Notice of Meeting and Agenda
Education and Children's Services Policy Board
Date Time Venue
Thursday, 12 March 2026 13:00 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN
Membership
Councillor Emma Rodden (Convener):     Councillor Jim Paterson (Depute Convener): 
Councillor Jennifer Adam:  Councillor Fiona Airlie-Nicolson:  Ms Mary Jane Bird:  Provost
Lorraine Cameron:  Councillor Carolann Davidson:  Councillor Audrey Doig:  Councillor Edward
Grady:  Councillor Gillian Graham:  Councillor Neill Graham:  Councillor Anne Hannigan: 
Councillor Lisa-Marie Hughes:  Councillor David McGonigle:  Councillor Marie McGurk: 
Councillor Iain McMillan:  Mr Jack Nellaney:  Councillor Iain Nicolson:  Mr Ravinder Singh: 
Councillor Ben Smith: 
Hybrid Meeting
Please note that this meeting is scheduled to be held in the Council Chambers.  However, it is a
hybrid meeting and arrangements have been made for members to join the meeting remotely
should they wish.
Members of the Press and Public
Members of the press and public wishing to attend the meeting should report to the customer
service centre where they will be met and directed to the meeting.
MARK CONAGHAN
Head of Corporate Governance
Page 1 of 347

Page 2

05/03/2026
Further Information
This is a meeting which is open to members of the public.
A copy of the agenda and reports for this meeting will be available for inspection prior to the
meeting at the Customer Service Centre, Renfrewshire House, Cotton Street, Paisley and online
at http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx
For further information, please email
democratic-services@renfrewshire.gov.uk
Webcasting of Meeting
This meeting will be filmed for live or subsequent broadcast via the Council’s internet site – at
the start of the meeting the Convener will confirm if all or part of the meeting is being filmed.  To
find the webcast please navigate to
https://renfrewshire.public-i.tv/core/portal/home
Page 2 of 347

Page 3

05/03/2026
Items of business  
Apologies
Apologies from members.
Declarations of Interest and Transparency Statements
Members are asked to declare an interest or make a transparency
statement in any item(s) on the agenda and to provide a brief
explanation of the nature of the interest or the transparency statement.
1 Revenue and Capital Budget Monitoring as at 8 January
2026
Joint report by the Director of Finance & Resources and the Director of
Children's Services.
4 - 12
2 Learning Estate Programme Update
Report by the Director of Children's Services.
13 - 17
3 Learning Estate Strategy Update – Outline Business
Cases
Report by the Director of Children's Services.
18 - 240
4 Inclusion Portfolio Progress
Report by the Director of Children's Services.
241 - 253
5 Distribution of Funding to Support Services for Children
and Families – Funding Allocation for 2026/27
Report by the Director of Children's Services.
254 - 260
6 Report on Keeping The Promise in Renfrewshire
Report by the Director of Children's Services.
261 - 333
7 Inspection of Castlehead High School by His Majesty’s
Inspectorate in Scotland
Report by the Director of Children's Services.
334 - 340
8 Inspection of Glencoats Primary School by Education
Scotland
Report by the Director of Children's Services.
341 - 346
Page 3 of 347

Page 4

05/03/2026
Page 4 of 347

Page 5

OFFICIAL   
To: Education and Children’s Services Policy Board
On: 12 March 2026
Report by: Director of Finance and Resources and Director of Children’s Services
Heading:  Revenue and Capital Budget Monitoring as at 9 January 2026 
1. Summary of Financial Position
1.1. The projected Revenue outturn at 31 March 2026 for Children’s Services is an
overspend of £0.983m (0.4%) against the revised budget for the year.
1.2. The projected Capital outturn at 31 March 2026 for Children’s Services is a
break-even position.
1.3. This is summarised in the table below and further analysis is provided in the
Appendices. 
Table 1: Revenue
Division
Revised
Annual Budget
£m
Projected
Outturn
£m
Budget
Variance
£m
Budget
Variance
%
Children’s Services 278.849 279.831 (0.983) (0.4%) 
Table 2: Capital
Division
Revised
Annual Budget
£m
Projected
Outturn
£m
Budget
Variance
£m
Budget
Variance
%
Children’s Services 53.694 53.694 0 0%
2. Recommendations
Members are requested to:
2.1. Note the projected Revenue outturn position for Children’s Services detailed
in Table 1 above;
2.2. Note the projected Capital outturn position for Children’s Services detailed in
Table 2 above; and. 
Item 1
Page 5 of 347

Page 6

OFFICIAL
3. Children’s Services Revenue Budget Projection - overspend of £0.983m
by 31 March 2026
3.1. The Revenue Budget Monitoring report at Appendix 1 identifies a projected
annual overspend of £0.983m (0.4% of total budget).
3.2. It should be noted that the projected outturn position reported here is based
on the latest information available, which is subject to change during the
financial year. Any change to this projection are updated at each board cycle.
Budget holders are obliged to seek mitigating action to minimise significant
budget variances.
4. Objective Analysis - Significant Variances
4.1. Early Learning & Childcare - £0.313m underspend
Employee Costs are currently projected to underspend, mainly due to
vacancies. This is partly offset by projected overspends in Premises Costs
and Transfer Payments. The movement since Period 8 is mainly due to
projected payments to partner providers. 
4.2. Primary Schools - £0.441m overspend
Employee costs, Premises costs and Transport costs are currently projected
to overspend. The Employee costs overspend relates to teaching staffing, the
overspend in Premises costs mainly due to janitorial supplies being greater
than budget, and the Transport costs overspend is due to the SPT school
transport contract being greater than available budget. The movement since
Period 8 is mainly due to updated teaching staffing forecasts.
4.3. Secondary Schools - £0.153m overspend
While Premises costs, and Transport costs are currently projected to
overspend, the position has significantly improved since Period 8 due to
updated teacher staffing forecasts.
4.4. ASN Schools - £0.322m overspend
Employee costs and Premises costs are currently projected to overspend. The
Employee costs overspend is due to teaching staffing, and Premises costs
overspend is mainly due to janitorial supplies being greater than available
budget. The movement since Period 8 is mainly due to updated staffing
forecasts.
4.5. Additional Support for Learning - £0.480m overspend
Employee costs are currently projected to overspend, mainly arising from an
increase in demand for Additional Support Needs Assistants (ASNAs) within
mainstream schools. Transport costs are currently projected to overspend,
partly due to demand and partly due to increased cost of provision. 
Page 6 of 347

Page 7

OFFICIAL
4.6. Children & Families - £0.044m underspend
Employee Costs and Third-Party Payments are currently projected to
underspend, and these are partly offset by projected overspends in Premises
Costs, Transport Costs, Supplies and Services and Transfer Payments. 
The underspend Employee costs is mainly due to turnover and within Third
Party Payments relates to Fostering & Adoption, where the number of
fostering and kinship arrangements is less than previously predicted. The
overspend in Premises Costs relates mainly to rents payable. The overspend
in Transfer payments relates to Direct Payments and Section 22 payments
across localities. The Supplies and Services projected overspend mainly
relates to demand for both Care at Home for children with additional support
needs, and payments to care leavers. The movement since Period 8 is
principally due to increased demand for residential placements.
5. Subjective Analysis - Significant Variances 
5.1. Employees - £0.244m underspend
Overspends are currently projected in teaching staffing across Primary and
ASN schools and are partly offset by underspends in Early Learning &
Childcare, Secondary and Additional Support for Learning. Projected
overspends arise in non-teaching staffing in Additional Support for Learning
due to the demand for Additional Support Needs Assistants (ASNAs) and are
partly offset by projected underspends in Early Learning & Childcare and
Children & Families, mainly due to vacancies and staffing turnover.
5.2. Premises Related - £0.515m overspend
The overspend in Premises costs is mainly due to increased janitorial costs,
across the school estate.
5.3. Transport Related - £1.063m overspend
The overspend in Transport costs is due to SPT contracts for both
mainstream school transport and ASN transport being higher than available
budget, predominantly caused by price inflation and, to a lesser extent, by an
increasing number of children requiring transport.
5.4. Third Party Payments - £1.733m underspend
The projected underspend in Third Party Payments relates mainly to fostering,
adoption and kinship, and will be kept under review throughout the year.
5.5. Transfer Payments - £1.487m overspend
The projected overspend in Transfer payments relates to Early Learning &
Childcare in relation to payments to partner providers, and to Children &
Families in relation to Direct Payments and Section 22 payments, which are
demand-driven. These are  kept under review throughout the year.
Page 7 of 347

Page 8

OFFICIAL
5.6. Income - £0.129m over-recovery
An over-recovery of income is currently projected within Primary, in relation to
rental income and Secondary schools, in relation to insurance premium
rebates within schools PPP contracts.
6. Revenue Budget Adjustments
6.1. Under the Council’s financial regulations, Directors and their nominated
officers, in consultation with the Director of Finance and Resources, have
certain delegated authority to transfer sums between subjective budget
headings within a service division to enable budget management throughout
the financial year. This is known as ‘budget virement’. 
6.2. Transfers between divisions of the same service / department in excess of
£100,000, and transfers between services / departments must be authorised
by the respective service Director and the Director of Finance and Resources
for submission to the relevant policy board for approval. 
6.3. There are no virements for which the Director seeks approval from the Board. 
6.4. The budget adjustments since the last report are either within delegation, or in
line with the earmarking of funds set aside in the 2025/26 budget motion and
the allocation of centrally held budgets already approved.
7. Capital Budget Projection - break-even position by 31 March 2026
7.1. The Capital Investment Programme 2025/26 to 2029/30 was approved by the
Council on 27 February 2025. Education and Children’s Services’ revised
Capital spend for 2024/25 is £53.694m. 
7.2. The in-year Capital budget is forecast to break even by 31 March 2026.
However, this will be monitored as the projects progress. Further details of the
programme can be found in the Capital Monitoring report at Appendix 3.
7.3. An acceleration of budget has taken place of £0.500m to reflect revised
programming of Thistle Primary School, since the previous board report.
___________________________________________________________________ 
Implications of this report 
1.  Financial 
The projected budget outturn position for Children’s Services’ Revenue
budget is an overspend of £0.983m. Income and expenditure will continue
to be monitored closely for the rest of the financial year, and steps will be
taken to mitigate any overspend, including virement, applying flexibility
within specific grant funding as permitted by the Scottish Government, and
potential use of earmarked reserves. 
Page 8 of 347

Page 9

OFFICIAL
The projected outturn position for Children’s Services’ Capital budget is a
break-even position. The Capital programme will continue to be monitored
closely for the rest of the financial year. 
2.  HR and Organisational Development 
While staffing budgets form a significant proportion of the Council’s revenue
budgets, there are no direct implications arising from the recommendations
in this report. 
3. Community/Council Planning 
Community Plan
Our Renfrewshire is thriving The Council’s revenue and capital spend
ensures that its facilities are fit for
purpose and safe for the community, to
maximise accessibility.
Our Renfrewshire is well 
Our Renfrewshire is fair 
Our Renfrewshire is safe
Council Plan
Reshaping our place, our
economy, and our future The Council’s revenue and capital spend
ensures that its facilities are fit for
purpose and safe for the community, to
maximise accessibility.
Building strong, safe, and resilient
communities
Tackling inequality, ensuring
opportunities for all
Creating a sustainable
Renfrewshire for all to enjoy
Ongoing revenue and capital budget
monitoring is a tool to enable good
financial management so that the Council
has resources now and in the future for
continued service delivery.
Working together to improve
outcomes 
4.  Legal 
There are no direct implications arising from the recommendations in this
report. 
5.  Property/Assets 
The capital expenditure noted in this report will result in lifecycle
maintenance improvements to existing properties and replacement of ICT
assets and infrastructure. 
6.  Information Technology 
While ICT assets and revenue costs are included within these reported
budgets, there are no direct implications arising from the recommendations
in this report. 
Page 9 of 347

Page 10

OFFICIAL
7.  Equality and Human Rights 
While new areas of spend may impact on particular groups, any such
impact would be assessed prior to the spend being incurred, therefore
there are no direct implications arising from the recommendations in this
report. 
8. Health and Safety
The capital expenditure noted in this report will result in lifecycle
maintenance improvements to existing properties and replacement of ICT
assets, which may in some cases improve health and safety arrangements. 
9. Procurement 
While Procurement is an important consideration prior to the Council
incurring any revenue or capital spend, there are no direct implications
arising from the recommendations in this report. 
10. Risk 
The potential risk that the Council will overspend its approved budgets for
the year will be managed at a Council-wide level by the Chief Executive
and Directors. 
11. Privacy Impact
There are no direct implications arising from the recommendations in this
report. 
12. Children’s Rights
There are no direct implications arising from the recommendations in this
report. 
13. Climate Risk
The Council aims to reduce its carbon and other emissions to net zero by
2030, however there are no direct implications arising from the
recommendations in this report. 
14. CoSLA Policy Position 
n/a 
___________________________________________________________ 
List of Background Papers: 
•   Revenue Budget and Council Tax 2025/26, Council 27 February 2025
•   Capital Investment Programme 2025/26 to 2029/30, Council 27 February 2025 
Authors: Richard Conway, Finance Business Partner
Linsey McGregor, Capital Accountant 
Page 10 of 347

Page 11

Appendix 1  OFFICIAL
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2025/26
1 April 2025 to 9 January 2026                  
POLICY BOARD :  EDUCATION & CHILDREN'S SERVICES                  
Objective Summary
Annual
Budget at
Period 8
Budget
Adjustments
Revised
Annual
Budget at
Period 10
Projected
Outturn
Budget
Variance 
(Adverse) or
Favourable
Previous
Projected
Outturn
Variance
Movement  
£000 £000 £000 £000 £000 % £000 £000
Directorate 1,462 0 1,462 1,469 (7) (0.5%) (1) (6)
Early learning and childcare 36,317 29 36,346 36,033 313 0.9% 450 (137)
Primary 71,377 208 71,585 72,026 (441) (0.6%) (536) 95
Secondary 97,815 167 97,982 98,135 (153) (0.2%) (588) 435
ASN Schools 8,619 23 8,642 8,964 (322) (3.7%) (233) (89)
Additional support for learning (ASL) 20,869 257 21,126 21,606 (480) (2.3%) (598) 118
Psychological services 1,423 0 1,423 1,423 0 0.0% 0 0
Education development 2,197 0 2,197 2,166 31 1.4% 31 0
Attainment Challenge (703) 0 (703) (703) 0 0.0% 0 0
Facilities management 505 (18) 487 455 32 6.6% (2) 34
Children & Families 38,237 64 38,301 38,257 44 0.1% 416 (372)
NET EXPENDITURE 278,118  730 278,848  279,831  (983) (0.4%) (1,061) 78
Page 11 of 347

Page 12

Appendix 2  OFFICIAL
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2025/26
1 April 2025 to 9 January 2026                  
POLICY BOARD :  EDUCATION & CHILDREN'S SERVICES                  
Subjective Summary
Annual Budget
at Period 8
Budget
Adjustments
Revised
Annual Budget
at Period 10
Projected
Outturn
Budget Variance 
(Adverse) or
Favourable
Previous
Projected Outturn
Variance
Movement  
£000 £000 £000 £000 £000 % £000 £000
Employees 198,138 358 198,496 198,252 244 0.1% (429) 673
Premises Related 12,449 333 12,782 13,297 (515) (4.0%) (380) (135)
Transport Related 7,309 2 7,311 8,374 (1,063) (14.5%) (1,077) 14
Supplies and Services 31,005 (499) 30,506 30,452 54 0.2% 32 22
Third Party Payments 17,818 572 18,390 16,657 1,733 9.4% 1,451 282
Transfer Payments 16,897 62 16,959 18,446 (1,487) (8.8%) (906) (581)
Support Services 1,103 0 1,103 1,181 (78) (7.1%) (30) (48)
GROSS EXPENDITURE 284,719  828 285,547  286,659  (1,112) (0.4%) (1,339) 227
Income (6,601) (98) (6,699) (6,828) 129 1.9% 278 (149)
NET EXPENDITURE 278,118  730 278,848  279,831  (983) (0.4%) (1,061) 78
Page 12 of 347

Page 13

Appendix 3  OFFICIAL 
Prior Years Approved  Budget Revised Projected Total Approved Projected
Expenditure Budget Adjustments Budget Outturn Budget Outurn
Project Title to 31/03/2025 2025-26 since previous 2025-26 2025-26 to 31-Mar-30 to 31-Mar-30
Board report
£000 £000 £000 £000 £000 £000 £000
EDUCATION & CHILDREN SERVICES
Primary Schools Estate Programme(SEMP) 10,544 80 0 80 80 0 0% 10,623 10,623 0 0%
Paisley Grammar New Campus 34,582 42,000 0 42,000 42,000 0 0% 85,600 85,600 0 0%
Thorn PS New Build 309 273 0 273 273 0 0% 14,000 14,000 0 0%
Dargavel Extension (Modular Units) 2,237 12 0 12 12 0 0% 2,250 2,250 0 0%
Thistle Primary School 1,116 7,634 500 8,134 8,134 0 0% 45,000 45,000 0 0%
Other Schools Investment Programmes 0 95 0 95 95 0 0% 95 95 0 0%
Total Schools Estate(inc Early Years) Programme 1,553 270 0 270 270 0 0% 1,823 1,823 0 0%
PMHS Extension 672 1,750 0 1,750 1,750 0 0% 36,894 36,894 0 0%
ELCC Improvements 6 82 0 82 82 0 0% 88 88 0 0%
Technology Replacement Strategy ICT 0 998 0 998 998 0 0% 4,998 4,998 0 0%
TOTAL EDUCATION & CHILDREN'S SERVICES
BOARD 51,019 53,194 500 53,694 53,694 0 0% 201,371 201,371 0 0%
CAPITAL INVESTMENT STRATEGY - NON-HOUSING SERVICES
Current Year 2025-26 Full Programme - All years
Budget Variance
(Adverse) or
Favourable
RENFREWSHIRE COUNCIL
1st April to 9th January 2026
POLICY BOARD: EDUCATION & CHILDEN'S SERVICES
Budget Variance
(Adverse) or
Favourable
Page 13 of 347

Page 14

OFFICIAL   
To:  Education and Children’s Services Policy Board
On: 12 March 2026
__________________________________________________________________ 
Report by:  Director of Children’s Services
__________________________________________________________________ 
Heading:  Learning Estate Programme Update 
__________________________________________________________________
1. Summary
1.1. The current phase of the Learning Estate Delivery Programme is ongoing with the following
live projects:
• Paisley Grammar School Community Campus 
• Park Mains High School Extension & Internal Interventions
• Thistle Primary School 
1.2. This report provides a short update on the latest development of project construction and
design progress. 
__________________________________________________________________
2. Recommendations 
Members of the Education and Children’s Services Policy Board are asked to: 
2.1. Note the progress of project delivery in the Learning Estate Programme. 
Item 2
Page 14 of 347

Page 15

OFFICIAL
3. Paisley Grammar School Community Campus 
3.1. The project to deliver a new Paisley Grammar School Community Campus continues to
deliver on time, and on budget, and is scheduled to complete by the summer of 2026. 
3.2. Construction is progressing at pace, with many areas in the building now fully complete
including decoration and furniture fit out. 
3.3. Digital fit out has now also commenced with interactive teaching boards now implemented
throughout the school, and all ICT equipment progressing through the order and
preparation stages. 
3.4. Work continues on the major construction of the new Advanced Manufacturing Innovation
District (AMIDS) South project that will deliver core travel infrastructure supporting the
school including a new link road that connects Renfrew Road to Harbour Road, facilitating
alternative travel routes for both active travel and vehicular access to the new school. 
3.5. Work also continues to complete the new underpass connecting Gallowhill to existing active
travel routes by utilising a former railway underpass. This work is scheduled to be
completed by spring 2026. 
3.6. The Council’s Roads Department is also progressing a number of identified improvement
works to the critical roads and footpath network in the vicinity of the new school. 
3.7. Recently, the Scottish Government approved exceptional closure days for Paisley Grammar
School. A request was made to allow vital preparation by staff for moving to the new school
at the end of this school year, and for set up time at the start of the new school year. This
means that pupils attending Paisley Grammar School will finish two days earlier in June
2026, and open two days later at the start of the new term in August 2026. As part of this
process, the school will advise pupils how to source any relevant learning material, and will
provide payments to all families of pupils who are in receipt of free school meals to account
for these days. 
4. Park Mains High School Extension & Internal Interventions 
4.1. The design process of the extended Park Mains High School is largely complete with some
final contractor and sub-contractor design portions that will follow at the point of
construction. The contractor is now completing the market testing process where all sub-
contractors, specialists, and materials will be procured and costed. 
4.2. At the Finance, Resources and Customer Service Policy Board in February 2026, a
contract recommendation was agreed to award Morrison Construction with the initial
construction contract to begin work to deliver the extension and internal intervention works. 
4.3. This process will allow the Contractor to begin construction work on site in March 2026 to
prepare the site and begin critical ground works in preparation of the full construction
beginning thereafter. 
4.4. Following commercial agreement and market testing of the remaining work packages, the
full construction contract is anticipated to be proposed to the same Board in April 2026 to
allow the main works construction to continue seamlessly from the work which will begin in
March 2026. This process has been planned to allow all works to complete by August 2027
as outlined in the project timelines. 
Page 15 of 347

Page 16

OFFICIAL
4.5. This market testing process will allow a final contract price for construction to be agreed
ahead of formally awarding both an advanced works contract, and a main works contract in
early 2026 ahead of construction. 
5. Thistle Primary School 
5.1. Work has now commenced on site to construct the new Thistle Primary School in Dargavel.
This initial phase of work has seen a substantial amount of groundworks including drainage,
foundations, and hard landscaping to be progressed. The structure of the new school
building is progressing and is now a visible feature. 
5.2. The project remains on track to complete in the summer of 2027 and updates will be
provided to this Board on the progress of construction as it progresses. 
5.3. A Head Teacher has been appointed for Thistle Primary School, and will take up post
shortly to ensure all operational and policy matters for the school are planned and
implemented within appropriate timelines. 
6. Business Case Development 
6.1. A separate report is being presented to this Board which includes the Outline Business
Case documents for the three initial projects agreed to proceed (Johnstone Primary School
Estate, Johnstone High School, and Trinity High School). 
6.2. These business cases have been produced to allow a decision to be made on the next
phase of delivery with a recommended shortlist of options presented. Please refer to
relevant report for full detail. 
______________________________________________________________ 
Implications of this report 
1.  Financial 
All budgets associated with the capital projects discussed in this report
have been agreed by Council and undergo rigorous management and
quality assurance on a regular basis. 
2.  HR and Organisational Development 
None. 
3. Community/Council Planning 
Our Renfrewshire is thriving -  New, and improved, learning estate
assets will allow our children and
young people to thrive with the best
possible infrastructure to support
their school experience. Staff, and
community users will benefit from
modern and inclusive environments. 
Reshaping our place, our
economy and our future 
-  The learning estate shall be
appropriately scaled and equipped
to meet curriculum expectations and
Page 16 of 347

Page 17

OFFICIAL
deliver an appropriate learning and
teaching experience for all. 
4.  Legal 
None. 
5.  Property/Assets 
These projects will deliver significant improvements to the learning estate,
extending the life of assets, and improving the experience of young people,
staff, and the wider community. 
6.  Information Technology 
Digital improvements will be delivered through the learning estate strategy,
where access to technology for all, will be a key priority for projects. 
7.  Equality and Human Rights  
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report. If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the
Council’s website. 
8. Health and Safety
None. 
9. Procurement 
Any procurement work required is conducted in collaboration with the
Council’s Procurement team and adheres to appropriate regulations. 
10. Risk 
All projects are bound by rigorous governance and supported by detailed
risk registers. Risk is reported and managed at various levels with scrutiny
applied to ensure mitigations and contingency plans are in place.   
11. Privacy Impact
None. 
12.  Climate Risk
New, and improved, learning estate assets will directly contribute to the
Council’s journey towards net zero. Sustainability is a key concept of all
projects. 
13.  Children’s Rights
When considering any future school provision, the impact this will have on
children is a key consideration, and any work will be based around the direct
needs of children to allow their education experience to thrive. Whilst
children have a right to choose where they wish to attend school in
collaboration with their parents, the council’s admissions policy applies to
ensure that schools that are oversubscribed can be managed. 
Page 17 of 347

Page 18

OFFICIAL
14. Cosla Policy Position 
None.     
Children’s Services
JL/JO Feb 2026 
Author: 
Jack Lochans – Strategic Learning Estate Manager
jack.lochans@renfrewshire.gov.uk 
Page 18 of 347

Page 19

1 
OFFICIAL 
To:  Education and Children’s Services Policy Board  
On:  12 March 2026 
Report by: Director of Children’s Services 
Heading: Learning Estate Strategy Update – Outline Business Cases 
1. Summary 
1.1 In 2024, Renfrewshire Council agreed a new learning estate strategy with the overall
aim of initiating a strategic programme of investment in schools through detailed
assessment of the entire learning estate. The ambition of the investment programme
is to ‘create the best possible learning estate to allow children and young people to
thrive’ 
1.2 A key output of the assessment was identification of a cohort of 14 priority schools
highlighted as requiring investment to ensure they meet the ambition of the strategy,
from which a business case process began, examining Johnstone primary school
estate, Johnstone High School, and Trinity High School. 
1.3 Following presentation of a Strategic Case for Change in respect of each to the
Education and Children’s Services Policy Board in August 2025, work began to further
investigate options for change, in the form of Outline Business Cases (OBC). The OBC
recommend a shortlist of options for future investment in each case, for Members to
consider.
___________________________________________________________________ 
2. Recommendations  
2.1 It is recommended that members of the Education and Children’s Services Policy
Board: 
a. Note the contents of the three OBC documents in respect of Johnstone
Primary estate, Johnstone High School, and Trinity High School, as outlined
in this report. 
b. Agree to the shortlisted options recommended in the OBC to be taken forward
to Full Business Case stage (FBC). 
Item 3
Page 19 of 347

Page 20

2 
OFFICIAL
c. Note the proposal to further develop the shortlisted options during 2026 as
part of a FBC, and to present the final recommended option for each business
case to this Policy Board early in 2027. 
d. Note the FBC development budget proposed for each project which will
enable technical issues to be progressed to further inform the feasibility of
options, allowing a robust final recommendation for each business case in
early 2027 to be developed. 
_____________________________________________________________ 
3. Background 
3.1 Renfrewshire Council published a new Learning Estate Strategy in 2024, setting out
plans to improve its education infrastructure through a structured approach to
assessment of school buildings. 
3.2 The entire school estate was assessed against numerous criteria including condition,
suitability for delivery of the curriculum, capacity and demand, with schools ranked
using a prioritisation framework. This identified those schools and areas most in need
of inclusion now in long-term investment planning, to ensure that the Council is best
placed to: 
• Secure best value from strategic learning estate decisions around investment 
• Meet the expected long-term demand for education provision across Renfrewshire
whilst delivering improvements in school buildings and learning environments 
• Ensure that the delivery of any new infrastructure complements other key
strategic objectives being progressed by the Council to optimise the use of assets
for communities and support wider redesign of services that better meet the
needs of communities. 
3.3 At the Education and Children’s Services Policy Board of March 2025, 14 priority
schools were agreed, including four schools in Johnstone - Auchenlodment, St
Margeret’s and Thorn Primaries, and Johnstone High School – and Trinity High
School in Renfrew.   
3.4 In May 2025, parameters were set out for examination of the context and potential
solutions for each project area through a business case process, including
agreement that other nearby schools could feature as part of the options where
appropriate. 
3.5 A Strategic Case for Change was created for Johnstone Primary estate, Johnstone
High School and Trinity High School and presented to E&CS Policy Board in August
2025. Members agreed on the context for change and agreed to the subsequent
development of OBC to focus on the development of options for change. 
3.6 An interim update to E&CS Policy Board was presented in October 2025, identifying
viable routes forward in respect of each priority project area. These were informed
through an understanding of the operating context at each school, set against the
business needs, objectives and scope articulated in critical success factors set out in
the Strategic Case for Change.
__________________________________________________________________
Page 20 of 347

Page 21

3 
OFFICIAL 
4. Outline Business Case 
4.1 Officers committed to return to this Board in March 2026 with an OBC for each of the
three priority project areas. These documents are presented as appendices 1, 2 and
3, as follows: 
• Johnstone Primary School Estate – Outline Business Case
• Johnstone High School – Outline Business Case
• Trinity High School – Outline Business Case 
4.2 The business cases are based on the HM Treasury Green Book recommended
structure, using the 5 Case model to set out the rationale for change and to articulate
potential solutions: 
• Strategic case – confirming that strategic objectives remain current and seek
agreement on the recommendation
• Economic Case – helping to determine that the preferred way forward offers
value for money
• Commercial Case – working towards a recommended deal by explaining
potential delivery models, procurement and engagement
• Financial Case – establishing affordability and funding requirements
• Management Case – planning for successful delivery 
4.3 Each OBC recaps the strategic and local context for the priority areas, examining
those factors that contribute to the need for change, clarifying the requirement for
long-term investment, referencing findings from initial community engagement and
highlighting the potential benefits. 
4.4 The documents go on to outline the potential solutions for each project area, building
on the preferred ways forward first outlined to this Board in October 2025. The OBC
discuss indicative costs in each case, before discussing the Council’s approach to
delivering the solutions, including the approach to procurement, financial feasibility
and effective management of the projects.
___________________________________________________________________ 
5.  Shortlisted Options and Indicative Costs 
Johnstone Primary School Estate 
5.1 For Johnstone Primary School Estate, the preferred route forward presented in
October 2025 to this Board, recommended a masterplan approach to the whole of
the primary school estate in the town, acknowledging and addressing the clear
overprovision of school places across Johnstone and the opportunity to make the
most of existing good-quality facilities as follows: 
Page 21 of 347

Page 22

4 
OFFICIAL
Address the overprovision of primary school places in Johnstone and the
requirements of the 3 priority schools of Thorn, Auchenlodment, and St
Margaret’s, by:
• Making best use of capacity of existing high-quality buildings including St
Anthony’s, West Johnstone Joint Campus, and Fordbank. 
• Considering the location of any new build school facility that would look to
combine more than one existing school on the same site
• Considering the most appropriate catchment area configurations to support
efficiency and capacity. 
A longlist of potential sites and school catchment configurations was developed in a
structure which aims to meet these requirements. 
5.2 The following shortlist of options emerged:
a) Merge Thorn and Auchenlodment catchment areas, combining both non-     
denominational schools in a single modern building by one of the following
means: 
1. Site 01 - Retrofit and extend the existing Auchenlodment Primary School
building to provide a modern 2 stream primary school, early years provision,
and community space at Aspen Place, Johnstone 
2. Site 01 – Construct a new build 2 stream primary school, early years
provision, and community space at the existing Auchenlodment primary
school site at Aspen Place, Johnstone 
3. Site 04 - Construct a new build 2 stream primary school with capacity, early
years provision, and community space at the site of the existing Thorn
Primary, Thorn Brae, Johnstone 
4. Site 09 - Construct a new build 2 stream primary school, early years
provision, and community space on a new Site at Poplar Avenue, Johnstone 
The above options are proposed to be supported with the following also taking place: 
b) Merge Cochrane Castle and Fordbank catchment areas, combining both
non-denominational schools at the current Fordbank Primary School site. 
c) Merge St Margaret’s and St David’s catchment areas, combining both    
denominational schools at the West Johnstone Joint Campus, creating a
single denominational school. 
5.3 Officers considered the potential cost of delivering a school project to combine
Auchenlodment and Thorn. This produced an overall potential cost for a modern 2
stream primary school as follows: 
Page 22 of 347

Page 23

5 
OFFICIAL
Cost scenario  Range
Retrofit Auchenlodment and
extend, for 434 pupils and
early-years facility matching
current provision.
£35 - £45m
Build a new 2 stream primary
for 434 pupils, and early-years
facility that matches current
provision.
£25 - £45m 
Johnstone High School 
5.4 The preferred route forward for Johnstone High School acknowledged the clear over-
capacity and poor condition at the school and the need to provide modern, good
quality facilities for learners as follows:
Address the capacity, school condition and suitability issues facing Johnstone
High School by retrofitting the current school or rebuilding a new school on
the current site, or a new site. 
5.5 For Johnstone High School, it is possible to consider either a new build or major
retrofit to provide a modern fit for purpose school environment. As a result of this, the
three routes forward are all possible:
Route 2 Route 3 Route 4
Retrofit the existing
school 
Rebuild on the
current Johnstone
High site 
Rebuild elsewhere
in the catchment
area 
5.6 To explore the specifics of these routes further, a long list of options to address the
routes forward was compiled. 
For Route 2 – Retrofit the existing school, there is no permutation or longlist of
options as it affects the current building. Variations of this option would be derived
through careful design and requirements. 
For Route 3 – Rebuild on the current Johnstone High site – there are two
possibilities with this option. The first being that the current building could be
demolished with a decant strategy implemented to then rebuild on the same footprint.
The second being to build a new school in a vacant area on the current site to keep
the current school in operation, avoiding the need for a decant. Both variations will be
explored further at the FBC stage. 
For Route 4 – Rebuild elsewhere in the catchment area, several options were
considered and are detailed in the OBC. 
5.7 The findings of the above exercise have resulted in the following shortlist of options
being proposed to be taken forward: 
Page 23 of 347

Page 24

6 
OFFICIAL
Option 01
Retrofit Johnstone High School on Site 01 Johnstone High School Beith
Road, Johnstone 
Option 02
New Build on Site 01 Existing Johnstone High School Site, Beith Road,
Johnstone 
Option 03
New Build on Site 03 Beith Road Playing Fields, Johnstone 
5.8 A further exercise was undertaken to produce indicative costs for provision of either a
retrofitted or new-build school:
Cost Scenario Range
Option 1 – Retrofit the existing
school
£122m
Option 2 – Rebuild on the
current Johnstone High site
£85 - £133m
Option 3 – Rebuild elsewhere in
the catchment area
£91 - £144m 
Trinity High School 
5.9 For Trinity High School, the preferred route forward acknowledges that the existing
school site is too small to expand the building to meet demand and would not be
used for a school of such size were it to be built new. This resulted in the only
possible route forward for Trinity to be as follows:
Address the capacity, school condition and suitability issues facing Trinity
High School by building a new school on a suitable site elsewhere in the
catchment area. 
5.10 The shortlist of options therefore is focussed in identifying a suitable site, which
meets the site assessment criteria and is preferably within the ownership of the
Council: 
Page 24 of 347

Page 25

7 
OFFICIAL
Site 8 
Rebuild Trinity High School on Site 08 – KGV Playing Fields Renfrew
Site 9 
Rebuild Trinity High School on Site 09 – East Craigend, Erskine
Site 10 
Rebuild Trinity High School on Site 10 – Barwood, Erskine 
5.11 Officers produced indicative costs for a new build school using one of the sites as an                                       
example for costing purposes: 
Cost scenario Range
New build Trinity High
School on a suitable site 
£120 - £180m 
5.12 Within the option of considering a new build Trinity High School at Site 8 – KGV
Playing Fields, officers have considered the wider principles of the Learning Estate
Strategy by considering it holistically with any nearby schools within an option. By
recognising that this site is adjoined to the current site of Renfrew High School,
officers considered whether the option of constructing a new Trinity High School at
this site would constrain the future development of a new Renfrew High School at a
future date. 
5.13 This assessment concluded that there is adequate land available on the KGV to
construct a new Trinity High School without constraining a future potential Renfrew
High School. This assessment has also demonstrated that through careful design
considerations, a new Trinity High School on this site could be designed in such a
way that it supported the basis of how a future shared campus or shared use of
facilities could be implemented, when the appropriate time to invest in a new Renfrew
High School arrives. 
5.14 Given this overview shows that it is possible to construct multiple development
options including a joint campus, it allows further work to be conducted through the
next stage of assessment to assess the development options for the KGV site that
present the best value outcome for the Council, and any further community views,
technical assessments or considerations. 
5.15 However, it should be noted that estimates for delivering a shared campus option
indicated a cost in the region of £220-320m. When set against the wider Learning
Estate priorities and scale of funding that has to date been made available (£170m)
affordability constraints may limit the deliverability of such an option in a single
phase.
5.16 It is important to note that this consideration will only be apply to the option of
constructing a new Trinity High School at Site 8 – KGV Playing Fields, due to the fact
that Renfrew High School currently adjoins this site. A full explanation of this
assessment is included in the OBC. 
Page 25 of 347

Page 26

8 
OFFICIAL
Indicative Costs – All Projects 
5.17 The indicative costs are based on preliminary information and should be considered
a framework from which detailed cost plans can be developed. The indicative costs
have been built from high level information, benchmarking from various sources
including the Scottish Futures Trust (SFT) funding metric, cost information from
current Renfrewshire Council education construction projects, costs from other
Council’s similar school projects and adjusting the costings where specific knowledge
has been gained from the desktop assessment of the site options. The BCIS cost
indices have also been used to calculate inflation up to the end of the anticipated
construction period. 
5.18 In considering the potential construction costs, it should be noted that all construction
sites are unique and will differ from site to site in ways that will impact construction
costs. This is as a result of ‘abnormal’ factors exclusive to every site. No two sites are
the same, for example flood risk mitigation or ground remediation may be more or
less consequential from site to site, with differing impact on the overall construction
costs as to how the design addresses the site. In that sense, the indicative costs
should be taken as a guide only, detailed site options appraisal will be necessary to
fully understand the geotechnical characteristics and construction cost impact before
making any final recommendations. 
5.19 The project is currently at RIBA Plan of Works Stage 0 where at this stage it is key to
define vision and goals, identify needs and opportunities and to establish a strategy.
Therefore, there is no current design information. Key assumptions and exclusions
are required to establish indicative costs and clearly indicate what is assumed as
included in the costs and what is excluded at this stage. 
5.20 To project an estimated cost for inflation purposes, the construction cost has been
based on an assumed construction commencement date of 2030. All figures should
be noted as exclusive of VAT. 
5.21 Key assumptions and exclusions were used in compiling the indicative costs in the
absence of any design commencing. This approach recognises that whilst a range of
cost estimates have been presented, these remain volatile, subject to external factors
and site specific detail that will become clearer as sites are investigated, and options
further explored at the next stage. 
5.22 It is important to highlight as part of this process, that no budget for construction will
be requested or crystalised until further work has been undertaken into the validation
of each option, and a recommendation is made thereafter at the conclusion of the
Full Business Case. 
5.23 It is however important to recognise that the validation and robust assessment of the
viability of each option will require detailed assessment and technical consideration.
As such, each business case will require an identified budget to deliver the next
stage of development, the FBC. These budgets are outlined below. It is intended that
the costs of progressing to FBC will be funded from the initial revenue contribution
agreed by Council to support the Learning Estate Strategy in 2025/26, and that this
contribution will be held in a ringfenced revenue reserve for this purpose.
Page 26 of 347

Page 27

9 
OFFICIAL 
5.24 Required indicative budgets to conclusion of FBC process: 
Project  Budget
Johnstone Primary School Estate   £330,000
Johnstone High School  £920,000
Trinity High School  £1,020,000 
5.25 These budget proposals have been developed by considering all internal technical
resource costs and all external professional services and consultant appointments
required to interrogate and validate the shortlist of options. This cost is made up as
follows: 
• Internal technical management costs to deliver project feasibility, cost
management, architectural services and project management
• Flood risk assessments
• Roads and transportation assessments 
• Space planning, and timetabling and demand modelling to develop schedules
of accommodation
• Civil and Structural Engineering for ground investigation surveys and intrusive
surveys on current school structures where required. 
6. Next Steps and Timeline 
6.1 Should the recommendations in these OBC be approved by Members, officers will
commence work to identify and recommend a preferred option in each case. This will
be reported to this Board by means of a Full Business Case (FBC)      
6.2 To properly prepare three FBC that can faithfully recommend a preferred option to
Members, officers will conduct further, detailed site assessments, undertake further
cost modelling to better understand the long-term implications of each shortlisted
option (including a whole life cost model), and a full programme of community
engagement and informal consultation to inform understanding and subsequent
decision making. 
6.3 It is anticipated that the informal consultation with whole school communities will be a
vital component in agreeing the most appropriate option to proceed with, however,
this will be balanced against business, financial, and technical assessments to
conclude the final option. A full programme of engagement is being developed and is
broadly anticipated to be conducted as follows: 
Page 27 of 347

Page 28

10 
OFFICIAL
Activity Stakeholders
Preparation and options
development
Senior Officers and SLT
Elected Members
Head Teachers
Targeted Early Engagement Parent Councils/Parents
Community Councils
Local Community Groups
Pupils
Staff
Council Services
Broad Public Engagement  Associated school parents and pupils
General public 
Neighbours 
Analysis and Refinement Project team 
6.4 The FBC would be presented in early 2027, and if approved, work would begin on
any required statutory consultation to be carried out that year. 
Implications of the Report 
1.  Financial – Council has agreed to make provision of £2.5m of revenue resource in
2025/26, with similar amounts being committed to on an annual basis each year over
the remaining years of the current Administration. The financial model underpinning
the strategy continues to be developed, along with the framework and analysis
required in the business case process. This financial provision will fund the
programme of work as it progresses through business case development. As the
FBCs develop, a clear funding strategy for each project will require to be agreed,
including both Council and any potential Scottish Government resource which may
become available via a successor programme to the Learning Estate Investment
Programme (LEIP).  
2.  HR & Organisational Development 
None 
3. Community/Council Planning 
- Our Renfrewshire is thriving   New and improved learning estate assets
will allow our children and young people to
thrive with the best possible infrastructure
to support their school experience. Staff
and community users will benefit from
modern and inclusive environments
Page 28 of 347

Page 29

11 
OFFICIAL
- Reshaping our place, our
economy and our future  
The learning estate shall be appropriately
scaled and equipped to meet curriculum
expectations and deliver an appropriate
learning and teaching experience for all. 
4.  Legal 
None 
5.  Property/Assets 
These projects will deliver significant improvements to the learning estate, extending
the life of assets and improving the experience of young people, staff and the wider
community. 
6.  Information Technology  
Digital improvements will be delivered through the learning estate strategy, where
access to technology for all will be a key priority for projects. 
7.  Equality & Human Rights 
The recommendations contained within this report have been assessed in relation to
their impact on equalities and human rights. No negative impacts on equality groups
or potential for infringement of individuals’ human rights have been identified arising
from the recommendations contained in the report. If required following
implementation, the actual impact of the recommendations and the mitigating actions
will be reviewed and monitored, and the results of the assessment will be published
on the Council’s website. 
8.  Health & Safety 
None 
9.  Procurement 
Any procurement work required will be conducted in collaboration with the Council’s
Procurement team and adhere to appropriate regulations. By developing the
business case framework outlined in this report, procurement and commercial
considerations will be conducted throughout. 
10.  Risk – 
All projects are bound by rigorous governance and supported by detailed risk
registers. Risk is reported and managed at various levels with scrutiny applied to
ensure mitigations and contingency plans are in place. The business case framework
set out in Learning Estate Strategy updates will directly work to identify, manage and
reduce risk. 
11.  Privacy Impact 
None 
12.  Children’s Rights 
When considering any future school provision, the impact this will have on children is
key consideration and any work will be based around the direct needs of children to
Page 29 of 347

Page 30

12 
OFFICIAL
allow their education experience to thrive. Whilst children have a right to choose
where they wish to attend school in collaboration with their parents, the Council’s
admission policy applies, to ensure that schools that are oversubscribed can be
managed. 
13.  Climate Risk  
New and improved learning estate assets will directly contribute to the Council’s
journey towards net zero. Sustainability is a key concept of all projects. 
14. COSLA Policy Position 
None 
List of Background Papers - Document.ashx – Strategic Case For Change Documents
for projects included in this report. Presented to the August 2025 Education and
Children’s Services Policy Board 
Children’s Services
JL/JO/GC Feb 2026 
Author: 
Jack Lochans – Strategic Learning Estate Manager
jack.lochans@renfrewshire.gov.uk 
Page 30 of 347

Page 31

1
OFFICIAL-SENSITIVE 
Johnstone Primary School Estate
Outline Business Case
Page 31 of 347

Page 32

Johnstone Primary School Estate Outline Business Case  2
OFFICIAL-SENSITIVE
DOCUMENT CONTROL SHEET 
Title: Johnstone Primary School Estate
Version Number 2
Document Type: Outline Business Case
Author: Learning Estate Project Team
Date Published: 18/02/2026
Document Versions: 
Version: Name: Update: Date
V0.1 Project Team Initial draft 28/11/25
V1 Project Team First draft for review  17/12/25
V1.1 Project Team Add site assessments and section 7 19/01/26
V1.2 Project Team Reworking Masterplan configuration
and options  28/01/26
V1.3 Project Team Reworking section 3 and amends
throughout for consistency 30/01/26
V1.4 Project Team Amendments and updates  11/02/26
V2 Project Team Final draft following review by Chief
Officers 18/02/26
Supporting Documentation / Location: 
Document Title: Location:
Strategic Case for Change Document.ashx
Page 32 of 347

Page 33

Johnstone Primary School Estate Outline Business Case  3
OFFICIAL-SENSITIVE
Table of Contents
1. EXECUTIVE SUMMARY ........................................................................ 7
1.1. Introduction .......................................................................................... 7
1.2. Background ........................................................................................... 8
1.3. Opportunity ......................................................................................... 10
1.4. Scope and Objectives .......................................................................... 11
1.5. Summary of Routes Forward ............................................................... 12
1.6. Preferred Route Forward and Options Shortlist .................................. 12
1.7. Indicative Costs ................................................................................... 14
1.8. Timeline ............................................................................................... 15
2. STRATEGIC CASE .............................................................................. 16
2.1. Strategic Context ................................................................................. 16
2.2. The Need for Change ........................................................................... 17
2.3. Investment Objectives ......................................................................... 17
2.4. Existing Arrangements ......................................................................... 18
2.5. Initial Engagement .............................................................................. 21
2.6. Scope and Service Requirements ....................................................... 22
3. ECONOMIC CASE .............................................................................. 24
Page 33 of 347

