Finance and Resources Service Impovement Plan Outturn Report 2025-26

Renfrewshire Council · 11 June 2026
Back to Finance, Resources and Customer Services Policy Board — 11 June 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

PUBLIC 
___________________________________________________________________ 
To: Finance, Resources and Customer Services Policy Board 
On: 11 June 2026
___________________________________________________________________ 
Report by: Director of Finance and Resources
___________________________________________________________________ 
Heading: Finance and Resources Service Improvement Plan Outturn Report
2025/26
___________________________________________________________________ 
1. Summary 
1.1 The Finance & Resources Service Improvement Plan 2025-28 was approved
by the Finance, Resources & Customer Services Policy Board in June 2025. 
The plan set out the priorities for the development of the service over a three
year period.  These priorities are aligned to those set out in the 2022-27 Council
Plan.  The Service Improvement Plan sets out the actions which will ensure
continuous improvement across the service and the performance indicators
which ensure the impact can be measured.  These reflect the priority themes of
the Council Plan and the refreshed Community Plan. 
1.2 This report provides a summary of the Finance & Resources service’s
performance against the actions and performance indicators agreed within the
Service Improvement Plan for 2025-28. An outturn report is included as an
appendix to this report. 
1.3 An updated Service Improvement Plan for 2025-28 is being presented to this
Board for approval, aligned to the priorities of the Council Plan. 
1.4 Over the past year, the service has made good progress in delivering positive
outcomes for Renfrewshire and its residents.  This is within an operating context
that remains complex and fast-moving.

Page 2

PUBLIC 
Economic conditions are currently changing rapidly and both households and
organisations are experiencing cost pressures and supply issues, and this is
unlikely to change in the near future.   
1.5 More detail of achievements is given in Section 4 but the list below notes some
highlights: 
• Leading on the Council’s Financial Sustainability programme;
• Delivery of the annual accounts and supporting the work of external audit;
• Continuing the revising of HR policies using friendly, inclusive language and
tone; 
• Ongoing work to support residents with the cost-of-living through the
administration of grant support, signposting to benefits and related
entitlements, and through the work of Advice Works;
• Work to deliver on the Council’s Plan for Net Zero through initiatives such
as the Green Print Strategy;
• Continuing the work with Council colleagues and partners, the procurement
service delivered a Meet the Buyers Renfrewshire event, supporting local
businesses to bid for public sector contracts;
• Completing the boundary review for electoral wards and preparing for the
delivery of the 2026 Scottish Parliamentary elections;
• Implementing our new Purchase to Pay system, which will reduce manual
invoice processing and speed up payments to suppliers;
• Developing and enhancing technological solutions that support access to
services, such as our digital assistant which is now able to deal with 39% of
incoming calls and provide quick answers to simple queries from residents;
• Launching a guaranteed interview scheme for care-experienced people who
meet the essential criteria for any roles they apply for;
• Continuing to provide a range of strategic and operational support to other
Council services to support the delivery of financial sustainability
programmes, the Plan for Net Zero, large scale infrastructure projects and
strong universal services. 
2. Recommendations 
2.1 It is recommended that the Finance, Resources and Customer Services Policy
Board: 
a) Note the contents of this report;
b) Note the progress to date on delivering the actions contained within the
Finance & Resources Service Improvement Plan;

Page 3

PUBLIC
c) Note the current performance of the service as measured by the scorecard
indicators. 
3. Background 
3.1 Our Service Improvement Plans are a clear statement of the outcomes each
service wants to achieve, the actions it will take to achieve this, and the
performance measures it will use to monitor progress and measure success. 
Updates on the actions and performance measures are included as an
appendix to this report. 
3.2 Service Improvement Plans fit within the wider framework provided by the
Council Plan and the Community Plan.  They allow elected members to have
oversight of developments within the service and to consider and develop policy
options which reflect customer need and resource availability. 
3.3 Section 4 of this report gives details of service activity and achievements in
2025/26, Section 5 covers actions which are delayed or cancelled and section
6 provides a narrative on performance. 
3.4 In line with our approach of refreshing Service Improvement Plans annually to
ensure they still reflect our organisational priorities, an updated Plan covering
the period 2026 to 2029 is also being presented to this Policy Board. 
4. Key achievements in 2025/26 
4.1 As well as strategic initiatives and customer-facing work, Finance & Resources
delivers support services to all other parts of the council including: 
• Payroll;
• Support with recruitment;
• Training and organisational development;
• ICT Servicedesk;
• Provision of ICT equipment;
• Invoicing and Payments;
• Administrative, committee and elected member support;
• Project and programme management;
• Health and Safety advice and support;
• Legal and Information Governance advice;
• Financial management and financial services;
• Internal audit
• Risk management.

