Page 1

___________________________________________________________________ 
To: Education and Children’s Services Policy Board 
On:  23 May 2024
__________________________________________________________________
Report by: Director of Children’s Services
_________________________________________________________________
Heading: Consultation arrangements regarding the proposal to establish a
new primary school in Dargavel Village and a Catchment Review
Affecting Dargavel Primary School and a new primary school to be
built at Dargavel Village 
1. Summary
1.1. At Education and Children’s services policy board on Thursday 18 January
2024, elected members agreed to proceed with a statutory consultation, in
accordance with the Schools (Consultation) (Scotland) Act 2010, on a
proposal to establish a new primary school in Dargavel village. the proposal
included a proposed site for the new primary school - an 8.5-acre site at the
north end of Craigton drive (denoted as site 9 (E1) within the consultation
proposal), and revised catchment areas for the existing Dargavel primary
school and the proposed new school. The report confirmed an anticipated
opening date for a new primary school by August 2027.
1.2. The Education and Children’s Services Policy Board also authorised the
Director of Children’s Services, or another appropriate officer nominated by
her, to take such action as is required to carry that consultation through to
completion, in accordance with the legal requirements.
1.3. The Education and Children’s Services Policy Board also noted that provision
for denominational pupils within Dargavel Village will remain unchanged within
the St.John Bosco Primary School catchment area.
1.4. Officers confirmed that a report on the outcome of the consultation would be
submitted to the education and children’s services policy board on 23rd May
2024. The consultation proposal and supporting information can be found at
Appendix 1A.  
1.5. The statutory consultation started on Monday 29 January, and ended on
Tuesday 26 March and followed a period of pre-engagement space planning
on a new primary school. The consultation was extensively promoted and

Page 2

provided a programme of information events and public meetings to enable
people to speak to council officers, to seek further information and to
participate in the consultation which is expanded on in more detail in the main
body of this report. In total, over 150 people attended consultation events, but
many more completed the consultation survey.  
1.6. Online Survey findings 
1.6.1. At the close of the consultation, the council had received 848  responses to
the online survey. After removing duplication, this reduced to 818 survey
responses (817 online and one in paper form). Additionally, there were 15
responses by email from 13 people. A quantitative analysis was undertaken
by Council Officers, with further qualitative analysis undertaken in two stages.
An independent consultant was commissioned to provide sentiment analysis
of the textual responses and to understand where there was most divergence
of opinion and why. In addition, council officers provided a further analysis of
all comments made by respondents to understand interdependencies and
common themes. The detail of the analysis can be found in Appendices 1K
and 1L.
1.6.2. The main findings confirm overwhelming support for a new school with 87.1%
of all respondents in support. The proposed site split respondents almost
evenly, with 40.6% opposition and 39.6% in support and 19.8% who did not
express a preference. Analysis of the textual responses does not produce a
clear alternative to the proposed site. The proposed catchment also split
respondents with 44% (357) who strongly agree or agree with the proposed
catchment, 43.6% (354) who did not express a preference and 12% (100)
disagreed or strongly disagreed.  
1.6.3. The most frequently mentioned topics raised in textual responses, within the
scope of the consultation, include an urgent need for a new primary school
and universal concerns regarding traffic and travel issues that need to be
addressed. Over a third of respondents referenced high school provision as a
pressing issue and although outwith the consultation scope, those responses
have been recorded and detailed in the report. Other topics raised include
ongoing frustration in relation to the Council’s previous error and concern
about the Council’s current engagement, planning and decision-making
processes in relation to the Dargavel development.   An independent,
qualitative analysis of the textual responses can be found at Appendix IK.  
1.7. Education Scotland 
1.7.1. In accordance with the terms of the Schools (Consultation) (Scotland) Act
2010 (“the 2010 Act”), Education Scotland attended two public meetings that
were part of the statutory consultation, and a Report was prepared by His
Majesty’s Inspectors of Education (HM Inspectors). Their Report provides an
independent and impartial consideration of the proposal to build a new
primary school in Dargavel Village including the proposed site and proposed
catchment review. Education Scotland were provided with the survey findings
of the statutory consultation, feedback captured at Information Exchange
Evenings and meeting minutes and a transcript of the recording of each of the
two public meetings.

Page 3

1.7.2. Renfrewshire Council received the final report from Education Scotland on
Monday 22 April, which confirmed HM Inspectors agree that the proposal has
the potential to provide educational benefits and that a new primary school will
address the need for increased non-denominational primary places in
Dargavel Village. Additionally, the Report made recommendations to address
that are consistent concerns raised by the community through the consultation
and directly with Education Scotland. Those include providing safe active
travel routes to the school, safely managing an increase in traffic at drop-off
and pick-up times at both the new school and Dargavel Primary School,
engaging with the community ongoing through the design and delivery of the
new school, and ensuring contingency planning should the delivery of the new
school be delayed. The Education Scotland report can be found at Appendix
1M. 
1.8. The purpose of this report is to provide the policy board with an overview and
analysis of the outputs from the consultation process and recommendations
which are reflective of the key areas of concern provided in the course of the
consultation exercise. The statutory consultation final report is included as
Appendix 1 to this document and will be published on the Council website. All
other relevant documents are appended to that report.
_______________________________________________ ___________________ 
2. Recommendations
2.1 The Education and Children’s services policy board is asked to:
• Note the findings of the Statutory Consultation on a new primary school
in Dargavel and the proposed changes to catchment areas, 
• Note the report by Education Scotland, prepared by His Majesty’s
Inspectors of Education (HM Inspectors) in accordance with the terms
of the Schools (Consultation) (Scotland) Act 2010 (“the 2010 Act”). 
• Note the overwhelming support for a new school and HM Inspectors’
view that the Proposal has the potential to provide education benefits
and address the under-provision within Dargavel Village. 
• Approve the proposed statutory consultation final report attached at
appendix 1. 
• Agree that officers progress the procurement, design, and construction
programme to deliver a new 800-capacity primary school, for opening
in August 2027, on the proposed site ‘Site 9 – E1’, as denoted in the
Statutory Consultation documentation and map. 
• Agree that officers progress planning for the implementation of the
revised catchment arrangements within Dargavel Village to take effect
from the operational opening of the new primary school. 
• Agree that officers will progress the following key areas of work:  
1. In conjunction with the Dargavel community, prepare and
implement a comprehensive engagement plan to ensure ongoing

Page 4

community engagement through the school design and planning
processes.  
2. Preparation of an integrated traffic and active travel plan as part of
the design and delivery of the new school to alleviate community
concerns relating to traffic congestion and safe active travel routes.
Members note that such planning and preparation arrangements
will be a requirement to support the statutory planning application
for the new school. 
3. Provide a report to a future Education and Childrens Services
Policy Board on proposed contingency plans, should there be any
delay to construction that would impact the anticipated August 2027
opening date. 
4. Provide a report to a future Policy Board with detailed options and
costs to deliver revised drop-off and pick-up area next to the
current Dargavel Primary School.
5. Continue to engage with the community and work in an open and  
responsive way to plan for future secondary school provision.
_____________________________________________ ___________
3. Statutory consultation publicity and events  
3.1. The statutory consultation started on Monday 29 January, and ended on
Tuesday 26 March. This followed a period of pre-engagement that involved
focus groups (24 individuals) and a resident survey (524 responses) to
consider space planning for a new primary school and to consider the needs
of pupils, parents, and carers, the wider community and school staff from the
earliest outset.  
3.2. Following the January Education and Children’s Services Policy Board, and to
publicise the consultation, the Council wrote to local parents and members of
the Dargavel community newsletter (519 individuals) to make them aware of
the launch date on Monday 29 January. From 29 January, a comprehensive
publicity plan was activated to promote a series of public information events
and to encourage people to attend and to participate in the consultation.  
3.3. All statutory consultees were contacted in writing with a link to a dedicated
webpage and an invitation to attend the public events. These included parents
and carers of pupils at Dargavel, Bishopton, St John Bosco primary schools;
staff and trade unions at the affected schools; parent councils of those
schools; elected members; the local community council and community
planning partnership; community groups who use the existing Dargavel
Primary School; and those who we expect may attend the new school -
parents and carers at Dargavel early learning and childcare centre, families
who had registered a child to start P1 at Dargavel Primary in summer 2024,
and later in the process we contacted parents and carers living in Dargavel or
Bishopton who had registered a child for a funded nursery place starting from
summer 2023. We also issued emails to the heads of other private or partner
nurseries in the areas with a request to share with their parents and carers.

Page 5

3.4. The consultation webpage on the council website included the formal
proposal paper, supporting information and details of the planned information
evenings, public meetings, and informal drop-in sessions, along with
information on what the public could expect from each, and how to book. It
also provided details of how members of the public could submit their views
directly and an outline of the decision-making process which would follow the
consultation. 
3.5. Paper copies of the proposal paper and supporting information were made
available at local schools, at Bishopton Library, and at council HQ at
Renfrewshire House in Paisley. Parents at Dargavel and Bishopton Primaries
were contacted directly by the schools to make them aware of the times
where senior officers were hosting informal drop-in sessions at those schools.
Public notices were also placed in the local media to advertise the
consultation and public events. 
3.6. Follow up communications to the groups listed above were activated on 8
February, 23 February, 13 March and 21 March. To help reach any groups
not covered by the above or who are not online, the distribution of information
flyers was organised in late February. This was issued to all postcodes for
Dargavel and Bishopton Primary School catchment areas to encourage
completion of the online survey. Posters covering the same information were
also distributed to key venues throughout the community.  
3.7. The public event programme was designed to be inclusive and accessible,
ensuring several local touchpoints for the community, scheduled at various
times, with opportunities to meet with senior officers and find out more about
the proposal. The service sought advice on the design of the events from
industry experts, The Consultation Institute, to ensure engagement was
effective and could reach as many people as possible. In total, over 150
people attended an event within the programme:  
• Informal drop-in sessions for existing parents and carers at Dargavel and
Bishopton Primaries (at school drop-off and pick-up times). These were
attended by 40 people.   
• Four information exchange evenings at Dargavel Primary School to allow
the community to meet senior officers in an informal setting and discuss
topics like site selection, transport and travel, and school construction,
capacity, and operations. Total attendance across the four sessions was
62.   
• Two public meetings took place where officers were able to feedback on
issues raised at the information sessions and invite questions from the
public. A representative from Education Scotland attended the meetings.
Total attendance across the two events was 57. 
• Engagement took place at Dargavel Primary School and Bishopton
Primary School with pupils and staff. 
• Meetings were also held with Dargavel Parent Council, Bishopton Parent
Council, Bishopton Community Council, and representatives from
Dargavel Residents Association

Page 6

___________________________________________________________________ 
4. Analysis of the Key Findings 
4.1. As mentioned in paragraph 4.5, an independent consultant was
commissioned by Renfrewshire Council to provide a qualitative analysis of the
textual responses within the consultation survey. This involved sentiment
analysis and understanding the reasons for comments expressed and what
particular positions or arguments might be most significant. This report can be
found at Appendix 1K. In addition, a quantitative analysis was carried out by
council officers (Appendix 1L)
4.2. The consultation questionnaire received a broad response with 818 surveys
analysed (817 online surveys and one written survey). A further 13 people
responded to the council by email (15) and those responses were included in
the analysis. Most survey respondents did not attend an information exchange
evening or a public meeting to seek more information from officers.  
4.3. The analysis of responses considers both the content and sentiment of all
comments without citing responses directly from respondents. The over-
arching findings are as follows:   
• There is overwhelming support for a new school, with 87.1% of all
respondents in support. 618 of those who responded ‘strongly support’ a
new school (75.4% of all respondents) and another 96 (11.8%) ‘support’ it.
The combined total of those who ‘oppose’ a new school is 77 (9.4%). 
• Views are almost evenly split on the proposed site for a new school,
with those who ‘disagree’ or ‘strongly disagree’ marginally exceeding the
number ‘agreeing’ or ‘strongly agreeing’ and a substantial number who did
not express a preference. 40.6% of respondents stated they were against
the proposed site (331) and 39.6% stated they were for the proposed site
(323), a difference of 1%. 19.8% (161) identified themselves as ‘neither
agreeing nor disagreeing’ with the proposed site.   
• Across all consultation responses, here is no widespread consensus
on an alternative site. 313 respondents to the consultation (38%) made
an alternative site suggestion when prompted, with 196 people (24%)
referencing a specific site or location: 
• 119 (14.6%) referenced the Slateford Road area. This included those
specifically stating Sites 22 or 23 – currently identified as greenbelt,
and those whose site or area description could reasonably be assumed
to identify Sites 22 or 23. Of those, 105 of these respondents had
previously stated they disagreed or strongly disagreed with the
proposed site for a new primary school. 
• 77 (9.4%) respondents suggested one of 21 other specific sites or
locations as alternatives to consider. 
• A further 117 (14%) respondents made a general location comment or
indicated a site characteristic e.g. ‘in Bishopton’ or ‘further away’.

Page 7

Those who agree with the proposed site opposed alternative sites for reasons
such as accessibility and deliverability, particularly those encroaching on
green spaces or located outside of Dargavel Village. 
• More people support the proposed catchment than those who are
opposed and an equal number expressed no preference. The
proposed catchment split respondents with 44% (357) who ‘strongly agree’
or ‘agree’ with the proposed catchment and 43.6% (354) who did not
express a preference. 12% (100) ‘disagreed’ or ‘strongly disagreed’.   
• There is consensus amongst respondents on important issues that
must be resolved by the council to ensure that a new primary school fully
meets the needs of the school community and wider community, and on
the need to provide reassurance that demand for secondary provision will
be fully and appropriately met. These topics and concerns were expressed
by respondents regardless of their support for a new primary school or
preference (or stated no preference) for where the school is located. 
• By far the most frequently expressed opinion - by all those who responded
to the survey, is the urgent need for a new school to meet rising demand.
Respondents highlighted the pressing need for more primary places to be
provided within the catchment to avoid children being separated and
schooled at various primary schools with capacity.   
• 36% of all respondents (296) either reference or are  advocating for  a new
high school/shared campus whether they agreed/strongly agreed (67) or
disagreed/strongly disagreed (172) with the proposed site or have no
preference (57). The sentiment behind this was strongly expressed. Of the
172 who reference high school/shared campus and disagree with the
proposed site, 60 referenced the Slateford Road area as their alternative. 
• There are frequently expressed concerns about safe travel and traffic
linked to the proposed site. 35% of all respondents (288) expressed this
concern whether they agreed/strongly agreed (49) or disagreed/strongly
disagreed (197) with the proposed site or have no preference (42). This
concern was strongly expressed. Conversely, many of those who support
the proposed site have said they believe it will ease traffic congestion by
reducing cross-travel from the north of the development and will be more
walkable and central to catchment, and therefore increase active travel. 
• Issues continue to be raised with the council’s (current and previous)
planning, governance, and transparency in relation to the school provision
in Dargavel.   
• Respondents in all groups expressed the importance of ensuring
community amenity within the new school. The design and operation of the
school must ensure the community have access for community use. 
• Smaller groups highlighted various topics and issues such as noise and
light pollution, needing the proposed site for housing, or the loss of a
Central Park – though there is no proposal to locate the school on the
Central Park.   
_

Page 8

• Those who disagreed or strongly disagreed with the proposed site
(331 respondents) were asked to provide a reason for their answer.
Those who subsequently responded, cited the following reasons:   
• 67% are concerned about traffic, congestion, parking, other road
infrastructure and associated issues with safety of children as their
main reason for disagreement and do not believe their concerns have
yet been addressed in relation to the proposed site. 
• 19% are advocating for a new high school/campus and would prefer an
alternative site to accommodate this. 
• 7.9% remain concerned about the council’s governance, planning and
decision making in relation to school provision for Dargavel Village. 
• 5.7% want the new school to be either co-located with the current
primary school or close to it (including the possibility of rebuilding the
current school).   
__________________________________________________________________  
5. Addressing and providing reassurance on common issues raised  
5.1. The most common issues that have emerged from the consultation process
and reflected in the recommendations made by Education Scotland, are
concerns within the community. Respondents express significant strength of
feeling when citing those issues. However, there is confidence that such
issues can be fully addressed to alleviate understandable community
concerns and the council is committed to doing everything it can to do so.
5.2. Urgent need for a new school to meet rising demand 
5.2.1. Subject to the outcome of the statutory consultation, officers have confirmed a
programme timeline to meet an August 2027 opening date. Hub West
Scotland have been engaged to deliver the project and have been
progressing a wide range of planning activities to support delivery of a new
school for some time. The Hub West Scotland model, procurement process
and pre-established supply chain arrangements supports tighter procurement
and delivery programme than a traditionally delivered project. Based on
planning arrangements progressed to date and progress being made by BAE
systems in respect to delivery of remediation and infrastructure programming,
there remains confidence that the August 2027 date continues to be a
deliverable timeline for the project.  
5.3. Safe active travel and traffic/congestion concerns 
5.3.1. Road traffic volumes, congestion concerns and the availability of safe active
travel routes to the existing and the proposed new school site were the most
recurring and consistent themes of concern expressed during the consultation
events with the local community.

Page 9

5.3.2. It was anticipated that concerns of this nature were likely to emerge through
the consultation process based on the extent they had featured in earlier pre-
engagement activity carried out by officers with the community. In this context
a planned independent transport and travel study was commissioned (carried
out by Stantec) in January 2024 to assess both the existing situation within
the development and to model the impact of the proposed new school site on
the capacity of the transport infrastructure across the Dargavel village as it is
completed. 
5.3.3. The traffic modelling undertaken as part of the study provided reassurance
that that the existing road infrastructure planned to be delivered by BAE
systems will accommodate the additional traffic that will be generated by trips
to and from both primary schools without any capacity issues arising on either
the overall road network, or with traffic volumes passing through key junctions
in the development. This provides a level of assurance that the flow of traffic
within the development will not experience congestion issues due to capacity
demand linked to peak school time travel.
5.3.4. The Stantec study also explored considerations in respect to traffic related
issues in and about the immediately vicinity of both schools, which can
present different challenges beyond overall road and junction capacity. The
study assessed the travel modes currently used to access Dargavel Primary
School, noting that existing active travel to the school already performs
comparably with the Renfrewshire primary school average as summarised
below:
• The overall proportion of pupils walking or using park and stride to get to
school is lower than the Renfrewshire average, but the proportion cycling
and scooting / skating is higher meaning that the overall proportion of
pupils using active travel is 69%, the same as the Renfrewshire average.
• The proportion of pupils being driven to school is slightly less than the
Renfrewshire average at 21%, compared to 24%. 
Mode Share Comparison versus Renfrewshire Average

Page 10

5.3.5. In relation to those driving to the school, Stantec traffic surveys and
monitoring identified a high proportion navigating into the school car park
and making use of the drop-off area and not staying for long – as the school
design intended. However, they also monitored some cars parking,
pavement mounted on the north side of Arrochar Drive between the school
“keep clear markings” and the signalised junction with Barrangary Road.
This results in Arrochar Drive being reduced to effectively one vehicle lane
in this area, with a requirement for “give and go”, and with the parking
impinging on pedestrian use of footpaths and clear lines of visibility.
Similarly, drivers were also seen park on the footways within the residential
streets accessed off Arrochar Drive, blocking walking routes and again
impinging on pedestrians. 
5.3.6. The Stantec study notes however that the existing primary school is
currently supporting housing across the whole development area, including
a significant proportion of housing to the north of the development that is
beyond a 15-minute walking distance from the school. It also noted housing
to the north of the development is impacted by incomplete travel
infrastructure that will eventually link the north of the village to the south of
the development where the school is located. Additionally, Arrochar Drive is
currently operating as a no through road, as the internal loop (Western Link
Road) has not been fully constructed. It is expected that the WLR will be
constructed by BAE by October 2025. The Stantec study notes that the
absence the completed loop road (WLR) has likely encouraged more driven
trips and traffic to and from the existing school from housing sites on the
north side of the village and that some of the existing traffic issues
associated with a high number of car-based trips to and from Dargavel
Primary School are exacerbated by these factors.
5.3.7. This undoubtedly contributes to existing issues with vehicle parking around
the current school location and this is reflected in the concerns expressed
by the community through the consultation response in relation to traffic and
safe active travel routes to school. 
5.3.8. It is critical moving forward that effective engagement and communication is
maintained with the community to evidence that a second school at site E1
and the existing Dargavel Primary school will provide school facilities that
are highly connected to their associated catchments and that those
connections represent a safe environment for travelling to and from the
school sites, irrespective of the mode of travel chosen. 
5.3.9. It is critical to consider how in the short-term traffic issues at the current
school can be resolved and to ensure that concerns relating to traffic
congestion and safe active travel linked to the new school’s proposed
location can be adequately and appropriately addressed in the design and
delivery planning of the new school.
5.3.10. First and foremost, it is important to recognise that delivery of the second
school and implementation of the revised catchments changes, along with
delivery of the full village infrastructure (both road and active travel) by BAE
Systems will deliver high active travel connectivity and travel times to both
schools.

Page 11

5.3.11. Dargavel Primary School’s catchment will significantly reduce in
geographical size and the positioning of site E1 was selected specifically to
maximise the opportunity to deliver the shortest active travel distances
within its catchment. Detailed travel modelling has been completed by
Stantec that confirms the following active travel times for both schools. 
5.3.12. This modelling confirms that both schools will have short commute times,
providing a high level of opportunity for active travel to school and reduced
need for travel by car. As outlined above, the existing school catchment by
contrast has a significant proportion of houses materially outwith a 15-
minute walking distance which Stantec have noted this will likely have
encouraged a greater level of travel by car.
5.3.13. In addition, officers have engaged with Stantec during the course of their
study to review a number of considerations that would further enhance safe
active travel to both schools, improve arrangements for drop-off and pick-up
by car at Dargavel Primary School and identify design factors to be carefully
considered in the delivery of a new school on the proposed site. It will be
critical such issues are progressed in a manner which aligns with the overall
communication and engagement plan set out in the recommendations.
5.3.14. Engagement with BAE Systems is underway to jointly progress planning
access and travel routes for the new school site as part of the school and
site design. This will carefully consider planned and enhanced active travel
infrastructure that BAE Systems will deliver and the design of a school site
with multiple access and egress points to minimise distances to housing
developments in the surrounding catchment area. 
5.3.15. In addition, it will be critical for there to be coordinated and pro-active joint
travel planning between both primary schools and the community to support
and champion active travel arrangements.
5.3.16. It is accepted that travel by car is unavoidable for some parents and carers
at drop-off and pick-up times and adequate design and capacity for parking
and drop-off/pick-up arrangements is a key requirement that will be planned
into the new school site design, informed by best practice design principles,
community engagement and from learning from other similar school sites
across the country. This will include exploring traffic control measures in and

Page 12

around the immediate vicinity of the school. Demonstrating well developed,
assessed and appropriate arrangements for traffic and travel to and from the
school site will be a key requirement that will support the statutory planning
application.   
5.3.17. In addition, and in recognition of the observed issues being experienced at
the current school site, officers are progressing an option appraisal for
improved drop-off and pick-up arrangements utilising the flexibility provided
through available land secured from BAE systems adjacent to Dargavel
Primary School whilst wider travel infrastructure is completed by BAE
Systems and revised catchments are implemented as the new school is
delivered. A report in this regard will be brought back to the Education and
Childrens Services Policy Board for consideration.
5.4. Ensure community amenity and community access within the new school  
5.4.1. Pre-engagement space planning captured the overwhelming support from the
community to deliver a school with the highest quality learning environment
and which supports flexible community use outwith school hours (98% of
those involved in pre-engagement supported the community having access to
the school for a variety of activities – outdoor sport, fitness and exercise
classes, social activities, children and toddler groups, adult learning classes,
health and wellbeing support. 
5.4.2. Officers can confirm this will be integral to the design, and a full size, floodlight
synthetic sport pitch with changing facilities is incorporated into the planned
school provision and site 9 E1 provides sufficient flexible land to support
community facilities. Further engagement with the community, including local
groups and sports clubs will take place during the design process to maintain
focus on community demand. In addition, following feedback from the
Dargavel community through the consultation process, officers are working
with the community to determine the best route to support and meet
community sports pitch needs whilst the new school-based facility is
delivered, and this will include consideration of how other existing pitch
provision can be best utilised to meet current and future need.     
5.5. High school provision/joint campus development – Outwith scope of
consultation
5.5.1. High school provision is not within the scope of the consultation. However it is
recognised that officers must continue to engage the community and work in
an open and responsive way to plan for future secondary school provision . A
new high school or joint primary/secondary campus were referenced by over
a third of respondents as important considerations for the Council, and this
included those who support the proposal for a new primary school on the
proposed site. Importantly, future high school provision for west Renfrewshire
is integral to the Council’s strategic learning estate review which will consider
long term demand profiles across Renfrewshire, as well as renewal and
replacement priorities and options for the primary and high school estate
across Renfrewshire. An engagement programme will support this long-term
review and will ensure the views of all communities are represented, including
Dargavel and Bishopton communities. This includes existing and ongoing
engagement in relation to the plans to extend Park Mains High School and the

Page 13

regular updating of school rolls and long term school roll projections for Park
Mains High School and implications of these..  
5.5.2. It should be noted that concerns have also been expressed by the wider Park
Mains High School community who are not statutory consultees in relation to
this primary provision consultation. Those concerns related specifically to a
desire not to impede the progress of the current project to extend Park Mains
High School. 
5.5.3. While officers progress the agreed work programme to extend Park Mains
High School - the confirmed catchment school for Dargavel and Bishopton, it
is fully accepted that there is a critical need to provide transparent and regular
updates to the wider community on updated school rolls and projections, to
provide the required reassurance that high school capacity will provide
sufficient spaces for all children living in the catchment in the long term. The
established Park Mains Parent Council Liaison Group has and will continue to
be the main forum for cascade of information and feedback from the
communities of each catchment primary school. This will include ongoing
engagement to inform the programme to extend the school. 
5.5.4. To date, through the Park Mains High School space-planning process,
consultants have worked with community members, school staff, pupils and
parents and carers to make sure views were captured as part of that process.
This covered how the existing building is currently used, satisfaction levels
with the current building, views on different types of learning space and what
building users would like to see from an extended Park Mains. Over 560
individuals completed surveys and 43 took part in focus groups. The school
design team and construction contractors have been confirmed and appointed
and work is continuing to meet the agreed August 2027 delivery date.  
5.6. Effective community engagement and transparent planning and decision-
making 
5.6.1. There is still an important journey to repair and rebuild the council’s
relationship with the local community. The process of consultation, outlined in
the report, provided numerous touchpoints to listen to the community and
provide deeper understanding of local concerns and challenges. Although
there are groups within the community who remain understandably angry
towards the council and sceptical of programme planning and delivery, there
is a wider community who are willing to work closely with the council to deliver
improvements for the community ongoing. It is vitally important the council
works strategically to engage those individuals and groups, use existing
forums and networks across the community, and provide genuine
opportunities for collaboration. This will include ongoing sharing and scrutiny
of roll projection data and agreeing an established mechanism for ongoing
engagement on active travel and traffic, high school transport, school design,
including ASN (Additional Support Needs) provision and wider community
needs.

Page 14

___________________________________________________________________
Implications of the Report
1. Financial 
The cost to delivery of a second school within Dargavel village has been
incorporated into the Council’s medium term financial planning arrangements
as reported to Council as part of regular medium term financial outlook
reports. 
2. HR & Organisational Development - None. 
3. Community/Council Planning:
Our Renfrewshire is
thriving 
Our Renfrewshire is fair 
Reshaping our place, our
economy, and our future 
Building strong, safe,
and resilient
communities 
Creating a sustainable
Renfrewshire for all to
enjoy 
Working together to
improve outcomes 
-  The revised catchment areas and approval
of site will give clarity to the community and
enable the new building to have a positive
start.
- The process is designed to ensure
everyone can give their views and have
them heard. 
- The catchment review informs the
development of the new building 
- There is a clear consideration given to
safe travel 
- The site evaluations had sustainability and
green space as a clear focus 
- Ensuring children have a high quality and
sustained primary education is at the core
of the process 
4. Legal
This proposal adheres to the procedures required to take forward any
proposal in terms of the Schools (consultation) (Scotland) Act 2010 amended
through the enactment of the Children and Young People (Scotland) Act 2014. 
5. Property/Assets 
Through its school estate management plan the council aims to have an
efficient and well maintained property portfolio which provides learning
environments which support the delivery of the curriculum. 
6. Information Technology

Page 15

Effective IT infrastructure within schools contributes to the development of
digital literacy and state of the art technology supports learning experiences
and the creation of new and diverse skills. 
7. Equality & Human Rights 
An Equality Impact Assessment has been carried out to support the
consultation process, ensuring that equalities considerations were taken into
account in the design and delivery of the consultation. In line with the
Council’s approach, a summary of this impact assessment will be published
on the Council’s website with a full version available on request. The Board
report refers to a number of key early considerations raised through the
consultation process, including meeting the needs of children and young
people with Additional Support Needs, considering the changing
demographics of relevant catchment areas and delivering a comprehensive
and inclusive engagement plan to ensure ongoing community engagement
through the school design and planning processes.  Further Equality Impact
Assessments will be carried out as appropriate throughout the lifecycle of this
proposal to pay due regard to equality and human rights considerations.
8. Health & Safety - None.
9. Procurement – As outlined in the report it is planned to deliver the new
school through Hub West Scotland.
10. Risk - None.
11. Privacy Impact - None.
12. Cosla Policy Position – None. 
13.  Climate Risk
A Climate Risk Strategy will be developed to address the design,
procurement, construction and ‘in use’ phases of the project.
_________________________________________________________ 
List of Background Papers 
___________________________________________________________________ 
Author:   Gerry Lyons, Interim Head of Education, gerry.lyons@renfrewshire.gov.uk 
10/05/2024

Page 16

Appendices Contents Page
A. Statutory Consultation Final Report
B. Information session brochure
C. Records of drop in session
D. Points raised at info sessions
E. Minutes of 2 public meetings
F. Transcript of 2 public meetings
G. Record of meeting with Bishopton Parent Council
H. Record of meeting with Dargavel parent council
I. Minute of Bishopton Community Council
J. The spreadsheet of all text responses
K. Peter McColl’s report - Qualitative Analysis: RESPONSES TO THE
DARGAVEL SCHOOL CONSULTATION, Peter McColl Ltd.
L. Summary of Key Issues
M. Education Scotland Report

Page 17

1
Appendix 1
RENFREWSHIRE COUNCIL
CHILDREN’S SERVICES
STATUTORY CONSULTATION FINAL REPORT
• Proposal: The establishment of a new primary school to be built at Dargavel Village on
an 8.5 acre site at the north end of Craigton Drive and
• a Catchment Review Affecting Dargavel Primary School and a new primary school to be
built at Dargavel Village
This document has been issued by Renfrewshire Council in terms of the Schools
(Consultation) (Scotland) Act 2010, as amended.
This Report includes:
1. Introduction and background to the statutory consultation
2. The Statutory Consultation and Community Engagement activities
3. On Line Questionnaire - Quantitative analysis of Likert Scale Questions responses
4. Online Questionnaire – Main issues and concerns identified in Likert Scale Questions
responses
5. Summary of main issues and Council response
6. Report from Education Scotland
7. Council Response to the Issues raised by Education Scotland
8. Summary
9. Equality Statement

Page 18

2 
1. INTRODUCTION/BACKGROUND TO THE STATUTORY CONSULTATION
PROCESS
1.1 On the 18th January 2024, the Education and Children’s Services Policy Board
approved a statutory consultation on a proposal to establish a new non-
denominational primary school in Dargavel, the site of the proposed new
building to be an 8.5 acre site at the north end of Craigton Drive, and to
consult on revised catchment areas for the existing Dargavel primary school
and the proposed new school.
1.2 The Education and Children’s Services Policy Board also authorised the
Director of Children’s Services, or another appropriate officer nominated by
her, to take such action as is required to carry that consultation through to
completion, in accordance with the legal requirements.
1.3 The Education and Children’s Services Policy Board also noted that provision
for denominational pupils within Dargavel Village will remain unchanged within
the St.John Bosco Primary School catchment area.
1.4 The statutory consultation was launched on January 29th 2024 and was
concluded on March 26th 2024. This was an 8-week consultation period which
goes beyond the minimum six-week period which is a requirement of the
Schools (Consultation) (Scotland) Act 2010 as amended.
2. THE STATUTORY CONSULTATION AND COMMUNITY ENGAGEMENT
ACTIVITIES
2.1 Renfrewshire Council consulted in line with the requirements of the Schools
(Consultation) (Scotland) Act 2010 as amended. This requires that local
authorities adopt a robust and transparent framework for consultations on
major changes to the education estate, for example, catchment areas. The
process requires authorities to actively involve and consult with all
stakeholders and other school users. The local authority is required to include
an educational benefit statement – that is, the local authority must produce a
statement setting out its assessment of the effects on children and young
people and other users of an affected establishment. There is a minimum six
week term-time consultation period. 
2.2 The report to the Education and Children’s Services Policy Board included as
an appendix the proposal paper. This included:
• the legal procedure for a public consultation over a new school 
• the reasoning behind our proposal, and the options we looked at when
developing it 
• our educational benefits statement
• the issues we considered when looking at possible sites for the new
school
• a list of streets affected by the proposed changes to the catchment.

Page 19

3
2.3 In advance of the consultation launch Renfrewshire Council put in place a
comprehensive communication and engagement plan. This had three key
aims, to:
• deliver a comprehensive public consultation which gave all interested
parties the chance to express their views
• help create a well-informed discussion around key issues affecting the
future of primary school provision in the area
• demonstrate the council’s willingness to hear directly from the local
community on their views around future school provision
2.4 Some community engagement work had already taken place prior to this
point, which was used to help inform the consultation content.
2.5 Space planning for a proposed new primary school took place over several
months in late 2023. This aimed to capture the views of the local community
and other key stakeholders on what they wanted from a new school building,
to help inform the brief for the design. This included an online community
survey, which received 524 responses, and focus groups with local
community and parent groups. 
2.6 The space-planning process was able to build on community feedback,
received over the course of the previous year through a number of public
meetings and forums, which indicated a very strong desire for a new primary
school situated within the centre of the village, which would also provide
community facilities after the school day.
2.7 Communication actions undertaken as part of this included:
• Pre-consultation communication
o In advance of the Education and Children’s Services Policy Board in
January, Renfrewshire Council wrote to local parents, members of our
opt-in Dargavel community email list, and key stakeholders to make
them aware the consultation was on the agenda.
o The Council did this again after the meeting to let them know
councillors had given approval to proceed and that there would be
communication once the consultation launched on Monday 29 January.
• Dedicated consultation webpage
o A dedicated webpage was created in advance of the launch. This
included:
o Information on what was being consulted on and why
o A link to the formal proposal paper
o Details of the planned information evenings, public meetings, and
informal drop-in sessions, along with information on what the public
could expect from each, and how to book these.
o Details of how members of the public could submit their views directly

Page 20

4
o An outline of the decision-making process which would follow the
consultation.
o A link was later added to the supplementary information created for the
public information sessions, covering the outputs from existing
engagement with the school community from the space-planning
exercise carried out in late 2023, further information on the process to
select the proposed site, and transport and travel links.
• Initial message to all statutory consultees
o When the consultation was launched on Monday 29 January, the
council wrote to all statutory consultees with a link to the above
webpage and an invitation to attend the public events. These
included:
o parents and carers of pupils at affected schools (Dargavel,
Bishopton, St John Bosco)
o staff and trade unions at the affected schools
o parent councils of those schools
o elected members
o the local community council and community planning partnership
o community groups who use the existing Dargavel Primary School
• The council also wrote to those who we expect may attend the new
school. This included:
o a text message to parents at Dargavel ELCC
o an email to the opt-in Dargavel community newsletter list. This was
created for anyone with an interested in school facilities in the area
who we wouldn’t otherwise reach (as of 29 January 2024, this had
519 subscribers)
o an email to the 141 families who had registered a child to start P1 at
Dargavel Primary in summer 2024
o emails to the heads of other private or partner nurseries in the area
with a request to share with their parents and carers
• Paper copies of the proposal paper and supporting information were
made available at local schools, at Bishopton Library, and at council
Headquarters at Renfrewshire House in Paisley.
• Parents at Dargavel and Bishopton Primaries were also contacted
directly by the schools to make them aware of the times where senior
officers were hosting informal drop-in sessions at those schools.
• Further messages to the community:
o The Council wrote again to the key groups listed above on several
further occasions during the consultation to help us maximise
engagement. This included:

Page 21

5
o 8 February – reminder message asking residents to sign up for the
public events (which ran between 14 February and 5 March)
o 23 February – message to let community know the online survey
had been launched.
o 13 March – a further reminder to fill out the survey, with our
response to some of the key issues raised at the public meetings,
and a reminder of the next steps.
o 21 March – a message to remind community members the
consultation had less than a week to go, with a final reminder to fill
out the survey before it closed
• The Council also wrote to the parents living in Dargavel or Bishopton
who had registered a child for a funded nursery place starting from
summer 2023 to invite them to take part in the survey.
• To help us reach any groups not covered by the above or who are not
online, we organised a direct distribution of fliers to all postcodes for
Dargavel and Bishopton PS catchment areas in late February. This
directed them to the webpage for more information, to the online
survey to submit their views, and to where in the local area paper
copies of the materials could be found. Posters covering the same
information were also distributed to key venues throughout the
community.
Public Events
2.8 The Council hosted a series of public events, designed to give members of
the local community the chance to meet the senior officers involved and find
out more about the proposal. This included:
• a series of informal drop-in sessions for existing parents and carers at
Dargavel and Bishopton Primaries (at school drop-off and pick-up times),
to allow them to talk to senior officers. 40 parents attended these sessions.
• Four information sessions were held at Dargavel Primary. These were
designed to allow community members to meet senior officers in an
informal setting and discuss topics like site selection, transport and travel,
and school construction, capacity and operations. Total attendance across
the four sessions was 62.
• Display boards were created for these information sessions which covered
outputs from engagement which had already taken place, including:
o what people had said pre-engagement through the space planning
public survey for the new school.
o based on that, plans and images showing examples of how it might
look
o a map of all sites considered for the new school, including those
suggested by the community, and analysis of how each was assessed
and scored

Page 22

6
o active travel and school access considerations
• Two public meetings took place where officers were able to feedback on
issues raised at the information sessions and invite questions from the
public. Total attendance across the two events was 57.
Meetings with statutory consultees
2.9 Meetings were also held with the following statutory consultee groups:
o Dargavel Primary Parent Council
o Bishopton Primary Parent Council
o Primary 5 -7 children in Bishopton Primary
o Primary 4-7 children in Dargavel Primary
o Staff of Bishopton Primary
o Staff of Dargavel Primary
o Individual meetings with ward elected members
o Bishopton Community Council
o Dargavel Residents Association
2.10  The statutory consultation period concluded on 26 March 2024.
2.11 As part of the consultation process, officers ensured that the views and
opinions of respondents were given due consideration. In order to ensure a
rigorous and through examination of the responses received, senior
members of Children’s Services read every response to validate key aspects
of responses and ensure all key issues were identified.
2.12 To provide rigour to the consideration of views and opinions of respondents,
there was a 2 stage qualitative analysis of all textual responses to identify
sentiment, strength of feeling and where comments, concerns and
suggestions carried real weight of argument. This provides a robust
understanding of community feeling. Stage 2 was carried out by council
officers analysing the comments across all questions and all views to
establish the most thorough possible understanding of the views expressed
in the consultation, Appendix B and C.
2.13 Officers performed quantitive analysis to understand percentage of respondents 
expressing a view and ensuring these were recorded and categorised. This ensured
alignment with  the themes identified with the consulates analysis and also the
feedback received  through the engagement process.
2.14 In a major consultation, there is the provision to update the formal proposal document
if information is found to be inaccurate or missing. Two minor inaccuracies were 
identified and updated during the consultation period:
I. In the site matrix, the scoring of two sites were not included. A correction
notice was issued on the website and officers wrote to all statutory consultees to
inform them of the change and the issue of the correction notice.

Page 23

7
II. In the catchment areas, there were two streets included in the catchment
area for the new Dargavel Primary school which should have been
included in the catchment area for Bishopton primary and two streets
without residences. The catchment areas were adjusted accordingly.
3. RESPONSES RECEIVED – ANALYSIS OF RESPONSES
3.1 There were a total of 817 responses to the questionnaire. The substantive
questions were as follows (one question asked for postcode).
Question 1: Please confirm you have read the statutory consultation document (full
document)
75 respondents said they had not read the document. The other 743 said they had.
Question 2: Which of the following best describes your interest in this consultation?
584 Resident Parent/Carer
167 Resident of Renfrewshire
45
42 
Pupil of affected school
Other

Page 24

8
Question 3: Please indicate whether you are happy for your comments to be made
public?
380 asked for their comments not to be shared and two did not answer this
question. As a result their comments are omitted from publication but were included
in the analysis. 436 expressly consented to their comments being made public.
Quantitative Responses
This section of the analysis focuses on the questions where the answers were on
the Likert Scale, going from Strongly Agree to Strongly Disagree – Questions 1-4;
Question 6 and Question 7. 
Question 4: To what extent do you agree a new primary school should be built in
Dargavel Village?
Their responses are presented in the chart below:

Page 25

9
• Strongly Agree: A significant majority – 618 respondents, strongly agree with the
proposition of building a new primary school.
• Agree: 96 respondents agree with the proposal.
• Neither Agree nor Disagree: 25 respondents have a neutral stance on the issue.
• Disagree: 28 respondents disagree with the proposal
• Strongly Disagree: 49 respondents are strongly against the proposal, indicating a
notable segment of respondents with strong reservations or opposition.
Question 6: To what extent do you agree the school should be built on the
proposed 8.5-acre site at the north end of Craigton Drive?
There were 172 responses strongly agreeing with the site proposed for the primary
school, 151 agreeing, 161 who indicated they neither agreed nor disagreed and 3
who left this box blank, and 127 who disagreed with the site, a further 204 strongly
disagreed with the site. 
These figures are represented in the following chart
49, 6%
28, 3%
25, 3%
96, 12%
618, 76%
To what extent do you agree a new primary school should be
built in Dargavel village
1. Strongly disagree
2. Disagree
3. Neither agree or disagree
4. Agree
5. Strongly agree
(blank)

Page 26

10
Question 7: To what extent do you agree with the proposed catchment area for the
existing Dargavel Primary School and the new school?
The overwhelming response to this question was ‘neither agree nor disagree’
reflecting its subordinate status to other questions about whether to build a new
school and where that school should be sited. There were 99 respondents who
strongly agreed with the proposed catchment, 258 who ‘agreed’, 354 who neither
agreed nor disagreed. There were 49 respondents who disagreed and 51 who
strongly disagreed.
204, 25%
127, 16%
161, 20%
151, 18%
171, 21%
To what extent do you agree the school should be built on the
proposed 8.5 acre site at the north end of Craigton Drive
1. Strongly disagree
2. Disagree
3. Neither agree or disagree
4. Agree
5. Strongly agree
(blank)
258, 32%
49, 6%354, 44%
99, 12%
51, 6%
To what extent do you agree with the proposed catchment
areas for the existing Dargavel Primary School and the
proposed new school?
Agree
Disagree
Neither agree nor disagree
Strongly agree
Strongly disagree
(blank)

Page 27

11
4. ONLINE QUESTIONNAIRE – FOLLOW UP COMMENTS
4.1 This section provides a collation of the most significant issues in the
comments explaining the responses to the Likert scale questions.
4.2 All comments have been independently analysed in the process
described earlier in this report. The reports of these analysis is attached
as appendix K and appendix L.
4.3 For the full details of the comments and points raised, please see these reports.
4.4 The main issues and concerns identified by the consultants analysis: Proposal 1 –
Building of a new school
1. Population Growth
2. Planning Issues
3. Community Impact and Quality of Life
4. Urgency to delivery primary capacity.
5. Respondents didnt feel qualified to express a view.
Proposal 2 – Site of new school
1. Traffic and Travel
a. Traffic congestion
b. Safety concerns – children and pedestrians
c. Traffic management plan
d. Concerns about arrangements for active travel
2. Location preference and justification
3. Critiques of consultation process
4. Long term educational planning – joint campus and secondary
provision
5. Concerns about division within the area caused by two schools in the
one area.
Proposal 3 – Catchment areas
1. Community Division
2. Community Needs – one catchment area for the whole village

Page 28

12 
Additional Comments
1. Council Decision making and planning
2. Data and Consultation process
3. Although outwith the scope of the consultation, there was significant
comment made expressing the view that a new secondary school or a 3-
18 campus should be built. 
5. EMAIL SUBMISSIONS 
5.1 Summary of Feedback on Proposed Design for Dargavel Primary School
There were submissions by email from 13 individuals. These are separate to
the online questionnaire. One individual submitted 3 responses. In total,
therefore there were 15 emailed responses. One individual completed the
survey on paper. 
These have been analysed separately because it cannot be ascertained
whether the respondents also responded to the survey. Their preferences
have not been added to the tallies, with the exception of the respondent who
was the sole paper response received to the questionnaire.
Initial Concerns and Transparency Issues
• Email respondent 1: Expresses appreciation for the council's efforts but
raises concerns about transparency and detailed planning, highlighting
potential biases in the proposal.
• Email respondent 2: Urges long-term planning, especially considering
population growth, and suggests a broader approach encompassing
community needs and future infrastructure.
• Email respondent 3: Expresses disappointment in short-sighted planning
decisions, advocating for a more comprehensive approach.
Site Selection and Community Impact
• Email respondent 2: Supports the proposed site within Dargavel for
minimizing impact on greenfield areas and emphasizes the need for
infrastructure within the designated development area.
• Email respondent 2: Echoes the sentiment for the school to be situated
within Dargavel, citing responsibilities of Renfrewshire Council and
developers to support the growing community.
• Email respondent 4: Opposes the proposed site due to concerns about
wildlife, noise, and traffic impact, suggesting a reconsideration of
alternative locations.
High School Provision and Community Engagement
• Email respondent 5: Criticizes past planning decisions and expresses
concerns about the consultation process, calling for accountability and
improved engagement.

Page 29

13 
• Email respondent 6: Raises concerns about high school capacity and
urges thorough consideration of secondary school provision alongside
primary school planning.
• Email respondent 7: Expresses interest in contributing to the consultation
remotely due to travel commitments, but makes no substantive
contribution. 
Infrastructure and Special Needs Support
• Email responded 8: Highlights the need for adequate support for children
with additional support needs and suggests addressing existing issues
before proceeding with new infrastructure.
• Email respondent 9: Recommends considerations for classroom design,
outdoor spaces, accessibility, and facilities for children with additional
needs.
• Email respondent 10: Advocates for equal consideration of existing
residents' amenity and raises concerns about light and noise pollution from
the proposed school site.
• Email respondent 11: Advocates for a smaller new school and proposes
extending Bishopton Primary instead to secure its long-term future.
• Email respondent 12: Expresses frustration with the consultation process
and criticizes the council's handling of high school provision, advocating
for better solutions for children's education.
Sports Facilities and Stakeholder Engagement
• Email respondent 13: Seeks confirmation on plans for a floodlit football
pitch adjacent to the new primary school, emphasizing the importance of
sports facilities.
• Email respondent 5: Calls for clarity on the proposed extension of Park
Mains High School and highlights concerns raised by stakeholders
regarding high school provision.
Specific Site Concerns and Personal Impact
• Email respondent 4: Voices concerns about the proximity of the proposed
school site to residential areas and potential negative impacts on wildlife,
noise, and traffic.
• Email respondent 3: Expresses disappointment in short-sighted planning
decisions and urges consideration of long-term impacts on children's
education and community well-being 
6. SUMMARY OF MAIN ISSUES AND COUNCIL RESPONSE 
Traffic 
The biggest and most recurring concern was Traffic and associated issues. 
Traffic issue 1 - Congestion

Page 30

14 
Traffic Issue 2 - Safety 
Traffic Issue 3 - Infrastructure to support Active Travel 
6.1 Traffic and Traffic Congestion
6.1.1 Road traffic volumes, congestion concerns and the availability of safe active
travel routes to the existing and the proposed new school site were the most
recurring and consistent themes of concern expressed during the
consultation events with the local community. 
6.1.2 It was anticipated that concerns of this nature were likely to emerge through
the consultation process based on the extent they had featured in earlier
pre-engagement activity carried out by officers with the community. In this
context a planned independent transport and travel study was
commissioned (carried out by Stantec) in January 2024 to assess both the
existing situation within the development and to model the impact of the
proposed new school site on the capacity of the transport infrastructure
across the Dargavel village as it is completed. 
6.1.3 The traffic modelling undertaken as part of the study provided reassurance
that that the existing road infrastructure planned to be delivered by BAE
systems will accommodate the additional traffic that will be generated by
trips to and from both primary schools without any capacity issues arising on
either the overall road network, or with traffic volumes passing through key
junctions in the development. This provides a level of assurance that the
flow of traffic within the development will not experience congestion issues
due to capacity demand linked to peak school time travel.
6.1.4 The Stantec study also explored considerations in respect to traffic related
issues in and about the immediately vicinity of both schools, which can
present different challenges beyond overall road and junction capacity. The
study assessed the travel modes currently used to access Dargavel Primary
School, noting that existing active travel to the school already performs
comparably with the Renfrewshire primary school average as summarised
below:
• The overall proportion of pupils walking or using park and stride to get to
school is lower than the Renfrewshire average, but the proportion cycling
and scooting / skating is higher meaning that the overall proportion of
pupils using active travel is 69%, the same as the Renfrewshire average.
• The proportion of pupils being driven to school is slightly less than the
Renfrewshire average at 21%, compared to 24%.

Page 31

15
Mode Share Comparison versus Renfrewshire Average
6.1.5 In relation to those driving to the school, Stantec traffic surveys and
monitoring identified a high proportion navigating into the school car park
and making use of the drop-off area and not staying for long – as the school
design intended. However, they also monitored some cars parking,
pavement mounted on the north side of Arrochar Drive between the school
“keep clear markings” and the signalised junction with Barrangary Road.
This results in Arrochar Drive being reduced to effectively one vehicle lane
in this area, with a requirement for “give and go”, and with the parking
impinging on pedestrian use of footpaths and clear lines of visibility.
Similarly, drivers were also seen park on the footways within the residential
streets accessed off Arrochar Drive, blocking walking routes and again
impinging on pedestrians. 
6.1.6 The Stantec study notes however that the existing primary school is
currently supporting housing across the whole development area, including
a significant proportion of housing to the north of the development that is
beyond a 15-minute walking distance from the school. It also noted housing
to the north of the development is impacted by incomplete travel
infrastructure that will eventually link the north of the village to the south of
the development where the school is located. Additionally, Arrochar Drive is
currently operating as a no through road, as the internal loop (Western Link
Road) has not been fully constructed. It is expected that the WLR will be
constructed by BAE by December 2025. The Stantec study notes that the
absence the completed loop road (WLR) has likely encouraged more driven
trips and traffic to and from the existing school from housing sites on the
north side of the village and that some of the existing traffic issues
associated with a high number of car-based trips to and from Dargavel
Primary School are exacerbated by these factors.
6.1.7 This undoubtedly contributes to existing issues with vehicle parking around
the current school location and this is reflected in the concerns expressed by

Page 32

16
the community through the consultation response in relation to traffic and
safe active travel routes to school. 
6.1.8 It is critical moving forward that effective engagement and communication is
maintained with the community to evidence that a second school at site E1
and the existing Dargavel Primary school will provide school facilities that
are highly connected to their associated catchments and that those
connections represent a safe environment for travelling to and from the
school sites, irrespective of the mode of travel chosen. 
6.1.9 It is critical to consider how in the short-term traffic issues at the current
school can be resolved and to ensure that concerns relating to traffic
congestion and safe active travel linked to the new school’s proposed
location can be adequately and appropriately addressed in the design and
delivery planning of the new school.
6.1.10 First and foremost, it is important to recognise that delivery of the second
school and implementation of the revised catchments changes, along with
delivery of the full village infrastructure (both road and active travel) by BAE
Systems will deliver high active travel connectivity and travel times to both
schools.
6.1.11 Dargavel Primary School’s catchment will significantly reduce in
geographical size and the positioning of site E1 was selected specifically to
maximise the opportunity to deliver the shortest active travel distances
within its catchment. Detailed travel modelling has been completed by
Stantec that confirms the following active travel times for both schools. 
6.1.12 This modelling confirms that both schools will have short commute times,
providing a high level of opportunity for active travel to school and reduced
need for travel by car. As outlined above, the existing school catchment by
contrast has a significant proportion of houses materially outwith a 15-
minute walking distance which Stantec have noted this will likely have
encouraged a greater level of travel by car.
6.1.13 In addition, officers have engaged with Stantec during the course of their
study to review a number of considerations that would further enhance safe
active travel to both schools, improve arrangements for drop-off and pick-up
by car at Dargavel Primary School and identify design factors to be carefully
considered in the delivery of a new school on the proposed site. It will be

Page 33

17
critical such issues are progressed in a manner which aligns with the overall
communication and engagement plan set out in the recommendations.
6.1.14 Engagement with BAE Systems is underway to jointly progress planning
access and travel routes for the new school site as part of the school and
site design. This will carefully consider planned and enhanced active travel
infrastructure that BAE Systems will deliver and the design of a school site
with multiple access and egress points to minimise distances to housing
developments in the surrounding catchment area. 
6.1.15 In addition, it will be critical for there to be coordinated and pro-active joint
travel planning between both primary schools and the community to support
and champion active travel arrangements.
6.1.16 It is accepted that travel by car is unavoidable for some parents and carers
at drop-off and pick-up times and adequate design and capacity for parking
and drop-off/pick-up arrangements is a key requirement that will be planned
into the new school site design, informed by best practice design principles,
community engagement and from learning from other similar school sites
across the country. This will include exploring traffic control measures in and
around the immediate vicinity of the school. Demonstrating well developed,
assessed and appropriate arrangements for traffic and travel to and from the
school site will be a key requirement that will support the statutory planning
application.   
6.1.17 In addition, and in recognition of the observed issues being experienced at
the current school site, officers are progressing an option appraisal for
improved drop-off and pick-up arrangements utilising the flexibility provided
through available land secured from BAE systems adjacent to Dargavel
Primary School whilst wider travel infrastructure is completed by BAE
Systems and revised catchments are implemented as the new school is
delivered. A report in this regard will be brought back to the Education and
Childrens Services Policy Board for consideration.  
The other most common issues were:
6.2 Ensure community amenity and community access within the new
school
6.2.1 Pre-engagement space planning captured the overwhelming support from
the community to deliver a school with the highest quality learning
environment and which supports flexible community use outwith school
hours (98% of those involved in pre-engagement supported the
community having access to the school for a variety of activities – outdoor
sport, fitness and exercise classes, social activities, children and toddler
groups, adult learning classes, health and wellbeing support. 
6.2.2 Officers can confirm this will be integral to the design, and a full size, floodlight
synthetic sport pitch with changing facilities is incorporated into the planned
school provision and site 9 E1 provides sufficient flexible land to support
community facilities. Further engagement with the community, including local
groups and sports clubs will take place during the design process to maintain
focus on community demand. In addition, following feedback from the

Page 34

18 
Dargavel community through the consultation process, officers are working
with the community to determine the best route to support and meet
community sports pitch needs whilst the new school-based facility is
delivered, and this will include consideration of how other existing pitch
provision can be best utilised to meet current and future need.  
6.3 High school provision/joint campus development – Outwith scope of
consultation
6.3.1 High school provision is not within the scope of the consultation. However it is
recognised that officers must continue to engage the community and work in
an open and responsive way to plan for future secondary school provision . A
new high school or joint primary/secondary campus were referenced by over
a third of respondents as important considerations for the Council, and this
included those who support the proposal for a new primary school on the
proposed site. Importantly, future high school provision for west Renfrewshire
is integral to the Council’s strategic learning estate review which will consider
long term demand profiles across Renfrewshire, as well as renewal and
replacement priorities and options for the primary and high school estate
across Renfrewshire. An engagement programme will support this long-term
review and will ensure the views of all communities are represented, including
Dargavel and Bishopton communities. This includes existing and ongoing
engagement in relation to the plans to extend Park Mains High School and the
regular updating of school rolls and long term school roll projections for Park
Mains High School and implications of these.  
6.3.2 It should be noted that concerns have also been expressed by the wider Park
Mains High School community who are not statutory consultees in relation to
this primary provision consultation. Those concerns related specifically to a
desire not to impede the progress of the current project to extend Park Mains
High School. 
6.3.3 While officers progress the agreed work programme to extend Park Mains
High School - the confirmed catchment school for Dargavel and Bishopton, it
is fully accepted that there is a critical need to provide transparent and regular
updates to the wider community on updated school rolls and projections, to
provide the required reassurance that high school capacity will provide
sufficient spaces for all children living in the catchment in the long term. The
established Park Mains Parent Council Liaison Group has and will continue to
be the main forum for cascade of information and feedback from the
communities of each catchment primary school. This will include ongoing
engagement to inform the programme to extend the school. 
6.3.4 To date, through the Park Mains High School space-planning process,
consultants have worked with community members, school staff, pupils and
parents and carers to make sure views were captured as part of that process.
This covered how the existing building is currently used, satisfaction levels
with the current building, views on different types of learning space and what
building users would like to see from an extended Park Mains. Over 560
individuals completed surveys and 43 took part in focus groups. The school

Page 35

19
design team and construction contractors have been confirmed and appointed
and work is continuing to meet the agreed August 2027 delivery date. 
6.4 Effective community engagement and transparent planning and
decision-making
6.4.1 There is still an important journey to repair and rebuild the council’s relationship
with the local community. The process of consultation, outlined in the report,
provided numerous touchpoints to listen to the community and provide deeper
understanding of local concerns and challenges. Although there are groups
within the community who remain understandably angry towards the council
and sceptical of programme planning and delivery, there is a wider community
who are willing to work closely with the council to deliver improvements for the
community ongoing. It is vitally important the council works strategically to
engage those individuals and groups, use existing forums and networks across
the community, and provide genuine opportunities for collaboration. This will
include ongoing sharing and scrutiny of roll projection data and agreeing an
established mechanism for ongoing engagement on active travel and traffic,
high school transport, school design, including ASN (Additional Support Needs)
provision and wider community needs. 
6.5 Issue - Numbers/Roll projections
6.5.1 Linked to the lack of trust in the Council’s planning processes, especially due
to the previous errors in numbers, there were concerns expressed about the
accuracy of the current projections on which the plans for the proposed new
building are based.
Response – There have been significant lessons learned from that process.
The current projections have been developed independently by Edge
Analytics which is a national leader in this field and provide a number range
on which the council has based a range of plans. As distinct from the
previous errors, the proposed new building, when added to the capacity of the
current primary school, provides 1234 spaces and could be stretched to 1300
spaces. That provides sufficient capacity for the most likely projection
scenario.
However, plans are being developed for how additional capacity could be
provided should numbers reach a peak which is higher than expected.. This
position is further strengthened by the annual monitoring of live data matched
against projections which will allow officers to ensure that provision is
sufficient for demand and to respond where any concerns arise.
6.6 Issue - Location of site; proximity to current school
6.6.1 There were concerns expressed about the proposed site being too close to the
current school and associated difficulties for the community.
Response:

Page 36

20
This would be something which would be managed by the headteachers of
the school. The council want there to be community cohesion in
Dargavel/Bishopton, so the headteachers will be encouraged to work
together; to collaborate on projects and to exploit every opportunity for the
children to work together.
There was also concern about increased noise and disruption caused by
the schools being close together. However, wherever the new school is
built, increased noise because of the number of children attending will be
very challenging to avoid.
Conversely some respondents, although fewer cited a preference for the
schools to be on the same site.
6.7 Issue - The nature of the Consultation Process
6.7.1 There was a view that about the fact there was only one option presented for
consultation and a suggestion this meant the decision had already been made.
Response:
The consultation process was designed in line with both the Schools
(Consultation) (Scotland) Act 2010, as amended and guidance provided by
Education Scotland linked to the act.
The guidance is there has to be a proposal on which to consult. For this
reason, there was the presentation of one option to engage with the
community about that proposal and issues associated with it. However,
throughout the process it was emphasised that if the outcome of the process
was a clear message of no support for the proposal, then officers would
present that view to the council for a decision on whether the proposal should
progress. Additionally, there was also a clear message that if there was a
prevailing view about an alternative proposal related to building a new school,
then this would be fully considered and presented to the Council for their
consideration.
While there were a range of views about the site, as can be seen in section 4
of this report, there was no clear view about one alternative site. The
alternative sites which were identified were Sites 22 and 23 in the site matrix–
predominantly, because they are large enough for a joint campus. These
were identified by 119 respondents, which is 14.6% of the total number of
respondents. However, both of these sites are situated within the green belt
and therefore would require a much more detailed and complex planning
process, with a final decision being made by the Scottish Government, rather
than the Council. There are also travel issues associated with these sites as
it would encourage increased car use in contradiction of the rationale for the
new site to maximise opportunities for children to walk to school. These
factors were considered within the scoring matrix.
There was a consistent message throughout the consultation that
respondents could suggest an alternative site/s. The survey was designed to
specifically ask respondents this question.

Page 37

21
6.8 Issue - Residential Impact and Expectations
6.8.1 People had bought houses in Dargavel village with certain expectations,
including what school their children would go to and these expectations have
not been met.
Response:
One of the regretful aspects of the current situation is that children have not
been able to go to the school their parents planned for them, and some have
had that decision made by a ballot. The 2027 deadline for the new school is to
minimise that uncertainty and to have enough provision to meet the
expectations of parents, and to meet their entitlement for their child to go to
their catchment school. 
6.9 Issue - Consideration of other sites
6.9.1 The site matrix did not give enough details of reasons why other sites had been
discounted.
Response:
There were key criteria for sites to meet the requirement of having a school in
the heart of Dargavel village and for the new school to be delivered by August
2027. These were applied to all sites identified by the Council and by the
community. If these criteria were not met, then the site was discounted. This
is a standard approach to site evaluation for statutory consultations.
6.10 Issue – Design of the new school
6.10.1 There have been recognised issues with the open plan nature of the current
school and a view that the new school should learn lessons from these.
Response:
There have been lessons learned from the experience of the existing
Dargavel Primary school. The headteacher, staff and children from Dargavel
primary school met with the space planners and shared their views and their
ideas for the new school. These have all been built into the space planning
process and will continue to inform the design of the new primary school to
ensure the best learning environment for all children.
6.11 Issue -Design process
6.11.1 Will the project be delivered on time and how long will the modular classrooms
be in the current school once the new school is ready?
A number of responses questioned the project plan for the new school and
expressed concerns the new school would not be ready for the planned
August 2027.

Page 38

22 
Response
There is currently an indicative timeline for the building of the new school.
This is based on timelines and deadlines for key aspects of the project, for
example, planning permission. The council is committed to delivering the new
school for opening in August 2027 and these timelines will be pushed forward,
wherever possible. The process will be managed through Hub West which will
speed up the tendering process for contractors and consultants. 
However, in response to the concerns raised in the consultation, there is now
planning for appropriate temporary measures, if there are indications the
deadline might not be met. The detail of these is still to be agreed, but will be
shared as part of the ongoing community engagement as the project
progresses. We emphasise that we are fully committed to delivering the
project on time for the school opening in August 2027.
When the new school opens, the modular classrooms will be removed from
the current school. This will take approximately 5 weeks.
6.12 Issue - Children with additional support needs
6.12.1 Would the new building be planned to meet the needs of all children, including
those with additional support needs?
Response:
Renfrewshire Council has a full commitment to inclusion and meeting the
needs of all children in our schools. This will be central to the design of the
new school and we will engage with a focus group of parents of children with
additional support needs to inform the design process. This will ensure design
decisions are informed by the full range of children’s needs.
6.13 Issue - Sufficient denominational spaces 
6.13.1 All projections indicate that denominational education can be met by St. John
Bosco primary school.
6.14 Issue -  Lack of facilities for teenagers in an area with a changing
demographic.
Response:
This issue came up in the discussions at the wide range of engagement
events, more so than in the online questionnaires. However, it is a very
important one for the local community where, over time, there will be an
increasing number of teenage young people and insufficient facilities and
activities for them. As part of continuing engagement, there will be planned
meetings with all relevant partners to explore the best strategy to make the
local community a positive one for young people with a full range of activities
in which they can participate.

Page 39

23 
7. REPORT FROM EDUCATION SCOTLAND
7.1 The Council has fully considered the report from Education Scotland.
7.2 Overall Education Scotland consider the council has set out reasonable
educational benefits for this proposal.
7.3 Education Scotland recognise that in the very substantial response to the
online questionnaire, there was no clear consensus on the proposed site on
Craigton Drive with less than half of respondents agreeing with the proposed
site and only slightly more, also less than half, disagreeing. There was a large
number of respondents who neither agreed or disagreed. Education Scotland
does confirm there is no consensus on an alternative site.
7.4 The issues noted in the report are as follows:
The authority needs to:
• ensure there are improved, adequate safe active routes to school.
They also need to develop robust and viable plans to efficiently
manage the significant increase in traffic that is expected.
• ensure that there are clear contingency plans in place, should there be
slippage in the projected timescales for the construction and opening of
the new school for August 2027.
• continue to consult with stakeholders about the design of the new
school, the facilities to be included and in considerations about the
community use of the site.
7.5 The report also highlighted that, in taking forward the proposals, the Council
should continue to work with stakeholders to mitigate their valid concerns and
to involve them, as appropriate, in the design of the new school. Children’s
services, along with other council services is very committed to ongoing
community engagement on education provision in Dargavel village and will
undertake this involvement as part of their already established community
engagement processes involving parents/carers, staff, children and other
stakeholders, for example community groups.
7.6 Although outwith the scope of the consultation, it would be helpful for the
council to continue to work with parents to address their concerns about
secondary provision. This is already in place through the Park Mains transition
group and presentations to Parent Councils about plans for the extension and
education provision.
8. COUNCIL RESPONSE TO THE ISSUES RAISED BY EDUCATION
SCOTLAND
8.1 Issue: Improved, adequate safe travel active routes to school, robust
and viable plans to efficiently manage the increase in traffic 
Response:

Page 40

24
The council commissioned Stantec to carry out a review  of Active Travel
provision at Dargavel village. The report confirmed there is sufficient road
network capacity and junction capacity to support a second primary school on
the proposed site. The report confirmed there are no implications regarding
proximity of school location.
The report does recommend a number of considerations to maximise active
travel to Dargavel Primary School and to the proposed school site and to
drop-off and pick-up by car at Dargavel primary school. Councill officers are
progressing options and proposals for improved drop off and pick up
arrangements at Dargavel primary school. Engagement with BAE systems is
underway to ensure future developments supports the travel and traffic
improvements required by the council.
Further analysis by Stantec indicates that with the council’s planned traffic
arrangements, a school on Site 9 E1, has the potential to be one of the most
walkable primary schools in Renfrewshire, with 71% of catchment pupils able
to walk to school within a 10 minute timeframe with 100% able to walk within
15 minutes.
It is recognised and fully accepted that travel by car is unavoidable for some
parents and carers at both drop off and pick up times. And adequate design
for parking and drop off/pick up arrangements will be planned into the school
design. Joint planning between both primary schools, community support of
active travel and temporary traffic management measures during school
drop-off and pick up times will also be required to ensure effective
arrangements for those pupils travelling to school by active travel or
transport.
8.2 Issue: Clear contingency plans in place, should there be slippage in
projected timescales
Response: The council and West Hub are confident that the school will be
delivered on time. However, recognising the concerns about slippage in
timescale, discussion has started on what the contingency plans will be in the
event there is slippage in the projected timescales. Council officers will provide a
report to a future Education and Childrens Services Policy Board on proposed
contingency plans, should there be any delay to construction that would impact the
anticipated August 2027 opening date. 
8.3 Issue: To continue to consult with stakeholders about the design of the
new school including community use.
Response:
The Council has had a detailed engagement with the community since the start of
the process of designing the new school. It is committed to continuing to do so. It
will design, in partnership with the community, processes for engagement in the
design of the new school, including plans for community spaces and community
use.

Page 41

25
9. SUMMARY
9.1 The Council team was committed to the largest possible engagement with the
proposals. Working with the community, this commitment has been delivered
with over 800 responses to the online questionnaire and the participation at
the various community events. This has led to a robust range of views on the
proposal which gives the Council confidence that the consultation has
reflected the views of the wider community.
9.2 Having considered all questionnaire responses; written and verbal responses
in conjunction with the Education Scotland report, it is proposed to deliver a
new primary school on the proposed site “site 9 – E1” as denoted in the
Statutory Consultation documentation opening in August 2027. The council
will continue to engage with the local community through the school design
and planning process.
9.3 We have paid close attention to concerns relating to active travel and traffic
management. Recommended actions will be progressed by officers to ensure
community concerns are mitigated and statutory obligations are met. These
mitigations will be a requirement of the statutory planning process.
9.4 Although outwith the scope of the consultation, we recognise the concerns
expressed about secondary provision and are committed to engaging with the
community in the manner described in section 5 of this report.
10. EQUALITIES STATEMENT
10.1 An Equalities and Human Rights Impact Assessment was undertaken as part
of the consultation exercise to pay due regard to equalities considerations as 
part of the Council’s Public Sector Equality Duty.

Page 42

Consultation on new
primary school in Dargavel
This is a proposal paper
This is a consultation on 2 proposals:
1  A proposal to establish a new primary
school in Dargavel Village on an 8.5-acre
site at the north end of Craigton Drive.
2	 	A	catchment	review	affecting	Dargavel	Primary	
School and the proposed new primary
school to be built at Dargavel Village.
www.renfrewshire.gov.uk
Appendix A

Page 43

Table of Contents
1. Summary
2.	 Procedure	for	Statutory	Public	Consultation
3.	 Rationale	for	Proposal
4.	 School	Configuration	Options
5.	 Site	Option	Appraisal
6.	 Catchment	Proposals
7.	 Educational	Benefits	Statement
8. Wider Site Considerations
9. Catchment Considerations
10.	 Statutory	Consultation	Process
Proposal Appendices
1.	 Edge	Analytics	Housing	and	Roll	Projections
2.	 Map	of	proposed	Catchment	Area	for	2	Dargavel	Primary	Schools
3. List of streets included in the new catchment areas
4.	 Dargavel	Education	Provision—New	Build—Site	Options	Matrix
5.	 Dargavel	Education	Provision—New	Build—Site	E1	location	map

Page 44

1. Summary
1.1  This paper asks for your views on the proposals
set out above, in accordance with requirements
of the Schools (Consultation) (Scotland) Act 2010.

Page 45

2  Procedure for Statutory Public Consultation
2.1   The procedures for the statutory public
consultation relating to this proposal are:
This paper will be issued simultaneously to:
• 	the	Parent	Council	or	combined	Parent	Council	
of	Dargavel	Primary	School;	Bishopton	Primary	
School	and	St.	John	Bosco	Primary	School;
•  the parents of the pupils at the schools 
identified	above;
•  the parents of any children who would be likely
to	become	pupils	at	the	affected	schools	or	
expected	by	Renfrewshire	Council	to	attend	
any	affected	school	within	2	years	of	the	
date	of	publication	of	this	proposal	paper;
• 	the	pupils	at	any	affected	school—for	the	
purposes of this consultation, Dargavel
Primary	School,	Bishopton	Primary	School	
(in so far as Renfrewshire Council considers
them	to	be	of	a	suitable	age	and	maturity);
• 	the	staff	(teaching	and	other)	at	these	schools;
•  any trade union which appears to Renfrewshire
Council	to	be	representative	of	the	staff	
(teaching	and	other)	at	any	affected	school;
• 	elected	members	of	wards	affected	by	
the	consultation	proposal;
• 	the	community	Council	(if	any);
•  the community planning partnership for
the area of the local authority in which any
affected	school	is	situated	and	any	other	
community planning partnership that the
education	authority	considers	relevant;	and
•  any other community groups using
any	of	the	affected	schools.
2.2 Also:
•  An advertisement will be prepared notifying
the public and inviting written comment
from individuals or organisations outlining
the proposal and the recommendations
and stating that full details can be
obtained	from	establishments	affected.	
This	will	be	published	in	The	Paisley	Daily	
Express	and	the	Renfrewshire	Gazette.
•  The paper will be available for inspection
at all reasonable times and without charge
at Renfrewshire House and on the Council
website at https://www.renfrewshire.gov.
uk/dargavel-school-consultation and at all
affected	schools	and	all	public	libraries.
•  The consultation is now underway
and will run until 26th March 2024.
•  A public meeting will be held at Dargavel
Primary	School	at	7pm	on	19th	February	2024	
to allow the proposal to be discussed and
oral	representations	to	be	considered.	Other	
public events will be held and details will be
communicated directly to the groups listed.
• 	Written	representation	should	be	made	to	Gerry	
Lyons, Interim Head of Education, Renfrewshire
House,	Cotton	Street,	Paisley	PA1	1LE	or	to	
Dargavel2consultation@renfrewshire.gov.uk, 
no later than noon on 26th March 2024.
2.3  Copies of the proposal paper and all written
representations and comments received will
be forwarded to Education Scotland who
will consider the papers and prepare a report
which will be sent to the education authority.
2.4  A consultation response report including a
summary of all written submissions from all
bodies and the report from Education Scotland
will	then	be	published	by	Children’s	Services	in	
advance of any Council decision. The report will
include	a	statement	of	the	authority’s	responses	
to any issues raised by representations received
or by the report from Education Scotland.
2.5  The consultation response report will be
available for inspection at all reasonable
times and without charge at Renfrewshire
House and on the Council website and at all
affected	schools	and	all	public	libraries.
2.6  The Schools (Consultation) (Scotland) Act 2010
does not require referral to Scottish Ministers
in cases other than closure of schools.
2.7	 	The	final	recommendation	considering	the	
results of the consultative process will be
presented to a meeting of the Education and
Children’s	Services	policy	board	on	23rd	May	
2024. Implementation of any decision may not be
carried out until at least three weeks have passed.

