Revenue and Capital Budget Monitoring 2026-27 at 19 June 2026

Renfrewshire Council · 10 September 2026
Back to Finance, Resources and Customer Services Policy Board — 10 September 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

PUBLIC
___________________________________________________________________
To: Finance, Resources and Customer Services Policy Board
On: 10 September 2026
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Revenue and Capital Budget Monitoring 2026/27 at 19 June 2026
___________________________________________________________________
1. Summary
1.1 At the close of reporting Period 3 on 19 June 2026, the projected revenue
outturn at 31 March 2027 for those services reporting to the Finance,
Resources and Customer Services Policy Board is an underspend position
of £0.198m (0.2%) against the revised budget for the year. 
1.2 The projected capital outturn at 31 March 2027 for projects reporting to the
Finance, Resources and Customer Services Policy Board is a break-even
position. 
1.3  This is summarised over the relevant services in the table below and further
analysis is provided in the report and appendices. 
Revised
Annual
Budget
£000
Projected
Outturn
£000
Budget
Variance
(Adv)/Fav
£000
Budget
Variance
%
Revenue    
Finance and Resources 58,003 57,988 15 (0.0%)
Environment, Housing and
Infrastructure  33,280 33,078 202 0.6%
Chief Executive's Service (Estates) 668 687 (19) (2.8%)
Miscellaneous 22,195 22,195 0 0%
Total 114,146 113,948 198 (0.2%)
Capital    
Finance, Resources and Customer
Services Policy Board 9,394 9,394 0 0%

Page 2

PUBLIC
2. Recommendations
2.1 Members are requested to: 
a) Note the projected Revenue outturn underspend position of £0.198m;
b) Note the projected Capital outturn break-even position; and
c) Note the budget adjustments detailed at sections 6 and 7. 
3. Revenue Budget Projection – underspend of £0.198m by 31 March 2027
3.1 The tables in Appendix 1 present the projected year-end position for all
services reporting to this Board, by both subjective analysis (what the budget
is spent on) and objective analysis (which division is spending the budget).
Significant variances affecting the projected position are analysed further
below. 
3.2 It should be noted that the projected outturn position reported here is based
on the latest information available, which is subject to change during the
financial year. The impact of any change on this projection will be updated at
each board cycle until the close of reporting Period 10. Budget holders are
obliged to seek mitigating action to minimise significant budget variances. 
4. Objective Analysis – Significant Variances
4.1 Environment, Housing and Infrastructure - £0.202m under spend 
Overall, Soft Facilities Management is forecasting an underspend of
£0.202m. This is predominantly due a projected underspend in employee
costs which is linked to the level of vacancies within the service and staff
turnover. This underspend is offset by an overspend within supplies and
services, which is in relation to one-off spend on equipment.
Income is forecast to be £0.157m under-recovered within Property Services. 
5. Subjective Analysis – Significant Variances
5.1 Employee Costs - £1.094m underspend 
This is mainly as a result of a projected underspend within Environment,
Housing and Infrastructure of £1.177m, which reflects current staff turnover
and recruitment challenges within Soft FM. Within Property, this is managed
in line with the spend on consultants and the projects being undertaken this
year.

Page 3

PUBLIC 
5.2 Supplies & Services - £0.270m overspend 
Soft FM (within Environment, Housing and Infrastructure) is projecting an
overspend of £0.338m, which in the main is due to one-off spend for
equipment. This will continue to be monitored throughout the year. The
impact on the overall position is being managed within the bottom line, with
part of the overspend offset by underspends in employee costs, as detailed
above. 
5.3 Income - £0.113m under recovered. 
The projected under-recovery of income in the main relates to Property
Services and is primarily due to a reduction in employee charges to capital
which reflects the timing of projects that are currently being undertaken. 
6. Revenue Budget Virements
6.1. Under the Council’s financial regulations, Directors and their nominated
officers, in consultation with the Director of Finance and Resources, have
certain delegated authority to transfer sums between subjective budget
headings within a service division to enable budget management throughout
the financial year. This is known as budget virement. 
6.2. Transfers between divisions of the same service / department in excess of
£100,000, and transfers between services / departments must be authorised
by the respective service Director and the Director of Finance and
Resources for submission to the relevant policy board for approval. 
6.3. Budget adjustments (for noting only) processed since the approval of the
Revenue Estimates amount to £0.844m and are outlined in the table below,
for information. 
Revenue Budget Adjustments for noting
New Funding
Objective
Heading
Subjective
Heading
Amount
(£m)
Reason
Finance &
Resources
Third Party
Payments
0.398 Scottish Government additional
allocation for the targeted Council
Tax revaluation of dwellings
Finance &
Resources
Employees 0.016 Scottish Government additional
allocation of DHP to mitigate the LHA
freeze for families  Transfer
Payments
0.754