Page 4

PUBLIC
4.2 Specific achievements in relation to the Service Improvement Plan are
highlighted below. 
Place 
4.3 The service continues to support delivery of the Council’s Cultural Infrastructure
programme with Paisley Town Hall, Paisley Learning & Cultural Hub and
Paisley Arts Centre all complete and operational.  Paisley Museum construction
is complete and the fit-out phase is underway to establish operational readiness
for a 2026/27 opening. 
4.4 In 2025/26 the Director of Finance and Resources highlighted the continuing
financial challenges the Council faces over the medium term, and that services
will need to continue to change to reflect this constrained financial environment.
A balanced budget was agreed for both 2025/26 and 2026/27, with no
requirement to utilise reserve balances to fund core expenditure. 
4.5 Legal and Democratic Services successfully completed the implementation of
the Scottish Parliamentary boundary review with a polling plan for the Scottish
Parliamentary elections in May 2026 having been prepared on the basis of the
new boundaries. 
4.6 The service continues to deliver strong universal services to all Renfrewshire
citizens in relation to the Scottish Welfare Fund (SWF) as well as the processing
of Discretionary Housing Payments (DHPs) to customers to mitigate the
bedroom tax as well as Financial Hardship and customers affected by the
Benefit Cap. 
Economy 
4.7 The Procurement and Economic Development teams continue to work together
to support local businesses to bid for Council contracts and related work.  A
draft Local Supply Chain Engagement Strategy has been developed and aims
to strengthen engagement with Renfrewshire’s SME community, increase local
supplier participation in public procurement, improve supplier awareness,
capability and readiness for public sector opportunities, and enhance visibility
of future contracting activity.  The Procurement team also worked in partnership
with the Housing Regeneration Service on the You Decide programme,
engaging directly with local Renfrewshire suppliers for under-£25,000
requirements.

Page 5

PUBLIC 
Fair 
4.8 Finance and Resources has supported thousands of Renfrewshire families with
cost-of-living pressures during 2025/26.  This includes the continued award of
Discretionary Housing Payments (DHPs) to mitigate the impact of the bedroom
tax, as well as DHPs to support customers experiencing financial hardship and
those affected by the Benefit Cap.  The service also continues to deliver the
Scottish Welfare Fund (SWF), processing new housing benefit applications
alongside crisis and community care grants, all within agreed timescales. 
4.9 The Digital, Transformation and Customer Services team has completed
development of a toolkit for launching DigiZones.  This included a stress test
and mock exercise carried out between February and March 2026, with learning
from these exercises used to strengthen the overall approach.  Plans are
underway to extend DigiZones into three Alcohol and Drugs Partnership
venues, working in collaboration with Renfrewshire Alcohol and Drugs
Partnership. 
Living our Values 
4.10 The P2P programme has completed the transition of purchasing functionality
into business as usual, with ongoing user engagement continuing to address
any issues. Work is underway to review Council PCard processes, alongside
the development of management information dashboards within the Business
World system. Initial work has also been completed to map future phases of the
programme, with further engagement planned to confirm timelines and
resource requirements. 
4.11 Implementation of the Customer Strategy continues, with use of the Council’s
MyAccount service remaining high at over 125,000 registered users.  The
Digital Advisor continues to handle simple transactional queries, answering
over 348,000 calls and responding to 39% of all enquiries, freeing customer
contact centre capacity for more complex and sensitive cases. 
4.12 Significant progress has been made in delivering the Digital Strategy, including
validation of the AI business case with senior officer input across all services
and Finance Business Partners. The business case, representing a major
medium-term digital transformation opportunity, was approved by Leadership
Board in April 2026. Progress has also continued across other priorities,
including Digital Inclusion, completion of the DigiZones evaluation, and work to
establish a data-led baseline of digital skills across the Council. The Data
Advisory Group continues to meet, focusing on data management, analysis and
skills, and is expected to support any future AI-related work.

Page 6

PUBLIC 
4.13 The People and OD team continue to engage and consult with services on the
four strategic outcomes of the new People Strategy, which will align to the key
priorities of the new Council Plan along with continuing to gather insights and
views from across the workforce via established Employee Engagement
forums.   
Improving Outcomes for Children and Young People 
4.14 The Corporate Management Team approved a guarantee of interview for
care-experienced candidates who meet the essential criteria, now embedded
in the Council’s Recruitment Policy.  In support of #KeepThePromise, a Care
Experienced Staff Network has also been established to support and share
experiences.  These actions demonstrate the Council’s commitment to
supporting care-experienced people into work. 
5. Actions which have been delayed or cancelled 
5.1 No actions were delayed or cancelled during 2025/26. 
6. Progress against performance measures 
6.1 Finance and Resources measured 31 performance indicators as part of the
2025/28 Service Improvement Plan.  Of these, 20 are collected quarterly and
11 are annual. 
6.2 In 2025/26, 14 indicators met or exceeded their targets, five narrowly missed
the target, and five did not meet the target.  A further five indicators are reported
as data-only measures, while two indicators are currently unavailable due to
the absence of a centralised reporting mechanism. 
6.3 The measure of procurement spend on local suppliers is part of the Local
Government Benchmarking Framework.  Updates are provided by the
Improvement Service and data for 2025/26 will not be available until December
2026.  2024/25 demonstrated improved performance and target was achieved
for the reporting year.  A programme of work continues to support local
suppliers, but external factors and our duty to achieve best value for the Council
impact this measure.

