To:  Education and Children’s Services Policy Board
On: Thursday 24 August 2023
___________________________________________________________________ 
Report by:  Interim Chief Education Officer
___________________________________________________________________ 
Heading:  Education Provision Dargavel
___________________________________________________________________
1. Summary
1.1 The purpose of this report is to provide Members with a further update on
education provision in Dargavel. 
1.2 Work has progressed to ensure the six new modular classrooms previously
agreed were installed at Dargavel Primary School for the beginning of the new
school session, meeting its immediate capacity needs.  
1.3 Discussions between BAE (Dargavel landowner) and Council officers to
secure a site for the new primary school within the Dargavel masterplan
development are at an advanced stage and will be subject to reports to both
the Infrastructure, Land and Environment Board and Planning and Climate
Policy Board. 
1.4 As previously advised, Officers are developing options should additional future
primary capacity be required over and above the second primary school in
Dargavel. As detailed in the main body of the report, such options will need to
be flexible and able to respond to a range of potential scenarios in terms of
peaks in potential demand versus that potential demand levelling off. As part
of progressing options, it is intended to engage with families in the early part
of this school session, and using feedback to inform what is presented to a
future Board.   
1.5 The Board at its meeting in May, agreed an extension to Park Mains High
School to increase its capacity up to 2000 pupils, informed by a roll projection
exercise which was supported by the Council’s data analytics consultants.
Since then, key stakeholders have continued to seek further clarity on the
rationale for this decision. This report provides additional background
information and data upon which the recommendations in the previous Board
report were based, and which will be used to inform further ongoing
engagement with key stakeholder groups.

Page 2

Page 2 of 11 
1.6 Beyond managing the immediate investment programme to meet the needs
emerging from the impact of the Dargavel Village development, along with
existing investment in a new Paisley Grammar School and planned
investment in a new Thorn Primary, the Council is required to consider the
long term learning needs of all communities in Renfrewshire and, in that
context, the consequential long term future investment requirements in the
overall learning estate. To that end, Officers have commenced a programme
to develop a long-term Learning Estate Strategy and Management Plan. This
programme of work will be a significantly more substantial and involved
exercise in contrast to previous school estate planning and consequently is
likely to take some time to complete over the course of the medium term. It
will, however, provide a strategic foundation from which the Council will be
better placed to understand the scale and timing of key investment needs and
interventions that will be required across the learning estate over the very long
term. The nature of this strategic long term programme will, by necessity, be
required to be responsive to both the management of long term condition and
suitability of the estate but also appropriately reflective of shifting long term
demand profiles, influenced by demographic change and changes across the
Renfrewshire area in relation to housing supply. 
___________________________________________________________________
2. Recommendations
2.1. It is recommended that Members note the content of the report. 
___________________________________________________________________ 
3. Background 
3.1 At the May meeting of the Education and Children’s Services Policy Board a
report was provided on education provision in Dargavel. That report is
available here. 
The Board agreed: 
(a)  To note that the six new modular classrooms continue to be expected
to be in place at Dargavel Primary School for August 2023; 
(b)  That the planning figure for the new primary school for 800 pupils be
approved; 
(c)  That planning for an extension to Park Mains High School to
accommodate an additional 400 pupils be approved; 
(d)  That any changes to the above planning assumptions that may be
required as a result of ongoing discussions with BAE would be reported
back to this Policy Board and that the planning figure of 400 be capped
at total capacity for Park Mains High School of 2000; and