Page 34

Johnstone Primary School Estate Outline Business Case  4
OFFICIAL-SENSITIVE
3.1. Potential Routes Forward.................................................................... 24
3.2. Preferred Route Forward ..................................................................... 30
3.3. Exploring Issues with the Johnstone Estate and Possible Solutions .. 32
3.4. Masterplan Redesign of Johnstone Learning Estate ........................... 38
3.4.1. Merge Thorn and Auchenlodment at a new build or modernised site (to be
agreed), and merge catchments ............................................................................. 38
3.4.2. Merge Cochrane Castle and Fordbank located at the current Fordbank
Primary School site, and merge catchments ........................................................... 40
3.4.3. Merge St Margaret’s and St David’s, located at the West Johnstone Joint
Campus, and merge catchments. .......................................................................... 43
3.5. Early Years Provision ........................................................................... 46
3.6. Site Assessment Criteria – Replacing Auchenlodment & Thorn
Primaries .......................................................................................................... 47
3.7. Site Options Assessment ..................................................................... 50
3.8. Shortlisted Options for new Thorn / Auchenlodment ......................... 66
3.9. Indicative Costs ................................................................................... 67
3.10. Transport Considerations ................................................................... 69
3.10.1. Merged Thorn and Auchenlodment ......................................................... 69
3.10.2. Merged Cochrane Castle and Fordbank .................................................. 70
3.10.3. Merged St Margaret’s and St David’s........................................................ 71
Page 34 of 347

Page 35

Johnstone Primary School Estate Outline Business Case  5
OFFICIAL-SENSITIVE
3.11. Timeline and Next Steps ..................................................................... 72
4. COMMERCIAL CASE .......................................................................... 73
4.1. Approach ............................................................................................. 73
4.2. Service Requirements ......................................................................... 73
4.3. Project Development .......................................................................... 73
5. FINANCIAL CASE ............................................................................... 75
5.1. Project Funding – Capital Expenditure ............................................... 75
5.2. Approvals Process ............................................................................... 75
5.3. Revenue Expenditure .......................................................................... 76
5.4. Indicative Costs ................................................................................... 77
5.5. Financial Risk / Optimism Bias ............................................................ 78
5.6. Interdependencies .............................................................................. 79
6. MANAGEMENT CASE ........................................................................ 80
6.1. Project Management and Project Governance Overview ................... 80
6.2. Project Roles ........................................................................................ 80
6.3. Reporting Arrangements ..................................................................... 81
6.4. Procurement Strategy ......................................................................... 84
6.5. Overall Project Benefits ....................................................................... 84
Page 35 of 347

Page 36

Johnstone Primary School Estate Outline Business Case  6
OFFICIAL-SENSITIVE
6.6. Community Benefits Realisation Arrangements ................................. 84
6.7. Risk Management Arrangements ........................................................ 85
6.8. Equalities and Human Rights .............................................................. 85
6.9. Communication, Engagement, and Community Voice....................... 85
7. CONCLUSION ................................................................................... 87
7.1. Summary of Shortlist of Options and Next Steps ................................ 87 
Page 36 of 347

Page 37

7
OFFICIAL-SENSITIVE
1. EXECUTIVE SUMMARY 
1.1. Introduction
This outline business case (OBC) is required as part of the Council’s new structured
approach to delivering its long-term strategy for the learning estate across
Renfrewshire. It builds on the context set out in a Strategic Case for Change (SCC)
examining the provision of primary schools in Johnstone, which was approved in
August 2025 at the Education and Children’s Services Policy Board (E&CS Policy Board).
In the SCC, 6 of the 7 primary schools in Johnstone were assessed to be working well
below optimal occupancy, with demand for places expected to stay the same or fall
further in the coming years. Further, the condition and suitability of three primary
schools was shown to be such that the schools feature in a priority cohort of
Renfrewshire schools requiring intervention if they are to meet the ambitions and
objectives of the Learning Estate Strategy.
The purpose of this OBC is to articulate a preferred route forward for the project by
identifying a shortlist of investment options likely to optimise value for money in
delivering change. A longlist of options is presented as part of the OBC, along with
analysis and rationale for their inclusion or exclusion from the shortlist. Additionally,
further detail is provided in respect to how the scheme will be prepared for
procurement and how the Council will put in place funding and management
arrangements for the successful delivery of the scheme. 
The OBC uses the following framework to present the preferred way forward, utilising
an adapted HM Treasury Green Book approach which is based on the 5 Case model: 
Strategic case – confirming that strategic objectives remain current and seek
agreement on the recommendation
Economic Case – helping to determine that the preferred way forward offers value for
money
Commercial Case – working towards a recommended deal by explaining potential
delivery models, procurement and engagement
Page 37 of 347

Page 38

Johnstone Primary School Estate Outline Business Case  8
OFFICIAL-SENSITIVE
Financial Case – establishing affordability and funding requirements
Management Case – planning for successful delivery 
Table 1: Business case development process
1.2. Background
The Learning Estate Strategy published by the Council in 2024, aims to initiate a
strategic programme of investment in schools, through detailed assessment of the
entire learning estate. The ambition of the investment programme is to ‘create the best
possible learning estate to allow children and young people to thrive’.
Schools were assessed against various criteria including condition, suitability for
delivering the curriculum, capacity and demand. Using a prioritisation framework, the
strategy assessed the entire learning estate, identifying those schools in need of long-
term investment planning now, to ensure that the Council is best placed to:
• Secure best value from strategic learning estate decisions around investment
Stage: Stage 1 Stage 2 Stage 3 Stage 4
Stage Outcome: Strategic Outline
Case Outline Business Case Full Business Case Final Delivery Business
Case
Stage Activities:
• Highlighting
strategic context
• Making the case
for change
• Agreeing scope
• Considering longlist
options
• Exploring the
preferred way
forward and
presenting a
shortlist
• Determine potential
value for money
• Preparing for the
potential deal
• Planning for
procurement
• Procuring the
solution
• Contracting the deal
• Ensuring successful
delivery
5-Case Model
(stage of
completeness): 
• Strategic 50%
• Economic 40%
• Commercial 10%
• Financial 10%
• Management 10%
• Strategic 80%
• Economic 70%
• Commercial 40%
• Financial 30%
• Management 50%
• Strategic 90%
• Economic 90%
• Commercial 90%
• Financial 75%
• Management 75%
• Strategic 100%
• Economic 100%
• Commercial 100%
• Financial 100%
• Management 100%
Gateway
Review:
Strategic Assessment Business Justification Delivery Strategy
Final Investment
Decision and financial
commitment
Page 38 of 347

Page 39

Johnstone Primary School Estate Outline Business Case  9
OFFICIAL-SENSITIVE
• Meet the expected long-term demand for education provision across
Renfrewshire whilst delivering improvements in school buildings and learning
environments 
• Ensure that the delivery of any new infrastructure complements other key
strategic objectives being progressed by the Council to optimise the use of assets
for communities and support wider redesign of services that better meet the
needs of communities. 
A cohort of 13 priority schools was identified, including three primary schools in
Johnstone - Auchenlodment, St Margeret’s and Thorn - where deteriorating building
condition and building suitability hamper the Council’s ambition to deliver the
curriculum in the best possible learning environments. 
The four remaining primary schools in Johnstone, these being Cochrane Castle and St
David’s Primaries (currently accommodated at the West Johnstone Joint Campus)
Fordbank Primary and St Anthony’s Primary, are all in good condition and provide good
quality, suitable learning environments for pupils. However, it was agreed that these
nearby schools would be taken into consideration, to examine whether existing
capacity is well used and ensure that any Council investment would deliver value for
money and benefit the whole community.
As a result, a Strategic Case for Change was produced, to consider the context of key
issues which, if not addressed, would limit the Council’s ability to deliver the objectives
of the Learning Estate Strategy. The document examined the operating context of the
Johnstone primary learning estate with reference to these objectives:
• Condition
• Suitability
• Sufficiency
• Inclusivity
• Digital
• Sustainability and Net Zero
• Community Facilities and Place shaping
• Active Travel 
Page 39 of 347

Page 40

Johnstone Primary School Estate Outline Business Case  10
OFFICIAL-SENSITIVE
The Strategic Case for Change articulates the current baseline position at each school
and identifies areas where existing arrangements are failing to provide the best possible
opportunity to support the Council in delivering against these objectives. 
The Johnstone area is noted as having a larger concentration of primary schools, and
primary school places, than towns of smaller population in Renfrewshire. This
geographical overprovision is borne out by roll projections produced for Renfrewshire
Council, which confirm that capacity exceeds demand, and that demand is expected to
fall further over the next ten years. 
This context was set against the ambition of the Learning Estate Strategy to test how
likely the current schools are to meet its ambition of educating all pupils in the best
possible learning environments.
Following approval of the strategic case for change, significant work has been
undertaken to identify options for change that meet the ambition and align with the
critical success factors articulated in the documents.
1.3. Opportunity
The opportunity to change and improve the provision of primary education in
Johnstone aims to advance the objectives of Renfrewshire Council’s new Learning
Estate Strategy, and to help meet the ambitions of wider Council and Scottish
Government policies. Those ambitions, fully considered in the Strategic Case for
Change, are summarised here:
• Improving the condition of schools
• Sustainability and Energy Efficiency
• Equity and Inclusion
• Adapting to Future Educational Needs
• Community and Public Use
• Strategic Planning and Investment 
• Collaborative Approach with Stakeholders
The ambitions encompass Renfrewshire Council’s determination to invest wisely whilst
reflecting the importance of operational efficiencies and cost avoidance in delivering
the Learning Estate Strategy. Thus, careful consideration of how to bring change to
Johnstone primary school estate, can additionally help increase building operational
Page 40 of 347

Page 41

Johnstone Primary School Estate Outline Business Case  11
OFFICIAL-SENSITIVE
efficiency through provision of improved, modern facilities. A new or refurbished school
can deliver modern standards and design and contribute to the Council’s Net Zero
commitments. 
Above all, this OBC sets out the opportunity for Renfrewshire Council to meet its
overarching aim of ensuring that its schools are modern, accessible to all and support
the delivery of high-quality education for learners.
1.4. Scope and Objectives
The Strategic Case for Change set out five overarching investment objectives for
primary school provision in Johnstone. Any investment in the learning estate must:
• Deliver the best learning environments and facilities possible
• Support improving attainment and ambition
• Maximise operational efficiency across the estate
• Reduce the contribution to the Council’s combined carbon footprint 
• Acknowledge that ageing schools with deteriorating conditions come closer to
the point of being no longer fit for purpose
Thus, primary school provision in Johnstone is noted as:
• Having overall capacity which exceeds current and projected demand.
• Including three schools where building condition and suitability hamper delivery
of a modern curriculum and efforts to raise attainment.
• Having three schools which require considerable on-going investment simply to
maintain the status quo.
• Featuring three schools which cannot contribute to Council’s net zero
commitments in its current form. 
To meet these objectives and help deliver change, this OBC examines viable options for
the delivery of:
• A new two stream primary school to accommodate 434 pupils with consideration
for an early-years facility.
• Reconfigured catchments to address the current underutilisation of the existing
high quality learning facilities in Johnstone.
Page 41 of 347

Page 42

Johnstone Primary School Estate Outline Business Case  12
OFFICIAL-SENSITIVE
1.5. Summary of Routes Forward
Possible options for the future of Johnstone Primary considered 4 potential routes
forward against the requirements for change:
1 – Do Nothing
2 – Retrofit Auchenlodment, St Margaret’s and Thorn Primary Schools
3 – Rebuild Auchenlodment, St Margaret’s and Thorn Primary Schools
4 – Masterplan’ redesign of the primary school estate in Johnstone, reducing the
number of schools in the estate, merge catchments to better use existing quality
facilities, consider provision of a new combined school
Analysis of the routes forward are presented in full in the Economic Case in Section 3.
This was produced following the collation of background information included in the
SCC, technical information, and analysis of the operating context of the Johnstone
primary school estate, as well as engagement with school staff and parents. 
1.6. Preferred Route Forward and Options Shortlist
The preferred route forward for the project has been determined using the critical
success factors identified in the SCC, to assess the viability of the various options under
consideration. This identified that delivery of change for primary school provision in
Johnstone was dependent on making the best use of existing good quality school
buildings to adapt to demand and ensure optimal occupancy across all schools. 
The routes forward and options rationale are discussed in greater detail in Section 3,
Economic Case, below, and this includes an overview of estimated costs for delivering
the project.
The preferred route forward was presented at an update to the ECSPB in October 2025,
as follows:
Route 4:  Masterplan Redesign of the Primary School Estate in Johnstone 
Address the overprovision of primary school places in Johnstone and the requirements of
the 3 priority schools of Thorn, Auchenlodment, and St Margaret’s, by:
Page 42 of 347

Page 43

Johnstone Primary School Estate Outline Business Case  13
OFFICIAL-SENSITIVE
• Making best use of capacity of existing high-quality buildings including St Anthony’s,
West Johnstone Joint Campus, and Fordbank. 
• Considering the location of any new build school facility that would look to combine
more than one existing school on the same site
• Considering the most appropriate catchment area configurations to support efficiency
and capacity. 
Section 3 of this business case provides an analysis of the issues facing the Learning
Estate in Johnstone and the potential solutions. Based on the multiple factors under
consideration, it is recommended that the following options are taken forward for
further detailed exploration at Full Business Case. 
a) Merge Thorn and Auchenlodment catchment areas, combining both non-     
denominational schools in a single modern building by one of the following
means: 
1. Site 01 - Retrofit and extend the existing Auchenlodment Primary School building
to provide a modern 2 stream primary school with capacity for 434 pupils at
Aspen Place, Johnstone 
2. Site 01 – Construct a new build 2 stream primary school with capacity for 434
pupils at the existing Auchenlodment primary school site at Aspen Place,
Johnstone 
3. Site 04 - Construct a new build 2 stream primary school with capacity for 434
pupils, at the site of the existing Thorn Primary, Thorn Brae, Johnstone 
4. Site 09 - Construct a new build 2 stream primary school with capacity for 434
pupils on a new Site at Poplar Avenue, Johnstone 
b) Merge Cochrane Castle and Fordbank catchment areas, combining both non-
denominational schools at the current Fordbank Primary School site. 
c) Merge St Margaret’s and St David’s catchment areas, combining both    
denominational schools at the West Johnstone Joint Campus, creating a single
denominational school.
Note: St Anthony’s Primary is not affected by the proposed options as it is a high quality
building operating at optimal capacity. Further detail is given in section 3. 
Page 43 of 347

Page 44

Johnstone Primary School Estate Outline Business Case  14
OFFICIAL-SENSITIVE
1.7. Indicative Costs
To identify an indicative planning cost for delivering options associated with the
preferred route forward, an exercise was conducted to consider the potential cost of
delivering a school project at the identified planning scale (a two-stream primary school
with early years provision, and additional community-use space).
The site of the current Auchenlodment Primary School was used as an example for
costing purposes, being a site wholly owned by the Council. 
The overall potential costs of a new primary school associated with the route forward
are as follows: 
Cost scenario Range
Retrofit Auchenlodment and extend, for 434 pupils and
early-years facility matching current provision. £35 - £45m
Build a 2-stream primary for 434 pupils, and early-years
facility that matches current provision. £25 - £45m
Table 2: Indicative costs 
The indicative costs above are provided for illustrative purposes only. Costs are subject
to change depending on consultation, design changes, planning requirements and
parameters, site locations and geotechnical site characterisation, procurement routes
and other external factors. Further detail can be found within section 3.9 (Economic
Case) and Section 5.4 (Financial Case) of this document. 
Page 44 of 347

Page 45

15
OFFICIAL-SENSITIVE
1.8. Timeline
In 2025 a high-level summary of the timeline for completing this business case process was outlined, as shown below. This
timeline is explained in more detail in section 3 of this document to show a potential route to construction. 
Page 45 of 347

Page 46

16
OFFICIAL-SENSITIVE
2. STRATEGIC CASE
2.1. Strategic Context
In August 2025, a business case presented to E&CS Policy Board set out the strategic
case for change to primary school provision in Johnstone. The paper outlined the
background and context, highlighting links to local and national strategies for
education, including Renfrewshire Council’s Learning Estate Strategy and Fairer
Renfrewshire policy, and Scottish Government’s National Learning Estate Strategy.
The strategic objective for this project is to ensure delivery of the best quality learning
environments for primary pupils in Johnstone whilst ensuring that capacity matches
demand for school places, both now and in the future. This OBC takes that initial case
for change and begins the process of identifying options for change in response to the
needs and drivers identified. The policy background is summarised below. 
• Renfrewshire Council Learning Estate Strategy – a long-term structured
approach to assessment of the learning estate through a prioritisation
framework which identifies those areas of the estate most in need of investment.
The strategy ensures careful planning to ensure that limited capital investment is
directed where it will have the greatest impact through reshaping, refurbishing
or replacing existing facilities. 
• Scottish Government’s National Learning Estate Strategy – reflecting the
ambition of the Scottish Attainment Challenge, which promotes equity in access
to quality education facilities as part of a drive to tackle the poverty related
attainment gap and promote inclusivity.
• Fairer Renfrewshire – recognising the role of the learning estate in reducing
inequalities and improving the life chances of pupils across Renfrewshire
• Strategic Planning and Investment – recognising the long-term nature of the
strategy for the learning estate, with a clear framework which identifies those
schools that require replacement, refurbishment or upgrading
• Strategic Property Strategy – seeks to ensure that Renfrewshire Council’s
property estate is strategically located and used to its fullest potential,
complementing existing facilities and services wherever possible. 
Page 46 of 347

Page 47

Johnstone Primary School Estate Outline Business Case  17
OFFICIAL-SENSITIVE
2.2. The Need for Change
As articulated in the Strategic Case for Change document which preceded this business
case, there is a clear and compelling case for introducing change to primary school
provision in Johnstone, as highlighted by a combination of factors, including: 
• Overprovision of primary school places – Johnstone primary schools have a current
planning capacity of 1,841 pupils, with demand for 1,259 places (68% of capacity) 
• Condition and Suitability – As identified in the Learning Estate priority matrix,
Auchenlodment, St Margaret’s and Thorn suffer from a mixture of poor condition and
poor suitability, challenging the ambition to ensure all pupils have access to modern,
accessible and good-quality learning environments 
• Opportunity to maximise operational efficiency – Provision of a school built to
modern teaching and building standards will help increase building operational
efficiency by replacing ageing facilities which cannot meet modern building
performance standards.
2.3. Investment Objectives
The following objectives have been identified as key to improving primary school
provision in Johnstone and aligning with the ambitions of the Learning Estate Strategy:
• Effectiveness – Meet the aims of the Council’s Learning Estate Strategy to initiate a
strategic programme of investment in schools; Ensure that every school is considered
in terms of Scottish Government Core Facts reporting criteria; Deliver the best
learning environments and facilities possible, exceeding, where able, Scottish
Government recommendations. 
• Efficiency – Provision of modern learning environments to support improving
attainment for pupils in Renfrewshire.
• Economy – Optimise operating costs for the estate through the creation of buildings
which are more energy efficient and through operation of a more efficient overall
school estate; Offer a reduction in the costs incurred maintaining ageing buildings;
Operation of buildings of a size suited to current and projected school rolls.
• Compliance – Careful planning for the replacement or refurbishment of schools to
lessen the impact from older buildings and make a valuable contribution to
Page 47 of 347

Page 48

Johnstone Primary School Estate Outline Business Case  18
OFFICIAL-SENSITIVE
Renfrewshire Council’s net zero commitments through the operation of more
efficient buildings.
• Replacement – The project acknowledges that as buildings age and maintenance
costs increase, they come closer to the point of being no longer fit for purpose as a
Council asset.
2.4. Existing Arrangements
A comprehensive overview of each primary school in Johnstone featured in the
Strategic Case for Change and a link is available at the beginning of this report under
‘Supporting Documentation’. The key facts relating to the operation of primary schools
in Johnstone are outlined in the following tables and narrative.
There are seven primary schools, four non-denominational and three denominational,
presenting a range of condition and age. Two of the primary schools form a joint
campus and are among the three schools built and maintained under public-private
partnership (PPP) in 2007; Four have early learning and childcare provision (ELCC) on-
site. Additionally, Johnstone has a standalone ELCC establishment. Two primary
schools feature a flexible learning resource (FLR), catering to pupils with additional
support needs (ASN) who do not attend either of Renfrewshire’s dedicated ASN schools. 
Whilst this Outline Business Case focuses on primary school provision in the Johnstone
catchment, it recognises that changes to the primary estate will also affect Early Years
provision. This is especially relevant where Early Years facilities are located within
priority primary school sites, such as St Margaret’s and Auchenlodment. The full
implications for Early Years provision will be assessed at the Full Business Case stage.
This will ensure that Early Years facilities remain consistent, appropriate, and aligned
with the Council’s learning estate strategy while improving the overall learning
environment.
The current planning capacity for Johnstone’s primary schools is 1,841 pupils (1143 or
57% non-denominational, 758 or 43% denominational). As of November 2025,
Children’s Services report that the current roll across all seven schools amounts to
1,218 pupils (689 non-denominational, 529 denominational). Therefore, it can be seen
that between them, Johnstone primary schools have 623 unfilled places, or in
percentage terms, can be seen as working at 66% of capacity. 57% of the current roll
attend non-denominational schools, 43% attend denominational schools.
Page 48 of 347

Page 49

Johnstone Primary School Estate Outline Business Case  19
OFFICIAL-SENSITIVE
Key facts and operating costs for Johnstone Primary School Estate are as follows: 
Table 3: Capacity and Roll Information
The following tables sum up key facts and operating costs for primary schools in
Johnstone. 
School Age Suitability Condition ELC FLR
Auchenlodment 64 B C Y N
Fordbank* 17 A B N Y
St Anthony’s 57 B A Y Y
St Margaret's 65 B B Y N
Thorn 36 C C N N
WJJC* 17 A B Y N
*PPP schools
Table 4 – Johnstone Primary Schools Key Facts 
School Capacity Current Roll 2029/30* 2033/34* 2037/38*
Auchenlodment 302 207 (68.5%) 262 (87%) 272 (90%) 270 (89%)
Cochrane Castle 189 103 (54%) 98 (52%) 115 (61%) 109 (58%)
Fordbank 345 245 (71%) 218 (63%) 194 (56%) 185 (54%)
St Anthony’s 302 280 (93%) 286 (94%) 270 (89%) 257 (85%)
St David’s 189 81 (43%) 87 (46%) 109 (57%) 104 (55%)
St Margaret's 272 165 (61%) 155 (57%) 156 (57%) 147 (54%)
Thorn 272 134 (49%) 103 (38%) 90 (33%) 83 (31%)
Page 49 of 347

Page 50

Johnstone Primary School Estate Outline Business Case  20
OFFICIAL-SENSITIVE
School Utilities Hard &
Soft FM Teaching Non-
Teaching* Other^ Rates Total
Auchenlodment £85,022 £247,491 £881,220 £450,653 £7,353 £40,800 £1,712,539
Fordbank £81,499 £1,339,512 £1,394,733 £187,256  £96,000 £3,099,000
St Anthony’s £84,024 £291,433 £1,508,912 £269,934 £74,832 £60,360 £2,294,495
St Margaret’s £30,933 £155,202 £749,005 £667,418 £43,293 £36,000 £1,684,276
Thorn £51,237 £127,568 £744,555 £74,749 £10,888 £25,920 £1,632,586
WJJC £112,838 £2,352,296 £1,320,359 £160,724  £129,600 £4,075,817
*includes ELC where present
^Waste; Grounds Maintenance; Transport; School Crossing Patrollers
£14,498,713
Table 5: Overview of Operating Costs 
School Teaching Non-Teaching Total
Cochrane Castle £759,659 £81,960 £841,649
St David’s £560,700 £639,464 £639,464
ELCC 0 £882,879 £882,879
Table 6: WJJC Staff Costs Breakdown 
Page 50 of 347

Page 51

Johnstone Primary School Estate Outline Business Case  21
OFFICIAL-SENSITIVE
Primary School No. of Pupils Cost
Auchenlodment 0 0
Cochrane Castle 0 0
Fordbank 0 0
St Anthony’s 75 £62,912
St David’s 0 0
St Margaret’s 10 £28,425
Thorn 0 0
Total: 104 £91,337
Table 7: School Transport Costs by School 
2.5. Initial Engagement 
Following presentation of the Strategic Case for Change to E&CS Policy Board in August
2025, officers undertook initial community and stakeholder engagement, outlining the
processes involved in identifying opportunities to deliver change.
A survey was issued to parents and carers, members of the community, and all school
staff at primary schools in Johnstone, inviting views around current school provision,
including school condition, location of facilities and what stakeholders feel should be
important to the Council in progressing future school investment.
Analysis of responses from parents, carers and the wider community identified the
following key themes and discussion points:  
• Building Maintenance and Facilities – The need for modern, well maintained school
building and improved sports infrastructure.
• Playground and Outdoor Spaces – An emphasis on the importance of well-
maintained playgrounds and outdoor learning spaces that encourage physical
activity and wellbeing.
Page 51 of 347

Page 52

Johnstone Primary School Estate Outline Business Case  22
OFFICIAL-SENSITIVE
• Accessibility and Inclusivity – The importance of inclusive environments that
support children with additional needs and ensure accessibility for all.
• Safety and Traffic Concerns – Safety during school drop-off and pick-up, especially
regarding traffic congestion and unsafe parking near schools. 
Responses from school staff highlighted recommendations based on similar themes: 
• Invest in modernising outdated buildings and facilities
• Improve outdoor learning and play areas with better drainage and equipment
• Ensure adequate breakout spaces and sensory room for pupils with additional
needs
• Enhance heating, ventilation and lighting systems
• Provide secure and accessible drop-off/pick-up zones
• Engage staff and community in future planning and design decisions
Both parents and staff identified strong appreciation for the modern, bright, and
accessible facilities at Fordbank PS and St Anthony’s PS, reinforcing a clear link
between building quality and positive user experience. Across the estate, stakeholders
consistently emphasised the need for improved outdoor provision, including
resurfaced playgrounds, safer active travel routes, better sports facilities, and sheltered
all weather learning spaces. Families also stressed the importance of inclusive
environments, highlighting a growing need for sensory spaces, regulation areas, and
dedicated support provision for neurodivergent and ASN pupils. Staff reinforced this,
calling for well-designed classroom layouts (avoiding open plan), breakout spaces, and
modernised infrastructure to support learning, wellbeing, and behaviour regulation.   
2.6. Scope and Service Requirements
The scope of this proposal for change is to configure primary school provision in
Johnstone in line with the strategic objectives set out and agreed in the Strategic Case for
Change and informed by an understanding of the operating context at each primary
school. Potential routes forward were set out in an interim update to E&CS Policy Board
in October 2025, based on the broad range of options outlined in the Economic Case,
below. The potential routes are summarised here: 
Page 52 of 347

Page 53

Johnstone Primary School Estate Outline Business Case  23
OFFICIAL-SENSITIVE
Route 1 Route 2 Route 3 Route 4 
Do nothing – continue
to operate primary
schools in Johnstone
as they currently are 
Retrofit/Refurbish
Auchenlodment, St
Margaret’s and Thorn
primary schools 
Rebuild
Auchenlodment, St
Margaret’s and Thorn
primary schools on
their current sites
‘Masterplan’ redesign
of the primary school
estate in Johnstone,
reducing the number
of schools in the
estate, merge
catchments to better
use existing quality
facilities, consider
provision of a new
combined school
Table 8: Potential Routes Forward 
Page 53 of 347

Page 54

Johnstone Primary School Estate Outline Business Case  24
OFFICIAL-SENSITIVE
3. ECONOMIC CASE
3.1. Potential Routes Forward
Each of the routes forward has now been subject to an assessment process to identify
their broad advantages and disadvantages, to better assess the overall merits of each
option.
This process allows for the identification of recommended viable routes to be
progressed in more detail to establish a long list of options to be considered. In the case
of Johnstone Primaries, the analysis outlined below identifies there is only a single
recommended viable route forward from which a long list of potential options has been
identified. The recommended route forward is: 
Route 4: Masterplan redesign of the Primary School Estate in Johnstone 
The routes forward are examined in detail below.
Route 1: Do nothing
Continue to operate all primary schools in Johnstone as they currently are with minimal
wind and watertight investment. This includes: Auchenlodment, St Margaret’s and
Thorn Primary Schools which have been identified as priorities for investment, as well
St Anthony’s, St David’s, Cochrane Castle, and Fordbank Primary Schools. 
Main Advantages:
Value for money  • Lower capital outlay required, albeit significant future capital outlay will still be
required on building maintenance to secure long term wind and watertight
condition, and to support net zero transition, none of which would support
improvement to configuration or suitability for delivering the curriculum. 
Main Disadvantages:
Strategic Fit  • Does not achieve ambition of Learning Estate Strategy with regards to condition or
suitability of schools. 
• Underestimates the challenges posed by the current condition and layout of the
school buildings and the challenge of improving the learning environments.
• Although St Margaret’s predates minimum space requirements under School
Premises (General Requirements and Standards) (Scotland) Act 1967, and BB103
Page 54 of 347

Page 55

Johnstone Primary School Estate Outline Business Case  25
OFFICIAL-SENSITIVE
Area Guidelines for Mainstream Schools, it should be stressed that the site is
severely constrained, with little usable outdoor space and the school would not be
built to its current size and extent if planned now.
• No benefit to the wider community can be derived from this option. 
Value for Money  • Will create an additional burden on the ongoing maintenance required of these
buildings which will have limited long term life given their age.  In addition, further
investment would be required to support long term net zero ambitions.
• Schools in Johnstone will continue to operate below optimal occupancy offering
poor value for money in the long term.
• This option would continue to see a very high standard of PPP school estate in
Johnstone underutilised, with significant financial outgoings associated with the
ongoing operation of these schools. 
Conclusions:
This option would bring no benefit to the school or wider community and would not serve to improve the
education experience of anyone involved and is likely to provide poor long term value for money given the
age and condition of the existing school.  
The primary school estate in Johnstone would continue to operate at inefficient levels, with roll
projections showing a further decline is to be expected across the area. With regards to the PPP estate
(Fordbank, Cochrane Caste, and St David’s – significant financial outlay is required each year to operate
these, and this option would not work to make best use of these very high standard buildings.  With the
disadvantages outlined above, this is not considered a viable option and will be discounted as a route
forward. 
Route 2: Retrofit Priority Schools in Johnstone
Carry out a comprehensive retrofit of the current buildings of Auchenlodment, St
Margaret’s and Thorn primary schools to bring them up to Net Zero Public Sector
Building Standards (NZPSBS) or better, whilst improving the overall condition and
suitability of the environments. 
Main Advantages: 
Strategic Fit • Contributes towards net zero ambitions through retention of embodied carbon
and improvements in energy consumption.
• Will allow buildings to be fully reconsidered to improve both condition and
suitability. 
Page 55 of 347

Page 56

Johnstone Primary School Estate Outline Business Case  26
OFFICIAL-SENSITIVE
Value for Money  •  Subject to detailed costing it may involve a lower capital outlay, although this
would require detailed analysis particularly given the dual costs of normal
wholescale refurbishment coupled with net zero retrofit requirements.
• Greater operational efficiency from a more energy efficient building
Main Disadvantages
Strategic Fit • Improvements to the site and external learning will be limited as any
improvements need to work with and around the existing site. 
• This option to retrofit would not address the over-provision of school capacity in
Johnstone and would result in the school capacity in operation with a declining
population.
• Although St Margaret’s predates minimum space requirements under School
Premises (General Requirements and Standards) (Scotland) Act 1967, and BB103
Area Guidelines for Mainstream Schools, please note that the site is severely
constrained, with little usable outdoor space; school would not be built to its
current size and extent if planned now.
Value for Money  • A net zero retrofit is a complex and demanding project requiring careful planning
and execution. although initial capital costs may be less in comparison to an
equivalent new-build, the costs will still be significant and the overall remaining
life of a refurbished building is likely to be less than a new build placing a level of
constraint on the long term value for money assessment.
Affordability  • The full extent of work required, and therefore cost, may only become fully
apparent as areas of the internal fabric of the building are exposed and a full
understanding of the buildings condition is apparent. This could result in the
divergence between refurbishment cost and new build cost being marginal and
ultimately impacting negatively on the whole life value for money appraisal. 
Achievability  • This option would involve significant disruption to the Johnstone primary school
estate with decants required for all schools during the extent of the works, or for
a very elongated and costly route to construction by working around current
building users. 
Conclusions:
This option is more attractive in terms of making the most of existing assets, retaining embodied carbon
and addressing Council commitments on net zero. However, the option would fail to address the
challenges around under capacity in the wider Johnstone school estate, and would present a missed
opportunity to deliver long term improvement in the learning estate for the community. Additionally,
although there may be the potential for a degree of short term affordability benefits, there is significant
uncertainty as to whether it would necessarily provide long term value for money and it would also be
highly disruptive to the school existing school community during the construction period.
Page 56 of 347

Page 57

Johnstone Primary School Estate Outline Business Case  27
OFFICIAL-SENSITIVE
Further, it is noted that St Margaret’s Primary School does not meet current minimum space
requirements as per legislation, and would therefore be questionable as to why a significant investment
in such a school would be taken forward given it is too small for modern standards.
On this overall basis, this option should not be considered as a viable route forward. 
Route 3: New Build Schools for all identified Priority Schools
Rebuild Thorn, Auchenlodment and St Margaret’s primary schools on their current sites,
to an appropriate reduced capacity, to continue as standalone primary schools. Retain
St David’s, Cochrane Castle, Fordbank and St Anthony’s primary schools as they are
now. 
Main Advantages:
Strategic Fit  • This would deliver a new schools built to modern educational and
building standards, of a size that allows for optimal occupancy and
deliver assets with the longest potential operational life.
• It would directly contribute towards net zero ambitions through
provision of new schools built to NZPBS standard or better.
Value for Money • Creation of buildings with modern heating and power systems will
greatly improve operational efficiency and new build provides the
opportunity to secure learning facilities with the maximum future life to
support long term value for money benefits. 
Main Disadvantages:
Strategic Fit • Provision of 3 new schools and disposal of their predecessors may not
be as sustainable as retrofitting current structures. However, it is
recognised that new buildings would be designed and constructed in a
manner that significantly contributes to the net zero plan with energy
efficiency at the forefront. It is also possible that material from
demolished buildings could be used on new sites as in fill or for levelling
land.  
• Constructing three new schools would not address the ongoing over
provision of school places in Johnstone. To be able to deliver schools to
‘optimal capacity’ would require all three new build schools to be
Page 57 of 347

Page 58

Johnstone Primary School Estate Outline Business Case  28
OFFICIAL-SENSITIVE
smaller than a single stream primary school (i.e. a school with 1 class
from primary 1 to primary 7 which equals a capacity of 217 places). Roll
projections show that all three schools are expected to fall well below
this figure of 217 therefore to build these schools at an ‘optimal’
capacity would require very small schools with combined year groups in
less than 7 classes. This would be a significantly limiting factor for
schools in such a tight urban geography.
• A new build project on the existing St. Margaret’s site would not meet
minimum space requirements under School Premises (General
Requirements and Standards) (Scotland) Act 1967, or BB103 Area
Guidelines for Mainstream Schools, and is therefore not a viable option –
a new site would be required. 
Value for Money  • Existing high-quality facilities at the West Johnstone Joint Campus, and
Fordbank, would remain underutilised, operating below optimal
capacity, therefore presenting poor value for money from the significant
financial outlay on PPP contracts.
Affordability  • This option would require considerable capital investment for single-
stream schools and would not offer best value for money given current
and projected demand across Johnstone as a whole and the wider
commitments of the Learning Estate Strategy.
• The investment required would limit council’s readiness to address
other priority schools identified through the learning estate strategy
Achievability  • This option would involve significant disruption to the Johnstone
primary school estate with decants required for all schools during the
extent of the works.
Conclusions:
Providing a new build property for each of the schools would require a significant capital cost and would
leave existing high-quality facilities underutilised and operating below optimal occupancy levels, with
continued excess capacity across the whole Johnstone Primary School Estate. Committing to the
replacement of three existing primary schools in like-for-like fashion may impact Renfrewshire Council’s
ability to maintain the necessary pace of investment in the Learning Estate Strategy. This route would
require new schools to be very small which will not provide best value with such close proximities of
schools. Further, with St Margaret’s site not meeting modern minimum space requirements, it would
require a new site to be identified for a new build school. This option should not be considered as a
viable route forward. 
Route 4: Masterplan redesign of the Primary School Estate in Johnstone 
Page 58 of 347

Page 59

Johnstone Primary School Estate Outline Business Case  29
OFFICIAL-SENSITIVE
This option would see the development of a wider master plan review and associated
proposals that would deliver a  reduced number of establishments and right-sized
overall school capacity across Johnstone This masterplan approach would secure the 
ambition of accommodating all primary school children in Johnstone in good quality
school accommodation, with high suitability for delivering the curriculum, that will
sustainably meet the educational needs across Johnstone over the long term and
support wider community needs. This option must consider the priority establishments
that require intervention as part of the Learning Estate Strategy prioritisation matrix.
These schools are Thorn, Auchenlodment, and St Margaret’s and options will consider: 
• Making best use of capacity of existing high-quality buildings including St
Anthony’s, West Johnstone Joint Campus, and Fordbank. 
• Consider the location of any proposed new build school facility that would look
to combine more than one existing school on the same site
• Consider the most appropriate catchment area configurations to support overall
efficiency and capacity to support the delivery of the best educational outcomes. 
Main Advantages:
Strategic Fit • Ensures that every pupil in Johnstone will be educated in modern, high-
quality condition schools. 
• Meets the requirements of Renfrewshire Council’s vision for education
and the objectives of the Learning Estate Strategy
• Contributes towards net zero ambitions through provision of a new
school built to NZPBS standard or better, with significant improvements
in energy consumption to the existing schools.
• Ensures all schools can work at optimal occupancy, reflecting changing
school rolls and demand.
• The sale of disused sites could bring capital receipts to the council.
Value for Money • Makes the most of existing high condition facilities including PPP estate
which attracts a high financial output each year to operate, offering
better value for money from the learning estate in Johnstone
• Offers opportunities to improve Early Years and additional support
needs provision in Johnstone through better use of existing space.
• Greater operational efficiency from a more energy efficient building of a
size that allows for optimal occupancy
Affordability • Appropriate levels of capital spend required through the provision of a
whole area master planned new build option, and making better use of
existing high-quality assets provides the best opportunity to
strategically develop and identify the most effective solution to meet the
Page 59 of 347

Page 60

Johnstone Primary School Estate Outline Business Case  30
OFFICIAL-SENSITIVE
long term needs of Johnstone in a manner that consider need across the
whole geography and will minimise unnecessary spend. 
Main Disadvantages:
Achievability • Potential need to decant pupils during new build element if a current
school site was selected, could bring disruption during this period,
albeit the scale of disruption of this option is significantly lower than
alternative options presented.
• Proposals to merge schools and or catchments areas present concerns
linked to the expectations and aspirations of parts of the school
community.
Conclusions:
This holistic master planned option provides the opportunity to identify a more efficient use of existing
quality learning environments, whilst addressing overprovision of capacity in Johnstone as a whole. The
implementation of a new build school option to accommodate more than one existing school will also
directly support addressing all objectives of the Learning Estate Strategy and works to significantly
improve the experience of all users of current poor condition buildings. 
This option would see current high-quality buildings utilised in an efficient way, making best use of the
assets, and ultimately will work to ensure that every primary pupil in Johnstone is educated in a high-
quality building, suitable for delivering the modern curriculum. 
This option and specific configurations within it should be further considered in the OBC process as
the preferred route forward. 
3.2. Preferred Route Forward
A qualitative assessment of the potential routes has provided commentary on their
practicality, adaptability and desirability, aligned to the critical success factors outlined
in the Strategic Case for Change. This identified those that do not offer a viable means
of delivering the required change and confirmed a preferred way forward for the
project:
Route 4:  Masterplan Redesign of the Primary School Estate in Johnstone 
Page 60 of 347

Page 61

Johnstone Primary School Estate Outline Business Case  31
OFFICIAL-SENSITIVE
Address the overprovision of primary school places in Johnstone and the requirements of
the 3 priority schools of Thorn, Auchenlodment, and St Margaret’s, by:
• Making best use of capacity of existing high-quality buildings including St Anthony’s,
West Johnstone Joint Campus, and Fordbank. 
• Considering the location of any new build school facility that would look to combine
more than one existing school on the same site
• Considering the most appropriate catchment area configurations to support efficiency
and capacity. 
This route forward was recommended and agreed following an update to the ECSPB in
October 2025.
One of the objectives of the Learning Estate Strategy is to have Renfrewshire schools,
where possible, operating at between 80-95% of capacity. As noted in the assessment of
the option to retrofit all priority schools, this would not address capacity and would
leave the same number of schools in the town in very close proximity operating
significantly under capacity and would require vast capital outlay. 
The question can therefore be asked as to why the option to rebuild all priority schools
as new, smaller schools, is not viable. The reason for this is that by building schools to a
smaller size to match projected future rolls, which are largely expected to continue to
drop, and have these schools working to ‘optimal capacity’ the size of schools would
require to be very small. In some cases, smaller than a single stream primary school (i.e.
a school with a single P1-P7 class, per year). To be working efficiently against capacity
in this scenario, schools would need to be built with classes working in combined year
groups in the same classroom. This would be a significant limiting factor for schools in
such a tight urban setting. 
By way of an example, Thorn Primary School projected school roll is expected to drop
as low as 82 pupils. A new build school for less than 100 pupils in a populated core town
of Renfrewshire, costing multiple millions of pounds, could not be justified as best value
considering there are currently 7 primary schools operating in the area. 
This confirms that there is a compelling case to focus attention on options within Route
4 – Masterplan redesign of the primary estate in Johnstone. 
Page 61 of 347

Page 62

Johnstone Primary School Estate Outline Business Case  32
OFFICIAL-SENSITIVE
3.3. Exploring Issues with the Johnstone Estate and Possible Solutions
When redesigning the Johnstone Primary Estate, it is essential to consider the following
elements holistically, as any change to school building condition, locations, catchments
and pupil rolls may have an impact elsewhere:
• Making best use of capacity at existing high-quality buildings including St Anthony’s,
West Johnstone Joint Campus, and Fordbank. 
• Considering the location of any new build school facility that would look to combine
more than one existing school on the same site
• Considering the most appropriate catchment area configurations to support efficiency
and capacity. 
Current School Estate
To address the issues facing the Johnstone school estate and identify options from the
preferred route forward, it is important to consider the current location and makeup of
the primary schools in Johnstone.
Of the six primary school buildings in Johnstone, highlighted on the map below, it can
be seen that the existing modern and high quality school buildings are clustered to the
centre/south-west of the town. These comprise of 2 non-denominational, and 2
denominational schools - St Anthony’s and St David’s primary schools, and Cochrane
Castle and Fordbank. Cochrane Castle and St David’s Primaries share the modern West
Johnstone Joint Campus. 
The three priority school buildings, identified through the Learning Estate Strategy all
lie to the north and east of Johnstone - Auchenlodment, Thorn and St Margaret’s. This
strongly indicates that any new build facility should be located to the north or east of
the town to address the need for a modern facility in this area of Johnstone and avoid
over concentration of the majority of primary schools to the south and west of the
town. 
Page 62 of 347

Page 63

Johnstone Primary School Estate Outline Business Case  33
OFFICIAL-SENSITIVE 
Map 1:Existing School Locations 
The second factor to consider is the current catchment areas of primary schools in
Johnstone which is detailed below:  
Non-Denominational Catchment Areas
The maps below show the current catchment areas and concentration of those who
attend both Auchenlodment and Thorn Primaries in relation to the location of the
schools.
Current high quality
school building
School building on
priority list
Page 63 of 347

Page 64

Johnstone Primary School Estate Outline Business Case  34
OFFICIAL-SENSITIVE
Map 2: Pupil concentrations - Thorn Primary School 
Map 3: Pupil concentrations - Auchenlodment Primary School 
Page 64 of 347

Page 65

Johnstone Primary School Estate Outline Business Case  35
OFFICIAL-SENSITIVE
The maps illustrate that the catchments of Thorn and Auchenlodment Primary Schools
are adjoining, with the majority of pupil draw residing within the catchment areas. Both
schools are at the eastern extremity of Johnstone, supporting the proposal that any
potential new school facility  to replace these priority schools should be located within
the current catchment area. 
Denominational Catchment Areas
The map below shows the current catchment area for St Margaret’s Primary, and the
concentration of pupils who attend the school. 
Map 4: Pupil concentrations – St Margaret’s Primary School
In line with the majority of denominational schools in the authority, the catchment area
serves a wide geographical area. St Margaret’s catchment is particularly large as it
includes a rural area with fewer residences. 
However, as illustrated in Map 4, above, the majority of the pupil draw for St Margaret’s,
whilst towards the centre and east of the town, is adjacent to the St David’s catchment
area and close to St David’s primary itself. 
Page 65 of 347

Page 66

Johnstone Primary School Estate Outline Business Case  36
OFFICIAL-SENSITIVE
Reflecting that the centre and south-west of Johnstone is already served by four
modern, high quality schools, and none of the priority schools to be addressed through
investment are in this area, it would not be considered appropriate for any option of a
further new build facility to be located in this geographical area of the town. Therefore,
it is recommended that any new build school to be constructed as part of the route
forward, should serve the north and east of the town. 
This approach will also better serve the wider Johnstone community by avoiding an
over concentration of school buildings, which are core community assets, in the centre
or southwest of the town. 
Taking account of these factors, this presents two possibilities for the new build
element of this masterplan route forward : 
a) A single new build joint campus for denominational and non-denominational
provision for the catchments of St Margaret’s, Thorn, and Auchenlodment primary
schools, clearly distinguishing the different non-denominational/denominational
schools with their own identity (on a site to be determined) 
b) A single new build non-denominational school for Thorn and Auchenlodment
Primary School catchment areas, on a site to be determined (see section 3.6) 
Considering a) above, moving St Margaret’s catchment to a new build joint campus
school would not address the overarching principles; of making best use of current
existing modern, high quality schools. At present the St Margarets catchment area
borders other denominational primary schools housed in high quality modern facilities,
which are currently operating significantly below capacity.
Therefore, it is recommended to further investigate options for a single new build non-
denominational school for Thorn and Auchenlodment Primary School catchment areas
only. This recommendation addresses the issue of the non-denominational Thorn and
Auchenlodment buildings.  
In this context, St Margarets remains a high priority school that requires attention.
However, analysis clearly demonstrates this priority can be addressed without the need
for provision of a new or refurbished building given the St Margaret’s catchment
borders that of St David’s, located at the West Johnstone Joint (WJJC) campus.  
Page 66 of 347