Page 7

PUBLIC 
6.4 The processing of housing benefits applications is once again exceeding
target with the current average reported as 18.71, well within the target time of
24 days.  Change of circumstances applications is also performing well with
an average of 4.19 days against a target time of 10 days. 
6.5 The processing of crisis grants was reported as 1 day against a target of a
two-day turnaround, and the processing of Scottish Welfare Fund applications
is currently averaging 9 days against a target time of 15 days.  Both indicators
are a further improvement over the same period for 2024/25. 
6.6 Complaints response times exceed targets – 91.1% of frontline complaints
were dealt with within 5 days and 90.7% of investigation complaints within 20
days.  Both indicators have a target of 85%. 
6.7 Invoice processing for small and medium sized businesses continues to be an
area of strong performance, with these dealt with in 5.53 days, on average; this
is against a target of 28 days.  Invoice processing indicator has exceeded its
target of 96.5% of all invoices to be processed with 30 days.  Performance for
2025/26 was 97.77%, with the service receiving over 330,000 invoices - an
increase of 60,000 invoices compared to 2024/25. 
6.8 The print volume performance indicator is now being reported following the
roll-out of new devices across the corporate and learning estate.  Usage over
the year was just over 20,000,000 pages printed, with 16.2m printed by schools,
3.5m by corporate users and just over 300,000 pages printed by members of
the public (e.g. in libraries).  Reducing overall print volumes remains a key focus
for the next reporting year. 
6.9 Three indicators which narrowly missed their target relate to council income –
two to the collection of council tax and one to the collection on non-domestic
rates.  The cost-of-living crisis is likely to have impacted on the collection of
council tax, which is slightly behind target at 94.66% collected against a target
of 95% for this year.  This will also have impacted collection rates for monies
owing from previous years.  The collection of non-domestic rates is improving
but still short of the 98% target, with 97.29% collected in 2025/26, and
improvement of 0.07% from the previous year. 
6.10 Absence levels across the service remain slightly above target.  Extensive work
has been done during 2025/26 to look at absence processes and policy and the
supports offered to both staff and managers.  Reducing absence levels will be
a key focus in 2026/27.

Page 8

PUBLIC
6.11 New service and council wide indicators have been introduced to provide
assurance on workforce development and engagement, focusing on
corporate induction, mandatory training, and personal development.   At
present, the recording processes only capture the completion of online
training and so the figures do not accurately represent the entire workforce
though mechanisms are being developed to ensure face to face inductions
are captured in future reporting.   While 1:1 personal development
discussions already take place across the service, there is currently no
centralised mechanism to support reporting.  To address this, new training
and guidance will be rolled out in 2026, alongside the introduction of forms
within Business World to enable centralised reporting on compliance with staff
1:1 performance and development discussions. 
Implications of the Report 
1. Financial - The Service Improvement Plan highlights resourcing pressures
arising from increasing demand for services and the current financial
environment.  Finance & Resources will lead on work relating to financial stability
and sustainability. 
2. HR & Organisational Development – No direct implications but the report notes
work ongoing by the People and OD team. 
3. Community/Council Planning – the report details a range of activities which
reflect local council and community planning themes. 
4. Legal – No direct implications but the report notes work delivered by Legal and
Democratic Services. 
5. Property/Assets -  None 
6. Information Technology – Digital resources are now key to the delivery of
services and strategies are in place to manage this.  The report notes progress
on delivery of work in this area. 
7. Equality & Human Rights - The recommendations contained within this report do
not require an impact assessment as the report is for noting only.   
8. Health & Safety –none 
9. Procurement – There are no direct implications but the report updates on
progress for actions impacting procurement.

Page 9

PUBLIC 
10. Risk – Risks related to the delivery and management of services are regularly
monitored and included in Renfrewshire Council’s Corporate and Strategic Risk
Registers. 
11. Privacy Impact - none 
12. COSLA Policy Position – none. 
13. Children’s Rights – this report is for noting and has no direct implications on
children’s rights.   
14. Climate Risk – There are no direct implications but the report updates on
progress on actions to tackle the climate risk. 
List of Background Papers: None
___________________________________________________________________ 
Author:  Pamela McDonald, Policy Officer, pamela.mcdonald@renfrewshire.gov.uk

Page 10

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Finance and Resources
Service Improvement Plan 2025 –28
Outturn Report 2025/26

Page 11

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Outturn Report 2025/26
• This outturn report details progress on delivery of our Service Improvement Plan, highlighting areas
where we are already making progress and some areas we want to focus on more, perhaps because
performance isn’t moving in the direction we anticipated or because of other pressures or factors
that makes this even more of a priority for us.
• The following pages shine a spotlight on some great projects or practice, and highlight areas where
we’d like to improve or develop further.  At a service level, there is a stronger focus on some of the
Council Plan Strategic Outcomes than other. Towards the end of this document, you’ll find a full
update against all the actions and performance indicators we use to measure progress. 
• We report on 29 performance indicators, 10 which are reported annually and 19 reported quarterly.
In this report, annual data is provided for 2023/24, 2024/25 and 2025/26 to show recent trends.

