Democracy Spraffa

Report - Replacement of Boilers and Full Gas Heating Systems – Tenanted Properties (RC-CPU-25-256)

Renfrewshire Council · 11 June 2026
Back to Finance, Resources and Customer Services Policy Board — 11 June 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

PUBLIC 
___________________________________________________________________
To:  Finance, Resources and Customer Services Policy Board
On:  11 June 2026
___________________________________________________________________
Report by: The Director of Finance and Resources and the Director of
Environment, Housing and Infrastructure 
___________________________________________________________________
Heading: Contract Authorisation Report for Replacement of Boilers and Full Gas
Heating Systems – Tenanted Properties (RC-CPU-25-256)
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to seek the approval of the Finance,
Resources and Customer Services Policy Board to award a Measured
Term Contract for Replacement of Boilers and Full Gas Heating
Systems – Tenanted Properties (RC-CPU-25-256) to McTear Contracts
Limited (Co. No SC309568). 
1.2 The recommendation to award the Contract follows a procurement
process that was conducted in accordance with the Open Procedure
under the Public Contracts (Scotland) Regulations 2015 for an above
Government Procurement Agreement (GPA) Threshold Works Contract
and the Renfrewshire Council Standing Orders Relating to Contracts. 
1.3 A Contract Strategy was approved by the Corporate Procurement
Manager on 18 March 2026 and the Head of Housing Services on 13
March 2026. 
___________________________________________________________________

Page 2

PUBLIC
2. Recommendations
It is recommended that the Finance, Resources and Customer Services
Policy Board: 
2.1 Authorises the Head of Corporate Governance to award a Measured
Term Contract for Replacement of Boilers and Full Gas Heating
Systems – Tenanted Properties (RC-CPU-25-256) to McTear Contracts
Limited (Co. no. SC309568). 
2.2 Authorises the approved total contract value of up to a maximum value
of £18,079,000, excluding VAT.
2.3 Notes, the Contract Period will be 24 months with the option to extend for
up to 12 months on two separate occasions, commencing on 13 July
2026.  In the event that the Contract does not commence on 13 July 2026,
the Contract Period shall run from the access date as stated in the Award
Schedule to the Letter of Acceptance. 
_________________________________________________________
3. Background
3.1 The Council has a requirement to appoint a suitably experienced and
qualified Contractor to carry out the replacement and maintenance of
boilers and full gas heating systems for tenanted properties within the
Renfrewshire Council’s housing stock.   
3.2 To initiate this procurement process a Contract Notice was published
on Find a Tender Service via the Public Contracts Scotland portal on
18 March 2026 with the tender documentation available for
downloading from the Public Contracts Scotland – Tender platform on
the same day. 
3.3 During the live tender period, 61 companies expressed an interest in
the tender. By the closing date set 12 noon, 20 April 2026 for return of
electronic tender submissions, 14 companies had submitted a tender
response, 42 companies did not respond, and 5 companies declined to
respond.
3.4 As required by Regulation 60 of the Public Contracts (Scotland)
Regulations 2015, as amended, each Tenderer was required to
complete a Single Procurement Document (“SPD”), which was to be
submitted with their tender submission. All 14 tender submissions were
evaluated against a pre-determined set of criteria within the SPD by
representatives from the following Council services: Housing Services,

Page 3

PUBLIC
the Corporate Procurement Unit, Corporate Risk and Corporate Health
and Safety.
3.5 All 14 tender submissions complied with the minimum selection criteria
of the SPD and progressed to evaluation against the published Award
Criteria which were based on a weighting of 30% Quality and 70%
Price.
3.6 During the evaluation process, three tenderers failed to comply with the
pricing instructions and were therefore treated as irregular bids in
accordance with Regulation 27 (6)(a) of The Public Contracts
(Scotland) Regulations 2015.
3.7 The remaining 11 tender submission scores relative to the award
criteria are noted below:
Company Price
(70%)
Quality
(30%)
Total
(100%)
McTear Contracts Limited (Company No
SC309568) 70.00% 25.38% 95.38%
MHSL Services Limited (Company No
SC317233) 64.26% 30.00% 94.26%
Procast Building Contractors Ltd. (Company
No SC407400) 60.21% 30.00% 90.21%
BRB Electrical Limited (Company No
SC246337) 56.72% 30.00% 86.72%
James Frew Limited (Company No
SC036286) 50.60% 28.50% 79.10%
City Gate Construction (Scotland) Limited
(Company No SC244614) 44.63% 30.00% 74.63%
MP Group UK Limited (Company No
SC421124) 42.89% 29.25% 72.14%
Sureserve Compliance North Limited
(SC163066) 41.34% 28.50% 69.84%
Retrofit Group Ltd (Company No
SC654383) 43.93% 19.75% 63.68%
Simple Heating Services Ltd (Company No
10982928) 34.96% 26.50% 61.46%
Easy Heat Systems Limited (Company No
SC181331) 31.48% 25.00% 56.48% 
3.8 The evaluation of the tender submissions identified that the tender
submission by McTear Contracts Limited was the most economically
advantageous to the Council.
3.9 The form of contract is SBCC Measured Term Contract for use in
Scotland (MTC/Scot 2011) amended by the Employer’s Amendments.

