Notice of Meeting and Agenda
Finance, Resources and Customer Services Policy Board 
Date Time Venue
Thursday, 23 April 2026 10:00 Remotely via MS Teams, 
Membership 
Councillor John Shaw (Convener): Councillor Fiona Airlie-Nicolson (Depute Convener):  
Councillor Alison Ann-Dowling: Councillor Jacqueline Cameron: Provost Lorraine Cameron:
Councillor Graeme Clark: Councillor Audrey Doig: Councillor Chris Gilmour: Councillor Edward
Grady: Councillor Neill Graham: Councillor Robert Innes: Councillor James MacLaren: Councillor
Sam Mullin: Councillor Iain Nicolson: Councillor Jim Paterson: 
Further Information - online meetings only
This meeting is on-line only but is a meeting which is open to members of the public by prior
arrangement. A copy of the agenda and reports for this meeting will be available for inspection
prior to the meeting at the Customer Service Centre, Renfrewshire House, Cotton Street, Paisley
and online at http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx
For further information, please email democratic-services@renfrewshire.gov.uk 
Webcasting of Meeting
This meeting will be filmed for live or subsequent broadcast via the Council’s internet site – at
the start of the meeting the Convener will confirm if all or part of the meeting is being filmed.  To
find the webcast please navigate to 
https://renfrewshire.public-i.tv/core/portal/home 
MARK CONAGHAN
Head of Corporate Governance
Page 1 of 214

Page 2

16/04/2026 
Items of business      
Apologies
Apologies from members. 
Declarations of Interest and Transparency Statements
Members are asked to declare an interest or make a transparency
statement in any item(s) on the agenda and to provide a brief
explanation of the nature of the interest or the transparency statement. 
1 Joint Consultative Board (Non-Teaching)
Minute of meeting held on 5 February 2026. 
6 - 8 
2 Revenue and Capital Budget Monitoring 2025/26 at 09
January 2026
Report by the Director of Finance & Resources. 
9 - 21 
3 Revenue and Capital Budget Monitoring – Council
Overview as at 09 January 2026
Report by the Director of Finance & Resources. 
22 - 34 
4 Business Services Performance Report
Report by the Director of Finance & Resources. 
35 - 46 
5 Customer Services Performance Report
Report by the Director of Finance & Resources. 
47 - 52 
6 Civic Hospitality
Report by Director of Finance and Resources. 
53 - 56 
7 Digital Strategy 2025/30 Update
Report by Director of Finance and Resources. 
57 - 69 
8 Corporate Policy on the Management of Radon
Report by Director of Finance and Resources. 
70 - 90 
9 Public Holiday Proposal: FIFA Men’s World Cup, 15 June
2026
Report by Director of Finance and Resources.     
91 - 97   
Page 2 of 214

Page 3

16/04/2026 
10 ‘People Strategy 2021/26’ - New and Revised HR&OD
Policies
Report by Director of Finance and Resources.
98 - 129 
11  Chief Executive’s Service – Health & Safety Action Plan &
Performance Indicators 2026/27
Report by Chief Executive. 
130 - 134 
12  Facilities and Property Services - Service Update Report
Report by Director of Environment, Housing & Infrastructure. 
135 - 142 
13  Corporate Procurement Strategy 2026/27
Report by the Director of Finance and Resources. 
143 - 159 
14  Contract Authorisation Report for Paisley Halloween
Festival – Parade & Town Centre Animation (RC-CPU-25-
168)
Joint report by the Director of Finance and Resources and the Chief
Executive’s Service. 
160 - 164 
15  Contract Authorisation Report for GAIA New Water Main
(RC-CPU-25-258)
Joint report by the Director of Finance and Resources and the Chief
Executive’s Service. 
165 - 170 
16  Contract Authorisation Report for Park Mains High
School Extension – Design and Build – Main Works
Contract (RC-CPU-24-053)
Joint report by the Director of Environment, Housing and Infrastructure
and the Director of Finance and Resources. 
171 - 177 
17  Contract Authorisation Report for Trinity High School –
Upgrade of 3G Pitch (RC-CPU-25-128)
Joint report by the Director of Finance and Resources and the Director
of Environment, Housing and Infrastructure.               
178 - 182
Page 3 of 214

Page 4

16/04/2026 
18  Contract Authorisation Report: Supply and Delivery of 2 x
16 Seat + Driver Wheelchair Accessible Buses - RC-CPU-
25-345
Joint report by the Director of Finance and Resources and the Director
of Environment, Housing & Infrastructure. 
183 - 187 
19  Reactive Repair & Maintenance of CCTV, Fire Alarm and
Intruder Alarm Systems (Including the Provision of an
Alarm Monitoring Service) - RC-CPU-25-060
Joint report by the Director of Finance and Resources and the Director
of Environment, Housing & Infrastructure. 
188 - 193 
20  Contract Authorisation Report for Provision of a
Professional Independent Advocacy Service for Adults
(RC-CPU-25-063)
Joint report by the Director of Finance and Resources and the Chief
Officer Renfrewshire Health and Social Care Partnership (RHSCP). 
194 - 198 
21  Notification of the award of a Contract for Single Building
Assessment – Approved Assessor and Verifier (RC-CPU-
25-089) under standing order 9.1(k) of Council Standing
Orders Relating to Contracts
Joint report by the Director of Finance and Resources and the Director
of Environment, Housing and Infrastructure. 
199 - 204 
22  Notification of the award of a Contract for Construction of
Red Smiddy to Erskine Active Travel Route Phases 4 and
5 (RC-CPU-25-158) Notification of the award of a Contract
for Construction of Red Smiddy to Erskine Active Travel
Route Phase 6 (RC-CPU-25-159)
Joint report by the Director of Finance and Resources and the Director
of Environment, Housing and Infrastructure.               
205 - 210   
Page 4 of 214

Page 5

16/04/2026 
23 Notification of the Award of a Contract for Supply and
Delivery of 1500 x Laptops (RC-CPU-26-008)
Report by Director of Finance & Resources.
211 - 214 
Page 5 of 214

Page 6

Minute of Meeting
Joint Consultative Board (Non-Teaching)
Date Time Venue
Thursday, 05 February 2026 15:00 Via Teams,
Present
Councillor Fiona Airlie-Nicolson, Councillor Audrey Doig, Councillor Chris Gilmour,
Councillor Lisa-Marie Hughes, Councillor Sam Mullin.
Representing Trades Unions
Ann Canning (GMB); Stephen Hicks and Margaret McIntyre (both UNISON).
In Attendance
C Dalrymple, Head of Facilities & Property Services (Environment, Infrastructure &
Housing); S Fanning, Strategic Lead Partner (Health & Safety); R Laouadi, HR Manager;  J
Barron, Committee Services Officer and D Cunningham, Committee Services and Licensing
Officer (all Finance & Resources); and K Burton, Operations Manager (Locality Teams)
(RHSCP).
Recording of Meeting
Prior to the commencement of the meeting the Chair intimated that this meeting would be
recorded for subsequent broadcast via the Council’s internet site.
Item 1
Page 6 of 214

Page 7

Appointment of Chairperson
In accordance with the terms of the constitution of the Joint Consultative Board (Non-
Teaching), which stated that the Chair of the Board should alternate between the
management-side and the trade unions it was proposed and agreed that Stephen Hicks
(UNISON) chair the meeting
DECIDED: That Stephen Hicks (UNISON) chair the meeting.
Apology
M Ferguson (UNISON).
Declarations of Interest
There were no declarations of interest intimated prior to the commencement of the
meeting.
Transparency Statements
Councillor Mullin indicated that he had a connection to items 1, 2 and 3 of the agenda
by reason of his membership of the union GMB. However, he indicated that he had
applied the objective test and did not consider he had an interest to declare.
Councillor Gilmour indicated that he had a connection to items 1, 2 and 3 of the agenda
by reason of his membership of the union UNITE. However, he indicated that he had
applied the objective test and did not consider he had an interest to declare.
Councillor Hughes indicated that she had a connection to items 1, 2 and 3 of the agenda
by reason of her membership of the union Unison. However, she indicated that she had
applied the objective test and did not consider she had an interest to declare.
1 Health, Safety & Wellbeing
There was submitted a report by the Director of Finance & Resources relative to
developments in relation to health, safety and wellbeing achievements of the Council
since the last meeting of this Board in November 2025. 
The Strategic Lead Partner (Health & Safety) advised that a report had been submitted
to the Health and Safety Executive (HSE) regarding a fatal incident involving one of the
Council’s demolition contractors and work was ongoing with  Police Scotland and the
HSE in this regard.
The Strategic Lead Partner (Health & Safety) was heard in response to questions on
the report.
Page 7 of 214

Page 8

DECIDED: That the report be noted.
2 Details of Grievances
There was submitted a report by the Director of Finance & Resources relative to the
number of grievances received.
The report provided information on grievances at both the informal and formal stages
and indicated that there was a total of 7 grievances as at January 2026, 4 fewer cases
than at the previous meeting of this Board in November 2025.
DECIDED: That the report be noted.
SEDERUNT
M McIntyre, UNISION, joined the meeting before consideration of the following item of
business.
3 Agency Workers
There was submitted a report by the Director of Finance & Resources relative to the
number of agency staff employed within the Council as at December 2025 which
detailed the capacity and Services in which they were engaged.
The HR Manager was heard in response to questions on the report.
DECIDED: That the report be noted.
4 Date of Next Meeting
DECIDED: That it be noted that the next meeting of the JCB (Non-Teaching) would be
held at 3pm on 23 April 2026 via the Teams platform.
Page 8 of 214

Page 9

PUBLIC
___________________________________________________________________
To: Finance, Resources and Customer Services Policy Board
On: 23 April 2026 
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Revenue and Capital Budget Monitoring 2025/26 at 9 January 2026
___________________________________________________________________
1. Summary
1.1 At the close of reporting Period 10 on 9 January 2026, the projected revenue
outturn at 31 March 2026 for those services reporting to the Finance,
Resources and Customer Services Policy Board is an underspend position
of £3.247m (3.4%) against the revised budget for the year. 
1.2 The projected capital outturn at 31 March 2026 for projects reporting to the
Finance, Resources and Customer Services Policy Board is a break-even
position. 
1.3  This is summarised over the relevant services in the table below and further
analysis is provided in the report and appendices. 
Revised
Annual
Budget
£000
Projected
Outturn
£000
Budget
Variance
(Adv)/Fav
£000
Budget
Variance
%
Revenue    
Finance and Resources 50.626 50.581 0.045 0.1%
Environment, Housing and
Infrastructure  28.297 28.530 (0.233) (0.8%)
Chief Executive's Service (Estates) 0.758 0.823 (0.065) (8.6%)
Miscellaneous 17.175 13.675 3.500 20.4%
Total 96.856 93.609 3.247 (3.4%)
Capital    
Finance, Resources and Customer
Services Policy Board 5.340 5.340 0 0% 
Item 2
Page 9 of 214

Page 10

PUBLIC
2. Recommendations
2.1 Members are requested to: 
a) Note the projected Revenue outturn underspend position of £3.247m;
b) Note the projected Capital outturn break-even position; and
c) Note the budget adjustments detailed at section 6 and the proposed
transfer to reserves detailed at section 5.4. 
3. Revenue Budget Projection – underspend of £3.247m by 31 March 2026
3.1 The tables in Appendix 1 present the projected year-end position for all
services reporting to this Board, by both subjective analysis (what the budget
is spent on) and objective analysis (which division is spending the budget).
Significant variances affecting the projected position are analysed further
below. 
3.2 It should be noted that the projected outturn position reported here is based
on the latest information available, which is subject to change during the
financial year, and that budget holders are obliged to seek mitigating action
to minimise significant budget variances. The final outturn position will be
reported to Council in June. 
4. Objective Analysis – Significant Variances
4.1 Environment, Housing and Infrastructure - £0.233m overspend 
The Public Building Repairs budget is currently forecasting an overspend of
£0.275m, which is a further improvement on the position reported at Period
8. The overspend is primarily driven by continued inflationary pressures and
rising costs, which have impacted the service over the last number of years.
The position continues to be closely monitored by management, with work
ongoing to understand the underlying cost drivers and mitigating actions
taken where possible, including moving to emergency repairs only in public
buildings. 
4.2 Chief Executive’s Service (Estates) - £0.065m overspend
This forecast position relates mainly to the costs of maintaining surplus
properties and progressing them to sale. 
4.3 Miscellaneous - £3.500m underspend
This forecast position arises from expected underspends within energy
costs, NDR relief and Learning Estate loan charges, as explained below.
Page 10 of 214

Page 11

PUBLIC 
5. Subjective Analysis – Significant Variances
5.1 Employee Costs - £1.200m underspend 
Within this position, Environment, Housing and Infrastructure is projecting an
underspend of £1.124m, which reflects current high staff turnover and
recruitment challenges, particularly within Soft FM.  This position is being
managed and will continue to be monitored for the remainder of the year. 
5.2 Premises Related - £0.646m underspend 
There is a projected overspend related to repairs and maintenance within
Public Building Repairs due the continued inflationary and cost pressures
that have been experienced by the service over the last few financial years.
This is offset by expected underspends within Miscellaneous Services on
energy costs, and empty property relief on Non-Domestic rates. 
5.3 Supplies and Services - £0.940m overspend 
This projected overspend predominantly relates to Soft FM, where there are
overspends in relation to the purchase of tools and equipment, as well as the
cost of providing school meals, which is subject to inflationary pressures. 
5.4 Depreciation and Impairment Losses - £2.000m underspend 
This forecast, within Miscellaneous Services, relates to an expected
underspend in loan charges. This budget was set aside on a recurring basis
in the 2025/26 budget to fund future borrowing for the Learning Estate
Strategy. This underspend will be set aside to fund business case
development costs, as outlined in the Learning Estate Strategy Update
report to the Education and Children’s Services Policy Board on 12 March
2026. This sum will be transferred to earmarked reserves. 
5.5 Income - £0.444m over-recovery 
Environment, Housing and Infrastructure is projecting an over-recovery of
income of £0.398m, arising principally from a higher than expected surplus
within Building Services, of which Public Buildings receives a share. This is
offset by under-recoveries within Soft FM, due to the loss of car parking
income and lower recharge income. 
6. Revenue Budget Virements
6.1. Under the Council’s financial regulations, Directors and their nominated
officers, in consultation with the Director of Finance and Resources, have
certain delegated authority to transfer sums between subjective budget
headings within a service division to enable budget management throughout
the financial year. This is known as budget virement. 
Page 11 of 214

Page 12

PUBLIC 
6.2. Transfers between divisions of the same service / department in excess of
£100,000, and transfers between services / departments must be authorised
by the respective service Director and the Director of Finance and
Resources for submission to the relevant policy board for approval. 
The budget adjustments processed since the previous report to board reflect
either the allocation of centrally held budgets already approved, or within
delegation. 
7. Capital Budget Projection – break even position by 31 March 2026
7.1 The revised Capital Investment Programme 2025/26 to 2029/30 was
approved by the Council on 1 May 2025. The Finance, Resources and
Customer Services approved capital spend for 2025/26 is £6.097m. 
7.2 The in-year Capital budget is forecast to break even by 31 March 2026,
however, this will be monitored as the projects progress. Further details of
the programme can be found in the Capital Monitoring report at Appendix 2. 
7.3 There have been a number of budget adjustments to reflect revised
programming for some capital projects. The revised capital spend for
2025/26 is £5.340m, and details of these adjustments, which amount to
(£0.757m) are as follows: 
Project Amount
(£m)
Budget carried forward into 2026/27 - updated cashflows
ICT Infrastructure Maintenance & Renewal Programme (0.271)
Artificial pitch upgrades (0.486)
Total (0.757) 
Implications of the Report
1. Financial
The projected budget outturn position for Finance, Resources and Customer
Services’ Revenue budget is an underspend of £3.247m (3.4%) at 31 March
2026.  Income and expenditure will continue to be monitored closely for the rest
of the financial year, with steps being taken as far as possible to mitigate any
overspends.  
The projected outturn position for Finance, Resources and Customer Services’
Capital budget is break-even, after the adjustments outlined at section 7.   
Page 12 of 214

Page 13

PUBLIC
2. HR & Organisational Development 
While staffing budgets form a significant proportion of the Council’s revenue
budgets, there are no direct implications arising from the recommendations in
this report.
3. Community/Council Planning
Community Plan
Our Renfrewshire is thriving The Council’s revenue and capital spend
ensures that its facilities are fit for purpose
and safe for the community, to maximise
accessibility.
Our Renfrewshire is well 
Our Renfrewshire is fair 
Our Renfrewshire is safe
Council Plan
Reshaping our place, our economy,
and our future The Council’s revenue and capital spend
ensures that its facilities are fit for purpose
and safe for the community, to maximise
accessibility.
Building strong, safe, and resilient
communities
Tackling inequality, ensuring
opportunities for all
Creating a sustainable Renfrewshire
for all to enjoy
Ongoing revenue and capital budget
monitoring is a tool to enable good financial
management so that the Council has
resources now and in the future for continued
service delivery.
Working together to improve
outcomes 
4. Legal 
There are no direct implications arising from the recommendations in this
report.
5. Property/Assets 
The capital expenditure noted in this report will result mainly in lifecycle
maintenance improvements to existing properties, replacement of ICT assets
and infrastructure and replacement of artificial pitches.
6. Information Technology 
While ICT assets and revenue costs are included within these reported
budgets, there are no direct implications arising from the recommendations in
this report. 
7. Equality & Human Rights 
While new areas of spend may impact on particular groups, any such impact
would be assessed prior to the spend being incurred, therefore there are no
direct implications arising from the recommendations in this report. 
Page 13 of 214

Page 14

PUBLIC
8. Health & Safety 
The capital expenditure noted in this report will result in lifecycle maintenance
improvements to existing properties and replacement of ICT assets, which may
in some cases improve health and safety measures.
9. Procurement 
While Procurement is an important consideration prior to the Council incurring
any revenue or capital spend, there are no direct implications arising from the
recommendations in this report.
10. Risk 
The potential financial risk that the Council will overspend its approved revenue
budgets for the year is managed at a Council-wide level by the Chief Executive
and Directors.
11. Privacy Impact 
There are no direct implications arising from the recommendations in this
report. 
12. Cosla Policy Position 
N/a
13. Children’s Rights 
There are no direct implications arising from the recommendations in this
report.
14. Climate Change
The Council aims to reduce its carbon and other emissions to net zero by 2030,
however there are no direct implications arising from the recommendations in
this report.   
List of Background Papers
• Revenue Budget and Council Tax 2025/26, Council 27 February 2025
• The Capital Investment Programme 2025/26 to 2029/30, Council 27
February 2025 
Author:     Valerie Howie and Lisa Dickie, Finance Business Partners; Alison Burns,
Corporate Finance Manager; and Linsey McGregor, Capital Accountant.
Page 14 of 214

Page 15

Appendix 1
PUBLIC
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2025/26
1 April 2025 to 9 January 2026                  
POLICY BOARD:  FINANCE, RESOURCES & CUSTOMER SERVICES                  
Objective Summary
Annual
Budget at
Period 8
Budget
Adjustments
Revised
Annual
Budget at
Period 10
Projected
Outturn
Budget
Variance 
(Adverse) or
Favourable
Previous
Projected
Outturn
Variance
Movement  
£000 £000 £000 £000 £000 % £000 £000
Finance and Resources 50,669 (43) 50,626 50,581 45 0.1% 75 (30)
Environment, Housing and Infrastructure 28,275 22 28,297 28,530 (233) (0.8%) (418) 185
Chief Executive's Service (Estates) 683 75 758 823 (65) (8.6%) (65) 0
Miscellaneous 17,914 (739) 17,175 13,675 3,500 20.4% 0 3,500
NET EXPENDITURE 97,541 (685) 96,856 93,609 3,247 3.4% (408) 3,655         
Subjective Summary
Annual
Budget at
Period 8
Budget
Adjustments
Revised
Annual
Budget at
Period 10
Projected
Outturn
Budget
Variance 
(Adverse) or
Favourable
Previous
Projected
Outturn
Variance
Movement  
£000 £000 £000 £000 £000 % £000 £000
Employees 90,340 (205) 90,135 88,935 1,200 1.3% 393 807
Premises Related 11,336 (157) 11,179 10,533 646 5.8% (1,111) 1,757
Transport Related 2,264 3 2,267 2,296 (29) (1.3%) (185) 156
Supplies and Services 24,815 380 25,195 26,135 (940) (3.7%) (939) (1)
Third Party Payments 1,868 0 1,868 1,860 8 0.4% 8 0
Transfer Payments 38,722 594 39,316 39,348 (32) (0.1%) 4 (36)
Support Services 877 0 877 927 (50) (5.7%) (65) 15
Depreciation and Impairment Losses 14,909 70 14,979 12,979 2,000 13.4% 0 2,000
GROSS EXPENDITURE 185,131 685 185,816 183,013 2,803 1.5% (1,895) 4,698
Income (87,590) (1,370) (88,960) (89,404) 444 0.5% 1,487 (1,043)
NET EXPENDITURE 97,541 (685) 96,856 93,609 3,247 3.4% (408) 3,655 
Page 15 of 214

Page 16

Appendix 1
PUBLIC
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2025/26
1 April 2025 to 9 January 2026                  
POLICY BOARD:  FINANCE, RESOURCES & CUSTOMER SERVICES                  
Objective Summary
Annual
Budget at
Period 8
Budget
Adjustments
Revised Annual
Budget at Period
10
Projected
Outturn
Budget
Variance 
(Adverse) or
Favourable
Previous
Projected
Outturn
Variance
Movement  
£000 £000 £000 £000 £000 % £000 £000
Finance and Resources Directorate (807) 0 (807) (793) (14) (1.8%) (15) 1
Audit Services 531 0 531 445 86 16.2% 83 3
Corporate Governance 3,552 0 3,552 3,517 35 1.0% 41 (6)
Digital, Transformation & Customer Services 25,478 (44) 25,434 25,464 (30) (0.1%) (25) (5)
Finance and Procurement 5,149 0 5,149 5,161 (12) (0.2%) 6 (18)
Business Services 7,931 1 7,932 7,933 (1) 0.0% (2) 1
People & Organisational Development 2,103 0 2,103 2,111 (8) (0.4%) (2) (6)
Social care (non-delegated) 821 0 821 833 (12) (1.5%) (11) (1)
Council and Externally Funded Schemes 5,911 0 5,911 5,911 0 0.0% 0 0
NET EXPENDITURE 50,669 (43) 50,626 50,581 45 0.1% 75 (30) 
Page 16 of 214

Page 17

Appendix 1
PUBLIC
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2025/26
1 April 2025 to 9 January 2026                  
POLICY BOARD:  FINANCE, RESOURCES & CUSTOMER SERVICES - FINANCE & RESOURCES                  
Subjective Summary
Annual
Budget at
Period 8
Budget
Adjustments
Revised
Annual
Budget at
Period 10
Projected
Outturn
Budget Variance 
(Adverse) or
Favourable
Previous
Projected
Outturn
Variance
Movement  
£000 £000 £000 £000 £000 % £000 £000
Employees 39,000 (15) 38,985 38,909 76 0.2% (10) 86
Premises Related 2,747 16 2,763 2,755 8 0.3% (10) 18
Transport Related 274 0 274 263 11 4.2% 11 0
Supplies and Services 11,754 (44) 11,710 11,791 (81) (0.7%) (83) 2
Third Party Payments 1,868 0 1,868 1,860 8 0.4% 8 0
Transfer Payments 37,663 0 37,663 37,673 (10) 0.0% (11) 1
Support Services 417 0 417 430 (13) (3.1%) (7) (6)
Depreciation and Impairment Losses 0 0 0 0 0 0.0% 0 0
GROSS EXPENDITURE 93,723 (43) 93,680 93,679 1 0.0% (102) 103
Income (43,054) 0 (43,054) (43,098) 44 0.1% 177 (133)
NET EXPENDITURE 50,669 (43) 50,626 50,581 45 0.1% 75 (30) 
Page 17 of 214

Page 18

Appendix 1
PUBLIC 
Objective Summary
Annual
Budget at
Period 8
Budget
Adjustments
Revised Annual
Budget at
Period 10
Projected
Outturn
Previous
Projected
Outturn
V i
Movement
£000 £000 £000 £000 £000 % £000 £000
Building Services 173 0 173 173 0 0.0% (1) 1
Public Building Repairs 6,733 22 6,755 7,030 (275) (4.1%) (402) 127
Soft Facilities Management Services 21,225 0 21,225 21,183 42 0.2% (15) 57
Property Services 144 0 144 144 0 0.0% 0 0
NET EXPENDITURE 28,275 22 28,297 28,530 (233) (0.8%) (418) 185
Subjective Summary
Annual
Budget at
Period 8
Budget
Adjustments
Revised Annual
Budget at
Period 10
Projected
Outturn
Previous
Projected
Outturn
i
Movement
£000 £000 £000 £000 £000 % £000 £000
Employees 34,376 707 35,083 33,959 1,124 3.2% 403 721
Premises Related 4,912 61 4,973 5,835 (862) (17.3%) (1,101) 239
Transport Related 1,812 176 1,988 2,028 (40) (2.0%) (196) 156
Supplies and Services 12,349 424 12,773 13,567 (794) (6.2%) (791) (3)
Third Party Payments 0 0 0 0 0 0.0% 0 0
Transfer Payments 168 2 170 192 (22) (12.9%) 15 (37)
Support Services 1,356 0 1,356 1,393 (37) (2.7%) (58) 21
Depreciation and Impairment Losses 1,677 70 1,747 1,747 0 0.0% 0 0
GROSS EXPENDITURE 56,650 1,440 58,090 58,721 (631) (1.1%) (1,728) 1,097
Income (28,375) (1,418) (29,793) (30,191) 398 1.3% 1,310 (912)
NET EXPENDITURE 28,275 22 28,297 28,530 (233) (0.8%) (418) 185
Budget Variance
(Adverse) or
Favourable
POLICY BOARD:  FINANCE, RESOURCES & CUSTOMER SERVICES - ENVIRONMENT, HOUSING AND INFRASTRUCTURE
RENFREWSHIRE COUNCIL
Budget Variance
(Adverse) or
Favourable
REVENUE BUDGET MONITORING STATEMENT 2025/26
1 April 2025 to 9 January 2026
Page 18 of 214

Page 19

Appendix 1
PUBLIC
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2025/26
1 April 2025 to 9 January 2026                  
POLICY BOARD:  FINANCE, RESOURCES & CUSTOMER SERVICES - CHIEF EXECUTIVE'S SERVICE (ESTATES)                  
Subjective Summary
Annual
Budget at
Period 8
Budget
Adjustments
Revised Annual
Budget at
Period 10
Projected
Outturn
Budget Variance 
(Adverse) or
Favourable
Previous
Projected
Outturn
Variance
Movement  
£000 £000 £000 £000 £000 % £000 £000
Employees 0 0 0 0 0 0.0% 0 0
Premises Related 1,379 27 1,406 1,406 0 0.0% 0 0
Transport Related 0 0 0 0 0 0.0% 0 0
Supplies and Services 4 0 4 69 (65) (1625.0%) (65) 0
Third Party Payments 0 0 0 0 0 0.0% 0 0
Transfer Payments 66 0 66 66 0 0.0% 0 0
Support Services 503 0 503 503 0 0.0% 0 0
GROSS EXPENDITURE 1,952 27 1,979 2,044 (65) (3.3%) (65) 0
Income (1,269) 48 (1,221) (1,221) 0 0.0% 0 0
NET EXPENDITURE 683 75 758 823 (65) (8.6%) (65) 0 
Page 19 of 214

Page 20

Appendix 1
PUBLIC
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2025/26
1 April 2025 to 9 January 2026                  
POLICY BOARD:  FINANCE, RESOURCES & CUSTOMER SERVICES - MISCELLANEOUS                  
Subjective Summary
Annual Budget at
Period 8
Budget
Adjustments
Revised Annual
Budget at
Period 10
Projected
Outturn
Budget Variance 
(Adverse) or
Favourable
Previous
Projected
Outturn
Variance
Movement  
£000 £000 £000 £000 £000 % £000 £000
Employees 16,964 (897) 16,067 16,067 0 0.0% 0 0
Premises Related 2,298 (261) 2,037 537 1,500 73.6% 0 1,500
Transport Related 178 (173) 5 5 0 0.0% 0 0
Supplies and Services 708 0 708 708 0 0.0% 0 0
Third Party Payments 0 0 0 0 0 0.0% 0 0
Transfer Payments 825 592 1,417 1,417 0 0.0% 0 0
Support Services (1,399) 0 (1,399) (1,399) 0 0.0% 0 0
Depreciation and Impairment Losses 13,232 0 13,232 11,232 2,000 15.1% 0 2,000
GROSS EXPENDITURE 32,806 (739) 32,067 28,567 3,500 10.9% 0 3,500
Income (14,892) 0 (14,892) (14,892) 0 0.0% 0 0
NET EXPENDITURE 17,914 (739) 17,175 13,675 3,500 20.4% 0 3,500 
Page 20 of 214

Page 21

Appendix 2
PUBLIC 
Prior Years Approved  Budget Revised Projected Total Approved Projected
Expenditure Budget Adjustments Budget Outturn Budget Outurn
Project Title to 31/03/2025 2025-26 since previous 2025-26 2025-26 to 31-Mar-30 to 31-Mar-30
Board report
£000 £000 £000 £000 £000 £000 £000
CORPORATE PROJECTS
ICT Infrastructure Maintenance & Renewal Programme 0 1,269 (271) 998 998 0 0% 4,469 4,469 0 0%
Lifecycle Capital Maintenance (LCM) Fund 0 3,650 0 3,650 3,650 0 0% 22,583 22,583 0 0%
Artificial Pitch Upgrades 1,315 571 (486) 85 85 0 0% 2,501 2,501 0 0%
Digital Infrastructure Provision 1,907 29 0 29 29 0 0% 1,936 1,936 0 0%
Commnunity Empowerment Fund 684 266 0 266 266 0 0% 951 951 0 0%
Villages Improvement Fund 349 251 0 251 251 0 0% 600 600 0 0%
Greenspaces and Parks 0 60 0 60 60 0 0% 60 60 0 0%
Retail Improvement Fund 149 1 0 1 1 0 0% 150 150 0 0%
TOTAL FINANCE, RESOURCES & CUSTOMER SERVICES BOARD 4,404 6,097 (757) 5,340 5,340 0 0% 33,250 33,250 0 0%
*Rolling programmes have a prior year year expenditure of £0 as the expenditure is not directly linked from one year to the next as a singular project.
RENFREWSHIRE COUNCIL
CAPITAL INVESTMENT STRATEGY - NON-HOUSING SERVICES
1st April to 9th January 2026
POLICY BOARD: FINANCE, RESOURCES & CUSTOMER SERVICES
Current Year 2025-26 Full Programme - All years
Budget Variance
(Adverse) or
Favourable
Budget Variance
(Adverse) or
Favourable
Page 21 of 214

Page 22

PUBLIC
___________________________________________________________________
To: Finance, Resources and Customer Services Policy Board
On: 23 April 2026
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Revenue and Capital Budget Monitoring – Council Overview as at
9 January 2026
__________________________________________________________________
1. Summary of Financial Position
1.1 At the close of reporting Period 10 on 9 January 2026, the projected revenue
outturn position at 31 March 2026 for Council services is an underspend
position of £2.183m (0.5%) against the revised budget for the year. Adult
Services (HSCP) is projecting an overspend of £5.546m (5.0%), resulting in
a net projected overspend of £3.363m (0.6%).
1.2 The projected capital outturn at 31 March 2026 all services is a break-even
position. 
1.3 This is split between General Fund Services and the Housing Revenue
Account (HRA) in the table below, with further analysis provided in the
Appendices.
Table 1
Revised
Annual
Budget
£000
Projected
Outturn
£000
Budget
Variance
(Adv)/Fav
£000
Planned
Use of
Reserves
£000
Revenue
General Fund Services (Council) 457.247 455.064 2.183 (0.445)
Adult Services (HSCP) 111.791 117.337 (5.546) (5.969)
Housing Revenue Account (HRA) 0 0 0 0
Total 569.038 572.401 (3.363) (6.414)
Capital Variance %
General Fund Services 111.506 111.506 0 0.0%
Housing Revenue Account (HRA) 46.546 46.546 0 0.0%
Total 158.052 158.052 0 0.0%
Item 3
Page 22 of 214

Page 23

PUBLIC
2. Recommendations
2.1 Members are requested to: 
a) Note the projected Revenue outturn overspend position of £3.363m;
b) Note the projected Capital outturn break-even position; and
c) Note the prudential indicators detailed in section 7 of the report.
_________________________________________________________
3. Revenue Budget Projection – overspend of £3.363m by 31 March 2026
3.1 The projected overspend of £3.363m across all services includes an
overspend of £5.546m for Adult Services (HSCP), offset by a forecast
underspend of £2.183m for Council services. 
3.2 The tables in Appendix 1 present the projected year-end position for all
services, by both subjective analysis (what the budget is spent on) and
objective analysis (which division is spending the budget). Significant
variances affecting the projected position are analysed further below. 
3.3 The projected outturn is based on information currently available, and
assumptions made by service budget holders.  The final outturn position will
be reported to Council in June. 
4. Objective Analysis – Significant Variances
4.1 Education & Children’s Services - £0.983m overspend 
This projected overspend includes £1.063m of Transport Costs mainly due
to SPT contracts for both mainstream and ASN school transport being higher
than available budget, predominately caused by price inflation. The projected
overspend also includes £1.487m within Early Learning & Childcare in
relation to payments to partner providers, and in Children & Families in
relation to Direct Payments and Section 22 payments, which are demand-
driven. There are pressures within Premises costs of £0.515m mainly due to
increased janitorial costs, across the school estate. 
These overspends are partly offset by underspends projected in Third Party
Payments of £1.733m mainly due to the number of fostering and kinship
arrangements being less than previously predicted, and a projected over-
recovery of income (£0.129m) within Primary, in relation to rental income
and Secondary schools, in relation to insurance premium rebates within
schools PPP contracts. 
Page 23 of 214

Page 24

PUBLIC
4.2 Infrastructure, Land & Environment - £0.197m overspend
The projected overspend arises from two main areas of the service, being
Waste Services and Social Transport. Within Refuse Collection employee
costs are impacting the overspend, with contract inflation in Waste Disposal
also creating pressures. In Social Transport, the pressure arises from the
need to hire agency staff to cover for long-term sickness absence and
vacancies. The service is actively working with HR to effectively manage this
within the team. 
4.3 Finance, Resources & Customer Services - £3.247m underspend 
The anticipated underspend arises within Miscellaneous services with
projected underspends on energy costs, non-domestic rates relief, and
Learning Estate loan charges. Of this, £2.000m will be transferred to
reserves to fund business case development costs, as outlined in the
Learning Estate Strategy Update report to the Education and Children’s
Services Policy Board on 12 March 2026. 
4.4 Adult Services - £5.546m overspend 
The overspend is mainly due to external care at home packages for both
Older People and those with Physical or Sensory Disabilities. This results
from increased acuity of patients with more complex needs discharged from
hospital, meaning more intensive Care at Home packages are required to
support people to remain in their own homes. There is also a forecast
overspend within Learning Disabilities in relation to Adult Care Placements
driven by increases in client needs, and therefore service demand. 
4.5 Housing Revenue Account (HRA) - break even
The HRA is projected to break-even overall in 2025/26. Demand for repairs
to HRA premises, including void properties, is still currently expected to be
managed within the revised budget levels. 
5. Capital Budget Projection – Housing Services Programme
5.1 The HRA Capital Investment Programme 2025/26 to 2029/30 was approved
by the Council on 27 February 2025. For 2025/26, the approved capital
budget totalled £46.546m. The current programme totals £46.546m,
indicating no budget adjustments since the last board report. 
5.2 Capital expenditure to 9 January 2026 amounted to £26.811m, representing
58% of available resources, compared to 64% for the same period in
2024/25. 
Page 24 of 214

Page 25

PUBLIC
5.3 27% of expected capital income has been received to date, compared to
47% for the equivalent period in 2024/25. This indicator is dependent on the
timing of asset disposals, and on the receipt of grants. 
5.4 The projected outturn position, after budget changes, is for the Housing
Services Programme to break even (see Appendix 2). However, inflationary
impacts of delays to work and related cost estimates are still ongoing and
may result in this forecast being revised at a future date.
6. Capital Monitoring: Non-Housing Services Programme
6.1 The General Services Capital Investment Programme 2025/26 to 2029/30
was approved by Council on 27 February 2025. For 2025/26, the approved
capital budget totalled £113.586m. The current revised programme totals
£111.506m (a decrease of £2.080m) resulting mainly from the net effect of: 
• budget increases of £1.600m, mainly as result of grant funding
approved by Transport Scotland for the Red Smiddy Roundabout to
Erskine ATT2; and
• budget carried forward from 2025/26 into 2026/27 of (£3.680m), mainly
as a result of Artificial Pitch Fund (£0.781m) not anticipated to
commence until later in the financial year as well as Community Halls
Refurbishment (£0.479m), Lagoon Internal Play Centre (£0.470m),
Place Based Investment Fund (£0.535m) and Ferguslie Belltrees
(£0.550) not anticipated to be complete until early next financial year.
The remainder relates to various smaller adjustments.  
6.2 Capital expenditure to 9 January 2026 totals £75.926m, representing 68% of
the available resources, compared to 66% for the equivalent period in
2024/25. 
6.3 Capital income totalling £30.473m has been received to 9 January 2026.
This represents 79% of the total anticipated income, compared to 60% for
the equivalent period in 2024/25. This is due to receipt of the City Deal Grant
of £13.7m in 2025/26. 
6.4 The projected outturn position after these budget changes is to break even
(see Appendix 2). However, the full impact of inflation on capital costs on
each project is not yet known, with increased costs through inflation and
compliance expected to lead to the risk of overspends across the capital
programme. 
Page 25 of 214

Page 26

PUBLIC
7. Capital Overview: Prudential Indicators 
7.1  The Council is required to set prudential indicators to ensure that its capital
investment plans are affordable, proportionate, prudent and sustainable. The
current prudential indicators were approved in the mid-year review by
Council on 11 December 2025. 
7.2 The CIPFA Prudential Code 2021 recommends that from 2024/25, a regular
update is provided to Members noting the current forecasts for prudential
indicators compared to those approved at the start of the financial year.
These are outlined in 7.3 to 7.7 below. 
7.3 Capital Expenditure: The limit on capital expenditure that the Council has
set for 2025/26 is shown in the table below. The limit is based on the
resources available to fund the capital programmes, split between Housing
and Non-Housing Services, but excludes the Public Sector Housing Grant,
as this is not considered to be capital spend for the Council. 
Approved Plan
£m
Forecast Expenditure
£m
Non-Housing 113 112
Housing 47 47
Total 160 159 
7.5       Capital Finance Requirement (CFR): The CFR originally planned by the
Council for 2025/26 is shown in the table below and is split between Housing
and Non-Housing Services. The projected outturn at 31 March 2026 is also
shown. Any significant increase in the capital expenditure without planned
funding at the point of spend will result in an increase to the CFR. 
Planned CFR to 
31 March 2026
£m
Projected CFR to 
31 March 2026
£m
Non-Housing 518 517
Housing 156 156
Total 674 673 
7.6   Operational Boundary: This is the focus of day-to-day treasury management
activity within the Council and is an estimate of the most likely, but not worst
case, scenario in terms of cashflow. 
Page 26 of 214