Page 12

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Place and Economy
Growing spend with local suppliers is central to Community Wealth
Building and is supported by the new Community Wealth Building
Act. Corporate Procurement is working with colleagues in
Economic Development to increase local business involvement in
market engagement and upcoming framework opportunities. A
draft Local Supply Chain Engagement Strategy is being developed
to strengthen local engagement. In addition to this, over 6,000
suppliers have been cleansed and reclassified through the P2P
Programme, improving identification of local, SME and third-sector
suppliers and supporting increased local participation where
appropriate

Page 13

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Fair and Green
A key element of our Green Print strategy is
now in place following the roll-out of new
devices across the corporate and learning
estate.  The next phase is underway, focusing
on driving culture changes to minimise usage,
carbon footprint and costs. During 2025/26 20
million pages were printed, of this 16.2 million
were printed in schools, 3.5 million by corporate
users and just over 300,000 by members of the
public for example in Libraries.  Reducing the
overall usage further will be a priority for
2026/27.
Average time to
process a Crisis
Grant application is
1 day
Average time to
process a new
housing benefit
application is 18.71
days

Page 14

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Living our Values
The P2P programme completed the
transition of purchasing functionality
into business as usual with ongoing
user engagement to resolve issues. 
Work is underway to review the council
PCard processes along with
development of management
information dashboards within the
Business World System.  Initial work
has been completed on mapping out
future phases of the programme, with
further engagement planned to confirm
timelines and resource requirements.
94.66% of Council Tax
due in 2025/26 has
been collected
91.1% of frontline
complaints were
responded to within five
days
The average time to pay
invoices to small and
medium sized businesses
was 5.53 days

Page 15

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Actions and indicators
Full list
FAR SIP 2025/26

Page 16

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Place
What we will do Due Date Status Progress update
Support delivery of the Council’s
infrastructure investment programme
31 December 2026 Paisley Town Hall, Paisley Learning & Cultural Hub and Paisley Arts Centre are all complete and operational. Paisley Museum construction is
complete and the fit-out phase is underway to establish operational readiness for a 2026/27 opening.
Support delivery of the Council’s financial
sustainability work 31 March  2028 The aim of this target is that the Council is able to maintain a balanced budget by 31 March 2028 within the context of a challenging
financial environment. This has so far been achieved for 2025/26, the first of the three financial years in scope.
Delivering strong universal services to all
Renfrewshire citizens 31 March  2027 The Service delivered in relation to the Scottish Welfare Fund (SWF) within target. It also processed Discretionary Housing Payments to
customers to mitigate the bedroom tax as well processing DHPs for Financial Hardship and customers affected by the Benefit Cap.
Implementing the Scottish Parliamentary
boundary review 31 March 2026 All work following the Boundary review is complete with a polling plan for the Scottish Parliamentary elections in May having been
prepared on the basis of the new boundaries.
Deliver Renfrewshire’s strategic capital
investment programmes, including cultural,
infrastructure, housing and school estate,
and maximise the long-term benefits for our
communities
31 March  2029
As reported to the Finance, Resources and Customer Services Policy Board the capital programme is in line to break-even in 2025/26. At 9
January 2026, 68% of the General Services capital budget and 58% of the HRA capital budget had been spent. A new 10-year capital
investment plan was approved by the Council on 26 February 2026.

Page 17

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Economy
What we will do Due Date Status Progress update
Actively engage with Renfrewshire
suppliers to increase the percentage of
procurement spend
31 March 2026
Initial development work commenced for the next Anchor Meet the Buyer event, which is anticipated to take place in quarter 3 (2026/27) as
well as preparations to support and present at the upcoming Chambers Business to Business event in May 2026. 
An initial draft Local Supply Chain Engagement Strategy has been developed and is being finalised. The strategy aims to strengthen
engagement with Renfrewshire’s SME community, increase local supplier participation in public procurement, improve supplier awareness,
capability and readiness for public sector opportunities, and enhance visibility of future contracting activity. A programme of online and in-
person engagement events is being considered for 2026/27 to support delivery of the strategy.
Procurement routes continue to be considered for all requirements and opportunities taken where possible to maximise local participation.
The Team issued 16 PINs for upcoming procurements and completed one Quick Quote with 100% Renfrewshire suppliers invited to bid, and
a further two with 75% Renfrewshire suppliers invited to bid.
The team engaged with the Supplier Development Programme and promoted the Transportation Framework opportunity on SDP website
contract opportunities section and included in their newsletter, as well as contacted all bus and taxi operators licensed by Renfrewshire
Council directly.
The team have worked in partnership with the Housing Regeneration Service on the You Decide programme, engaging directly with local
Renfrewshire suppliers for under-£25,000 requirements.
The procurement team continue to liaise with colleagues in Economic Development for support in identifying local suppliers with an interest
in forthcoming opportunities.

Page 18

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Fair
What we will do Due Date Status Progress update
Use learning from early implementer phase
of DigiZones to expand coverage across
Renfrewshire supporting our citizens and
communities to get online.
31 March 2026
The DigiZones onboarding toolkit has now been completed. A stress test and mock exercise were carried out between February and March
2026, and the learning from this has been used to strengthen the overall approach.  The DigiZones Early Implementer Phase Evaluation
Report has been finalised. Publication is currently on hold and will take place after the Election.  Content is currently being added to the
DigiZones SharePoint site, and work is underway to provide access for members of the DigiZones Sub Group.
A scoring and weighting framework has been agreed to support the fair and consistent assessment of any new DigiZones applications.
A new round of Digital Lifelines funding has been agreed, and a funding application is being developed. This includes plans to extend
DigiZones into three Alcohol and Drugs Partnership (ADP) venues, working in partnership with Renfrewshire Alcohol and Drugs
Partnership.  In addition, elected members have approved funding within the 2026/27 budget to support the expansion of DigiZones
across Renfrewshire.

