roads, the Strategic Category Manager and the
Corporate Procurement Manager on 12 May 2026.
___________________________________________________________________ 
2. Recommendations
It is recommended that the Finance, Resources and Customer Services
Policy Board:

Page 2

PUBLIC
2.1 Authorises the Head of Corporate Governance to enter into a
Framework Agreement for Roads Related Maintenance Works
(reference RC-CPU-24-335) (“Framework Agreement”) consisting of
Lot 1, Lot 2 and Lot 4 only with the Suppliers listed in Appendix 2 of this
report. 
2.2 Authorises a maximum approved contract value of £30,000,000
excluding VAT for the entire period. 
2.3 Authorises the Framework Agreement for a period of 3 years with the
option to extend on 1 occasion for a period of up to 12 months at the
sole discretion of the Council. 
2.4 Notes the anticipated Framework Start Date is 5 October 2026 however
the exact date will be confirmed in the Council’s Letter of Acceptance
issued to each Supplier. 
2.5 Notes that Call-Off Contracts made under this Framework Agreement
will be awarded by way of a Work Order using the selection procedure
or the quotation procedure. The most appropriate procedure is at the
discretion of the Council and will be subject to the Renfrewshire Council
Standing Orders Relating to Contracts, the requirements of the Work
Order (Call-Off Contract) for the Works and the need to secure best
value.
_________________________________________________________
3. Background
3.1 Renfrewshire Council has a statutory obligation to maintain and
improve all public roads (excluding trunk roads) within the Council
boundary. 
3.2 This Council Framework Agreement for Roads Related Maintenance
Works (reference RC-CPU-24-335) includes maintenance and
improvements of roads related maintenance works for the Council’s
road maintenance programme. 
3.3 The Framework Agreement was tendered with 6 Lots as detailed
below:
• Lot 1 – Carriageway Resurfacing
• Lot 2 – Footway Resurfacing
• Lot 3 – Road Markings
• Lot 4 – Minor Traffic Improvements 
• Lot 5 – Road Lighting
• Lot 6 – Drainage Improvement Works

Page 3

PUBLIC
3.4 The Framework Agreement will be formed under the NEC4 Framework
Contract, June 2017 edition with bespoke Z Clauses. Call-Off Contracts
(“Work Order”) awarded under the Framework Agreement will be
formed using the NEC4 Engineering and Construction Short Contract,
June 2017 edition with bespoke Z Clauses or, alternatively, the NEC4
Term Service Short Contract June 2017 edition with bespoke Z
Clauses. The Council will determine the most appropriate terms as part
of defining the requirements of the individual Work Order. 
3.5 The Framework Agreement was tendered as an above GPA Threshold
Works Framework Agreement using the Open Procedure in
accordance with the Public Contracts (Scotland) Regulations 2015, as
amended and the Renfrewshire Council Standing Orders relating to
Contracts. The Contract Notice was dispatched via the Public Contracts
Scotland portal on 26 May 2026 and advertised on the Find a Tender
Service (FTS) on the same date. The Tender Documents were
available for immediate download through the Public Contracts
Scotland – Tender portal. 
3.6 During the tendering period, 61 organisations expressed an interest in
the Framework Agreement. By the closing date set for return of
electronic tenders, 12 noon on Thursday, 2 July 2026, 20 organisations
provided a response, 10 declined to respond and 31 were
unresponsive. The 20 Tender Submissions received were evaluated by
a panel comprising representatives from Environment, Housing and
Infrastructure, the Corporate Procurement Unit, Health and Safety and
Risk. 
3.7 The Tenderers were initially evaluated against a pre-determined set of
criteria in the form of the Single Procurement Document, SPD
(Scotland). One Tenderer failed to respond to a clarification request
relating to the SPD(Scotland), as a result their Tender Submission was
deemed irregular and not evaluated further. The remaining 19
Tenderers satisfied the Council’s requirements in respect of their
responses to the SPD (Scotland). 
3.8 The technical and commercial responses contained in the Tender
Submission were each scored against the published award criteria for
the Framework Agreement of 40% technical (Quality) and 60%
commercial (Price) for each Lot. At this stage, one Tenderer withdrew
their bid for Lot 2 – Footway Resurfacing and one Tenderer withdrew
their bid for Lot 6 – Drainage Improvement Works. 
3.9 Following evaluation of Tender Submissions for Lot 3 – Road Markings,
Lot 5 – Road Lighting and Lot 6 – Drainage Improvement Works, the
Council determined that best value could not be derived from awarding
each of these Lots.  Therefore, the Council has decided not to
recommend the award of these Lots, as permitted within the Invitation
to Tender.