Page 46

3  Rationale for Proposal to establish a new primary school and catchment review
3.1  In August 2019, following a consultation process in
the	first	half	of	2019,	the	Education	and	Children’s	
Service	Policy	Board	agreed	the	defined	catchment	
for a new non-denominational primary school
within Dargavel Village. In January 2022, the newly
constructed	Dargavel	Primary	School	in	Arrochar	
Drive, within the village development, opened.
3.2	 	In	November	2022,	a	report	was	presented	to	a	
Special	Education	and	Children’s	Services	Board	
setting	out	that	the	Council	had	identified	that	
the primary school capacity provided at Dargavel
Primary	School	would	be	insufficient	to	meet	the	
revised	projected	demand	expected	to	emerge	
from the catchment area, as the Dargavel Village
development progresses to completion.
3.3	 	Following	detailed	and	updated	projection	
modelling undertaken by the Council and
specialist consultancy Edge Analytics in the
first	half	of	2023,	the	Education	and	Children’s	
Services	Policy	Board	agreed	the	need	to	
plan to deliver a second primary school to
meet	the	revised	projected	demand.
3.4  Although underpinned by the best available data
and a tried and tested model that has been used
extensively	across	the	UK	by	Edge	Analytics,	it	
is	recognised	that	pupil	projection	modelling	in	
relation	to	major	sites	retain	unavoidable	risk	
and uncertainty. This is particularly the case
when	projecting	over	a	significant	timeframe.	
Given	almost	a	decade	of	development	is	yet	
to be delivered in Dargavel Village, the future
demand	projections	produced	from	the	modelling	
carry an inevitable degree of uncertainty.
3.5	 	The	Edge	Analytics	model—which	projects	over	
a 15-year period and has assumed a completion
of the Dargavel Village development in 2033,
has indicated a peak in non-denominational
demand	of	1,131	in	2033/34.	This	is	expected	to	
reduce	over	the	second	half	of	the	2030’s	to	a	
slightly lower stabilised level of demand. This
pattern of a peak demand followed by a lower
stabilised level of demand is evidenced in other
large-scale	developments	across	the	UK.
3.6  In addition, further scenario modelling, informed
by one year of live data for the forthcoming
2024/25	year	suggests	that	if	P1	admissions	
continued	long-term	at	this	rate—higher	than	
the Edge Analytics modelling, a peak demand
of around 1,500 could emerge in 2033/34.
Discussions with Edge Analytics indicate this
scenario	is	not	consistent	with	the	experience	
of large community growth areas elsewhere in
the	UK	and	would	place	Dargavel	Village	in	the	
very	upper	tier	of	education	demand	profile.
3.7	 	In	this	context	and	based	on	the	core	Edge	
Analytics modelling (peak demand of 1,131),
the	Education	and	Children’s	Services	Policy	
board agreed that a second school should be
planned	for	to	expand	non-denominational	
education provision and deliver 800 pupil
places	in	addition	to	the	existing	capacity	
of	Dargavel	Primary	School	(434).
3.8	 	This	followed	engagement	with	Dargavel	Parent	
Council and their strong advocacy for a second
primary school to be delivered. It was also agreed
that	options	would	be	identified	for	managing	
potential	upper	end	projection	scenarios,	
should this be required in the long-term.
3.9  Therefore, the proposal for consultation is to
deliver a new non-denominational primary
school within Dargavel Village for 800 pupils, and
to revise catchment arrangements between
Dargavel	Primary	School	and	the	new	school.	The	
proposal notes that that the catchment primary
school for all denominational pupils in Dargavel
Village	will	remain	St	John	Bosco	Primary	School.
3.10  In accordance with Section 2 and Schedule
1,	Para.	2	and	4	of	the	2010	Act,	a	proposal	to	
establish a new school and a proposal to vary
any admission arrangements for a school,
including altering or establishing the catchment
area of a school, is a relevant proposal for the
purposes	of,	and	subject	to,	the	2010	Act.

Page 47

4	 School	Configuration	Options
4.1	 	Although	the	Council	identified	an	unavoidable	
requirement to deliver a new school and
additional permanent non-denominational
primary school capacity of 800, it is recognised
that there are options that can be considered to
achieve	an	expansion	in	capacity	at	this	scale.
Option	1—fulfil	the	need	through	delivery	
of a new 800 capacity primary school.
	
Option	2—fulfil	the	need	through	delivery	of	a	
new smaller capacity school of circa 600 and
extend	capacity	at	the	existing	Dargavel	Primary	
School which is now possible following an
additional	land	parcel	adjacent	to	the	existing	
school being secured from BAE systems.
	
Option	3—fulfil	the	need	through	delivery	of	a	
new smaller school of circa 600 capacity and
extend	the	catchment	of	Bishopton	Primary	
School to encapsulate an element of Dargavel
Village. This option recognises that a degree of
surplus	capacity	exists	at	Bishopton	Primary	
School that could support demand from an
expanded	catchment	area	encompassing	an	
appropriately	sized	element	of	Dargavel	Village	
that	is	within	closest	proximity	to	the	school	
and	benefits	from	a	safe	walking	route.
	
Option	4—fulfil	the	need	through	a	combination	of	
both 2 and 3, where a much smaller new school is
delivered	of	a	similar	scale	to	the	existing	Dargavel	
Primary,	with	the	existing	Dargavel	Primary	
extended	and	Bishopton	Primary	catchment	
extended	to	take	in	an	element	of	Dargavel	Village.
4.2  In assessing the options, the key consideration
focused on the following assessment criteria:
• 	To	what	extent	the	option	delivers	a	learning	
environment which best supports the
delivery of the curriculum and the best
educational	experience	for	all	learners.
• 	To	what	extent	the	option	supports	
environmentally sustainable facilities
with lower carbon footprints, satisfactory
building	conditions,	sufficiency	
levels and education facilities.
In addition to these core educational assessment
criteria, additional wider factors were
considered as part of the assessment process.
• 	To	what	extent	the	option	would	assist	in	
preserving the broad conclusion of the 2019
consultation	exercise	to	maintain	a	clearly	
identifiable	primary	school	provision	and	
catchment serving Dargavel Village, whilst
retaining	a	separately	identifiable	catchment	for	
Bishopton	Primary	School	which	should	remain	
focused on the needs of the historic village.
• 	Given	the	uncertainty	and	risk	in	relation	to	
the potential for further additional capacity
demand	to	emerge,	to	what	extent	the	
option supports the Council to maintain
flexibility	to	respond	to	potential	upper	
demand scenarios emerging in the future.
• 	The	extent	to	which	the	proposal	can	deliver	
facilities that would, outside of school
operating	times,	provide	flexible	space	
to support a wide range of community
activities and uses within Dargavel Village.
This acknowledges community feedback
during the pre-consultation engagement that
accessible	and	flexible	community	facilities	
is a key requirement the community would
like	to	see	fulfilled.	This	also	recognises	the	
existing	Dargavel	Primary	School	design	
failed	to	adequately	meet	this	expectation.
• 	The	financial	cost	and	value	for	money	
of the proposed solution.
4.3  Based on the above criteria, the option
appraisal	assessment	has	identified	that	option	
1, delivery of a new 800 school provides the
best	overall	school	configuration	outcome.
4.4  A 3 to 18 campus for Dargavel and Bishopton has
previously been suggested by some members
of the community. This consultation does not
propose	to	alter	the	catchment	area	for	Park	
Mains High School. A detailed analysis of high
school	demand	and	provision	for	the	Park	
Mains	catchment,	and	the	Council’s	decision	to	
extend	Park	Mains	High	School	was	subject	to	
a Report to Board on 24th August 2023 which
can be accessed via www.renfrewshire.gov.uk

Page 48

5	 	Site	Option	Appraisal
5.1  Renfrewshire Council began identifying and
assessing potential sites within the Dargavel area
to locate a second primary school in December
2022. Since then, there have been additional
sites suggested by both BAE Systems as part of
discussions in relation to the Dargavel Village
development as well as suggestions that have been
promoted directly by members of the community.
5.2  The key factors which have been used to guide the
site	search	by	Council	officers,	guide	discussions	
with BAE Systems and the assessment of all
options	identified	throughout	the	process	have	
focused on a series of key criteria outlined and
explained	in	the	site	evaluation	matrix	(Appendix	4).
5.3	 	This	matrix	has	been	used	in	an	appraisal	
assessment	where	all	the	identified	sites	
were evaluated against these criteria and the
associated	site	evaluation	matrix	is	outlined	
in	Appendix	4.	Sites	which	did	not	meet	the	
required	site	size	were	automatically	discounted.
5.4	 	As	detailed	in	Appendix	4,	the	site	referred	
to as E1 to the north end of Craigton Drive
within the Dargavel Village masterplan, has
been	identified	as	the	preferred	location	and	is	
identified	on	the	map	provided	at	Appendix	5.
6.  Catchment Proposals
6.1  The impact of this proposal is illustrated through
existing	and	proposed	catchment	maps	for	
Dargavel	Primary	School	and	the	proposed	
new primary school within Dargavel Village
and	is	attached	as	Appendix	2	to	this	report.
6.2  It is proposed that, if approved, the catchment
changes	would	be	implemented	to	take	effect	
following construction of the new school
which it is anticipated will be in 2027.
6.3  If the proposals are approved, all pupils living 
in	affected	addresses	currently	attending	
Dargavel	Primary	School	would	be	entitled	to	
continue attending to the end of primary 7. 
If they are entitled to free school transport, 
in	line	with	the	Council’s	transport	policy,	
then this entitlement would also continue.
6.4  Siblings of pupils currently attending Dargavel
Primary	School	would	also	be	entitled	to	attend	
the school with their sibling if their older sibling
is registered in the school when they enrol.
6.5	 	Free	school	transport	for	new	primary	1	pupils	
would only be provided in instances where the
pupil enrols in the school at a time when their
sibling still attends the school and where that
sibling is entitled to free school transport.

Page 49

7	 	Educational	Benefits	Statement
7.1	 	Under	the	2010	Act	where	the	Council	has	
formulated a relevant proposal, the Council
must	prepare	an	educational	benefits	
statement (“an EBS”) in accordance with
Sections 1 and 3 of the 2010 Act.
7.2	 	The	Educational	Benefits	Statement	
must include the following:
	
	
a)			the	Council’s	assessment	of	the	likely	
educational	effects	of	a	relevant	
proposal (if implemented) on:
	
(i)	 the	pupils	of	any	affected	school;
	
(ii)	 any	other	users	of	the	school’s	facilities;
(iii)  any children who would (in the future
but for implementation) be likely to
become	pupils	of	the	school;	or
(iv)  the pupils of any other schools
in	the	Council’s	area,
	
	
b)		the	Council’s	assessment	of	any	other	likely	
effects	of	the	proposal	(if	implemented),
	
	
c)		an	explanation	of	how	the	Council	
intends to minimise or avoid any adverse
educational	effects	that	may	arise	from	
the proposal (if implemented),
	
	
d)		a	description	of	the	educational	benefits	
which the Council believes will result from
implementation of the proposal (with
reference to the persons whom it believes
will	derive	them),	as	well	as	the	Council’s	
reasons for coming to those beliefs.
7.3 	Educational	Benefits	Statement
7.3.1  Section 3 of this document sets out the strategic
context	and	rationale	for	the	identified	need	
to deliver a second primary school as part of
increasing by 800 the non-denominational
primary school capacity serving Dargavel.
7.3.2	 	The	educational	benefits	of	the	proposed	
building and the proposed location
as outlined in the proposal:
• 	will	ensure	sufficient	primary	school	capacity	to	
meet	projected	demand,	providing	catchment	
school places for catchment children. This
will be monitored on an ongoing basis.
•  ensures all schools serving Dargavel
Village and Bishopton have a viable and
sustainable school roll, located within
the local area and can serve children,
families, and the community of Dargavel.
•  ensures continuity of learning as children
will go through all stages of their primary
education in a 21st century learning
environment which will accommodate
future	demand—future-proofed	for	peak	
projections	and	is	sector-leading	in	its	design.
•  will provide the school with a learning
environment where it can build a culture of the
highest	expectations;	placed	at	the	heart	of	the	
community this will contribute to the creation a
community identity for Dargavel Village which
can be grown through community engagement
and learning, and which sends the most positive
messages about the children and their potential.
•  dining areas will be welcoming, naturally
ventilated areas with immediate access to
outdoor dining and the IT infrastructure
allows for cashless catering arrangements
which will enhance the inclusive ethos of
the	school	while	supporting	the	efficient	
management of dining sittings.

Page 50

7.4 Learning,	Teaching	and	Assessment
7.4.1  The Council has been working with a Space
Planning	Consultant	who	has	worked	with	key	
stakeholders to develop a strategic brief on what
a 21st Century learning environment should look
like as part of the proposed new school. This
includes classroom spaces which will enable
children	to	experience	the	full	range	of	learning	
and teaching approaches with the facility for
whole	class	learning;	for	children	to	work	and	
learn	together	in	groups	of	different	sizes	and	to	
learn independently based on planned learning.
This will provide an environment where teachers
will be able to give children a voice in their own
learning and the opportunity to lead their learning.
7.4.2  The digital connectivity within the proposed
new school will provide the opportunity for
children to develop digital learning skills and
learn through digital learning methodologies.
7.4.3	 	Proposals	include	plans	for	learning	plazas	to	
support	project-based	learning;	multi-purpose	
spaces which will allow children to learn in
different	contexts	in	all	curricular	areas;	and	
break out spaces where teachers will be able
to develop play pedagogy developing skills
for learning life and work in all children.
7.4.4  This wide range of learning spaces will improve
the quality of assessment and professional
judgement	as	teachers	will	be	able	to	plan	
learning on a stage and level basis which can
be delivered and assess across more than one
class, allowing teachers to develop shared
understanding of assessment standards.
7.5 	Curriculum—Developing	the	4	capacities	
in	all	4	contexts	of	learning
7.5.1	 	Over	and	above	classroom	spaces,	the	proposed	
school environment will provide opportunities to
experience	the	ethos	and	life	of	the	school.	The	
children	will	develop	as	confident	individuals	
through whole school activities including school
shows;	choirs	and	instrumental	bands;	school	
clubs and opportunities to work with community
partners	in	a	range	of	different	activities.
7.5.2  The planned environment and assembly
spaces will provide opportunities to build
positive	relationships	across	the	school;	
opportunities for inputs from partners on
key aspects of personal and social education
including	keeping	safe	and	healthy;	building	
positive	self-esteem	and	self-efficacy.
7.5.3	 	Outdoor	spaces	will	be	designed	to	encourage	
and enhance pupil participation in outdoor
learning	and	deliver	positive	experiences	of	
outdoor play, supporting children to become
responsible	citizens	and	effective	contributors.
7.5.4	 	High	quality	sport	and	P.E.	facilities	will	provide	
space for children to participate in a wide range
of	sport	and	exercise	supporting	the	delivery	
of the Health and Wellbeing curriculum.
7.5.5  The proposed location of a new school, in the
heart	of	the	community	and	sufficiently	close	to	
Dargavel	Primary	School	and	Bishopton	Primary	
School, will allow children to participate in
activities where they can work together to improve
their	community;	to	help	vulnerable	people	in	
their community and so grow their understanding
about	what	it	means	to	be	responsible	citizens.
7.5.6	 	The	school’s	proposed	location	within	the	
catchment	of	Park	Mains	High	School	will	allow	
pupils	to	benefit	from	well-established	cluster	
planning	activities	as	well	as	highly	effective	
support for primary/secondary transition.

Page 51

7.6 	Supporting	Children	with	
additional support needs
7.6.1  The range of spaces that can be delivered
within the proposed new school will enable the
school leadership team to design facilities which
support	children	who	require	targeted	support—
assessed	through	Renfrewshire	Council’s	staged	
intervention policy. This may include break out
spaces which allow for targeted intervention for
groups	of	children	who	require	support	in	specific	
areas	to	achieve	expected	levels	of	achievement,	
and	flexible	space	which	could	be	used	for	
sensory rooms for neurodivergent children
and space for nurture bases and safe spaces.
Additionally, spaces can be created for visiting
partners to support children through counselling
or	group	work	where	there	is	identified	need.
7.6.2  The creation of this high-quality learning
environment will send positive messages about
all children supporting an ethos of inclusion
and equality where all children feel valued. This
is supported by the range of spaces available
for whole school development on issues of
equality. The proposed building will be compliant
with the provisions of the Equality Act (2010).
7.7 	Career	Long	Professional	Learning	
and Leadership Development
7.7.1  The proposed building is a 21st century work
environment where teachers will have enhanced
facility to work together on planning learning
and school improvement activity. The digital
capability and high quality work spaces will
enhance this further providing potential for
improvements	for	digital	learning	and	to	maximise	
the	possibilities	presented	by	Artificial	Intelligence.
7.7.2  The quality of assessment and moderation
will also be improved as there is high quality
space for teachers to work together, share
practice and learn from each other. The
proposed site also presents opportunity for
the 2 primary schools and Dargavel primary
school to improve through looking outward.

Page 52

8  Wider Site Considerations
8.1  The preferred site has been assessed as fully
meeting all the criteria for the new building. The
Council	owns	the	land;	it	provides	the	necessary	
space	for	the	new	school	building	and	is	sufficiently	
distanced	from	the	existing	primary	school,	whilst	
maximising	opportunity	for	active	travel	and	
supporting environmental considerations. In
addition, the site presents the most deliverable
proposal in terms of timeframe and costs
for completion. This positions this site as the
optimum location for ensuring continuity and
sustainability	in	children’s	learning	and	delivering	
the planned provision within Dargavel village.
8.2  The site will allow the school design to plan for
delivering high quality space for community
use outwith school hours as well as additional
outdoor sport pitch provision in this new
and growing area, enabling social capital
and community involvement in developing
the use of the space. This will strengthen
community and school capacity to promote
health, wellbeing and resilience. Attention will
be given on creating new opportunities for the
local community. As a result, the proposal will
provide not only a high-quality educational
environment for children but will also realise
significant	outcomes	for	the	entire	community.
8.3  The site position within the heart of the Dargavel
Village and the central amenity parkland
area, coupled with the proposed catchments,
maximises	the	opportunity	for	safe	active	travel	
to	school,	for	both	the	new	school	and	existing	
Dargavel	primary	and	maximises	convenience	
for community use outwith school hours.
8.4  Consideration of the integration of the proposed
school site with Dargavel Village road and
pathway infrastructure will be part of the formal
planning application process and will ensure
safe	traffic	flows	and	optimum	road	safety	for	
pedestrians and all road users. The infrastructure
considerations will include measures such as
active travel infrastructure to primarily support
children walking, wheeling, or cycling to the
central location of both schools, as well as
providing	effective	drop	off/pick	up	arrangements	
for private cars and school bus services. Council
Officers	will	work	collaboratively	on	issues	
related	to	managing	traffic	and	road	safety	in	
and	around	the	existing	school	site	and	proposed	
school	site.	Previous	learning	and	community	
feedback will inform the future design process.
8.5	 	Delivering	effective	road	restrictions	around	
the	proposed	new	school	and	Dargavel	Primary	
School will be considered holistically to promote
the best environment possible for travel to and
from	the	school	grounds.	Traffic	management	
schemes will be designed to promote positive
and considerate pedestrian and road user
behaviour	in	the	proximity	of	the	school.
8.6	 	Officers	from	Environment,	Housing	and	
Infrastructure will lead the development
and assessment of safe walking routes and
a school travel plan to ensure the network
around the proposed new school is safe.
8.7   Initial engagement has commenced with a
transport consultant to identify early opportunities
to pro-actively incorporate such infrastructure
and wider design considerations early into the
school design process and to support the more
substantial work associated with the transport
assessment which will be subsequently carried out
as part of the future planning application process.

Page 53

9  Revised Catchment Considerations
9.1	 	The	revised	catchment	areas	have	been	identified	
from the number of houses planned in the
Dargavel	Village	and	the	projected	pupil	yield	
from those planned houses. This has been
supplemented by data gathered about the roll of
the current primary school and indications from
the actual number of children in the school, which
will be closely monitored on an ongoing basis.
9.2	 	Despite	the	inherent	uncertainty	as	projections	
stretch over a longer period, the proposal is
designed to provide a viable and sustainable pupil
roll in both primary schools both in the short and
long term. The proposed catchments will allow
teacher	staffing	levels	and	stage	classification	
arrangements	to	be	effective,	and	children	will	be	
able to learn in a sustainable way in their local area.
9.3  The revised catchment areas improve the
options for safe and sustainable travel as they
reduce travel distances, making walking to
school highly viable for almost all children
attending	the	school.	This	has	benefits	for	the	
children’s	health	and	well-being	as	well	as	
having a positive environmental impact with the
potential	for	a	significant	and	sustained	reduction	
in children being brought to school by car.
9.4  The proposed new primary school will be part of
the	Park	Mains	High	School	cluster	comprising	
Bargarran, Barsail, Bishopton, Dargavel, Rashielea,
Langbank and Inchinnan primary schools. As such
it	will	benefit	from	existing	strong	relationships	
with the associated secondary school. There will
be an increased roll for the secondary school, but
all	projection	work	undertaken	by	the	Council	
and consideration of viable options indicate
this increase can be accommodated with a
planned	extension	to	the	existing	school,	the	
design of which is part of ongoing engagement.

Page 54

10  Statutory Public Consultation Process
10.1  This document has been issued by Renfrewshire
Council for consultation in accordance with the
Schools (Consultation) (Scotland) Act 2010.
10.2  What is a statutory consultation?
In Scotland, local authorities have a statutory duty
to	ensure	the	adequate	and	efficient	provision	
of education in their areas. If a local authority
proposes	to	change	any	part	of	the	existing	
education provision in its area, then it must engage
in a formal consultation process in the Schools
(Consultation) (Scotland) Act 2021. This act aims
to	ensure	that	all	major	changes	which	affect	
schools	are	subject	to	clear	consultation	with	
parents, children, young people and communities.
10.3  When does the Statutory Public
Consultation start?
The consultation will start on Monday 29th
January 2024 and close on 26th March 2024,
which includes a period of 30 school days.
10.4  Who will have access to this proposal document?
The proposal document has been made available
to all interested parties, including parent Councils,
Education Scotland, parents and carers of
children	attending	the	establishments	affected,	
Staff	Trade	Unions	and	any	other	users	of	the	
establishments as detailed in the distribution list.
The proposal document is published
on the Council website at:
https://www.renfrewshire.gov.uk/
dargavel-school-consultation
Copies are also available at Renfrewshire House,
Dargavel	Primary	School	and	local	libraries.
Copies can also be made available in
alternative formats or translated for readers
whose	first	language	is	not	English.
10.5  What if I notice an error in the document?
If any inaccuracies or omissions are discovered
in this proposal document, either by the
Council or any person, the Council will
determine if relevant information has been
omitted or if there has been any inaccuracy.
The Council may then take appropriate action,
which may include the issue of a correction notice,
the reissuing of the proposal document or the
revision of the timescale for the consultation
period, if appropriate. In that event, relevant
consultees and Education Scotland will be advised.
10.6 	How	will	I	get	a	chance	to	give	my	opinion?
You will be able to give your
opinion on the proposal:
• 		Online	at—
https://www.renfrewshire.gov.uk/
dargavel-school-consultation
•  By completing an online response form at 
https://www.renfrewshire.gov.uk/
dargavel-school-consultation
•  By submitting a paper copy of the
response	form,	attached	at	Appendix	7
• 	By	emailing—
Dargavel2consultation@renfrewshire.gov.uk
• 	In	writing	to	Gerry	Lyons,	Interim	Head	
of Education, Renfrewshire House,
Cotton	Street,	Paisley	PA1	1LE
All responses must be submitted by no later than
close of business Tuesday 26th March 2024.

Page 55

10.7 	Will	there	be	any	meetings	for	the	public?
There will be a public meeting on Monday 19th
February	at	7pm	in	Dargavel	Primary	School.	
This meeting will provide an opportunity for
interested parties to hear about the proposal
from	Council	officers,	ask	questions	and	have	
their views recorded so that these can be
considered as part of the consultation process.
Other	public	events	will	be	held	and	details	will	
be communicated directly to the groups listed.
	
	
Advance	notice	of	specific	questions	or	issues	
to be raised at the public meeting will be
accepted	up	to	Friday	16th	February	2024.	This	
will allow all issues to be covered and give
those who may not be comfortable speaking
publicly their opportunity to be heard.
A note will be taken of comments, questions, and
officer	responses	at	the	public	session.	The	notes	
will be published on the Council website and a copy
will be made available on request. The notes will
be forwarded to Education Scotland along with all
other submissions and comments that are received
by the Council during the consultation process.
10.8 	Will	any	other	agencies	be	
involved in the process?
The Schools (Consultation) (Scotland) Act 2010 
requires that a report on the proposal on the 
proposal is prepared by Education Scotland. 
Education Scotland may attend the 
public meetings.
	
	
Once	the	statutory	public	consultation	period	
comes to an end, Education Scotland have three
weeks to consider the educational aspects of the
proposal and submit a report to the Council.
Education Scotland receives a copy of relevant
papers from the Council, including:
•  A copy of the proposal, paper copies of
the written representations or a summary
of them (if Education Scotland agree)
•  A note of the oral representations made
at	the	public	meeting	sessions;	and
•  Any other related documents
Education Scotland may visit schools as
part of their consideration of the proposal
and	meet	with	children,	staff	and	parents	
who	may	be	affected	by	the	proposal.
	
	
Upon	receipt	of	the	proposal	document	and	other	
relevant documentation, Education Scotland will
consider the educational aspects of the proposal.
They will ensure that their report takes account of:
• 	The	educational	benefits	statement
•  The representations received
by	the	Council;	and
•  Any further representations made directly to
Education Scotland on educational aspect of
the proposal which is considered relevant.
The consultation report that the Council publishes
following the statutory public consultation must
include the report from Education Scotland in full.
10.9  Will the outcome of the consultation
be made public?
The Head of Service (Education) will prepare a
report on the results of the consultation process.
The report will take account of all Education
Scotland recommendations. This report will be
published in electronic and printed formats and
will	be	advertised	in	the	Paisley	Daily	Express	and	
the	Renfrewshire	Gazette.	It	will	be	available	on	the	
Council website and from Council Headquarters.
The report will include a record of the total number
of written representations made during the
consultation period, a summary of written and
oral	representations	and	the	Council’s	response	to	
recommendations made by Education Scotland. 
A copy of the Education Scotland report will be an
appendix	to	the	consultation	report	which	will	be	
published and available for further consideration
for a period of more than 3 weeks ahead of
presentation to Elected members in May 2024.
10.10  When will the Council make a decision
on the outcomes of the consultation?
The consultation report, together with any other
relevant documentation, will be considered by
the	Education	and	Children’s	Services	Policy	
Board, who will make a decision in May 2024.

Page 56

Proposal Appendix 1
Roll	Projection—Edge	Analytics
Dargavel	Primary	School
600
800
1000
1200
1400
2023-24
2024-25
2025-26
2026-27
2027-28
2028-29
2029-30
2030-31
2031-32
2032-33
2033-34
2034-35
2035-36
2036-37
2037-38
2038-39
530
Scenario HOUSING-E HOUSING-E (P1 Adjusted - 140) HOUSING-E (P1 Adjusted - 150)
Scenario 2023-24
  2024-25
  2025-26
  2026-27
  2027-28
  2028-29
  2029-30
  2030-31
  2031-32
  2032-33
  2033-34
  2034-35
  2035-36
  2036-37
  2037-38
  2038-39
 
HOUSING-E 573 666 773 861 960 1017 1064 1096 1121 1125 1131 1095 1063 1035 1013 995
HOUSING-E (P1 Adjusted - 140) 604 729 872 996 1133 1229 1314 1353 1385 1391 1399 1356 1318 1284 1257 1235
HOUSING-E (P1 Adjusted - 150) 614 750 906 1043 1195 1305 1405 1448 1483 1490 1500 1454 1412 1377 1347 1324
Scenario

Description
HOUSING-E The HOUSING-E scenario includes the impacts of planned housing on cohort size, through the application of primary and
secondary pupil yield factors to a trajectory of planned housing growth. The pupil yield factors have been derived by Edge
Analytics, using pupil yield evidence from a sample of dwelling growth areas, located in Renfrewshire and across Scotland.
HOUSING-E (P1 Adjusted – 140) The HOUSING-E (P1 Adjusted - 140) scenario uses assumptions that are consistent with the HOUSING-E scenario. In this scenario,
the P1 intake is adjusted to reflect 140 P1 Registrations at Dargavel Village Primary School in August 2023 (2023-24). For
Bishopton Primary School and St John Bosco Primary School, P1 Registrations of 40 and 23 respectively have been assumed.
HOUSING-E (P1 Adjusted – 150) The HOUSING-E (P1 Adjusted - 150) scenario uses assumptions that are consistent with the HOUSING-E scenario. In this scenario,
the P1 intake is adjusted to reflect 150 P1 Registrations at Dargavel Village Primary School in August 2023 (2023-24). For
Bishopton Primary School and St John Bosco Primary School, P1 Registrations of 40 and 23 respectively have been assumed.

Page 57

Power BI Desktop
Scenario 2023-24 2024-25 2025-26 2026-27 2027-28 2028-29 2029-30 2030-31 2031-32 2032-33 2033-34 2034-35 2035-36 2036-37 2037-38 2038-39
HOUSING-E 573 666 773 861 960 1017 1064 1096 1121 1125 1131 1095 1063 1035 1013 995
HOUSING-E (P1 Adjusted - 140) 604 729 872 996 1133 1229 1314 1353 1385 1391 1399 1356 1318 1284 1257 1235
HOUSING-E (P1 Adjusted - 150) 614 750 906 1043 1195 1305 1405 1448 1483 1490 1500 1454 1412 1377 1347 1324
School
Dargavel Primary


Roll Projection - Edge Analytics
Proposal Appendix 2
Current Dargavel Catchment Map
Proposed	Dargavel	Catchment	Map

Page 58

Proposal Appendix 3
Streets	affected	by	proposal—Dargavel	Primary	School	and	a	
New	Primary	School	to	be	built	at	Dargavel	Village
As at 28th November 2023
Aberlady Way
Abington Circle
Acer Drive
Alness Way
Applecross Drive
Arrochar Drive
Ballantrae Crescent
Balnagown Drive
Barbeg Crescent
Barmore Crescent
Barmore Drive
Barmore Wynd
Barrangary Road
Birch Road
Birchtree Road
Boghall Drive
Boghall	Place
Bolerno Avenue
Bolerno Circle
Bolerno Crescent
Bolerno	Gardens
Bolerno	Place
Bolerno Wynd
Broadford	Place
Catterline Way
Cedarwood	Gardens
Central	Park	View
Cherrytree	Gardens
Colintraive Crescent
Craigmuir Drive
Craigmuir Road
Craigmuir Way
Craigton Drive
Crail Crescent
Crosshill Avenue
Crosshill Mews
Crosshill Road
Crosshill Wynd
Culrain Drive
Dalbeattie Way
Dalgety Drive
Dornie Way
Drumbeg Road
Dunbeath Circle
Dundonnell Road
Durness Avenue
Elder Crescent
Elie Drive
Fern	Way
Forge	Crescent
Forge	Way
Gatehead	Avenue
Gatehead	Crescent
Gatehead	Drive
Gatehead	Grove
Gatehead	Wynd
Girvan	Terrace
Glenluce	Drive
Greenock	Road
Inveraray Road
Kilmartin	Gardens
Kilmelford	Drive
Kirkconnel	Road
Kirriemuir	Circle
Lairg View
Limetree Lane
Lochside Avenue
Lochview Wynd
Luss	Grove
Melness	Grove
Melvich Way
Millbank Avenue
Millbank Circle
Millbank Crescent
Millbank Drive
Moffat	Gardens
Mosshall Drive
Nairn	Drive
Northbrae	Drive
Northbrae	View
Ormsary	View
Plockton	Way
Portpatrick	Avenue
Portree	Crescent
Rossland Crescent
Sanquhar Way
Skelmorlie Avenue
Slateford Road
Station Lane
Station Road
Tain Avenue
Tayinloan Way
Thurso Crescent
Torrisdale Crescent
Ullapool	Grove
Whitemoss Way
Whitemoss Wynd
Whithorn Crescent
The development is still under construction and more addresses may be added
to this list, which fall within the boundary of the development site.

Page 59

Dargavel—New	Primary	School—Site	Option	Matrix Proposal Appendix 4
SITES
Ref Site Name Size Active
Travel
Ownership
of land
Land use
designation
Anticipated
additional
cost
Total
Score
Council officer comments
1 Site W7 
(Dargavel Masterplan)
10.9 acres 
= PASS 3 2 3 3 11 Not considered an optimum location due to close proximity (diagonally
across road) from existing Dargavel Primary School
2
Site C1 
(Dargavel Masterplan—
adj existing DPS)
2.5 acres 
= FAIL    
3
Site A 
(periphery of Masterplan
—west of Whithorn
Crescent)
5.93 acres 
= FAIL    
4
Site B 
(periphery of Masterplan
west of plot W11)
8.08 acres 
= PASS 3 2 3 2 10
This site has the disadvantage of being accessed primarily via residential
streets through masterplan plots W9, W10 and W11. This is very likely to
result in adverse impacts for residents in these streets. Although a distinct
new road access could be provided to Site B this would significantly add to
the construction costs.
DEFINITIONS
Size Active Travel Ownership of land Land use designation Anticipated additional cost of developing
Site is large enough to
accommodate proposed
scale of school capacity
Site is less than 1km walking
distance from majority of
school catchment residents
Site is owned by RC, 
BAE or other.
*see notes
Site is identified for future
development in adopted Local
Development Plan
This criterion is based on a relatively flat, unencumbered site
with good existing or committed road access would represent the
lowest cost solution for site development. *see notes
SCORING
Size Active Travel Ownership of land Land use designation Anticipated additional cost of developing
PASS = Site is > 8acres
in size
3 =  majority of catchment <1km
walking distance
3 = site is owned by RC 3 =  land designated for
development
3 = no anticipated additional costs
FAIL = Site is < 8acres
in size
2 =  less than 50% of catchment
<1km walking distance
2 = site is owned by BAE 2 =  land has no definite status
(eg. Unallocated land)
2 =  either significant earthworks, new road, additional utility
connections required for development site
1 =  majority of catchment >1km
walking distance
1 =  site is owned by other
than RC or BAE
1 =  site is allocated for open
space or green belt
1 = more than one significant additional cost required

Page 60

Ref Site Name Size Active
Travel
Ownership
of land
Land use
designation
Anticipated
additional
cost
Total
Score
Council officer comments
5
Site C 
(periphery of Masterplan
—west of plot W8)
6.28 acres 
= FAIL    
6
Site D 
(periphery of Masterplan
—west of plot W5)
6.00 acres 
= FAIL    
7
Site E 
(periphery of Masterplan
—East of Slateford Road)
4.50 acres 
= FAIL    
8
Site F 
(periphery of Masterplan
—between Birch Road
and railway line)
4.99 acres 
= FAIL    
9 Site E1 
(Dargavel Masterplan)
8.5 acres 
= PASS 3 3 3 3 12
10 Site E2  
(Dargavel Masterplan)
8.5 acres 
= PASS 3 2 3 3 11 Not considered as optimum a site as E1 due to closer proximity to existing
Dargavel Primary School
11 Site W2  
(Dargavel Masterplan)
9.1 acres 
= PASS 3 2 3 3 11
Site W2 is closer to planned housing development in Dargavel Masterplan
than site E1. This could lead to impacts on residential amenity through the
planned introduction of floodlighting for the community sports provision at
the new school
12 Newton Road Playing
Fields, Bishopton
7.5 acres 
= FAIL    
13 Holm Park, Bishopton 9.5 acres 
= PASS 1 1 1 2 5
Owned by Community Development Trust and very unlikely to be available
for new school development. Site is designated as Green Belt in LDP with a
presumption against its loss to development. Planning status could elongate
planning consenting process by up to 2 years.  Site is relatively remote from
proposed catchment.
14 North of Ingliston Drive 9.0 acres 
= PASS 1 1 1 1 4
Site is designated as Green Belt in LDP with a presumption against its loss to
development. Planning status could elongate planning consenting process
by up to 2 years.  Site is relatively remote from proposed catchment.
15 East of Slateford Road,
Bishopton
8.2 acres 
= PASS 3 1 1 1 5
Site is designated as Green Belt in LDP with a presumption against its loss to
development. Planning status could elongate planning consenting process
by up to 2 years.  Site is relatively remote from proposed catchment.

Page 61

Ref Site Name Size Active
Travel
Ownership
of land
Land use
designation
Anticipated
additional
cost
Total
Score
Council officer comments
16 West of Greenock Road,
Bishopton
8.0 acres 
= PASS 1 1 1 1 4
Site is designated as Green Belt in LDP with a presumption against its loss to
development. Planning status could elongate planning consenting process
by up to 2 years.  Site is relatively remote from proposed catchment.
17 East of Greenock Road,
Bishopton
8.0 acres
= PASS 1 1 1 1 4
Site is designated as Green Belt in LDP with a presumption against its loss to
development. Planning status could elongate planning consenting process
by up to 2 years.  Site is relatively remote from proposed catchment.
18 Ingliston Drive,
Bishopton
2.3 acres 
= FAIL    
19 Matey’s Field, Bishopton
(Camphill Gardens)
1.5 acres 
= FAIL    
20 Site W (Parent Council)—
Station Road, Bishopton
6.4 acres (tbc)
= FAIL    
21 Site X (Parent Council)—
Gladstone Hill, Dargavel
27.5 acres 
= PASS 3 2 1 1 7
Site is designated as open space in Dargavel Masterplan with a presumption
against development.  Current landform (steeply sloping site) would result in
significantly increased costs of construction compared to Site E1.
22
Site Y (Parent Council)—
West of Slateford Road,
Bishopton
61.7 acres 
= PASS 1 1 1 1 4
Site is designated as Green Belt in LDP with a presumption against its loss to
development. Planning status could elongate planning consenting process
by up to 2 years.  Site is relatively remote from proposed catchment.
23
Site Z (Parent Council)—
Ferry Road / Greenock
Road, Bishopton
70.4 acres 
= PASS 1 1 1 1 4
Site is designated as Green Belt in LDP with a presumption against its loss to
development. Planning status could elongate planning consenting process
by up to 2 years.  Site is relatively remote from proposed catchment.
*NOTES
Size Ownership of land Anticipated additional cost of developing
8 acres considered the minimum size
required for an 800 capacity primary
school and necessary community
facilities. Sites smaller than this
threshold not considered further
This is scored based on the speed and ease of delivery of the school. A
third party owner will inevitably involve negotiations and costs to purchase
(not otherwise accounted for elsewhere) and lead to a longer timescale for
delivery. A BAE owned site is considered to be quicker due to their imperative
to find a solution to assist future housebuilding but not as quick as a Council
owned site.
This criterion is based on a relatively flat, unencumbered site
with good existing or committed road access would represent the
lowest cost solution for site development. Sites with no existing
or committed road access of a suitable nature or with significant
earthwork requirements will add significantly to the cost of the
development

Page 62

Proposal Appendix 5
Map	of	proposed	Site	for	Proposed	new	Primary	school

Page 63

www.renfrewshire.gov.uk

Page 64

Parents, carers and residents of Dargavel are
being asked for their views on the location 
of the new school and the catchment area.
Have your say here or online 
Visit www.renfrewshire.gov.uk/dargavel-school-
consultation for details on how to take part.
This includes information sessions,
public meetings, informal drop-ins 
and written feedback. 
Dargavel school
consultation
Welcome to this statutory consultation
event on a proposed new primary
school in Dargavel and its catchment.
Appendix B

Page 65

What you have told us so far
A PROPOSED NEW PRIMARY SCHOOL FOR DARGAVEL VILLAGE—PRE-CONSULTATION ENGAGEMENT
98%
support the community   
having access to the school
outwith school hours for a variety of
activities—outdoor sports, fitness and
exercise classes, social activities, children
and toddler groups, adult learning
classes, health and wellbeing support.
Parent and carer priorities… a school
in the heart of the community, the right
size, good playground space, considered
parking and drop off, a 5G floodlit
artificial pitch, traffic management, 
not open plan, quiet spaces, community
campus, inclusive of P1 to P7.
Space planning is the process of analysing
how space in a building and in rooms will
be used.
We consider possible space uses, respond
to the needs of those who will use the
space, and we ensure spaces are used
efficiently.
Informed by 651 survey responses
and stakeholder interviews with
pupils, parents and carers, community
representatives, community groups 
and parent groups, in late 2023.
Our process—to listen and discuss, 
to agree and test the vision and ambition,
to develop a spacial model to support 
the school design.
Space planning

Page 66

Programme timeline
(Subject to the outcome of statutory consultation)
A PROPOSED NEW PRIMARY SCHOOL FOR DARGAVEL VILLAGE—PRE-CONSULTATION ENGAGEMENT
September 2023 to March 2024 January to 
February 2024
March 2024
April 2024 May 2024
March 2025
January to 
March 2024
March to June
2024
July 2025
July to 
December 2024
August 2027
•  Tender development for design team, architects and engineers
• Space Planning engagement and development of concept designs
Site Investigation Works 
on proposed site E1
Architect appointment
•  Engineer appointment
• Main contractor appointment
Planning application
Statutory Consultation 
on a proposed new primary
school (its proposed site and
a catchment review)
Detailed design
Elected Members will consider
the responses received from the
statutory consultation. Future
timeline will depend on the
outcome of the Board decision.
Construction on site
Technical design conclusion
Proposed opening date

Page 67

Vision and Objectives
A PROPOSED NEW PRIMARY SCHOOL FOR DARGAVEL VILLAGE—PRE-CONSULTATION ENGAGEMENT
Vision
The new primary school in Dargavel Village will provide an innovative 
& inclusive learning environment for 800 pupils. It will provide facilities 
to support community use & prioritise design approaches that are
flexible and sustainable.
Innovative
Infrastructure to
support embedded
technology &
enhance the learning
experience
Welcoming entrance
experience for
visitors, community 
& parents
The heart of the
community
Spaces to support
multiple activities 
and users
A building which is
easy to maintain 
& repair
Low impact energy
solutions
Systems to allow the
shut down of zones
when not in use
Simple building
controls
Spaces that can open
up and close down
according to activities
Spaces that can be
easily adapted from
one use to another
to support future
changes in demand
Zoning to allow out
of hours access to
indoors & outdoors
facilities &  multi-
functional space
A design that
supports flexible use
of spaces by multiple
users
Maximise
opportunities for
the whole learning
community & wider
community
Range of quiet /
retreat spaces to
support individual
learning preferences
Careful consideration
of acoustics and noise
levels & volume of
spaces
Spaces that support 
& nurture
Variety of learning
environments to suit
age, stage & need
Outdoor learning
spaces that support
learning activities,
health & wellbeing
& foster wider
participation
Inclusive Community
focused Flexible Sustainable
Objectives
A vision, key themes and ideas emerged from what people told us during
the space planning.

Page 68

Space Planning—Multi-Use spaces
A PROPOSED NEW PRIMARY SCHOOL FOR DARGAVEL VILLAGE—PRE-CONSULTATION ENGAGEMENT
PLEASE NOTE:   All plans and images shown are examples of how the proposed new school could
look, based on feedback from the space planning—these are not actual designs.
2 Court Sports Hall & Drama /Music Studio
(+ Adult changing to support community use)
Life Skills / Literacy Space (Learning, 
Community & Afterschool activity)
STEM / Numeracy Space (Learning, 
Community & Afterschool activity)

Page 69

Space Planning—Learning spaces
A PROPOSED NEW PRIMARY SCHOOL FOR DARGAVEL VILLAGE—PRE-CONSULTATION ENGAGEMENT
Priorities
•  Differentiation of furniture types 
& layouts across key stages
•  Free flow between class bases 
and breakout
•   Acoustic separation & shelter 
to support focus
8–10
3–8 10 +
PLEASE NOTE:   All plans and images shown are examples of how the proposed new school could
look, based on feedback from the space planning—these are not actual designs.

Page 70

Space Planning—Support spaces
A PROPOSED NEW PRIMARY SCHOOL FOR DARGAVEL VILLAGE—PRE-CONSULTATION ENGAGEMENT
Strategy
•  Range of semi-enclosed and enclosed
opportunities within class bases,
breakout for learners to retreat for
shelter, focused or regulatory activities
Class bases Breakout
Pupil SupportRetreat Space
PLEASE NOTE:   All plans and images shown are examples of how the proposed new school could
look, based on feedback from the space planning—these are not actual designs.

Page 71

Space Planning—Outdoor spaces
A PROPOSED NEW PRIMARY SCHOOL FOR DARGAVEL VILLAGE—PRE-CONSULTATION ENGAGEMENT
Opportunities for learning 
& the community
• Growing space
• Outdoor classrooms
• Wildlife
• Fitness
• Playing
PLEASE NOTE:   All plans and images shown are examples of how the proposed new school could
look, based on feedback from the space planning—these are not actual designs.

Page 72

Site locations
SITE PLANNING AND SELECTION
How we approached selecting a proposed site 
for a new primary school
An options exercise was carried out 
by Renfrewshire Council to look at
potential sites for a proposed second
primary school.
Five sites within Dargavel Village
Masterplan were suggested to BAE by
the council—sites 1,2,9,10 and 11. BAE
suggested five more sites 3,4,5,6 and 8.
Six more sites were then considered by
the council. These were sites greater
than eight acres and immediately on
the periphery of Bishopton or Dargavel
Village—sites 12,13,14,15,16 and 17.
Seven additional sites were suggested 
by the Parent Council and other
community representatives. 
•  All sites were scored in respect of size,
active travel credentials, ownership,
land use designation and cost, allowing
scores to be assigned and a proposed
site identified for consultation.
•  Scores between 4 and 12 were recorded
with site E1 coming out on top.

Page 73

Site locations
SITE PLANNING AND SELECTION
Ref Site Name
1 Site W7 (Dargavel Masterplan)
2 Site C1 (Dargavel Masterplan—
adj existing DPS)
3 Site A (periphery of Masterplan—
west of Whithorn Crescent)
4 Site B (periphery of Masterplan 
west of plot W11)
5 Site C (periphery of Masterplan—
west of plot W8)
6 Site D (periphery of Masterplan—
west of plot W5)
Key
New School site options
Proposed site
Other options considered
Existing Dargavel Primary School
Village Centre
Access routes
Constructed
Propossed
Ref Site Name
7 Site E  (periphery of Masterplan—
East of Slateford Road)
8 Site F  (periphery of Masterplan—
between Birch Road and railway line)
9 Site E1 (Dargavel Masterplan)
10 Site E2  (Dargavel Masterplan)
11 Site W2  (Dargavel Masterplan)
12 Newton Road Playing Fields, Bishopton
13 Holm Park, Bishopton
14 North of Ingliston Drive
15 East of Slateford Road, Bishopton
Ref Site Name
16 West of Greenock Road, Bishopton
17 East of Greenock Road, Bishopton
18 Ingliston Drive, Bishopton
19 Matey’s Field, Bishopton
(Camphill Gardens)
20 Site W (Parent Council)—
Station Road, Bishopton
21 Site X (Parent Council)—
Gladstone Hill, Dargavel
22 Site Y (Parent Council)—
West of Slateford Road, Bishopton
23 Site Z (Parent Council)—
Ferry Road/Greenock Road, Bishopton
© Crown Copyright and database rights 2024.  
OS Licence number 100023417

Page 74

Site analysis/scoring
SITE PLANNING AND SELECTION
Definitions
Size Active Travel Ownership of land Land use designation Anticipated additional cost of developing
Site is large enough to
accommodate proposed 
scale of school capacity
Site is less than 1km walking
distance from majority of school
catchment residents
Site is owned by RC, 
BAE or other.
*see notes
Site is identified for future
development in adopted
Local Development Plan
This criterion is based on a relatively flat,
unencumbered site with good existing or
committed road access would represent the lowest
cost solution for site development. *see notes
Scoring
Site Size Active Travel Ownership of land Land use designation Anticipated additional cost of developing
PASS = Site is > 8acres in size 3 =  majority of catchment <1km
walking distance
3 = site is owned by RC 3 =  land designated 
for development
3 = no anticipated additional costs
FAIL = Site is < 8acres in size 2 =  less than 50% of catchment
<1km walking distance
2 = site is owned by BAE 2 =  land has no definite status
(eg. Unallocated land)
2 =  either significant earthworks, new road,
additional utility connections required 
for development site
1 =  majority of catchment >1km
walking distance
1 =  site is owned by other
than RC or BAE
1 =  site is allocated for open
space or green belt
1 =  more than one significant additional 
cost required
Sites
Ref Site Name Size Active
Travel
Ownership
of land
Land use
designation
Anticipated
additional cost
Total
Score
Council officer comments
1 Site W7 
(Dargavel Masterplan)
10.9 acres 
= PASS 3 2 3 3 11 Not considered an optimum location due to close proximity
(diagonally across road) from existing Dargavel Primary School
2
Site C1 
(Dargavel Masterplan—
adj existing DPS)
2.5 acres 
= FAIL    
3
Site A 
(periphery of Masterplan—
west of Whithorn Crescent)
5.93 acres 
= FAIL    
4
Site B 
(periphery of Masterplan
west of plot W11)
8.08 acres 
= PASS 3 2 3 2 10
This site has the disadvantage of being accessed primarily via
residential streets through masterplan plots W9, W10 and W11.
This is very likely to result in adverse impacts for residents in these
streets. Although a distinct new road access could be provided 
to Site B this would significantly add to the construction costs.
5
Site C 
(periphery of Masterplan—
west of plot W8)
6.28 acres 
= FAIL    
6
Site D 
(periphery of Masterplan—
west of plot W5)
6.00 acres 
= FAIL    
7
Site E 
(periphery of Masterplan—
East of Slateford Road)
4.50 acres 
= FAIL    
8
Site F 
(periphery of Masterplan
—between Birch Road and
railway line)
4.99 acres 
= FAIL    
9 Site E1 
(Dargavel Masterplan)
8.5 acres 
= PASS 3 3 3 3 12
10 Site E2  
(Dargavel Masterplan)
8.5 acres 
= PASS 3 2 3 3 11 Not considered as optimum a site as E1 due to closer proximity 
to existing Dargavel Primary School
11 Site W2  
(Dargavel Masterplan)
9.1 acres 
= PASS 3 2 3 3 11
Site W2 is closer to planned housing development in Dargavel
Masterplan than site E1. This could lead to impacts on residential
amenity through the planned introduction of floodlighting for the
community sports provision at the new school
12 Newton Road Playing
Fields, Bishopton
7.5 acres 
= FAIL    
13 Holm Park, Bishopton 9.5 acres 
= PASS 1 1 1 2 5
Owned by Community Development Trust and very unlikely to be
available for new school development. Site is designated as Green
Belt in LDP with a presumption against its loss to development.
Planning status could elongate planning consenting process by 
up to 2 years.  Site is relatively remote from proposed catchment.
*Notes
Size Ownership of land Anticipated additional cost of developing
8 acres considered the minimum size required for an 800 capacity
primary school and necessary community facilities. Sites smaller
than this threshold not considered further
This is scored based on the speed and ease of delivery of the
school. A third party owner will inevitably involve negotiations
and costs to purchase (not otherwise accounted for elsewhere)
and lead to a longer timescale for delivery. A BAE owned site is
considered to be quicker due to their imperative to find a solution
to assist future housebuilding but not as quick as a Council owned
site.
This criterion is based on a relatively flat, unencumbered site
with good existing or committed road access would represent the
lowest cost solution for site development. Sites with no existing
or committed road access of a suitable nature or with significant
earthwork requirements will add significantly to the cost of the
development

Page 75

Sites
Ref Site Name Size Active
Travel
Ownership
of land
Land use
designation
Anticipated
additional cost
Total
Score
Council officer comments
14 North of Ingliston Drive 9.0 acres 
= PASS 1 1 1 1 4
Site is designated as Green Belt in LDP with a presumption against
its loss to development. Planning status could elongate planning
consenting process by up to 2 years.  Site is relatively remote from
proposed catchment.
15 East of Slateford Road,
Bishopton
8.2 acres 
= PASS 3 1 1 1 5
Site is designated as Green Belt in LDP with a presumption against
its loss to development. Planning status could elongate planning
consenting process by up to 2 years.  Site is relatively remote from
proposed catchment.
16 West of Greenock Road,
Bishopton
8.0 acres 
= PASS 1 1 1 1 4
Site is designated as Green Belt in LDP with a presumption against
its loss to development. Planning status could elongate planning
consenting process by up to 2 years. Site is relatively remote from
proposed catchment.
17 East of Greenock Road,
Bishopton
8.0 acres 
= PASS 1 1 1 1 4
Site is designated as Green Belt in LDP with a presumption against
its loss to development. Planning status could elongate planning
consenting process by up to 2 years. Site is relatively remote from
proposed catchment.
18 Ingliston Drive, Bishopton 2.3 acres 
= FAIL    
19 Matey’s Field, Bishopton
(Camphill Gardens)
1.5 acres 
= FAIL    
20 Site W (Parent Council)—
Station Road, Bishopton
6.4 acres
(tbc) = FAIL    
21 Site X (Parent Council)—
Gladstone Hill, Dargavel
27.5 acres 
= PASS 3 2 1 1 7
Site is designated as open space in Dargavel Masterplan with a
presumption against development.  Current landform (steeply
sloping site) would result in significantly increased costs of
construction compared to Site E1.
22
Site Y (Parent Council)—
West of Slateford Road,
Bishopton
61.7 acres 
= PASS 1 1 1 1 4
Site is designated as Green Belt in LDP with a presumption against
its loss to development. Planning status could elongate planning
consenting process by up to 2 years. Site is relatively remote from
proposed catchment.
23
Site Z (Parent Council)—
Ferry Road / Greenock
Road, Bishopton
70.4 acres 
= PASS 1 1 1 1 4
Site is designated as Green Belt in LDP with a presumption against
its loss to development. Planning status could elongate planning
consenting process by up to 2 years. Site is relatively remote from
proposed catchment.
*Notes
Size Ownership of land Anticipated additional cost of developing
8 acres considered the minimum size required for an 800 capacity
primary school and necessary community facilities. Sites smaller
than this threshold not considered further
This is scored based on the speed and ease of delivery of the
school. A third party owner will inevitably involve negotiations
and costs to purchase (not otherwise accounted for elsewhere)
and lead to a longer timescale for delivery. A BAE owned site is
considered to be quicker due to their imperative to find a solution
to assist future housebuilding but not as quick as a Council owned
site.
This criterion is based on a relatively flat, unencumbered site
with good existing or committed road access would represent the
lowest cost solution for site development. Sites with no existing
or committed road access of a suitable nature or with significant
earthwork requirements will add significantly to the cost of the
development
Site analysis/scoring (continued)
SITE PLANNING AND SELECTION
Definitions
Size Active Travel Ownership of land Land use designation Anticipated additional cost of developing
Site is large enough to
accommodate proposed 
scale of school capacity
Site is less than 1km walking
distance from majority of school
catchment residents
Site is owned by RC, 
BAE or other.
*see notes
Site is identified for future
development in adopted
Local Development Plan
This criterion is based on a relatively flat,
unencumbered site with good existing or
committed road access would represent the lowest
cost solution for site development. *see notes
Scoring
Site Size Active Travel Ownership of land Land use designation Anticipated additional cost of developing
PASS = Site is > 8acres in size 3 =  majority of catchment <1km
walking distance
3 = site is owned by RC 3 =  land designated 
for development
3 = no anticipated additional costs
FAIL = Site is < 8acres in size 2 =  less than 50% of catchment
<1km walking distance
2 = site is owned by BAE 2 =  land has no definite status
(eg. Unallocated land)
2 =  either significant earthworks, new road,
additional utility connections required 
for development site
1 =  majority of catchment >1km
walking distance
1 =  site is owned by other
than RC or BAE
1 =  site is allocated for open
space or green belt
1 =  more than one significant additional 
cost required

Page 76

Active Travel and school access
TRANSPORT AND TRAVEL
A local priority
•  Feedback from our Space Planning
process and through community
representatives has flagged safe travel
to and from the proposed new primary
school as a priority for parents 
and carers.
•  This will be a core element of 
our planning and will be carefully
considered through engagement 
with parents and carers, as we agree 
a site for the new primary school 
and progress its development.
•  Improvements to active travel will
be made at the existing Dargavel
Primary School, including improving
arrangements for parents and carers 
at drop-off and pick-up.
•  In 2023, the council commissioned
Stantec to carry out a review of Active
Travel Provision at Dargavel Village.
This has recommended areas for
consideration to improve Active Travel
to Dargavel Primary School, and to
consider when planning the proposed
new primary school. You can find 
out more from Officers today.
Active Travel improvements
to consider at Dargavel
Primary School
•  Create an active travel corridor from
Barrangary Road along Arrochar 
Drive and widening footpaths on 
the proposed section of the Western
Loop Road.
•  Erect wayfinding signs to show the
distance from key points on the
footpath and cycleway network 
to the school. Signs should consist 
of distances in metres and time.
•  Provide a temporary car park in the
council owned vacant site adjacent 
to the school for parents and carers 
for drop off and pick up to remove 
the current on-street parking.
•  Construct a footway crossover—giving
priority to pedestrians, over the access
to the temporary car park.
•  Impose a Traffic Regulation Order 
(at school times only), replacing police
cones, extended along  Arrochar Drive.
PLEASE NOTE:   Active Travel improvements may be a mixture of some/all of the above. 
The recommendations will be considered in discussion with BAE.

Page 77

Active Travel and school access
TRANSPORT AND TRAVEL
Active Travel considerations
along the Western Loop Road
(WLR)
•  Provide a 4.5m active travel corridor
(footway / cycleway) on the school side 
of the WLR.
•  Provide a 3.5m wide footway / cycleway
along the western side of the WLR.
•  Link all Active Travel routes (shared
footway / cycleways) with footpaths
within Central Park.
•  Each development parcel must provide 
a safe (and preferably segregated)
footway / cycleway link to the WLR 
of at least 3.5m wide. 
Active Travel considerations
to support proposed new
school at proposed site E1
•  Position the proposed car park to
encourage the least distance travelled
by parents / carers and ensure adequate
provision for bus parking and drop-off /
pick-up.
•  Provide separate drop-off provision 
for buses and cars.
•  Provide footpaths into the school 
of at least 3.5m width.
•  Integrate links from development
parcels to the Western Loop Road and
consider the provision of a controlled
crossing point (Toucan) on the Western
Loop Road at the point of highest likely
demand for pedestrians and cyclists.
•  Provide splayed entries from the
Active Travel corridor to school access
footpaths.
•  Provide School Keep Clear markings 
along the entire school frontage.
•  Implement Traffic Regulation Order 
(at school times only) on the Western
Loop Road.
•  Implement a joint travel plan with 
the current Dargavel Primary School.
PLEASE NOTE:   Active Travel improvements may be a mixture of some/all of the above. 
The recommendations will be considered in discussion with BAE.

Page 78

Active Travel (walking and wheeling)
routes with existing consent
TRANSPORT AND TRAVEL

Page 79

Information Session – scribe template
Date: 8/2/24
Scribe name: Lauren Johnston
Session:  Bishopton Primary (Online)
Council officers present: Gerry Lyons, Wendy McNaught
Liz Marshallsay
Kellyann
Liz
Cathryn Henderson
Rhona
Claire
Fiona Johnston
Kate Roy
Nicola
Laura Hill
Janis Logue
DB
General discussion points
Gerry outlined the wider engagement approach as part of the statutory consultation process. Realise this has not been as effective in the past and want
to do better.  Do this in different ways.  
Shared dates and format of information sessions and public meetings. 
Giving people opportunity to ask questions, get them answered and recorded.
Outlined the statutory consultation process – a relevant proposal needs to be presented.  Propose an opening of a new school for 800 children in
Dargavel, site selection and review of catchment.  We are seeking opinions on these areas.  1 proposal does not mean “a done deal”.  Based on views, a
report will be published and shared with councillors.  Other alternatives can be suggested and put forward for consideration. Site chosen is the one we
are most confident it can be built for 2027. 
Appendix C

Page 80

Identified areas which individuals would like covered in public meetings
Specific questions raised
EY provision
Nursery provision in Bishopton – 73 spaces in council nursery.  Has there
been any discussions about extending. 
Interpretation of responses and scale of consultation
Location and site don’t impact me personally or children.  Risk of delay to
the new build and implications for children in Bishopton.  How are views
being interpreted.  Certain voices perhaps dominating positions that are
not representative.
Geographical opportunities – how wide is the consultation
Consultation outcomes 
800 new primary school – if people disagree what would be the outcome?
Response provided
Will discuss this with the early years teams in terms of capacity and
requirement.
There are a range of different ways to respond and how these will be
interpreted. There is an online questionnaire for people to complete which
are directly about the proposal which are scaled.  This will give us hard
indicators and a range of views will be added to this information. Education
Scotland are also part of this.  There interpretation will also be pulled
together into a report which will be presented to members with
recommendations.
Need a full rounded picture of community view and not just a small
number who are particularly active. Encourage people to complete the
survey.   Anyone can comment on the consultation in Renfrewshire and give
an opinion to make it as open ended.  Stat consultees will have different
engagement processes. 
We would need to look at the extent of the responses and balance.
Concern as representative of the council that beyond Aug 27 numbers of
children cannot be met between Bishopton and Dargavel and we would
need to look further out and we don’t want to be in this position.  However,
we need to be led by community on this.  It is not an election or
referendum.  We are gathering views and then can make a decision based
on wide range of views.

Page 81

How do you decide to go ahead with proposal – must be a cutoff /
threshold 
If decision is for the proposal not going ahead, the proposal goes back to
drawing board.  Rashilea has been put forward as being potential solution
but this is not clear in proposal. 
Long term planning
Interim positions – interim plans for High School.  Where is the longevity in
planning.  Planning permission for another 300 houses, has this been taken
into account 
There is no definitive score.  If people are saying they are not in favour, its
more important to understand why and what proposal is feasible. It doesn’t
come down to a scoring system.  A range of views and opinions are taken
and then recommendations are proposed.  Not about the biggest number
wins.  All comes back down to discussions and a final paper which will be
presented to politicians. 
Proposal paper needs to be presented in a particular way – educational
benefits are presented on the option and we tend not to go into if it is not
successful.  Gathering this type of information through the engagement.  
Figures from Edge Analytics include up to 10-15 years. The proposal we are
putting forward will meet the requirement for primary education for the
long term.  There is a peak that comes and it will fall again as development
settles.  All houses (4322 houses) have been included in projections not just
on current houses.  We are doing regular monitoring of actual and
projected figures, NHS data about births and number of children of certain
ages and early years. So, the Primary planning is a very long term picture
which also includes scenarios.  Secondary is not an interim position. There
is an extension to be built which will take capacity to 2000 and this is
permanent.  In terms of the impact on children, they will have an
outstanding education.  Have been a HT of 2000 and to inform
conversation, we are getting a range of info from schools of similar size so
people get an understanding of benefits and challenges.  Understand
concerns about figures. About a much wider look about the requirements
across the area for the long term.  Plans are also adding to community
facilities – 2 flood lit pitches which will add to football facilities, Arena for
concerts.  Plans enhance community facilities.  Quite substantial long term
planning is in place.

Page 82

Planning contingency re new build
2027 – what is contingency it doesn’t come in on time e.g. pandemics. Will
children be sent to Rashilea.  Regular updates going forward  
Projections
What data has been used to project capacity for new school
Secondary placing requests
Secondary – What year will placement requests be stopped.
Secondary extension
Extension to PMHS – will this go ahead
The programme plan is significant and this is being monitored extensively. 
There is a commitment to delivery and we will keep a close eye on the plan
and have a plan B in place.  Parent council and groups invited to support
what regular updates look like and how often they require them.  We need
to build trust.  We are being conscientious and will engage as fully as we
can.  
Range, nature and size of housing and number of children generated from
size of housing has been taken into account by Edge.  We know the nature
of houses that are being proposed – projections based on pupil yield and
denominational / non-demon yield.  There is a methodology that Edge
Analytics use to produce the projection.  Council team has done same
exercise and came out the same numbers.  Live data is also being taken into
account.  NHS data is given to Edge to take account in projections 
As part of the Education Scot Act there is a requirement to plan numbers
based on young people in catchment.  As we monitor catchment area, we
need to deliver this requirement.  No specific year for stopping placing
requests.  As we move towards peak, we will start to look at placing
requests being reduced and places being capped to catchment only.  The
real driver is based on 1st year as this decision is for 6 years.  The whole
process is run on 1st year cap.   The projections include actual and projected
from feeder primaries.  
This is a firm plan and doesn’t require stat consultation.  Have committed to
come and have more detailed conversation about provision.  Might be
about adjusting catchments to other areas.  PMHS wont get any bigger than
circa 2000.  If it gets to this point, there is a wider conversation to be had
about other schools and solutions.

Page 83

Community facilities
Will these be open to all and wont be shelved – MUGA downgraded
Roll projection question from Liz – adjusted figures – wasn’t clear on
question. Was being promoted by someone else to ask question and lacked
clarity.
Is there a plan B
Bishopton condition
Bishopton – lifespan and resources. 
Secondary
Numbers of pupils from Bishopton/Dargavel currently going to Park Mains.
Along with projected numbers for each year. Based upon the numbers used
by edge
Community facilities will be open to all – not just primary children. 
Regarding teenager facilities and potential implications, this is an
interesting conversation for the council.  Know impact of having positive
teenager facilities.  PMHS extension will also have additional facilities.  
Facilities  are fundamental to design of school and are as important as
classroom space. There will be 2 4G Pitches and are in plans and wont be
easy to pencil through. Building a community facility which is not ancillary
Plan B would be about adjusting catchment areas at other end of area of
the village and the proposal would be to send other addresses to other
schools.  There would need to be a stat consultation to do this and might
need to increase capacity of other schools.  
Current Bishopton comes under wider learning estate strategy and this is
informed by conditions surveys every 5 year.  Work required to maintain
the school including an amount of money that needs to be spent. 
Increased funding to ensure children are fully resource.  Conversations with
estates team and HT are ongoing.  
Provide David Kelly with figures
david.mcisaac@gmail.com

Page 84

Not enough done to improve Bishopton Primary and has never been
rewarded for this and should be high on priority 
Fair and valid point – and has been noted
Any other points / info 
Gerry will be back to wider community council at a later date. 
Information Session – scribe template
Date: 8/2/24
Scribe name: Lauren Johnston
Session:  Bishopton Primary (Afternoon)
Council officers present: Gerry Lyons
Sam Marshallsay
General discussion points
Identified areas which individuals would like covered in public meetings
Specific questions raised
Projections
Edge Analytics – tried and tested model, scenarios based on standard, 140
and 150. Why are you not using 150 scenario given current P1? Working on
slim margins. 2027 wont be met for new build based.  Temp modular
classroom for whole education journey from Primary – Secondary. Need to
build in a safety net regarding figures. 
If there are 3 years of 150 intake, will this be the model taken forward
Response provided
A number of roll projections and scenarios were discussed with the parent.
We are monitoring actual figures twice per year.  We have projections and
it essential that we track actuals.  We have proposed to analyse data after
Census (Sept) and after enrolment (March). This will be the data that
defines the next stages and identify red flags.  Things are different from last
time, projections tell us a lot and live figures are absolutely critical. Looking
at 150 model in 2 primary 1s cohorts.  New set of figures for the whole
estate coming at end of month.

Page 85

When will figures be presented to council?
New school timeframe
New school wont be built on time based on previous experience
Bishopton Primary condition
How much longer does Bishopton Primary have in its lifecycle?
Extension then new build
Why not build an extension first rather than new build? Very difficult to get
lets for community spaces.  It can be built very quickly
Projections
BAE convinced Renfrewshire Council to change the build model.  Dargavel is
exceptional and so the numbers will also be exceptional.
Modular units
If the modular units are not being used, will they be gone or stay in the
playground?
Trigger points for additional options
What is the latest we will need the extension – 1500+ mark, what is the
decision point 
We have to act when we don’t have capacity.  We have things now in place
which will help us identify when we need to and this is different to
previous.
Potential dates to be shared with parent?
Project plan in place which illustrates when the new build will be complete. 
Conditions surveys have been completed.  With some investment, it is
more than suitable for another 20-30 years. There is no intention of
Bishopton Primary not being here in next 20 years. 
We have looked at different models including an extension first and then
new build. Extension will only provide classroom space and not community
space.  It is not fiscally responsible to do the extension first. 
We are saying regardless of the projection range we can meet capacity. 
Numbers do not suggest that we cannot meet capacity.  Have a range and
live data.  Need to look at forward decisions and make it work and have
people to work with us. 
Get answer
Will share this information when a plan is place

Page 86

Site selection
Consultation document –the doc is biased toward a singular option.  Other
appraisals were shut down largely due to time.  E1 – there cannot be no
arguments against in E1.  It is blank.  Where are the negative points about
E1.  Access and roads not being built are the negatives that have not been
documented.  
E1 meets all criteria.  Public consultation gives people the option to explore
other sites however this will delay programme.  The statutory guidance
states you have to put a proposal on the table.  E1 presents no negatives in
terms of getting the new school built by Aug 27.  If people come back in the
consultation that they do not want site E1, we have to take this into
account. We have a responsibility as a council to take this into account.  
Transport consultant has been commissioned to look at all transport issues.
Any other points / info
See council who have repeatedly failed and refused to listen to community.

Page 87

Information Session – scribe template
Date: 8/2/24
Scribe name: Lauren Johnston
Session:  Bishopton Primary (Morning)
Council officers present: Gerry Lyons
David Woodrow
Danielle Cox
General discussion points
Parent raised issue of having to move children to Bishopton due to noise issue with Dargavel – children are hearing impaired.  Both schools have been
very supportive. 
Feel we need to start afresh regardless of previous issues but the children are a priority. 
Discussion about ASN and diversity of needs and how to engage with parents / carers. 
Identified areas which individuals would like covered in public meetings
Specific questions raised
Community facilities 
Is this still going to built and not taken over by new builds?
Catchment review 
Catchment review addresses in scope
Road safety with new primary 
Concerns around roads and traffic with new school being built
Response provided
Plan is still in place to build park.
Addresses and catchment are outlined in the proposal.  Parent was
recommended to respond formally on the catchment address through the
formal consultation. 
Full survey has been completed by external consultant which is picking up
issues.  Report will be available in due course.  The report includes a series
of recommendations for the council to deal with the issues.  Active travel

Page 88

ASN 
Will there be an ASN wing in new school.  Recommend council to engage
with acoustic experts as part of design 
Transport / seatbelts 
Community council raised that there was no seatbelts on buses to Park
Mains.  A bus appeared that had no seatbelts and has continued to arrive
at school 
will be encouraged but pavements are too narrow and so this needs to be
addressed.  New pavements being built have to be bigger. This is a
conversation to be had with BAE.  A drop off car park at current Dargavel is
also being considered as a recommendation. 
There will be spaces but there wont be a specific wing. We are aiming for a
properly integrated approach.  Need to look at planning, facilities, staffing. 
Lenses will be children with ASN.  Space planning team are taking this into
account.  ASN input is going to be very important and should be an ongoing
conversation as school is getting built.  Very good point made regarding
engaging experts and will look at engaging all experts e.g. audio, visual.
Gerry offered to bring parent in as part of the design and consultation.  
Gerry will pick this up with Transport team.
Any other points / info
Joe Donal – audiologist.  Key contact  
First Wednesday in March for Community Council – Gerry to attend.