Page 27

PUBLIC
Risk analysis and risk management strategies are taken into account, as are
plans for capital expenditure, estimates of the CFR and estimates of cashflow
requirements for all purposes. It is possible that this boundary could be
breached occasionally and this should not be regarded as significant.
However, a sustained or regular trend of such would be significant and require
investigation and action. 
Planned Operational
Boundary to 
31 March 2026 
£m 
Projected Operational
Boundary to 
31 March 2026
£m
Borrowing 550 549
Other Long-Term Liabilities 124 124
Total 674 673 
7.7   Authorised Limit: This is based on the same assumptions as the Operational
Boundary, with additional headroom to ensure sufficient capacity to allow for
both planned and exceptional cashflow requirements, without breaching the
limit. The reasons for movement are as above. 
Planned Authorised
Limit to 
31 March 2026
£m
Projected Authorised
Limit to 
31 March 2026
£m
Borrowing 578 577
Other Long-Term Liabilities 124 124
Total 702 701 
7.8   Ratio of Financing Costs to Net Revenue: A key measure of affordability is
the incremental impact of investment decisions on Council Tax or housing
rents. Estimates of the ratio of financing costs to net revenue stream provide
an indication of how much of the Council’s revenue budget is committed to the
repayment of debt. 
Approved Ratio of
Financing Costs to Net
Revenue 2025/26 
%
Projected Ratio of
Financing Costs to Net
Revenue 2025/26 
%
Non-Housing 2.73 3.04
Housing 24.53 24.15 
Financing costs include the interest payable with respect to forecast borrowing
levels, interest payable on finance leases, interest and investment income,
loans fund and finance lease principal repayments and gains/losses on the
repurchase or early settlement of borrowing. There is only a marginal change
in the projected ratios due to the updated profiling and interest rate outlook.
Page 27 of 214

Page 28

PUBLIC 
Revenue streams relate either to the amounts received in terms of
government grant and local taxpayers for Non-Housing, or to the amounts
received from tenants in respect of housing rents for Housing.
8. Private Sector Housing Grant Programme
8.1. The overall budget provision for this programme is included within the revenue
budget. However, in order to monitor the performance of the individual
programmes, it is included within capital budget monitoring procedures. 
8.2. The Council approved expenditure up to £1.100m for 2025/26. The current
revised programme totals £1.100m indicating no budget adjustments since the
previous Communities and Housing Policy Board on 10 March 2026. 
8.3. The programme is expected to fully spend by 31 March 2026 and will be
contained within the overall resources. 
Implications of the Report
1. Financial
The projected budget outturn position for General Fund Services Revenue
budget, including HSCP, is an overspend of £3.363m (0.6%) and break even
for the HRA Revenue budget. Income and expenditure will continue to be
monitored closely for the rest of the financial year and, where necessary, steps
will be taken to mitigate any overspends.    
The projected outturn position for General Fund Services and HRA Capital
budgets is a break-even position. The Capital programme will continue to be
monitored closely for the rest of the financial year.   
2. HR & Organisational Development 
While staffing budgets form a significant proportion of the Council’s revenue
budgets, there are no direct implications arising from the recommendations in
this report. 
3. Community/Council Planning
Community Plan
Our Renfrewshire is thriving The Council’s revenue and capital spend
ensures that its facilities are fit for
purpose and safe for the community, to
maximise accessibility.
Our Renfrewshire is well 
Our Renfrewshire is fair 
Our Renfrewshire is safe 
Page 28 of 214

Page 29

PUBLIC
Council Plan
Reshaping our place, our
economy and our future The Council’s revenue and capital spend
ensures that its facilities are fit for
purpose and safe for the community, to
maximise accessibility.
Building strong, safe and resilient
communities
Tackling inequality, ensuring
opportunities for all
Creating a sustainable
Renfrewshire for all to enjoy
Ongoing revenue and capital budget
monitoring is a tool to enable good
financial management so that the Council
has resources now and in the future for
continued service delivery.
Working together to improve
outcomes 
4. Legal 
There are no direct implications arising from the recommendations in this
report. 
5. Property/Assets 
The capital expenditure noted in this report will result in lifecycle maintenance
improvements to existing properties and replacement of ICT, infrastructure, and
plant and equipment. 
6. Information Technology 
There are no direct implications arising from the recommendations in this
report. 
7. Equality & Human Rights 
While new areas of spend may impact on particular groups, any such impact
would be assessed prior to the spend being incurred, therefore there are no
direct implications arising from the recommendations in this report. 
8. Health & Safety 
There are no direct implications arising from the recommendations in this
report. 
9. Procurement 
While Procurement is an important consideration prior to the Council incurring
any revenue or capital spend, there are no direct implications arising from the
recommendations in this report. 
Page 29 of 214

Page 30

PUBLIC
10. Risk 
The potential financial risk that the Council will overspend its approved revenue
budgets for the year is managed at a Council-wide level by the Chief Executive
and Directors. 
11. Privacy Impact 
There are no direct implications arising from the recommendations in this
report. 
12. Cosla Policy Position  - N/a 
13. Children’s Rights - There are no direct implications arising from the
recommendations in this report. 
14. Climate Change
The Council aims to reduce its carbon and other emissions to net zero by 2030,
however there are no direct implications arising from the recommendations in
this report.
___________________________________________________________________ 
List of Background Papers 
• Revenue Budget and Council Tax 2024/25, Council 27 February 2025
• The Capital Investment Programme 2025/26 to 2029/30, Council 27
February 2025
• 2025/26 Delegated Health and Social Care Budget, Renfrewshire
Integration Joint Board 21 March 2025
___________________________________________________________________ 
Author: Alison Burns, Corporate Finance Manager 
Linsey McGregor, Accountant (Capital)
Page 30 of 214

Page 31

Appendix 1 
PUBLIC 
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2025/26
1 April 2025 to 9 January 2026         
POLICY BOARD:  FINANCE, RESOURCES & CUSTOMER SERVICES - OVERVIEW         
Policy Board - Objective Summary
Annual
Budget at
Period 8
Budget
Adjustments
Revised
Annual
Budget at
Period 10
Projected
Outturn
Budget
Variance 
(Adverse) or
Favourable
Previous
Projected
Outturn
Variance
Movement  
£000 £000 £000 £000 £000 % £000 £000
Communities and Housing Services 15,276 14 15,290 15,290 0 0.0% 0 0
Education and Children's Services 278,118 730 278,848 279,831 (983) (0.4%) (1,061) 78
Infrastructure, Land and Environment 39,765 82 39,847 40,044 (197) (0.5%) (380) 183
Finance, Resources and Customer Services 97,541 (685) 96,856 93,609 3,247 3.4% (408) 3,655
Adult Services 111,791 0 111,791 117,337 (5,546) (5.0%) (5,393) (153)
Planning  856 (1) 855 817 38 4.4% 32 6
Economy and Regeneration 3,168 3 3,171 3,104 67 2.1% 57 10
Chief Executive's Service 22,134 246 22,380 22,369 11 0.0% 18 (7)
GENERAL SERVICES NET EXPENDITURE 568,649 389 569,038 572,401 (3,363) (0.6%) (7,135) 3,772
Housing Revenue Account (HRA) 0 0 0 0 0 0.0% 0 0
NET EXPENDITURE 568,649 389 569,038 572,401 (3,363) (0.6%) (7,135) 3,772 
Page 31 of 214

Page 32

Appendix 1 
PUBLIC
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2025/26
1 April 2025 to 9 January 2026         
POLICY BOARD:  FINANCE, RESOURCES & CUSTOMER SERVICES - OVERVIEW         
Subjective Summary
Annual
Budget at
Period 8
Budget
Adjustments
Revised
Annual
Budget at
Period 10
Total
Projected
Outturn
Budget
Variance 
(Adverse) or
Favourable
Previous
Projected
Outturn
Variance
Movement  
£000 £000 £000 £000 £000 % £000 £000
Employees 392,770 202 392,972 389,531 3,441 0.9% 1,653 1,788
Premises Related 56,667 348 57,015 57,164 (149) (0.3%) (1,710) 1,561
Transport Related 19,110 65 19,175 20,202 (1,027) (5.4%) (1,178) 151
Supplies and Services 97,551 663 98,214 100,044 (1,830) (1.9%) (1,742) (88)
Third Party Payments 97,599 572 98,171 102,759 (4,588) (4.7%) (4,848) 260
Transfer Payments 91,901 1,384 93,285 95,298 (2,013) (2.2%) (1,179) (834)
Support Services 6,442 0 6,442 6,622 (180) (2.8%) (113) (67)
Depreciation and Impairment Losses 37,133 (184) 36,949 34,948 2,001 5.4% 9 1,992
GROSS EXPENDITURE 799,173 3,050 802,223 806,568 (4,345) (0.5%) (9,108) 4,763
Income (230,524) (2,661) (233,185) (234,167) 982 0.4% 1,973 (991)
NET EXPENDITURE 568,649 389 569,038 572,401 (3,363) (0.6%) (7,135) 3,772 
Page 32 of 214

Page 33

Appendix 2 
PUBLIC 
Prior Years Approved  Budget Revised Projected
Expenditure Budget Adjustments Budget Outturn Total Approved Projected
to 31/03/2025* 2025-26 since previous 2025-26 2025-26 Budget Outurn
Board report to 31-Mar-30 to 31-Mar-30
£000 £000 £000 £000 £000 £000 £000
EDUCATION & CHILDREN'S SERVICES
Education & Children's Services 51,019 53,194 500 53,694 53,694 0 0% 201,371 201,371 0 0%
TOTAL 51,019 53,194 500 53,694 53,694 0 0% 201,371 201,371 0 0%
COMMUNITIES, HOUSING & PLANNING
Housing (HRA) 57,731 46,546 0 46,546 46,546 0 0% 350,163 350,163 0 0%
Housing (PSHG) 0 1,100 0 1,100 1,100 0 0% 4,700 4,700 0 0%
TOTAL 57,731 47,646 0 47,646 47,646 0 0% 354,863 354,863 0 0%
INFRASTRUCTURE, LAND & ENVIRONMENT
Environment & Infrastructure 142,219 16,625 1,800 18,425 18,425 0 0% 229,760 229,760 0 0%
TOTAL 142,219 16,625 1,800 18,425 18,425 0 0% 229,760 229,760 0 0%
ECONOMY & REGENERATION
Economy and Development 98,353 18,450 (1,468) 16,982 16,982 0 0% 124,187 124,187 0 0%
TOTAL 98,353 18,450 (1,468) 16,982 16,982 0 0% 124,187 124,187 0 0%
FINANCE, RESOURCES & CUSTOMER SERVICES
Corporate Projects 4,404 6,097 (757) 5,340 5,340 0 0% 33,250 33,250 0 0%
TOTAL 4,404 6,097 (757) 5,340 5,340 0 0% 33,250 33,250 0 0%
PLANNING & CLIMATE CHANGE
Climate Projects 0 875 (425) 450 450 0 0% 1,167 1,167 0 0%
TOTAL 0 875 (425) 450 450 0 0% 1,167 1,167 0 0%
LEADERSHIP
Leisure Services 25,402 2,223 (1,730) 493 493 0 0% 28,805 28,805 0 0%
Chief Executives 169,252 16,122 0 16,122 16,122 0 0% 229,198 229,198 0 0%
TOTAL 194,654 18,345 (1,730) 16,615 16,615 0 0% 258,003 258,003 0 0%
TOTAL ALL BOARDS 548,380 161,232 (2,080) 159,152 159,152 0 0.0% 1,202,601 1,202,601 0 0%
MADE UP OF:
Non-Housing Programme 490,649 113,586 (2,080) 111,506 111,506 0 0% 847,738 847,738 0 0%
Housing Programme (HRA) 57,731 46,546 0 46,546 46,546 0 0% 350,163 350,163 0 0%
Housing Programme (PSHG) 0 1,100 0 1,100 1,100 0 0% 4,700 4,700 0 0%
PROGRAMME TOTAL 548,380 161,232 (2,080) 159,152 159,152 0 0.0% 1,202,601 1,202,601 0 0%
Budget Variance (Adverse)
or Favourable
Budget Variance (Adverse)
or Favourable
RENFREWSHIRE COUNCIL
CAPITAL INVESTMENT STRATEGY - NON-HOUSING SERVICES
1st April to 9th January 2026
POLICY BOARD: FINANCE, RESOURCES & CUSTOMER SERVICES
Current Year 2025-26 Full Programme - All years
Page 33 of 214

Page 34

Appendix 2 
PUBLIC 
2025/26
Housing Non Housing PSHG Total
Services Services Programme
A. RESOURCES AVAILABLE TO FUND CAPITAL PROGRAMME £'000 £'000 £'000 £'000
1. Prudential Borrowing 36,037 51,861 87,898
2a General Capital Grant 14,826 750 15,576
2b. Specific Capital Grant 5,000 572 5,572
3. Usable Capital Receipts 575 22,979 23,554
4. Contribution From Current Revenue (CFCR) 4,934 21,268 350 26,552
5 Total Resource Availability 46,546 111,506 1,100 159,152
B. CAPITAL PROGRAMME
6. Resources Available 46,546 111,506 1,100 159,152
7. Current Programme 46,546 100% 111,506 100% 1,100 100% 159,152 100%
C. ACTUAL EXPENDITURE VS PROJECTED
8. Resource Availability 46,546 111,506 1,100 159,152
9. Cash Spent at 9 January 2026 26,811 58% 75,926 68% 512 47% 103,249 65%
10. Cash to be Spent by 31 March 2026 19,735 35,580 588 55,903
D. ACTUAL RECEIPTS VS PROJECTED
11. Current Programme (total receipts expected) 5,575 38,377 750 44,702
12. Actual Cash Received at 9 January 2026 1,504 27% 30,473 79% 601 80% 32,578 73%
13. Receipts to be received by 31 March 2026 4,071 7,904 149 12,124
RENFREWSHIRE COUNCIL
2025/26 CAPITAL BUDGETS MONITORING SUMMARY REPORT TO 9th January 2026
Page 34 of 214

Page 35

PUBLIC
_________________________________________________________________ 
To: Finance, Resources and Customer Services Policy Board
On:  23 April 2026
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Business Services Performance Report
___________________________________________________________________
1. Summary 
1.1 This report details performance across key Business Services functions
including revenue collection and benefit administration for the period ending
28 February 2026.
___________________________________________________________________
2. Recommendations 
2.1 It is recommended that the Board: 
• Note the contents of the report.
___________________________________________________________________
3. Revenue Collection 
3.1 Council Tax 
3.1.1 This section details the collection performance as at 28 February 2026 for
Council Tax.  It also provides details of the total sums collected for the previous
financial year. 
3.1.2 The billable sum for 2025/26 is £112,519,026. 
3.1.3  The sums collected to date for 2025/26 are £104,975,140 which is 93.30% of
the billable sum (93.13% last year). This represents an increase of 0.17% in
cash collection as a proportion of net charges billed compared with the same
position for 2024/25. 
Item 4
Page 35 of 214

Page 36

PUBLIC
3.1.4 The Council Tax Reduction (CTR) awarded is £15,137,702, amounting to
11.86% of the billable sum, which is 0.05% more than at the same point last
year, the number of recipients of CTR has increased by approximately 4%. 
3.1.5 The Service continues to encourage the take-up of CTR, and process claims
following notification of Universal Credit awards being in place. Take-up
activities are ongoing including tracking of potential applications, data
matching and analysis to maximise CTR awards and support customers,
where possible. 
3.2 Non-Domestic Rates 
3.2.1 This section details the collection performance as at 28th February 2026 for
Non-Domestic Rates (NDR).  It also provides details of the total sums
collected for the last financial year. 
3.2.2 The Non-Domestic Rates (NDR) charges billed for 2025/26 amount to
£111,701,161. 
3.2.3 Cash receipts to date amount to £108,821,793 which is 97.42% of the sum
billed. This is an increase in cash collection as a proportion of net charges
billed of 0.69% compared with the same position for 2024/25. 
3.2.4  Appendix 1 shows NDR collection for 2024/25 of greater than 100%. This has
been caused by backdated rateable value reductions advised by 
Renfrewshire Valuation Joint Board,  which have created significant credit
balances. Work is ongoing to refund affected customers. 
3.2.5 Payment collection for NDR starts in May each year.  
4.         Benefit administration 
This section details the processing performance in relation to Housing Benefit,
Council Tax Reduction, and the Scottish Welfare Fund, as at the end of
February 2026.  Also provided is an update on the funding and expenditure
position in relation to Discretionary Housing Payments (DHP) and the Scottish
Welfare Fund plus details of Housing Benefit Overpayment recovery. 
4.1 Workload and Performance 
4.1.1 The Service aims to balance the varied and changing workload resulting from
the impacts of the ongoing Cost of Living Crisis. 
4.1.2 The Service continues with a positive trend; this is reflected in the performance
data below showing most indicators within target for the period. 
4.1.3 Training and support remains in place for all staff members. Training for
benefits work is an extensive process, taking several weeks for a new team
member to become proficient in a single process, and many months to be fully
trained in all areas and be fully productive. 
Page 36 of 214

Page 37

PUBLIC
4.1.4 The Service maintains a targeted plan aimed at sustaining improved
performance. 
4.2 Speed of Processing – Housing Benefit 
4.2.1 As detailed in Table 1 below, processing speed for New Claims is within target
for the period. 
4.2.2 In relation to New Claims processed within 14 days of all information received,
this measure is also within target for the period. 
4.2.3     Processing of Changes in Circumstance (CIC) is well within target for the
reporting period. 
(Supplementary processing information is attached in Appendix 2 for
members’ reference) 
Table 1 – Housing Benefit Performance Summary
Performance measure
4 Week Reporting
Period
12 February 2026
to
11 March 2026
Year to
date
position
Annual
Target
New Claims – processing time (no. of
days) 18 days 19 days 20 days
New Claims - % processed within 14
days of all information received 98% 95% 92%
Changes in Circumstance –
processing time (no. of days) 5 days 4 days 7 days 
4.3 Speed of Processing – Council Tax Reduction (CTR) 
4.3.1 The majority of new applications for CTR relate to customers claiming
Universal Credit (UC). Due to the DWP’s UC claim mechanism, the service
can’t begin processing such applications until 28 days has elapsed. The
processing target therefore appears inflated but has been set at a challenging
35 days. 
4.3.2 Delayed CTR awards do not negatively impact on customers to the extent they
would with housing benefit claims, but the service nevertheless endeavours
to process these as quickly as possible. 
4.3.3 As detailed in Table 2 below, processing speed for CTR New Claims is within
target for the period. 
4.3.4     Processing of CTR Changes in Circumstance (CIC) is well within target for the
reporting period. 
Page 37 of 214

Page 38

PUBLIC
Table 2 – Council Tax Reduction Performance Summary
Performance measure
4 Week Reporting
Period
12 February 2026
to
11 March 2026
Year to
date
position
Annual
Target
New Claims – processing time (no. of
days) 28 days 28 days 35 days
Changes in Circumstance –
processing time (no. of days) 3 days 3 days 7 days 
4.4 Housing Benefit Overpayments 
4.4.1 Council expenditure on Housing Benefit (HB) is largely funded by the DWP
via a process known as Housing Benefit Subsidy. 
4.4.2 Where a HB payment is found to have been made in error, a Housing
Benefit Overpayment debt (HBO) will be raised against the customer who
has been overpaid. This often negatively effects the level of subsidy the
Council receives.   
4.4.3 If an overpayment arises due to a customer failing to report a change in their
circumstances, the Council will receive subsidy amounting to 40% of the
overpayment value. These are known as Claimant Errors. If the
overpayment instead arises due to the Council not acting quickly enough on
information received, or as a result of staff error, the level of subsidy
received will either be 100%, 40%, or zero, depending on the cumulative
total of such errors during the financial year compared to total HB
expenditure. These are known as Local Authority Errors (LA Errors). 
4.4.4 Provided the total of LA Errors amounts to less than 0.48% of all HB
expenditure, 100% subsidy will be paid by the DWP to the Council to cover
this classification of error. If this threshold is breached but the ratio is not
greater than 0.54% of expenditure, the Council will receive only 40% subsidy
for LA Errors. Where the value exceeds 0.54% the Council loses out on all
subsidy for LA Errors. 
4.4.5 As of 22nd March 2026, the total of LA Errors was below the lower threshold at
0.38% of all HB expenditure which, if the position was maintained for the
remainder of the financial year, would result in the Council receiving 100%
subsidy for LA Errors. 
4.4.6 The service strives to minimise LA Errors and is closely tracking progress in
this area. The position has been improving month on month since the
situation reported at the November board (effective 12/10/25) when errors
were at 0.52% with a projected loss of £106k. 
Page 38 of 214

Page 39

PUBLIC
4.4.7 The migration of customers from HB to Universal Credit makes meeting the
LA Error thresholds increasing challenging due to the resulting overall
reduction in HB expenditure. 
4.4.8 Regardless of the level of subsidy received for a HBO, the service will
normally endeavour to recover the full amount of the overpayment from the
customer or landlord who has been overpaid. Appendix 3 shows year to date
HBO recovery performance. 
4.5  Discretionary Housing Payments 
4.5.1  The total budget for Discretionary Housing Payments for 2025/26 is shown in
Table 3 below. 
4.5.2 The budget shows the indicative spending split provided to the Council by
Scottish Government. 
4.5.3 The DHP budget has been calculated to include the full Scottish Government
estimate of the amount of funding required to fully mitigate the effect of both
the Benefit Cap and the Bedroom Tax.  These estimates include a 20%
reserve allocation, which will be paid in May 2026, if required. 
4.5.4 Between September & November 2025 Scottish Government announced two
additional sets of DHP funding for Renfrewshire Council totalling £36k to
support households in temporary accommodation in finding settled homes.
This is shown in Table 3 below. 
4.5.5 The total Financial Hardship budget currently available to the Council,
including the latest £36k funding, is now 98% of the equivalent spend during
2024/25. 
4.5.6 In line with DHP Policy and DHP Regulations, the Service makes awards to
fully mitigate the effect of the Benefit Cap and the Bedroom Tax and maximise
spend within the year. 
4.5.7 Table 4 shows the performance information in relation to DHPs. The table
shows that the average processing time in relation to DHP is within target. 
Table 3 – DHP Budget 
Funding – indicative allocations Amount
Renfrewshire Council £450,000
Financial Hardship – Scottish Government £256,782
Benefit Cap* – Scottish Government £190,792
Temporary Accommodation Support - Scottish Government £36,000
Bedroom Tax* – Scottish Government £2,622,438
Total budget for the year £3,556,012
Page 39 of 214

Page 40

PUBLIC
*These figures represent the maximum amount required to cover the estimated shortfall of
customers impacted by the Benefit Cap or Bedroom Tax. 
Table 4 – DHP Performance Summary 
Measure 1 April 2025 to 28 February 2026
Volume of DHP applications received 5,867 applications
Volume of DHP decisions made 5,709 decisions 
Number of DHP awards 5,439 awards 
Average processing time (target 29 days) 7 days
Total amount committed/paid £3,439,199 
4.6 The Scottish Welfare Fund 
4.6.1 The Scottish Welfare Fund (SWF) provides a safety net for vulnerable people
on low incomes through the provision of Community Care Grants and Crisis
Grants.  The Scottish Welfare Fund is a national scheme, underpinned by law
and delivered on behalf of the Scottish Government by all local councils.  The
SWF replaced elements of the Social Fund abolished by the Department for
Work and Pensions in 2013. 
4.6.2 The Service makes awards in 2025/26 in line with Scottish Government
guidance and had spent 83.5% of the total budget for the SWF by the end of
February 2026. 
4.6.3 The total budget for the SWF for 2025/26 is shown in Table 5 below. 
4.6.4 £600,000 of additional funding, previously allocated by the Council for 2024/25
SWF but then held in reserve, was approved for spend during 2025/26 at the
June 2025 meeting of the Finance, Resources and Customer Services Policy
Board. 
4.6.5 As highlighted in previous reports, the Scottish Welfare Fund budget was
under significant pressure, with almost 75% of the initial whole year budget
spent at the three quarters point in the year. This was alleviated by the
announcement of additional funding by Scottish Government as outlined in
4.6.6 below. Officers continue to monitor spend very closely to ensure funds
are sufficient. Looking at most recent trends there will now be sufficient
funds to continue making awards at the current priority level for the
remainder of 2025/26, this would have been unlikely without the additional
funds announced. 
4.6.6 The initial budget received from Scottish Government for 2025/26 was the
same as that for 2024/25. The First Minister’s announcement on 8th January
2026 confirmed additional £5.5m of funding for the SWF across Scotland, with
£193,000 being allocated to the Council under the distribution methodology. 
Page 40 of 214

Page 41

PUBLIC
4.6.7 In line with Scottish Government legislative guidance, applications for the
Crisis and Community Care Grants (CCGs) are categorised as Low, Medium,
High and High Most Compelling priority, both in terms of the circumstances of
the applicant and the items requested (in the case of CCGs). Due to the
financial pressure on the budget the Council has been awarding on a High
priority basis since May 2021 and has only ever made awards on a High Most
Compelling basis twice before, most recently in 2018/19 for a short period. 
4.6.8 Under High priority awards are likely to be made to customers considered
highly vulnerable and who are in immediate and severe need of the goods
applied for. With a switch to High, Most Compelling customers would need to
be both highly vulnerable and at immediate risk, with a need for goods which
is extremely severe. 
4.6.9  The performance data relating to the Fund is presented in Table 5 below.  The
Service processed both Crisis Grants and Community Care Grants within
target for the period. 
Table 5 – SWF Performance Summary (Crisis & Community Care Grants) 
Measure
1 April 2025 
to 
28 February 2026
Number of Crisis Grant applications received 8,356
Number of Crisis Grant Awards 5,385
Total amount paid for Crisis Grants £642,660.26
Average Processing time year to date (2
working days target) 2 days
Average Processing time within February 1 day
Number of Community Care Grant applications
received 2,616
Number of Community Care Grant Awards 1,487
Total amount paid for Community Care Grant £1,108,878.15
Average processing time year to date (15
working days target) 8 days
Average processing time within December 6 days
Total amount paid/committed from the fund £1,751,538.41  
Budget from Council 2025/26 £600,000.00
Initial Budget provided by Scottish
Government £1,252,119.00
Remaining Top-up Budget provided by
Scottish Government December 2024 £52,503.70
Top-up Budget announced by Scottish
Government January 2026 £193,000.00
Total Budget £2,097,622.70
Page 41 of 214

Page 42

PUBLIC 
_____________________________________________________________
Implications of the Report 
1. Financial - The level of collection of Local Taxation continues to provide funding
for the delivery of Council services throughout Renfrewshire.   The benefits which
are administered by the Service and have a statutory basis are managed in
accordance with those requirements. 
2. HR & Organisational Development – None. 
3. Community/Council Planning – 
• Our Renfrewshire is fair - An effective Benefits service is vital to the quality
of life of many of our citizens as it provides vital support for low income
households to sustain tenancies and meet their rent obligations.  
• Working together to improve outcomes - An efficient and effective billing
and administrative process for the collection of local taxes is vital for
ensuring the recovery of income to the Council to support the provision of
local services. This is supported by a range of payment opportunities for
the public, including electronic and digital payments (e.g. Direct Debit,
Website and Telephone). 
• Working together to improve outcomes – Efficient and effective customer
service is vital to ensuring that citizens have equality of access to Council
services, whether this is digitally, by telephone or face to face. 
4. Legal – the benefits which are administered by the Service and have a
statutory basis are managed in accordance with those requirements 
5. Property/Assets – None. 
6. Information Technology – None.  
7.  Equality & Human Rights - The recommendations contained within this report
in relation to performance updates has been considered in relation to its impact
on equalities and human rights. No negative impacts on equality groups or
potential for infringement of individuals’ human rights have been identified
arising from the recommendations contained in the report because it is for
consideration of performance only. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12.. Climate Risk – None. 
Page 42 of 214

Page 43

PUBLIC
13. Children’s Rights – The recommendations contained within this report in
relation to performance updates has been considered in relation to its impact
on Children’s Rights. No negative impacts have been identified arising from the
recommendations contained in the report because it is for consideration of
performance only. 
14. Cosla Policy Position – None.
_________________________________________________________
List of Background Papers 
None.
___________________________________________________________________ 
Author:           Emma Shields, Head of Business Services, Risk and Safety
Page 43 of 214

Page 44

PUBLIC
Appendix 1
RENFREWSHIRE COUNCIL
REVENUES COLLECTION STATEMENT AS AT 28 FEBRUARY 2026                    
COUNCIL TAX                      
2024/25   2025/26            
£m   £m                      
Projected Yield     110.304   122.243                                        
Gross Charges     115.377   127.657    
Less rebates     13.595   15.138                      
Net Charges Billed     101.782   112.519                      
Cash Collected     96.301   104.975    
Rebate Grant     13.595   15.138                              
109.897   120.113                      
Cash collected as % of Net Charges 94.62%   93.30%    
Income as % of Projected Yield 99.63%   98.26%                                                          
NON DOMESTIC RATES                    
2024/25   2025/26            
£m   £m                      
Projected Yield     108.979   109.467                                        
Gross Charges     140.801   142.995    
Less reliefs     29.598   31.294                      
Net Charges Billed     111.203   111.701                      
Cash Collected     111.883   108.822                      
Cash collected as % of Net Charges 100.61%   97.42%    
Cash collected as % of Projected Yield 102.66%   99.41%                    
Page 44 of 214

Page 45

PUBLIC
Appendix 2 
REVISIONS    
Where a claimant disputes a benefits decision in the first instance, they can request for it to be looked at again.
This is known as a Revision. The process involves a Senior Benefit Assessor reviewing the decision
thoroughly to decide whether the decision should stand. 
Target 28 days     
Result last report Oct’ 25: 16 days  Nov’ 25: 15 days  Dec’ 25: 10 days 
Result Last 3 months Dec’ 25: 10 days  Jan’ 26: 24 days  Feb’ 26: 14 days 
Comment:-  Revisions processed well within target. 
ACCURACY    
The Service proactively monitors the accuracy of benefits decisions made through a robust audit checking
programme. The Service targets to audit a minimum of 4% of calculations. 
Target %  Actual % 
Volume of Audits 2025/26  4%  16% 
Accuracy – February 2026  95%  96%          
Accuracy – 2025/26  95%  96% 
Comment:-  The Service continues to analyse errors and action trends/patterns by providing additional
guidance/training where needed. Accuracy is within target but continues recognised as a key priority for
sustained improvement, targeted training takes place following errors being identified and a detailed training
matrix is in place. 
APPEALS    
Where a claimant disputes a Benefits decision and also disputes a revision decision, they can formally make an
Appeal. The Benefits Service will prepare a detailed submission which is then considered by the Independent
Tribunals Service. Preparation of a submission is a very involved process and requires significant data gathering. 
Target processing speed
(number of days) 60     
Result: last 3 months
(days) December: 92 days  January: 15 days  February: 21 days 
Average (12 months to
date) 29 days     
Average Appeals
Completed 
(12 th t d t )
3 Appeals per
month      
Comment:- Appeals volumes are very low, which is expected due to reducing Housing Benefit caseload and are
well within target for January and February. Regrettably, as previously reported, the December figure reflects one
appeal which took far longer than target to resolve. Initial vetting of that appeal was delayed far beyond normal
practice. Had this delay not been coupled with extreme complexities it would still have been resolved within 60
days, but the involvement of multiple agencies slowed the process considerably. 
Page 45 of 214

Page 46

PUBLIC 
HOUSING BENEFIT OVERPAYMENTS    
The service is responsible for raising overpayments where Housing Benefit has been paid in
error. If these have resulted from errors made by claimants, the cost is partially funded by the
DWP. The service attempts to recover both newly raised and historic debts from claimants or
landlords as appropriate and the position is developing well towards the annual target. 
Overpayments raised 2025/26 £909,765 
Overpayments raised and
recovered in year £575,150 
% Recovery for above          
(Target 50%) 63.22% 
All recovery in year £1,204,058 
All recovery vs raised in year
(Target 120%) 132.35% 
All recovery vs all debt          
(Target 16.50% by yr end) 15.95% 
Total debt outstanding at end of
reporting period £6,342,731 
Page 46 of 214

Page 47

1 
PUBLIC 
___________________________________________________________________
To: Finance, Resources and Customer Services Policy Board
On: 23 April 2026
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Customer Services Performance Report
___________________________________________________________________
1. Summary
1.1 This report details performance across key Customer Service functions
including Call Centre, E-mail, Face to Face and Digital Support for customers
during February 2026.
___________________________________________________________________
2. Recommendations
2.1 It is recommended that the Board:
• Note the contents of the report. 
_________________________________________________________
3. Customer Service Provision
3.1 This section details the performance of the customer service centre for
February 2026. The report provides an update on the overall contact centre
call and e-mail volumes.  
Face to Face services continue in Renfrewshire House, and details of
customer volumes are provided in this report.
Demand for Digital Services remains high, and this report will update members
on the level of online transactions being completed and the performance of
the Digital Advisor “Millie”.
Item 5
Page 47 of 214

Page 48

2 
PUBLIC 
3.2 Contact Centre Performance
3.2.1 High level monthly summary – for the month of February, the contact centre
received 18,308 and answered 98% against a primary target of 90% for the
period.   
Table 1 – Customer Service Unit – Primary Target (call handling)
Primary target Year Calls Received February
Performance
Year to Date
90% calls
answered
2026 18,308 98% 98%
2025 21,288 98% 97% 
3.2.2 The call centre achieved the primary target of answering over 90% of calls
received.  
3.2.3 The secondary target is to respond to 70% of all calls within 40 seconds. 
Table 2 – Customer Service Unit – Secondary Target (call handling)
Secondary target Year February
Performance
Year to Date
70% calls in 40
seconds
2026 72% 70%
2025 68% 68%  
3.2.4 The contact centre achieved the secondary target and answered over 70% of
calls within 40 seconds. 
The total call volume is lower than the same period last year and members will
note continuing trend where we are seeing an increase in e-mails and onilne
transactions as the Digital Advisor provides customers with a choice in how to
interact with the Council. 
The process for Free School Meals and Clothing grant applications for the new
school session re-opened in June, and to date the team have processed 4,105
applications for Free School Meals and Clothing Grants and paid £668,100 in
clothing grants to 5,018 children. 
Page 48 of 214

Page 49

3 
PUBLIC 
For the same period last year, 4,277 applications were processed with
£706,380 paid to 5,454 children.
The applications for clothing grants in this school year closed on the 31st
March, however the team will continue to process requests for Free School
Meals.  Clothing Grant applications for the next school year will re-open in
June.
3.2.5 In addition to the calls outlined above, customers also contact the Council
using e-mail as their preferred channel.   
The e-mails received in the last three months for each service are outlined in
table 3 below. 
Table 3 – E-mail contact volumes 
Service December
2025
January
2026
February
2026
Blue Badge 268 383 367
General Enquiry 831 1028 1009
Environmental 85 54 35
Free School Meals / Clothing
Grants
48 28 25
Housing Repairs 1131 1453 1490
Licensing 273 421 488
Mybins 576 552 399
Roads and Lighting Faults 175 215 136
Garden Waste 19 13 27
Total e-mails handled 3,406 4,147 3,976 
The volume of e-mails has increased following the introduction of the digital
advisor.  Customers are being made aware of options in how to contact us
and we continue to see some now choosing to use digital methods like e-mails
and online services for non-emergency or routine enquiries, e.g. LED lighting
units, applying for larger bins, reporting misuse of a blue badge.  
3.3 Face to face service provision
3.3.1 The Customer Service Centre offers face to face support to customers where
this is required.  
3.3.2 Table 4 below shows the volume of customers who received face to face
support during the month of February 2025. 
Table 4 – Face to Face Customer Volumes
Service Total Customers
Birth Registration 80
Marriage Registration 45
Licensing 70
TOTAL 195
Page 49 of 214

Page 50

4 
PUBLIC
4      Digital Service Provision
4.1 Digital Advisor (Millie)
For the month of February, the Digital Advisor received 19,062 calls. 
Depending on the nature of the customers query, Millie will either provide an
appropriate response to the customer or will transfer the customer to the
correct advisor in the call centre.  Table 5 below shows the performance levels
for the month and year to date. 
Table 5 – Digital Advisor Performance 
Calls Received Transferred to
Advisor
Response
Provided
February 2025 19,062 64% 36%
Year to Date 242,169 63% 37% 
The top 5 reasons for transfers, which account for 76% of all transferred calls
are.
• Report a new housing repair 27%
• Council Switchboard  17%
• Council Tax   12%
• Automated Payments  10%
• Recycling    10% 
The team continue to monitor the performance of the digital advisor, and
make regular changes to improve the overall effectiveness of the service. 
4.2 Online Digital Services
The Council continues to see a high level of requests processed through the
online platform, with an additional 13,027 customers registered in the last
year. The total number of registered users on the MyAccount platform is now
126,062. 
Since the start of the financial year we continue to see customers using our
online service with 329,092 online transactions completed, which is 117,916
higher than the same period last year.  The graph below shows this increase
in online activity over the past 5 years.
Page 50 of 214

Page 51

5 
PUBLIC   
___________________________________________________________________
Implications of the Report
1. Financial – None 
2. HR & Organisational Development – None 
3. Community/Council Planning –  
• Working together to improve outcomes – An efficient and effective
Customer Services Unit is vital to ensuring citizens have equality of
access to Council services whether this is digitally, by telephone or
face to face. 
4. Legal - None 
5. Property/Assets - None 
6. Information Technology - None -   
7. Equality & Human Rights - The Recommendations contained within this
report have been assessed in relation to their impact on equalities and human
rights. No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report because it is for consideration of
performance only.   If required following implementation, the actual impact of
the recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the
Council’s website.   
8. Health & Safety – None 
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar
Online Transactions
2021/22 2022/23 2023/24 2024/25 2025/26
Page 51 of 214

Page 52

6 
PUBLIC
9. Procurement - None. 
10. Risk - None 
11. Privacy Impact - None 
12. Cosla Policy Position – Non applicable. 
13. Climate Risk – none. 
14. Children’s Rights –The administration of Free School Meals and Clothing
Grants has a positive impact on article 24 (Health, Water, Food,
Environment) and article 27 (Food, Clothing, A Safe Home) of the United
Nations Convention on the Rights of the Child.
_________________________________________________________
List of Background Papers 
(a)  None 
___________________________________________________________________ 
Author:           Gary Innes, Senior Service Delivery Manager (Customer and Digital
Operations)
Page 52 of 214

Page 53

PUBLIC 
_________________________________________________________________ 
To: Finance, Resources and Customer Services Policy Board 
On: 23 April 2026
__________________________________________________________________ 
Report by: Director of Finance and Resources
__________________________________________________________________ 
Heading: Civic Hospitality
__________________________________________________________________ 
1. Summary 
1.1 The following requests for civic hospitality have been received for the
financial year 2026/27. 
a) Correspondence had been received from Dates-n-Mates in relation to
their charity Ceilidh, requesting the possibility of sponsoring a table at
their event on Thursday 26th March 2026.  Dates-n-Mates is a charity
which supports adults with learning disabilities across Renfrewshire to
connect with one another, make friends, build confidence and help to
form lasting relationships. 
Following consultation with the Provost, it was agreed to sponsor a table
for Renfrewshire members at the cost of £500 and the Head of Corporate
Governance used his delegated authority to approve the request and
make the necessary arrangements. 
b) Correspondence had been received from the Mayor of the town Council
of Sant Vicenç de Torelló in Catalonia, the municipality in which the
Borgonya Colony is situated requesting the possibility of a small
reception for their visiting group, who were hoping to explore more of the
historical links between Borgonya and Paisley on 9th April 2026. 
Borgonya was founded in 1894 by J&P Coats who created an industrial
connection between the two towns by building a textile mill, workers from
Paisley went to Borgonya to impart their knowledge and skills which
cultivated a longstanding friendship between the towns, with a particular
affinity embedded in the shared love of football, with CD Borgonya
adopting the St Mirren FC colours. 
Item 6
Page 53 of 214