Page 4

PUBLIC
3.10 The costs for this Measured Term Contract will be met from the
Housing Revenue Account Capital Programme Budget.
3.11 Community Benefits were requested as part of the procurement
process and McTear Contracts Limited confirmed that the following
Community Benefits would be made available to the Council for this
Measured Term Contract: 
___________________________________________________________________
Implications of the Report
1. Financial – The total approved contract value will be up to a maximum
value of £18,079,000., excluding VAT, for the Contract Period,
including optional extensions (total 4 years). The costs will be met from
the Housing Revenue Account Capital Programme Budget.   
2. HR & Organisational Development - None directly arising from this
report.  
3. Community/Council Planning –  
• Our Renfrewshire is thriving – Making sure the infrastructure is in
place to support growth in local economy and population (such as
housing, transport and schools)
• Our Renfrewshire is well - Developing strong community-based
services that respond to local need
• Our Renfrewshire is safe - Protecting vulnerable adults and
children, ensuring they can live safely and independently
• Place - Working with partners to ensure our neighbourhoods are
safe, vibrant and attractive places to live 
4. Legal - The procurement of this Measured Term Contract has been
conducted as an above GPA (Works) Open Procedure in accordance
with the Renfrewshire Council Standing Orders Relating to Contracts
Community Benefit Description  No of People
/ Activity
Modern Apprenticeship  2
Work Experience Placement for an individual 16+
years of age (who is not currently in employment,
education or training) and preferably from an
identified priority group.
8
Financial Support for a Social Enterprise within
Renfrewshire 4

Page 5

PUBLIC
2026 and the Public Contracts (Scotland) Regulations 2015, as
amended.   
5. Property/Assets - By awarding this Measured Term Contract, the
Council will have the ability to carry out the replacement and
maintenance of boilers and full heating systems within the
Renfrewshire Council area. 
6. Information Technology - None directly arising from this report. 
7. Equality & Human Rights - None directly arising from this report. 
8. Health & Safety – McTear Contract Limited Health and Safety
credentials were evaluated by the Council’s Corporate Health and
Safety team and met the requirement regarding Health & Safety.
9. Procurement – This Measured Term Contract was tendered in
compliance with the Renfrewshire Council’s Standing Orders Relating
to Contracts and statutory requirements in respect of procurement
procedures, efficiency and modern government.
10. Risk – McTear Contracts Limited insurance levels have been assessed
and evaluated to confirm they meet the minimum requirements
regarding insurance risk.
11. Privacy Impact - None directly arising from this report 
12. Climate Risk – The level of impact associated with provision of this
service has been assessed using the Scottish Government
Sustainability Test and is considered to be high risk with mitigations set
out below:
• Waste – waste products produced through this contract will be
required to be recycled and disposed of appropriately. –
• Energy Efficiency – products provided through this contract must
meet applicable energy standards. 
• Vehicles – Given the nature of the requirement reduction in vehicles
is difficult to navigate. The SPD will require suppliers to respond
with detail about the sustainability of their working practices at 4C.7. 
• Communities – Community benefits will be requested through this
contract which will enable community enrichment.
13. Children’s Rights – None directly arising from this report.

Page 6

PUBLIC
14. Cosla Policy Position – No COSLA Policy Position implications have
arisen or are anticipated.
_________________________________________________________
List of Background Papers 
(a)  None
___________________________________________________________________ 
Author:           Joanna Tannock, Assistant Category Manager,
joanna.tannock@renfrewshire.gov.uk