Page 89

Information Session – scribe template
Date: 7/2/24, 7pm (online)
Scribe name: Lauren Johnston
Session:  Dargavel Primary School – conversation online 
Council officers present: Gerry Lyons, Mrs Farrell, Gerry Carlton
Kasey Paton
Wendy
Amy Ferry
Cheryl Kremer
Yannick
Mr Brown
Lyle Brown
Cheryl Kremer
Sarah K
General discussion points
NA
Identified areas which individuals would like covered in public meetings
NA 
Specific questions raised
Secondary 
The impact on the high school is a concern.  Any information on how this
would be managed would be good
Placements / right to remain
Response provided
The focus of the consultation is on the new primary school site and
catchment.  Gerry has offered to speak to parents / carers after Easter
regarding secondary provision. 
Pupils who are currently attending Dargavel Primary have the right to
remain.  Siblings will be given priority for the primary school.

Page 90

Has it been 100% confirmed that pupils can stay at the current school? And
siblings can also go to the current school?
Transport and secondary provision
Logistics and transport of new school.  Cant separate secondary discussion
from consultation.  Transport is an issue due to PMHS
Catchments and transport entitlement 
Catchments – if you are in new catchment area but wish to remain at
Dargavel, will school bus still be provided due to distance?
Extension to Dargavel and statutory consultation 
Is a stat consultation required for an extension at Dargavel
Accepted this point that transport is an issue. There will be stand at the
information session where transport and travel can be addressed. 
Gerry will respond directly to this question regarding transport.
There is no requirement for statutory consultation on the potential
extension at Dargavel Primary.  This will be fed back to parents. 
Any other points / info 
The questions will be responded to via email to parents.

Page 91

Information Session – scribe template
Date: 7/2/24 – 9am
Scribe name: Lauren Johnston
Session:  Dargavel Primary School – parent conversation
Council officers present: Gerry Lyons
3 parents attended
• David Woodrow
• Gillian Fyfe
• Dawn Millar
General discussion points 
Sessions provide an option for parents / carers to attend a more informal, open ended discussion.
Consultation 
Gerry updated the parents on statutory consultation process.  Must have a proposal to consult on as part of this.  There are 2 parts; build a new school for
800 children and on an identified site.  The second part is about the proposed catchment for the schools.   There is a proforma for parents / carers to
complete.  Rationale for proposal has been based on roll projections and education provision.  Confident that the proposals provides us with sufficient
space.  Council has recognised that there has been error made.  Consultancy brought in to support work on projections.  This is based on 140 intake and
150 intake and this is where the figures have come from for the new school.  Proposal is for 800 however we are aware figures might be bigger and there
are proposals to add additional capacity if required.  This could be extension, modular units and using capacity in Bishopton.   Monitoring figures yearly,
particularly live data as this is more important.  We will look at numbers at census and enrolment (actual and potential).  Plans for new school look great. 
Recognise the stress that families are going through and want to minimise the stress. 
Understand that there are concerns about having a proposal in place and appearing as a “done deal” but this is required as part of consultation and need
to be open to the possibility of looking at different options, sizes, solutions.  August 2027 is our driver and when the new school will be open.  This is in
line with projections.  Parents / carers need to be aware that different options / solutions will impact on timescales.

Page 92

Site
Sites have been looked and assessed on criteria (size of site was one of the main criteria).  Details of sites are outlined in papers.  Options are presented.
Traffic / travel 
Traffic has been raised as an issue.  We have been monitoring this. We know this is a concern for community.  Active travel should be encouraged but
people will continue to use cars.  We need to look at congestion.  Independent traffic consultant commissioned. They have looked at issue around
congestion, access and possible solution.  Council will share detail of this in due course.  BAE are part of this conversation as their will be responsibility on
their part for some of the solution.  Mr. Woodrow raised concerns around consultants being used in the area.  Historically not a great relationship.   
Pitches 
There will be 2 pitches as part of the new Primary school.  There will be community facilities in the new school (e.g. theatre).  Consultation is about
getting feedback from community on these issues.  
Engagement 
Part of our approach is community engagement and to improve on this as part of the consultation process so have given as many options for parents /
carers to engage and feel listened to. We are learning from mistakes. Want to hear what people think who live in the community. 
Dates and approaches were shared on info session and public meetings.
Identified areas which individuals would like covered in public meetings
NA 
Specific questions raised 
Parent expressed that they are very happy with school and in particular
senior management team.  Child has significant ASN and school have been
very supportive.  Child is very much enjoying the school.  
Size of current DPS 
What is the size of current school in square metres compared to new
school
Response provided
Get figure for public meeting in case raised

Page 93

Impact of new catchments and remaining in current school 
If child is here currently, will they be moved to new school as part of new
catchment 
Size of new Primary School
Concerns around proposed size of new school 
What happens if don’t reach maximum projected figure
Secondary school concerns 
Need to start speaking now about secondary arrangements and what
happens as new build communities start popping up. Will this impact on
PMHS 
Children are entitled to stay in their current school but you will have a
choice if you stay in the new catchment.  Any children who have a sibling
will also be prioritised in current school. Some people will be balloting
which is not ideal.  Internal works to increase capacity as current school. 
Pinch point is 2027.  Project plan in place for build of new school. 
There are primary schools of similar size but that would be the largest.  The
size/space of the school is important to ensure that it works for the number
of children.  Figures going into the new school will be gradual.  
We have a range of figures provided by Edge Analytics (not adjusted, 140
and 150).  It will sit somewhere between the lowest and highest.  We need
a plan for the highest projection. 
This consultation is based on the new primary school and catchment and
not secondary.  Communities will have the opportunity to speak more
about this.  Council recognises there are concerns around the figures and
size of school.  Gerry explained his experience of managing large schools
and combining this with experiences of other schools of similar size and
views of parents / carers.  This will be shared and provided in due course.
Need to take account of the other 7 learning communities in relation to
PMHS.  
New buildings / communities might not necessarily be linked to PMHS. 
Need to consider zoning and look at options.  The size of PMHS will be
capped at 2000.  
Gerry has committed to speak to Bishopton after Easter to discuss
secondary and will give DPS parents the same opportunity.

Page 94

Travel / Transport
Transport figures of busing children to Bishopton.  Not parental choice to
send children to Bishopton and so transport should be provided to those
families. 
Additional cars in the area raised – active travel is not always practical.  
School crossing patrollers
Potential location of these going forward
Wider infrastructure and community facilities 
Wider infrastructure issues raised – no health centre, 1 shop, MUGA gets
locked at night.  
Community groups – not a lot available for children in the area.
Learning from current DPS 
Need to take learning from the design of current Primary.
Get costs for public meeting. Transport policy was outlined e.g. over 1 mile
you are entitled to transport however not all will use that.  Questionnaire
will go out to all parents who live 1 mile or less away to understand what
transport would be required.  Responses will determine school transport
requirements.  Independent travel consultant has a detailed report and will
be considered as part of planning.  Range of solutions outlined.  Know this
is a big issue for community. 
Can raise with team
New school proposals will look at what value it can add to the community
in terms of additional facilities.  
Different kinds of spaces to support groups in the proposed new build. 
There will be 2 flood-lit pitches. Facility will be high quality and deal with
some of these issues. Community is a big driver for design. 
School staff have been part of the Space Zero sessions.  Feedback on open
plan design.  There are a lot more dedicated classrooms.  Less open plan.
Some learning plazas.  Can share Space Zero presentations. 
Any other points / info 
Builders have options on land and this is a concern – impact on green space.  Gerry to pick up with Mr. Woodrow
PMHS and new secondary school being built – 20 minute rule. Every resource should be within 20 mins. Idea of building a new secondary school actively
damages feeder school.  It is not an appropriate response for a council but recognise how it would be for individual communities.

Page 95

Information Session – scribe template
Date: 7/2/24 – 9am
Scribe name: Lauren Johnston
Session:  Dargavel Primary School – parent conversation
Council officers present: Gerry Lyons
2 parents attended
• David Woodrow
• Gillian
General discussion points
Sessions provide an option for parents / carers to attend a more informal, open ended discussion.
Dates were shared on info session and public meetings. 
Meeting mainly focused on parent / carer questions. 
Identified areas which individuals would like covered in public meetings
NA
Specific questions raised
Siblings and placements 
What is the position on siblings and P1 intake 
School rolls raised and how many children will be starting in P1.
Response provided
If there is a sibling in the school, the child will be prioritised. 
Statutory position outlined including placing request process. 
Within catchment group first and then siblings. 
42 siblings starting this year and other places are balloted, deferments (15)
and placing requests (8). 
Internal works ongoing to increase the current capacity in current DPS

Page 96

Modular Units 
As roll increases each year – who will be accommodate in cabins.
Parent was offered a tour of the modular units. 
Timeframes on portakabins at Parkmains High School – concern around
children always being taught in portakabins e.g. moving from a cabin in
Primary and the Secondary. 
Roll projections / Edge Analytics 
Is 260 the working assumption for PMHS intake
Initial roll projections different from Edge Analytics and rate of build in the
area 
Capacity 
What is the maximum capacity for current and new school without
modular units 
Cant say what the plan will always be for modular units as it is dependant
on class sizes.  P1 will mainly be in main building and the structure is set up
well for p2-p5.  
Extension is planned to be ready for 2027 – modular provision wont be
required once extension is in place.  It is there currently for flexibility. 
Therefore young people won’t have the experience of always being taught
in a cabin. 
Projected figures for PMHS were provided and S1 intake. 
This figure was confirmed from the roll projection board paper. 
Milestones were outlined in terms of when roll projections would be
reviewed including census and actuals.  
There was a Council team who did the initial roll projections.  Edge is an
expert company working on Dargavel, Bishopton and the whole of
Renfrewshire estate to inform wider strategy.  The internal team will also
compare their figures with Edge figures.  The approach will also take
account of live data.  The data includes 15 years projection so need to
review at least twice a year. 
All calculations are based on houses granted, applied and pending.  4322
houses is the planned amount and Edge have projected based on this
figure. 
Gerry provided written note of max capacities for the parent / carer
DPS 1 - 434 (500) with extension – 634 (700)
DPS 2 – 800 max
Total = 1500

Page 97

New build v extension 
Why build a new school first.  There is an option to extend DPS 1 first and
then explore new build options.   Bishopton is coming to end of life-span –
why not consider a replacement rather than extensions.
Pitches 
Muga pitch and changes to original plans.
Can we push for DPS Muga to be a 3G pitch – gives another community
asset to be used.  
Traffic and Travel 
Road safety a concern – Beat the Street was a positive approach
There have been a number of near misses
Concern that the new build will increase traffic flow in the area 
New secondary provision 
What is the magic number for a new secondary school to be built in the
area
Including Bishopton and potential for extending Bishopton
Expect figures to level out but building to max scenario.
These are all options to consider. 
Based on condition surveys, investment can improve Bishopton Primary
and replacement is not a planned option.  
Plan for new Primary includes 2 3G flood-lit pitches.
Parent / carers are welcome to ask the question on the MUGA pitch.
Traffic and travel – there is an independent traffic consultant reviewing and
solutions will be put in place to improve situation.  Issue is wider because
the catchment of new school is within walking distance and we are going to
do a lot of work to encourage active travel.  Will be available to discuss at
info session.
Consultant is looking at this in terms of the new school as well as BAE as
they have a responsibility.  
Meeting with East Ren / Dundee as there are similar issues with new builds
being in close proximity and how this is managed. 
There is no figure.  We need to look at existing capacity and schools in the
area before considering a new build.  
Any other points / info
Reviewed land out the back window of the staff room.

Page 98

Appendix D
DPS Information Session Evening – 14/2/24
Roll projections
• Concern about numbers in the new primary and are they definitely accurate and what
happens if it is higher than projected.
Health and Safety - Ponds
• People concerned that ponds on the walking route aren’t fenced off – what will be done
about it?
Balloting 
How will the ballots work in 25/26? Gerry explained.
DPS Information Session Evening – 15/2/24
Secondary
• Secondary provision and size of school
• Concern about 2000 secondary school – how will that work.
Catchment
• Concerns around splitting up children from their established groups
• Can we finalise catchments as early as we can before school opens
• Will people get opportunity to move to new and will there be sufficient space to
accommodate
Site
• Site selection – why proposed site was selected and matrix very helpful
• Family very positive about particular site
Facilities
• Will we be able to fit a full size pitch and Muga – Cllr McLaren
• Will it be possible for BFC to store equipment
• Will there be spaces as the current school doesn’t have this
Project delivery
• Will it be finished on time
• Timelines and project going to plan
• Parent with child due to start in 2026 – anxious about future plans, reassured by preferred
option and timetable for delivery of preferred option.
Roads / travel

Page 99

• For the green parkland area around the development this is not being released until 2034 for
access, can this be brought forward as would appear an ideal rural walking/activity area
• Have any considerations been given to widening the roads through the village – The roads
have been created in such a way as to minimise traffic speeds where possible, increasing the
width of lanes encourages increased traffic speeds which is the opposite of the desired
effect.
• Is there any consideration of a temporary drop off pick up area for the two schools and if so
how long could this be in place for and could it be made permanent
• Can we have a route map of the new Bus Service (514) – GH WILL GET THIS FROM SPT
• Active travel – will the routes through Central Park be lit.
• Better drop-off/pick-up at existing school – too busy
General
• Keen to know that the new school will have more traditional style classrooms – child has
hearing loss and keen we have learned from open plan style. Impressed by the space
planning and wondered when construction will start. Child in P1 at the moment and sibling
arriving 2025. May switch to new school if catchment allowed.
• Very positive – what happens when the new school opens in terms of how quickly it will fill,
could it be empty for a spell until catchment settles. Will that impact resource or would
resource be shared with the existing school. Asked about ICT. Son at existing DP school. Loves
it. No active travel issues. Walks every day. Quote – the antagonists will never be happy.
• Will there be an acoustician appointed for the design

Page 100

26/2/24
Info session
Central park development timescales 
Supportive of site and with planning timescales.  Would prefer new schools as closer to house. 
Contingency planning and programme being on time
Concerns around site location
Numbers / roll projections. Right to remain and ballot processes – how is this managed in numbers?
Early years – capacity / space / extension 
Catchments – closer to new building. Management of catchment re Bishopton 
Community facilities
Sustainability of school – make sure it is sustainable 
Plans for site next to DPS1 which was purchased
Very supportive of active travel but pavements are too narrow 
Supportive of wayfaring 
Cordite burn potential name change.
Couple who live next to site E1 – concern over noise and light from floodlights in day and evening.
Were told this would be mitigated during planning application. Expressed view this was dne deal and
not much they could do. Preference is site 1, and split the extra 800 pupils over that site and current
school site (plus C1).
Site location map to be available which links up numbers to site for public (it is on a easel board)
• Greenock Road and Rosalind Crescent – check catchment – should they be in Bishopton 
• Sachelcourt Avenue – missing from new catchment, but not in document 
• Station Lane – is it not a street, is this a new development?
Provisions for teenagers 
Have we got 10 year census data and will this be part of the projections
Use of pitches during school time – lets during school
How long will the building last?  Will it be more than 20 years.

Page 101

Info session
29/2/24 
Site selection 
• Need to choose a second school site that is further out or further away from school –
northern periphery.  Slateford Road site was suggested.  Further away from existing school
and easing catchment. 
• Community members feel that the reason we have gone with preferred site is due to cost –
cheapest option.  
• Extend school – build on greenfield site and merging with Bishopton. 
• Wrong place for school – too busy
• If the outcome of the consultation is against the proposal, does the site automatically defer
to the next highest scored in matrix – point made that the next 2 highest scoring are in
relatively same location and not optimal. 
• Concern over traffic/access to both schools with proposed plans. Feel being rail roaded into a
decision to meet 2027 deadline as other options possibly not achievable in same timescale.
• Fait accompli - site 9 already selected by Council as purchased it from BAE
• Other options should have been offered as part of consultation
• Site 9 is cheapest site for Council to choose of all those shown - others could be achieved but
more expensive
• Schools should not be on same road - going to cause traffic chaos on Arrochar Drive
• Why did Council not push BAE to let them consider other sites?
• A site to north of Village (West of Slateford Road area – site 22) would be preferable;
• Most understanding why BAE suggested sites to west would not work.
• Why not use Newton Road pitch site (site 12) for new school and flip existing sports pitches
to site 9. Could then plan for Bishopton / Dargavel joint PS catchment over time by redrawing
New school 
• Lots of questions about timeline and delivery programme 
• In main, will it be built on time and what is the plan if not 
Facilities 
• When will drop off area be built at existing DPS
• Not enough amenities in Dargavel to reflect Council Tax banding
• Health facility is not adding capacity. GPs are just moving between buildings.
• Concern over lack of early years provision and out of school care (plus general lack of
community facilities).
Catchment 
• Why has catchment been done this way – to merge with Bishopton.  
• Children are in Bishopton but have a Dargavel catchment. Once new school is open what is
their entitlement and how will this affect siblings 
• Parkmains – similar question.  Disruptive start to primary and want to avoid at secondary. 
• Children not getting into catchment school due number of siblings and right to remain

Page 102

Transport, travel and roads
• Will the new school site have off-street car drop off facilities / area?
• Will lessons be learnt by Council from existing traffic situation at DPS;
• Buses dropping off from PMHS already cause significant issues on Slateford Road and
elsewhere
• Not realistic to think pupils will walk to primary school
• Footpaths and active travel links not sufficient
• How long will the construction of the road outside the two schools take
• Suggestion that there is an issue with settlement of the proposed road and BAE have told
residents it could take up to two years for the roads to complete
Other
• Council need to start planning for secondary school provision at Dargavel
• Will Arrochar Drive be the same road width on section still to be built?
• Any thoughts as to how to make the two schools feel connected and to minimise any chance
of division with friends/neighbours going to separate schools?
• Concerns that its already a done deal and its only going ahead based on costs
• Why not close Bishopton and have one big school.
• PMHS union rep posed some question.
• When is the final consultation report due
• Letter drop would be better, difficult to hear about events as child not at a nursery and other
parent missed the Carealot update, though it was provided. Not currently received leaflet.
Not signed up to newsletter. Saw the poster.
• Parent wished his specific views to be captured.  David Gunn – school is in wrong location.
Serous concerns about traffic because 2 sizable schools are so close together.  No concerns
have been alleviated after speaking to officers this evening. Location of school has been
chosen based on finance and not based on optimal conditions for the long term i.e. urgent
school provision required within the next 5 years v a school location that will exist for the
long-term (60-70 years).  Short term choices not long term.
• Impact on St John Bosco

Page 103

Appendix E
Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
Statutory Public Consultation: Dargavel Primary School
Public Meeting 1: Monday 19th February
Minutes of Meeting
Introduction and Welcome
G. Lyons welcomed everyone to the meeting and thanked people for coming. He introduced
the officers who were present:
Renfrewshire Council Officers present: 
Gerry Lyons, Interim Head of Education – Chair
Janie O’Neil, Director of Children’s Services 
Louisa Mahon, Head of Marketing and Communications 
Chris Dalrymple, Head of Facilities and Property Services 
Gerry Hannah, Head of Climate, Public Protection and Roads
Frank Farrell, Programme Manager for Property Services
David Love, Chief Planning Officer 
Introductory Presentation.
G. Lyons opened the meeting with a presentation to inform discussions. He identified 2
principles which underpinned the proposals being consulted on:
How do we get the best for the children?
How will the new school provide facilities which will enhance the community?
He emphasised that the proposal is a relevant proposal under the Act and that alternatives to
that proposal will be welcomed and fully considered/
He summarised the issues which had emerged from earlier discussions and the information
sessions:
• Projections, numbers and pupil data
• How was the site decision made?
• Concerns about traffic and safety
• Design of the new building
• Planning for children with additional support needs

Page 104

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
• Community facilities – what are they and will they be delivered?
• The project plan and will it be delivered on time
• Summary of the views of children
Discussion/Questions and Answers
Q. Can I ask about ASN and numbers of staff?
A. There are a range of plans which don’t tie into teacher numbers per se. All the
classrooms have client spaces and breakout spaces for children to get time just to
themselves, there are spaces like that around the school, particularly important for
neurodivergent children, children who struggle to cope with too much noise, you
know, any breaks in routine. So, there are lots of breakout spaces, there’s one in
every classroom, designed, there are additional ones-, there are support bases for
children to work in small groups or to get targeted support based on the needs, so
they’re built into the design of the school as well. One of the specific matters we’ve
had asked of us is about children who are hearing impaired, so we are going to
involve-, do a bit of a consult with an education audiologist, just to get their view on
things we should definitely watch out for, things we should definitely be building in to
the design of the building.
We have a fundamental commitment to inclusion and to meeting the needs of all of
our children, and that will inform everything that we’re doing here. And anything that
we learn throughout the process, we will feed it back in but some of it is very much
about the design of the building and the outdoor spaces are important from that point
of view as well. So, lots of different spaces, lots of different kinds of bases for children
and we’ll take on board audiology, and visual impairment as well, obviously, it goes
without saying, to ensure that it’s the most inclusive school it can be. But it’s very
much at the forefront of our thinking in terms of design.
Q. And if there are children with higher needs, is there any thought of having extra
space for people who can’t be accommodated in a mainstream school, or not in the
whole, sort of, big picture of things here? Is that just not going to happen?
A. Yes, so fundamentally we are committed to a presumption of mainstreaming, that’s
the policy of the government and we work to that policy. And we actually are very
much of the view that if we can have our children in mainstream schools, that’s where
they can be. However, through our planning process and the Staged Intervention, if
there are children for whom that’s not appropriate, we have a range of other options
that we can use.
Q. What plans are there for teachers anyway in terms of, will they get some training for
kids with additional needs?
A. I think, challenge in Scottish education around additional support needs, and our
teachers are having to cope with an increasing number of children with additional
support needs of a wide variety, actually. And certainly, the Morgan Review, which
looked at additional support needs-, one of the big things in the Morgan Review was
the importance of workforce development, about supporting staff in schools so that
they feel equipped to support all children. We have made massive strides in inclusion
in Renfrewshire in the last two, three years in terms of building our Staged

Page 105

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
Intervention policy, and then wrapping support and teacher training around that.
We’re going to continue to do that and we will continue to grow our expertise and our
understanding of all of that. To me, that’s right at the heart of our policies, that’s not a
Dargavel issue, per se, that’s a Renfrewshire Council issue, and that’s an all children
in Scotland issue.
Q. How do you feel you’ve got your predictions this time right, compared to the last time
that was a complete and utter mess?
A. So, there are a lot of aspects of the answer to that question but all of them are
equally important. One is, try not to make the same mistake twice, you know, we
don’t want to find ourselves in the situation, we know the pain it has caused. You and
I had a big chat about that the other night, the pain that was caused to the community
by the last exercise and we’ve really looked closely at why that happened. We’ve
been working with a consultancy called Edge Analytics and all the projections that we
have for the new schools, and for primary provision in the area, have been developed
by them using a model that they’ve used across the whole of Britain. So, what that’s
giving us, is a range of numbers-, so they have their own model, which took us to
1,131. We then asked them to do the same exercise from a starting point of 140 in
primary one and that took us to 1,300. And then we asked them to do that with the
basis of 150 at the moment in primary one, and then used their model from that
starting point, and that took us to 1,500. This is not a definitive position, that we know
the number, we don’t know the number, but we believe that the number will sit
somewhere between that 1,100 and that 1,500, but we are putting in plans if it gets to
1,500.
These the numbers as they are at the moment, so you’ve got 434 in here, as a
capacity. With the modular classrooms at the moment, it’s 595 that you’ve got in the
building at the moment.
We’ve got 595 children in Dargavel Primary, we’ve got Bishopton Primary at the
moment that can accommodate at a maximum 519, it’s not there yet but that’s the
maximum that they can have. So, with current provision, we can get to 1,100, which
buys us the time to build the new school. August 2027 is a crucial point because at
August 2027.
When you build the new school, the calculation is done on the basis of a new school
of 800 and this school at 434. We could stretch it to 500 but that’s using every space,
and using every nook and cranny, so we prefer not to. So, at that point, Bishopton
isn’t part of the projections, it’s a separate projection for Bishopton Primary. You then
have a situation where between that 800 school and this school, you could potentially
accommodate the 1,300. However, if it goes to 1,500 we have the option of
extending this school so that we can accommodate 1,500 between the two Dargavel
Primary schools. We think that between the two Dargavel Primary schools we have
planned we can meet the numbers that are projected but we have plans, and if the
plans go beyond 1,500, and we’ve got no indication that they will, then Bishopton
Primary still provides additional capacity for us if we need it. So, the difference I think,
is two-fold, one is, the projections are more detailed, two is, there’s a plan B, there’s
a plan C.

Page 106

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
The other part of this which is really important is projections, inevitably the longer
time goes on, become less reliable. You’ll know that, so the other part of this is that
we are also monitoring the live data, so we’re monitoring the number of children in
the schools every year and we’re going to do that, we think twice a year, there’s still a
bit of discussion around that. But it feels to me that the right way of doing that is after
census, so we take a census of all schools in Scotland in September, and that tells
us how many children are actually in a building, it also tells us how many staff are in
the building. We then have the enrolment process, which happens between January
and March, depending on the sector, and we will take the figures again, and that will
tell us who looks as though they’re coming, and we will measure that against the
projections. That will allow us to make decisions if we think it’s starting to look more
than we thought, or indeed less than we thought, so we think we’ve covered much
more.
Q. You’re saying that the total numbers are 1,500 roughly, is that inclusive of all the
children going to Bishopton Primary and not just the two primary schools within
Dargavel site? Or is that inclusive of all children?
A. That’s the Dargavel children because that’s what we have to accommodate with the
building of the new school.
Q. What are the current combined school rolls for Bishopton and Dargavel at the
moment, and what’s the current capacity for the two schools?
A. At the moment, you’ve got 595 in here, and 450-ish in Bishopton.
Q. Sorry, is that the occupancy?
A. That’s the occupancy, we committed to Bishopton Primary that we wouldn’t take them
above 519 and we’ve got the 595 here. We can extend that a bit, via, if we get the
work done on the acoustics in here, we could potentially add in another modular
classroom which would give us another 25.
Q. You don’t anticipate within the next three and a half years that the existing capacity is
going to get breached?
A. No, 2027 is the time, if we don’t have the new build up by 2027, we’ve got an issue
because the statutory requirement on us is, that we meet the needs of all catchment
children. And that means, they either go into their catchment school, which is where
we will end up, but if they don’t get into their catchment school they get offered the
nearest available school. Up until August 2027, that is Bishopton Primary, beyond
August 2027 you go beyond Bishopton Primary, you start to bring in Rashielea Primary
as another one. So, we don’t want to get to that stage, that’s why August 2027 is so
important
Q. How confident are you about the speed of housebuilding and occupancy?
A. All our projections are based on the final figure which is 4,322 houses in this area and
the projection model used by Edge Analytics, which has now been mirrored by our
own team, takes in number of houses, number of children per house on a formula,
NHS data, migration into the local area.

Page 107

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
the other thing to think about is just the rate of housebuilding, so ultimately that will
be continually monitored to ensure that we are having a live data account of the
occupancy of these units that are coming forward. The market might change, if the
economy changes, you know, the housebuilding might slow down, it might speed up,
so it’s about making sure that we continually monitor that on a live basis to ensure
that we know what’s coming forward and what’s being occupied.
Q. My view of that is, that’s unacceptable, we can’t have kids from Dargavel coming
here, coming to the new school and actually if they don’t get in to either of those
schools, they go to Bishopton. Or actually, if they don’t even get into that school they
go to Rashielea, like, we can’t even get to that stage, that shouldn’t even be on the
radar.
A. The radar doesn’t go much beyond 1,500 because that’s a what a projection has
given us as the very, very maximum. Edge Analytics and ourselves believe that the
number will be less than that, we are pretty confident about that but what we can’t do,
What we cannot do is take a position of, in any eventuality, us not knowing what to
do. So, all I’m trying to show you there is not what we think will happen-, if you say to
me, what do I think will happen, I think Dargavel village will be served by two primary
schools, and those two primary schools will accommodate all the children that live in
the village, I believe that’s what will happen. That’s what the basis of this proposal is
but it’s incumbent on us to learn from the last experience, so that we’re saying, ‘So, if
not, and it gets to that, do we have a plan?’ ‘Yes, we do.’ ‘And if, despite everything
telling us it’s not the case, it goes beyond that, what then?’ So, all I’m trying to do is
give you comfort, which is, we’re going into every single possible scenario but we’re
planning on the scenario which we think is the one that will come through, which is
the two primary schools meet the requirement.
Q. You’re talking about roll projections, does that take into account the fact that,
potentially in the future, there could be more than 4,322 houses built? I don’t know.
A. Yes, so there are 4,200 houses consented as we currently sit, you know, ultimately
the developer can’t exceed that without coming to the Council for further planning
consent. So, if they come to the Council for further planning consent, at that time
that’s when the consideration is then, you know, ‘Do you give them permission, and if
you were to give them permission, what is the impact?’ So, ultimately, we’d be going
to our education colleagues to say, you know, ‘Here’s another proposal, how do we
deal with that? Is there capacity? What is the mitigation? Should that be, you know,
even considered? That further consent is informed by a conversation about
education provision.
Q. Is that the BAE’s consent?
A. Yes, that’s the BAE’s consent, so that’s the planning consent and that’s what they
have in their overall masterplan.
Discussion followed about numbers and how they might be calculated or responded to:
Q. Because there are 2,000 houses still to be built, which is equivalent to 500 kids at the
current rate. Has that been built in?

Page 108

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
A Gerry Lyons: Yes, so the current rate is about 800, another 500 will take you up
closer to that 1,300 that we think is the optimum figure. Yes?
Q. Jack Clark: Yes, so, I’ve got a couple of points I want to make. The first one, just
following on from the point about, sort of, roll numbers and things like that is, that you
said that it will be between 1,100 and 1,500, so you’re projecting for it. But that’s still
quite a big disparity in terms of pupil numbers, I mean, if I take the primary school
that I went to, you know, 400 pupils is four times the size of the whole school that I
went to. So, it’s a big number of kids, and I was just wondering what provisions were
in place in terms of individual class sizes, to try and keep them around, sort of, 30
and under (Timecode: 00:40:00) pupils, and about teacher numbers and things?
What plans are in place and what were you thinking of doing with that? The other
thing, just around a similar, sort of, theme is, you’ve got this methodology for
projecting how many kids are going to be in the school and that, and you’ll take your
high, low, median. Is there enough confidence for that for going into other schools? I
realise it’s a bit tangential but about projecting that and if there are schools in future
going to be built, or in new estates like where I stay, in Paisley, we’ve got the
Hawkhead village that’s just been built and-, 
A. Gerry Lyons: It’s actually not tangential, I’ll take that point first if that’s okay,
because we are now in a place, in Renfrewshire Council, where we’re looking at the
whole learning estate. In one of the exercises which is just about to be shared with
us, Edge Analytics have done projected rolls for all of the schools in Renfrewshire
Council, so that we can see, you know, how it all fits together, what the numbers are
coming forward, and that will inform planning, which Janie will be very much leading,
in terms of the learning estate, with all the colleagues round this table. So, that’s not
just primary, that’s primary and secondary to inform learning estate planning, so
that’s not a tangential point.
Q. Is, or will that data be available?
A. Yes, absolutely, to go back to your first point, class sizes have statutory limits
associated with them. So, primary one is a maximum of 25, primary two to four is 30,
and primary five to seven is a maximum of 33. Again, we would be at the very top
end of the occupation of the school if we were getting to numbers like 33, but those
are the, kind of, statutory maximums. The schools will not open full, so they won’t be
at those maximums but again, they will be decisions made by the Head Teachers of
the school, who, for example, might decide to make a class where the children are
blending and working really well together a bit bigger, to enable them to make a class
where the children have a few more challenges a bit smaller. We leave that with the
Head Teacher of the school to decide.
Q. Regarding the numbers, and just jumping back to Bishopton and Dargavel, well
Bishopton, because it’s one village ultimately, Dargavel’s just a different area. Can I
recommend that you don’t just look at Dargavel’s side in isolation and that you do
look at Bishopton? The demographic of Bishopton has changed dramatically, Mr
Woodrow, you’ve been here a long time, I have as well, I grew up in this village,
when I was a child this was classed an old person’s village. It is not that anymore, it
is young, it is a young person’s village. It needs to be taken into consideration. I think
if you’re only considering Dargavel and not looking at Bishopton, and you think

Page 109

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
there’s this gap in capacity that can be filled by Bishopton, we could end up in the
same situation again.
A. Yes, we have projections for Bishopton as part of the wider learning estate planning,
so we’ve got that, so you don’t need to think that we’re ignoring Bishopton, we’re not.
The only point I’m making about Bishopton is the fact that it’s involved at the
moment, and when does it stop being involved?
43 will be the number in primary one in Bishopton once the new Dargavel is built. It
has capacity for double that without the school even needing to be have any
consideration of extending. It’s not out of the question to extend it, as well, so we will
keep Bishopton under review as part of the wider learning estate, I suspect that won’t
be my issue but it will certainly be Janie’s. But it’s really helpful for us to hear that
because you understand this community better than I do, you understand it much
better than I do.
Q. What’s the current primary 1 in Bishopton Primary? How is it affected by Dargavel?
A. 100. It will be 43 once the new school is built. However there will be capacity within
the school in the event the numbers grow in future years.
Discussion: There was then an expanded discussion about facilities and activities for
teenagers in Bishopton. Concern was expressed about this leading to young people
vandalising the area and residents stressed they would like that taken into account.
This led into a discussion about the numbers for Park Mains High School and the possibility
that the planned extension would not be big enough and the same problem would arise as
the original problem with the primary provision. 
As this is not in the scope of the consultation, it in not outlined in detail in the minutes.
However, the discussion is contained in the accompanying transcription of the meeting.
Q. I know obviously there’s a lot more data analytics going on there but is there now
more consideration to put in more listening to people that are actually on the ground
doing it, rather than just sitting and going, ‘The computer says I fit 12,000 people,
that’s it’?
A. When you’re looking over the independent reports and the feedback you’ve had from
independent organisations, then you sit and talk to David, you talk to parents, you
talk to the Parent Councils, the recurring message is, ‘We told you things and you
didn’t pay attention. We told you things and you discounted them. We told you things
and you put them in the bin.’ We do not want anyone saying that about Renfrewshire
Council, so we’re in a position just now where we’ve got this proposal on the primary
school, but it’s much bigger than that. It’s the start of a more, I think, exciting
approach to community engagement, a more engaged Council, I believe, a more
engaged group of services, because all these guys round here have all been very
clear, ‘We want to know about this, we want to get it right.’
So, we will finish the consultation and it will be what it will be, it will not be the end of
the process, we will keep coming back to you with our progress, we’ll keep coming
back to you with what we think the numbers are looking like, and we will invite you

Page 110

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
openly to tell us what you’re finding, what you’re thinking. And all of that will be
meshed together so that we continue to plan effectively to meet the needs both of the
children, the families and the community. But we can’t do that ourselves and we don’t
want to do it ourselves. We believe that the figures we’re getting are right but if
someone comes along and says, ‘I’m telling you, there’s a lot more kids appearing in
that village than we thought,’ we’re not going to say, ‘No luck, the computer said it’s
not that.’ We won’t do that.
Q. Yes, tell me about the design process and how the community will be kept informed
of how the design is developing?
A. I could take that, we discussed this last Wednesday. The design process follows a
rigid process itself, it goes through-, they’re called RIBA stages, architectural stages.
Right now, we are at the point where we’re trying to appoint a consultant. So,
consultant architects, consultant engineers, we’re appointing them to try and get
ahead of the game, obviously, so that when we do have the consultation process
complete we are ready to start on a design. So, right now there isn’t a design as such
because we don’t have a site. The design process as you see from the timeline up
there, we’re saying that we will be on site for, I think, June, approximately 2025 and
we’ll be finished by August ’27.
Q. So, that’s construction commencing June ’25? And that’s based on the proposed plot
that you have just now and not a different plot, I assume?
A. That’s based on something as a starting point, yes. July ’25, sorry.
Then July ’25 to August ’27 is the construction but there are design processes before
that
Q. How will the community be kept informed of what is planned to be built or proposed
to be built?
A. It would be similar to this I would imagine, it would be something we discuss with the
client, which is education, Children’s Services, they would come to us and say, ‘We
want to have, maybe, presentation sessions with boards, this is what we’re
proposing.’
It’s the same answer to that last point that you made, how do we feed back to the
community? So, Community Council, separate forums, I think we need to have a
conversation about what the right forums are, where you want to hear from us, where
you want presence from us. Those types of forums we can absolutely bring back
design as it progresses.
One of the questions that we asked about in terms of what we’re looking for from an
architect, ‘Is an architect just prepared to come along and talk to the community
about their proposals, the designs and how it’s all going to fit together?’ So, we will
keep that process going, so that you know when we move from what effectively is
concept planning at the moment, to more detailed design planning and what that
looks like, and that’s something that we can just get feedback from you on the best
way to share that. Would that be a, kind of, open evening or, you know, actual-, I’ve

Page 111

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
not got the answer to that but I’m happy for you to give me the answer and I’ll make
sure that all my colleagues here know about it, for you. 
Designers we look at, obviously, one of the questions we put to them, they have to
experience in building-, obviously not building schools but engagement process, and
understand the engagement process, the consultation process, and that was quite
high on the questions we set. So, we don’t propose to bring every single consultant
to meetings, that’s not going to help, but the lead consultant, the designer, is who is
probably most appropriate and the best one to actually discuss any specific
questions, queries. They would bring these, sort of, designs to these sessions.
Discussion: How can we do things differently to get more people engaged in the consultation
process?
Details in the transcription pages 26-29
Q. Is there the possibility of the MUGA being upgraded to a 4G pitch?
A. Honest answer, I don’t know, we can have that conversation but I don’t know.
There then followed concluding discussions about the importance of on going community
engagement as the project progresses.
Peter McColl stressed the importance of people expressing views through the formal
consultation process as that was the only way to be sure that views will be heard.
The meeting was then brought to a conclusion with thanks to everyone for attending and
taking part in the discussions so openly and respectfully.
G. Lyons

Page 112

Appendix E
Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
Statutory Public Consultation: Dargavel Primary School
Public Meeting 2: Tuesday 5th March 2024
Minutes of Meeting
Renfrewshire Council Officers present: 
Gerry Lyons, Interim Head of Education – Chair
Janie O’Neill, Director of Children’s Services 
Louisa Mahon, Head of Marketing and Communications 
Chris Dalrymple, Head of Facilities and Property Services 
Gerry Hannah, Head of Climate, Public Protection and Roads
Frank Farrell, Programme Manager for Property Services
Alasdair Morrison, Head of Planning
Introductory Presentation.
G. Lyons opened the meeting with a presentation.
Welcome to all of you and thank you for coming, it’s great to see so many of you here tonight. If I can
just introduce myself, for those of you that I’ve not met before. I’m Gerry Lyons, I am interim Head
of Service for Children’s Services in Renfrewshire Council and the lead for this statutory consultation,
I will be leading and chairing proceedings tonight. I have a range of colleagues with me who you’ll
meet as the night goes on, I’m not going to introduce them all just now but they’ll introduce
themselves as we go through the proceedings tonight. We also have representation from Education
Scotland who is here purely as an observer and will not become involved in any conversations, that’s
not Education Scotland’s role, it’s to observe and to evaluate the process, and to give feedback, so
that’s the way that will work from the Education Scotland perspective. 
I’m going to open tonight with a very short presentation because tonight is really not about you
listening to me or to anyone else but much more about you getting a chance to-, for us to listen to
you and we know that’s not been something that has been done in the past particularly successfully,
but we are very determined to rectify that and to take a listening position on all of the issues, as far
as we possibly can. So, let me just, kind of, introduce then-, and although this is a proposal which is
very practical, the building of a new school in a particular place and a series of catchment areas, I
think it’s worth taking some time to reflect on what sits underneath that, and to hold on to what sits
underneath it, which are these two things here. That firstly, we want to deliver the highest possible

Page 113

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
quality education provision for all of the children, and that’s both now and in the future, there is a
pressing element to this and I’m sure we’ll talk a bit about the pressing element of it. So, we have to
deliver for the children now, but we also have to deliver a facility that, in whatever number of years
from now, is still worthy of those children, is still giving them an environment where they can learn
and achieve their potential, so those are the two joint commitments to the children. 
The second principle is one which is really important to us and has been really important to loads of
people we’ve spoken to, which is that community commitment, the facilities for community use
which enhance the community of Bishopton and Dargavel. Already we’ve had lots of feedback from
people saying that that’s something that’s really missing at the moment, that’s a real miss, and also
that we set out on that road before and never really delivered that. One of the important principles
is that both of these things are fundamental to the proposal. One is not ancillary to the other, they
are absolutely fundamental and therefore our intent is to deliver on both of them. So, tonight is, just
for the context, a public meeting, it sits within the statutory consultation guidelines that are set out
by the government, and we have a set of outcomes linked to those principles that we want to deliver
tonight. The first one is that transparency, and again, that’s been a criticism in the past, that we
haven’t been as transparent as we could be, and tonight we are going to-, and throughout this
process actually, it’s been a real guiding light for all of the officers involved, that we are transparent
about facts and if we don’t have facts, about going and getting those facts, and bringing them back.
About the constraints that exist and that we have to accommodate within this process and the
challenges that we face, and some of those are challenges which impact very directly on you, if not
all of them. So, we have to be open about that and help give a genuine picture of the situation
where we are. 
We want to listen and we want to understand the lived experience, which for a lot of you has been
very upsetting, has been challenging, and has made you very angry, and we get that, but we want to
understand it better. We want to hear the widest range of views and part of this whole approach has
been to get as many different ways that people could contribute as we could, so that we could hear
from as many people as possible, and all the views that exist, both within the community and across
the whole of Bishopton. What are the concerns and what are the thoughts? Again, so that we can
inform what we’re doing by those. A statutory consultation has to start with a proposal, and we do
have a proposal, but it is open to alternatives and to the possibility that there’s a better way of doing
this, and we need to hear what those alternatives might be, so that we can give them consideration
prior to any decision making. We want tonight to be a positive experience for everyone and I’m
aware, and I’ve had it told to me in other sessions that we’ve had, that previous public meetings
weren’t necessarily positive for people. We want tonight, whatever happens and whatever you feel
about the outcomes, that at least you feel it’s been a positive two hours of your life, and that it was
worth coming along. So, we want that for everyone tonight.
So, the way we’re going to organise the session, we’ve got this quick introduction from myself, we’re
then going to split into two groups. The first group will go next door and they will work with Gerry
and Alistair Morrison to talk about the site, transport, and all issues associated with that. Those
people are the people that are responsible for delivering on those issues, so they’re the best people
to talk to. The second group will stay here with myself and we will talk about catchment areas, roll
projections, admissions, all the, I suppose, education stuff. You’re not tied to any of those, you can
talk about anything you want but those are the, kind of, focus. We’ll do that for about 35 minutes,

Page 114

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
give or take, we’ll then have a quick comfort break and I’ll go next door, and Alistair and the team
will come in here, and we’ll have the second workshop where we swap round the areas of focus.
We’ll then come together about 8:40 for any final questions or any final comment, or any issues that
you wanted to hear about that you’ve not had the chance to hear about. The whole design of the
evening is about giving as wide a range of information and fitting in with those outcomes that we
identified. 
The ethos of the meeting and how we want to conduct the meeting. We want it to be open, so if
you’ve got something to say, it’s right and proper that you say it, I don’t want anyone to feel that
they can’t say whatever they want to say, and that there’s an honest exchange of views. You will
probably disagree with each other, that’s absolutely fine, but that is open and honest, and well
intentioned, and holding on, I think, to those principles about getting it right for the children and for
the community. We want that done with that backdrop of mutual respect and a civil way of going
about our business, and that as chair, is something that I have responsibility for, to chair in a way
that makes sure that that’s intact, that we hold on to finding solutions and looking forward, but not
in a way that disregards what happened in the past. What happened in the past is absolutely
relevant and still live for so many people, but we want to try to, kind of, give credit to that, recognise
that, but also say, ‘Right, so what do we do differently moving forward?’ Lastly, that if you ask
something we don’t have the answer to, we are going to tell you we don’t have the answer, but we
are going to commit to finding the answer and bringing it back to you, so that there’s not a, kind of,
waffling our way round things we don’t quite get. We are going to be honest and say, ‘I don’t know
the answer to that but we will commit to getting it to you, and when we’ll get it to you.’ So, that is
really how we want to organise the evening and hopefully run the evening, I hope you’re all
comfortable with that. 
Let me give you a wee sense of what we’ve heard already and that may be something you’ve heard
already, if you’ve been at information sessions, so apologies for that, but it maybe sets a scene for
some of the discussions we’re going to have. One of the biggest conversations we’ve been having is
about the numbers, of course that was one of the biggest issues the last time, if the not the biggest
issue. So, ‘Are the numbers accurate? How are we making decisions? Are we thinking through all the
possibilities?’ We’ve had quite a lot of chat about that. The site decision, there is a site matrix, we
have gone through a scoring process, Alistair will talk to that and answer any questions about the
site matrix. The decision-making process is outlined in the booklet that you can take away with you,
and the timing. 
Consistently what I’ve said, and I’ll say it again this evening, is that August 2027 is a key date for this.
We have primary one parents who are having the location of their child’s education, and primary
one education, decided by a ballot. We want that situation to exist for as little time as possible, it’s
on us that it does exist, so there’s no hiding from that fact, but it’s not where we want to be. I’m
very aware of how important that is to all of you, and you want certainty. August 2027 is a key date
for us because until then, we can manage the primary one numbers between Dargavel and
Bishopton. By August 2027 we can no longer do that and the schools would then extend out to the
next nearest school. We want to avoid that scenario at all costs, so timing has been one of the things
that is driving our position on all of this. We know there have been huge traffic and safety concerns,
we know there continue to be huge traffic and safety concerns. There was a conversation the other
night about a temporary drop-off zone in this school, and you’ll get more detail of that this evening

Page 115

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
from Alistair and from Frank. I had my first meeting today about the scheduling of that temporary
drop-off zone and when it will be ready, and when it will be available for use. It was a very early
discussion and Frank and Alistair are far better positioned to talk about that than me. 
We can talk about the design of the building, we have tried to learn from the experience of this
building, and the experience of people who work here and who learn here, and they’ve been
involved in our conversations about the new building. We’ve heard so much about community
facilities, you know, the MUGA that’s in this school, which was never what people thought they were
getting, about the importance of a sports pitch, sports facilities, those facilities that allow people to
have clubs and have societies, and all of that kind of stuff, so we know how important that is. 
Questions and Answers
The meeting was organised into 2 workshops led by different members of the Renfrewshire Council
Team.
Workshop 1 Group 1- Pupil Projections; Project Plan 
Workshop 2 Group 1 – Choice of Site, Traffic and Transport Issues
The 2 workshops are minuted separately.

Page 116

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
Workshop 1 Group 1
This workshop was led by Gerry Lyons Interim Head of Education; Chris Dalrymple Head of Facilities
and Property
Q. As I mentioned in the notes that I sent to you, at this stage we’ve had Space Zero, we’ve had
all the consultations and presentations, at this point in time it’s words and objectives and
what have you. To make a decision, in my mind, on things like basic designs and drawings
should be so that people can look at that detail. Not just a whole load of words, and there
have been a lot of words so far. You mentioned there that there’s a decision going to be
made towards the end of March.
A. The consultation process finishes at the end of March, the actual decision in terms of
starting the process will be made on 23rd May.
Q:  Yes, but what is that decision going to be?
A The decision will be that the board approves the building of a new school, what site it should
be on, and that the catchment areas are whatever they are at the end of the consultation.
So, that will be the decision. That starts a process that, you know, Frank and colleagues will
lead around those design issues that you talk about, and that will be an important part of
the process because that’s when you start to see, ‘What’s this thing going to look like?’
You’re right, that’s vitally important and we want the community to be able to influence that
as much as possible, but that’s the, kind of, end of a statutory process that says, to a date-, it
should be six weeks, ours has lasted about eight weeks. Then a final report, then a report
from Education Scotland, which they take about three weeks of work to do, and following
their report, there are then three weeks for us to consider what they come back to us with.
I’m looking at my colleague over there just to see that I’m saying that properly. Then we put
that to the board, the board decision is the start of a process, not the end of a process, if
that makes sense.
Q. From the green light going ahead to this school opening, what was that time frame? You
guys don’t know the basics?
A. I can give you an idea of some of the issues with the timeline for this, this was slightly
different because it wasn’t built by Renfrewshire Council, it was through BAE, and they
appointed their own contractors, their own design team. It was through part of the COVID
period, so that timeline that you see, it took quite a bit of time to open. It shouldn’t impact
on this new school because we shouldn’t have, obviously, a pandemic. So, it’s slightly
different, this is obviously 400, 440, we’re going to build an 800 school, it’s a bigger (talking
over each other) entirely.
Q. Well, give us an estimate of a school that you’ve built of the same size without COVID.
800, well, we’re looking at two years’ construction, that’s for the new school.
So, that’s construction, what about the full design phase and the ordering of materials etc?

Page 117

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
So, if it’s two years’ construction, how long for design and material order?
A It’s basically when we get the consultation approved, we get the go ahead to basically build
on whatever site it is that you want, presumably. That date which we’ll probably say May,
when is the consultation approval?
So, May 24th is the decision, the technical design conclusion will take place from July to
December 2024. You’ve then got planning application, am I right in saying that takes about
20 weeks?
Q. Not a lot of room for error in there, is there?
Tight, I don’t think it’s achievable.
Q: If I could just drill into that a bit too, I think. So, looking at the programme that’s in the
(inaudible), a couple of things jump out to me, I’m just curious as to the logic behind it. So,
starting with the programme, we’re looking at March now, so detailed design will be now,
architects appointed this month as well, why are you putting detailed planning in at March
’25?
A. Because we don’t have enough important planning information to go on, we don’t think we
have enough detail.
Q: But your engineers, main contractors, your feedback from technical design, if they’re all
dealt with before that, it’s a very unusual move.
A: I would qualify that by saying this is indicative timing, if we can get the consultants
appointed earlier, the planning process might commence earlier.
Q. It strikes me that there’s a strategy there, in the public domain, which planning has to be,
that you give us three months as a community to comment against that planning
application. If it doesn’t go ahead at the eleventh hour it’s all the community’s fault because
August ’27 is a key date, do you understand?
A. It’s not meant to come across like that, that was never the intention, I’m sorry you read it
that way, that’s not the case at all.
A: I think there’s an important element, just on one of the things you said, that I want to come
back to. We do not have any intention in operating in a way that says that anything that
doesn’t go as we wish it to go would be the community’s fault. That’s not what we’re trying
to do here, if the community tell us that there’s something better and something they would
prefer, we’re going to respect that. If it doesn’t fit in with the timeline that we’d hope for,
then fine, but that won’t be about fault, that will be about saying, ‘Full transparency, full
recognition of what people are saying.’ If you say to me, ‘August 2027, Gerry, is really
important to you but it’s not as important to this community, we’d rather stretch it out to
August 2030,’ then I have got to take cognizance of that, and I would not be saying for one
second, ‘Well, if it’s not dealt with by August 2027, that’s your fault.’ Because that’s not the
way we want to go forward. So, I know the point you’re making, I just want to pick up that
wee issue about fault.

Page 118

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
Q. No, it’s fine and it’s a valid point for the room, my point isn’t about blame, it’s that the
process doesn’t seem right, it doesn’t follow any project I’ve ever seen. Detailed planning is
something we try and tick the box off early, to make sure you’ve got your consultants, your
community, your engagement, your public-, you’d have the look, the feel, the size, the
quantum, you’d have all those things done by technical design. Second to that, there are two
years for the design, sorry not design, the delivery, only delivery of the project, for the
school. A school that size averages about 78 to 82 weeks.
There are about six months of a difference there between the two years and the eighteen
months. If you had a rejig of the programme, you’d have a lot more time there, I think, to
look at site selection, community engagement and the benefit of what we want as a
community, rather than what feels a little like racing to a programme that looks very busy.
Key points, we’ve got to get to the solution that works because I do agree, August ’27 is a
very important date. I do not want to see any child failed in the education element of this
community but it just feels really quick to race through this, given that I was here a year ago
when we were talking about site selection, and we’re still talking about trying to get this
work the best route possible. So, I’m not pointing fingers, I’m asking simple questions as to,
Is this the right programme? I don’t believe it is but there’s enough time there still to look at
it, change it, and see, ‘What do we want? What can we bring and what can we contribute?’
A. If I can just intrude, so my name’s Chris Dalrymple, I’m the Head of Facilities and Property
Services, so Frank and I will work closely together I think as Gerry’s alluded to, and Frank has
said, see if we can pull things forward, we absolutely will. We were asked to look at an
indicative timescale to allow us to work through the programme, some of the comments
you’ve said there are very fair. I’d like to discuss them in a wee bit more detail, I’m sure
Frank would as well, as the Programme Manager for the technical unit but we want to work
with the community and we really want to give as much time, in case we encounter
something that we aren’t expecting, you sound like you’re in the game as well, you know
what you’re talking about. We will encounter some problems, we want to give ourselves
some scope so that that key date is being met, but I’d like Frank and I to discuss that a wee
bit more with you as part of this consultation
This is indicative, this is the indicative timescale we’ve got to meet an August ’27 date. So,
yes, some of these dates might move around, you know what it’s like. We’re not going to
micromanage every single activity here but the end date is August ’27 that we’ve been
aiming for. So, planning application ’25, it might be earlier than that, it depends on what
happens to technical design, what happens to the consultation with, obviously, the
residents, the community, also with education. 
Q. One of the things that was raised by the community was the fact that the land that’s
currently being used, or potentially going to be used, is the old ROF site. It needs
remediated, it needs cleaned up. If we’d gone for a clean site, which there are quite a
number of around the perimeter of the site, albeit yes, they are in green belt or whatever,
but I think if there’s a will, there’s a way and that would be one way of taking things forward

Page 119

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
with a bit more confidence. Because at the moment, you don’t know what you’re going to
find under that ground, it could be ammonium perchlorate
it could be nitrocellulose, it could be whatever because that is an old site, it’s part of the old
development. We flagged this up easily last year some time but they’ve gone, ‘No,’ because
of the complexities of the relationship with BAE, this was a way ahead quickly that
Renfrewshire Council could get a site. 
A. Essentially just that BAE have remediating that site already, they’ve started to remediate it
already, and they were doing that last year as well, that site and various other sites. So, the
whole point is that they cleanse that site down to a standard level, be it 450 or 750 below
the base, and they’re obviously going to clean that of what materials they find in there,
hotspots etc. So, it should be clean if that’s the site we eventually choose, that’s what we
hope.
Q. Going back to the point on duration, the architect appointment is the end of this month?
Frank Farrell:  Yes.
Q What do you base the architect appointment on? On ability or whatever?
A. Well, there’s a competitive tender process that’s going on through Hub West. We’ve
engaged with Hub West and I don’t know if anybody’s aware what Hub West is, it’s an
organisation that authorities can use for a straight supply chain that they have available for
consultants and contractors. So, they engage with the market for architects, engineers,
contractors and they have a team ready to, basically, start once we agree what site it is, they
can start on the design. So, they haven’t designed anything because we don’t know where
we’re going to be putting it yet, so it’s really just to get a head start on the design process
itself.
Q. Are they looking at different architects at the moment?
A. That process is being undertaken by Hub West, the same with engineers.
Q. They then go into detailed design March to June, I mean, that’s a tight schedule.
A. That’s detailed design commencing, then we’re going to appoint an engineer, mechanical
engineer as well. They will feed in to the existing design for the architect, the architect starts
first, there are various ways around it but this one’s going to feed in with the architect. So, it
is tight but that doesn’t actually complete until December ’24, the technical design, there
are various stages it goes through, and detailed design commences then.
Q. That’s the commencing date?
A. Yes, so there’s a nine-month, kind of, designing period.
Q. The amount of detail that you have around the planning. You say, you want the community
to be involved in the decision if there’s a better way to do something, it’s all about the
children, it’s all about community investment, and you’ve just mentioned there that you’re
not going to micromanage this. Having a community that has households that are full of

Page 120

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
anxiety and stress over where their children are going, the discussion around primary ones
having to be ferried out of the village to start a school career away from their nursery mates,
their children that they socialise with in the village, that is not good for the community. So,
the August ’27 date is really non-negotiable and yes, it’s very good to have the community’s
input into it but do you not think you really need to take the bull by the horns a little bit here
and actually put some guidance out there of what can and cannot be moved?
A. Yes,  I think the one of the challenges of that point is that we are very much-, not
constrained, that’s not the right way of saying it, but we have to finish a period of statutory
consultation. Until we finish that period of statutory consultation we can’t give, and move
forward with, precise details about anything because it would be inappropriate to do so. So,
while I understand what you’re saying and I understand the anxiety, nevertheless, this
process is governed by a set of guidelines that are not ours and are non-negotiable.
Q. That’s the standing situation but as a number of people have said, we’re talking about the
same things we were talking about a year ago. So, in that timeframe you could have set out
a number of things that are within the art of the possible to do, and not to do, which gives
the community time to comment on that. You’ve had comment upon comment, so now
we’re moving closer to that deadline of August ’27, it’s quite clearly not about the children
because if it was then you would be doing more to tighten those timeframes and using
things that, it’s just really disappointing just now to be at this point and you still can’t tie
down a plan.
A. I understand why you’re saying that, what I’m saying to you is that the team have got an
indicative timeline. We will engage with you as much as we possibly can once this, we’ve
done so during this process, we will continue to do so after this process, and throughout the
whole process, to give as much comfort as we can around the progress that’s being made
and the decisions that are being made. Inevitably, we are in a particular process at the
moment and we can’t do too much until that’s finished. That’s outwith our gift, I understand
your concern about it.
Q. What’s the remit of the design team? Is it to design the school in isolation or is it to design
the school within the masterplan? Second question, is the school going to be passive house
or net zero? The Renfrewshire Council net zero policy is to be by 2030, which, this school will
be finished by ’27, or sorry, started by ’27. It falls within that strategy, are we taking
cognizance of that so that the school is operationally cheap to run, helping the burden on
the Council? So, the first and the second part, if you don’t mind.
A. Our remit within property services is to build the school, design the school but obviously
we’ve got to do that in conjunction with the site itself. We obviously liaise with BAE, we’ve
been doing that with this school as well. So, yes, we will be building the school, not in
isolation, even though it is a standalone project for us, we’ll have to liaise with BAE,
essentially, because of the access routes, active travel, various other things. Basically, it’s
both, we have to design a school for our client and obviously the community, but we still
have to link up with BAE.
The brief to Hub West is to look for passive house certified, if we can achieve that, net zero,
we can (inaudible) standards because it sounds as if you probably know the building regs

Page 121

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
have become far more stringent in the last couple of months, that comes in in April. So, we
will be building to the new standards and we will be looking for passive house, possibly
certified building, but certainly net zero aspirations contained within.
Q. To the first one, the design and masterplan, which is a good thing, looking at the current
school and the situation for traffic, it’s not the best for buses. There’s no design in the
masterplan for lay-bys, for parking areas, for example, so when you’re trying to drop your
child off at school, like I do, you can get stuck behind twenty cars quite easily with one bus.
Now, another school, assuming that site goes ahead because of time and the deals that are
being done, it’s quite close in proximity so the buses then increase, the volume of traffic
increases. I know there have been traffic studies done recently but we’re probably about,
what, 55% roughly through the development, so there are a lot more cars and people still to
come. Will the masterplan be changed as part of this process, so that we can factor in lay-
bys and more provisions for the buses and the traffic during that point in time?
I think legally it’s BAE’s masterplan, the Council’s remit is to protect the community in that
masterplan and the vision of that masterplan. That masterplan serves the community, so
yes, legally BAE have that. It’s going to really get my fires going if we hide behind BAE with
that because the voice of us telling you is that we have an opportunity to change this. BAE
are on the hook for aspects of it, but it’s not been built yet, so why not change that before it
gets built, while there’s an opportunity to do that? You know, for me, legally, the section 75
is proportional to the original masterplan, not the current and the future masterplan. There
must be something we can do there to annoy them about that, noise them up a bit, get
something in our favour.
A. Sorry, can I suggest that you ask that question next door? Everything associated with section
75 and all those issues is another workshop.
Q. So, the detail of my question was that content but the question is, is that element in the
scope of the design team?
A. The school in isolation or the school within the masterplan. We have a site, potentially
(inaudible), sorry, so we’ve got to make that work, if that’s the chosen site. What we then
do, as I say, is liaise with BAE to see what impact that might have on their masterplan. That
will be fed on from Alistair’s team back to BAE, through planning. We can’t, obviously, build
the roads, separate roads outwith, we can maybe influence it, we can advise what we think
is going to work following feedback from the community but we probably haven’t got, as
you say, the gift to actually physically make changes until BAE sign it off. So, we need to
consider everything you’re saying, take account of it just as Gerry says, discussions regarding
the layout, the plan, that is probably the point that we have a better point to say, ‘Right, this
doesn’t work, that works,’ and then take that back to Alistair’s team to work with BAE. at
factor in.
One of the key things is, we’ll be working very closely with Gerry Hannah, who’s next door,
and his team. So, yes, Frank’s team and my team will be responsible for designing the
building, building the bricks and mortar, but we can’t do that in isolation. We need to take in
cognizance with Gerry to say, from a planning position, ‘We need to think about roads, we
need to think about the drop-off.’ So, it’s a bit of both, we need that design work in there to

Page 122

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
make sure the pick-ups, the drop-offs, the car parking spaces, everything linked to our
colleagues in Roads will be part of that planning discussion. We just can’t answer part of the
section 75 stuff, next door, because it’s Alistair and Gerry but there will be that very close
working relationship between us and Gerry Hannah, and the team who are next door.  
Q. So, I know that there was some discussion a while back about a proposed campus to include
more nursery space and more high school space. What is the estimated cost for this new
primary school to be built?
A. £45 Million
Q. What about the extension to Park Mains?
A. £30 million
Q. Why is there not an option to choose one of the larger sites to have a larger campus?
A. One of the answers to the question is a financial one, you’re talking about 75 million, the
building of a campus as you’ve described is closer to 90 million
PARK MAINS
The session then spent time on a discussion about Park Mains High School being extended
as the secondary provision for the issue.
This is not a material component of the consultation so is not included in the minute of the
Public meeting. However, the detail is contained within the accompanying transcript.
ACCOUNTABILITY
Q. I think in the background of what people are saying there, I think a good question to ask
would be, ‘How are the Council and the Council officers going to be held accountable for the
process that we’re going through just now?
A. I can understand the question, one of the things about this process, and I’ve said this right
from the start, and I’ll say it again tonight, is that I am the named person for this. I am
leading this process, I am leading this consultation, and I believe we’re doing the right thing
so I will hold myself accountable for that, and I will invite you to hold me accountable if, in
fact, what I say to you is what we’re going to deliver, we don’t deliver.
Q. What will be the mechanism for that? What will be the mechanism for holding you
accountable?
A. So, I can understand the question, one of the things about this process, and I’ve said this
right from the start, and I’ll say it again tonight, is that I am the named person for this. I am
leading this process, I am leading this consultation, and I believe we’re doing the right thing
so I will hold myself accountable for that, and I will invite you to hold me accountable.

Page 123

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
Q. Would you resign?
A. I would have resigned, yes, and I would resign. this is important enough to me that I will put
my reputation on the line to say, ‘I’m going to deliver this.’ If I don’t deliver it, or I make a
complete mess of it, God forbid I don’t do either of the two of them, then I would go, ‘Aye,
fair do’s,’ and I would walk away.
Q. I was here ten years ago and I was sold the dream of one school for all, because I didn’t like
the idea of two schools. I certainly don’t like the idea of three because of, just, the rivalry
between them. So, to get to the, ‘Sold the dream, buy the house, build and live in a
community,’ a community which is pretty much divided by a railway line that really annoys
me. ‘We’re all in this together,’ we’re not, it’s either Dargavel or Bishopton, to me, it’s one.
The third school is creating a bit of strength between everybody that it impacts but at the
same time, it’s driving a bit more of a divide. So, the Council are front and centre for driving
the success.
A. Yes, absolutely, and I’m going to say two things to you about that. One is, never at any point
am I going to ask this community to put their faith in anything I actually say, because why
would you? What you need to see is action, you need to see transparent communication
throughout the process, responsiveness to issues that have been raised, and some of those
have been raised tonight, and that will be that. Building trust back with this community’s not
going to take one statutory consultation, building trust back with this community’s going to
take five years of delivering what we said we’d deliver.
I don’t want you to think I’m saying that, you know, ‘I will be accountable so trust me,’ I
don’t want you to do that. What I want you to do is to watch the actions, watch the
behaviours, watch the processes and engage with them as fully as you can, as you’ve done
tonight, which is brilliant, and we will help grow it and respond to things. It will only be at
that point, at the end of it, that you can say to me, ‘Gerry, aye, do you know what,’ or,
‘Gerry, I told you that you were getting it wrong.’ But I don’t want trust in people, I want
systems and structures that are tight, that you can look at and go, ‘Aye, that looks robust
and that looks as though it’s going to drive,’ I take your point about the community, I do.
COUNCIL DECISION MAKING
There was then discussion about the process by which the council would make the decision about
the outcome of the Public Consultation.
IMPACT OF QUESTIONNAIRES
Q. can you quantify how it is if we say no to the proposed site? It’s off the online or the forms
that we’ve sent in?
A. It’s not an X% type thing, it’s about the weight and the range of views. If we get a position
that we do not think supports our position, we have to present that to the board to say, ‘This
is not a supported proposal,’ and then they would make a decision one way or another.
Then, potentially, it’s back to looking at another site or another plan.

Page 124

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
Q. That will increase the costs because we’ve already got the site and we’ve got it for how
we’ve got it.
A. Not necessarily the costs but it would lead to a slippage in timeframe.
PARK MAINS
There was then further discussion about Park Mains, again contained in the accompanying
transcript.
Session End

Page 125

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
Workshop 2 Group 1
Introductions by Alasdair Morrison and Gerry Hannah
Q. Why are we not following the RIBA plan of works for the programme? I raised that question
in the last session and the answer was a bit woolly, so your detailed planning is before
starting on site by three months, why is not the RIBA plan of works? You’re following the
Hub process to procure it, so it should be aligned to RIBA.
A. Yes, I think where that’s come from, I’ve had that question raised before but I think it’s
because what’s been presented here, in the programme timeline, in the documents is a
more generic, I mean, it’s been done in a sequential way to make it look as if you’re working
your way through the maze but in reality, there will be a number of things happening at the
same time. But the process that we will follow will be along the lines of the RIBA process
that you’re referring to. It maybe doesn’t come across like that in the way that it’s set out
there.
Q. March 2025, planning application, July ’25 start on site. That’s three months, okay the
duration for planning if it all goes well is fine but your sequence of actually putting your
detailed planning in is right at the very end.
A. No, I don’t think it is, so the thing is, I don’t think when that’s come across, I think that’s the
approval of the planning application, I don’t think that’s the submission of the planning
application. I think it’s, again, this way of trying to show it in a, if you’ll forgive me, in a
sequential manner to make the dates, but in reality, a lot of these things will be overlapping
and running in parallel, that would be my interpretation of it.
Q. I would expect it to be a year before, and yes, you could rejig that, but you’d be able to save
about six months to nine months in that programme by actually looking at it in detail.
A. I mean, you don’t want to condense and concertina everything, and then find that at the last
minute we’re not able to achieve it, because as you heard from Gerry, that wouldn’t be a
great scenario for us to be in.
Q. My question is a two-parter, so I asked in the last session about the design remit of the
consultants. Are they designing a school in isolation or are they designing a school within the
definition of the masterplan? The reason I asked the question is, a school in isolation, fine, it
shouldn’t be, it should be within the definition of the masterplan, the reason I ask that is
because of the implications to transport.
Right now, there is an issue with buses, there are no lay-bys, there’s nowhere for them to
stop really, even outside the school here, it’s on the road, not off the road. For an additional
school within a stone’s throw, because we aren’t getting a different site, we’re getting that
site, how are all the additional transport requirements going to be taken into cognizance?
Especially given that we’re not fully developed out as a masterplan, the reason I’m asking is,
proportionality of the section 75, half of that main artery hasn’t been built yet, the design is
up for grabs. Can we not, as an opportunity to learn from the lessons of shoehorning things
in, look at the integration to the wider community and factor in the buses, the cars, the

Page 126

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
active travel and all the things that we need to do to make it successful and lighten the load
and pressure from this school, which is just down the road from it?
A. One of the things we’ve concluded so far is, getting a transport consultant in to speak to us
at an early stage. So, we realise obviously, as part of the consultation we’re taking forward a
proposed site for the consultation, at that point we engaged with a transport consultant,
just to do some early work, early prep work for us and not, so outwith the scope of a
transport assessment to accompany the planning application, just to give us a, kind of, early
head’s up in terms of the kinds of things that we should be looking out for.
Some great points you made there in terms of the road and influencing the infrastructure
yet to come because that was one of the key things that they picked up in terms of active
travel corridors and wider, shared walking and cycling routes, and how we can deliver that
working in partnership with BAE. That’s going to be a big focus for us going forward, so
obviously yes, the pick-up and drop-off at the schools, those kinds of things. With the
greatest will in the world this isn’t all going to be solved by active travel and we’re not silly
enough to try and think that’s going to be the case but that’s going to be a big focus, on how
we can encourage that as much as we possibly can. Big credit to the school, the staff here,
the pupils, the parents who support active travel existing at this school, it’s the highest
percentage active travel at any school across Renfrewshire. So, that’s a real positive.
What we’d be looking to do is continue to work with this school and the new school in terms
of the school travel plans and how we can make that as successful as we possibly can. But all
of the points you’ve raised in there are things that we will be working with, with BAE and the
plans going forward.
Q. The active travel aspect’s part of your net zero strategy, so I understand the net zero
strategy and your active travel but the active travel isn’t working. My daughter goes to this
school, she is incredibly upset when there are awards being given for park and walk. I don’t
park and walk, I’ve got work to get to. She is my priority in life but I’m here for 7:45, eight
o’clock every day dropping her off, it’s okay at that time of day but see if you come ten,
fifteen minutes later, it gets difficult. If you come about half an hour after that, it’s almost
impossible and if you’re close to nine o’clock, there’s no way you’re getting to work on time.
Active travel is a joke, we’re a fair-weather community on the west coast of Scotland, if it’s
great and it’s sunny we’ll walk, if it’s wet, no way in hell, and if it’s snowing, no chance. It
can’t be based on policies that are written for the UK and Scotland wide, it has to be
something fit for purpose for this community, and active travel is not that.
A. No, and again, we accept that that’s not going to be the single solution. It would be silly of us
to sit here and think that was going to be the one stop shop to solve all of our problems, it’s
not, it’s about how we make the school as connected as possible but recognising that there
are other solutions at play as well. So, as Alasdair  said, looking at the pick-up, drop-off
facilities. We appreciate there is a peak in the morning, the peak’s probably spread out a lot
more in the morning than it is in the afternoon and the afternoon’s probably a more
condensed peak, and that’s the stuff we’ve started working with the school and Parent
Council on, on how we can try and bring solutions to the table for that as well.