Page 67

Johnstone Primary School Estate Outline Business Case  37
OFFICIAL-SENSITIVE
St David’s is a high quality modern teaching environment however it is operating at only
43% of capacity.  To address the issue of undercapacity at St Davids and the WJJC as a
whole, it is possible to merge St Margaret’s Primary with St David’s Primary at the
West Johnstone Joint Campus, making better use of the high quality WJJC.
The section of the WJJC currently occupied by St Davids Primary is not sufficient to
accommodate both St Davids and St Margarets pupils together. The required capacity
can however be achieved by moving the non-denominational cohort of Cochrane Castle
out of the WJJC, allowing the WJJC to become a single denominational primary
housing both St Margarets and St Davids Cohorts. This is the only denominational
primary school building that is of high quality, with an adjoining catchment that can
accommodate the St Margarets cohort. 
St Anthony’s Primary school building is condition A and is not on the priority list.  The
school has a capacity of 302 and with 280 pupils it is currently at 93% capacity. 
Projections show the school roll is expected to drop slightly in the next decade;
however, capacity is projected to remain at above 85%. There is therefore no additional
capacity that would  allow any future  relocation or merger  within this existing facility.
Another of the town’s newer, high quality schools, Fordbank Primary, in the southwest
of Johnstone is currently operating at 70% of capacity, with this expected to drop to
56% by 2033-34. Given the very close proximity (0.7 mile) between Fordbank and
Cochrane Castle (WJJC), and to make better use of the Fordbank school, it is
recommended to merge Cochrane Castle with Fordbank primary housing both
cohorts at the existing Fordbank Primary School Building.  This has the added benefit
of releasing space at the West Johnstone Joint Campus to accommodate a single
denominational primary (as described above) and also leave additional space for
further flexible use. 
Summary of analysis
Based on this analysis of school locations, catchments, rolls and condition, officers
from Education and Children’s Services and Technical Services, have concluded that
the following 3 options should be explored in order to progress the masterplan
reconfiguration of the Johnstone Learning Estate.  These are:
1. Merge Auchenlodment and Thorn at a new-build or modernised site (to be
agreed), and merge catchments. 
Page 67 of 347

Page 68

Johnstone Primary School Estate Outline Business Case  38
OFFICIAL-SENSITIVE
2. Merge Cochrane Castle and Fordbank, at the current Fordbank Primary School
site, and merge catchments. 
3. Merge St Margaret’s and St David’s at the West Johnstone Joint Campus, creating
a single denominational school building, and merge catchments.
The following section looks at each option in more detail.
3.4. Masterplan Redesign of Johnstone Learning Estate
3.4.1. Merge Thorn and Auchenlodment at a new build or modernised site (to be agreed),
and merge catchments
Both Auchenlodment and Thorn Primary Schools have been identified as part of the
prioritisation list in the Learning Estate Strategy as both buildings are not viable in their
current form for the future of education provision. A rationale has been provided as part
of the assessment of the potential routes forward for why it is not appropriate to
consider constructing two new replacement schools for these catchments. This option
proposes to bring together both school catchments and merge the existing schools into
a single non-denominational school. 
The key consideration as part of this option, is the size and location of the school to be
constructed. Potential locations are set out with full analysis in following sections. To
inform the potential size of the single school, the following information has been
considered. 
Table 9: Auchenlodment and Thorn capacity and roll 
School Current
Capacity
Current Roll Projected
Roll 2029/30*
Projected
Roll 2033/34*
Projected
Roll 2037/38*
Auchenlodment 302 207 (68.5%) 262 (87%) 272 (90%) 270 (89%)
Thorn 272 134 (49%) 103 (38%) 90 (33%) 83 (31%)
Combined Totals 574 341 (59%) 365 (63% 362 (63%) 353 (61%)
Page 68 of 347

Page 69

Johnstone Primary School Estate Outline Business Case  39
OFFICIAL-SENSITIVE
The above information demonstrates that whilst the Auchenlodment school population
is expected to grow reflecting the latest housing construction data that has been
included, the overall picture for non-denominational school places in the east of the
town of Johnstone between Thorn and Auchenlodment, is expected to continue to
operate significantly below optimal capacity. 
It should also be recognised that currently there are over 40 pupils who attend
Auchenlodment from out with the catchment through a placing request. Future
projection figures take into account the same volume of placing requests continuing to
be received for this school which contributes to a rising school roll. Whilst parental
choice exists for placing a child in a school where a space exists, school planning, and
admissions policies exist to protect this, where prioritisation should be given to those
who live in the catchment.  It is also widely recognised that schools should be built
based on the most efficient size and scale to serve its defined catchment, and schools
should not be built to an unnecessary oversized scale to accommodate historic placing
request patterns. 
Analysis of current primary school makeup of the town of Johnstone illustrates, where
schools are oversized for demand, this creates anomalies in catchment school
attendance where over 30% of children do not attend their catchment school. 
In the instance above, when considering the size and scale of the new build non-
denominational school for Johnstone, a definitive size will not be agreed until later
stages of project design and agreement. However, for the purpose of site selection, and
provisional analysis, all assumptions will be based on the following: 
• A ‘2-stream’ primary school which means a school that has two classes per year stage
(i.e. P1a, P1b, P2a, P2b etc.) 
• An early years provision of at least the scale of the current provision in Auchenlodment
Primary School. 
• Additional space to support community use, of which the use will be defined through
project development and engagement. 
Based on this information and provisional ‘2-stream’ primary school scope, this would
equate to 434 pupil places. This metric will be fully agreed as the project develops, as
this would suggest circa 80 places in excess of the projected demand. Equally, it is fully
recognised that contingency and flexibility are core elements of school planning, and
the final size of the school development will be defined at a later stage. 
Page 69 of 347

Page 70

Johnstone Primary School Estate Outline Business Case  40
OFFICIAL-SENSITIVE
3.4.2.  Merge Cochrane Castle and Fordbank located at the current Fordbank Primary
School site, and merge catchments
The second aspect of the masterplan reconfiguration promotes Cochrane Castle
Primary School catchment merging with the Fordbank Primary School catchment. 
Fordbank and Cochrane Castle are existing non-denominational schools and ‘gate to
gate’, each school sits in very close proximity at approximately 0.7 miles from each
other. 
The catchment areas border each other and are illustrated below: 
Map 5: Fordbank and Cochrane Castle Catchments 
Page 70 of 347

Page 71

Johnstone Primary School Estate Outline Business Case  41
OFFICIAL-SENSITIVE
In considering the relocation of Cochrane Castle pupils, to Fordbank, current pupil
residences were considered, as illustrated below. A significant portion of the school
population resides in close proximity to Fordbank, and the distance between each
school is largely insignificant in terms of distance compared to pupil residences:
Map 6: Pupil concentrations – Cochrane Castle 
Should catchment areas be merged, relocating Cochrane Castle to Fordbank, a revised
catchment area would be required, as illustrated below, with the dashed line
representing the current boundary between school catchments.
Page 71 of 347

Page 72

Johnstone Primary School Estate Outline Business Case  42
OFFICIAL-SENSITIVE
Map 7: Meged catchment for Fordbank and Cochrane Castle 
Whilst proximity of schools and catchment areas is shown to be supportive of this
proposed change, the most important factor thereafter is the size and scale of the
revised Fordbank Primary school roll by accommodating Cochrane Castle school
catchment. The following table indicates the forecasted pupil projections for both
schools, and their combined total: 
Table 10: Cochrane Castle Fordbank capacity and roll
School Current
Capacity
Current Roll Projected
Roll 2029/30*
Projected
Roll 2033/34*
Projected
Roll 2037/38*
Cochrane Castle   189 103 98 115 109
Fordbank 345 245 218 194 185
Combined Totals 345 348 (100%) 316 (91%) 309 (89%) 294 (85%)
Page 72 of 347

Page 73

Johnstone Primary School Estate Outline Business Case  43
OFFICIAL-SENSITIVE 
This information shows that currently, combining both schools with no intervention,
Fordbank would be at, or slightly in excess of 100% capacity based on the current
school rolls. There are however multiple factors that would support this move, as
follows: 
• The timing of any change would be subject to full statutory consultation and
conclusion of the business case process, meaning no change will take place
imminently. As time progresses, the school roll of both schools is expected to drop
which would help facilitate any change and as demonstrated above, the projected roll
suggests that the over the next 5-10 years the school capacity will move towards the
optimal 85% position.   
• Catchment areas would be fully reviewed and proposed as part of the next stage (Full
Business Case) and it could be possible to make minor adjustments to the catchment
boundary that sits on the eastern edge of the town, prior to any proposal of it
becoming the catchment of the new non-denominational primary school (currently
Thorn and Auchenlodment Primary School). A section of this catchment area could be
repurposed to be part of the new build school catchment, creating a better and more
efficient balance between both schools, and reducing the demand on Fordbank. 
• Currently Fordbank Primary School capacity does not account for three full size class
bases that accommodate a Flexible Learning Resource (FLR) for pupils with additional
support needs. It would be possible to relocate this provision to the West Johnstone
Joint Campus, which, as analysis shows, would have adequate surplus capacity even
when considering the proposed merging of both denominational schools (St
Margaret’s and St David’s). 
These factors will be fully explored as the business case process continues, however
they highlight that multiple avenues of flexibility exist to support this proposal, and it is
a viable masterplan option.
3.4.3. Merge St Margaret’s and St David’s, located at the West Johnstone Joint Campus,
and merge catchments.
The third aspect of the masterplan reconfiguration would follow on the merging of
Cochrane Castle Primary School catchment with Fordbank Primary School, allowing
West Johnstone Joint Campus, which houses St David’s Primary School, to become a
single denominational school. This would subsequently allow the catchment of St
Page 73 of 347

Page 74

Johnstone Primary School Estate Outline Business Case  44
OFFICIAL-SENSITIVE
Margaret’s to merge with St David’s and be placed at the current St David’s Primary
School building. 
St Margaret’s and St David’s are existing denominational schools and again are in very
close proximity to each other. ‘Gate to gate’, each school sits approximately 0.6 miles
apart . 
The current catchment areas border each other and are illustrated below: 
Map 8: St Margarets and St Davids Catchment areas
In considering the relocation of St Margaret’s pupils to St David’s, the current pupil
draw for St Margaret’s Primary School has been considered, shown below. The
proximity of the schools is marked. Given the location of pupil residences, this change
would not impact the vast majority of pupils. 
Additionally, a significant portion of pupils who attend St Margaret’s do not live within
the catchment of the school, living within the St David’s or St Anthony’s catchment
areas.
Page 74 of 347

Page 75

Johnstone Primary School Estate Outline Business Case  45
OFFICIAL-SENSITIVE 
Map 9: St Margaret’s catchment area
Should a merged catchment be progressed, to relocate St Margaret’s, a revised
catchment area for St David’s Primary School would be required, which would look as
follows, with the dashed line representing the current boundary of catchment between
schools, that would be removed:
Map 10: Merged catchment St Margaret’s and St David’s 
Page 75 of 347

Page 76

Johnstone Primary School Estate Outline Business Case  46
OFFICIAL-SENSITIVE
Whilst proximity of schools and catchment areas is shown to be supportive of this
proposed change, the most important factor thereafter is the size and scale of the
revised St David’s Primary school roll in accommodating St Margaret’s school
catchment. The following figures represent the forecasted pupil projections of both
schools, and what these would look like combined:
Table 11: St Davids and St Margarets capacity and roll 
The above information shows that, should Cochrane relocate to Fordbank Primary
School, the remaining capacity at West Johnstone Joint Campus would double to 378. 
These figures indicate that St Margaret’s could be comfortably merged with St David’s
today and still be significantly under current capacity. 
This additional space also offers further flexibility in the overall masterplan
consideration. As noted in Fordbank appraisal above, it would be possible to relocate
the existing FLR resource from Fordbank to St David’s, to utilise excess space, and
support accommodating Cochrane Castle to Fordbank. Additionally, a move of the FLR
to the WJJC would allow for an expansion of the FLR resource to meet any increase in
demand.
3.5. Early Years Provision
Whilst this Outline Business Case focuses on primary school provision across the
Johnstone area catchments, it is acknowledged that any proposed changes to the
existing Primary School learning estate will have an impact on the Early Years provision
across the catchment.  This will be of particular significance where provision forms part
School Current
Capacity
Current Roll Projected Roll
2029/30*
Projected
Roll 2033/34*
Projected Roll
2037/38*
St David’s 189 81 87 109 104
St Margaret's N/A 165 155 156 147
Combined Totals 189 + 189 of
vacant Cochrane
Castle capacity =
378
246 (65%) 242 (64%) 265 (70%) 251 (66%)
Page 76 of 347

Page 77

Johnstone Primary School Estate Outline Business Case  47
OFFICIAL-SENSITIVE
of existing primary school sites which are listed as priority schools for investment. In
this case the existing St Margarets and Auchenlodment Primary Schools have dedicated
Early Years facilities on site.
The impacts on Early Years provision across the Johnstone area will be considered in
full at the Full Business Case Stage for the Johnstone Primary Schools. This will ensure
that provision of Early Years facilities remains consistent and appropriate whilst
delivering the aspirational outcomes of the Council’s learning estate strategy, creating
the best learning environments and facilities possible for both the Primary Schools and
Early Years provision across the Estate.
The above measures will be fully explored as the business case process continues,
however it confirms that it is a viable masterplan proposal. 
3.6. Site Assessment Criteria – Replacing Auchenlodment & Thorn Primaries
The preferred route forward indicates that viable options are dependent on
identification of a suitable site for the creation of a new school building for
Auchenlodment and Thorn. To identify potentially viable sites, a list of site assessment
criteria has been derived by considering core legislative, policy, and technical
considerations. A long list of potential site options has been assessed to identify sites
that present potential viability and warrant further investigation and feasibility
assessment. Note that this stage of the process is a broad pass / fail assessment of long
list options for viability purposes and is not a weighted scored assessment. A more
detailed assessment approach of this nature will form part of the next stage of the
business case process. The assessment criteria utilised are as follows: 
Ownership  Sites wholly within the ownership of Renfrewshire Council will be prioritised
over those owned by others recognising this provides greater certainty of
site deliverability. Consideration will be given to brown field sites where
remediation and use will be of benefit to the community, or where sites can
provide for the retention and or improvement of community facilities,
amenities or green spaces.
Site size/area Sites will be assessed against the median area requirements set out in BB103
as sufficient for a school of the following size and description:
Page 77 of 347

Page 78

Johnstone Primary School Estate Outline Business Case  48
OFFICIAL-SENSITIVE
a) Accommodate a primary school of 434 pupils + early years facility and
additional community space, equating to 18,973m2 
Active Travel A review of sites in relation to their potential to support Active Travel,
proximity to public transport, road networks, cycling and walking routes; the
potential for increased pupil transport requirements.
Planning Sites will be assessed against current local & national planning policies and
current land area designation.
Placemaking Consideration will be given to potential for place making benefits, such as
community and green public spaces. Areas will be assessed for their context
within and connection to the local community and how strategic use of the
site could bring wider, long-term benefits to the area.
Flood Risk Sites will be assessed in line the guidance set out in Policy 22 of the NPF4.
Flood risk potential is common and significant across the Renfrewshire
estate and dependent on the scale of risk, will not necessarily result in the
rejection of a site. The level of risk and site history, along with the impact of
remediation and flood protection will all be considered in the assessment of
the site.
An assessment of site topography will examine factors that may affect the
efficient use of the site, including shape, gradients across and adjoining the
site, features such as water ways, culverts & previous uses. Previous
industrial use may bring issues of ground contamination or existing
buildings that need to be factored into site remediation.
Budget Budget considerations will principally be concerned with highlighting
potential additional costs for abnormal site issues.  For example,
construction on brown-field sites requiring ground remediation works for
ground contaminations. Projects in green or rural areas incurring additional
costs associated with installing utilities, and the construction or upgrade of
local road and pedestrian routes.
Commentary Any additionally significant issues that require consideration, such as
location within the catchment area. 
Table 12: Site Assessment Criteria 
The following 11 sites were identified as being within Council ownership and located in
Johnstone. The sites were considered against the criteria and the requirements for
change. A desktop assessment was completed for each site, which has concluded that
there are 3 options that have strong viability potential and are appropriate for further
Page 78 of 347

Page 79

Johnstone Primary School Estate Outline Business Case  49
OFFICIAL-SENSITIVE
detailed examination and assessment at the next stage. A high level overview of all 11
sites is outlined below. This represents the longlist of site options to deliver the project.
Whilst the detail included in this business case has shown that it is not viable to
consider sites for a new build primary school to the centre or southwest of Johnstone, a
comprehensive exercise has been conducted across the breadth of Johnstone,
including sites that ultimately are not appropriate due to their location in the town.
Whilst these sites have been assessed, and the findings are presented below; they will
not be supported as viable options to proceed with.
Additionally, an exercise was also conducted to analyse areas of land in private
ownership in the town, to determine their potential viability to develop a new primary
school. It was concluded that there is no additional land in private ownership that offers
a better option than those sites in Council ownership and was therefore not progressed
any further. 
Page 79 of 347

Page 80

Johnstone Primary School Estate Outline Business Case  50
OFFICIAL-SENSITIVE
3.7. Site Options Assessment
11 sites within Council ownership have been identified and assessed. The location of the sites is shown on the map below. A full
assessment of all 11 sites then follows.
Map 11: Site Options
Page 80 of 347

Page 81

Johnstone Primary School Estate Outline Business Case  51
OFFICIAL-SENSITIVE 
Page 81 of 347

Page 82

Johnstone Primary School Estate Outline Business Case  52
OFFICIAL-SENSITIVE 
Page 82 of 347

Page 83

Johnstone Primary School Estate Outline Business Case  53
OFFICIAL-SENSITIVE 
Page 83 of 347

Page 84

Johnstone Primary School Estate Outline Business Case  54
OFFICIAL-SENSITIVE 
Page 84 of 347

Page 85

Johnstone Primary School Estate Outline Business Case  55
OFFICIAL-SENSITIVE 
Page 85 of 347

Page 86

Johnstone Primary School Estate Outline Business Case  56
OFFICIAL-SENSITIVE 
Page 86 of 347

Page 87

Johnstone Primary School Estate Outline Business Case  57
OFFICIAL-SENSITIVE 
Page 87 of 347

Page 88

Johnstone Primary School Estate Outline Business Case  58
OFFICIAL-SENSITIVE 
Page 88 of 347

Page 89

Johnstone Primary School Estate Outline Business Case  59
OFFICIAL-SENSITIVE 
Page 89 of 347

Page 90

Johnstone Primary School Estate Outline Business Case  60
OFFICIAL-SENSITIVE 
Page 90 of 347

Page 91

Johnstone Primary School Estate Outline Business Case  61
OFFICIAL-SENSITIVE 
Page 91 of 347

Page 92

Johnstone Primary School Estate Outline Business Case  62
OFFICIAL-SENSITIVE
Site Summary 
Site No Site Name Strategy (New
build/Retrofit)
Recommended
to take forward
to FBC
Rationale
1 Existing Auchenlodment Primary
School Site, 
New Build/ Extend &
Retrofit
Yes The site benefits from being the established focal point for the local
community, providing primary school teaching, as well as nursery
and after school care. The heavy grading across the site raises
design challenges that may compromise design options; however,
the overall site area can accommodate this development through
careful design consideration. As this school lies in a tight
neighbourhood area, particular attention will be required on the
views of the local community for the impact this development may
have, and what benefits can be brought. 
2 Existing Johnstone High School
Site
New Build No This site is located out with the catchment areas of Thorn and
Auchenlodment primaries and is therefore considered unsuitable
as part of the wider estate masterplan and reconfigured
catchments. This Site is not recommended for further
consideration at FBC
3 Existing St Margaret’s Primary
School Site, 
Extend / Renovate / New
Build
No The existing site is significantly undersized to accommodate a
modern primary school under BB103. Although a two-story design
or refurbishment of the existing school may improve the condition
Page 92 of 347

Page 93

Johnstone Primary School Estate Outline Business Case  63
OFFICIAL-SENSITIVE
or sufficiency of the school, the external area is insufficient to
accommodate external learning, social and sports spaces that are
standard in education provision. This option is not recommended
for further consideration at FBC Stage
4 Existing Thorn Primary School
Site
New Build Yes The central location of the site within its catchment helps to
promote active travel, however the access point to the site requires
improvement. The triangular shape of the site places design
challenges to the development of an optimised design.
Development of the site will likely require compromise on the scale
of external learning, social and sports spaces. 
5 Former primary school site &
housing disposal site, Beith
Road – Greenend Avenue,
Johnstone
New Build No This site is located out with the catchment areas of Thorn and
Auchenlodment primaries and is therefore considered unsuitable
as part of the wider estate masterplan and reconfigured
catchments. This Site is not recommended for further
consideration at FBC
6 Beith Road Playing Fields,
Johnstone 
New Build No This site is located out with the catchment areas of Thorn and
Auchenlodment primaries and is therefore considered unsuitable
as part of the wider estate masterplan and reconfigured
catchments. This Site is not recommended for further
consideration at FBC
Page 93 of 347

Page 94

Johnstone Primary School Estate Outline Business Case  64
OFFICIAL-SENSITIVE
7 Sites at Spateston Road
/ Hallhill Road, Johnstone 
New Build No This site is located out with the catchment areas of Thorn and
Auchenlodment primaries and is therefore considered unsuitable
as part of the wider estate masterplan and reconfigured
catchments. This Site is not recommended for further
consideration at FBC
8 King George V Playing Fields,
Miller Street, Johnstone 
New Build No There is significant flood risk at the proposed site which would
require major engineering works to ensure that both the land and
buildings are sufficiently protected from flood risks - The cost of
such measures is considered prohibitive compared to alternative
options. This Site is not recommended for further consideration at
FBC
9 Poplar Avenue Playground,
Johnstone 
New Build Yes The site is well placed centrally within the Johnstone Castle
community and sits between the current Thorn and
Auchenlodment schools. It has a high level of permeability that
would support active travel routes. However, additional works,
interventions may be required to improve safe pupil routes
particularly where pupils need to cross Beith Road. Although there
is a gradient across the site it is not significant and should not
compromise design development.  Although a change of use in the
site would be a direct loss of amenity for the local community this
could be offset by the incorporation of shared space in the
development of a proposal. There is a high prevalence of on street
Page 94 of 347

Page 95

Johnstone Primary School Estate Outline Business Case  65
OFFICIAL-SENSITIVE
parking which may need assessment, monitoring and additional
controls during a construction phase. 
10 Tannahill Playground, Tannahill
Crescent, Johnstone 
New Build No This site is located out with the catchment areas of Thorn and
Auchenlodment primaries and is therefore considered unsuitable
as part of the wider estate masterplan and reconfigured
catchments. This Site is not recommended for further
consideration at FBC
11 Thomas Shanks Park,
Johnstone 
New Build No This site is located out with the catchment areas of Thorn and
Auchenlodment primaries and is therefore considered unsuitable
as part of the wider estate masterplan and reconfigured
catchments. This Site is not recommended for further
consideration at FBC
Table 13: site assessment summary 
Any site which is recommended for further investigation as a viable option will be subject to thorough legal checks around
ownership to ensure a full understanding of any constraints on development and its likely impact. Should any site require legal
processes to amend land designation this would be fully considered at the next stage of assessment and reflected in project
timelines where necessary.
Page 95 of 347

Page 96

66
OFFICIAL-SENSITIVE
3.8. Shortlisted Options for new Thorn / Auchenlodment 
Based on the assessments, the following options can be deemed potentially viable
locations for a new build school merging Thorn and Auchenlodment. 
Option 01
Extend and refurbish the Existing Auchenlodment at Site 01 - Existing Auchenlodment Primary
School, Aspen Place, Johnstone
Option 02
New Build at Site 01 - Existing Auchenlodment Primary School, Aspen Place, Johnstone
Option 03
New Build at Site 04 - Existing Thorn Primary School, Thorn Brae, Johnstone
Option 04
New Build at Site 09 - Poplar Avenue Playground, Johnstone 
Table 14: Options Shortlist 
It is recommended that these options are taken forward to the next stage of assessment
at Full Business Case, to be considered as part of extensive engagement, and further
technical and cost analysis.
Of the four options above, two are variations of the same site, resulting in a shortlist of
three sites. These three shortlisted sites are shown in Map 12, below: 
Page 96 of 347

Page 97

Johnstone Primary School Estate Outline Business Case  67
OFFICIAL-SENSITIVE
Map 12: Shortlisted Sites
Any site which is recommended for further investigation as a viable option will be
subject to thorough legal checks around ownership to ensure a full understanding of
any constraints on development and its likely impact. Should any site require legal
processes to amend land designation this would be fully considered at the next stage of
assessment and reflected in project timelines where appropriate.
3.9. Indicative Costs
The indicative costs are based on preliminary information and should be considered a
framework from which detailed cost plans can be developed. The indicative costs have
been built from high level information, benchmarking from various sources including
the Scottish Futures Trust (SFT) funding metric, cost information from current
Renfrewshire Council education construction projects, costs from other Council’s
similar school projects and adjusting the costings where specific knowledge has been
gained from the desktop assessment of the site options. The BCIS cost indices have also
been used to calculate inflation up to the end of the anticipated construction period. 
Page 97 of 347

Page 98

Johnstone Primary School Estate Outline Business Case  68
OFFICIAL-SENSITIVE
In considering the potential construction costs, it should be noted that all construction
sites are unique and will differ from site to site in ways that will impact construction
costs. This is as a result of ‘abnormal’ factors exclusive to every site. No two sites are the
same, for example flood risk mitigation or ground remediation may be more or less
consequential from site to site, with differing impact on the overall construction costs
as to how the design addresses the site. In that sense, the indicative costs should be
taken as a guide only, detailed site options appraisal will be necessary to fully
understand the geotechnical characteristics and construction cost impact before
making any final recommendations. 
The project is currently at RIBA Plan of Works Stage 0 where at this stage it is key to
define vision and goals, identify needs and opportunities and to establish a strategy.
Therefore, there is no current design information. Key assumptions and exclusions are
required to establish indicative costs and clearly indicate what is assumed as included
in the costs and what is excluded at this stage.
To project an estimated cost for inflation purposes, the construction cost has been
based on an assumed construction commencement date of 2030. All figures should be
noted as exclusive of VAT.
Key assumptions and exclusions were used in compiling the indicative costs in the
absence of any design commencing. This approach recognises that whilst a range of
cost estimates have been presented, these remain volatile, subject to external factors
and site specific detail that will become clearer as sites are investigated, and options
further explored at the next stage.
It is important to highlight as part of this process, that no budget will be requested or
crystalised until further work has been undertaken into the validation of each option,
and a recommendation is made thereafter at the conclusion of the Full Business Case. 
As shown previously in Table 3, the indicative costs are as follows: 
Page 98 of 347

Page 99

Johnstone Primary School Estate Outline Business Case  69
OFFICIAL-SENSITIVE
Cost scenario  Range
Retrofit Auchenlodment and
extend, for 434 pupils and early-
years facility matching current
provision.
£35 - £45m
Build a 2 stream primary for 434
pupils, and early-years facility
that matches current provision
£25 - £45m 
3.10. Transport Considerations
Renfrewshire Council policy states that primary school pupils who live more than one
mile away from their catchment school by the shortest safe walking route, are eligible
for home to school transport. 
The following tables shows current rates of eligibility for school transport on the basis
of the options proposed in the OBC, for the existing school sites and the potential new
sites outlined above. 
3.10.1. Merged Thorn and Auchenlodment
Based on pupil census data for 2025/6, of the pupils who reside within the catchment
and attend the catchment school, no pupils are eligible for school transport for either
Auchenlodment or Thorn Primaries.  If the catchments were to merge, based on this
data it would change as shown below. This does not take into account the expected roll
increase at a new merged school and is based on 2025-26 data for comparison only. 
Page 99 of 347

Page 100

Johnstone Primary School Estate Outline Business Case  70
OFFICIAL-SENSITIVE
Current School Site Pupils Eligible
Thorn PS 0
Auchenlodment PS 0
Proposed School Site Pupils Eligible
New school at site 1 –
Auchenlodment  36
New school at site 4 –
Thorn 53
New school at site 9 –
Poplar Avenue 0
Table 15: Transport eligibility Thorn/Auchenlodment   
3.10.2. Merged Cochrane Castle and Fordbank
Based on pupil census data for 2025/6, of the pupils who reside within the catchment
that attend the catchment school, no pupils are eligible for school transport for either
Cochrane Castle or Fordbank Primaries.  If the catchments were to merge, based on this
data it would change as shown below.  This does not take into account the expected roll
increase at a new merged school and is based on 2025-6 data for comparison only. 
Table 16: Transport eligibility Cochrane Castle/Fordbank 
Current School Site Pupils Eligible
Cochrane Castle 0
Fordbank 0
Proposed School Site Pupils Eligible
Fordbank, incorporating
Cochrane Castle 36
Page 100 of 347

Page 101

Johnstone Primary School Estate Outline Business Case  71
OFFICIAL-SENSITIVE
3.10.3. Merged St Margaret’s and St David’s
Based on pupil census data for 2025/6, of the pupils who reside within the catchment
that attend the catchment school, 10 pupils are eligible for school transport for St
Margarets and none for St Davids.  If the catchments were to merge, based on this data it
would change as shown below. This does not take into account the expected roll
variation at a new merged school and is based on 2025-26 data. 
Current School Site Pupils Eligible
St Margaret’s 10
St David’s 0
Proposed School Site Pupils Eligible
West Johnstone Joint Campus 57 
Table 17: Transport Eligibility St Margaret’s/St David’s 
Page 101 of 347

Page 102

72
OFFICIAL-SENSITIVE
3.11. Timeline and Next Steps
Should the recommendations contained in this OBC be approved, officers will commence work to identify and recommend
a preferred option for a new building for Auchenlodment and Thorn Primaries. 
The next steps in that process are to complete a Full Business Case articulating the recommended option by the end of
2026, for presentation and agreement early in 2027. If approved by Council, work would begin on Statutory Consultation to
be carried out during 2027. Timescales would be dependent on timing around Local Government elections scheduled for
May 2027 and completion of the associated RIBA stages, with the current anticipated timeline showing that construction
could commence by 2030. 
Page 102 of 347

Page 103

73
OFFICIAL-SENSITIVE
4. COMMERCIAL CASE
4.1. Approach
An overarching procurement strategy will be prepared as the Project develops, and a
preferred option for delivery is identified. The strategy will set out the various contracts
required to deliver the project including the proposed procurement route, contract
objectives, tender methodology and timelines. Pre-market engagement and
consultation will be undertaken to ensure a detailed market analysis is completed to
test the suitability of the proposed approach to procurement and ensure proposals are
attractive and viable for the competitive market. 
The Project procurement strategy will remain a live document, updated to reflect the
outcomes of each stage of the project’s development and responsive to changes in
market conditions identified through analysis and ongoing engagement. Bespoke
contract strategies will be developed for each requirement detailing the specific
requirements and tendering methodology adopted for that contract while aligning with
the overall aims and objectives set out in the overarching strategy.
4.2. Service Requirements
The project team require external consultants to provide specialist services and works
to support the development of the Full Business Case. Services required may include
support with space planning, site surveys, intrusive building surveys, legal and planning
advisers and cost consultants.  The Project team will work with dedicated procurement
officers to develop strategies for each contract requirement with consideration to the
Council’s standing orders relating to Contracts and principles of best value.
4.3. Project Development
Procurement strategy will be developed for the FBC stage that will discuss in detail the
most beneficial route to market depending on the proposed final recommendation. 
Page 103 of 347

Page 104

Johnstone Primary School Estate Outline Business Case  74
OFFICIAL-SENSITIVE
The procurement process for the detailed design and construction stages of the project
is subject to development. The Council is looking at a range of options including
framework routes for procurement of consultants and/ or contractors. In the event
there are no suitable existing arrangements to use, it is anticipated options will be as
follows:
• Multi- disciplinary design team (MDDT) procured using Restricted Procedure in
accordance with Council’s Standing Orders relating to Contracts and Public
Contracts (Scotland) Regulations 2015 as amended. 
• Construction works contract, likely to follow a Restricted Procedure in
accordance with Council’s Standing Orders relating to Contracts and Public
Contracts (Scotland) Regulations 2015 as amended. It is likely to be a 2-stage
contract model with pre-construction services agreement (PCSA) to allow early
contractor involvement followed by award of main works contract once detailed
design is complete. 
• Ad-hoc/specialist consultant support may be required to support the project
team. The project team will work with dedicated procurement officers to
develop a strategy for each contract with consideration to the Council’s standing
orders relating to Contracts and principles of best value.   
Page 104 of 347

Page 105

Johnstone Primary School Estate Outline Business Case  75
OFFICIAL-SENSITIVE
5. FINANCIAL CASE
5.1. Project Funding – Capital Expenditure
Until such time that a specific option has been decided to proceed with at the
conclusion of the business case process, no formal project exists and therefore no full
capital budget exists. The purpose of this business case process is to allow a decision to
be made on the best option to commit capital expenditure on, and only at the
conclusion of the process will a request be made to Council to commit to the required
project budget. 
This OBC has outlined the current estimated cost to deliver on the agreed route
forward, and this estimate will continue to be refined and updated as more detail
becomes available at the next stage of assessment. 
5.2. Approvals Process
To date, work to develop proposals to reconfigure primary school provision in
Johnstone has not incurred any external costs, with all spend being incurred on already
budgeted internal resources. To take the project forward through to approval of the
FBC further costs will be incurred on both internal and external resource. This spend is
required to ensure the Council is presented with a robust and tested recommendation
with professional advice on the specifics of the option.
To conclude and present the FBC for this project, a budget will be required and will be
progressed through established budget setting processes. This budget is made up of all
internal technical resource costs and all external professional services and consultant
appointments required to interrogate and validate the shortlist of options. This cost is
made up as follows:
• Internal technical management costs to deliver project feasibility, cost
management, architectural services and project management
• Flood risk assessments
• Roads and transportation assessments 
• Space planner to produce timetabling and demand modelling to develop
schedule of accommodation 
• Civil engineering to conduct ground investigation surveys on shortlist of sites 
Page 105 of 347

Page 106

Johnstone Primary School Estate Outline Business Case  76
OFFICIAL-SENSITIVE
• Structural engineer to conduct intrusive survey of existing asset as required
Approvals for spending this development budget will be agreed through current project
governance to ensure accountability and transparency. 
5.3. Revenue Expenditure
The new primary school will be owned and operated by Renfrewshire Council. The
operating model will align with current arrangements for Renfrewshire Council assets
and learning establishments. 
Potential operating costs for a new school will be further explored as part of the Full
Business Case which will be developed throughout 2026. Whole life cost modelling will
capture elements of future revenue spend across the expected lifetime of the proposed
new school.  Operating costs for the current school have been captured and are
indicated in the Strategic Case, above. Initial indication shows that the cost of operating
a new primary school would be broadly reflective of current operational costs including
staffing, and facilities management. 
It should however be noted that depending on the specific location of the shortlist of
options, the cost of school transport could vary, albeit this cannot be seen as a single
measure of value in an option. The cost of delivering home to school transport has to be
considered in the broader context of the educational and community value that can be
derived through the development of a new school. This matter will be explored in more
detail at the FBC stage where each of the shortlisted options will be investigated in
greater detail for the estimated revenue costs associated with it. 
When considering the wider context of this business case and the preferred route
forward, it is anticipated that significant financial savings can be achieved through the
redesign of the Johnstone Primary Learning Estate. This matter will be fully
investigated throughout the next stage of the process as part of the Full Business Case. 
Page 106 of 347

Page 107

Johnstone Primary School Estate Outline Business Case  77
OFFICIAL-SENSITIVE
5.4. Indicative Costs
The indicative cost information outlined in sections 1.7 and 3.6 was prepared using
current market cost information, including Scottish Futures Trust (SFT) benchmark
data, cost information associated with current Council education construction projects,
and BCIS cost forecast indices to underpin indexing current construction cost metrics to
anticipated future construction date. Indicative costs are based on an assumed
construction commencement date of 2030 and all costs should be considered as
exclusive of VAT. 
In considering the potential construction costs, it should be noted that all construction
sites are unique and will differ from site to site in ways that will impact construction
costs. This is as a result of ‘abnormal’ factors exclusive to every site. No two sites are the
same, for example flood risk mitigation or ground remediation may be more or less
consequential from site to site, with differing impact on the overall construction costs
as to how the design addresses the site. In that sense, the indicative costs should be
taken as a guide only, detailed site options appraisal will be necessary to fully
understand the geotechnical characteristics and construction cost impact before
making any final recommendations. 
The project is currently at RIBA Plan of Works Stage 0 where at this stage it is key to
define vision and goals, identify needs and opportunities and to establish a strategy.
Therefore, there is no current design information. Key assumptions and exclusions are
required to establish indicative costs and clearly indicates what is assumed as included
in the costs and what is excluded at this stage.
The cost range, as shown previously in Table 2, gives a high-level indicative estimate
based on a number of key assumptions and exclusions which may be subject to change,
given the early stage of the project. These will be further refined as the project
develops. 
Cost scenario Range
Retrofit Auchenlodment and extend, for 434 pupils and
early-years facility matching current provision. £35 - £45m
Build a 2-stream primary for 434 pupils, and early-years
facility that matches current provision. £25 - £45m
Page 107 of 347

Page 108

Johnstone Primary School Estate Outline Business Case  78
OFFICIAL-SENSITIVE 
The key assumptions and exclusions used in compiling potential costs help ensure full
financial transparency. The following are highlighted as examples:
Assumptions:
• It is assumed that Auchenlodment, St Margaret’s and Thorn shall remain operational
while the new primary school construction works are ongoing, apart from the option to
rebuild/retrofit on the site of Auchenlodment where a decant allowance has been
required.
• Estimated costs are based on construction costs at prices (4th Qtr. 2025)
• It is assumed services and utility connections are available locally
• Inflationary allowances have been made in accordance with current published BCIS
Tender Price Indices
Exclusions:
• Refurbishment works costs to the existing St Margaret’s and Thorn Primary Schools
during construction or retrofit works have been excluded
• Legal Costs 
• Planning Conditions
• Section 75 Planning works/contributions
• Operational costs, Hard FM or Lifecycle/Whole Life costs
These potential costs were produced for a new build/retrofit primary school for the
provisional scope identified as part of this business case, which is a school of 434
capacity, with early years provision, and a level of additional community use space.
5.5. Financial Risk / Optimism Bias
In calculating potential costs, the estimate includes an allocation for risk and
uncertainty. For example, it must be acknowledged that cost indications are based on
an indicative programme that includes a construction period, commencing in 2030.
Where a delay occurs and the programme slips, costs would inevitably change as
factors such as inflation are brought to bear.
Optimism bias allows for mitigation of any unexpected increases or changes
throughout the process but cannot account for all external factors. 
Page 108 of 347

Page 109

Johnstone Primary School Estate Outline Business Case  79
OFFICIAL-SENSITIVE
5.6. Interdependencies
As indicated, the project examining the future of Johnstone Primary School Estate is
developing concurrently with two other Learning Estate capital projects. All three
projects are working to an overall aspirational budget commitment that will continue to
be defined and will require Council commitment to secure the required budget at the
conclusion of the Full Business Case process. 
Different requirements, circumstances and context for each project will have a bearing
on the final cost requirements and their share of the overall funding available, making
them highly dependent on each other. 
Page 109 of 347

Page 110

Johnstone Primary School Estate Outline Business Case  80
OFFICIAL-SENSITIVE
6. MANAGEMENT CASE
6.1. Project Management and Project Governance Overview
Currently, Renfrewshire Council is undertaking several capital projects focussed on
learning estate improvements, covering both primary and secondary schools. This work
has built on existing expertise within the key teams likely to be involved in any project
to improve the provision of the Johnstone primary learning estate, giving the Council
an experienced pool of resources to draw from. Work is underway within Children’s
Services to create a dedicated Learning Estate Programme Team to deliver on the
ambition of the Learning Estate Strategy.
6.2. Project Roles
Learning Estate projects will be overseen at Chief Officer level by the Director of
Children’s Services who acts as the Programme Sponsor for all projects. Senior
accountability is assumed by the Head of Education for Strategy and Improvement who
takes the position of Senior Responsible Owner (SRO). 
In common with all Learning Estate projects, delivery of change for the Johnstone
Primary School Estate will be led by the Strategic Learning Estate Manager who holds
senior accountability of project delivery to the SRO with day-to-day project leadership
guiding the project teams through all aspects from inception, through to construction
execution and handover. This leadership hierarchy will ensure that projects are
successfully delivered upholding quality across project time, cost, and scope, ultimately
delivering the intended outcomes and high-quality learning establishments for all.  The
Strategic Learning Estate Manager will be guided by subject matter experts who will
control and resource the programme with the appropriate skillsets, with professional
technical management in construction and the built environment coming from the
Council’s Technical Services. 
It is crucial to note however, that whilst leadership roles have been established,
appropriate officer level programme governance has been established to ensure that
there is no single source of programme decision making. This process ensures
accountability and robust decision making with representation covering all key Council
services. 
Page 110 of 347

Page 111

Johnstone Primary School Estate Outline Business Case  81
OFFICIAL-SENSITIVE
Each project will require bespoke levels of resource depending on the scale and
complexity but will follow a consistent approach. A dedicated Programme Manager will
lead the overall success and delivery of the programme by implementing and executing
full governance and control across all projects, supporting the Strategic Learning Estate
Manager. 
Project management resource will be provided by the Council’s Programme
Management Unit to cover business case development, business change processes, and
fundamental client-side project management throughout the lifecycle. Technical
expertise will be provided by the Councils’ Technical Services who will provide
construction project management, contract management, and subject matter expert
roles where appropriate through design and delivery. 
Additional resources will be required for each project with ongoing resource allocation
covering critical services such as Finance, Communications, Education, Procurement,
and Legal. 
All resources allocated to Learning Estate projects will report to the Strategic Learning
Estate Manager for their involvement in these projects, with decision making being
made by the appropriate authority level, either the Project Board, or Delivery Board, as
noted below in section 6.3. 
The Council has developed significant experience over the past 15 years delivering
major and complex investment programmes across the learning estate (which includes
three major projects currently in delivery), leisure estate, cultural estate as well as
major transport infrastructure. This experience places the Council in a strong position
to understand the resource and governance arrangements required to deliver
investment programmes of scale and this will be invaluable to support the Council’s
investment focus shifting to a long-term strategic learning estate investment
programme.
6.3. Reporting Arrangements
This project will be monitored using current project management tools to record
progress against timelines, monitor risk, and track change etc. Reporting will be used to
manage and drive the project and ensure accountability to the public more generally.
Beyond day-to-day project management activity, reporting will occur at regular
Page 111 of 347

Page 112

Johnstone Primary School Estate Outline Business Case  82
OFFICIAL-SENSITIVE
intervals to established boards, with key decisions and milestones signed off at an
appropriate level. 
At Council level, this project will be reported to the Education & Children’s Services
Policy Board for all decision making and progress updates. Where financial decisions on
matters such as high value contract awards are required, this project will report to the
Finance, Resources & Customer Services Policy Board as per agreed Council
governance.
At officer level, this project will be reported to both a Project Board, and a Delivery
Board. The Delivery Board holds the senior officer level decision making authority for
the project and will act as the ultimate officer level decision making body within its
terms of reference and agreed scope/authority. This Board consist of Director / Head of
Service representation of all key Council services. 
The Project Board will consist of Senior Managers / Heads of Service of all key Council
services and will act as the operational decision making body for all matters as agreed
in the scope, budget, and timeline of the project. 
This governance is illustrated in the image below:
Page 112 of 347

Page 113

83
OFFICIAL-SENSITIVE 
Education & Children s Services Policy Board
Learning Estate Delivery Board
Chair – Director of Children s Services
Director / Head of Service Representation
Strategic Learning Estate Manager (Strategy & Delivery Lead)
Learning Estate Project Board
Chair – Head of Education Strategy & Improvement
Head of Service / Senior Manager Representation
Finance, Resources & Customer Services Policy Board (FRCS)
All Learning Estate High Value Project Contract Awards
Senior Managers and Specialist Advisers
Project Delivery Team
Council Decision Making Level
Officer Decision Making Level
Project Delivery Level
Page 113 of 347

Page 114

84
OFFICIAL-SENSITIVE
6.4. Procurement Strategy
The project team has a dedicated specialist procurement officer who will take the lead
in developing an overarching Learning Estate Project Procurement Strategy. 
In the short term, initial assessment of the project will identify any requirement for
consultant services to assist with technical aspects of project development. If the OBC
is approved at E&CS Policy Board, consultants will be required to support the project
team as it develops a Full Business Case (FBC). This work will be led by the specialist
procurement officer and has been referenced in the Commercial Case, above.
6.5. Overall Project Benefits
Delivery of change to primary school provision in Johnstone would deliver key project
benefits to local schools and stakeholders as well as the wider community:
• Ensuring the most productive use of the primary school estate across Johnstone is
achieved to ensure all pupils will be educated in the best possible learning
environments over the long term
• A reduction in operational cost and increased efficiency through provision of a school
estate that fits demand and can operate at optimal occupancy
• Maximise operational efficiency through modern, sustainable and efficient buildings
with a reduced need for maintenance of dilapidated buildings. 
• A reduction in Renfrewshire Council’s carbon footprint through the operation of a
school better equipped to meet energy performance targets through more efficient
operation.
• Securing community anchor sites in the catchment area providing facilities for public
use outside of school hours.
6.6. Community Benefits Realisation Arrangements
Renfrewshire Council has an established and successful Community Benefits approach
which aims to deliver social, economic and environmental benefits for Renfrewshire’s
communities as part of contract delivery. Community benefits are considered for
inclusion on all regulated procurement over £50,000 and are delivered by suppliers and
contractors in partnership with local organisations and supported by the Council’s
Page 114 of 347

