Page 1

ARGYLL AND BUTE COUNCIL  OBAN, LORN AND THE ISLES 
AREA COMMITTEE 
ROADS AND INFRASTRUCTURE
SERVICES 
SEPTEMBER 2024 
RECYCLING AND RECOVERY PERFORMANCE 
1.0 EXECUTIVE SUMMARY 
1.1 Argyll and Bute Council is both a waste collection and waste disposal authority. 
1.2 Waste disposal is dealt with by 3 separate models across the council as follows: 
• Island sites e.g. on Mull and Islay where landfill sites are operated directly
by the council;
• Helensburgh and Lomond area where waste is disposed of at sites outside
of Argyll and Bute;
• A 25 year (2001 – 2026) Waste PPP contract which covers the rest of Argyll
and Bute. 
1.3 Waste figures for all four administrative areas have been summarised within
this report.  Due to the way the reporting is carried out it is not possible to
accurately break down the information on an area by area basis for all data.  
1.4 National policy decisions, guidance and regulations e.g. relating to the
Biodegradable Municipal Waste landfill ban will have a significant impact on future
recycling, composting and recovery performance. 
1.5 It is recommended that Members note and give consideration to the details as
outlined in this report and the national policy drivers that will likely impact over the
coming years.

Page 2

ARGYLL AND BUTE COUNCIL  MID ARGYLL KINTYRE AND ISLANDS
AREA COMMITTEE 
ROADS AND INFRASTRUCTURE
SERVICES 
SEPTEMBER 2024 
RECYCLING AND RECOVERY PERFORMANCE 
2.0 INTRODUCTION 
2.1 Argyll and Bute Council is both a waste collection and waste disposal authority. 
Recycling, composting and recovery (i.e. other landfill diversion) statistics are
reported quarterly within the council’s performance management system. 
Statutory returns to SEPA e.g. licensed site tonnage, landfill tax and waste data
flow vary from quarterly to annual. 
2.2 This report provides details on the council’s recycling and landfill diversion
performance along with national policy, targets and regulations which are likely to
impact on future performance. 
3.0 RECOMMENDATIONS 
3.1 It is recommended that Members note and give consideration to the details as
outlined in this report and the national policy drivers that will likely impact over the
coming years. 
4.0 DETAILS 
4.1 The Council’s waste strategy was approved by the Environment, Development
and Infrastructure Committee in September 2019. Whilst this strategy will emerge
in line with government guidance, regulation legislation, and contractual
requirements the Strategy is predicated on the model shown below in Figure 1.

Page 3

Figure 1 
4.2 Argyll and Bute Council operates a performance management system.  Quarterly
recycling/composting, recovery and landfill percentages are included and split
between the Islands waste disposal sites, Waste Management PPP and
Helensburgh/Lomond areas.  These details include: 
• percentage of waste recycled and composted;
• percentage of waste recovered e.g. other landfill diversion;
• combined percentage of waste recycled, composted and recovered; 
• percentage of waste to landfill; 
• tonnes of biodegradable municipal waste to landfill. 
Percentages Summary of Landfill, Recycling, Composting and Recovery
2022 and 2023 
2022 2023
Argyll & Bute
wide
% of waste recycled, composted and
recovered
51.8% 53.0%
% waste recycled and composted 37.6% 43.3%
% waste recovered 14.2% 9.7%
% waste landfilled 48.2% 47.0%
Tonnes of municipal waste to landfill 28,265 30,872