Page 127

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
Q. With all the research that’s been done is there going to be any retro work done to this
school? The walking path in from one side of the village is awful, it’s dangerous, there are
children getting knocked over, there are people with prams getting pushed out of the way,
there are bikes, scooters up your ankles. There are children getting injured and hurt, it’s not
safe. So, with all the work that’s being done on this proposal, what is the plan to make this
area safe?
A. Okay, that’s a really good point and something Alasdair and I met with BAE last week to talk
around, the existing infrastructure and what we can look at. So, the transport consultant is
not only looked at future improvements and the, kind of, new school coming on board, but
actually, ‘What can we improve existing infrastructure-wise?’ The path network around the
school was an area that’s flagged up as an area to for us to work with BAE on. Just for clarity,
there is a very small amount of the road network here that the Council are responsible for,
it’s still in the developer’s hands, and that’s something the Council obviously looks to adopt,
the road, when the developer says it’s ready for adoption. So, that’s a process we work
through with BAE and we’ll continue to do so. Kevin from the Parent Council has flagged up
what I would term the, kind of, remote path to link the school to the-,
Q. To the path that comes through the park?
A. Yes, and that’s an area that we want to follow up as a priority in terms of, there was a
previous suggestion that the whole path network was three metres wide, there’s no way the
whole path network is three metres wide, that’s the, kind of, standard we want to see. So,
we recognise there are some pinch points, some pinch locations on the route there,
Q. Is that bit owned by the Council currently? Has that been handed over?
There was then discussion about the role of BAE systems and how they could be held
responsible for changes to travel arrangements in the area.
Q. So, my quick question was, you said it’s the highest percentage of active transport at this
school, what is that percentage, and what is the Council average? What would you be
projecting it to be for the new school? I’m assuming it would be no more or equal to the
average for the whole area, for the whole Council.
A. I don’t have the exact figures to hand and I’d need to double check that, so don’t quote me
on that and I’ll be able to confirm the figures. That was, from memory, a couple of
percentage points higher than the closest school. So, that’s something that we would look at
as a minimum standard going forward now, because we’ve been really successful and the
kids have been really successful in really promoting that. We recognise that won’t be every
single day in November and December. We’re not, again, silly enough to think that’s going to
be the case either. But we want to provide opportunities as much as possible. If anyone has
looked at the bike sheds outside here in the morning, they are absolutely jam packed and
we’ve worked with the school in providing additional infrastructure, and that’s what we
would do with any new school location as well. Regardless of what site it was, we would
work with the school in terms of identifying what infrastructure would make it as successful
as possible for active travel.

Page 128

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
Q. You’ve touched upon the provision of transportation getting into this school, obviously it’s a
bit of an issue, particularly I see, around the intersection between Slateford Road and
Craigton. It’s a bit crazy in the morning, so, it’s already like that, we’ve got buses taking
people to Park Mains, buses taking people, I would assume, into Renfrew, to Trinity, and
we’ve got buses taking people elsewhere. What are we going to do when we add another
school into that mix? Is there going to be any retroactive work to the existing infrastructure,
to-, do you know what I mean? You’re never going to get a bus down the road, down
Slateford in the morning, to get to a new school because you can’t get a car down there in
the morning. So, what’s going to be done to address that?
A. The work we’ve been doing at the earliest stage just now, is purely focused on the new
school for now, it’s then about taking that work and taking that much wider. Within the
programme you’ll see obviously it refers to a planning application, within that planning
application process we would be doing a transport assessment that looks at the transport in
the widest possible sense. It’s not just about walking and wheeling to and from school, but
the reason for getting the transport consultant on board so early with us, is so that we can
do quite a lot of that work in advance. We don’t want to wait for a planning application to
then tell us, ‘Here’s what you need to do in a relatively short period of time.’ We’re trying to
get as much of that early work done that we possibly can.
So, if you look at the junction capacity for instance, the junction at the bottom of the road,
the traffic signals junction there, that operates at about 60% capacity, which is really, really
low, really low for an urban type junction arrangement. So, what we know is, we’ve got
plenty of capacity there, ‘Right, okay, so where else is a concern?’ This transport consultant
will tell us where else the concern is. The example you’ve used there of buses being on the
road, ‘How many buses are there going to be?’ That transport modelling, telling us where
the buses are going to be going, those are the next, kind of, steps of work that we’ll be
looking to take forward.
Q. A few weeks ago, my wife and I passed the front of the school and we met our local police
officer who was there advising some order into the drop-off location. He said he was
concerned about the safety issues, so I knew I was coming to these meetings and so, a few
weeks hence I decided, I might even have been watching your car, I don’t know. I stood, it’s
okay. I decided to look at what was happening, so I was there round about, maybe a wee bit
after you, at 8:15. There were two cars on the east side, no, no, the south side, you guys
have got this north and south, east, west rubbish. Anyway, I think it’s the south side, two
cars. By the time 8:55 came, there were 25 cars and then the people have got to stop when
the other one’s coming the other way, the bus is there. What we have in Bishopton, in the
existing school in Old Greenock Road, it’s like the dodgems sometimes. What has been
created for this school is exactly the same thing, it’s not any different. What would be the
solution? You mentioned lay-bys, you’ve got an undeveloped piece of land on the south side
of this school, is that Renfrewshire land?
A. The immediate acre and a half just,
Discussion:
The immediate acre and a half just,

Page 129

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
M1: Right, that would be a good site for a short stay car park.
A: That is the proposal that we’re currently working on, I wouldn’t call it a short stay car park,
M1: Well, I think you should work on that, that would take,
A: But a drop-off and pick-up location for the school. 
M1: Think about the capacity that you need for that car park and that would take the cars off
Arrochar Drive.
A: Yes, it should, if it’s successfully implemented it should make a great deal of impact on that
issue that you’ve raised.
Q. Whatever the location of the new school, you do the same thing?
A. That is currently in the plans.
Q. You were saying that the way that people are using that road isn’t the way that it was
designed, how are they supposed to use it?
A. Well, what I mean by that in terms of not the way that they’re using it, is that if the road
infrastructure was all in place and Arrochar Drive was complete all the way up to meet
Craigton Road.
Q. So a through road?
A. Well, what I mean by that in terms of not the way that they’re using it, is that if the road
infrastructure was all in place and Arrochar Drive was complete all the way up to meet
Craigton Road.
Q. Is the site then, position nine or whatever it is, is that not the-, sorry, is that not then just
going to force more traffic onto that junction at Slateford and Craigton? You’re then going to
have the added complication of people from that end trying to this school and people from
this end trying to get to the new school. Or trying to get in and out of the village. Well, yes,
in the morning it’s carnage, there are people parked up on the pavement, you can’t see
round the corner, there are cars everywhere, people everywhere, kids everywhere, buses
everywhere.
A. In terms of the junction capacity, just at Craigton and Slateford there, is that what you’re
reckoning will be a pinch point? It’s one of those things that with the current road network
not being fully complete, we really need to look at the transport modelling with the
assumption that that road network is complete, and how the road network is then going to
be used with that completed section. Again, junction capacity we’re not looking at being an
issue for us, it’s more about, as you say, maybe the mention of things like the buses and how
we can look at potential solutions that might be in place for the buses. From a wider
infrastructure point of view, obviously the pick-up, the drop-off-, the parking facility, rather,
at the train station and the completion of that is obviously going to be a thing that we’ll be
looking for the developer to take forward as well. So, it’s not just focused on what we do

Page 130

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
about one particular junction, it’s really looking at the traffic modelling taking in the whole
of the road network and what potential solutions there might be for us. 
Further Discussion about road access – details in accompanying transcript.
Section 75
Q. So, the question I got asked to bring to this one, I didn’t get to ask at the other one, I moved
here ten years ago, I was sold the dream of a community with one school for all the kids to
go to. That’s how I grew up, I went to a 600 capacity primary school, I had no problems with
the capacity, I liked the idea of one school, one community. We’re now having three schools,
that’s horrendous, the politics between those schools is not acceptable. But section 75, I
don’t understand, I’m not fully up to speed with section 75 agreements. It was
proportionality and it was based against the original design, and capacity and number of
residential units in the masterplan. That’s obviously grown significantly, why has the section
75 not grown along with it, based on the new plots and units? And if it’s not, why can’t we
do something retrospectively like other developments across Scotland where they charge a
levy per residential unit to contribute towards the infrastructure and costs around that area?
A. Okay, there’s a lot in there, so, I mean, I probably won’t have time to answer all the queries
about the section 75 but in a nutshell, the original outline planning permission, in terms of
the number of residential units for Dargavel was 2,500. That was the original masterplan,
the community growth area, the structural growth plan of yesteryear. BAE then came
forward in about 2016, something like that, I might get the years slightly off here, but 2016,
2017, with a planning application to increase that by another 1,350. At the same time as
doing that, and again, I can’t offer you an explanation tonight because I wasn’t involved at
the time, I wasn’t even close to the project, the Council took the decision, amongst other
things, amid other decisions that were taking place which we could go into but, like I said,
we probably won’t have time, in terms of the money for the Community Development Trust
in Bishopton, money that was going to get put towards Newton Road playing fields. But the
Council decided to then remove certain elements from within the section 75 for Dargavel as
a result of granting that planning permission for the increased number of houses. I can’t
answer the question as to why they did that in detail because, like I say, I wasn’t involved
and I don’t think of the-, well, I know none of the officers who are here tonight were indeed
still-, who are currently involved with the Council.
So, that decision’s been taken, it has been, to use your terminology, watered down, if that
was the terminology you used, or I’ll use that terminology. Section 75 was diluted to a
significant extent between the 2012 version, the original planning application, and the 2018
version that we now have. The point you were making before about, ‘Will the new primary
school be designed on the basis of, almost, from scratch, or will it be designed within the
existing masterplan that we have?’ We’re faced with a number of constraints, not least of
which is a masterplan that’s been agreed, a section 75 that’s been agreed, and a broad
layout of where housing zones and where the infrastructure will go that’s been agreed. That
is effectively baked in and that’s why we’ve only got the infrastructure that we’ve got. I can’t
do anything about that as we sit here today, I can negotiate. with Gerry and other

Page 131

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
colleagues. with BAE to try and make the most of what we’ve got, Louisa was involved in
that meeting as well. 
We’ve certainly insisted that they need to do an awful lot better in terms of completing
infrastructure long before the school is here, long before the second primary school, and
also to make that based on a much wider, much better, much more enhanced level of path
network to allow active travel to happen in the places that it can happen. We’ve still to
explore and finalise the details in terms of what that’ll mean for car parking, and drop-off,
and lay off, bus lay-bys and such like, we’re still in discussion with them about that. But we
will be doing everything we can to make the traffic system here work as best as it can, given
the circumstances that we’ve got.
SESSION ENDS

Page 132

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
WORKSHOP 1 AND 2 (combined) Group 2
These have been combined because the discussion was more challenging to minute.
The minute of this session combines questions and summary of discussion about issues where there
were comments made rather than questions asked.
1. There was initial discussion about a specific matter related to what school a child would go
to and the sibling policy.
SITE CHOICE
Q. Talk us through, there are a lot of scores that are very close here, what was it that made the
site that you’ve decided on for the proposal, why did you go with that one?
A. The 23 sites that were under consideration are all set out there in the matrix and hopefully
the scoring is relatively self-explanatory in terms of why scores were attributed to the
individual sites. Then all that’s happened is they’ve just been put forward and populated the
matrix on that basis. So, the criteria are along the lines of ownership of the site, its current
development land status, how close it is to the households that will form that catchment,
any additional costs that would be involved, in terms of, if you had to build new roads to it
for instance, that’s obviously a significant factor. So, it’s been extrapolated through, and as
you pointed out, a number of the sites score quite closely, they do.
Q. We weren’t asked our opinions prior to this, which is frustrating me because it’s already
been commented that if we propose a different solution, that almost puts everything back
to square one. Which in my opinion means that’s presented as if that puts 2027 at risk, so if
we did propose a different solution, does that put the 2027 deadline at risk? How long does
it take you to get to this point, and if we proposed a different solution, how quickly could we
get to the next consultation for that new solution?
CHOICE OF SITE, TIMING OF PROJECT AND ALTERNATIVES
There was discussion about views on the site and the consultation on the choice. There was concern
expressed about the view that the site was a “done deal” and, despite the view, it was the wrong
choice, there was no option to change it because of timings.
The Council confirmed that the site was not a “done deal” and if the consultation outcome was that
an alternative site should be chosen, then the council would respond to that, as a statutory
obligation. The council has consistently stressed the importance of having the new school open by
August 2027, to prevent children being sent to more than one school as there would be insufficient
space in Dargavel Primary and Bishopton Primary. However, if the prevailing view was that the delay
would be more important to get a preferred site, than arrangements would be made to
accommodate that.
There was then a statement it was the wrong site due to the significant issues with traffic which is
dangerous. There was further concern about the timescale and whether it could be achieved. The
person wanted that statement recorded for public record.
The fact the site was central to the development was a key consideration.

Page 133

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
There was then discussion about active travel. The council confirmed that active travel was not the
only consideration and that a range of traffic management arrangements were being explored.
There was then some discussion about other sites and why they are worthy of consideration. There
was particular focus on site 22 and there was a full explanation given of the planning process as the
site is in the green belt.
There was then further discussion about site E1 and the arrangements being put in place,
especially in terms of traffic. There was then further discussion about all aspects of the traffic issue
– this is the major issue in the consultation.
There was then discussion about the community facilities and how important these were. The
council team stressed full commitment to the council facilities being built into the school as a
priority.
DESIGN OF THE SCHOOL
The bulk of the discussion in the second workshop with Gerry Lyons Interim Head of Education and
Emma Henry Head of Inclusion was focused on the design of the school:
Strong views the school should not be open plan.
Concern about:
• The experience in the current school and issues with noise.
• The experience of children with additional support needs in the current school.
• The planned work on acoustics and when it will be completed.
There was detail given about the space planning for the new build school and the consideration
which had been given to providing flexible learning spaces, which could support learning in all 4
contexts for learning. There was also a commitment to keep the learning needs of all children at the
centre of the design process.
There was a clear statement from the Council team that the intent was not to design an open plan
school and that the community would be involved in discussions as the design process developed.
COMMUNITY FACILITIES
There was a strong view expressed that community facilities should be fundamental to the design of
the new school. There were explanations as to the impact of the current lack of facilities.
The Council team renewed their commitment to the school providing a range of facilities for
community use
Last Session Summing Up
Comments:
F4: I think you guys should have had your due diligence to go back through the
history, know the issues, know the questions, because a lot of them are
repeat questions that we’ve asked time and time again, and never had an

Page 134

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
answer. So, you guys had a due diligence to trail back through all the other
recorded meetings, identify what was going to come up, because we’ve
asked it before, and have an answer for us. That’s a consultation, don’t feel
insulted at 
F4: So, they’re talking about surveys they’ve had, they’ve had 253 surveys and
they’re saying that there’s an overwhelming difference in opinion on those.
So, again, that’s a very small section of the community. 
F4: Our concern is, the people that have filled out those forms don’t necessarily
have the full information at hand because if they’re not at these meetings
they’re not asking probing questions to identify PR spin versus fact. That’s
our concern, and that’s why tonight, we’ve had the opportunity to ask the
experts, we’ve had the opportunity to decide, ‘Are we satisfied with the
answer of the experts?’ I know I’m not, so that’s why it would be interesting
to gauge from the room, ‘How do we feel? And does the feeling tonight
represent the 253 surveys that are filled out?’ 
Gillian Hoyle: I have one question, when are you going to come back to us about Park
Mains, the secondary allocation?
Gerry Lyons: I have to finish this proposal and that will take me to Easter, and I can’t give
you a precise date but some time between Easter and June I will come back
and have discussions about Park Mains.
Gillian Hoyle: The reason I’m asking is because I don’t think I can confidently say whether I
think plot nine is the right allocation or not without understanding Park
Mains, because I do not believe we’ve got the right allocation for the
secondary school. 
Gerry Lyons: Okay, I disagree with you, I believe that I can show that, but it’s a discussion
about Park Mains and this is a consultation about Dargavel Primary. 
Gillian Hoyle: It relates to the primary school for me.
Gerry Lyons: Yes.
F5: Is anything that’s said here tonight likely to change the proposal of preferred
location or is it a done deal that it’s going to be-,
Gerry Lyons: No, it’s not a done deal, we have to pull together, not just tonight, we’ve
had another public meeting already, we’ve had all the information sessions,
we’ve had the meetings with the statutory consultees, who have been-,
well, I’ve not had the meeting with Dargavel Parent Council yet, I’ll do that
on 12th March. I’m going to the Community Council tomorrow night, we’ve
met with all the statutory consultees, we’ve met with the children, the
teachers, the elected members. We have to pull all of that together as the
outcome of the consultation, this is just one part of it, but having done that
(Timecode: 00:40:00), we have a statutory responsibility, if we believe that

Page 135

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
there are clear messages about things that need to change, to take that on
board and change them. That’s what we will do if we see that as coming
across clearly from the responses. 
Q: Gerry, what’s the timescale on that then, in terms of decision making?
A: So, the statutory consultation finishes on 26th March, Education Scotland
then have three weeks to do their work. So, they do, you know, they look at
all of this, they’ve been here, they looked at all the documentation, they’re
coming to both schools on the week beginning 26th. They then write a
report, they’ve got three weeks to do that. We then have three weeks to
respond to their report and then that’s all pulled together and it will be
taken to a meeting of the elected members on the board on 23rd May. That
will be the decision where it either goes forward or it stops and then the
work, and that timeline that you’ve got there, will move forward from there.
Yes.
Q: If the proposed site goes ahead and you’re ready for August ’27, does that
mean that the kids here get their playground back? Like, do the buildings
outside get taken down?
A: The temporary classrooms have got a five year warranty on them and one of
the things that we have looked at is how quickly we would remove them if
we get to that position, and we can move them in a-, Frank?
A: A matter of weeks, so yes. 
Q: But the capacity, that’s the plan?
A: Yes.
I just wasn’t sure.
What developer contributions are going to be extracted from the remaining
phases of residential developments?
Zero.
Yes, we’re not doing that.
F1:
M3:
Various voices:
F1:
Alasdair Morrison: I mean, I don’t know if it was with this group, forgive me, or if it was with
the group next door earlier, but the section 75 agreement already sets out
the developer contributions for the quantum of housing development for
Dargavel. That’s what’s usually agreed at what’s called a planning in
principle stage, which was that 2018 decision I referred to. Usually then
when you come forward with your detailed layout and design of the houses,
there’s no further discussion around that. That’s the normal way the
planning process works, anything that comes additional in terms of
developer contributions would be at the behest of BAE.

Page 136

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
Q:
A:
Q:
A
Q:
A:
Q:
A.
Q:
Alasdair Morrison:
M3:
Gerry Lyons:
Kevin:
There are examples around Scotland of other developments that don’t have
section 75s and they apply a levy to the units of residential development
built. Why are we not exploring that as a legal standpoint?
I don’t know where these examples are but if you’re talking about the roof
tax, as it became known in the media, it’s not legally possible to do that in
Scotland. There’s case law in Aberdeenshire where they were significantly
reprimanded as a Council for trying to do that with a big development to the
south on one of the estates.
The Highland Council are doing it.
They don’t do a roof tax, they do-,
They don’t do a roof tax, no, they do (talking over each other)
No, it’s called a developer contribution standard, which is applied in terms
of for new developments, and Renfrewshire Council is currently in the
process of working towards having such approved guidance.
Because there are a number of plots still to be developed and units to be
built.
There are.
And we’ve already heard tonight, which will be minuted, and everyone
already knows it anyway, that the section 75 was, as you said, diluted or
watered down. Surely, we should be doing everything we can, or you as a
Council should be doing everything you can, to regain as much money from
the huge profits that these developers are making. 
Yes, well I
We’re the ones left with that legacy, we’re the ones that are being robbed
of a community that should be a lot stronger and better. Yes, tonight we’re
talking about schools, what are these kids going to do at weekends and on
evenings? When they get older and teenagers? There’s a huge capacity right
now but when they’re older it’s going to be wild, and we’re left with that. 
Yes, one of the really interesting things that’s come up through all the
conversation we’ve had is that one. ‘What about the teenagers and the
young people as they go through?’ And I think that is a really important
thing to look at and to have conversations about, and to explore, so that’s
certainly one aspect I think will come out of this consultation, that we will
have a further look at, ‘Well, what can we offer our young people so that
they’re not bored, and then because they’re bored, they then start to do
things that they wouldn’t normally do?’ So, it’s a really helpful input actually.
Gerry, can I ask one, sorry?

Page 137

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
Gerry Lyons: Aye, of course.
Kevin: Just following on from that, in terms of any, kind of, building that we do with
the school, anything else within Bishopton here, there’s got to be a
community benefit aspect included into that in terms of the scoring matrix
for any contactor etc. that’s approved. What is that going to look like for
Bishopton? Is that money going to stay within Bishopton? Can we stipulate
things such as contribution towards Holm Park, for instance, and the
facilities there? 
Gerry Lyons: I need to take that back to the procurement team, Kevin, but I will because I
don’t know the answer.
M7: Why are procurement not here?
Gerry Lyons: We, went with the biggest issues that had come up in the early stages and
procurement hasn’t really been one of them but that’s a question we don’t
know the answer to. Procurement will be able to give you a steer and we’ll
certainly going to come back to you with that. 
F1: The next time can we have people who are going to come and lead the bull
by the horns, instead of people that say, ‘I believe,’ ‘I don’t expect you to
have trust in me,’ ‘Don’t take my word,’? It’s not acceptable to have a leader
that’s representing the community,
Gerry Lyons: Listen, what I’m saying to you is,
M7: Don’t interrupt what the lady’s saying.
Gerry Lyons: Sorry, pardon.
F1: No, you’ve stood there through the whole first section using, ‘I believe,’ and
saying, ‘You don’t need to trust what I’m saying,’ ‘Don’t take my words as a
promise of delivery.’ No leader stands there and sets that tone, a leader
leads by example. 
Gerry Lyons: I’m going to come back at you on that because I couldn’t disagree with you
more. What a leader doesn’t do is say, ‘Believe me, believe me, believe me,’
when you believed people previous to me and they let you down. What I am
asking you to do, is to watch the processes, watch the systems, watch the
engagement, watch the progress through all of those things and then make
a decision. Don’t take my word for it because you did that before. So, it’s not
a failure of leadership in my opinion, what I’m saying to you is an honest
steer, which is, ‘There’s loads to be done here, there are lots of processes to
go through, were I you and I’d gone through what you’d gone through, then
I would be reluctant to take someone’s word on it.’ 
F1: Take our (talking over each other) out of it,

Page 138

Director of Children’s Services: Janie O’Neill
Council Headquarters, Renfrewshire House, Cotton Street, Paisley PA1 1TZ
Website:  www.renfrewshire.gov.uk
Gerry Lyons: Just let me finish, and on that basis, I wouldn’t ask you to take my word for it
but what I will ask you to do is to watch the actions, and hopefully at the
end of that you’ll come back to me and say, ‘Gerry, you did deliver,’ and
then that will be a good thing for the children.
F1: (talking over each other) we want evidence, we want facts and we want
information, take the emotion out of it, as a professional, on a professional
level. This is not professional, it’s not been delivered professionally and
we’re not-, 
Gerry Lyons: Okay, all I can do is to say, I note your point, thank you for making it, I
completely disagree with it.
F1: (talking over each other)
Gerry Lyons: And that’s now nine o’clock so I have to bring it to a conclusion.
Louisa Mahon: Thank you very much, everyone. 
F4: At what point do we find out-, so, of all the questions that have been posted
out or the information grabs, what timeline are we looking at for getting
that back to us?
Gerry Lyons: So, once we pull all of this together, the timeline is that period between the
consultation period finishing and all the reports being written. 
F4: (talking over each other) the transcription for tonight?
Louisa Mahon: There were some key questions that we’ll get back to you asap on. If you
give us, like, a week to come back to you, would that be okay? We’ve all got
all your email addresses from everyone that’s here, so we can either try and
get it out to you directly or we can put it out through the Parent Councils
and the Community Council, would that be okay? So, key questions we’ve
picked up tonight, we’ll get that (talking over each other)
F4: When will the transcription for tonight’s meeting be available?
Louisa Mahon: We normally have that around (talking over each other)
David: The clock is ticking, the clock is ticking, we need to see action from the
Council in getting this a bit better than it is. I can’t say they’re ever going to
get it right, and BAE have-, they’re a corporate body, they’ve done
everything that Renfrewshire Council asked them to do, and it’s the
mistakes that have been made by Renfrewshire Council that have caused all
of this.
Gerry Lyons: Yes, and as I said at the start, we’ve got to now try to move forward to
change that situation. Thank you for coming along and thank you for your
participation this evening.

Page 139

Dargavel Primary 19.02.24 Appendix F
Gerry Lyons:
Janie O’Neill:
David Love: 
Jack Lochans:
Laura Miller:
Gerry Lyons: 
Laura Miller:
Gerry Lyons: 
Laura Miller:
Gerry Lyons:
Laura Miller:
Gerry Lyons:
Maggie Russell:
Gerry Lyons:
Louisa Mahon:
Grant:
George Morrison:
Gerry Lyons:
Jack Clark:
Ann:
Good evening, everyone, lovely to see you all and for the parents that are
here, welcome. This is all about your children and that’s the most important
thing. There are loads of officers here as well, so we’ll maybe do a wee
round the table and let the officers introduce themselves. For those of you
who don’t know me, I’m Gerry Lyons, I’m the interim Head of Service for
Children’s Services in Renfrewshire. 
Hi, I’m Janie O’Neill, I’m the Director for Children’s Services in Renfrewshire
Council.
Hi, I’m David Love, the Chief Planning Officer for Renfrewshire Council.
Hi, Jack Lochans Education Manager for Renfrewshire Council. 
Do you want me to-,
You can say if you want, you’re under no pressure.
(Talking over each other) just the officers. No, my name’s Laura Miller, I’m
one of the-, I’m a parent of a child at this school. 
And what primary is your child?
She’s in primary one. 
She’s in primary one.
Yes.
Okay, that’s fine. 
My name’s Maggie Russell, I’m the Secretary, joint Local Secretary for the EIS
trade union and so, I’m interested just to hear, listen to what the information
is around-, because it’ll affect, obviously, our trade union members as well. 
Good to see you, Maggie.
Hi everyone, I’m Louisa, I’m the Head of Marketing and Communications at
the Council and a member of the Corporate Management Team, so it’s lovely
to see everyone here tonight, thank you for participating. 
I’m Grant, I’m actually a local resident of Dargavel, I just came round for that,
and that’s me. 
George Morrison, local resident, Chairman of Bishopton Football Club,
retired public sector Manager.
And avid football supporter.
Hi, I’m Jack Clark, I’m a resident of Paisley but I’m just interested to see
what’s happening with the school.
And I’m Ann, I’m not of this actual board but I’m extremely interested in
what’s happening, I’m a Councillor in, sort of, South West, but I’m just
extremely interested because it’s an incredibly vital thing that’s happening,
so.

Page 140

Dargavel Primary 19.02.24
Frank Farrell:
Gerry Hannah:
Chris Dalrymple:
Louise Chisholm: 
Gerry Carlton: 
Gillian Hoyle: 
Andrea McMillan:
Gerry Lyons:
Peter McColl:
Lucy Adamson:
Lauren Johnston:
Gerry Lyons:
I’m Frank Farrell I’m the (inaudible) Programme Manager for Property
Services at Renfrewshire Council.
Good evening, everyone, my name’s Gerry Hannah, I’m the Council’s Head of
Climate, Public Protection and Roads.
Good evening, everyone, my name’s Chris Dalrymple, I am the Head of
Facilities and Property Services within Renfrewshire Council. Three hats on
unfortunately, so one, my Property Services team will build the second
school, secondly my Hard FM team will look after and maintain that school,
and thirdly, my Soft FM team will do all the cleaning, catering and janitorial
within the school. 
Okay, I’m Louise Chisholm, I’m one of the Deputy Heads at Dargavel.
Hi everyone, I’m Gerry Carlton, I’m the Head Teacher at Dargavel. 
Hi, I’m Gillian Hoyle, I have a child in primary one. 
Hi, I’m Andrea McMillan and I’m from Education Scotland, so I’m here as an
observer tonight. So, Education Scotland will do an independent report
following the completion of this consultation. So, it’s a common thing for us
to come along, so you might see me taking a few notes, nothing is attributed
directly to people, it’s just to inform in our future report. 
And you’ve got colleagues there?
I’m Peter McColl, I’m from the Consultation Institute, we’ve been helping to
plan the consultation. 
Hi, I’m Lucy Adamson, I’m the Council’s Communications Manager, I work
with Louisa.
I’m Lauren Johnston, I’m the Service Improvement Manager for Children’s
Services. 
I remember when I was younger, they used to say that one of the things that
was unique about Partick Thistle Football Club was that at the start of every
game they could get the fans to introduce themselves because there were so
few of them. So, we’re, kind of, falling into that, it’s unusual that at a public
consultation everybody introduces themselves but the numbers are such
that we can do that. Let me just talk you through the, kind of, context of this
meeting, so we’ve had some information sessions, we’ve had drop-in
sessions. We are in the middle of a statutory public consultation and this is
the public meeting that is a statutory requirement of any public consultation.
So, it’s slightly different from the drop-ins that-, for example the one you
were at last week, in that sense that this is, kind of, part of the report,
everything that comes out of this is going to be included in the report. And it
is an opportunity for everyone to gather thoughts and views in a more
formal way. The structure of the night I’m going to take you through shortly,
but I’m going to start with just an introductory presentation. It will be very
short and then we can talk about how we’re going to make the night work to
the benefit of the parents, primarily. I don’t really care about what’s to the

Page 141

Dargavel Primary 19.02.24
benefit of the officers but it’s got to benefit the parents, so we’ll try to do
that. 
So, there are key principles in everything, certainly that I do as an education
person all the way through my career, and it’s always started with the same
thing, which is, ‘How do we get the best for the children?’ This whole
exercise, this whole process is about, ‘How do we get the best for the
children?’ In this particular context, in terms of primary provision and this
statutory consultation is about that, it’s about the building of a second
primary school on an identified site, and on the catchment areas for the two
schools. But it’s not really about that mechanical set of issues, it’s about
saying, ‘How do we get this right for the children in primary one, now, the
ones that are three years old, who are going to be coming through, the ones
who are not yet born, and do the very best for them?’ And sitting alongside
that is that this school should also enhance this community, it should add
community facilities, it should allow people in the local community to be
able to take part in all kinds of activities, some sport, some performing arts,
some health and fitness, whatever it’s going to be. So, the two, kind of,
drivers of the proposal are the children and the community, and if we can
get this right, we would expect to deliver for both. 
So, the outcomes of tonight are slightly, I suppose, altered because of the
few numbers of parents that are here, and that will be part of conversation, I
imagine. But we want to share as much information as we can, we want to
be as transparent as we can possibly be, which is completely transparent,
and we want you to know the facts. There is nothing here that’s off the table
in terms of talking about things and we want to be completely clear about
that, because that allows you to make a decision about the proposal. We
want to listen, we especially want to listen to the parents, to the community
representatives, to everyone that’s here with a-, I suppose, who’s got a
vested interest, who are directly affected by this, we want to hear your
views. And probably equally importantly, we want you to feel that your
views are being heard, and are being taken seriously, and are being
responded to, so that’s important. 
The challenge sometimes of a statutory consultation is that you need a
proposal, the Act says you have to propose something, but the proposal is
merely that, it’s a proposal. So, one of the things we want to know about is,
‘Are there alternatives to that proposal and which one would you like us to
consider?’ So, I’ll give you an example that in one of the conversations I’ve
had someone was suggesting that the first step, rather than build the new
school, should be to extend this school to buy time. So, we’ve got that as an
alternative proposal that we’ve had some discussions about and that will
stay as a live alternative proposal throughout the consultation period, and
we’ll respond to that towards the end. So, if there are other proposals then
we want to hear them, and we want to consider them, and we have a
statutory requirement to consider them, so we’ll certainly do that. We want
everyone to feel comfortable, we want everyone to feel you can contribute
and say whatever you want to say, and have that heard and responded to
appropriately. And we want tonight to be positive, it doesn’t matter what
the numbers are, tonight is about your child, and your child, and about your

Page 142

Dargavel Primary 19.02.24
community, and everyone’s community, so that’s the important thing, that
you have a positive experience, and that you leave here saying, ‘Aye, that
was worth doing, that was worth going to.’ 
You get advice about how you run public meetings and it tends to be about
bigger crowds, and about respect, and-, but all I’m going to say is that every
single engagement we’ve had with the community of Dargavel throughout
this process has been exactly what you would want, it’s been open, it’s been
frank, it’s been respectful, hopefully on both sides. And we’ve got a chance
to understand the lived experience that you’ve had so that we can respond
to that and make it better, and tonight’s no different, we just want to hear
those things. So, tonight’s plan has shifted slightly, we wanted to get around
the table and talk about all aspects of this. Depending on the numbers, we
were going to split into two groups, we’re now just going to do a round table
discussion. So, it is recorded, I don’t take these everywhere I go, by the way,
just in case you (Timecode: 00:10:00) thought, you know, I just walk about
with these big microphones. It’s not that at all, but it is recorded and that’s
more about us being able to keep an accurate record of the discussion, as
opposed to anything public. It’s just being able to take it, we will then take it
and have it transcribed and that will allow us then to take time with what
we’ve got. So, coffee break we’ll have, all the points will be discussed and
covered, and then we’ll look at what happens next, and that’s what we’re
hoping to do tonight.
So, very quickly, this is what we’ve heard so far. So, so far we’ve had three
drop-in sessions in Dargavel Primary, three drop-in sessions in Bishopton
Primary, two information exchanges in here last week. I’ve met with the
Parent Council of Bishopton Primary, I will meet with the Parent Council of
Dargavel Primary, we’ve heard from the children and some of their stuff is up
there, and some more on the screens. Both schools, Bishopton and Dargavel,
I’ve met with both groups of staff to hear their views and their concerns. 
And then we’ve pulled together what the big issues are that have come out
from that process. And the first one is, the projections, the numbers, the
data, that was our issue the last time, the numbers didn’t turn out, let’s be
honest, the way we expected them to, and hence the reason we’re here. So,
the roll projections, then, have been a big conversation, to say, ‘Right, have
you got it right? Have you learned from previous mistakes? Are you
confident about your projections? Tell us more about that.’ So, we can talk
more about that tonight as well, there’s no problem with that. 
So, part of the proposal is not just that we build a new school, it’s that we
build it on a site at the north of Craigton Drive, and again, ‘How have we
done that? How did we get to that?’ And if you’ve got questions about that,
and people already have had-, we know there’s a big concern about traffic,
we know there’s a big concern about cars, and travel, and congestion, and all
of those issues, more around safety than anything else. So, again, we’ve had
some discussion and we can have more discussion about that tonight. The
design of the building, we’ve designed this building in a particular way. One
of the really positive pieces of work that was done prior to this process was,
the staff who work here have been involved in discussions about the new
school, have fed in their experience of working in this school, as have

Page 143

Dargavel Primary 19.02.24
members of the community, parents, and various other people. And we’ve
learned from that, and we’ve fed that in to the design of the new school, but
we will talk a bit about the design tonight, and answer any questions that
you’ve got about that. One of the particular ones we’ve have had is that the
open plan is something that we would want to have another look at, and we
will certainly be having another look at that at, and ‘Are we factoring in
planning for children with additional support needs?’ And in terms of our
commitment to all of our children, then, we absolutely have to do that, and
we can talk a bit more about that as well.
The second part, of course, is the community facility, 98% of parents, as we
were coming out of the last situation, said, ‘This has to be a community
facility, it has to provide things that we don’t have as yet, so how are we
going to do that?’ And we’ve had some discussions about that, and George
and I talked about that last time as well. And the project delivery, people
have said, ‘August 2027 feels tight, are you going to get it ready for August
2027?’ So, we can talk more about that, we can talk about the project plan,
but that’s already prompted some discussions about, ‘What might we have
in place if there seem to be delays?’ I won’t say, ‘In the event that there’s a
pandemic,’ because God forbid that we should have that, because we won’t
have an answer if there’s a pandemic, but something smaller scale, ‘What do
we do?’ So, these are all the things that have come up, as I say, alternatives
are part of this process, they have to be, but more importantly, they ought to
be because we want to know we’re doing the right thing for the children and
for the community, so we need to know that from you. 
These are the things we’ve heard about so far, I’m just going to finish with
what the children have said. You can have a wee wander around and see
what the Dargavel children have said, it’s not too dissimilar to what the
Bishopton children said. ‘It’s a bit too close to a burn,’ was their view on the
site, that’s not unreasonable. They were a bit concerned about falling in, to
be fair, and I, kind of, get that, so that’s quite nice. They thought the
catchment was fine, ‘Make sure Bishopton doesn’t get too big, the
catchment should be even,’ but they were very concerned that they’d heard
that we were building the school beside a bomb factory and they wanted to
know if there were still bombs in said factory. I couldn’t answer that
question, I said I would come back to them to confirm there are in fact no
bombs, so the children were very clear. The children have been great around
welcoming Dargavel children into the school, they feel they’ve had more
new people to get to know and new friends. It’s felt a bit uncomfortable at
times, particularly in that interim period, as opposed to now, when the two
schools were together and operating separately, and they didn’t like that,
they thought that was strange, so they talked to that. They also talked about
the fact that, you know, with more children in the school, ‘Is there a
possibility that there might be more bullying?’ And my answer to that, to all
of them, was, ‘The staff in the school, the aims of the school, the ethos of
the school will make sure that that’s not the case,’ but they wanted to ask
that question and their view is the most important of all. 
In terms of the future of Bishopton Primary they had a very clear message
which was, ‘You’re not going to knock it down, are you?’ I think somebody

Page 144

Dargavel Primary 19.02.24
had said, ‘There’s a man coming who’s going to knock your school down,’
because until I said, ‘No,’ to that, they were a bit tense about asking that
question. And they would like a more modern school, and then lastly, ‘What
would make Bishopton Primary better?’ Well, they would like a zip wire, a
swing and more mirrors in the toilets, so nice basic stuff there. The mirrors in
the toilets were a particular issue around if you’ve got tomato ketchup on
your face and you need to get it wiped off, or if your pal tells you, ‘You’ve got
tomato ketchup on your face,’ and you need to check because maybe your
pal’s just winding you up. So, what was great about the children was how
open they were about their experience of having other children in the school
and what it meant for them. But their voice is vitally important and some of
what they said there is important to us, and you’ll see that from the Dargavel
consultation as well. But we deliberately finish with the children because no
matter what our discussion is tonight, we want to keep the children at the
centre of it. 
Is that okay? So, there are the basics of where we are, the rest of the night is
really as open ended as it has to be. I can lead on some of those issues,
which I will go back to, these things here, and anybody that’s got any
questions then, we’ll answer them as fully and in as much detail as we can.
We’ve got the experts around the room who we will call on to give you a
specific answer but that’s what we’re going to try and achieve tonight, is that
okay? So, anywhere you want to start? Anyone at all? As a good teacher I
always give thinking time. 
Louise Chisholm: Actually, Gerry, can I just ask about the ASN needs? Because that’s not
something I’ve picked up a lot on, and it’s something I’ve been asked about
specifically recently, and I haven’t had the answer to. I’ve got a friend who
teaches at Riverbrae and she was particularly asking, and I couldn’t answer
that question. What are the plans in terms of teaching numbers, or? 
Gerry Lyons: There are a range of plans that tend not to tie into teacher numbers per se,
but much more into the way the school’s designed. So, all the classrooms
have client spaces and breakout spaces for children to get time just to
themselves, there are spaces like that around the school, particularly
important for neurodivergent children, children who struggle to cope with
too much noise, you know, any breaks in routine. So, there are lots of
breakout spaces, there’s one in every classroom, designed, there are
additional ones-, there are support bases for children to work in small
groups or to get targeted support based on the needs, so they’re built into
the design of the school as well. One of the specific matters we’ve had asked
of us is about children who are hearing impaired, so we are going to involve-,
do a bit of a consult with an education audiologist, just to get their view on
things we should definitely watch out for, things we should definitely be
building in to the design of the building. 
We have a fundamental commitment to inclusion and to meeting the needs
(Timecode: 00:20:00) of all of our children, and that will inform everything
that we’re doing here. And anything that we learn throughout the process,
we will feed it back in but some of it is very much about the design of the
building and the outdoor spaces are important from that point of view as

Page 145

Dargavel Primary 19.02.24
well. So, lots of different spaces, lots of different kinds of bases for children
and we’ll take on board audiology, and visual impairment as well, obviously,
it goes without saying, to ensure that it’s the most inclusive school it can be.
But it’s very much at the forefront of our thinking in terms of design. 
Louise Chisholm: And if there are children with higher needs, is there any thought of having
extra space for people who can’t be accommodated in a mainstream school,
or not in the whole, sort of, big picture of things here? Is that just not going
to happen?
Yes, so fundamentally we are committed to a presumption of
mainstreaming, that’s the policy of the government and we work to that
policy. And we actually are very much of the view that if we can have our
children in mainstream schools, that’s where they can be. However, through
our planning process and the Staged Intervention, if there are children for
whom that’s not appropriate, we have a range of other options that we can
use for (talking over each other).
So, they would attend schools which are already there?
Yes.
It’s just her thought was, that with such a large number of homes, the
chances are there will potentially be children with quite high additional
needs.
Absolutely, and we have got the current numbers around ASN that Gerry’s
provided and the Head Teacher of Bishopton provided, so we’ve got a sense
of the numbers. They’re not huge and they wouldn’t be such that would
cause us to have to make, I suppose, a separate provision, but they are
certainly present enough that we have to be aware in our planning, and in
the work that teachers do and support staff do, to make sure that the
children have their needs met. But that’s an ongoing thing, we are actually
going to have a separate meeting for parents with children with additional
support needs, so that they can talk to us about any concerns they’re going
to have. And we’ll have that fairly soon after this bit of the process. 
Okay, thank you.
So, I realise what you said about how you’re not putting numbers on
teachers or anything like that, and it’s very much around the school building
and design, and everything. But, you know, what plans are there for teachers
anyway in terms of, will they get some training for kids with additional
needs? Or what, you know?
Gerry Lyons:
Louise Chisholm:
Gerry Lyons:    
Louise Chisholm:
Gerry Lyons:
Louise Chisholm:
Jack Clark:
Gerry Lyons: So, there’s an ongoing, I think, challenge in Scottish education around
additional support needs, and our teachers are having to cope with an
increasing number of children with additional support needs of a wide
variety, actually. And certainly, the Morgan Review, which looked at
additional support needs-, one of the big things in the Morgan Review was
the importance of workforce development, about supporting staff in schools
so that they feel equipped to deal with the children that they have to deal
with. And some of that can be very challenging, Maggie I know, has been

Page 146

Dargavel Primary 19.02.24
involved in some challenges around that, and members talking about that.
We have made massive strides in inclusion in Renfrewshire in the last two,
three years in terms of building our Staged Intervention policy, and then
wrapping support around that, and teacher training around that. We’re
going to continue to do that and we will continue to grow our expertise and
our understanding of all of that. To me, that’s right at the heart of our
policies, that’s not a Dargavel issue, per se, that’s a Renfrewshire Council
issue, and that’s an all children in Scotland issue. 
Janie O’Neill: Absolutely, that’s what I was going to say, it’s across Scotland and obviously
any support and training for the staff would be the same support and
training that’s available, or will be made available to all of our teaching staff
in Renfrewshire. And it’s something that, as a profession, I think we’re
reflecting on at the moment because of the, you know, focus that there has
been and also what’s been coming back reported at a national level, as you’ll
probably be aware. But absolutely, there have been huge strides made, and
again, obviously Gerry and I are more recently involved in Renfrewshire’s
provision but we’re well aware of the huge strides that have been made and
which will continue to be made moving forward, supporting our ASN young
people. And part of the planning, as Gerry said, for the second primary
school in Dargavel will incorporate that, as it will with any other new build
schools moving forward. 
Okay, thank you, Janie. 
Any other specific questions just now?
I’ll start with the fun one then, the numbers, everyone loves the numbers.
How do you feel you’ve got your predictions this time right, compared to the
last time that was a complete and utter mess?
Louise Chisholm:
Gerry Lyons:
Grant:
Gerry Lyons: So, there are lots of bits to the answer to that question but all of them are
equally important. One is, try not to make the same mistake twice, you
know, we don’t want to find ourselves in the situation, we know the pain it
has caused. You and I had a big chat about that the other night, the pain that
was caused to the community by the last exercise and we’ve really looked
closely at why that happened. We’ve been working with a consultancy called
Edge Analytics and all the projections that we have for the new schools, and
for primary provision in the area, have been developed by them using a
model that they’ve used across the whole of Britain. So, what that’s giving
us, is a range of numbers-, so they have their own model, which took us to
1,131. We then asked them to do the same exercise from a starting point of
140 in primary one and that took us to 1,300. And then we asked them to do
that with the basis of 150 at the moment in primary one, and then used
their model from that starting point, and that took us to 1,500. This is not a
definitive position, that we know the number, we don’t know the number,
but we believe that the number will sit somewhere between that 1,100 and
that 1,500, but we are putting in plans if it gets to 1,500. 
So, if I can talk you through the numbers as they are at the moment, so
you’ve got 434 in here, as a capacity. With the modular classrooms at the

Page 147

Dargavel Primary 19.02.24
moment, I’m just looking at Gerry out of the corner of my eye, it’s 595 that
you’ve got in the building at the moment.
Gerry Carlton: We’ve got 595, yes.
Gerry Lyons: So, we’ve got 595 children, we’ve got Bishopton Primary at the moment that
can accommodate at a maximum 519, it’s not there yet but that’s the
maximum that they can have. So, with the current provision, we can get to
1,100, which buys us the time to build the new school. August 2027 is a
crucial point because at August 2027-,
Gillian Hoyle: Sorry, can I ask a point on that? You’re saying that the total numbers are
1,500 roughly, is that inclusive of all the children going to Bishopton Primary
and not just the two primary schools within Dargavel site? Or is that
inclusive of all kids?
Gerry Lyons: That’s the Dargavel children.
Gillian Hoyle: So, that’s the Dargavel but then you’re looking at capacity of just Dargavel
and Bishopton?
Gerry Lyons: At the moment because that’s what we need to deliver into the new school’s
build.
Gillian Hoyle: But to look at the capacity we need to also look at the current capacity
within Bishopton.
Gerry Lyons: Yes.
Gillian Hoyle: It’s all one village ultimately but the original village, the new village-,
Gerry Lyons: The thing about Bishopton is, when the new school is built, it will go back.
So, there are 100 in primary one just now, it will go back to 43 in primary one
when the new school is built.
Gillian Hoyle: I appreciate that, I’m just trying to make sure that the numbers don’t get
mixed up again.
Gerry Lyons: Completely get it, and anything that you say that helps not mess it up, we
want to hear it. 
Gillian Hoyle: If you’re looking at three schools and one number, and two schools and
another number, I think there might be a mess up somewhere. We need to
look at those three across all areas. 
Gerry Lyons: No, because we’re not looking at three schools at any point in terms of what
I’ve just said. The interim position is, the position between now and August
2027, that has to take in Dargavel Primary-,
Gillian Hoyle: And that’s what you’re anticipating the 1,500?
Gerry Lyons: No, no, that’s what it takes to, August 2027, which is a maximum of 1,000
between the two schools. 
Gillian Hoyle: Okay.

Page 148

Dargavel Primary 19.02.24
Gerry Lyons: When you build the new school, the calculation is done on the basis of a
new school of 800 and this school at 434. We could stretch it to 500 but
that’s using every space, and using every nook and cranny, so we prefer not
to. So, at that point, Bishopton isn’t part of the projections, it’s a separate
projection for Bishopton Primary. You then have a situation where between
that 800 school and this school, you could potentially accommodate the
1,300. However, if it goes to 1,500 we have the option of extending this
school so that we can accommodate 1,500 between the two Dargavel
Primary schools. We think that between the two Dargavel Primary schools
we have planned we can meet the numbers that are projected but we have
plans, and if the plans go beyond 1,500, and we’ve got no indication that
they will, then Bishopton Primary still provides additional capacity for us if
we need it. So, the difference I think, is two-fold, one is, the projections are
more detailed, two is, there’s a plan B, there’s a plan C, as opposed to, ‘Oh
my God, what are we going to do now (Timecode: 00:30:00)?’ Which was,
kind of, the last time.
The other part of this which is really important is projections, inevitably the
longer time goes on, become less reliable. You’ll know that, so the other part
of this is that we are also monitoring the live data, so we’re monitoring the
number of children in the schools every year and we’re going to do that, we
think twice a year, there’s still a bit of discussion around that. But it feels to
me that the right way of doing that is after census, so we take a census of all
schools in Scotland in September, and that tells us how many children are
actually in a building, it also tells us how many staff are in the building. We
then have the enrolment process, which happens between January and
March-ish, depending on the sector, and we will take the figures again, and
that will tell us who looks as though they’re coming, and we will measure
that against the projections. That will allow us to make decisions if we think
it’s starting to look more than we thought, or indeed less than we thought,
so we think we’ve covered much more. Okay, George. 
George Morrison: What are   the current combined
school rolls for Bishopton and Dargavel at the moment, and what’s the
current capacity for the two schools?
Gerry Lyons: At the moment, you’ve got 595 in here, and 450-ish in Bishopton.
George Morrison: Sorry, is that the occupancy?
Gerry Lyons: That’s the occupancy, we committed to Bishopton Primary that we wouldn’t
take them above 519 and we’ve got the 595 here. We can extend that a bit,
via, if we get the work done on the acoustics in here, we could potentially
add in another modular classroom which would give us another 25.
George Morrison: Right, asking the question I was really meaning to ask then is, you don’t
anticipate within the next three and a half years that the existing capacity is
going to get breached?
Gerry Lyons: No, 2027 is the time, George, if we don’t have the new builds up by 2027,
we’ve got an issue because the statutory requirement on us is, that we meet
the needs of all catchment children. And that means, they either go into

Page 149

Dargavel Primary 19.02.24
their catchment school, which is where we will end up, but if they don’t get
into their catchment school they get offered the nearest available school. Up
until August 2027, that is Bishopton Primary, beyond August 2027 you go
beyond Bishopton Primary, you start to bring in Rashielea Primary as
another one. So, we don’t want to get to that stage, that’s why August 2027
is so important. 
George Morrison: It’s a bit of an off the wall question, but in terms of making the projections,
presumably you’ve had to take account of housebuilding rates and
occupancy. How confident are you about the (inaudible) speed of
housebuilding and occupancy?
Gerry Lyons: So, there are people here who know more about housebuilding and
occupancy than I do but in terms of-, all our projections are based on the
final figure which is 4,322 houses in this area and the projection model used
by Edge Analytics, which has now been mirrored by our own team, takes in
number of houses, number of children per house on a formula, NHS data,
you know, migration into the local area, that kind of thing. So, it’s very
extensive, David, I don’t know if you’ve got anything you would add to that. 
David Love: Yes, I mean, I think the other thing to think about is just the rate of
housebuilding, so ultimately that will be continually monitored to ensure
that we are having a live data account of the occupancy of these units that
are coming forward. The market might change, if the economy changes, you
know, the housebuilding might slow down, it might speed up, so it’s about
making sure that we continually monitor that on a live basis to ensure that
we know what’s coming forward and what’s being occupied.
Janie O’Neill: (Talking over each other)
Laura Miller: Oh sorry, do you want to-,
Janie O’Neill: No, on you go.
Laura Miller: Because that obviously didn’t happen before, I’ve lived in Dargavel village
now for over ten years, and when we were sold our house we were told,
‘This is going to be an area with 2,500 houses,’ now, it’s up to, you know,
what you said, 4,322 houses. I mean, is that the maximum? Because at the
end of the day, I can’t see it being the maximum because there’s so much
space here that, you know, more houses could be built and more houses
could be built. You know, we pay such a high rate of Council tax that when a
plan-, you know, I don’t know how it all works but if plans go in and it’s like,
‘Okay, we’re going to get X amount of extra houses, this is X amount of
Council tax a year,’ no brainer. It’s frustrating when we’re sitting here and I’m
trying not to get angry about it, but this is our kids, and when you’re sitting
here thinking that, ‘We think that this will sit somewhere between 1,100 and
1,500 kids. August 2027’s a crucial point, if there are more than 1,500 then
Bishopton Primary have additional capacity.’ Like, my view of that is, that’s
unacceptable, we can’t have kids from Dargavel coming here, coming to the
new school and actually if they don’t get in to either of those schools, they
go to Bishopton. Or actually, if they don’t even get into that school they go

Page 150

Dargavel Primary 19.02.24
to Rashielea, like, we can’t even get to that stage, that shouldn’t even be on
the radar. 
Gerry Lyons: No, I completely agree with you and it’s actually not on the radar.
Laura Miller: Right.
Gerry Lyons: The radar doesn’t go much beyond 1,500 because that’s a what a projection
has given us as the very, very maximum. Now, Edge Analytics and ourselves
believe that the number will be less than that, we are pretty confident about
that but what we can’t do, and I understand your anger, and your anger’s
perfectly justifiable, but what we cannot do-, I will come in, in a minute, I’m
honestly not ignoring you. What we cannot do is take a position of, in any
eventuality, us not knowing what to do. So, all I’m trying to show you there is
not what we think will happen-, if you say to me, what do I think will
happen, I think Dargavel village will be served by two primary schools, and
those two primary schools will accommodate all the children that live in the
village, I believe that’s what will happen. That’s what the basis of this
proposal is but it’s incumbent on us to learn from the last experience, so that
we’re saying, ‘So, if not, and it gets to that, do we have a plan?’ ‘Yes, we do.’
‘And if, despite everything telling us it’s not the case, it goes beyond that,
what then?’ So, all I’m trying to do is give you comfort, which is, we’re going
into every single possible scenario but we’re planning on the scenario which
we think is the one that will come through, which is the two primary schools
meet the requirement. 
Laura Miller: And I appreciate that, and I know that you have to have things in place for
eventualities, if, you know, things don’t happen. But I think my concern is,
are the-, you know, you’re talking about roll projections, does that take into
account the fact that, potentially in the future, there could be more than
4,322 houses built? I don’t know. 
Gerry Lyons: So, I’m going to led David answer that, that’s a planning issue.
David Love: Yes, so there are 4,200 houses consented as we currently sit, you know,
ultimately the developer can’t exceed that without coming to the Council for
further planning consent. So, if they come to the Council for further planning
consent, at that time that’s when the consideration is then, you know, ‘Do
you give them permission, and if you were to give them permission, what is
the impact?’ So, ultimately, we’d be going to our education colleagues to say,
you know, ‘Here’s another proposal, how do we deal with that? Is there
capacity? What is the mitigation? Should that be, you know, even
considered?’
Laura Miller: Okay, so there’s a possibility that it could be exceeded but that all needs to
be signed off, like, within-, 
David Love: That’s all subject to further consent.
Gerry Lyons: That further consent is informed by a conversation about education
provision.
David Love: Yes.

Page 151

Dargavel Primary 19.02.24
Gerry Lyons: Because you can’t just keep loading and loading and you don’t have any
schools.
David Love: Yes.
Laura Miller: No, of course, we’re in a worse position than we are just now, yes.
Gerry Lyons: Absolutely but at the moment, everything we believe is that we’re going to
be dealing with 4,322 houses.
David Love: That’s what they’ve got consent for at the moment.
Gillian Hoyle: Is that the BAE’s consent?
David Love: Yes, that’s the BAE’s consent, so that’s the planning consent and there’s
nothing-, 
Gillian Hoyle: Just now.
David Love: Yes, there’s nothing to indicate that that’s-,
That’s not the house builders that have committed to X amount of houses on
a plot of land, that is BAE’s consent for this wider development?
No, that’s what BAE have in terms of their overall master plan. Yes, the
overall master plan (talking over each other).
I just want to be sure on that.
Okay, very patiently.
The reassurance is good but bear in mind consent was given 4,200 without
the infrastructure being there to support it, that’s how there’s some
nervousness in the community about the process. 
I know, do you know, I was thinking there, George, particularly your
question. I think it’s really important, and Gerry’s tried to highlight it, is that,
see the last time round, a number was projected and there was a steadfast
refusal to go back and look at the number again, irrespective of people like
yourself, David, continually asking for it to be revisited, and that was the
massive error. The key difference this time is that this will be reviewed
continually, and every time we review it, and we’ve got an updated position,
we’ll share it. So, that’s the key change, the whole ethos is different. 
What is the current Dargavel generated number of children? That’s the
effect of this school and-, sorry.
No, it’s okay, David, on you go, it’s fine.
Because there are 2,000 houses still to be built, which is equivalent to 500
kids at the current rate. Has that been built in?
Yes, so the current rate is about 800, another 500 will take you up closer to
that 1,300 that we think is the optimum figure. Yes?
Gillian Hoyle:
David Love:
LauraMiller:
Gerry Lyons:
George Morrison:
Louisa Mahon:
David:
Gerry Lyons:
David:
Gerry Lyons:
Jack Clark: Yes, so, I’ve got a couple of points I want to make. The first one, just
following on from the point about, sort of, roll numbers and things like that

Page 152

Dargavel Primary 19.02.24
is, that you said that it will be between 1,100 and 1,500, so you’re projecting
for it. But that’s still quite a big disparity in terms of pupil numbers, I mean, if
I take the primary school that I went to, you know, 400 pupils is four times
the size of the whole school that I went to. So, it’s a big number of kids, and I
was just wondering what provisions were in place in terms of individual class
sizes, to try and keep them around, sort of, 30 and under (Timecode:
00:40:00) pupils, and about teacher numbers and things? What plans are in
place and what were you thinking of doing with that? The other thing, just
around a similar, sort of, theme is, you’ve got this methodology for
projecting how many kids are going to be in the school and that, and you’ll
take your high, low, median. Is there enough confidence for that for going
into other schools? I realise it’s a bit tangential but about projecting that and
if there are schools in future going to be built, or in new estates like where I
stay, in Paisley, we’ve got the Hawkhead village that’s just been built and-, 
Gerry Lyons: It’s actually not tangential, I’ll take that point first if that’s okay, because we
are now in a place, in Renfrewshire Council, where we’re looking at the
whole learning estate. In one of the exercises which is just about to be
shared with us, Edge Analytics have done projected rolls for all of the schools
in Renfrewshire Council, so that we can see, you know, how it all fits
together, what the numbers are coming forward, and that will inform
planning, which Janie will be very much leading, in terms of the learning
estate, with all the colleagues round this table. So, that’s not just primary,
that’s primary and secondary to inform learning estate planning, so that’s
not a tangential point.
Jack Clark: Is, or will that data be available for-,
Gerry Lyons: Yes, absolutely, to go back to your first point, class sizes have statutory limits
associated with them. So, primary one is a maximum of 25, primary two to
four is 30, and primary five to seven is a maximum of 33. Again, we would be
at the very top end of the occupation of the school if we were getting to
numbers like 33, but those are the, kind of, statutory maximums. The schools
will not open full, so they won’t be at those maximums but again, they will
be decisions made by the Head Teachers of the school, who, for example,
might decide to make a class where the children are blending and working
really well together a bit bigger, to enable them to make a class where the
children have a few more challenges a bit smaller. We leave that with the
Head Teacher of the school to decide. 
Janie O’Neill: (Talking over each other) around that, obviously. That’s the decisions that
would be made by the teachers, yes. 
Gerry Lyons: Their knowledge of the children.
Jack Clark: Because it all affects, like, hiring decisions for hiring the actual teachers as
well. You know, you can’t go in expecting you’re going to get, for talking’s
sake, 1,500 pupils, and planning for that, and then you only get 1,200
actually. In that case, then you’ve got to lay off some teachers.
Gerry Lyons: So, all staffing decisions are made on what we call, ‘per capita,’ per child, so
based on the number of children in the school we will have a staffing

Page 153

Dargavel Primary 19.02.24
complement. One of the things that’s come back to us from the staff is, how
early will we make decisions about, you know, ‘What is the number of staff
in the school? How will we recruit? How will we manage that for staff?’ So,
that’s been feedback in the consultation from the staff in the two schools
and that will be something that we’ll factor in to our discussions. It will be a
combination of things, it will be a combination of staff who may be surplus
around the school, a consideration of giving people the opportunity to
move, which they did in Glasgow. They built a new school in Glasgow and
every school that lost children, the staff were given the opportunity to move
to the new school. And then there will be recruitment in that as well and
probationer opportunities. So, it’s further down the line, as you can image
but there’s a fairly well-established process for recruiting staff to any new
school and we’ll follow it. 
Gillian Hoyle: Regarding the numbers, and just jumping back to Bishopton and Dargavel,
well Bishopton, because it’s one village ultimately, Dargavel’s just a different
area. Can I recommend that you don’t just look at Dargavel’s side in isolation
and that you do look at Bishopton? The demographic of Bishopton has
changed dramatically, Mr Woodrow, you’ve been here a long time, I have as
well, I grew up in this village, when I was a child this was classed an old
person’s village. It is not that anymore, it is young, it is a young person’s
village. It needs to be taken into consideration.
David: That’s one of the areas that we feel-, the amount of modernisation to
houses-, the bulk of the village came in the 50s and 60s, and I make a fairly
brutal comment that they all have now gone out in boxes leaving houses,
good two or three-bedroom houses, solid houses, on the market. Folk come
in and look at the houses-, 
Gerry Lyons: That’s across the village, David?
David: Across the village and that’s where Bishopton Primary’s roll is going to be
different from what it is now.
Gillian Hoyle: Exactly, and I think if you’re only considering Dargavel and not looking at
Bishopton, and you think there’s this gap in capacity that can be filled by
Bishopton, we could end up in the same situation again.
Gerry Lyons: Yes, we have projections for Bishopton as part of the wider learning estate
planning, so we’ve got that, so you don’t need to think that we’re ignoring
Bishopton, we’re not. The only point I’m making about Bishopton is the fact
that it’s involved at the moment, and when does it stop being involved? It’s a
really interesting point about the changing-,
Gillian Hoyle: It’s never going to be, it’s not going to stop being involved. Bishopton as a
whole has changed, you put an M8 junction in, it’s now a commuter village
for people to get up to Glasgow really quickly. So, young couples and families
moved to the area instead of what was an older person’s village, where they
were commuting, or, which was the original, sort of, demographic, were the
people who were coming and working in this ROF factory. So, its
demographically split fundamentally changed. 
Various voices confirm that ROF is Royal Ordnance Factory.

Page 154

Dargavel Primary 19.02.24
Gerry Lyons: Is that the bombs?
Gillian Hoyle: Yes, well, it was. ROF, sorry, yes, well, it was.
Various voices state that it was rockets.
Gillian Hoyle: Yes, it was ammunition. 
Gerry Lyons: So, it was the people who worked in that factory that (talking over each
other.)
Gillian Hoyle: A lot of the houses that were built in the original village were built to house
people that were working in the factory. 
Gerry Lyons: Okay, so there are a couple of things about that, one is, 43 will be the
number in primary one in Bishopton once the new Dargavel is built. It has
capacity for double that without the school even needing to be have any
consideration of extending. It’s not out of the question to extend it, as well,
so we will keep Bishopton under review as part of the wider learning estate,
I suspect that won’t be my issue but it will certainly be Janie’s. But it’s really
helpful for us to hear that because you understand this community better
than I do, you understand it much better than I do. 
What’s the current primary one in Bishopton?
It’s 100.
And that’s because of here?
Yes.
David:
Gerry Carlton:
David:
Gerry Carlton:
David: 75 off 100.
You’ve got 100 going to Bishopton at the moment, 103 or something. Gerry Carlton:
David: 103, but I still think you’re going to be having a problem if you’re classing 43
as the end product. 
Gerry Lyons: Yes, but remember, it’s 43 at the moment, if it goes beyond that, it can go
beyond that by quite a significant number within the current building
without any issues.
Janie O’Neill: I was just going to say that’s the first time I’ve heard anyone speak of the fact
that things have changed so much, because part of the original, horrible,
sort of, thing that went wrong was that people looked at a comparison to an
old, established town, and a brand new town. It’s the first time I’ve heard
anyone say, ‘But that’s changed now,’ because this all happened twenty
years ago, obviously. 
Laura Miller: They used the numbers of the original village which was an old-, no offence
to anyone but it was an old person’s village, I grew up here, it was an old
person’s village.  They looked at you funny when you were doing things as a
kid.
Gillian Hoyle: Yes, but it’s all different you see, now. 
Various voices talk over each other and laugh.

Page 155

Dargavel Primary 19.02.24
Laura Miller: That sounded a lot more dodgy than it was meant to sound but really,
anything I did my mum knew about.
Gerry Lyons: That’s a childhood memory that’s not gone away. 
Laura Miller: But it is a different village now.
Janie O’Neill: So it’s changed so-, because that was obviously 20 years ago.
Gillian Hoyle: But the numbers they used to project the school at that point in time were
based off of the original old village. (Talking over each other) people coming
to a commuter town. 
David: And Braehead flats.
Janie O’Neill: Very interesting. 
David: It was one child in every seven houses, is what the original projection was,
and if you kept the number that ended up there, your 342 divides-, 2,300 by
7, you get 342. Could we persuade them that that was wrong? We tried, we
tried. 
Gillian Hoyle: Numerous, numerous.
Janie O’Neill: Thankfully, it’s a completely distant team of people.
Gerry Lyons: Yes, and I think David makes a really important point though, and I think it’s
the point that Louisa made, people like David raised issues, questioned the
numbers broadly, brought new numbers to the table, and every time they
did, we just left them. We took them and went like that, ‘Not right.’
David: Corporate arrogance.
Gerry Lyons: We’re not doing that this time, he loves that phrase, how many times has
that man used that phrase to me?
David: As many times as I’ve had a letter from Renfrewshire Council. I’m sorry, and
the other thing that we’ve got to get our heads round, and you folk all have
to get round, the secondary provision is going down the same way. They’ve
got it wrong at the moment and they’re going to get it wrong until it comes
to, ‘Oh dear, we’ve reached 2,000.’ How are you going to tell folk who live in
Erskine, ‘Oh, your kids are going to have to go to the Renfrew school,’? So,
that’s another subject.
Gerry Lyons: I’m going to come back to that, it is another subject and it’s a subject that
we’re going to engage with the community about because it’s really, really
important. Just to pick up the issue about the changed nature, one of the
things that we want out of this process is a better understanding of that. See
what we’ve got up there around thoughts, ideas (Timecode: 00:50:00) and,
you know, Peter in his advice to us, one of the things he said to us is, ‘You
need to understand the lived experience of people in Dargavel village and
more widely in Bishopton village,’ and I know you’re not separating the two.
Gillian Hoyle: It bugs me that people do.

Page 156

Dargavel Primary 19.02.24
Gerry Lyons: So, listening to that from you is really, really important because I need to
understand that, we all need to understand that because one of the other
conversations we might be having at some point, not just now, is, ‘What do
our teenagers do?’
David: Oh yes.
Gerry Lyons: What do they do? Not just now, David, was the phrase (various laughing and
talking over each other), did you not hear that bit of it?
Gillian Hoyle: The Residents Association and the Community Council have proposed
numerous things, my husband’s on the Residents Association and he has
proposed numerous things which have been vetoed, ignored, shoved in the
bin, to be honest. (Talking over each other) I know you were in that too.
Gerry Lyons: So, there’s lots of conflict but that changing nature of this community is a
really important part of this and I don’t live here, so I need you to tell me
that. David’s consistently telling me it. 
Janie O’Neill: Sorry, Gerry, the community facilities that are going to come through as well,
should be helpful in that regard, at least in terms of how we can ensure that
they’re a benefit. The schools obviously, primarily, the learning estate, that’s
key but as a community resource really, the drawbridge has got to be down,
the doors are open, it’s got to be there for everybody. Of course, an
important demographic will be teenagers as it changes again but what
you’re saying there about how it’s changed over the last period of time,
we’ve gone from being, you know, an older persons’, residents’ area, to now
a younger families’ and so on-, ten years from now-, I’m thinking about that
myself, just having moved into a new estate and then my daughter’s now just
about to turn eighteen, we moved in when she was six, it’s very different-,
the needs, you know, so I totally understand, thinking ahead and how things
have changed. We’ve got to be on the front foot for that, that’s what’s
important, just, you know, what you’re saying, and learning from, as you
rightly say, Gerry, people like yourself and obviously from David as well. We
want to do that, that’s what, obviously, tonight’s about as well, is getting
that information-, 
Gillian Hoyle: Tonight’s obviously about the primary school but it needs to be taken into
consideration because right now if you look at the example in Glasgow
recently, where children vandalised a playpark that was recently built and
absolutely destroyed it. Ultimately, they’ve done that because they didn’t
have anything to do in the local area, so I know that the focus has to be on
the primary school but there are wider considerations because ultimately,
those teenagers are going to come, unfortunately, into schools like this and
vandalise it and that’s what we do not want to happen. 
Gerry Lyons: Well, there are a couple of things about that. I mean, I think it’s a valid point
and we don’t want young people to be bored and then take out that
boredom in damaging-, I’m sure Gerry’s hugely comforted about prospect of
marauding teenagers. 
David: It’s all happening in Bishopton.

Page 157

Dargavel Primary 19.02.24
Gillian Hoyle: I’m trying to protect the school.
Various voices talking over each other.
Gerry Lyons: It’s not happening here, it’s not happening here (talking over each other) if
she was here you wouldn’t say that. 
Janie O’Neill: I’m just going to note these things actually up, so we can take them
(inaudible)
David: I know that there is vandalism at Bishopton Primary and it’s not just local, it
comes from elsewhere.
Gillian Hoyle: There always was.
David: But you don’t have issues here.
Gerry Lyons: Can I also pick up something from my experience of working in Glasgow? So,
I worked in the east end of Glasgow, taking in Easterhouse, Cranhill and
there were significant issues with gang violence in those areas over a period
of time. And one of the things that made that better was good activities for
teenage children to do, diversionary activity.
Gillian Hoyle: Exactly, and that’s why I’m saying there needs to be some consideration into
that.
Gerry Lyons: So, I think we’re very much aware of that, I think that’s a really good part of
the conversation and we’ll keep it live in the conversation to make sure that
we don’t create those issues. But maybe a bit more than that, that we do the
best we can for our teenagers, that’s part of this. 
David: A big step forward would be to get the funding to put into the development
trust so they can actually get the playing fields that were meant to happen
here, which money was taken out-, BAE said, ‘Fine, take it, stop RMG having
power over the playing fields, leave it to the community.’ And then it got
transferred but no money got transferred and BAE’s making (inaudible) of it.
Gerry Lyons: Okay, thank you for that. 
David: But that’s one for Renfrewshire Council.
Gerry Lyons: No, that’s part of the conversation, that is absolutely part of the
conversation. Okay, sorry, I do apologise. Listen, I’ve been a teacher all my
life, I still can’t spot a hand when it’s up, it’s absolutely ridiculous.
Grant: No, it’s okay, it’s fine. Some people have put the points already, so I’ll try not
to mention too much because obviously-, 
Gerry Lyons: No, no (talking over each other)
Grant: I’m from Erskine originally, so the high schooling-, Park Mains was my high
school, I was the last year at the old school before it got knocked down, my
sister moved into the new school, so, before all the new, fancy facilities.
Gerry Lyons: (Talking over each other)

Page 158

Dargavel Primary 19.02.24
Grant: No, I did have a good experience in my sixth year but I don’t want to go into
the full projection, I know there’s bits going through but obviously the main
bit, the main crux from before-, obviously, you know, the stuff we’ve been
pushing for. I know people across different areas have been complaining
about the ideas and numbers, I know even, people were worried about Park
Mains when the new school got built. There was a question, because
capacity was slightly less, I believe, than the previous one that was there. I
don’t know if it was a better school or not, I’m not going to say the issue of
having it, but is there going to be a case now along with all these
projections-, I know obviously there’s a lot more data analytics going on
there but is there now more consideration to put in more listening to people
that are actually on the ground doing it, rather than just sitting and going,
‘The computer says I fit 12,000 people, that’s it’? 
Gerry Lyons: Aye, no, I mean, I think, you know that way when you’re looking over the
independent reports and the feedback you’ve had from independent
organisations, then you sit and talk to David, you talk to parents, you talk to
the Parent Councils, the recurring message is, ‘We told you things and you
didn’t pay attention. We told you things and you discounted them. We told
you things and you put them in the bin.’ We do not want anyone saying that
about Renfrewshire Council, so we’re in a position just now where we’ve got
this proposal on the primary school, but it’s much bigger than that. It’s the
start of a more, I think, exciting approach to community engagement, a more
engaged Council, I believe, a more engaged group of services, because all
these guys round here have all been very clear, ‘We want to know about this,
we want to get it right.’ 
So, we will finish the consultation and it will be what it will be, it will not be
the end of the process, we will keep coming back to you with our progress,
we’ll keep coming back to you with what we think the numbers are looking
like, and we will invite you openly to tell us what you’re finding, what you’re
thinking. And all of that will be meshed together so that we continue to plan
effectively to meet the needs both of the children, the families and the
community. But we can’t do that ourselves and we don’t want to do it
ourselves. We believe that the figures we’re getting are right but if David
comes along and says, ‘Gerry, I’m telling you, there’s a hell of a lot more kids
appearing in that village than we thought,’ we’re not going to say, ‘No luck,
David, the computer said it’s not that.’ We won’t do that. 
David: Unfortunately, Bishopton at the moment, is very reticent to give out
information to the community.
Gerry Lyons: Yes, okay, I’m just going to listen to that (inaudible).
David: We’ve got a Freedom of Information in-,
Gerry Lyons: I know that.
Gillian Hoyle: There have been multiple Freedom of Information requests and all of those
have either been denied or ignored.
David: And that’s since the Bowles Report which said, ‘You have to get-,

Page 159

Dargavel Primary 19.02.24
Gillian Hoyle: Yes, my husband’s put in multiple, David’s put in multiple as well and they
have been ignored, so-,
Gerry Lyons: Okay, the FOI process is run separately, I don’t even-, the one thing we didn’t
bring was anybody to do with the FOI process but to some extent that’s you
asking us for things, what I’m talking about here is you giving us things that
we can work with, it’s a different thing. 
Gillian Hoyle: Yes, it just needs to be both ways, I do agree with the way that you’re going
about things from an analytics point of view, it sounds like the right
approach but we need to be able to see the outcomes of that approach. So,
for example, the David Bowles report and the Edge Analytics data suggested
certain numbers, that was prior to my son going into P1, those numbers
you’ve taken into account. But prior to you guys doing this they were not
getting taken into account.
Gerry Lyons: But they weren’t beforehand, okay.
Gillian Hoyle: I’m just using that as an example.
Gerry Lyons: No, I know what you’re saying.
Gillian Hoyle: I’m saying, we need to see that coming back from you guys, ‘Right okay,
we’ve taken that on board, this is what our projection was, this is what the
number is now,’ so that we can see what’s happening.
Gerry Lyons: In a way, that’s about engagement throughout the whole process, isn’t it?
Gillian Hoyle: Into the future.
Gerry Lyons: Aye, okay, listen, I don’t think-,
Gillian Hoyle: Each of your six monthly state points where you’re saying you’re going to
review the numbers, it’s just about putting it up on your website so people
can see it.
Gerry Lyons: Just come back and tell us, aye, no, absolutely.
Gillian Hoyle: You don’t need to do much more than put it up and let us see it.
Gerry Lyons: We fully intend that, and again, that’s just really helpful feedback in terms of,
‘Do this properly,’ and we will certainly do that. 
Janie O’Neill: Louisa has made a note of all the things we’re talking about, so we’ll (talking
over each other)
Gerry Lyons: Louisa’s writing like billy-oh over there, and obviously we’re getting a
transcription of this so we pick up everything, because that’s what we want
to do, so that’s really helpful, thank you. 
David: There’s been far better engagement with the community in the last month
than there was throughout the whole of the run up to the debacle. 
Gerry Lyons: Well, I think our colleagues will be pleased to hear that.
David: It was a debacle.