Page 54

PUBLIC
Following consultation with the Provost, it is was agreed to provide a tour
of the Renfrewshire Council chamber, followed by a light buffet lunch for
approximately 15 people at the cost of £200 and the Head of Corporate
Governance used his delegated authority to approve the request and
make the necessary arrangements. 
c) Correspondence has been received from the Provincial Grand Lodge of
Renfrewshire East in relation to their 200th anniversary, suggesting the
possibility of civic hospitality to accompany an event that they are holding
in Paisley Town Hall on Saturday 6th June 2026 for approximately 270
people. 
Following consultation with the Provost, it was agreed to provide a
welcome drink from local supplier Two Towns Down for the event as
detailed above at the cost of £840 and that it be delegated to the Director
of Finance & Resources in consultation with the Provost to make the
necessary arrangements.   
d) Correspondence has been received from Rays of Hope Cancer Support
in relation to a Charity Ladies Lunch event being held on Saturday 14th 
November at Ingliston Country Club suggesting the possibility that we
take a table of 10 at the event.   
Following consultation with the Provost, it is proposed that the Board
agree to take a table at the above mentioned event at the cost of £500
and that it be delegated to the Director of Finance & Resources in
consultation with the Provost to make the necessary arrangements.   
e) Correspondence has been received from St Mary’s Church in relation to
the 150th anniversary of their congregation and suggesting the possibility
of civic hospitality in the form of a hot buffet for approximately 200 people
to be held at their premises on Saturday 12th December 2026. 
Following consultation with the Provost, it is proposed that the Board
agree to the hospitality as detailed above at the cost of approximately
£2500 and that it be delegated to the Director of Finance & Resources in
consultation with the Provost to make the necessary arrangements. 
f) Each year Renfrewshire, in celebration of our Armed Forces has a flag
raising ceremony to thank our local armed forces community for their
continued service to our Country.  It is proposed that this year we
continue the tradition of the Flag raising service on Friday 19th June with
light refreshments in Paisley Abbey following this event.   
The Royal British Legion Scotland Paisley Comrades Branch together
with the 102 Field Squadron are collaborating on a family fun day for our
local Armed Forces community and families on Saturday 27th June and
have suggested the possibility of a contribution towards the costs of a
buffet for approximately 200 people. 
Following consultation with the Provost, it is proposed that the Board
agree to provide hospitality for Renfrewshire’s Armed Forces Day events
as detailed above at the total cost of approximately £2600 and that it be
delegated to the Director of Finance & Resources in consultation with the
Provost to make the necessary arrangements. Page 54 of 214

Page 55

PUBLIC 
1.2  The budget provision for 2026/27 for Civic Hospitality (including international
Links) is £46,460.  Should the above be agreed, and taking account of
previous decisions, the remaining balance would be approximately £30,370. 
2. Recommendations 
2.1 That the Board agrees to: (a) provide the hospitality as detailed above for the
Provincial Grand Lodge Renfrewshire East, St Mary’s Church congregation
and for the Armed Forces 2026 arrangements. (b) take a table at Rays of
Hope Cancer Support Ladies Lunch and; (c) that it be delegated to the
Director of Finance & Resources in consultation with the Provost to make the
necessary arrangements 
2.2 That the Board note the action taken by the Head of Corporate Governance in
terms of his delegated authority in respect of sponsoring a table for Dates-n-
Mates and the reception for visitors of Borgonya. 
Implications of the Report 
1. Financial – The costs of the request from civic hospitality will be met from the
2026/27 budget provision. 
2. HR & Organisational Development – None. 
3. Community/Council Planning – Civic receptions provide recognition of the
contributions made by individuals and organisations to the fabric of life in
Renfrewshire. 
4. Legal - None. 
5. Property/Assets - None. 
6. Information Technology – None. 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report. If required following implementation, the actual
impact of the recommendations and the mitigating actions will be reviewed
and monitored, and the results of the assessment will be published on the
Council’s website. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None.
Page 55 of 214

Page 56

PUBLIC 
11. Privacy Impact - None. 
12. Climate Risk – None. 
13. Children’s Rights – Not applicable. 
14. Cosla Policy Position – Not applicable. 
__________________________________________________________________ 
List of Background Papers 
(a) Background Paper 1 – Email correspondence in relation to the Dates-n-
Mates event 
(b) Background Paper 2 – Email correspondence from the Mayor of Sant
Vicenç de Torelló
(c) Background Paper 3 – Email correspondence from the Provincial Grand
Lodge Renfrewshire East
(d) Background Paper 4 – Email correspondence from Rays of Hope Cancer
Support
(e) Background Paper 6 – Email correspondence from St Mary’s Church 
The foregoing background papers will be retained within Finance & Resources
for inspection by the public for the prescribed period of four years from the date
of the meeting. The contact officer within the service is Donna Gallagher,
Member Services Officer (Telephone – 0141 487 1115, e-mail –
donna.gallagher- pt@renfrewshire.gov.uk) 
Author: Donna Gallagher – Member Services Officer. Tel: 0141 487 1115
E-mail donna.gallagher-pt@renfrewshire.gov.uk
Page 56 of 214

Page 57

PUBLIC 
___________________________________________________________________
To: Finance Resources and Customer Services Policy Board
On: 23 April 2026
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Digital Strategy 2025 – 2030 Update
___________________________________________________________________
1. Summary
1.1 The Council’s Digital Strategy 2025 – 2030 was approved by the Finance,
Resources and Customer Services Policy Board in April 2025. Since its
approval, the Council has made strong progress in delivering the Digital
Strategy 2025 – 2030 which is built around six strategic themes in support of
four strategic objectives. 
1.2 Annual progress reports are to be presented to members for noting and
scrutiny. The purpose of this report is therefore to provide members with an
update on the progress made within the last 12 months. 
2. Recommendations
2.1  Members are requested to:
a) Note the progress achieved over the past 12 months in delivering the
Council’s Digital Strategy 2025 – 2030. 
b) Note that the next progress report will be submitted for scrutiny in April 2027.
_________________________________________________________
3.  Background
3.1 We have made significant progress in recent years to invest in digital
technology and services, changing how we work and how our customers
interact with us. 
Item 7
Page 57 of 214

Page 58

PUBLIC
The Digital Strategy 2025 - 2030, which was developed using customer insights
and in consultation with senior managers from across the Council, builds on the
success and learnings from our previous strategy, and recognises the need for
bolder, Council-wide transformation. To ensure the successful delivery of this,
we identified the need for a strengthened corporate approach. We have created
a coordinated programme of work, built around six strategic themes in support
of four strategic objectives. We recognise that five years is a long time,
particularly in the digital world, so we will conduct a review of the strategy after
year two, to ensure our objectives are still relevant and aligned. 
The four strategic objectives are:
• Our employees and residents will be digitally capable and supported in the
use of digital solutions.
• We will achieve corporate transformation with a single coordinated
approach that breaks down operational silos.
• Data will become a critical asset to us and the backbone to our
transformation and future decision making.
• We will be a modern organisation, where our services, people and culture
are ready to deliver for the future. 
Achievement of these objectives is being managed through a programme of
work built around the following six strategic themes, which have been
developed in consultation with senior managers:
• Digital Inclusion.
• Data.
• Our Technology and Infrastructure.
• Digitally Enabled Workforce.
• Leadership and Culture.
• Digital Public Services. 
3.2 Theme 1 Digital Inclusion
3.2.1 Renfrewshire continues to advance a nationally recognised, partnership‑led
digital inclusion programme that helps residents access devices and
connectivity, build essential digital skills, and confidently use online public
services in an increasingly digital world.  Progress to date includes DigiRen,
Citizens Voice Forum, and National Recognition and Alignment. 
3.2.2 DigiRen
• Partnered with SCVO to establish an Essential Digital Skills baseline and
presented the 2024/25 annual impact report Creating a Fairer and Digitally
Inclusive Renfrewshire during DigiKnowVember.
Page 58 of 214

Page 59

PUBLIC
• 170+ events registered as part of DigiKnowVember, engaging 1,200+
participants through workshops, webinars, and community activities to
boost digital confidence.
• The Network now includes 200+ individuals from 70+ organisations
(Renfrewshire-based and national), deepening collaboration and extending
support into more settings. 
3.2.3 Citizens Voice Forum 
• Members collaborate to advance digital inclusion priorities, access, skills,
confidence, and meaningful use, ensuring no community is left behind.
• The Fairer Renfrewshire Fund continues to support the Digital Champions
project, delivering 2,000+ volunteer hours and helping 800+ learners,
scaling peer-to-peer learning.
• DigiZones have seen 71,000+ visits, offering free device access, public Wi-
Fi, and tailored support. An early-phase evaluation is underway to inform
future scaling, with refined quarterly impact reporting.
• The Pachedu ‘E-Quality Access’ project, a community-led device reuse
initiative, soft-launched during DigiKnowVember and is in the process of
rolling out across four pilot libraries, reducing e-waste, promoting
sustainability, and supporting RenZero goals. 
3.2.4  National Recognition and Alignment
• Renfrewshire is the only Scottish Council referenced in the refreshed
national Digital Strategy for its leadership in digital inclusion.
• Digital inclusion is embedded as a standalone strategic priority within
Renfrewshire’s ambitious Digital Strategy and the CLD Plan 2024–2027. 
3.2.5 Renfrewshire’s digital inclusion approach continues to evolve, with ambitious
plans for 2026 that include signing Scotland’s Digital Inclusion Charter to align
with national standards, exploring data-driven insights to predict and prevent
digital exclusion, and developing a Digital Inclusion e-learning module with the
Scottish Government, initially for the third sector and later for citizens.
Furthermore, we will look to expand DigiZones into Health & Social Care
Partnership venues, leverage community benefits in contracts to create
opportunities for communities and third sector partners, support the rollout of
MyCare.Scot to enable digital access to health and care services, and publish
the DigiZones early implementer evaluation report to inform scaling and
continuous improvement.  
Page 59 of 214

Page 60

PUBLIC
3.3 Theme 2 Data 
3.3.1 The Data Strategy Framework, developed and approved in 2023, was reviewed
and updated to ensure it continues to be fit-for-purpose. Service Improvement
Plans have been updated across all Directorates to include data improvement
activities, ensuring appropriate visibility and tracking of progress. Activities are
relevant to each Directorate based on requirements aligned to the Data
Strategy but broadly includes data analysis and visibility for senior decision
makers, dashboard opportunities, Customer Services performance statistics,
data skills gaps, and data quality improvement activities. The Data Catalogue
created and populated by Data Advisory Group representatives, continues to
be reviewed and updated, providing a register of Council critical data sets and
ownership. 
3.3.2 The Data Advisory Group is progressing a range of practical data
improvement activities aligning with the Data Strategy Framework, including:
• Providing training for identified common skills gaps, such as the practical
analysis and management of data, through training videos and supporting
discussions lead by the Data Analytics Manager.
• A Technical Sub-group has been created to provide a forum for deeper
dives into technical data challenges, such as address consistency across
systems.
• Progressing investigation of data aggregation and processing opportunities
on new technologies, through a practical use-case in partnership with
HSCP.
• Continued support for AI roadmap development.
• Providing a place to present and discuss the data-related activities of
services, encouraging others to share insights, learn from each other, spot
opportunities for collaboration, and improve the value of our data. 
3.4 Theme 3 Technology and Infrastructure
3.4.1 The Housing Innovations Project (HIP) is a two-phase implementation with
Phase 1 being transition from OHMS - a twenty-year-old housing management
on premise system - to NEC Housing as a cloud-based service.  Phase 1
focuses on housing management and creating a streamlined integrated and
scalable management system harnessing modern technology to provide a
better user experience and ultimately benefiting our tenants by providing a
more streamlined, aligned service. Since contract signing with NEC and kick off
in January 2025, the project team has conducted over 70 solution design and
configuration sessions across rents, allocations, estates, anti-social behaviour,
Customer Services, servicing and interfaces and integrations with
finance, GIS and document management. The team have also embedded a
benefits realisation approach, completed test cycle 1 and developed a training
programme for end users. HIP Phase 1 is due to go live in late 2026.
Page 60 of 214

Page 61

PUBLIC 
3.4.2 November 2025 saw the successful launch of the new Procure to Pay (P2P)
service comprising an improved P2P operating model and the launch of the
Business World Procurement Module replacing PECOS. This launch was the
culmination of months of work from Finance, Business World ERP
and Procurement colleagues, supported by the Project Management team and
in collaboration with colleagues from across the organisation. Following the
successful launch of the P2P service, the team will continue to improve use of
data, gain the most from the new technology’s capability, and make interactions
with suppliers as efficient as possible. As with Phase 1, the team will engage
across the organisation to harness local knowledge, promote innovation and
optimise the design of the operating model going forward.   
3.4.3 In 2025, major steps were taken to strengthen cyber resilience and protect the
Council’s digital assets, successfully passing Public Services Network
(PSN) and Payment Card Industry (PCI) accreditations, ensuring we meet the
highest security standards. The team rolled out mandatory cyber training for all
staff to boost awareness and safe practices. This includes phishing awareness
training for staff who click once on phishing campaign emails, plus follow-
up tutor-led training for staff who click more than once. The Classification
Scheme & Sensitivity Labelling for Corporate and Schools staff was
successfully rolled out in November and the team supported Civil
Contingency Business Continuity Planning (BCP) events to raise cyber risk
awareness among departments and senior leadership. The team also
implemented password strength testing and Multi-Factor Authentication (MFA)
rollout across the Council. Both of these were significant activities and further
enhance the protection of the Council network. 
3.4.4 The reduced Council print estate was rolled out by the end of November 2024
and all sites have access to a printer. From that point the Council has been
securing savings on lease costs and the project continues to work with services
to reduce the volume of printer usage to further reduce the costs to the Council
with regular reports on usage taken to the Performance Board. In June 2025
the Council moved to fully using recycled paper across the print estate. This
also adds to the savings being generated and positively contributes to the
Council’s Net Zero objectives. 
3.5 Theme 4 Digitally Enabled Workforce
3.5.1 In 2025, significant progress was made in digital learning and upskilling,
particularly in how learning is assigned, tracked, and reported. Integration
between Business World ERP and iLearn has been central to these
improvements. 
Page 61 of 214

Page 62

PUBLIC
3.5.2 In 2025, we started using Job Characteristics in Business World ERP to simplify
the assignment of mandatory learning to specific positions. This ensures our
approach is more scalable and allows for more granular and role specific
learning assignment moving forward. 
3.5.3 Using the Job Characteristics in Business World ERP, and in particular the
option to alert users when required courses have not been completed, allowed
learners to stay on top of their own learning proactively. This has resulted in
mandatory completion levels across all services going up to record levels from
56% at the end of 2024 to 87% at the end of 2025. 
3.5.4 To ensure inclusivity, we also worked with front line colleagues to offer ‘Tool
Box Talks’ alternatives. With a huge effort from Environment, Housing &
Infrastructure in particular, this has resulted in well over 1,000 mandatory
course completions for front line, non-networked colleagues who we would not
have been able to reach historically via the digital approach.   
3.5.5 Over and above the mandatory learning, iLearn has been widely used for all
types of e-learning courses, with over 8,000 colleagues accessing iLearn and
completing a total of 73,500 courses in 2025 alone. This has again highlighted
the effectiveness of iLearn and e-learning for reaching and upskilling a wide
audience. 
3.5.6 To strengthen quality assurance and ensure continuous improvement,
feedback forms were embedded within all mandatory and corporate induction,
as well as newly added courses in iLearn. These allow colleagues to rate each
course out of four stars and provide optional written comments. Introduced
around a year ago, this approach has already generated over 25,000
responses, with an average 3.57 rating out of 4 (and less than 1% giving 1 star).
We continue to act on feedback provided as we get it, including cleaning up
quizzes or fixing links. 
3.5.7 Work has started on using the Course Schedular feature of Business World
ERP, allowing instructor led courses to be scheduled, and attendance recorded
in Business World ERP directly. This will ensure both instructor led, and e-
learning course completions are recorded and tracked via Business World ERP
for a comprehensive learning record. 
3.5.8 Work has been done to establish essential digital skills for networked
colleagues at Renfrewshire Council, based on the Scottish Council for
Voluntary Organisations framework and tailored to our needs. Uptake
measures are in place, through insights from M365 usage, course completions
as well as network accesses, giving us an understanding of where upskilling
is required at all levels.  
Page 62 of 214

Page 63

PUBLIC  
3.5.9 In support of the essential digital skills, and to ensure we are making the most
of our M365 licenses, new iLearn courses for each of the M365 apps are being
worked on to ensure learners can access relevant support for their role. These
courses will complement our existing M365 Learning content accessible directly
via the Teams app which provide guides relevant to how the M365 apps are
used at Renfrewshire Council. 
3.5.10 We are reviewing the corporate induction content as well as processes, to make
them mandatory and trackable, with alerts similar to existing mandatory
courses. This will ensure new starters meet corporate requirements and gain
essential digital skills as needed. This process will also involve capturing
alternative induction delivery methods, such as face to face for a more
comprehensive and accurate view on corporate induction completion. 
3.5.11 Our staff based Digital Champions network continue to meet on a regular basis,
sharing best practices around the use of M365 and other Council tools within
their services, while also supporting the roll out of Council wide digital initiatives
such as Windows 11 and the Green Print initiative.   
3.6 Theme 5 Leadership and Culture 
3.6.1 Managers now have access to an expanding set of dashboards and reports
within Business World ERP, giving them direct visibility of key people
information such as mandatory learning compliance, absence data and
team-level workforce insights. This shift towards digital self-service supports
more consistent and informed management decisions, reduces reliance on
manual processes, and helps embed a culture where ERP is fully utilised as
the primary source of people information. 
3.6.2 Work is underway on a new Leadership Development Programme designed to
support managers at different levels across the organisation. The programme
will include a strong focus on digital leadership skills, ensuring leaders
understand both the digital tools available to them and the behaviours and
mindset needed to operate confidently in a modern, data-driven organisation. 
3.6.3 A new set of mandatory courses specifically for line-managers is being
introduced and will be managed and tracked through Business World ERP. The
first course to launch is Managing Absence, which will help establish a
consistent baseline of expectations for anyone with line-management
responsibilities. Additional modules will follow to ensure managers are
equipped with the knowledge and behaviours required for effective people
management and digital adoption. 
Page 63 of 214

Page 64

PUBLIC
3.6.4 The Digital Champions network continues to play a key role in building a
collaborative digital culture across services. Work is ongoing to expand the
network, while supporting Champions to assist their colleagues digitally,
including supporting the rollout of new systems and tools. This peer-support
model reinforces digital growth, encourages colleagues to make fuller use of
the Council’s digital tools — particularly our M365 apps — and helps embed
the behaviours needed for a modern, digitally confident organisation. 
3.7 Theme 6 Digital and Public Services
3.7.1 The introduction of Millie, the Council’s AI phone assistant, has resulted in
significant improvements in customer service performance, channel shift,
operational efficiency, and citizen experience. As of November 2025, across
380,606 AI-handled calls, Millie has accurately answered 134,777 questions,
reducing pressure on Customer Service Advisors and offering residents a
faster route to information 24/7. Deflection rates - one of the strongest indicators
of AI success - show a clear and sustained ability to autonomously resolve
queries. When excluding auto-escalations, Millie has achieved 39.82%
effective deflection, meaning four out of ten people receive everything they
need through the AI without requiring a human advisor. In recognition
of this cutting-edge project, Millie and the Customer Services
team were recognised at the COSLA Excellence Awards and more recently at
the Holyrood Scottish Public Service Awards. Based on the success of Millie,
and learning established from the AI innovation being progressed by other
Councils across the UK, an AI Transformation Assessment has been
progressed by the Council, supported by ICS.AI, our procured AI partner. 
3.7.2 The Digital Experience (DxP) team successfully launched the new Council
website, streamlining the website, improving navigation for users, and
enhancing the overall user experience. This is a UK first and this user-centric
approach has drawn positive attention from senior figures at GOV.UK and the
Scottish Government. A Consultations Hub has been created, streamlining
public consultations and encouraging greater community engagement with
council initiatives. In addition, the team modernised our communications by
transitioning to the Sendgrid platform, which now enables us to reach residents
more effectively through email, SMS, and WhatsApp. The DxP programme
has ambitious plans for the coming year. The team will complete the migration
and update of all remaining content to the new website. The intranet will also
see significant improvements, with priority content being rewritten and moved
to enhance internal communications and resources. The Health and Social
Care Partnership (HSCP) website is set to be fully integrated into
Renfrewshire.gov.uk, further unifying our digital presence. Finally, the team are
preparing to support the future use of AI at the Council, ensuring the
Council remains at the forefront of digital innovation.  
Page 64 of 214

Page 65

PUBLIC 
3.7.3 The Digital Portfolio has a Digital Board, with representation from across all
Council services and partners. It also has Elected Member representation. The
purpose of this Board is to support successful delivery of the in-focus
projects, provide assurance and help to overcome challenges and barriers that
may impact progress. It is also a useful forum for information sharing and to
support each other to deliver on key priorities. The Board meets approximately
6 times a year.  Digital is increasingly part of our everyday life, and as such
most projects undertaken regardless of the programme or portfolio of work,
will likely have a digital implication. Over the coming months, and to ensure that
decisions regarding digital solutions are being made with all key subject matter
experts round the table, the team are proposing to establish a Change Advisory
Board (CAB). It will be expected that services will bring new projects to a CAB
meeting for discussion before they can proceed. Only once approval at CAB
can the project then proceed for corporate monitoring via the Transformation
Board. Depending on the nature of the project, and whether they align with the
Digital Strategy’s strategic objectives, they may become an in-focus project for
the Digital Board. 
3.7.4 The Smart Social Housing (SSH) project sets out an ambition to develop a
business case opportunity to secure the deployment of market leading fibre
broadband connectivity and smart sensor assets into the Council’s social
housing units at no cost to the tenant. 
3.7.5 As outlined earlier in the report, the Council has successfully driven forward the
development of Millie, our Digital AI Advisor since her launch in November
2024. During the implementation of Millie and its associated success as a
transformation project, it was recognised that the Council was at the forefront
of AI development in Scotland and as part of sourcing suitable partner Councils
to work with, opportunities have been explored on a wider basis across the UK.
In this context, the Council officers have established productive relationships
and regularly engaged with Derby City Council who have also launched an AI
driven Digital Advisor called ‘Darcie’ as part of a wider corporate transformation
programme underpinned by AI innovation. In December 2024, Derby City
Council announced a corporate wide AI innovation programme as a key part of
their overall transformation and financial saving programme. This programme
has been underpinned by an AI Transformation Assessment which was
undertaken by the council with the help of an external AI partner. An AI
Transformation Assessment is designed to support a council to evaluate current
AI readiness, identifying opportunities for AI-driven improvements, and
developing a structured roadmap for AI adoption. Derby City Council have
welcomed establishing a working relationship with the Renfrewshire Council
and have been open and highly collaborative in sharing their journey thus far to
develop their AI capability. 
Page 65 of 214

Page 66

PUBLIC
It is envisaged that the working partnership will provide future opportunities to
jointly share best practice as well as development capacity to support
accelerated adoption by both organisations. 
3.7.6 Based on the success of Millie so far, and learning established from the AI
innovation being progressed by Derby City Council (and some other local
authorities across the UK), an AI Transformation Assessment has been
progressed by the Council over the second half of 2025, supported by ICS.AI,
our procured AI partner. The work progressed during 2025 has seen the
completion of a significant programme of stakeholder engagement, workshops,
data analysis, financial validation solution demonstrations and trials. This AI
Transformation Assessment has provided the Council with a developing
understanding of how AI solutions can enhance efficiency, reduce costs, and
improve service delivery. Senior officers from across all Council services have
been actively working with our AI partner on a challenge and validation stage
to ensure that the output from this critical initial assessment stage is sufficiently
credible and robust to support the development of a full business case. 
3.7.7 This business case is now complete and has been reviewed and approved by
the Corporate Management Team in March 2026. The business case provides
a clear understanding of the scale of opportunity and the key priorities for
building on the success of Millie and progressing the Council’s sector leading
development of AI capability. It presents a strategic pathway to achieve both
financial sustainability and service excellence through targeted artificial
intelligence implementation. A key part of the business case is the
implementation of AI which will require strong governance arrangements. The
Council recognises that as AI becomes a larger part of public service delivery,
ethical governance and transparent safeguards are essential to protect
residents’ rights, prevent bias, and ensure AI continues to support key services
and our valued workforce. As AI technologies learn over time, ongoing
oversight and regular updates to elected members are necessary to ensure
safe, transparent and responsible use as these systems evolve. 
3.7.8 Throughout the development of the business case, it has been highlighted the
significance of maintaining human oversight in decision making even where AI
tools are integrated to alleviate administrative burdens. This represents one of
the most significant digital transformation opportunities for Renfrewshire
Council over the medium term to support the delivery of both financial savings
but critically delivery of better services and outcomes but also improved ways
of working as an organisation and better supporting and equipping our
workforce. This transformation represents significant strategic investment
requiring robust risk management. 
Page 66 of 214

Page 67

PUBLIC
All risks have been comprehensively assessed with detailed mitigation
strategies (e.g. staff adoption and change resistance, savings not materialising
as projected, data quality and availability, etc.). The overall risk assessment is
classed as manageable with comprehensive mitigations. The Council can
proceed with confidence that both financial and delivery risks are manageable
and protected. 
4. Next Steps (2026) 
4.1 The next year looks to be an equally busy and exciting time for the digital
portfolio programme of work. We will continue to prioritise work that meets the
key objectives and themes as articulated in our Digital Strategy (2025–2030).
4.2 The validation of an AI business case focussed on opportunities to further
deploy AI technologies across the organisation, including a roadmap for
implementation. 
4.3 Following the successful launch of our P2P service, we will continue to improve
our use of data, gain the most from our new technology’s capability, and make
our interactions with suppliers as efficient as possible. As with Phase 1, we will
engage across the organisation to harness local knowledge, promote
innovation, and optimise the design of the operating model going forward. 
4.4 The Data Advisory Group (DAG) will continue to be essential moving forward
in supporting our digital transformation activities. 2026 will see the ongoing
creation of a Technical Sub-group for deeper dives into technical data
challenges. DAG will also be progressing the investigation of data aggregation
and processing opportunities on Microsoft’s Fabric platform, through a practical
use-case. Fabric could be crucial for the success of further AI opportunities as
a go-to location for trusted, accurate data. 
4.5 Signing up to Scotland’s Digital Inclusion Charter, reinforcing our commitment
to national standards and exploring innovative ways to predict and prevent
digital exclusion using data-driven insights, aiming to identify risk factors before
they become barriers. The team will also be publishing the DigiZones early
implementer evaluation report, sharing lessons and successes to inform future
scaling. 
Page 67 of 214

Page 68

PUBLIC 
Implications of the Report 
1. Financial 
The Digital Strategy 2025 - 2030 is supporting the Council’s ongoing financial
sustainability which is dependent on the ability of the Council to transform and
modernise services.  
2. HR & Organisational Development – None.
.
3. Community/Council Planning 
Renfrewshire’s Council Plan 2022-2027 sets out how we will work with partners,
communities and business to achieve lasting positive change across Renfrewshire.
The Council Plan has five strategic outcomes, these are - Place, Economy, Fair, Green
and Living our Values. Our digital ambition threads through all of these strategic
outcomes and the delivery of this Digital Strategy will support the Council to achieve
our vision for Renfrewshire, taking into consideration of national digital initiatives.
Across Council services, Service Improvement Plans (SIP) act like delivery plans for
the Council Plan, showing how service activity contributes to the overall delivery of our
strategic outcomes. Similarly, our digital progress can also be reported through SIP
where appropriate. The Council has developed four core values which guide how we
deliver our services and make decisions every day. All of these values are relevant to
the Digital Strategy, but collaboration and learning are key to the successful delivery
of our digital vision. 
4. Legal - None. 
5. Property/Assets – None. 
6. Information Technology – As outlined in the report. 
7. Equality & Human Rights – None. 
8. Health & Safety - None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
Page 68 of 214

Page 69

PUBLIC
12. Climate Change – None. 
13. Children’s Rights – None. 
14. Cosla Policy Position – None.
_________________________________________________________ 
List of Background Papers 
Digital Strategy 2025 – 2030. 
___________________________________________________________________ 
Author:  Patrick Murray, Head of Digital, Transformation and Customer Services
Page 69 of 214

Page 70

HS/02/10/477 
PUBLIC 
To:  Finance, Resources and Customer Services Policy Board 
On:  23 April 2026 
Report by: Director of Finance and Resources 
Heading: Corporate Policy on the Management of Radon 
1. Summary
1.1 The policy attached to this report ensures that we meet our legal obligations in
line with the requirements of the Ionising Radiations Regulations 2017 and
provide a safe and supportive living and working environment. 
1.2 The Health and Safety at Work Act 1974 and the Management of Health and
Safety at Work Regulations 1999 (as amended) places duties on the Council to
ensure, so far as is reasonably practicable, the health of our employees and
others that could be impacted by acts or omissions.   
1.3 Following approval from Members, Officers will follow an engagement plan to
work with Housing and other Services to implement the Policy.   
2 Recommendations 
2.1 Members are asked to approve the Corporate Policy on the Management of
Radon. 
3. Policy Background. 
3.1 This Corporate Policy on the management of radon has been developed in
response to a reclassification by the UK Health Security Agency (UKHSA) and
the British Geological Survey (BGS). Using an updated statistical modelling
approach, these bodies have identified certain areas of Renfrewshire as having
a higher potential for radon occurrence due to local ground conditions. This
reclassification does not reflect any change in the underlying geology, or the
actual levels of radon being emitted. 
Item 8
Page 70 of 214

Page 71

HS/02/10/477 
PUBLIC 
3.2 As a result of this reclassification, the Council has implemented a programme
of radon monitoring across selected Council homes, operational buildings,
schools and nurseries within the affected areas of Renfrewshire. This
programme will provide evidence-based data on actual radon levels and inform
any necessary actions to reduce exposure where required. 
3.3 The Policy establishes a clear governance framework for the management of
radon risks, defines roles and responsibilities and ensures effective
maintenance of control measures. 
___________________________________________________________________ 
Implications of the Report
1. Financial - There may be minor cost implications associated with implementing
radon protection measures in both new-build and existing properties located
within radon-affected areas. 
2. People & Organisational Development - This policy supports the Council’s
commitment to the health, safety, and wellbeing of employees by managing
their exposure to radon. 
3. Community/Council Planning – This policy supports the Place and Green
objectives contained within the Council plan. 
4. Legal - The Council will continue to comply with current health and safety
legislation and best practice. 
5. Property/Assets - There is a potential risk of minor impacts to our property
assets associated with the requirement to implement radon protection
measures across both new-build developments and existing buildings situated
within radon-affected areas. 
6. Information Technology - Not applicable. 
7. Equality & Human Rights 
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have
been identified arising from the recommendations contained in the report as it
is for noting only. If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website. 
8. Health & Safety - This policy strengthens the Council’s governance
responsibilities by demonstrating its commitment to maintaining robust and
effective health and safety radon management across its property assets.  
Page 71 of 214

Page 72

HS/02/10/477 
PUBLIC
9. Procurement – Not applicable 
10. Risk – This policy supports the Council’s overarching governance framework
by aligning with the effective management of radon risk across the Council’s
property assets
11. Privacy Impact - Not applicable.
12. Climate Risk – Robust health and safety practices strengthen the Council’s
governance responsibilities by supporting effective radon environmental
controls across its property assets.
13. Children’s Rights – Not applicable
14. Cosla Policy Position - Not applicable.
___________________________________________________________________
List of Background Papers: Corporate Policy on the Management of Radon 
___________________________________________________________________ 
Author:  Steven Fanning, Strategic Health, and Safety Manager 
Page 72 of 214

Page 73

PUBLIC
Issue Number: HS/##/## 
Issue Date: ##/2026 
Review Date: ##/20## 
This document is
available in alternative
formats on request. 
Renfrewshire Council
Corporate Policy on the
Management of Radon in
Council Homes and
Workplaces  
Page 73 of 214

Page 74

PUBLIC
1 Introduction ................................................................................................................... 3
2 Radon properties............................................................................................................ 3
3 Health implications ........................................................................................................ 3
4 Radon Thresholds .......................................................................................................... 4
5 Legal duties ................................................................................................................... 4
6 Internal responsibilities .................................................................................................. 5
7 Information and training ................................................................................................. 6
8 Management of radon..................................................................................................... 7
8.1 Risk Assessment .................................................................................................... 7
8.2 Radon monitoring ................................................................................................... 7
8.3 Record keeping ....................................................................................................... 8
9 Radon protection measures ............................................................................................ 8
9.1 New buildings ......................................................................................................... 9
9.2 Existing buildings .................................................................................................... 9
10 Review of policy and procedures ..................................................................................... 9
10.1 Regular review ............................................................ Error! Bookmark not defined.
10.2 Review as a result of legislative changes ...................... Error! Bookmark not defined.
10.3 Review as a result of incidents, complaints or corrective action . Error! Bookmark not
defined. 
APPENDIX 1 – Building Radon Checklist ................................................................................ 10
APPENDIX 2 Generic risk matrix and action protocol ............................................................. 13
APPENDIX 3 – Recording maintenance visits and the operational state of radon remedial   
measures ............................................................................................................................ 17   
Page 74 of 214

Page 75

PUBLIC
1 Introduction
This document sets out the Council’s policy for managing risk associated with
exposure to radon by employees and persons using Council buildings. Long
term exposure to radon may increase the risk of developing lung cancer,
especially for smokers.
This policy has been developed in line with the general principles outlined in the
Council’s Health and Safety Policy and should be used in conjunction with
relevant legislation, Health and Safety Executive (HSE)/UK Health Security
Agency (UKHSA) guidance, and other recognised procedures relating to the
presence of radon in buildings.
Where Services occupy premises that are not owned/managed by the Council,
they should ensure that the presence of radon is managed by a system
comparable to that described in this document
2 Radon properties
Radon is a naturally occurring colourless, odourless radioactive gas. It is formed
by the radioactive decay of small amounts of uranium and radium that are
naturally present in rocks and soils. As a gas, it can seep out through cracks and
fissures in the subsoil and will either be released to the atmosphere or can
accumulate in the spaces beneath and within buildings.
Areas of the UK where UKHSA/British Geological Survey estimate that 1% or
more of homes will have a radon level above 200 Becquerels/m³ (Bq/m³) are
designated ‘radon affected’ areas. An interactive map showing these areas (as
1km grid squares) is freely available online:
(www.ukradon.org/information/ukmaps).
The vast majority of Renfrewshire is currently mapped as Class 1 (not radon
affected). However, some small areas are shown as radon affected areas –
these go up to Class 6, where >30% of properties are estimated to have radon
>200 Bq/m3.
The Council implemented a programme of testing for radon in Council properties
in these areas during 2025 and will continue to monitor those properties on a
scheduled basis.
3 Health implications
Most of the radon gas breathed in is immediately exhaled and presents little
radiological hazard. However, the decay products of radon are radioactive solids.
These particles attach to atmospheric dust and water droplets which, when
breathed in, can become lodged in the lungs and airways.
Some decay products of radon emit harmful radiation called alpha particles,
which can cause cellular damage within the lungs.
The largest exposure arises in domestic settings (due to the amount of time
generally spent at home) but significant exposures can also occur in the
workplace. Studies have shown that the risk from radon exposure at 100 Bq/m3
Page 75 of 214

Page 76

PUBLIC
over 30 years increases the risk of lung cancer by 5-31%1. The absolute risk is
estimated as 25 times greater for smokers than non-smokers2. UKSHA reports
that the dose-response relationship appears linear, and that there is no evidence
of a ‘safe’ concentration below which there is no risk.
4 Radon Thresholds
The workplace action level specified in the Ionising Radiations Regulations 2017
(IRR 2017) is 300 Bq/m³ as an annual average. Where this is exceeded,
employers are legally required to notify the Health and Safety Executive (HSE)
and take prompt action to restrict employee and public exposure to below the
relevant annual dose limit (e.g. an effective dose of 1mSv per year for members
of the public)3. 
The residential action level (set out in the UK National Radon Action Plan, 2018)
is 200Bq/m3 as an annual average. A target level of 100 Bq/m3 has also been set
as the ideal outcome following remedial action in existing homes and inclusion of
protective measures in new homes.
The UKHSA recommends that the domestic target level is also applied to
schools and buildings with public occupancy exceeding 2000 hours per year. In
domestic settings, UKHSA recommends that action to reduce radon exposure is
taken where the target level is exceeded (even if below the action level)
particularly where there are smokers in the household.
The Council will therefore adopt a ‘threshold level’ of 100 Bq/m3 in all our
properties (including workplaces and homes) as the point at which we will
consider whether remedial action to reduce radon exposure is appropriate.
5 Legal duties
The Council recognises its responsibilities as an employer and landlord and aims
to reduce exposure to radon to the lowest level that is reasonably practical, and in
all cases below the specified action levels, by:
• Identifying and testing for radon in Council buildings in radon affected areas.
• Having clear procedures in place for the management of radon in affected
buildings.
• Developing and maintaining records of radon levels in Council buildings.
• Providing suitable information, training and advice to employees and other
persons likely to be exposed to radon in Council buildings.
• Consulting, where necessary, with the Council’s Radiation Protection Adviser
(RPA), HSE, UKHSA and specialist consultants. 
1https://assets.publishing.service.gov.uk/media/5a7ea84aed915d74e6225a5d/RCE-  
2 https://www.who.int/news-room/fact-sheets/detail/radon-and-health 
3 Schedule 3 Part 1(5) of The Ionising Radiation Regulations (2017)
Page 76 of 214

Page 77

PUBLIC
• Ensuring that any remedial measures put in place to reduce the level of radon
in a property are monitored and maintained effectively; and
• Reviewing its policy and procedures relating to radon as required.
6 Internal responsibilities
General health and safety responsibilities are detailed in the Corporate Health,
Safety and Policy. Specific responsibilities in relation to radon are detailed below.
The Director of Environment, Housing & Infrastructure must ensure that sufficient
resource is made available to:
• Provide competent advice on radon risk.
• Conduct radon risk assessments and monitoring where required.
• Provide competent information, instruction and training to staff, and
• Ensure the effective implementation of radon control measures throughout the
Council estate.
Specific tasks include:
• The Environmental Health & Community Safety Manager from Climate,
Public Protection & Roads has been appointed for the co-ordination of radon
protection within Renfrewshire Council. This officer will be the main liaison
between both internal Council Services and external bodies.
• Identifying Council buildings that require risk assessment (including testing)
using the BGS/UKSHA’s definitive ‘radon potential’ dataset. This licensed
dataset from BGS is available to the Council via the Public Sector Geospatial
Agreement (PSGA).
• Identifying Council workplaces with basements that are occupied for more
than 50 hours per year, and ensuring they are monitored whether in radon
affected areas or not, in line with UKHSA advice
• Ensuring radon risk assessments are completed for Council properties in
radon affected areas, and that subsequent recommendations are
implemented.
Although it is the responsibility of the Director of Environment, Housing and
Infrastructure, for the tasks above, effective radon management will require input
from other Council services and directorates, and appropriate cross-service staff
collaboration/delegation will be expected.
The Head of Housing, the Head of Facilities and Property Services and the Head
of Climate, Public Protection & Roads will be responsible for ensuring that:
• Contract and engineering works are undertaken in accordance with best
practice and in a manner that eliminates, reduces or controls identified radon
risks.
Page 77 of 214

Page 78

PUBLIC
• a database of Renfrewshire Council properties in radon affected areas is
maintained (in line with current UKHSA/BGS radon datasets).
• all new Council buildings in radon affected areas are designed with the
appropriate level of radon protection.
• where radon protection is required, a suitable contractor(s) is identified with
the appropriate training and expertise to design and carry out remedial works.
• a programme of regular, recorded inspections and testing is maintained to
demonstrate that radon protection works are undertaken to the required
standard and that any control measures in Council buildings are performing
satisfactorily, and 
• radon is included in risk assessments for all Renfrewshire Council controlled
workplaces and homes in radon affected areas.
Responsible Persons (RP) in premises that have radon shall:
• maintain all on-site records pertaining to radon control measures, including risk
assessments, test results and inspection reports
• ensure that any protection measures provided to control/reduce radon ingress
to the building are properly maintained and regularly monitored to ensure
effectiveness (e.g. mechanical ventilation using fans).
• Ensure that all control measures (including restricted occupation/access) are
followed
• Communicate with local staff
(Note: The procedure for a PPP school may differ from that described above and
you should seek clarification from the PPP Projects Officer in the first instance).
The Strategic Health and Safety Manager shall be responsible for ensuring that
the Health and Safety team monitor the performance of the Council’s radon
policy and the effectiveness of its arrangements.
7 Information and training
The Council will provide sufficient information and training to ensure that
employees in radon affected premises, understand the potential health risks
posed by radon in the workplace, and the importance of any management and
control measures provided.
Information shall be provided by briefing sessions, toolbox talks, articles in staff
newsletters and on the Council intranet, and cascading of information within the 
All employees (e.g. building maintenance personnel, contractors and others)
who may work in radon affected buildings shall be given information regarding
the safe operation of any engineering controls such as switches, radon
membranes/barriers, ventilation systems, sump controls, fans, vents etc) that are
in place to reduce radon ingress. 
Page 78 of 214