Page 4

PUBLIC
Re-allocations of approved funding (pay inflation)
Objective
Heading
Subjective
Heading
Amount
(£m)
Reason
Miscellaneous Employees (0.604) Allocation to services of funding for
residual pay inflation and the
revision to employer’s pension
contributions
Environment,
Housing &
Infrastructure
Employees (0.220) Alignment of budgets within the
Environment, Housing &
Infrastructure Service – Soft
Facilities Management and Property
Services to Directorate (which
reports to ILE Policy Board)
Drawdown from ringfenced reserves Amount (£m)
Drawdown from the Council’s Service Modernisation and Reform
reserve to transform services to provide an improved experience
for citizens and local communities
0.270
Drawdown of prior years’ Discretionary Housing Payment
underspend to fund the 2026/27 programme (per the Business
Services Performance Report)
0.043
Drawdown of prior years’ Scottish Welfare Fund underspend to
fund the 2026/27 programme (as per the Business Services
Performance Report)
0.124 
7. Capital Budget Projection – break even position by 31 March 2027
7.1 The revised Capital Investment Programme 2026/27 to 2035/36 was
approved by the Council on 14 May 2026. The Finance, Resources and
Customer Services approved capital spend for 2026/27 was £6.265m. 
7.2 The in-year Capital budget is forecast to break even by 31 March 2027,
however, this will be monitored as the projects progress. Further details of
the programme can be found in the Capital Monitoring report at Appendix 2. 
7.3 Budget adjustments have taken place between years to reflect revised
programming of some capital projects. The resulting capital budget for
2026/27 is £9.394m, and details of the adjustments, which amount to
£3.129m, are as follows: 
Project Amount (£m) 
Budget carried forward into 2026/27 - updated cashflows
ICT Infrastructure Maintenance & Renewal Programme 0.292
Lifecycle Capital Maintenance (LCM) Fund 0.410
Artificial Pitch Upgrades 0.477
Artificial Pitches (Schools) 0.085
Digital Infrastructure Provision 0.029

Page 5

PUBLIC
Budget carried forward into 2026/27 - updated cashflows
Community Empowerment Fund 0.233
Greenspaces and Parks 0.054
Villages Improvement Fund 0.188
Retail Improvement Fund 0.001
Budget reallocated between projects 2026/27 - updated cashflows
Lifecycle Capital Maintenance (LCM) Fund 0.476
Artificial Pitches Upgrade (0.476)
Artificial Pitches (Schools) committed from Budget
Motion 2026/27 1.400
Budget reallocated to Revenue 2026/27
Villages Improvement Fund (0.040)
Project Amount 3.129 
Implications of the Report
1. Financial
The projected budget outturn position for Finance, Resources and Customer
Services’ Revenue budget is an underspend of £0.198m (0.2%) at 31 March
2027.  Income and expenditure will continue to be monitored closely for the rest
of the financial year, with steps being taken as far as possible to mitigate any
overspends.  
The projected outturn position for Finance, Resources and Customer Services’
Capital budget is break-even, after the adjustments outlined at section 7.   
2. HR & Organisational Development 
While staffing budgets form a significant proportion of the Council’s revenue
budgets, there are no direct implications arising from the recommendations in
this report. 
3. Community/Council Planning
Community Plan
Our Renfrewshire is thriving The Council’s revenue and capital spend
ensures that its facilities are fit for
purpose and safe for the community, to
maximise accessibility.
Our Renfrewshire is well 
Our Renfrewshire is fair 
Our Renfrewshire is safe 
Council Plan
Reshaping our place, our
economy, and our future
The Council’s revenue and capital spend
ensures that its facilities are fit for