Page 160

Dargavel Primary 19.02.24
Various voices talk over each other.
David: You haven’t responded to David’s point yet.
Gerry Lyons: Haven’t responded to what?
David: John McIntosh’s invitation.
Various voices talk over each other.
Gerry Lyons: Excuse me, did you get that?
Louise Mahon: What would help ongoing? I know you’ve mentioned the sharing of the data
at every review point, but in terms of maintaining this level of engagement,
what would be most helpful?
David: Your education committee not being railroaded by (Timecode: 01:00:00) the
politicians.
Laura Miller: Children’s policy boards, the children’s services policy boards.
David: Yes, policy board, there’s been-,
Gillian Hoyle: I think that was a frustration across everybody, the situation became very
political and what happened was two sides were basically fighting over
Dargavel Primary, and ultimately that’s why people ended up going to the
press because they got sick to death of us-, our kids becoming a pawn in a
political game.
Gerry Lyons: See when you say two sides, is that two political-,
Gillian Hoyle: Political parties, yes, watch back some of those historical sessions, they were
eye opening, frightening, scary, disheartening.
David: I sat through the full committee meeting where virtually every Councillor in
that room ate humble pie and then in the very next school board meeting it
was back to the same old game. And you guys as officers, notice there aren’t
any elected members here. Oh, my apologies, yes you did speak to me at
that meeting, my apologies.
Gerry Lyons: I had a meeting with all the elected members-,
David: They’ve just got to get their act together and get it sorted out.
Gillian Hoyle: They need to stop putting it in this political hotcake and trying to win points
over our kids. They’re losing the respect of the village as a result.
Gerry Lyons: I think holding on to that principle of getting the best for the children and
young people is really worth doing, and certainly everything that we’re going
to be taking to the board will come from that position. So, we will certainly
make that point strongly.
Janie O’Neill: We want to keep them at the centre.
Gerry Lyons: Keep the children at the centre, keep the community at the centre and that
gives us the best chance of getting it right, but any ideas you can give Louisa
for the ongoing engagement, we would really appreciate that. You don’t

Page 161

Dargavel Primary 19.02.24
have to come up with it tonight, if you want to drop an email to me then by
all means do that, and we will look at what’s feasible, you know. Once, I
mean, David, you’ll be glad to know, now I’ve got my house in Dargavel
(talking over each other)-,
David: You’re joking! (Laughter)
Gillian Hoyle: You wouldn’t dare.
Janie O’Neill: I was having a look on my way in, I was like, ‘There are some nice properties
around here, (talking over each other) much of a commute.’
Gerry Lyons: Once you see me sitting outside Sainsbury’s with a table you’ll be able to get
hold of me. But that ongoing engagement’s really, really important.
Gillian Hoyle: It is.
Gerry Lyons: But you can help us design that, so help us design it.
Gillian Hoyle: It’s how you’ll changed the mindset of this village. 
Gerry Lyons: Aye, okay, listen, we know it’s not going to take a couple of meetings and
one consultation, (talking over each other) building community trust is-,
Louisa Mahon: There are obviously a lot of topics outwith the proposal we’re consulting on
tonight but I think it’s important we capture those, and that’s what we come
back and speak to you about again. It’s not losing sight of the fact that there
are other concerns and issues that we need to be chatting to you about
regularly and working closely on.
David: I’ve made the point about the funding for the development trust to actually
do something. Oh sorry, my apologies.
Louisa Mahon: Community development trust.
Gillian Hoyle: So, if you’re looking at engagement within the community, there are already
Residents Associations, there’s Bishopton Community Council. Very rarely is
the Council actually able to attend those sessions, being able to attend
those-, not every time, I know they’re quite frequent, I know how often my
husband has to go to them. You don’t need to attend them all the time but
being able to feed back into those sessions from time to time, I don’t think is
a bad thing. 
Gerry Lyons: Yes, great, no, not at all.
David: Gerry’s at the next Community Council.
Gillian Hoyle: Oh, are you?
David: The formal-,
Gillian Hoyle: He didn’t show me in his invite, he was going through them all, he said,
‘There’s nobody from the Council.’ 
David: The formal consultation polity doesn’t know because the agenda’s not out
yet because we’ve got another consultation on the same night, so we’ll be
second.

Page 162

Dargavel Primary 19.02.24
So, use existing forums more effectively.
Yes, the forums are there, they just-, and maybe we’re not making best use
of the forums ourselves but there are opportunities.
That would be appreciated.
Good shout, yes, good shout, okay.
And that’s to you, Louisa?
Yes please.
Okay. 
Is that okay? Okay, any other points that people want to raise, or anything
you would like to hear more about?
Yes, tell me about the design process and how the community will be kept
informed of how the design is developing.
I could take that, we discussed this last Wednesday. The design process
follows quite a-, it’s quite a rigid process itself, it goes through-, they’re
called RIBA stages, architectural stages. Right now, we are at the point where
we’re trying to appoint a consultant. So, consultant architects, consultant
engineers, we’re appointing them to try and get ahead of the game,
obviously, so that when we do have the consultation process complete we
are ready to start on a design. So, right now there isn’t a design as such
because we don’t have a site. The design process as you see from the
timeline up there, we’re saying that we will be on site for, I think, June,
approximately 2025 and we’ll be finished by August ’27. I can’t see that far.
So, that’s construction commencing June ’25?
June ’25, yes.
And that’s based on the proposed plot that you have just now and not a
different plot, I assume?
That’s based on something as a starting point, yes. July ’25, sorry.
Then July ’25 to August ’27 is the construction but there are design
processes before that.
So, the process of-,
How will the community be kept informed of what is planned to be built or
proposed to be built?
Well, essentially, it would be similar to this I would imagine, it would be
something we discuss with the client, which is education, Children’s Services,
they would come to us and say, ‘We want to have, maybe, presentation
sessions with boards, this is what we’re proposing.’
Louisa Mahon:
Gillian Hoyle:
Louisa Mahon:
Gerry Lyons:
David:
Louisa Mahon:
David:
Gerry Lyons:
George Morrison:
Frank Farrell:
George Morrison:
Frank Farrell:
Gillian Hoyle:
Frank Farrell:
Gerry Lyons:
Frank Farrell:
George Morrison:
Frank Farrell:
Chris Dalrymple: It’s the same answer to that last point that you made, how do we feed back
to the community? So, Community Council, separate forums, I think we need
to have a conversation about what the right forums are, where you want to

Page 163

Dargavel Primary 19.02.24
hear from us, where you want presence from us. Those types of forums we
can absolutely bring back design as it progresses.
Gerry Lyons: One of the questions that we asked about in terms of what we’re looking for
from an architect, ‘Is an architect just prepared to come along and talk to the
community about their proposals, the designs and how it’s all going to fit
together?’ So, we will keep that process going, so that you know when we
move from what effectively is concept planning at the moment, to more
detailed design planning and what that looks like, and that’s something that
we can just get feedback from you on the best way to share that. Would that
be a, kind of, open evening or, you know, actual-, I’ve not got the answer to
that but I’m happy for you to give me the answer and I’ll make sure that all
my colleagues here know about it, for you. 
Chris Dalrymple: Designers we look at, obviously, one of the questions we put to them, they
have to experience in building-, obviously not building schools but
engagement process, and understand the engagement process, the
consultation process, and that was quite high on the questions we set. So,
we don’t propose to bring every single consultant to meetings, that’s not
going to help, but the lead consultant, the designer, is who is probably most
appropriate and the best one to actually discuss any specific questions,
queries. They would bring these, sort of, designs to these sessions.
George Morrison: You’ll be doing it through Hub West, have you actually appointed firms yet?
Have they been appointed yet?
Chris Dalrymple: No, the Hub West process, you come to a financial close, so you can actually
have interviews with your potential design team, get that set up, and then
use Hub West. So, we are still a bit away from that and hopefully the
consultation process will be finished before we actually start physically
designing. 
George Morrison: My past experience when I was employed was dealing with design teams in
the public sector, etc, and my experience has always been, you need to keep
close tabs on them because they doing what they like to do, what they think
is good, and there’s quite a communication chain, a lengthy chain between
the community, education, yourself, back to the architects. The longer the
chain is the harder it is to keep the people in the community informed of
what’s going on. I’ve experienced that myself and I know from experience
that architects, they’ve got their own concepts, their own ideas and you
need to keep on top of them to try and make sure what they’re designing is
what you really want rather than what they think would be a good idea. 
We’ve not had that many problems dealing with architects in the past,
designers.
Lucky you.
Chris Dalrymple:
George Morrison:
Chris Dalrymple: Well, I think it depends what project it’s been on but for schools we’ve got
quite a good track record within Renfrewshire Council. I know obviously
people are going to talk about the school and the issues with that but we try
and ensure that when we’re building, designing a school, it’s designed
around what has been, obviously, identified by the client and what is-, not so

Page 164

Dargavel Primary 19.02.24
much this, this is probably quite a new process for new build schools but the
design process is essential. We’ve got a team of engineers, architects,
project managers, in house, a small team but we manage these jobs
through-, and we have to get a consultant project manager, a consultant
designer to oversee, that’s what we do.
To be fair, my experience of Hub is, they were a bit easier to manage and
influence, I go away back to the days of PFI and they were a lot harder to
actually control and influence. You got what you were getting rather than
what you wanted. 
Hub West want to work with us on this job.
Hub’s better, yes, it’s a long-term partnership arrangement.
We have done a great deal of new build schools with Hub West in the last
ten years, so we are basically-, I’m not saying dictating, but directing them
on what we want, and we’ll take information from this and we’ll feed that
back to them. 
The best people to ask are the two sitting here, they have the experience,
basically, of the current designed school, learning from what’s here for
Dargavel and making it better for the new one. You guys know what works
and what doesn’t.
And they’ve done that, so Space Zero, they spoke to myself and Louise and
they’ve also met with a group of staff. And you’ll see, if you read the pupil
consultation (Timecode: 01:10:00), when we asked them to give us their
views on the new school, they went straight for the design and it’s the open
plan design. When we walked into this school, it was, like, ‘Wow, this is
amazing,’ but then after a few weeks and a few months you think, ‘This is
quite noisy.’ And the open plan works well, it’s got its benefits but it doesn’t
suit everyone, and that’s the biggest thing that we want them to take away. 
I think what Gerry’s mentioned there about open plan, from my day and
probably a lot of people here, cellular classrooms were the way everybody
was taught, then it moved into a, sort of, cellular/open plan, and there
seems to be a possibility that people want to go back into the cellular. 
It’s having that possibility, and I think there’s that as well.
Various voices talking over each other.
A flexibility, I’ve had some good feedback about the use of partitions and
stuff like that, so that’s really helpful. 
George Morrison:
Chris Dalrymple:
George Morrison:
Chris Dalrymple:
Gillian Hoyle:
Gerry Carlton:
Frank Farrell:
Gillian Hoyle:
Gerry Lyons:
Frank Farrell: That’s what I’m saying, that’s the kind of things we’ll take from Gerry, and
not just this school but all schools as well, and we always do that, there are
always lessons learned from feedback. There are going to be new, sort of,
standards that education will say, ‘We want something changed, this is what
we would require in terms of breakout areas,’ and that’s what we’ve tried to
develop and evolve designs.

Page 165

Dargavel Primary 19.02.24
Gerry Lyons: Okay, any other questions? I do, I actually have a question that I’m going to
ask of the community people and the parents that are here, which is, it
doesn’t take a, you know, genius to work out that there are not that many
parents here. So, we had two sessions last week with small numbers of
parents attending, we’ve had tonight where we’d hoped to see a, you know,
really good number. The drop-in sessions we had, the numbers were fine, we
had good conversations but they weren’t big numbers. What can we do
differently, or what should we be doing that we’re not already doing to hear
from a bigger number of people get people along to these events so that we
could hear from the whole community? Can you give me a steer on that?
Gillian Hoyle: It’s difficult because you’re being tarred with what happened a year ago. All
of these people came to sessions, myself included, and sat in here, and
listened to us being lied to, us being told we’re liars, us being told numerous
different things by certain members of the group. And people are not happy
about it and do not want to have to sit here and listen to it again. There was
one woman in one of our sessions who burst into tears because she was
physically lied to and told that she was a liar, in the session, in front of-, I
don’t even know how many people were in there, there must have been
about 50 or 60 that were in there. It’s a difficult one to change.
Gerry Lyons: We’ve got to break through it somehow.
Gillian Hoyle: I don’t know how you can change that.
Gerry Lyons: Because if you’re angry, and you’re saying you were getting angry earlier on,
I want to know that. I don’t want you to be talking about how angry you are
somewhere else, I want you to look my straight in the eye-, which I know you
did, and you did so very well, I congratulate you on that, and tell me, ‘Gerry,
I’m absolutely raging about this.’ There are people out there that I’m not
hearing from and I just want to get them-, am I better just doing an online
thing? Am I better sitting outside Sainsbury’s with my table with a pen, you
know? Our team want to know that, don’t we Louisa? We’re frustrated and-,
David: The first meeting I had in here, in the relatively recent past, on the Monday
we had easily 60 or 70 people here.
Gerry Lyons: We did, yes.
David: Now that was because they were directly affected by what was happening,
that was-, they’d been moved into Bishopton rather than here. So, they had
a direct input into what their thing was. All the people in Dargavel were sold
a message that this was going to be a sustainable community, that all the
resources would be there, and here you’re all paying £2,152 a year to
Renfrewshire Council and we’re saying, ‘What are you getting for it? You’re
not even getting the grass cut.’ I’m sorry, that’s where there needs to be a
completely clear-, and what the Councillors were asking-, or one side of the
Council was asking for a review of the secondary provision, to take it down
to what is the situation. If we had three secondary schools in this part of the
world, Gryffe, Park Mains and Bishopton, about 1,000 pupils per school,
that’s what you have to start talking to people about because the people

Page 166

Dargavel Primary 19.02.24
you’re going to affect-, it will affect them in the long term, because their
primary kids are not going to get a place locally. 
I hold my hands up, I suffered all my school my days from being shipped out
to Paisley, to go to school in Paisely. I couldn’t get involved in extramural
activities because I had to get the 4:06 train to get back home or someone
would be wondering where the hell I’d got to, and it’s that feeling of
belonging to a community. And from that point of view, when BAE
themselves said, ‘We’ll need to have a secondary school on this site after
1,500 houses are built,’ but 4,322 and it’s completely off Renfrewshire
Council’s agenda.
Gillian Hoyle: Can I also just say, just in general, I mean, I think, when you’re doing your
information sessions, like for example your meeting tonight, which is a
Monday night. You’ve got your meeting, I think, in March, the next public
meeting, which is a Tuesday. So, I think it’s good that you’re doing them on
different days but obviously, I think, the main issue is what you said about
the way people have been treated in the past. I think, just in general, to take
into account that folk have got kids at home, you know, they might not have
childcare, during the day they might not be able to come in because they’re
working. You know, I came to the meeting today because I know that, you
know, my husband’s at home looking after the kids. He works in London, I
know that by the time the March meeting comes, he’ll probably be in
London, so you know, I won’t be able to go to that one. So, just in terms of
logistics, not everybody will be able to-, I’d quite like to come to the one in
March again, but that’s also a factor that maybe needs to be taken into
account. But it’s good that you’re doing them on different days and at
different times and things.
Gerry Lyons: Is an online solution part of that, or is that just too simplistic to say that?
Gillian Hoyle: No, I mean, I think that’s useful, I think it’s useful for people who maybe
can’t get out but yes, at the end of the day you’ve got childcare, you’ve got
kids who you need to get homework done, get into bed, kids who don’t want
to get into bed and it takes longer than-, 
Gerry Lyons: Aye, so like, childcare facilities at the meeting wouldn’t help that?
Gillian Hoyle: Oh no, well, I don’t-,
Various voices talking over each other.
Laura Miller: We would have a lot of hyper kids.
Gerry Lyons: Janie said to me, ‘I’ll look after any children.’ (Laughter) Don’t deny you said
it, Janie, because I heard you. But no, it is genuinely saying, there are the
challenges, what’s the answer? And at the moment we’re not getting the
answer because we’re not getting people-, but I take your point that there
are scars there that need dealing with and how do you do that? Yes.
Jack Clark: Yes, I think there are a couple of things I was just going to say on that, is that,
as you’ve just said, it’s about rebuilding trust and rebuilding goodwill
between the parents and between the Council and everyone else. And
having, sort of, flexible options for people who can’t come in for childcare

Page 167

Dargavel Primary 19.02.24
but I think the other things is around the, sort of, community aspect of it. I
mean, I was quite similar growing up, it was a half hour bus ride to school, I
couldn’t do any, like, extracurricular activities at school. But there has been
so much tonight that I’ve noticed about talking about Community Councils
and Parent Councils, and things, and getting them involved. But the thing is,
not everyone’s involved in their Community Council. I mean, if you take
Paisely, four of the Community Councils there have gone defunct, a fifth
one’s at risk of going defunct in a few weeks’ time. People just aren’t
involved in the Community Councils, you can’t just use that as a way of doing
it, you need to reach out, whether it’s-, 
Gerry Lyons: No, so, what would you suggest is a better way of doing it then?
Jack Clark: Well, I think yes, having them on board where possible but also, I don’t
know, just having stuff through the Council. Say, if there was, like, something
that goes out from the Council, like a newsletter or something, for talking’s
sake, and it says, ‘There’s a consultation on the primary school on this day at
this time. There’s also a Zoom link if you want to come along on Zoom.’  And
just being more direct with people rather than doing it through, like, a third
party like a Community Council.
Gerry Lyons: Alright, okay.
David: My comment is that it’s far better since-, well, I’m saying the last three or
four months, you’re getting updates every so often online. Some of it’s
relevant, a lot of it’s other places but you see things happening and from
that point of view, it’s a bit of a building block towards re-engaging. 
Gillian Hoyle: Exactly.
Laura Miller: That’s what we want.
Gillian Hoyle: We need to start-, I think you’re not-,
Gerry Lyons: And we know it’s not a (talking over each other) process.
Gillian Hoyle: I don’t think you’re going to start seeing the numbers coming to this again
until you’ve started to make in-roads, until they’ve started to see the
changes happening. That’s why I was saying about continually reporting the
numbers and see where you-, people are seeing change, seeing the
difference and then will want to be engaged.
Gerry Lyons: So, are we suggesting then that the public consultation will not be the right
forum for that, it will go beyond that?
Gillian Hoyle: This is a long-term thing, this isn’t a quick win.
Gerry Lyons: No, I know that anyway, but what I mean is in terms of making this
consultation work, which only runs until the end of March, that we should
just-, I don’t mean resign ourselves because I never give up on anything-,
Gillian Hoyle: You need to go with what you’ve got.
Gerry Lyons: But we just need to keep doing what we’re doing but recognising we might
be doing it to small numbers, but each one maybe matters.

Page 168

Dargavel Primary 19.02.24
Janie O’Neill: My intention’s not to get to the end of the consultation and say, ‘Right, that’s
it,’ (Timecode: 01:20:00) it’s about continuous engagement with the
communities, and this is hopefully, as you say, a building block. We
understand it’s not going to happen quickly or overnight but we’re quite-,
we’ll keep offering as much as we can, the whole team feels exactly the
same way, and we recognise it will take time but we hope that, you know,
we’ll get there, and we’ll work with you to do that, and listen to you as well. 
Gerry Lyons: And there’s no reason why you should trust that, you just need to see it and
experience it. And that’s the point, isn’t it, and that’s why you (talking over
each other).
Gillian Hoyle: Exactly and that’s why we reply, ‘Continue reporting,’ actions speak louder
than words.
Sure, I agree.
Okay, great, is that not a bad place to leave it, do you think? Peter, sorry.
Janie O’Neill:
Gerry Lyons:
Peter McColl: Could I just say one more thing, which is, I think-, I mean, I can’t speak for
you and how you’ve experienced this but if you have found that there’s been
a change of attitude, I think it’s really important that the engagement comes
in to the consultation in the period when the consultation’s open. And I
appreciate what you’re saying about a lack of trust and things but I think
there are questions that will have to be answered as a result of the
consultation. And therefore getting as rich a response into the consultation
as possible is really important and, I mean, I think there’s a willingness to
listen, and I think it would be helpful to get more responses in that spirit.
Really, what Gerry started with, we want to get the best thing for the
children and for the community, and I think that has to be the priority here.
Gerry Lyons: And there will be an online questionnaire released very shortly which will
allow people who can’t come to meetings through that forum, so that will be
another opportunity that people will have. 
Gillian Hoyle: I do have two more things, yes, I am being that person when everyone wants
to go home. First of all, the existing Dargavel Primary, there were things
descoped in the original plans, specifically the MUGA, it was originally meant
to be a 5G pitch with floodlights. Is there an opportunity in all of this to get
the MUGA upgraded and it become the 5G pitch that it was originally meant
to be?
Gerry Lyons: Honest answer, I don’t know, honest answer.
David: It’s a very similar one to the funding to the (talking over each other)
Gerry Lyons: Aye, but listen, we’re taking a note of it, so, let’s start the conversation but I
don’t know.
Chris Dalrymple: I think that’s what we’d need to discuss, Gerry, as part of it. Obviously, the
last one wasn’t run by us, we had an oversight of it, and it you’re absolutely
right, it was descoped. One of the key things for the new school is making
sure that finance, resources, everything that Frank’s team are going to put
into this correct.

Page 169

Dargavel Primary 19.02.24
David: And ringfenced.
Gillian Hoyle: Ultimately, we know that the current football clubs use Inverclyde and they
pay, I’m imagining, quite a lot of money every single week to another
community instead of coming back into Dargavel Primary or the other
primary school. 
George Morrison: Thousands of pounds every year going out of this community.
Gillian Hoyle: That should be coming back into this community.
David: Or on to the Development Trust. 
Chris Dalrymple: I would completely agree, anything that’s in Renfrewshire should be staying
in Renfrewshire, more locally, within Bishopton, and it’s one of the
commitments that there will be a synthetic pitch with floodlights that can be
used by the community, in the new school.
Gillian Hoyle: In the new school.
Chris Dalrymple: Correct.
Gillian Hoyle: Yes, I’m keen to try and see about getting this one upgraded so that there is
then a facility for the kids, and there are two facilities then instead of just
one. 
Gerry Lyons: I think that would be an excellent quick win for the Council.
Gillian Hoyle: There was a lot of disdain on the MUGA, just, there were a lot of views on
that one.
Gerry Lyons: I’m not going to back over the dad race when they all got too competitive
and somebody fell and got badly-,
Louise Chisholm: It’s me that organises that, wheesht.
Gerry Lyons: (Talking over each other) with the MUGA, that’s all I want to say.
Gillian Hoyle: My second point then, was on the secondary school. I do still think that you
are open to issues down the line with the secondary school and that it
should be getting considered as part of Bishopton. 
Gerry Lyons: I hear that, I hear what you’re saying, it’s a different conversation but it’s a
conversation that we’ll have, absolutely.
David: The priority’s the primary at the moment. 
Gerry Lyons: Yes, and this is a consultation on the primary. 
Gillian Hoyle: Yes, it is, but let’s not just push it down the line.
Gerry Lyons: But let’s not just that we’re not talking about the secondary, we’re going to
talk about the secondary, we’re going to have similar conversations about
the secondary as this. And we will have those conversations from the
different perspectives that we bring to them, and that’s right and proper, so I
can assure you of that, you don’t need to worry about it, we’ll have that
conversation.

Page 170

Dargavel Primary 19.02.24
Laura Miller: Yes, because I think, you know, and I probably speak for every parent that’s
going to have a child coming through either this school or the new school,
that-, and even actually, kids that will be going to Bishopton Primary, you
know, between these three schools you’re going to have a lot of children
who’ve had a very-, and this is no offence against the teachers because this
is a great school, a very disrupted primary education, through no fault of the
teachers or anything, but through, you know the whole process of-, you
know, you’re going to have some children who when they go to high school,
have potentially been in three separate primary schools, three different
primary schools, they’ve been in Bishopton, they’ve been here, maybe
they’ll have their last year over in the new school. And whilst the primary
school’s important, high school’s extremely important, you’re going up-, this
is where you’re going to, you know, potentially get your qualifications. 
So, I think, yes, you need to get the primary school sorted and everything
needs to get done with that, but I definitely don’t think that we can lose
sight because I’m just thinking about having my daughter thinking that she’s
going to be going to Park Mains with her pals. But is she going to be going to
Park Mains with her pals? What happens if she’s not and she’s getting
shipped to, you know, another high school? If I wanted her to go to that high
school I’d move to that catchment area, you know, and that’s-, I think a lot of
parents will be concerned, and I know what you’re saying, it’s about the
primary school, and I get that, but I definitely think that we shouldn’t lose
sight because this is just going to be more complications further down the
line.
Gerry Lyons: Yes, I’m not saying that in terms of, it’s not in our sights, it is in our sights and
it’s absolutely in our sights. My point is only that this consultation’s about
this bit, but your point’s a valid one. 
Laura Miller: Of course.
Gerry Lyons: And your whole educational journey’s important to parents for their
children, and we know that, so we want to keep talking about that, and we’ll
have those conversations. I’m already committed to going to Bishopton
Community Council to talk about Park Mains after Easter, and I’m happy to
make that offer for officers to come and have these conversations. Which
might just at first be coming and saying, ‘Right, we know where we think we
are, tell us where you’re coming from,’ and then build from there.
And the Park Mains Head Teacher is going to do that as well. Louisa Mahon:
Gerry Lyons: And the Park Mains Head Teacher, so we’ve got a plan for that, and just
watch out for that coming down the line, okay? Everyone okay with that?
Are we okay to draw it to a conclusion?
In fact, you guys have been out often enough.
No, it’s alright.
David:
Louisa Mahon:
Gerry Lyons: Listen, we made a commitment to engage and we can’t engage from
somewhere else, we can only engage in here, so we’re delighted to be here.
And as I said at the start, I love these meetings, these meetings are terrific,

Page 171

Dargavel Primary 19.02.24
really good, they’re open, they’re frank, they’re decent, and they’re with
people who are genuinely concerned about getting the best for the children.
I’ll talk to people like that forever.
Laura Miller: We respect that.
Gerry Lyons: So, there’s no problem with that at all, I thoroughly enjoyed it. I wish I’d
spoken to more, you know my frustration there and I hope you don’t mind
me acknowledging that.
Louisa Mahon: You’ve still got the opportunity, I mean, there are two more information
evenings, there’s another public meeting where-, 
Gerry Lyons: Aye, we’re trying to do things differently.
Louisa Mahon: Absolutely, we’re so keen for more people to come along and attend, so
we’re going to be talking, I think, this week, about getting information out to
everyone across the villages, how can we do that, try and encourage more
people to come along attend, if you can help us with that, that would be
great.
David: (Talking over each other) to push (talking over each other) folk coming,
there’s a barrier to be broken down.
Gerry Lyons: Absolutely.
Laura Miller: There’s definitely a barrier to be broken down but, I guess, I would say I’m a
bit disappointed there’s nobody from the PC here, from the Dargavel Parent
Council. 
Janie O’Neill: I have to admit, I was really surprised when I arrived because based on the
number of emails and the amount of talking, and conversation, and what an
incredibly huge, sort of, subject this is, I honestly thought it would be very,
very busy. I have to be honest, I’m very surprised.
Gerry Lyons: And we certainly planned for that but it’s helpful for us to get, again, lived
experience from people saying, ‘This is probably why, Gerry, and it’s
probably beyond your capability at the moment to fix it, but time will maybe
help with that,’ so that’s fine. But listen, can I say to everyone who’s been
here, thank you for (a) coming along and (b) for the way you’ve contributed.
I’ve really enjoyed talking to you, I think we’ve all enjoyed hearing your
concerns and the way you’ve expressed them. And, you know, just to finish
with our commitment, I’ve been talking to everyone here in the offices and
there’s not one person who’s not absolutely determined to get this right, and
I can assure you of that. So, we’re going to keep working through.
David: Right, tell the politicians that. (Laughter)
Gerry Lyons: I’m going to leave David with the last word on that (Laughter, talking over
each other).
Recording ends.

Page 172

Dargavel Primary 05.03.24
Introduction
Gerry Lyons: Okay, good evening, everyone, lovely to see you all and I’m sorry I’m using the mic.
You’ll see there are microphones around all the proceedings tonight, which are for
the recording of tonight, with a view to getting an accurate record of the discussions.
So, all the sessions will be recorded, I’m using the mic, not just because I’ve got a bit
of a throat but because we can record, like I say. So, firstly, welcome to all of you and
thank you for coming, it’s great to see so many of you here tonight. If I can just
introduce myself, for those of you that I’ve not met before. I’m Gerry Lyons, I am
interim Head of Service for Children’s Services in Renfrewshire Council and the lead
for this statutory consultation, I will be leading and chairing proceedings tonight. I
have a range of colleagues with me who you’ll meet as the night goes on, I’m not
going to introduce them all just now but they’ll introduce themselves as we go
through the proceedings tonight. We also have representation from Education
Scotland who is here purely as an observer and will not become involved in any
conversations, that’s not Education Scotland’s role, it’s to observe and to evaluate
the process, and to give feedback, so that’s the way that will work from the
Education Scotland perspective. 
I’m going to open tonight with a very short presentation because tonight is really not
about you listening to me or to anyone else but much more about you getting a
chance to-, for us to listen to you and we know that’s not been something that has
been done in the past particularly successfully, but we are very determined to rectify
that and to take a listening position on all of the issues, as far as we possibly can. So,
let me just, kind of, introduce then-, and although this is a proposal which is very
practical, the building of a new school in a particular place and a series of catchment
areas, I think it’s worth taking some time to reflect on what sits underneath that, and
to hold on to what sits underneath it, which are these two things here. That firstly,
we want to deliver the highest possible quality education provision for all of the
children, and that’s both now and in the future, there is a pressing element to this
and I’m sure we’ll talk a bit about the pressing element of it. So, we have to deliver
for the children now, but we also have to deliver a facility that, in whatever number
of years from now, is still worthy of those children, is still giving them an
environment where they can learn and achieve their potential, so those are the two
joint commitments to the children. 
The second principle is one which is really important to us and has been really
important to loads of people we’ve spoken to, which is that community
commitment, the facilities for community use which enhance the community of
Bishopton and Dargavel. Already we’ve had lots of feedback from people saying that
that’s something that’s really missing at the moment, that’s a real miss, and also that
we set out on that road before and never really delivered that. One of the important
principles is that both of these things are fundamental to the proposal. One is not
ancillary to the other, they are absolutely fundamental and therefore our intent is to
deliver on both of them. So, tonight is, just for the context, a public meeting, it sits
within the statutory consultation guidelines that are set out by the government, and
we have a set of outcomes linked to those principles that we want to deliver tonight.
The first one is that transparency, and again, that’s been a criticism in the past, that
we haven’t been as transparent as we could be, and tonight we are going to-, and
throughout this process actually, it’s been a real guiding light for all of the officers
involved, that we are transparent about facts and if we don’t have facts, about going
and getting those facts, and bringing them back. About the constraints that exist and

Page 173

Dargavel Primary 05.03.24
Introduction
that we have to accommodate within this process and the challenges that we face,
and some of those are challenges which impact very directly on you, if not all of
them. So, we have to be open about that and help give a genuine picture of the
situation where we are. 
We want to listen and we want to understand the lived experience, which for a lot of
you has been very upsetting, has been challenging, and has made you very angry,
and we get that, but we want to understand it better. We want to hear the widest
range of views and part of this whole approach has been to get as many different
ways that people could contribute as we could, so that we could hear from as many
people as possible, and all the views that exist, both within the community and
across the whole of Bishopton. What are the concerns and what are the thoughts?
Again, so that we can inform what we’re doing by those. A statutory consultation has
to start with a proposal, and we do have a proposal, but it is open to alternatives and
to the possibility that there’s a better way of doing this, and we need to hear what
those alternatives might be, so that we can give them consideration prior to any
decision making. We want tonight to be a positive experience for everyone and I’m
aware, and I’ve had it told to me in other sessions that we’ve had, that previous
public meetings weren’t necessarily positive for people. We want tonight, whatever
happens and whatever you feel about the outcomes, that at least you feel it’s been a
positive two hours of your life, and that it was worth coming along. So, we want that
for everyone tonight.
So, the way we’re going to organise the session, we’ve got this quick introduction
from myself, we’re then going to split into two groups. The first group will go next
door and they will work with Gerry and Alistair Morrison to talk about the site,
transport, and all issues associated with that. Those people are the people that are
responsible for delivering on those issues, so they’re the best people to talk to. The
second group will stay here with myself and we will talk about catchment areas, roll
projections, admissions, all the, I suppose, education stuff. You’re not tied to any of
those, you can talk about anything you want but those are the, kind of, focus. We’ll
do that for about 35 minutes, give or take, we’ll then have a quick comfort break and
I’ll go next door, and Alistair and the team will come in here, and we’ll have the
second workshop where we swap round the areas of focus. We’ll then come
together about 8:40 for any final questions or any final comment, or any issues that
you wanted to hear about that you’ve not had the chance to hear about. The whole
design of the evening is about giving as wide a range of information and fitting in
with those outcomes that we identified. 
Just, I suppose, the ethos of the meeting and how we want to conduct the meeting.
We want it to be open, so if you’ve got something to say, it’s right and proper that
you say it, I don’t want anyone to feel that they can’t say whatever they want to say,
and that there’s an honest exchange of views. You will probably disagree with each
other, that’s absolutely fine, but that is open and honest, and well intentioned, and
holding on, I think, to those principles about getting it right for the children and for
the community. We want that done with that backdrop of mutual respect and a civil
way of going about our business, and that as chair, is something that I have
responsibility for, to chair in a way that makes sure that that’s intact, that we hold on
to finding solutions and looking forward, but not in a way that disregards what
happened in the past. What happened in the past is absolutely relevant and still live
for so many people, but we want to try to, kind of, give credit to that, recognise that,

Page 174

Dargavel Primary 05.03.24
Introduction
but also say, ‘Right, so what do we do differently moving forward?’ Lastly, that if you
ask something we don’t have the answer to, we are going to tell you we don’t have
the answer, but we are going to commit to finding the answer and bringing it back to
you, so that there’s not a, kind of, waffling our way round things we don’t quite get.
We are going to be honest and say, ‘I don’t know the answer to that but we will
commit to getting it to you, and when we’ll get it to you.’ So, that is really how
(Timecode: 00:10:00) we want to organise the evening and hopefully run the
evening, I hope you’re all comfortable with that. 
Let me give you a wee sense of what we’ve heard already and that may be
something you’ve heard already, if you’ve been at information sessions, so apologies
for that, but it maybe sets a scene for some of the discussions we’re going to have.
One of the biggest conversations we’ve been having is about the numbers, of course
that was one of the biggest issues the last time, if the not the biggest issue. So, ‘Are
the numbers accurate? How are we making decisions? Are we thinking through all
the possibilities?’ We’ve had quite a lot of chat about that. The site decision, there is
a site matrix, we have gone through a scoring process, Alistair will talk to that and
answer any questions about the site matrix. The decision-making process is outlined
in the booklet that you can take away with you, and the timing. 
Consistently what I’ve said, and I’ll say it again this evening, is that August 2027 is a
key date for this. We have primary one parents who are having the location of their
child’s education, and primary one education, decided by a ballot. We want that
situation to exist for as little time as possible, it’s on us that it does exist, so there’s
no hiding from that fact, but it’s not where we want to be. I’m very aware of how
important that is to all of you, and you want certainty. August 2027 is a key date for
us because until then, we can manage the primary one numbers between Dargavel
and Bishopton. By August 2027 we can no longer do that and the schools would then
extend out to the next nearest school. We want to avoid that scenario at all costs, so
timing has been one of the things that is driving our position on all of this. We know
there have been huge traffic and safety concerns, we know there continue to be
huge traffic and safety concerns. There was a conversation the other night about a
temporary drop-off zone in this school, and you’ll get more detail of that this evening
from Alistair and from Frank. I had my first meeting today about the scheduling of
that temporary drop-off zone and when it will be ready, and when it will be available
for use. It was a very early discussion and Frank and Alistair are far better positioned
to talk about that than me. 
We can talk about the design of the building, we have tried to learn from the
experience of this building, and the experience of people who work here and who
learn here, and they’ve been involved in our conversations about the new building.
We’ve heard so much about community facilities, you know, the MUGA that’s in this
school, which was never what people thought they were getting, about the
importance of a sports pitch, sports facilities, those facilities that allow people to
have clubs and have societies, and all of that kind of stuff, so we know how
important that is. 
The big question, you know, ‘Is the school going to be ready on time?’ We believe it
is but following the consultation and the kind of conversations we’ve had during the
consultation, we’ve now started processes to say, ‘So, what will be our position if it
starts to look as though it’s not going to be ready in time?’ There’s a bit of a, ‘Heaven

Page 175

Dargavel Primary 05.03.24
Introduction
forfend,’ around that but nevertheless, we want to be ready on the off-chance. What
are the alternatives? Again, we’ve heard alternatives, we’ve heard proposed
alternatives from people in terms of different sites, and again, we have to be open to
them. We did have a question about how it works if the decision is that we don’t use
the site that’s in the proposal, do we just move to the next one? The answer to that
question is, ‘No, that’s not what happens.’ What happens is, we have to go back to
the joint board and we have to draw up a new proposal, we have to identify the
specifics of it and bring back a new statutory consultation on that new proposal,
whatever that may be. So, that’s, kind of, what happens if the statutory consultation
doesn’t lead to a moving forward of the proposal. 
The other thing that we’ve started a conversation about is that at the end of this
statutory consultation is 26th March but that should not be the end of the
engagement with the community. So, we are looking at, ‘How do we keep the
community involved in our ongoing monitoring of numbers? How do we keep you up
to date with the progress of the building and the planning? How do we keep listening
to you about any concerns you might have, any progress we’ve got in traffic
management or any of those issues?’ So, we will be looking at an ongoing
community engagement strategy, so that it’s not a case of, ‘Right, that’s the statutory
consultation over, no more discussion.’ I did get a bit of feedback today about that,
how important that was, and that seems to me to make perfect sense, and the
comms team were very, very keen that we start to plan that out. 
So, these are things we’ve heard so far, they’re not the only things, and we’ll hear
new things tonight, and please, if there’s something up there-, if there’s something
missing, please let us know what it is and we will have the conversation based on
that. So, that’s, kind of, where we are just now, that’s setting the scene. As I say, we
want to have as much time for discussion as possible, so as I say, we’re going to split
you into two. It’s not going to be particularly scientific but if everyone from this
microphone here, on this side, stays here and everyone on this side goes through the
partitions, then that will be the two groups, and then we’ll swap round. Obviously if
you are here with someone and that split doesn’t work for you then don’t hesitate
just to stay where you are, and we’re not worrying about that. Is that okay? So, off
you go and then we’ll come back at the end for some discussion, thanks very much. 
M1: Excuse me please, sorry, can I check, is the recording happening next door as well?
Gerry Lyons: Yes.
M1: Good, and where can we get access to this recording?
Gerry Lyons: We are going to transcribe the recording and that will be part of the record of the
consultation. 
M1: When will we get access to that?
Gerry Lyons: The consultation will be published as part of the final report and everything that sits
underneath it, it will probably be on the website but again, we’ll take advice as to
how to make it easiest to access. Okay?
Recording ends.

Page 176

Dargavel Primary 05.03.24 Session One
Gerry Lyons: Okay everyone, lovely to see you as I said, and we’re together for the next
half hour or so, give or take. I don’t want to just keep talking as this is an
evening for you, and we’ve got to make as much time-, we want to make as
much time as we can. So, it’s up to yourselves, if somebody’s got a question,
let’s start there and then build from there, if it’s easier for me to talk you
through a couple of issues then just tell me what you’d like to know a bit
more about. 
M1: As I mentioned in the notes that I sent to you, at this stage we’ve had Space
Zero, we’ve had all the consultations and presentations, at this point in time
it’s words and objectives and what have you. To make a decision, in my
mind, on things like basic designs and drawings should be so that people can
look at that detail. Not just a whole load of words, and there have been a lot
of words so far. You mentioned there that there’s a decision going to be
made towards the end of March.
Gerry Lyons: The consultation process finishes at the end of March, the actual decision in
terms of starting the process will be made on 23rd May. 
M1: Yes, but what is that decision going to be?
Gerry Lyons: So, that decision will be that the board approves the building of a new
school, what site it should be on, and that the catchment areas are whatever
they are at the end of the consultation. So, that will be the decision. That
starts a process that, you know, Frank and colleagues will lead around those
design issues that you talk about, and that will be an important part of the
process because that’s when you start to see, ‘What’s this thing going to
look like?’ You’re right, that’s vitally important and we want the community
to be able to influence that as much as possible, but that’s the, kind of, end
of a statutory process that says, to a date-, it should be six weeks, ours has
lasted about eight weeks. Then a final report, then a report from Education
Scotland, which they take about three weeks of work to do, and following
their report, there are then three weeks for us to consider what they come
back to us with. I’m looking at my colleague over there just to see that I’m
saying that properly. Then we put that to the board, the board decision is the
start of a process, not the end of a process, if that makes sense. 
David: Is that the Education Board or the full Council?
Gerry Lyons: That’s the Education and Skills Board, yes. 
F1: (Inaudible, too far from microphone) when that happened for this school-,
Gerry Lyons: Sorry, just-,
F1: So, from the time that that green light go ahead was given for this school,
what was the period of time for design and build to the school opening? To
give an idea-,
Gerry Lyons: So, there is a board next door that you can look at, it’s also in your booklet.
So, I’ll just talk you through it and then you can look at it on your own.
F1: Yes, so if you can give us an idea of how long that process was, to give-,

Page 177

Dargavel Primary 05.03.24 Session One
Sorry, Gerry, are you talking about the previous, this school?
This school here.
Oh, this school.
From the green light going ahead to this school opening, what was that time
frame? Because if we’re talking ’27-,
What an excellent question and it’s my first, ‘Don’t know,’ of the night, I
honestly don’t know how long it took.
You don’t know how long it took to build this school?
No, because I wasn’t working in the Council at the time, I know when it all,
kind of, came to light, but guys, have you got a sense of that?
So, the school that we’re having the debate about not having enough size,
the area that we’re talking about, you guys don’t know the basics? That’s so
bad.
Yes, no, no, absolutely, Frank, can you give us a sense of-,
I can give you an idea of some of the issues with the timeline for this, this
was slightly different because it wasn’t built by Renfrewshire Council, it was
through BAE, and they appointed their own contractors, their own design
team. It was through part of the COVID period, so that timeline that you see,
it took quite a bit of time to open. It shouldn’t impact on this new school
because we shouldn’t have, obviously, a pandemic. So, it’s slightly different,
this is obviously 400, 440, we’re going to build an 800 school, it’s a bigger
(talking over each other) entirely.
Well, give us an estimate of a school that you’ve built of the same size
without COVID.
800, well, we’re looking at two years’ construction, that’s for the new school.
So, that’s construction, what about the full design phase and the ordering of
materials etc? Because that’s-,
Could I just ask you two, is that for the recording? Not because you’re
(talking over each other), it’s just for the recording.
So, if it’s two years’ construction, how long for design and material order?
It’s basically when we get the consultation approved, we get the go ahead to
basically build on whatever site it is that you want, presumably. That date
which we’ll probably say May-, when is the consultation approval?
May 23rd.
May 23rd, so it’s probably May onwards. So, you’re talking about May ’24 to
August ’27. 
Chris Dalrymple:
F1: 
Gerry Lyons:
F1:
Gerry Lyons:
F1:
Gerry Lyons:
F1:
Gerry Lyons:
Frank Farrell:
F1:
Frank Farrell:
F1:
Gerry Lyons:
F1:
Frank Farrell:
Gerry Lyons:
Frank Farrell:
Gerry Lyons: So, May 24th is the decision, the technical design conclusion will take place
from July to December 2024. You’ve then got planning application, am I right
in saying that takes about 20 weeks?

Page 178

Dargavel Primary 05.03.24 Session One
Frank Farrell: No, that’s building standards, planning depends on Alistair, Alistair’s next
door, planning on depends on exactly what you’re building. 
Gerry Lyons: Right, so we’ve got that from March 2025, construction on site in July 2025,
with a view to the opening of the school in August 2027. 
F1: Very, very tight.
Gerry Lyons: That’s the project plan.
F1: Not a lot of room for error in there, is there?
?: Tight, I don’t think it’s achievable.
M3: If I could just drill into that a bit too, I think. So, looking at the programme
that’s in the (inaudible), a couple of things jump out to me, I’m just curious
as to the logic behind it. So, starting with the programme, we’re looking at
March now, so detailed design will be now, architects appointed this month
as well, why are you putting detailed planning in at March ’25? 
Frank Farrell: Because we don’t have enough important planning information to go on, we
don’t think we have enough detail. 
M3: But your engineers, main contractors, your feedback from technical design, if
they’re all dealt with before that-, it’s a very unusual move. 
Frank Farrel: I would qualify that by saying this is indicative timing, if we can get the
consultants appointed earlier, the planning process might commence earlier.
M3: It strikes me that there’s a strategy there, in the public domain, which
planning has to be, that you give us three months as a community to
comment against that planning application. If it doesn’t go ahead at the
eleventh hour it’s all the community’s fault because August ’27 is a key date,
do you understand?
Frank Farrell: It’s not meant to come across like that, that was never the intention, I’m
sorry you read it that way, that’s not the case at all.
Gerry Lyons: I think there’s an important element, just on one of the things you said, that
I want to come back to. We do not have any intention in operating in a way
that says that anything that doesn’t go as we wish it to go would be the
community’s fault. That’s not what we’re trying to do here, if the community
tell us that there’s something better and something they would prefer, we’re
going to respect that. If it doesn’t fit in with the timeline that we’d hope for,
then fine, but that won’t be about fault, that will be about saying, ‘Full
transparency, full recognition of what people are saying.’ If you say to me,
‘August 2027, Gerry, is really important to you but it’s not as important to
this community, we’d rather stretch it out to August 2030,’ then I have got to
take cognizance of that, and I would not be saying for one second, ‘Well, if
it’s not dealt with by August 2027, that’s your fault.’ Because that’s not the
way we want to go forward. So, I know the point you’re making, I just want
to pick up that wee issue about fault. 
M3: No, it’s fine and it’s a valid point for the room, my point isn’t about blame,
it’s that the process doesn’t seem right, it doesn’t follow any project I’ve

Page 179

Dargavel Primary 05.03.24 Session One
ever seen. Detailed planning is something we try and tick the box off early,
to make sure you’ve got your consultants, your community, your
engagement, your public-, you’d have the look, the feel, the size, the
quantum, you’d have all those things done by technical design. Second to
that, there are two years for the design-, sorry not design, the delivery, only
delivery of the project, for the school. A school that size averages about 78
to 82 weeks. 
Sorry, I didn’t hear the last bit there. Frank Farrell:
M3: The average duration for a primary school of that size, passive house, net
zero is taking 78 to 82 weeks, so there are about six months of a difference
there between the two years and the eighteen months. If you had a rejig of
the programme, you’d have a lot more time there, I think, to look at site
selection, community engagement and the benefit of what we want as a
community, rather than what feels a little like racing to a programme that
looks very busy. Key points, we’ve got to get to the solution that works
because I do agree, August ’27 is a very important date. I do not want to see
any child failed in the education element of this community but it just feels
really quick to race through this, given that I was here a year ago when we
were talking about site selection, and we’re still talking about trying to get
this work the best route possible. So, I’m not pointing fingers, I’m asking
simple questions as to, ‘Is this the right programme?’ I don’t believe it is but
there’s enough time there still to look at it, change it, and see, ‘What do we
want? What can we bring and what can we contribute?’
Chris Dalrymple: If I can just intrude, so my name’s Chris Dalrymple, I’m the Head of Facilities
and Property Services, so Frank and I will work closely together (Timecode:
00:10:00). I think as Gerry’s alluded to, and Frank has said, see if we can pull
things forward, we absolutely will. We were asked to look at an indicative
timescale to allow us to work through the programme, some of the
comments you’ve said there are very fair. I’d like to discuss them in a wee bit
more detail, I’m sure Frank would as well, as the Programme Manager for
the technical unit but we want to work with the community and we really
want to give as much time-, in case we encounter something that we aren’t
expecting, you sound like you’re in the game as well, you know what you’re
talking about. We will encounter some problems, we want to give ourselves
some scope so that that key date is being met, but I’d like Frank and I to
discuss that a wee bit more with you as part of this consultation. 
Frank Farrell: As Chris says, this is indicative, this is the indicative timescale we’ve got to
meet an August ’27 date. So, yes, some of these dates might move around,
you know what it’s like. We’re not going to micromanage every single
activity here but the end date is August ’27 that we’ve been aiming for. So,
planning application ’25, it might be earlier than that, it depends on what
happens to technical design, what happens to the consultation with,
obviously, the residents, the community, also with education. 
Gerry Lyons: It’s a really fair point and Chris will follow that up, so thank you for it.
David: One of the things that was raised by the community was the fact that the
land that’s currently being used, or potentially going to be used, is the old

Page 180

Dargavel Primary 05.03.24 Session One
ROF site. It needs remediated, it needs cleaned up. If we’d gone for a clean
site, which there are quite a number of around the perimeter of the site,
albeit yes, they are in green belt or whatever, but I think if there’s a will,
there’s a way and that would be one way of taking things forward with a bit
more confidence. Because at the moment, you don’t know what you’re
going to find under that ground, it could be ammonium perchlorate, it could
be nitrocellulose, it could be whatever because that is an old site, it’s part of
the old development. We flagged this up easily last year some time but
they’ve gone, ‘No,’ because of the complexities of the relationship with BAE,
this was a way ahead quickly that Renfrewshire Council could get a site. 
Guys, do you want to make any comment on that? Thanks, David. Gerry Lyons:
Frank Farrell: Essentially just that BAE have remediating that site already, they’ve started
to remediate it already, and they were doing that last year as well, that site
and various other sites. So, the whole point is that they cleanse that site
down to a standard level, be it 450 or 750 below the base, and they’re
obviously going to clean that of what materials they find in there, hotspots
etc. So, it should be clean if that’s the site we eventually choose, that’s what
we hope.
Gerry Lyons: Thank you.
M1: Going back to the point on duration, the architect appointment is the end of
this month?
Yes.
What do you base the architect appointment on? On ability or whatever?
Frank Farrell:
M1:
Frank Farrell: Well, there’s a competitive tender process that’s going on through Hub
West. We’ve engaged with Hub West and I don’t know if anybody’s aware
what Hub West is, it’s an organisation that authorities can use for a straight
supply chain that they have available for consultants and contractors. So,
they engage with the market for architects, engineers, contractors and they
have a team ready to, basically, start once we agree what site it is, they can
start on the design. So, they haven’t designed anything because we don’t
know where we’re going to be putting it yet, so it’s really just to get a head
start on the design process itself.
Are they looking at different architects at the moment?
That process is being undertaken by Hub West, the same with engineers.
M1:
Frank Farrell:
M1: They then go into detailed design March to June, I mean, that’s a tight
schedule. 
I can’t comment on that, that’s not my thing. ?:
Frank Farrell: That’s detailed design commencing, then we’re going to appoint an
engineer, mechanical engineer as well. They will feed in to the existing
design for the architect, the architect starts first, there are various ways
around it but this one’s going to feed in with the architect. So, it is tight but
that doesn’t actually complete until December ’24, the technical design,

Page 181

Dargavel Primary 05.03.24 Session One
there are various stages it goes through, and detailed design commences
then. 
That’s the commencing date?
Yes, so there’s a nine-month, kind of, designing period-,
Yes, it is.
M1:
Gerry Lyons:
Frank Farrell:
M1: It’s got to be tight if it’s on one side, it’s not (talking over each other) the
diagram.
We haven’t put every single activity in there. 
No, but it’s about (talking over each other)
If that was the start of-,
Okay, it starts in March, all things being equal.
(Inaudible) no doubt about that.
Frank Farrell:
Gerry Lyons:
M1:
Frank Farrell:
Gerry Lyons:
F1: Sorry, I mean, it’s just quite disappointing, the detail-, (inaudible, too far
from microphone)
Gerry Lyons: It’s just we won’t be able to take a note of your point, that’s the only issue. I
know you might not like it but it’s just for the accuracy of the meeting. 
F1: Right, okay, so the amount of detail that you have around the planning. You
say, obviously, you want the community to be involved in the decision if
there’s a better way to do something, it’s all about the children, it’s all about
community investment, and you’ve just mentioned there that you’re not
going to micromanage this. Having a community that has households that
are full of anxiety and stress over where their children are going, the
discussion around primary ones having to be ferried out of the village to
start a school career away from their nursery mates, their children that they
socialise with in the village, that is not good for the community. So, the
August ’27 date is really non-negotiable and yes, it’s very good to have the
community’s input into it but do you not think you really need to take the
bull by the horns a little bit here and actually put some guidance out there of
what can and cannot be moved?
Gerry Lyons: Yes, absolutely, yes, I think the one of the challenges of that point is that we
are very much-, not constrained, that’s not the right way of saying it, but we
have to finish a period of statutory consultation. Until we finish that period
of statutory consultation we can’t give, and move forward with, precise
details about anything because it would be inappropriate to do so. So, while
I understand what you’re saying and I understand the anxiety, nevertheless,
this process is governed by a set of guidelines that are not ours and are non-
negotiable. 
F1: That’s the standing situation but as a number of people have said, we’re
talking about the same things we were talking about a year ago. So, in that
timeframe you could have set out a number of things that are within the art
of the possible to do, and not to do, which gives the community time to

Page 182

Dargavel Primary 05.03.24 Session One
comment on that. You’ve had comment upon comment, so now we’re
moving closer to that deadline of August ’27, it’s quite clearly not about the
children because if it was then you would be doing more to tighten those
timeframes and using things that-, it’s just really disappointing just now to
be at this point and you still can’t tie down a plan.
Gerry Lyons: Yes, I think, I mean, at the end of the day that’s your view. I disagree with
you that it’s not about the children, the whole driver is to get this right for
the children. 
F1: It’s not (talking over each other)
Gerry Lyons: However, I understand why you’re saying that, what I’m saying to you is that
the team have got an indicative timeline. We will engage with you as much
as we possibly can once this-, we’ve done so during this process, we will
continue to do so after this process, and throughout the whole process, to
give as much comfort as we can around the progress that’s being made and
the decisions that are being made. Inevitably, we are in a particular process
at the moment and we can’t do too much until that’s finished. That’s, kind
of, outwith our gift, I understand your concern about it. 
F1: It’s one very small part of-,
Gerry Lyons: I understand your concern about it but we are determined to engage with
you as much as we can as we go through the next stages. I should just get
four or five mics, shouldn’t I?
M3: If I could drill in a bit to the design appointments, what’s the remit? So, two
questions, what’s the remit of the design team? Is it to design the school in
isolation or is it to design the school within the masterplan? Second
question, is the school going to be passive house or net zero? The
Renfrewshire Council net zero policy is to be by 2030, which, this school will
be finished by ’27, or sorry, started by ’27. It falls within that strategy, are we
taking cognizance of that so that the school is operationally cheap to run,
helping the burden on the Council? So, the first and the second part, if you
don’t mind.
Just repeat the first part again? Frank Farrell:
M3: The first part is the remit of the design, is it the school in isolation or is the
school within the masterplan?
Frank Farrell: Our remit within property services is to build the school, design the school
but obviously we’ve got to do that in conjunction with the site itself. We
obviously liaise with BAE, we’ve been doing that with this school as well. So,
yes, we will be building the school, not in isolation, even though it is a
standalone project for us, we’ll have to liaise with BAE, essentially, because
of the access routes, active travel, various other things. Basically, it’s both,
we have to design a school for our client and obviously the community, but
we still have to link up with BAE. 
Chris Dalrymple: The second one was about the passive house.

Page 183

Dargavel Primary 05.03.24 Session One
Frank Farrell: Passive house, yes, the brief to Hub West is to look for passive house
certified, if we can achieve that, net zero, we can (inaudible) standards
because it sounds as if you probably know the building regs have become far
more stringent in the last couple of months, that comes in in April. So, we
will be building to the new standards and we will be looking for passive
house, possibly certified building, but certainly net zero aspirations
contained within. 
M3: To (Timecode 00:20:00) the first one, the design and masterplan, which is a
good thing, looking at the current school and the situation for traffic, it’s not
the best for buses. There’s no design in the masterplan for lay-bys, for
parking areas, for example, so when you’re trying to drop your child off at
school, like I do, you can get stuck behind twenty cars quite easily with one
bus. Now, another school, assuming that site goes ahead because of time
and the deals that are being done, it’s quite close in proximity so the buses
then increase, the volume of traffic increases. I know there have been traffic
studies done recently but we’re probably about, what, 55% roughly through
the development, so there are a lot more cars and people still to come. Will
the masterplan be changed as part of this process, so that we can factor in
lay-bys and more provisions for the buses and the traffic during that point in
time? Bearing in mind that one of the main arteries have yet to be built, so is
there an opportunity, I’m asking, to change-,
Are you talking about BAE’s masterplan? Frank Farrell:
M3: I think legally it’s BAE’s masterplan, the Council’s remit is to protect the
community in that masterplan and the vision of that masterplan. That
masterplan serves the community, so yes, legally BAE have that. It’s going to
really get my fires going if we hide behind BAE with that because the voice of
us telling you is that we have an opportunity to change this. BAE are on the
hook for aspects of it, but it’s not been built yet, so why not change that
before it gets built, while there’s an opportunity to do that? You know, for
me, legally, the section 75 is proportional to the original masterplan, not the
current and the future masterplan. There must be something we can do
there to annoy them about that, noise them up a bit, get something in our
favour. There are more houses-, 
Gerry Lyons: Sorry, can I suggest that you ask that question next door? Everything
associated with section 75 and all those issues is another workshop. 
M3: But section 75 to one side, the road has yet to be completed, there’s a loop,
so half of that, roughly, is still to be done.
Gerry Lyons: The team next door is talking about that road loop as well.
M3: But is that in the design remit?
M1: (Talking over each other) and agree with the comments about traffic. That
was one of my main comments to you and I wait to-, 
Gerry Lyons: Yes, there is a full discussion about traffic in the other workshop.

Page 184

Dargavel Primary 05.03.24 Session One
M3: So, the detail of my question was that content but the question is, is that
element in the scope of the design team? So, the school in isolation or the
school within the masterplan, the masterplan is to design that factor in.
Frank Farrell: We have a site, potentially (inaudible), sorry, so we’ve got to make that
work, if that’s the chosen site. What we then do, as I say, is liaise with BAE to
see what impact that might have on their masterplan. That will be fed on
from Alistair’s team back to BAE, through planning. We can’t, obviously,
build the roads, separate roads outwith, we can maybe influence it, we can
advise what we think is going to work following feedback from the
community but we probably haven’t got, as you say, the gift to actually
physically make changes until BAE sign it off. So, we need to consider
everything you’re saying, take account of it just as Gerry says, discussions
regarding the layout, the plan, that is probably the point that we have a
better point to say, ‘Right, this doesn’t work, that works,’ and then take that
back to Alistair’s team to work with BAE. 
Chris Dalrymple: Sorry, Gerry.
Gerry Lyons: Yes, Chris, on you go.
Chris Dalrymple: Can I very quickly come in there? So, one of the key things is, we’ll be
working very closely with Gerry Hannah, who’s next door, and his team. So,
yes, Frank’s team and my team will be responsible for designing the building,
building the bricks and mortar, but we can’t do that in isolation. We need to
take in cognizance with Gerry to say, from a planning position, ‘We need to
think about roads, we need to think about the drop-off.’ So, it’s a bit of both,
we need that design work in there to make sure the pick-ups, the drop-offs,
the car parking spaces, everything linked to our colleagues in Roads will be
part of that planning discussion. We just can’t answer part of the section 75
stuff, next door, because it’s Alistair and Gerry but there will be that very
close working relationship between us and Gerry Hannah, and the team who
are next door.  
Gerry Lyons: Yes.
Gillian Hoyle: Thank you.
M4: Sorry, before you start speaking, shall we just keep that microphone and you
keep that one?
Gillian Hoyle: Yes, you keep that.
Gerry Lyons: Aye, we’re going to keep one here.
M4: Saves having them-,
Gerry Lyons: Although I’ve now got 5,000 steps on my pedometer that I didn’t have
before I came, yes, good shout. 
Gillian Hoyle: So, I know that there was some discussion a while back about a proposed
campus to include more nursery space and more high school space. What is
the estimated cost for this new primary school to be built?
Gerry Lyons: The estimated cost of the new primary school?

Page 185

Dargavel Primary 05.03.24 Session One
Gillian Hoyle: Yes.
Gerry Lyons: 45 million.
Gillian Hoyle: And what about the extension to Park Mains?
Gerry Lyons: 30 million.
Gillian Hoyle: Why is there not an option to choose one of the larger sites to have a larger
campus? Because as the projections look, we’re due to be at capacity in
eight years at Park Mains, even with the extension. 
Gerry Lyons: Yes, so the answer to your question’s got different parts to it, and some of
them are about the planning of secondary education. One of the answers to
the question is a financial one, you’re talking about 75 million, the building
of a campus as you’ve described is closer to 90 million. So, there is a financial
element to that, the other element to it-,
Gillian Hoyle: Rather than wasting 70 million.
Gerry Lyons: Sorry?
Gillian Hoyle: Rather than spending 70 odd million and still being at capacity, and having
no high school for any local (talking over each other).
Gerry Lyons: Yes, that’s not what we intend though.
Gillian Hoyle: Yes, so what’s the plan?
Gerry Lyons: Our understanding is, and all our projections at the moment, we will build to
a capacity of 2,000 in Park Mains. 
Gillian Hoyle: Yes.
Gerry Lyons: There’s a bit of flex in that, it might go up to 2,050.
Gillian Hoyle: I think the numbers actually didn’t even include the new houses in Erskine
that are getting built as well. 
Gerry Lyons: Yes, well, if you just let me finish, I’ll try and cover all of that for you. So,
we’re looking at 2,000, all of our projections say that that will be sufficient
for Park Mains and to meet the community which Park Mains serves, which
is much greater than Dargavel, it serves seven different learning
communities. So, one of our concerns is to ensure that the Dargavel solution
does not negatively impact on those other learning communities, who have
also got a very strong view as to what should happen. We believe that the
capacity of Park Mains will be sufficient, if we find there are circumstances
which suggest that it’s not going to be, that would not be a matter of looking
at Park Mains again to try to make it even bigger. That would then be a wider
estate management plan, so for example, if there was planning in Erskine,
one of the changes in the process now is that the planning team come to
Children’s Services, and ask the question about, ‘If this planning was to be
granted, is there sufficient education infrastructure to meet it?’ We have the
option of saying, ‘No,’ and that would then lead to a planning refusal. 
David: Gerry, that goes completely against Scottish Government policy.

Page 186

Dargavel Primary 05.03.24 Session One
Gerry Lyons: Well, all I’m saying is, that’s one of the processes that we’ve got.
F3: It goes against what you’ve done to date, which is to-,
Gerry Lyons: Aye, the Scottish Government might overrule that-,
F3: Even Renfrewshire Council, we asked you last time to put a hold on
development that goes ahead within Dargavel during one of the last
sessions, and you did not. You continued to develop, you continued to
approve plans.
Gerry Lyons: When was that?
F3: Six months, nine months ago.
Gerry Lyons: Right, okay, but if those developments do happen, so if David’s position
comes to pass and the Scottish Government say, ‘You can’t do that, you need
to grant planning permission,’ you will then move into a much wider estate
management, an education estate management at that end, to
accommodate those new houses in Erskine. David, if you just let me finish,
thank you. So, we believe that, and all of our planning is very much based on
the fact that, this community will be served, efficiently, appropriately and to
a high quality by Park Mains, and anything that would impact beyond that
will be dealt with by a different solution.
Gillian Hoyle: But only until eight years’ time and then we’re over capacity. 
Gerry Lyons: No, absolutely not.
Gillian Hoyle: So, where do the kids go when it’s over 2,000?
Gerry Lyons: Our projections, and I’m going to come back to projections in a minute-,
Gillian Hoyle: Yes, which to be fair (talking over each other)
Gerry Lyons: Our projections, and this is not what this consultation’s about, I’m going to
do more on this, our projections say that it will not go over 2,000 to a point
that we have to look at putting children elsewhere. The other point is that
projections being what they are, the further you go, the less reliable they
become. So, we’re going to monitor the actual rolls in the school at two
separate occasions, we’re going to monitor them after census, and we’re
going to monitor them after enrolment figures. That’s twice in the year, and
that twice in the year will allow us to have live data to match to the
projections to make decisions about what else we need to do. 
Gillian Hoyle: But then do we run into the same issue, where it’s too late to do something
about, like we did with this primary school and-,
Gerry Lyons: No, we won’t run into that issue because sitting alongside that is discussions
we are having at the moment about thresholds, and the thresholds of,
‘When is the latest point we can make a decision?’ So we don’t run into what
happened here, and we’ve got no intention of running into what happened
here.
F3: What’s the contingency if-, and we know that we’ve been told that the
projections don’t include some developments in Erskine, so what is the

Page 187

Dargavel Primary 05.03.24 Session One
contingency if Park Mains hits capacity? It would be that then our choice as
parents is removed about what high school they go to.
Gerry Lyons: No.
F3: Where you said at the beginning it’s not fair for parents who have been part
of a ballot (Timecode: 00:30:00), there is the potential that that’s going to
happen when the kids go to high school. 
Gerry Lyons: Yes, we have got no indications to say that’s going to be the case, and we do
not want people who were in a ballot in primary one to be in a ballot in S1,
that would be thoroughly inappropriate. We have no indications in any of
the planning that we have done-, and I appreciate for this community that’s
something that’s hard to take a leap of faith on, and I’m not asking you to. 
David: You failed in the past, Gerry, you failed badly in the past.
Gerry Lyons: We have.
David: We, as a community, are telling you what you need to do, and the bottom
line is, we need a secondary school in this community, then you would have
three secondary schools, Gryffe, Park Mains and here. And you wouldn’t
have an over-capacity at Park Mains because you could allow building to
happen in Erskine.
Gerry Lyons: Yes, we’re not going to have an over-capacity in Park Mains, and actually that
masterplan that David put together, ten, fifteen years ago, would have been
potentially a different conversation. But one of the things that’s not been
factored in, by you David, actually, is the fact that Park Mains secondary
school has got a capacity for 1,400 young people.
David: Correct.
Gerry Lyons: If you just let me finish, David, if that’s okay. 1,400 young people, they
currently have that capacity, the plan that David puts together significantly
affects that school. It takes the numbers of that school down to much less
than its capacity, affecting the children at that school, affecting those
communities. Those communities have already written to the Council to
express their concern that that’s even being considered and leading to a
situation where we have built a school for 1,400 and we’ve got 800 children
in it. That would just be poor practice on our part. 
Gillian Hoyle: Well, the projections for this August is that you’re already over the 1,400 for
Park Mains anyway, so.
Gerry Lyons: Yes.
Gillian Hoyle: So, how are you planning to look after those kids then, if your capacity-,
Gerry Lyons: We’ve got a modular classroom already been put into Park Mains.
Gillian Hoyle: So, but this is growing and growing the next few years-,
Gerry Lyons: The other thing you’ve not factored in-,
Gillian Hoyle: Sorry, if you can just let me finish.

Page 188

Dargavel Primary 05.03.24 Session One
Gerry Lyons: Yes, sure, sorry.
Gillian Hoyle: This is growing and growing over the next few years, so if you don’t have any
capacity for them, like, what is our option? I have two children, currently in
primary one and primary two, and by your projections, Park Mains is going
to be too big by the time we get to that stage.
Gerry Lyons: I don’t know where you’re getting that from, to be honest with you.
Gillian Hoyle: Julie Calder is where I got the information. 
Gerry Lyons: If the projections, for example, take you to 2200, what’s in those projections
at the moment is placing requests. One of the options we have that if there
comes a point where we think that placing requests are negatively impacting
on a catchment area, we then refuse those placing requests. So, any figure
there already includes placing requests, 160, roughly and they would all be
refused to ensure that it does not impact on the children for whom that’s a
catchment school.
Gillian Hoyle: You’re saying that the capacity at the moment is 1,400 and that Erskine
community is unhappy that that would drop to 800 but if you were to build a
new high school it’s going to obviously take an amount of years for that to
happen. So, surely at that stage there are changes you can make to Park
Mains, you can make it more community based, have more space for the
community, whilst we’re building a school that we clearly need in this area.
Gerry Lyons: To be honest with you, I don’t know. You’ve got a 1,400 school that’s got
education facility for 1,400 young people, classrooms etc. We do not need to
do anything to that building apart from add an extension, to meet our
statutory requirements, which is to fulfil the catchment demand for that
school, and we believe the plans we’ve got are going to allow us to do that.
Gillian Hoyle: So, you can guarantee that there’s going to be capacity?
Gerry Lyons: I don’t give guarantees, one of the big errors that this Council made was
giving guarantees. What I’m saying to you is, with what I know at the
moment, I am confident that we are not going to find ourselves in a
situation, where, as you’ve described, you can’t get your child into the
school in first year, that’s your catchment school. 
F3: It’s tricky though because we’re getting mixed messages, only at a meeting
six months ago Julie Calder did say that Park Mains would reach capacity in
six months, sorry, in eight years. So, I’m struggling, she’s obviously looking at
the same numbers as you-, 
Gerry Lyons: Yes, so two things about that, one is that it won’t go beyond capacity, two,
we’ve not factored in the placing request issue-,
F3: 160’s not going to make a difference.
Gerry Lyons: It is.
Gillian Hoyle: But you also didn’t factor in the new housing in Erskine that’s been
approved. (Various voices join in about the Erskine development.)