Page 4

Waste PPP
% of waste recycled, composted and
recovered
57.6% 61.2%
% waste recycled and composted 36.3% 46.0%
% waste recovered 21.3% 15.2%
% waste landfilled 42.4% 38.8%    
Helensburgh &
Lomond
% of waste recycled, composted and
recovered
44.7% 39.5%
% waste recycled and composted 40.6% 39.3%
% waste recovered 4.2% 0.2%
% waste landfilled 55.3% 60.5%    
Islands
% of waste recycled, composted and
recovered
37.3% 36.3%
% waste recycled and composted 36.7% 36.3%
% waste recovered 0.6% 0 %
% waste landfilled 62.7% 63.7% 
4.3 Some points to note are as follows: 
• There was an overall improvement in recycling performance in 2023 which
was mainly due to an increase in green garden waste, soils and rubble
tonnages recycled by Renewi from the PPP area. 
• There was a drop in recovery performance in 2023 compared to 2022. This
was in part due to an energy from waste trial carried out by Renewi in the
PPP area in 2022, whereby Renewi sent circa 1,500 tonnes of general
mixed residual general waste to an energy from waste (EFW) plant in the
central belt. A similar but smaller trial was carried out by Renewi in 2023,
whereby a reduced amount of circa 700 tonnes of residual general waste
was sent to EFW during the year. 
• The drop in recovery performance was also due to a reduction in recovery
from the Helensburgh and Lomond area. Following The Scottish
Government introduction of a Landfill Tax Abatement Order legislation in
2022, Barr Environmental decided to discontinue their waste treatment plant
from July 2022 and landfill all residual general waste at their Auchencarroch
landfill site near Alexandria. With no recycling or recovery occurring from the
mixed general waste at the Barr site from July 2022 onwards, this had a

Page 5

negative impact on overall recycling and recovery rates from the
Helensburgh and Lomond area. The negative impact affected 6 months of
figures in 2022 and the full year in 2023.This also had a minor impact on the
Islands waste recovery rate which fell from 0.6% in 2022 to 0% in 2023 as
the Tiree/Coll general waste was transferred to the mainland and disposed
of at the Auchencarroch site. 
• The overall combined recycled, composted and recovery rate however
increased from 51.8% in 2022 to 53% in 2023.  This is mainly due to the
increased recycling in the PPP area described in the first bullet point above. 
• The recovery in the Waste PPP area is carried out by Renewi mainly through
residual waste mechanical biological treatment plants based at their waste
facilities near Oban, Dunoon and Lochgilphead. In 2022 and 2023 Renewi
also sent some residual general waste to an energy from waste (EFW) plant
in the central belt. Waste sent for energy from waste is also classed as
recovery. 
• The recovery in the Helensburgh and Lomond area was carried out by Barr
Environmental at their Auchencarroch waste facility, near Alexandria. As
described, Barr ceased operation of their mixed residual waste treatment
plant following The Scottish Government Landfill Tax Abatement Order
which was introduced from July 2022. Since July 2022 until the end of 2023,
Barr landfilled all mixed general waste at their Auchencarroch Landfill Site.
In January 2024, Barr Environmental closed the Auchencarroch landfill site
and ceased operations completely at the end of March 2024. Since January
2024, Helensburgh and Lomond’s general waste has been going for refuse
derived fuel (RDF)/energy from waste which will see a significant increase
in recovery tonnages for 2024. 
• Cardboard is consistently now the most prominent recycling material in the
blue recycling bin (previously paper which was the highest proportion pre-
pandemic). The increase in the cardboard proportion in recent years is likely
due to more on-line purchasing while newspapers are not as widely
purchased in hard copy compared to previous years. 
• The overall percentage waste to landfill in 2023 (47.0%) was a lower
percentage than 2022 (48.2%) due to the increased recycling levels in the
PPP area relating mainly to green garden waste ,soils and rubble. 
• The tonnage of municipal waste to landfill, however in 2023 (i.e. 30,872
tonnes) was more than in 2022 (i.e.28,365 tonnes).This was mainly due to
the Renewi energy from waste trial being smaller in 2023 than in 2022,
plus Barr Environmental landfilled all general waste in 2023 following the
cessation of their waste treatment plant from July 2022. 
• Recycling and composting is mainly from recycling collections to households
and businesses, bring sites and segregated wastes from recycling/civic
amenity sites. Recovery is predominantly moisture/process loss and
compost like output from mixed waste treatment plants operated by Renewi.