Page 6

PUBLIC
Council Plan
Building strong, safe, and resilient
communities
purpose and safe for the community, to
maximise accessibility.
Tackling inequality, ensuring
opportunities for all
Creating a sustainable
Renfrewshire for all to enjoy
Ongoing revenue and capital budget
monitoring is a tool to enable good
financial management so that the Council
has resources now and in the future for
continued service delivery.
Working together to improve
outcomes 
4. Legal 
There are no direct implications arising from the recommendations in this
report. 
5. Property/Assets 
The capital expenditure noted in this report will result mainly in lifecycle
maintenance improvements to existing properties, replacement of ICT assets
and infrastructure and replacement of artificial pitches. 
6. Information Technology 
While ICT assets and revenue costs are included within these reported
budgets, there are no direct implications arising from the recommendations in
this report. 
7. Equality & Human Rights 
While new areas of spend may impact on particular groups, any such impact
would be assessed prior to the spend being incurred, therefore there are no
direct implications arising from the recommendations in this report. 
8. Health & Safety 
The capital expenditure noted in this report will result in lifecycle maintenance
improvements to existing properties and replacement of ICT assets, which may
in some cases improve health and safety measures. 
9. Procurement 
While Procurement is an important consideration prior to the Council incurring
any revenue or capital spend, there are no direct implications arising from the
recommendations in this report. 
10. Risk 
The potential financial risk that the Council will overspend its approved revenue
budgets for the year is managed at a Council-wide level by the Chief Executive
and Directors.

Page 7

PUBLIC
11. Privacy Impact 
There are no direct implications arising from the recommendations in this
report. 
12. Cosla Policy Position 
N/a 
13. Children’s Rights 
There are no direct implications arising from the recommendations in this
report. 
14. Climate Change
The Council aims to reduce its carbon and other emissions to net zero by 2030,
however there are no direct implications arising from the recommendations in
this report.  
List of Background Papers
• Revenue Budget and Council Tax 2026/27, Council 26 February 2026
• Non-Housing Capital Investment Programme, Prudential Framework
and Treasury Management Strategy, and Capital Strategy 2026/27 -
2035/36, Council 26 February 2026 
Author:     Valerie Howie and Lisa Dickie, Finance Business Partners; 
Alison Burns, Corporate Finance Manager; 
and Geoff Borland, Finance Manager.

Page 8

Appendix 1
PUBLIC
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2026/27
1 April 2026 to 19 June 2026              
POLICY BOARD:  FINANCE, RESOURCES & CUSTOMER SERVICES              
Objective Summary
Approved
Annual Budget
Budget
Adjustments
Revised Annual
Budget at
Period 3
Projected
Outturn
Budget Variance 
(Adverse) or Favourable  
£000 £000 £000 £000 £000 %
Finance and Resources 56,353  1,650 58,003  57,988  15 0.0%
Environment, Housing and Infrastructure 33,451  (171) 33,280  33,078  202 0.6%
Chief Executive's Service (Estates) 668 0 668 687 (19) (2.8%)
Miscellaneous 22,830  (635) 22,195  22,195  0 0.0%
NET EXPENDITURE 113,302  844 114,146  113,948  198 0.2%       
Subjective Summary
Approved
Annual Budget
Budget
Adjustments
Revised Annual
Budget at
Period 3
Projected
Outturn
Budget Variance 
(Adverse) or Favourable  
£000 £000 £000 £000 £000 %
Employees 97,374  197 97,571  96,804  767 0.8%
Premises Related 12,517  109 12,626  12,762  (136) (1.1%)
Transport Related 2,770  0 2,770  2,768  2 0.1%
Supplies and Services 28,990  944 29,934  30,204  (270) (0.9%)
Third Party Payments 1,956  398 2,354  2,352  2 0.1%
Transfer Payments 40,316  696 41,012  41,023 (11) 0.0%
Support Services 452  280 732  775 (43) (5.9%)
Depreciation and Impairment Losses 20,449  0 20,449  20,449  0 0.0%
GROSS EXPENDITURE 204,824  2,624 207,448  207,137  311 0.1%
Income (91,522) (1,780) (93,302) (93,189) (113) (0.1%)
NET EXPENDITURE 113,302  844 114,146  113,948  198 0.2%