Page 189

Dargavel Primary 05.03.24 Session One
Gerry Lyons: That peak issue only lasts for a short space of time and it then it starts to
come back down. So, we’ve got plans in place for all of that, we’re confident
that what we’ve got in place will deliver the secondary education that you
need. We will have further discussions about this once we move beyond the
statutory consultation on the primary, which is what we’re here for. 
David: Yes, but it’s meant to be happening in 2027.
F3: There are options. 
David: Park Mains is meant to be happening by 2027.
Gerry Lyons: Yes, it is.
David: So, why not spend the 30 million here rather than in Erskine?
M5: I think in the background of what people are saying there, I think a good
question to ask would be, ‘How are the Council and the Council officers
going to be held accountable for the process that we’re going through just
now?’
Gerry Lyons: So, I can understand the question, one of the things about this process, and
I’ve said this right from the start, and I’ll say it again tonight, is that I am the
named person for this. I am leading this process, I am leading this
consultation, and I believe we’re doing the right thing so I will hold myself
accountable for that, and I will invite you to hold me accountable if, in fact,
what I say to you is what we’re going to deliver, we don’t deliver. 
M5: What will be the mechanism for that? What will be the mechanism for
holding you accountable?
Gerry Lyons: The mechanism?
M5: Yes.
Gerry Lyons: Yes, well, as with everything, if I don’t do the work that I’m meant to do and
I get it wrong, then there would be disciplinary procedures, performance
management, all of those things that I would be subject to. But do you know
what, more importantly than that, I would be subject to myself saying, ‘I
thought I was going to do something and I got it right.’
M5: Would you resign?
Gerry Lyons: I would have resigned, yes, and I would resign.
M5: Because it’s that accountability that, as a community, I think is lacking from
the lessons learned.
Gerry Lyons: Yes, I’ve already said that this is important enough to me that I will put my
reputation on the line to say, ‘I’m going to deliver this.’ If I don’t deliver it, or
I make a complete mess of it, God forbid I don’t do either of the two of
them, then I would go, ‘Aye, fair do’s,’ and I would walk away. 
M5: You don’t need to do that, so it shows that you’re motivated and driven to
achieve that, but for me, whilst it’s nice to hear that, we need to have
something more than just you and your reputation. Because I was here ten

Page 190

Dargavel Primary 05.03.24 Session One
years ago and I was sold the dream of one school for all, because I didn’t like
the idea of two schools. I certainly don’t like the idea of three because of,
just, the rivalry between them. So, to get to the, ‘Sold the dream, buy the
house, build and live in a community,’ a community which is pretty much
divided by a railway line that really annoys me. ‘We’re all in this together,’
we’re not, it’s either Dargavel or Bishopton, to me, it’s one. The third school
is creating a bit of strength between everybody that it impacts but at the
same time, it’s driving a bit more of a divide. So, the Council are front and
centre for driving the success.
Gerry Lyons: Yes, absolutely, and I’m going to say two things to you about that. One is,
never at any point am I going to ask this community to put their faith in
anything I actually say, because why would you? What you need to see is
action, you need to see transparent communication throughout the process,
responsiveness to issues that have been raised, and some of those have
been raised tonight, and that will be that. Building trust back with this
community’s not going to take one statutory consultation, building trust
back with this community’s going to take five years of delivering what we
said we’d deliver. 
So, no, I don’t want you to think I’m saying that, you know, ‘I will be
accountable so trust me,’ I don’t want you to do that. What I want you to do
is to watch the actions, watch the behaviours, watch the processes and
engage with them as fully as you can, as you’ve done tonight, which is
brilliant, and we will help grow it and respond to things. It will only be at that
point, at the end of it, that you can say to me, ‘Gerry, aye, do you know
what,’ or, ‘Gerry, I told you that you were getting it wrong.’ But I don’t want
trust in people, I want systems and structures that are tight, that you can
look at and go, ‘Aye, that looks robust and that looks as though it’s going to
drive-,’ I take your point about the community, I do.
David: Can I make a comment that, since you came on board, since Janie’s about,
there has been a hell of a lot more consultation than there ever was in the
past. But the problem is, you’ve still got Councillors there who think the way
ahead is the way it’s been going. I’m sorry, I saw two Education Board
meetings where politics came into the exercise. You guys can’t touch that,
you have to accept what they decide. So, this meeting that’s going to happen
in whatever time it is-,
Gerry Lyons: May 25th.
David: That’s why I asked the question, is it going to be just the Education Board or
is it going to be the whole Council? I’m sorry, the Education Board has been
culpable in a lot of the problems that this community is experiencing, and
from that point of view we need to see a bit of a sea change in the whole
attitude to how the provision of education, and leisure and recreation-,
twenty-minute rule, out the window, you know, three to eighteen provision,
out the window. We’re now seeing a huge focus on primary education
(Timecode 00:40:00), and that is very important, and that has to happen, but
the bottom line comes, the next phase, which is secondary education, and
there’s been a huge silence on that because the Education Board do not

Page 191

Dargavel Primary 05.03.24 Session One 
want to see any change. Now, the bottom line is, the process for child
education is for children and communities, not for the accountants, and
that’s something that’s got to be borne in mind throughout all of this
exercise. You failed badly in this community, Renfrewshire Council has got a
big task to pick up in getting it right this time.
Gerry Lyons: Thanks David and I’m just going to note those comments. I suppose, the only
one I would come back on is the issue about for the community, not for the
accountants, and if I lived in this community I’d be saying the same. I have a 
fiscal responsibility, I don’t have a blank cheque, I don’t have an opportunity
to spend as much as, you know, whatever. I have to work within a budget
and I have responsibility to the whole Council around that. That’s the only
issue I would pick up but I do take your point about the politicians. I’ve heard
you saying it before and I completely understand why you feel that way. 
M4: I was just going to ask, so August 2027 is the hard objective time that we’re
trying to achieve. So, site nine is what has been proposed and that’s going
forward in the consultation and the proposal. If we say no to that, beyond
that, that timeframe’s gone, we can’t achieve that. 
Gerry Lyons: No.
M4: So, really the consultation isn’t about the proposal of where it is because
we’re beyond that, because we all have kids that we want to get into
primary school or primary one for August 2027. So, we have to really accept
that, is what I’m trying to clarify. We’re accepting it’s site nine and we’re
moving forward and we need to use the opportunity now to make sure that
we achieve the-, 
Gerry Lyons: The timeline.
M4: The timeline, and not make the mistakes as we had with this one, which is I
know is what we’re trying to achieve. But a lot of good points have been
raised about, like, the figures for the schools and stuff like that, so my
question really is, is this going to really be achievable in the timeframe? And
then are we, like the lady over there said, going to be in eight years’ time,
where we’re hoping-, some of us are hoping to stay here for the rest of our
lives or for a long period of time. Is that really going to be achievable?
Because for some of us, we’re actually considering whether the next year’s
going to be worth staying here because (talking over each other).
Gerry Lyons: Aye, of course, because at the end of the day, you’ve got to make the right
decision for your child, haven’t you? So, I’m happy to come back and have
further discussion about Park Mains, and I know you’re very concerned
about it, and I want to have further discussion with you about it. The
primary perspective, the team, we know it’s tight but we believe we’re going
to deliver it. We also know the imperative that’s on us to deliver it for the
children in the area and for the community. So, we believe we can do that,
we set out to do it, and everything we’re doing is around that timeline. We
are going to start conversations very soon about, ‘What if it looks as though
it’s slipping a wee bit? What can we do to, kind of, buy ourselves some
time?’ That’s a different part of the conversation.

Page 192

Dargavel Primary 05.03.24 Session One 
M4: Sorry, Gerry, can you quantify how it is if we say no to the proposed site? It’s
off the online or the forms that we’ve sent in?
Gerry Lyons: Yes.
M4: So, are you legally obliged to say no if-, how many people is it (talking over
each other).
Gerry Lyons: Well, it’s not got a, kind of, X% type thing, it’s about the way and the range
of views. If we get a position that we do not think supports our position, we
have to present that to the board to say, ‘This is not a supported proposal,’
and then they would make a decision one way or another. Then, potentially,
it’s back to looking at another site or another plan, or-,
M4: That will increase the costs because we’ve already got the site and we’ve got
it for how we’ve got it.
Gerry Lyons: Not necessarily increase the costs but certainly would lead to a slippage in
time. 
M4: Right, anyone else got a question?
Gerry Lyons: Okay folks, I’m conscious that it’s the worst chaired workshop in the world, it
was supposed to finish at 7:55. I’m going to take one more question and
then we’ll swap round but you can come back with things you’ve not had a
chance to ask at the very end. 
Gillian Hoyle: I’m going to come back to Park Mains, I’m sorry. I have asked this and you
know at the last two consultations I’ve been at, and I’m yet to hear a clear
answer on what’s going to happen for Park Mains. We, as a community, need
to know what’s going to happen in secondary school (talking over each
other)
Gerry Lyons: Your children will go to Park Mains secondary school. 
Gillian Hoyle: We said this about Dargavel (talking over each other)
Gerry Lyons: Your children-,
Gillian Hoyle: I’m sorry, and I get that you are a different community to who you were
before, from Renfrewshire Council. You have told us all this before, we are
sitting here, how many people have mentioned Park Mains high school to
you? I have mentioned it at each of my sessions that I’ve come to and I’ve
still not got an answer, I need an answer, we need an answer.
Gerry Lyons: So, two things about that, one is, this is a statutory consultation on a
proposal for primary education. 
Gillian Hoyle: We’ve lost that battle, we lost that a long time ago.
Gerry Lyons: I don’t think so, I think we’ll recover that and I think you’ll end up with the-,
the plan for this school is outstanding. This is going to be an outstanding
primary school. 
F3: There is no plan, there’s a plot, a slight plot, there’s no plan.

Page 193

Dargavel Primary 05.03.24 Session One
Gerry Lyons: Yes, well, let me change it slightly then. The intent for this primary school is
an outstanding primary school. 
F3: This one.
Gerry Lyons: Across the two schools. But listen, I understand why you don’t believe me
when I say that and I’m not asking you to-,
F3: You use the word believe an awful lot, I don’t believe you are SQEP to do this
role. Like, it is infuriating sitting here, this lady-,
Gerry Lyons: You don’t believe I’m?
F3: SQEP, I don’t think you’re suitably qualified to be in this role. This lady has
expressed a number of times how upset she is and yet you’re palming
everyone off. You could at least acknowledge-,
Gerry Lyons: Sorry, I don’t intend palm anyone off and I’m sorry you don’t feel I’m
qualified for the role. Again, I’m-,
F3: You use the word believe continuously, you might believe that aliens are
going to come and build the school, we’re not having it.
Gerry Lyons: I’m going to disagree with you, what I’m going to say to you is, the
conversation about Park Mains is a separate conversation which will happen
at a separate time.
F3: Not really when we’re looking at a site-,
Gillian Hoyle: It’s not, exactly, this goes back to the campus we spoke about earlier.
Gerry Lyons: Yes, but just in terms of the process, this is a statutory consultation on the
primary proposal. I will happily come back with much more detail about Park
Mains and much more discussion about Park Mains once this process is
finished. But to some extent, you have to allow us to do what we’re setting
out to do now, and then we will come back on the Park Mains issues much
more.
F3: But it’s related.
Gerry Lyons: I’m sorry you don’t feel I’m qualified for the job, I just have to respect that,
I’m surrounded by outstandingly qualified people. In terms of secondary
education, I was a secondary Head Teacher for thirteen years, so whether
that qualifies me or not, I don’t know.
F3: So, you know how to run a school and educate children, it doesn’t
necessarily mean you’re very good at town planning. 
Gerry Lyons: I’m not doing the planning, it’s my planning colleagues that are doing the
planning and they’ll talk to you next door.
Gillian Hoyle: Can I come back to your point on Park Mains and why we’re talking about
this just now?
Gerry Lyons: Yes, of course you can.

Page 194

Dargavel Primary 05.03.24 Session One
Gillian Hoyle: One of the things that was proposed by the community was a campus that
includes a high school and primary school, hence why we are bringing this
up just now and want answers. But you are pushing that down the line and
you’re not answering it, and that’s why-,
Gerry Lyons: No, I’m not pushing it down the line, I’m telling you straight, Gillian, the
answer is Park Mains secondary school. 
Gillian Hoyle: None of us-,
F3: That’s on record, we’ll just list all our children and it’s on record they’ll go to
Park Mains.
Gerry Lyons: I just said to you that-,
?: (inaudible) 
Gerry Lyons: All our projections tell us that we will meet the secondary requirements of
this community in Park Mains secondary school. 
F1: And see all the figures that (talking over each other)
Gerry Lyons: We will continue to monitor that to make sure that we do but that’s what all
our projections are telling us.
F1: Is that you guys that are going to monitor it or is it all going to be
independently reviewed? Because you obviously mucked it up royally the
last time.
Gerry Lyons: Yes, true, we are working with independent consultants.
F1: So, you believe that your figures will be-, 
Gillian Hoyle: So, have you given us a guarantee? You said you don’t give guarantees. Have
I got a guarantee that my daughter will get into Park Mains? I would want
that in writing.
Gerry Lyons: What I’m saying is-,
M5: He’s going to resign, if he doesn’t-, 
Various voices talking over each other.
Gillian Hoyle: I’m sure we’ve heard that one before as well.
Gerry Lyons: The planning is on the basis that secondary education will be provided by
Park Mains. If it starts to look as though that’s not the case, we will of course
come back and tell you what the situation is and why. 
Gillian Hoyle: So, there’s not a guarantee? Okay.
Gerry Lyons: Yes, okay, listen, thank you everyone, I’m sorry, I have to swap people round.
I can get your question at the very end. I’m going to go next door, you all stay
here and we’ll send the team in here, thank you. 
Recording ends.

Page 195

Dargavel Primary 05.03.24   Session 2
Alasdair Morrison:
Gerry Hannah:
M3:
F3:
M3:
Alasdair Morrison:
M3:
Alasdair Morrison:
M3: 
Alasdair Morrison:
I think we’re about good to go if everybody is back in the room. I’m sure
you’re all warmed up after that first session with colleagues. So, the purpose
of this second group, we’ll introduce ourselves in a second, is to talk about
site location and transport particularly. So, what we’re aiming to do is, if
you’ve got specific questions, we’ll try and deal with as many of these as we
can within the allotted time, which is round about 30 minutes. We’re on
record again, which you’ll have noticed from the first session. We’ll try and
fit in as many people as possible, so if it feels as if a conversation’s going on
for quite a time, we’ll try and break away from that to try and give as many
people as possible a chance to as the questions they want to ask, to be as
fair as possible. So, I’ll introduce myself first, I recognise a lot of faces from
the information evenings before, I’m Alasdair  Morrison, I’m the Council’s
Head of Economy and Development, and I’m responsible for, amongst other
things, planning and building control, land, property estates and such like.
I’ll let my colleague here, Gerry, introduce himself. 
Thanks very much Alasdair , for those I haven’t met over the course of the
evenings here, my name’s Gerry Hannah, I’m the Council’s Head of Climate,
Public Protection and Roads, so that covers the, kind of, roads
infrastructure, transport, active travel in and around the school. But
obviously, if there are questions about the existing school, the new school
and the, kind of, wider development, we can try and pick up on those at the
same time. I think how we ran the session next door, and I’m not sure how
the session you’ve just had run in here was, we basically just opened the
floor up to questions from yourselves, tried to get round as many people, as
Alasdair  said, within the time we have. If anybody feels they wanted to ask
a question but maybe they didn’t want to ask it in a bigger group setting, if
they want to just catch either maybe Alasdair  or myself after it, and ask it
on an individual basis, then obviously we’re happy to do that, because not
everybody feels comfortable in doing these things in a group setting at
times. So, really, over to yourselves. 
Have we lost one of the mics?
Oh no, it’s here.
Just so we don’t have to yo yo again. 
We’ve silenced you right away (Laughter).
Just to save us getting the steps. I’m going to digress a little bit because
Alasdair , you said Head of Planning, is that right?
Yes.
Why are we not following the RIBA plan of works for the programme? I
raised that question in the last session and the answer was a bit woolly, so
your detailed planning is before starting on site by three months, why is not
the RIBA plan of works? You’re following the Hub process to procure it, so it
should be aligned to RIBA. 
Yes, I think where that’s come from-, I’ve had that question raised before but
I think it’s because what’s been presented here, in the programme timeline,

Page 196

Dargavel Primary 05.03.24   Session 2
in the documents is a more generic-, I mean, it’s been done in a sequential
way to make it look as if you’re working your way through the maze but in
reality, there will be a number of things happening at the same time. But the
process that we will follow will be along the lines of the RIBA process that
you’re referring to. It maybe doesn’t come across like that in the way that it’s
set out there. 
We talked about the programme before, there’s plenty of excess in there, I’m
not going to go over that again because you can get that in the transcript.
But, Head of Planning, your planning process would be before building work,
and you’d expect to see that when you’re doing your detail, to start following
the process and getting the engagement and the statutory consents. The
Hub model is predicated by the RIBA plan of work, so you’d want to get that
before you start getting your approvals to proceed as a design team and
contractor. 
Yes.
But that programme is the complete opposite.
So, where are you picking up on-, do you want to pick up specifics in terms of
(talking over each other) what you think-,
March 2025, planning application, July ’25 start on site. That’s three months,
okay the duration for planning if it all goes well is fine but your sequence of
actually putting your detailed planning in is right at the very end.
No, I don’t think it is, so the thing is, I don’t think when that’s come across-, I
think that’s the approval of the planning application, I don’t think that’s the
submission of the planning application. I think it’s, again, this way of trying
to show it in a, if you’ll forgive me, in a sequential manner to make the
dates, but in reality, a lot of these things will be overlapping and running in
parallel, that would be my interpretation of it, in terms of trying to show-,
I would expect it to be a year before, and yes, you could rejig that, but you’d
be able to save about six months to nine months in that programme by
actually looking at it in detail.
Well, I guess, what we’ve done with this programme is to build in a degree of
contingency to make sure that we can still deliver by the date that we’re
aiming for which is, as you heard from Gerry, August 2027.
Yes, we’ve covered it.
I mean, you don’t want to condense and concertina everything, and then
find that at the last minute we’re not able to achieve it, because as you
heard from Gerry, that wouldn’t be a great scenario for us to be in.
M3:
Alasdair Morrison:
M3:
Alasdair Morrison:
M3:
Alasdair
Morrison:
M3:
Alasdair Morrison:
M3:
Alasdair Morrison:
M3:
It would be a riot, I think, and I mean that in the sense of we would be a
mob-handed riot, not as in having a party, just to make that clear. This one, I
asked a question in the last session and I was asked to bring it to this one
instead. My question is a two-parter, so I asked in the last session about the
design remit of the consultants. Are they designing a school in isolation or
are they designing a school within the definition of the masterplan? The

Page 197

Dargavel Primary 05.03.24   Session 2
reason I asked the question is, a school in isolation, fine, it shouldn’t be, it
should be within the definition of the masterplan, the reason I ask that is
because of the implications to transport. 
Right now, there is an issue with buses, there are no lay-bys, there’s nowhere
for them to stop really, even outside the school here, it’s on the road, not off
the road. For an additional school within a stone’s throw, because we aren’t
getting a different site, we’re getting that site, how are all the additional
transport requirements going to be taken into cognizance? Especially given
that we’re not fully developed out as a masterplan, the reason I’m asking is,
proportionality of the section 75, half of that main artery hasn’t been built
yet, the design is up for grabs. Can we not, as an opportunity to learn from
the lessons of shoehorning things in, look at the integration to the wider
community and factor in the buses, the cars, the active travel and all the
things that we need to do to make it successful and lighten the load and
pressure from this school, which is just down the road from it? 
Alasdair Morrison: I’ll let Gerry pick up on that but we had a very useful meeting to that effect
with BAE just last week, so. 
Gerry Hannah: Right, thanks very much for that, a really good question. I’m not sure
whether you’ve been to any of the information evenings before so, if I’m
about to repeat myself please tell me. So, on the boards next door, and you’ll
maybe get a chance to have a look before you leave this evening, obviously
some of the information’s in here but it’s maybe easier to see on a larger
scale, one of the things we’ve concluded so far is, getting a transport
consultant in to speak to us at an early stage. So, we realise obviously, as
part of the consultation we’re taking forward a proposed site for the
consultation, at that point we engaged with a transport consultant, just to
do some early work, early prep work for us and not-, so outwith the scope of
a transport assessment to accompany the planning application, just to give
us a, kind of, early head’s up in terms of the kinds of things that we should
be looking out for. 
Some great points you made there in terms of the road and influencing the
infrastructure yet to come because that was one of the key things that they
picked up in terms of active travel corridors and wider, shared walking and
cycling routes, and how we can deliver that working in partnership with BAE.
That’s going to be a big focus for us going forward, so obviously yes, the pick-
up and drop-off at the schools, those kinds of things. With the greatest will
in the world this isn’t all going to be solved by active travel and we’re not
silly enough to try and think that’s going to be the case but that’s going to be
a big focus, on how we can encourage that as much as we possibly can. Big
credit to the school, the staff here, the pupils, the parents who support
active travel existing at this school, it’s the highest percentage active travel
at any school across Renfrewshire. So, that’s a real positive-, 
F2: It's not a choice, it’s a necessity so that we don’t crash or kill children on the
way to school. 
Gerry Hannah: Yes, I appreciate that and what we’d be looking to do is continue to work
with this school and the new school in terms of the school travel plans and

Page 198

Dargavel Primary 05.03.24   Session 2
M3:
Gerry Hannah:
Alasdair Morrison:
M6:
Alasdair Morrison:
Gillian Hoyle:
Gerry Hannah:
how we can make that as successful as we possibly can. But all of the points
you’ve raised in there are things that we will be working with, with BAE and
the plans going forward. 
The active travel aspect’s part of your net zero strategy, so I understand the
net zero strategy and your active travel but the active travel isn’t working.
My daughter goes to this school, she is incredibly upset when there are
awards being given for park and walk. I don’t park and walk, I’ve got work to
get to. She is my priority in life but I’m here for 7:45, eight o’clock every day
dropping her off, it’s okay at that time of day but see if you come ten, fifteen
minutes later, it gets difficult. If you come about half an hour after that, it’s
almost impossible and if you’re close to nine o’clock, there’s no way you’re
getting to work on time. Active travel is a joke, we’re a fair-weather
community on the west coast of Scotland, if it’s great and it’s sunny we’ll
walk, if it’s wet, no way in hell, and if it’s snowing, no chance. It can’t be
based on policies that are written for the UK and Scotland wide, it has to be
something fit for purpose for this community, and active travel is not that. 
No, and again, we accept that that’s not going to be the single solution. As I
said, it would be silly of us to sit here and think that was going to be the one
stop shop to solve all of our problems, it’s not, it’s about how we make the
school as connected as possible but recognising that there are other
solutions at play as well. So, as Alasdair  said, looking at the pick-up, drop-
off facilities. We appreciate there is a peak in the morning, the peak’s
probably spread out a lot more in the morning than it is in the afternoon
and the afternoon’s probably a, kind of, more condensed peak, and that’s
the stuff we’ve started working with the school and Parent Council on, on
how we can try and bring solutions to the table for that as well. Sorry, the
lady next you has maybe just got a question, while we’re here.
That gentleman there next with the pen.
It is a follow on from that question. 
Sorry, no, we’ll go there first (Timecode 00:10:00) and then we’ll come to
you.
Sorry, it is my last one, I know that I-, with all the research that’s been done
is there going to be any retro work done to this school? Because that only
walking path in from one side of the village is awful, it’s dangerous, there are
children getting knocked over, there are people with prams getting pushed
out of the way, there are bikes, scooters up your ankles. There are children
getting injured and hurt, it’s not safe. So, with all the work that’s being done
on this proposal, what is the plan to make this area safe?
Okay, that’s a really good point and something Alasdair  and I met with BAE
last week to talk around, the existing infrastructure and what we can look
at. So, the transport consultant is not only looked at future improvements
and the, kind of, new school coming on board, but actually, ‘What can we
improve existing-infrastructure-wise?’ The path network around the school
was an area that’s flagged up as an area to for us to work with BAE on. Just
for clarity, there is a very small amount of the road network here that the

Page 199

Dargavel Primary 05.03.24   Session 2
Council are responsible for, it’s still in the developer’s hands, and that’s
something the Council obviously looks to adopt, the road, when the
developer says it’s ready for adoption. So, that’s a process we work through
with BAE and we’ll continue to do so. Kevin from the Parent Council has
flagged up what I would term the, kind of, remote path to link the school to
the-, 
Gillian Hoyle: The path that comes through the park.
Gerry Hannah: Yes, and that’s an area that we want to follow up as a priority in terms of,
there was a previous suggestion that the whole path network was three
metres wide, there’s no way the whole path network is three metres wide,
that’s the, kind of, standard we want to see. So, we recognise there are some
pinch points, some pinch locations on the route there-,
Gillian Hoyle: Is that bit owned by the Council currently? Has that been handed over?
Gerry Hannah: No.
Gillian Hoyle: Could you not hold them responsible for (talking over each other)
Gerry Hannah: So, that’s for us to work with BAE on and see how we can actually improve
the infrastructure that’s existing up to a standard that we’d want to adopt. 
Gillian Hoyle: So, BAE have a really high safety policy and that’s one of their critical actions,
I’m quite sure if it’s highlighted that there are children getting injured, it’s
going to be quite an important one for them. 
Gerry Hannah: Yes, and Kevin, to be fair, has been highlighting that to BAE at the joint
meetings we’ve had with them and the Parent Council, and it is an area we
will take forward. 
We’re working with (inaudible) on this at the moment, what improvements
are required for this school, what needs to be designed into the new school,
and what happens along that western link road, so we are working-, 
(talking over each other) a responsibility of getting children into this school
safely regardless of who owns the street or the road, so-, 
Absolutely. 
This gentleman here.
So, my quick question was, you said it’s the highest percentage of active
transport at this school, what is that percentage, and what is the Council
average? What would you be projecting it to be for the new school? I’m
assuming it would be no more or equal to the average for the whole area,
for the whole Council. 
So, I don’t have the exact figures to hand but I think, off the top of my head,
the figures were around 62.9%. 
For here?
Louisa Mahon:
Gillian Hoyle:
Various voices:
Alasdair Morrison:
M6:
Gerry Hannah:
M6:
Gerry Hannah: For here, yes, I don’t have the exact figures to hand and I’d need to double
check that, so don’t quote me on that and I’ll be able to confirm the figures.

Page 200

Dargavel Primary 05.03.24   Session 2
That was, from memory, a couple of percentage points higher than the
closest school. So, that’s something that we would look at as a minimum
standard going forward now, because we’ve been really successful and the
kids have been really successful in really promoting that. We recognise that
won’t be every single day in November and December. We’re not, again, silly
enough to think that’s going to be the case either. But we want to provide
opportunities as much as possible. If anyone has looked at the bike sheds
outside here in the morning, they are absolutely jam packed and we’ve
worked with the school in providing additional infrastructure, and that’s
what we would do with any new school location as well. Regardless of what
site it was, we would work with the school in terms of identifying what
infrastructure would make it as successful as possible for active travel. 
M6: Thank you.
M5: So, you’ve touched upon the provision of transportation getting into this
school, obviously it’s a bit of an issue, particularly I see, around the
intersection between Slateford Road and Craigton. It’s a bit crazy in the
morning, so, it’s already like that, we’ve got buses taking people to Park
Mains, buses taking people, I would assume, into Renfrew, to Trinity, and
we’ve got buses taking people elsewhere. What are we going to do when we
add another school into that mix? Is there going to be any retroactive work
to the existing infrastructure, to-, do you know what I mean? You’re never
going to get a bus down the road, down Slateford in the morning, to get to a
new school because you can’t get a car down there in the morning. So,
what’s going to be done to address that?
M4: Especially with having 1,500 more-,
M5: Exactly, yes, because-,
Gerry Hannah: Yes, so, again, really good points. So, the work we’ve been doing at the
earliest stage just now, is purely focused on the new school for now, it’s then
about taking that work and taking that much wider. So, within the
programme you’ll see obviously it refers to a planning application, within
that planning application process we would be doing a transport assessment
that looks at the transport in the widest possible sense. It’s not just about
walking and wheeling to and from school, but the reason for getting the
transport consultant on board so early with us, is so that we can do quite a
lot of that work in advance. We don’t want to wait for a planning application
to then tell us, ‘Here’s what you need to do in a relatively short period of
time.’ We’re trying to get as much of that early work done that we possibly
can. 
So, if you look at the junction capacity for instance, the junction at the
bottom of the road, the traffic signals junction there, that operates at about
60% capacity, which is really, really low, really low for a, kind of, urban type
junction arrangement. So, what we know is, we’ve got plenty of capacity
there, ‘Right, okay, so where else is a concern?’ This transport consultant will
tell us where else the concern is. The example you’ve used there of buses
being on the road, ‘How many buses are there going to be?’ That transport

Page 201

Dargavel Primary 05.03.24   Session 2
modelling, telling us where the buses are going to be going, those are the
next, kind of, steps of work that we’ll be looking to take forward.
M5: What, realistically, can you do? Because it’s a canyon, Slateford Road’s a
canyon, there are houses either side of it. There is nowhere to put buses
unless you drop the kids at the top of Slateford Road and expect-,
David: (talking over each other) don’t have a secondary school in Erskine
(inaudible). I’m sorry, it comes back, it comes back, how long is it going to
be?
This gentleman here was going to ask a question.
A few weeks ago, my wife and I passed the front of the school and we met
our local police officer who was there advising some order into the drop-off
location. He said he was concerned about the safety issues, so I knew I was
coming to these meetings and so, a few weeks hence I decided, I might even
have been watching your car, I don’t know. I stood-, it’s okay. I decided to
look at what was happening, so I was there round about, maybe a wee bit
after you, at 8:15. There were two cars on the east side-, no, no, the south
side, you guys have got this north and south, east, west rubbish. Anyway, I
think it’s the south side, two cars. By the time 8:55 came, there were 25 cars
and then the people have got to stop when the other one’s coming the other
way, the bus is there. What we have in Bishopton, in the existing school in
Old Greenock Road, it’s like the dodgems sometimes. What has been created
for this school is exactly the same thing, it’s not any different. So, I, kind of,
thought, ‘What would be the solution?’ You mentioned lay-bys, you’ve got
an undeveloped piece of land on the south side of this school, is that
Renfrewshire land?
The immediate acre and a half just-,
Right, that would be a good site for a short stay car park.
That is the proposal that we’re currently working on, I wouldn’t call it a short
stay car park-,
Well, I think you should work on that, that would take-,
But a drop-off and pick-up location for the school. 
Think about the capacity that you need for that car park and that would take
the cars off Arrochar Drive.
Yes, it should, if it’s successfully implemented it should make a great deal of
impact on that issue that you’ve raised.
Whatever the location for the new school, you do the same thing.
That is currently in the plans.
Alasdair Morrison:
M1:
Alasdair Morrison:
M1:
Alasdair Morrison:
M1:
Alasdair Morrison:
M1:
Alasdair Morrison:
M1:
Alasdair Morrison:
M1: So, you have the long-term car parking for teachers etc. that you have here. I
might add the drop-off procedure, the cars that were coming in to Arrochar
Drive, I saw them drive down into the drop-off area, they dropped their

Page 202

Dargavel Primary 05.03.24   Session 2
children and away they went. The bus came in, it dropped off the children
and away it went. The problem was the on-street parking.
Alasdair  Morrison: Well, for me, you’ve highlighted one of the most significant issues, the way
in which people are currently using the infrastructure is not perhaps the way
it was originally designed to work. But it’s working in that way out of
necessity as much as anything else, part of which is the fact that the western
link road has never been completed in time for the school operating and for
an awful lot of the housing being built. If that hadn’t been the case, I think
we’d probably be having a slightly different discussion (Timecode: 00:20:00).
M1: I notice in your documentation, the consultation documentation, that you
will indeed take on board the traffic consultant and it is highly important,
because once the new school’s-, all that will mean is increased cars,
increased buses, it’s a problem now, it will be at least twice the problem if
you introduce-, you don’t need a consultant to tell you that. 
F1: I’ve lost what I was going to ask because it was part of what you were saying.
Oh, you were saying that the way that people are using that road isn’t the
way that it was designed, how are they supposed to use it?
Alasdair Morrison: Well, what I mean by that in terms of not the way that they’re using it, is
that if the road infrastructure was all in place and Arrochar Drive was
complete all the way up to meet Craigton Road-,
A through road, yes, okay. F1:
Alasdair Morrison: Then I don’t think people would necessarily all be looking to do a U-turn in
the road and come back the same way, because they would have a different
alternative road to-,
That’s up to the developers then, I take it, and not the Council. F1:
Alasdair Morrison: It’s up to the developer, BAE updated us at the meeting last week, Gerry,
they hope to have the whole of the western link road completed by
November ’25.
F1: Right, okay.
M5: Is the site then, position nine or whatever it is, is that not the-, sorry, is that
not then just going to force more traffic onto that junction at Slateford and
Craigton? You’re then going to have the added complication of people from
that end trying to this school and people from this end trying to get to the
new school. Or trying to get in and out of the village using-, 
Gerry Hannah: So, just in terms of the junction capacity, just at Craigton and Slateford there,
is that what you’re reckoning will be a pinch point?
M5: Well, yes, in the morning it’s carnage, there are people parked up on the
pavement, you can’t see round the corner, there are cars everywhere,
people everywhere, kids everywhere, buses everywhere.
Gerry Hannah: Again, it’s one of those things that with the current road network not being
fully complete, we really need to look at the transport modelling with the
assumption that that road network is complete, and how the road network

Page 203

Dargavel Primary 05.03.24   Session 2
is then going to be used with that completed section. Again, junction
capacity we’re not looking at being an issue for us, it’s more about, as you
say, maybe the mention of things like the buses and how we can look at
potential solutions that might be in place for the buses. From a wider
infrastructure point of view, obviously the pick-up, the drop-off-, the parking
facility, rather, at the train station and the completion of that is obviously
going to be a thing that we’ll be looking for the developer to take forward as
well. So, it’s not just focused on what we do about one particular junction,
it’s really looking at the traffic modelling taking in the whole of the road
network and what potential solutions there might be for us. 
Louisa Mahon: Forgive my ignorance about that particular area, but see if there were
improved drop-off and pick-up facilities at this school and wherever the new
school is, would that ease some of that parking you’re talking about?
M5: It’s not so much about parking, it’s about through traffic and buses, and I get
what you’re saying about junction capacity, I’m sure over a 24-hour period
that junction is pretty lightly used but at particular peak times it’s
exceptionally busy. Not just actually the junction but further up Slateford
Road, we have buses that tend to hold just outside the development in the
morning, that blocks that up. You get people trying to get out of the estate,
they can’t get out because people are going round buses coming into the
estate, you’ve then got buses stopping at various points all the way down
Slateford Road, and I know it’s the same along Craigton Drive. That’s only
going to get worse by adding another school in that location and even by
completing that link road, that’s going to make it worse again. And there’s
nothing that you can do to Slateford Road or to that junction because it’s
hemmed in on all sides by houses. 
M4: Can I just expand on this gentleman’s point, sorry? Just because where we’re
going to be putting that link road, we’re now going to be-, so at the moment
they come down Slateford and turn left onto Craigton Drive, all we’re going
to be doing is changing them to turn right onto Craigton Drive and go all the
way along. Now we’re going to have two schools on the same road, so an
800-pupil school and 500 and whatever this one is. Then they’re all going to
go down-, alright, a high percentage are all going to go down to join the
motorway for the M8, to carry on to work. So, what we’re doing, that
junction I think you said was 60% now, that’s a set of traffic lights that’s just
going to go nuts with an extra 800-,
Sorry, would people not, if they were coming from Slateford from the north
end or the west end-,
Depending on this gentleman’s point of view-,
Would they not have the alternative of being able to come Craigton Drive as
well? So, they wouldn’t have to go down by Arrochar. 
Alasdair Morrison:
M4: 
Alasdair Morrison:
M4: Yes, and I’m not saying everyone will, but it will be a lot quicker to carry on
the road-, say they’re dropping off at the new school, site nine, if they carry
on they’re going to be entering the road, Barrangary Road, to get onto the
motorway a lot quicker than doing a U-turn, which we don’t really want

Page 204

Dargavel Primary 05.03.24   Session 2
them to do anyway because then they’ll start-, go down the road, do a U-
turn and then go back round the loop of Craigton with all the speed bumps
and-,
Or go out by Slateford, I guess, would be the other option. Alasdair Morrison:
M4: Or go out by Slateford but again, if they’re doing that and going on the M8,
and going towards Glasgow, then they’re going a much longer route, which
people are-, this gentleman here is trying to get to work. I go the other way,
so it’s fine for me but everyone else is going to be going that direction. 
Alasdair Morrison: One of the things the Council would, I guess, point out, is that if the
intended or proposed pick-up and drop-off facilities are there, then when
people come back out of that pick-up and drop-off facility, they would have
the alternative of going either way. So, they wouldn’t all necessarily go the
same way, they could go the way that suits them best, the way that suits
their-,
M4: They would have an alternative but the large majority, in my humble
opinion, would probably use the quickest route because I would, if I was
going into Glasgow for work, I would use the quickest route to get there on
time. All the traffic that you’re going to hit is just going to be amplified. So, I
know you would have the option, you would, to go round, and you may on
some days use that because it might be quicker to go round than wait in the
queue at the traffic lights at the bottom of that road.  But with an extra 800-,
I’m not saying everyone will be using a car, but for a large majority, even if
you said half, use the car-,
Gerry Hannah: I appreciate that the number 800 obviously sounds an exceptionally high
number. 
M4: I know that’s a max capacity.
Gerry Hannah: Let’s assume all 100% use the car, in the worst case scenario, 800 is
stretched over a longer period of time in the morning, as you highlight, with
things like breakfast club, with arrivals at school tending to be more spread
out. The problem, or the main pinch point we see when we’re working with
the school here, is when people start arriving and doing pick-ups from 2:30
onwards. That becomes much more of a problem for us and that’s where
we’re directing the transport consultant-, with the local knowledge the
school and parents are giving us in terms of what they see as being the
problems here. ‘Are they going to be replicated there? What can we do to
minimise the chances?’ 
Just to give that, kind of, reassurance, and I appreciate the information that’s
been given in the past and maybe there’s a lack of trust in what’s being said,
and I totally understand that, and I wouldn’t try and convince you otherwise.
But in terms of that junction capacity for 60% taking another 800 cars over a
45 minute window, for instance, it’s not something that’s going to max out
the capacity of a traffic signal junction. It’s more about the other
infrastructure that we need to look at, in terms of clearing the road space
and making sure that there isn’t that congestion, people stuck behind buses
and the like, and having those discussions with bus operators, that they can’t

Page 205

Dargavel Primary 05.03.24   Session 2
be stacking buses up in the middle of a network and causing issues. That’s
for us to take away and have those conversations. 
This gentleman and then this lady in the grey here. Alasdair Morrison:
M3: I’ll go back to my point earlier on, and it’s lessons learned and it’s what’s
right for the community, and I totally agree with all the transportation issues.
The school cannot be designed in isolation, that’s why I asked the question, a
simple question, is the remit of the design team the school or the integration
of the school? It’s very, very different, it has to be the integration of the
school, it’s got to the be the wider impact of all these concerns within the
community. I absolutely agree there’s got to be something done at the
school, at the destination but there has to be something done throughout
the masterplan. Slateford Road is a nightmare, I don’t go near it, not in the
morning times, because the buses are just parked all the way up, they’ve got
nowhere else to go. The problems outwith the development, ‘Don’t care
about it,’ that’s what BAE think, they only care about their money, they’re
developers. I don’t blame them for it, that’s just the world that they live in,
that’s how they work. We have to live with this and you’re there to protect
us from the developer (Timecode 00:30:00), from the people that just want
to cut every corner and make it as cheap as possible because it’s all about
profits. If you don’t protect us, we’re going to get worse and it’s not a threat,
that’s just-, Gerry earlier on said he was going to resign if this doesn’t work,
we need accountability because the Council let us down horrendously
before. 
So, the question I got asked to bring to this one, I didn’t get to ask at the
other one, I moved here ten years ago, I was sold the dream of a community
with one school for all the kids to go to. That’s how I grew up, I went to a 600
capacity primary school, I had no problems with the capacity, I liked the idea
of one school, one community. We’re now having three schools, that’s
horrendous, the politics between those schools is not acceptable. But
section 75, I don’t understand, I’m not fully up to speed with section 75
agreements. It was proportionality and it was based against the original
design, and capacity and number of residential units in the masterplan.
That’s obviously grown significantly, why has the section 75 not grown along
with it, based on the new plots and units? And if it’s not, why can’t we do
something retrospectively like other developments across Scotland where
they charge a levy per residential unit to contribute towards the
infrastructure and costs around that area? 
Alasdair  Morrison: Okay, there’s a lot in there, so, I mean, I probably won’t have time to answer
all the queries about the section 75 but in a nutshell, the original outline
planning permission, in terms of the number of residential units for Dargavel
was 2,500. That was the original masterplan, the community growth area,
the structural growth plan of yesteryear. BAE then came forward in about
2016, something like that, I might get the years slightly off here, but 2016,
2017, with a planning application to increase that by another 1,350. At the
same time as doing that, and again, I can’t offer you an explanation tonight
because I wasn’t involved at the time, I wasn’t even close to the project, the
Council took the decision, amongst other things, amid other decisions that

Page 206

Dargavel Primary 05.03.24   Session 2
were taking place which we could go into but, like I said, we probably won’t
have time, in terms of the money for the Community Development Trust in
Bishopton, money that was going to get put towards Newton Road playing
fields. But the Council decided to then remove certain elements from within
the section 75 for Dargavel as a result of granting that planning permission
for the increased number of houses. I can’t answer the question as to why
they did that in detail because, like I say, I wasn’t involved and I don’t think
of the-, well, I know none of the officers who are here tonight were indeed
still-, who are currently involved with the Council.
So, that decision’s been taken, it has been, to use your terminology, watered
down, if that was the terminology you used, or I’ll use that terminology.
Section 75 was diluted to a significant extent between the 2012 version, the
original planning application, and the 2018 version that we now have. The
point you were making before about, ‘Will the new primary school be
designed on the basis of, almost, from scratch, or will it be designed within
the existing masterplan that we have?’ We’re faced with a number of
constraints, not least of which is a masterplan that’s been agreed, a section
75 that’s been agreed, and a broad layout of where housing zones and
where the infrastructure will go that’s been agreed. That is effectively baked
in and that’s why we’ve only got the infrastructure that we’ve got. I can’t do
anything about that as we sit here today, I can negotiate. with Gerry and
other colleagues. with BAE to try and make the most of what we’ve got,
Louisa was involved in that meeting as well. 
We’ve certainly insisted that they need to do an awful lot better in terms of
completing infrastructure long before the school is here, long before the
second primary school, and also to make that based on a much wider, much
better, much more enhanced level of path network to allow active travel to
happen in the places that it can happen. We’ve still to explore and finalise
the details in terms of what that’ll mean for car parking, and drop-off, and
lay off, bus lay-bys and such like, we’re still in discussion with them about
that. But we will be doing everything we can to make the traffic system here
work as best as it can, given the circumstances that we’ve got. 
M3: Sorry, I shouldn’t have given my mic away, but there’s no legal recourse for
the dilution or watering down as you’ve said of the section 75? Because
that’s a disservice to the community, section 75s never go down, they go up.
Alasdair  Morrison: Yes, sorry? No, we can, sorry-, a legal recourse, we can’t make it, there’s no
way back from the discussion, as I said, unless BAE agree to it. It’s a
multilateral agreement, it’s not a unilateral agreement, the section 75, so
basically both parties need to agree.
Gillian Hoyle: It wasn’t agreed with us, it wasn’t agreed with us as homeowners, can we
not use our homeowners’ rights and take you guys to court over the fact that
you’ve changed the section 75, changed things we were sold on, on our
properties? We were sold community hubs, we were sold the central park
that was meant to be amazing, we were sold the community centre. None of
this has come to fruition because you guys diluted the section 75 on us
without consulting the community.

Page 207

Dargavel Primary 05.03.24   Session 2
That’s absolutely right.
I can’t answer the question as to who was consulted because-,
None of us were, we were here. 
Well, I take your word for that because I wasn’t involved at the time but in
terms of-, well, actually you wouldn’t expect me to, I can’t give you legal
advice in terms of what you would be entitled to do and what you wouldn’t
be entitled to do. 
So, in other words, we take you to court.
Has anybody counted the number of times the Council have said tonight, ‘I
wasn’t here,’ because I’ve got about 50.
We should have had a bingo card. 
Well, at the end of the day, if you’re not here, you’re not here.
It wasn’t me (talking over each other)
What are you meant to say? What would you say, if you weren’t here, what
would you say?
I think you guys should have had your due diligence to go back through the
history, know the issues, know the questions, because a lot of them are
repeat questions that we’ve asked time and time again, and never had an
answer. So, you guys had a due diligence to trail back through all the other
recorded meetings, identify what was going to come up, because we’ve
asked it before, and have an answer for us. That’s a consultation, don’t feel
insulted at all.
Yes, and we’re doing that and we’re continuing to do it but we need the
questions asked first. 
(talking over each other) recorded?
So, Gerry, can you do a hands around the table for, ‘Put your hand up if you
think this is the right site for this school?’ Can we have that?
I’m more than happy to do it, it’s not a problem.
So, put your hands up, if you’re a parent, put your hands up if you think-,
A parent.
Don’t let him not ask it.
No, wait a minute, I’m not convinced that the people here want me to do
that.
No.
So, no, I’m not going to do it. Okay, so we’ve got ten, fifteen minutes for
extra questions for people to ask, thank you for that. 
David:
Alasdair 
Morrison: Gillian
Hoyle: Alasdair 
Morrison:
Gillian Hoyle: M5:
F4:
Gerry Lyons:
?:
Gerry Lyons:
F4:
Gerry Lyons:
F4:
M7:
Gerry Lyons: M7:
F4:
M7:
Gerry Lyons:
Various voices:
Gerry Lyons:
M7:
I didn’t understand that, why can we not have a parents’-,

Page 208

Dargavel Primary 05.03.24   Session 2
F4: A vote.
Gerry Lyons: Because not everyone wants that.
F4: But to be honest, they’re basing it on-, so they’re talking about surveys that
they’ve had-, 
Gerry Lyons: Could you sit down, please, if you don’t mind? Thank you.
F4: So, they’re talking about surveys they’ve had, they’ve had 253 surveys and
they’re saying that there’s an overwhelming difference in opinion on those.
So, again, that’s a very small section of the community. 
Gerry Lyons: Excuse me, do you mind sitting down? Thank you.
F4: Our concern is, the people that have filled out those forms don’t necessarily
have the full information at hand because if they’re not at these meetings
they’re not asking probing questions to identify PR spin versus fact. That’s
our concern, and that’s why tonight, we’ve had the opportunity to ask the
experts, we’ve had the opportunity to decide, ‘Are we satisfied with the
answer of the experts?’ I know I’m not, so that’s why it would be interesting
to gauge from the room, ‘How do we feel? And does the feeling tonight
represent the 253 surveys that are filled out?’ I think that would be
interesting. 
M7: Aye, maybe we should have a vote, ‘Should we be allowed to vote?’ Would
that be alright?
Gerry Lyons: Listen, at the end of the day, I’m chairing the meeting and whether it suits
you or not, I’m not going to have a show of hands. We have a very detailed
process, we’ve got an online questionnaire and if you’ve not filled it in, can I
encourage you to do so? To get your views heard, especially if you’ve not
already filled it in and you’ve now heard from the experts. That will be a
very, very important document. What I don’t want to do in a public meeting
is take it down to that level of, ‘Who’s hands like it and who’s hands don’t?’
Because you then move into a situation where there’s an element of peer
group pressure in that, whether we like it or not, there’s an element of
community pressure, and it doesn’t fit in with the criteria that I set at the
start of this meeting, which was about respect, civility and a good
experience for everyone. So, on that basis, I’m not going to have a show of
hands, I’m happy to take any additional questions because we’ve still got five
minutes, and if there are no questions I’ll finish the meeting. But if there are
questions about the proposal, not about what happened five years ago or
three years ago, but about the actual proposal, then I’m happy to take them,
because in my role as chair that’s now the phase of the meeting that we’re
now in. Gillian?
Gillian Hoyle: I have one question, when are you going to come back to us about Park
Mains, the secondary allocation?
Gerry Lyons: I have to finish this proposal and that will take me to Easter, and I can’t give
you a precise date but some time between Easter and June I will come back
and have discussions about Park Mains.

Page 209

Dargavel Primary 05.03.24   Session 2
Gillian Hoyle: The reason I’m asking is because I don’t think I can confidently say whether I
think plot nine is the right allocation or not without understanding Park
Mains, because I do not believe we’ve got the right allocation for the
secondary school. 
Gerry Lyons: Okay, I disagree with you, I believe that I can show that, but it’s a discussion
about Park Mains and this is a consultation about Dargavel Primary. 
Gillian Hoyle: It relates to the primary school for me.
Gerry Lyons: Yes.
F5: Is anything that’s said here tonight likely to change the proposal of preferred
location or is it a done deal that it’s going to be-,
Gerry Lyons: No, it’s not a done deal, we have to pull together, not just tonight, we’ve had
another public meeting already, we’ve had all the information sessions,
we’ve had the meetings with the statutory consultees, who have been-, well,
I’ve not had the meeting with Dargavel Parent Council yet, I’ll do that on 12th
March. I’m going to the Community Council tomorrow night, we’ve met with
all the statutory consultees, we’ve met with the children, the teachers, the
elected members. We have to pull all of that together as the outcome of the
consultation, this is just one part of it, but having done that (Timecode:
00:40:00), we have a statutory responsibility, if we believe that there are
clear messages about things that need to change, to take that on board and
change them. That’s what we will do if we see that as coming across clearly
from the responses. 
M7: Gerry, what’s the timescale on that then, in terms of decision making?
Gerry Lyons: So, the statutory consultation finishes on 26th March, Education Scotland
then have three weeks to do their work. So, they do, you know, they look at
all of this, they’ve been here, they looked at all the documentation, they’re
coming to both schools on the week beginning 26th. They then write a
report, they’ve got three weeks to do that. We then have three weeks to
respond to their report and then that’s all pulled together and it will be
taken to a meeting of the elected members on the board on 23rd May. That
will be the decision where it either goes forward or it stops and then the
work, and that timeline that you’ve got there, will move forward from there.
Yes.
F1: If the proposed site goes ahead and you’re ready for August ’27, does that
mean that the kids here get their playground back? Like, do the buildings
outside get taken down?
Gerry Lyons: The temporary classrooms have got a five year warranty on them and one of
the things that we have looked at is how quickly we would remove them if
we get to that position, and we can move them in a-, Frank?
A matter of weeks.
A matter of weeks, so yes. 
Frank Farrell:
Gerry Lyons:
F1: But the capacity, that’s the plan?

Page 210

Dargavel Primary 05.03.24   Session 2
Gerry Lyons: Yes.
I just wasn’t sure.
What developer contributions are going to be extracted from the remaining
phases of residential developments?
Zero.
Yes, we’re not doing that.
F1:
M3:
Various voices:
F1:
Alasdair 
Morrison:
I mean, I don’t know if it was with this group, forgive me, or if it was with the
group next door earlier, but the section 75 agreement already sets out the
developer contributions for the quantum of housing development for
Dargavel. That’s what’s usually agreed at what’s called a planning in principle
stage, which was that 2018 decision I referred to. Usually then when you
come forward with your detailed layout and design of the houses, there’s no
further discussion around that. That’s the normal way the planning process
works, anything that comes additional in terms of developer contributions
would be at the behest of BAE.
There are examples around Scotland of other developments that don’t have
section 75s and they apply a levy to the units of residential development
built. Why are we not exploring that as a legal standpoint?
I don’t know where these examples are but if you’re talking about the roof
tax, as it became known in the media, it’s not legally possible to do that in
Scotland. There’s case law in Aberdeenshire where they were significantly
reprimanded as a Council for trying to do that with a big development to the
south on one of the estates.
The Highland Council are doing it.
They don’t do a roof tax, they do-,
They don’t do a roof tax, no, they do (talking over each other)
No, it’s called a developer contribution standard, which is applied in terms of
for new developments, and Renfrewshire Council is currently in the process
of working towards having such approved guidance.
Because there are a number of plots still to be developed and units to be
built.
There are.
And we’ve already heard tonight, which will be minuted, and everyone
already knows it anyway, that the section 75 was, as you said, diluted or
watered down. Surely, we should be doing everything we can, or you as a
Council should be doing everything you can, to regain as much money from
the huge profits that these developers are making. They are laughing
because they’re running away with it, plus we took money off the table willy
nilly for some reason, who knows. They’ve all gone, whoever did that,
they’re probably retired and having a great time.
M3:
Alasdair  Morrison:
M3:
Alasdair  Morrison:
M3:
Alasdair  Morrison:
M3:
Alasdair  Morrison:
M3:
Alasdair 
Morrison:
Yes, well I-,

Page 211

Dargavel Primary 05.03.24   Session 2
M3: We’re the ones left with that legacy, we’re the ones that are being robbed of
a community that should be a lot stronger and better. Yes, tonight we’re
talking about schools, what are these kids going to do at weekends and on
evenings? When they get older and teenagers? There’s a huge capacity right
now but when they’re older it’s going to be wild, and we’re left with that. 
Gerry Lyons: Yes, one of the really interesting things that’s come up through all the
conversation we’ve had is that one. ‘What about the teenagers and the
young people as they go through?’ And I think that is a really important thing
to look at and to have conversations about, and to explore, so that’s
certainly one aspect I think will come out of this consultation, that we will
have a further look at, ‘Well, what can we offer our young people so that
they’re not bored, and then because they’re bored, they then start to do
things that they wouldn’t normally do?’ So, it’s a really helpful input actually. 
M3: But it’s going to cost money, everything does.
Gerry Lyons: Well, at the moment we don’t-,
M3: So, the developer question of a contribution (talking over each other)
Gerry Lyons: Yes, at the moment we don’t know what it is.
M3: But there must be other routes to get the money (talking over each other)
Gerry Lyons: But the conversation is a good one to have, I think, and I appreciate you
raising it. Okay, everyone, I’m aware-,
Kevin: Gerry, can I ask one, sorry?
Gerry Lyons: Aye, of course.
Kevin: Just following on from that, in terms of any, kind of, building that we do with
the school, anything else within Bishopton here, there’s got to be a
community benefit aspect included into that in terms of the scoring matrix
for any contactor etc. that’s approved. What is that going to look like for
Bishopton? Is that money going to stay within Bishopton? Can we stipulate
things such as contribution towards Holm Park, for instance, and the
facilities there? Very simply, what the gentleman’s just said, can we get that,
kind of, put in place, where it’s (talking over each other) children’s-,
Gerry Lyons: I need to take that back to the procurement team, Kevin, but I will because I
don’t know the answer.
M7: Why are procurement not here?
Gerry Lyons: We, kind of, went with the biggest issues that had come up in the early
stages and procurement hasn’t really been one of them but that’s a question
we don’t know the answer to. Procurement will be able to give you a steer
and we’ll certainly going to come back to you with that. 
F1: The next time can we have people who are going to come and lead the bull
by the horns, instead of people that say, ‘I believe,’ ‘I don’t expect you to
have trust in me,’ ‘Don’t take my word,’? It’s not acceptable to have a leader
that’s representing the community-,

Page 212

Dargavel Primary 05.03.24   Session 2
Gerry Lyons: Listen, what I’m saying to you is-,
M7: Don’t interrupt what the lady’s saying.
Gerry Lyons: Sorry, pardon.
F1: No, you’ve stood there through the whole first section using, ‘I believe,’ and
saying, ‘You don’t need to trust what I’m saying,’ ‘Don’t take my words as a
promise of delivery.’ No leader stands there and sets that tone, a leader
leads by example. 
Gerry Lyons: I’m going to come back at you on that because I couldn’t disagree with you
more. What a leader doesn’t do is say, ‘Believe me, believe me, believe me,’
when you believed people previous to me and they let you down. What I am
asking you to do, is to watch the processes, watch the systems, watch the
engagement, watch the progress through all of those things and then make a
decision. Don’t take my word for it because you did that before. So, it’s not a
failure of leadership in my opinion, what I’m saying to you is an honest steer,
which is, ‘There’s loads to be done here, there are lots of processes to go
through, were I you and I’d gone through what you’d gone through, then I
would be reluctant to take someone’s word on it.’ 
F1: Take our (talking over each other) out of it-,
Gerry Lyons: Just let me finish, and on that basis, I wouldn’t ask you to take my word for it
but what I will ask you to do is to watch the actions, and hopefully at the end
of that you’ll come back to me and say, ‘Gerry, you did deliver,’ and then that
will be a good thing for the children.
F1: (talking over each other) we want evidence, we want facts and we want
information, take the emotion out of it, as a professional, on a professional
level. This is not professional, it’s not been delivered professionally and
we’re not-, 
Gerry Lyons: Okay, all I can do is to say, I note your point, thank you for making it, I
completely disagree with it.
F1: (talking over each other)
Gerry Lyons: And that’s now nine o’clock so I have to bring it to a conclusion.
Louisa Mahon: Thank you very much, everyone. 
F4: At what point do we find out-, so, of all the questions that have been posted
out or the information grabs, what timeline are we looking at for getting that
back to us?
Gerry Lyons: So, once we pull all of this together, the timeline is that period between the
consultation period finishing and all the reports being written. 
F4: (talking over each other) the transcription for tonight?
Louisa Mahon: There were some key questions that we’ll get back to you asap on. If you
give us, like, a week to come back to you, would that be okay? We’ve all got
all your email addresses from everyone that’s here, so we can either try and
get it out to you directly or we can put it out through the Parent Councils

Page 213

Dargavel Primary 05.03.24   Session 2 
and the Community Council, would that be okay? So, key questions we’ve
picked up tonight, we’ll get that (talking over each other)
F4: When will the transcription for tonight’s meeting be available?
Louisa Mahon: We normally have that around (talking over each other)
David: The clock is ticking, the clock is ticking, we need to see action from the
Council in getting this a bit better than it is. I can’t say they’re ever going to
get it right, and BAE have-, they’re a corporate body, they’ve done
everything that Renfrewshire Council asked them to do, and it’s the mistakes
that have been made by Renfrewshire Council that have caused all of this.
Gerry Lyons: Yes, and as I said at the start, we’ve got to now try to move forward to
change that situation. Listen folks, I’m very aware of the time, our let only is
until nine o’clock, thank you for coming along and thank you for your
participation this evening. 
Recording ends.

Page 214

Dargavel Primary 05.03.24
B session, second room combined
Alasdair  Morrison:
Gerry Hannah:
Alasdair  Morrison:
Louisa Mahon:
Various voices:
Louisa Mahon:
Alasdair  Morrison:
Dougie:
Louisa Mahon:
-land estates, upcoming development and other things. I’ll let Gerry
introduce himself.
Thanks, Alasdair , for those I’ve not met yet over the course of the evenings
we’ve had here, my name’s Gerry Hannah, I’m the Council’s Head of Climate,
Public Protection and Roads. So, I’m here to talk about any, kind of, road
related infrastructure development, both around the existing school site but
obviously the proposed school site. Obviously, if there are questions around
the wider development as well, then okay, we can try and address them at
the same time.
So, this first group tonight, for the first, I think we’ve got about 30 minutes,
do we, round about, maybe just a bit under, was to focus on site location and
transport issues. So, if we can keep any questions to that, we’ll obviously get
these recorded as we go along and we’ll try, as far possible, to take it in turns
in terms of, if somebody wants to speak, if they can indicate and put their
hand up, and then we’ll try and deal with that question as we can. If
anybody’s got something related to it, we’ll try and cover that same issue, so
long as we keep tabs on time overall. We’ll try and obviously share that out
amongst everybody around it so everybody gets a chance to have a say as far
as we possibly can.
Just to say, is everyone okay with us recording this?
Yes, of course.
We’ll do the transcript etc. for it, and if there’s anything that comes up that’s
not, I guess, on topic in terms of site and also travel and transport, I’ll make a
note of it. So, if there’s stuff we want to come back and meet with you
about, or specific questions, I’ll keep a note of that and make sure that we
do get back to you with what those issues are.
And as Gerry covered, anything specific about the design of the school, you’ll
cover it when you go through and join the second group. So, I’m quite happy
to go with whoever wants to kick off. 
I’ll go first. In terms of site location, does that influence catchment areas?
I’ve got a question around children at the existing school, so if you’ve got
children at the existing school just now, the new school’s built, the
catchment area’s drawn, and your children fall into the new catchment area,
is there any impact in terms of the children at the current school?
No, sorry, I know that’s-, from working with the team-, sorry, my name’s
Louisa, I’m the Head of Marketing and Communications, I should have
introduced myself, apologies everyone. If your child is currently at Dargavel
Primary or even if your child is currently at Bishopton Primary School,
irrespective of what happens with the catchment area, if you wish to remain,
that’s absolutely fine. If you had siblings, you would then-, the sibling policy,
you’ve got the prioritisation within the sibling policy, so you’re not under
any, sort of, pressure to make a change.

Page 215

Dargavel Primary 05.03.24
B session, second room combined
So, following on from that then, if you’ve got a sibling-, is the sibling policy
going to apply to the new school as well, whereby if you’ve got one sibling at
this school, for example, this one-,
Yes.
They would get the first priority-, 
For the new school in 2027?
Yes.
Sorry, if you were?
So, if there was a child at the school here-,
Yes, but were in the other catchment?
Yes.
You could choose to move.
Both?
Yes.
Yes, so effectively it’s new households bringing children to school that would
be affected by the catchment. If your children are already at the school, their
siblings would get the chance to go to the same school. 
But how would that affect-,
That’s probably better for Gerry and Janie because they can answer them a
lot better for you but yes, as Louisa said, we-,
It’s okay, we know how the catchment policy works and the sibling policy
works. Are your children currently here?
Dougie’s is, mine is not, mine is two and a half. Looking at the plans tonight,
we are splitting the border between both catchment areas, I mean, right on
the line, so would it be one or the other? I think following on from Dougie’s
question then would be, if we proposed going to the new school over this
one because there have been a lot of concerns and voices raised about the
design of this school, the open plan etc. If this one was better for our child’s
needs, would the sibling policy then mean that if Dougie moved his child to
the other school, the new school, would that then mean that there’s one
less space for our child to go to that school, so therefore they would go into
a ballot as well? Because my daughter wouldn’t have a sibling, therefore
would that space be missing because Dougie’s then taken that space up? No
offence to you, mate. Does that make sense?
Yes, it does.
Yes, if that got to-,
M9:
Louisa Mahon:
M9:
Dougie: 
M9:
Louisa Mahon:
M9:
Louisa Mahon:
M9:
Louisa Mahon:
M9:
Louisa Mahon:
Alasdair  Morrison:
M9:
Kevin:
Louisa Mahon:
M9:
Louisa Mahon:
Gerry Hannah:
Alasdair  Morrison: There’s Janie, who might be able to answer in terms of-, might be the best
bet.

Page 216

Dargavel Primary 05.03.24
B session, second room combined
M9: If we’re off topic, apologies, but-,
Louisa Mahon: No, not at all, it’s a catchment question, a specific one. So, I’ll let you explain.
M9: Right okay, so if you’ve got one-,
F4: I know, that’s a very specific question, I think we should be talking more
generalised but if we go in, can I ask a general question?
So, if we’ve got somebody who wants to have two children at the school, at
this school but they wanted (talking over each other) would be gone, so my
child, who’s then going to school-, she’s two and a half just now, so she’ll
probably be going (talking over each other)
Yes, so I appreciate that, but one question, please.
Because I’m looking at the scores and they’re all very close, what made that
(talking over each other) the decision (talking over each other)
Try and do that, it’s just because the recording won’t pick us up if-,
Various voices talking over each other
So, this lady over here was asking a question, do you want to ask it again just
for the purposes of the tape?
Yes, so I was just asking you to, sort of, talk us through, there are a lot of
scores that are very close here, what was it that made the site that you’ve
decided on for the proposal-, why did you go with that one?
Okay, so the 23 sites that were under consideration are all set out there in
the matrix and hopefully the scoring is relatively self-explanatory in terms of
why scores were attributed to the individual sites. Then all that’s happened
is they’ve just been put forward and populated the matrix on that basis. So,
the criteria are along the lines of ownership of the site, its current
development land status, how close it is to the households that will form
that catchment, any additional costs that would be involved, in terms of, if
you had to build new roads to it for instance, that’s obviously a significant
factor. So, it’s been extrapolated through, and as you pointed out, a number
of the sites score quite closely, they do. 
There was no public consultation on that scoring, is that correct?
This is the public consultation on the-, 
The decisions have been made, I can’t change the score, is what I’m asking.
You can comment on the consultation that’s in front of us tonight, sir, so you
can comment on everything that’s contained within the consultation
documents. 
M9:
Gerry Hannah:
Liz:
Alasdair  Morrison:
Alasdair  Morrison:
Liz:
Alasdair  Morrison:
David:
Alasdair  Morrison:
David:
Alasdair  Morrison:
F4: We weren’t asked our opinions prior to this, which is frustrating me because
it’s already been commented that if we propose a different solution, that
almost puts everything back to square one. Which in my opinion means
that’s presented as if that puts 2027 at risk, so if we did propose a different
solution, does that put the 2027 deadline at risk? How long does it take you

Page 217

Dargavel Primary 05.03.24
B session, second room combined
Alasdair  Morrison:
Liz:
F4:
Kevin:
Liz:
F4:
Liz:
?:
Alasdair  Morrison:
Kevin:
David:
F4:
David:
to get to this point, and if we proposed a different solution, how quickly
could we get to the next consultation for that new solution?
Okay-,
Sorry to butt in but Gerry Lyons has already confirmed to me that it
absolutely would change the timeline and it wouldn’t come in, in 2027.
So, why were we not consulted?
It’s very, very difficult to get 2027 (talking over each other)
If you throw that out, you have to accept that comes with bussing all the
children out to different schools. 
So, it’s almost like we’re being held to ransom.
It’s really not a proposal, like, it’s not really an option.
This date is not going to happen-, 
If we just go with one at a time.
The date is very, very optimistic in my opinion as it is. I’ve already raised
most of these, kind of, concerns with you, Alasdair , in terms of, I think we
should have gone to, almost, a pre-consultation to try to get the right site,
and not further delay unnecessarily. Which I think is what you’re pretty
much saying there, is if we had more input as a community, it might not
have been the site that we chose, and we may have a better chance of being
closer to 2027 than what we are just-,
Just because this is going to be on public record, I just want to make the
point that I think this is the wrong location for the following reasons. It’s far
too close to the existing primary, about 400 metres, it’s on the same road as
the existing primary and there is already traffic chaos at the existing primary.
That location has been chosen because it’s a negotiation that happened with
BAE and it is fait accompli that is going to be the location. We are not being
consulted, it is going to be that location. 
Totally agree.
It’s not the right location, because this has been relevant to this discussion,
because of the traffic management situation. We’re going to have a whole
bunch of people coming in one direction from the north of Dargavel to drop
their kids at the proposed new school and then heading towards the
motorway. Then pupils coming to this school in the opposite direction trying
to do a U-turn. Now, the solution to that in the Council’s eyes is to create an
active travel policy, which is great and one that I support, but parents and
grandparents just don’t follow it. When it rains people get in their car and
they drive to school, and they drop off and pick up their kids. It doesn’t work
because of Renfrewshire Council’s policy of primary one and two children
needing to eyeball a parent or guardian to let their child be released. So, you
need to park next to the school to pick up your child, so you get a whole
bunch of parking issues, like you do here and historically you have at
Bishopton Primary.

Page 218

Dargavel Primary 05.03.24
B session, second room combined
I know we spoke about this before, your solution was, ‘Well, we can double
yellow line it, maybe, if it doesn’t work, we can double yellow line it
(Timecode: 00:10:00).’ It just pushes the cars further out but your honest
appraisal to me was, last week, ‘If it’s bad, we’ll see if we can come up with a
solution.’ So, that’s not good enough because this community has been let
down by Renfrewshire Council in so many ways and there’s a long list. I get
the pressures to provide schooling for 2027 but you can’t make the wrong
decision-, 
F4: Again.
David: For the long term just to fix a short term problem. Building a school for 1,100
to 1,400 pupils within 400 metres of each other is not a good solution, so it
needs to think again.
Forgive me, can I ask, what is the question you’re asking us here tonight
though? I know you’ve got comments and I think these comments are all
valid and (talking over each other) the consultation but-,
I’m putting on record and I hope it’s being recorded, that this is the wrong-,
I’m not asking a question, this is a consultation where I’m putting my public
opinion on record, and I encourage more people to do that. 
Yes.
Sure.
It’s not the right location and the traffic management plan hasn’t been
thought through, and it needs to be thought through before it moves
forward with an actual solution. 
Okay, so, thank you, if you don’t-,
(talking over each other) preferred.
I’m just looking at these sites up in the north part of the village and I don’t
understand why we’ve got, ‘We’re having two schools and we’re splitting
catchment areas when we’ve got a very sizeable housing development. Why
are we not having a school on the opposite end? Because this school is in
the south, so why are we not having-, 
Money.
Can I ask Alistair that question then? Very similar, so when we met before
Christmas, Alistair, you had mentioned that part of the initial considerations
that you were tasked to go away with was, making a central location where
everybody can do active travel within the middle of the development, that
was the primary consideration at that point. Having a site more remote was
not optimal, is pretty much what came out of that. It was to be in the centre
of the village which made it more easily accessible. 
Alasdair 
Morrison:
David:
F4:
Alasdair  Morrison:
David:
Alasdair  Morrison:
F4:
Liz:
?:
Kevin:
Alasdair  Morrison: The more central it is to the catchment, Kevin, almost certainly the more
propensity there will be for people to walk or use active travel to get to that
location, almost certainly.

Page 219

Dargavel Primary 05.03.24
B session, second room combined
F4: But you can see from the current location that active travel is not the
solution and I don’t think we should be relying on that or heavily focused on
that as a reason for the location. Because in practical terms, it’s not real life
and if you just speak to the families that have to get to work, you’ve got
younger children, you’ve got parents helping with pick-up and drop-off,
that’s not really life. So, I don’t think we should be anchoring too much on
that because-, 
Various voices talking over each other.
Sorry, just, there’s a-, in terms of the (talking over each other) Alasdair  Morrison:
Gerry Hannah: I’ll bring in the lady in the green in a wee minute, if that’s alright, there are
just a couple of points being raised just now that are probably worthwhile
clarifying. Nobody has said active travel is the only solution here, so just to
get that correct here. Nobody has said that that’s going to be the magic
bullet that solves any problems in relation to traffic management. We all
have lived lives where you drop kids at school on your way to work, so
nobody’s sitting here thinking it’s all going to be done through active travel,
that would be silly of us to think so. What we want to try and do is promote
active travel as much as we possibly can, you can see how well it operates in
the school here. This school has the highest uptake of kids that walk, wheel
and cycle to school in any school across Renfrewshire, so we’re building on
something that’s already very successful here and the kids have embraced
that greatly. So, fair play to them and the parents. 
Kevin: Which is great (talking over each other) issues outside.
Gerry Hannah: Absolutely. 
F5: Double the size of the issues.
Gerry Hannah: What we want to do is, we want to build on that, so just to address that
point. There are a range of options, not just looking purely active travel,
what we’ve done to this point is we’ve commissioned a transport consultant
to work with us, in terms of identifying potential opportunities. Transport
assessments, full detailed transport assessments only come into play when
there’s a planning application process ready to proceed, right, we’re not at
that stage yet, obviously this is part of the consultation process. But to do
some early work, that’s why we’ve got the transport consultant on board, to
give us some ideas in terms of what potential options there may be, not just
exclusively active travel, just to-, 
F4: That makes me really nervous, that it’s not a point to talk about that.
Gerry Hannah: I’m really sorry, sorry, excuse me, but the lady in the green-,
F4: Can I just make one more comment?
Gerry Hannah: No.
F4: Because it’s been such a fight to even get something simple like a lollipop
lady to support us. 
Liz: (talking over each other) transport consultant.