Page 19

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Living our values
What we will do Due Date Status Progress update
Deliver a refreshed approach to workforce
planning and workforce innovation. 30 June 2026
Progress continues with planning approaches to engage and consult with services on the four draft strategic outcomes of the new People
Strategy, which will now be implemented, following members approval, mid-2027.  This will align to the key priorities of the new Council
Plan.  A survey will be conducted early 2026 to gauge and understand how services’ workforce planning and organisational development
needs can be met, whilst navigating current and future financial sustainability challenges.    We continue to gather insights and views from
across the workforce, via our established Employee Engagement forums.  As these approaches evolve, they will become an integral part of
how we listen and involve our workforce in shaping the future of our organisation.
Benchmarking and development of the 4 strategic outcomes has informed the main content of the survey to go to key stakeholders. This
will be conducted imminently, following which the year 1 and 2 priority actions of the People Strategy will be identified.
Deliver the Purchase to Pay programme
which will streamline payments and
deliver a more efficient process
31 December 2025
P2P activity has focused on completing the transition over to the BAU management of the new Business World System.  This has included
regular engagement with ERP Team to resolve any identified issues / bugs within the system and support and communicate with users of the
system.   In addition, activity has been undertaken to commence a review of the council PCard processes with all existing processes mapped
out and development sessions planned for next quarter. Draft management information dashboards have been developed within Business
World which will be finalised next quarter.
Initial work has been completed on mapping out future phases of the programme with further engagement required to establish final
timeline and resource requirements.
Deliver the Internal Audit Plan for
2025/26. 31 March 2026
Our completion of the Audit Plan was 90.1% against a target of 90%. Contingency time and overtime helped the team achieve target
despite some short-term capacity issues.. Some non operational tasks including some developmental work and staff training were
temporarily de-prioritised and these will be progressed during 2026/27. Arrangements are ongoing to implement the approved new team
structure.
Implement the new Customer Strategy. 31 March 2029
Use of the Council’s Myaccount service remains high, with over 125,000 registered users now on the platform and the Digital Advisor
continues to respond well to simple, transactional customer queries. Since it was implemented, it has answered over 348,000 calls and
provided a response to 39% of all calls, freeing up resources in the customer contact centre to focus on more complex and sensitive
enquiries.

Page 20

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Living our values
Due Date Status Progress update
Implement the new Digital Strategy 30 April 2030
Since the last update in Jan 2026, there has been significant work undertaken on validating the AI business case with input from senior
officers from across all services including Finance Business Partners. The business case is now complete and has been reviewed and
approved by the Corporate Management Team. The business case represents one of the most significant digital transformation
opportunities for the Council over the medium term. A report was approved at Leadership Board in April 2026. Progress continues within
the other key themes of the Digital Strategy including Digital Inclusion and the preparation of an evaluation report on DigiZones and using
data to support and evidence a baseline of digital skills across the council. The Data Advisory Group (DAG) continue to meet with a focus
on data management, data analysis and data skills. It is anticipated that DAG priorities will be to support any future AI programme of work.
Align service data activities with Digital
Strategy objective: Data is a critical asset
and ensure visibility of data activities at
Directorate SMT
30 November 2025
From DAG discussions with SMT and DAG reps, the following data dashboards will be further investigated/developed for presentation at
FARS SMT: FOI/SARS Performance, Debt Recovery, Absence Stats/Monitoring & Customer Services Performance
Further SIP actions will be developed to track progress of solutions development.
Identify data skills gaps , e.g. data input,
data analysis and address in alignment with
the People Strategy
30 November 2025
DAG reps across FARS have identified a range of skills gaps to be addressed. Appropriate training will be made available through the DAG
to appropriate staff covering: Power BI/MS Fabric data platform administration, Data Management & Analysis, Further Power BI user
training and opportunities in Finance and  Data Compliance team in HR: appropriate training/upskilling
Ensure data owners are aware of
responsibilities, and align with Data
Catalogue
31 July 2026
Limited progress on additional updates to the Data Catalogue has led to rethink of approach using IAR entries as start point and direct
liaison with DAG reps to align service data sets with IAR entries. This approach will ensure consistency and connection between IAR and
Data Catalogue and be better longer term. Core DAG team are assisting DAG reps to complete their relevant entries, however this will take
longer than originally expected, hence target date extended (original due date 31 Dec 25).
Review data quality in key line of business
systems and develop improvement plan in
alignment with organisational priorities
31 December 2025
A number of areas for improvement of data quality across FARS have been identified in Granicus, ERP, Active Directory and generally with
addressing in systems across the Council. The DAG will work with the relevant DAG reps on data quality improvement solutions.
Further SIP actions will be developed to track progress of the solutions development and implementation.
Further define data analysis requirements
to improve decision-making and build
capabilities locally within services where
required
31 December 2025
Initial training/awareness session on Data Analysis & Management is complete. Ongoing liaison now with DAG reps to address specific
gaps etc. This will be managed as BAU through the DAG.
Power BI upskilling in Finance being addressed in action FR.SIP.25.05.07.