Page 3

Page 3 of 11 
(e)  That modelling and planning of any possible future secondary capacity
demand for the catchment area will be considered within the context of
the wider Renfrewshire council school estate management plan. 
3.2 This report provides an update following on from the above decision and
further developments. 
4.  Meeting immediate capacity needs 
4.1 The previously agreed six new modular classrooms at Dargavel Primary
School are now in place and operational for the new school session and
generally feedback has been positive. 
4.2 The report to the Policy Board in May flagged the risk that the current
increased demand for places at Dargavel Primary School could breach its
increased capacity come August 2024. At this stage, and based on known
data, that remains an expectation. It was also noted that in such
circumstances there would be a requirement to apply the Council’s
admissions policy, and pupils who are not allocated a space through the
process will be directed to another school. The most appropriate alternative is
Bishopton Primary, which is the nearest primary school and currently has
surplus capacity. 
4.3 As previously reported, the associated ballot process for spaces will take
place in January 2024 ahead of the August 2024 intake. Plans are in place to
support that process and allow families appropriate time to make any
necessary plans. 
5 Next steps for primary provision in Dargavel 
5.1 Discussions between BAE Systems (Dargavel landowner) and Council
Officers to secure a site for the new primary school within the Dargavel
masterplan development are at an advanced stage. In this respect, proposed
heads of terms for the transfer of land to Council ownership will be subject to
a report to the Infrastructure, Land and Environment Policy Board. The
proposed land transfer comprises an 8.5 acre site to accommodate the new
school and circa 1.5 acres of land adjacent to the existing Dargavel Primary
School to provide scope for increased flexibility within the school site over the
longer term. In addition, a report will also be presented to the Planning and
Climate Policy Board to set out proposed changes to the Dargavel masterplan
and section 75 agreement to reflect the revised land agreement. On the
assumption recommendations associated with both reports are approved after
consideration by the respective boards, this will allow appropriate conclusion
of legal missives and provide certainty over land availability to support the
Council to deliver the new school and have increased flexibility in respect to
the existing school site. 
5.2  To ensure a full understanding of space planning and utilisation requirements,
a space planning package has been issued to tender and a preferred
contractor has been identified with award pending, and this work will be
progressed over the coming months to support the detailed design process.

Page 4

Page 4 of 11 
5.3 A review of BAE System’s land remediation scope has been undertaken and it
has been identified that the optimal approach will be to defer full site ground
investigation until BAE handover the site to Renfrewshire Council following the
completion of certified remediation in December 2024. 
5.4 In relation to the delivery route for the new school, officers have been
assessing options to deliver through a traditional Council led procurement and
delivery model, similar to that adopted for the new Paisley Grammar School
and also utilising Hub West (Scotland) which the Council has most recently
used to procure and deliver the Paisley Learning and Cultural Hub. 
5.5 Officers have been in active dialogue with Hub West Scotland (HWS), in
relation to indicative project cost and programme which may provide an
accelerated route to market and potentially a tighter delivery timeline. 
5.6 In parallel, officers are currently progressing arrangements to support the
issue of tenders associated with appointment of multi disciplinary design
team, consultant packages and Principal Contractor which is required as part
of a traditional procurement route. 
5.7 Identification of the preferred procurement and delivery route will take account
of anticipated programme, interface implications with the BAE associated
remediation and infrastructure programme, appropriate engagement timelines
with the local community, as well as wider resourcing demands within the
Council. 
5.8 The draft programme for delivery of the new school is currently estimated to
support an August 2027 school start date. As work progresses to refine the
procurement and delivery programme, this anticipated delivery date will be
increasingly firmed up and all opportunities will be explored where practicable
and achievable to accelerate this operational date. 
6. Planning for potential additional primary capacity demands 
6.1 The report to Board in May advised that an options appraisal had commenced
to determine viable opportunities that would be available to the Council,
should additional future capacity within Dargavel Village be required in the
long-term. 
6.2 This work is being progressed recognising the longer term risk presented
through the projection work completed with Edge Analytics, which identified
potential upper end scenarios where long term demand within Dargavel
Village for the two primary schools could emerge as high as circa 1,500
pupils. 
6.3 It is recognised that over the long term, large scale housing developments,
such as Dargavel Village, will progress through a natural lifecycle in relation to
associated education demand. This will result in a likely peak in demand with
a gradual reduction towards a lower mature long term level as housing
reaches circa 20 years in age. Given the scale of Dargavel Village and that it
will take circa 20 years to fully complete the development itself, the period of
the peak demand may plateau for a medium term period. Developing a
greater understanding of the likely shape and timing of both the peak and
mature demand profile within the village over the very long term will be