Page 220

Dargavel Primary 05.03.24
B session, second room combined
F4: So, it makes me so nervous that-, 
Gerry Hannah: I appreciate the points you’re making.
Liz: We got told repeatedly that the road wasn’t busy enough for a lollipop
person, so that’s the travel consultants, we don’t have faith in that.
Gerry Hannah: Aye, I listen, I’m sorry but-, aye, I’m sorry, I appreciate the points you’re
making but this lady has been waiting patiently here.
F7: When we were here the last time, we know the site was chosen because the
Council owned the land, which was good. Then we raised the thought of the
issue with the SuDS and we said, ‘What if BAE owned the SuDS and the
Council owned the primary school, what happens with the, kind of, not no-
man’s land but if child were to chuck a bag or, what safety concerns were
going to be put in place?’ We’re wondering since we chatted last time, have
you guys been able to have a conversation about that or have you had a
solution to it?
Gerry Hannah: Yes, we’ve actually met with BAE last week on a number of different issues
and it is regular engagement we have with them. One of the issues we did
bring up was the feedback from parents and others around the concerns
around that specific point you make. That’s something that we’ll be working
with them together on, and looking at enhancing safety measures around,
the water courses, to make sure that the kids are safe when they’re in the
vicinity. I don’t want overly dramatize things here but just so people are
aware, any, kind of, other water courses we have, we look at potential life-
saving equipment, all of that, water safety equipment but also supported by
education in the schools and things like that as well, just make kids aware of
what dangers exist and how they behave in a way around it. 
No, I’m pretty sure that’s a bit unrealistic.
That doesn’t always work, so that’s a continual ongoing process but we have
made contact with BAE and met with them about that. 
Okay.
F7:
Gerry Hannah:
F7:
Alasdair  Morrison: Can I just add to that point, just while Gerry’s made it? So, you’ll all be aware
of the area that’s known as Central Park, it sits in between so it might be
seen a no-man’s land but there is a significant investment to go in there in
the next twelve to eighteen months. So, there will be an awful lot more
connectivity in terms of footpaths, it will be an awful lot easier to go from
the east side, so the, sort of, far side, if you like, of the village centre, and
come to this side of the school by coming through the central area of
Dargavel. 
F7: Just on that point, so in the twelve to eighteen months is there somewhere I
could find that document to read it? Like, so that the plans that you’re
talking about-,
Alasdair  Morrison: Oh yes, yes, they’re all published, they’re all on the Council’s website, so we
could direct you towards that.

Page 221

Dargavel Primary 05.03.24
B session, second room combined
F7:
Louisa Mahon:
F7:
Kevin:
David:
The Council’s website, I’ll find it there.
(talking over each other) you’re talking about is particularly the focus of the
discussion with BAE and it’s ongoing with further recommendations to come
back, so that-, 
Okay, ongoing.
Yes, Central Park was meant to be completed by this point in the
development but BAE continue to push that back because they say it’s not
financially viable unless they get more houses, and get more development,
and more parcels sold. Going back to your point you mentioned about the
Council owned that part of the land which the school’s proposed on, the
Council negotiated on that part of land, but they had options to negotiate
for any other parcel of land-, 
And they don’t own that.
And they don’t own the land per se, if a school is not built on that parcel of
land it transfers back to BAE. So, the land is only available to the Council to
build a school on, it doesn’t-, the Council wouldn’t be able then to build
houses etc, it would be a school-, 
We had this conversation at the information evening, I think it was last week.
The Council owns the site.
The Council owns the option but it’s only to build the school, you don’t-,
No, the Council doesn’t have an option, the Council owns the site, it doesn’t
have an option on the site, let’s be-,
So, if the Council-,
Let’s all go then, if the Council own the site, let’s just go because the
decision’s made, there’s no consultation, make your mind up. So, is this a
consultation or is it fait accompli?
It is a consultation but the Council own that site.
The Council own the site but if a school is not built on that site, what
happens to that site, Alasdair ?
Well, if that was to happen then the site would revert to BAE.
The site reverts to BAE. So, if a school is not built on that site, it reverts to
BAE.
So, you don’t want (talking over each other)
So, technically the Council only own that site if we continue to build a school
there. 
Which is the current proposal.
Which is the current proposal.
Kevin:
Alasdair  Morrison:
Kevin:
Alasdair  Morrison:
Kevin:
David:
Alasdair  Morrison:
Kevin:
Alasdair  Morrison:
Kevin:
F4:
Kevin:
Alasdair  Morrison:
Kevin:
Alasdair  Morrison: Yes.

Page 222

Dargavel Primary 05.03.24
B session, second room combined
Kevin:
Liz:
Alasdair  Morrison:
Liz:
David:
Liz:
David:
Liz:
Alasdair  Morrison:
Kevin:
Alasdair  Morrison:
Liz:
Alasdair  Morrison:
Okay, now, in terms of the scoring, Liz asked a very, very fair question earlier
on, that every other-, there are a lot of other sites that are very, very close-,
I’m looking at number 22, for instance, and I just think that that would be a
much better solution to-, 
Which one is 22? (talking over each other)
Yes, that one up there. The north part-,
It’s off Slateford Road, it creates equidistance between the three primary
schools. 
So, that to me, would be an ideal site.
I second that, for the record, much better.
So, firstly, did you buy this site before you decided and before this public
consultation started? In which case, again, what’s the point of the
consultation? Secondly, why did you discount 22?
Okay, can I take-, sorry, can I-,
(talking over each other) site scoring, sorry Alasdair , but it feeds into that as
well. So, you’ve scored site E1 as one point higher than ten of the other
ones, but if we’d done the site scoring matrix before entering negotiations
for site E1, then they would all have been equal, so why have we chosen E1
above the likes of 22, for instance?
There’s a lot in there in terms of coming back to scoring. So, your first point
in terms of the purchase of the site, so the feeling within Renfrewshire
Council was that in order to be able to offer the certainty of being able to
deliver a school by the timescale that is necessary as you heard from Gerry,
in terms of summer ’27, we felt we needed to own the site. So that when we
came and did a proposed consultation, as we’re doing in this current
exercise, we’d be able to say (Timecode: 00:20:00) with certainty that we can
deliver a school if the proposed consultation backs that site. So, that’s why
we went in to bat with BAE to negotiate to purchase the site, which we’ve
done. There were a lot of things that came in on the back of that, there have
been comments thrown around in terms of the relative cost of that, I can
explain all that if we’ve got time tonight, or send it to you at a later date. But
there was an awful lot of negotiation that went in from BAE in terms of what
they got back in return to allow the Council to own that site, and it certainly
wasn’t for nothing but I can quantify all that for you in terms of exactly how
much BAE got back in return. 
Did they want more for 22?
I mean, this question comes up but BAE don’t currently own site 22 or at
least not all of it. They have an option on a tiny part of it, related to the
demands-, I know Kevin feels differently but if you let me come back, Kevin,
in terms of-, so, 22, the major difficulty with 22, aside from the fact that a lot
of people that are in the catchment-, so if you imagine the catchment was
drawn, again, like that, you might say it might be drawn differently but let’s

Page 223

Dargavel Primary 05.03.24
B session, second room combined
assume for the purposes of the consultation it’s drawn roughly what I call
south west to north east, through the middle of Dargavel. Then the people
at the bottom end are obviously going to have an awful lot more distance to
walk, if you’re wanting to promote active travel. But the main reason against
22 is its deliverability, it’s in the green belt and therefore-, for a site that’s in
the green belt there’s a fairly elongated, protracted process that needs to be
gone through in order to get planning consent, and the final decision does
not lie with Renfrewshire Council, it lies with Scottish Ministers. So, we felt
that was introducing a huge amount of uncertainty that would elongate the
timescale and give us an idea of not really knowing when we’d be able to
deliver a school. So, these are the main reasons why we didn’t go with 22.
David: You are right on that, to be fair, I absolutely agree it would elongate the
timescales because it is green belt area, but this is a generational decision,
the school’s going to be here for 60 years. It’s not actually about 2027,
there’s a pressing need because of the incompetence of your organisation to
get us to this point but you have to look at the long term, and having two
schools so close to each other with all the traffic chaos that that’s going to
cause, is not the best thing to create a good place to work, to live. You
wouldn’t have the same catchment area, you would change the catchment
area, the catchment area here’s been drawn, like, with a line, like Stalin
when he drew the railway through Russia. It’s a line through the village
which is the best you’ve got to do with this proposal but you would change
the catchment, so that the north end of the village went to 22 and the south
side of the village, which a lot of it is still to be built on, would come to this
school, which is actually significantly smaller. 
Gerry Hannah: So, see if I can just-, 
Louisa Mahon: (talking over each other)
Gerry Hannah: Sorry Louisa, can I just come in? We’ve only got ten minutes or so left in here
and I suppose-,
F4: Site 21, what was the problem with site 21?
Louise Mahon: No, there was something quite important just to add in to the conversation,
in the early days when we had the public meetings, two things were raised
as being really important, and that was getting a school as quickly as
possible, so that children weren’t displaced further than need be. And also,
to have a school that was still broadly in the heart of the community, so
they’re some of the principles that have been followed when we’ve been
looking at this as well. 
David: That principle’s great but we’ve not got a blank canvas, we’re in a mess. Like,
so if you’re building this amazing place then you want a big school in the
heart. Let’s not forget BAE should have been building this whole thing, this
should have been one big school in one location, fit for purpose, but it’s not
and we are where we are. So, I think we can discount the, ‘Let’s do it all nice
and fluffy,’ because we’re in a mess.

Page 224

Dargavel Primary 05.03.24
B session, second room combined
F8: I would like to say I disagree, I don’t actually think Dargavel should have one
great big primary school.
Kevin: I don’t either.
F8: I think that would be a big mistake, so I do think two schools is actually right,
and I think site 22 is quite hilly and quite wet, there’s a stream and things
that run through it. I’m not sure site 22 would be the ideal building place.
David: There’s a stream right outside this school, you know, it’s not-,
F8: But you’re right, it should have been decided-, the planning department has
let Dargavel down badly.
David: But you’re right about the size, I didn’t want a gigantic school but they
messed up on the numbers.
F8: Yes.
David: If they’d got the numbers right, they would have built a gigantic school and
BAE would have paid for it, so that’s what would have happened, and we as
taxpayers wouldn’t be forking out £45 million. We’re in a mess, that’s the
point I’m making.
Kevin: There are a couple of bits there as well, so in the original plans back in 2001,
2002, there were meant to be three primary schools and a secondary school.
That’s all been cut down at various points through section 75s, despite
additional housing. So, my conversation with Jenny Gilruth, the Cabinet
Secretary, last summer, her ideal number for a primary school is nowhere
close to 800, she believes that to be closer to 450. An 800 primary school is
huge, it’s far too big. So, if we’re looking at an 800 primary school, should we
really be looking at one primary school or two primary schools? It’s across
the board but we’re in this mess, and yes, I take Louisa’s point, one of the big
things was, ‘We need a school and we need it quickly,’ and that’s correct. But
whatever decisions are taken affect not just you and I, it affects everybody
for 50, 60 years now. That is a huge consideration, so as David quite rightly
said earlier on, yes, it might be that we need a little tiny bit more short term
pain to make sure we get this decision right, because we live with it, our kids
live with it, our grandkids live with it. We’re going to have to have this for
years, and years, and years, and still be paying for it, so we need to get it
right. 
F8: I think the reality is though, that the planning department along with BAE-,
let BAE away with a whole lot of errors, and the realistic position is you are
not going to get the best solution anymore, you are just going to get the best
you can do in the situation, which is different to getting the best thing.
Kevin: Absolutely, 100% and I completely get that.
F8: And we’re where we are now.
David: But this is a 45 million decision of our taxpayers’ money, our money, so it
does, kind of, matter that we get it right.
Kevin: Absolutely, so is E1 then-,

Page 225

Dargavel Primary 05.03.24
B session, second room combined
Gerry Hannah:
Alasdair  Morrison:
F4:
Gerry Hannah:
F4:
Gerry Hannah:
F4:
Gerry Hannah:
F4:
?:
Gerry Hannah:
Sorry, if I can cut across, Kevin, sorry, we’ve only got a finite time. Again,
sorry, just to bring it back, the principle this evening was for us to answer
questions that will allow you as a community to answer and respond to the
consultation. So, I don’t want anybody to leave here thinking they’ve not
been able to ask a question they wanted to ask in relation to the subjects
that myself and Alasdair  are here to cover with you.
Without being able to ask a question.
So, how could you reassure us then? So, those two plots being so close
together, you as experts reassure me, why is that okay for those two plots to
be so close together?
Do you want me to answer from a, kind of, roads perspective?
Everything perspective.
So, to cover it from a, kind of, roads perspective, going back to the work that
we’ve done to date so far. So, when it became clear there was going to be a
consultation identifying a proposed site-, as I understand, I’m not an
education person, but I understand the Education Act says you have to go
forward with a specific site as part of a consultation. So, that became clear,
obviously there was going to be a proposed site. Once that proposed site
that was going to be part of the consultation became clear, we engaged a
transport consultant to look at both the proposed site, but also how that
would then interact with the existing school site and the wider development,
including future development that’s still yet to come online, with the
development here. They’ve identified a number of opportunities for us to
work through over the coming weeks, months and years in terms of making
the school as accessible as possible. That looks at just simple things like the
location we’ve got here just now, we know-,
I’m looking for something specific though, I get the political fluff and we
don’t have a lot of time-, 
Sorry, I’m not a politician, that’s not my role.
It sounds fluffy, I genuinely want the facts. So, you head up roads for
Renfrewshire Council, so you’re involved in planning everything,
emergencies, road closures, you name it. Reassure me why it’s okay for that
number of pupils, therefore that number of parents, to be on those-, so
close together at that time. 
On the one road.
Where I was coming to was, you’ve got the location here, existing. So, we’ve
identified, working with Kevin and the school in terms of parent behaviours,
largely, in terms of parking behaviours before school time, whether that’s-, I
think we agree, particularly at pick-up time in the afternoon we have a peak
problem, in the morning it’s spread out because of breakfast clubs etc, it’s a
much wider peak but in the afternoon it’s a much more narrow peak. So,
looking at potential behaviour changes, and there are two ways you do
behaviour changes. You either do it through education and supporting the

Page 226

Dargavel Primary 05.03.24
B session, second room combined
school through it or you look at what restrictions you put in place. The other
thing is then looking at-, 
F4: I’m interested in the number, so not restrictions, the number.
Gerry Hannah: So, if you let me finish, the other thing we then look at is, what is there in
the way of pick-up and drop-off facilities for the school, and is that sufficient
for the numbers that are coming here just now? I think there would be a
consensus that that is an area that we have to look at and it’s something that
we’re looking at just now in terms of the available land use that we have
here, and how we can address pick-up and drop-off. 
F4: That’s not an answer.
Dougie: On that point, no, I think Arrochar Drive’s not a great route at the moment,
you’ve got cars parked up one side, all the cars trying come down, trying to
go up. I think what the point is as well, if you’ve got another school on that
same road, and that’s the accessible road to get to the motorway, what’s the
alternative, for example, for the parents that do need to drive, do need to
drop-, parents and grandparents, guardians, that do have to drive outside of
the village? So, if that is the one road, what is the plan in terms of how you
get from the new school to the motorway, for example (Timecode:
00:30:00)?
F4: And what number of cars do you predict will be using that road?
David: But then this is the fact that the plan is going, ‘It’s a mess, we’ll see if we can
come up with a solution.’ That’s the plan, there is no plan because they’re
going to have massive clashes.
F4: And we’ve been part of lots of meetings, we’re not getting answers.
Gerry Hannah: If I can answer this gentleman’s question, if that’s alright?
F4: But can you answer my question first? With all due respect I don’t feel I got
an answer.
Gerry Hannah: So, yes, we’ve got the link road from here to here that isn’t built yet, and
that’s the road that BAE have started the process of building just now. So, if
you can imagine, I’ll draw this more crudely, but the catchment area along
here somewhere. So, what you’ve got to look at then, in terms of the future
development of the school, is how the traffic’s obviously going to interact
there. Is it all going to be interactions coming down this way, up this way?
Which, obviously, that’s one of the points that was quite rightly raised. A
number of options to look at in terms of how that interacts, you have the
potential for parking exclusion zones which have operated very successfully
around a number of schools in Glasgow, we’ve trialled it here in
Renfrewshire around a number of schools as well. That is largely self-policing
but also is enforced as well, by the police. That would say that cars outwith
people who live in that particular zone do not enter that zone between the
hours of say, 8:30am and 9:15, 2:30pm and 3:15. 
That is just one option, another option potentially could be, do you look at
some form of one way system to keep the traffic interactions from coming

Page 227

Dargavel Primary 05.03.24
B session, second room combined
against one another? What we asked the transport consultant to come up
with was a number of options, not just one solution that’s going to be, as I
said, the magic bullet that’s going to solve all the problems.
F4: So, at this point in the consultation we don’t-, and that’s really frustrating to
me, that you don’t have that answer to present to us right now, and to me
that’s quite huge. You’re talking about exclusion, so putting up signs, ‘Don’t
Park Here,’ that’s not what I’m asking you, I’m asking for the 1,100 families
that have to drop-off at school then get to work. Have you guys proposed or
looked at what percentage of those are typically, like my family, three
minutes away, kids can walk to school without crossing a road, great? Have
you looked at the families that are not in my position and that need a car?
How many are you expecting to be using a car to go through that area and
how do you fit them in? I’m not asking for how do you exclude them
because that’s not the answer, that’s not what we want as a community. I
don’t want to be excluded from being able to drop my child off at school and
get to work on time. I’m asking you, if I have to take my car, where do I drop
my kid off and what traffic am I going to deal with?
Can I try and answer your question that you are making-,
I’d love it, I’d love an answer.
In a slightly different way. What you’ve got with Dargavel is approximately
4,300 houses planned. You’ve only got the road network that has been
proposed by BAE and accepted by the Council. You haven’t got any other
road network and you’ve got the housing sites where they are, regardless of
where you put the schools. So, the other alternatives that people have
suggested in terms of, you know, you could put a school up in this area,
you’ve still only got that road network. So, the challenge that you’re
suggesting there is going to be faced in Dargavel regardless of where you put
the school. 
I did say, if your schools are not that close together-,
Various voices talking over each other.
Hold on, sorry-,
The (talking over each other) would be, everybody from this area would be
going to this school, sorry, if you moved it from here. Everybody from here
would be going up, drop their kids at school and join the motorway.
Everybody from here would go to this school and go and join the motorway.
And you’re telling me, sorry, in terms of that that would make-, in terms of
using exactly the same roads that there would be no-, 
Various voices talking over each other.
You’re farming them off in different directions.
Alasdair  Morrison:
F4:
Alasdair  Morrison:
F4:
Alasdair  Morrison:
Dougie:
Alasdair  Morrison:
F4:
Alasdair  Morrison: There would be no congestion going towards Slateford Road and no
congestion coming towards here just because you put them at the other
ends?

Page 228

Dargavel Primary 05.03.24
B session, second room combined
Kevin: If you’ve got the site there, the left hand side of Slateford Road, 22, you’ve
then got the traffic going up Slateford Road, which makes it more
advantageous for them to either go along through Bishopton onto the
motorway or go down towards Langbank. 
Alasdair  Morrison: Sorry, with respect, Kevin, that assumes that that traffic wants to go to the
motorway.
Kevin: But that’s what I’m saying, that’s where 99% of people are going, on the
motorway to go to Glasgow.
Gerry Hannah: Sorry, this gentleman’s not asked a question yet.
M8: A school in the middle of a large housing estate, 4,000 houses, and you’re
putting a school right in the middle, and you’ve only got these few roads,
two roads in to the estate. It’s just going to cause, you know-, 
Liz: You’re drawing everybody in, instead of spreading them out. It makes no
sense at all. You’re just creating a bottleneck right in the middle instead of
spreading it out. I don’t (talking over each other)
F4: (talking over each other) this is bonkers.
Liz: Any possibility you don’t understand that there’s a difference between half
of the village going north and half of the village going south. Two lines of
traffic going this way, it’s completely different to everybody meeting in the
middle and once you go up to the north you have so many more options, yes
to go to the motorway. If you want to go back all the way round then fine
but most people would choose to go a different way. 
F4: And restrictions are not the answer because my daughter used to go to
Newmains Primary. So, fine, you can’t park here, you can’t park there, so
what do parents have to do? Oh, we park there instead and the traffic’s all
still in the same areas. The schools are too close together, that to me is quite
frightening that that’s the solution you guys are proposing.
Kevin: You mentioned as well the enforceable aspect, Gerry, that’s only enforceable
if we’ve got people to enforce it. We’re limited to the wardens that you’ve
got available to you, there’s not going to be any more money for that, we
know that, with budgetary pressures.
F4: But it’s not about enforcing it, people need a solution.
Kevin: That’s what I’m saying but the police do not have any more numbers either,
they’re getting squeezed across the board. So, having an enforceable aspect
of an exclusion zone isn’t going to be the answer because more and more-, 
F4: It’s wrong.
M8: The other thing, I was reading in the magazine today, the IBE, that there are
another 309 homes being built by Persimmon, I’m not sure where they’re
going to be.
Alasdair  Morrison: They’re in this quadrant up here.

Page 229

Dargavel Primary 05.03.24
B session, second room combined
M8: In that corner? Yes, so again, there are issues in Craigton Road to get in and
out, so you’ve got the people coming in to drop their children off at school,
and all the other people travelling through going wherever they’re going to.
You’re just making a, you know-, 
Alasdair  Morrison: But the road system, again going back to that point, the road system that’s
been developed for Dargavel and was in the original masterplan going way
back to the years that Kevin was referring to there, assessed this in detail.
This was done by BAE, which is all-, 
M8: Okay, you may not change the road but you don’t have to put the school
there, that’s what I’m saying, if the school’s not there, you’re not going to
have so much traffic. 
Gerry Hannah: Sorry, this lady here’s made a couple of points and I’ve not been able to
catch them yet, sorry. 
F7: Although, that infrastructure and that road design, that was what was
proposed at the time but that was before we decided to put two schools
with, like, over 1,000 kids at it, so you’re changing-, you can’t just keep that
same plan for something that is now different. That road structure is there,
we can’t change it but we’re deciding what to put into it now, so you’re
making the wrong decisions as to putting it in, you need to look actually at,
‘What do we have in this road structure and how can we best utilise this
structure that we have?’ Rather than just fire it all in, in the middle, and clog
the road structure.
Liz: Sure, firing it in.
David: And on that point, the road structure as well isn’t fit for purpose as it is just
now. All it takes is one car to be parked on Craigton Road and if you’ve got
traffic going both ways, for example, it’s tailed all the way back.
Liz: Think of emergency services as well, if you’ve got a fire, if you’ve got an
emergency, if you’ve got an ambulance needing to come through there.
David: Which is frightening right now, if there was a fire at this school and a fire
engine had to get here at 8:45am, there would be trouble. 
M8: They’ve got ramps that slow things down, you’ve got everyone parking their
cars on both sides of the road. So, just, you know, a problem area.
Gerry Hannah: See, just in terms of the, kind of, road infrastructure, the road infrastructure
outside the school is very typical to the road infrastructure outside any
school. 
David: It doesn’t need to be there. It’s the same as the Edinburgh bypass, right, you
must have known with the Edinburgh bypass it was a mistake to do it at that
point, it doesn’t mean you just go along with it.
Gerry Hannah: Sorry, just to pick up on that point, it is right and it’s right that it’s narrowed,
the road lanes are specifically narrowed outside a school, so that it
discourages people from driving faster because the space is less.

Page 230

Dargavel Primary 05.03.24
B session, second room combined
F4: And that’s why, to my point about parking provision. So, that’s why to my
point, going back to it, I know I keep bleating on about it but whatever the
new proposal is, you have to give reasonable, appropriate space for car
drop-off points to stop-,
Gerry Hannah: I think that’s the point I made earlier about pick-up and drop-off zone.
David: (talking over each other) the drop-off zone because you’ve got 128 P1s, for
example, and P2s, that you can’t just use a drop-off zone as well, you-,
Liz: I think it was supposed to be a drop-off zone here that never worked, like,
that was the whole plan for here.
Yes, that’s because you have to eyeball your children. To be fair, you are
right, I’ve read the Scottish Governments guide on roads and your narrow,
tight turns slows down, speed bumps, it’s all-, you’re absolutely right about
how it’s designed. But in the design, there wasn’t an 800 pupil school there.
So, if only we had the Head of Renfrewshire Council planning here who
might think, ‘I’m in charge of roads, we need to do things differently here!’
You’ve just signed off on, I think it’s close to 700 houses, up in that top left
corner, Persimmon and Taylor Wimpey’s to come, isn’t it?
509.
With Taylor Wimpey, and Charles Church, and Persimmon, is it not closer to
700?
No, it’s 509.
500, let’s go with that, so you’ve just signed off on that, there’s not a dot of
green space within it, it’s just houses packed in. You guys are in charge of
this, you can control the situation, you have to sign it off. 
I mean, there is green space within the-,
Where?
Within the planning applications for here.
There’s, like, a pinprick sized green space, come on.
And the fact as well, the original road network and infrastructure here was
put in place based on the 2,300 odd houses that were initially planned.
2,500 but-,
2,500 but we’re now 2,000 over that, but still utilising the same road
infrastructure that was planned for-,
David:
Alasdair  Morrison:
David:
Alasdair  Morrison:
David:
Alasdair  Morrison:
David:
Alasdair  Morrison:
David:
Kevin:
Alasdair  Morrison:
Kevin:
Alasdair  Morrison: But Kevin, sorry, again, without-, I do need to come back to you in terms of
the other point but the point here, was that all this land here was all
allocated for employment use back in the original masterplan for Dargavel.
The land that’s now been accepted by the Council (Timecode: 00:40:00) to
change to housing, that was the 2018 decision.

Page 231

Dargavel Primary 05.03.24
B session, second room combined
F4:
Alasdair  Morrison:
F4:
Alasdair  Morrison:
David:
?:
Liz:
David:
?:
David:
Gerry Hannah:
David:
Gerry Hannah:
Dougie:
And you accepted it without changing the infrastructure, so again, it all falls
down to you guys as a body-,
Only because we’re short of time, but that’s because the assessment
showed that there is plenty capacity in the road infrastructure and the road
junctions to deal with level of development. If it wasn’t-, 
But not a second primary school.
Well, the second primary school, as you know, is a new issue that’s emerged
which we’re now dealing with in this consultation. But there’s very little that
we can do to actually change the infrastructure that’s already in for
Dargavel.
Alasdair , that’s the holistic view that just doesn’t exist in Dargavel though,
you approve houses, for example, we’re talking about the school situation
just now. You can go wider than just the school in terms of, you keep giving
land away for houses but you’re not thinking about health centres, you’re
not thinking about parks. It’s all the wider things.
There are no leisure facilities, nothing.
Yes, there’s literally nothing for all these millions of children to do around
here.
What are they all going to do when they’re teenagers? It is literally a crime
zone waiting to happen. 
It’s already a crime zone. 
Various voices talking over each other
(talking over each other) the official consultation on these places.
I’m sorry, again, just to be boring and bring us back to time, we’re probably
just getting to that point of having to switch room. Are there maybe any last
points to be raised before we do that?
See, can I make just one last point? Because it’s going to happen and you
guys know that, whether you pretend or not. Please stick a roundabout here
so that when people are going through they can turn round without having
to do U-turns.
I come from East Kilbride, I love a roundabout (Laughter), I’ll be trying to get
as many roundabouts as I possibly can. 
See, in terms of the acre requirement, is that because we are factoring in
that community element to it? So, we’re talking about the sports facilities
etc, I do drop-offs at Saturday mornings to Park Mains and the football
pitches are busy with kids, and the noise is there, it’s vibrant. There’s
nothing like that in Bishopton, we talk about carbon neutral as a country
that we’re heading towards but if you want to do anything in Bishopton
you’ve got to get in your car and you’ve got to drive somewhere. So, the
location, if we’re going with that location, is it because it’s a prominent
centre of the village, it’s going to be the hub, you’re going to have sports
facilities-,

Page 232

Dargavel Primary 05.03.24
B session, second room combined
Gerry Hannah: It’s easily accessible for people, they don’t need to take their car to do drop-
off on a Saturday morning, it’s right next to them, yes.
Louisa Mahon: They’ll talk about that next door, actually, in terms of the fact it’s community
use outwith school hours, so what that site will provide for community
facilities that should have been part of this one as well. 
Kevin: What that’ll provide is, at the moment, one artificial pitch, is that correct,
Louisa, still?
Louisa Mahon: (talking over each other) go through the detail (talking over each other) and
it’s maybe worthwhile, I don’t know if you were at the information session,
just looking at what’s come out of the space planning through, sort of,
community engagement process as well. Is Gerry-, are they-,
?: They’re just finishing up, so it’s not to rush you, they’re just finishing up
answering questions.
David: Just as a top tip, next time you’re designing a consultation and the decision is
made after the elected members will consider the responses from the
statutory consultation after the architect’s been appointed, after the
detailed design, after the engineer’s been appointed, and after the main
contractor’s been appointed. And then you’re telling us they’re going to
consider maybe changing it, like, come on. 
F4: That’s been the issue all along, there’s been this complete lack of (talking
over each other)
David: That’s all there.
F4: From the very outset.
Louisa Mahon: The whole point was being in a position where, if the proposal was
successful, we’re ready to go. If we’re not, we’re not.
?: Exactly, we were asked repeatedly to do that by the community.
David: No, because I was on the Parent Council when this kicked off and I asked
Steve Quinn, ‘Can you listen to the community before you make decisions?’
And the decision is made and this is all lip service, all of it is lip service.
F4: It just feels like history repeating still.
Liz: Yes, and that’s what’s so disappointing because we’ve been repeatedly
reassured-,
Kevin: And that’s what you’re going to get with Park Mains as well though, and
that’s the big elephant in the room. 
Liz: But that’s not a public consultation, that’s just done.
Kevin: Absolutely, that’s fait accompli.
F4: (talking over each other) so, Park Mains isn’t being discussed at all tonight
then?
Liz: No, it’s not a public consultation.

Page 233

Dargavel Primary 05.03.24
B session, second room combined
F4: (talking over each other)
David: I’d love to ask the person in charge of climate how seventeen double-decker
buses from Bishopton and Langbank is acceptable to go to Park Mains rather
than building a high school here. 
Gerry Hannah: If they’re all electric and hydrogen then that’s great. So-,
Various voices talking over each other.
Gerry Hannah: Just to mention a point there, and I think Gerry, for those that have come to
one of the previous evenings but Gerry did give a commitment to come back
at a later date and talk about the Park Mains issue, because I know that was
something that was raised by a number of people. So, I don’t know what the
format of that will be but I’m sure Gerry will be able to advise that. 
Kevin: (inaudible) this is why we’re doing it and we’re not going to change it
because at the end of the day, it’s a done deal. 
Liz: I know, they don’t have to do a public consultation.
Various voices talking over each other.
Dougie: (talking over each other) Bishopton Primary as well, so with it being 2027 as
it is just now, notwithstanding there could be delays, there is just that
understanding of how that impacts the existing schools, so Bishopton being
a top one in terms of, does it have the infrastructure to cope with the
additional demand?
Liz: So, Bishopton has been guaranteed that we will not move above 500 and-,
Kevin: 512.
Liz: Was it 512?
Kevin: Gerry gave a summary at the last-,
Liz: So, that’s not in the plans.
David: I guarantee (talking over each other)
Kevin: What is in play is a potential expansion here for additional pupils. 
Liz: It is a nightmare.
Kevin: Whether that be more portacabins, whether that be utilising cupboard
spaces that we’ve got here. Once we have the acoustics done during the
summer then Gerry has already said that he is looking to reevaluate how
many pupils could be accommodated within the current Dargavel Primary
School, if it ultimately is-,
David: Two years ago when this situation was identified, Steve Quinn sat in this
school and said, ‘There are issues with acoustics, it’ll be sorted in six
months.’ And it was supposed to happen in the October, it didn’t, it was
supposed to happen last summer and it didn’t, you know that. And it’s
allegedly going to happen this summer, two years on. So, when these guys,

Page 234

Dargavel Primary 05.03.24
B session, second room combined
and nothing personal against you, professional and great people, right, but
when your organisations sit and tell us something-,
Liz: We don’t believe that.
David: We’ve got no belief in it because every single thing you’ve told us has fallen
down, failed and been incompetent, and I’m sorry about that, and you guys
are picking up the pieces. But I’ve got no sympathy for that because we can’t
cut you credit for that because we’ve cut so much credit. Why are the
acoustics not fixed in this school? It’s unacceptable. 
Alasdair  Morrison: You’ll see when you go through next door, maybe he would answer that
question for you. 
Dougie: On the point, though, around having the lack of trust, in the 2027 plan,
Bishopton having a capacity issue, potentially looking at expanding this one,
what happens though, if we continue to give houses? You continue to have
children enrolling for P1 between now and whenever the school is built, and
Bishopton and Dargavel exceed their size?
It goes to ballot-, Kevin:
Alasdair  Morrison: Sorry, can I just answer your question about house numbers because it has
come up a few times. So, the house numbers in here in terms of-, all have
planning consent already, in terms of an outline. That was dictated by BAE
and as we’ve discussed already-,
David: Can you just be honest on that though? Because part of the quid pro quo for
you getting that land for free, for the new school, was that you approved
those 500 houses, because you had held them because you have got a
statutory obligation to provide schooling and you can’t do that. So, a quid
pro quo was, ‘We’ll give you the land for free but you have to sign off on 500
houses.’ If you had said, ‘No, it’s not acceptable for our kids to have that,
we’re not doing it.’
My point being, the 500 houses are already baked in, if you like.
They weren’t.
Alasdair  Morrison:
David:
Alasdair  Morrison: They are because if you look back, the original outline planning consents
that have been granted for Dargavel give permission to the whole quantum.
What’s missing, what you’re talking about in terms of the 500 they’re having
up here in what’s the, sort of, north west quadrant or the north west sector,
was what’s called an application for matters specified in conditions. So, it’s a
detailed planning permission that shows the layout you referred to and the
number of houses.
David: And there’s a statutory obligation before you rubber-stamp that to ensure
there’s schooling in place. And the only way you can do schooling in place is
to propose this as a school and that was the quid pro quo for BAE to give you
the land for free.
Alasdair  Morrison: I mean, you’re slightly correct and slightly incorrect, if I may, so the actual
requirement to do it is at the time when the planning application is granted,

Page 235

Dargavel Primary 05.03.24
B session, second room combined
which would have been at the time it was granted first and foremost, the
outline planning permission for it. The Council didn’t do that because the
Council believed that the school that was promoted at the time, the one
primary school with 430 capacity, was sufficient. That’s the previous-, 
When was that?
That was 2018. 
So, we knew at that point that it wasn’t sufficient? We did.
No, no-,
We did.
We did but they (talking over each other)
Various voices talking over each other.
But the numbers have been thrown out, so at that point-,
But we’ve touched on that in terms of looking back through the, you know,
with hindsight, is that the Council recognises the decision then was
incorrect.
So, with hindsight, never mind and just plough on-,
Yes, on top of that as well, we’ve maintained our statutory objection to
detailed planning permission to any further house building because we know
that we are (talking over each other)
Various voices talking over each other
Can I just remind everyone, I know we’ve recorded everything but can you
fill in the online survey? Because that’s where you can put more detail etc,
so, make sure you do that too.
(talking over each other) for a final comment, I don’t feel we’ve been given
anywhere near enough detail for this to be considered an official
consultation. I don’t feel that we’ve had any detail from a roads and an
infrastructure, and a planning point of view.
But what you can do is, you can email and say, ‘Here are specific questions,’
and ask for more information.
I’ll just get that answer, I’ll literally-, Gerry Hannah is the man who’s the
Head of Roads and has been Head of Roads at Renfrewshire Council for a
long, long, long time, so if he can’t give me that answer, what’s the point in
me writing it down?
I think he will be able to give you it, I think if you get him to get back to you.
Liz:
Alasdair  Morrison:
Liz:
Alasdair  Morrison:
Liz:
David:
Liz:
Alasdair  Morrison:
Liz:
Kevin:
Louisa Mahon:
F4:
Louisa Mahon:
F4:
Louisa Mahon:
F4: I’ve just asked the question, I’ve literally asked the question and I didn’t get
the answer, so-,

Page 236

Dargavel Primary 05.03.24
B session, second room combined
Louisa Mahon: I don’t think he actually got to be able to answer it, to be fair, there are a lot
of people wanting different comments. I think Gerry will be able to give you
a lot of the detail you’ve looked for (Timecode: 00:50:00).
Liz: Could we not just do that though and then stipulate that? So, that’s a
question that probably most people have and I think one of the biggest
concerns about the site is about the traffic. So, can something be put
together so that people who aren’t sure or people haven’t been able to get
their answers for-, because it’s not a good forum, is it, really, for detailed
answers.
F4: (talking over each other) that was the perfect time for him to give us a
straight answer and there was no straight answer, it’s a politician’s answer,
it’s horrible. 
Gerry Lyons: Okay folks, can I just, kind of, change the direction of the conversation.
You’ve obviously got some issues that you want to explore a bit more and
we’ll get some time at the very end to allow you to do that, of course we
will. And if you think you’ve not heard answers then we want to find out
exactly what you’ve not heard and come back to you on that. So, as I said,
I’m Gerry Lyons, I’m the Head of Education, I’m leading on the consultation
and this part, this workshop, is very much about roll projections, about the
education bit of it because I’ve got the planning guys here who talk about
timelines and planning permission, I’m not qualified for anything, the
timeline for the building and all that kind of stuff. I don’t know about that
stuff but they’re here for that. I can answer as much as I can about the
projections and about things associated with the decision making. So, is
there a question you’d like to start with? Would you like me to start with
something? Really, it’s your meeting, so it’s over to you to either make a
start or to raise an issue. 
F8: At the consultation meetings a couple of weeks ago, you put up a design for
a new school which was, in my opinion, and I don’t expect you to comment,
but in my opinion was a far better design for a school than this current one.
Is that design agreed? You know, will you change it to be more like this
current school just because that would save money? What you were
proposing at the other school was a more expensive but, in my opinion, a
better educational establishment. Is that plan agreed or what?
Gerry Lyons: Yes, so what was at the information sessions and what’s in the booklet that
you’ve got are the space planning recommendations.
Sorry, are we referring to these?
These here and these are the illustrations.
Frank Farrell:
Gerry Lyons:
Frank Farrell: They aren’t designs, they are indicative space planners, we don’t have a
design yet. There is no architect-,
But you put it up at the information thing as a potential design. F8:
Frank Farrell: It is, essentially to show what space planners have envisaged. This is just
their aspirations of what the spaces could look like.

Page 237

Dargavel Primary 05.03.24
B session, second room combined
It’s like a mood board.
To give us a visual idea of what we could do.
Liz:
Frank Farrell:
Gerry Lyons: Aye, one of the big issues which we’ve had come through the consultation
has been the open plan nature of this school. One of the things we’ve done
as part of the initial work on the new school is, the space planners have met
with the Head Teacher of this school, with teachers from this school, and
children from this school about the experience of being in this school. That’s
been used to inform that. My view is that I don’t think a completely open
plan arrangement is the right one, I think flexibility is what we want for our
children’s learning. You and I had an interesting debate about walls or
partitions when you were here before, which I really enjoyed. So, I think
there are lessons to be learned from this, I’m going to feed those lessons in
all the way down the line because I think we can deliver something which is
more conducive to learning for all of the children, particularly for children
with additional support needs, with a different kind of design. The indicative
stuff from the team gives us a steer as to what that potentially might look
like, architects and designers have to then do their bit, of course they do. But
from my point of view, I’m taking a very strong view around what I think is
important and that for me, is about flexibility rather than being tied into
either completely closed or completely open.
F8: Yes, and I would agree with that, and if you don’t get that design right, then
through no fault of their own, children with additional support needs
become very chaotic for everyone’s education. And that’s a shame because
they then end up with a reputation that they don’t deserve because the
building’s not-, and your idea of, it’s spaces, educational spaces, worries me.
So, I don’t agree with educational spaces. 
Gerry Lyons: It’s just at this point, the definition of an educational space is open for
debate. But one of the things that we’re really focused on is the inclusion
aspect of all of this. We can’t afford to have children for whom the very
building is an obstacle to their learning, we just can’t afford to have that. 
Various voices talking over each other.
Gerry Lyons: Yes, I’m hearing that and we’re doing work just now to mitigate that.
Emma Henry: Yes, so if I can come in on that.
Gerry Lyons: Emma’s the Head of Inclusion.
Emma Henry: Yes, so one of the things that we’ve worked really hard on over the last
couple of years-, so my previous post, Head Teacher of St Catherine’s,
Education Manager for ASN Inclusion and so, Head of Education with ASN
Inclusion within my remit. So, over the last couple of years we’ve really
looked at the, kind of, GIRFEC refresh and what that looks like within our
establishments, and how we can use our spaces better for our children with
additional support needs. Now, Dargavel, Bishopton and Park Mains were all
part of that in terms of being early adopters, so they’ve actually supported
what we currently have in terms of planning and our, kind of, vision for our
estate has been led through the eyes of the practitioners. That’s the

Page 238

Dargavel Primary 05.03.24
B session, second room combined
practitioners here as well, so you can appreciate that we have to work with
what we have, and what we’re looking at is the professional learning
programme that sits behind that. So, we have things like, for example, the
circle framework. What I can do is, we have parent ambassador groups for
additional support needs, and also information sessions that go into much
more detail about everything that I’m talking about. I know it’s just a, kind
of, flavour of it but those sessions are there for you to attend and join, find
out more about that and about how this space and other spaces can be used
more effectively for children with additional support needs. 
F4: So, what about just the general issue with the noise in this school? Because
that obviously affects all children, both of mine, so-,
Yes, so we’re doing some work-,
I’ll take that one.
Yes, Frank will talk to you about the acoustic work that we’re doing.
Gerry Lyons:
Frank Farrell:
Gerry Lyons:
Frank Farrell: I know this has been issue since it opened two years ago, so there’s a
building warrant in to carry out works this summer. We’re going to try and
do advanced works, which aren’t warrantable works, that means we can do
it without having a building warrant, the aspiration is to try and do some at
Easter, some in May, so that in the summer we can concentrate on basically
enclosing certain areas so that the acoustics are improved. We appointed a
consultant to do this, as you know consultants who are involved in the
design, structural consultant, so that is underway, that’s been designed.
That’s got a building warrant in and we’re planning to carry works out this
summer for the new term. 
David: Just, that’s been two years that pupils have suffered this, as part of the
consultation for this school it was fed back that the community didn’t think
that open planning would work. Are you the new Julie Calder? I hope that’s
not offensive.
Emma Henry: No, that’s him, I’m not, that’s Gerry.
David: But you’re Steve Quinn, are you not?
Emma Henry: No, no Janie. 
David: Who’s Steve Quinn?
Emma Henry: Janie.
David: Who?
Kevin: Janie, at the back.
Various voices talking over each other.
David: Are you going to (talking over each other) I think the Director of Education
should definitely not be on the periphery. 
Gerry Lyons: So, in terms of identities, the new Steven Quinn, the new Julie Calder
(talking over each other)

Page 239

Dargavel Primary 05.03.24
B session, second room combined
David: Steve Quinn never missed an opportunity to be in the limelight so I don’t
think you should either. So, he sat here with Julie Calder and said to us that-,
Liz: ‘Your children won’t be damaged.’
David: ‘They won’t be affected by this, this is a cutting edge design. I’ve got loads of
experience.’ See that conversation you just had about all of these working
groups, we heard all of that, and how this works. Then it opened and then
within five seconds flat the Head Teacher was saying, ‘This is chaos, you guys
need to sort it.’ Steve Quinn sat here, the best part of two years ago, and
said, ‘We’re going to sort it in six months,’ and two years on it’s not sorted.
You’ve got kids in ear defenders and I know that you’re now saying, ‘Well,
we’re going to fix it,’ great, I’ll believe it when I see it. But what confidence
do I have that you’re going to listen to what we’re telling you now about this
new school? Because we’re going to potentially end up being in the same
position, we need a cast iron guarantee as part of this consultation that you
will not build an open plan school. 
M9: Yes, on that note, I know families that have actually preferred to go to
Bishopton Primary although they live in Dargavel purely for that reason.
F4: My daughter prefers the portacabins, my primary six is loving life in a
portacabin because she can hear her teacher, genuinely loving life in a
portacabin.
David: I do love that phrase, ‘Loving life in a portacabin.’
Kevin: We’ve lost Parent Council members because they’ve moved the children
because the kids have got-, 
Liz: Yes, we did that, my husband’s very involved in the Parent Council and when
Eli was coming into school in primary one, my daughter was going out to
Park Mains, we made the decision that, a combination of the numbers, a
combination of the acoustics, a combination of the traffic because I am one
of those parents that needs to drop my kid off and then get to work-, it was a
no-brainer for us and we moved over to Bishopton, and I’m not alone in that,
there are lots of us. 
Kevin: Yes, so just coming back as well to what you’re saying there (Timecode:
01:00:00). So, we’re talking about, we know there are a large number in this
school who have got the ASN, kind of, needs especially with the sound and
the hearing issues. We’ve already looked at, as well, and said that 2027 is
our pinch point and that’s when it becomes really, really tight. You’ve already
mentioned as well, Gerry, about looking at the numbers currently in this
school in terms of trying to expand the capacity here to take that shortfall.
So, how is that going to work? Because we already have such a high
proportion of kids here with ASN needs, Bishopton’s in the same boat, we’re
going to then be taking more kids into these smaller areas, we’re going to be
squeezing them in like sardines almost.
David: Steve Quinn gave the Parent Council of this school a categoric guarantee that
he would not extend this school beyond those portacabins, are you
backtracking on that?

Page 240

Dargavel Primary 05.03.24
B session, second room combined
Gerry Lyons: No, so-,
Kevin: But on top of that as well-,
Gerry Lyons: Where we are at the moment-, sorry Kevin.
Kevin: Sorry, yes, so in terms of that, is it going to be a detriment to the kids that
are currently here with ASN, the kids that are currently at Bishopton with
ASN needs, by even just now, bringing in more and more kids, even up to
2027? Is that going to be an issue? Because I think it is, I seriously think it is.
Gerry Lyons: I don’t believe so, I don’t believe so, because we have to manage the
capacity of the school as to what we’ve got. So, we’ve got 595 in the school
just now including the modular units or the-,
Liz: Portacabins.
Gerry Lyons: Portacabins, depending on what phraseology’s your favourite.
Kevin: If you look at the side it says, ‘Portacabin!’
Gerry Lyons: That’s the company.  
Various voices talking over each other. 
Gerry Lyons: It’s a technicality, but I suppose my point is this, we’ve got 595 at the
moment, the plans moving forward are to operate with a new school of 800.
We won’t be at 800 when we open, it won’t open at 800. That should allow
us to take this school down to 434 and operate within that. Now, there is a
potential scenario where it goes up to 1,500 and that point, we would have
to consider, David, your point, which would be that to meet that, if it gets to
1,500-, if you push me on it, I think it will sit somewhere between the two,
between 1,100 and 1,500 but if it goes to 1,500 we would then be looking at
800 there and a potential extension to here. 
Are the portacabins included your numbers there?
Not in the 434. 
So, they’re temporary portacabins, when would they be moved?
But it would have to be (talking over each other)
Yes, they’ve only got a-,
Five-year.
Five-year building warranty. 
David:
Gerry Lyons:
David:
Kevin:
Gerry Lyons:
Frank Farrell:
Gerry Lyons:
Dougie: Can we just touch on the areas that are designed for health and wellbeing?
So, you’ve got the MUGA, you’ve got the playground and-, the impact of the
portacabins for one, but the other one is the gym hall I was going to touch
on. The impact of the portacabins inside the playgrounds is it condenses the
playground, so if that becomes a longer term solution it does impact the
children’s play outdoors. We had a lot of issues where the gym hall-, because
of the size of school, the gym hall needs to be used across the entire school,
so when it comes to PE days for the kids, they’ve got to go outside because

Page 241

Dargavel Primary 05.03.24
B session, second room combined
the gym hall has a rota, for example. The playground will have an impact on
that, the MUGA has an impact on that, for example, as well, where if it’s
raining-,
Gerry Lyons: Is that a negative impact you’re talking about?
Dougie: Yes, if it’s raining outside, for example, the MUGA can’t be used. There are
many days that the kids will just do physical activity in their classrooms
where they’re standing behind their desk doing yoga, for example. It’s not
development in terms of the hand eye coordination and all that, kind of,
good stuff. There’s a commitment that needs to be given to this school
around how you future proof the health and wellbeing spaces for recreation,
but is that learning being built into the new school as well, where you’re
building a gym hall that’s big enough for the actual school itself?
Gerry Lyons: Yes, is the short answer to that, we believe that the plans have sufficiently
sized health and wellbeing spaces in terms of sport and exercise. There is a
public pitch built into it which will not be changed to anything that-, you
know, that’s built in and one of the things that I was saying was-,
Kevin: That was the same here, we were told it wouldn’t be changed here (talking
over each other)
Gerry Lyons: Kevin, but you know the issue there is-,
Kevin: It comes down to money because (talking over each other) building it.
Gerry Lyons: I’m not asking you-,
Kevin: And it will come down to money eventually.
Gerry Lyons: Aye, I’m not asking you to believe me because why would I? Because you’ve
already pointed out, you’ve been told stuff that never happened. I think the
difference, in terms of the pitch is, in some ways-, and I wasn’t here, so you’ll
understand that there was an element that it was a, ‘If we can do it, great, if
we can’t then there’s something there we could-,’ it is fundamental to the
design of the new school, that it not only provides a high level education
space for the children but it provides those facilities for the community, and
the pitch is part of that. One of the things that I’ve been told by you, and I
don’t know if you mentioned it, David, but I know that George Morrison
talked about the fact that he’s taking his teams all over the place to play,
Bishopton Football Club.
Kevin: I’ve told you, I’ve been refereeing games with Bishopton over 35’s, for
instance, at Toryglen-,
Gerry Lyons: Aye, I’m not that concerned about Bishopton over 35’s (talking over each
other) that’s from a football perspective.
Kevin: (talking over each other) but it is, that is our community. 
Gerry Lyons: I agree completely. 
M9: I play for the Bishopton over 35s and we play in Scotstoun.

Page 242

Dargavel Primary 05.03.24
B session, second room combined
Gerry Lyons: Sorry, I’m only concerned about-,
Kevin: Scotstoun, Toryglen.
Gerry Lyons: No, but your point’s a good one.
Dougie: But you have to get in a car, it’s back to the original point I made in the last
one, which is, we’re in a society where we want to become carbon neutral.
For anything that we want to do in Bishopton, you’re getting in a car and you
have to drive somewhere.
Gerry Lyons: Absolutely, so that’s why, as I said at the start, one of the key principles of
this is, community facility. So, that will be sport in terms of the pitches, in
terms of gym halls, I’ve got dance studios we’re looking at as well, and other
kinds of facilities for art and design, you know, that kind of thing as well. So
that the new building actually adds value to this community and deals with
some of those issues.
Kevin: Is that a cast iron guarantee you’ve given us that you’re not going to be
taking away-,
Gerry Lyons: I don’t give cast iron guarantees, Kevin, I can’t even give you a cast iron
guarantee that I’ll be here tomorrow.
Kevin: Gerry, can you give us a cast iron guarantee that (talking over each other) is
going to be a 4G pitch?
Gerry Lyons: Kevin, do you not think that one of the things we’ve got to do is learn from
mistakes? One of the mistakes that was made the last time was that people
gave cast iron guarantees and didn’t deliver on them. 
Various voices talking over each other.
David: You’ve just said we need to learn from mistakes, okay so the mistake is, you
didn’t have a 3G pitch. Just say you’re going to fix it, it’s a little gesture,
you’re going to fix it.
Gerry Lyons: Oh, that one?
David: Okay, no, at the new school. This consultation is about the new school, I
could give you a list as long as my arm about this school if you want but I
never quite nailed you all down to stating on the public record that the new
school that you’re going to build is not going to be open plan. Can each of
you just say that? Yes?
Gerry Lyons: As far as I possibly can, and I know you don’t like that phrase but I’m going to
use it, because I’m not going to do what Steven Quinn did which was to give
cast iron guarantees he didn’t deliver on. 
Liz: What are you consulting on?
Gerry Lyons: I am completely against open plan schools. 
David: So, is the new school going to be open plan, yes or no?
Gerry Lyons: Not at the moment.

Page 243

Dargavel Primary 05.03.24
B session, second room combined
David: Is it going to be open plan? Sorry, you need to speak so it’s recorded.
Janie O’Neill: No, it will not be an open plan school, you have been very clear with us that
that’s what you don’t want and I’m assuming that, you’re speaking for a
number of parents around it.
F4: Absolutely. 
Liz: I don’t think anyone (talking over each other)
Janie O’Neill: So, we’re absolutely not in favour of building something which the
community don’t agree with and which has not been conducive to-,
David: So, if it costs £500,000 more, is that in the budget?
Janie O’Neill: Can I just finish my point? Because I want to just talk about the open plan
bit, because obviously when I’ve come in, that’s been something that you
were talking about and you feel strongly about. You’ll know that at one point
everybody wanted an open plan school, well, not here, generally, in Scotland
there were lots of schools being built. I know that just because of my
background but now, obviously, there’s a change around that, people don’t
want it. You’re talking about your child being in a portacabin and enjoying it-,
David: ‘Living her best life’ was actually the phrase.
Janie O’Neill: And I totally understand that, so the other thing, which obviously, Gerry-, I
know it’s up there, you might not have had a chance to look at it. The other
thing has been about the voices of, obviously, the children themselves and
what they feel better about. You’ve said your child is loving it, and I would
assume that that’s the, kind of, feeling and background-, the feedback you’re
getting from both of your children. 
David: The teachers do too, the teachers enjoy being in portacabins.
Janie O’Neill: Yes, and again-,
David: It’s quiet, it’s isolated and frankly, you don’t have kids in ear defenders, I
mean, that’s embarrassing. 
Gerry Lyons: Some of the feedback we’ve had from the teachers is exactly that, which is-,
David: Because when you guys aren’t around the teachers tell us the truth. When
you guys come in, they tell you what they think you want to hear.
Various voices talking over each other.
Janie O’Neill: No, no, you’re talking to a teacher.
David: It’s not funny either, it’s not funny, this is kids’ education. Kids are wearing
ear defenders up there because they can’t hear.
Janie O’Neill: No, of course it’s not funny.
David: Children with additional support needs are causing chaos to other people,
it’s not a laughing matter.
Janie O’Neill: No, not laughing.

Page 244

Dargavel Primary 05.03.24
B session, second room combined 
Gerry Lyons: Of course, it’s not a laughing matter.
Emma Henry: See when it comes to, just to, kind of, touch on additional support needs,
every child has a bespoke package if they need it, okay? So, we’re looking at
every child individually, if a child requires ear defenders it will be for a
reason, it will be part of their package of support. So, there might be reasons
that sit within that, and it might be a busy space, it might be a less busy
space, it can be for sensory reasons, there can be a whole variety of reasons.
Liz: There are also children though, that started wearing ear defenders for no
other reason than that their class was really noisy.
Emma Henry: I can’t comment on that without knowing all the background (talking over
each other)   
Various voices talking over each other.
Emma Henry: Yes, and I appreciate that but what I would say is, that in relation to, when
we’re looking at children’s individual support plans, it’s about really looking
at exactly what they need in the environment that they’re in. Whether that
be here, in the new school, in Bishopton, wherever it is, so it’s bespoke
(Timecode: 01:10:00) to those children.
David: If you go through that list, where on the list comes, ‘The children need a
really noisy environment’? Where does that-, that they need it? Which child
needs that?
Emma Henry: Well, see in terms of the curriculum-, so, if we take additional support needs
out of it, Head Teacher, primary teacher, there are different activities that
require different levels of activity within it, so that’s why-,
David: You’re playing football in a MUGA, great, shout and scream, that’s great but
if you’re trying to do a maths equation-, 
Emma Henry: You could be doing something within your class and that’s why a flexible
space is actually much, much better for that because that gives you, within
your class-,
David: And you would say (talking over each other) there are times you need quiet?
Emma Henry: Let me finish, yes, absolutely. 
David: And the class next door’s doing the riotous act, that’s the issue. 
Emma Henry: Is that not what Frank was talking about in relation to-,
David: About fixing it? Two years on, it’s not fixed. 
Kevin:  What we’ve got just now, what we’ve got in this school, for instance, we
have got areas where you’ve got two classes back to back, an open plan
space. So, you’ve got no partition, you’ve got nothing there at all. What the
teachers are having to do is try and plan their activities together to try and
make it as good as they possibly can in terms of how it works. But that
doesn’t always work because one group might have PE but it’s peeing down
outside and they can’t get out. So, they’re having to do PE in their class-,

Page 245

Dargavel Primary 05.03.24
B session, second room combined 
Dougie: Because there’s no gym space.
Kevin: When somebody else is trying to do more focused activity. And that does not
happen, it is really, really difficult.
Dougie: Renfrewshire Council 2024, welcome.
Kevin: Because of the way the school is designed. I’m just using the P1 because you
can go and look at it and check, it’s so, so difficult.
Emma Henry: I’ve been, I’ve seen it.
Gerry Lyons: I’ve walked round the school and one of the things that we’re trying to say
here is that-, we’re consulting on a new school, you’re telling us very clearly
that the design of this school is not working for the children the way it was
hoped.  So, therefore we’re going to take that on board and do a better job
with the new school. 
Kevin: What I’m going to ask as well, is that I really hope that when we’re doing
that with a new school, this school does not get left behind with the children
who are in this catchment area.
Gerry Lyons: Absolutely.
Liz: And Bishopton, specifically.
Kevin: And Bishopton.
Liz: (talking over each other)
Kevin: So, Bishopton’s a bit more challenging because of the space but for me,
we’re talking about a new park-,
Gerry Lyons: Listen, don’t start Liz on what she wants for Bishopton. 
Kevin: I know exactly what Liz wants for Bishopton, to a large extent. But we’re
talking about a new 4G football park at the new school, let’s get that turned
into a 4G park where it is then, more utilised throughout the day. Even if it’s
a 9V9 park, we can get some of the kids in there playing, using it outwith
hours. We can make that-,
F4: Yes, don’t make it that we need to wait three years, I’ve already lived in
Dargavel for five years.
Kevin: Don’t make us wait for that, that can be done tomorrow.
F4: So, don’t make us wait three years.
Kevin: Yes, that can be done tomorrow but let’s not make it a them and us
mentality again with the new school and this school. It’s got-,
Dougie: (talking over each other) down the line, we cost more money further down
the line but we also invest in people right now as well. The returns would be
exponential, you keep things local to Bishopton, people want to stay here,
you’ll get your Council taxes, the rollover effect is massive, I don’t need to
tell you that, but it’s huge.

Page 246

Dargavel Primary 05.03.24
B session, second room combined
Gerry Lyons: No, no, it’s a fair point and it is also a fair point, and it’s a point that certainly
has to be a part of the ongoing community engagement discussion which is
that this should not be-, and I’ll use inverted commas, so I’m not saying, ‘A
second prize,’ to the new school. We have to ensure that what we offer all
the children in Dargavel is a quality of education provision that’s equal
whatever school you go to, and I include Bishopton in that. But some of that
is about more than just the buildings, it’s about the quality of learning and
teaching, it’s about the planning of the curriculum and all of those other
issues. Certainly, what we don’t want is that that has to be done to
accommodate a design that’s not helpful, so we’re going to work really hard
to make sure that doesn’t happen. 
Dougie: For the record, sorry, I didn’t see your hand up there, the teachers in here
are absolutely amazing, what they do with the mess you guys have thrown
them, the collective mess of Renfrewshire Council (talking over each other)
Gerry Lyons: I met with them during an in-service day and I was really, really impressed
with them.
Emma Henry: Yes, they’re brilliant.
Gerry Lyons: Really impressed with the Head Teacher, so you’ve got great teachers
working with it. They gave me a loud message as well, they didn’t say
something different to what you’re saying to me today. So, we hear what
you’re saying.
Chris Dalrymple: If I can very quickly (talking over each other)
Dougie: Honestly, this lady puts her hand up, everybody else just butts in, she needs
to speak because (talking over each other)
F7: We asked a question at the start, was the design agreed and we have
actually really enjoyed looking at the school, and we really do think it’s a
very good school. So, we would really hope that this is what the school looks
like and, I guess, I have two questions. My first question is, what are the
barriers for this  school to not look like this? Obviously, cost being one but
are there any other barriers? Then my second question is, if the design of
the school is not currently agreed, when would you envisage that you would
have a design ready for? Because I, kind of, saw this and thought, ‘This is
what it’s going to look like,’ and I went home really excited. If that’s not the
case, when would you be able to tell us?
F4: Because there’s no architect at the moment.
Gerry Lyons: So, the design, the colleagues will be able to take you through that.
Chris Dalrymple: If I can very quickly-, because that’s perfect, that’s the perfect lead in to what
I was going to say. So, my name’s Chris Dalrymple, I’m the Head of Facilities
and Property Services, and with my colleague Frank, we’re going to be
responsible for projecting managing and building this building. Exactly as you
have said there, we’re going to listen, that’s why we’re here tonight, to
listen, to make sure that the mistakes that were made here aren’t made
again, and Frank and the team that will project manage this will take it on

Page 247

Dargavel Primary 05.03.24
B session, second room combined
board. We can’t do a proper design until we know the exact site. So, we’ve
talked about passive house, net zero, next door etc, for us to get the
orientation, the site, the design, the build, the topography, we need to know
that site first. But Frank and the team are working in the background with
Hub West Scotland to look at architects, designers. Space planning have
done that, we did that for a reason, so it would help influence our design as
we move forward. So, the question you asked there is, ‘What would stop it
looking like that?’ You talked about money, that is part of it but we went to-,
Space Solutions?
Gerry Lyons: Space Zero.
Chris Dalrymple: Space Zero, to help us do that, to influence it so that Frank’s project
managers can look at it and say, ‘Well, there you go, we’ve got ready made
plans there, how do we build this into our design so we can get it looking like
that?’ We can look at making sure it’s not fully open plan, that we listen as
part of this, because what I don’t want to do is, no offence, be sitting here in
three years and saying, ‘Chris you’ve sat here and said you were going to
listen to us,’ that’s why we’re here tonight, to listen.
F7: So, the Space Zero people, they’re architects or designers, they’re not
teachers themselves and they might have-, they’re like, ‘Oh, this is a banging
idea, this is going to be amazing,’ and then actually you could probably ask a
teacher and then they’d go, ‘Oh no, I don’t like that.’ Is that being consulted
as well?
Chris Dalrymple: 100% and that’s why we need to liaise with, not just Janie, Gerry and Emma
but Gerry Carlton in here with other teachers, so that we can learn from
that. Because you’re right, I’ve worked with Space Zero, who have helped us
in Renfrewshire Council, our buildings recently, and it looked great on paper
but when you went to actually, physically do it, you couldn’t quite do it the
same way. So, again, it’s great on a piece of paper but we have to get it right,
and again Janie, I think it’s right, we’ve got the governance we feel correct to
review this at the Learning Estate Programme Board. That we’ve got people
feeding into it, that we keep checking what we’re doing is correct and
obviously speaking to the community as well. 
F7: Are you doing that quarterly, how are you checking how it all-,
Chris Dalrymple: Our Learning Estate Board, I think is every-,
Gerry Lyons: It’s every two weeks.
Chris Dalrymple: Every two weeks. 
Janie O’Neill: Every two weeks, yes (talking over each other) meets with the Board every
two weeks. 
Gerry Lyons: So, we’ve got a Project Board-,
Chris Dalrymple: Yes, we’ve got a Project Board and Programme Board.
Gerry Lyons: So, between the two-, 
David: Will we be able to feed into the design, like, as a community?

Page 248

Dargavel Primary 05.03.24
B session, second room combined
Gerry Lyons: Yes, so one of the, kind of, conditions-, not so much a condition, one of the
criteria for appointing the architect is that that architect is bought in to
coming out to the community with the drawings, with the proposals, and
just taking that whole community engagement. So, the short answer is yes,
because that’s one of the conditions we’ve put on an architect. 
David: Can I put a niche request in for incorporating some nature friendly solutions,
we’re in a semi-rural environment, you could put in swift boxes, it’s an
amazing learning experience for the children to see birds nesting. You could
build hedges for hedgehogs, that’s a niche request but can I put that, since
you’re here?
Gerry Lyons: I don’t know if it is a niche request actually, I think one of the big issues for-,
one of the things on the education reform agenda was the feedback from
young people that the environment and climate change is one of the biggest
priorities in their education. 
David: It’s spending time in nature that calms you down, that’s the whole-,
Liz: But you’ll have to make sure that there’s stuff for the older kids to do
otherwise they’ll come in and trash it all. 
Gerry Lyons: Yes, and actually that’s been some of the really interesting feedback from
the consultation, which is, ‘What can we do for the teenage population in
this area, who at the moment don’t seem to have a hell of a lot to do?’ 
Kevin: (talking over each other) building a high school and getting better facilities
involved with that as well? More football, more sports, more-, 
Gerry Lyons: Yes, actually-, 
Various voices talking over each other. 
Gerry Lyons: (talking over each other) persistence that I love.
Kevin: But I don’t think I’m alone in that Gerry, I think that is a big concern.
Gerry Lyons: No, you’re not alone.
F4: Can I just come back to, actually, now that we’ve brought this up, and I
appreciate that’s not about tonight, but something that’s sticking in my head
is that you reckon that pupil numbers could go up to 1,500. So, straight away
that rings huge alarm bells for me on the Park Mains situation. So, my
understanding is there are further conversations to be had but-,
Gerry Lyons: Yes, there is.
F4: That’s a wild issue for me and by the time 2027 comes, my kids, it’ll be high
school I’ll be looking at.
Gerry Lyons: Listen, it’s absolutely one of the issues that’s come up, you know, throughout
all the conversations that we’ve had. I don’t want to fob you off and I won’t
fob you off. I need to come back and have other conversations about Park
Mains, and I need to (Timecode: 01:20:00) bring the figures with a lot more
thoroughness than I’ve brought so far, so that we can have that debate and

Page 249

Dargavel Primary 05.03.24
B session, second room combined 
that conversation. I’ve already got a date in my diary for the Bishopton
Parent Council-,
David: It’s already been signed off by the Council that they’re building an extension
capped at 2,000, it’s fait accompli.
Liz: It’s not a consultation.
David: What are you going to be talking to us about?
Gerry Lyons: We’re going to talk to you about why we think that’s the right solution and
what might happen-,
David: Seventeen double decker buses from Bishopton and Langbank, at a cost of
£1 million a year, your figures, £1 million a year to bus them.
Gerry Lyons: Yes, again, undoubtedly the transport issue’s one that we have to look at and
you know that but all I’m saying is, in terms of the numbers, we’ll come back
and we’ll have that conversation with you as to why we think they’ll work,
whereas a lot of you think they won’t. And I get that, so that’s fine.
David: You won’t listen to us and you’ll do what you want, and that’s the proven
track record of Renfrewshire Council. ‘Don’t listen to the community, do
what we think is best, we’re proven wrong, change the people and say, “It
wasn’t me, I’m sorry.”’ I can give you 25 examples of that.
Gerry Lyons: David, at no point have I said, ‘It wasn’t me.’ 
David: I think you did say, ‘I wasn’t here at that time,’ earlier, which is the same as,
‘It wasn’t me.’
Gerry Lyons: Well, that’s different, at the end of the day, we are here as Renfrewshire
Council, we recognise what’s happened before, completely get that. And I
think you’re right actually, I think you’re right-,
David: Park Mains is not going to work, we’ll tell you that. 
Gerry Lyons: I think you’re right in the sense that you’re saying, ‘These are the
experiences we’ve had before,’ I can’t undo that, I just can’t undo it. All I can
try and do is be thorough, open, engaged and precise about what we’re
trying to do. 
David: My attack’s not on you personally and you have to say that, but we’ve heard
it all before. 
Various voices talking over each other.
Gerry Lyons: That’s the point I can’t change though, isn’t it?
Liz: But part of that is, you’re coming out and you’re doing a, sort of, public
consultation and inviting views but it already feels like it’s already decision
made. 
F4: Yes, it’s more of a token gesture, that’s what it feels like.
David: The decision has been made.