Page 115

Johnstone Primary School Estate Outline Business Case  85
OFFICIAL-SENSITIVE
Community Benefit Forum and Delivery Partners. Monitoring of community benefits will
be managed through project and delivery boards and a benefits realisation strategy will
be aligned with the overarching procurement strategy.
6.7. Risk Management Arrangements
The project team has commenced a risk register to capture and monitor risk on behalf
of the Council. Risk management will remain an active part of the project management
process for the duration of this project with regular dedicated sessions focussing on the
risk register to complement its inclusion as a standing agenda item in project working
groups and meetings at all levels.
6.8. Equalities and Human Rights
Any equality impact on current users and staff at all schools in Johnstone, as well as the
wider community, as a consequence of this project, will be considered at all stages it
develops. Initial Equality and Human Rights Impact Assessments (EQHRIA) have been
carried out at programme level. This will inform the basis of all future assessments,
where individual impact assessments will be conducted, specifically relating to the
upcoming community engagement and consultation. All proposals outlined in this
business case would be subject to formal statutory consultation where impacts will
again be considered in detail.
6.9. Communication, Engagement, and Community Voice
Informal community and stakeholder engagement commenced in August this year,
following publication of the SCC. Engagement has included meetings with
headteachers, ward members and the parent council for all Johnstone primary schools,
to keep all interested parties informed of progress and likely timelines for this project. 
A survey was issued to parents and staff, inviting their views on the school and what
they would improve, what should be important for any future investment. Those
findings are referenced in the Strategic Case (section 2.6, above). Responses to the
survey helped shape analysis of the routes forward and options considered in this OBC. 
Page 115 of 347

Page 116

Johnstone Primary School Estate Outline Business Case  86
OFFICIAL-SENSITIVE
Engagement with key stakeholders and the wider community will be key to the
successful determination of the overall best value option to proceed with at the
conclusion of the Full Business Case. To ensure clear communication and stakeholder
input to the process, the project team will carry out an informal consultation on the
short-listed options described in section 3.5 from April 2026.  More detail is provided in
section 7.1 Summary of Shortlisted Options and Next Steps 
Page 116 of 347

Page 117

Johnstone Primary School Estate Outline Business Case  87
OFFICIAL-SENSITIVE
7. CONCLUSION
7.1. Summary of Shortlist of Options and Next Steps 
This OBC confirms that current capacity, future roll projections and the varying
conditions of the school estate in Johnstone can only be resolved by a masterplan
reconfiguration of the Johnstone learning estate which takes account of the following
aims: 
Route 4:  Masterplan Redesign of the Primary School Estate in Johnstone 
Address the overprovision of primary school places in Johnstone and the requirements of
the 3 priority schools of Thorn, Auchenlodment, and St Margaret’s, by:
• Making best use of capacity of existing high-quality buildings including St Anthony’s,
West Johnstone Joint Campus, and Fordbank. 
• Considering the location of any new build school facility that would look to combine
more than one existing school on the same site
• Considering the most appropriate catchment area configurations to support efficiency
and capacity. 
The business case concludes that the following 3 elements should be included in a masterplan
approach, capturing those options that should be progressed to the Full Business Case stage: 
a) Merge Thorn and Auchenlodment catchment areas, combining both non-     
denominational schools in a single modern building by one of the following
means: 
1. Site 01 - Retrofit and extend the existing Auchenlodment Primary School building
to provide a modern 2 stream primary school with capacity for 434 pupils at
Aspen Place, Johnstone 
2. Site 01 – Construct a new build 2 stream primary school with capacity for 434
pupils at the existing Auchenlodment primary school site at Aspen Place,
Johnstone 
3. Site 04 - Construct a new build 2 stream primary school with capacity for 434
pupils, at the site of the existing Thorn Primary, Thorn Brae, Johnstone 
4. Site 09 - Construct a new build 2 stream primary school with capacity for 434
pupils on a new Site at Poplar Avenue, Johnstone
Page 117 of 347

Page 118

Johnstone Primary School Estate Outline Business Case  88
OFFICIAL-SENSITIVE 
b) Merge Cochrane Castle and Fordbank catchment areas, combining both non-
denominational schools at the current Fordbank Primary School site. 
c) Merge St Margaret’s and St David’s catchment areas, combining both    
denominational schools at the West Johnstone Joint Campus, creating a single
denominational school.
Note: St Anthony’s Primary is not affected by the proposed options as it is a high quality
building operating at sufficient capacity. Further detail is given in section 3.
To prepare the Full Business Case, more detailed site assessments, further cost
modelling, and community consultation are required to recommend a single best value
option to proceed with on conclusion of the next stage of the business case process. 
Taking into account the Council’s commitment to include communities in decision
making, the project team will conduct an informal consultation on the options outlined
above.  The purpose of carrying out an informal consultation during the Full Business
Case stage is to:
• Comply with recommended best practice in ensuring that the public are involved
in decision making
• Comply with UNCRC to involve children in making decisions that affect them
• Explain the options clearly to stakeholders and the public
• Understand early in the process local views on the options
• Refine options based on local views and feedback
• Present a final option that is the most suitable for the community and the council
• Reduce the potential for community objections at a later stage
• Enhance relationships with local communities/individuals
Key stakeholder groups that will be engaged in the informal consultation include:
• Pupils and parents – parent councils, all parents and pupils
• Local community – Community councils, youth groups, local development
groups, local interest groups, general population in school catchment
• School staff - Head teachers, teaching staff, admin staff, support staff.  
• Local early years children and parents
• Politicians – local ward members, ECSPB members, local MPs, local MSPs, 
• Council Services – all council services who contribute to the creation, running and
maintenance of school facilities
• Future building users – groups with letting arrangements 
• Neighbours – current and potential neighbours to school buildings/sites.
Page 118 of 347

Page 119

Johnstone Primary School Estate Outline Business Case  89
OFFICIAL-SENSITIVE
• Statutory bodies – Education Scotland, Police Scotland, Scottish Fire and Rescue
Service, Sport Scotland. 
Activity Stakeholders Methods
Preparation and
options
development
Senior Officers and SLT
Elected Members
Head Teachers
Briefings
Workshops
1-1 interviews
Targeted Early
Engagement
Parent Councils/Parents
Community Councils
Local Community Groups
Pupils
Staff
Council Services
Roud table meetings
Briefings
Workshops
Focus Groups
Surveys
Broad Public
Engagement 
Associated school parents
and pupils
General public 
Neighbours
Surveys
Public events
Analysis and
Refinement
Project team 
Table 18: Engagement Activity
The Full Business Case process is expected to take the remainder of 2026 to complete
and will be presented back to a future cycle of the Education and Children’s Services
Policy Board in 2027 for approval of a final recommended option. 
Page 119 of 347

Page 120

Johnstone Primary School Estate Outline Business Case  90
OFFICIAL-SENSITIVE 
Children’s Services
Renfrewshire Council
Renfrewshire House
Cotton Street
Paisley
PA1 1BR 
Page 120 of 347

Page 121

1
OFFICIAL-SENSITIVE 
Johnstone High School
Outline Business Case
Page 121 of 347

Page 122

Johnstone High School Outline Business Case  2
OFFICIAL-SENSITIVE
DOCUMENT CONTROL SHEET 
Title: Johnstone High School
Version Number 2
Document Type: Outline Business Case
Author: Learning Estate Project Team
Date Published: 18/02/2026
Document Versions: 
Version: Name: Update: Date
V0.1 Project Team Initial draft 28/11/2025
V0.2 Project Team Amendments and further draft 16/12/2025
V1 Project Team First draft for review  17/12/2025
V1.1 Project Team Amendments and further draft 19/01/2026
V1.2 Project Team Further amendments 13/02/2026
V2 Project Team Final draft following review by Chief
Officers 18/02/26
Supporting Documentation / Location: 
Document Title: Location:
Strategic Case for Change Document.ashx
Page 122 of 347

Page 123

Johnstone High School Outline Business Case  3
OFFICIAL-SENSITIVE 
Table of Contents
1. EXECUTIVE SUMMARY ........................................................................ 6
1.1. Introduction .......................................................................................... 6
1.2. Background ........................................................................................... 7
1.3. Opportunity ........................................................................................... 9
1.4. Scope and Objectives ............................................................................ 9
1.5. Summary of Routes Forward ............................................................... 10
1.6. Preferred Route Forward and Options Shortlist .................................. 11
1.7. Indicative Costs ................................................................................... 11
1.8. Timeline ............................................................................................... 13
2. STRATEGIC CASE .............................................................................. 14
2.1. Strategic Context ................................................................................. 14
2.2. The Need for Change ........................................................................... 15
2.3. Investment Objectives ......................................................................... 15
2.4. Existing Arrangements ......................................................................... 16
2.5. Initial Engagement .............................................................................. 17
2.6. Scope and Service Requirements ....................................................... 18
Page 123 of 347

Page 124

Johnstone High School Outline Business Case  4
OFFICIAL-SENSITIVE
3. ECONOMIC CASE .............................................................................. 20
3.1. Potential Routes Forward.................................................................... 20
3.2. Preferred Route Forward ..................................................................... 25
3.3. Site Assessment Criteria ...................................................................... 26
3.4. Site Options Assessment ..................................................................... 29
3.5. Shortlisted Options ............................................................................. 36
3.6. Indicative Costs ................................................................................... 37
3.7. Transport Considerations ................................................................... 39
3.8. Timeline and Next Steps ..................................................................... 40
4. COMMERCIAL CASE .......................................................................... 41
4.1. Approach ............................................................................................. 41
4.2. Service Requirements ......................................................................... 41
4.3. Project Development .......................................................................... 41
5. FINANCIAL CASE ............................................................................... 43
5.1. Project Funding – Capital Expenditure ............................................... 43
5.2. Approvals Process ............................................................................... 43
5.3. Revenue Expenditure .......................................................................... 44
5.4. Indicative Costs ................................................................................... 44
Page 124 of 347

Page 125

Johnstone High School Outline Business Case  5
OFFICIAL-SENSITIVE
5.5. Financial Risk / Optimism Bias ............................................................ 46
5.6. Interdependencies .............................................................................. 46
6. MANAGEMENT CASE ........................................................................ 47
6.1. Project Management and Project Governance Overview ................... 47
6.2. Project Roles ........................................................................................ 47
6.3. Reporting Arrangements ..................................................................... 48
6.4. Procurement Strategy ......................................................................... 51
6.5. Overall Project Benefits ....................................................................... 51
6.6. Community Benefits Realisation Arrangements ................................. 51
6.7. Risk Management Arrangements ........................................................ 52
6.8. Equalities and Human Rights .............................................................. 52
6.9. Communication, Engagement, and Community Voice....................... 52
7. CONCLUSION ................................................................................... 53
7.1. Summary of Shortlist of Options and Next Steps ................................ 53 
Page 125 of 347

Page 126

6
OFFICIAL-SENSITIVE
1. EXECUTIVE SUMMARY 
1.1. Introduction
This outline business case (OBC) is required as part of the Council’s new structured
approach to delivering its long-term strategy for the learning estate across
Renfrewshire. It builds on the context set out in a Strategic Case for Change (SCC)
examining the future of Johnstone High School in Johnstone, which was approved in
August 2025 at the Education and Children’s Services Policy Board (E&CS Policy Board).
In the SCC, Johnstone High school was assessed as working far below optimal
occupancy with demand for places likely to remain at or below 60% of capacity over the
next 10-15 years. Further, the school building was noted as being in poor condition,
with suitability also impacting delivery of a modern school curriculum and efforts to
improve the learning environment in line with the ambitions of Renfrewshire Council’s
Learning Estate Strategy.
The purpose of the OBC is to articulate a preferred way forward for the project by
identifying a shortlist of investment options likely to optimise value for money in
delivering change. A longlist of options is presented as part of the OBC, along with
analysis and rationale for their inclusion or exclusion from the shortlist. Additionally,
further detail is provided in respect to how the scheme will be prepared for
procurement and how the Council will put in place funding and management
arrangements for its successful delivery.
The OBC uses the following framework to present the preferred way forward, utilising
an adapted HM Treasury Green Book approach which is based on the 5 Case model:
Strategic case – confirming that strategic objectives remain current and seek
agreement on the recommendation
Economic Case – helping to determine that the preferred way forward offers value for
money
Commercial Case – working towards a recommended deal by explaining potential
delivery models, procurement and engagement
Financial Case – establishing affordability and funding requirements
Page 126 of 347

Page 127

Johnstone High School Outline Business Case  7
OFFICIAL-SENSITIVE
Management Case – planning for successful delivery 
Table 1: Business case development process
1.2. Background
The learning estate strategy published by the Council in 2024, aims to initiate a strategic
programme of investment in schools through detailed assessment of the entire learning
estate. The ambition of the investment programme is to ‘create the best possible
learning estate to allow children and young people to thrive’.
Renfrewshire’s schools were assessed against various criteria including condition,
suitability for delivering the curriculum, capacity and demand. Using a prioritisation
framework, the strategy assessed the entire learning estate, identifying those schools in
need of long-term investment planning now, to ensure that the Council is best placed
to: 
• Secure best value from strategic learning estate decisions around investment
Stage: Stage 1 Stage 2 Stage 3 Stage 4
Stage Outcome: Strategic Outline
Case Outline Business Case Full Business Case Final Delivery Business
Case
Stage Activities:
• Highlighting
strategic context
• Making the case
for change
• Agreeing scope
• Considering longlist
options
• Exploring the
preferred way
forward and
presenting a
shortlist
• Determine potential
value for money
• Preparing for the
potential deal
• Planning for
procurement
• Procuring the
solution
• Contracting the deal
• Ensuring successful
delivery
5-Case Model
(stage of
completeness): 
• Strategic 50%
• Economic 40%
• Commercial 10%
• Financial 10%
• Management 10%
• Strategic 80%
• Economic 70%
• Commercial 40%
• Financial 30%
• Management 50%
• Strategic 90%
• Economic 90%
• Commercial 90%
• Financial 75%
• Management 75%
• Strategic 100%
• Economic 100%
• Commercial 100%
• Financial 100%
• Management 100%
Gateway
Review: Strategic Assessment Business Justification Delivery Strategy
Final Investment
Decision and financial
commitment
Page 127 of 347

Page 128

Johnstone High School Outline Business Case  8
OFFICIAL-SENSITIVE
• Meet the expected long-term demand for education provision across
Renfrewshire whilst delivering improvements in school buildings and learning
environments
• Ensure that the delivery of any new infrastructure complements other key
strategic objectives being progressed by the Council to optimise the use of assets
for communities and support wider redesign of services that better meet the
needs of communities. 
A cohort of 13 priority schools was identified, highlighting Johnstone High School as a
key site where deteriorating building conditions and the suitability of the school
buildings hamper the Council’s ability and ambition to deliver the curriculum in the
best possible learning environment. 
A further consideration identified at Johnstone High School was based on analysis of
pupil roll projections. Thus, Johnstone High School is noted as operating significantly
below planning capacity. Further, demand for places is projected to remain well below
planning capacity over the next 10-15 years.
In response, officers produced a Strategic Case for Change, to consider the context of
key issues which, if not addressed, would limit the ability to deliver the strategic
objectives of the Learning Estate Strategy for Johnstone High School. The document
examined the operating context at the school with reference to the objectives of the
strategy:
• Condition
• Suitability
• Sufficiency
• Inclusivity
• Digital
• Sustainability and Net Zero
• Community Facilities and Place shaping
• Active Travel 
The Strategic Case for Change sets out the current baseline position at the school. It
highlights the challenges presented by the physical environment and excess capacity,
and how this hampers the Council’s desire to ensure future delivery of the modern
curriculum. 
Page 128 of 347

Page 129

Johnstone High School Outline Business Case  9
OFFICIAL-SENSITIVE
Following approval of the strategic case for change, significant work has been
undertaken to identify options for change that meet these ambitions and align with the
critical success factors articulated in the documents.
1.3. Opportunity
The opportunity to change and improve the provision of Johnstone High School aims to
advance the objectives of Renfrewshire Council’s new Learning Estate Strategy, and to
help meet the ambitions of wider Council and Scottish Government policies. Those
ambitions, fully considered in the Strategic Case for Change, are summarised here:
• Improving the condition of schools
• Sustainability and Energy Efficiency
• Equity and Inclusion
• Adapting to Future Educational Needs
• Community and Public Use
• Strategic Planning and Investment 
• Collaborative Approach with Stakeholders
The ambitions encompass Renfrewshire Council’s determination to invest wisely whilst
reflecting the importance of operational efficiencies and cost avoidance in delivering
the Learning Estate Strategy. Thus, careful consideration of how to bring change to
Johnstone High School, can additionally help increase building operational efficiency
through provision of improved, modern facilities. A new or refurbished school can
deliver modern standards and design and contribute to the Council’s Net Zero
commitments. 
Above all, this OBC sets out the opportunity for Renfrewshire Council to meet its
overarching aim of ensuring that its schools are modern, accessible to all and support
the delivery of high-quality education for learners.
1.4. Scope and Objectives
The Strategic Case for Change set out five overarching investment objectives for
Johnstone High School. Any investment in the learning estate must:
• Deliver the best learning environments and facilities possible
• Support improving attainment and ambition
Page 129 of 347

Page 130

Johnstone High School Outline Business Case  10
OFFICIAL-SENSITIVE
• Maximise operational efficiency across the estate
• Reduce the contribution to the Council’s combined carbon footprint 
• Acknowledge that ageing schools with deteriorating conditions come closer to
the point of being no longer fit for purpose
Thus, Johnstone High School is identified as a school which does not match current or
future demand; whose building condition and layout hamper delivery of a modern
curriculum and efforts to raise attainment further; whose buildings require
considerable on-going investment simply to maintain the status quo; and which cannot
contribute to Council’s net zero commitments in its current form.
To meet these objectives and deliver change, this OBC will examine viable options for
the delivery of a new-build or major retrofit secondary school for a roll of circa 1,000
pupils (revised up or down based on detailed project development), with sufficient
space for community or partner facilities to be considered. with consideration of any
associated community facilities in line with the Council’s wider strategic property
strategy. The school should remain within the current catchment area.
1.5. Summary of Routes Forward
Possible options for the future of Johnstone High School considered 4 potential routes
forward against the requirements for change:
1 – Do Nothing
2 – Retrofit and Refurb
3 – Rebuild Johnstone High on the current site
4 – Rebuild Johnstone High on another site 
Analysis of the routes forward are presented in full in the Economic Case in Section 3.
This was produced following the collation of background information included in the
SCC, technical information, and analysis of the operating context at Johnstone, as well
as engagement with school staff and parents. 
Page 130 of 347

Page 131

Johnstone High School Outline Business Case  11
OFFICIAL-SENSITIVE
1.6. Preferred Route Forward and Options Shortlist
The preferred route forward for the project has been determined using the critical
success factors identified in the SCC, to assess the viability of the various options under
consideration. This recommended delivery of change by addressing the capacity and
school condition issues facing Johnstone High School by refurbishing the current
school or rebuilding it at the current site or elsewhere in the catchment: 
Route 2 Route 3 Route 4
Retrofit the existing
school
Rebuild on the current
Johnstone High site
Rebuild elsewhere in
the catchment area
Table 2: Preferred Routes Forward 
This OBC appraises the routes forward, proposing and assessing various site options
and recommending an options shortlist. This process and analysis are presented in the
Economic Case, section 3, below. The shortlisted options are: 
Option 01
Retrofit Johnstone High School on Site 01 Johnstone High School Beith Road, Johnstone
Option 02
New Build on Site 01 Existing Johnstone High School Site, Beith Road, Johnstone
Option 03
New Build on Site 03 Beith Road Playing Fields, Johnstone
Table 3: Options Shortlist
1.7. Indicative Costs
To identify an indicative planning cost for delivering options associated with the
preferred route forward, an exercise was conducted to consider the potential cost of
delivering a school project at the identified planning scale (a secondary school of 1,000
capacity with additional community-use space).
Page 131 of 347

Page 132

Johnstone High School Outline Business Case  12
OFFICIAL-SENSITIVE
These costs are discussed in greater detail at section 3.6 (Economic Case) and 5.4
(Financial Case), below. 
The overall potential costs of a new Johnstone High School built to the set criteria are
shown here: 
Cost Scenario Range
Option 1 – Retrofit the existing
school
£121m
Option 2 – Rebuild on the current
Johnstone High site
£85 - £133m
Option 3 – Rebuild elsewhere in
the catchment area
£91 - £144m   
Table 4: Indicative Costs 
The indicative costs above are provided for illustrative purposes only. Costs are subject
to change depending on consultation, design changes, planning requirements and
parameters, site locations and geotechnical site characterisation, procurement routes
and other external factors. 
Page 132 of 347

Page 133

13
OFFICIAL-SENSITIVE
1.8. Timeline
In 2025 a high-level summary of the timeline for completing this business case process was outlined, as shown below. This
timeline is explained in more detail in section 3 of this document to show a potential route to construction. 
Page 133 of 347

Page 134

14
OFFICIAL-SENSITIVE
2. STRATEGIC CASE
2.1. Strategic Context
In August 2025, a business case presented to E&CS Policy Board set out a strategic case
for change at Johnstone High School. The paper outlined the background and context,
highlighting links to local and national strategies for education, including Renfrewshire
Council’s Learning Estate Strategy and Fairer Renfrewshire policy, and Scottish
Government’s National Learning Estate Strategy.
The strategic objective for this project is to ensure delivery of the best quality learning
environments for secondary pupils in the Johnstone High School catchment area,
whilst ensuring that capacity matches demand for school places, both now and in the
future. This OBC takes that initial case for change and begins the process of identifying
options for change in response to the needs and drivers identified. The policy
background is summarised below. 
• Renfrewshire Council Learning Estate Strategy – a long-term structured
approach to assessment of the learning estate through a prioritisation
framework which identifies those areas of the estate most in need of investment.
The strategy ensures careful planning to ensure that limited capital investment is
directed where it will have the greatest impact through reshaping, refurbishing
or replacing existing facilities. 
• Scottish Government’s National Learning Estate Strategy – reflecting the
ambition of the Scottish Attainment Challenge, which promotes equity in access
to quality education facilities as part of a drive to tackle the poverty related
attainment gap and promote inclusivity.
• Fairer Renfrewshire – recognising the role of the learning estate in reducing
inequalities and improving the life chances of pupils across Renfrewshire
• Strategic Planning and Investment – recognising the long-term nature of the
strategy for the learning estate, with a clear framework which identifies those
schools that require replacement, refurbishment or upgrading
• Strategic Property Strategy – seeks to ensure that Renfrewshire Council’s
property estate is strategically located and used to its fullest potential,
complementing existing facilities and services wherever possible
Page 134 of 347

Page 135

Johnstone High School Outline Business Case  15
OFFICIAL-SENSITIVE
2.2. The Need for Change
As articulated in the Strategic Case for Change document which preceded this business
case, there is a clear and compelling case for introducing change to Johnstone High
School, as highlighted by a combination of factors, including: 
• Operating below optimal capacity – Johnstone High School has a planning capacity
of 1380 pupils and a pupil roll this year of 867; roll projections indicate that demand
will remain low and potentially fall further over the next 10-15 years.
• Condition and Suitability – ‘Core Facts’ reporting indicates that the condition (rated
‘C’) and suitability (rated ‘B’) of the of the building should be improved and that
£13.29m of spending will be required over the next 20 years simply to keep the
building operating at its current level. Accessibility is an issue in some parts of the
building.
• Opportunity to maximise operational efficiency – Provision of a school built to
modern teaching and building standards will help increase building operational
efficiency by replacing ageing facilities which cannot meet modern building
performance standards.
2.3. Investment Objectives
The following objectives have been identified as key to improving learning
environments across Renfrewshire through investment, and aligning with the ambitions
of the Learning Estate Strategy:
• Effectiveness – Meet the aims of the 2024 Learning Estate Strategy to initiate a
strategic programme of investment in schools; Ensure that every school is considered
in terms of Scottish Government Core Facts reporting criteria; Deliver the best
learning environments and facilities possible, exceeding, where able, Scottish
Government recommendations. 
• Efficiency – Provision of modern learning environments to improve attainment for
pupils in Renfrewshire
• Economy – Optimise operating costs for the estate through the creation of buildings
which are more energy efficient and through operation of a more efficient overall
school estate; Offer a reduction in the costs incurred maintaining ageing buildings;
Operation of buildings of a size suited to current and projected school rolls.
Page 135 of 347

Page 136

Johnstone High School Outline Business Case  16
OFFICIAL-SENSITIVE
• Compliance – Careful planning for the replacement or refurbishment of schools to
lessen the impact from older buildings and make a valuable contribution to
Renfrewshire Council’s net zero commitments through the operation of more
efficient buildings.
• Replacement – The project acknowledges that as schools age and maintenance
costs increase, they come closer to the point of being no longer fit for purpose as a
Council asset.
2.4. Existing Arrangements
A comprehensive overview of Johnstone High School was included in the Strategic Case
for Change and is summarised below. The key facts relating to its operation are outlined
in following tables and narrative.
Johnstone High School is a non-denominational secondary school whose catchment
area covers all of Johnstone as well as surrounding villages as far as Lochwinnoch.
Johnstone serves seven primary schools in the catchment area and circa 5% of current
pupils attend from outside the catchment area. The planning capacity for Johnstone
High is 1,380 and the current roll is 867. 
School Age Suitability Condition
Johnstone
High 64 B C
Table 6: Key Facts 
School Capacity Current Roll 2029/30* 2033/34* 2037/38*
Johnstone
High 1,380 867 (63%) 908 (66%) 813 (59%) 772 (56%)
Table 7: Capacity and Roll Information (‘Sufficiency’) 
School Utilities Hard &
Soft FM
Teaching Non-
Teaching
Other* Rates Total
Johnstone
High £297,641 £476,690 £5,160,214 £404,279 £269,256 £136,800 £6,744,880
* Waste, Grounds Maintenance; Transport
Table 8: Overview of Operating Costs 
Page 136 of 347

Page 137

Johnstone High School Outline Business Case  17
OFFICIAL-SENSITIVE 
Location No. of Pupils Annual
Cost
JOHNSTONE HS –
W.AUCHENGOWAN/BELLTREES/WINDYHILL/MID HARTFIELD /
NETHER BROADFIELD/BOWFIELD/E.MUIRDYKES/LADESIDE
3 £16,963
JOHNSTONE HS – NEWTON OF BELLTREES /
HARTFIELD/BOWFIELD / E.MUIRDYKES/MERCHANT’S CLOSE 9 £24,700
JOHNSTONE HS (LINK)/LOCHWINNOCH PS – LOC 20 £9,942
JOHNSTONE HS / LOCHWINNOCH PS – (LINK) LOCHWINNOCH
AREA FARMS AND COTTAGES 28 £20,693
JOHNSTONE HS – BROOKFIELD / KILBARCHAN 15 £8,593
JOHNSTONE HS – CHURCH STREET, WOODISDE COTTAGE,
PADDOCK WARDEND, KILBARCHAN 8 £3,800
JOHNSTONE HS – CHURCH STREET,  KILBARCHAN 9 £6,333
JOHNSTONE HS – LOCHWINNOCH AND HOWWOOD 7 £28,025
JOHNSTONE HS – LOCHWINNOCH AND HOWWOOD 4 £79,800
JOHNSTONE HS – LOCHWINNOCH FARMS 1 £7,600
JOHNSTONE HS – LOCHWINNOCH FARMS 2 £16,401
Total: 106 £255,229
Table 9: Breakdown of Transport Costs
2.5. Initial Engagement 
Following presentation of the Strategic Case for Change to E&CS Policy Board in August
2025, officers undertook informal community and stakeholder engagement, outlining the
processes involved in identifying opportunities to deliver change. 
Page 137 of 347

Page 138

Johnstone High School Outline Business Case  18
OFFICIAL-SENSITIVE
A survey was issued to parents, carers and school staff at Johnstone High School, inviting
views around current school provision, including school condition, location of facilities
and what stakeholders feel should be important to the Council in progressing future
school investment. 
Analysis of responses from parents, carers and the wider community suggested that
whilst there is general happiness with the location of the school and the facilities on offer,
most respondents acknowledged the challenges the building poses to users. The survey
identified the following key themes and discussion points: 
• Good location within Johnstone
• Deteriorating, run-down building condition
• Modernisation of classroom facilities to support contemporary learning
• Need for improved toilet facilities
• Need for improved windows and ventilation 
Responses from school staff highlighted similar themes: 
• The building is rundown and unfit for modern education, but the school ethos is
strong
• There is a lack of ICT and classroom conditions need improvement
• Families in the community require a better environment to support their
education 
In summary, both groups identify issues with ventilation, heating, windows, and air
quality, alongside inadequate toilets, dated classrooms, and insufficient indoor social
and dining spaces that lead to congestion and reduced pupil morale. Corridor widths
and general circulation were raised as recurring issues by parents and staff, with both
describing overcrowding at transitions as challenging. Outdoor areas are viewed as
underused, poorly maintained or lacking in purposeful design, with calls for greener,
more inviting and sheltered spaces for socialising, recreation and structured learning.
2.6. Scope and Service Requirements
The scope of this proposal for change is to provide an improved Johnstone High School
in line with the strategic objectives set out and agreed in the Strategic Case for Change,
informed by an understanding of the operating context. Potential routes forward were
set out in an interim update to E&CS Policy Board in October 2025, based on the broad
Page 138 of 347

Page 139

Johnstone High School Outline Business Case  19
OFFICIAL-SENSITIVE
range of options outlined in the Economic Case, below. The potential routes were
articulated as follows and are set out in section 3, Economic Case: 
Route 1 Route 2 Route 3 Route 4
Do nothing – continue
to operate Johnstone
High
Retrofit/Refurbish
Johnstone High
Rebuild Johnstone
High at current site
Rebuild Johnstone
High at alternative site
Table 10: Potential Routes Forward 
Page 139 of 347

Page 140

Johnstone High School Outline Business Case  20
OFFICIAL-SENSITIVE
3. ECONOMIC CASE
3.1. Potential Routes Forward
In line with the summary of routes forward that are outlined above as part of the
Strategic Case each has now been subject to an assessment process to identify the
broad advantages and disadvantages to assess the overall merits of each option.
This process allows in the first instance, identification of recommended viable routes to
be considered in more detail to establish a long list of options to be considered. In the
case of Johnstone High, the analysis outlined below identifies three viable routes
forward from which a long list of potential options has been identified. The potential
viable routes from the list below are: 
Route 2 – Retrofit the existing Johnstone High
Route 3 – New Build Johnstone High at the Current Site
Route 4 – New Build Johnstone High at an Alternative Site 
All routes forward are examined in detail below. 
Route 1: Do nothing
Retain the building as-is with minimal wind and watertight investment and continue to
operate the high school in its current format 
Main Advantages:
Value for money  • Lower capital outlay required, albeit significant future capital outlay will still be required
on building maintenance to secure long term wind and watertight condition and to
support net zero transition, none of which would support improvement to configuration
or suitability for delivering the curriculum. 
Page 140 of 347

Page 141

Johnstone High School Outline Business Case  21
OFFICIAL-SENSITIVE
Main Disadvantages:
Strategic Fit  • Maintaining the current building will not help ensure delivery of the best possible
learning environments for all users, nor would it meet the objectives of the Learning
Estate Strategy or help future proof against further developments in technology or
curriculum.
Value for Money  • The most recent condition report in 2022 assessed the buildings as ‘C- Poor’ (exhibiting
major defects/not operating efficiently) with a maintenance cost of £13.29m over the
next 20 years to maintain the building as it is now at a poor standard. This would not
bring any improvement to the overall suitability and layout of the building or its grounds
to support curriculum delivery, and the building would have a limited long term life
given its age. In addition, further investment would be required to support long term net
zero ambitions.
• The building is, and would remain in future, too big for its current and projected roll,
making operation less efficient and operationally more expensive 
Conclusions:
With the disadvantages outlined above, this is not considered a viable option and will be discounted as a
route forward. This option would bring no material benefit to the school or wider community and would not serve
to improve the education experience of anyone involved and is likely to provide poor long term value for money
given the age and condition of the existing school. Johnstone High School would continue to operate at inefficient
levels. This option will not be considered further. 
Route 2 – Retrofit the existing Johnstone High  
Carry out a comprehensive retrofit of Johnstone High School to bring it up to Net Zero
Public Sector Building Standards (NZPSBS) or better, whilst improving the overall
condition and suitability of the environments.
Main Advantages
Strategic Fit  • Contributes towards net zero ambitions through retention of embodied carbon and
significant improvements in energy consumption.
• Spaces within the building can be redesigned to reduce overall capacity of school to
meet decline in demand, making better use of the asset in a layout reconfiguration. 
Value for Money • Greater operational efficiency from a more energy efficient building of a size that allows
for optimal occupancy. 
Affordability  • Continued use of existing sports facilities at the adjacent sports hub and therefore fewer
design considerations 
Page 141 of 347

Page 142

Johnstone High School Outline Business Case  22
OFFICIAL-SENSITIVE 
Main Disadvantages:
Strategic Fit  • The most appropriate location and provision within the asset could be compromised by
being constrained with current configuration and location of building on site. 
Value for Money  • A deep retrofit is a complex and demanding project requiring careful planning and
execution. Initial capital costs for a retrofit may be higher in comparison to an
equivalent new-build, and the overall remaining life of a refurbished building is likely to
be less than a new build, placing a level of constraint on the long term value for money
assessment.
• Due to the design of current building and inefficient layout, large portions of the
building may require to be demolished and rebuilt as part of a retrofit, leading to the
question of whether better overall value would be gained in a new build.
• Initial estimates indicate a higher outlay for this option than building new, as outlined
above.
• Coupled with the higher initial outlay, the whole life value for money would be further
undermined by a shorter long-term life associated with a refurbished as opposed to new
build structure.
Affordability • Refurbishment projects carry inherently higher risk than new build due to latent defects
and the uncertain scale of works that will be required. The full extent of work required,
and therefore cost and timeline, may only become fully apparent as areas of the internal
fabric of the building are exposed and a full understanding of the building condition is
apparent. This could result in the further divergence between refurbishment cost and
new build ultimately impacting negatively on the whole life value for money appraisal. 
Achievability  • A decant would be required for pupils of the school over a long spanning construction
period. In a secondary school this would present significant challenge in terms of
maintaining curriculum delivery and retaining access to specialist equipment or
workshops. Construction work taking place during term time would add a higher level of
complexity and extra cost to the project.
Conclusions:
This option has attraction in terms of making the most of existing assets, retaining embodied carbon and
addressing Council commitments on net zero. The overall cost and challenges associated may represent poorer
up-front affordability as well as poorer whole life value for money if the building cannot meet critical success
factors and the ambition of the Learning Estate Strategy around longevity, for example, if the superstructure even
with a deep retrofit, has a limited lifespan. This option could simply delay the inevitable requirement of a new build
school being required when considered over a whole lifetime period. 
Although the option can facilitate layout and configuration changes which would deliver improved suitability and
capacity in line with the Learning Estate Strategy, it would unlikely offer an optimal outcome as the existing
building would provide a level of constraint on flexibility. 
Page 142 of 347

Page 143

Johnstone High School Outline Business Case  23
OFFICIAL-SENSITIVE
Whilst this option presents a range of significant challenges, it is credible and viable and it is proposed to be
retained and investigated further, paying particular attention to potential decant logistics, and associated
costings of the project. Notwithstanding a commitment to investigate further, it is not expected at this stage
this option is likely to present an optimal solution. It is important as part of the overall business case process
that, as a viable option, it is considered and if discounted the reasoning is transparently and clearly set out
when compared against alternative options to clearly demonstrate best value decision making. 
Route 3: New Build Johnstone High at Current Site 
Rebuild Johnstone High School at the current site, either on the current footprint, or
elsewhere within the site; with the potential for decanting current pupils during
building works, depending on school placement on site.
Main Advantages:
Strategic Fit • This would deliver a new school built to modern educational and building standards, of
a size that allows for optimal occupancy and deliver an asset with the longest potential
operational life.
• Meets the requirements of Renfrewshire Council’s vision for education and the
objectives of the Learning Estate Strategy.
• It would directly contribute towards net zero ambitions through provision of a new
school built to NZPBS standard or better, with significant improvements in energy
consumption to the existing school.
Value for Money • Creation of a building with modern heating and power systems will greatly improve
operational efficiency and a new build provides the opportunity to secure a learning
facility with the maximum future life to support long term value for money benefits.
Affordability • Continued use of existing sports facilities at the adjacent sports hub meaning lower
design and build costs
• If rebuilding elsewhere on a suitable position on the current site, decant costs could be
avoided and disruption to the school environment significantly mitigated.
Main Disadvantages:
Strategic Fit • If rebuilding on the existing footprint, the short-term disruption associated with a
decant may outweigh longer term gain for all stakeholders. 
• If rebuilding on the existing footprint, decanting pupils and staff may not align with
resourcing constraints especially around available space or demand for modular
classrooms and could therefore attract significant costs to provide a suitable decant
facility.
Achievability • A decant would be required to rebuild the school on its existing footprint. In a secondary
school this would pose significant challenges in terms of maintaining curriculum
Page 143 of 347

Page 144

Johnstone High School Outline Business Case  24
OFFICIAL-SENSITIVE
delivery and retaining access to specialist equipment or workshops. This would add
another level of complexity and cost to the project. 
• Finding suitable premises in which to base the school during decant may be an onerous
task, whilst the option of decanting the school community throughout other secondary
schools in Renfrewshire risks additional upheaval for other school communities.
Conclusions:
This option would be able to deliver on all objectives associated with the Learning Estate Strategy with the ability
to offer an enhanced education experience through provision of a much-improved asset with greater operational
efficiency in a more sustainable fashion. However, if rebuilding on the existing footprint, rather than elsewhere on
the site, this option would involve decanting of the school community to facilitate a rebuild.  Careful consideration
of the decant strategy would have to be undertaken to determine the overall impact of this option on the learning
and teaching experience for the period of the decant, and of the additional cost involved in facilitating the decant.
The viability of this option will become clearer in the investigation of a decant strategy (if required), which
will inform costs and assess the likely disruption to the working of the school. This option (and the sub-
option of the specific location of the new school within the existing site) should continue to be assessed
further and can then be compared against alternative options to determine the option with overall best
value. 
Route 4: New Build Johnstone High at an Alternative Site
Build a new Johnstone High School elsewhere in the catchment on a suitable site; on
completion, demolish the current building and sell or develop the land.
Main Advantages:
Strategic Fit • This would deliver a new school built to modern educational and building standards,
of a size that allows for optimal occupancy and greater operational efficiency,
delivering an asset with the longest potential operational life.
• Meets the requirements of Renfrewshire Council’s vision for education and the
objectives of the Learning Estate Strategy
• It would directly contribute towards net zero ambitions through provision of a new
school built to NZPBS standard or better, with significant improvements in energy
consumption to the existing school.
• Would allow repurposing of the existing site for Council use or sale.
Value for Money • Creation of a building with modern mechanical and electrical systems will greatly
improve operational efficiency, and a new build provides the opportunity to secure a
learning facility with the maximum future life to support long term value for money
benefits.
Page 144 of 347

Page 145

Johnstone High School Outline Business Case  25
OFFICIAL-SENSITIVE
• The overall cost may be less than that for a retrofit of the existing school.
Achievability  • Flexibility of timescale through the continued operation of the existing school during
the design and build process 
• Avoids decanting of the school community with all associated cost and upheaval
Main Disadvantages:
Value for Money • The cost of buying suitable land for the new school if suitable Council-owned land
cannot be identified.
• Depending on the location chosen, the potential for increased school transport
budgets due to increased travel distances for pupils
Achievability • Finding a suitable site for a new school could potentially present some challenges.
Conclusions:
This option would address condition, sufficiency and suitability and would be able to meet most if not all of the
objectives of the Learning Estate Strategy. As outlined above an alternative site may introduce wider
considerations including meeting active travel objectives if appropriate land cannot be sourced in an appropriate
location of the catchment area coupled with the scale of requirement associated with the number of pupils
requiring home to school transport. Such implications will become clearer through specific site assessment
process. However, this route forward should continue to be progressed further to identify alternative
delivery options to determine the shortlisted options which present the overall best value. 
3.2. Preferred Route Forward
Qualitative assessment of the potential routes provided commentary on their
practicality, adaptability and desirability, aligned to the critical success factors outlined
in the Strategic Case for Change. This identified the route that does not offer a viable
means of delivering the required change and confirmed preferred routes forward to
address the capacity, condition and suitability of Johnstone High. The preferred routes
forward are: 
Route 2 – Retrofit the existing Johnstone High
Route 3 – New Build Johnstone High at the Current Site
Route 4 – New Build Johnstone High at an Alternative Site
Page 145 of 347

Page 146

Johnstone High School Outline Business Case  26
OFFICIAL-SENSITIVE
These routes forward were recommended to Members of this Board and agreed
following an update to the E&CS Policy Board in October 2025. 
3.3. Site Assessment Criteria 
The preferred route forward indicates that viable options are dependent on
identification of a suitable site for the construction of a new Johnstone High School. To
identify potentially viable sites, a list of site assessment criteria has been derived by
considering core legislative, policy, and technical considerations. A long list of potential
site options has been assessed to identify sites that present potential viability and
warrant further investigation and feasibility assessment. Note that this stage of the
process is a broad pass / fail assessment of long list options for viability purposes and is
not a weighted scored assessment. A more detailed assessment approach of this nature
will form part of the next stage of the business case process. The utilised assessment
criteria are as follows: 
Ownership  Sites wholly within the ownership of Renfrewshire Council will be prioritised
over those owned by others recognising this provides greater certainty of
site deliverability. Consideration will be given to brown field sites where
remediation and use will be of benefit to the community, or where sites can
provide for the retention and or improvement of community facilities,
amenities or green spaces.
Site size/area Sites will be assessed against the median area requirements set out in BB103
as sufficient for a school of the following size and description:
a) Accommodate a secondary school of 1,000 pupils and additional
community space, equating to 58,800m2 
Active Travel A review of sites in relation to their potential to support Active Travel,
proximity to public transport, road networks, cycling and walking routes; the
potential for increased pupil transport requirements.
Planning Sites will be assessed against current local & national planning policies and
current land area designation.
Placemaking Consideration will be given to potential for place making benefits, such as
community and green public spaces. Areas will be assessed for their context
Page 146 of 347

Page 147

Johnstone High School Outline Business Case  27
OFFICIAL-SENSITIVE
within and connection to the local community and how strategic use of the
site could bring wider, long-term benefits to the area.
Flood Risk Sites will be assessed in line the guidance set out in Policy 22 of the NPF4.
Flood risk potential is common and significant across the Renfrewshire
estate and dependent on the scale of risk, will not necessarily result in the
rejection of a site. The level of risk and site history, along with the impact of
remediation and flood protection will all be considered in the assessment of
the site.
An assessment of site topography will examine factors that may affect the
efficient use of the site, including shape, gradients across and adjoining the
site, features such as water ways, culverts & previous uses. Previous
industrial use may bring issues of ground contamination or existing
buildings that need to be factored into site remediation.
Budget Budget considerations will principally be concerned with highlighting
potential additional costs for abnormal site issues.  For example,
construction on brown-field sites requiring ground remediation works for
ground contaminations. Projects in green or rural areas incurring additional
costs associated with installing utilities, and the construction or upgrade of
local road and pedestrian routes.
Commentary Any additionally significant issues that require consideration, such as
location within the catchment area. 
Table 11: Site Assessment Criteria 
The following five sites were identified as within Council ownership and located in the
catchment area and were therefore subject to assessment. The sites were considered
against the criteria and the requirements for change. A desktop assessment was
completed for each site, which has concluded that three sites, including the current site
of the school, have strong viability potential and are appropriate for further detailed
examination and assessment at the next stage. A high level overview of the viability
assessment for each site is outlined below and represent the longlist of site options to
deliver the project.
Any site which is recommended for further investigation as a viable option will be
subject to thorough legal checks around ownership to ensure a full understanding of
any constraints on development and its likely impact. Should any site require legal
Page 147 of 347

Page 148

Johnstone High School Outline Business Case  28
OFFICIAL-SENSITIVE
processes to amend land designation this would be fully considered at the next stage of
assessment and reflected in project timelines where appropriate.
Over and above this long list of Council owned sites, an exercise was also conducted to
analyse additional areas of land in private ownership in the town, to determine
potential viability to develop a new secondary school. This process concluded there are
no additional parcels of land in private ownership that offer a better option than those
identified in Council ownership and was therefore not progressed any further given the
added complexity lack of ownership would bring. 
Page 148 of 347

Page 149

29
OFFICIAL-SENSITIVE 
3.4. Site Options Assessment
5 sites within Council ownership have been identified and assessed. The location of the sites is shown on the map below. A
full assessment of all 5 sites then follows.
Map 1: Site Options
Page 149 of 347

Page 150

Johnstone High School Outline Business Case  30
OFFICIAL-SENSITIVE 
Page 150 of 347

Page 151

Johnstone High School Outline Business Case  31
OFFICIAL-SENSITIVE 
Page 151 of 347

Page 152

Johnstone High School Outline Business Case  32
OFFICIAL-SENSITIVE 
Page 152 of 347

Page 153

Johnstone High School Outline Business Case  33
OFFICIAL-SENSITIVE 
Page 153 of 347

Page 154

Johnstone High School Outline Business Case  34
OFFICIAL-SENSITIVE 
Page 154 of 347

Page 155

Johnstone High School Outline Business Case  35
OFFICIAL-SENSITIVE
Site Summary
Site
Ref. Site Name Strategy (Extend/New
build/Renovate/Dispose)
Recommended
to take
forward to FBC
Rationale
1 Existing Johnstone High School New Build Yes
The viability of this option will become clearer in the investigation of a
potential decant strategy, which will inform costs and assess the likely
disruption to the working of the school. This option should continue to be
assessed further and can then be compared against alternative options to
determine the option with overall best value.
1 Existing Johnstone High School Renovate Yes
Whilst challenges exist with this option, it is proposed to be retained and
investigated further, particularly around potential decant logistics, and
associated costings of the project. This can then be compared against
alternative options to determine the options with overall best value. 
2
Site at Johnstone / Howwood By-Pass,
Johnstone New Build No
Loss / Destruction of green space, Hazards including Black Cart Water, Existing
Overhead High Voltage Power Infrastructure, Significant earthworks required
to allow development of site. Construction of road access routes are
challenging.
3 Beith Road Playing Fields, Johnstone New Build No
Site Size may be too small to develop a modern high school to the full potential
that could be realised on a larger site. 
4 Site at Midton Road, Howwood New Build No
Agricultural land requires change of use; the existing road infrastructure would
require significant upgrading and volume of traffic may be detrimental to the
surrounding area. Position of site away from urban population would require
significant increase in transport requirement
5 Thomas Shanks Park, Johnstone New Build No
As a public park gifted to the people of Johnstone in 1926, Thomas Shanks Park
has significant legal protection as an open space within the town. It will not be
taken further as a potential site.
Table 12: Option Recommendations 
Page 155 of 347