Page 9

Appendix 1
PUBLIC 
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2026/27
1 April 2026 to 19 June 2026              
POLICY BOARD:  FINANCE, RESOURCES & CUSTOMER SERVICES - FINANCE & RESOURCES              
Objective Summary
Approved Annual
Budget
Budget
Adjustments
Revised Annual
Budget at Period 3
Projected Outturn Budget Variance 
(Adverse) or Favourable  
£000 £000 £000 £000 £000 %
Finance and Resources Directorate (493) 0 (493) (496) 3 0.6%
Audit Services 591 0 591 552 39 6.6%
Corporate Governance 4,422 0 4,422 4,367 55 1.2%
Digital, Transformation & Customer Services 27,399 130 27,529 27,589 (60) (0.2%)
Finance and Procurement 5,695 393 6,088 6,090 (2) 0.0%
Business Services 8,897 162 9,059 9,050 9 0.1%
People & Organisational Development 2,357 0 2,357 2,381 (24) (1.0%)
Social care (non-delegated) 830 0 830 834 (4) (0.5%)
Council and Externally Funded Schemes 6,655 965 7,620 7,621 (1) 0.0%
NET EXPENDITURE 56,353  1,650 58,003  57,988  15 0.0%

Page 10

Appendix 1
PUBLIC
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2026/27
1 April 2026 to 19 June 2026              
POLICY BOARD:  FINANCE, RESOURCES & CUSTOMER SERVICES - FINANCE & RESOURCES              
Subjective Summary
Approved Annual
Budget
Budget
Adjustments
Revised Annual
Budget at
Period 3
Projected
Outturn
Budget Variance 
(Adverse) or Favourable  
£000 £000 £000 £000 £000 %
Employees 42,548  1,901 44,449  44,554  (105) (0.2%)
Premises Related 2,791  (4) 2,787  2,772  15 0.5%
Transport Related 266  0 266  277  (11) (4.1%)
Supplies and Services 11,849  433 12,282  12,214  68 0.6%
Third Party Payments 1,956  398 2,354  2,352  2 0.1%
Transfer Payments 38,010  975 38,985  38,977  8 0.0%
Support Services 241  0 241  266  (25) (10.4%)
Depreciation and Impairment Losses 0  0 0  0  0 0.0%
GROSS EXPENDITURE 97,661  3,703 101,364  101,412  (48) 0.0%
Income (41,308) (2,053) (43,361) (43,424) 63 0.1%
NET EXPENDITURE 56,353  1,650 58,003  57,988  15 0.0%

Page 11

Appendix 1
PUBLIC 
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2026/27
1 April 2026 to 19 June 2026              
POLICY BOARD:  FINANCE, RESOURCES & CUSTOMER SERVICES - ENVIRONMENT, HOUSING AND INFRASTRUCTURE              
Objective Summary
Approved Annual
Budget
Budget
Adjustments
Revised Annual
Budget at Period
3
Projected Outturn Budget Variance 
(Adverse) or Favourable  
£000 £000 £000 £000 £000 %
Building Services 173 0 173 173 0 0.0%
Public Building Repairs 8,950 (71) 8,879 8,879 0 0.0%
Soft Facilities Management Services 24,020 (61) 23,959 23,757  202 0.8%
Property Services 308 (39) 269 269  0 0.0%
NET EXPENDITURE 33,451  (171) 33,280  33,078  202 0.6%              
Subjective Summary
Approved Annual
Budget
Budget
Adjustments
Revised Annual
Budget at Period
3
Projected Outturn Budget Variance 
(Adverse) or Favourable  
£000 £000 £000 £000 £000 %
Employees 41,292  (1,100) 40,192  39,320  872 2.2%
Premises Related 6,086  99 6,185  6,336  (151) (2.4%)
Transport Related 2,229  0 2,229  2,216  13 0.6%
Supplies and Services 15,304  (545) 14,759  15,097  (338) (2.3%)
Third Party Payments 0  0 0  0  0 0.0%
Transfer Payments 185  0 185  203  (18) (9.7%)
Support Services 1,357  0 1,357  1,376  (19) (1.4%)
Depreciation and Impairment Losses 2,200  0 2,200  2,200  0 0.0%
GROSS EXPENDITURE 68,653  (1,546) 67,107  66,748  359 0.5%
Income (35,202) 1,375 (33,827) (33,670) (157) (0.5%)
NET EXPENDITURE 33,451  (171) 33,280  33,078  202 0.6%