Page 79

PUBLIC
8 Management of radon
8.1 Risk Assessment
Council buildings have been initially assessed to identify the potential for the
presence of radon gas. This assessment will be based on the UKHSA/BGS
radon probability dataset (25m grid) which will negate the need to order detailed
site-specific reports from BGS.
Council premises located in radon affected areas (i.e. Class 2 – Class 6 Areas)
will, as part of the risk assessment, be monitored for radon gas levels (see
‘Building Radon Checklist’ in Appendix 1). The results of the test will determine
what actions will arise. Appendix 2 gives more detail on reassessment and
actions.
For Council housing, all tenants of houses and ground-floor flats in radon
affected areas have been offered a test kit. It is acknowledged that testing in
homes will require the tenant’s voluntary participation, and such testing will not
be mandatory. The tenants and homeowners have been given information to
support this activity. The Head of Housing Services will be responsible for
maintaining a list of which properties have been tested, and for ensuring that
new tenants in radon affected areas are offered a radon test kit when they move
in.
8.2 Radon monitoring
The radon level within buildings can be extremely variable and will be dependent
on a number of factors including:
• the underlying geology;
• details of how the building is constructed; and
• how the building is heated and ventilated.
Monitoring is carried out using passive detectors which are left in place for a
period of at least 3 months to reflect typical occupancy. This longer-term
monitoring ensures any short-term fluctuations are evened out, and an annual
average concentration is then calculated based on this monitoring period.
Radon monitoring will be carried out in Council properties at suitable intervals for
the level of risk, based upon, for example, published geological information,
radon map data and/or the results of previous monitoring in the vicinity.
Council premises (without basements) located in non-radon affected areas will
not be routinely tested for radon. This position will be reviewed if there is a
further change by UKHSA/British Geological Surveys and specific properties
may be tested if required following any risk assessment. Council buildings with
basement/subterranean areas that are occupied >50 hours/year will be identified
and monitored in line with UKHSA guidance, whether they are in a radon
affected area or not.
Page 79 of 214

Page 80

PUBLIC
In premises where the level of radon is found to be below the threshold level (as
specified by the Council) re-testing for radon will be carried out at specified
intervals, based on an assessment of the risk (see Appendix 2). Re-tests may
also be necessary following any significant changes to a building’s use or
performance (for example if the basement begins to be used more frequently or
there are energy efficiency upgrades which require below ground construction).
Managing the re-test process will be the responsibility of the relevant service.
When remedial measures are installed to reduce radon levels, the property will
be immediately re-tested to confirm that the measures are functioning correctly
and effectively. Regular checks of such measures require to be undertaken by
the building’s duty holder (which may be quarterly or annual depending on the
type of mitigation measures applied).
8.3 Record Keeping
The maintenance of records relating to radon at Council properties will be the
responsibility of the Head of Housing, the Head of Facilities and Property
Services and the Head of Climate, Public Protection & Roads. It is anticipated
that information relating to radon will be included in the Council’s property asset
management systems (for example CAMIS, Apex). 
Records shall include:
• Property name, UPRN or Council identifier.
• Details of the property’s radon monitoring results.
• Records of risk assessments.
• The monitoring strategy for the property and any deviations from this.
• The design and function of any radon related remedial measures undertaken
at the property, along with records of installation and any regular
maintenance/inspection, and
• Any requirements for controlled or restricted access/occupation.
9 Radon protection measures
Any buildings which have been identified as exceeding the Council’s radon
‘threshold level’ may require appropriate controls to safeguard employees, tenants
and/or other occupants of the building in accordance with Appendix 2. 
The Building Research Establishment guidance document BR 211 (‘Guidance on
protective measures for new buildings (including supplementary advice for
extensions, conversions and refurbishment projects)’) provides guidance on the
design of practical, cost-effective radon protection measures. The most suitable
mitigation measure (or combination of measures) will be dependent on several
factors including radon levels, as well as the building design. 
Page 80 of 214

Page 81

PUBLIC
9.1 New buildings
It is better to prevent radon from entering a building than to try to remove it once
present. All new Council buildings in radon affected areas will be designed and
built in accordance with mandatory standard 3.2 set out in Schedule 5 to the
Building (Scotland) Regulations 2004 such that “…. there will not be a threat to
the health of people in or around the building due to the emission and
containment of radon gas”.
9.2 Existing buildings
Where monitoring shows the radon level to be above the Council’s adopted
‘threshold level’ of 100 Bq/m3, further risk assessment will be carried out. This
will include property-specific considerations, as well as cost/benefit analysis to
determine whether further action is warranted.
Where remedial measures are considered necessary, they will be designed and
implemented as soon as is reasonably practicable. Any such measures will be
appropriate to the level of radon detected, the type of building affected and the
occupancy rate. Following the introduction of remedial measures, the property
will be re-tested as set out in Appendix 2.
In exceptional circumstances, it may be necessary to introduce access
restrictions on a temporary basis until it is shown that radon levels have been
reduced to an acceptable level.  Once mitigation measures have been installed,
details of the system and any associated test/inspection results should be
recorded as set out in Section 8.3. A template checklist for recording inspection
visits is included in Appendix 3. 
10 Review of the policy 
The Corporate Health and Safety Team will monitor this policy for its
effectiveness.  This policy and accompanying documentation contained within
will be reviewed and, where necessary, revised on a three-yearly cycle unless an
earlier revision is prompted by significant changes in legislation, procedures,
best practice or organisational learning.  Any changes or amendments to this
policy will be done in consultation with The Environmental Health & Community
Safety Manager from Climate, Public Protection & Roads and the recognised
trade unions.  
Page 81 of 214

Page 82

PUBLIC
APPENDIX 1 – Building Radon Checklist
Building details
Building Address: Name/description/UPRN/use  
Section 1 
a) Is the building in a radon affected area? 
• Refer to BGS/UKHSA ‘radon potential dataset’
(licensed and available on ArcGIS Online under
the PSGA)
Yes  No 
b) Does the building have a basement which
constitutes a workplace and is occupied for >50
hours per year and/or is the building benched
into a slope?
Yes  No 
Note 
If both answers in Section 1 are ‘No’, the building is considered to be at low risk
from radon, and the checklist is complete. 
The checklist should be reviewed at increments of 10 years
Proceed to Section 4 
If either answer is ‘Yes’, continue to Section 2 
Section 2
a) Has the building been tested for the presence of
radon gas? If Yes, provide the date(s) of
previous testing, and the result (in Bq/m3) 
(Results/test certificates can be appended to
this file) 
If No, proceed to Section 3 
Yes  No 
b) If tested, are the number of locations per
building considered sufficient to represent the
regularly occupied ground floor and basement
levels?
Yes  No 
Page 82 of 214

Page 83

PUBLIC
c) Were the most recent measured levels below
the relevant action level (e.g. the Council’s
‘threshold level’ of 100 Bq/m3
Yes  No 
Note 
If the answers to questions a, b and c in Section 2 are all ‘Yes’ then the building
checklist is complete. The checklist should be reviewed at increments of 10 years. 
Proceed to Section 4 
Otherwise, continue to Section 3 
Section 3 - Outcome
Review the available property data and select the action(s) required 
a) Does the building need to be tested for radon? 
If yes, advise the relevant service to commission a
test. 
Yes  No 
b) Does a risk assessment need to be carried out? 
e.g. if radon levels above the Council’s ‘threshold
level of 100 Bq/m3 have been recorded, discuss
occupation rates/use profile/building design with
the relevant service to obtain site-specific
information. 
If yes, record further details here 
Yes No
c) Do radon protection measures need to be
reviewed or installed? 
Yes No
Comments/Observations/Notes/Actions Date
Section 4  - Assessors Details
Risk
assessor
Name 
Signature 
Page 83 of 214

Page 84

PUBLIC
Position  Date 
Next
review
date 
A copy of this checklist should be made available to the building manager/head of
centre and also held in the Councils asset management system
Page 84 of 214

Page 85

PUBLIC
APPENDIX 2 Generic risk matrix and action protocol 
Following monitoring and verification of radon levels within a building, the table below sets out the proposed course of action. The
proposed action levels apply to all building types (residential, schools and other workplaces – see Note 1) 
Measured radon
level (Bq/m³)   Action 
< 100   • No remedial action required  
• Re-test at 10-year intervals and/or after any significant refurbishment or change of use 
100 - 200    • Take initial practical steps e.g. check existing ventilation and seal obvious entry points (for
example, floor cracks, pipe runs) and/or
• Carry out building-specific risk assessment (likely to be applicable for occupational
settings rather than residential) and where relevant
• Re-test (paid for by Council). 
If re-test result falls within the same range: 
• Consider and/or implement tailored mitigation strategy within 6 months (see Note 2). This
may include engineered methods (see Note 3). 
• Advise tenants/employees of other ways they can reduce their risk (e.g. stop smoking) if
not reasonably achievable to meet target level of 100 Bq/m3 
• Re-test at 5-year intervals and/or after any significant refurbishment or change of use. 
200 -
1000    
• Develop and/or implement tailored mitigation strategy within 3 months (see Note 2) This
may include short-term practical steps (e.g. increasing ventilation and sealing entry
points) and longer term engineered methods (see Note 3). 
Page 85 of 214

Page 86

PUBLIC   
• For workplaces only, also: 
- At >300 Bqm-3, report to HSE as required by IRR 2017 (see Note 4) and
- Consider restricting access to specific areas, based on site-specific risk assessment.
This should take into account factors including radon level, the building design and the
pattern and duration of occupation – seek advice from UKHSA / HSE / NHS
GG&C as required (see Note 5) 
• Re-test after remediation (free of charge from UKHSA) 
• Re-test annually for 2 years and at suitable intervals thereafter and/or after any significant
refurbishment or change of use 
> 1000 
> 1000 
Residential 
Workplaces 
• For residential: 
- Consult with the UKHSA/NHS Greater Glasgow & Clyde’s Public Health Protection Unit
re. short-term intervention/advice to tenants 
- Develop and/or implement tailored mitigation strategy within 6 weeks (see
Note 2) This is likely to include engineered methods (see Note 3). 
- Re-test once remedial works complete (free of charge from UKHSA) 
• For workplaces: 
- Report to HSE as required by IRR 2017 (see Note 4) 
- Consult with HSE / UKSHA / NHS GG&C and consider any requirement to 
□ impose immediate restrictions on access to affected area, based upon site specific
risk assessment (see Note 5) 
□ inform and advise employees and any others likely to be exposed 
Page 86 of 214

Page 87

PUBLIC
• Develop and implement tailored mitigation strategy within 6 weeks (see Note 2). This is
likely to include engineered methods (see Note 3). 
• Re-test once remedial works are complete (free of charge from UKHSA) 
• Re-test annually for 3 years and at suitable intervals thereafter, and/or after any significant
refurbishment or change of use 
Notes 
1) UKHSA recommends the adoption of the residential target (100 Bq/m3) and action levels (200Bq/m3) for schools and non-domestic
buildings with public occupancy exceeding 2000 hours per year.   
2) When setting timescales for implementing mitigation measures, we may need to allow time for any required statutory approvals
(e.g. building warrants) and also consultation/agreement with private owners in mixed-tenure blocks. Mitigation measures will
be identified subject to cost-benefit analysis. 
3) A tailored mitigation strategy may need to be developed for each individual building. There are practical and relatively
inexpensive measures that can be adopted, but the most effective solution in each case will depend upon a number of independent
factors including the initial radon level and the characteristics of the building being remediated (e.g. floor type, heating and
ventilation).  
Examples of different types of mitigation, their relative effectiveness and suitability in different situations are discussed in HPA’s
2011 publication “An Analysis of radon remediation methods”. Appendix B of that document describes each method listed below. It
is anticipated that advice will need to be sought from specialist consultants to develop detailed designs for specific buildings. 
Active sump = A sump under a solid floor or impermeable membrane with a fan sucking or blowing from the sump 
Passive sump = A sump under a solid floor or impermeable membrane with no fan 
Positive ventilation = A fan, usually in the loft space, blowing into the living space 
Natural sub-floor ventilation = Clearing airbricks or replacing them with modern vents and/or increasing their number 
Page 87 of 214

Page 88

PUBLIC
Active sub-floor ventilation = A fan beneath the floor which sucks or blows 
Passive ventilation = Trickle vents in windows or windows that open on a lockable catch. Best done on lower floors to minimise
the ‘stack effect’ and to be kept permanently open. 
Sealing floors = Sealing cracks and gaps in floors (unsuitable for timber floors). Usually done in combination with other methods 
Sealing loft hatch = Reduces upward flow of air and thereby reduces the negative pressure in the house. Usually done
in combination with other methods. 
In general, active sumps can be expected to result in up to a 6-fold reduction in radon levels. Other methods such as passive
sumps, positive ventilation, natural and active sub-floor ventilation are less effective, offering a typical 2-fold reduction. Passive
ventilation and sealing are generally the least effective, offering a less than 2-fold reduction in levels. 
4) The Ionising Radiation Regulations 2017 
5) Where restrictions on entry are implemented to control occupational exposure, in extreme cases also consider carrying out
personal monitoring of any persons required to enter the affected area 
Page 88 of 214

Page 89

PUBLIC
APPENDIX 3 – Recording maintenance visits and the operational state of
radon remedial measures
Where mechanical equipment has been installed to reduce the level of radon within
a building, a programme of regular checks/inspections should be included in the
design specification and implemented as part of the property’s routine maintenance
programme
Guidance notes:
• Mechanical measures to reduce radon gas (e.g. fans fitted to sumps) should
operate continuously, and should not be switched off for any reason other
than repair or maintenance
• Lights attached to fused spur outlets should be illuminated at all times. This
indicates that the power is on, NOT that a fan is working so additional checks
need to made to confirm that the fan is running.
• Air bricks identified as forming part of the ventilation system must always be
clear and in good condition
• Radon vent stacks should be checked to prevent damage/incorrect use. Look
for
o Inappropriate connection of wastewater to the vent stack
o Removal of rain caps to the vent stack
o Vent stack being capped off during re-roofing
o Vent stack damage due to vandalism.
• Any concerns about the correct operation of the systems should be raised
with the relevant service (e.g. Housing, Facilities and Property Services)
A template checklist is included below 
Active Radon Remedial Measures Check
Building name 
Address/UPRN/Description 
Date
Are radon
reduction
measures in
order (/ X)
Defect Action taken Owner     
Page 89 of 214

Page 90

PUBLIC     
Page 90 of 214

Page 91

PUBLIC   
___________________________________________________________________
To:  Finance, Resources and Customer Services Policy Board
On:  23 April 2026
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Public Holiday Proposal: FIFA Men’s World Cup, 15 June 2026
___________________________________________________________________
1. Summary 
1.1 The Scottish Government has designated Monday 15 June 2026 as a national
bank holiday to celebrate Scotland’s participation in the FIFA Men’s World Cup.
This was confirmed through Royal Proclamation on the 4 February 2026.   
1.2 Although nationally recognised, the adoption of this date as a local public
holiday remains a discretionary decision for each Council.  Across Scotland,
Councils are taking differing approaches. 
1.3 COSLA, at the time of writing this report, has advised that the majority of
Councils have opted not to observe the holiday, citing cost, fairness, disruption,
and limited practical benefit; however a small number of Councils have decided
to recognise it.  COSLA has confirmed there is no national policy position on
the holiday. 
1.4 The key consideration is whether the value of observing the public holiday
outweighs the associated financial, operational and workforce implications. 
This report therefore outlines relevant information to allow the Board to
determine the most appropriate approach. 
1.5 Some Trade Unions have indicated they may be supportive of recognising the
holiday, but no formal collective position has been submitted to the Council. 
1.6 Council Officers have submitted a request to the Scottish Government for a
conditional exceptional school closure on 15 June 2026 to align with the
proposed bank holiday. This exemption from the requirement for 190 school
days was lodged by the 23 March deadline. 
Item 9
Page 91 of 214

Page 92

PUBLIC   
The Scottish Government has approved the request, subject to conditions,
ensuring Members retain the option to designate the day as an additional school
closure. 
1.7 If Members approve any of the options involving a change to local
arrangements, this will be communicated across services, employees and
communities through usual channels.
___________________________________________________________________
2. Recommendations 
2.1 Members are asked to: 
• Consider and agree one of the options set out in section 5 of this report. 
• Note the Scottish Government’s approval of a conditional exceptional
school closure on this date, and that should a decision to implement the
public holiday be approved, a report will require to be presented to the
Education and Children’s Services Board.
• Instruct Officers to implement and communicate their decision agreed by
Members.
___________________________________________________________________
3 Background 
3.1 Members have previously agreed the schedule of 12 public holidays the Council
will observe in 2026. These are attached for information in Appendix 1. 
3.2 The Council has on previous occasions, aligned its public holiday schedule with
nationally determined arrangements. This included adjustments made during
the Queen’s Diamond Jubilee in 2012 to support extended national
celebrations, and again in 2022 when the UK-wide changes introduced for the
Platinum Jubilee moved the traditional late-May bank holiday to early June and
added an additional day of celebration. The Council also observed the national
public holiday declared for the State Funeral of Her Majesty Queen Elizabeth II
in September 2022, during which all schools and nurseries in Renfrewshire
were closed. Collectively, these changes required significant planning and
coordination across schools, early years provision, essential services and
partner organisations. 
3.3 Historically, such adjustments have been directly linked to nationally significant
events occurring on, or intrinsically connected to, the designated holiday date.
In this instance, Scotland’s opening match is scheduled for 2.00am on Sunday
14 June, with the proposed public holiday being scheduled on Monday 15 June. 
3.3 Members are invited to consider the balance of factors relevant to determining
a preferred approach, including the symbolic value of the proposal, community
expectations, operational planning requirements, workforce implications and
the associated financial costs. 
Page 92 of 214

Page 93

PUBLIC   
4. Implications 
4.1 Each of the options presented carries different financial, operational, workforce
and administrative implications. The areas potentially impacted across the
options include staffing and rota arrangements for essential services, school
and early years calendars, ICT and payroll system configuration, and
coordination across services and partners. The scale and type of impact differ
for each option. 
4.2 Section 5 below sets out the options for how the Council may approach the
proposed public holiday. Each option summarises the associated operational,
financial and planning implications to support Members in considering how the
different approaches would operate in practice.  Only Option 2 (additional public
holiday) carries direct financial costs, estimated at £80,000–£100,000 for
essential service delivery. 
5 Options for Members Consideration 
5.1 Members are asked to note that options 1–3 involve the designation of a public
holiday and therefore determine whether the Scottish Government’s
exceptional school closure approval is triggered.  Option 4 does not create a
public holiday, applies only to non-essential Local Government Employees, and
has no impact on school or early years provisions.   
5.2 Option 1:  Do Not Recognise 15 June 2026 as a Public Holiday.  The Council
retains its existing public holiday arrangements and 15 June would proceed as
a normal working day. 
Key Considerations: 
• Aligns with the approach taken by the majority of other Councils, based
on reasons they have identified such as cost pressures and the benefits
of service continuity.
• Avoids unfunded costs and limits operational disruption for essential
services, schools, early years settings, families and partners.
• Reduces the risk of community concern relating to affordability or service
disruption.
• Some employees and Trade Unions may feel the Council is not aligning
with national sentiment.
• Some employees may perceive this as missing out on a benefit available
in other areas of the public sector.
• If Members wish to support this option, managers may, where service
needs allow, be supported to be flexible for the day in approving leave
or time-back arrangements, provided essential services are maintained. 
5.3 Option 2:  Provide an Additional Public Holiday.  The Council designates 15
June 2026 as an additional Public Holiday, in addition to the existing public
holiday schedule. 
Page 93 of 214

Page 94

PUBLIC   
Key Considerations: 
• Provides clear and visible recognition of the national event and aligns
with the Scottish Government announcement.
• Scottish Government has approved a conditional exceptional school
closure on this date.
• Introduces an estimated additional cost of £80,000–£100,000 for
essential service provision.
• Decisions taken in other Council areas have attracted differing
community responses, reflecting varying views on recognition of the date
and service operation.
• May attract concern from our communities regarding affordability,
service disruption or fairness.
• Employees’ experience of the day would differ depending on operational
requirements.
• Requires significant Business World adjustments and changes to
scheduling and communication, and payroll configuration.
• Creates operational impacts for schools, early years settings and
families due to established calendars.
• The match occurs at 2am the previous day, which may limit the practical
relevance and benefit of the timing of the public holiday.
• Increases the total number of public holidays in 2026 to 13.
• Requires Education & Children’s Services Policy Board approval in
relation to schools and early years settings closures. 
5.4 Option 3:  Substitute One of the May Public Holidays.  The Council moves
either the 4 May or 25 May public holiday to 15 June, resulting in no increase
to the total number of public holidays. 
Key Considerations: 
• Recognises the date through substitution of an existing public holiday,
resulting in no increase to the number of days or the related financial
cost.
• Reflects previous approaches used for national events such as Jubilee
years.
• No other Scottish Councils have indicated that they intend to adopt this
approach in 2026.
• School, early years and service calendars would require adjustment to
reflect the substituted date.
• Essential services would operate according to the revised public holiday
schedule.
• Some employees and Trade Unions may feel that this provides no net
additional benefit.
• Could disrupt May holiday plans for families, schools and businesses.
• Requires Business World adjustments and changes to scheduling and
communication.
• May be unpopular due to long-standing May holiday expectations in
Renfrewshire.
Page 94 of 214

Page 95

PUBLIC   
• Some may feel the approach does not fully align with the national
announcement.
• Requires Education & Children’s Services Policy Board approval in
relation to schools and early years settings closures. 
5.5 Option 4: Provide a Day of “No Work Requirement” (Similar to the Festive
Closure for Local Government Employees).  The Council would designate 15
June as a day on which employees not required to deliver essential services
would not be required to work.  It would not be recorded as a public holiday. 
Key Considerations: 
• This arrangement applies only to non-essential Local Government
Employees and does not create a public holiday or alter school term
dates. As it is not a public holiday, the Scottish Government’s
exceptional school closure approval would not apply, and schools and
early years settings would operate as normal. This makes the option
materially different in scope from Options 1–3.
• Offers symbolic recognition without altering the public holiday calendar.
• Essential services would operate as normal, with time-off-in-lieu
arrangements applied for employees who work on the day
• Avoids premium-rate costs associated with public holiday working.
• Creates differing experiences between essential and non-essential
employees, which may be perceived as inequitable.
• Requires bespoke rota planning and may create staffing pressures.
• More complex to manage than retaining existing arrangements. 
5.6 Members will be aware that different approaches to 15 June 2026 are being
taken across Scotland, reflecting local operational, workforce and
service-planning requirements.  Following the Council’s decision, Officers will
implement and communicate the agreed arrangements.
___________________________________________________________________
Implications of the Report
1. Financial – Approving an additional public holiday has financial implications
primarily relating to the costs of maintaining essential service delivery should
an additional public holiday be recognised. As outlined in section 4 of this
report, this may result in costs of £80,000 to £100,000 associated with
premium rates of pay for employees required to work on the day. 
2. People & Organisational Development - There are implications for
employee expectations, workforce planning and operational delivery.
Introducing an additional day, or substituting an existing public holiday, would
require significant adjustments to the Council’s ERP (Business World) system,
as well as communication and coordination across all services. Not
recognising the holiday may lead to perceptions among some employees and
Trade Unions that the Council is not aligning with national sentiment. 
3. Community Planning – None. 
Page 95 of 214

Page 96

PUBLIC   
4. Legal - There are no legal implications arising from the recommendations.
Adoption of the public holiday remains a discretionary local decision and is not
mandated in legislation. 
5. Property/Assets – None 
6. Information Technology – There are no direct IT implications beyond the
system changes outlined under People & OD, or essential ICT report required
to support those working on the day, which would only be required if Members
approved an additional or substituted holiday. 
7. Equality & Human Rights 
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report. If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of any reassessment will be published on the Council’s
website.
8. Health & Safety - None.
9. Procurement – None.
10. Risk – The main risks relate to workforce perception, operational disruption
and financial pressures should the Council recognise an additional public
holiday. 
11. Privacy Impact – None.
12. Cosla Policy Position – COSLA has identified several Councils are not
recognising the holiday. The recommended position is consistent with current
emerging national practice. 
13. Climate Risk – None.
14. Children’s Rights – The recommendations contained within this report have
been considered in relation to their potential impact on children and young
people, taking account of the options and key considerations set out in the
report. If schools and associated services were to close as a result of the
public holiday, this would result in a limited and short-term change to the
normal school routine and may have implications for childcare arrangements
for families. Any such impact would be mitigated through advance notice and
existing school holiday planning arrangements, and no significant adverse
impact on children is anticipated.
_________________________________________________________
Author:  Raymond Cree, Head of People and Organisational Development 
Page 96 of 214

Page 97

PUBLIC   
APPENDIX 1 – 2026 Public Holidays for Local Government Employees 
Holiday  2026
New Year Thursday 1 January 2026
Friday 2 January 2026
Monday 5 January 2026
Good Friday Friday 3 April 2026
Easter Monday Monday 6 April 2026
May Day Monday 4 May 2026
Spring Bank Holiday Monday 25 May 2026
Fair Holiday Monday 3 August 2026
Autumn Holiday Friday 25 September 2026
Monday 28 September 2026
Christmas Friday 25 December 2026
Monday 28 December 2026
Day of no work requirement Thursday 31 December 2026 
Non-teaching staff in schools
Children’s Services issue a separate list of school holidays for term time employees. 
Page 97 of 214

Page 98

PUBLIC 
___________________________________________________________________
To: Finance, Resources and Customer Services Policy Board
On: 23 April 2026
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: ‘People Strategy 2021-26’ - New and Revised HR&OD Policies
___________________________________________________________________
1. Summary 
1.1 As part of the on-going implementation of our People Strategy priorities ‘Our
People Our Future 2021-2026’, approved by Members in March 2021, key work
continues to be progressed by Officers in relation to our ongoing HR&OD Policy
Review Plan.  The review plan helps to improve the workplace culture and staff
experience by creating the right conditions for change, to deliver future
modernised and sustainable services. 
1.2 Our revised HR&OD policies create the right supportive foundations to ensure
they adequately empower and support the level of organisational development
and embed the cultural change journey. The policy review has incorporated our
values and a has clear focus on flexibility, health and wellbeing, equality,
diversity, and inclusiveness. 
1.3 The Council is committed to conducting its business with honesty and integrity,
and it expects all employees to maintain high standards in accordance with the
Council’s Code of Conduct for Employees.   
1.4 The purpose of this report is to seek approval from Members to implement the
revised policies attached in the following appendices: 
• Revised Whistleblowing Policy (Appendix 1).
• Revised Recruitment Policy (Appendix 2).
• Revised Parenting Leave and Pay Policy (Appendix 3).
Item 10
Page 98 of 214

Page 99

PUBLIC 
1.5 The revisions are required as a result of the Employment Rights Act 2025, which
received Royal Assent on 18 December 2025 and represents a significant
reform of employment legislation. The Act introduces a range of new statutory
rights and protections for workers, with its provisions being implemented on a
phased basis through commencement regulations. While some measures took
effect immediately or in early 2026, further provisions are due to come into force
during 2026 and 2027.  The revisions proposed in this report are necessary to
ensure that Council policies and practices remain compliant as the Act’s
provisions are progressively implemented. 
1.6 Consultation has been undertaken with the recognised Trade Unions, and
relevant feedback has been taken into account in shaping the revised policies.
The policies have been modernised to reflect contemporary standards in style,
presentation and language, and to support inclusive and best practice
approaches. 
1.7  Following approval from Members, Officers will review associated training
modules on iLearn to support the implementation of the policies. The policies
will be communicated to all managers and employees within the Council via the
normal channels.
__________________________________________________________________
2. Recommendations 
2.1 It is recommended that members: 
• Approve the revised Whistleblowing Policy at Appendix 1.
• Approve the revised Recruitment Policy at Appendix 2.
• Approve the revised Parenting Leave and Pay Policy at Appendix 3.
__________________________________________________________________
3. Background 
3.1 The Council strives to create a healthy, open and inclusive working environment
which enables all colleagues to carry out their roles in a safe and supportive
way. This is important to maintain health and wellbeing which remains our top
priority. 
3.2 The Employment Rights Act 2025 will require a number of HR&OD Policies to
be updated to reflect the legislative reforms being implemented from the Act. 
The Whistleblowing, Recruitment and Parenting Leave and Pay Policy have
been reviewed to align with these reforms and best practice. 
3.3 Section 4 of the report provides Members with a summary of each policy and
key changes required. 
3.4 Through implementing these policies, the Council will promote and
encourage people to fully use all the supportive provisions available. 
Page 99 of 214

Page 100

PUBLIC
4 Revised Whistleblowing Policy 
4.1 Whistleblowing is protected in law, providing safeguards for employees and
workers who raise concerns in the public interest. 
4.2 The revised Whistleblowing Policy sets out the Council’s approach to
supporting employees and workers to raise concerns, in the public interest,
about wrongdoing, malpractice or risks to health and safety. The policy
promotes openness, accountability and a culture where concerns can be raised
safely and appropriately, in line with the Council’s values and governance
arrangements. 
4.3 The Employment Rights Act 2025 introduced reforms to strengthen
whistleblowing protections, including the explicit inclusion of disclosures
relating to sexual harassment as qualifying protected disclosures when raised
in the public interest.  The Whistleblowing Policy has been updated to reflect
this statutory change and to ensure that individuals who raise such concerns
are protected from detriment or dismissal in accordance with the legislation. 
5 Revised Recruitment Policy 
5.1 To deliver the Council’s vision and values and respond effectively to the needs
of Renfrewshire’s communities, the Council requires a skilled, adaptable and
motivated workforce. This policy supports the attraction and recruitment of
people who are committed to continuous improvement and capable of working
in a dynamic and evolving public service environment. 
5.2 As reported to Members within the annual progress update on the Council’s
People Strategy ‘Our People, Our Future 2021–2026’ on 13 November 2025,
the Council has committed to guaranteeing an interview for individuals from
care-experienced backgrounds who meet the essential criteria for the role for
which they are applying. This commitment is now embedded within the
Recruitment Policy as a core element of the Council’s inclusive recruitment
approach. 
5.3 The policy strengthens the importance of robust pre-employment checks and
sets out the Council’s statutory responsibilities in relation to right-to-work
verification and safer recruitment and vetting practices, including the disclosure
of unspent convictions where required. 
5.4 Updated supporting guidance and the continued development of recruitment
good practice will be made available to managers and employees to support
the fair, inclusive and consistent application of this policy across the
organisation.  
Page 100 of 214

Page 101

PUBLIC 
6. Revised Parenting Leave and Pay Policy   
6.1 The revised Parenting Leave & Pay Policy, provides information and awareness
of the types of parenting leave and pay entitlements available for all employees
with parenting responsibilities.  It will offer flexibility to employees at particular
stages of their lives and encourage the sharing of parenting responsibilities. 
6.2  The Employment Rights Act 2025 introduced Day 1 rights to Paternity Leave
and Parental Leave entitlements. The Parenting Leave and Pay Policy has
been updated to reflect the Paternity Leave change.  Statutory Paternity Pay
still requires 26 weeks’ service.  Parental leave is already a Day 1 right in the
Council. 
6.3 The revised policy also includes provision for Bereaved Partners’ Paternity
Leave.  This provides bereaved fathers and partners with an enhanced
entitlement to paternity leave where the child’s mother or primary carer or
adopter dies within the first year of the child’s life. Regulations made under the
Act enable extended leave of up to 52 weeks, providing additional protection
and support during exceptionally difficult circumstances. 
__________________________________________________________________
Implications of the Report
1. Financial - The Council’s ongoing financial sustainability is dependent
on the ability of the Council to transform and modernise services. 
2. People & Organisational Development – People & OD and Internal
Audit will provide advice and guidance to managers and employees in
the interpretation and application of these policies. 
3. Community Planning – None. 
4. Legal – The Council will meet its legislative and best practice
requirements. 
5. Property/Assets – None 
6. Information Technology – As outlined in the report.
7. Equality & Human Rights
The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report because for example it is for noting only. 
Page 101 of 214

Page 102

PUBLIC
If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the
Council’s website.
8. Health & Safety - None.
9. Procurement – None.
10. Risk – None.
11. Privacy Impact – None.
12. Climate Risk – None.
13. Children’s Rights – None.
14. Cosla Policy Position – None.
_____________________________________________________
List of Background Papers
_________________________________________________________________
Author Eddie Simpson, Strategic Lead Partner (Organisational Development)
eddie.simpson@renfrewshire.gov.uk 
Page 102 of 214

Page 103

1 
PUBLIC      
Appendix 1  Issue Number: 3                           
Issue Date: 04/26
Review Date:  04/28
This document is available in
alternative formats on
request. 
For all Council employees.  
Whistleblowing Policy
Page 103 of 214

Page 104

2 
PUBLIC 
CONTENTS
1. Introduction        3
2. Purpose and Aims       3
3. Scope of policy       3
4. What is whistleblowing?      3
5. Procedure for Raising a Whistleblowing Concern  4
6. Raising a Whistleblowing Concern to Elected Members 5
7. Sexual Harassment Disclosures     6
8. Confidentiality and Anonymity     6
9. External disclosures       6
10. Protection and Support for Whistleblowers   7
11. False Reporting       7
12. Responsibility and Training     7
13. Monitoring and Review      8
14. Contacts        8 
VERSION CONTROL
Version  Date Details of Review/Revisals made Next Review date
1 January
2023
Drafting of new policy to reflect current
legislative requirements 
[February 2025] 
2 April 2026 Drafting of revised to reflect legislative
requirements
[April 2028]                    
Page 104 of 214

Page 105

3 
PUBLIC
1. Introduction 
1.1 The Council is committed to conducting its business with honesty and integrity,
and it expects all employees to maintain high standards in accordance with the
Council’s Employee Code of Conduct. Part of that is creating an open and
supportive working environment where employees feel able to speak up about
any suspected wrongdoing. This Policy details our process for dealing with
Whistleblowing. 
1.2 This Policy has been agreed and implemented following consultation with the
recognised Trade Unions. 
2. Purpose and Aims 
2.1 The purpose of this Policy is to provide a mechanism for employees of the
Council and other workers within the Council as detailed in section 3.1 of the
policy, to report a concern which they have about serious wrongdoing or
malpractice within the Council.  It draws on the rights and obligations contained
within the Employment Rights Act 1996, the Employment Rights Act 2025, the
Public Interest Disclosure Act 1998 and the Enterprise and Regulatory Reform
Act 2013. 
2.2 The aims of this policy are: 
(a) To encourage employees and other workers within the Council to report
suspected wrongdoing as soon as possible, in the knowledge that their
concerns will be taken seriously and investigated as appropriate, and
that their confidentiality will be respected.
(b) To provide employees and other workers with guidance as to how to
raise those concerns.
(c) To reassure employees and other workers that they should be able to
raise genuine concerns without fear of reprisals, even if they turn out to
be mistaken. 
3. Scope of policy 
3.1 This Policy covers all Council’s employees, workers, officers, consultants,
contractors, volunteers, casual workers and agency workers. 
4. What is whistleblowing? 
4.1 Whistleblowing is the disclosure of information which relates to suspected
malpractice, wrongdoing or dangers at work. This may include:
• Criminal activity;
• Failure to comply with any legal or professional obligation or
regulatory requirements;
• Miscarriages of justice;
• Danger to health and safety;
• Damage to the environment;
Page 105 of 214

Page 106

4 
PUBLIC
• Information tending to show any matter falling within any one of
the preceding paragraphs has been, is being or is likely to be
deliberately concealed;
• Sexual harassment disclosures. 
4.2 A “whistleblower” is a person who raises a genuine concern relating to any of
the above. If you have any genuine concerns related to suspected malpractice,
wrongdoing or danger affecting any of the Council’s activities (a
whistleblowing concern) you should report it under this Policy. 
4.3 Whistleblowing does not cover less serious matters, such matters should be
raised by an employee to their line manager. An employee’s concerns about
their own employment which should be addressed in accordance with the
relevant HR policy, for example the Council’s Grievance Procedure or Respect
at Work Policy, as appropriate. 
4.4 If an employee or other worker is uncertain whether something is within the
scope of this Policy they should seek advice from the Whistleblowing Officer,
whose contact details are at the end of this Policy. 
5. Procedure for Raising a Whistleblowing Concern 
5.1 An employee or other worker wishing to raise a matter that is covered by the
categories covered in this Policy should: 
(a) Contact the appropriate designated officer in the employing Service in
the Council. The Designated Officers are those identified in Annex 1 to
this Policy. The concern should be raised, preferably, in writing and to
avoid any doubt, should be preferably described as a “Whistleblowing
Concern”.    
(b) Call the Confidential Whistleblowing Hotline.
(c) Completing the online form at www.renfrewshire.gov.uk, search for
‘Whistleblowing Policy’. 
5.2 Employees within the Renfrewshire Health and Social Care Partnership can
access the National Whistleblowing Standards in relation to NHS Services.
Further information can be obtained from Chief Officer and accessed here. 
5.3 Where a whistleblowing concern is made directly to a line manager, the line
manager should immediately forward details of the concern to the Designated
Officer. 
5.4 Any whistleblowing concern received in accordance with paragraph 5.1 above,
will be sent to the Designated Officer (set out in Annex 1 of this Policy). If a
whistleblowing concern is made which alleges wrongdoing by a Designated
Officer, then that concern should be made directly to the Chief Executive. In the
event the whistleblowing concern relates to the Chief Executive then that
concern should be made directly to the Council’s Monitoring Officer. Once a
whistleblowing concern has been submitted, the Designated Officer (or
Page 106 of 214

Page 107

5 
PUBLIC
nominated officer in their absence) will acknowledge receipt as soon as
possible and within a maximum of 5 working days.   
5.5 At this stage of the process, it is important that both parties maintain
confidentiality where that is required to ensure that the matter can be dealt with
in the appropriate way, avoid prejudice and protect individual rights. 
5.6 The whistleblowing concern will then be considered and a decision taken as to
whether, and in what way, the matter should proceed. 
5.7 Should the Designated Officer decide not to take any action you will be notified
and given the reason(s) for this decision. 
5.8 If the Designated Officer decides that further action is required based on your
whistleblowing concern, then you will be notified of this decision and the likely
timescale. 
5.9 Once the matter has been concluded and the appropriate action taken in
response to your concern, you will be informed, subject to confidentiality being
maintained, as required. 
5.10 Under the terms of this Policy, you may seek a progress update from the
Designated Officer regarding the status of your concern, although it must be
understood that the response may have to be qualified in order to protect other
interests. 
5.11 Whilst the Council cannot guarantee the outcome you are seeking, the Council
will try to deal with your concern fairly and in an appropriate way.  By using this
Policy, you can help the Council achieve this. 
5.12 If you are not satisfied with the way your whistleblowing concern has been dealt
with, you can raise this with the Chief Executive. 
6 Raising a Whistleblowing Concern to Elected Members 
6.1 Where an Elected Member is approached by an employee or other worker as
set out in section 3 above in connection with a whistleblowing concern covered
under this Policy, the Elected Member should encourage that individual to raise
their concern in accordance with this Policy. 
6.2 In cases where an Elected Member receives a whistleblowing concern, they
shall send it directly to the Whistleblowing Officer who will then process it in line
with this policy. 
6.3 Elected Members must not investigate any whistleblowing concerns
themselves. 
Page 107 of 214