Page 250

Dargavel Primary 05.03.24
B session, second room combined
Gerry Lyons: The public consultation on the primary is absolutely not a decision made.
Liz: But it’s that or we say, ‘Back to the drawing board,’ and then we have to
accept the risk of having to bus the children out to other schools. Those are
our options, which aren’t-,
Gerry Lyons: Not necessarily you accept the risk, you accept the risk of having to do
something temporary but in some regards, that’s just us being fully
transparent about the constraints. It might not be that you have to bus them
to other schools, it might be, but all I’m doing is saying to you is that as a
community, that’s what you need to know to make a decision. If, knowing all
of that, you say, ‘Do you know what, Gerry? To get it to where we absolutely
want to get it to, we’ll go to 2030,’ then tell me that. 
F4: Who makes that decision though? Because is there is a democratic vote?
Gerry Lyons: That’s the Councillors who will make the final decision.
F4: You know, so to me, to leave it to the Councillors is just easy answers signed
off. 
David: The Council decide it, it’s whipped on party lines, the SNP have the majority.
The current governing SNP have never gone against the guidelines of the
officers, the people who are making the decision are these people here.
That’s the fact of the matter. The decision is made whether they’re going to
(talking over each other)
Gerry Lyons: The technical final decision will be with the Councillors but we have a view
that our proposal is the right one.
F4: But that’s what makes tonight the biggest waste of time.
David: Hands up if you think this proposal is the right one, of the parents in the
room? So, that’s a resounding, big fat no. 
Gerry Lyons: But then I’ve got 200 online questionnaires that don’t reflect that, so it’s
bigger than this David, than we just put our hands up. 
Liz: I heard that there were only 140.
Kevin: There were 120 when I was at the Council meeting last week, when I was
speaking to Louisa and yourself. 
Janie: 253 as of today.
Liz: That’s good, that’s great.
Kevin: Fantastic. 
Gerry Lyons: That’s great and those are not reflecting-,
Kevin: Are we able to see what the feedback is? Because I know from a lot of
people that have filled it in, what their views are. I would suggest it’s not
overwhelming rejection of the site but it’s more because of-,

Page 251

Dargavel Primary 05.03.24
B session, second room combined
F4: My worry is, when I talk to people there’s a huge potential that people that
have filled out these surveys or whatever, they’re doing it lacking lots of
basic information.
Kevin: Absolutely.
F4: Because everything’s a PR exercise, so you guys are giving us the information
that you want us to have, we, that come to these, probe, we then actually
learn, ‘Actually, that’s not fact, that’s not fact, that’s PR spin, that’s PR spin.’ 
David: Very few people look into the actual facts, they believe the PR unfortunately.
F4: Exactly. 
David: And the Council rely on that apathy and that’s why it’s-,
Gerry Lyons: I’m going to come back to that point.
F4: It’s terrifying.
Kevin: What I’m hearing from people that I know have filled out the survey, is they
feel that they’ve got to accept site E1 because if they don’t, they don’t have
a school by 2027 and it’s likely to be mid 2030s before a solution is delivered.
F4: Yes, this man’s had his hand up.
M10: You just mentioned E1 as well there but we also talked about, you weren’t in
the room of course, but the previous session looked at plot 22. Is there
scope within the Council to consider a joint or split school that would look at
primary and secondary on a bigger space? Is that ever on the plans-,
?: 22 looks good for that.
M10: Yes, exactly and is that ever a consideration?
Gerry Lyons: I think it’s been considered and for reasons-, I’ve not been involved in that
consideration, and that’s not me saying, ‘It’s nothing to do with me,’ so I
think the decision was made that it wasn’t the right option. 
M10: Should that have gone to public consultation?
F4: Yes.
Gerry Lyons: No, it doesn’t have to go to public consultation.
Kevin: It has been considered, however, local elected members have decided that
they do not want a high school in Bishopton. They want to extend Park
Mains because that was always what Park Mains was built and designed for.
So, Park Mains was built so that it could be extended if required. They were
basing that on the 2,000 number of houses, 2,500, so they’ve decided that
regardless, they are going to extend Park Mains because if they don’t, it
leaves Park Mains sitting between 800 and 1,000 pupils which is half-,
Gerry Lyons: It leaves it sitting between 650 and 800. 
Kevin: Well, that’s not what’s been shown by Edge Analytics.
David: The extension’s not (talking over each other)

Page 252

Dargavel Primary 05.03.24
B session, second room combined
Gerry Lyons:
Dougie:
Gerry Lyons:
Kevin:
Gerry Lyons:
Kevin:
Chris Dalrymple:
Kevin:
Chris Dalrymple:
Kevin:
Various voices talking over each other.
Anyway, listen, I have to be aware of time. It’s 8:45, we’ve got to get the
janny home, so I’m going to take one more question and then we’ll go in
next door and finish for nine o’clock. The Park Mains discussion is, you know,
beyond this, this is a statutory consultation that finishes at a particular time
and I’m more than happy to come back and have further discussion about
Park Mains. Yes, sorry, you’ve got the last one. 
I mentioned about gym and recreation earlier, and I just wanted to have on
record as well about lunch facilities and the lunch hall. There’s a situation
just now where the lunch hall, even though it’s spaced across, there’s a rota
for lunches, if you’re packed lunch or you’re getting facilities at the school,
then you can’t actually sit together because there’s not enough space. So,
you’ve got some kids actually sitting having their lunch in the classroom just
now, so that has to be something that’s addressed in the new school, but if
you’re expanding the school in the future as well, in terms of using
portacabins etc, you have to consider wider facilities.
We have to consider that, okay, thank you.
Can I just (talking over each other)
No, that was the last one, Kevin, thank you. No, no, that’s time, we’ve got to
end. Come through next door and (talking over each other)
Various voices and background noise from 01:27:00 to end of recording.
There was a reason we could not build on a hill because that is what I’ve
been told by Alasdair  Morrison. We cannot build the school on a hill but
one of the big things that we’re getting from the kids-, it’s very expensive
but apart from money, one of the things we’re getting from the kids is
they-,
Money’s a factor.
It is a factor but it can’t be the main driver when we’re in this position.
What we’re getting from the kids and teacher is that they are loving having
direct access to outside space. If we build a new school, we’re not going to
build it all on the one level because it’s impossible, we’re going to have to
build it the same as we have here, up the level. If that was on a hill, for
instance, then we have got direct access, top floor out at the back, ground
floor out at the bottom, but there is still that potential. So, is there a reason
why that cannot even be looked at? Because that’s one of the things which
is (talking over each other). It wasn’t, when I spoke to Alasdair , a lot of the
sites were discounted because it was on hill, it would be expensive, and
that was literally it. It wasn’t looked at, the other benefits. 
To be honest, that is a big part of it, Kevin, is finance (inaudible)
But why (inaudible) got to? Because what we were told was, ‘We need to
fix this, we’ve not set a budget but this is what we expect it to cost.’ So,
we’ve not told been told (talking over each other) exactly. But if it was to
cost 70 million to get the right solution then it’s £70 million, whereas what
we’re doing just now is, we’re saying, ‘This is our budget now.’ So, we are
then

Page 253

Dargavel Primary 05.03.24
B session, second room combined
Chris Dalrymple:
Kevin:
Chris Dalrymple:
Kevin:
Chris Dalrymple:
Gerry Hannah:
Chris Dalrymple:
Kevin:
Chris Dalrymple:
Kevin:
Gerry Lyons:
Chris Dalrymple:
(inaudible), so what the lady said as well, ‘Are there any reasons why it won’t
look like what’s on the actual board?’ We’re saying, ‘Because that is our
budget, that’s what we’re tied to now.’ 
No, that’s a different answer (inaudible) We’ll be criticised if we build
something expensive, we’ll be criticised if we don’t do it on the site that’s
the preference.
You’re bringing in well over £10 million a year already from this
development, Council tax, well over. We don’t get our bins emptied, we get
our bins emptied at the house but we’ve got to pay for all the (inaudible)
round about, the paths and whatever else, (inaudible). We pay for the grass
cutting, we’ve not got a leisure centre, we’ve got to go to Erskine and
Renfrew. We don’t get anything here at all but all that money’s going into
the pot, but there’s nothing coming back. 
I suppose, the only answer is, it’s not going into our pot, if you know what I
mean, so again-,
Aye, but that’s what I’m saying, it’s one of the ones of saying, ‘Right okay, we
can’t make it too expensive but you’ve got to make sure you get it right.’ For
me, it’s getting right and it might cost an extra £10 million but you get it right
because (inaudible) the kids ultimately. 
I suppose, the biggest thing is, we’ll be led by Alasdair  and finance etc. We
will know exactly what our budget is and we will build-,
(talking over each other) it might sound negative, but it’s a fact, that’s the
harsh realities of-, 
Anyway, let’s go in. I just wanted to ask you because I know we spoke on the
phone (Timecode: 01:30:00) a couple of times, any problems with the school
crossing patrol?
(inaudible) much, much better.
Good.
But it’s really the ones where we are (inaudible for several seconds) It’s just
so busy and (inaudible)
Listen, at the end of the day, I’m chairing the meeting and whether it suits
you or not, I’m not going to have a show of hands. We have a very detailed
process, we’ve got an online (talking over each other)
(talking over each other)
Recording ends.

Page 254

Appendix G
Parent Council 
29th January 2024
Subcommittee for fundraising
Gerry
What the consultation is:
Process – talk through 
Gerry – solution for whole of Renfrewshire Children 
Community engagement - not necessarily get what you want
- Proposal – only a relevant proposal
- Build a second PS in Dargavel on site identified
- Adjust catchment areas
- New 800 pupils – sufficient based on projection of Edge Analytics
- Copies of proposal in school
- 2 drop in sessions – conversation café – 9am-2pm – 8th February
- Drop in online – 8th February
- 4 evening sessions – all depts represented
- 19th February public meeting
- 2 more evening sessions
- 2nd public meeting
- Online questionnaire
- Is this the only proposal – Liz – this is a proposal
- Do you own the site?
o 100% we own the site
- Standard consultation is done on one proposal if people put forward another
proposal needs to be listened to
- If no solution by August 27 – pupils may need to go out with Bishopton Primary
- Edge Analytics – recognised leaders in the filed
- Has it been used on a similar development
- Yes

Page 255

Appendix H
Kevin McIntyre
Chairperson
Dargavel Primary Parent Council
Janie O’Neill
Childrens Services
Renfrewshire Council
Renfrewshire House
Cotton Street
Paisley
PA1 1TZ
Subject: Response to New Dargavel Primary School Consultation
Dear Janie,
I am writing on behalf of the Parent Council to formally address our objections to the
proposed site E1 for the new Dargavel Primary School as part of the ongoing
consultation process.
Our primary concern centres around the safety implications associated with site E1,
particularly regarding traffic risks and proximity to water courses. We firmly believe that
the proposed location poses an intolerable risk to the safety of our children, with
inadequate infrastructure to support the anticipated volumes of traffic and foot traffic.
Additionally, the strain on the footpath network and the proximity to water courses
heightens safety concerns, particularly for the youngest children attending the current
primary school and the proposed school.
Furthermore, we are deeply troubled by the flawed nature of the consultation process
thus far. From the outset, there have been instances of information being withheld or
presented incompletely, seemingly to validate the predetermined selection of site E1.
The divisive narrative surrounding the necessity of site E1, coupled with the exclusion of
alternative sites from the consultation, only reinforces our belief that the consultation
process has been biased and lacking in transparency.  It is evident from this process
that the council are continuing to simply pay lip service to residents rather than
enacting the promises made in light of the 'Bowles' report to actively listen to the
community to repair trust and confidence.  
It is our contention that the Education Department and Renfrewshire Council have
failed to learn from past mistakes, as evidenced by the disregard for community input
and the continued neglect of the needs of Bishopton residents.   By proceeding with the
current proposed site at E1 coupled with failing to develop proposals for a secondary
school to serve the Bishopton area shows the complete disdain that the local

Page 256

Appendix I
Bishopton Community Council – Excerpt of Minute of meeting 6.3.24
Primary School Consultation Louisa stated that there had been a leaflet drop throughout the
area although this was late in some areas. She urged people to do the online survey, or to
contact them directly. Further copies of the consultation documents would be sent to David
for distribution. Gerry stated the consultation was for the second primary school for
Dargavel, he would take any questions, and if unable to answer he would get back to David.
He said he, and RC were now trying to rectify the lack of communication and trust between
the residents and RC. A list of questions had been submitted to Gerry prior to the meeting,
many of which were of concerns about the state Bishopton Primary School, - it needs
repairs, it is over 60 years old, the grounds were a disgrace and what was the “end of life”
plan for BPS. Gerry replied that there was limited funding for the existing school’s estate ,
and while BPS was “a wind and water tight structure, and was a welcoming environment for
education”, he was well aware of the impact Dargavel had had on the school. Sam
Marshalsay felt that the impact on BPS was being downplayed. In the rush to re-configure
the school for the increase in pupils from Dargavel, much of the school’s resources were
disposed of due to lack of storage as all space was required for teaching. Sam stated RC
does not seem to realize the scale of investment needed in the buildings and playground.
Gerry said he would speak with the Head Teacher to get a better understanding, but that the
Parent Council MUST be involved. He stated there were 62 educational facilities in
Renfrewshire, all requiring maintenance. BPS was classed as “B” on a condition survey and
would be maintained “fit for purpose”. 
In a letter to Gerry the point was made that the outdoor learning area was in effect useless
as it was continuously vandalized (despite CCTV), a plea that security of the site was more
important than fence painting! It was also noted that some windows in the school do not
open, and it gets very stuffy in warm weather! Also that the library roof had leaked for 9
years! It was stated that BPS “must not be left behind”, but also that Dargavel PS must not
be left behind either! Gerry said he would try to find ways of funding improvements, e.g.
fence painting. but was mindful of the need to “triage” requirements for the whole schools
estate. The Learning Estate is looked at Annually! BPS was highly rated by HMI. 
The vandalism was regarded as a symptom of there being little or nothing for teenagers to
do. There was no transport to Erskine, where PMHS offered some activity. Gerry stated he
was happy to back a bigger discussion on activities for teenagers. Alan Brown referred back
to the original S75 which had included community facilities, but RC and BAE had removed
them. He urged that no more houses should be built until all current problems are resolved.
David Love (Planning) said that since planning approval had been granted, it would not be
possible to do that! Ms Ure accepted the appalling situation and apologised for it and stated
that BPS would NOT be ignored. This lack of facilities led on to a discussion around the
possibility of a secondary campus in the Bishopton/Dargavel area, and the capacity of
PMHS in the future. A lively discussion around the pupil numbers ensued, with Alan Brown
taking to the whiteboard to explain his calculations :- BPS capacity 519, DPS design
capacity 430, new Primary School design capacity 800. Total pupils in Darg/Bish 1750. This
is equivalent to approx 250 pupils per year. For the 6 years of secondary this could be 1500
pupils at PMHS from the Bishopton Dargavel area alone. With the Council capping PMHS at
2000 pupils this leaves only 500 places for all pupils from Erskine, Inchinnan and Langbank
which does not seem reasonable. Mr Lyons stood by the projected pupil numbers supplied
by Edge Analytics (consultants engaged by RC), stating there were NO scenarios from Edge
Analytics showing more than 2159, which included 160 llacing requests (which would be

Page 257

Appendix J
Responses to the consulta�on survey can be found here
htps://www.renfrewshire.gov.uk/ Dargavel-school-consulta�on –
this data only includes those respondents who provided permission
to publish their comments.

Page 258

ANALYSIS OF
RESPONSES TO
THE DARGAVEL
SCHOOL
CONSULTATION
Peter McColl
PETER MCCOLL LIMITED | SOCIAL RESEARCH
Appendix K

Page 259

1
Table of Contents
EXECUTIVE SUMMARY ................................................................................................................................. 2
DISCUSSION OF FINDINGS .......................................................................................................................... 2
METHODOLOGY ........................................................................................................................................... 4
ANALYSIS OF RESPONSES ............................................................................................................................ 6
QUESTION 4: PLEASE CONFIRM YOU HAVE READ THE STATUTORY CONSULTATION DOCUMENT (FULL DOCUMENT) ... 6
QUESTION 5: WHICH OF THE FOLLOWING BEST DESCRIBES YOUR INTEREST IN THIS CONSULTATION? ........................ 6
QUESTION 6: PLEASE INDICATE WHETHER YOU ARE HAPPY FOR YOUR COMMENTS TO BE MADE PUBLIC? ................. 6
QUESTION 7: TO WHAT EXTENT DO YOU AGREE A NEW PRIMARY SCHOOL SHOULD BE BUILT IN DARGAVEL VILLAGE?
........................................................................................................................................................................... 6
QUESTION 8: CAN YOU TELL US THE REASON FOR YOUR ANSWER [TO QUESTION 7]? ............................................. 7
QUESTION 9: TO WHAT EXTENT DO YOU AGREE THE SCHOOL SHOULD BE BUILT ON THE PROPOSED 8.5-ACRE SITE AT
THE NORTH END OF CRAIGTON DRIVE? .............................................................................................................. 13
QUESTION 10: CAN YOU TELL US THE REASON FOR YOUR ANSWER [TO QUESTION 9]? ........................................ 14
QUESTION 11: IF YOU DON’T BELIEVE THE NEW SCHOOL SHOULD BE BUILT ON THE PROPOSED SITE, WHAT IS YOUR
SUGGESTED ALTERNATIVE AND WHY?.................................................................................................................. 24
QUESTION 12: TO WHAT EXTENT DO YOU AGREE WITH THE PROPOSED CATCHMENT AREA FOR THE EXISTING
DARGAVEL PRIMARY SCHOOL AND THE NEW SCHOOL? ..................................................................................... 25
QUESTION 13: CAN YOU TELL US THE REASON FOR YOUR ANSWER [TO QUESTION 12]? ...................................... 26
QUESTION 14 IF YOU HAVE ANY OTHER SUGGESTIONS, IDEAS, ISSUES OR CONCERNS ABOUT THE PROPOSED
SCHOOL, ITS LOCATION AND/OR CATCHMENT PLEASE DETAIL THOSE HERE ........................................................... 27
EMAIL SUBMISSIONS .................................................................................................................................. 30
CROSS ANALYSIS ....................................................................................................................................... 32
CONCLUSION ............................................................................................................................................. 36
ANNEX: CODEFRAME ................................................................................................................................ 37

Page 260

2
Executive summary 
The consultation questionnaire enjoyed a broad response with 818 responses
and found that there was overwhelming support for a new school. The
proposed site split respondents almost evenly, with only 8 more opposing the
chosen site than those who support it (331 to 323) and 161 respondents who
did not express a preference. The most mentioned topics in textual responses
included an urgent need for a new school and the need to ensure that
amenity and traffic issues with a new school are addressed. Some concerns
raised through the consultation relate to issues that are outwith the scope
consultation, such as high school provision, and concerns remain about the
council’s planning and decision making in relation to the Dargavel
development. 
Discussion of findings 
There were a total of 818 survey responses analysed. The council initially
received 847 online survey responses, but after removing duplication this
reduced to 817, plus one written survey. Additionally, there were 15 responses
by email or paper form to the consultation that did not fill out the survey.
These were from 13 people: one had also responded to the survey and
wished to make additional comment. 
Not all questionnaire respondents answered all questions, and many asked
for their comments not to be made public. This analysis considers both the
content and sentiment of all comments without citing any responses directly
from respondents who did not wish their comments to be made public. The
comments expressed by respondents fall into several categories. 
There is overwhelming support for a new school. 618 of those who responded
‘strongly support’ a new school (75.6% of all respondents). Another 96 (11.8%)
‘support’ it. This combined total in favour of a new school is 87.1%. The
combined total of those who ‘oppose’ a new school is 77 (9.4%).   
Responses on the proposed site are much more evenly split. Those who
disagree or strongly disagree with the proposed site very marginally exceed
the number agreeing or strongly agreeing with the proposed site and a
significant number did not express a preference. In raw numbers this is 331
against the proposed site (40.6%) to 323 for the proposed site (39.6%) - a
difference of just 1%, and 161 who identified themselves as ‘neither agreeing
nor disagreeing with the proposed site’ (19.8%). 
A qualitative analysis of the textual comments revealed the most consistent
comments raised about the decision to build a new primary school and on
the siting of the new primary school fall into the following categories:

Page 261

3  
1. The need for a new school to be built as soon as possible to meet rising
demand – which is by some distance the most frequently expressed
opinion;
2. Traffic at the new school and the existing Dargavel Primary School;
3. The proximity of the new school to the existing school;
4. The community should have access to the school for community use;
5. Some wished for the current primary school to be extended, rather
than a new school being built;
6. Having two primary schools will result in division in the community. 
Over a third of respondents referred to high school provision, including
comments that the Dargavel and Bishopton community should have their
own new high school or a joint high school and primary school site. Whilst not
part of the consultation – the council has previously decided high school
provision, those sentiments are presented for transparency. 
Some comments made by respondents, relating to the council’s planning
and decision making processes and the approach to consultation, are also
outwith the scope of this consultation but merit careful consideration by
Renfrewshire Council as it progresses its review of its consultation and
engagement practices.   
On the terms of the consultation, the proposal to build the school enjoys
strong support, and the site also enjoys strong support in its potential for a
stand-alone primary school. 
Of the 331 respondents who disagree or strongly disagree with the proposed
site, when specifically asked in question 10, around 223 (67%) cite concerns
about traffic, congestion, parking, other road infrastructure and associated
issues with safety of children as their main reason for disagreement. They
express concern that questions about mitigation of these issues have not yet
been adequately addressed. They say that the proposed site is too close to
the current school. 
The next group of objections from this group - about 36 respondents, focus on
the lack of a high school or shared campus provision for 3-18 year education
Some of those agreeing with the proposed site or not expressing a
preference, would also ‘support’ a shared campus with primary and
secondary provision.   
Others are concerned that provision of other facilities (including community
and sporting amenities) have not been adequately considered (1%). 
About 5% of those who object to the proposed site want the new school to
be either co-located with the current primary school or be very close to it

Page 262

4
(including the possibility of rebuilding the current school). They cite reasons of
convenience if they have to drop off/collect children from different schools. 
4.7% of all those who commented (39) discuss a perceived lack of strategic
planning or foresight by the Council, including the failure to address
demographic change, rushing the decision, or making the decision based on
financial rather than community or educational reasons. Smaller groups of
objectors include residents who express concern about the loss of a Central
Park, noise and light pollution, or needing the site for housing instead. 
Those who responded in support of the proposed site all agree with a single
proposal. Those who disagree have expressed a number of different
approaches, none of which have been developed, tested and analysed in
the same detail as the proposed site has been. 
Analysis of the textual responses does not produce a clear alternative to the
proposed site. 
Methodology 
The responses were grouped by strength of response (strongly agree through
to strongly disagree), the nature of the responses was then analysed using a
codeframe which drew out the key textual themes in each set of responses.
The code frame is provided in the annex. 
Having ascertained the key themes and applied a codeframe, it was
possible to make observations about the qualitative data, which are
reflected in the comments above. 
Responses on the Likert scale (Strongly agree through to Strongly disagree)
were used to perform basic quantitative analyses that are presented below. 
This quantitative analysis then informed a qualitative analysis so that the
reasons for respondents position could be understood. This took the form of
sentiment analysis and helped to clarify what issues were being expressed
together, and why particular positions were taken. This analysis helps to
understand both the arguments that are most frequently used and the
arguments that, while only infrequently mentioned might be significant. 
The qualitative analysis was then used to create a quantitative frame for
analysis drawing on the most frequently mentioned arguments. This gives an
idea of the breadth of feeling about particular issues. This analysis was done
on the textual responses to the question which divided opinion most –

Page 263

5
“Can you tell us the reasons for your answer to the question: To what extent
do you agree the school should be built on the proposed 8.5-acre site at the
north end of Craigton Drive?” 
The responses provided by email were, except for one, not compatible with
the questionnaire analysis. These have been analysed separately. The one
that was included was a printed out and handwritten response to the
questionnaire. Likert scale responses were added to the questionnaire, and
the text analysed with the emails. 
Please note that percentages throughout the report are rounded to the
nearest whole number.

Page 264

6
Analysis of responses 
There were a total of 818 responses to the questionnaire. The substantive
questions were as follows (one question asked for postcode). 
Questions 1-3 asked for respondents name, address and postcode and there
is no analysis recorded. 
Question 4: Please confirm you have read the statutory
consultation document (full document)  
818 respondents answered this question.
75 respondents (9.2%) said they had not read the document. The other 743
(90.8%) said they had. 
Question 5: Which of the following best describes your interest in
this consultation? 
584 Resident Parent/Carer
167 Resident of Renfrewshire
45 Pupil of affected school
42 Other 
The categorisation above is used to protect respondent identity. 
Question 6: Please indicate whether you are happy for your
comments to be made public? 
816 respondents answered this question. 
380 respondents (46%) asked for their comments not to be shared. 2
respondents did not answer this question. The other 436 (53%) responded that
they were content for their comments to be made public. Comments from
those who did not answer the question and from those who did not wish their
comments to be made public have had their comments included in the
analysis but will not be directly cited. 
Question 7: To what extent do you agree a new primary school
should be built in Dargavel Village? 
816 respondents answered the question
Respondents to this question were offered a Likert scale as follows:
Strongly Agree – Agree – Neither Agree nor Disagree – Disagree – Strongly
Disagree
Their responses are presented in the chart below:

Page 265

7 
• Strongly Agree: A significant majority – 618 (76%) of respondents,
strongly agree with the proposition of building a new primary school. 
• Agree: 96 (12%) of respondents agree with the proposal.
• Neither Agree nor Disagree: 25 (3%) of respondents have a neutral
stance on the issue.
• Disagree: 28 (3%) of respondents disagree with the proposal
• Strongly Disagree: 49 (6%) of respondents are strongly against the
proposal, indicating a notable segment of respondents with strong
reservations or opposition. 
Question 8: Can you tell us the reason for your answer [to question
7]? 
759 respondents answered this question. 
Responses have been analysed by the extent to which the respondent
agreed with the statement on the Likert scale. The analysis below provides an
overview of all the responses made. Some respondents raised multiple issues
within their response. 
Those who strongly agree 
Population Growth and School Capacity: 
Code: INSUF_CAPACITY
Strongly agree 76%
Agree, 12%
Neither, 3%
Disagree3%
Strongly disagree 6%
To what extent do you agree a new
primary school should be built in Dargavel
Village?
Strongly agree Agree Neither Disagree Strongly disagree

Page 266

8 
• The rapid population growth in Dargavel necessitates the urgent
construction of a new primary school.
• Existing schools, notably Dargavel Primary and Bishopton Primary, are
struggling to accommodate increasing student numbers, leading to
overcrowding and compromised learning environments.
• Families moving to the area were promised adequate schooling
facilities, but the current situation falls short of expectations, with
classrooms at capacity and makeshift solutions in place. 
Long-Term Planning and Future Needs: 
Code: PLANNING_ISSUES 
• While addressing the immediate need for a new primary school is
crucial, there are calls for long-term planning to accommodate future
educational requirements.
• Suggestions include considering the need for a secondary school and
ensuring that new school infrastructure is designed with future growth in
mind. 
Community Impact and Quality of Life: 
Code: COMMUNITY_NEEDS 
• Beyond educational concerns, there are broader impacts on the
community, including disruptions to family life, property values, and
community cohesion.
• Families moving to Dargavel were promised local schooling options,
but the current situation may require children to be bused to schools in
neighbouring towns, affecting quality of life and community
integration. 
Urgency and Immediate Action: 
Code: OVERCROWDING 
• The need for immediate action is emphasized to address the shortfall in
school places and alleviate strain on existing resources.
• Delaying the construction of a new school will only exacerbate the
problem and prolong the compromised learning environment for
students. 
Indifference and Lack of Expertise: 
Code: GOV_QUEST

Page 267

9
• Some respondents express indifference to the specific location of the
school as long as it meets basic requirements.
• Other respondents acknowledge a personal lack of expertise in urban
planning, but there's recognition of the broader community’s need for
action. 
Planning Failures and Council Oversight: 
Code: GOV_QUEST
• There are a number of comments expressing dissatisfaction with
Renfrewshire Council's planning and management, most significantly
the failure to anticipate the demand for school places and provide
adequate infrastructure.
• Concerns are raised about the lack of foresight in building a school
that quickly reached capacity, highlighting deficiencies in planning
and coordination. 
Traffic Management and Safety: 
Code: TRAFFIC_INFRA 
• Concerns about traffic congestion, safety issues, and inadequate road
infrastructure around proposed school sites are raised.
• Proximity to existing schools exacerbates traffic congestion and safety
risks, necessitating careful consideration of site selection. 
Parental Concerns and Preferences: 
Code: RESIDENTIAL_IMPACT 
• Concerns about noise levels, safety, and ease of access for children
attending schools in close proximity.
• Preferences include a larger campus with adequate facilities, including
space for outdoor activities and parking. 
Those who agree 
Those who indicated they ‘agreed’ with the proposal to build a new school
gave the following reasons: 
Solutions and Suggestions: 
Code: COMBINED_SCHOOL

Page 268

10
• Respondents propose solutions for future planning, advocating for
facilities that include both primary and secondary schools. Urgency is
emphasized in addressing the issue, given the ongoing population
growth and the failures of the council's initial planning efforts. 
Community Impact and Concerns:  
Code: TRAFFIC_INFRA 
• Concerns expressed about the impact on the community, particularly
regarding traffic and infrastructure. Respondents emphasize the need
for proper planning to address these issues and ensure that new school
facilities meet the community's needs. 
Need for Additional School Facilities: 
Code: INSUF_CAPACITY 
• Respondents highlight capacity underestimation and planning failures
by the council, stressing the urgent need for new schools to
accommodate population growth. The inadequacy of current school
provision and its impact on children's education are major concerns,
with calls for comprehensive solutions to address the issue. 
Criticism of Council's Handling and Planning Errors: 
Code: GOV_QUEST 
• Criticisms are directed towards the council's errors in handling the
development, leading to overcrowding of existing schools.
Disappointment with planning decisions is expressed, with residents
questioning the lack of foresight in not building larger schools initially. 
Those who neither agree nor disagree 
Those who indicated “neither agree nor disagree” thought the following: 
Planning and Governance 
Code: RESIDENTIAL_IMPACT
Code: COMMUNITY_NEEDS 
• Criticism that the council did not adequately plan for the school's
capacity needs, suggesting that Dargavel should have been built
larger or extended.
• There is a demand for a broader approach to addressing both short-
term primary school capacity and long-term secondary school needs.

Page 269

11
• Some respondents believe the village is already large enough and that
further housing development may not warrant the need for a new
school. 
Location and Community Impact 
Code: RESIDENTIAL_IMPACT 
• Respondents suggest exploring other sites within the Bishopton area for
the school, not just limiting to Dargavel.
• There's dissatisfaction with the council's handling, with concerns about
the village's expansion and its impact on the need for more schools.
• Some respondents feel unaffected by the proposal due to not having
children attending the local schools. 
School Size and Scope 
Code: EDUCATION_QUALITY 
• There is a desire for a larger combined primary and secondary school
to cater to future growth.
• Some argue that a high school would be a better addition considering
future capacity needs.
• Suggestions are made for a larger school that includes nursery, primary,
and secondary levels to address long-term needs. 
Traffic and Infrastructure Concerns 
Code: TRAFFIC_INFRA 
• Concern about increased traffic due to the addition of more houses
and a new school, particularly noting the strain on current roads.
• There's a call for the school to be built in an area that can
accommodate its needs without negatively impacting the village.
• Ideally, existing infrastructure such as roads and the primary school
would be improved rather than building entirely new facilities. 
Those who disagree
Those who indicated they ‘disagree’ with the proposal to build a new school
thought the following: 
Campus and Facility Expansion:

Page 270

12 
Code: OVERCROWDING 
• There's a preference among respondents for the development of joint
primary-secondary campuses to alleviate stress on existing schools.
Suggestions for extending existing schools are made, with concerns
raised about the conditions of some current school facilities. 
School Location and Infrastructure: 
Code: NEW_SCHOOL_LOCATION 
• Respondents express concerns about the suitability of the proposed
school location, emphasizing the need to consider the entire
community's needs. Traffic congestion and existing infrastructure
inadequacies are highlighted as significant issues. 
Secondary School Provision: 
Code: COMBINED_SCHOOL 
• Respondents emphasize the need for secondary school provision to
cater to the growing population. Suggestions include investing in
existing schools or building new high schools to meet the demands of
both Dargavel and Bishopton. 
Accountability and Oversight: 
Code: GOV_QUEST 
• Criticisms are directed towards previous planning decisions and
management, with residents feeling misled about the development's
amenities and infrastructure. Calls for better oversight and
accountability in future planning processes are made to ensure
community needs are met effectively. 
Community Impact and Division: 
Code: RESIDENTIAL_IMPACT 
• Concerns are voiced about potential community division and
disruption caused by the proximity of multiple schools. Respondents
express worries about the impact on residential areas and the quality
of education in hastily constructed facilities.

Page 271

13 
Those who strongly disagree 
Those who strongly disagreed expressed the following views: 
Concerns about Traffic and Infrastructure: 
Code: TRAFFIC_INFRA 
• Concerns are raised regarding potential traffic congestion, safety risks,
and existing infrastructure inadequacies, exacerbated by the
proposed construction of additional schools. 
Desire for Comprehensive Education Facilities: 
Code: COMBINED_SCHOOL 
• Respondents advocate for the construction of a larger super-school or
campus that includes nursery, primary, and secondary education to
meet both current and future educational needs. 
Call for Long-term Planning: 
Code: PLANNING_ISSUES 
• Respondents emphasize the importance of long-term planning to
address both primary and secondary education needs, alongside
broader community priorities and future population growth. 
Criticism of Past Planning Decisions: 
Code: GOV_QUEST 
• There is widespread criticism of past planning decisions, particularly
regarding the failure to anticipate the need for sufficient school
capacity. 
Question 9: To what extent do you agree the school should be
built on the proposed 8.5-acre site at the north end of Craigton
Drive? 
815 respondents completed this question. 
172 (21%) respondents strongly agree with the site proposed for the primary
school, 151 (19%) agree, 161 (20%) indicate they neither agree nor disagree,
127 (16%) respondents disagree with the site, with a further 204 (25%) who
strongly disagree. (>1%) 3 respondents left this box blank.

Page 272

14 
Chart 1: shows the support for the new school on the proposed site: 
Chart 2: shows the same data, but with the strongly agree and agree figures
grouped, and the disagree and strongly disagree figures also grouped: 
Question 10: Can you tell us the reason for your answer [to
Question 9]? 
702 respondents completed this question.
This was the section where there was most divergence of opinion, reflecting
the answer to the previous question. 
172
151
164
127
204
Support for School on Proposed Craigton Drive
Site
Strongly Agree Agree Neither Disagree Strongly Disagree
323
331
164
Combined Agree/Strongly Agree and
Disagree/Strongly Disagree with Neither
Agree & Strongly Disagree Neither Agree nor Disagree Disagree & Stongly Disagree

Page 273

15 
The qualitative analysis showed that there were a number of key issues. We
used this analysis to quantify the number of respondents across the Likert
scale. 
Many responses covered more than one of these issues. For this reason we
have drawn out the 4 key issues and analysed the number of responses that
covered each of them. It is worth noting that, because one response may
mention both the traffic issue and the desire for a new high school the
number of times each issue is cited is greater than the total number of
responses received. For methodological reasons it is worth considering these
responses in each relevant category. So, for instance a response that reads
“we need to build a new school as soon as possible, but the traffic concerns
for the proposed site need to be considered” counts as both ‘new school’
and ‘traffic’. Where someone has left the text fields blank their response is
covered by the count on the Strongly Agree-Strongly Disagree scale, but not
in this analysis. Where comment fall outwith the terms being sought here, the
response is not counted. 
Other issues that were raised in the textual fields are considered through a
qualitative analysis. 
Given the split on the question of whether the proposed site was appropriate,
this analysis is undertaken on the response to that question. 
The categories below cluster responses around the following arguments: 
New school: those who believe any or all of the following – a new school
should be built as soon as possible on the site recommended. 
High school: those who believe any or all of the following – that there should
be secondary provision, a joint campus, provision for young people from the
ages of 3-17 or 18. 
Traffic: those who believe any or all of the following – that the site will have a
notable impact on traffic, that this needs to be managed, that there are
safety concerns, that access needs to be considered, that there will be an
impact on parking. 
Facilities: those who believe any or all of the following – that the facilities
proposed for the site have a significant impact on the appropriateness of the
site. 
Governance: those who believe any or all of the following – that previous
mistakes are significant in their view of the current decision, that there are

Page 274

16
questions about the competence of Renfrewshire Council to make decisions;
or that they regretted past mistakes by the Council. 
Strongly
Agree
Agree Neither Disagree Strongly
Disagree
Total
New school 122 71 25 2 0 220
High School 4 6 11 16 20 57
Traffic 19 14 27 66 157 283
Facilities 0 0 3 0 4 7
Governance 2 4 8 6 19 39
Total: 147 95 74 90 198 
Those who strongly agree 
Community Consensus on Location: 
Code: NEW_SCHOOL_LOCATION 
• Respondents who strongly agreed advocate for a central location
within Dargavel, highlighting the site's proximity to existing infrastructure,
safety for children, and minimal disruption to green spaces. The
consensus favours a site council-owned and already earmarked for
development. 
Urgent Need for a New Primary School: 
Code: INSUF_CAPACITY 
• There is a pressing need for a new primary school in the town to
accommodate the growing population and sustain future families.
Suggestions point towards locating it at either end of Dargavel,
emphasizing the importance of accessibility and minimizing
congestion. 
Practical Considerations and Timeliness: 
Code: TRAFFIC_INFRA 
• Concerns about traffic congestion and safety lead to a preference for
two separate schools, to evenly distribute foot traffic and minimize
disruption. The urgency to begin construction to meet demand by 2027
is emphasised, with little appetite for prolonged debate on alternative
sites. 
Community Integration and Accessibility:

Page 275

17
CODE: NEW_SCHOOL_LOCATION 
• Respondents stress the importance of community integration and
accessibility, advocating for schools within walking distance for most
families and offering amenities beyond educational facilities. The
proposed site is seen as suitable for these objectives. 
Support for Current Proposal: 
CODE: NEW_SCHOOL_LOCATION
CODE: INSUF_CAPACITY 
• The current proposal for the new school site garners widespread
support, with residents citing factors such as proximity to existing
schools, accessibility, and ease of transport for catchment areas.
Emphasis is placed on the need to act swiftly and efficiently to address
the shortage of primary school places. 
Opposition to Alternative Sites: 
CODE: NEW_SCHOOL_LOCATION 
• Opposition is expressed towards alternative sites, particularly those
encroaching on green spaces or located outside Dargavel, citing
concerns about accessibility and community cohesion. Suggestions
favour sites within the development itself. 
Those who agree 
Those who agree expressed the following positions, 
Mixed Opinions and Uncertainty: 
CODE: NEW_SCHOOL_LOCATION
CODE: INSUF_CAPACITY 
• Some express strong preferences or concerns, while others lack
information or feel indifferent.
• Lack of alternative options and urgency to address school capacity
shortage emphasized. 
Desired School Features: 
Code: COMBINED_SCHOOL 
• Suggestions for accommodating future population growth.

Page 276

18
• Advocacy for a shared campus model integrating primary and
secondary education.
• Concerns about space, facilities, nursery provisions, and high school
requirements. 
Community Impact: 
CODE: NEW_SCHOOL_LOCATION
CODE: INSUF_CAPACITY 
• Respondents express worries about noise, traffic, and child safety.
• There is a strong desire for quick construction to address educational
needs. 
Site Selection Considerations: 
CODE: TRAFFIC_INFRA 
• Respondents prioritize population density, road network, and
accessibility.
• Some suggest relying on professional guidance for decision-making.
• Due diligence and consultation with roads managers deemed
necessary. 
CODE: TRAFFIC_INFRA 
• Concerns raised about potential traffic congestion, especially on busy
main roads.
• Proper planning for road infrastructure, parking, and pedestrian
pathways essential. 
Those who neither agree nor disagree 
Traffic and Infrastructure Concerns: 
CODE: TRAFFIC_INFRA 
• Respondents express concerns about potential traffic congestion,
especially given the already busy main road in the area.
• Proper planning for road infrastructure, parking facilities, and
pedestrian pathways is highlighted as crucial to mitigate traffic issues
and ensure safe access to the school.

Page 277

19 
Community Impact: 
Code: COMMUNITY_NEEDS 
• Some respondents express worries about the impact of the new
school's location on the community, including noise levels, traffic
congestion, and safety for children.
• There's a desire for the school to be built quickly to address the pressing
need for additional educational facilities in the area. 
Mixed Opinions and Uncertainty: 
Code: COMMUNITY_NEEDS
Code: INSUF_CAPACITY 
• While some respondents note strong preferences or concerns about
the proposed site, others admit to not having enough information or
feeling indifferent about the location.
• The lack of alternative options and the urgency of addressing the
shortage of school capacity in the area are recurring themes in the
responses. 
Desired Features of the School: 
CODE: COMBINED_SCHOOL
• Suggestions are made for the school to accommodate future
population growth, with some advocating for a shared campus model
that includes both primary and secondary education facilities.
• Concerns are raised about the adequacy of space and facilities,
particularly regarding nursery provisions and high school requirements. 
Considerations for Site Selection: 
CODE: NEW_SCHOOL_LOCATION 
• Respondents emphasise that the most important factors are population
density, road network, and access when selecting a site for a new
school.
• Some respondents suggested that decisions should be guided by
professionals and experience rather than relying solely on input from
residents who may lack relevant expertise.
• Due diligence, including consultation with relevant experts, is thought
necessary to ensure the chosen location is suitable in terms of size and
accessibility.

Page 278

20
Those who disagree 
Those who disagreed expressed the following concerns. It is worth noting that
many of them are contradictory, with some disagreement coming from the
proximity to the existing school and some from the lack of proximity to the
current school. The strongest concern was about traffic. 
Location Concerns: 
Code: NEW_SCHOOL_LOCATION
Code: TRAFFIC_INFRA 
• Concerns are expressed about the proposed site's proximity to the
existing Dargavel Primary School, highlighting potential traffic issues
and safety concerns. Some want the existing school to be extended,
rather than a new school built. 
• Respondents worry about increased traffic congestion, particularly
during school drop-off and pick-up times, citing existing traffic problems
in the area.
• Concerns are raised about the ability of local roads to handle the
increased volume of traffic, with some suggesting that the roads are
already too narrow.
• Respondents living near the proposed site express concerns about
potential noise and disruption caused by the new school.
• Some respondents believe that the proposed site lacks suitable access
and road infrastructure to accommodate the new school.
• Respondents suggest that there are better alternative sites available for
the new school, which would address traffic and safety concerns more
effectively.
• Need for a joint nursery, primary and high school: Respondents
advocate for a more comprehensive approach to planning, including
consideration of nursery, primary, and secondary school facilities on
larger campuses.
• Concerns are raised about the potential impact of the new school on
property values in the surrounding area.
• Some express disappointment that the proposed school site
encroaches on green space originally designated as a nature park.
• Concerns are raised about the need for remediation of the proposed
site before construction can begin, potentially leading to delays in the
project timeline. 
Traffic Management and Safety: 
Code: TRAFFIC_INFRA 
• Respondents express concerns about the safety of children due to
increased traffic and congestion around the proposed school site.

Page 279

21
• There is a lack of a comprehensive traffic management plan to
address the anticipated increase in traffic volume.
• Concerns are raised about the safety of pedestrians, particularly
children walking to and from school, given the expected increase in
traffic.
• Respondents want to divert traffic away from residential areas and
create dedicated routes for school traffic to minimize disruption. 
Council Planning and Consultation: 
Code: GOV_QUEST
• Some respondents feel that there has been insufficient consultation
and consideration of alternative options for the new school site.
• Criticisms are directed towards the council's decision-making process,
with some suggesting that cost-saving measures have outweighed
community benefits.
• Concerns are raised about the prioritisation of the project timeline over
comprehensive planning and consultation, particularly regarding the
needs of families in the community.
• Some feel that the proposal has been rushed without adequate
consideration of alternative sites and their implications. 
Infrastructure and Access: 
Code: TRAFFIC_INFRA 
• Some respondents advocate for improvements to local infrastructure,
including road widening and pavement construction, to
accommodate increased traffic and ensure pedestrian safety.
• Suggestions are made to ensure that the new school facilities are
accessible by foot or bicycle and incorporate energy-efficient design
principles.
• Concerns are raised about the impact of increased traffic on local
roads and the ability of existing infrastructure to handle the additional
load.
• Criticisms are directed towards the limited access points to the
proposed site, which may exacerbate traffic congestion and safety
concerns. 
Long-Term Planning: 
Code: COMBINED_SCHOOL 
• Advocacy for a long-term approach to educational planning to future-
proof against population growth and changing community needs.

Page 280

22
• Suggestions for long-term school planning that considers nursery,
primary, and secondary school facilities on larger campuses to
streamline access and resources.
• Calls for the prioritization of community needs over short-term cost-
saving measures in educational planning decisions. 
Educational Planning: 
Code: COMBINED_SCHOOL 
• Respondents want secondary school facilities in addition to primary
school facilities to address future educational needs.
• Suggestions are made to incorporate community facilities such as
sports facilities and meeting spaces into the school campus to benefit
the wider community.
• Some argue for a more forward-thinking approach to educational
planning to accommodate future population growth and prevent
overcrowding in existing schools. 
Community Impact: 
Code: COMMUNITY_NEEDS 
• Concerns are raised about the potential division within the community
caused by the new school, particularly if children from the same family
are attending different schools.
• Some express concerns about the potential devaluation of properties
in the surrounding area due to the presence of the new school and
associated traffic congestion.
• Respondents living near the proposed site worry about the disruption to
their daily routines and quality of life caused by increased traffic and
noise.
• Suggestions are made to incorporate community facilities into the new
school campus to benefit residents beyond the school community. 
Environmental Impact: 
Code: COMMUNITY_NEEDS 
• Disappointment is expressed over the loss of green space originally
designated for a nature park, which some feel should have been
preserved.

Page 281

23
• Concerns are raised about the challenges and potential delays
associated with remediating the proposed site before construction can
begin.
• Concerns are expressed about the impact of construction and
increased human activity on local wildlife habitats and biodiversity. 
Those who strongly disagree 
Those who strongly disagreed with the site proposed gave the following
reasons. By far the most common concerns are those relating to traffic. 
Traffic Management and Infrastructure: 
Code: TRAFFIC_INFRA 
• Addressing traffic management concerns, proposals include splitting
traffic flow and enhancing infrastructure such as wider roads and
additional entry/exit points to ease congestion in the village. 
Location Preference and Justification: 
Code: COMBINED_SCHOOL 
• Those who strongly disagreed with the siting prefer Site 22 or 23 for a 3-
18 campus, aiming to address the educational needs adequately.
Concerns are expressed regarding traffic congestion and property
values necessitating consideration of alternative locations, some
suggesting sites further away from existing schools to manage traffic
and integrate the community effectively. 
Critiques of Current Consultation Process: 
Code: GOV_QUEST 
• There was criticism of the consultation process, which does not include
high school provision. 
Other Suggestions: 
Code: COMMUNITY_NEEDS
Code: NEW_SCHOOL_LOCATION
Code: TRAFFIC_INFRA

Page 282

24 
• Various site proposals are made, considering factors such as
community-driven decision-making, safety, and minimizing disruption.
Some respondents favoured a Park Mains High School extension and
preference for extending Dargavel Primary also feature, emphasizing
long-term educational planning and community integration. 
Community Integration and Facility Accessibility: 
Code: COMMUNITY_NEEDS 
• Suggestions involve creating shared campus facilities and ensuring
accessibility for residents, emphasizing the importance of nearby
amenities and sufficient parking facilities for staff, visitors, and parents. 
Environmental and Future Planning: 
Code: GOV_QUEST 
• Recommendations include utilizing greenfield and brownfield sites,
emphasizing long-term planning to accommodate potential
secondary school expansion and evolving community demographics,
while avoiding hasty decisions driven solely by cost. 
Cost Considerations and Planning Transparency: 
Code: GOV_QUEST 
• Concerns about cost-effectiveness prompt calls for transparent
planning processes and independent evaluation of sites, advocating
for informed decision-making and consideration of alternatives like
expanding existing schools. 
Question 11: If you don’t believe the new school should be built on
the proposed site, what is your suggested alternative and why? 
422 respondents answered this question. Of these 35 responded with ‘N/A’.
12.7% of respondents specifically suggested an alternative site. Those who
responded raise the following issues: 
General Concerns and suggestions 
• Community members express the need for a holistic approach to
school planning, emphasizing the necessity of considering both primary
and secondary education facilities.

Page 283

25
• There are concerns regarding the adequacy of community
engagement and transparency in the consultation processes.
Suggestions include improving communication and ensuring more
inclusive participation.
• The potential traffic congestion and infrastructure inadequacy due to
the new school constructions are frequently highlighted. 
Primary School Concerns 
• Residents are worried about the capacity of the proposed new primary
school and its location, stressing that it might not be sufficient to handle
the growing population.
• There are apprehensions about the environmental impact, increased
traffic, and disruption to the community due to school construction. 
Secondary School Needs 
• Urgent need for a new secondary school to accommodate the
increasing number of children, with many calling for a community
campus that includes primary through secondary education.
• Concerns about overcrowding at Park Mains and other existing
schools, with fears that they won't be able to accommodate future
student populations effectively. 
Proposals for Community Campus 
• Responses advocate for a community campus approach, integrating
primary, secondary, and recreational facilities to serve both
educational needs and community use.
• Calls for long-term, forward-thinking planning that looks beyond
immediate needs to address future generations' requirements. 
Environmental and Safety Issues 
• Points are raised about the environmental impact of additional
constructions and the need for sustainable, eco-friendly building
practices.
• There are numerous mentions of safety concerns related to traffic and
the accessibility of schools, especially for young children and those with
special needs. 
Question 12: To what extent do you agree with the proposed
catchment area for the existing Dargavel Primary School and the
new school?

Page 284

26
811 respondents answered this question. 
44% (357) respondents strongly agree or agree with the proposed catchment
(99 strongly agreed and 258 agreed), 43.6% (354) did not express a
preference and neither agree or disagree, and 12% (100) respondents
disagree or strongly disagree (49 disagree and 51 strongly disagree). 
Question 13: Can you tell us the reason for your answer [to
Question 12]? 
452 respondents answered this question. Of those 15 responded with ‘N/A’, or
‘no’.
The responses demonstrated a desire for clarity and fairness. Many
respondents emphasized the importance of transparency and community
involvement in the decision-making process regarding catchment areas,
highlighting the need for clear communication and consideration of all
stakeholders' perspectives. 
There were some concerns about social cohesion, accessibility, and the long-
term effects of dividing the village into separate catchment areas indicating
a broader interest in community well-being beyond just logistical aspects. 
Positive Feedback: 
Code: COMMUNITY_NEEDS 
• Some respondents expressed contentment with the proposed
catchment areas due to their personal circumstances, such as having
children already attending one of the schools or foreseeing their
younger children attending the same school as their older siblings. 
Code: COMMUNITY_NEEDS 
• Many respondents found the proposed catchment areas to be logical
based on geographic considerations, housing density, and the overall
size of Dargavel. They believe the split makes sense for the community
and facilitates walking to school. 
Code: COMMUNITY_NEEDS 
• Several respondents indicated general satisfaction or acceptance with
the proposed catchment areas, even though they may not have
strong opinions on the matter.

Page 285

27
Neutral Feedback: 
Code: COMMUNITY_NEEDS 
• Some respondents stated that the catchment areas did not directly
affect them or their families, leading to a neutral stance on the issue. 
Code: COMMUNITY_NEEDS 
• Others expressed uncertainty or the need for more details before
forming a strong opinion. 
Code: COMMUNITY_NEEDS 
• A few respondents acknowledged their lack of involvement or
relevance to the catchment area decision due to factors such as not
living in Dargavel or not having children attending primary school. 
Negative Feedback: 
Code: COMMUNITY_NEEDS 
• Some respondents expressed concerns about the proposed division of
the village into separate catchment areas, fearing potential animosity,
rivalry, or social divides among residents and children attending
different schools. 
Code: COMMUNITY_NEEDS 
• Some respondents disagreed with the proposed catchment areas,
citing issues such as unfairness, inconvenience, or the need for
alternative solutions, including a single catchment area for the entire
village. 
Code: GOV_QUEST 
• A few respondents criticized the decision-making process, questioning
the rationale behind the proposed catchment areas, the timing of the
consultation, and the perceived lack of consideration for community
needs and preferences. 
Question 14 If you have any other suggestions, ideas, issues or
concerns about the proposed school, its location and/or
catchment please detail those here

Page 286

28
478 respondents answered this question.
This question provided an opportunity for respondents to air any other
concerns, suggestions and comments. Responses are analysed and
summarised below: 
Overall Lack of Trust in Renfrewshire Council: 
Code: GOV_QUEST 
• Distrust due to previous error and perceived lack of transparency and
accountability.
• Concerns about decisions being made without genuine community
consultation.
• Previous mistakes by the council have eroded trust. 
Primary School Provision: 
Code: NEW_SCHOOL_LOCATION 
• Need for a new primary school due to overcrowding and lack of
planning.
• Concerns about the proposed location and timing of the new school.
• Suggestions to split Bishopton Primary School's capacity more
effectively.
• Request for football pitches with floodlights for school and community
use. 
Secondary School Provision: 
Code: COMBINED_SCHOOL 
• Lack of secondary school provision in Bishopton/Dargavel area.
• Concerns about overcrowding and adequacy of Park Mains High
School.
• Calls for a new secondary school or expansion of Gryffe High School. 
Community Campus and Facilities: 
Code: COMMUNITY_NEEDS 
• Suggestions for a campus model including nursery, primary, and high
school.
• Need for safe access routes, adequate parking, and traffic
management around schools.
• Requests for more amenities and facilities for children in the area. 
Council Decision Making and Planning:

Page 287

29 
Code: GOV_QUEST 
• Criticisms of Renfrewshire Council's handling of education planning.
• Accusations of ignoring community input and pushing through
predetermined plans.
• Calls for dismissal of those responsible for past mistakes and proactive
planning for the future. 
Data and Consultation Process: 
Code: GOV_QUEST 
• Concerns about the accuracy and transparency of data used by the
council.
• Allegations of selective use of data to support predetermined
outcomes.
• Requests for comprehensive consultation including input from parent
councils. 
Traffic and Infrastructure: 
Code: TRAFFIC_INFRA 
• Worries about increased traffic congestion and parking issues.
• Calls for safe walking and cycling routes for children.
• Need for improved traffic management to ensure safety around
schools. 
Long-Term Planning and Future Needs: 
Code: COMMUNITY_NEEDS
Code: COMBINED_SCHOOL 
• Urgency for long-term solutions that anticipate future population
growth.
• There were a number of requests for Catholic school provision in
Dargavel
• Suggestions for holistic planning considering all age groups from nursery
to high school.
• Concerns about the impact of current decisions on future generations
and the community's viability.

Page 288

30
Quality of Education and School Environment: 
Code: EDUCATION_QUALITY 
• Concerns about the quality of education in overcrowded schools.
• Requests for appropriate learning environments, including classrooms
and facilities.
• Opposition to open-plan school designs and preference for traditional
classrooms. 
Email submissions 
Summary of Feedback 
There were 15 emailed submissions by email from 13 individuals which are
separate to the online questionnaire. One individual submitted 3 responses.
One individual had also completed the survey. 
These were analysed separately because it cannot be ascertained whether
the respondents also responded to the survey. Preferences have not been
added to the overall tallies, with the exception of respondent 2 who returned
the only paper survey. 
Initial Concerns and Transparency Issues 
Code: GOV_QUEST 
• Email respondent 1: Expresses appreciation for the council's efforts but
raises concerns about transparency and detailed planning,
highlighting potential biases in the proposal.
• Email respondent 2: Urges long-term planning, especially considering
population growth, and suggests a broader approach encompassing
community needs and future infrastructure.
• Email respondent 3: Expresses disappointment in short-sighted planning
decisions, advocating for a more comprehensive approach. 
Site Selection and Community Impact 
Code: NEW_SCHOOL_LOCATION 
• Email respondent 2: Supports the proposed site within Dargavel for
minimizing impact on greenfield areas and emphasizes the need for
infrastructure within the designated development area.
• Email respondent 2: Echoes the sentiment for the school to be situated
within Dargavel, citing responsibilities of Renfrewshire Council and
developers to support the growing community.

Page 289

31
• Email respondent 4: Opposes the proposed site due to concerns about
wildlife, noise, and traffic impact, suggesting a reconsideration of
alternative locations. 
High School Provision and Community Engagement 
Code: COMBINED_SCHOOL 
• Email respondent 5: Criticizes past planning decisions and expresses
concerns about the consultation process, calling for accountability
and improved engagement.
• Email respondent 6: Raises concerns about high school capacity and
urges thorough consideration of secondary school provision alongside
primary school planning.
• Email respondent 7: Expresses interest in contributing to the consultation
remotely due to travel commitments, but makes no substantive
contribution. 
Infrastructure and Special Needs Support 
Code: EDUCATION_QUALITY 
• Email respondent 8: Highlights the need for adequate support for
children with additional needs and suggests addressing existing issues
before proceeding with new infrastructure.
• Email respondent 9: Recommends considerations for classroom design,
outdoor spaces, accessibility, and facilities for children with additional
needs.
• Email respondent 10: Advocates for equal consideration of existing
residents' amenity and raises concerns about light and noise pollution
from the proposed school site.
• Email respondent 11: Advocates for a smaller new school and proposes
extending Bishopton Primary instead to secure its long-term future.
• Email respondent 12: Expresses frustration with the consultation process
and criticizes the council's handling of high school provision,
advocating for better solutions for children's education. 
Sports Facilities and Stakeholder Engagement 
Code: PLANNING_ISSUES 
• Email respondent 13: Seeks confirmation on plans for a floodlit football
pitch adjacent to the new primary school, emphasizing the importance
of sports facilities.

Page 290

32
• Email respondent 5: Calls for clarity on the proposed extension of Park
Mains High School and highlights concerns raised by stakeholders
regarding high school provision. 
Specific Site Concerns and Personal Impact 
Code: RESIDENTIAL_IMPACT 
• Email respondent 4: Voices concerns about the proximity of the
proposed school site to residential areas and potential negative
impacts on wildlife, noise, and traffic.
• Email respondent 3: Expresses disappointment in short-sighted planning
decisions and urges consideration of long-term impacts on children's
education and community well-being 
Cross analysis 
The key questions in the questionnaire that can be analysed quantitively
relate to attitudes toward a new school and toward the proposed site.
Therefore, this cross analysis allows the interdependency of individual
responses to be considered. To do this there was an analysis of positivity
towards building school and positivity towards school site. The number of
those strongly agreeing with the school being built and strongly agreeing with
the site was the single largest group – a plurality. The second largest group
were those who agreed with the proposal to build the school, but disagreed
with the site. A significant group strongly agreed that the school should be
built but neither agreed nor disagreed with the proposed site. 
You can see in the chart below that the strongest poles of opinion are around
those who strongly support the site and those who are strongly against the
site. Taking those who support the site and those who support it strongly gives
almost identical numbers when compared to those who do disagree or
strongly disagree with the site. 323 respondents support, 331 oppose it. The
difference amounts to 1% of the respondents.

Page 291

33 
This data is replicated in the following table: 
Key: 
School ++: Strongly Agree with proposal to build primary school
School +:  Agree with proposal to build primary school
School +/-:: Neither Agree nor Disagree with proposal to build primary school
D: Disagree with proposal to build primary school
E: Strongly Disagree with proposal to build primary school
F: No opinion expressed 
1: Strongly Agree it should be on the proposed site
2: Agree it should be on the proposed site
3: Neither Agree nor Disagree it should be on the proposed site
4: Disagree it should be on the proposed site
5: Strongly disagree it should be on the proposed site
6: No opinion expressed 
157
123
124
84
129
1
10
24
23
20
18
1
1
2
8
8
6
0
1
2
3
12
10
0
2
0
3
3
41
0
0 50 100 150 200 250
Strongly Support Site
Support Site
Neither
Against Site
Strongly Against Site
No opinion
Support for School Build vs Support for Proposed Site
Very Strong Support for School Build Strong Support for School Build
Neither Against School Build
Very Against School Build No Opinion
School
++
School 
+
School
+/-
School 
-
School 
- -
School 
0
Site ++ 157 10 1 1 2 0
Site + 123 24 2 2 0 0
Site +/- 124 23 8 3 3 0
Site - 84 20 8 12 3 0
Site - - 129 18 6 10 41 0
Site 0 1 1 0 0 0 0

Page 292

34
Strongly Agree with proposal to build primary school: 
156 of those who strongly agree with the proposal to build the school strongly
agree it should be on the 8.5 acre site identified 
123 of those who strongly agree with the proposal to build the school agree it
should be on the 8.5 acre site identified 
124 of those who strongly agree with the proposal to build the school neither
agree nor disagree it should be on the 8.5 acre site identified 
84 of those who strongly agree with the proposal to build the school disagree
it should be on the 8.5 acre site identified 
129 of those who strongly agree with the proposal to build the school strongly
disagree it should be on the 8.5 acre site 
1 of those who strongly agree with the proposal to build the school expressed
no opinion about whether it should be on the 8.5 acre site identified 
Agree with the proposal to build the primary school: 
10 of those who agree with the proposal to build the school strongly agree it
should be on the 8.5 acre site identified 
24 of those who agree with the proposal to build the school agree it should
be on the 8.5 acre site identified 
23 of those who agree with the proposal to build the school neither agree nor
disagree it should be on the 8.5 acre site identified 
20 of those who agree with the proposal to build the school disagree it should
be on the 8.5 acre site identified 
18 of those who agree with the proposal to build the school strongly disagree
it should be on the 8.5 acre site 
1 of those who agree with the proposal to build the school expressed no
opinion about whether it should be on the 8.5 acre site identified 
Neither Agree nor Disagree with the proposal to build the primary school: 
1 of those who neither agree nor disagree with the proposal to build the
school strongly agrees it should be on the 8.5 acre site identified

Page 293

35
2 of those who neither agree nor disagree with the proposal to build the
school agree it should be on the 8.5 acre site identified 
8 of those who neither agree nor disagree with the proposal to build the
school neither agree nor disagree it should be on the 8.5 acre site identified 
8 of those who neither agree nor disagree with the proposal to build the
school disagree it should be on the 8.5 acre site identified 
6 of those who neither agree nor disagree with the proposal to build the
school strongly disagree it should be on the 8.5 acre site 
0 of those who neither agree nor disagree with the proposal to build the
school expressed no opinion about whether it should be on the 8.5 acre site
identified 
Disagrees with the proposal to build the primary school: 
1 of those who disagree with the proposal to build the school strongly agrees
it should be on the 8.5 acre site identified 
2 of those who disagree with the proposal to build the school agree it should
be on the 8.5 acre site identified 
3 of those who disagree with the proposal to build the school neither agree
nor disagree it should be on the 8.5 acre site identified 
12 of those who disagree with the proposal to build the school disagree it
should be on the 8.5 acre site identified 
10 of those who disagree with the proposal to build the school strongly
disagree it should be on the 8.5 acre site 
0 of those who disagree with the proposal to build the school expressed no
opinion about whether it should be on the 8.5 acre site identified 
Strongly Disagrees with the proposal to build the primary school: 
2 of those who strongly disagree with the proposal to build the school strongly
agree it should be on the 8.5 acre site identified 
0 of those who strongly disagree with the proposal to build the school agree it
should be on the 8.5 acre site identified

Page 294

36
3 of those who strongly disagree with the proposal to build the school neither
agree nor disagree it should be on the 8.5 acre site identified 
3 of those who strongly disagree with the proposal to build the school
disagree it should be on the 8.5 acre site identified 
41 of those who strongly disagree with the proposal to build the school
strongly disagree it should be on the 8.5 acre site 
0 of those who neither agree nor disagree with the proposal to build the
school expressed no opinion about whether it should be on the 8.5 acre site
identified 
No opinion on whether to build the primary school 
1 respondent who expressed no opinion about whether the school should be
built strongly agreed that it should be built on the 8.5 acre site. 
Conclusion 
The consultation itself was limited to consideration of a new primary school for
Dargavel, and the responses indicate overwhelming support for a new
primary school. 
There were slightly fewer respondents who agreed with the proposed site of
the school than those who disagreed. Those who disagreed with the
proposed site identified several different reasons for their objections. The main
objection to the proposed site focused on traffic, parking and other road
infrastructure issues. Objections to Renfrewshire Council’s approach to
delivering the current Dargavel Primary School and the current process were
also identified, as were concerns about the Council’s strategic planning and
governance oversight. Other objections – relating to high school provision,
are out of scope of this consultation. 
The question of the catchment area will be determined by whether to
proceed with the school or not, and if so, which site to use.

Page 295

37
Annex: Codeframe 
Insufficient Capacity of Current School
• Code: INSUF_CAPACITY
• Example: "The current school has no space." 
Governance questions about Renfrewshire Council
• Code: GOV_QUEST
• Example: " Far too many children in existing primary’s due to past
mistakes with planning which requires immediate action to
correct. 
Traffic and Infrastructure Concerns
• Code: TRAFFIC_INFRA
• Example: "Craigton Drive is already incredibly busy... The influx of
traffic will render the whole estate as a giant traffic jam." 
Overcrowding and Overcapacity
• Code: OVERCROWDING
• Example: " Dargavel primary is at full capacity and the council
need to accommodate the children affected for the future
house builds." 
Location and Placement of New School
• Code: NEW_SCHOOL_LOCATION
• Example: "I agree that a new school is required but believe this
should be built outside Dargavel, in Bishopton." 
Community Impact and Needs
• Code: COMMUNITY_NEEDS
• Example: " The school should be built in the most suitable location
and the needs of the whole of Bishopton should be considered. 
Planning and Foresight Issues
• Code: PLANNING_ISSUES
• Example: " Be better in future at planning." 
Desire for Combined Primary and Secondary School
• Code: COMBINED_SCHOOL
• Example: "It seems prudent... to anticipate future requirements
by constructing a combined primary and secondary school." 
Residential Impact and Expectations
• Code: RESIDENTIAL_IMPACT
• Example: "I moved to Dargavel... thinking that we would be able
to walk our son to school... He is due to start school in 2024 and
hasn’t got a place in Dargavel."

Page 296

38 
Quality of Education
• Code: EDUCATION_QUALITY
• Example: "The current school is not big enough for the number of
children... This will in turn put immense pressure on teachers and
negatively impact the children's learning."

Page 297

Appendix L
Summary of Key Issues

Page 298

Schools (Consultation) (Scotland) Act 2010
Report by Education Scotland addressing educational aspects of
the proposal by Renfrewshire Council to build a new primary school
in Dargavel Village and review the catchment areas for the proposed
new school and Dargavel Primary School.
April 2024
Appendix M

Page 299

1   | Schools (Consultation) (Scotland) Act 2010
Renfrewshire Council © Crown Copyright
1. Introduction
1.1 This report from Education Scotland has been prepared by His Majesty’s Inspectors of
Education (HM Inspectors) in accordance with the terms of the Schools (Consultation) (Scotland)
Act 2010 (“the 2010 Act”). The purpose of the report is to provide an independent and impartial
consideration of a proposal by Renfrewshire Council to build a new primary school in Dargavel
Village and review the catchment areas for the proposed new school and for Dargavel Primary
School. Section 2 of the report sets out brief details of the consultation process. Section 3 of the
report sets out HM Inspectors’ consideration of the educational aspects of the proposal, including
significant views expressed by consultees. Section 4 summarises HM Inspectors’ view. Upon
receipt of this report, the Act requires the council to consider it alongside any relevant
considerations the council received and then prepare its consultation report. The council’s
consultation report should include this report and must contain an explanation of how, in finalising
the proposal, it has reviewed the initial proposal, including a summary of points raised during the
consultation process and the council’s response to them. The council has to publish its
consultation report at least three weeks before it takes its final decision. With all proposals the
council needs to follow all statutory obligations set out in the 2010 Act. 
1.2 HM Inspectors considered:
• the likely effects of the proposal for children of the schools; any other users; children likely
to become pupils within two years of the date of publication of the proposal paper; and other
children and young people in the council area;
• any other likely effects of the proposal;
• how the council intends to minimise or avoid any adverse effects that may arise from the
proposal; and
• the educational benefits the council believes will result from implementation of the proposal,
and the council’s reasons for coming to these beliefs.
1.3 In preparing this report, HM Inspectors undertook the following activities:
• attendance at public meetings held on 19 February and 5 March 2024 in connection with
the council’s proposals;
• attendance at a public information session on 29 February 2024;
• consideration of all relevant documentation provided by the council in relation to the
proposal, specifically the educational benefits statement and related consultation
documents, written and oral submissions from parents and others;
• consideration of further representations made directly to Education Scotland on relevant
educational aspects of the proposal; and
• visits to the sites of Dargavel Primary School and Bishopton Primary School, including
discussion with relevant consultees.
2. Consultation process
2.1 Renfrewshire Council undertook the consultation on its proposal(s) with reference to the
Schools (Consultation) (Scotland) Act 2010.
2.2 The statutory consultation period for this proposal ran from 29 January until 26 March 2024.
The council published the proposal paper on its website. Paper and electronic copies of the
proposal paper were made available to stakeholders and interested parties. Written responses

Page 300

2   | Schools (Consultation) (Scotland) Act 2010 
Renfrewshire Council © Crown Copyright
were accepted by letter or email. Public meetings took place on 19 February and 5 March 2024.
There were 43 public attendees in total across the two meetings. The council also held several
open information sessions and informal drop-in sessions for the public between the 14 and
29 February 2024. In total, around 100 people attended one or more of these sessions. There
were 817 responses to the council’s questionnaire on the proposal. The majority of the
respondents to the questionnaire were parents/carers of school aged children, or those that had a
child attending nursery in Renfrewshire. Most respondents (88%) strongly agreed or agreed that
the new primary school should be built in Dargavel Village. There is no clear consensus on the
proposed site at Craigton Drive. Less than half of respondents (39%) agreed with the chosen site,
while slightly more (41%) disagreed. The remaining respondents (20%) neither agreed or
disagreed with the proposed site. With regards to the proposed catchment area, a minority (44%)
are in favour, the same percentage (44%) neither agree nor disagree, and 12% disagree. 
3. Educational aspects of proposal 
3.1 HM Inspectors consider that the council has set out reasonable educational benefits for this
proposal. The council estimates the completion of the Dargavel Village development by 2033.
Dargavel Primary School, which opened in October 2021, was built for a pupil roll of 400. It is
currently well over capacity with just over 600 children currently attending. The council’s projected
figures indicate a peak in demand for around 1,130 non-denominational primary places in
academic year 2033-34 in the Dargavel area. The proposed school would have capacity for
800 pupils. The main educational benefit of this proposal is that it addresses current and future
capacity issues at Dargavel Primary School and Bishopton Primary School. It will enable the
council to continue to provide sufficient places for children in the catchment areas covered by the
proposal. The council state that the proposed catchment areas within the proposal will distribute
the pressure arising from new housing development evenly across primary schools in Dargavel.
The council have stated that a sibling guarantee will be put in place associated with the catchment
changes. 
3.2 Almost all respondents to the questionnaire, attendees at the public meetings, and
stakeholders that HM Inspectors spoke to at Dargavel and Bishopton Primary Schools agree that
there is a need for a new primary school. A significant minority of survey respondents and the
majority of stakeholders who met with HM Inspectors do not believe that the proposed site for the
new school is appropriate. Many of the stakeholders that HM Inspectors spoke to think there
should be more time to consider alternative sites for the new school. However, there is currently
no consensus on an alternative site. 
3.3 Stakeholders raised significant concerns, both in comments on the survey and when
speaking to HM Inspectors, about the volume of traffic that would result from two large primary
schools being in close proximity. Stakeholders are worried that the road infrastructure is not in
place to support the expected increased traffic at peak drop-off and pick-up times at the schools.
Parents and children of Dargavel Primary School, that HM Inspectors spoke to, do not consider
existing traffic management arrangements provide sufficient safety for children getting to the
school. They believe these safety issues may increase should the proposed site be chosen. For
example, children and parents say the footpath for walking and cycling to school is not sufficiently
wide enough for the current Dargavel Primary School population. Therefore, they do not consider
it could accommodate increased use by a second, much larger school community. If the proposal
is accepted, the council will need to work with the Dargavel community to address their concerns
as a priority. The council will need to ensure the suitability of the proposed site in respect of the
road infrastructure and adequate safe routes, including for active travel such as walking or cycling. 
3.4 The majority of parents that HM Inspectors spoke to are not confident that the council’s
timescale for the construction of the new school is realistic. Stakeholders across both Dargavel

Page 301

3   | Schools (Consultation) (Scotland) Act 2010 
Renfrewshire Council © Crown Copyright
and Bishopton Primary Schools do not want to see delays to a new school being ready for children
by August 2027. They worry that there will be a detrimental impact on Dargavel and Bishopton
Primary Schools if the new school is not ready in time. A number of parents that HM Inspectors
spoke to in both school communities say that they feel constrained into opting for the council’s
proposed site, so that their child may be assured a place at a local school. Whether the proposal is
agreed or not, it will be important for the council to identify and share with stakeholders,
appropriate contingency plans for all scenarios. 
3.5 Children, parents and staff feel strongly that the design of the new school, and the provision
of outdoor facilities for sport and physical activity, must be better than the build specification for
Dargavel Primary School. The council acknowledge this and are currently making remedial
adaptations to Dargavel Primary School, for example to improve soundproofing in teaching
spaces. Residents in Dargavel Village, who live adjacent to the proposed school site, are
concerned that the intended community use of the new school’s sports facilities will impact on the
volume of traffic and natural habitat of the area. It will be important for the council, if the proposal
is agreed, to continue to consult with stakeholders about the design of the new school, the
facilities to be included and in considerations about the community use of the site. 
3.6 A majority of stakeholders who met HM Inspectors at Bishopton Primary School stated that
they wish to see further investment in their school. They appreciate that the council’s resources
are limited, but they feel it is important to ensure that there is equity between all primary schools in
the area. Staff and children at Bishopton Primary School have experience in welcoming and
settling large numbers of new children to the school. However, they do not wish to return to
Bishopton Primary School accommodating up to 700 children, as was the case when the opening
of Dargavel Primary School was delayed. The majority of parents are concerned that any delay to
the new school will negatively impact on the numbers of children attending Bishopton Primary
School. HM Inspectors agree that it is important that all schools provide a safe and suitable
learning environment for all pupils. 
3.7 Almost all parents and staff who met with HM Inspectors raised significant concerns about
the future capacity of Park Mains High School. This is due to the continuing expansion of Dargavel
Village and other housebuilding in towns within the catchment area for the secondary school.
Parents who met with HM Inspectors are worried that the council may have underestimated the
projected school roll for Park Mains High School. Parents who met with HM Inspectors would like
to see consideration of a 3-18 campus, instead of primary provision only. They feel that Bishopton
and Dargavel should have more early learning and childcare provision. They also feel strongly that
the community should have its own secondary school. The council’s projected figures are that
around 1,000 young people who live in Bishopton and Dargavel will require to be transported to
and from Park Mains High School each day. Parents that met with HM Inspectors do not feel that
this is financially nor environmentally sound. Although outwith the scope of this consultation, it
would be helpful for the council to continue to work with parents to address their concerns about
secondary provision.   
4. Summary 
HM Inspectors agree that the proposal has the potential to provide educational benefits. A new
primary school should address the need for increased non-denominational primary places in
Dargavel Village. Almost all stakeholders agree that there is a need for a new school. However, a
significant number of stakeholders have concerns about the proposed location for the new school.
They are concerned about children having access to adequate safe walking and cycling routes.
They are also very worried about the potential impact of significantly increased traffic on an
already congested road. Should the proposal be approved, it will be essential that the council
ensure there are improved, adequate safe active routes to school. They also need to develop

Page 302

4   | Schools (Consultation) (Scotland) Act 2010 
Renfrewshire Council © Crown Copyright
robust and viable plans to efficiently manage the significant increase in traffic that is expected.
Stakeholders are also concerned about the council’s timescale for the project. If the proposal is
agreed, HM Inspectors recommend the council should ensure that there are clear contingency
plans in place, should there be slippage in the projected timescales for the construction and
opening of the new school for August 2027. If the proposal is agreed, HM Inspectors recommend
strongly that the council continue to work with stakeholders to help mitigate their valid concerns
and involve them, as appropriate, in the development of the new school. 
HM Inspectors
April 2024