Page 6

In addition there was also some recovery from a Renewi energy from waste
trial where some residual general waste was sent to an energy from waste
plant in the central belt. 
• SEPA published annual recycling, recovery and landfill data for local
authorities focuses mainly on recycling/composting from household waste
and less on recovery in line with the waste hierarchy. 
Landfill Ban 
4.4 The Waste (Scotland) Regulations were introduced by the Scottish Government
in 2012 and included a landfill ban of biodegradable waste from 2021. 
4.5 The landfill ban planned for 2021 was subsequently delayed by The Scottish
Government until the end of 2025.  This delay was welcomed by the Council and
provided more time for alternative solutions and funding to be sought.  An update
report on the Waste PPP/Landfill Ban was included in the June 2024
Environment, Development and Infrastructure Committee plus additional Scottish
Government funding of £1.5 million towards compliance in the PPP contract area
was announced in July this year. 
Deposit Return Scheme (DRS) 
4.6      The UK Government had indicated a planned start date of October 2025 for a UK
wide deposit return scheme, however this has since been delayed until 2027. 
4.7 A UK wide DRS scheme may result in an overall increase in recycling including
other environmental benefits e.g. current non-recyclers may use the scheme plus
there should be less littering of such items. The scheme may however, see a slight
reduction in Council recycling performance if plastic drinks bottles and cans are
no longer handled by Council recycling collections albeit they should still be
recycled in future via the UK wide DRS scheme. 
Scottish Government Circular Economy Bill 
4.8    During June 2024, The Scottish Government published details of its Circular
Economy Bill. Further details on these Scottish Government proposals and Bill
have been and will be reported at future ED&I Committees as they progress.
Some of the main proposals which relate to local authorities recycling are as
follows: 
• A Duty of Care on households regarding their waste and recycling with new
powers given to local authorities for the issuing of fixed penalties to enforce
this.
• Local Authorities will be required to comply with a statutory code of practice
on recycling.
• The Scottish Government will have the powers to set mandatory recycling
targets on Local Authorities from 2030 onwards.

Page 7

5.0 CONCLUSION 
5.1 In concluding this report, steady progress was made on overall recycling and
composting performance during 2023. Recovery performance however
decreased which resulted in increased tonnages to landfill in 2023. Landfill should
be reduced in 2024 as the Barr Environmental Auchencarroch landfill site (near
Alexandria) closed at the end of 2023.The council now uses alternative providers
for the Helensburgh and Lomond general waste which now goes mainly for
recovery e.g. refuse derived fuel/energy from waste. National Policy drivers such
as the ban on municipal waste to landfill, the deposit return scheme and the
circular economy bill will have significant implications for future recycling,
composting and recovery performance. 
6.0 IMPLICATIONS 
6.1 Policy National policies and regulations will likely impact
on future recycling, composting and recovery
performance. The council’s policy is to reduce
landfill.   
6.2 Financial  The end of 2025 ban on biodegradable waste to
landfill will have financial implications.  An update
report was included in the June 2024
Environment, Development and Infrastructure
Committee.   
6.3 Legal The landfill ban is a legal requirement under the
Waste (Scotland) Regulations 2012.  Other legal
requirements may likely result following The
Scottish Government Circular Economy Bill e.g.
statutory code of practice for recycling.   
6.4 HR None known.   
6.5 Fairer Scotland Duty:   
6.5.1 Equalities – protected
characteristics 
None known.
6.5.2 Socio-economic Duty  None known.
6.5.3 Islands The landfill ban will require increased transport of
waste off the islands of Mull and Islay from the
Glengorm (Mull) and Gartbreck (Islay) waste and
recycling facilities.

Page 8

6.6 Climate Change The landfill ban will significantly reduce methane
emissions from landfill sites however there will be
additional transport related emissions with waste
having to travel longer distances for
treatment/disposal. 
6.7 Risk Risks to the council on the landfill ban and any
other future statutory requirements are mainly
financial.   A future UK wide deposit return
scheme for plastic drinks containers and cans will
hopefully have an overall environmental benefit,
although it may impact on council recycling rates.   
6.8 Customer Services None at present. 
6.9 The Rights of the Child
(UNCRC)
None known 
Executive Director with Responsibility for Roads and Infrastructure Services:
Kirsty Flanagan 
Policy Lead:  Councilor John Armour 
For further information contact: John Blake – Fleet, Waste & Transport Manager