Page 108

6 
PUBLIC
7. Sexual Harassment Disclosures
7.1 The Employment Rights Act 2025 explicitly recognises sexual harassment as a
category of wrongdoing that can form the basis of a protected whistleblowing
disclosure. This means that where an employee or other worker reasonably
believes that their disclosure about sexual harassment is made in the public
interest, they will be protected from detriment and, where applicable, unfair
dismissal under whistleblowing law. This update removes previous ambiguity
by adding sexual harassment directly to the statutory list of protected matters,
thereby strengthening legal protections and supporting greater confidence for
workers to raise such concerns through whistleblowing channels. 
8 Confidentiality and Anonymity 
8.1 The Council hopes that all employees or other workers will be able to raise
whistleblowing concerns openly under this Policy. However, if an employee or
other worker wishes to raise their concern confidentially, the Council will try to
ensure that their identity remains anonymous. If it is necessary for anyone
investigating the employee or other worker’s concern to know their identity, then
this will be discussed directly with them. 
8.2 The Council does not encourage employees or other workers to raise concerns
anonymously. Proper investigation may be more difficult or impossible if the
Council cannot obtain further information. It is also more difficult to establish
whether any allegations are credible. Employees or other workers who are
concerned about possible consequences if their identity is revealed should
raise this with the Designated Officer and appropriate measures may be taken
to preserve confidentiality. An employee or other worker can seek advice from
the Council’s whistleblowing hotline or Protect, the independent whistleblowing
charity, who offer a confidential helpline (details are set out below). 
9. External disclosures 
9.1 The aim of this Policy is to provide an internal mechanism for reporting,
investigating and remedying any wrongdoing in the workplace. It is expected
that the internal mechanisms outlined in this Policy will be used and with
confidence. If, however, there is genuine cause to believe that an internal
disclosure to one of the identified officers would not be appropriate for particular
reasons, it is accepted that a disclosure to an external regulator may be
protected. It will very rarely, if ever, be appropriate to alert the media and
employees and other workers are strongly encouraged to report concerns
through this Policy and its internal mechanisms. 
9.2 The independent whistleblowing charity, Protect, operates a confidential
helpline. They also have a list of prescribed regulators for reporting certain
types of concern. Their contact details are at the end of this Policy. 
9.3 Whistleblowing concerns usually relate to the conduct of the Council’s
employees, but they may sometimes relate to the actions of a third party, such
as a customer, supplier or service provider. In some circumstances the law will
Page 108 of 214

Page 109

7 
PUBLIC
protect you if you raise the matter with the third party directly. However, the
Council encourages its employees and other workers to report such concerns
internally first. An employee or other worker should contact the Whistleblowing
Officer for guidance regarding this. 
10. Protection and Support for Whistleblowers 
10.1 It is understandable that whistleblowers are sometimes worried about possible
repercussions. The Council encourages openness and transparency and will
support employees and other workers who raise genuine concerns under this
policy, even if they turn out to be mistaken. Employees and other workers
raising concerns under this Policy will be protected, provided that the concern
is made in the reasonable belief that it is in the public interest. 
10.2 Employees and other workers raising a concern under this policy must not
suffer any detrimental treatment as a result of raising the concern. Detrimental
treatment includes dismissal, disciplinary action, harassment, victimisation or
other unfavourable treatment connected with raising a concern. If you believe
that you have suffered any such treatment, you should inform the
Whistleblowing Officer immediately. If the matter is not remedied, you should
raise it formally using the Council’s Grievance Procedures or Respect at Work
Policy. 
10.3 An employee or other worker must not threaten or retaliate in any way against
another individual raising a whistleblowing concern. Any employee or other
worker involved in such conduct may be subject to disciplinary action under the
Council’s Disciplinary Procedures. In addition, where an employee or other
worker has been subjected to a detriment by another employee, they could be
personally liable for their own conduct. 
11. False Reporting 
11.1 There may be instances when a concern is submitted, based on reasonable
belief by an employee or other worker that something is wrong at a particular
time, which is subsequently demonstrated to be false or inaccurate. In such
circumstances, they will be informed of the discrepancy between their concern
and the facts at hand. Provided that the Council is satisfied that the employee
or other worker had a reasonable belief that such a situation should be reported,
no further action will be taken. 
11.2 If an employee or other worker has deliberately raised a concern that they know
to be untrue or unfounded this may lead to a disciplinary investigation and
disciplinary action taken against them. 
12. Responsibility and Training 
12.1 Internal Audit has overall responsibility for this policy and for reviewing the
effectiveness of actions taken in response to concerns raised under this policy.
The Whistleblowing Officer will maintain a register of concerns raised and the
outcomes, as required. The Whistleblowing Officer (or other delegated officer)
Page 109 of 214

Page 110

8 
PUBLIC
will present an annual report to the Audit, Risk and Scrutiny Board detailing the
number of whistleblowing complaints received and actions taken by the
Council. This annual report will be anonymised to protect confidentiality. 
12.2 The Designated Officers must provide information regarding any concerns
received to the Whistleblowing Officer. Regular updates and information about
outcomes of any investigations must be provided to the Whistleblowing Officer
to allow them to maintain the register of concerns. 
12.3 The Designated Officers must ensure that all managers and other staff who
may deal with concerns or investigations under this Policy receive regular and
appropriate training. 
13. Monitoring and Review 
13.1 This Policy will be reviewed regularly and in line with any legislative and/or
organisational changes. The recognised trade unions will be consulted on any
future changes to this Policy. 
14. Contacts
Whistleblowing Officer Chief Auditor (or delegated officer)
whistleblowingofficer@renfrewshire.gov.uk
Monitoring Officer Head of Corporate Governance  
mark.conaghan@renfrewshire.gov.uk
Renfrewshire Council’s external
auditors
Azets
0141 567 450
Whistleblowing hotline
Available Monday-Thursday from
9am to 4.45pm and Friday 9am to
3.55pm
0300 300 1314
whistleblowingofficer@renfrewshire.gov.uk
Protect
(Independent whistleblowing charity) 
The Green House
244-254 Cambridge Heath Road
London
E2 9DA
Telephone: 020 3117 2520 
Email: whistle@protect-advice.org.uk 
Website: www.protect-advice.org.uk   
Page 110 of 214

Page 111

9 
PUBLIC
Annex 
DESIGNATED OFFICERS TO WHOM WHISTLEBLOWING CONCERNS MAY BE
REPORTED 
Alan Russell – Chief Executive
Gordon McNeil – Director of Environment, Housing and Infrastructure
Alastair MacArthur – Director of Finance and Resources
Janie O’Neill – Director of Children’s Services
Billy McClean – Chief Officer of the Renfrewshire Health and Social Care
Partnership 
Page 111 of 214

Page 112

1 
PUBLIC
Appendix 2     
For all Council employees.   
Local recruitment procedures are in place for Chief Officers and
Teachers. 
Recruitment Policy
Issue Number: 3                           
Issue Date: 02/26
Review Date:  02/28
This document is available
in alternative formats on
request. 
Page 112 of 214

Page 113

2 
PUBLIC
Contents          Page Number 
1. Introduction         3 
2. Purpose of the Policy       3       
3. Scope          3 
4. Responsibilities        4 
5. Recruitment Principles       4      
6. Statutory Right to Work Checks      5 
7. Declaration of Unspent Convictions      6 
8. Supporting Renfrewshire’s Communities     6 
9. Recruitment Training       6 
10. The Equality Act and the Public Sector Equality Duty   6 
11. Recruitment Complaints       7 
12. Conflict of Interest        7 
13. Confidentiality        7 
14. Equality and Human Rights Impact Assessment   7 
15. Monitoring and Review        8 
Page 113 of 214

Page 114

3 
PUBLIC
1. Introduction 
1.1 The Council is committed to attracting, selecting and appointing the best people
to deliver high-quality services for our communities.  We will recruit and retain
a workforce of the highest calibre and recognise that a diverse workforce,
bringing together different perspectives, experiences, values and backgrounds,
enhances organisational effectiveness and decision-making. As an equal
opportunities employer, we are committed to fostering an inclusive and fair
recruitment culture where everyone feels valued, respected and able to perform
at their best. 
1.2 Recruitment and selection decisions will be based solely on merit. All
candidates will be given a fair and equitable opportunity to demonstrate their
skills, experience and potential, regardless of any protected characteristic, in
line with relevant equality legislation. 
1.3 The Council will provide clear guidance and support for both managers and
candidates to ensure this policy is applied consistently and transparently,
promoting best practice in inclusive and effective recruitment. 
2. Purpose of The Policy 
2.1 The purpose of this policy is to provide a robust, consistent and transparent
framework for the recruitment and selection of employees across the Council.
It is designed to support services and managers to attract, assess and appoint
the most suitable candidates in a fair, inclusive and lawful manner. 
2.2 This policy aims to: 
• Ensure recruitment and selection decisions are objective,
evidence-based and made on merit.
• Promote fair, consistent and effective recruitment practices across all
Council services.
• Embed the Council’s equality, diversity and inclusion commitments
throughout all stages of the recruitment and selection process.
• Ensure compliance with all relevant employment and equality
legislation and reflect recognised best practice.
• Support the development and sustainability of a skilled, diverse and
high-performing workforce capable of meeting current and future
service delivery needs. 
3. Scope 
3.1 The principles of this policy apply to all potential candidates and existing
employees. Separate local procedures apply when recruiting the Chief
Executive, Chief Officers, and Teaching staff. We also have separate
procedures in place for volume recruitment.   
3.2 This policy applies to the recruitment of posts that are permanent, temporary,
fixed term or casual/sessional. Services must ensure that any other partner
Page 114 of 214

Page 115

4 
PUBLIC
agencies acting on behalf of the Council for the purposes of recruitment
resources or shared recruitment campaigns apply the principles in this policy. 
4. Responsibilities   
4.1 All Managers, Elected Members, People & OD, Customer and Business
Services and the Trade Unions all have a part to play in ensuring the principles
of this policy are applied effectively. 
5. Recruitment Principles 
5.1 Vacancies will be advertised online, but we will provide and accept applications
in accessible formats where necessary. We can offer alternative, accessible
versions of the application form in formats such as large print, braille, audio,
Easy Read, and other languages if required. 
5.2 Prior to advertising, a vacancy must exist in the organisational structure, with a
job-evaluated, current job description and person specification available. 
5.3 An organised panel interview will assess a candidate’s suitability.  Selection will
be based on the essential and desirable criteria of the person specification. 
Panels will use structured scoring against the criteria and will record reasons
for decisions.  Other relevant assessment tools may also be used (appropriate
to the post being advertised). 
5.4 We are a Disability Confident employer and guarantee an interview to all
candidates with disabilities who meet the essential criteria for the job. 
5.5 We will consider any reasonable adjustments throughout the recruitment
process to support and promote a positive and inclusive recruitment
experience.  Advice on reasonable adjustments should be sought from People
& OD. 
5.6 As part of the commitment to #KeepThePromise, we will guarantee an interview
to all candidates who are care-experienced and meet the essential criteria for
the job. 
5.7 All candidates will be given reasonable information about what to expect in
advance regarding application format and assessment tools. 
5.8 If you are currently working with us and on the redeployment register, you will
normally be given the opportunity to note interest in jobs before they are
advertised.  If successful, the post will not be advertised. 
5.9 We will obtain a record of each candidate’s employment history and explore
any gaps with the candidate. 
5.10 All necessary pre-employment checks (for example, references, right to work,
appropriate vetting) must be completed before any successful candidate
commences employment with us.
Page 115 of 214

Page 116

5 
PUBLIC 
5.11 For posts where a criminal record check is required, this will be detailed in the
job advertisement and pack. Only successful candidates will be asked to give
details of their criminal record in line with legislation. 
5.12 Where a former employee has received voluntary redundancy or voluntary early
retirement, we will not normally re-employ or re-engage them for a period of 2
years from the date of leaving. 
5.13 Where a candidate gives inaccurate or misleading information or withholds
relevant information, this may be considered grounds for withdrawing a job offer
if a reasonable explanation is not provided. If the candidate has already been
appointed, we may take disciplinary action up to and including dismissal if a
reasonable explanation is not provided. 
5.14 Where a candidate is a former employee who was dismissed by us, we will be
entitled to review and consider the circumstances of the dismissal when
deciding whether to select the candidate for interview, and/or recruit. This will
also apply if the candidate resigned before the outcome of a disciplinary hearing
or investigation into an allegation of gross misconduct. 
5.15 All candidates will be assessed in line with our competencies, vision, and
values. 
5.16 We will issue a contract of employment to candidates on the first day of being
appointed to the Council.  We aim to appoint candidates within a maximum
period of 4-5 weeks after the preferred candidate is notified. For job roles that
have shorter notice periods, we will try where possible to have contracts sent
within a 2-week period. 
5.17 After the offer of employment is accepted, your personal data, for example your
personal email address or mobile number, may be used to share important
updates or information with you to improve communication and engagement.
You may opt out of this at any point. 
6. Statutory Right to Work Checks 
6.1 Vacancy Managers must ensure statutory right to work checks have been
completed before employment starts. All recruitment and vetting evidence will
be retained in line with data protection requirements. 
6.2 Where criminal record checks are required, this will be stated in the advert and
pack. Only the successful candidate will be asked to provide relevant details,
and only where lawful and proportionate.
6.3 For regulated roles involving children and/or protected adults, under the
Disclosure Scotland Act, PVG scheme membership is a legal requirement.
Services must follow Disclosure Scotland guidance and the Council’s safer
recruitment procedures.
Page 116 of 214

Page 117

6 
PUBLIC
6.4  We will not ask about spent convictions unless an applicable legal exception
applies. Where disclosure is requested, we will consider the information
received from Disclosure Scotland and assess its relevance to the role before
making any decision.   
7. Declaration of Unspent Convictions 
7.1 Applicants must disclose any unspent convictions during the recruitment
process, as required under the Rehabilitation of Offenders Act 1974. The
Council may consider this information when assessing suitability for a role,
ensuring that any decision is fair, proportionate, and directly relevant to the
position’s responsibilities. Failure to declare unspent convictions when asked
may result in withdrawal of an offer or termination of employment if discovered
later.   
7.2 Convictions that will never be spent, will be considered on a case-by-case
basis.  Appointment may be refused where the nature and severity of the
offence are relevant to the job role, and where appointment would pose an
unacceptable and significant risk to the Council, including the potential for
reputational harm.  Hiring mangers seek advice from People & OD and Legal
Services for any such cases. 
8. Supporting Renfrewshire’s Communities 
8.1 We are committed to supporting local business growth and tackling
unemployment in Renfrewshire and will therefore participate in all the Council’s
local employability initiatives and national government initiatives as part of the
recruitment process to assist with training opportunities and creating jobs for
disadvantaged or disengaged groups across Renfrewshire. We remain fully
committed to collaborating with schools, colleges, and universities, promoting
our employment opportunities and various career pathway routes into
employment through apprenticeships, traineeships, and internship
programmes. 
9. Recruitment Training 
9.1 If involved in the recruitment process, you must ensure you have received
training on the Council’s Recruitment Policy. The Chair of the Recruitment
Panel must be assured all panel members have received training prior to any
recruitment activities being undertaken. 
10. The Equality Act and the Public Sector Equality Duty 
10.1 The Equality Act 2010 and the Public Sector Equality Duty requires us to gather
evidence and use equality monitoring information from applicants to help
ensure we take all reasonable steps to eliminate possible discrimination. Your
equality monitoring data will be anonymised and will help us to ensure our
recruitment practices are fair and reasonable and understand the impact our
recruitment processes have on applicants from different equality groups.  We
will investigate reasons for any disproportionate trends in the recruitment
Page 117 of 214

Page 118

7 
PUBLIC
information and will consider, where appropriate, using positive action and
targeted recruitment to better perform the equality duty and encourage
applications from underrepresented groups for posts within the Council.   
10.2 Where requested, reasonable adjustments to the recruitment process will be
considered to ensure that no candidate is disadvantaged because of their
disability or any other protected characteristic. 
11. Recruitment Complaints 
11.1 Applicants who consider they have been unfairly treated in the application of
this policy, may submit a complaint to the Head of People & OD for
consideration. 
12. Conflict of Interest 
12.1 Recruitment panel members must declare any personal relationship with a
candidate, including family connections or close relationships outside of work. 
Where such a conflict exists, the panel member may be required to withdraw
from the recruitment and selection process to ensure fairness and
transparency. 
13. Confidentiality 
13.1 We will treat all information on application forms confidential and restrict access
to this information to those involved directly in the recruitment process and its
administration. 
13.2 Information relating to the recruitment process and activities should be
recorded, maintained, and processed confidentially and securely by the
relevant Service, HR & OD and Customer and Business Services. Any
information recorded and maintained will be used only to monitor the
effectiveness of this policy. 
13.3 Information processed may include paper or electronic records and will be done
so in line with Data Protection Laws, including the UK General Data Protection
Regulation (“UK GDPR”), the Data Protection Act 2018 and any enactment
thereunder or amendment thereto. 
13.4 The recruitment process and decisions arising from it must be documented and
documentation held securely for at least 6 months. 
14. Equality and Human Rights Impact Assessment 
14.1 This policy has been equality impact assessed in line with the Council’s
obligation to comply with the Equality Act 2010. 
Page 118 of 214

Page 119

8 
PUBLIC
15. Monitoring and Review 
15.1 This policy will be reviewed regularly and in line with any legislative changes
and best practice relating to recruitment activities.  The recognised trade unions
will be consulted on any future changes to this policy. 
Page 119 of 214

Page 120

1 
[PUBLIC  
Appendix 3     
Issue Number: 3                           
Issue Date: 04/26
Review Date:  04/28
This document is available
in alternative formats on
request. 
For all Council employees excluding Teachers. 
Parenting Leave and                       
Pay Policy
Supporting parents to get the balance right
Page 120 of 214

Page 121

2 
[PUBLIC 
Contents         Page Number 
1. Introduction          3
2. Purpose of the policy        3
3. Scope           4
4. Responsibilities         4
5. Ante-natal Leave and Pay        4
6. Maternity, Adoption and Surrogacy Leave and Pay    4
7. Maternity, Adoption and Surrogacy Support Leave and Pay   6
8. Paternity Leave and Pay        6
9. Shared Parental Leave and Pay       7
10. Parental Leave         7
11. Neonatal Care Leave and Pay       8
12. Parental Bereavement Leave       8
13. Bereaved Partner’s Paternity Leave (BPPL)     8
14. Additional Supportive Leave       9
15. Redeployment Rights         9
16. Confidentiality         10
17. Equality and Human Rights Impact Assessment    10
18. Monitoring and Review        10 
Page 121 of 214

Page 122

3 
[PUBLIC
1. Introduction
1.1 We are working to be the most supportive, caring and inclusive employer we
can be.  We want to provide you with a workplace where you feel safe, valued
and listened to, a place where you will have a good experience each day and
feel supported to achieve your own goals and aspirations, helping you to reach
your full potential.  We want to support you with parenting responsibilities to
achieve a better balance between your life inside and outside of work. 
1.2 Wherever you are employed in the Council, the work you carry out every day
matters to the communities and colleagues we serve, and without it, we cannot
deliver essential services to our communities or achieve our Council vision and
values.   
1.3 The Parenting Leave Policy is designed to offer you support and flexibility at
particular stages in your life, encouraging shared parenting responsibilities
between both parents and supporting the Council to address its gender pay gap
priorities.   
1.4 This policy covers leave and pay provisions relating to: 
• Ante-natal. 
• Maternity, Adoption and Surrogacy 
• Paternity 
• Shared Parental Leave
• Parental Leave
• Neonatal Care 
• Parental Bereavement 
1.5 Depending on the type of leave and pay entitlements, requests approved will
be pro-rated in line with your working hours/work pattern. For example, if you
only work on Mondays and Tuesdays, then one week of leave is 2 days. 
1.6 To ensure fair, inclusive and consistent implementation of this policy, including
eligibility criteria, pay rates as well as requesting and approval processes,
supporting guidance will be available on the Council’s intranet and from the
People & OD Team. 
2. Purpose of the Policy 
2.1 The purpose of the policy is to outline the Council’s parenting leave and pay
provisions available to the workforce, which supports and encourages our
people to share parenting responsibilities. 
2.2 The policy aims to: 
• Support employees who have parenting responsibilities and help them
achieve a better balance between working and parenting commitments;
Page 122 of 214

Page 123

4 
[PUBLIC
• Provide information and raise awareness of the different types of
parenting leave available in the Council, eligibility criteria and the
associated pay rates;
• Meet all legislative employment requirements and demonstrate best
practice;
• Apply fair, inclusive and consistent requesting and approval processes;
• Support the Council’s workforce planning, and gender pay priorities. 
2.3 This policy complements other Council policies such as Flexible Working,
Supportive Leave, Pregnancy Loss, Respect at Work, and Equality & Diversity. 
3. Scope 
3.1 This policy applies to all Council employees, excluding Teaching staff where
separate procedures are in place.  Advice and guidance on this and other leave
provisions are available from the People & Organisational Development (OD)
team. 
4. Responsibilities 
4.1 Managers, Elected Members, People & OD, Customer and Business Services
and the Trade Unions all have a part to play in ensuring the principles of this
policy are applied effectively. Responsibilities are outlined in the Parenting
Leave and Pay Supporting Guidance.   
5. Ante-natal Leave and Pay 
5.1 Antenatal leave is available to employees, which allows pregnant employees
and the father, partner or intended parent, the ability to request reasonable
paid time off to attend ante-natal care appointments including parentcraft and
dental.  You can request this leave using Business World. 
6. Maternity, Adoption and Surrogacy Leave and Pay 
6.1 You are entitled to take up to 52 weeks Statutory Maternity Leave or Adoption
Leave from day one of your employment. 
6.2 You do not have to take 52 weeks Maternity Leave however the mother is
required by law to take the first 2 weeks leave after the baby is born.  This is
called Compulsory Maternity Leave. 
6.3 Maternity and Adoption leave is made up of: 
• 26 weeks Ordinary Maternity Leave or Ordinary Adoption Leave
(OML/OAL) and;
• 26 weeks Additional Maternity Leave or Additional Adoption Leave
(AML/AAL).  
Page 123 of 214

Page 124

5 
[PUBLIC
6.4 If you have 26 weeks or more continuous service at the 15th week before
Expected Week of Childbirth/Expected Week of Adoption (EWC/EWA), you will
receive Occupational Maternity Pay or Ordinary Adoption Pay (OMP/OAP) and
Statutory Maternity Pay or Statutory Adoption Pay (SMP/SAP) at the following
rates:
• Week 1-6 6 weeks at 90% of a week’s pay,
including SMP where eligible. 
• Week 7-18 12 weeks at 50% of a week’s pay plus the
lower rate of SMP provided earnings do
not exceed normal pay. 
• Week 19-39 21 weeks at the SMP rate. 
• Week 40-52 Unpaid 
6.5 If you have less than 26 weeks continuous service at the 15th week before the
EWC/EWA, you will not be eligible for either OMP/OAP or SMP/SAP. However,
you may be entitled to receive up to 39 weeks of Maternity Allowance or
Adoption Allowance payable by the Government. 
6.6 If you are a surrogate or intended parent and apply for a parental order in
respect of the child within 6 months of the birth, and you expect the order to be
granted, you are entitled to take leave in line with the maternity, adoption and
Surrogacy leave and pay provisions at section 6.4 above.   
6.7 Payments made by the Council during Maternity Leave or Adoption Leave
which are over and above your statutory entitlement are made on the
understanding that you will return to employment with the Council for a period
of at least 3 months. SMP/SAP payments made to you would not be recovered. 
6.8 You should inform your line manager that you are pregnant as soon as you are
happy to do so and no later than the 15th week before the EWC/EWA.  At this
time, a maternity risk assessment for new and expectant mothers will be
completed by your line manager.   
6.9 You should request Maternity Leave on Business World and attach the required
documentation such as your MATB1 form, Matching Certificate and /or Parental
Order, when available. 
6.10 During your Maternity or Adoption Leave, you can choose to work up to 10 days
which can worked in agreement with your line manager throughout the year. 
These are called Keeping in Touch (KIT) days. The hours you work on an
agreed KIT day will be paid at your normal rate of pay. This will not affect your
statutory entitlements. 
6.11 We are a Breastfeeding Friendly Scotland employer. We support and
encourage colleagues who wish to continue to breastfeed or express milk in the
Page 124 of 214

Page 125

6 
[PUBLIC
workplace (including milk to be donated).  We will encourage flexible
arrangements so that you can breastfeed and will provide suitable facilities so
you can express milk and store it.  We will raise awareness of the facilities
available at work locations. You should discuss any requirements should you
feel comfortable to do so with your line manager. 
7. Maternity, Adoption and Surrogacy Support Leave and Pay 
7.1 Maternity, Adoption and Surrogacy Support Leave of up to a maximum of 1
weeks’ paid leave (pro-rated) can be requested by fathers, partners, or intended
parents who have less than 26 weeks continuous service with the Council or
around the time of the birth or adoption placement/match.  In addition,
Maternity, Adoption and Surrogacy Support Leave of up to a maximum of 1
weeks’ paid leave will also be available to request for a nominated carer of an
expectant mother, adopter, or intended parent at or around the time of the birth
or adoption placement/match.  This will enable nominated carers to assist in the
care of the child and provide support to the mother, primary adopter, or intended
parent.   
7.2 You may take this leave during the period from 1 week before the EWC/EWA
and up to 3 weeks after the birth, match, or placement for adoption.   
7.3 When you request Maternity, Adoption and Surrogacy Support Leave you must
provide your line manager with evidence that you are a nominated carer for the
child.  This evidence must be either confirmation from your GP or a birth
certificate confirming the child’s date of birth and a declaration from the person
you are supporting.  Leave will only be approved once this evidence is provided. 
7.4 Maternity, Adoption and Surrogacy Support Leave is not available to fathers,
partners or intended parents who access paid Paternity Leave provisions. 
8. Paternity Leave and Pay 
8.1 If you are responsible for your child’s upbringing and wish to take time off work
to care for your child or support the primary adopter of your child, you are
entitled to Statutory Paternity Leave.   
8.2 You must provide notice to take paternity leave from your first day of
employment with the Council as soon as reasonably practicable.  You can
request up to a maximum of 4 weeks Paternity Leave.  Paternity Leave is
unpaid during the first 26 weeks of your employment. 
8.3 If you have 26 weeks continuous service with the Council at the start of the 15th
week before the EWC/EWA and are either: 
• A biological father; 
• A partner or husband who is not the baby’s biological father; 
• A mother’s female partner or civil partner in a same sex couple;
• A partner/husband/wife of a person adopting a child;
• A partner/civil partner of a person adopting a child;
Page 125 of 214

Page 126

7 
[PUBLIC
• the intended parent (if you are having a baby through a surrogacy
arrangement); 
You can request up to a maximum of 4 weeks paid Paternity Leave. 
8.4 You will be paid at 100% of a weeks’ pay for the first week, followed by 3 weeks
paid at 90% of a weeks’ pay (including SPP). This can be taken consecutively
or in separate one-week blocks at any point in the first 12 months following the
birth of your child or after placement for adoption. You get the same amount of
leave even if you have more than one child, for example, twins. 
8.5 You will need to provide 4 weeks’ notice for each period of paid Paternity Leave
and submit your request on Business World. You can vary the dates if you give
at least 4 weeks’ notice of the variation. We recognise that notice periods for
Adoption Leave will vary due to the inherent fluctuations in the adoption
process. 
8.6 You can take paternity leave after a period of shared parental leave. 
9. Shared Parental Leave and Pay 
9.1 Shared Parental Leave allows eligible mothers, fathers, partners, and adopters
to choose how to share time off work after their child is born or when placed
with them for adoption. This provides you with more flexibility in how to share
the care of your child in the first year following birth or adoption.  You can decide
to be off work at the same time as your partner and/or take it in turns to have
periods of leave to look after your child. You can share up to 50 weeks of leave
and up to 37 weeks of pay between you and your partner.   
9.2 To be eligible for Shared Parental Leave, both parents must meet the
requirements set out in the Supporting Guidance.  Shared Parental Leave will
be paid in line with the Council’s current Maternity and Adoption Pay provisions. 
9.3 During your Shared Parental Leave, you can choose to work up to 20 days.
These are called Shared Parental Leave in Touch (SPLIT) days, which can be
worked in agreement with your line manager throughout the year. The hours
you work on an agreed SPLIT day will be paid at your normal rate of pay. This
will not affect your statutory provisions. 
9.4 You may also take Statutory Paternity Leave with pay if you have already taken
Shared Parental Leave and pay.   
10. Parental Leave 
10.1 Parental Leave is an additional entitlement and allows parents to request up to
18 weeks’ unpaid leave, per child up to their 18th birthday, to look after their
child’s welfare. You can request up to a maximum of 4 weeks’ unpaid parental
leave for each child in a 12-month period.  You must take parental leave as
whole weeks, for example, 1 week or 2-week blocks and you can request this
leave using Business World. 
Page 126 of 214

Page 127

8 
[PUBLIC
11. Neonatal Care Leave & Pay 
11.1 Neonatal Care Leave is available to support you if your child is receiving or has
received neonatal care within the first 28 days after the day of their birth and for
a continuous period of at least 7 days. This leave is available from day one of
your employment. 
11.2 You are entitled to request 1 weeks’ leave for every 7 days your child spends
in neonatal care up to a maximum of 12 weeks leave. This leave can be used
within the first 68 weeks of your child’s birth but not at the same time as any
other leave you may be taking such as Maternity Leave. 
11.3 If you have 26 weeks or more continuous service with the Council you will
receive Statutory Neonatal Care Pay throughout the leave period. If you have
less than 26 weeks continuous service, you will not be eligible for Statutory
Neonatal Care Pay. 
11.4 You can request this leave using Business World. 
12. Parental Bereavement Leave 
12.1 Losing a child is an unimaginable trauma. Parental Bereavement Leave is
available to you if you lose a child under the age of 18 or suffer a stillbirth after
24 weeks of pregnancy. This leave is available from day one of your
employment. Your manager will also provide you with any additional support or
assistance you may need.  We will continue our journey to improve the
workplace experience by creating an environment where our people who have
experienced trauma can feel safe and have a sense of control to re-engage and
return to productivity. 
12.2   You are entitled to 2 weeks leave and this can be taken as a single block or as
2 separate weeks within 56 weeks of the date of the death or stillbirth. This
leave is in addition to any other leave you may take and should not be taken at
the same time. 
12.3 If you have 26 weeks or more continuous service with the Council you will
receive Statutory Parental Bereavement Pay throughout the leave period. If you
have less than 26 weeks continuous service, you will not be eligible for
Statutory Parental Bereavement Pay. 
13. Bereaved Partner’s Paternity Leave (BPPL) 
13.1 The right to take BPPL applies where the primary carer dies and is intended to
support continuity of care for children in highly distressing circumstances. 
13.2 In the event of bereavement (where the child’s mother or primary adopter dies
in childbirth, or within 12 months of birth or placement for adoption), the
bereaved father or partner is entitled to statutory Bereaved Partner’s Paternity
Leave from day one of employment. 
Page 127 of 214

Page 128

9 
[PUBLIC
13.3 The father of the child or partner of the deceased will be entitled to take up to
52 weeks' unpaid leave before the child's first birthday (provided they have the
main responsibility for the child’s upbringing and are taking the BPPL to care
for the child).  If, however, the child’s primary carer dies 20 weeks after
childbirth, the employee will only be entitled to 32 weeks’ leave. 
13.4 BPPL usually starts and ends within the same 52-week period following the
child’s birth or adoption. There is a limited exception to this where the
bereavement occurs less than 14 days before the end of the 52-week period.
In those circumstances, the employee may take up to 14 days’ BPPL. 
13.5 Employees may work up to ten “keeping in touch” days during leave, by
agreement, without bringing the leave to an end. 
13.6 If the child dies, bereaved fathers/partners can remain on paternity leave for up
to 8 weeks within the 52-week period, if they have not taken BPPL before the
child’s death. 
13.7 Employees will benefit from extended enhanced redundancy protection
(mirroring protections available to those taking maternity leave). Similar rights
are provided for those who have adopted a child.   They are also entitled to
return to the job or in some circumstances, to a suitable alternative job. 
14. Additional Supportive Leave   
14.1 You can request a period of unpaid supportive leave, up to a maximum of 1
year to support any of the above leave provisions. 
14.2 Your Head of Service may approve unpaid supportive leave if your service is
able to cover the duties of your post, without serious disruption to the service
or significant financial cost. 
14.3 You can request this in writing to your Head of Service explaining the reasons
for the request and the requested start and end date. 
14.4 Additional leave may be available in line with other Council policies to support
the above leave provisions. 
15. Redeployment Rights 
15.1 We will prioritise offers of suitable alternative employment to a wider range of
employees where their roles no longer exist as part of a service review. Those
who are away from work because they are on maternity, adoption or shared
parental leave, already have this right. Under the regulations this right extends
to cover the following: 
• Pregnant employees - From the date you inform your manager that you
are pregnant, until your maternity leave starts, or where the pregnancy
ends and you are not entitled to maternity leave, until two weeks after 
• the end of the pregnancy.
Page 128 of 214

Page 129

10 
[PUBLIC 
• On maternity or adoption leave - For 18 months from the date of birth or
the date of placement for adoption. 
• On shared parental leave – For 18 months from the date of birth or the
date of placement for adoption, when taking a period of at least 6 weeks
continuous leave. When taking less than 6 weeks continuous leave or
discontinuous leave, the protected period will end on the last day of each
period of leave taken.
16 Confidentiality 
16.1 Information relating to Parenting Leave and Pay provisions will be recorded,
maintained and processed confidentiality and securely by your service, line
manager, People & OD and relevant partners.  Information will not be divulged
to any third parties without your written consent. 
16.2 Information processed may include paper or electronic records and will be done
so in line with Data Protection Laws, including the UK General Data Protection
Regulation (“UK GDPR”), the Data Protection Act 2018 and any enactment
thereunder or amendment thereto.” 
17 Equality and Human Rights Impact Assessment 
17.1 This policy has been impact assessed in line with the Council’s obligation to
comply with the Equality Act 2010 and the Public Sector Equality Duty. 
18 Monitoring and Review 
18.1 This policy will be reviewed regularly and in line with any legislative and
organisational changes. The recognised trade unions will be consulted on any
future changes to this policy.   
Page 129 of 214

Page 130

PUBLIC 
_________________________________________________________________________
To: Finance, Resources and Customer Services Policy Board
On: 23 April 2026
Report By:  Chief Executive 
Heading:  Chief Executive’s Service – Health & Safety Action Plan &
Performance Indicators 2026/2027 
1. Summary 
1.1 The Council’s Health, Safety and Welfare Policy requires each service to submit an
annual Health and Safety action plan to the relevant Policy Board. 
1.2 The Chief Executive’s Service action plan and performance indicators for 2026/2027
is attached as Appendix 1 to this report. It sets out the planned actions the service
will undertake during 2026/2027, outlining the service’s commitment to continuous
improvement in health and safety performance in accordance with the People
Strategy – Ongoing implementation of key priorities (Health and Wellbeing Plan
2024/2029).
________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Finance, Resources and Customer Services Policy
Board:
i) approves the Chief Executive’s Service health and safety action plan and
performance indicators for 2026/2027 at Appendix 1.
__________________________________________________________________ 
3. Background 
3.1 The Chief Executive’s Service delivers a range of strategic services within the
organisation. 
Item 11
Page 130 of 214

Page 131

PUBLIC 
We do this through a range of activities delivered across our service areas: policy
and partnerships, economy and development, City Deal and infrastructure, and
communications, marketing and events. Our services are delivered by 226
employees, led by the Chief Executive who is supported by the Head of Policy and
Partnerships, the Head of Marketing and Communications, the Head of Economy
and Development, and the Programme Director (City Deal and Infrastructure). 
3.2  The Chief Executive’s Service Head of Policy and Partnerships is the lead officer for
health, safety and wellbeing within the service and is supported by the Strategy,
Policy and Insight Manager.  We have a proactive approach and commitment to
health, safety and wellbeing which is supported by the service’s working group.
Psychological is the biggest absence reason both council-wide and within the service
and we have had a recent focus on employee mental health. 
3.3 The service’s health and safety working group forms part of the wider corporate
health and safety governance structure. The group provides a platform for reviewing
service-level performance, identifying emerging risks, and sharing wellbeing activity.
Key actions, issues and updates from the service group are highlighted at the
Corporate Health and Safety Committee, ensuring that local and service priorities
align with corporate policy and decision-making. 
3.4 As with other Council services, employees have been hybrid working, splitting their
working week between home and office. The service has adapted its processes and
procedures to ensure that standards for all employees working from home or in the
office are maintained, with the health, safety and wellbeing of employees being a
priority. The service’s health and safety working group meet’s quarterly via Teams. 
3.5 The action plan and performance indicators 2026/2027 identifies areas for future and
continued action which is included as Appendix 1 to this report. The action plan is
monitored on a quarterly basis by the service’s health and safety working group and
an biannual progress report will be presented to the Finance, Resources and
Customer Services Policy Board in both Autumn 2026 and Spring 2027. 
3.6 The preparation of this action plan has been supported by the Health and Safety
Team within Finance and Resources, Business, Risk & Safety. 
Page 131 of 214

Page 132

PUBLIC
Implications of the Report 
1. Financial Implications – None. 
2. People & Organisational Development - This report supports the Council’s
commitment to the health, safety, and wellbeing to employees and anyone else who
could be affected. 
3. Community/Council Planning Implications – None. 
4. Legal Implications – None. 
5. Property/Assets Implications – None. 
6. Information Technology Implications – None. 
7. Equality & Human Rights Implications - The recommendations contained within
the report have not been assessed in relation to their impact on equalities.  Should
the need arise, any specific actions will be reviewed for their impact on equality
groups. 
8. Health & Safety Implications - The report supports and demonstrates the Council
and the Chief Executive’s service’s commitment to ensuring effective health and
safety management.
9.  Procurement Implications - None. 
10.  Risk Implications - The report supports the overarching management of risk within
Renfrewshire Council. 
11.  Privacy Impact Implications - None. 
12. Cosla Policy position – None. 
13. Children’s Rights – this report is for noting and has no direct implications on
children’s rights.   
14. Climate Risk – None.
___________________________________________________________________ 
List of Background Papers 
None
___________________________________________________________________ 
Author:           Pamela McDonald, Policy Officer, pamela.mcdonald@renfrewshire.gov.uk 
Page 132 of 214

Page 133

PUBLIC 
Chief Executive's Service Health and Safety Action Plan & Performance Indicators 2026/2027                                        Appendix 1 
Action Code Action Title Due Date
CEH&S26.01
Continue to implement the Council’s Health & Wellbeing Strategy ensuring all employees are aware of
initiatives and participate where relevant / required, including any related performance management
measures.  The service focus will primarily be supporting employee mental health.
31-Mar-2027
CEH&S26.02 Awareness and compliance with the current corporate policy on Health, Safety and Welfare. 31-Mar-2027
CEH&S26.03 Monitor all task based risk assessments on the services risk assessment register to ensure they remain
suitable and sufficient.   31-Mar-2027
CEH&S26.04 Build on the success of a planned management led health and safety inspection programme for 2026/27
across all service locations. 31-Mar-2027
CEH&S26.05 Support the Councils trauma programme by ensuring trauma-informed principles are included in service
health, safety and wellbeing activity, including the service WOIR planned programme. 31-Mar-2027
CEH&S26.06 Monitor DSE assessments. 31-Mar-2027
CEH&S26.07 Monitor the completion of health and safety training on iLearn across the service, specifically Display
Screen Awareness, Evacuation Process for Renfrewshire House and for managers outwith HQ: Asbestos
Awareness, Duty to Manage Asbestos Refresher and Control of Contractors courses.
31-Mar-2027
CEH&S26.08 Implement a procedure for managers to monitor employee H&S training needs within their service area
providing service overview of overall H&S training compliance. 30 Sept 2026
CEH&S26.09 Continue to actively promote a positive reporting culture and monitor all accidents/incidents to ensure
timely action and compliance. 31-Mar-2027
CEH&S26.10 Ensure that all events planned have an individual event manual which includes health and safety. 31-Mar-2027
CEH&S26.11 Ensure all service areas are represented at the Chief Executive’s health and safety working group. 31-Mar-2027 
PI Code Performance Indicator(s) Target 
2026/27
CEHSRA % of risk assessments reviewed within 30 days of planned review date.  100%
CEHSWOIR Number of WOIRs completed within the year. 4
Page 133 of 214