Page 156

36
OFFICIAL-SENSITIVE
3.5. Shortlisted Options 
Based on the site assessments, the following options can be deemed potentially viable
locations for a new build Johnstone High School, as shown previously in Table 3: 
Option 01
Retrofit Johnstone High School on Site 01 Johnstone High School Beith Road, Johnstone
Option 02
New Build on Site 01 Existing Johnstone High School Site, Beith Road, Johnstone
Option 03
New Build on Site 03 Beith Road Playing Fields, Johnstone 
It is recommended that these options are taken forward to the next stage of assessment
at Full Business Case, to be considered as part of extensive engagement, and further
technical and cost analysis.
Any site which is recommended for further investigation as a viable option will be
subject to thorough legal checks around ownership to ensure a full understanding of
any constraints on development and its likely impact. Should any site require legal
processes to amend land designation this would be fully considered at the next stage of
assessment and reflected in project timelines where appropriate. 
Page 156 of 347

Page 157

Johnstone High School Outline Business Case  37
OFFICIAL-SENSITIVE
Map 2: Shortlisted Sites 
3.6. Indicative Costs
The indicative costs are based on preliminary information and should be considered a
framework from which detailed cost plans can be developed. The indicative costs have
been built from high level information, benchmarking from various sources including
the Scottish Futures Trust (SFT) funding metric, cost information from current
Renfrewshire Council education construction projects, costs from other Council’s
similar school projects and adjusting the costings where specific knowledge has been
gained from the desktop assessment of the site options. The BCIS cost indices have also
been used to calculate inflation up to the end of the anticipated construction period. 
In considering the potential construction costs, it should be noted that all construction
sites are unique and will differ from site to site in ways that will impact construction
costs. This is as a result of ‘abnormal’ factors exclusive to every site. No two sites are the
Page 157 of 347

Page 158

Johnstone High School Outline Business Case  38
OFFICIAL-SENSITIVE
same, for example flood risk mitigation or ground remediation may be more or less
consequential from site to site, with differing impact on the overall construction costs
as to how the design addresses the site. In that sense, the indicative costs should be
taken as a guide only, detailed site options appraisal will be necessary to fully
understand the geotechnical characteristics and construction cost impact before
making any final recommendations. 
The project is currently at RIBA Plan of Works Stage 0 where at this stage it is key to
define vision and goals, identify needs and opportunities and to establish a strategy.
Therefore, there is no current design information. Key assumptions and exclusions are
required to establish indicative costs and clearly indicate what is assumed as included
in the costs and what is excluded at this stage.
To project an estimated cost for inflation purposes, the construction cost has been
based on an assumed construction commencement date of 2030. All figures should be
noted as exclusive of VAT.
Key assumptions and exclusions were used in compiling the indicative costs in the
absence of any design commencing. This approach recognises that whilst a range of
cost estimates have been presented, these remain volatile, subject to external factors
and site specific detail that will become clearer as sites are investigated, and options
further explored at the next stage.
It is important to highlight as part of this process, that no budget will be requested or
crystalised until further work has been undertaken into the validation of each option,
and a recommendation is made thereafter at the conclusion of the Full Business Case. 
As shown previously in Table 4, the indicative costs are highlighted below: 
Cost Scenario Range
Option 1 – Retrofit the existing
school
£122m
Option 2 – Rebuild on the current
Johnstone High site
£85 - £133m
Option 3 – Rebuild elsewhere in
the catchment area
£91 - £144m 
Page 158 of 347

Page 159

Johnstone High School Outline Business Case  39
OFFICIAL-SENSITIVE
3.7. Transport Considerations
Renfrewshire Council policy states that secondary school pupils who live more than two
miles away from their catchment school by the shortest safe walking route, are eligible
for home to school transport. 
Based on pupil census data for 2025/6, 106 pupils (13%) are eligible for transport to and
from school.  If the location of the school were to change, based on this data it would
change as shown below. This does not take into account any expected roll variation at a
new school and is based on 2025-6 data and is shown for comparison only. 
Current School Pupils Eligible
Johnstone High 106
Possible School Site Pupils Eligible
Site 01 – Existing
Johnstone High 106
Site 3 - Beith Road
Playing Fields 185  
Table 13: Transport Eligibility
Page 159 of 347

Page 160

40
OFFICIAL-SENSITIVE
3.8. Timeline and Next Steps
Should the recommendations contained in this OBC be approved, officers will commence work to identify and recommend
a preferred option for the replacement of Johnstone High School. 
The next steps in that process are to complete a Full Business Case articulating the recommended option by the end of
2026, for presentation and agreement early in 2027. If approved by Council, should it be required, based on the option,
work would begin on Statutory Consultation to be carried out during 2027. Timescales would be dependent on timing
around Local Government elections scheduled for May 2027 and completion of the associated RIBA stages, with the current
anticipated timeline showing that construction could commence by 2030. 
Page 160 of 347

Page 161

41
OFFICIAL-SENSITIVE
4. COMMERCIAL CASE
4.1. Approach
An overarching procurement strategy will be prepared as the Project develops, and a
preferred option for delivery is identified. The strategy will set out the various contracts
required to deliver the project including the proposed procurement route, contract
objectives, tender methodology and timelines. Pre-market engagement and
consultation will be undertaken to ensure a detailed market analysis is completed to
test the suitability of the proposed approach to procurement and ensure proposals are
attractive and viable for the competitive market. 
The Project procurement strategy will remain a live document, updated to reflect the
outcomes of each stage of the project’s development and responsive to changes in
market conditions identified through analysis and ongoing engagement. Bespoke
contract strategies will be developed for each requirement detailing the specific
requirements and tendering methodology adopted for that contract while aligning with
the overall aims and objectives set out in the overarching strategy.
4.2. Service Requirements
The project team require external consultants to provide specialist services and works
to support the development of the Full Business Case. Services required may include
support with space planning, site surveys, intrusive building surveys, legal and planning
advisers and cost consultants.  The Project team will work with dedicated procurement
officers to develop strategies for each contract requirement with consideration to the
Council’s standing orders relating to Contracts and principles of best value.
4.3. Project Development
Procurement strategy will be developed for the FBC stage that will discuss in detail the
most beneficial route to market depending on the proposed final recommendation. 
Page 161 of 347

Page 162

Johnstone High School Outline Business Case  42
OFFICIAL-SENSITIVE
The procurement process for the detailed design and construction stages of the project
is subject to development. The Council is looking at a range of options including
framework routes for procurement of consultants and/ or contractors. In the event
there are no suitable existing arrangements to use, it is anticipated options will be as
follows:
• Multi- disciplinary design team (MDDT) procured using Restricted Procedure in
accordance with Council’s Standing Orders relating to Contracts and Public
Contracts (Scotland) Regulations 2015 as amended. 
• Construction works contract, likely to follow a Restricted Procedure in
accordance with Council’s Standing Orders relating to Contracts and Public
Contracts (Scotland) Regulations 2015 as amended. It is likely to be a 2-stage
contract model with pre-construction services agreement (PCSA) to allow early
contractor involvement followed by award of main works contract once detailed
design is complete. 
• Ad-hoc/specialist consultant support may be required to support the project
team. The project team will work with dedicated procurement officers to
develop a strategy for each contract with consideration to the Council’s standing
orders relating to Contracts and principles of best value.   
Page 162 of 347

Page 163

Johnstone High School Outline Business Case  43
OFFICIAL-SENSITIVE
5. FINANCIAL CASE
5.1. Project Funding – Capital Expenditure
Until such time that a specific option has been decided to proceed with at the
conclusion of the business case process, no formal project exists and therefore no full
capital budget exists. The purpose of this business case process is to allow a decision to
be made on the best option to commit capital expenditure on, and only at the
conclusion of the process will a request be made to Council to commit to the required
project budget. 
This OBC has outlined the current estimated cost to deliver on the agreed route
forward, and this estimate will continue to be refined and updated as more detail
becomes available at the next stage of assessment. 
5.2. Approvals Process
To date, work to develop proposals for a new Johnstone High School has not incurred
any external costs, with all spend being incurred on already budgeted internal
resources. To take the project forward through to approval of the FBC further costs will
be incurred on both internal and external resource. This spend is required to ensure the
Council is presented with a robust and tested recommendation with professional
advice on the specifics of the option.
To conclude and present the FBC for this project, a budget will be required and will be
progressed through established budget setting processes. This budget is made up of all
internal technical resource costs and all external professional services and consultant
appointments required to interrogate and validate the shortlist of options. This cost is
made up as follows:
• Internal technical management costs to deliver project feasibility, cost
management, architectural services and project management
• Flood risk assessments
• Roads and transportation assessments 
• Space planner to produce timetabling and demand modelling to develop
schedule of accommodation 
• Civil engineering to conduct ground investigation surveys on shortlist of sites
Page 163 of 347

Page 164

Johnstone High School Outline Business Case  44
OFFICIAL-SENSITIVE
• Structural engineer to conduct intrusive survey of existing asset as required
Approvals for spending this development budget will be agreed through current project
governance to ensure accountability and transparency. 
5.3. Revenue Expenditure
The new Johnstone High School will be owned and operated by Renfrewshire Council.
The operating model will align with current arrangements for Renfrewshire Council
assets and learning establishments. 
Potential operating costs for a new school will be further explored as part of the Full
Business Case which will be developed throughout 2026. Whole life cost modelling will
capture elements of future revenue spend across the expected lifetime of the proposed
new school.  Operating costs for the current school have been captured and are
indicated in the Strategic Case, above. Initial indication shows that the cost of operating
a new high school would be broadly reflective of current operational costs including
staffing, and facilities management. 
It should however be noted that depending on the specific location of the shortlist of
options, the cost of school transport could vary, albeit this cannot be seen as a single
measure of value in an option. The cost of delivering home to school transport has to be
considered in the broader context of the educational and community value that can be
derived through the development of a new school. This matter will be explored in more
detail at the FBC stage where each of the shortlisted options will be investigated in
greater detail for the estimated revenue costs associated with it. 
5.4. Indicative Costs
The indicative cost information outlined in sections 1.7 and 3.6 was prepared using
current market cost information, including Scottish Futures Trust (SFT) benchmark
data, cost information associated with current Council education construction projects,
and BCIS cost forecast indices to underpin indexing current construction cost metrics to
anticipated future construction date. Indicative costs are based on an assumed
construction commencement date of 2030, and all costs should be considered as
exclusive of VAT. 
Page 164 of 347

Page 165

Johnstone High School Outline Business Case  45
OFFICIAL-SENSITIVE
In considering the potential construction costs, it should be noted that all construction
sites are unique and will differ from site to site in ways that will impact construction
costs. This is as a result of ‘abnormal’ factors exclusive to every site. No two sites are the
same, for example flood risk mitigation or ground remediation may be more or less
consequential from site to site, with differing impact on the overall construction costs
as to how the design addresses the site. In that sense, the indicative costs should be
taken as a guide only, detailed site options appraisal will be necessary to fully
understand the geotechnical characteristics and construction cost impact before
making any final recommendations. 
The project is currently at RIBA Plan of Works Stage 0 where at this stage it is key to
define vision and goals, identify needs and opportunities and to establish a strategy.
Therefore, there is no current design information. Key assumptions and exclusions are
required to establish indicative costs and clearly indicates what is assumed as included
in the costs and what is excluded at this stage.
The cost range, as shown previously in Table 4, gives a high-level indicative estimate
based on a number of key assumptions and exclusions which may be subject to change,
given the early stage of the project. These will be further refined as the project
develops. 
Cost scenario Range
Retrofit the existing school  £121m
Rebuild on the current site  £89 - £128m
Rebuild elsewhere in the
catchment area 
£96 - £139m 
The key assumptions and exclusions used in compiling potential costs help ensure full
financial transparency. The following are highlighted as examples:
Assumptions:
• It is assumed the works shall be phased to allow the retrofit of the existing Johnstone
High School. Maximum of 5 phases.
• Estimated costs are based on construction costs at prices (4th Qtr. 2025).
• It is assumed services and utility connections are available locally.
• Inflationary allowances have been made in accordance with current published BCIS
Tender Price Indices.
Page 165 of 347

Page 166

Johnstone High School Outline Business Case  46
OFFICIAL-SENSITIVE
Exclusions:
• Refurbishment works costs to the existing Johnstone High School during the new high
school construction have been excluded
• Legal Costs 
• Planning Conditions
• Section 75 Planning works/contributions
• Operational costs, Hard FM or Lifecycle/Whole Life costs
Cost estimates for this project assume that Johnstone High School must be rebuilt on a
suitable site wholly owned by Renfrewshire Council, to preclude the cost of land
purchase. The estimates were developed on the basis of provision for 1,000 pupils.
Whilst the project may not build to this exact number of pupils, it provides a realistic
baseline to analyse costings. 
5.5. Financial Risk / Optimism Bias
In calculating potential costs, the estimate includes an allocation for risk and
uncertainty. For example, it must be acknowledged that cost indications are based on
an indicative programme that includes a construction period, commencing in 2030.
Where a delay occurs and the programme slips, costs would inevitably change as
factors such as inflation are brought to bear.
Optimism bias allows for mitigation of any unexpected increases or changes
throughout the process but cannot account for all external factors. 
5.6. Interdependencies
As indicated, the project examining the future of Johnstone High School is developing
concurrently with two other Learning Estate capital projects. All three projects are
working to an overall aspirational budget commitment that will continue to be defined
and will require Council commitment to secure the required budget at the conclusion of
the Full Business Case process. 
Different requirements, circumstances and context for each project will have a bearing
on the final cost requirements and their share of the overall funding available, making
them highly dependent on each other.
Page 166 of 347

Page 167

Johnstone High School Outline Business Case  47
OFFICIAL-SENSITIVE
6. MANAGEMENT CASE
6.1. Project Management and Project Governance Overview
Currently, Renfrewshire Council is undertaking several capital projects focussed on
learning estate improvements, covering both primary and secondary schools. This work
has built on existing expertise within the key teams likely to be involved in any project
to improve the provision of Johnstone High, giving the Council an experienced pool of
resources to draw from. Work is underway within Children’s Services to create a
dedicated Learning Estate Programme Team to deliver on the ambition of the Learning
Estate Strategy.
6.2. Project Roles
Learning Estate projects will be overseen at Chief Officer level by the Director of
Children’s Services who acts as the Programme Sponsor for all projects. Senior
accountability is assumed by the Head of Education for Strategy and Improvement who
takes the position of Senior Responsible Owner (SRO). 
In common with all Learning Estate projects, delivery of change for Johnstone High
School will be led by the Strategic Learning Estate Manager who holds senior
accountability of project delivery to the SRO with day-to-day project leadership guiding
the project teams through all aspects from inception, through to construction
execution and handover. This leadership hierarchy will ensure that projects are
successfully delivered upholding quality across project time, cost, and scope, ultimately
delivering the intended outcomes and high-quality learning establishments for all.  The
Strategic Learning Estate Manager will be guided by subject matter experts who will
control and resource the programme with the appropriate skillsets, with professional
technical management in construction and the built environment coming from the
Council’s Technical Services. 
It is crucial to note however, that whilst leadership roles have been established,
appropriate officer level programme governance has been established to ensure that
there is no single source of programme decision making. This process ensures
accountability and robust decision making with representation covering all key Council
services. 
Page 167 of 347

Page 168

Johnstone High School Outline Business Case  48
OFFICIAL-SENSITIVE
Each project will require bespoke levels of resource depending on the scale and
complexity but will follow a consistent approach. A dedicated Programme Manager will
lead the overall success and delivery of the programme by implementing and executing
full governance and control across all projects, supporting the Strategic Learning Estate
Manager. 
Project management resource will be provided by the Council’s Programme
Management Unit to cover business case development, business change processes, and
fundamental client-side project management throughout the lifecycle. Technical
expertise will be provided by the Councils’ Technical Services who will provide
construction project management, contract management, and subject matter expert
roles where appropriate through design and delivery. 
Additional resources will be required for each project with ongoing resource allocation
covering critical services such as Finance, Communications, Education, Procurement,
and Legal. 
All resources allocated to Learning Estate projects will report to the Strategic Learning
Estate Manager for their involvement in these projects, with decision making being
made by the appropriate authority level, either the Project Board, or Delivery Board, as
noted below in section 6.3. 
The Council has developed significant experience over the past 15 years delivering
major and complex investment programmes across the learning estate (which includes
three major projects currently in delivery), leisure estate, cultural estate as well as
major transport infrastructure. This experience places the Council in a strong position
to understand the resource and governance arrangements required to deliver
investment programmes of scale and this will be invaluable to support the Council’s
investment focus shifting to a long-term strategic learning estate investment
programme.
6.3. Reporting Arrangements
This project will be monitored using current project management tools to record
progress against timelines, monitor risk, and track change etc. Reporting will be used to
manage and drive the project and ensure accountability to the public more generally.
Beyond day-to-day project management activity, reporting will occur at regular
Page 168 of 347

Page 169

Johnstone High School Outline Business Case  49
OFFICIAL-SENSITIVE
intervals to established boards, with key decisions and milestones signed off at an
appropriate level. 
At Council level, this project will be reported to the Education & Children’s Services
Policy Board for all decision making and progress updates. Where financial decisions on
matters such as high value contract awards are required, this project will report to the
Finance, Resources & Customer Services Policy Board as per agreed Council
governance.
At officer level, this project will be reported to both a Project Board, and a Delivery
Board. The Delivery Board holds the senior officer level decision making authority for
the project, and will act as the ultimate officer level decision making body within its
terms of reference and agreed scope/authority. This Board consist of Director / Head of
Service representation of all key Council services. 
The Project Board will consist of Senior Managers / Heads of Service of all key Council
services and will act as the operational decision making body for all matters as agreed
in the scope, budget, and timeline of the project. 
This governance is illustrated in the image below:
Page 169 of 347

Page 170

50
OFFICIAL-SENSITIVE 
Education & Children s Services Policy Board
Learning Estate Delivery Board
Chair – Director of Children s Services
Director / Head of Service Representation
Strategic Learning Estate Manager (Strategy & Delivery Lead)
Learning Estate Project Board
Chair – Head of Education Strategy & Improvement
Head of Service / Senior Manager Representation
Finance, Resources & Customer Services Policy Board (FRCS)
All Learning Estate High Value Project Contract Awards
Senior Managers and Specialist Advisers
Project Delivery Team
Council Decision Making Level
Officer Decision Making Level
Project Delivery Level
Page 170 of 347

Page 171

51
OFFICIAL-SENSITIVE
6.4. Procurement Strategy
The project team has a dedicated specialist procurement officer who will take the lead
in developing an overarching Learning Estate Project Procurement Strategy. 
In the short term, initial assessment of the project will identify any requirement for
consultant services to assist with technical aspects of project development. If the OBC
is approved at E&CS Policy Board, consultants will be required to support the project
team as it develops a Full Business Case (FBC). This work will be led by the specialist
procurement officer and has been referenced in the Commercial Case, above.
6.5. Overall Project Benefits
Provision of a new or extensively refurbished high school in Johnstone would deliver
key project benefits to the school and local community. 
• The modernisation of Johnstone High School, making it fit for purpose, with the
intention that in future, pupils will be educated in the best possible learning
environments
• Maximise operational efficiency through modern, sustainable and efficient buildings
with a reduced need for maintenance of dilapidated buildings.
• A reduction in Renfrewshire Council’s carbon footprint through the operation of a
school better equipped to meet energy performance targets through more efficient
operation
• A community anchor site in west Johnstone providing facilities for public use outside
of school hours, complementing public use of the shared sports facilities of
Johnstone Community Sports Hub
6.6. Community Benefits Realisation Arrangements
Renfrewshire Council has an established and successful Community Benefits approach
which aims to deliver social, economic and environmental benefits for Renfrewshire’s
communities as part of contract delivery. Community benefits are considered for
inclusion on all regulated procurement over £50,000 and are delivered by suppliers and
contractors in partnership with local organisations and supported by the Council’s
Page 171 of 347

Page 172

Johnstone High School Outline Business Case  52
OFFICIAL-SENSITIVE
Community Benefit Forum and Delivery Partners. Monitoring of community benefits will
be managed through project and delivery boards and a benefits realisation strategy will
be aligned with the overarching procurement strategy.
6.7. Risk Management Arrangements
The project team has commenced a risk register to capture and monitor risk on behalf
of the Council. Risk management will remain an active part of the project management
process for the duration of this project with regular dedicated sessions focussing on the
risk register to complement its inclusion as a standing agenda item in project working
groups and meetings at all levels.
6.8. Equalities and Human Rights
Any equality impact on current users and staff at Johnstone High School, as well as the
wider community, as a consequence of this project, will be considered at all stages it
develops. Initial Equality and Human Rights Impact Assessments (EQHRIA) have been
carried out at programme level. This will inform the basis of all future assessments,
where individual impact assessments will be conducted, specifically relating to the
upcoming community engagement and consultation. 
6.9. Communication, Engagement, and Community Voice
Informal community and stakeholder engagement commenced in August this year,
following publication of the SCC. Engagement has included meetings with
headteachers, ward members and the parent council for Johnstone High School, to
keep all interested parties informed of progress and likely timelines for this project. 
A survey was issued to parents and staff, inviting their views on the school and what
they would improve, what should be important for any future investment. Those
findings are referenced in the Strategic Case (section 2.6, above). Responses to the
survey helped shape analysis of the routes forward and options considered in this OBC. 
Engagement with key stakeholders and the wider community will be key to the
successful determination of the overall best value option to proceed with at the
Page 172 of 347

Page 173

Johnstone High School Outline Business Case  53
OFFICIAL-SENSITIVE
conclusion of the Full Business Case. To ensure clear communication and stakeholder
input to the process, the project team will carry out an informal consultation on the
short-listed options described in section 3.5 from April 2026.  More detail is provided in
section 7.1 Summary of Shortlisted Options and Next Steps 
7. CONCLUSION
7.1. Summary of Shortlist of Options and Next Steps 
This outline business case confirms that there is a need to either retrofit the current
Johnstone High, or build a new Johnstone High, either on the current site or elsewhere.
The provisional scope to allow progression of site assessment, costing, and options
analysis is to consider a school of 1,000 pupils. 
The minimum site area required for a high school for 1,000 pupils is 56,656m² as per
Building Bulletin BB103 and 69,746m² as per The School Premises Regulations
(Scotland) 1967.
This business case concludes that from the longlist of options that have been assessed
against the preferred route forward to construct a new high school on a suitable
alternative site. As shown previously in Table 3, the following options should be
progressed to a Full Business Case Process. 
Option 01
Retrofit Johnstone High School on Site 01 Johnstone High School Beith Road, Johnstone
Option 02
New Build on Site 01 Existing Johnstone High School Site, Beith Road, Johnstone
Option 03
New Build on Site 03 Beith Road Playing Fields, Johnstone 
Page 173 of 347

Page 174

Johnstone High School Outline Business Case  54
OFFICIAL-SENSITIVE
To prepare the Full Business Case, more detailed site assessments, further cost
modelling, and community consultation are required to recommend a single best value
option to proceed with on conclusion of the next stage of the business case process. 
Taking into account Audit Scotland’s recommendations that the Council include
communities in decision making, the project team will conduct an informal
consultation on the options outlined above.  The purpose of carrying out an informal
consultation during the Full Business Case stage is to:
• Comply with recommended best practice in ensuring that the public are involved
in decision making
• Comply with UNCRC to involve children in making decisions that affect them
• Explain the options clearly to stakeholders and the public
• Understand early in the process local views on the options
• Refine options based on local views and feedback
• Present a final option that is the most suitable for the community and the council
• Reduce the potential for community objections at a later stage
• Enhance relationships with local communities/individuals
Key stakeholder groups that will be engaged in the informal consultation include:
• Pupils and parents – parent councils, all parents and pupils
• Local community – Community councils, youth groups, local development
groups, local interest groups, general population in school catchment
• School staff - Head teachers, teaching staff, admin staff, support staff.  
• Associated schools - parents, pupils and staff of associated primary, secondary or
nursery schools
• Politicians – local ward members, ECSPB members, local MPs, local MSPs, 
• Council Services – all council services who contribute to the creation, running and
maintenance of school facilities
• Future building users – groups with letting arrangements 
• Neighbours – current and potential neighbours to school buildings/sites.
• Statutory bodies – Education Scotland, Police Scotland, Scottish Fire and Rescue
Service, Sport Scotland. 
Page 174 of 347

Page 175

Johnstone High School Outline Business Case  55
OFFICIAL-SENSITIVE
Activity Stakeholders Methods
Preparation and
options
development
Senior Officers and SLT
Elected Members
Head Teachers
Briefings
Workshops
1-1 interviews
Targeted Early
Engagement
Parent Councils/Parents
Community Councils
Local Community Groups
Pupils
Staff
Council Services
Roud table meetings
Briefings
Workshops
Focus Groups
Surveys
Broad Public
Engagement 
Associated school parents
and pupils
General public 
Neighbours
Surveys
Public events
Analysis and
Refinement
Project team 
Table 14: Engagement Activity 
The Full Business Case process is expected to take the remainder of 2026 to complete
and will be presented back to a future cycle of the Education and Children’s Services
Policy Board in 2027 for approval of a final recommended option. 
Page 175 of 347

Page 176

Johnstone High School Outline Business Case  56
OFFICIAL-SENSITIVE 
Children’s Services
Renfrewshire Council
Renfrewshire House
Cotton Street
Paisley
PA1 1BR 
Page 176 of 347

Page 177

1
OFFICIAL-SENSITIVE 
Trinity High School 
Outline Business Case
Page 177 of 347

Page 178

Trinity High School Outline Business Case  2
OFFICIAL-SENSITIVE
DOCUMENT CONTROL SHEET 
Title: Trinity High School
Version Number 2
Document Type: Outline Business Case
Author: Learning Estate Project Team
Date Published: 18/02/2026
Document Versions: 
Version: Name: Update: Date
V0.1 Project team Initial draft 17/11/25
V0.2 Project team Amendments 21/11/25
V0.3 Project team Further draft 25/11/25
V1 Project team First draft for review  17/12/25
V1.1 Project team Update site assessments and section 7 20/01/26
V1.2 Project team Amendments and updates 10/02/26
V2 Project team Final draft following review by Chief
Officers 18/02/26
Supporting Documentation / Location: 
Document Title: Location:
Strategic Case for Change Document.ashx
Page 178 of 347

Page 179

Trinity High School Outline Business Case  3
OFFICIAL-SENSITIVE
Table of Contents
1. EXECUTIVE SUMMARY ........................................................................ 6
1.1. Introduction .......................................................................................... 6
1.2. Background ........................................................................................... 7
1.3. Opportunity ........................................................................................... 9
1.4. Scope and Objectives ............................................................................ 9
1.5. Summary of Routes Forward ............................................................... 10
1.6. Preferred Route Forward and Options Shortlist .................................. 10
1.7. Indicative Costs ................................................................................... 11
1.8. Timeline ............................................................................................... 13
2. STRATEGIC CASE .............................................................................. 14
2.1. Strategic Context ................................................................................. 14
2.2. The Need for Change ........................................................................... 15
2.3. Investment Objectives ......................................................................... 15
2.4. Existing Arrangements ......................................................................... 16
2.5. Initial Engagement .............................................................................. 17
2.6. Scope and Service Requirements ....................................................... 18
3. ECONOMIC CASE .............................................................................. 20
Page 179 of 347

Page 180

Trinity High School Outline Business Case  4
OFFICIAL-SENSITIVE
3.1. Potential Routes Forward.................................................................... 20
3.2. Preferred Route Forward ..................................................................... 25
3.3. Site Assessment Criteria ...................................................................... 26
3.4. Site Options Assessment ..................................................................... 28
3.5. Shortlisted Options ............................................................................. 42
3.6. Site 2, Netherton Avenue, Renfrew – Advanced Manufacturing .......... 43
3.7. Site 8, King George V Playing Fields, Renfrew – Renfrew High School
Consideration .................................................................................................. 44
3.8. Indicative Costs ................................................................................... 45
3.9. Transport Considerations ................................................................... 47
3.10. Timeline and Next Steps ..................................................................... 48
4. COMMERCIAL CASE .......................................................................... 49
4.1. Approach ............................................................................................. 49
4.2. Service Requirements ......................................................................... 49
4.3. Project Development .......................................................................... 49
5. FINANCIAL CASE ............................................................................... 51
5.1. Project Funding – Capital Expenditure ............................................... 51
5.2. Approvals Process ............................................................................... 51
5.3. Revenue Expenditure .......................................................................... 52
Page 180 of 347

Page 181

Trinity High School Outline Business Case  5
OFFICIAL-SENSITIVE
5.4. Indicative Costs ................................................................................... 52
5.5. Financial Risk / Optimism Bias ............................................................ 54
5.6. Interdependencies .............................................................................. 54
6. MANAGEMENT CASE ........................................................................ 55
6.1. Project Management and Project Governance Overview ................... 55
6.2. Project Roles ........................................................................................ 55
6.3. Reporting Arrangements ..................................................................... 57
6.4. Procurement Strategy ......................................................................... 59
6.5. Overall Project Benefits ....................................................................... 59
6.6. Community Benefits Realisation Arrangements ................................. 59
6.7. Risk Management Arrangements ........................................................ 60
6.8. Equalities and Human Rights .............................................................. 60
6.9. Communication, Engagement, and Community Voice....................... 60
7. CONCLUSION ................................................................................... 62
7.1. Summary of Shortlist of Options and Next Steps ................................ 62 
Page 181 of 347

Page 182

6
OFFICIAL-SENSITIVE
1. EXECUTIVE SUMMARY 
1.1. Introduction
This outline business case (OBC) is required as part of the Council’s new structured
approach to delivering its long-term strategy for the learning estate across
Renfrewshire. It builds on the context set out in a Strategic Case for Change (SCC)
examining the future of Trinity High School in Renfrew, which was approved in August
2025 at the Education and Children’s Services Policy Board (E&CS Policy Board).
In the SCC, Trinity High School was assessed as working beyond optimal occupancy,
with demand for places projected to outweigh current capacity in the coming years.
Further, the school buildings and the site of the school cannot expand in a way that
would meaningfully improve the learning environment due to space constraints.
Consequently, the condition and suitability of the school cannot be addressed utilising
the current building. As a result, the strategic assessment concluded that the school
cannot meet the ambitions of the Learning Estate Strategy without change.
The purpose of this OBC is to articulate a preferred route forward for the project by
identifying a shortlist of investment options likely to optimise value for money in
delivering change. A longlist of options is presented as part of the OBC, along with
analysis and rationale for their inclusion or exclusion from the shortlist. 
The OBC uses the following framework to present the preferred way forward, utilising
an adapted HM Treasury Green Book approach which is based on the 5 Case model:
Strategic case – confirming that strategic objectives remain current and seek
agreement on the recommendation
Economic Case – helping to determine that the preferred way forward offers value for
money
Commercial Case – working towards a recommended deal by explaining potential
delivery models, procurement and engagement
Financial Case – establishing affordability and funding requirements
Management Case – planning for successful delivery
Page 182 of 347

Page 183

Trinity High School Outline Business Case  7
OFFICIAL-SENSITIVE 
Table 1: Business case development process
1.2. Background
The Learning Estate Strategy published by the Council in 2024, aims to initiate a
strategic programme of investment in schools, through detailed assessment of the
entire learning estate. The ambition of the investment programme is to ‘create the best
possible learning estate to allow children and young people to thrive’.
Schools were assessed against various criteria including condition, suitability for
delivering the curriculum, capacity and demand. Using a prioritisation framework, the
strategy assessed the entire learning estate, identifying those schools in need of long-
term investment planning now, to ensure that the Council is best placed to:
• Secure best value from strategic learning estate decisions around investment 
• Meet the expected long-term demand for education provision across
Renfrewshire whilst delivering improvements in school buildings and learning
environments 
Stage: Stage 1 Stage 2 Stage 3 Stage 4
Stage Outcome: Strategic Outline
Case Outline Business Case Full Business Case Final Delivery Business
Case
Stage Activities:
• Highlighting
strategic context
• Making the case
for change
• Agreeing scope
• Considering longlist
options
• Exploring the
preferred way
forward and
presenting a
shortlist
• Determine potential
value for money
• Preparing for the
potential deal
• Planning for
procurement
• Procuring the
solution
• Contracting the deal
• Ensuring successful
delivery
5-Case Model
(stage of
completeness): 
• Strategic 50%
• Economic 40%
• Commercial 10%
• Financial 10%
• Management 10%
• Strategic 80%
• Economic 70%
• Commercial 40%
• Financial 30%
• Management 50%
• Strategic 90%
• Economic 90%
• Commercial 90%
• Financial 75%
• Management 75%
• Strategic 100%
• Economic 100%
• Commercial 100%
• Financial 100%
• Management 100%
Gateway
Review: Strategic Assessment Business Justification Delivery Strategy
Final Investment
Decision and financial
commitment
Page 183 of 347

Page 184

Trinity High School Outline Business Case  8
OFFICIAL-SENSITIVE
• Ensure that the delivery of any new infrastructure complements other key
strategic objectives being progressed by the Council to optimise the use of assets
for communities and support wider redesign of services that better meet the
needs of communities.
A cohort of 13 priority schools was identified, with Trinity High School in Renfrew, being
identified as the number one priority school for investment in Renfrewshire. This was
based on the condition and suitability of the school building, driven by constraints on
the size of the school’s site, which hampers the Council’s ability and ambition to deliver
an evolving curriculum in the best possible learning environment. A further influence on
the prioritisation of this school was pupil projection forecasts showing the school
capacity being exceeded in the years to come through greater demand from housing
development in the catchment.
As a result, a Strategic Case for Change was produced, to consider the context of key
issues which, if not addressed, would limit the Council’s ability to deliver the objectives
of the Learning Estate Strategy. The document examined the operating context at
Trinity with reference to those objectives:
• Condition
• Suitability
• Sufficiency
• Inclusivity
• Digital
• Sustainability and Net Zero
• Community Facilities and Place shaping
• Active Travel
The Strategic Case for Change articulates the current baseline position at the school
and identifies areas where the limitations of the site mean that the school cannot
expand to meet demand or ensure future delivery of the modern and evolving
curriculum. This context was set against the aims of the Learning Estate Strategy, to
test how likely the current school is to meet the ambition of educating pupils in the best
possible learning environments.
Following approval of the strategic case for change, significant work has been
undertaken to identify options for change that meet these ambitions and align with the
critical success factors articulated in the documents. 
Page 184 of 347

Page 185

Trinity High School Outline Business Case  9
OFFICIAL-SENSITIVE
1.3. Opportunity
The opportunity to change and improve the provision of secondary education for pupils
in the Trinity High School catchment area, aims to advance the objectives of
Renfrewshire Council’s new Learning Estate Strategy, and to help meet the ambitions of
wider Council and Scottish Government policies. Those ambitions, fully considered in
the Strategic Case for Change, are summarised here:
• Improving the condition of schools
• Sustainability and Energy Efficiency
• Equity and Inclusion
• Adapting to Future Educational Needs
• Community and Public Use
• Strategic Planning and Investment 
• Collaborative Approach with Stakeholders
The ambitions encompass Renfrewshire Council’s determination to invest wisely whilst
reflecting the importance of operational efficiencies and cost avoidance in delivering
the Learning Estate Strategy. Thus, careful consideration of how to bring change to
Trinity High School, can additionally help increase building operational efficiency
through provision of improved, modern facilities. A new or refurbished school can
deliver modern standards and design and contribute to the Council’s Net Zero
commitments. 
Above all, this OBC sets out the opportunity for Renfrewshire Council to meet its
overarching aim of ensuring that its schools are modern, accessible to all and support
the delivery of high-quality education for learners.
1.4. Scope and Objectives
The Strategic Case for Change set out five overarching investment objectives for Trinity
High School. Any investment in the learning estate must:
• Deliver the best learning environments and facilities possible
• Support improving attainment and ambition
• Maximise operational efficiency across the estate
• Reduce the contribution to the Council’s combined carbon footprint 
• Acknowledge that ageing schools with deteriorating conditions come closer to
the point of being no longer fit for purpose
Page 185 of 347

Page 186

Trinity High School Outline Business Case  10
OFFICIAL-SENSITIVE
Thus, Trinity High School is identified as a school which cannot match current or future
demand; whose building condition and layout hampers delivery of a modern
curriculum and efforts to raise attainment further; whose buildings require
considerable on-going investment simply to maintain the status quo; and which cannot
contribute to Council’s net zero commitments in its current form.
To meet these objectives and deliver change, this OBC will examine viable options for
the delivery of a new-build secondary school for a roll of circa 1400 pupils (to be revised
up or down based on detailed project development) with consideration of any
associated community facilities, in line with the Council’s wider strategic property
strategy. The school should remain within the current catchment area.
1.5. Summary of Routes Forward
Possible options for the future of Trinity High School considered 4 potential routes
forward against the requirements for change:
1 – Do Nothing
2 – Retrofit and Refurb
3 – Rebuild Trinity on the current site
4 – Rebuild Trinity on another site
Analysis of the routes forward are presented in full in the Economic Case in Section 3.
This was produced following the collation of background information included in the
SCC, technical information, and analysis of the operating context at Trinity, as well as
engagement with school staff and parents. 
1.6. Preferred Route Forward and Options Shortlist
The preferred route forward for the project has been determined using the critical
success factors identified in the SCC, to assess the viability of the various options under
consideration. This identified that delivery of change for Trinity High School was
dependent on moving the school from its current location and, consequently, on the
identification of a new site for the school. 
Page 186 of 347

Page 187

Trinity High School Outline Business Case  11
OFFICIAL-SENSITIVE
The routes forward and options rationale are discussed in greater detail in the
Economic Case in Section 3 and includes an overview of estimated costs for delivering
the project. 
The preferred route forward can be described as follows:
Address the capacity, school condition and suitability issues facing Trinity High
School by building a new school on a suitable site elsewhere in the catchment area.
This OBC appraises potential site options that have been identified to deliver this
preferred route forward. The shortlisted sites are: 
Site 8 
Rebuild Trinity High School on Site 8 – KGV Playing Fields Renfrew
Site 9
Rebuild Trinity High School on Site 9 – East Craigend, Erskine
Site 10 
Rebuild Trinity High School on Site 10 – Barwood, Erskine
Table 2: Shortlisted Options 
1.7. Indicative Costs
To identify an indicative planning cost for delivering options associated with the
preferred route forward, an exercise was conducted to consider the potential cost of
delivering a school project at the identified planning scale (a secondary school of 1,400
capacity with additional community-use space).
The site at East Craigend, Erskine from the options shortlist and used as an example for
costing purposes, being a site wholly owned by the Council. The total includes the cost
of demolition of the existing Trinity High School building.
The overall potential costs of a new Trinity High School have been estimated as follows:
Page 187 of 347

Page 188

Trinity High School Outline Business Case  12
OFFICIAL-SENSITIVE 
Cost scenario Range
New build stand-alone
Trinity High School on a
suitable site 
£120 - £180m
Table 3: Indicative costs 
The indicative costs above are provided for illustrative purposes only. Costs are subject
to change depending on consultation, design changes, planning requirements and
parameters, site locations and geotechnical site characterisation, procurement routes
and other external factors. Further detail can be found within section 3.7 (Economic
Case) and Section 5.4 (Financial Case) of this document. 
Page 188 of 347

Page 189

13
OFFICIAL-SENSITIVE
1.8. Timeline
In 2025 a high-level summary of the timeline for completing this business case process was outlined, as shown below. This
timeline is explained in more detail in section 3 of this document to show a potential route to construction. 
Page 189 of 347

Page 190

14
OFFICIAL-SENSITIVE
2. STRATEGIC CASE
2.1. Strategic Context
In August 2025, a business case presented to E&CS Policy Board set out a strategic case
for change at Trinity High School. The paper outlined the background and context,
highlighting links to local and national strategies for education, including Renfrewshire
Council’s Learning Estate Strategy and Fairer Renfrewshire policy, and Scottish
Government’s National Learning Estate Strategy.
The strategic objective for this project is to ensure delivery of the best quality learning
environments for secondary pupils in the Trinity High School catchment area, whilst
ensuring that capacity matches demand for school places, both now and in the future.
This OBC takes that initial case for change and begins the process of identifying options
for change in response to the needs and drivers identified. The policy background is
summarised below.
• Renfrewshire Council Learning Estate Strategy – a long-term structured
approach to assessment of the learning estate through a prioritisation
framework which identifies those areas of the estate most in need of investment.
The strategy ensures careful planning to ensure that limited capital investment is
directed where it will have the greatest impact through reshaping, refurbishing
or replacing existing facilities. 
• Scottish Government’s National Learning Estate Strategy – reflecting the
ambition of the Scottish Attainment Challenge, which promotes equity in access
to quality education facilities as part of a drive to tackle the poverty related
attainment gap and promote inclusivity.
• Fairer Renfrewshire – recognising the role of the learning estate in reducing
inequalities and improving the life chances of pupils across Renfrewshire
• Strategic Planning and Investment – recognising the long-term nature of the
strategy for the learning estate, with a clear framework which identifies those
schools that require replacement, refurbishment or upgrading
• Strategic Property Strategy – seeks to ensure that Renfrewshire Council’s
property estate is strategically located and used to its fullest potential,
complementing existing facilities and services wherever possible. 
Page 190 of 347

Page 191

Trinity High School Outline Business Case  15
OFFICIAL-SENSITIVE
2.2. The Need for Change
As articulated in the Strategic Case for Change document which preceded this OBC,
there is a clear and compelling case for introducing change to Trinity High School, as
highlighted by a combination of factors, including:
• Operating beyond optimal capacity – Trinity High School has a planning
capacity of 1,032 pupils and pupil roll this year of 1,026; roll projections indicate
that demand will rise and remain at or over-capacity across the next 10-15 years. 
• Condition and Suitability – ‘Core Facts’ reporting indicates that the condition
(rated ‘B’) and suitability (rated ‘C’) of the of the building should be improved,
and that £10m of spending will be required over the next 20 years simply to keep
the building operating at its current level. The school is built on a site which is
too small for an establishment of its size and population. The school has
expanded over the years through additional buildings but still offers poor
suitability for delivery of the curriculum. It cannot expand further on its current
site. Provision of a school tailored to modern teaching requirements will better
meet the demands of the curriculum. 
• Opportunity to maximise operational efficiency – Provision of a school built to
modern teaching and building standards will help increase building operational
efficiency by replacing ageing facilities which cannot meet modern building
performance standards.
2.3. Investment Objectives
The following objectives have been identified as key to improving school provision in
for Trinity and aligning with the ambitions of the Learning Estate Strategy:
• Effectiveness – Meet the aims of the Council’s Learning Estate Strategy to initiate a
strategic programme of investment in schools; Ensure that every school is considered
in terms of Scottish Government Core Facts reporting criteria; Deliver the best
learning environments and facilities possible, exceeding, where able, Scottish
Government recommendations. 
• Efficiency – Provision of modern learning environments to support improving
attainment for pupils in Renfrewshire.
• Economy – Optimise operating costs for the estate through the creation of buildings
which are more energy efficient and through operation of a more efficient overall
Page 191 of 347

Page 192

Trinity High School Outline Business Case  16
OFFICIAL-SENSITIVE
school estate; Offer a reduction in the costs incurred maintaining ageing buildings;
Operation of buildings of a size suited to current and projected school rolls.
• Compliance – Careful planning for the replacement or refurbishment of schools to
lessen the impact from older buildings and make a valuable contribution to
Renfrewshire Council’s net zero commitments through the operation of more
efficient buildings.
• Replacement – The project acknowledges that as buildings age and maintenance costs
increase, they come closer to the point of being no longer fit for purpose as a Council asset.
2.4. Existing Arrangements
A comprehensive overview of Trinity High School was included in the Strategic Case for
Change and is summarised below. The key facts relating to its operation are outlined in
the following tables and narrative.
Trinity High School is a denominational secondary school serving a catchment area
stretching from the northwest of Renfrewshire on the river Clyde, across Langbank,
Erskine and on to Renfrew and north Paisley. Trinity serves four primary schools in the
catchment area and 5% of current pupils attend from outside the catchment area. The
planning capacity for Trinity High is 1,032. The current roll is 1,026 pupils.
Key facts and operating costs for Trinity High:
School Age Suitability Condition
Trinity High 61 C B
Table 4: Key Facts 
School Capacity Current Roll 2029/30 2033/34
Trinity High 1032 1,026 (99%) 1,010 (97%) 1,030 (99.8%)
Table 5: Capacity and Roll Projection Information (‘Sufficiency’) 
School Utilities Hard &
Soft FM
Teaching Non-
Teaching
Other* Rates Total
Trinity High £283,861 £473,053 £5,143,877 £466,093 £211,004* £139,200 £6,717,088
* Waste, Grounds Maintenance, Transport
Table 6: Overview of Operating Costs 
Page 192 of 347