Page 21

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Living our values
What we will do Due Date Status Progress update
Adopt standard dashboards in our ERP as
business-as-usual. 31 December 2025 A number of dashboards have been created within the ERP. The DAG will continue to give the ERP team a forum to highlight potential uses
of data and dashboards and give services a forum to seek dashboarding solutions etc as BAU
Implement the next phase of transformation
through the actions arising from the
Council’s financial sustainability and
improvement workstreams and the new
Reshaping Renfrewshire programme
31 March 2028
The aim of this action is that the Council is able to maintain a balanced budget by 31 March 2028 within the context of a challenging
financial environment. This has so far been achieved for 2025/26, the first of the three financial years in scope. The Transformation Board
has met 7 times and considered updates and progress on a wide range of projects and programmes, providing advice and guidance as
required.

Page 22

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –Children and Young People
What we will do Due Date Status Progress update
Contribute to the Council’s commitment to
The Promise for all care experienced people 31 March 2029
The Corporate Management Team approved guaranteeing an interview to any care-experienced candidate who meets the essential
criteria for the role they are applying for. This has recently been incorporated within the Council’s Recruitment Policy. As part of the
commitment to#KeepThePromise, the Council has created a Care Experienced Staff Network. This group is for those who are Care
Experienced both directly and indirectly, who work in Renfrewshire, where group members can input and share learned experiences and
advice. These are ways the Council is demonstrating our commitment to supporting care experienced people into work.

Page 23

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Place
Indicator Current
Status
2023/24 2024/25 2025/26
Explanation of performance
Value Target Value Target Value Target
FINSUS1 Total useable reserves as
a % of council annual budgeted
revenue
43.2% Data Only 41.7% Data Only N/A Data Only The Council planned the use of earmarked reserves to fund the
budgeted deficit in 2023/24.
FINSUS2 Uncommitted General
Fund Balance as a % of council
annual budgeted net revenue
2.2% Data Only 1.9% Data Only N/A Data Only Minor reduction due to use of the Uncommitted Balance to fund
emergency charity donations.
FINSUS3 Ratio of Financing Costs
to Net Revenue Stream - General
Fund
3.13% 3.47% 2.9% 3.47% N/A 3.47% Marginal increase due to the impact of interest rates over the year;
expected to continue over the next 12 months.
FINSUS4 Ratio of Financing Costs
to Net Revenue Stream - Housing
Revenue Account
27.7% 28.59% 22.7% 28.59% N/A 28.59% Principal loan repayments from the HRA loans fund was also lower
in 2023-24 due to older debt being fully paid off in 2022-23.
FINSUS5 Actual outturn as a
percentage of budgeted
expenditure
100.59% 100% 100% 100% N/A 100%
Indicator over 100 here shows an overspend against budget. In
23/24 this was due to a number of inflationary factors, including
pay and fuel, and increased cost of children’s residential care.
FINSUS6 Reliance on Reserves as
a % of Net expenditure 0.5% Data Only 0.9% Data Only N/A Data Only
This figure is derived from the use of reserves in-year divided by
the Net Expenditure on a Funding basis as reported in the Local
Financial Returns. In 2024/25, the Council exceeded the national
average due to a Council Tax freeze, which limited income-raising
powers and led to an increased reliance on reserves (£4.324m) in-
year.

Page 24

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Economy
Indicator Current
Status
2023/24 2024/25 2025/26
Explanation of performance
Value Target Value Target Value Target
% of procurement
spend spent on
local enterprises 20.15% 23% 22% 21% N/A 21%
Growing direct spend with local suppliers is a core principle of Community Wealth Building. The use of
public procurement to help generate, circulate and retain wealth within the local economy is explicitly
recognised in the new Community Wealth Building Bill, introduced on 25 March 2025. To support this, the
Corporate Procurement team is working in partnership with Economic Development to increase local
business involvement in market engagement activity, including participation in the development of future
council frameworks and bidding for contracts on frameworks approaching renewal. Development of a draft
Local Supply Chain Engagement Strategy underway to identify how the Council can improve engagement
with local businesses and services can be better supported to identify and invite local businesses to submit
bids. Through the P2P Programme, a cleanse of over 6000 suppliers on the Business World system has
been undertaken with updated categorisations added such as ‘local supplier’, SME, ‘third sector’ which will
improve the recording of local suppliers and help highlight opportunities, where appropriate, to increase
local engagement across specific areas.
The 2025/26 figure will not be available until the second half of 2026.