Page 134

PUBLIC
PI Code Performance Indicator(s) Target 
2026/27
CEHSWOIRACT Number of actions completed from WOIRs. Data Only
CEHSDSE % of employees with a current DSE assessment.  100% 
Page 134 of 214

Page 135

PUBLIC 
To: Finance, Resources and Customer Services Policy Board
On: 23 April 2026 
Report by: Director of Environment, Housing & Infrastructure 
Heading: Facilities and Property Services - Service Update Report 
1 Summary 
1.1 Environment, Housing & Infrastructure brings together a range of Council
services and activities, with both strategic and operational responsibilities. This
report provides an operational performance update on Facilities Management
(Hard and Soft Services), Building Services and Technical Services delivered by
Environment, Housing & Infrastructure since the last Policy Board in February
2026. 
2 Recommendations
It is recommended that members of the Finance, Resources and Customer
Services Policy Board: 
2.1 Note the content of this report. 
3 Operational Update 
Hard Facilities Management (Hard FM) 
3.1 Public Buildings – Capital Projects 
3.1.1 As part of on-going improvements for sports/activities across the learning estate,
Officers are currently exploring the provision for additional Multi Use Games
Arenas (MUGAs) and upgrades to red blaes pitches, within a number of primary
schools. This work will be discussed with Children’s Services and undertaken on
a priority basis as the budget allows. A commission has been raised for feasibility
studies to 5 schools:
• Barsail PS
• St Anne’s PS
Item 12
Page 135 of 214

Page 136

PUBLIC
• Gallowhill PS
• East Fulton PS 
• Kilbarchan PS 
3.1.2 Feasibilities studies are now complete, and the reports are currently being
reviewed. Officers have also shared with colleagues within Children’s Services,
and a meeting will be arranged to discuss best way forward. The current estimated
cost plan indicates a budget of more than £1m may be required for the works,
therefore, certain schools will require to be prioritised as the current capital budget
remaining (circa £0.5m) is not sufficient. 
3.1.3 Following the commitment at the Council budget in February 2026 to provide
£1.4 investment in school football pitches, preparation has started on the
provision of 2 new artificial pitches for St Benedict’s HS and Linwood HS. This
would ensure a 3G provision at all secondary schools in Renfrewshire. Due to
the PPP contract, discussions have started with AMEY and Renfrewshire
Schools Partnership to assess ground conditions and look to move forward.  
3.1.4 The tender for decarbonisation surveys to 5 schools went out to the market and
was reviewed in late January 2026. The contract has been awarded to ECD
Architects and surveys have concluded. The current programme indicates that
reports will be ready for submission/review by mid-May 2025. A further update
will be brought to this policy board in due course. 
3.1.5 A contract has been awarded for part renewal of Heriot Primary School roof and
works will commence during the summer break. 
3.1.6 A project is currently being set up for future investment in the OneRen estate
following the allocation of funding as part of the budget setting meeting in
February 2026. 
3.2 Public Buildings - Lifecycle Replacement works 
3.2.1 Works have progressed well this fiscal year and officers continue to explore
areas of investment across the estate. 
3.2.2 The 26/27 Lifecycle Proposals for the PPP Schools estate has been received
from Renfrewshire Schools Partnership and is currently under review by the
Authority. 
2025/26 (New Works) 
Site Work Required
Park Mains H.S. Replace door swing operators and sensors
Johnstone Town Hall
Replace automatic door operator (inner disabled
access door)
Renfrewshire House South roof pipework/insulation replacement
Page 136 of 214

Page 137

PUBLIC
Beechwood Community Centre
Restoration of Mahogany basket weave mosaic
parquet staves (complete)
Johnstone Castle Community Centre Replace Network Video Recorder
Castle Semple Condition survey 
Underwood Road Improve barriers
St Margarets P.S. Remove bossed render
Mary Russell Various roof repairs and gym wall
Weavers Linn Replace fire alarm panel
Renfrew High School Repairs to windows
Houston Park Repair fence
Riverbrae school
Fit access ladder at Sprinkler tank for H&S
purposes
Glenburn Resource Centre Signage and lighting upgrades 
3.3 Public Buildings – Reactive/General Improvement works: 
3.3.1 The Hard FM team are currently working on the following commissions: 
• HQ Building Management System upgrade - options appraisal includes
the installation of new routers and is currently being finalised with ICT.  
• HQ lining of car park, general clean up and drainage works. Works are
on-going. 
• Renfrew Victory Baths – Roofing works to be added to the contract
planned for late 2026/27. Minor improvements or upgrades will be carried
out post contract award.
• Officers continue to explore potential upgrade works within community
buildings and to help promote potential CAT transfers.
• Lochfield Primary School party wall – 3 design packages have been
issued to the neighbours affected. The plan is to knock down the wall and
rebuild during the summer break.
• Over 40 defibrillators across the school estate have been being renewed. 
3.4 Public Buildings compliance – Key Performance Indicators (KPIs) 
3.4.1 Compliance stats for this quarter are on target, returning 90% across all tasks.
Officers will continue to monitor to ensure high levels are maintained. 
3.4.2 Compliance performance within the PPP Schools has returned to 100% for
October, November & December. 
3.5 Public Buildings - Repairs data 
3.5.1 The repairs profile remains as expected, as detailed below: 
Page 137 of 214

Page 138

PUBLIC
2025/26
Repairs
Education Core Prestige OneRen Total
7542 1962 958 267 10729 
The pressure on the repairs budget remained a challenge at the end of the
financial year which led to emergency-only jobs. Any deferred jobs will be
actioned early in the 2026/27 financial year. 
3.6 Responsive Repairs 
3.6.1 The numbers shown below are only the repairs carried out by Building Services
on behalf of Housing Services from April 2025 to February 2026. These numbers
are very similar to the total numbers at the same point in 2024/25. 
3.6.2 Repairs to Public Buildings
Building Services carry out responsive repairs across public buildings and OneRen
properties across Renfrewshire. Officers are working with our colleagues within Hard FM
to identify and improve aspects of categorisation to ensure the works are being deployed
with the correct timescale for completion. 
Page 138 of 214

Page 139

PUBLIC 
3.6.3 Compliance - Public Buildings
Building Services carry out compliance works across a number of areas. Officers from
both teams work together to continue to track and monitor data to maximise and increase
the compliance of the Renfrewshire Council estate. 
3.7 Voids 
3.7.1 From January through February 2026, Building Services void team received
278 job orders, 79 of which have been full Void packages with an average
estimation of 133 operative hours per property, the team are continuing to
perform well and turn around void properties quickly. 
3.7.2 The increased remedial workload in void properties shows no sign of falling and
continues keeping within KPI targets challenging. Building Services continue to
use every available resource to ensure the timescales are being met, with
reports showing the average void days for Building Services, minus exemptions
in January was 10.7 days and February coming in at 12.2 days, this puts
Building Services in a great position for finishing year end below the 14-day KPI
target. 
4     Soft Facilities Management (Soft FM) 
4.1 School Meals 
4.1.1 The annual School meal survey has been issued for completion by Soft FM staff,
Children's Services staff, pupils and parents to gain wider feedback on the current
menu cycle. Open for 4 weeks this will provide a narrative to develop the next menu
cycle for Aug 2026. This has been shared on learning platforms, and the cashless
catering system Parent Pay. 
4.1.2 New tills are being installed in Renfrewshire Secondary Schools to help assist in the
rollout of the pre-order app across the remaining Secondary School sites. Due to
connectivity issues due to the age of the on-site equipment, this was identified as a
requirement to enable a smoother service delivery without wi-fi connectivity impacting
service. 
4.1.3 All planned kitchen works to upgrade school sites to cooking establishments have been
implemented. A further 2 sites, St John Ogilvie Primary in Paisley and St Fillan's
Primary in Houston, are planned to return to fully operational cooking kitchens by April
2026 utilising remaining capital budget. These will see minor kitchen improvements
carried out with the purchase of new equipment along with the creation of new Senior
Page 139 of 214

Page 140

PUBLIC
Facilities Operative - Production Cook positions. 
4.2 Scottish Child Payment 
4.2.1 Work continues to focus on increasing the number of pupils accessing universal free
school meals (P1–P5), free school meals, and paid meals across both primary and
secondary schools. While uptake remains strong in the early years of primary
education, data indicates a gradual decline in participation among older primary year
groups.   
4.3 Food Waste Management in Renfrewshire Primary Schools 
4.3.1 In response to heightened focus on sustainability and compliance with HMIE
inspections and Food for Life award criteria, Renfrewshire Primary Schools have fully
implemented a comprehensive food waste management strategy. Beginning in August
2025, a structured process was introduced to track and measure food production,
service, and dining hall waste across all schools. This initiative included the installation
of new waste segregation units in dining halls and close collaboration with Children’s
Services to actively engage pupils in reducing food waste through awareness and
participation. 
4.3.2 Branding has now been introduced within school dining environments. New signage,
badges, and associated materials have been implemented and introduced to schools
to promote positive messaging around school meals and sustainability, reinforcing the
importance of reducing waste. 
4.3.3 Food waste at production and service stages has been significantly minimised through
the pre-order system integrated with cashless catering. However, despite these
measures, waste levels within dining halls remain a challenge, primarily due to uneaten
meals and plate waste. A PowerPoint education resource has been developed and
shared with Children's Service’s staff to further share the collaborative approach to
reducing food waste within dining halls continued engagement with pupils, staff, and
stakeholders will be essential to address this issue and drive further improvements. 
4.4    Breakfast Provision 
4.4.1   In response to the Scottish Governments announcement in relation to a free breakfast 
provision for all primary age pupils, discussions have begun with other Local Authorities         
to understand models currently in place and the logistical challenges around the 
supervision of pupils at breakfast services. Due to the announcement of 1 hour per day 
supervision.  
5     Technical Services 
5.1 Current Commissions 
5.1.1 Officers within Technical Services continue to work across the Renfrewshire
Council’s property portfolio and given the workload, major projects are reported
to the respective Board e.g. Education and Children’s Services Board. 
Page 140 of 214

Page 141

PUBLIC 
Implications of the Report 
1. Financial – Any financial elements referenced in this report will be progressed
through the Council’s financial & budget planning process. 
2. HR & Organisational Development – Apprentice recruitment detailed in the
report will be undertaken as per standard Renfrewshire Council recruitment
processes. 
3. Community/Council Planning – the report details a range of activities which
reflect local community and council planning themes. 
4. Legal – As detailed within the report. 
5. Property/Assets – As detailed within the report in relation to work on the
Council property portfolio. 
6. Information Technology - None 
7. Equality & Human Rights – The recommendations contained within this
report have been assessed in relation to their impact on equalities and human
rights. No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report. If required following implementation,
the actual impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be published
on the Council’s website. 
8. Health & Safety – Advice and guidance is being given to protect the health and
safety of employees and service users when carrying out priority services for
the
Council in line with government and health guidance. 
9. Procurement – As noted within the report. 
10. Risk – None 
11. Privacy Impact – The Scottish Government have introduced legislation to
allow the data sharing with local authorities in relation to parents/carers who
receive the Scottish Child Payment. 
12. COSLA Policy Position – None 
13. Children’s Rights – Facilities and Property Services are essential in trying to
assist and deliver in support of Children’s Rights. In particular, the report
demonstrates compliance by ensuring buildings are suitable provides good
educational establishments (Article 28 - Access to Education) and by delivering
schools meals and nutritious food (Article 27 – Food, Clothing, and a safe
home).
Page 141 of 214

Page 142

PUBLIC 
14. Climate Change – Parts of the work undertaken in this report will reduce
carbon emissions and assist in trying the reach Net Zero targets by improving
efficiency of current buildings and new buildings across the portfolio. 
List of Background Papers 
None 
Author: Gordon McNeil, Director of Environment, Housing & Infrastructure
Email: gordon.mcneil@renfrewshire.gov.uk
Page 142 of 214

Page 143

PUBLIC 
___________________________________________________________________
To:  The Finance, Resources and Customer Services Policy Board
On:  23 April 2026
___________________________________________________________________
Report by: The Director of Finance and Resources
___________________________________________________________________
Heading: Corporate Procurement Strategy 2026-2027 
___________________________________________________________________
1. Summary
1.1 The Procurement Reform (Scotland) Act 2014 requires that any public
sector body that expects to have significant procurement expenditure
must:
A. Prepare a procurement strategy, setting out how the authority
intends to carry out regulated procurements; or
B. Review its procurement strategy for the current financial year and
make any revisions to it as the authority considers appropriate. 
1.2 In accordance with this requirement, Renfrewshire Council published its
Corporate Procurement Strategy in 2023 covering the period 2023/24
to 2025/26. 
1.3 The Corporate Procurement Strategy sets out the strategic context
within which the Council is operating, and highlights the key priorities
for the Procurement Team, to ensure that they can support the Council
to deliver its strategic goals and objectives. 
1.4 This updated Corporate Procurement Strategy 2026-2027 aligns to the
goals and objectives set out in the Council Plan and recognises the
need to address wider social policy through procurement. It covers the
period 1 April 2026 to 31 December 2027 to accommodate the planned
refresh of the Council Plan in 2027.
___________________________________________________________________
Item 13
Page 143 of 214

Page 144

PUBLIC
2. Recommendations
2.1 It is recommended that the Finance, Resources and Customer Services
Policy Board:
a) Approves the Corporate Procurement Strategy 2026-2027; and 
b) Notes that in accordance with legislation, this strategy will be
subject to annual review and updated as appropriate. 
_________________________________________________________
3. Background
3.1 Section 15 of the Procurement Reform (Scotland) Act requires that any
public sector body with an annual regulated procurement spend of
£5million per annum or more publishes a Procurement Strategy.
3.2 Regulated procurements are contracts with values over £50,000 and
above for goods and services, and of £2million and above for works.
3.3 The Scottish Government guidance for the preparation of a
procurement strategy confirms that: 
“A procurement strategy allows a contracting authority to set out how it
intends to ensure that its procurement activity delivers value for money
and contributes to the achievement of the authority’s broader aims and
objectives, in line with Scotland’s National Outcomes.”
3.4 Section 18 of the Procurement Reform (Scotland) Act requires public
bodies who publish procurement strategies to also publish an Annual
Report which provides an update on performance in terms of the
actions set out in the procurement strategy. Both the Procurement
Strategy and the Annual Procurement Report are published on
Renfrewshire Council’s website.
3.5 Appendix 2 to this report contains the Procurement Strategy for
Renfrewshire Council for 2026-2027.  It demonstrates how
procurement in Renfrewshire will play a fundamental role in supporting
the delivery of the Council Strategic Objectives
3.6 The Procurement Strategy sets out four Strategic Objectives for
Procurement: 
1. Provide effective and efficient procurement services for our
stakeholders;
2. Support the Council’s financial challenges;
Page 144 of 214

Page 145

PUBLIC
3. Support Community Wealth Building and local growth;
4. Support the Council’s net zero ambitions.
___________________________________________________________________
Implications of the Report
1. Financial – none arising directly from this report.   
2. HR & Organisational Development – none arising directly from this
report. 
3. Community/Council Planning – Renfrewshire Council’s Procurement
Strategy aligns to each one of the five Strategic Outcomes established
in the Council Plan, setting out goals and actions for the Corporate
Procurement Team to support the delivery of these Strategic
Outcomes.  
4. Legal – The Procurement Strategy is published in accordance with the
requirements of Section 15 of the Procurement Reform (Scotland) Act
2014. 
5. Property/Assets - none arising directly from this report.   
6. Information Technology - none arising directly from this report.  
7. Equality & Human Rights - none arising directly from this report.   
8. Health & Safety - none arising directly from this report.
9. Procurement - The Procurement Strategy is published in accordance
with the requirements of Section 15 of the Procurement Reform
(Scotland) Act.
10. Risk - none arising directly from this report.
11. Privacy Impact - none arising directly from this report.
12. Climate Risk - none arising directly from this report.
13. Children’s Rights - none arising directly from this report.
14. Cosla Policy Position - none arising directly from this report. 
_____________________________________________________________________________________________________
List of Background Papers - None
Author:         Jenny Bowles, Corporate Procurement Manager
Jenny.bowles@renfrewshire.gov.uk, 0141 487 0386
Page 145 of 214

Page 146

1 
PUBLIC 
Renfrewshire Council
Corporate Procurement Strategy
2026 and 2027 
Page 146 of 214

Page 147

2 
PUBLIC
Table of Contents
1. Statutory Duty .................................................................................... 3
2. The Local Context - Renfrewshire ...................................................... 3
3. Procurement In Renfrewshire ............................................................ 3
4. Supporting Council and National Priorities....................................... 4
5. Procurement Strategic Objectives ..................................................... 9
6. Monitoring, Reviewing and Reporting on Strategy .......................... 11
7. Strategy Ownership and Contact Details ......................................... 11
8. Appendix 1 – Action Plan Details ..................................................... 12 
Page 147 of 214

Page 148

3 
PUBLIC
1. Statutory Duty
Section 15 of the Procurement Reform (Scotland Act 2014) sets out the requirements for public
contract authorities with “significant” spend to “prepare a procurement strategy setting out how
the authority intends to carry out regulated procurements”.  
This procurement strategy addresses the requirements of the Procurement Reform (Scotland) Act
2014 and sets out our strategic vision for procurement in Renfrewshire Council. 
2. The Local Context - Renfrewshire
Renfrewshire’s diverse towns, cultural identify and strategic location within the wider City Region
provide a solid foundation for growth and prosperity for its 175,000 residents.  The area benefits
from a broad range of valuable assets – including established transport connections, a dynamic
business base, and ambitious regeneration programmes – that collectively offer substantial
opportunities to drive sustainable economic development.  
These advantages must be fully utilised to address inequalities in educational attainment,
employment, poverty, and health. It is essential that economic growth delivers benefits for all
communities across Renfrewshire. 
At the same time, the financial pressures facing the Council are significant with the Council
required to achieve significant savings over the coming years. These fiscal challenges must also be
considered alongside broader external factors, including climate change, and the impact of global
geopolitical issues on the UK’s and Renfrewshire’s access to food, fuel, and other essential
commodities.
3. Procurement In Renfrewshire
All procurement in Renfrewshire Council is carried out in full accordance with the Renfrewshire
Council’s Standing Orders Relating to Contracts and, where relevant value thresholds are met, the
requirements of:
• The Public Contracts (Scotland) Regulations 2015; the Concessions Contracts (Scotland)
Regulations 2016; the Utilities Contracts (Scotland) Regulations 2016;
• The Procurement Reforms (Scotland Act 2014) and all regulations and guidance made under
and in terms of that Act (the Procurement Reform Rules); and
• The principles of fairness, equal treatment, non-discrimination, proportionality, and
transparency (the Principles of Procurement).
Page 148 of 214

Page 149

4 
PUBLIC
Renfrewshire Council spends in the region of £300m per annum with contractors and third sector
to deliver goods, works and services across the region.  
All contracts with a value of over £25,000 and above are procured by the Corporate Procurement
Unit (CPU) and they ensure that all contracts established support the Council in delivery of its
statutory functions and delivery of its core objectives and values.
The Council faces significant economic and financial pressures, with substantial savings required
over the coming years.  It is therefore essential that our spending power delivers maximum value
for money, underpinned by a strong commercial focus and a commitment to innovation in how
we respond to these challenges.  
Procurement activity must not only support financial efficiency but also drive positive and lasting
changes in our local communities.  For this reason, we are committed to Community Wealth
Building and to embedding its principles within our procurement processes.  This approach
ensures that our expenditure supports sustainable local benefits – including employment, skills
development and opportunities for local community groups and residents.
In the financial year 2024/25, the Council engaged with 4,924 suppliers, of which 1,438 were small
and medium enterprises (SMEs) who received 53% of the total spend.  20.09% of the Council’s
spend was with local suppliers based within Renfrewshire, which accounts for £62.1m into the
local economy.  By strengthening local supply chains and increasing spend into the Renfrewshire
area, procurement helps retain economic value within our communities, supports business
growth, and contributes to a more resilient local economy.
4. Supporting Council and National Priorities 
Procurement in Renfrewshire Council is shaped by the wider economic landscape, as well as local
and national priorities.  Supporting the delivery of these priorities is central to the work of the
procurement team, and all procurement activity is undertaken with clear alignment to the
outcomes the Council aims to achieve. 
Renfrewshire Council Landscape and Priorities
Renfrewshire Council’s Plan for 2022-2027 sets out the Council’s vision for Renfrewshire: “Creating
a fairer Renfrewshire built on innovation, wellbeing and opportunity” and identifies five strategic
outcomes:
1. Place – working together to enhance wellbeing across communities.
Page 149 of 214

Page 150

5 
PUBLIC
2. Economy – building an inclusive, green and resilient economy (matching people, skills and
opportunities).
3. Fair – nurturing bright, happy and healthy futures for all.
4. Green – leading Renfrewshire to Net Zero.
5. Living our values – making a difference together.
National Procurement Priorities
This procurement strategy also aligns to the vision in the Public Procurement Strategy for
Scotland:
The national strategy sets out that public procurement bodies should aim to procure in a way that
is:
• Good for Businesses and their Employees – Maximise the impact of procurement to boost a
green, inclusive and wellbeing economy, promoting and enabling innovation in procurement.
• Good for Places and Communities – Maximising the impact of procurement with strong
community engagement and development to deliver social and economic outcomes as a
means to drive wellbeing by creating quality employment and skills
• Good for Society – Ensure that we are efficient, effective, and forward thinking through
continuous improvement to help achieve a fairer and more equal society.
• Open and Connected – Ensure procurement in Scotland is open, transparent, and connected
at local, national, and international levels.
The Public Procurement Strategy for Scotland identifies four key enablers to the success of the
strategic aims and objectives of public procurement in Scotland.  These enablers are:
Procurement Capability, Supplier Development, Engagement, and Collaboration
Page 150 of 214

Page 151

6 
PUBLIC
How Procurement Will Support Delivery of the Key Outcomes and
Priorities
Renfrewshire Council Strategic Outcome Place 
National Procurement Priority Good for Places and Communities
Renfrewshire Council is committed to empowering and supporting local people, enriching our
communities, and celebrating our rich local heritage. This commitment is reflected not only through
our frontline services but also in the way we plan, invest and delivery long-term outcomes for the
region.
Through effective procurement practices we contribute to a wide range of key projects which impact
our Place – from infrastructure and local regeneration to social initiatives that improve wellbeing and
inclusion.
• We will support regeneration initiatives and the Learning Estate Strategy, engaging proactively with
the market to encourage new ideas, promote innovation, and ensure the delivery of sustainable,
best value outcomes
• We will apply robust contract management to foster strong collaborative relationships with our
suppliers and ensure that Community Benefits are delivered effectively and in ways that genuinely
benefit Renfrewshire’s communities 
• We will strengthen and increase our engagement with local suppliers, social enterprises and
supported businesses across Renfrewshire to build local capability and capacity, and to encourage
innovate approaches
• We will integrate community wealth building into our procurement activity to ensure a local-
focused approach that retains and circulates wealth within the Renfrewshire economy, creating
meaningful opportunities for local people. 
Renfrewshire Council Strategic Outcome Economy
National Procurement Priority Good for Business and their Employees
Through thoughtful and strategic procurement activity, the Council can ensure that investment in
goods, services and works directly contributes to the local economy.  This includes creating
opportunities for local residents, supporting community organisations, and enabling projects that
enhance the cultural and social fabric of our area.
Page 151 of 214

Page 152

7 
PUBLIC
A strong focus on local economic development also ensures that Renfrewshire Businesses are
supported to compete for, and benefit from, Council contracts.  
• We will ensure tender opportunities are available to the wider market and undertake early market
engagement using Prior Information Notices
• We will further develop our tender documentation to make it easier for businesses to submit strong
competitive bids
• In line with our Contract Standing Orders, we will ensure that 75% of suppliers invited to bid for
Quick Quote exercises are local businesses where possible
• We will collaborate with the Council’s Economic Development service to deliver supplier
engagement sessions for businesses interested in accessing public sector contracts, working to
remove barriers and increase local participation in procurement
• We will support small and medium sized enterprises by ensuring prompt payment on receipt of a
valid invoice and we will pay all other suppliers within 30 days of receiving a valid invoice, or in full
accordance with the contractual payment terms where these specify an alternative arrangement
• We will ensure that contracts include clauses requiring contractors to apply the same payment
terms to subcontractors and throughout their supply chains
• We will encourage payment of the Real Living Wage to all tenders, recognising the positive impact
that fair pay can have on reducing in-work poverty and strengthening the local economy. 
Renfrewshire Council Strategic Outcome Fair
National Procurement Priority Good for Society
Fairness sits at the heart of all Renfrewshire Council’s activities, and procurement plays a vital role in
ensuring that this principle is embedded across every contracted service.  By applying transparent,
consistent and proportionate procurement practices (throughout the tender processes, bid evaluation,
and contract management) the Council ensures that all suppliers have a genuine opportunity to
compete for contracts.  Through fair and ethical procurement, we can help ensure delivery of inclusive
and equitable outcomes for the people of Renfrewshire.
• We will ensure that all procurement activity is conducted professionally, fairly, and transparently, in
line with regulatory requirements and best practice
• We will publish our procurement pipeline on Public Contracts Scotland, providing visibility of
planned activities to support market awareness and engagement
Page 152 of 214

Page 153

8 
PUBLIC
• We will ensure that all procurement activity supports the Equality Act 2019 and the Equality Act
2010 (Specific Duties) (Scotland) Regulations 2012
• We will assess Fair Work First criteria in all applicable tenders to promote fair working practices
across our supply chain
• We will continue to promote compliance with the Health and Safety at Work etc Act 1974 (c.37) and
associated regulations among contractors and sub-contractors 
• Where appropriate, we will include options for the procurement of fairly and ethically traded goods
and supporting responsible and sustainable purchasing. 
Renfrewshire Council Strategic Outcome Green
National Procurement Priority All
Procurement is recognised nationally as a key enabler in ensuring that the public sector’s spending
power in Scotland contributes effectively to achieving Net Zero targets.  
Renfrewshire Council has committed to working towards a Net Zero target by 2030. To support this
target we expect our suppliers to take active, measurable steps that align with our environmental
objectives.   Where appropriate and feasible, we will design our procurement processes to prioritise
partnership with suppliers who share our commitment to circularity, whole life value and the
minimisation of environmental impact. 
• We will collaborate with the Sustainability Team to enhance the use of sustainability-related
specifications, key performance indicators, requirements and evaluations within the end-to-end
procurement process
• We will challenge our client services to take a hierarchy approach to buying and in the first instance
reconsider whether the purchase is needed, or whether needs can be met in a more sustainable or
green manner 
• We will support the implementation of the Climate Change Impact Assessment (CCIA) within the
Council to allow for effective collaboration around key sustainability risks and opportunities in
contracts
• We will utilise the Scottish Government’s range of Sustainable Procurement tools such as the
Sustainability Test, Life Cycle Impact Mapping and eLearning modules where relevant and
proportionate.
Page 153 of 214

Page 154

9 
PUBLIC
• Where we use the Single Procurement Document (SPD) question 4C.7 (where proportionate and
relevant), we will encompass the outputs into our contract management activities. 
Renfrewshire Council Strategic Outcome Living Our Values
National Procurement Priority Open and Connected
Renfrewshire Council’s core values - we are fair, we are helpful, we are great collaborators, we value
learning - closely align with the national objective of Open and Connected.  Through strong
collaboration with internal services, suppliers and wider partners, the procurement function actively
supports these ambitions by fostering open communication, promoting equitable access to
opportunities, and encouraging shared learning.
• We will work in partnership with procurement bodies across the public sector to exchange best
practice, share lessons learned, and promote continuous improvement in procurement activity at
local and national levels
• We will maintain strong collaboration with internal stakeholders to ensure our procurement
activities actively support the Council’s priorities 
• We will increase the available training and learning opportunities for internal stakeholders on the
procurement function and processes to foster greater collaboration
• We will remain engaged with our supply base and work in partnership with our Economic
Development service to provide guidance and support to local businesses and SMEs, helping them
access and benefit from public sector opportunities
• We will continue to promote and enable innovation, seeking innovative solutions where
appropriate to meet emerging, unique or reimagined service and operational needs. 
5. Procurement Strategic Objectives
This procurement strategy is designed to contribute to Renfrewshire’s ambitions by ensuring that
our purchasing decisions support the Council’s financial position, maximise local value and
stimulate inclusive growth.
For this strategy the Council has four key procurement strategic objectives, each of which has
specific actions aligned to it, as detailed within Appendix 1 - Action Plan.
Page 154 of 214

Page 155

10 
PUBLIC
1. Provide effective and efficient procurement services for our stakeholders
We will provide effective and efficient procurement services that meet the needs of our
stakeholders. This means ensuring that our processes are transparent, timely, and commercially
robust, while offering clear guidance and proactive support throughout the procurement lifecycle.
By continuously improving our systems, building strong internal relationships, and aligning our
activity with organisational priorities, we will deliver a procurement function that adds
measurable value.
2. Support the Council’s Financial Challenges
Delivering Best Value outcomes means ensuring that every pound the Council spends achieves
maximum financial return and long-term value for the public. This outcome places a clear
emphasis on strong commercial discipline and securing competitive pricing through effective
market engagement. We will prioritise robust contract management, and support services with
the identification of savings opportunities that drive financial efficiency and support the Council’s
wider budgetary objectives.
3. Support Community Wealth Building and local growth 
Supporting Community Wealth Building and local growth means using the Council’s spending
power to strengthen the local economy. We will work proactively to create opportunities for local
businesses, SMEs, social enterprises, and third-sector organisations to compete for Council
contracts, removing unnecessary barriers and improving visibility of upcoming opportunities. By
designing procurements that encourage local participation, promoting fair work practices, and
embedding community benefit requirements where appropriate, we will help build a more
resilient, inclusive local economy. 
4. Support the Council Zet Zero ambitions 
Supporting the Council’s Net Zero ambitions means ensuring that procurement actively
contributes to reducing carbon emissions, and promoting sustainable practices across all
categories of spend. We will embed climate-conscious decision-making into our processes by
prioritising low-carbon solutions, encouraging innovation, and assessing whole-life environmental
impacts as part of our commercial evaluations. By engaging suppliers on their own Net Zero
commitments, setting clear expectations, and promoting circular economy principles, we will use
our purchasing power to drive meaningful change across supply chains. This approach ensures
that procurement plays a central role in helping the Council meet its 2030 Net Zero target while
delivering long-term environmental and financial benefits for Renfrewshire.
Page 155 of 214

Page 156

11 
PUBLIC
6. Monitoring, Reviewing and Reporting on Strategy
The key actions set out in this Corporate Procurement Strategy will be monitored by the
Corporate Procurement Manager over the duration of the strategy.  
The action plan included in Appendix 1 to this strategy will be included within future Annual
Procurement Reports, providing an opportunity to report on the achievement of and compliance
with our strategic objectives, as well as noting any actions yet to be competed.
7. Strategy Ownership and Contact Details
The owner of this Corporate Procurement Strategy is:
Jenny Bowles, Corporate Procurement Manager.
Page 156 of 214

Page 157

12 
PUBLIC
8. Appendix 1 – Action Plan Details
Procurement Strategic
Objective
Action Timescale
Provide efficient and
effective procurement
services for our stakeholders
Work with suppliers and stakeholders to assess and
implement process improvements (including identification
of potential digital solutions), promoting consistency and
standardisation where feasible.
Dec 2027
Provide efficient and
effective procurement
services for our stakeholders
Implement a competency framework-aligned training and
development programme to enhance CPU team capability
and ensure consistent, efficient service performance.
FY26/27
Provide efficient and
effective procurement
services for our stakeholders
Collaborate with stakeholders to assess training
requirements and subsequently develop and implement a
Procurement Training module within iLearn.
FY26/27
Provide efficient and
effective procurement
services for our stakeholders
Enhance procurement process, guidance and
documentation for stakeholders, clarifying roles and
responsibilities, and setting out anticipated process
timelines.
Dec 2027
Provide efficient and
effective procurement
services for our stakeholders
The CPM and the Category Managers will actively engage in
cross-sector working groups to share knowledge and best
practice and support continuous improvement.
FY26/27
Support the Council’s
Financial Challenges
Monitor contract and non-contract spend via the P2P
Process and target opportunities to rationalise and
standardise products.
Dec 2027
Support the Council’s
Financial Challenges
Review and update the Contract and Supplier Management
Policy.
FY26/27
Support the Council’s
Financial Challenges
Implement standard Procurement Data Reports for services
based on Purchase to Pay information to support
identification of opportunities to target savings and
efficiencies. 
FY26/27
Page 157 of 214

Page 158

13 
PUBLIC
Support Community Wealth
Building and local growth
Together with the Economic Development Team, we will
coordinate and support events targeted at local business
including the annual Council Local Supplier event, an out-
of-hours procurement workshop for suppliers, and a Tender
Talk session delivered alongside the Supplier Development
Programme. 
Dec 2027
Support Community Wealth
Building and local growth
We will publish our pipeline on Public Contracts Scotland
twice a year and, where appropriate, release a Prior
Information Notice for each procurement activity to ensure
suppliers receive early notification of potential
opportunities.
Dec 2027
Support Community Wealth
Building and local growth
We will strengthen our Community Benefits Menu and
approach to ensure suitability, enable successful supplier
delivery and maximise benefits for local residents.
FY26/27
Support Council Net Zero
Objectives
We will support the Council implementation of the CCIA by
conducting a procurement focused trial and progressing
the findings from that exercise.
FY26/27
Support Council Net Zero
Objectives
Incorporate net zero and sustainability principles into
contract management, engaging suppliers to improve the
climate resilience of their supply chains. 
FY26/27
Support Council Net Zero
Objectives
Engage with the Council Sustainability Team to support
further alignment of contract strategies, specifications and
tender evaluations with net zero goals.
FY26/27 
Page 158 of 214

Page 159

14 
PUBLIC 
Corporate Procurement Manager
Renfrewshire Council
Renfrewshire House
Cotton Street
Paisley
PA1 1BR 
Page 159 of 214

Page 160

PUBLIC 
___________________________________________________________________
To:  Finance, Resources and Customer Services Policy Board
On:  23 April 2026
___________________________________________________________________
Report by: The Director of Finance and Resources and the Chief Executive’s
Service
___________________________________________________________________
Heading: Contract Authorisation Report for Paisley Halloween Festival – Parade
& Town Centre Animation (RC-CPU-25-168)
___________________________________________________________________
1. Summary
1.1 The purpose of this report is to seek approval of Finance, Resources
and Customer Services Policy Board to award a Services Contract for
Paisley Halloween Festival - Parade and Town Centre Animation (RC-
CPU-25-168) to Cirque Bijou Limited (Co no. 05051525). 
1.2 The recommendation to award Paisley Halloween Festival - Parade
and Town Centre Animation Contract follows a procurement process
that was conducted in accordance with the Open Procedure under the
Public Contracts (Scotland) Regulations 2015, as amended and The
Renfrewshire Council Standing Orders Relating to Contracts 2026 for
an above Government Procurement Agreement (Services) Contract. 
1.3 A Contract Strategy was approved by the Head of Marketing and
Communications on 14 January 2026 and the Interim Strategic
Category Manager on 13 January 2026.
___________________________________________________________________ 
2. Recommendations
It is recommended that the Finance, Resources and Customer Services
Policy Board: 
Item 14
Page 160 of 214

Page 161

PUBLIC
2.1 Authorises the Head of Corporate Governance to award a Services
Contract for Paisley Halloween Festival – Parade & Town Centre
Animation (RC-CPU-25-168) to Cirque Bijou Limited (Co No.
05051525).
2.2 Authorises the Approved Contract value of £524,845 excluding VAT.  
2.3 Notes it is anticipated start date of the contract will be 25 May 2026 
until 30 November 2027 with the option to extend for a further 12
months at the sole discretion of the Council until no later than 30
November 2028. In the event that the Contract does not commence on
25 May 2026, the contract period shall run from the start date as stated
in the Award Schedule to the Letter of Acceptance issued to Cirque
Bijou Limited. The end date of the contract will remain fixed.
_________________________________________________________
3. Background
3.1 Renfrewshire Council has a requirement for a highly experienced and
established creative company to develop and deliver a parade and
town centre animation for Paisley Halloween Festival 2026 on Friday
23 and Saturday 24 October 2026, and Friday 29 and Saturday 30
October 2027 (with the Council Contract extension option for Friday 27
and Saturday 28 October 2028).
3.2 To initiate this procurement process, a Contract Notice was published
on the Find a Tender Service via the Public Contracts Scotland
advertising portal on 15 January 2026 with the tender documentation
available for downloading from the Public Contracts Scotland – Tender
portal from this date.
3.3 During the live tender period, seventeen organisations expressed
interest to participate in the tender. By the closing date set for the
return of electronic tender submission, 12 noon 16 February 2026, one
organisation submitted a response, nine declined to respond, and
seven organisations did not submit a response. The nine organisations
which declined to respond cited capability and capacity as their reason
for not participating in this tender.
3.4 As required by Regulation 60 of the Public Contracts (Scotland)
Regulations 2015, as amended all Tenderers were each required to
complete a Single Procurement Document (“SPD”), which was to be
submitted with their tender submission. The tender submission was
evaluated against a pre-determined set of criteria within the SPD by
representatives from the following Council services: Events Team, the
Page 161 of 214

Page 162

PUBLIC
Corporate Procurement Unit, Corporate Risk and Corporate Health and
Safety.
3.5 The tender submission complied with the minimum selection criteria of
the SPD and progressed to evaluation against the published Award
Criteria which was based on a weighting of 80% Quality and 20% Price.
3.6 The tender submission scores relative to the award criteria are noted
below
Company Price
(20%)
Quality
(80%)
Total
(100%)
Cirque Bijou Limited 20.00% 64.63% 84.63% 
3.7 The Tender Submission received by Cirque Bijou Limited met the
criteria set out in the procurement documents and was within the
Council’s set budget and was therefore deemed to be value for money.
3.8 Community Benefits were requested as part of the procurement
process and Cirque Bijou Limited confirmed that the following
Community Benefits would be made available to the Council for this
Contract:
Community Benefit Description No of People /
Activity
Work Experience Placement for an individual 16+
years of age
2
Industry Skills Transfer to Schools 2
___________________________________________________________________
Implications of the Report
1. Financial – The Approved Contract Value is £524,845, excluding VAT,
for the entire Contract period of 25 May 2026 until 30 November 2027,
including the optional 12 month extension. The costs will be met from
the Revenue General Service Budget. 
2. HR & Organisational Development – None directly arising from this
report. 
3. Community/Council Planning –  
• Our Renfrewshire is thriving – Maximising economic growth,
which is inclusive and sustainable
Page 162 of 214