Page 193

Trinity High School Outline Business Case  17
OFFICIAL-SENSITIVE
Location No. of Pupils Current Annual Cost
TRINITY HS - ERSKINE (MAINS
HILL/GARNIEL 40 £33,411
TRINITY HS - BISHOPTON (DARGAVEL
VILLAGE NORTH & SOUTH) /
BARHILL, ERSKINE
(LINBURN/MILLFIELD)/INCHINNAN
144 £73,333
TRINITY HS - BISHOPTON (DARGAVEL
VILLAGE) 10 £57,185
TRINITY HS - INCHINNAN (INDIA
DR)/ERSKINE 50 £33,796
Total: 244 £197,727
Table 7: Transport Costs Breakdown
2.5. Initial Engagement 
Following presentation of the Strategic Case for Change to E&CS Policy Board in August
2025, officers undertook some initial engagement, outlining the processes involved in
identifying opportunities to deliver change.
A survey was issued to parents, carers, and all school staff at Trinity High School,
inviting views around current school provision, including school condition, location of
facilities and what stakeholders feel should be important to the Council in progressing
future school investment.
Analysis of responses from parents, carers and the wider community suggested a
community affection and connection for the school and its location whilst most
respondents acknowledged the challenges the building poses to users. The survey
identified the following key themes and discussion points:
• Modernisation/refurbishment is the most persistent theme: many describe
the building as old, dated, tired and want a significant upgrade. 
• Toilets and hygiene are frequent cited issues: (cleanliness, locks, capacity,
safety/vaping). 
Page 193 of 347

Page 194

Trinity High School Outline Business Case  18
OFFICIAL-SENSITIVE
• Social and dining space is viewed as insufficient: calls for more seating,
sheltered areas, and quiet/regulated spaces (including for neurodivergent
learners)
• Sports and outdoor facilities are widely seen as under-provisioned (requests
range from full-size pitches and MUGAs to a swimming pool). 
• Parking/drop-off is problematic; parents want safer, more orderly
arrangements. 
• Location is valued for centrality and transport links, though many note the site
is constrained for growth.
Responses from school staff at Trinity again highlighted some positive aspects of the
school and its location but described issues and challenges posed by the building’s size
and constraints.
• Physical Condition – Significant concerns include inadequate toilets, poor
social spaces, leaks, ventilation problems, and outdated infrastructure.
• Central Location Benefits - The school’s central location offers convenient
transport links and access to local amenities, praised by all staff groups.
• Staff Workspace Challenges - Teaching staff face fragmented departments
impacting efficiency; office staff lack sufficient administrative space and
facilities.
• Security and Safety Concerns - Multiple entry and exit points complicate
monitoring, raising staff concerns about school security and safety.
Both parents and staff strongly support investment in modern, high-quality learning
environments, and highlight the need for buildings in good condition, modern
teaching facilities, improved sports and outdoor learning areas, and robust digital
infrastructure as top priorities for any future redevelopment
2.6. Scope and Service Requirements
The scope of this proposal for change is to provide an improved Trinity High School in
line with the strategic objectives set out and agreed in the Strategic Case for Change,
informed by an understanding of the operating context. Potential routes forward were
set out in an interim update to E&CS Policy Board in October 2025, based on the broad
range of options outlined in the Economic Case, below. This included an accompanying
assessment of advantages and disadvantages as well as a narrative description of the
preferred way forward.
Page 194 of 347

Page 195

Trinity High School Outline Business Case  19
OFFICIAL-SENSITIVE
To provide a basis on which to consider potential options to invest in Trinity High
School, a provisional scale was set as a secondary school of 1,400 pupils, with an
additional 500m2 of community space that can be developed into an appropriate
community offer, following engagement. (500m2 total site space, 300m2 gross internal
floor area). To allow this scale to be translated into building footprint and site size
metrics, BB103 guidance was utilised as the best practice metric for sizing. 
The outputs of this indicate that a secondary school of 1,400 pupils plus community
space equates to an ideal site requirement of 79,310 m2 (19.6 acres). 
The potential routes forward were informed through consideration of a broad range of
options for change with an accompanying assessment of their advantages and
disadvantages, concluding with a narrative description of the preferred way forward. 
The routes are summarised here: 
Route 1 Route 2 Route 3 Route 4
‘Do nothing’ – Retain
the building as-is and
continue to operate
the high school in its
current format
Retrofit/Refurbish
Trinity High School to
improve its overall
condition and
suitability
Rebuild Trinity High
School at the current
site
Rebuild Trinity at a
new site elsewhere in
the catchment area
Table 8: Potential Routes Forward   
Page 195 of 347

Page 196

Trinity High School Outline Business Case  20
OFFICIAL-SENSITIVE
3. ECONOMIC CASE
3.1. Potential Routes Forward
In line with the summary of routes forward that are outlined as part of the Strategic
Case, each has now been subject to an assessment process to identify the broad
advantages and disadvantages to assess the overall merits of each option. 
This process allows in the first instance, identification of recommended viable routes to
be considered in more detail to establish a long list of options to be considered. In the
case of Trinity, the analysis outlined below identifies there is only a single
recommended viable route forward from which a long list of potential options has been
identified. The recommended route forward is: 
Route 4 - Rebuild Trinity HS at a new site within in the catchment area. 
An overview of the rationale of why Route 4 has been identified as the only
recommended viable route is outlined in the detailed assessments below: 
Route 1: Do nothing
Retain the building as-is, with minimal wind and watertight investment, and continue to
operate the high school in its current format.
Main Advantages:
Value for money  • Lower capital outlay required, albeit significant future capital outlay will still be
required on building maintenance to secure long term wind and watertight
condition, and to support net zero transition, none of which would support
improvement to configuration or suitability for delivering the curriculum. 
• Long term demand on places for Trinity could potentially be managed through
strict application of Renfrewshire Council admissions policy for schools.
Main Disadvantages:
Strategic Fit  • Maintaining the current building will not help ensure delivery of the best possible
learning environments for all users, nor would it meet the objectives of the
Learning Estate Strategy or help future proof against further developments in
technology or curriculum.
• Although Trinity predates minimum space requirements under School Premises
(General Requirements and Standards) (Scotland) Act 1967, and Area Guidelines
for Mainstream Schools (BB103) it should be stressed that the site is severely
Page 196 of 347

Page 197

Trinity High School Outline Business Case  21
OFFICIAL-SENSITIVE
constrained, with little usable outdoor space and the school would not be built to
its current size and extent if planned now.
• School capacity is not sufficient for demand, making operation less efficient and
more expensive
• The current building does not meet the ambition of the Learning Estate Strategy in
that it will not help ensure delivery of the best possible learning environments for
all users or help future proof against further developments in technology and
curriculum. 
• Does not contribute to Renfrewshire Council ambitions for sustainability and
energy efficiency.
Value for Money  • The most recent condition report shows that remedial maintenance cost of at least
£10m over the next 20 years will be required to simply maintain the building as it is
now. This would not bring any improvement to the overall suitability and layout of
the building or its grounds to support curriculum delivery, and the building would
have a limited long term life given its age. In addition, further investment would be
required to support long term net zero ambitions.
• The building is, and would remain in future, too small for its current and projected
roll, making operation less efficient.
Conclusions:
With the disadvantages outlined above, this is not considered a viable solution and will be
discounted as a route forward. This option would bring no benefit to the school or wider community
and would not serve to improve the education experience of anyone involved and is likely to provide
poor long term value for money given the age and condition of the existing school.   
Route 2: Retrofit and Refurbish
Carry out a comprehensive retrofit of Trinity High School to bring it up to Net Zero Public
Sector Building Standards (NZPSBS) or better, whilst improving the overall condition and
suitability of the environments. 
Main Advantages:
Strategic Fit  • Contributes towards net zero ambitions through retention of embodied carbon
and significant improvements in energy consumption.
Value for Money • Creation of a building that is more energy efficient and may improve operational
efficiency
• Potentially, less capital outlay required than for a new-build option, although this
would require detailed analysis particularly given the dual costs of normal
wholescale refurbishment coupled with climate retrofit requirements.
Page 197 of 347

Page 198

Trinity High School Outline Business Case  22
OFFICIAL-SENSITIVE
Main Disadvantages:
Strategic Fit  • Although Trinity predates minimum space requirements under School Premises
(General Requirements and Standards) (Scotland) Act 1967, and Area Guidelines
for Mainstream Schools (BB103) it should be stressed that the site is severely
constrained, with little usable outdoor space and the school would not be built to
its current size and extent if planned now.
• The site constraints would limit the design in being able to deliver the full
ambition of the Learning Estate Strategy. 
Value for Money  • A deep retrofit is a complex and demanding project requiring careful planning
and execution. Although initial capital costs may be less in comparison to an
equivalent new build, the costs will still be significant and the overall remaining
life of a refurbished building is likely to be less than a new build placing a level of
constraint on the long term value for money assessment.
• Due to the design of current building and inefficient layout, large portions of the
building may require to be demolished and rebuilt as part of a retrofit, leading to
the question of whether better overall value would be gained in a new build.
Affordability • The full extent of work required, and therefore cost and timeline, may only
become fully apparent as areas of the internal fabric of the building are exposed
and a full understanding of the buildings condition is apparent.
Achievability  • A decant would be required for pupils of the school over a long spanning
construction period. In a secondary school this would pose significant challenge
in terms of maintaining curriculum delivery and retaining access to specialist
equipment or workshops. This would add a level of complexity and cost to the
project.
• Finding suitable premises in which to base the school during decant may be an
onerous task, whilst the option of decanting the school community throughout
other secondary schools in Renfrewshire risks additional upheaval for other
school communities.
Conclusions:
This option is more attractive in terms of making the most of existing assets, retaining embodied
carbon and addressing Council commitments on net zero. However, the option would fail to
address challenges around suitability and sufficiency, with the footprint of the current site falling
significantly short of current required space metrics for a secondary school of this size and would
present a missed opportunity to deliver long term improvement in the learning estate for the
community. Additionally, although there may be the potential for a degree of short term
affordability benefits, there is significant uncertainty as to whether it would necessarily provide
long term value for money and it would also be highly disruptive to the school existing school
community during the construction period. On this overall basis, this option should not be
considered as a viable route forward.
Page 198 of 347

Page 199

Trinity High School Outline Business Case  23
OFFICIAL-SENSITIVE
Route 3: New Build Trinity High School at Current Site
Rebuild Trinity High School at the current site on its existing footprint with consideration
for partner/community facilities, while decanting pupils elsewhere for the duration of the
demolition and building works. 
Main Advantages:
Strategic Fit  • This would deliver a new school built to modern educational and building
standards, of a size that allows for optimal occupancy.
• It would directly contribute towards net zero ambitions through provision of a
new school built to NZPBS standard or better
Value for Money • Creation of a building with modern mechanical and electrical systems will greatly
improve operational efficiency and a new build provides the opportunity to
secure a learning facility with the maximum future life to support long term value
for money benefits.
Main Disadvantages:
Strategic Fit  • Although Trinity predates minimum space requirements under School Premises
(General Requirements and Standards) (Scotland) Act 1967, and Area Guidelines
for Mainstream Schools (BB103) it should be stressed that the site is severely
constrained, with little usable outdoor space and the school would not be built to
its current size and extent if planned now.
• The site constraints would limit the design in being able to deliver the full
ambition of the Learning Estate Strategy. 
Achievability  • A decant would be required for pupils of the school over a long spanning
construction period. In a secondary school this would pose significant challenge
in terms of maintaining curriculum delivery and retaining access to specialist
equipment or workshops. This would add a level of complexity and cost to the
project.
• Finding suitable premises in which to base the school during decant may be an
onerous task, whilst the option of decanting the school community throughout
other secondary schools in Renfrewshire risks additional upheaval for other
school communities.
Conclusions:
The current site of Trinity High School is unsuitable for construction of a modern school due to the
footprint of the current site falling significantly short of required space metrics for a modern
secondary school of this size. Any option involving decanting of the school community to facilitate
a rebuild or refurbishment of the school would bring considerable challenges and disbenefits. This
option would fail to achieve improvements to the suitability of the school environment due to
Page 199 of 347

Page 200

Trinity High School Outline Business Case  24
OFFICIAL-SENSITIVE
constrained site space. This option should not be considered as part of the preferred way
forward. 
Route 4: New Build Trinity High School at Alternative Site
Build a new High School elsewhere in the catchment area on a suitable site with
consideration for partner/community facilities; on completion, demolish the current
building and sell or develop the land. 
Main Advantages:
Strategic Fit  • This would deliver a new school built to modern educational and building
standards, of a size that allows for optimal occupancy.
• Contributes towards net zero ambitions through provision of a new school built
to NZPBS standard or better, with significant improvements in energy
consumption to the existing school.
Value for Money • Creation of a building with modern mechanical and electrical systems will greatly
improve operational efficiency.
Achievability  • Flexibility of timescale through the continued operation of the existing school
during the design and build process
• Avoids decanting the school community with all associated cost and
complication.
• A secondary school building project on a new site would prove highly attractive
to the market increasing the opportunity to secure best value through the
procurement phase.
Main Disadvantages:
Achievability  • Finding a suitable site for a new school could potentially present some
challenges.
• The cost of buying suitable land to house the new school if suitable Council-
owned land cannot be identified would add to the costs.
• An alternative site could potentially introduce wider considerations such as the
scale of required transport that would need to be factored into the overall
options appraisal process. 
Conclusions:
This option would address condition, sufficiency and suitability and would be able to meet most if
not all of the objectives of the Learning Estate Strategy. As outlined above an alternative site may
introduce wider considerations including meeting active travel objectives if appropriate land
cannot be sourced in an appropriate location of the catchment area coupled with the scale of
requirement associated with the number of pupils requiring home to school transport. Such
Page 200 of 347

Page 201

Trinity High School Outline Business Case  25
OFFICIAL-SENSITIVE
implications will become clearer through specific site assessment process. However, this route
forward should continue to be progressed further to identify alternative delivery options to
determine the shortlisted options which present the overall best value.
3.2. Preferred Route Forward
A qualitative assessment of the potential routes has provided commentary on their
practicality, adaptability and desirability, aligned to the critical success factors outlined
in the Strategic Case for Change. This identified those that do not offer a viable means
of delivering the required change and confirmed a preferred way forward for the
project:
Address the capacity, school condition and suitability issues facing Trinity High
School by building a new school on a suitable site elsewhere in the catchment area.
This route forward was recommended and agreed following an update to the ECSPB in
October 2025.
Whilst the qualitative narrative associated with each route forward clarifies its viability,
further rationale for not considering certain options involving the current Trinity High
School and its site is as follows. 
By considering minimum legislative site sizing, for Trinity High School to accommodate
its current number of pupils with no growth, would require a site of circa 57,000m2. The
current Trinity site is only 19,000m2, falling significantly short of current legislative
requirements. As the school predates the introduction of these current standards, it has
continued to operate, but there could be no justification to rebuild or refurb the current
school on a site that is so constrained in size. By considering potential growth, and
scope of project sizing, up to 1,400 pupils, the site size would require to be 79,000m2 by
following the BB103 sizing requirements. This shows that the current site is circa
60,000m2 too small.
This concludes that there is a compelling case to focus attention on options generation
against Route 4 – to build a new Trinity High School on a suitable alternative site in the
catchment area. 
Page 201 of 347

Page 202

Trinity High School Outline Business Case  26
OFFICIAL-SENSITIVE
3.3. Site Assessment Criteria
The preferred route forward indicates that viable options are dependent on
identification of a suitable site for the construction of a new Trinity High School. To
identify potentially viable sites, a list of site assessment criteria has been derived by
considering core legislative, policy, and technical considerations. A long list of potential
site options has been assessed to identify sites that present potential viability and
warrant further investigation and feasibility assessment. Note that this stage of the
process is a broad pass / fail assessment of long list options for viability purposes and is
not a weighted scored assessment. A more detailed assessment approach of this nature
will form part of the next stage of the business case process. The assessment criteria
utilised are as follows:
Ownership  Sites wholly within the ownership of Renfrewshire Council will be prioritised
over those owned by others recognising this provides greater certainty of
site deliverability. Consideration will be given to brown field sites where
remediation and use will be of benefit to the community, or where sites can
provide for the retention and or improvement of community facilities,
amenities or green spaces.
Site size/area Sites will be assessed against the median area requirements set out in BB103
as sufficient for a school of the following size and description:
a) Accommodate a secondary school of 1400 pupils + community space,
equating to 79,310m2 (19.6acres)
Active Travel A review of sites in relation to their potential to support Active Travel,
proximity to public transport, road networks, cycling and walking routes; the
potential for increased pupil transport requirements.
Planning Sites will be assessed against current local & national planning policies and
current land area designation.
Placemaking Consideration will be given to potential for place making benefits, such as
community and green public spaces. Areas will be assessed for their context
within and connection to the local community and how strategic use of the
site could bring wider, long-term benefits to the area.
Flood Risk Sites will be assessed in line the guidance set out in Policy 22 of the NPF4.
Flood risk potential is common and significant across the Renfrewshire
estate and dependent on the scale of risk, will not necessarily result in the
rejection of a site. The level of risk and site history, along with the impact of
remediation and flood protection will all be considered in the assessment of
the site.
Page 202 of 347

Page 203

Trinity High School Outline Business Case  27
OFFICIAL-SENSITIVE
An assessment of site topography will examine factors that may affect the
efficient use of the site, including shape, gradients across and adjoining the
site, features such as water ways, culverts & previous uses. Previous
industrial use may bring issues of ground contamination or existing
buildings that need to be factored into site remediation.
Budget Budget considerations will principally be concerned with highlighting
potential additional costs for abnormal site issues.  For example,
construction on brown-field sites requiring ground remediation works for
ground contaminations. Projects in green or rural areas incurring additional
costs associated with installing utilities, and the construction or upgrade of
local road and pedestrian routes.
Commentary Any additionally significant issues that require consideration, such as
location within the catchment area. 
Table 9: Site Assessment Criteria
The following 11 sites were identified as being within Council ownership and in the
catchment area and were subject to assessment. The sites were considered against the
criteria and the requirements for change. A desktop assessment was completed for
each site, which has concluded that there are 3 options that have strong viability
potential and are appropriate for further detailed examination and assessment at the
next stage. A high level overview of the viability assessment for each site is outlined
below and represent the longlist of site options to deliver the project.
Any site which is recommended for further investigation as a viable option will be
subject to thorough legal checks around ownership to ensure a full understanding of
any constraints on development and its likely impact. Should any site require legal
processes to amend land designation this would be fully considered at the next stage of
assessment and reflected in project timelines where appropriate.
Page 203 of 347

Page 204

Trinity High School Outline Business Case  28
OFFICIAL-SENSITIVE
3.4. Site Options Assessment
11 sites within Council ownership have been identified and assessed. The location of the sites is shown in Map 1, below:  
Map 1: Potential Sites
Page 204 of 347

Page 205

Trinity High School Outline Business Case  29
OFFICIAL-SENSITIVE
The three areas highlighted with a yellow circle represent locations considered as potential sites that are in private ownership, with
the majority already in use.  Having considered these areas, it is clear that there is no additional benefit to either the location, or
the site’s suitability that is greater than any site in Council ownership identified through the list of site assessments contained
within this business case. For that reason, as well as the fact that a financial outlay and significant, lengthy, legal process would be
required to obtain private land, it has been determined that there is no benefit to progressing the consideration of any site in these
locations. 
The 11 site assessments for land in Council ownership are outlined below: 
Page 205 of 347

Page 206

Trinity High School Outline Business Case  30
OFFICIAL-SENSITIVE
Option 1: New build Trinity High School on Site 01 Cockels Loan, Renfrew
Page 206 of 347

Page 207

Trinity High School Outline Business Case  31
OFFICIAL-SENSITIVE
Option 2: New build Trinity High School on Site 02 Netherton Avenue 
Page 207 of 347

Page 208

Trinity High School Outline Business Case  32
OFFICIAL-SENSITIVE
Option 3: New build Trinity High School on Site 03 Erskine Town Centre North
Page 208 of 347

Page 209

Trinity High School Outline Business Case  33
OFFICIAL-SENSITIVE
Option 4: New build Trinity High School on Site 04 Kilpatrick Avenue, Erskine
Page 209 of 347

Page 210

Trinity High School Outline Business Case  34
OFFICIAL-SENSITIVE
Option 5: New build Trinity High School on Site 05 Kilpatrick Drive, Erskine
Page 210 of 347

Page 211

Trinity High School Outline Business Case  35
OFFICIAL-SENSITIVE
Option 6: New build Trinity High School on Site 06 Bargarran, Erskine
Page 211 of 347

Page 212

Trinity High School Outline Business Case  36
OFFICIAL-SENSITIVE
Option 7: New build Trinity High School on Site 07 Broomhill, Erskine
Page 212 of 347

Page 213

Trinity High School Outline Business Case  37
OFFICIAL-SENSITIVE
Option 8 New build Trinity High School on Site 08 KGV Playing Fields, Renfrew
Page 213 of 347

Page 214

Trinity High School Outline Business Case  38
OFFICIAL-SENSITIVE
Option 9: New build Trinity High School on Site 09 East Craigend, Erskine
Page 214 of 347

Page 215

Trinity High School Outline Business Case  39
OFFICIAL-SENSITIVE
Option 10: New Build Trinity High School on Site 10 Barwood, Erskine
Page 215 of 347

Page 216

Trinity High School Outline Business Case  40
OFFICIAL-SENSITIVE
Option 11: New build Trinity High School on Site 11 Robertson Park, Renfrew
Page 216 of 347

Page 217

Trinity High School Outline Business Case  41
OFFICIAL-SENSITIVE
Site
No Site Name Strategy (Extend/New
build/Renovate/Dispose)
Recommended to
take forward to
FBC
Rationale
0 Existing Trinity High Retrofit or New Build No The footprint of the current site falls significantly short of required space metrics for a secondary school of this
size. This option should therefore not be considered as part of the preferred way forward.
1 Cockles Loan, Renfrew New Build No The existing site is significantly undersized to accommodate a modern High School with the required Capacity under BB104. Site is of
irregular geometry compromising potential.
2 Netherton Avenue New Build No Site is within key strategic area for economic growth; education falls outside of these key factors. Noise from adjacent Glasgow
airport could prohibit external learning opportunities
3 Kilpatrick Drive, Erskine
Town, North New Build No The flood risks associated with this site drastically reduce the practical useable area of the site, effectively brining it below
the minimum requirements of BB103.
4 Kilpatrick Avenue, Erskine New Build No The flood risks associated with this site drastically reduce the practical useable area of the site, effectively brining it below
the minimum requirements of BB103.
5 Kilpatrick Drive, Erskine New Build No The site is considerably undersized to provide minimum secondary school accommodation
6 Bargara, Erskine New Build No
This site is unsuitable for major development with no established publicly accessible routes or adjacencies to suitable
routes.  Providing suitably sized utility connections would likely require a significant development programme to make connections
to existing utility routes on public roads. 
7 Broomhill, Erskine New Build No Significant challenges with topography requiring significant earthworks to allow development which is considered cost and time
prohibitive. Also, significant challenges in creating pedestrian links as there is no existing pedestrian footpath infrastructure
8 King George 5th, Playing
Fields, Renfrew New Build YES
This site has the potential to provide multiple benefits, including positive impacts on active travel, potential for place making and
efficiencies though shared facilities with Renfrew High School, Site Is Located within the existing Trinity High Catchment and is of
adequate size for construction of a Modern High School 
9 East Craigend, Erskine New Build YES
The overall scale of the site and its central location represent potential significant place making opportunities with its proximity to
Park Mains School and the wider Erskine area. Addressing the existing SINC classifications may impact on the planning and statutory
approvals process. The existing overhead power line will restrict potential building development either side of the line, however the
site is sufficiently large enough that building development could be accommodated out with an exclusion zone. 
10 Barwood, Erskine New Build YES
Site is sufficiently large enough to accommodate. Design development, for this site would need to carefully consider how public
amenities are maintained and enhanced by the project, particularly the existing community play and sports facilities. Potential
vehicular access to the site is restricted to the southeast boundary with Barhill Road. However, the site benefits from good existing
pedestrian routes to and around the site that could be expanded to create links via the adjoining residential area to the southwest of
the site.
11 Robertson Park, Renfrew New Build No Requires closure of existing community assets and removal of existing well used public green space
Table 10: Site Summaries
Page 217 of 347

Page 218

42
OFFICIAL-SENSITIVE
3.5. Shortlisted Options
Based on the site assessments and as shown previously in the executive summary, the
following options, as previously shown in Table 2, can be deemed potentially viable
locations for a new build Trinity High School.
Site Option 08
New build Trinity High School on Site 08 – KGV Playing Fields Renfrew
Site Option 09
New build Trinity High School on Site 09 – East Craigend, Erskine
Site Option 10
New build Trinity High School on Site 10 – Barwood, Erskine 
It is recommended that these options are taken forward to the next stage of assessment
at Full Business Case, to be considered as part of extensive engagement, and further
technical and cost analysis. These three shortlisted sites are shown in Map 2, below: 
Page 218 of 347

Page 219

Trinity High School Outline Business Case  43
OFFICIAL-SENSITIVE
Map 2: Shortlisted Sites
3.6. Site 2, Netherton Avenue, Renfrew – Advanced Manufacturing
This site was included as a long list option to ensure that all available Council-owned
sites in the catchment area were considered before inclusion or exclusion from the
shortlist. 
The site falls entirely within the Advanced Manufacturing and Innovation District
Scotland (AMIDS), developed by Renfrewshire Council and key partners to bring high-
value jobs to Renfrewshire. AMIDS is a UK national asset, designed to deliver a world-
leading cluster of innovative businesses. There are two anchor tenants in place with
further development commencing this year. 
Funding agreements with partners to develop the site include restrictions on how the
land can be used, to protect the integrity of the asset and the delivery of long term
economic growth targets. The Council has committed to ensure consistency in how
AMIDS is developed and to protect the expected benefits of innovation clustering and
the long-term investment in the site. 
Page 219 of 347

Page 220

Trinity High School Outline Business Case  44
OFFICIAL-SENSITIVE
Development of a school at AMIDS would not comply with the restrictions on land use
agreed by the Council, would not meet the Council’s ambitions for the site and would
limit its ability to deliver the benefits of development. 
3.7. Site 8, King George V Playing Fields, Renfrew – Renfrew High School Consideration
Renfrewshire Council has committed to addressing its entire learning estate holistically,
following the principles of the Learning Estate Strategy. Thus, where a priority school
has been identified, officers should consider whether other local facilities could be
improved or upgraded as part of the solution. 
Given that one of the shortlisted sites (Site 8 – KGV Playing Fields) is adjoined to the
location of Renfrew High School, consideration was given to what impact a new Trinity
High School on the same location may bring. 
The primary consideration at this stage of the business case process was to determine if
there was adequate land available on the site of KGV to develop a new Trinity High
School without constraining a future development of a new Renfrew High School. This
desktop assessment concluded that there is adequate land available across the
expanse of KGV to construct a new Trinity High School, without constraining options for
a future potential Renfrew High School on the same site. This assessment has also
demonstrated that through careful design considerations, a new Trinity High School on
this site could be designed in such a way that it supported the basis of how a future
shared campus or shared use of facilities could be implemented, when the appropriate
time to invest in a new Renfrew High School arrives. 
At the point of agreeing the prioritisation of the Learning Estate Strategy, Renfrew High
School was identified as a ‘middle cohort’ school, meaning that it would move to
business case stage for investment over the next 10-20 years. However, in considering
one of the principles of the strategy, neighbouring schools close to options for
development of a priority school could be considered to determine if there is a benefit
of constructing within the same development. 
When considering the option of rebuilding Trinity High on site 08 – King George V
Playing Fields, its size and proximity to the current Renfrew High supported the need for
a desktop exercise to be carried out to consider the feasibility of the site to
Page 220 of 347

Page 221

Trinity High School Outline Business Case  45
OFFICIAL-SENSITIVE
accommodate two school campus. This exercise confirmed that the size and
configuration of the site provided significant flexibility that could accommodate several 
future development options ranging from two separate school campuses with or
without some shared facilities developed independently from each other or at the same
time through to a fully integrated joint campus 
Given this overview shows that it is possible to construct multiple development options
including a joint campus, it allows further work to be conducted through the next stage
of assessment to assess the development options for the KGV site that present the best
value outcome for the Council, and any further community views, technical
assessments or considerations. 
However, it should be noted that estimates for delivering a shared campus option
indicated a cost in the region of £220-320m. When set against the wider Learning
Estate priorities and scale of funding that has to date been made available (£170m)
affordability constraints may limit the deliverability of such an option in a single phase.
It is important to note that this consideration will only be apply to the option of
constructing a new Trinity High School at Site 8 – KGV Playing Fields, due to the fact
that Renfrew High School currently adjoins this site. The process of completing the Full
Business Case, at the next stage, will take an objective view by considering the financial
affordability, technical assessments, and community views on all options presented in
the shortlist. 
3.8. Indicative Costs
The indicative costs are based on preliminary information and should be considered a
framework from which detailed cost plans can be developed. The indicative costs have
been built from high level information, benchmarking from various sources including
the Scottish Futures Trust (SFT) funding metric, cost information from current
Renfrewshire Council education construction projects, costs from other Councils’
similar high school projects and adjusting the costings where specific knowledge has
been gained from the desktop assessment of the site options. The BCIS cost indices
have also been used to calculate inflation up to the end of the anticipated construction
period. 
Page 221 of 347

Page 222

Trinity High School Outline Business Case  46
OFFICIAL-SENSITIVE
In considering the potential construction costs, it should be noted that all construction
sites are unique and will differ from site to site in ways that will impact construction
costs. This is as a result of ‘abnormal’ factors exclusive to every site. No two sites are the
same, for example flood risk mitigation or ground remediation may be more or less
consequential from site to site, with differing impact on the overall construction costs
as to how the design addresses the site. In that sense, the indicative costs should be
taken as a guide only, detailed site options appraisal will be necessary to fully
understand the geotechnical characteristics and construction cost impact before
making any final recommendations. 
The project is currently at RIBA Plan of Works Stage 0 where at this stage it is key to
define vision and goals, identify needs and opportunities and to establish a strategy.
Therefore, there is no current design information. Key assumptions and exclusions are
required to establish indicative costs and clearly indicate what is assumed as included
in the costs and what is excluded at this stage.
To project an estimated cost for inflation purposes, the construction cost has been
based on an assumed construction commencement date of 2030. All figures should be
noted as exclusive of VAT.
Key assumptions and exclusions were used in compiling the indicative costs in the
absence of any design commencing. This approach recognises that whilst a range of
cost estimates have been presented, these remain volatile, subject to external factors
and site specific detail that will become clearer as sites are investigated, and options
further explored at the next stage.
It is important to highlight as part of this process, that no budget will be requested or
crystalised until further work has been undertaken into the validation of each option,
and a recommendation is made thereafter at the conclusion of the Full Business Case. 
As shown previously in Table 3, the indicative costs are as follows: 
Cost scenario Range
New build stand-alone
Trinity High School on a
suitable site 
£120 - £180m
Page 222 of 347

Page 223

Trinity High School Outline Business Case  47
OFFICIAL-SENSITIVE
3.9. Transport Considerations
Renfrewshire Council policy states that secondary school pupils who live more than two
miles away from their catchment school by the shortest acceptable walking route, are
eligible for home to school transport. 
Based on pupil census data available for 2025/6, of the current roll, 929 pupils are from
the catchment area, of whom, 244 pupils (26%) are eligible for home to school
transport.  If the location of the school were to change, based on this data it would
change as shown below. This does not take into account the future projected roll
increase and is based on 2025-6 data for comparison only. 
Current School Pupils Eligible
Trinity High 244
Possible School Site Pupils Eligible
Site 8 – KGV Playing Fields,
Renfrew 245
Site 9 – East Craigend,
Erskine 750
Site 10 – Barwood, Erskine 767           
Table 11 – Trinty High - Pupil travel eligibility
Page 223 of 347

Page 224

48
OFFICIAL-SENSITIVE
3.10. Timeline and Next Steps
Should the recommendations contained in this OBC be approved, officers will commence work to identify and recommend
a preferred option for the replacement of Trinity High School. 
The next steps in that process are to complete a Full Business Case articulating the recommended option by the end of
2026, for presentation and agreement early in 2027. If approved by Council, work would begin on Statutory Consultation to
be carried out during 2027. Timescales would be dependent on timing around Local Government elections scheduled for
May 2027 and completion of the associated RIBA stages, with the current anticipated timeline showing that construction
could commence by 2030. 
Page 224 of 347

Page 225

49
OFFICIAL-SENSITIVE
4. COMMERCIAL CASE
4.1. Approach
An overarching procurement strategy will be prepared as the Project develops, and a
preferred option for delivery is identified. The strategy will set out the various contracts
required to deliver the project including the proposed procurement route, contract
objectives, tender methodology and timelines. Pre-market engagement and
consultation will be undertaken to ensure a detailed market analysis is completed to
test the suitability of proposed approach to procurement and ensure the proposals are
attractive and viable for the competitive market. 
The Project procurement strategy will remain a live document, updated to reflect the
outcomes of each stage of the project’s development and responsive to changes in
market conditions identified through analysis and ongoing engagement. Bespoke
contract strategies will be developed for each requirement detailing the specific
requirements and tendering methodology adopted for that contract while aligning with
the overall aims and objectives set out in the overarching strategy.
4.2. Service Requirements
The project team require external consultants to provide specialist services and works
to support the development of the Full Business Case. Services required may include
support with timetable and demand modelling, site surveys, intrusive building surveys,
legal and planning advisers and cost consultants.  The Project team will work with
dedicated procurement officers to develop strategies for each contract requirement
with consideration to the Council’s standing orders relating to Contracts and principles
of best value.
4.3. Project Development
Procurement strategy will be developed for the FBC stage that will discuss in detail the
most beneficial route to market depending on the proposed final recommendation. 
Page 225 of 347

Page 226

Trinity High School Outline Business Case  50
OFFICIAL-SENSITIVE
The procurement process for the detailed design and construction stages of the project
is subject to development. The Council is looking at a range of options including
framework routes for procurement of consultants and/or contractors. In the event there
are no suitable existing arrangements to use, it is anticipated options will be as follows:
• Multi- disciplinary design team (MDDT) procured using Restricted Procedure in
accordance with Council’s Standing Orders relating to Contracts and Public
Contracts (Scotland) Regulations 2015 as amended. 
• Construction works contract, likely to follow a Restricted Procedure in
accordance with Council’s Standing Orders relating to Contracts and Public
Contracts (Scotland) Regulations 2015 as amended. It is likely to be a 2-stage
contract model with pre-construction services agreement (PCSA) to allow early
contractor involvement followed by award of main works contract once detailed
design is complete. 
• Ad-hoc/specialist consultant support may be required to support the project
team. The project team will work with dedicated procurement officers to
develop a strategy for each contract with consideration to the Council’s standing
orders relating to Contracts and principles of best value.   
Page 226 of 347

Page 227

Trinity High School Outline Business Case  51
OFFICIAL-SENSITIVE
5. FINANCIAL CASE
5.1. Project Funding – Capital Expenditure
Until such time that a specific option has been decided to proceed with at the
conclusion of the business case process, no formal project exists and therefore no full
capital budget exists. The purpose of this business case process is to allow a decision to
be made on the best option to commit capital expenditure on, and only at the
conclusion of the process will a request be made to Council to commit to the required
project budget. 
This OBC has outlined the current estimated cost to deliver on the agreed route
forward, and this estimate will continue to be refined and updated as more detail
becomes available at the next stage of assessment. 
5.2. Approvals Process
To date, work to develop proposals for a new Trinity High School has not incurred any
external costs, with all spend being incurred on already budgeted internal resources. .
To take the project forward through to approval of the FBC further costs will be incurred
on both internal and external resource. This spend is required to ensure the Council is
presented with a robust and tested recommendation with professional advice on the
specifics of the option.
To conclude and present the FBC for this project, a budget will be required and will be
progressed through established budget setting processes. This budget is made up of all
internal technical resource costs and all external professional services and consultant
appointments required to interrogate and validate the shortlist of options. This cost is
made up as follows:
• Internal technical management costs to deliver project feasibility, cost
management, architectural services and project management
• Flood risk assessments
• Roads and transportation assessments 
• Space planner to produce timetabling and demand modelling to develop
schedule of accommodation 
• Civil engineering to conduct ground investigation surveys on shortlist of sites 
Page 227 of 347

Page 228

Trinity High School Outline Business Case  52
OFFICIAL-SENSITIVE 
Approvals for spending this development budget will be agreed through current project
governance to ensure accountability and transparency. 
5.3. Revenue Expenditure
The new Trinity High School will be owned and operated by Renfrewshire Council. The
operating model will align with current arrangements for Renfrewshire Council assets
and learning establishments. 
Potential operating costs for a new school will be further explored as part of the Full
Business Case which will be developed throughout 2026. Whole life cost modelling will
capture elements of future revenue spend across the expected lifetime of the proposed
new school.  Operating costs for the current school have been captured and are
indicated in the Strategic Case, above. Initial indications are that the cost of operating a
new Trinity High School would be broadly reflective of current operational costs
including staffing, and facilities management. 
It should however be noted that depending on the specific location of the shortlist of
options, the cost of school transport could vary significantly, albeit this cannot be seen
as a single measure of value in an option. The cost of delivering home to school
transport must be considered in the broader context of the educational and community
value that can be derived through the development of a new school. This matter will be
explored in more detail at the FBC stage where each of the shortlisted options will be
investigated in greater detail for the estimated revenue costs associated with it. 
5.4. Indicative Costs
The indicative cost information outlined in sections 1.7 and 3.7 was prepared using
current market cost information, including Scottish Futures Trust (SFT) benchmark
data, cost information associated with current Council education construction projects,
and BCIS cost forecast indices to underpin indexing current construction cost metrics to
anticipated future construction date. Indicative costs are based on an assumed
construction commencement date of 2030, and all costs should be considered as
exclusive of VAT. 
Page 228 of 347

Page 229

Trinity High School Outline Business Case  53
OFFICIAL-SENSITIVE
In considering the potential construction costs, it should be noted that all construction
sites are unique and will differ from site to site in ways that will impact construction
costs. This is as a result of ‘abnormal’ factors exclusive to every site. No two sites are the
same, for example flood risk mitigation or ground remediation may be more or less
consequential from site to site, with differing impact on the overall construction costs
as to how the design addresses the site. In that sense, the indicative costs should be
taken as a guide only, detailed site options appraisal will be necessary to fully
understand the geotechnical characteristics and construction cost impact before
making any final recommendations. 
The project is currently at RIBA Plan of Works Stage 0 where at this stage it is key to
define vision and goals, identify needs and opportunities and to establish a strategy.
Therefore, there is no current design information. Key assumptions and exclusions are
required to establish indicative costs and clearly indicates what is assumed as included
in the costs and what is excluded at this stage.
The cost range, as shown previously in Table 3, gives a high-level indicative estimate
based on a number of key assumptions and exclusions which may be subject to change,
given the early stage of the project. These will be further refined as the project
develops. 
Cost scenario Range
New build stand-alone Trinity
High School on a suitable site  £120 - £181m 
The key assumptions and exclusions used in compiling potential costs help ensure full
financial transparency. The following are highlighted as examples: 
Assumptions:
• It is assumed the existing Trinity High School shall remain open while new build
construction works are ongoing
• Estimated costs are based on construction costs at prices (4th Qtr. 2025)
• It is assumed services and utility connections are available locally
• Inflationary allowances have been made in accordance with current published BCIS
Tender Price Indices
Page 229 of 347

Page 230

Trinity High School Outline Business Case  54
OFFICIAL-SENSITIVE 
Exclusions:
• Refurbishment works costs to the existing Trinity High School during the new high
school construction have been excluded
• Legal Costs 
• Planning Conditions
• Section 75 Planning works/contributions
• Operational costs, Hard FM or Lifecycle/Whole Life costs 
These potential costs were produced for a new build high school for the provisional
scope identified as part of this business case, which is a secondary school of 1,400
capacity, with a level of additional community use space.
5.5. Financial Risk / Optimism Bias
In calculating potential costs, the estimate includes an allocation for risk and
uncertainty. For example, it must be acknowledged that cost indications are based on
an indicative programme that includes a construction period, commencing in 2030.
Where a delay occurs and the programme slips, costs would inevitably change as
factors such as inflation are brought to bear.
Optimism bias allows for mitigation of any unexpected increases or changes
throughout the process but cannot account for all external factors. 
5.6. Interdependencies
As indicated, the project examining the future of Trinty High School is developing
concurrently with two other Learning Estate capital projects. All three projects are
working to an overall aspirational budget commitment that will continue to be defined
and will require Council commitment to secure the required budget at the conclusion of
the Full Business Case process.
Different requirements, circumstances and context for each project will have a bearing
on the final cost requirements and their share of the overall funding available, making
them highly dependent on each other.
Page 230 of 347

Page 231

Trinity High School Outline Business Case  55
OFFICIAL-SENSITIVE 
6. MANAGEMENT CASE
6.1. Project Management and Project Governance Overview
Currently, Renfrewshire Council is undertaking several capital projects focussed on
learning estate improvements, covering both primary and secondary schools. This work
has built on existing expertise within the key teams likely to be involved in any project
to improve the provision of Trinity, giving the Council an experienced pool of resources
to draw from. Work is underway within Children’s Services to create a dedicated
Learning Estate Programme Team to deliver on the ambition of the Learning Estate
Strategy.
6.2. Project Roles
Learning Estate projects will be overseen at Chief Officer level by the Director of
Children’s Services who acts as the Programme Sponsor for all projects. Senior
accountability is assumed by the Head of Education for Strategy and Improvement who
takes the position of Senior Responsible Owner (SRO). 
In common with all Learning Estate projects, delivery of change for Trinity High School
will be led by the Strategic Learning Estate Manager who holds senior accountability of
project delivery to the SRO with day-to-day project leadership guiding the project
teams through all aspects from inception, through to construction execution and
handover. This leadership hierarchy will ensure that projects are successfully delivered
upholding quality across project time, cost, and scope, ultimately delivering the
intended outcomes and high-quality learning establishments for all.  The Strategic
Learning Estate Manager will be guided by subject matter experts who will control and
resource the programme with the appropriate skillsets, with professional technical
management in construction and the built environment coming from the Council’s
Technical Services. 
It is crucial to note however, that whilst leadership roles have been established,
appropriate officer level programme governance has been established to ensure that
Page 231 of 347

Page 232

Trinity High School Outline Business Case  56
OFFICIAL-SENSITIVE
there is no single source of programme decision making. This process ensures
accountability and robust decision making with representation covering all key Council
services. 
Each project will require bespoke levels of resource depending on the scale and
complexity but will follow a consistent approach. A dedicated Programme Manager will
lead the overall success and delivery of the programme by implementing and executing
full governance and control across all projects, supporting the Strategic Learning Estate
Manager. 
Project management resource will be provided by the Council’s Programme
Management Unit to cover business case development, business change processes, and
fundamental client-side project management throughout the lifecycle. Technical
expertise will be provided by the Councils’ Technical Services who will provide
construction project management, contract management, and subject matter expert
roles where appropriate through design and delivery. 
Additional resources will be required for each project with ongoing resource allocation
covering critical services such as Finance, Communications, Education, Procurement,
and Legal. 
All resources allocated to Learning Estate projects will report to the Strategic Learning
Estate Manager for their involvement in these projects, with decision making being
made by the appropriate authority level, either the Project Board, or Delivery Board, as
noted below in section 6.3. 
The Council has developed significant experience over the past 15 years delivering
major and complex investment programmes across the learning estate (which includes
three major projects currently in delivery), leisure estate, cultural estate as well as
major transport infrastructure. This experience places the Council in a strong position
to understand the resource and governance arrangements required to deliver
investment programmes of scale and this will be invaluable to support the Council’s
investment focus shifting to a long-term strategic learning estate investment
programme.
Page 232 of 347

Page 233

Trinity High School Outline Business Case  57
OFFICIAL-SENSITIVE
6.3. Reporting Arrangements
This project will be monitored using current project management tools to record
progress against timelines, monitor risk, and track change etc. Reporting will be used to
manage and drive the project and ensure accountability to the public more generally.
Beyond day-to-day project management activity, reporting will occur at regular
intervals to established boards, with key decisions and milestones signed off at an
appropriate level. 
At Council level, this project will be reported to the Education & Children’s Services
Policy Board for all decision making and progress updates. Where financial decisions on
matters such as high value contract awards are required, this project will report the
Finance, Resources & Customer Services Policy Board as per agreed Council
governance.
At officer level, this project will be reported to both a Project Board, and a Delivery
Board. The Delivery Board holds the senior officer level decision making authority for
the project and will act as the ultimate officer level decision making body within its
terms of reference and agreed scope/authority. This Board consist of Director / Head of
Service representation of all key Council services. 
The Project Board will consist of Senior Managers / Heads of Service of all key Council
services and will act as the operational decision making body for all matters as agreed
in the scope, budget, and timeline of the project. 
This governance is illustrated in the image below:
Page 233 of 347

Page 234

58
OFFICIAL-SENSITIVE 
Education & Children s Services Policy Board
Learning Estate Delivery Board
Chair – Director of Children s Services
Director / Head of Service Representation
Strategic Learning Estate Manager (Strategy & Delivery Lead)
Learning Estate Project Board
Chair – Head of Education Strategy & Improvement
Head of Service / Senior Manager Representation
Finance, Resources & Customer Services Policy Board (FRCS)
All Learning Estate High Value Project Contract Awards
Senior Managers and Specialist Advisers
Project Delivery Team
Council Decision Making Level
Officer Decision Making Level
Project Delivery Level
Page 234 of 347

Page 235

59
OFFICIAL-SENSITIVE
6.4. Procurement Strategy
The project team has a dedicated specialist procurement officer who will take the lead
in developing an overarching Learning Estate Project Procurement Strategy. 
In the short term, initial assessment of the project will identify any requirement for
consultant services to assist with technical aspects of project development. If the OBC
is approved at E&CS Policy Board, consultants will be required to support the project
team as it develops a Full Business Case (FBC). This work will be led by the specialist
procurement officer and has been referenced in the Commercial Case, above.
6.5. Overall Project Benefits
Provision of a new Trinity High School would deliver key project benefits to the school
and the wider community including the following: 
• The modernisation of Trinity High School, making it fit for purpose, with the intention
that in future, pupils will be educated in the best possible learning environments
• Maximise operational efficiency through modern, sustainable and efficient buildings
with a reduced need for maintenance of dilapidated buildings.
• A reduction in Renfrewshire Council’s carbon footprint through the operation of a
school better equipped to meet energy performance targets through more efficient
operation.
• A community anchor site in the catchment area providing facilities for public use
outside of school hours.
6.6. Community Benefits Realisation Arrangements
Renfrewshire Council has an established and successful Community Benefits approach
which aims to deliver social, economic and environmental benefits for Renfrewshire’s
communities as part of contract delivery. Community benefits are considered for
inclusion on all regulated procurement over £50,000 and are delivered by suppliers and
contractors in partnership with local organisations and supported by the Council’s
Community Benefit Forum and Delivery Partners. Monitoring of community benefits will
Page 235 of 347

