ARGYLL AND BUTE COUNCIL                                    OBAN, LORN AND THE ISLES
AREA COMMITTEE 
ROADS AND INFRASTRUCTURE                 14 SEPTEMBER 2024
SERVICES                     
OBAN FLOODING UPDATE 
1.0 INTRODUCTION 
1.1 A recent report providing an update on Oban flooding issues was considered by
the Environment, Development and Infrastructure Committee in June 2024. 
1.2 The report considered short, medium and long term measures to help to mitigate
flooding. 
2.0 RECOMMENDATIONS 
2.1 It is recommended that the Oban, Lorn and the Isles Committee consider and
note the report provided to the Environment, Development and Infrastructure
Committee. 
3.0 DETAIL 
3.1 At the meeting of the Environment, Development and Infrastructure Committee
held on 20 June 2024, the Committee gave consideration to a report proposing
that all funding opportunities be explored including lobbying the Scottish
Government to seek to secure funding to implement flood prevention works in
Oban, as well as exploring any additional funding opportunities. The report
detailed a number of short, medium and long term actions and works that had
been identified to mitigate flooding.  
Decision  
The Environment, Development and Infrastructure Committee –  
1.     noted the content of the submitted report; and  
2.     endorsed the proposals by officers to lobby for funding and explore
external funding opportunities and agreed that the Chair engages with the
Scottish Government to try and secure additional resource to mitigate flooding
issues in Oban.

Page 2

Update on works 
3.2 Since the report to the Environment, Development and Infrastructure
Committee in June, the following actions/works have commenced/been
completed: 
• A new concrete plinth has been installed to house a new control box for
the pumps at Lochavullin car park. A new control box is due to be
installed.
• A new safety railing has been installed around the plinth by a local
fabricator.    
• We are currently working on researching and finding a specialist
consultant to deal with invasive species around the burn, and are liaising
with SEPA with the view to source a contractor to come and remove
debris and foreign objects from the burn.  Any trees and vegetation will
also be removed from the burn in line with SEPA recommendations. 
3.3 In terms of long term measures there is currently no identified funding. The cost
of permanent flood prevention measures is likely to run into several tens of
millions of pounds.   
4.0 CONCLUSION 
4.1 This report provides the Oban, Lorn and the Isles Area Committee with an update
on flooding matters in Oban. 
5.0 IMPLICATIONS 
5.1 Policy – In line with existing Council policies and in line with the Flood Risk
Management (Scotland) Act 2009. 
5.2 Financial – No funding identified for long term solution, this report proposes that
lobbying is taken forward with a view to securing funding. 
5.3  Legal – The Council has four key responsibilities under the Flood Risk
Management (Scotland) Act 2009:
• Prepare maps of bodies of water etc
• Assess bodies of water
• Prepare local flood risk management plans and carry out the Actions
identified in the LFRMP
• Carry out clearance and repair works. 
5.4  HR – None known. 
5.5  Fairer Scotland Duty: None known.

Page 3

5.5.1   Equalities - protected characteristics – An EqSEIA will be required as and
when long term solutions can be progressed.
5.5.2   Socio-economic Duty – None known.
5.5.3 Islands – None known. 
5.6 Climate Change – Due regard will be given to climate change with a view to
minimising any climate change impact and these will be considered as and
when they arise.   
5.7  Risk – None known. 
5.8  Customer Service – None known. 
5.9 The Rights of the Child (UNCRC) – None known. 
Executive Director with responsibility for Roads and Infrastructure Services:
Kirsty Flanagan 
Policy Lead for Roads, Transport and Amenity Services: Councillor John Armour
August 2024 
For further information contact: 
Jim Smith, Head of Roads and Infrastructure Services
jim.smith@argyll-bute.gov.uk 
Elsa Simoes, Infrastructure Design Manager 
elsa.simoes@argyll-bute.gov.uk 
APPENDICES 
Appendix 1 – Oban Flooding Update – June EDI Committee