Page 163

PUBLIC 
• Our Renfrewshire is well – Supporting the wellness and resilience
of our citizens and communities 
• Reshaping our place, our economy and our future - Demonstrating
that Renfrewshire is a great place to grow up, it’s a place of
opportunity for those that live and work here, and it’s a brilliant
place for a day out 
• Building strong, safe and resilient communities - Improving lives
and securing wellbeing through a stronger, inclusive and
sustainable economy, being creative, imaginative and linking
opportunities to enhance the benefits for Renfrewshire 
• Working together to improve outcomes - Ensuring Renfrewshire
Council delivers Best Value for our citizens and customers, that we
demonstrate we are a well governed, effective organisation 
4. Legal - The procurement of this Contract was conducted in accordance
with the requirements of the Renfrewshire Council Standing Orders
Relating to Contracts 2026 and The Public Contracts (Scotland)
Regulations 2015, as amended for an above Government Procurement
Agreement Value Services Contract. 
5. Property/Assets – None directly arising from this report. 
6. Information Technology - None directly arising from this report.
7. Equality & Human Rights – None directly arising from this report.
8. Health & Safety – Cirque Bijou Limited’s Health and Safety credentials
were evaluated by the Council’s Corporate Health & Safety team and
met the requirements regarding Health & Safety.
9. Procurement – The procurement procedure outlined within this report
ensures that the Council meets its statutory requirements in respect of
procurement procedures, efficiency and modern government.
10. Risk – Cirque Bijou Limited insurance has been assessed and
evaluated by the Council’s Risk team to confirm they meet the
Council’s minimum requirements regarding insurance risk.
11. Privacy Impact - None directly arising from this report.
Page 163 of 214

Page 164

PUBLIC
12. Climate Risk - The level of impact associated with provision of this
service has been assessed using the Scottish Government
Sustainability Test and is considered to be low risk.
13. Children’s Rights – This report demonstrates compliance with Article
31 (Rest, Play, Culture, Arts) as every child has the right to rest, relax,
play and to take part in cultural and creative activities.
14. Cosla Policy Position – None directly arising from this report.
_________________________________________________________
List of Background Papers 
(a)  none 
___________________________________________________________________ 
Author:           Stuart McLean, Procurement Adviser,
stuart.mclean@renfrewshire.gov.uk 
Page 164 of 214

Page 165

PUBLIC 
___________________________________________________________________
To:  Finance, Resource and Customer Services Policy Board
On:  23 April 2026
___________________________________________________________________
Report by: The Chief Executive and Director of Finance and Resources
___________________________________________________________________
Heading: Contract Authorisation Report for GAIA New Water Main (RC-CPU-25-
258)
___________________________________________________________________
Summary
1.1 The purpose of this report is to seek the approval of the Finance,
Resources and Customer Services Policy Board to enter into an
Agreement for the design and build of GAIA New Watermain (RC-CPU-
25-258) with Scottish Water Horizons Limited (Co. no. SC264806). 
1.2 The procurement exercise was conducted in accordance with the
Renfrewshire Council’s Standing Orders relating to Contracts for the
award of a below Regulated works contract. 
1.3 A Contract Strategy and request to negotiate this Agreement was
approved by the Programme Director – City Deal and Infrastructure and
the Corporate Procurement Manager on behalf of the Head of Finance
and Procurement on 28 March 2026. 
___________________________________________________________________
Recommendations 
2.1 It is recommended that the Finance, Resources and Customer Service
Policy Board:
2.2 Authorises the Head of Corporate Governance to award an Agreement
for the design and build of the Glasgow Airport Investment Area (GAIA)
Item 15
Page 165 of 214

Page 166

PUBLIC
New Water Main to Scottish Water Horizons Limited (Co.
no.SC264806), subject to the Head of Finance and Procurement, in
consultation with the Head of Corporate Governance, being satisfied
that the terms and conditions are acceptable to the Council.   
2.3 Authorises the contract period of 27 weeks from the Agreement start
date.  
2.4 Authorises the Fees of £1,085,658.14 excluding VAT.
2.5 Authorises a contingency spend of £162,848.72 excluding VAT, which
equates to 15.00% of the Fees. 
2.6 Authorises the total Approved Contract Value of £1,248,506.86
excluding VAT, which is the total of the Fees plus the contingency
spend.
2.7 Authorise Scottish Water Horizons Limited’s (SWH) liability to the
Council in connection with the Agreement be limited as follows:
• total liability (excluding death or personal injury resulting from
the SWH's own negligence) of SWH under or in connection with
the Agreement, whether in contract, in delict, for breach of
statutory duty or otherwise, shall not exceed two hundred and
fifty thousand pounds (£250,000);
• SWH’s liability for any delay shall be limited to 1% (one per cent)
of the Fees; and 
• The Council shall indemnify and keep indemnified SWH against
all third party claims, demands, proceedings, damages, costs,
charges and expenses arising out of or in connection with the
Agreement, save to the extent that such claims, demands,
proceedings, damages, costs, charges or expenses arise from
or are attributable to the negligence, breach of contract or wilful
default of SWH.
The limits of liability are a condition of the Standard and Particular
Terms and Conditions of the Agreement with Scottish Water Horizons
Limited. 
_________________________________________________________
Background
3.1  The Council requires to appoint Scottish Water Horizons Limited to
carry out the design and build of the GAIA New Water Main (the
“Project”) at the Advanced Manufacturing Innovation District (AMIDS). 
Page 166 of 214

Page 167

PUBLIC
SWH is the relevant commercial arm of Scottish Water for undertaking
these works and have pre-approved the design with Scottish Water to
ensure it will meet vesting requirements. The scope of works includes
slip-lining the existing pipe through Netherton up to the bridges,
stopping up the pipework at the roundabout and constructing a
permanent connection to the supply pipe at the National Manufacturing
Institute Scotland (NMIS) and the Medical Manufacturing Innovation
Centre (MMIC) buildings. 
3.2  SWH’s design minimises disruption at the AMIDS site to undertake the
works and future-proof the build out of AMIDS by enabling a future
connection at Portnauld Farm, as well as an easy connection for the
Tech Terrace. 
3.3 SWH will appoint and manage a Scottish Water approved contractor to
undertake the works via sub-contract arrangements and, on completion
of the works, SWH will provide the Council the outputs required to
conclude Scottish Water’s vesting application process. 
3.4 This procurement exercise was conducted using the negotiated
procedure in accordance with 14.3 of the Renfrewshire Council’s
Standing Orders relating to Contracts relying on the circumstances
stated in Regulation 6 (1)(b) (iii) of the Procurement (Scotland)
Regulations 2016.  This states that “a contracting authority may award
a public contract following negotiated procedure without prior
publication of a contract notice or prior information notice in any of the
following cases— (iii) the protection of exclusive rights, including
intellectual property rights but only, in the case of paragraphs (ii) and
(iii), where no reasonable alternative or substitute exists and the
absence of competition is not the result of an artificial narrowing down
of the parameters of the procurement.”
3.5 The award of this Agreement is subject to the Council’s agreement of
SWH Standard and Particular terms and conditions.
3.6 Community Benefits were requested as part of the procurement
process and Scottish Water Horizons Limited has committed to
delivering the following community benefits as part of the Agreement: 
Community Benefit  No. of People/
Activities
Non-financial support for a Social Enterprise or
other approved community initiative 8
Page 167 of 214

Page 168

PUBLIC
Implications of the Report
1. Financial – the maximum approved contract value of £1,248,506.86
excluding VAT will be contained within existing City Deal and
Infrastructure Project Resources. 
Note – the payment terms of the Agreement require the Council to pay
Scottish Water Horizons Limited in advance based on programme
milestones and not on completion of specific activities. 
This condition has been agreed with the Director of Finance and
Resource for this Agreement, with consideration to Scottish Water
Horizons Limited’s strong financial and economic standing and the
absence of other reasonable alternatives to undertake the works and
services required for this project. 
2. HR & Organisational Development – None arising directly from this
report 
3. Community/Council Planning –  
• Place – Working together to enhance wellbeing across
communities;
• Economy – building an inclusive, green and resilient economy;
• Fair – nurturing bright, happy and healthy futures for all; 
• Living our values – making a difference together. 
4. Legal - The procurement was conducted as a negotiated procedure
without prior call for competition in accordance with the requirements of
the Renfrewshire Council Standing Orders relating to Contracts. The
award of the Agreement is subject to the Council’s agreement of the
SWH Standard and Particular Terms and Conditions. 
5. Property/Assets - The completed pipework will be vested by Scottish
Water on completion of the vesting application process. 
6. Information Technology – None arising directly from this report. 
7.  Equality & Human Rights - No negative impacts on equality groups or
potential for infringement of individuals’ human rights have been
identified rising from the recommendations contained in the report. 
8. Health & Safety – Scottish Water Horizons Limited’s health and safety
accreditations have been reviewed by Corporate Health and Safety and
meet the Council’s requirements. 
Page 168 of 214

Page 169

PUBLIC 
9. Procurement – The procurement was conducted as a negotiated
procedure without prior call for competition and the requirements of the
Renfrewshire Council Standing Orders relating to Contracts. The award
of the Agreement is subject to the Council’s agreement of SWH
Standard and Particular Terms and Conditions. 
10. Risk – Scottish Water Horizons Limited’s insurance documents have
been assessed and meet the Council’s requirements regarding
insurable risk.  
The Consultant’s liability to the Council in connection with the
Agreement is limited as follows:
• total liability (excluding death or personal injury resulting from
the Consultant's own negligence) of the Consultant under or in
connection with the Agreement, whether in contract, in delict, for
breach of statutory duty or otherwise, shall not exceed two
hundred and fifty thousand pounds (£250,000);
• Consultant’s liability for any delay shall be limited to 1% (one per
cent) of the Fees 
• The Council shall indemnify and keep indemnified SWH against
all third party claims, demands, proceedings, damages, costs,
charges and expenses arising out of or in connection with the
Agreement, save to the extent that such claims, demands,
proceedings, damages, costs, charges or expenses arise from
or are attributable to the negligence, breach of contract or wilful
default of SWH. 
The limits of liability are a condition of the Standard and Particular
Terms and Conditions of the Agreement with Scottish Water Horizons
Limited. 
11. Privacy Impact – None directly arising from this report. 
12. Climate Risk – the works will contribute to Scottish Water Horizons
Limited’s Climate Adaption Plan 2024 to improve the resilience of
infrastructure and services to climate change impact and ensure the
sustainability of Scotland’s water and waste water systems. 
13. Children’s Rights - None arising directly from this report. 
14.  Cosla Policy Position - None arising directly from this report.
_______________________________________________________
Page 169 of 214

Page 170

PUBLIC
List of Background Papers 
(a)  None
___________________________________________________________________ 
Author:          Rebecca Park, Strategic Category Manager,
rebecca.park@renfrewshire.gov.uk 
Page 170 of 214

Page 171

PUBLIC 
___________________________________________________________________
To: Finance, Resources and Customer Services Policy Board
On: 23 April 2026
___________________________________________________________________
Report by: The Report by the Director of Environment, Housing and Infrastructure
and the Director of Finance and Resources
___________________________________________________________________
Heading: Contract Authorisation Report for Park Mains High School Extension –
Design and Build – Main Works Contract (RC-CPU-24-053)
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to seek the approval of the Finance, Resources
and Customer Services Policy Board to award the Main Works Contract for
Park Mains High School Extension – Design and Build (RC-CPU-24-053) (the
Main Works Contract) to Galliford Try Construction Limited, T/A Morrison
Construction Scotland (co.no. 02472080). 
1.2 On 13 February 2025, a report was taken to the Finance, Resources and
Customer Services Policy Board following a tender exercise to appoint a
contractor for pre-construction services and a Design and Build Contract in
respect of the Park Mains High School Extension – Design and Build.  The
report to that board set out that Galliford Try Construction, T/A Morrison
Construction Scotland was the most economically advantageous tender.  At
that board the recommendation was approved to award the Pre-Construction
Services Agreement for Park Mains High School Extension – Design and
Build to Galliford Try Construction Limited, T/A Morrison Construction
Scotland.  It was noted that a further report would be brought back to board
once a more definite cost had been established in respect of the build element
for the Park Mains High School Extension. 
1.3 The Advanced Works Contract was approved at the Finance, Resources and
Customer Services Policy Board meeting on 5 February 2026, and the works
Item 16
Page 171 of 214

Page 172

PUBLIC
are due to complete on 8 June 2026. At this Board’s meeting on 5 February
2026, it was advised that a further report would be brought to a future
Finance, Resources and Customer Services Policy Board meeting to seek
approval of the award of the Main Works Contract. 
___________________________________________________________________ 
2. Recommendations
It is recommended that the Finance, Resources and Customer Services Policy
Board: 
(a) Authorises the Head of Corporate Governance to award the Main Works
Contract for the Park Mains High School Extension – Design and Build
(RC-CPU-24-053) to Galliford Try Construction Limited, T/A Morrison
Construction Scotland (co.no. 02472080). 
(b) Authorises the amount for the Main Works Contract of £28,310,167
exclusive of VAT. 
(c) Authorises a contingency spend of £2,831,017 which equates to 10% of
the Main Works Contract. 
(d) Authorises a total Approved Contract Value of £31,141,184 (which is the
total of the Main Works Contract plus the contingency spend). 
(e) Notes the anticipated the Date for Possession of the Site is 8 June 2026
and the Date for Completion of the Works is 58 weeks from the Date for
Possession of the Site. The works will be completed in phases and the
anticipated Date of Possession of Sections and the anticipated Date of
Completion of the Sections will be captured in the awarded Main Works
Contract. 
(f) Notes a Performance Bond is required as part of the Mains Works
Contract. 
(g) Notes that the Contract includes caps on liability for the following: 
a. Public liability (in respect of property damage only) at the level of
£25million for each and every claim. 
b. Professional Indemnity at the level of £10million in the aggregate with
an annual automatic reinstatement. 
c. For uninsurable risks, in the absence of any Council or project metric
to use, liability is capped at the Contract Sum. 
_________________________________________________________
Page 172 of 214

Page 173

PUBLIC
3. Background
3.1 This procurement exercise is for the appointment of a Contractor for the
creation of an extension at Park Mains High School. The requirement
was tendered for a single Contractor to provide both pre-construction
services and construction.
Park Mains High School is located in Erskine within the Renfrewshire
Council area. School estate management planning is central to the
Council’s asset management strategy. Planned housing developments
within the Bishopton and Erskine areas of Renfrewshire have resulted
in significant school growth in the catchment area. As a result of these
planned housing developments there is a need to increase the current
pupil capacity within Park Mains High School by extending the current
building infrastructure to accommodate the increasing pupil roll. 
3.2 The procurement exercise is for a single contractor to deliver all
Contracts related to the Park Mains High School Extension. This
procurement was tendered as an above Threshold procurement in
accordance with Public Contracts (Scotland) Regulations 2015
Regulation 29 – Restricted Procedure. The Restricted Procedure is
conducted in two stages, Selection (Stage 1) and Invitation to Tender
(Stage 2). 
3.3  On 13 February 2025 the Finance, Resources and Customer Services
Policy Board approved the recommendation to award a Contract for
Pre-Construction Services Agreement for Park Mains High School
Extension – Design and Build (RC-CPU-24-053) to Galliford Try
Construction Limited, T/A Morrison Construction Scotland, which
formed part of the procurement exercise for the complete Design and
Build (D&B) Works Contract for Park Mains High School Extension –
Design and Build (RC-CPU-24-053).  The report noted that a further
report would be brought to a future Finance, Resources and Customer
Services Policy Board seeking formal approval to enter into the Design
and Build Contract with Galliford Try Construction Limited, T/A Morrison
Construction Scotland. 
3.4 The Pre-Construction Services are due to conclude early June 2026;
RIBA Stage 3 is complete, and RIBA Stage 4 is currently underway. 
3.5 On 5 February 2026 the Finance, Resources and Customer Services
Policy Board approved the recommendation to award an Advance
Works Contract for Park Mains High School Extension – Design and
Build (RC-CPU-24-053) to Galliford Try Construction Limited, T/A
Morrison Construction Scotland, which formed part of the procurement
Page 173 of 214

Page 174

PUBLIC
exercise for the complete Design and Build (D&B) Works Contract for
Park Mains High School Extension – Design and Build (RC-CPU-24-
053).  
3.6 The Advance Works commenced on site on 21 March 2026 and will be
complete by 8 June 2026. The Advance Works consist of site set-up,
soil strip & formation of pilling mat, localised drainage and fire hydrant
diversions, installation of underground drainage attenuation tanks and
formation of the new carpark to base course level. 
3.7 This recommendation is to enter into a Main Works Contract with
Galliford Try Construction Limited, T/A Morrison Construction for the
creation of an extension at Park Mains High School. The Contractor
and their supply chain will deliver the extension.  
3.8 As tendered, the form of Design and Build Contract will be SBCC
Design and Build Contract for use in Scotland 2016 edition,
accompanied with bespoke Employer’s Amendments and
Preliminaries.  
3.9 The costs for all Contracts forming the Park Mains High School
Extension – Design and Build (RC-CPU-24-053) will be met through the
Capital – General Services budget. 
___________________________________________________________________
Implications of the Report
1. Financial - The cost for the Main Works Contract of £31,141,184
(which is the total of the Main Works plus the contingency spend)
excluding VAT, will be met through the Capital – General Services
budget. 
2. HR & Organisational Development - None directly arising from this
report. 
3. Community/Council Planning –  
• Our Renfrewshire is thriving – maximising economic growth,
which is inclusive and sustainable.
• Our Renfrewshire is well - supporting the wellness and resilience
of our citizens and communities.
• Our Renfrewshire is fair - addressing the inequalities which limit
life chances.
• Our Renfrewshire is safe - protecting vulnerable people and
working together to manage the risk of harm.  
Page 174 of 214

Page 175

PUBLIC 
Place:
- Demonstrating that Renfrewshire is a great place to grow up, it's a
place of opportunity for those that live and work here, 
Economy:
- Improving lives and securing wellbeing through a stronger, inclusive
and sustainable economy, being creative, imaginative and linking
opportunities to enhance the benefits for Renfrewshire. 
- Matching the skills developed in Renfrewshire with the opportunities
available in Renfrewshire and equipping all children and young
people to achieve success in life. 
Fair: 
- Reducing inequalities in Renfrewshire, focusing on supporting our
communities through the cost-of-living crisis with dignity and
empowering people to live fulfilled lives. 
Green: 
- Working across partners and communities to deliver the priority
areas highlighted in our Plan for Net Zero, working towards a net
zero Renfrewshire by 2030.
- Ensuring our journey to net zero is a just transition with climate
justice and fairness at the heart, finding opportunities to challenge
inequalities in new green ways as we tackle the climate crisis.
- Integrating climate considerations into our long term strategic and
financial planning as an organisation 
- Planning for future climate adaptations when designing our services
and our developing our place, particularly considering the impacts
for our most vulnerable citizens.
- Boosting our green economy, creating good green jobs that are
sustainable for the future. 
Living Our Values:
- Leading positively through transition and change. 
- Delivering best value for our citizens and customers. 
4. Legal - The procurement of this and related Contracts for the Park
Mains High School Extension has been conducted in accordance with
the Restrictive Procedure under the Public Contracts (Scotland)
Page 175 of 214

Page 176

PUBLIC
Regulations 2015, as amended and the Renfrewshire Council’s
Standing Orders Relating to Contracts for an above GPA Works
Contract. 
5. Property/Assets - The Council’s investment in its learning estate offers
the opportunity for a place-based approach to local outcomes:
integrating local services to support communities. Extending the current
building infrastructure at Park Mains High School to accommodate the
increasing pupil roll. 
6. Information Technology – None directly arising from this report.  
7. Equality & Human Rights – None directly arising from this report.  
8. Health & Safety - Galliford Try Construction Limited, T/A Morrison
Construction Scotland health and safety credentials were evaluated by
Corporate Health and Safety and met the Council’s requirements
regarding health and safety for this procurement exercise. 
9. Procurement – The procurement procedures outlined within this report
ensures that the Council meets its statutory requirements in respect of
procurement procedures, efficiency and modern government.   
10. Risk - Project specific risk registers have been established. These
internal risk registers will be kept under regular review and reported to
the Council’s internal Learning Estate Project Board. 
The Contract includes caps on liability for the following: 
a. Public liability (in respect of property damage only) at the level of
£25 million for each and every claim. 
b. Professional Indemnity at the level of £10 million in the aggregate
with an annual automatic reinstatement. 
c. For uninsurable risks, in the absence of any Council or project
metric to use, liability is capped at the Contract Sum. 
11. Privacy Impact - None directly arising from this report.
12. Climate Risk – The level of impact associated with the provision of
these works have been assessed using the Scottish Government
Sustainability Test and is considered to be overall high risk. 
Mitigations the Council has taken in regard to sustainability within this
Contract is to include contractual elements within the Scope such as:
Page 176 of 214

Page 177

PUBLIC
- The Contractor should aim to ensure that any deliveries to site are
consolidated to reduce emissions.  
- The Contractor is required to provide a Site Specific Waste
Management Plan detailing where all the waste produced will be
recycled or if it cannot be recycled where the waste will go.   
13. Children’s Rights – This report does not cover a new policy, function
or strategy nor a substantive change to an existing policy, function or
strategy which will have an impact on children’s rights. 
14. Cosla Policy Position – None directly arising from this report.
_______________________________________________________
List of Background Papers 
(a) Contract Authorisation Report: Park Mains High School Extension –
Design and Build (RC-CPU-24-053) on 13 February 2025 to Finance,
Resources and Customer Services Policy Board
(b) Contract Authorisation Report: Park Mains High School Extension –
Design and Build – Advance Works (RC-CPU-24-053) on 5 February
2026 to Finance, Resources and Customer Services Policy Board
___________________________________________________________________ 
Author:           Joanna Tannock, Assistant Category Manager, Corporate
Procurement Unit, Joanna.tannock@renfrewshire.gov.uk   
Page 177 of 214

Page 178

PUBLIC 
___________________________________________________________________
To:  Finance, Resources and Customer Services Policy Board 
On:  23 April 2026
___________________________________________________________________
Report by: The Director of Finance and Resources and the Director of
Environment, Housing and Infrastructure 
___________________________________________________________________
Heading: Contract Authorisation Report for Trinity High School – Upgrade of 3G
Pitch (RC-CPU-25-128)
___________________________________________________________________
1. Summary
1.1 The purpose of this report is to seek the approval of the Finance,
Resources and Customer Services Policy Board to award a Works
Contract for Trinity High School – Upgrade of 3G Pitch (reference RC-
CPU-25-128) to Fairways Sportsgrounds Limited (Co.no.SC314941). 
1.2 The recommendation to award the Trinity High School – Upgrade of 3G
Pitch Contract follows a procurement process which was conducted in
accordance with the Quick Quote procedure under the Council’s
Standing Orders Relating to Contracts 2026 for a below Regulated
(Works) Contract. 
1.3 A Contract Strategy was approved by the Interim Strategic Category
Manager on 20 January 2026 and Head of Facilities and Property
Services on 21 January 2026.  
___________________________________________________________________ 
2. Recommendations
It is recommended that the Finance, Resources and Customer Services
Policy Board: 
2.1 Authorises the Head of Corporate Governance to award a Works
Contract in the form of SBCC Minor Works Building Contract with
Item 17
Page 178 of 214

Page 179

PUBLIC
Contractor’s Design for use in Scotland (MWD/Scot), 2013 Edition with
Employer’s Amendments for Trinity High School – Upgrade of 3G Pitch
(reference RC-CPU-25-128) to Fairways Sportsgrounds Limited
(Co.no.SC314941).  
2.2. Authorises the Total Tendered Contract Sum of £179,999.50 excluding
VAT.  
2.3 Authorises a contingency spend of £17,999.95 which equates to 10%
of the Total Tendered Contract Sum.  
2.4 Authorises a total Approved Contract value of £197,999.45 excluding
VAT, which is the Total Tendered Contract Sum plus the contingency
spend.  
2.5 Notes, the anticipated Date of Commencement of the Works is 6 July
2026, and the anticipated Date for Completion is 13 August 2026.  The
actual dates will be as stated in the Award Schedule issued with the
Council’s Letter of Acceptance to Fairways Sportsgrounds Limited.   
_________________________________________________________
3. Background
3.1 Renfrewshire Council has a requirement to appoint a Contractor to
carry out the upgraded work to the current artificial pitch at Trinity High
School.
3.2 The Quick Quote procurement process was utilised for this Works
Contract in accordance with Renfrewshire Council Standing Orders
relating to Contracts, standing order 18. To initiate this procurement
process, seven organisations were invited to participate in the Quick
Quote. The tender documentation was published on Public Contracts
Scotland – Tender Portal on Wednesday 21 January 2026 with the
tender documentation available for the downloading from the PCS-
tender portal from this date.
3.3 By the closing date for the return of electronic tender submissions, 12
noon, Tuesday 17 February 2026, three organisations submitted a
tender response, four organisations did not respond for various reasons
including due to time constraints and supply chain issues.  
3.4 Tenderers were required to complete a Single Procurement Document
(Scotland) (“SPD”) in accordance with the Renfrewshire Council
Standing Orders relating to Contracts 11.5 and to submit this document
with their tender submission.  All three organisations were evaluated
against a pre-determined set of criteria in the form of the SPD by
representatives from the following Council Services: Property Services,
Page 179 of 214

Page 180

PUBLIC
the Corporate Procurement Unit, Corporate Risk and Corporate Health
& Safety.  
3.5 All three tender submissions complied with the minimum selection
criteria within the SPD.  The three tender submissions were each
evaluated against the Award Criteria which were based on a weighting
of 60% Price and 40% Quality.   
3.6 The scores relative to the Award Criteria for each of the three tender
submissions are noted below: 
Price
(60%)
Quality
(40%)
Total
(100%)
1 Fairways Sportsgrounds Limited
(SC314941) 60.00% 38.00% 98.00%
2 Allsports Construction &
Maintenance Limited (SC291456) 54.25% 28.00% 82.25%
3 Tony Patterson Sportsgrounds Ltd
(NI051896) 43.69% 31.00% 74.69% 
3.7 The evaluation of tender submissions received identified that the
submission by Fairways Sportsgrounds Limited is the most
economically advantageous tender.
3.8 Community Benefits were requested as part of the procurement
process and Fairways Sportsgrounds Limited have committed the
following Community Benefits:
Community Benefits Description No of People / Activity
Financial Support for a Social Enterprise
or other approved community initiative 4
___________________________________________________________________
Implications of the Report
1. Financial – The Approved Contract Value is £197,999.45, excluding
VAT, which includes the Total Tendered Contract Sum and the
Contingency.  The costs for this Contract will be met through the
Lifecycle Maintenance Fund.   
2. HR & Organisational Development – None directly arising from this
report.   
3. Community/Council Planning –  
• Our Renfrewshire is thriving – maximising economic growth,
which is inclusive and sustainable. 
Page 180 of 214

Page 181

PUBLIC
• Our Renfrewshire is well – supporting the wellness and resilience
of our citizens and communities.  
• Our Renfrewshire is fair – addressing the inequalities which limit
life chances.
• Our Renfrewshire is safe – protecting vulnerable people and
working together to manage the risk of harm.   
Place: 
- Working with partners to ensure our neighbourhoods are safe,
vibrant and attractive places to live. 
Living our Values: 
- Ensuring Renfrewshire Council delivers best value for our
citizens and customers, that we demonstrate we are a well
governed, effective organisation.   
4. Legal - The procurement of this Contract was conducted in accordance
with the requirements of the Renfrewshire Council’s Standing Orders
Relating to Contracts for a below Regulated value Works Contract
using the Quick Quote Procedure, in accordance with Standing Order
18.   
5. Property/Assets – The current artificial pitch is due for renewal; this
work will upgrade it to ensure it maintains its standards for usage.   
6. Information Technology - None directly arising from this report.  
7. Equality & Human Rights - None directly arising from this report.  
8. Health & Safety - Fairways Sportsgrounds Limited Health and Safety
credentials were evaluated by the Council’s Corporate Health & Safety
team and met the requirements regarding Health & Safety.
9. Procurement - The procurement procedure outlined within this report
ensures that the Council meets its statutory requirements in respect of
procurement procedures, efficiency, and modern Government.  
10. Risk - Fairways Sportsgrounds Limited insurance has been assessed
and evaluated to confirm they meet the minimum requirements
regarding insurance risk.  
11. Privacy Impact - None directly arising from this report.   
12. Climate Risk – The level of impact associated with the provision of
these works have been assessed using the Scottish Government
Sustainability Test and is considered High Risk:    
Page 181 of 214

Page 182

PUBLIC 
To mitigate against the High Risk, the Contractor will: 
- promote environmentally safe working practices. 
- Minimise avoidable waste, use of energy, materials & natural
resources by following the discipline of prevent, reduce, segregate, re-
use and recycle.  
13. Children’s Rights – This contract supports Article 31 of the United
Nations Convention on The Rights of the Child (UNCRC), which states
that children and young people have the right to have fun in the way
they want to, whether by playing sports, watching films, or doing
something else entirely.      
14. Cosla Policy Position – None directly arising from this report.  
_________________________________________________________
List of Background Papers 
(a)  None 
___________________________________________________________________ 
Author:          Kevin Milliken, Senior Procurement Specialist, Corporate Procurement
Unit, (kevin.milliken@renfrewshire.gov.uk) 
Page 182 of 214

Page 183

PUBLIC 
___________________________________________________________________
To:  Finance, Resources and Customer Services Policy Board
On:  23 April 2026
___________________________________________________________________
Report by: The Director of Finance and Resources and The Director of
Environment, Housing & Infrastructure 
___________________________________________________________________
Heading: Contract Authorisation Report: Supply and Delivery of 2 x 16 Seat +
Driver Wheelchair Accessible Buses - RC-CPU-25-345
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to seek the approval of the Finance,
Resources and Customer Services Policy Board to award a Contract
for Supply and Delivery of two (2), 16-Seat + Driver Wheelchair
Accessible Buses to Woodall-Nicholson Ltd t/a Treka Bus
(Co.no.15010430). 
1.2 The recommendation to award the Contract follows a further
competition made under Lot 8 of the Crown Commercial Services
Framework for Purchase of Standard and Specialist Vehicles (ref:
RM6244). 
1.3 An Overarching Transport Contract Strategy was prepared by the
Corporate Procurement Unit which covered the purchase of vehicles for
the Vehicle Replacement Programme from 2023 to 2027, and was
approved by the Director of Environment and Infrastructure, and the
Strategic Commercial and Procurement Manager in February 2023. An
Executive Summary Strategy specific to the Supply and Delivery of 2
no. 16-Seat + Driver Wheelchair Accessible Bus was approved on 12
February 2026. 
___________________________________________________________________ 
Item 18
Page 183 of 214

Page 184

PUBLIC
2. Recommendations
It is recommended that the Finance, Resources and Customer Services
Policy Board: 
2.1 Authorises the Head of Corporate Governance to award a contract for
Supply and Delivery of 2 x 16 Seat + Driver Wheelchair Accessible Bus
– RC-CPU-25-345 to Woodall-Nicholson Ltd t/a Treka Bus, being a
Call-Off Contract made under Lot 8 of the Crown Commercial Services
Framework Agreement for Purchase of Standard and Specialist
Vehicles, reference RM6244.  
2.2 Authorises the Contract value of up to £213,750, excluding VAT.   
2.3 Notes that Woodall-Nicholson Ltd t/a Treka Bus have confirmed
delivery of the two vehicles within 10 weeks from receipt of the
Council’s Purchase Order. Delivery of these vehicles will be made to
Fleet Services, Underwood Road, Paisley. 
2.4 Notes, the Call-Off Contract will be concluded in accordance with the
Framework Schedule 7 Call Off Award Procedure using the CCS Order
Form.
2.5 Authorises in accordance with the Framework Agreement Core Terms
an aggregate liability cap of 150% of the Estimated Yearly Charges.
_________________________________________________________
3. Background
3.1 As part of the Vehicle Replacement Programme for 2025/26,
Environment, Housing & Infrastructure Services identified a
requirement to purchase two (2), 16 Seat + Driver Wheelchair
Accessible Buses. In accordance with Standing Order 29.5 of the
Renfrewshire Council Standing Order relating to Contracts, the Crown
Commercial Services Framework for Purchase of Standard and
Specialist Vehicles (ref: RM6244), Lot 8 Buses and Coaches (over 17
seats) was identified as the best option for these vehicle purchases.
3.2 This procurement exercise was conducted as a further competition
under the Crown Commercial Services Framework for Purchase of
Standard and Specialist Vehicles (ref: RM6244), Lot 8 Buses and
Coaches (over 17 seats). 
3.3 The further competition was issued to Suppliers on the 13 February
2026 with tender documentation available for downloading from the
Page 184 of 214

Page 185

PUBLIC
Public Contract Scotland Tender platform on this date. The 12
Suppliers on Lot 8 Buses and Coaches (over 17 seats) of the
Framework Agreement were all invited to participate in the further
competition.
3.4 By closing date set for return of electronic tenders set for 12 noon on
27 February 2026, one Supplier provided a Tender submission, with 11
Suppliers not providing a response. 
3.5 The Supplier who submitted a response, continued to meet the
requirements of the Single Procurement Document (SPD) issued by
them when applying for a place on the Crown Commercial Services
Framework for Purchase of Standard and Specialist Vehicles (ref:
RM6244).
3.6 The Tender Submission was evaluated against an award criteria of
90% Price and 10% Quality The scores achieved by the Supplier is
detailed in the table below: 
Price
(90%)
Quality
(10%)
Total
(100%)
1 Woodall-Nicholson Ltd t/a
Treka Bus 
90.00% 10.00% 100.00% 
3.7 Community Benefits were sought for this contract and Woodall-
Nicholson Ltd t/a Treka Bus have offered the following:
Community Benefit Description No of People
/ Activity
Financial Support for a Social Enterprise or other approved
community initiative    1
___________________________________________________________________
Implications of the Report
1. Financial - The £213,750 cost of this contract will be funded from the
Environment, Housing & Infrastructure Capital budget allocation for the
Vehicle Replacement Programme for financial year 2026/27. 
2. HR & Organisational Development - None directly arising from this
report. 
Page 185 of 214

Page 186

PUBLIC
3. Community/Council Planning –  
• Fair
Reducing inequalities in Renfrewshire, focusing on supporting our
communities through the cost-of-living crisis with dignity and
empowering people to live fulfilled lives 
4. Legal - The procurement of this contract was conducted in accordance
with the requirements for a further competition under Lot 8 of the Crown
Commercial Services Framework Agreement for Purchase of Standard
and Specialist Vehicles (ref: RM6244) and the Renfrewshire Council
Standing Orders Relating to Contracts. 
5. Property/Assets - When delivered, these 2 vehicles will replace older
buses and become an integral part of the Council’s fleet. 
6. Information Technology – None directly arising from this report.
7. Equality & Human Rights - No negative impacts on equality groups or
potential for infringement of individuals’ human rights have been
identified arising from the recommendations contained in the report. If
required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the
Council’s website.  
8. Health & Safety - Woodall-Nicholson Ltd T/A Treka Bus’s health and
safety credentials were evaluated by Corporate Health and Safety and
met the Council’s requirements regarding Health and Safety.
9. Procurement – The procurement procedures outlined within this report
shall ensure that the Council meets its statutory requirements in
respect of procurement procedures, efficiency and modern
Government.
10. Risk - Woodall-Nicholson Ltd T/A Treka Bus’s insurances have been
assessed and evaluated to confirm that they have met the minimum
requirements regarding insurable risk.
11. Privacy Impact - None directly arising from this report.
12. Climate Risk– The continued replacement of current Renfrewshire
Council vehicles with new vehicles of Euro 6 emission standards, helps
Renfrewshire Council continue to reduce the carbon footprint of the
fleet by removing older and less environmentally friendly vehicles. 
Page 186 of 214

Page 187

PUBLIC
These vehicles will be able to run on hydrotreated vegetable oil (HVO)
fuel without any modification to the vehicles or fuel pumps.
13. Children’s Rights – No implications have arisen or are anticipated.
14. Cosla Policy Position – No Cosla Policy Position implications have
arisen or are anticipated.
._________________________________________________________
List of Background Papers 
(a)  None
___________________________________________________________________ 
Author:          Kirstin Hornby, Procurement Assistant,
Kirstin.Hornby@renfrewshire.gov.uk 
Page 187 of 214

Page 188

PUBLIC 
___________________________________________________________________
To:   Finance, Resources and Customer Services Policy Board
On:  23 April 2026
___________________________________________________________________
Report by: The Director of Finance and Resources and the Director of
Environment, Housing & Infrastructure
___________________________________________________________________
Heading: Reactive Repair & Maintenance of CCTV, Fire Alarm and Intruder
Alarm Systems (Including the Provision of an Alarm Monitoring Service)
- RC-CPU-25-060
___________________________________________________________________
1. Summary
1.1 The purpose of this report is to seek the approval of the Finance,
Resources and Customer Services Policy Board to award a Contract
for Reactive Repair & Maintenance of CCTV, Fire Alarm and Intruder
Alarms Systems (Including the Provision of an Alarm Monitoring
Service), reference RC-CPU-25-060, to Dalkia Scotshield Limited
(SC133446). 
1.2 The recommendation to award a Contract for Reactive Repair & Alarm
Maintenance of CCTV, Fire Alarm and Intruder Alarms (Inclusive of an
Alarm Monitoring Service) follows a procurement exercise which was
conducted in accordance with the Public Contracts (Scotland)
Regulations 2015 for an above GPA Threshold Services contract
following the Open Procedure and the Renfrewshire Council Standing
Orders Relating to Contracts. 
1.3 A Contract Strategy was approved by the interim Corporate
Procurement Manager and the Head of Facilities and Property Services
on 26 January 2026.
___________________________________________________________________ 
Item 19
Page 188 of 214

Page 189

PUBLIC
2. Recommendations
It is recommended that the Finance, Resources and Customer Services
Policy Board: 
2.1 Authorises the Head of Corporate Governance to award a Contract for
Reactive Repair & Maintenance of CCTV, Fire Alarm and Intruder
Alarm Systems (Inclusive of an Alarm Monitoring Service), reference
RC-CPU-25-060, in the form of an SBCC Measured Term Contract for
use in Scotland 2011, MTC/Scot (2011 Edition) incorporating the
Employer’s Amendments, to Dalkia Scotshield Limited (SC133446). 
2.2 Authorises the cumulative spend under this Measured Term Contract
up to a maximum approved contract value of £1,400,000 excluding
VAT.   
2.3 Note, the Contract Period will be for 2 years with the option for
Renfrewshire Council, at its sole discretion to extend the Contract
Period for up to a further 12 months on 2 separate occasions, subject
to satisfactory operation and performance.  
2.4 It is anticipated that the commencement date will be 18 July 2026.  In
the event that the Measured Term Contract does not commence on 18
July 2026, the Contract Period shall run from the commencement date
as stated in the Award Schedule to the Letter of Acceptance. 
_________________________________________________________
3. Background
3.1 The Council has a statutory duty under the Health and Safety at Work
etc. Act 1974 to ensure that all properties under its control are suitably
maintained to ensure that they are safe and without risk to health to
both employees and members of the public.
A number of the Council’s Public Buildings are fitted with Intruder
Alarms, Fire Alarms, and Closed-Circuit Television (CCTV) systems.
The maintenance of these systems ensures that they remain
serviceable to assist in the protection of users of the properties. The
Council does not have in-house resources suitably trained to carry out
the regular maintenance of these systems, therefore an external
contractor is employed for this purpose.
Along with regular maintenance, the Contract will include for the
provision of a 24/7 reactive repair service and a 24/7 alarm monitoring
service where appropriate. The alarm monitoring service will cover both
fire and intruder alarm activations. The monitoring of CCTV systems
will not be within the scope of this Contract and will remain in-house.
Page 189 of 214