Page 4

PUBLIC
3.10 The scores achieved by each Tenderer for Lot 1 – Carriageway
Resurfacing, Lot 2 – Footway Resurfacing and Lot 4 - Minor Traffic
Improvements are set out in Appendix 1- Evaluation Scoring to this
report. The Invitation to Tender identified that 4 Suppliers would be
approved for inclusion in each Lot, but the Council reserved the right to
increase or decrease the number of Suppliers per Lot as determined
appropriate by the Council.  The Council has opted to recommend a
maximum number of 4 Suppliers per Lots 1, 2, and 4 and the
recommended suppliers and their associated ranking are detailed in
Appendix 2 to this report. 
3.11 The Framework Agreement ordering procedures are either the
selection procedure or the quotation procedure. Where the selection
procedure is applied, then the Supplier ranked first in each Lot will be
invited to apply for the Work Order. Should the first ranked Supplier
reject the invitation, the second ranked Supplier will be invited to apply
for the Work Order, and so on until the Work Order has been awarded.
The Framework Agreement does not afford any Supplier any
exclusivity. 
3.12 The Supplier ranking information as detailed in Appendix 2 to this
report will be fixed for the first year of the Framework Agreement. On
an annual basis the Council will invite Suppliers to submit a price
refresh. Where the revised prices and rates are accepted, the Council
shall re-evaluate the commercial score and add this score to the
original Quality score achieved by each Supplier. Suppliers will be re-
ranked in accordance with the revised scores across each Lot. The
new ranking will apply to any Work Order awarded after the applicable
Framework Agreement anniversary. 
3.13 All Suppliers accepted for this Framework Agreement have committed
to providing five Community Benefit Points for every £150,000
(excluding VAT) spent through Work Orders. The Community Benefits
to be delivered will be consistent with the Council’s Community Benefits
Outcome Menu.
___________________________________________________________________
Implications of the Report
1. Financial – The total approved Framework Agreement value will be up
to a maximum of £30,000,000, excluding VAT, for the total 4-year
framework period, including the 12-month extension. The costs of all
Work Orders issued under this Framework Agreement will be met by
both Roads capital and revenue budgets, and in some cases from
external funding.   
2. HR & Organisational Development – None directly arising from this
report.

Page 5

PUBLIC
3. Community/Council Planning – Place – Working with partners to
ensure our neighbourhoods are safe, vibrant and attractive places to
live. The Framework Agreement will support the delivery of this
outcome.  
4. Legal – The tendering procedure for this Framework Agreement was
conducted in accordance with the Open Procedure under the Public
Contracts (Scotland) Regulations 2015, as amended, and the
Renfrewshire Council’s Standing Orders Relating to Contracts under for
above GPA threshold Works Framework Agreement. Work Orders
issued by the Council under this Framework Agreement will be
contracted under either the NEC4 Engineering and Construction Short
Contract, June 2017 edition incorporating the Council’s amendments (Z
Clauses) or using the NEC4 Term Service Short Contract, June 2017
edition incorporating the Council’s amendments (Z Clauses) as issued
as part of the Invitation to Tender. 
5. Property/Assets – The Council’s roads infrastructure will be
maintained to a high standard. 
6. Information Technology – None directly arising from this report. 
7. Equality & Human Rights – None directly arising from this report. 
8. Health & Safety – All Suppliers health and safety credentials were
evaluated by Corporate Health and Safety and met the Council’s
requirements regarding health and safety.
9. Procurement – The procurement procedures outlined within this report
will ensure that the Council meets its statutory requirements in respect
of procurement procedures, efficiency and modern government. 
10. Risk – All Suppliers insurances were evaluated by Risk and met the
Council’s requirements regarding insurable risk.
11. Privacy Impact – None directly arising from this report. 
12. Climate Risk – The level of impact associated with works connected
with the Framework Agreement has been assessed using the Scottish
Government Sustainability Test and is considered to be high risk.
Suppliers awarded Work Orders under the Framework Agreement will
be required to organise their activities in such a way that the impact
they have on the environment is minimised.