Page 5

Page 5 of 11 
informed by both the longer term projection modelling being developed with
Edge Analytics, along with actual data that will emerge over the coming years.
This actual data will be very closely monitored and increasingly provide
greater confidence of the scale and timing of any additional demand that may
have to be addressed beyond that which can be provided once the second
primary school is operational within Dargavel village. 
6.4 In line with best practice and national guidance which exists in England,
Developing additional capacity options will require to provide flexibility to
respond to a range of potential scenarios. This includes scenarios both in
terms of the scale of additional physical capacity required, but also
recognising the need to manage efficiently and effectively the scale and likely
period of a temporary peak or plateau of demand. It will be important that in
positioning itself to respond, the Council does so with the best possible
information and intelligence that will be available at the point in time and not
plan to deliver interventions which would ultimately result in over-provision of
permanent capacity over the long term.   
6.5 In this context two broad options have been identified: 
 Extending capacity of the existing Dargavel Primary School (sufficient
land supply through an extended school site is expected to be secured
to future proof this option through the land agreement with BAE
Systems). 
 Use of the surplus capacity at Bishopton Primary School on a
permanent basis.
6.6 As part of progressing this work it is intended to engage with families in the
early part of this school session in advance of returning to Board with a more
detailed options appraisal to be considered. 
7. Secondary school provision 
7.1 At the Board meeting in May, members approved plans to deliver a 400 pupil
extension to the capacity of Park Mains High School, and to cap that school’s
capacity at the new 2000 capacity figure provided by the extension. 
7.2 Engagement with a range of stakeholders since that decision was taken, has
flagged a strong desire for a greater understanding of the underlying data and
projections that underpinned that recommendation. Information in this regard
has been shared with a wide range of stakeholders and it is planned for
further engagement sessions to be carried out-with parent councils and
relevant community groups following the summer break period to reinforce,
share and communicate the data underlying and supporting that decision. 
7.3 As previously advised, Edge Analytics have modelled the projection of the
school roll through until 2033-34 which is shown below (Table 1). The first
model is based on their standard model output and the second is an updated
version of their model based on the actual number of S1 registrations at the
time of calculation.