Page 12

Appendix 1
PUBLIC  
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2026/27
1 April 2026 to 19 June 2026              
POLICY BOARD:  FINANCE, RESOURCES & CUSTOMER SERVICES - CHIEF EXECUTIVE'S SERVICE (ESTATES)              
Subjective Summary
Approved Annual
Budget
Budget
Adjustments
Revised Annual
Budget at Period
3
Projected Outturn Budget Variance 
(Adverse) or Favourable  
£000 £000 £000 £000 £000 %
Employees 0 0 0  0  0 0.0%
Premises Related 1,316 0 1,316  1,316  0 0.0%
Transport Related 0 0 0  0  0 0.0%
Supplies and Services 4 0 4  4  0 0.0%
Third Party Payments 0 0 0  0  0 0.0%
Transfer Payments 66 0 66  67  (1) (1.5%)
Support Services 503 0 503  502  1 0.2%
GROSS EXPENDITURE 1,889  0 1,889  1,889  0 0.0%
Income (1,221) 0  (1,221) (1,202) (19) (1.6%)
NET EXPENDITURE 668 0 668 687 (19) (2.8%)

Page 13

Appendix 1
PUBLIC 
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2026/27
1 April 2026 to 19 June 2026              
POLICY BOARD:  FINANCE, RESOURCES & CUSTOMER SERVICES - MISCELLANEOUS              
Subjective Summary
Approved Annual
Budget
Budget
Adjustments
Revised Annual
Budget at Period
3
Projected Outturn Budget Variance 
(Adverse) or Favourable  
£000 £000 £000 £000 £000 %
Employees 13,534  (604) 12,930  12,930  0 0.0%
Premises Related 2,324  14 2,338  2,338  0 0.0%
Transport Related 275  0 275 275  0 0.0%
Supplies and Services 1,833  1,056 2,889 2,889  0 0.0%
Third Party Payments 0  0 0 0  0 0.0%
Transfer Payments 2,055  (279) 1,776 1,776  0 0.0%
Support Services (1,649) 280 (1,369) (1,369) 0 0.0%
Depreciation and Impairment Losses 18,249  0 18,249 18,249  0 0.0%
GROSS EXPENDITURE 36,621  467 37,088  37,088  0 0.0%
Income (13,791) (1,102) (14,893) (14,893) 0 0.0%
NET EXPENDITURE 22,830  (635) 22,195  22,195  0 0.0%

Page 14

Appendix 2
PUBLIC 
Prior Years Approved  Budget Revised Projected Total Approved Projected
Expenditure Budget Adjustments Budget Outturn Budget Outurn
Project Title to 31/03/2026 2026-27 since previous 2026-27 2026-27 to 31-Mar-31 to 31-Mar-31
Board report
£000 £000 £000 £000 £000 £000 £000
CORPORATE PROJECTS
ICT PROGRAMME 15,165 1,000 292 1,292 1,292 0 0% 19,857 19,857 0 0%
Lifecycle Capital Maintenance (LCM) Fund 8,397 4,650 886 5,536 5,536 0 0% 29,416 29,416 0 0%
Artificial Pitches Upgrade 1,324 615 1 616 616 0 0% 1,940 1,940 0 0%
Artificial Pitches(Schools) 0 0 1,485 1,485 1,485 0 0% 1,485 1,485 0 0%
Digital Infrastructure Provision 1,907 0 29 29 29 0 0% 1,936 1,936 0 0%
Community Empowerment Fund 717 0 233 233 233 0 0% 951 951 0 0%
Greenspaces and Parks 1,396 0 54 54 54 0 0% 1,449 1,449 0 0%
Villages Improvement Fund 412 0 148 148 148 0 0% 561 561 0 0%
Retail Improvement Fund 0 0 1 1 1 0 0% 1 1 0 0%
TOTAL FINANCE, RESOURCES & CUSTOMER SERVICES BOARD 29,318 6,265 3,129 9,394 9,394 0 0% 57,596 57,596 0 0%
RENFREWSHIRE COUNCIL
CAPITAL INVESTMENT STRATEGY - NON-HOUSING SERVICES
1st April to 19th June 2026
POLICY BOARD: FINANCE, RESOURCES & CUSTOMER SERVICES
Current Year 2026-27 Full Programme - All years
Budget Variance
(Adverse) or
Favourable
Budget Variance
(Adverse) or
Favourable