Page 6

PUBLIC
13. Children’s Rights – None directly arising from this report.
14. Cosla Policy Position – None directly arising from this report.
_________________________________________________________
List of Background Papers - None
___________________________________________________________________ 
Author:           Brian Bradley, Assistant Category Manager, 0141 487 1522,
brian.bradley@renfrewshire.gov.uk

Page 7

PUBLIC
Appendix 1 – Evaluation Scoring 
Lot 1 – Carriageway Resurfacing
Tenderer Quality Price Total
John McGeady Limited (SC080553) 36.67% 60.00% 96.67%
JH Civil Engineering Limited (SC195621) 36.67% 59.14% 95.81%
Hillhouse Quarry Group Limited (SC135103) 36.67% 54.60% 91.27%
Maclay (Civil Engineering) Limited (SC058460) 30.83% 44.61% 75.44%
William Hamilton trading as Hamilton Tarmac
(Sole Trader) 35.42% 37.69% 73.11%
Luddon Construction Limited (SC057943) 36.67% 35.71% 72.38%
Stepford Group Ltd (SC644529) 33.33% 35.31% 68.64% 
Lot 2 – Footway Resurfacing
Tenderer Quality Price Total
John McGeady Limited (SC080553) 36.67% 60.00% 96.67%
JH Civil Engineering Limited (SC195621) 36.67% 52.77% 89.44%
Ipsum Infrastructure (SC263385) 36.67% 44.03% 80.70%
Hillhouse Quarry Group Limited (SC135103) 36.67% 34.12% 70.79%
Luddon Construction Limited (SC057943) 36.67% 32.44% 69.11%
Bottom Groundworks & Plant Hire Limited
(SC578729) 33.33% 34.81% 68.14%
Stepford Group Ltd (SC644529) 33.33% 34.01% 67.34%
Keal Contracts Limited (SC693824) 32.08% 34.68% 66.76%
William Hamilton trading as Hamilton Tarmac
(Sole Trader) 35.42% 25.90% 61.32%
Rainton Construction (Scotland) Ltd (SC565812) 26.25% 34.69% 60.94%
Landscapes and Contracts Limited (SC223969) 30.00% 27.48% 57.48% 
Lot 4 – Minor Traffic Improvements
Tenderer Quality Price Total
John McGeady Limited (SC080553) 36.67% 60.00% 96.67%
Stepford Group Ltd (SC644529) 33.33% 34.10% 67.43%
Luddon Construction Limited (SC057943) 36.67% 24.94% 61.61%
Lochwynd Limited (SC143213) 36.67% 22.72% 59.39%
Hillhouse Quarry Group Limited (SC135103) 36.67% 18.18% 54.85%
Bottom Groundworks & Plant Hire Limited
(SC578729) 33.33% 17.31% 50.64%
Keal Contracts Limited (SC693824) 32.08% 15.42% 47.50%
Maclay (Civil Engineering) Limited (SC058460) 30.83% 12.32% 43.15%
Landscapes and Contracts Limited (SC223969) 30.00% 12.01% 42.01%
Geo-Rope Ltd (SC231151) 28.75% 12.61% 41.36%

Page 8

PUBLIC
Appendix 2 – Places on the Framework Agreement to be awarded 
Lot 1 – Carriageway Resurfacing
Tenderer Ranking
John McGeady Limited (SC080553) 1st
JH Civil Engineering Limited (SC195621) 2nd 
Hillhouse Quarry Group Limited (SC135103) 3rd 
Maclay (Civil Engineering) Limited (SC058460) 4th 
Lot 2 – Footway Resurfacing
Tenderer Ranking
John McGeady Limited (SC080553) 1st
JH Civil Engineering Limited (SC195621) 2nd 
Ipsum Infrastructure Limited (SC263385) 3rd 
Hillhouse Quarry Group Limited (SC135103) 4th 
Lot 4 – Minor Traffic Improvements
Tenderer Ranking
John McGeady Limited (SC080553) 1st
Stepford Group Ltd (SC644529) 2nd 
Luddon Construction Limited (SC057943) 3rd 
Lochwynd Limited (SC143213) 4th