Page 6

Page 6 of 11 
7.4 Edge Analytics ‘standard model’ projections are currently running higher than
confirmed live data. While Edge projections indicate an August 23 school roll
of 1480, the actual pupil roll for August 23 is projected at 1455 (this will be
confirmed when schools return), which is much closer to the revised model
(S1 Adjusted). This demonstrates that continual review of live data will be
required to fully assess future demand and to allow a continual process of
updating the projection model. 
7.5 Park Mains High School – like other secondary schools – accommodates
pupils who arrived from ‘non-feeder’ primary schools (placing requests and
those from denominational primary schools in the catchment area).  Recent
analysis has shown the average number of Park Mains pupils who have
arrived from ‘non-feeder schools’ to be 160, accounting for around 10% of the
recent total school roll. 
7.6 There is potential to manage admission from ‘non-feeder’ schools to ensure
capacity for feeder primary schools in the long term.  Over time, this could
reduce the proportion of pupils in receipt of discretionary provision at Park
Mains High School. 
7.7 The ‘standard Edge model’ and ‘Adjusted Edge scenario’ detailed in Table 1
assume a continuation of non-feeder pupils arriving into S1 in future years.
The ‘Adjusted Edge scenario’ indicates that in 2033/34, demand is projected
to be less than the 2000 capacity. 
7.8 The remaining rows show the impact of excluding ‘non-feeder’ pupils from
Park Mains projections.  This will take several years to fully track through, with
enrolled pupils from ‘feeder’ and ‘non-feeder’ schools leaving the school,
replaced only by those attending ‘feeder’ primaries.  Table 1 serves to
illustrate an approximate number of pupils who would require places at Park
Mains in the given years, should ‘non-feeder’ provision be removed from
these calculations.   
Table 1
Scenario 2020-
21
2021-
22
2022-
23
2023-
24
2024-
25
2025-
26
2026-
27
2027-
28
2028-
29
2029-
30
2030-
31
2031-
32
2032-
33
2033-
34
Standard Edge model 1,419 1,426 1,440 1,480 1,531 1,589 1,640 1,686 1,732 1,802 1,903 1,985 2,072 2,134
Standard Edge model
excluding placing
requests/denominational
placements 
1259 1266 1280 1320 1371 1429 1480 1526 1572 1642 1743 1825 1912 1974
Adjusted Edge scenario 1,419 1,426 1,440 1,453 1,476 1,505 1,524 1,543 1,568 1,629 1,718 1,791 1,868 1,923
Standard Edge model
excluding placing
requests/denominational
placement(Approx 160
pupils)
1259 1266 1280 1293 1316 1345 1364 1383 1408 1469 1558 1631 1708 1763 
7.9 The underlying background data within Edge Analytics modelling
demonstrates that while the future secondary yield from Dargavel will increase
as the development progresses towards completion over the next 10 year
period, the yield from the other towns and villages within the Park Mains High
School catchment is forecast to decline, even after accounting for known and
planned areas of new house development. This declining long term demand
from other areas, along with the planned extended capacity, is projected to
provide confidence of sufficient secondary capacity over this time period.

Page 7

Page 7 of 11 
7.10 It is recognised that over the longer term, from the mid 2030s and heading
towards 2040, the full impact on the secondary sector from Dargavel Village
will become more evident in Park Mains High School. It is recognised that as
this develops, there will remain a potential risk for the 2000 capacity at Park
Mains High School to be insufficient over the much longer term. 
7.11 Much greater certainty of the actual long term trajectory will be increasingly
secured as the Council moves towards the end of this decade and actual
primary data increasingly emerges. This reflects the fact that as the actual
number of primary school pupils in the associated school system (including
Dargavel) becomes increasingly certain, this provides a much clearer pipeline
of primary school pupils that will arrive in secondary for up to seven years
ahead. 
7.12 Therefore, as the Council moves towards the end of this decade, careful
monitoring of all the associated actual data will be critical to continue to inform
and feed into longer term forecasts. This will provide a clearer indication at
that point if   the Council will potentially be required to plan for any additional
requirement towards the middle to the end of the following decade. 
7.13 Such a decision if required, would be incorporated into the Council’s strategic
longer term Learning Estate Planning and Investment programme which is
discussed below. This strategic long term planning work will consider future
demand profiles, school capacities and key investment requirements
associated with secondary school provision across Renfrewshire. This will
include secondary schools within the estate which have significant lifecycle
investment requirements and/or potential replacement needs following mid-life
refurbishments that commenced around 20 years ago including Gryffe High
School, Renfrew High School, Trinity High School, Johnstone High School
and Castlehead High School.
 
7.14 Members will be aware that over recent months there has been suggestion
from members of the Dargavel & Bishopton community for the provision of a
new secondary school in Bishopton/Dargavel to serve the western part of the
existing Park Mains catchment area as an alternative to expanding Park
Mains High School to meet future growth in demand. Such an option has not
previously been presented to the Board for consideration on the basis it would
create very significant inefficiencies in the school estate and have significant
additional financial consequences for the Council. 
7.15 A proposal to develop an additional secondary provision within the existing
Park Mains catchment specifically for  Dargavel, Bishopton, Langbank would
leave the current [un-extended] Park Mains High School significantly under-
occupied This would create a significant imbalance in the overall school
estate, leading to an overall inefficiency in the delivery of education
(particularly within the context of the residual Park Mains High School roll), as
well as significant additional financial costs for the Council.   
7.16 To demonstrate this impact, the table below, outlines the projected occupancy
of Park Mains High School if those pupils from the feeder primary schools in
the Western part of the current catchment (Langbank PS, Dargavel PS,
Bishopton PS) attended an alternative new secondary school.