Page 190

PUBLIC
This contract will be managed by Facilities Management (Support
Services) who are responsible for the delivery of repairs and
maintenance services for all Council owned properties.
3.2 The Contract is a Measured Term Contract and will be formed using
the SBCC Measured Term Contract for use in Scotland 2011,
MTC/Scot (2011 Edition) incorporating the Employer’s Amendments as
set out in the Tender Documents.
3.3 A Contract Notice advertising the tender opportunity was dispatched via
the Public Contracts Scotland portal to the Find a Tender System
(FTS), with the notice published on FTS on 26 January 2026.  The
Tender Documents were available for download from the Public
Contracts Scotland – Tender portal on this date.  
3.4 During the tender period, 44 organisations expressed an interest in the
Contract. By the closing date set for the return of electronic tenders,
2pm on 25 February 2026, 14 organisations submitted a tender
response, 12 organisations declined to respond, and 18 organisations
did not respond. 
3.5 The Tender Submissions received were evaluated by a panel
compromising of representatives from Environment, Housing and
Infrastructure, Information Technology, Security and Compliance,
Health and Safety, Risk and the Corporate Procurement Unit. 
3.6 An initial review of the Tender Submissions noted that one Tenderer
failed to submit a commercial response and as such did not meet the
requirements of the Invitation to Tender. Their Tender was rejected as
a result. 
3.7 In accordance with this being an above GPA Threshold Contract and
Public Contracts (Scotland) Regulation 2015, Tenderers were
evaluated against a pre-determined set of criteria in the form of the
Single Procurement Document (“SPD”). The remaining 13 Tenderers
satisfied the Council’s requirements in respect of their responses to the
SPD. 
3.8 The Technical and Commercial responses contained in each Tender
Submission were then scored against the award criteria of 45%
Technical (Quality) and 55% Commercial (Price).
3.9  Following evaluation of the Tender Submissions, 6 Tenderers failed to
meet the Council’s minimum Cyber Security requirements and were
excluded from the procurement process. 
Page 190 of 214

Page 191

PUBLIC
3.10 During the evaluation one Tenderer withdrew their Tender Submission
due to an error identified in their Commercial offer which meant they
were unable to maintain their bid.
3.11 The scores relative to the award criteria of the remaining Tenderers are
noted below: 
Price 
(55%)
Quality 
(45%) Total (100%)
1 Dalkia Scotshield
Limited
(SC133446)
53.66% 39.50% 93.16%
2 Fortress Security
Alarms Ltd.
(SC179153)
55.00% 37.75% 92.75%
3 Openview Security
Solutions Limited
(03376202)
35.80% 37.75% 73.55%
4 Invincible Security
Ltd. (SC221100) 27.39% 35.25% 62.64%
5 King
Communications &
Security Limited
(SC317976)
28.75% 33.75% 62.50%
6 DFP Services
Limited
(04123832)
21.23% 38.75% 59.98% 
3.12 The evaluation of Tender Submissions received identified that the
submission by Dalkia Scotshield Limited (SC133446) was the most
economically advantageous tender.
3.13 Community Benefits were requested as part of the procurement
process and Dalkia Scotshield Limited (SC133446) have committed to
the following Community Benefits:
Community Benefit Offered No. of people/activity
Industry Awareness Event 4
Modern Apprentice 3
___________________________________________________________________
Implications of the Report
1. Financial - The maximum value for this Measured Term Contract is
£1,400,000 excluding VAT. This is for the initial 2-year Contract Period
and the extension options of up to 12 months on two occasions (four
years in total). The cost of this Measured Term Contract shall be met
Page 191 of 214

Page 192

PUBLIC
from the Hard Facilities Management revenue repairs budget within
Environment, Housing and Infrastructure Services. 
2. HR & Organisational Development – TUPE implications may apply to
this Contract. 
3. Community/Council Planning –  
• Place: Working with partners to ensure our neighbourhoods are
safe, vibrant and attractive places to live
• Living our Values: Ensuring Renfrewshire Council delivers Best
Value for our citizens and customers, that we demonstrate we are a
well governed, effective organisation. 
4. Legal - The procurement of this Measured Term Contract has been
conducted as an above GPA Threshold services Contract using the
Open Procedure in accordance with the Renfrewshire Council Standing
Orders Relating to Contracts and the Public Contracts (Scotland)
Regulations 2015, as amended. 
5. Property/Assets – This Measured Term Contract will ensure that the
CCTV, Fire and Intruder alarms within the Council’s estate are properly
maintained. 
6. Information Technology - The service provider’s Cyber Security
submissions have been assessed by representatives from the Council’s
Cyber Security team and met the Council’s requirements regarding
Cyber Security.   
7. Equality & Human Rights – None directly arising from this report 
8. Health & Safety – Dalkia Scotshield Limited’s health & safety
credentials were evaluated by Corporate Health and Safety and met
the Council’s requirements regarding health and safety. 
9. Procurement – The procurement procedure outlined within this report
ensures that the Council meets its statutory requirements in respect of
procurement procedures, efficiency, and modern Government.  
10. Risk – Dalkia Scotshield Limited’s insurances have been assessed and
evaluated, and these met the Council’s requirements.
11. Privacy Impact – Dalkia Scotshield Limited has confirmed compliance
with the Data Processor Agreement and have committed to sign the
Agreement.  
Page 192 of 214

Page 193

PUBLIC
12. Climate Risk– The level of impact associated with provision of this
service has been assessed using the Scottish Government
Sustainability Test and is considered to be low risk.
13. Children’s Rights – None directly arising from this report.
14. Cosla Policy Position – none directly arising from this report.
_________________________________________________________
List of Background Papers 
(a)  None
___________________________________________________________________ 
Author:           Aileen Ross, Procurement Adviser, aileen.ross@renfrewshire.gov.uk 
Page 193 of 214

Page 194

PUBLIC 
___________________________________________________________________
To:   Finance, Resource and Customer Services Policy Board
On:   23 April 2026
___________________________________________________________________
Report by: The Director of Finance and Resources and the Chief Officer
Renfrewshire Health and Social Care Partnership (RHSCP)
___________________________________________________________________
Heading: Contract Authorisation Report for Provision of a Professional
Independent Advocacy Service for Adults (RC-CPU-25-063)
___________________________________________________________________
1. Summary
1.1 The purpose of this report is to seek the approval of the Finance,
Resources and Customer Services Policy Board to enter into a
Contract for Provision of a Professional Independent Advocacy Service
for Adults with The Advocacy Project (Scotland).
1.2 The recommendation to award this Contract follows a procurement
exercise which was conducted as an Open Procedure for an above
Threshold contract in accordance with the Public Contracts (Scotland)
2015 Regulations 2015, as amended, Social and Other Specific
Services and the Renfrewshire Council’s Standing Orders Relating to
Contracts.
1.3 A Contract Strategy was approved by the Chief Officer (RHSCP) and
the Chief Finance Officer (RHSCP) on 01 August 2025 and Strategic
Category Manager on 31 July 2025.
1.4 A recommendation for award of this contract was presented to the
Finance, Resources and Customer Services Policy Board on 20
November 2025, the Contract was awarded 16 December 2025,
however, that service provider terminated the contract on 27 January
2026, prior to the Commencement Date.  As the remaining tenderer
submissions offers were still available for acceptance the Corporate
Procurement Unit have prepared this new recommendation.
___________________________________________________________________
Item 20
Page 194 of 214

Page 195

PUBLIC
2. Recommendations
It is recommended that the Finance, Resources and Customer Services Policy
Board:
2.1 Authorises the Head of Corporate Governance to award a Contract for
the Provision of a Professional Independent Advocacy Service for
Adults, reference RC-CPU-25-063, to The Advocacy Project (Scotland)
(Scottish Charity Number SC020564);
2.2 Authorises up to a maximum approved contract value of £761,130
excluding VAT; 
2.3 Note that the maximum approved contract value includes additional
funding for Alcohol and Drugs focused advocacy up to a value of
£140,000 (£35,000/annum), from Scottish Government. This will be
confirmed annually but is NOT guaranteed for the duration of the
Contract; 
2.4 Authorises the award of a Contract for a period of 3 years with the
Council option to extend for up to a further 12 months on 1 occasion.
The extension will be at the sole discretion of the Council;
2.5 Notes that the anticipated Commencement Date for the Contract is 01
October 2026 to accommodate transitional requirements, including
TUPE; and
2.6 Notes that the Contract awarded following the Finance, Resources and
Customer Services Policy Board on 20 November 2025 for this
Contract for Professional Independent Advocacy Service for Adults was
terminated by the Provider.
_______________________________________________________
3. Background
3.1 The Council has a current contract for the Professional Independent
Advocacy Service for Adults, which was due to expire on 31 March
2026. Following an Open Tender procedure for a replacement contract,
a recommendation was presented to the Finance, Resources and
Customer Services Policy Board on 20 November 2025 and approved
for Commencement on 01 April 2026. However, the recommended
Tenderer terminated the Contract on 27 January 2026, due to a change
in circumstances. 
3.2 To ensure continuity of the Service, an interim contract has been put in
place with the incumbent provider until 31 October 2026 until this
longer term contract can be approved and implemented.
3.3 Under the Mental Health (Care and Treatment) (Scotland) Act 2003,
NHS Boards and Local Authorities have a duty to fund independent
Page 195 of 214

Page 196

PUBLIC
advocacy. The Contract provides a Service which plays an important
role in supporting adults living in the Renfrewshire Council area to have
their views heard and considered by the people who are involved in
decision making that will affect their lives.
3.4  A Contract Notice was published on the Find a Tender Service via the
Public Contracts Scotland website on 01 August 2025. The Invitation to
Tender was also published and available on this date from Public
Contracts Scotland – Tender. The Tender Deadline was 12 noon on 15
September 2025. There were 3 Tender Submissions received.
3.5 Following the change in circumstances of the previously recommended
Tenderer and the termination of this Contract the validity of the 2
remaining Tender Submissions were confirmed and those offers
extended by the remaining 2 Tenderers. A revised evaluation was
conducted using those remaining bids. 
3.6 Tender submissions were evaluated against a pre-determined set of
selection criteria in the form of the Single Procurement Document
(SPD) (Scotland) and criteria to assess capacity and capability to
deliver services. These were evaluated by representatives from the
Corporate Procurement Unit (CPU), RHSCP, Health and Safety, Risk
and Cyber teams. All Tenderers demonstrated compliance with the
minimum selection criteria set and were assessed as a pass. 
3.7 Each Tender Submission was evaluated against the published award
criteria of 70% Quality and 30% Price by representatives from both the
CPU and the RHSCP. The Total Score achieved by each Tenderer is
detailed below. 
Tenderer Quality
(70%)
Price
(30%)
Total
Score
The Advocacy Project (Scotland) 64.00% 30.00% 94.00%
You First Advocacy 60.00% 29.99% 89.99%
3.8  The Tender Submission received by The Advocacy Project (Scotland)
met the criteria set out in the procurement documents and was
therefore deemed to be best value for money.
3.9 Community Benefits were requested as part of this procurement
process. The recommended Tenderer offered the Community Benefits
detailed below:
Community Benefit Number
Work Placement for an individual aged 14+ years of age  4
Industry Awareness Events - Schools/Invest in
Renfrewshire – Employability/Further Education 4
Page 196 of 214

Page 197

PUBLIC
Community Benefit Number
Non-financial support for a Social Enterprise within
Renfrewshire 4
Non-financial support for a Community Project/Group 4
___________________________________________________________________
Implications of the Report
1. Financial - The maximum value of £761,130, excluding VAT, for the initial
3 year period plus further extension of up to a further 12 months will be
met from the RHSCP Adult Services Budget. Funding up to £140,000
(£35,000/annum) from Scottish Government for Alcohol and Drugs
focused advocacy will be confirmed and implemented each year, where
available. 
2. HR & Organisational Development - None directly arising from this
report.
3. Community/Council Planning – 
• Place – working together to enhance wellbeing across communities -
Developing local plans that reflect the voices of our communities,
alongside strengthening our local partnerships, working together to
deliver local priorities. 
• Fair – nurturing bright, happy and healthy futures for all – 
o Reducing inequalities in Renfrewshire, focusing on supporting
our communities and empowering people to live fulfilled lives;
o Working with a range of partners to support the improved health
and wellbeing of our citizens.
4. Legal - This procurement was carried out in accordance with the
procedures for an above Threshold Contract as permitted under part 3
Section 7 (Social and Other Specific Services) of the Public Contracts
(Scotland) Regulations 2015, as amended, and the Council’s Standing
Orders Relating to Contracts. The Tenderer previously recommended and
awarded the Contract terminated the Contract prior to performing any
Service under the Contract. The tender submissions from the remaining 2
Tenderers remained open and available for acceptance. Due to timings
for this recommendation, the remaining Tenderers agreed to extend the
validity period of their Tender Submissions to permit completion of this
award.
5. Property/Assets – None directly arising from this report.
6. Information Technology – The Council’s Security & Compliance team
evaluated the cyber security evidence submitted by the recommended
Page 197 of 214

Page 198

PUBLIC
and this met the Council’s minimum requirements. ICT will support the
review of cyber security evidence on an annual basis.
7. Equality & Human Rights - The recommendations contained within this
report have been assessed in relation to their impact on equalities and
human rights. No negative impacts on equality groups or potential for
infringement of individuals’ human rights have been identified arising from
the recommendations contained in the report.  If required following
implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored.
8. Health & Safety – The Corporate Health and Safety team evaluated the
Health and Safety evidence submitted by the recommended Tenderer and
these met the Council’s minimum requirements.
9. Procurement – The Tenderer previously recommended and awarded the
Contract terminated the Contract prior to performing any Service under
the Contract, the remaining 2 Tenderers agreed to extend the validity
period of their Tender Submissions. This subsequent recommendation
has followed procurement regulations and Renfrewshire Council Standing
Orders relating to Contracts, to ensure that the Council meets its statutory
requirements in respect of procurement procedures, efficiency and
modern Government
10. Risk - The Council’s Risk team evaluated the insurance evidence
submitted by the recommended Tenderer, and these met the Council’s
minimum requirements.
11. Privacy Impact – The Council’s Information Governance Team and
RHSCP conducted a data protection impact assessment as part of the
procurement exercise. The recommended Tenderer will be a Data
Controller and will be required to comply with the Conditions of Contract
including Data Protection Conditions.
12. Climate Risk – The level of impact associated with the services was
assessed using the Scottish Government Sustainability Test and is
considered to be low impact.
13. Children’s Rights – None directly arising from this report.
14. Cosla Policy Position – None directly arising from this report.
_______________________________________________________
List of Background Papers - none
___________________________________________________________________ 
Author: Shona Brydson, Senior Procurement Specialist, Corporate Procurement
Unit, shona.brydson@renfrewshire.gov.uk 
Page 198 of 214

Page 199

PUBLIC 
___________________________________________________________________
To:  Finance, Resources and Customer Services Policy Board
On:  23 April 2026
___________________________________________________________________
Report by: The Director of Finance and Resources and the Director of
Environment, Housing and Infrastructure 
___________________________________________________________________
Heading: Notification of the award of a Contract for Single Building Assessment –
Approved Assessor and Verifier (RC-CPU-25-089) under standing
order 9.1(k) of Renfrewshire Council Standing Orders Relating to
Contracts
___________________________________________________________________
1. Summary
1.1 The purpose of this report is to notify the Finance, Resources, and
Customer Services Policy Board of the award of a Contract for Single
Building Assessment – Approved Assessor and Verifier Project (RC-
CPU-25-089) authorised for award by the Head of Housing Services
and Corporate Procurement Manager under standing order 9.1(K) of
Council Standing Orders Relating to Contracts on 4 March 2026.  The
Contract was awarded to Firntec Limited (Co.no 13460282) on 26
March 2026.   
1.2 Council received grant funding from the Scottish Government’s
Cladding Remediation Programme – Single Building Assessments to
carry out Initial Gateway Assessments and full Single Building
Assessments to 14 of the Council’s high rises, a condition of which sets
out how and when the funding needs to be used.  The funding was
required to be committed by 31 March 2026.  However, the Scottish
Government has provided flexibility to the funding deadline and it can
now be used beyond April 2026.  To ensure the grant could be utilised
within the required timescale, the Interim Corporate Procurement
Manager approved the use of standing order 9.1(k) of Council Standing
Item 21
Page 199 of 214

Page 200

PUBLIC
Orders Relating to Contracts which requires the retrospective reporting
of the contract award to this Policy Board.   
1.3 The procurement exercise was conducted as an above Government
Procurement Agreement Open Tender Procedure, as detailed within
section 3 of this report.  
_________________________________________________________
2. Recommendations 
The Finance, Resources and Customer Services Policy Board is asked
to note that:
2.1 The Contract for Single Building Assessment – Approved Assessor and
Verifier (RC-CPU-25-089) was awarded to Firntec Limited (Co.no
13460282), in accordance with clause 9.1(K) of Council Standing
Orders Relating to Contracts January 2024 by the Director of
Environment, Housing and Infrastructure on 26 March 2026 as detailed
in section 3 of this report.  
2.2 The Total of the Prices is £516,450 excluding VAT. This Contract is
fully funded by Scottish Government’s Cladding Remediation
Programme – Single Building Assessments.  
2.3 A contingency spend is available of £51,645 which equates to 10% of
the Total of the Prices.
2.4 The total Approved Contract value is £568,095 excluding VAT, which is
the Total of the Prices plus the contingency spend as approved by
Head of Housing Services and Corporate Procurement Manager.  
2.5 The starting date was 30 March 2026, and the completion date is 52
weeks from the starting date. 
2.6 The Consultant’s total Liability to the Council within this Contract for
matters for which insurance is provided is £10 million and the
Consultant’s total Liability to the Council for other matters is £10 million.  
_________________________________________________________
3. Background
3.1 Renfrewshire Council had the requirement to appoint an approved
Scottish Government Single Building Assessment Consultant to
undertake initial Gateway Assessments and Single Building
Assessments to 14 high rise residential buildings within the
Renfrewshire Council area.  The outcome of these assessments is to
Page 200 of 214

Page 201

PUBLIC
produce two reports, in an agreed format, as well as provide expert
advice to the Council.  
3.2  The Consultant must adhere to the Single Building Specification
document published by the Scottish Government in June 2024, the
proscribed procedures and adhere to PAS9980. These requirements
were stated within the tender documentation issued for the Contract. 
3.3 The Contract is fully funded by the Scottish Government’s Cladding
Remediation Programme – Single Building Assessments and there are
conditions attached to how and when the funding needs to be used. 
Therefore, to ensure the Council meets the funding conditions, the
Interim Corporate Procurement Manager agreed the use of standing
order 9.1(K) as summarised in paragraph 1.2.  
3.4 The procurement was compliant with the Procurement Regulations. A
Contract Notice was published on Find a Tender Service via the Public
Contracts Scotland advertising portal on 10 November 2025 with tender
documentation available for downloading from Public Contracts
Scotland – Tender portal from this date.   
3.5 During the live tender period, 21 organisations expressed an interest in
this tender, however, only 9 were Scottish Government approved
Assessors, a selection criteria requirement.  By the closing date set for
the return of electronic tender submissions at 12 noon on 10 December
2025, 7 organisations submitted a tender response, 3 organisations
declined to respond (1 organisation was a Scottish Government
Approved Assessor), and 11 organisations did not respond.   
3.6 As required by Regulation 60 of the Public Contracts (Scotland)
Regulations 2015, as amended, Tenderers were each required to
complete a Single Procurement Document (“SPD”), which was to be
submitted with their tender submission. All 7 organisations were
evaluated against a pre-determined set of criteria in the form of the
SPD by representatives from the following Council Services: Housing
Services, the Corporate Procurement Unit, Corporate Risk and
Corporate Health & Safety.  
3.7 All 7 tender submissions complied with the minimum selection criteria
of the SPD.   Each tender submissions was evaluated against the
Award Criteria which were based on a weighting of 70% Quality and
30% Price.  
3.8 During this evaluation one tender submission was considered to be
abnormally low and the information presented to the Council in
response to the Regulation 69 enquiry had not satisfied the Council that
Page 201 of 214

Page 202

PUBLIC
the Tenderer price could have been maintained in the performance of
the Contract.  This bid was treated as irregular in accordance with
Regulation 27 (6)(d) of The Public Contracts (Scotland) Regulations
2015 and did not progress to the award stage. 
3.9 The scores relative to the award criteria for the 6 remaining Tenderers
are noted below: 
Quality
(70%)
Price
(30%)
Total
(100%)
1 Firntec Ltd (Co.no 13460282) 65.00% 23.45% 88.45%
2 Global HSE Solutions Ltd
(co.no.05906312) 57.25% 23.05% 80.30%
3
Bailey Partnership (Group) Ltd
(co.no. 15873896)  42.50% 30.00% 72.50%
4 Diamond and Company (Scotland)
Limited (co.no. SC649205) 52.25% 18.75% 71.00%
5 Thomas & Adamson International
Limited (co.no. SC171733) 44.75% 25.79% 70.54%
6
Ahearne Fire Engineering Limited
T/A AFEC International (an Eire
registered Company) (CRO
number 347221)
9.50% 22.53% 32.03% 
3.10 The evaluation of tender submissions received identified that the
submission by Firntec Ltd was the most economically advantageous
tender. 
3.11  To ensure the grant could be utilised within the required timescale, the
Interim Corporate Procurement Manager approved the use of standing
order 9.1(k) of Council Standing Orders Relating to Contracts which
requires the retrospective reporting of the contract award to this Policy
Board. 
3.12 Community Benefits were requested as part of the procurement
process and Firntec Ltd have committed the following Community
Benefits: 
Community Benefits Description No of People / Activity
Industry Awareness Event  1
Non-Financial support for a Social
Enterprise within Renfrewshire  1
Financial support for a Social Enterprise
within Renfrewshire  1
Non-Financial support for a Community
Project/ Group 1
Page 202 of 214

Page 203

PUBLIC
___________________________________________________________________
Implications of the Report
1. Financial  
The Approved Contract Value is £568,095 excluding VAT, which is the
Total of the Prices and the Contingency.  This Contract is fully funded
by the Scottish Government’s Cladding Remediation Programme –
Single Building Assessments.   
2. HR & Organisational Development – None directly arising from this
report.   
3. Community/Council Planning –  
• Our Renfrewshire is thriving – maximising economic growth,
which is inclusive and sustainable. 
• Our Renfrewshire is well – supporting the wellness and resilience
of our citizens and communities.  
• Our Renfrewshire is fair – addressing the inequalities which limit
life chances.
• Our Renfrewshire is safe – protecting vulnerable people and
working together to manage the risk of harm.   
Living our Values: Ensuring Renfrewshire Council delivers Best Value
for our citizens and customers, that we demonstrate we are a well
governed, effective organisation.
4. Legal – This Contract was awarded under standing order exemption
9.1(k) of Council Standing Orders Relating to Contracts by the Head of
Housing Services and Corporate Procurement Manager and in
compliance with the Procurement Regulations and Procurement
Principles. 
5. Property/Assets – the services provided in this Contract will ensure a
comprehensive risk assessment for the Council’s 14 multi-storey blocks
to identify any unsafe external wall cladding, internal fire safety and
determining any remedial works that will be required to be undertaken.   
6. Information Technology – None directly arising from this report.   
7. Equality & Human Rights – None directly arising from this report.   
Page 203 of 214

Page 204

PUBLIC
8. Health & Safety – Firntec Ltd health and safety credentials were
evaluated by Corporate Health and Safety and met the Council’s
requirements regarding health and safety.   
9. Procurement – The procurement procedure outlined within this report
ensures that the Council meets its statutory requirements in respect of
procurement procedures, efficiency, and modern Government.   
To ensure the funding conditions are met such as a commitment by 31
March 2026 for the Scottish Government’s Cladding Remediation
Programme – Single Building Assessments the Interim Corporate
Procurement Manager approved the use of standing order 9.1(k) of
Council Standing Orders Relating to Contracts which requires the
retrospective reporting of the contract award to this Policy Board.  
10. Risk – Firntec Ltd insurance has been assessed and evaluated to
confirm they meet the minimum requirements regarding insurance risk. 
This Contract includes caps on liability.  Firntec Limited total liability to
the Council for matters for which insurance is provided is £10 million
and the Consultant’s total Liability to the Council for other matters is
£10 million.    
11. Privacy Impact – None directly arising from this report.   
12. Climate Risk – The level of impact associated with the provision of
these works have been assessed using the Scottish Government
Sustainability Test and is considered Low Risk.  
13. Children’s Rights – None directly arising from this report.  
14. Cosla Policy Position – None directly arising from this report.
_________________________________________________________
List of Background Papers 
(a)  None
___________________________________________________________________ 
Author:          Kevin Milliken, Senior Procurement Specialist, Corporate Procurement
Unit, (kevin.milliken@renfrewshire.gov.uk) 
Page 204 of 214

Page 205

PUBLIC 
___________________________________________________________________
To:  Finance, Resources and Customer Services Policy Board
On:  23 April 2026
___________________________________________________________________
Report by: The Director of Finance and Resources and the Director of
Environment, Housing and Infrastructure
___________________________________________________________________
Heading: Notification of the award of a Contract for Construction of Red Smiddy
to Erskine Active Travel Route Phases 4 and 5 (RC-CPU-25-158) 
Notification of the award of a Contract for Construction of Red Smiddy
to Erskine Active Travel Route Phase 6 (RC-CPU-25-159)
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to notify the Finance, Resources and
Customer Services Policy Board of the award of: 
• A Contract for Construction of Red Smiddy to Erskine Active
Travel Route Phases 4 and 5, reference RC-CPU-25-158 to
John McGeady Limited; and
• A Contract for Construction of Red Smiddy to Erskine Active
Travel Route Phase 6, reference RC-CPU-25-159 to John
McGeady Limited. 
1.2 The Council was offered a grant from Transport Scotland’s Tier 2
Active Travel Fund for Construction on the condition that the associated
spending commenced  before 31 March 2026. In order to meet the
condition, the Head of Finance and Procurement approved the use of
standing order 9.1k of the Council Standing Orders Relating to
Contracts with the requirement for retrospective reporting to this Policy
Board. 
Item 22
Page 205 of 214

Page 206

PUBLIC
1.3 In accordance with the authority granted by the Head of Finance and
Procurement as noted in 1.2 above, the Head of Climate, Public
Protection and Roads authorised the award of these two Contracts on 7
January 2026. The Letters of Acceptance were issued on the same
date.
___________________________________________________________________ 
2. Recommendations 
The Finance, Resources and Customer Services Policy Board is asked
to note:
2.1 The Contract for Construction of Red Smiddy to Erskine Active Travel
Route Phases 4 and 5, reference RC-CPU-25-158, was awarded to
John McGeady Limited (SC080553); and  
2.2 The Contract for the Construction of Red Smiddy to Erskine Active
Travel Route Phase 6, reference RC-CPU-25-159, was awarded to
John McGeady Limited (SC080553).
2.3 The detail provided in section 3 of this report in connection with the
Contract for Construction of Red Smiddy to Erskine Active Travel Route
Phases 4 and 5 and the Contract for Construction of Red Smiddy to
Erskine Active Travel Route Phase 6. 
2.4 The Contract for the Construction of Red Smiddy to Erskine Active
Travel Route Phases 4 and 5, reference RC-CPU-25-158, was
awarded for an approved contract value of £811,095 (excluding VAT). 
This was from a Total Tendered Contact Sum of £737,359 excluding
VAT plus a 10% contingency spend of £73,736 (excluding VAT).
2.5 The Contract for the Construction of Red Smiddy to Erskine Active
Travel Route Phase 6, reference RC-CPU-25-159, was awarded for an
approved contract value of £351,358 (excluding VAT).  This was from a
Total Tendered Contract Sum of £319,416 plus a 10% contingency
spend of £31,942 (excluding VAT).
2.6 The cost of these Contracts will be wholly met from funding provided by
Transport Scotland’s Tier 2 Active Travel Infrastructure Fund for
Construction.
2.7 The starting date for both Contracts was 19 January 2026 with the
completion date for both Contracts being 26 weeks from the starting
date. 
2.8 Note that the Council required Tenderers to appoint a supported
business as a subcontractor to provide the signage required for this
Page 206 of 214

Page 207

PUBLIC
Contract. John McGeady Limited have nominated a supported
business for this requirement. 
_________________________________________________________
3. Background
3.1 The Council was offered a grant from Transport Scotland’s Tier 2
Active Travel Fund for the construction of an active travel route in 2
stages:
• Phases 4 and 5 are for the construction of 1.4 kilometres of shared
footway and cycleway from the end of the existing shared footway
and cycleway on Greenock Road, round Red Smiddy Roundabout,
north onto Southbar Road to Southholm Roundabout; and
• Phase 6 is for the construction of 0.616 kilometres of shared
footway and cycleway from Southholm Roundabout to the
overbridge on the A726 on the northbound verge.
A stipulation of the grant required the Council to commence work on
the Contracts at the earliest opportunity so most of the funding could be
utilised during the 2025/2026 financial year with the remaining being
provided during the 2026/2027 financial year.
3.2 To meet the grant conditions, the Head of Finance and Procurement
approved the use of 9.1k Council Standing Orders Relating to
Contracts to enable the work to commence before 31 March 2026. The
Contract awards were authorised by the Head of Climate, Public
Protection and Roads on 7 January 2026 and issued on the same date.
3.3 The tendering procedure for these below Regulated threshold Works
Contracts followed the Open Procedure in accordance with
Renfrewshire Council’s Standing Orders Relating to Contracts.
3.4 A Contract Notice was published on the Public Contracts Scotland
advertising portal on Thursday 13 November 2025 and the tender
documentation was available for downloading from the Public Contracts
Scotland – Tender platform from this date. 
3.5 During the tender live period, 27 organisations expressed an interest in
the Contracts. By the closing date for return of electronic Tenders, 12
noon on Friday 19 December 2025, 8 companies submitted a
response, 6 declined to respond and 13 showed no further interest. 
3.6 In accordance with Standing Order relating to Contracts 11.5, each
Tenderer was required to submit a completed Single Procurement
Document (SPD) as part of their Tender Submission. The completed
SPD documents were evaluated against a pre-determined set of criteria
Page 207 of 214

Page 208

PUBLIC
in the SPD. All 8 Tenderers satisfied the Council’s requirements in
respect of their responses to the SPD.
3.7 The technical and commercial responses in each Tender Submission
were then scored against the award criteria of 40% technical (Quality)
and 60% commercial (Price) in accordance with the Invitation to Tender
(ITT). The Council stated in the ITT that Tenderers must bid for both
Phases 4 and 5, and Phase 6 and that Tenderers who failed to submit
a bid for both Contracts would have their bid rejected.  The ITT also
stated that the Council intended to award both Contracts to one
Contractor. 
3.8 Tenderers were required to provide one Technical response and one
Commercial response within their submission.  As part of the
Commercial response, Tenders had to submit tendered sums for both
Contracts, which were aggregated and evaluated.  One Tenderer failed
to provide a Commercial response and their Tender was rejected as a
result. 
3.9 The scores relative to the award criteria of the Tenderers are noted
below: 
Price
(60.00%)
Quality
(40.00%)
Total
(100.00%)
1 John McGeady Limited
(SC080553) 58.15% 31.25% 89.40%
2 Bottom Groundworks & Plant
Hire Limited (SC578729) 60.00% 21.75% 81.75%
3 Covanburn Contracts Limited
(SC263761) 48.17% 31.00% 79.17%
4 Advance Construction
(Scotland) Limited (SC202570) 53.35% 24.25% 77.60%
5 Hillhouse Quarry Group Limited
(SC135103) 49.87% 21.25% 71.12%
6 M Squared (Scotland) Ltd
(SC479137) 39.67% 30.00% 69.67%
7 Ground Control Limited
(01795094) 20.47% 21.25% 41.72% 
3.10 The evaluation of tender submissions received identified that the
submission by John McGeady Limited (SC080553) was the most
economically advantageous Tender for both Contracts.
3.11 Community Benefits were requested as part of the procurement
process and John McGeady Limited has committed to the following
Community Benefits across these two Contracts: 
Community Benefit Description No of People
/ Activity
Page 208 of 214

Page 209

PUBLIC
S/NVQ (or equivalent) for  
• New Employee
• Existing Employee  
• Supply Chain Employee
2
Business advice/support to a local SME /Social Enterprise/
Voluntary organisation 1
Commitment to ensure that supply chain opportunities are
prioritised for Renfrewshire based businesses 2
___________________________________________________________________
Implications of the Report
1. Financial – the maximum approved Contract value for:
• Construction of Red Smiddy to Erskine Active Travel Route
Phases 4 and 5, reference RC-CPU-25-158 is £811,095 which
includes the Total Tendered Contract Sum plus 10%
contingency.  
• Construction of Red Smiddy to Erskine Active Travel Route
Phase 6, reference RC-CPU-25-159, is £351,358 (excluding
VAT) which includes the Total Tendered Contract Sum plus 10%
contingency.  
The costs for these Contracts will be wholly met through the Transport
Scotland’s Tier 2 Active Travel Infrastructure Fund for Construction. 
2. HR & Organisational Development – None arising directly from this
report. 
3. Community/Council Planning – Place – Working with partners to
enhance wellbeing across communities. The Contracts will support the
delivery of this outcome. 
4. Legal – the exemption under Standing Orders relating to Contract 9.1k
was used for the award of these two Contracts. The Contracts were
awarded by CPU and Environment, Housing and Infrastructure. 
5. Property/Assets – these Contracts will build a segregated two-way
cycle/pedestrian track located between the Red Smiddy roundabout
and Erskine. 
6. Information Technology – none arising directly from this report. 
7. Equality & Human Rights – none arising directly from this report. 
Page 209 of 214

Page 210

PUBLIC
8. Health & Safety – John McGeady Limited’s health and safety
credentials were evaluated by Corporate Health and Safety and met
the Council’s requirements regarding health and safety. 
9. Procurement – The procurement procedures outlined within this report
shall ensure that the Council meets its statutory requirements in
respect of procurement procedures, efficiency and modern
government.
10. Risk – John McGeady Limited’s insurances were assessed to confirm
that they have met the minimum requirements regarding insurable risk.
11. Privacy Impact – None arising directly from this report. 
12. Climate Risk – The level of impact associated with works connected
with the Contracts has been assessed using the Scottish Government
Sustainability Test and is high risk. John McGeady Limited have been
required to organise their activities in such a way that the impact they
have on the environment is minimised.
13. Children’s Rights – None arising directly from this report.
14. Cosla Policy Position – None arising directly from this report.
_________________________________________________________
List of Background Papers 
None. 
___________________________________________________________________ 
Author:           Brian Bradley, Assistant Category Manager, 0141 487 1522,
brian.bradley@renfrewshire.gov.uk 
Page 210 of 214

Page 211

PUBLIC 
___________________________________________________________________
To:  Finance, Resources and Customer Services Policy Board
On:  23 April 2026
___________________________________________________________________
Report by: The Director of Finance and Resources 
___________________________________________________________________
Heading: Notification of the Award of a Contract for Supply and Delivery of
1500 x Laptops (RC-CPU-26-008) 
___________________________________________________________________
1. Summary
1.1 The purpose of this report is to request that the Finance, Resources
and Customer Services Policy Board homologates the decision of the
Director of Finance and Resources and Head of Digital, Transformation
and Customer Services on 08 April 2026 to award a Contract for the
Supply and Delivery of 1,500 x Laptops (RC-CPU-26-008) to HP Inc
UK Limited (Co Registration No. 09408979). 
1.2 The Council received notification on 01 April 2026 that the price of
laptops on the Scottish Procurement single supplier Framework for
Mobile Client Devices (SP-24-008) (the Framework) would increase by
25%-30% from 13 April 2026. In order to mitigate this cost increase,
and with consideration of the Council’s Best Value obligations, the
decision was taken to conduct a procurement exercise using the Direct
Award procedure under the Framework to award a contract outside of
the board cycle. 
1.3 A Contract Strategy was approved by the Head of Digital,
Transformation and Customer Services and the Corporate
Procurement Manager on 08 April 2026 reflecting the circumstances
set out in this report.
___________________________________________________________________ 
Item 23
Page 211 of 214

Page 212

PUBLIC
2. Recommendations
It is recommended that the Finance, Resources and Customer Services
Policy Board homologates: 
2.1 the decision taken by the Director of Finance and Resources and the
Head of ICT, Transformation and Customer Service to award a contract
for Supply and Delivery of 1,500 x Laptops, which was awarded to HP
Inc UK Limited (Company Registration No. 09408979) via a direct
award procedure off the Scottish Procurement single supplier
Framework for Mobile Client Devices (SP-24-008) by the Director of
Finance and Resources on 09 April 2026.
2.2 that the approved contract value is £669,870, excluding VAT.  
2.3 that the Contract will be in place from 09 April 2026 until full delivery of
the laptops is received, which is anticipated to be August 2026.
_________________________________________________________
3. Background
3.1 Renfrewshire Council identified the need to purchase 500 laptops for
corporate requirements to support the Council’s continued refresh
programme, and 1,000 laptops for Education to replace teacher and
high school PC labs laptops that are more than 6 years old.  
3.2 A contract for the supply and delivery of 1,500 x laptops was awarded
to HP Inc UK Limited as a direct award off the Scottish Procurement
single supplier Framework for Mobile Client Devices (SP-24-008). The
Framework offers a compliant route to market with fixed pricing on core
devices, including laptops. HP Inc UK Limited is the only supplier
awarded to the Framework, and call off contracts are only possible via
the direct award procedure under this Framework.  
3.3 The Scottish Government advised on 01 April 2026 that the price of
laptops on the Scottish Procurement single supplier Framework for
Mobile Client Devices (SP-24-008) would increase between 25%-30%
from 13 April 2026 due to supply constraints for memory components,
caused by significant demand increase from the AI sector and lower
supply in the consumer market. This has resulted in a shortage of
memory components and a substantial increase in pricing. It was
estimated that the price increase would cost the Council up to an
additional £200,000 if the Contract was concluded after 12 April 2026,
and therefore to avoid this additional cost, and with consideration of the
Council’s Best Value duty, a decision was made to award a Contract
urgently to secure the current rates.
Page 212 of 214

Page 213

PUBLIC
3.4 The procurement exercise was conducted in accordance with the Direct
Award procedure for the Framework and in accordance with the
procedures for use of a third-party framework under the Council’s
Standing Orders Relating to Contracts.
3.5 The costs in respect of the Contract will be split, with £223,290 funded
by the ICT Capital Budget and £446,580 funded by the Education
Capital Budget.
___________________________________________________________________
Implications of the Report
1. Financial – The Approved Contract Value is £669,870, excluding VAT.
The costs will be met from the ICT Capital Budget (£223,290) and the
Education Capital Budget (£446,580). 
2. HR & Organisational Development – None directly arising from this
report. 
3. Community/Council Planning –
Place - working together to enhance wellbeing across
communities – creating a Renfrewshire where those who live, work,
visit and invest are digitally capable and connected 
Living Our Values – Ensuring Renfrewshire delivers Best Value for
our citizens and customers, that we demonstrate we are a well
governed, effective organisation 
4. Legal - The contract was awarded as a Direct Award made under the
Scottish Procurement single supplier Framework for Mobile Client
Devices (SP-24-008). The Client service seeks to homologate the
decision taken to award the contract outside the board cycle for
reasons as stated on the background to this report. 
5. Property/Assets – The Council will take ownership of 1,500 new
laptops upon delivery. 
6. Information Technology – The Contract shall ensure supply of
laptops to serve the ICT lifecycle maintenance programme.
7. Equality & Human Rights – None directly arising from this report.
8. Health & Safety – HP Inc UK Limited’s health and safety credentials
were assessed by Scottish procurement as part of the evaluation for
the Framework.
Page 213 of 214

Page 214

PUBLIC
9. Procurement – The procurement procedure was conducted in
accordance with the Direct Award procedure for the Scottish
Procurement single supplier Framework for Mobile Client Devices (SP-
24-008). 
10. Risk – HP Inc UK Limited’s tender submission in relation to insurances
for appointment to the Framework were evaluated and continue to be
monitored by Scottish Procurement.
11. Privacy Impact - None directly arising from this report.
12. Climate Risk - The level of impact associated with provision of this
service has been assessed using the Scottish Government
Sustainability Test and is considered to be low risk.
13. Children’s Rights – None directly arising from this report.
14. Cosla Policy Position – None directly arising from this report.
_________________________________________________________
List of Background Papers 
(a)  none
___________________________________________________________________ 
Author:           Jenny Bowles, Corporate Procurement Manager,
jenny.bowles@renfrewshire.gov.uk 
Page 214 of 214