Page 236

Trinity High School Outline Business Case  60
OFFICIAL-SENSITIVE
be managed through project and delivery boards and a benefits realisation strategy will
be aligned with the overarching procurement strategy.
6.7. Risk Management Arrangements
The project team has commenced a risk register to capture and monitor risk on behalf
of the Council. Risk management will remain an active part of the project management
process for the duration of this project with regular dedicated sessions focussing on the
risk register to complement its inclusion as a standing agenda item in project working
groups and meetings at all levels.
6.8. Equalities and Human Rights
Any equality impact on current users and staff at Trinity High School, as well as the
wider community, as a consequence of this project, will be considered at all stages it
develops. Initial Equality and Human Rights Impact Assessments (EQHRIA) have been
carried out at programme level. This will inform the basis of all future assessments,
where individual impact assessments will be conducted, specifically relating to the
upcoming community engagement and consultation. All proposals outlined in this
business case would be subject to formal statutory consultation where impacts will
again be considered in detail.
6.9. Communication, Engagement, and Community Voice
Informal community and stakeholder engagement commenced in August this year,
following publication of the SCC. Engagement has included meetings with
headteachers, ward members and the parent council for Trinity High School, and all
associated primary school parent councils to keep all interested parties informed of
progress and likely timelines for this project. 
A survey was issued to parents and staff, inviting their views on the school and what
they would improve, what should be important for any future investment. Those
findings are referenced in the Strategic Case (section 2.5, above). Responses to the
survey helped shape analysis of the routes forward and options considered in this OBC. 
Page 236 of 347

Page 237

Trinity High School Outline Business Case  61
OFFICIAL-SENSITIVE
Engagement with key stakeholders and the wider community will be key to the
successful determination of the overall best value option to proceed with at the
conclusion of the Full Business Case.  To ensure clear communication and stakeholder
input to the process, the project team will carry out an informal consultation on the
short-listed options described in section 3.5 from April 2026.  More detail is provided in
section 7.1 Summary of Shortlisted Options and Next Steps 
Page 237 of 347

Page 238

Trinity High School Outline Business Case  62
OFFICIAL-SENSITIVE
7. CONCLUSION
7.1. Summary of Shortlist of Options and Next Steps 
This outline business case confirms that there is a need to construct a new build Trinity
High School at an alternative site within the catchment. The provisional scope to allow
progression of site assessment, costing, and options analysis is to consider a school of
1,400 pupils with an additional allowance for community use. 
The minimum site area required for a high school for 1,400 pupils plus an additional
space left over for community or partner facilities (500m² site additional) is 79,310m² as
per Building Bulleting BB103 and 69,746m² as per The School Premises Regulations
(Scotland) 1967.
This business case has therefore concluded that from the longlist of options that have
been assessed against the preferred route forward to construct a new high school on a
suitable alternative site, that the following options, previously show in Table 2, should
be progressed to the Full Business Case Process.
Site Option 08
New build Trinity High School on Site 08 – KGV Playing Fields Renfrew
Site Option 09
New build Trinity High School on Site 09 – East Craigend, Erskine
Site Option 10
New build Trinity High School on Site 10 – Barwood, Erskine
To prepare the Full Business Case, more detailed site assessments, further cost
modelling, and community consultation are required to recommend a single best value
option to proceed with on conclusion of the next stage of the business case process. 
Taking into account the Council’s commitment to include communities in decision
making, the project team will conduct an informal consultation on the options outlined
above.  The purpose of carrying out an informal consultation during the Full Business
Case stage is to:
Page 238 of 347

Page 239

Trinity High School Outline Business Case  63
OFFICIAL-SENSITIVE
• Comply with recommended best practice in ensuring that the public are involved
in decision making
• Comply with UNCRC to involve children in making decisions that affect them
• Explain the options clearly to stakeholders and the public
• Understand early in the process local views on the options
• Refine options based on local views and feedback
• Present a final option that is the most suitable for the community and the council
• Reduce the potential for community objections at a later stage
• Enhance relationships with local communities/individuals
Key stakeholder groups that will be engaged in the informal consultation include:
• Pupils and parents – parent councils, all parents and pupils
• Local community – Community councils, youth groups, local development
groups, local interest groups, general population in school catchment
• School staff - Head teachers, teaching staff, admin staff, support staff.  
• Associated schools - parents, pupils and staff of associated primary, secondary or
nursery schools
• Politicians – local ward members, ECSPB members, local MPs, local MSPs, 
• Council Services – all council services who contribute to the creation, running and
maintenance of school facilities
• Future building users – groups with letting arrangements 
• Neighbours – current and potential neighbours to school buildings/sites.
• Statutory bodies – Education Scotland, Police Scotland, Scottish Fire and Rescue
Service, Sport Scotland. 
Page 239 of 347

Page 240

Trinity High School Outline Business Case  64
OFFICIAL-SENSITIVE
Activity Stakeholders Methods
Preparation and
options
development
Senior Officers and SLT
Elected Members
Head Teachers
Briefings
Workshops
1-1 interviews
Targeted Early
Engagement
Parent Councils/Parents
Community Councils
Local Community Groups
Pupils
Staff
Council Services
Roud table meetings
Briefings
Workshops
Focus Groups 
Broad Public
Engagement 
Associated school parents
and pupils
General public 
Neighbours 
Surveys
Public events 
Analysis and
Refinement
Project team 
Table 12: Engagement Activity
The Full Business Case process is expected to take the remainder of 2026 to complete
and will be presented back to a future cycle of the Education and Children’s Services
Policy Board in 2027 for approval of a final recommended option.   
Page 240 of 347

Page 241

Trinity High School Outline Business Case  65
OFFICIAL-SENSITIVE 
Children’s Services
Renfrewshire Council
Renfrewshire House
Cotton Street
Paisley
PA1 1BR 
Page 241 of 347

Page 242

Page 1 of 13 
To:  Education and Children’s Services Policy Board
On: 12 March 2026
___________________________________________________________________ 
Report by:  Director of Children’s Services
___________________________________________________________________ 
Heading:  Inclusion Portfolio Progress
___________________________________________________________________
1. Introduction
1.1. Renfrewshire Council continues to prioritise the creation of an inclusive,
nurturing and rights-based educational system for all children and young
people. The Inclusion Portfolio represents a substantial area of work that
draws together staged intervention, transitions, targeted provision,
educational psychology, multi-agency partnerships, and policy development.
This report provides a detailed account of progress made throughout 2025–
26, outlining both achievements and future developments to support
continuous improvement.
___________________________________________________________________
2. Staged Intervention
2.1. The Staged Intervention Framework is now well embedded across the
authority, with schools demonstrating increased consistency in assessment,
planning and review. Locality Education Officers undertake regular quality
assurance of Child’s Plans, Multi-Agency Plans and Team Around the Child
meeting records, enabling clearer alignment between school-level supports
and wider local authority processes. Schools are increasingly evidencing
precise identification of need, targeted interventions, and appropriate
timescales for monitoring progress. This has strengthened confidence that
children are receiving support at the right time and ensures that decisions
made through the Education Support Review Group (ESRG) panel are
informed by high-quality documentation.
2.2. In order to ensure continued progress and ensure Renfrewshire is as efficient
as possible we are currently trialling the use of Trellis, an artificial intelligence
tool designed to streamline planning processes. Early feedback indicates that
staff find the system beneficial, reporting reduced administrative burden and
improved efficiency in managing staged intervention documentation. 
Item 4
Page 242 of 347

Page 243

Page 2 of 13 
___________________________________________________________________
3. Working with Parents and Carers
3.1. Effective engagement with parents and carers remains central to
Renfrewshire’s inclusive ethos. To support families in understanding staged
intervention processes, a comprehensive Frequently Asked Questions guide
is being developed. This resource aims to strengthen transparency around
decision-making, clarify the role of different professionals, and ensure families
feel informed and supported.
3.2. The Parent Ambassador Group continues to provide valuable insight into how
communication with families can be strengthened. Their contributions have
informed improvements to public-facing materials and shaped the
development of more accessible documentation. An audit of website content
is also underway to ensure online information is accurate, clearly presented,
and aligned with updated policy and practice.
___________________________________________________________________
4. Transitions
4.1. Transitions represent a critical phase for children with additional needs, and
work continues to refine processes across Early Years, Primary and
Secondary sectors for our children and young people with ASN.
Early Years to Primary 1 (EY–P1)
4.2. The EY–P1 ESRG process is now highly established and supported by
rigorous quality assurance conducted by Education Officers. Documentation
submitted by Early Learning and Childcare Centres shows significant
improvement, with only a very small number of cases requiring additional
follow-up. Communication between settings, families and partner agencies
continues to be strong.
4.3. Next session, settings with new managers will receive strengthened support
to ensure consistency in planning and transition approaches. Monitoring of
children recommended for deferral, those placed in mainstream with
enhanced support packages, and those attending joint placements with
Flexible Learning Resources (FLR) will be prioritised to evaluate sustainability
and long-term outcomes.
Primary 7 Transitions
4.4. Education Officers have begun engaging with schools from Primary 5
onwards for children with additional needs. This earlier involvement has
reduced anxiety for families, improved cross-sector collaboration, and enabled
more proactive planning. A new P7 transition matrix has been drafted to
further enhance transparency and consistency and will be finalised following
review.
___________________________________________________________________
5. Flexible Learning Resource (FLR) – Strategic Development
5.1. The FLR Working Party continues to lead a comprehensive review of
Renfrewshire’s FLR model. Drawing on inspection findings, professional
Page 243 of 347

Page 244

Page 3 of 13 
collaboration exercises, and emerging data analysis, the group is developing
a clearer vision for FLR provision across the authority. This includes reviewing
strengths and areas for development within current practice, clarifying roles
and processes, and creating stronger mechanisms for evaluating outcomes
and measuring impact.
5.2. The role of the Virtual Head Teacher will be central to driving consistency,
coordinating provision, and ensuring equity of access for children across all
FLRs.
5.3. The Virtual Head role has been providing strategic support across several key
areas:
• Flexible Learning Resource (FLR): Bringing together FLR provision to
ensure flexibility in meeting the needs of learners. This approach is
needs-led ensuring equity of access.
• Consistency of Practice: Strengthening consistency in paperwork, support
processes, approaches and culture across all FLR settings.
• Data-Informed Decision Making: Developing a comprehensive dashboard
to support analysis, planning and continuous improvement, alongside a
review of the workforce.
• Training and Workforce Development: Delivering leadership training, staff
training and professional networking opportunities to upskill colleagues in
response to the increasingly complex needs of children and young people.
• Care Experienced Children and Young People: Ensuring meeting the
needs of our Care Experienced learners remains a key priority across all
aspects of the role.
• Skills Academy Development: Leading the development of a Skills
Academy to enhance pathways and support bespoke learning options for
our young people.
• Centralised Alternative to Exclusion Support: Overseeing a pilot of a
centralised service designed to offer alternatives to exclusion.
• Improving Attendance: Supporting targeted work to improve attendance for
children and young people who are persistently absent or non-attenders.
Coaching, Modelling and Outreach
5.4. Following extensive consultation, both working groups have concluded that
coaching and modelling should be positioned as a Stage 2 intervention. This
ensures early, timely support without placing unsustainable pressure on FLR
staffing. Outreach activities will continue to be delivered as a Stage 3
intervention for more complex cases. Feedback from secondary settings
indicates that coaching and modelling is more complex to implement due to
the number of staff involved with each pupil. As a result, an ASN-Locality
Inclusion Support Network (LISN) style model is being explored to support
sustained multi-disciplinary dialogue, consultation requests and structured
follow-up.
___________________________________________________________________
Page 244 of 347

Page 245

Page 4 of 13 
6. Child-Centred Risk Assessment (CBRA)
6.1. Following recent training in Managing and Recording Violence and
Aggression the Children’s Services Health and Safety Group therefore
commissioned a review of the Child-Centred Risk Assessment (CBRA)
approach.
6.2. Revisions have been drafted to improve usability, promote greater
consistency across settings and strengthen clarity around risk evaluation.
Collaboration with digital colleagues is underway to explore a digital and
visual version of the tool, which will support easier adoption by staff. Once
initial testing is complete, the revised CBRA will be presented to the Health
and Safety Group for formal approval.
___________________________________________________________________
7. Renfrewshire Educational Psychology Service (REPS)
7.1. The Educational Psychology Service has delivered an extensive and high-
quality programme of professional learning, consultation and strategic support
across Early Years, Primary, Secondary and ASN sectors. Training has
covered areas including Non-Violent Resistance, literacy difficulties,
neurodiversity, nurture, FLR language and communication, EBSA, de-
escalation, cultural competency and targeted support programmes across the
authority.
7.2. REPS continues to provide leadership at both local and national levels,
contributing to national networks, conferences and academic publications.
Their role in developing EBSA guidance, updating Standard Circular 5, and
supporting nurture and relational practice remains central to Renfrewshire’s
inclusive strategy.
7.3. See Appendix 1 for a full overview.
___________________________________________________________________
8. Early Language and Communication & Joint Speech and Language
Therapy (SLT) Working
8.1. A key priority for Renfrewshire is improving the speech, language and
communication environment across Early Years settings. A multi-agency
group has been established, involving Educational Psychology, Early Years
Education, Speech and Language Therapy, Health Visiting and Health
Improvement. This collaborative approach aims to strengthen early
identification, improve universal and targeted provision, and build staff
capacity across sectors.
8.2. A pilot programme will begin in Glenburn and Foxbar Early Learning and
Childcare Centres, providing workforce training, improved information sharing
through use of Ages and Stages Questionnaire data, and enhanced
community led support. Findings will inform a full authority roll out.
8.3. Joint work between REPS and SLT continues to strengthen workforce
development, reduce duplication, support neurodiverse learners and improve
consistency in assessment and planning across sectors.
Page 245 of 347

Page 246

Page 5 of 13 
___________________________________________________________________
9. Education Officer (CAMHS/Neurodevelopmental)
9.1. Demand for CAMHS and neurodevelopmental services continues to rise.
Approximately 2,200 young people are currently open to services,
representing 8.8% of the school roll. Since August 2025, the Education Officer
received 418 new referrals, with projections indicating referrals could reach
2,000 by June 2026.
9.2. A pilot approach to neurodevelopmental assessment was delivered between
October 2024 and June 2025, prioritising school-based assessments and
transition-focused casework. Feedback from families, schools and young
people was extremely positive. As a result, school-based assessment and
feedback processes will continue.
9.3. See appendix 2 for a full overview.
___________________________________________________________________
10. Health and Wellbeing
10.1. So far this session, The Exchange Counselling Service have supported 772
children and young people across primary and secondary sectors.  The data
collated from referral themes and needs that emerge nationally are used to
inform both curricular and professional learning needs across education
establishments.  
10.2. From March to December 2025, we will be piloting a new addition to our
counselling service.  The focus of this will be working with primary aged
children who have been referred to CAMHS for a neurodevelopmental
assessment but require additional support and strategies to help manage
dysregulation in school and at home.  This pilot means that we should be able
to take 50 referrals and offer 400 therapeutic sessions.
10.3. Our training offer includes child exploitation online and internet safety, gender-
based violence and early intervention, self-harm training and suicide
prevention training.  Underpinning all of this work is Renfrewshire’s
Approaches to Cognitive Behaviour Therapy, a unique professional learning
course designed to give staff across our education establishments the
confidence and skills to support conversations with pupils, parents/carers and
staff around wellbeing.  Our training offer is coordinated and delivered by the
Health and Wellbeing Development Officer who has established training
teams across Children’s Services, Youth Services, OneRen, Educational
Psychology, Health and 3rd sector organisations.
___________________________________________________________________
11. Policy Review and Development
11.1. A significant programme of policy development has taken place during 2025–
26. Standard Circular 5, Attendance in Educational Establishments, has
undergone a full revision with all Head Teachers. The Home Education policy
has been updated and is aligned with national guidance. The Anti-Bullying
policy is being reviewed in collaboration with Educational Psychology to
ensure strong alignment with nurturing approaches and Respect Me
Page 246 of 347

Page 247

Page 6 of 13 
guidance. Draft Flexi-Schooling guidance has been prepared and will undergo
consultation. The ASN Transitions Policy has been updated alongside the
Parent Ambassador Group, including a new parent-friendly version.
___________________________________________________________________ 
Implications of this report 
1.  Financial 
Financial implications will be considered and planned for in line with ASL
budget 
2.  HR and Organisational Development 
We will liaise fully with HR in relation to staffing 
3. Community/Council Planning 
• Our Renfrewshire is thriving – looking at inclusion in this way provides
schools and Children’s Services with a robust way to evaluate the
quality of ASN provision. 
• Tackling inequality, ensuring opportunities for all – ASN data and
intelligence is analysed fully to ensure that we are working towards
equity and excellence.
4.  Legal 
No implications. ASL legislation will be fully considered as appropriate 
5.  Property/Assets 
No implications. 
6.  Information Technology 
No implications 
7.  Equality and Human Rights 
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report because for example it is for noting only.   If required following
implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.   
8. Health and Safety
No implications 
9. Procurement 
No implications 
10. Risk 
No implications 
11. Privacy Impact
No implications
Page 247 of 347

Page 248

Page 7 of 13 
12.  Climate Risk
No implications 
13. Children’s Rights
Article 29 (goals of education) Education must develop every child’s
personality, talents and abilities to the full. It must encourage the child’s
respect for human rights, as well as respect for their parents, their own and
other cultures, and the environment. 
14. Cosla Policy Position 
No implications 
List of Background Papers 
Getting it right for every child (GIRFEC)
The Promise Scotland
United Nations Convention on the Rights of the Child
Support for Learning: All our Children and all their Potential 
___________________________________________________________________
Children’s Services
EH/KO/JO’N
17/02/2026 
Author: Emma Henry, Head of Education emma.henry@renfrewshire.gov.uk 
Page 248 of 347

Page 249

Page 8 of 13 
Appendix 1 
Renfrewshire Educational Psychology Service – training, development work and
support delivered to Renfrewshire’s establishments between January 2025 and
December 2025 
Training         Attendees
NVR Whole establishment Part 1 – Primary     45
NVR Whole establishment Part 1 – ELCC     15
NVR Whole establishment Part 1 – High School    145
NVR Whole establishment Part 2 – High School    85
NVR refreshers (parts 1 and 2) – Primary      181
NVR Whole establishment Part 2 – Primary     25
NVR Parent Groups – Primary       66
NVR ASNA Training        30
NVR Coaching Sessions – Primary      60
NVR Level 1 Training        53
NVR Level 2 Training        12
NVR Level 2 Practitioner Enquiry Coaching     8
NVR Supervision for Level 3 staff       6
NVR Level 3 training        5
NVR Coaching & Training for EPs      10
Solution Oriented Training – across all sectors      10
Neurodiversity input – High School      50
Literacy Difficulties Coaching – Primary       29
Literacy Difficulties Coaching – High School     8
RICE Support & Development groups – ELCC     20
FLR Training on Language and Communication – Primary & High  30
ASNA Language & Communication Training     51
Anti-Racism Awareness – Primary      68
Neurodiversity – ELCC        15
The Adolescent Brain and Neurodiversity – High School   60
Compassionate and Connected Classroom Resource – Primary  41
Attendance and EBSA whole school – Primary     19
EBSA/Anxiety Parent Group       4
EBSA Support & Development Groups      12
EBSA Training – Family Wellbeing      20
Introduction to Cultural Competency Tool – Primary    14
KidSkills Intervention – ELCC       15 
Renfrewshire Nurturing Relationships Approach (RNRA)
Accreditation Numbers:  2025
5 Gold Schools
5 Amethyst
10 Ruby
4 Jade 
RNRA Training & RNRA Core Group Support    No. of
Groups
Core Group
Early Years          15
Primary School         33
High School          4
ASL           1
Page 249 of 347

Page 250

Page 9 of 13 
Training                                                                                                       Attendees
Nurture Principle – Primary       370
Nurture Principle – High School       50
Nurture Principle – ELCC        145
RNRA core training mop up – across all sectors     43
RNRA Leadership Training – all sectors      25
All Behaviour is Communication Session for Parents    15 
RNRA in May 2025
RNRA in May took place across May 2025, organised by REPS but hosted by 15
establishments across the Early Years, Primary and Secondary sectors. These
establishments volunteered to share good practice in relation to RNRA with
colleagues. Over 80 people visited across the 15 open doors events and feedback
was overwhelmingly positive. 
Locality Support Network (LSN)
This is a well-established platform that enables practitioners to discuss individual
children and young people in their localities alongside colleagues from neighbouring
schools, Educational Psychology and specialist support services.  This can include
discussions regarding interventions to support with attendance as well as training: 
Venturing into play         6
Complex Milestones        7
Language and Communication       8
De-escalation         7
Seasons for Growth Awareness       8
Nurturing Me          9
START Assessment        8
SCERTS Assessment        7
Seasons Parent Programme for Loss & Bereavement    9
De-escalation strategies to support dysregulated behaviours   7 
Inclusion Training & Support
Smart Targets – Primary        25
Circle of Friends – Primary        15
Local Literacy Coaching - Primary      12
Leuven Training - Primary        15
CIRCLE input – ELCC/Primary        57
P1 Autism & Inclusive Practice       26
Zones of Regulation – Primary       10
Seasons Parent Programme for Kinship Carers – ELCC & Primary  16
Seasons Parent Programme – Awareness Raising    14
Loss & Bereavement Training – ASNAs      30
Loss & Bereavement Training – Primary      11
Responsive Communication (intensive interaction & Learning Tracks) 15
Workshops around target setting and evaluation    30
Sensory Processing & Sensory Circuits – ELCC    17
SCERTS Training – Primary       4
Let’s Not Just See How it Goes – Autism Professional Learning  40
FLR Training – Speech & Language Training     25
Solution Oriented Training – ASL       10
Neurodiversity Sessions – Fostering and Adoptive Parents   15
Page 250 of 347

Page 251

Page 10 of 13 
Conversation Café – supporting transition – ELCC Parents   15
VERP Group – 5 sessions – ELCC      6
Supporting Transitions        20
The Service is a key member of the ESRG     
Development of EBSA Guidance and revision of Standard Circular 5 
Conference talks; Academic & Professional Papers & Policies
National Action Enquiry Article – The Adaptive Teacher
ASPEP Paper:  Promoting the Role of the EP
ASPEP Paper:  Supporting Positive Behaviour & Relationships
Renfrewshire Equity Conference – EBSA
West Partnership Conference – EBSA
Anti-Racism resource blog created to support schools implementing  anti-racism
approach in their establishment
Academic article: Self-reflection as a pathway to cultural competence in Educational
Psychology: Developing a reflective practice tool - Rachel Beattie, Ashley Cairns &
Jemma Coysh
Academic article: Educational Psychologists using Non Violent Resistance as a
framework to support schools on their anti-racism journey – Brigitte Short & Rebecca
Gibson-Knowles
Hosting of a national Anti-Racism Network for Educational Psychologists.
National Action Enquiry work – the role of the EP in learning, teaching and pedagogy
National Launch of EBSA Toolkit for ASPEP/SDEP
EBSA film for Scottish Government 
Page 251 of 347

Page 252

Page 11 of 13 
Appendix 2 
Education Officer (CAMHS / Neurodevelopmental Pathways)
Progress Report 
This report provides an overview of current activity, demand trends, and key
developments within the Education Officer (CAMHS/Neurodevelopmental) role.
Referral rates continue to rise, highlighting the need for close collaboration between
education, health and social care to ensure timely, coordinated and effective support
for children, young people and families across Renfrewshire. 
Current Context and Demand Overview 
• Approximately 2,200 Renfrewshire children and young people are currently
open to CAMHS and Neurodevelopmental (ND) services.
• Between August 2025 and January 2026, the Education Advisor received 418
new referrals.
• Since the role commenced in August 2023, a total of 1,517 new referrals have
been received — representing 6% of the school roll. 
Year-on-Year Referral Comparison 
Analysis of new referrals from August to January across three consecutive years
shows: 
• A consistent upward trajectory in referral numbers
• Increased engagement from: 
o schools
o children and young people
o parents and carers
o wider multi-agency partners
o 
This sustained rise in demand reflects: 
• growing awareness of neurodevelopmental needs
• clearer and more accessible referral pathways
• increasing complexity within school communities
• earlier identification and intervention across establishments 
The data continues to demonstrate the essential role of the Education Advisor in
supporting the system to respond proportionately and effectively. 
Summary of Key Functions and Supports Provided 
The Education Officer (CAMHS/ND) provides a wide range of support across
education, health and social work. This includes the following key areas: 
System and Multi-Agency Coordination
• Acts as a single point of contact for information-sharing across education,
CAMHS, ND services and child protection (where appropriate).
• Provides educational context during Health triage of ND and CAMHS referrals
• Liaises with multi-agency partners to ensure accurate signposting and access
to the most appropriate pathways.
Support to Establishments
Page 252 of 347

Page 253

Page 12 of 13 
• Advice and consultation for Senior Management Teams, class teachers and
support staff.
• Support with referrals from both schools and social work.
• Joint planning and problem-solving around complex or high-risk cases.
• Coordination of discharge planning and follow-up support within schools.
Support for Families and Children
• Advocacy and guidance for children, young people and their parents/carers.
• Clarification of processes, expectations and timescales within CAMHS and
ND pathways.
• Support through key transitions including between sectors and stages. 
Training and Workforce Development Training delivered across:
• Education
• CAMHS
• Neurodevelopmental Services
• Social Work 
Training content includes:
• understanding neurodevelopmental presentations
• effective classroom and pastoral support strategies
• pathways, processes and referral requirements
• promoting inclusive, strength-based practice 
Pilot Assessment Model (Oct 2024 – June 2025) 
A pilot assessment model was established with the following features: 
• ND assessments undertaken in schools wherever possible
• Feedback meetings held within the school environment
• Targeted prioritisation at key transition points, including: 
o P4–P7
o S3–S6 
This model provided richer contextual information, reduced barriers for families, and
strengthened continuity of support across services. 
Pilot Outcomes 
Feedback from schools, families and children/young people has been consistently
positive, highlighting: 
• improved contextual understanding within assessments
• reduced stress for children and young people
• stronger, more collaborative planning between education and health
• increased transparency around next steps and supports 
As a result:
• ND assessments will continue to take place in schools wherever practicable
• The involvement of the Education Advisor will remain central to the
assessment and support process 
Additional Insights from Data
• Referral data confirms a year-on-year increase, demonstrating sustained
growth in demand.
Page 253 of 347

Page 254

Page 13 of 13 
• All comparator data shows increasing engagement across schools, families,
and young people.
• Education continues to represent the highest proportion of referrals.
• The ‘Other’ category — including Whole Family Wellbeing, Interrupted
Learning and Third Sector referrals shows modest but steady growth. 
Page 254 of 347

Page 255

P a g e 1 | 7 
To:  Education and Children’s Services Policy Board
On:   12 March 2026
___________________________________________________________________ 
Report by:  Director of Children’s Services
___________________________________________________________________ 
Heading:  Distribution of Funding to Support Services for Children and
Families – Funding Allocation for 2026/27
___________________________________________________________________
1. Summary
1.1. Renfrewshire Council is committed to supporting the independent sector’s
contribution to early years provision in the Renfrewshire Council area, through
the allocation of funding to support a range of private and voluntary sector
organisations which deliver services for families with young children.  
1.2. This report provides information on the proposed allocation of funding during
2026/27 to out of school care groups in the private and voluntary sector and
for early years voluntary sector organisations, playgroups and toddler groups.
1.3. Acceptance of the recommendations contained within the report will result in 
£83,015 disbursed grant funding to private and voluntary sector organisations. 
___________________________________________________________________
2. Recommendations
2.1. The Education and Children’s Services Policy Board is asked to:
i. approve the grant funding to support the delivery of services for
children and young people as outlined in appendix 1 to this report; and
ii. agree the proposed allocation of grant funding for out of school care
and pre five voluntary sector (subject to the completion of satisfactory
checks and assessments)  as detailed in appendices 2 and 3 attached
to this report. 
Item 5
Page 255 of 347

Page 256

P a g e 2 | 7 
3. Background
3.1. Renfrewshire Council has been committed to developing and supporting
services for families for many years.  A number of private and voluntary sector
organisations deliver a range of these types of service within Renfrewshire.
3.2. Working in partnership with providers from the private and voluntary sector,
including out of school care and playgroups has enabled the Council to
continue to support families with young children.  
___________________________________________________________________
4. Proposals for the Allocation of Funding 2026/27
4.1.  Applications for funding to support the delivery of services to families and
young children are submitted via the Council’s grant process for early years
funding.
4.2. These early years funding arrangements are compliant with the Council’s
grant funding requirements and subject to the Council’s Conditions of Grant. 
Payments will only be made to those recommended organisations detailed
within this report when all satisfactory checks and assessments have been
completed. These checks include financial information (bank statements and
annual accounts), and latest Care Inspectorate grades for those services
required to register with the Care Inspectorate. Services require to have Care
Inspectorate Grades of 3 or above. 
4.3. Appendix 1 of this report provides an overview of the proposed allocation of 
£83,015 for grants to the private and voluntary sector organisations supporting
children and families, out of school care services and pre-5 voluntary sector
playgroups for 2026/27. The proposed allocation of funding:2 individual
voluntary sector organisations; pre-5 voluntary sector playgroups; and toddler
groups, is agreed in accordance with previous grant allocation and available
budget.  The proposed grant for out of school care is based on a points
system.
4.4. Appendix 2 attached to the report provides a breakdown of the proposed
allocation of £22,815 grant funding to the out of school care services sector
listed in Appendix 2. 
4.5. The points system agreed for the disbursement of the resources for out of
school care services continues to ensure an equal and fair allocation of the
resources. Each point awarded translates into a sum of money, with the
funding allocated to each organisation then approved by the Policy Board.
The Education and Children’s Services Policy Board at its meeting on the 15
March 2018 approved a point value of £100 per point. The proposed
allocation of funding outlined in appendix 2 continues to be based on a point
value of £100.
4.6. Appendix 3 of this report provides a breakdown of the proposed allocation of
£1,000 in total for the pre-5 voluntary sector playgroups and toddler groups
identified in Appendix 3. 
4.7. Further applications for early years funding grants which are under £1,500 will
be approved by the Director of Children’s Services, using delegated authority
provided to her under the Council’s scheme of Delegation Functions.  Any
Page 256 of 347

Page 257

P a g e 3 | 7 
award greater than £1,500 will be presented for approval at a future Education
and Children’s Services Policy Board meeting.
_________________________________________________________
Implications of this report 
1.  Financial 
Cost relating to the proposals in this report will be met from existing funding
resources.  
2. 
3.
HR and Organisational Development
None. 
Community Plan/Council Planning
Our Renfrewshire is thriving -  Ensuring the best start in life for
children and young people.
Our Renfrewshire is well -  Early intervention will lead to healthier
outcomes for children and young
people. 
Our Renfrewshire is safe -  The provision of funding to local
groups contributes to the
development of local communities.   
Building strong, safe and
resilient communities 
-  The quality of community life is
enhanced by supporting parents,
children and young people. 
Tackling inequality, ensuring
opportunities for all 
-  Effective governance arrangements
ensure that the organisations
receiving funding comply with
legislative requirements. 
Creating a sustainable
Renfrewshire for all to enjoy 
Working together to improve
outcomes. 
-  Support to families and flexible
childcare placements will support
parents into and sustain employment,
training or enter education. 
Ensuring children have a high-quality
early learning and childcare
experience. 
4.  Legal 
The Education (Scotland) Act 1980 empowers the Council to provide a range
of grants. Grant payments will be made in accordance with the Council’s
Conditions of Grant.   
The Council’s Conditions of Grant will apply to any grant for funding to the
approved voluntary sector organisations, out of school care and play group
and toddler groups as detailed in appendices 1, 2 and 3 of the report.  
5.  Property/Assets 
None. 
Page 257 of 347

Page 258

P a g e 4 | 7 
6. 
7. 
Information Technology
None. 
Equality and Human Rights 
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have
been identified arising from the recommendations contained in the report. 
Services registered with the Care Inspectorate are required to comply with the
Equality Act 2010. 
8.  Health and Safety
None. 
9.  Procurement 
None. 
10. 
11.
Risk
All grant awards issued by the Council are subject to the Council’s Conditions
of Grant as detailed in paragraph 4.2 of this report and compliance with
appropriate risk management procedures. 
Privacy Impact
Personal information will only be held as required for the grant application and
meeting the conditions of grant. This will be done in accordance with all data
protection legislation. 
12. Climate Risk
None.
13. Children’s Rights
Every child has the right to relax, play and take part in a wide range of cultural
and artistic activities (Article 31 (leisure, play and culture)). 
14. Cosla Policy Position
None. 
List of Background Papers
None. 
___________________________________________________________________
Children’s Services
JC/KO 16/02/26 
Author: Julie Caldwell . Early Learning and Childcare Development Officer 
julie.caldwell@renfrewshire.gov.uk 
Page 258 of 347

Page 259

P a g e 5 | 7 
Appendix 1
Distribution of Funding to Support Services for Children and Families 2025/26 
Service  Outcome Funding
proposed
2026/27
Home-Start Renfrewshire and Inverclyde Less isolation for families improving mental health
and confidence levels.  Training and development
opportunities provided to volunteers and
parents/carers. 
(Grant funding is to support Renfrewshire families) 
£45,200
Care Inspectorate Provider Name: 
Moorpark Community Association Cherrie
Children’s Day-care 
Name of Group on Application Form:
Moorpark Community Association Cherrie
Children’s Day-care 
Care Inspectorate Service Name:
Cherrie Children Daycare
Young children aged 0 to 3 years being supported
within a safe and stimulating environment and being
able to access good quality learning experiences
supported by knowledgeable and enthusiastic staff. 
£14,000
Out of School Care Services (appendix 2) Support to out of school care services in the
independent sector to provide high quality play
experiences for children and an affordable service for
parents/carers. 
£22,815
Pre-5 Voluntary Sector Grants (appendix 3) Support to individual pre-5 voluntary sector providers. £1,000
Total  £83,015 
Page 259 of 347

Page 260

P a g e 6 | 7 
Appendix 2 
Care Inspectorate Provider Name Name of Group on Application Form Care Inspectorate Service Name SIMD
2026
Private
0 Points
Voluntary 1
point
Renfrewshire
Council
Targeted Data
Zone Area
5 Points
Subsidised
Places
1 Point per 8
places
Equipment
1 point per 8
existing places
Expansion of
childcare
places
2 points per 8
places for
existing
providers
Expansion of
childcare
places 5
points per 8
places for
New Provider
Holiday cover
1 point per 8
places
Use Schools
or Community
halls Term
Time Only -1
point
Year Round -2
Points
Points
Accrued
Award
Recommended
Carli's Kindergarten Ltd Carli's Kindergarten Ltd CK Childcare 9 0 0 9.13 17.5 0 0 17.5 -2 42.13 £4,213.00
Carli's Kindergarten Ltd Carli's Kindergarten Ltd CK Childcare 5 0 0 0.63 3 0 0 0 -1 2.63 £263.00
Chatterbox  Childcare Ltd                        
Registered Company Name:       
CHATTERBOX CHILDCARE LTD.
Chatterbox Childcare Ltd Chatterbox Childcare Ltd 6 0 0 1.25 8.25 0 0 0 -1 8.5 £850.00
Gryffe Manor Nursery Ltd Gryffe Manor Out of School Care Gryffe Manor Out of School Care 10 0 0 0.00 10 0 0 6.25 -2 14.25 £1,425.00
Hummingbird Out of School Care
Limited Hummingbird out of school care ltd Hummingbird Out of School Care
Limited 4 0 0 0.00 7.125 1.75 0 7.125 0 16 £1,600.00
Insafe Hands Childcare Limited   
Registered Company Name: 
INSAFEHANDS CHILDCARE LIMITED
Insafe Hands Childcare LTd St. James Out of School Care 2 0 5 0.00 7.5 0 0 0 -1 11.5 £1,150.00
Insafe Hands Childcare Limited    
INSAFEHANDS CHILDCARE LIMITED Insafe Hands Childcare LTd Insafe Hands (Newmains) 9 0 0 0.00 5 0 0 5 -2 8 £800.00
Insafe Hands Childcare Limited  
INSAFEHANDS CHILDCARE LIMITED Insafe Hands Childcare LTd In Safe Hands 2 0 5 0.00 3 0 0 3 0 11 £1,100.00
KLAS Care C.I.C. KLAS Care C.i.C KLAS Care C.I.C 4 0 0 3.75 6.25 0 0 0 -1 9 £900.00
KLAS Care C.I.C. KLAS Care C.i.C KLAS Care 3 0 0 4.38 5 0 0 5 -2 12.38 £1,238.00
Making Memories Childcare Ltd Making Memories Childcare Ltd Making Memories Childcare Ltd
(Out of School Care) 7 0 0 0.50 3.75 2.5 0 3.75 0 10.5 £1,050.00
Moorpark Community Association
Cherrie Children's Day-care
Moorpark Community Association
Cherrie Children's Day-care Cherrie Children Daycare 1 1 5 0.00 5 0 0 5 -2 14 £1,400.00
Ralston After School Care Committee Ralston out of school care Ralston After School Care 9 1 0 1.25 10 0 0 10 -2 20.25 £2,025.00
Roin Ltd ROIN LTD T/A JENNYSWELL OSC
@LOCHFIELD Jennyswell OSC -Lochfield 4 0 0 0.00 4 0 0 0 -1 3 £300.00
Roin Ltd ROIN LTD T/A JENNYSWELL OSC AT
TODHOLM Jennyswell OSC -Todholm 4 0 0 0.00 6.25 0 0 6.25 -2 10.5 £1,050.00
School's Out Centres Limited School's Out Centres Limited  'School's Out' -  Bargarran 5 0 0 2.13 6.25 0 0 6.25 -2 12.63 £1,263.00
School's Out Centres Limited School's Out Centres Limited 'School's Out' - Barsail 4 0 0 2.75 6.25 0 0 0 -1 8 £800.00
Strawberry Field Nursery Strawberry Field Nursery Strawberry Field Out of School
Care 8 0 0 2.38 7.5 0 0 4 0 13.88 £1,388.00
£22,815.00
OUT-OF-SCHOOL CARE SUPPORT 2026/27                                
Provider Details Criteria Total
Page 260 of 347

Page 261

P a g e 7 | 7 
Appendix 3 
Distribution of funding support services for children and families - pre-five voluntary sector grants 2026/27 
Organisation  Purpose of Grant  Recommendation 
Award 2026/27
Langbank Playgroup  To provide quality play opportunities for children that promote all
aspects of their learning and development. 
£500    
Lochwinnoch Toddlers Group To provide opportunities for children that promote all aspects of
their learning and development. 
£500
Total   £1,000
Page 261 of 347

Page 262

Page 1 of 5 
To:  Education and Children’s Services Policy Board
On: 12 March 2026
___________________________________________________________________ 
Report by:  Director of Children’s Services
___________________________________________________________________ 
Heading:  Report on Keeping The Promise in Renfrewshire 
________________________________________________________________
1. Summary
1.1. This paper provides information on how Renfrewshire is delivering on The
Promise.  The documents attached at appendix 1 and appendix 2
Renfrewshire’s Promise – Report on Keeping The Promise to
Renfrewshire’s Infants, Children, Young People and Families (2026),
cover activity from February 2025 to February 2026.
1.2. The report outlines Renfrewshire’s continued progress in delivering Scotland’s
Promise, ensuring Care Experienced infants, children, young people and
families are safe, loved and respected. It summarises key developments
across early help, whole‑family support, education, youth voice, employability
and children’s hearings. 
1.3. The report highlights strengthened partnership working, increased
participation from young people, growth of the Promise Keeper Network, and
ongoing workforce development rooted in trauma‑informed and rights‑based
practice. It also sets out how services, including housing, employability,
justice, maternity, digital inclusion and education, are embedding
compassionate, relational approaches shaped by lived experience. 
1.4. The report demonstrates Renfrewshire’s collective commitment to system
change, reducing stigma, improving outcomes and building a more inclusive
environment for Care Experienced people.
1.5. Two versions of the report have been produced:  
• Renfrewshire’s Promise (2026): a full strategic and operational report
for stakeholders (appendix 1).
• The Pinky Promise 2026: a child‑friendly, plain English version created
with younger readers to support accessible understanding of The
Promise (appendix 2).
Item 6
Page 262 of 347

Page 263

Page 2 of 5 
___________________________________________________________________
2. Recommendations
2.1. The Education and Children’s Services Policy Board is asked to:
[a] note the contents of both reports attached (Renfrewshire’s Promise
2026 and The Pinky Promise 2026), which outline Renfrewshire’s
progress in delivering The Promise during 2025–26.
___________________________________________________________________
3. Background
3.1. The Promise remains a core strategic priority for Renfrewshire’s Children’s
Services Partnership. Partners are committed to providing support to children
and families at the earliest opportunity, as outlined in the Children’s Services
Partnership Plan 2023–26 and reinforced through Scotland’s Promise
Plan 24‑30 and associated national implementation requirements.
3.2. Delivering The Promise in Renfrewshire forms part of a broader vision to
improve outcomes for infants, children and young people who may face
adversity, trauma, inequality or barriers to positive life chances. The local
approach aligns with GIRFEC, UNCRC incorporation, the National Trauma
Transformation Programme and the Whole Family Wellbeing agenda.
3.3. Between 2017 and 2020, Scotland’s Independent Care Review engaged with
more than 5,500 people, including Care Experienced infants, children, young
people, adults, and members of the paid and unpaid workforce. Their insights
informed the foundations of The Promise.
3.4. The Independent Care Review concluded in 2020 with a set of
recommendations describing the changes required to transform Scotland’s
“care system.” The Scottish Parliament committed to fully implementing these
recommendations by 2030. Renfrewshire’s local activity is directly aligned with
these national expectations.
3.5. Renfrewshire’s local governance and delivery are supported by dedicated
leadership and strong partnership oversight. The Promise Manager provides
strategic leadership for Renfrewshire’s Children’s Services Partnership,
ensuring local plans reflect national priorities and legislative developments,
and coordinating multi‑agency implementation across council services,
appropriate children’s services partners and third‑sector partners. The
Promise Ambassador supports teams to embed the voice of Care
Experienced people in service design and improvement and co‑chairs the
Supporting the Workforce workstream, which focuses on developing
employment pathways and strengthening staff capability.
3.6. Oversight is provided by Renfrewshire’s Promise Strategic Oversight Group,
chaired by the Head of Children and Justice Social Worker/Chief Social Work
Officer and brings together senior leaders from the council, children’s services
partners and third‑sector partners. The Group meets a minimum of three
times per year to provide clear governance, monitor progress and ensure a
cohesive, cross‑sector approach to keeping The Promise.
Page 263 of 347

Page 264

Page 3 of 5 
3.7. Delivering The Promise is both a programme of work and a cultural shift. It
challenges traditional systems, redefines roles and supports the development
of services that are compassionate, inclusive and responsive.
3.8. The full 2026 report provides detailed information on activity delivered across
Renfrewshire, including progress in the following areas:
The Promise in Renfrewshire - Provides an overview of Renfrewshire’s
commitment to Keeping The Promise, including guiding principles, priorities,
challenges, and how services are aligning with national expectations.
Renfrewshire’s Promise Approach in Numbers - Summarises key statistics
showing activity, engagement, and progress across the year, such as
numbers of Promise Keepers, youth participation, school involvement, and
partnership work.
Youth Voice Leading Change - Highlights how Care Experienced young
people shape decisions, including youth‑led campaigns, creative projects,
community space redesigns, and events like Promise YouthyFest.
Renfrewshire’s Promise Keeper Network - Describes the expanding
network of Promise Keepers across services and sectors, showcasing how
staff champion The Promise and influence practice and culture change.
Promise Keeper Conference 2025 - Reports on the annual conference
focused on employability for Care Experienced people, including key
speakers, themes, reflections, and outcomes.
Renfrewshire Language Policy - Explains work to promote inclusive,
non‑stigmatising language around Care Experience, including progress,
consultation, and planned updates.
Supporting the Workforce and Spotlight on Employability - Covers efforts
to improve employability for Care Experienced young people, including the
Human Library, Care Experienced Staff Network, guaranteed interview
scheme, and workforce learning.
Whole Family Wellbeing Approach in Renfrewshire - Describes
Renfrewshire’s approach which delivers early, relationship-based family
support aligned with The Promise, enhancing wellbeing, strengthening
families and reducing the need for crisis interventions.
Keeping The Promise in Children’s Hearings - Outlines improvements
across the Children’s Hearings System, including trauma‑informed practice,
child‑friendly scheduling, advocacy, and cross‑council collaboration.
Community Justice and The Promise: Working Together - Demonstrates
how community justice activity aligns with The Promise through early
intervention, partnership working, lived‑experience involvement, and
whole‑system planning.
Renfrewshire Council’s Housing Services: Delivering on The Promise -
Describes how housing and homelessness services support Care
Experienced young people with personalised pathways, prevention work, and
trauma‑informed practice.
Page 264 of 347