Page 8

Page 8 of 11 
Table 2
 
Capacity: 1591
Year 2023 2024 2025 2026 2027 2028 2029 2030
Other feeder
schools
850 830 800 770 725 675 670 660
Occupancy 53% 52% 50% 48% 45% 42% 42% 41%
Placing requests
and primary
denominational
children from area 
160  160  160  160  160  160  160  160
Occupancy 63% 62% 60% 58% 56% 52% 52% 52% 
7.17 In addition to creating significant unoccupied secondary school capacity at
Park Mains High School, there would also be material direct financial
consequences for the Council to address, of both a capital and a revenue
nature. 
Capital Costs 
7.18 As previously reported to members, it is estimated that the extension to Park
Mains High School will cost in the region of £27 million - £30 million with BAE
Systems obliged under the existing S.75 agreement to pay for in effect half of
this cost (reflecting an obligation to pay for additional capacity requirements
for up to a cap of 200 pupils). Utilising the recognised Scottish Futures Trust
cost matrix the high level potential cost of a new secondary school is
estimated to exceed £90 million. 
7.19 It is It is also important to note that the Council does not own additional land in
the area that would support delivery of a secondary school and therefore there
would potentially be further costs associated with site acquisition. 
7.20 Assuming BAE Systems would be agreeable to allow their established
contribution to be directed towards a new school, the net additional capital
costs for the Council to meet would potentially be in excess of £60 million (ie
the Council would require to fund a net cost of £75 million as opposed to £15
million for the extension to Park Mains). This would potentially incur up to £4.0
million per year in prudential borrowing costs. Given the scale of investment
requirement that exists across the Council’s wider school estate, this
additional cost would ultimately draw investment capacity away from other
potential future projects which the Council may identify as being key priorities. 
Revenue Costs 
7.21 From a revenue perspective, it is assessed that broadly the Council would
incur additional net annual revenue costs from operating an additional
secondary school. 
7.22 Removing costs associated with providing school transport for children from
Bishopton and Dargavel is estimated to save eventually in the region of £0.8
million. This, however, would be offset by additional net school management
costs of £1.1 million that would be incurred from having both Park Mains High
School and a new additional secondary school.

Page 9

Page 9 of 11 
7.23 Further the operational running costs associated with Park Mains High School
would continue to be incurred despite being significantly underoccupied with
new running costs associated with the new secondary to be incurred. This net
growth in running costs are estimated to be in the region of £1.2 million. 
7.24 In total therefore, the estimated net additional annual costs, including
borrowing costs, related to an additional high school in the Dargavel area
would be in the region of £5.5 million. 
7.25 Such a direction of travel would therefore cut directly across the Council’s
statutory obligation to deliver best value for Renfrewshire and directly
contradict the obligation to achieve efficient use of existing capacity across the
Council’s wider school estate, as well as creating an inevitable consequential
impact on the Council’s capacity to invest in other priority areas of the school
estate as outlined above. 
7.26 Given the ongoing engagement with stakeholders and ongoing interest in this
particular suggestion, it is anticipated that this background information will be
shared and discussed with stakeholders.
 