Page 25

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Fair
Indicator Current
Status
2023/24 2024/25 2025/26
Explanation of performance
Value Target Value Target Value Target
Time taken for processing new
housing benefit applications up until
the posting of notification of outcome
of the application (cumulative)
18.99 24 17.93 24 18.71 24 Processing speed for New Claims was well within target for
2025/26.
Time taken for processing change of
circumstance housing benefit
applications up until the posting of
notification of outcome of the
application (cumulative)
8.08 10 4.3 10 4.19 10 Processing of Changes of Circumstance was well within target
for 2025/26.
Average speed of processing a Crisis
Grant (Scottish Welfare Fund) in days 2 2 2 2 1 2
The service continues to meet the target for processing Crisis
Grants. Average days to process during 2025/26 was within the
2 day target.
Average speed of processing a
Community Care Grant (Scottish
Welfare Fund) in days
10 15 10 15 9 15 Processing speed for Community Care Grants was well within
target for 2025/26.

Page 26

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Green
Indicator Current
Status
2023/24 2024/25 2025/26
Explanation of performance
Value Target Value Target Value Target
Print volume – number of
pages printed by council
services
NEW INDICATOR 20,072,369 Data only
Usage in 2025/26 was just over 20,000,000 pages and the aim is to
reduce this next year.  A breakdown of figures has shown that 16.2m
pages were printed by schools, with 3.5m printed by corporate users
and just over 300,000 by members of the public (e.g. in libraries).

Page 27

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Living our values
Indicator Current
Status
2023/24 2024/25 2025/26
Explanation of performance
Value Target Value Target Value Target
Cost of collecting council tax
per chargeable dwelling 8 11.5 7.77 11.5 N/A 9.5 The 2025/26 figure will not be available until the second half of 2026.
Percentage of Council Tax
due in the year, collected by
the end of the year
(cumulative position to date)
94.28% 96% 94.49% 96% 94.66 95%
Council Tax collection for 2025/26 was up by 0.17% on the 2024/25 position. Recovery
of Council Tax remains challenging with continued pressure on many household
budgets. The service will continue to maximise collection through timeous recovery
activity and utilising all tools at its disposal, including working with our recovery agents.
Collection performance may be relatively static until the cost of living crisis eases.
Percentage of income due
from Council Tax for prior
years (cumulative position to
date)
97.19% 97.27% 97.12% 97.27% 97.08% 97.15%
Prior years' collection at the end of 2025/26 is down slightly on that for 2024/25 (-
0.04%).  Follow up continues to be run each month and prior year collection is
monitored.
Percentage of Non Domestic
Rates due in the year,
collected by the end of the
year (cumulative to date)
96.95% 98% 97.22% 98% 97.29% 98% Business rates collection levels for 2025/26 are up by 0.07% from the 2024/25 position.

Page 28

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Living our values
Indicator Current
Status
2023/24 2024/25 2025/26
Explanation of performance
Value Target Value Target Value Target
F&R Front Line complaints
(Cumulative) 86.6% 85% 91.9% 85% 91.1% 85% 530 frontline complaints were received in total in 2025/26
with 483 of these completed within the five-day timescale.
Total % of investigation (Stage 2)
complaints responded to within
targets by Finance & Resources 
(cumulative to date)
94% 85% 97.16% 85% 90.7% 85%
182 investigation complaints were received in total in
2025/26 with 165 of these completed within the twenty-day
timescale.
Number of invoices paid within 30
days of receipt, as a % of all
invoices paid council wide
(cumulative)
96.82% 96% 97.83% 96% 97.77% 96.5%
During 2025/26 a total of 334,516 invoices were received of
which 327,043 were processed within 30 days. Performance
has met target for the reporting year.
Average days Small and Medium
sized businesses invoices paid 7.5 28 5.27 28 5.53 28
At the end of 2025/26 (01/04/25 – 15/04/26) 107,588 SME
invoices were received of which 103,827 were processed
within 28 days with the average days to process an invoice
reported at 5.53 days. The team’s strong performance
throughout the reporting year has ensured that target has
been exceeded.

Page 29

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Living our values
Indicator Current
Status
2023/24 2024/25 2025/26
Explanation of performance
Value Target Value Target Value Target
% of Finance and Resources FOI
requests completed within
timescale
89.6% 100% 93% 100% 95% 90%
During 2025/26, there were 405 single service FOIs dealt
with by FAR of which 383 were completed within
timescale (95%). Target has been achieved for this
reporting period.
Percentage of Audit Plan
completed (cumulative) 92% 95% 93.6% 90% 90.1% 90%
Our completion of the Audit Plan was 90.1% against a
target of 90%. Contingency time and overtime helped the
team achieve target despite some short-term capacity
issues.. Some non operational tasks including some
developmental work and staff training were temporarily
de-prioritised and these will be progressed during
2026/27. Arrangements are ongoing to implement the
approved new team structure.
Percentage of Data Advisory Group
meetings with attendance from all
FAR reps
NEW INDICATOR 87.5% 100%
One service area was not represented at 1 out of 2
meetings within this period. All other services represented
at both meetings.