8. Review of the school estate 
8.1 Beyond managing the immediate investment programme to meet the needs
emerging from the impact of the Dargavel Village development along with the
existing major investment programme in a new Paisley Grammar School and
planned investment in a new Thorn Primary, the Council is required to
consider the long term needs of all communities in Renfrewshire, and in that
context, the consequential long term future investment priorities across the
overall learning estate. 
8.2 To that end, officers have commenced a programme to develop a long-term
Learning Estate Strategy and Management Plan. This programme of work will
be a significantly more substantial and involved exercise in contrast to
previous school estate planning, seeking to develop a strategic view of what
the potential phased investment requirements are for the learning estate over
the next 20 – 25 years, the anticipated priorities and key changes and
opportunities within the estate planning that may need to be considered and
planned for as well as the potential cost and financial planning considerations
that would be associated with delivering over the very long term a strategic
programme of investment. 
8.3 Consequently, it is recognised that from the current position, it is likely to take
an extended period of time to develop this initial strategic outlook which will
require to be invested in moving forward by the Council to ensure it remains
current and valid. 
8.4 Despite the challenging requirements to deliver a strategic outlook of this
nature, it is recognised that it will provide the Council with effective
foundations from which the Council will be better placed to understand and
articulate the scale and timing of key strategic investment needs and
interventions that will be required across the learning estate over the long
term.

Page 10

Page 10 of 11 
8.5 The nature of this strategic long term planning exercise will by necessity be
required to be responsive to both the management of long term condition and
suitability of the existing estate but also appropriately reflective of shifting long
term demand profiles, influenced by demographic change and changes
across the Renfrewshire area in relation to future housing supply – much of
which over the long term is not at this stage visible even as potential
development sites. 
8.6 Consequently, this strategic planning programme requires to be underpinned
by a range of foundation baseline datasets and information which at present
the Council either does not have or which is not in an up to date position, and
will therefore require to be developed and secured as the first priority. This will
include: 
 Up to date asset condition and sufficiency assessments associated
with the existing school estate underpinned by updated surveys along
with updated capacity and roll assessments. 
 A long term projection of the likely change in scale and shape of
education demand across Renfrewshire, broken down to individual
school catchment level. This is a substantial piece of long term
projection work that will need to be informed by live data sets, the
potential impact of projected long term demographic trends that are
likely to impact on Renfrewshire as well as Scotland as a whole, as well
as more local understanding of likely future housing development
patterns and net migration growth anticipated as well as over the much
longer term areas of potential housing growth that may yet emerge in
the future strategic planning context. 
 Understanding over the long term the potential lifespan of existing
schools and/or requirements for major lifecycle refurbishments taking
into account likely planned cyclical lifecycle maintenance by the
Council. 
8.7 As outlined above, this represents a significant programme of work that will
require significant officer resource, supplemented by commissioned expertise
and capacity to support key workstreams as well as strong corporate
collaboration and programme governance arrangements. It is anticipated that
regular updates will be provided to the board as this work progresses over
what is anticipated will be over the medium term period. 
Implications of this report 
1.  Financial
This report is for noting and as such there no implications which arise
directly from this report. 
2.  HR and Organisational Development 
This report is for noting and as such there no implications which arise
directly from this report. 
3.  Legal 
This report is for noting and as such there no implications which arise
directly from this report.

Page 11

Page 11 of 11 
4.  Property/Assets 
This report is for noting and as such there no implications which arise
directly from this report. 
5.  Information Technology 
This report is for noting and as such there no implications which arise
directly from this report. 
8. Health and Safety
This report is for noting and as such there no implications which arise
directly from this report. 
9. Procurement 
This report is for noting and as such there no implications which arise
directly from this report. 
10. Risk 
This report is for noting and as such there no implications which arise
directly from this report. 
11. Privacy Impact
This report is for noting and as such there no implications which arise
directly from this report. 
12.  Cosla Policy Position 
This report is for noting and as such there no implications which arise
directly from this report. 
13. Climate Risk
This report is for noting and as such there no implications which arise directly
from this report.   
List of Background Papers 
(a) None. 
___________________________________________________________________
Children’s Services
JC 
Author:  Julie Calder, Head of Education/Interim Chief Education Officer