Page 30

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Living our values
Indicator Current
Status
2023/24 2024/25 2025/26
Explanation of performance
Value Target Value Target Value Target
Average number of work days lost
through sickness absence per
employee (F&R) (FTE)
8.9 8.5 8.96 8.5 9.11 8.5
Sickness absence has remained broadly stable in 2025/26
compared to the previous financial year, with a small
increase in total work days lost.
Year-on-year absence levels reflect a combination of
offsetting movements across sickness categories.
Reductions in psychological, respiratory and cancer
related absence have been largely offset by increases in
musculoskeletal and stomach and bowel related absence
during the year.
Managers continue to be supported by People & OD
through established absence case management
processes. Employees have access to Occupational Health
services and the Time for Talking counselling service
where appropriate. Within the Performance Board
Absence Project, 4 corporately agreed workstreams are in
progress to help improve the Council’s absence
performance. A revised training module with guidance for
managers will be implemented in early spring 2026.
Through ongoing support and effective, timeous caseload
management, improvement is anticipated as preventative
and support measures continue to be embedded.

Page 31

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Living our values
Indicator Current
Status
2023/24 2024/25 2025/26
Explanation of performance
Value Target Value Target Value Target
Percentage of new Council staff
completing corporate induction
within 30 days of start date
NEW INDICATOR 16% 100%
Over the coming months this module will be made
mandatory for all staff with regular Business World alerts
set up to remind staff to complete this training with
reminders escalated to managers. Like mandatory
training, induction content has been converted into
toolbox talks for delivery to frontline staff. It is anticipated
that completion rates will increase significantly.
Percentage of Council staff who have
participated in a Personal
Development 1 to 1 discussion within
the last year
Not available NEW INDICATOR N/A 100%
Whilst we acknowledge that 1:1 personal development
discussions already happen across services, there is no
central way to enable reporting on this
currently. Therefore, to support the reporting of this new
performance indicator, new training and guidance on how
to apply this policy is scheduled to be rolled out during the
first quarter 2026. Alongside this, forms will be created
within Business World to allow the Council to report
centrally on staff 1:1 performance and development
compliance.

Page 32

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Living our values
Indicator Current
Status
2023/24 2024/25 2025/26
Explanation of performance
Value Target Value Target Value Target
Percentage of Council staff who have
completed all mandatory training NEW INDICATOR 85% 100%
Mandatory training completion has continued to rise
through 2025, despite the addition of new courses such as
Information Classification, Prevent Duty: Awareness, Risk
Management and the P2P Approver/Requisitioner modules.
This improvement reflects sustained CMT focus, regular
comms as well as the new Business World reminders, which
have helped users proactively stay on top of their
mandatory course requirements. Strong and sustained
improvement levels remain consistent with the previous
quarter. Although the 100% target was not achieved,
overall progress across the year was positive, particularly
given the expansion of mandatory training requirements
during the overall period, including Information
Classification, Prevent Duty: Awareness, Risk Management,
and P2P Approver/Requisitioner training. The introduction
of these courses increased the overall completion
requirement for staff and temporarily widened the
compliance gap as employees worked to complete new
modules. Regular reports are provided to the Council’s
Corporate Management Team and Senior Management
Teams across the Council for scrutiny and support.

Page 33

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Living our values
Indicator Current
Status
2023/24 2024/25 2025/26
Explanation of performance
Value Target Value Target Value Target
Percentage of new FAR staff
completing corporate induction
within 30 days of start date
NEW INDICATOR 48% 100%
Over the coming months this module will be made
mandatory for all FARS staff with regular Business World
alerts set up to remind staff to complete this training with
reminders escalated to managers. Monthly reports will be
provided to the Service SMT for scrutiny and support. It is
anticipated that completion rates will increase
significantly.
Percentage of FAR staff who have
participated in a Personal
Development 1 to 1 discussion
within the last year
Not available NEW INDICATOR N/A 100%
Whilst we acknowledge that 1:1 personal development
discussions already happen across FARS, there is no central
way to enable reporting on this currently. Therefore, to
support the reporting of this new performance indicator,
new training and guidance on how to apply this policy is
scheduled to be rolled out during the first quarter
2026. Alongside this, forms will be created within Business
World to allow the Council to report centrally on staff 1:1
performance and development compliance.

Page 34

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan – Living our values
Indicator Current
Status
2023/24 2024/25 2025/26
Explanation of performance
Value Target Value Target Value Target
Gender pay gap (%) 0.44 Data Only -0.52 Data Only N/A Data Only
As at 31 March 2025, the Council’s mean gender pay gap
stands at -0.52%. This figure is based on and follows the
standard methodology of comparing the mean hourly pay of
males and females, excluding overtime payments.
Average hourly rate (Male): £21.25
Average hourly rate (Female): £21.36
Gender Pay Gap: -0.52%
Percentage of FAR staff who have
completed all mandatory training NEW INDICATOR 99% 100%
Mandatory course completions have remained steadily high
within FARs with close to 100% completion, despite the
introduction of additional mandatory courses throughout the
year.
Performance targets are reviewed by SMT and Business
World alerts are in place to help employees stay on top of
their learning requirements. Performance against the
mandatory training completion indicator within FARS
remained consistently high throughout 2025/26, with near-
full compliance achieved across all four quarters. While the
100% target was narrowly missed, overall performance
demonstrates a strong culture of compliance and effective
management oversight within the service.

Page 35

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Finance and Resources
Service Improvement Plan 2025 - 28
Outturn Report
June 2026