Page 265

Page 4 of 5 
Renfrewshire’s Promise Partnership Projects in Education - Summarises
two major school‑based Promise projects showing how schools improved
inclusion, transitions, and wellbeing.
Communities that Care: Building Inclusive School Communities -
Explains the whole‑school programme delivered with Who Cares? Scotland to
reduce stigma, integrate learning about Care Experience, and promote
empathy and inclusion.
Stronger Start: Embedding The Promise in Maternity Support - Describes a
wrap‑around financial advice and advocacy service in maternity settings,
supporting families early and reducing stressors that impact infant wellbeing.
Circuit: Reimagining Digital Education and Creative Technology -
Outlines the digital skills programme co‑designed with Care Experienced
young people, offering creative tech learning, safe spaces, and improved
access to digital opportunities.
___________________________________________________________________ 
Implications of this report 
1.  Financial - Delivering The Promise needs sustained investment with
long‑term, stable funding vital to maintain early intervention and prevention. 
2.  HR and Organisational Development - There are workforce impacts,
including promoting the Care Experienced Staff Network, iLearn Promise
module, revised recruitment and the Guaranteed Interview Scheme,
requiring HR input, staff training and wider organisational awareness. 
3. Community/Council Planning 
Building strong, safe and
resilient communities 
-  Providing families and children with
support to remain together will
ensure our communities are
supportive places for children to
grow up in. 
Tackling inequality, ensuring
opportunities for all 
-  Providing families and children with
the help they need at the earliest
point possible will ensure our
communities are inclusive for all. 
Working together to improve
outcomes 
-  Providing excellent quality care is
central to ensuring that the most
vulnerable children and families in
Renfrewshire are provided with an
opportunity to achieve their potential 
4.  Legal - The report references forthcoming legislation including the Children 
(Care, Care Experience and Services Planning) (Scotland) Bill and UNCRC
incorporation, both of which will have implications for compliance, duties and
decision‑making across Children’s Services. 
Page 265 of 347

Page 266

Page 5 of 5 
5.  Property/Assets - None
6.  Information Technology - None
7.  Equality and Human Rights - Activity around The Promise directly supports
equality, anti‑stigma work, trauma‑informed practice and rights‑based delivery.
The report outlines whole‑system work aimed at reducing inequality,
improving inclusion, and addressing discriminatory barriers for Care
Experienced people
8.  Health and Safety - None
9.  Procurement - None
10.  Risk - The report references short‑term funding, workforce pressures, and
evolving legislative reform, alongside a heavy reliance on cross‑sector
collaboration to deliver outcomes.
11.  Privacy Impact - None
12.  Climate Risk - None
13.  Children’s Rights - The report links The Promise to UNCRC incorporation,
embedding children’s rights in planning and practice so young people are
heard, involved in decisions and supported through rights-based,
trauma-informed services.
14.  COSLA Policy Position - COSLA remains committed to delivering The
Promise, noting this requires realistic, coherent and adequately funded
national policy. 
List of Background Papers 
The foregoing background papers will be retained within children’s services for
inspection by the public for the prescribed period of four years from the date of the
meeting.   
___________________________________________________________________
Children’s Services 
Author:  Maurice Gilligan, Promise Manager, Children’s Services,
maurice.gilligan@renfrewshire.gov.uk 
Page 266 of 347

Page 267

Renfrewshire’s Promise
Keeping The Promise
in Renfrewshire
Report on Keeping The Promise to Renfrewshire’s
Infants, Children, Young People and Families.
March 2026
Page 267 of 347

Page 268

Renfrewshire’s Promise
Contents
1
5
6
8
9
10
11
14
15
17
19
21
26
29
32
34
35
36
39
The Promise in Renfrewshire
Renfrewshire’s Promise Approach in Numbers
Youth Voice Leading Change
Renfrewshire’s Promise Keeper Network
Promise Keeper Conference 2025
Renfrewshire Language Policy
Supporting the Workforce — Spotlight on Employability
Whole Family Wellbeing Approach in Renfrewshire
Keeping The Promise in Children’s Hearings
Community Justice and The Promise: Working Together
Renfrewshire Council’s Housing Services: Delivering on The Promise
Renfrewshire’s Promise Partnership Projects in Education
Communities that Care: Building Inclusive School Communities
Stronger Start: Embedding The Promise in Maternity Support
Circuit: Reimagining Digital Education and Creative Technology
Promise Team Contact Information and Biographies
Appendix 1 — Renfrewshire’s Promise Strategic Oversight Group
Appendix 2 — What is the Promise
Glossary
Page 268 of 347

Page 269

Renfrewshire’s Promise
The Promise in Renfrewshire
This report reflects our shared commitment to
Keeping The Promise in Renfrewshire and
marks our continued progress on this journey.
It covers the period from February 2025
to February 2026.
Thank you to all who continue to
champion this work.
Page 269 of 347

Page 270

1Renfrewshire’s Promise
The Promise in Renfrewshire
Our Commitment
The Promise remains a strategic priority for
Renfrewshire’s Children’s Services Partnership. As
partners, we are committed to working together to
provide support to children and families at the earliest
possible stage, in line with our shared ambition to
keep The Promise. This commitment is embedded in
the Renfrewshire Children’s Services Partnership Plan
2023–26 and is aligned with our wider vision to improve
outcomes for infants, children and young people who
face poverty, adversity, trauma and inequality
Our approach actively encourages a culture
where children, young people and families feel
safe, empowered and heard. We strive to create
environments where they can ask questions, express
concerns, and shape the services they receive.
Listening meaningfully to lived experience is a
cornerstone of our work, and we are committed to
ensuring that engagement leads to action.
Loving and Nurturing Principles:
Central to our approach is a commitment to loving,
nurturing relationships and listening to children,
young people and families. We strive to create a
culture where people feel safe and empowered
to ask questions and shape the services they
receive. We recognise that children experience the
care system through relationships, and that those
relationships must be grounded in compassion,
trust, and respect.
Page 270 of 347

Page 271

2Renfrewshire’s Promise
The Promise in Renfrewshire
Resources and Funding
Short-term, fragmented funding continues to
hinder progress. We advocate for long-term,
trust-based investment that prioritises prevention
and early intervention. Strategic modelling of
investment and disinvestment is essential to
ensure resources are allocated effectively.
Legislative Reform
The development of the Children (Care, Care
Experience and Services Planning) (Scotland) Bill
and the incorporation of the UNCRC must simplify
the legal landscape, strengthen rights, and enhance
protections for all Care Experienced people.
Whole Family Support
Support must be holistic, relational, and free
from stigma. The ten principles of intensive family
support should be embedded in practice, ensuring
timely and equitable access for all families.
Supporting the Workforce
Scotland’s workforce faces increasing
pressures, including high caseloads, retention
challenges, and limited resources. There is a
growing consensus on the need to enhance
support through improved wellbeing initiatives,
continuous training, and opportunities for
reflective practice. Addressing these issues is vital
to sustaining a resilient and effective workforce.
Data, Measurement and Reporting
Informed by The Promise Progress Framework,
we recognise the need for improved data linkage,
transparency, and local outcome measurement—
particularly from the perspective of Care
Experienced individuals.
Guided by National Priorities
Our local delivery is aligned with and guided by
the national priority areas set out by The Promise,
which define the systemic changes required by
2030. These priorities are interdependent and
must be addressed collectively across both
national and local systems.
Voice and Participation
Meaningful engagement is essential.
Coproduction and inclusive decision-making
ensure that services reflect lived experience and
respond to genuine need.
Governance and Accountability
Clear roles, responsibility, and oversight are
fundamental. We advocate for streamlined
structures, stronger leadership, and shared
accountability across Children’s Services and
wider partnerships.
Strategic Planning and Direction
The publication of Plan 24–30 marks a shift towards
more actionable planning. Sector-specific route
maps and alignment with national frameworks are
key to delivering consistent and effective services.
Page 271 of 347

Page 272

3Renfrewshire’s Promise
The Promise in Renfrewshire
Our Promise work is aligned with key national
frameworks and the emerging legislative 
landscape including:
• Incorporation of the UNCRC
• Getting It Right For Every Child (GIRFEC)
• National Trauma Transformation Programme
• Equalities legislation and approaches
stigma-free communication around Care Experience,
and contributes to its ongoing refinement.
A Promise Delivery Mapping and Planning
Tool, developed in collaboration with The
Promise Scotland, continues to inform our local
implementation. This tool has been shared with other
local authorities as an example of good practice.
Strategic Drivers and Alignment
Renfrewshire’s Promise work is now entering a critical
phase in the 10-year programme. The publication
of Plan 24–30 and the Scottish Government’s
Implementation Plan Update have provided a renewed
framework for delivery. These plans emphasise:
• The need for clear roles, responsibilities
and milestones
• A shift from consultation to action and
measurable impact
• The importance of whole-system collaboration
and long-term investment
In Renfrewshire, we have mapped our local priorities
against these national plans and reviewed our
governance arrangements to ensure they are fit for
purpose. We are actively engaging with children,
young people, parents and carers to understand what
Plan 24–30 means for them.
Governance and Oversight
Renfrewshire’s delivery of The Promise is overseen
by the Promise Strategic Oversight Group, which
reports directly to the Children’s Services Partnership.
Following a recent governance review, reflecting
national recommendations for streamlined and
accountable structures, three core workstreams now
inform and provide reports to the Oversight Group:
• Whole Family Wellbeing Steering Group
• Supporting the Workforce
• Renfrewshire Children’s Hearings
Improvement Partnership
Each workstream is chaired by senior leaders across
the partnership and thereby reflecting the national
priority areas.
Renfrewshire Health and Social Care Partnership
(RHSCP) provides strategic leadership in delivering
The Promise, contributing to planning, service
development, and performance oversight.
RHSCP Senior leaders are active members of the
Promise Strategic Oversight Group and play a key role
in shaping Renfrewshire’s Whole Family Wellbeing
approach. They also support workforce development
through the Supporting the Workforce workstream.
Additionally, RHSCP champions Renfrewshire’s
Language Policy, promoting person-centred,
Page 272 of 347

Page 273

4Renfrewshire’s Promise
The Promise in Renfrewshire
Next Steps
• Continue to strengthen relationships with
national partners
• Monitor and respond to legislative developments
• Support the development and implementation
of Plan 24–30 route maps
• Ensure our local delivery is aligned with the
Promise Progress Framework and contributes
to the national Story of Progress
• Maintain a focus and advocate for long term,
trust-based funding, workforce wellbeing, and
whole family support
National Engagement and Influence
Renfrewshire’s Promise Team maintains strong,
constructive relationships with:
• The Promise Scotland
• Scottish Government
• COSLA
We are active participants in COSLA’s Promise
Leads Network and have hosted visits from national
partners to showcase our progress. Renfrewshire
Council’s Children’s Service contributions to national
consultations have included:
• The Children (Care, Care Experience and Services
Planning) (Scotland) Bill
• Developing a universal definition of Care
Experience
• Future of Fostering Consultation
• Children’s Hearings Redesign
Community Planning and Strategic
Engagement
The Promise Manager and Promise Ambassador
have provided strategic support, insight, and
challenge to key partnership forums, including
Renfrewshire’s Children’s Services Partnership, the
Community Planning Partnership Executive Group,
and the Forum for Empowering Communities. These
contributions have helped reinforce the statutory
role of Community Planning Partnerships in tackling
inequalities. As a result, Chief Officers and third sector
leaders have demonstrated increased awareness and
a stronger commitment to delivering on The Promise.
The Promise Manager continues to work closely with
policy leads across Renfrewshire Council and HSCP to
embed The Promise into:
• Service Improvement Plans
• Strategic Plans
• Mid-Year Monitoring Reports
• Corporate Management Team discussions
Page 273 of 347

Page 274

5Renfrewshire’s Promise
We continue to build momentum, strengthen
partnerships, and place infants, children, young
people, and families at the heart of everything we
do. This snapshot highlights the commitment of all
involved in The Promise, the innovation within our
communities, and the leadership demonstrated
across services.
The numbers below tell a story of progress, of growing
networks, meaningful engagement, and tangible
change. From schools embracing the Communities
That Care programme to young people shaping their
own spaces through YouthyFest, Renfrewshire is
demonstrating what it means to Keep The Promise.
We know that behind every statistic is a person be it a
child, a practitioner, a partner all working together to
make things better.
Promise Keeper Network
• 407 active Promise Keepers in Renfrewshire
• 105 new Promise Keepers joined in the past year
Annual Promise Keeper Conference
• 102 attendees (December 2025)
Promise Human Library 
• 101 staff members
Promise Team Engagements
• 146 internal partner engagements
• 57 external partner engagements
• 82 Renfrewshire organisations (including
council services) actively involved in Keeping
The Promise
Youth Voice
• 189 participants attended Promise 
YouthyFest 2025
Recognition & Strategic Alignment
• 2 submissions to national awards showcasing
Renfrewshire Council’s Promise-related work
• 7 key partner/service plans aligned with
The Promise
Communities That Care (CtC) Programme
• 63 schools completed Stage 1: Care Aware
• 61 schools completed Stage 2:
Curriculum Delivery
• 43 schools actively delivering CtC lessons
• 85% of schools engaged in lesson delivery
• 500+ sector partners trained
• 783 pupils provided feedback
Education Projects
2 school projects funded via the Promise
Partnership Fund: 
• Johnstone High School
• St Andrew’s Academy
Next Steps
• Utilise and share data to demonstrate
Renfrewshire’s commitment to Keeping
The Promise
• Integrate insights into strategic
planning processes
• Monitor engagement trends to identify active
areas and those requiring further outreach
• Acknowledge and celebrate the contributions
of active partners and Promise Keepers
• Promote cross-sector collaboration by
highlighting the breadth of commitment
across services
Renfrewshire’s Promise Approach in Numbers
Page 274 of 347

Page 275

6Renfrewshire’s Promise
Renfrewshire Council Youth Services has been at the
forefront of amplifying the voices of Care Experienced
young people across the region. Through a rights-
based approach rooted in the UNCRC and aligned
with National Youth Work Outcomes, the service has
embedded youth voice into local decision-making.
Empowerment is championed through locality-based
forums and targeted outreach, ensuring that even the
most marginalised voices are heard and acted upon.
Central to this work is the Promise Champs
programme, which continues to evolve, reflecting
young people’s transitions to positive destinations
and welcoming new members through ongoing
consultation and outreach.
Youth-Led Campaigns and Events
The Promise Champs have played a pivotal role
in shaping services and leading change. Their
involvement in youth-led initiatives has included the
annual Promise Present Drives, which in 2023 and
2024 distributed over 300 parcels to Care Experienced
young people across Renfrewshire.
These campaigns were supported by Youth Services,
social workers, and Promise Keeper networks. The
Champs also organised inclusive events such as the
Festive Lunch and WinterFest, which brought together
young people, carers, and families for celebration,
connection, and youth-led activities.
Summer Programme and
Residential Experiences
Thanks to the Promise Partnership Youth-led Corra
Fund, Youth Services delivered a six-week summer
programme co-designed with Promise Champs.
Activities included weekly youth clubs, drama
workshops, residentials, and trips to destinations
such as Edinburgh Zoo and Glasgow’s Splatter Art
Studio. These experiences removed barriers to
participation and created safe spaces for building
friendships, developing skills, and accessing support.
One young person shared, “This year we were
encouraged to be more independent as a group
and plan and decide on things ourselves. It was cool
that we got to choose exactly what we wanted to do
without the worry of money restrictions.”
Creative Projects and Visual Identity
Creative projects have also been central to the
Champs’ work. The Promise Champs logo and
branding were developed through interactive
workshops with artist Rachel Jardine, resulting in
branded hoodies and posters that strengthened
group identity and visibility.
A parallel project with Promise Ambassadors at
St Andrews High School led to the creation of a
logo for badges and keyrings, designed to support
peer mentoring and reduce stigma. These visual
storytelling efforts align with Renfrewshire’s Language
Policy and promote trauma-informed, inclusive
representation of Care Experience.
Youth Voice Leading Change
Page 275 of 347

Page 276

7Renfrewshire’s Promise
Youth Voice Leading Change
Wider Strategic Alignment
These activities are mapped using Renfrewshire’s
Promise Mapping Tool and reported to the Strategic
Oversight Group, ensuring transparency and
alignment with national priorities. The programme
contributes directly to Renfrewshire’s Promise Plan
2024–2030 and will inform the development of the
Promise Strategic Plan 2026–2029.
Next Steps
• Continue consulting with Care Experienced
young people to identify unmet needs and
opportunities for improvement
• Support youth-led redesigns and creative
projects that reflect the voices and experiences
of young people
• Ensure learning from these activities inform
and support the Promise Strategic Oversight
Group and align all work with Scotland’s
Promise Plan (2024–2030) and Renfrewshire’s
Promise Strategic Plan (2026–2029)
• Review progress regularly to ensure
accountability and impact
Youth-Led Redesign of Community Spaces
Youth-led redesigns of community spaces have
further demonstrated the Champs’ leadership. Four
venues were transformed, including the Throughcare
meeting room at St James Centre, the Methodist Halls
used for youth clubs, an outdoor garden at Johnstone
High School, and the entrance of Paisley YMCA.
These redesigns created welcoming, youth-friendly
environments that support wellbeing, learning, and
social connection.
A young person involved in the redesign shared,
“Redesigning the space made me feel like it was ours,
it’s somewhere I want to be.”
Promise YouthyFest 2025
The Promise YouthyFest 2025, attended by 189
participants, was a standout achievement. Designed
and delivered by Promise Champs, the festival featured
music, funfair activities, creative zones, and wellbeing
spaces. It showcased youth voice and removed barriers
to participation, with families describing the event as
“inclusive,” “uplifting,” and “fun.”
As one young person reflected, “Planning the summer
Youth Festival was my favourite part of this year, it was
super fun with lots of things to do and I got to do it all
with my friends from club.”
Page 276 of 347

Page 277

8Renfrewshire’s Promise
Renfrewshire’s Promise Keeper Network is a
community of local champions for The Promise who
promote, advocate and improve outcomes for the
Care Experienced community. There are currently 407
Promise Keepers, and this number is growing across
Renfrewshire. They ensure The Promise remains
at the forefront of service design and delivery. The
Promise Keeper Network encompasses the idea that
Care Experienced people will access lots of different
services in their lives, from council tax to leisure
services. It is important that those areas are informed
and sensitive to their needs.
Our Care Experienced community have told us that
they want genuine and authentic people to champion
The Promise, and the dedication and commitment
our Promise Keepers show further emphasises this.
The Promise Keeper network is diverse in terms of
seniority and services represented. For example,
Social Work, Education, the wider council, the HSCP,
Elected Representatives, Community Planning
Partners and the third sector. We have been delighted
that over the past year, we have expanded our
network in both numbers and diversity, welcoming
nearly 100 more Promise Keepers to the network. We
also now have representation from local sports teams,
with both Glenvale FC and Basketball Paisley having
Promise Keepers.
The Promise Keeper Network has supported the
long-term sustainability of the CORRA funded
project in St Andrew’s Academy, with Senior Leaders
and Principal Teachers joining the network and
considering the small changes they can enact within
their school and curriculum to advocate for the rights
and awareness of their Care Experienced pupils.
The Corporate Management Team within the Council
made a commitment to ensuring that as a group, they
would sign up to become Promise Keepers. We have
supported a number of the Corporate Management
Team to meet this commitment, including the Chief
Executive, over the past year.
We have also welcomed volunteers from Home-Start
Renfrewshire to the Promise Keeper Network, who
brought their commitment and enthusiasm to the
role in ensuring that they are sensitive to the needs
of both Care Experienced children and adults when
working with the families that they support.
We aim promote a sense of community and
commitment within the Promise Keeper Network,
supporting individuals to cascade their learning to their
wider teams. Across this past year, this has involved
numerous discussions, inputs and presentations
across Renfrewshire to further promote the network.
We have hosted a range of Promise Keeper Catch-Up
sessions in 2025, with a key focus on employability
and language which has continued to inform our work
centrally. We continue to listen to our Promise Keepers
in terms of the support and information they would
benefit from and respond accordingly. One of the
core principles of the Promise Keeper Network is that
it is a learning network, as a Promise Keeper and as a
network, we are constantly learning from each other.
Renfrewshire’s Promise Keeper Network is informed
by our Care Experienced community, they are at the
very heart of what we do.
Next Steps: 
• Continue to raise awareness and grow
the network
• Celebrate success and share case studies
• Support our current Promise Keepers
Renfrewshire’s Promise Keeper Network
Page 277 of 347

Page 278

9Renfrewshire’s Promise
On the 4th of December 2025, we hosted our third
annual Promise Keeper Conference with a theme
focused on employability – “How Can We Strive for
Renfrewshire to be the Best Place for Care Experienced
People to Work?”. The half day event involved a range
of speakers, videos and discussions, with networking
opportunities throughout. Over 100 Promise Keepers
attended the event which was the highest turnout for
a Promise Keeper Conference to date.
The conference was opened by Alan Russell, Chief
Executive of Renfrewshire Council who set the tone
for the day, reinforcing both his commitment and the
council’s commitment to The Promise and supporting
our Care Experienced community in Renfrewshire.
Colleagues from OneRen reflected on the journey
they have been on over the past few years around
The Promise, sharing details about changes to
recruitment, opportunities for Care Experienced
people and how Care Experience has been included
within the redesign of Paisley Museum. Yvonne
Ward shared information with the group about
the success of the Career Ready programme in
Renfrewshire and showcased a short film where
young people who were involved in the programme
shared their experiences. Melissa McGrogan from
Invest in Renfrewshire shared information about
their service offer for Care Experienced young people
including some positive case studies emphasising the
importance of their work.
Prior to the conference, the Promise Ambassador
worked with three Care Experienced members of staff
to create a short film sharing their experience of being
Care Experienced and working in Renfrewshire. This
film highlighted the importance of ensuring that we
consider the needs of Care Experiences adults in our
work, and remember that some of our colleagues
may also be Care Experienced and require support
and compassion.
The final item of the day was a session termed “In
Conversation With…” which was chaired by Pauline
Moss. This involved a short interview which each
participant including Thomas Seisay from Haus
of Seisay, Mary Cumming from Glenvale FC and
Raymond Cree and Eddie Simpson from People & OD
in Renfrewshire Council. Each participant engaged
in an informal conversation with Pauline about their
work on The Promise and their visions for the future.
“Thank you so much for an amazing and
inspiring event.”
“Great speakers and a lovely mix of
different perspectives.”
“My first Promise Keeper Conference and
was a great experience”
“It felt the speakers came from a diverse
number of services and backgrounds. In
the previous Promise Conference, there
were a diverse group of speakers but
mostly from Social work and universal
services. I think this year’s speakers
demonstrates the progress made in
highlighting the role of the wider council
staff, communities and partners in
understanding and implementing the
Promise.”
“From listening to others, I have came
away with both some ideas and renewed
motivation, especially in respect of our
recruitment processes.”
“All speakers were brave and inspiring.”
“Speakers were all very engaging with
interesting and varied speeches - great to
hear more about what is going on, there is
so much more than we knew about on our
door step.”
Promise Keeper Conference 2025
Page 278 of 347

Page 279

10Renfrewshire’s Promise
The Renfrewshire Language Policy was launched in
April 2022 and was created through consultation with
Care Experienced young people and staff from the
Promise Keeper network around words they felt were
negative or stigmatising.
The Language Policy is a set of guidelines for how
we speak about, describe Care Experience, and Care
Experienced children and young people. This language
will continue to evolve, and services and organisations
are encouraged to review their language. The policy is
helping us to move away from overly professionalised
words and phrases to adopt person-centred language,
which challenges existing stigma.
Staff across all services at Renfrewshire Council as
well as council partners, have been asked to consider
the impact of our language when engaging with
children, young people and their families and modify
it where possible.
For many of us, acronyms such as LAC/LAAC had
been embedded in our everyday language and
practices for several years. However, for a child or
young person, they may hear this and think they are
“lacking” in something. We recognise that “Looked
After” is a statutory, legal term, and are encouraging
staff to use the term in full “Looked After Child” or
“Looked After and Accommodated Child.”
We are working to review the Language Policy
across 2026/27 through consultation with our Care
Experienced community, Promise Keeper Network
and wider workforce, while monitoring the legislative
landscape for updates which may impact this work.
This work has begun, with an initial survey to scope
initial thoughts and evaluative feedback of the
current policy which will then direct our plans as we
commence further consultation.
We are keen to gather the views of as many teams
and young people as possible and would welcome
input at any stage of this work.
This evaluation and consultation period allows us
to ensure that the Renfrewshire Language Policy is
up to date and relevant and still meets its original
aims to tackle stigmatising language being used in
Renfrewshire where possible.
Support is available from the Promise Ambassador
for services to implement the Renfrewshire Language
Policy in their work.
Next Steps: 
• In 2026/27 we will progress the review of the
language policy in consultation with the Care
Experienced community and with partners
• Produce and promote an updated policy
Renfrewshire Language Policy
Page 279 of 347

Page 280

11Renfrewshire’s Promise
We have a working group in place for Supporting
the Workforce which is co-chaired by Felix Haggerty
(Training and Development Manager) and Sam
Macrae (Promise Ambassador). This group is attended
by a range of staff from across the partnership and
third sector. The group have actioned the below key
items around the theme of Supporting the Workforce
and improving employment opportunities for the
Care Experienced community.
The Promise Human Library
Across our Promise Keeper Network, we have a
wealth and diversity of professional career experience,
and weare keen to ensure that our Care Experienced
community can benefit from this. We are in the
process of creating a “Promise Human Library” where
we “match” young people with Promise Keepers who
work in a career field that they might be interested in.
The Promise Keeper would be able to decide in terms
of capacity how they can support the young person,
this may be a phone call, an email exchange or an
office visit.
This project aims to address the lack of social capital
that many Care Experienced young people face when
accessing informal information and experiences about
job opportunities, while complimenting the existing
support on offer from our employability services.
The Promise Human Library launched in July 2025
after a recruitment period where we have over 100
staff members signed up.
Young people can sign up to the Promise Human
Library through a Microsoft Forms page where they
can share information about the career area they
are interested in and other interests they have. From
this they will be matched with a member of staff who
aligns to their interests. Young people can access a
phonecall, email exchange, online meeting, in person
meeting, office visit and work shadowing through the
Human Library, dependent on the career area and
staff availability.
Across the past year we have supported 5 young
people to access the Promise Human Library,
with positive feedback being reported about the
experience. We are currently working to raise
awareness of this resource across teams and services.
“The young person did confirm that she
found this meeting to be extremely
helpful and informative, and she would
recommend this type of shared knowledge
for career minded young people.”
Next Steps: 
• Continue to recruit staff to the Human Library
• Raise awareness of the Human Library to
ensure young people are able to access
Supporting the Workforce  — Spotlight on Employability
Page 280 of 347

Page 281

12Renfrewshire’s Promise
Supporting the Workforce  — Spotlight on Employability
Next Steps: 
• Continue to work with Marketing and
Communications to ensure that all staff are
aware of the network
• Continue to expand on the membership of
the network 
• Continue to develop the work and scope of
the network
Care Experienced Staff Network
In May 2025, we launched the Care Experienced Staff
Network. This mirrors similar networks which are in
place in organisations for LGBT+ staff, or for those
with caring responsibilities. One of the network aims
is to share the living experience of Care Experienced
staff to inform improvements around how we can
better support Care Experienced colleagues in the
Council. Most importantly, the network will provide a
space for individuals seeking peer support and a safe
space to create and experience a sense of community
and belonging.
This network is for those with both direct and indirect
Care Experience to ensure a breadth of experiences.
We will continue to be mindful of the balance
between these two groups and ensure that both are
given appropriate space to share their views. Those
with indirect experiences of care act as allies within
the group, given their proximity to the issues that
affect Care Experienced people.
To date, the group have met twice and have discussed
ideas around membership, terms of reference,
meeting structures and areas for future focus. The
sessions are stigma free, with a focus on providing a
safe space and enacting positive change, rather than
focused on the sharing of personal Care Experiences.
iLearn Module for all Staff
An iLearn module has been developed to ensure
that all staff can access basic information about The
Promise and can be signposted to further information
and how they can get involved locally. The module
covers the journey from the Independent Care Review
to The Promise, highlighting key issues and why this
work was needed. It also covers examples of local
practice such as the Promise Keeper Network and
Renfrewshire Language Policy.
The module is accessible to all staff on the e-learning
platform and can be requested by external
organisations who can receive a bespoke link.
The iLearn will be reviewed in 2026 to ensure it is
up to date and reflective of the current status of the
Promise in Renfrewshire.
Next Steps:
• Continue to promote the iLearn module across
the council and partners
Page 281 of 347

Page 282

13Renfrewshire’s Promise
Supporting the Workforce — Spotlight on Employability
all application forms for roles, with an explanation
of Care Experience. Care Experienced people would
be able to self-identify on this form if they choose to,
however there is no requirement to do so.
We are also working closely with HR around this
project to ensure that hiring managers are able to
provide a good package of feedback if the person
is unsuccessful to ensure they are able to bring that
feedback to their next interview.
Next Steps:
• Continue to liaise with HR and CMT colleagues
to launch this work
• We will be working closely with hiring
managers around the time of the launch to
ensure they are educated about this and
understand the significance
Guaranteed Interviews for Care
Experienced People who meet Minimum
Job Requirements
In July 2022, the Corporate Management Team
approved the creation of a Guaranteed Interview
Scheme for Care Experienced applicants who meet
the essential criteria of the role. An option to declare
Care Experience on myjobscotland will be in place
if the applicant wishes to share that they are Care
Experienced. This scheme aims to address some
of the barriers that Care Experienced people may
face when entering employment for the first time or
advancing through their careers.
The scheme will launch in early 2026 and a range
of briefings and learning materials will be available
for hiring managers and those involved in the
recruitment process. There will also be monitoring
of data around the uptake of the scheme.We have
been working closely with HR colleagues to ensure
that Care Experienced people are able to receive
support when applying for council roles. We are
working on introducing guaranteed interviews for
Care Experienced people who meet the minimum
requirements for job roles in the council.
This project aims to level the playing field and address
some of the barriers that many Care Experienced
people may experience when gaining experience
and qualifications. This will be clearly displayed on
Page 282 of 347

Page 283

14Renfrewshire’s Promise
Renfrewshire’s Whole Family Wellbeing Approach
is firmly rooted in the foundations of The Promise:
Voice, Family, Care, People and Scaffolding. It reflects
a shared commitment across the Children’s Services
Partnership to ensure children grow up loved, safe
and respected, with support that is relational,
compassionate and available early.
Since 2022, investment through the Scottish
Government’s Whole Family Wellbeing Fund has
strengthened early help pathways, improved access
to support, and enabled the development of an
integrated Family Wellbeing Service offering the right
help at the right time. The approach continues to
evolve through ongoing collaboration with families,
the third sector and the wider workforce, ensuring
support reflects what matters to children and those
who care for them.
The structure of the Family Wellbeing Service delivers
on The Promise’s call for a simplified, decluttered
system. It strengthens GIRFEC staged intervention,
reduces duplication, and ensures support follows
family need rather than organisational boundaries.
In line with the Promise foundations of Voice and
Scaffolding, Renfrewshire has introduced a digital
Request for Assistance, allowing children, families and
professionals to seek help directly, without stigma
or gatekeeping. This promotes equity of access and
reinforces a culture where asking for help is welcomed.
Through strong partnerships with third sector
organisations, Renfrewshire provides flexible,
relationship-centred support based on what families
say they need. This includes:
• weekend and holiday activities for children 
with ASN
• therapeutic music, arts and water-based
programmes
• parenting and early years support
• nurture-focused community activities
• support for neurodiverse families and care
experienced parents
Joint training, coproduction and shared learning help
create a coherent, joined-up system.
More than 1,000 families accessed support last year,
reflecting both the level of need and the impact
of a compassionate, accessible early help model.
Evaluation shows:
• improved child wellbeing and 
emotional regulation
• increased parental confidence
• strengthened family relationships
• reduced escalation to crisis services
This progress aligns directly with The Promise’s call
to shift practice and investment towards prevention,
relational support and community-based help.
Renfrewshire’s Whole Family Wellbeing Approach fully
embodies the foundations of The Promise. Families’
voices shape service design: digital tools improve
access and transparency; support is relational,
non-stigmatising and sustained for as long as needed;
and system scaffolding is being redesigned to
provide stable, rights-based support. The workforce
is supported through strong supervision, training and
shared values that centre relationships and uphold
children’s rights.
Next Steps
• The Family Wellbeing Manager will continue
to attend Renfrewshire’s Promise Strategic
Oversight Group to ensure accountability for
delivering the changes children and families
have asked for.
• For further information on Renfrewshire’s
Whole Family Wellbeing Approach, please
contact the Family Wellbeing Manager.
Whole Family Wellbeing Approach in Renfrewshire
Page 283 of 347

Page 284

15Renfrewshire’s Promise
The Paisley Children’s Hearings Improvement
Partnership (CHIP) has evolved as a key multi-agency
forum for driving forward change across the Children’s
Hearings System in Renfrewshire, East Renfrewshire,
and East Dunbartonshire. This demonstrates
a deepening commitment to the principles of
The Promise and recognises the importance of
collaborative, cross boundary leadership. It seeks
to create a system that is truly rights based, trauma
informed and centred on the needs and experiences
of children and young people.
The CHIP brings together a broad range of statutory
and third-sector partners, each playing a key role in
driving improvement. Core membership includes
representatives from the Scottish Children’s Reporter
Administration (SCRA), led by Locality Reporter
Managers and Senior Practitioners. Children’s
Hearings Scotland (CHS) is represented by the
Partnership Coordinator and Wellbeing Coordinator.
Senior officers from Renfrewshire, East Renfrewshire,
and East Dunbartonshire Councils participate,
including the Promise Manager and Education and
Social Work leads. Extended membership includes
Police Scotland and NHS Greater Glasgow and Clyde.
The CHIP is also seeking additional representation
from the legal profession.
Advocacy organisations such as Who Cares? Scotland,
Barnardo’s, and Partners in Advocacy ensure the
voices of children and young people inform the
improvement process. The Children 1st Safeguarders
Panel also contributes, embedding safeguarder
perspectives in discussions.
The CHIP is also advocating for wider extended
membership from key partners such as Police
Scotland, Health and Wellbeing leads, and
representatives from the legal profession, including
the local Bar Association. This diverse and inclusive
membership places the group in a strong position to
adopt a whole-system approach to improvement. It
acknowledges that a child’s experience of a Hearing
is shaped by the combined efforts of various agencies
and professionals.
Previously known as the Renfrewshire Better Hearings
Group, the forum was renamed in August 2020 to
“Keeping The Promise in Renfrewshire’s Children’s
Hearings”. This clearly signalled a pivotal shift in
purpose and alignment with the national ambition
articulated in The Promise, with a specific focus on
the Children’s Hearings System.
Since its inception, the CHIP has overseen the
development and implementation of a range
of initiatives, including the co-production of the
Renfrewshire Charter “Our Commitments to Children
and Young People Attending Hearings” and the
creation of Hearing Preparation Guidelines to support
children and young people in understanding and
participating meaningfully in their Hearings. These
resources are now being adapted for use across
the wider CHIP footprint, ensuring consistency and
shared learning across the three local authority areas.
The group’s work has been consistently informed
by SCRA’s Keeping The Promise Route Plan, which
outlines the national organisation’s commitments
to reforming the Children’s Hearings System. This
alignment ensures local developments are responsive
to the needs of children and families while contributing
effectively to national transformation efforts.
Keeping The Promise in Children’s Hearings
Page 284 of 347

Page 285

16Renfrewshire’s Promise
Keeping The Promise in Children’s Hearings 
• Embedding trauma-informed, rights-based
approaches across all aspects of the 
Hearing process.
The CHIP’s governance arrangements ensure 
strong accountability and alignment with local and
national structures.
The Chair, Nicola Harkness (Locality Reporter 
Manager, SCRA), provides regular updates to the
Renfrewshire Strategic Promise Oversight Group,
and equivalent corporate parenting forums in East
Renfrewshire and East Dunbartonshire will also be
provided updates. This ensures that the work of the
CHIP is visible, strategically aligned, and supported at
the highest levels.
Next Steps
• As the CHIP continues to evolve, the Promise
Manager will maintain active engagement in all
relevant forums and working groups
• The group will continue to monitor the
implementation of legislative changes, share
learning across local authority boundaries, and
adapt its approach in response to feedback
from children, families, and practitioners
The CHIP’s work is taking place within a rapidly
evolving legislative and policy landscape. The
implementation of the Children (Care and Justice)
(Scotland) Act 2024 and the anticipated passage of
the Children (Care, Care Experience and Services
Planning) (Scotland) Bill represent significant shifts in
how Scotland supports children and young people.
These reforms place a renewed emphasis on early
intervention, family support, and the rights of Care
Experienced children and young people. The CHIP is
actively engaging with these developments, ensuring
that local planning and practice are aligned with
emerging statutory duties and national expectations.
In response to the Scottish Government’s December
2023 reply to the Hearings for Children Report, the
CHIP had developed an Action Plan. Aligned with
The Promise and structured around the report’s
recommendations, the plan will now guide the
next phase of improvement across the three local
authority areas. Key priorities include:
• Strengthening advocacy access and uptake,
ensuring children and young people are supported
to express their views and understand their rights.
• Improving the quality and consistency of reports
and information presented at Hearings.
• Supporting the workforce through joint training,
reflective practice, and a shared understanding of
the purpose and use of compulsion.
A key area of focus over the past two years has been
the implementation and expansion of Child Friendly
Scheduling. Recognising that traditional Hearing
arrangements can be disempowering or distressing
for children, the group has led the Deferred Hearings
Project in Renfrewshire. This initiative aims to
reduce unnecessary deferrals and provide a more
personalised experience by offering children and
young people greater flexibility in the timing, location,
and format of their Hearings. The project has shown
early success in increasing participation and reducing
delays and how now being scaled up as part of
Phase 2 of the national Child Friendly Scheduling
pilot. Continued success and wider rollout will rely on
strong engagement from all agencies, particularly in
capturing the voices of children and their families.
This work is closely linked to the Taking Control of
My Hearing project, co-designed with young people
from Our Hearings, Our Voice. The project includes
two key components: redesigned Pre-Hearing Visits
(PHVs) delivered by trained SCRA support staff,
and the distribution of the “Taking Control of My
Hearing” Scrapbook, a child-friendly resource that
helps children prepare for their Hearing and express
their views. These developments reflect a clear
commitment to the Foundation of Voice, ensuring
that children are heard and actively involved in
shaping their own experiences.
Page 285 of 347

Page 286

17Renfrewshire’s Promise
Renfrewshire Community Justice Partnership
exemplifies how local justice work can support and
advance the aims of The Promise. By embedding
lived experience, promoting early intervention,
and aligning with broader strategic priorities, the
Community Justice Partnership is helping to create a
justice system that is more responsive, inclusive, and
supportive of children and families.
The partnerships work delivers justice
outcomes while also laying the foundation
for lasting societal transformation, helping
ensure every child in Renfrewshire grows
up feeling loved, safe, and respected.
Renfrewshire’s Community Justice Partnership (RCJP)
plays a vital role in delivering community justice
priorities locally, with a strong focus on collaboration,
innovation, and person-centred approaches. Its work
is closely aligned with the principles of The Promise,
especially in supporting children, young people,
and families affected by justice involvement. The
Partnerships 2024–2025 annual return to Community
Justice Scotland demonstrates how the Community
Justice Partnership has embedded The Promise into
its strategic and operational frameworks, ensuring
justice activity contributes meaningfully to improved
outcomes for families in Renfrewshire.
Central to the Community Justice Partnership’s
approach, delivered through the Community Justice
Strategic Group, is a strong commitment to early
intervention, prevention, and rehabilitation. The
partnership recognises that individuals involved in
the justice system often face complex challenges,
including poverty, trauma, mental health issues, and
substance use.
By addressing these root causes through integrated,
person-centred support, the partnership aims to
reduce reoffending and support individuals to
rebuild their lives. Effective collaboration among
justice partners is essential to when helping people
subject to community justice interventions desist
from offending. By pooling expertise, sharing
information, and creating seamless pathways tailored
to individual needs, we are better equipped to tackle
the underlying drivers of offending behaviour and
promote positive outcomes.
This approach reflects The Promise’s call for holistic,
trauma informed, and rights-based support for families
particularly those affected by parental imprisonment.
The governance structure is deliberately
designed to support and advance the
aims of The Promise. Through shared
leadership, integrated planning, cross
sector collaboration, and a strong focus on
lived experience, the partnership ensures
that justice initiatives are part of a cohesive,
child-centred approach to public service
delivery in Renfrewshire.
RCJP’s governance is closely aligned with
Renfrewshire’s Promise Strategic Oversight Group,
enabling justice initiatives to be developed within
a broader, child-centred vision. This alignment
supports shared leadership and joint planning,
especially in areas like mitigating the impact of
parental imprisonment and enhancing support for
justice affected families. Strategic and operational
sub-groups use data, lived experience, and service
insights to inform decisions thus reflecting The
Promise’s emphasis on listening to those with lived
experience and shaping services around their voices.
Community Justice and The Promise: Working Together
Page 286 of 347

Page 287

18Renfrewshire’s Promise
Community Justice and The Promise: Working Together
Next Steps
• Strengthen alignment between The Promise
Strategic Oversight Group and the Community
Justice Strategic Group to ensure unified
leadership and planning
• Integrate the needs of justice-involved families
into all relevant strategic frameworks
• Advance targeted support for children and
families affected by imprisonment, including
wraparound and community-based alternatives
• Promote staff and stakeholder engagement to
cultivate a compassionate justice culture
• Provide regular updates on joint progress and
areas for improvement to stakeholders and the
wider community
their experiences, informing service improvements.
Similarly, the Community Navigator Pilot, delivered
with Braveheart Industries, offered person centred
support and generated independent evidence on
service user experiences. These initiatives embody
The Promise’s call for co-designed services that are
respectful, effective, and shaped by those they serve.
Supporting families during and after justice
involvement is a key priority and the partnership
works with housing, health, and employability
services to ensure individuals leaving custody have
access to stable accommodation, healthcare, and
employment pathways. Integration with wider
strategic planning further reinforces the commitment
to whole-system change.
The partnership is actively working to reduce stigma
and build public confidence in community-based
justice. Through targeted communications, staff
engagement, and collaboration with the third sector,
the partnership is promoting a more compassionate
and inclusive understanding of justice and this is fully
aligned with The Promise’s vision.
The governance model is intentionally
designed to advance The Promise’s
aims through:
• Shared leadership and strategic alignment:
Both the Community Justice Strategic Group
and the Promise Strategic Oversight Group
are chaired by John Trainer, ensuring a unified
vision and seamless coordination
• Evidence informed planning: Operational sub-
groups gather insights from lived experience
and service impact to guide strategic decisions
• Cross-sector collaboration: The partnership
works closely with other strategic bodies,
including the Local Employability Partnership
and Alcohol and Drug Partnership, to ensure
justice involved individuals and their families
are considered in wider service planning
• Community and third sector engagement:
Initiatives like the Community Justice Grant
Scheme empower local organisations to
deliver justice related activities aligned with
The Promise
Participatory methods are central to the Community
Justice partnership’s approach. Projects like the
Community Payback Order (CPO) Photo Project have
provided individuals with creative platforms to share
Page 287 of 347

Page 288

19Renfrewshire’s Promise
Housing and homelessness services are integral to
Renfrewshire Council’s commitment to The Promise,
particularly in supporting Care Experienced children,
young people, and families.
The Promise sets out a clear vision: every child
and young person should grow up in a safe, stable,
and loving home. It recognises that housing
instability, including frequent moves, unsuitable
accommodation, and homelessness, can
severely impact the wellbeing, development, and
relationships of Care Experienced individuals.
Renfrewshire Council’s Environment, Housing and
Infrastructure (EH&I) Strategic Improvement Plan
(SIP) reflects this priority through a series of targeted
actions led by Housing Services and the wider EH&I
team. These actions are designed to tackle and
prevent youth homelessness and ensure that Care
Experienced young people have access to housing
pathways that are tailored, affordable, and responsive
to their individual needs and preferences.
Key commitments outlined in the
SIP include:
• Developing personalised housing pathways for
Care Experienced young people, co-designed
with partners and stakeholders
• Supporting Renfrewshire’s Promise Team and
Oversight Group, ensuring that the voices of
Care Experienced individuals are central to
service design, delivery, and evaluation
• Embedding The Promise across housing and
homelessness services, including promoting
the Promise Keeper Network, implementing
Renfrewshire’s inclusive Language Policy, and
encouraging staff to complete The Promise
i-learn module
• Reviewing service arrangements and
practices to ensure they are informed by
lived experience and reflect trauma-informed,
relationship centred approaches
• Creating meaningful feedback opportunities
for Care Experienced service users to influence
continuous improvement
• Supporting inclusive recruitment practices,
including guaranteed interviews for Care
Experienced applicants who meet essential
criteria, to promote representation within
Housing Services
Renfrewshire Council’s Housing Services: Delivering on The Promise
Page 288 of 347

Page 289

20Renfrewshire’s Promise
Renfrewshire Council’s Housing Services: Delivering on The Promise
Next Steps 
• The Promise Manager and Promise Ambassador
will continue to support Housing and
Homelessness services in relation The Promise
• Support the wider E,H&I around all aspects in
relation to The Promise
In addition to strategic planning, Renfrewshire Council
provides direct support to young people under 25
who are homeless or at risk. Youth Housing Options
Advisers conduct Housing Options Interviews to assess
individual circumstances and prevent homelessness
wherever possible. Where emergency accommodation
is required, ongoing support is provided to help young
people transition into stable housing.
Support is tailored to individual needs and may
include assistance with family reconciliation,
resettlement, tenancy sustainment, and practical life
skills such as budgeting and furnishing a home. Care
Experienced young people receive enhanced support
with housing applications, priority assessments, and
are often supported outside of formal homelessness
processes to ensure equitable access to housing and
opportunities for independent living.
Renfrewshire Housing Services remain committed
to delivering on The Promise by ensuring that Care
Experienced children, young people, and families
are supported through compassionate, responsive,
and inclusive housing solutions. The Council’s
work reflects a broader commitment to improving
outcomes and creating a system that acts with the
same care and consistency as a good parent in
never allowing a young person to leave care into
homelessness or uncertainty.
The Promise also highlights the impact of housing
insecurity as a contributing factor in children entering
care. Renfrewshire Council has embedded early
intervention strategies within its services to support
families at risk of eviction, overcrowding, or poor living
conditions. This preventative work is aligned with the
SIP’s cross cutting theme of Improving Outcomes for
Children and Families, ensuring that housing services
contribute to safe and nurturing environments.
Support for kinship and foster carers is another
critical area. Housing Services work to ensure that
carers particularly those supporting sibling groups
have access to appropriate housing that offers space,
stability, and security. The council acknowledges the
significant responsibilities many carers undertake
and is committed to addressing housing and financial
barriers to support sustainable, nurturing placements.
Renfrewshire Council’s Housing Services approach
is increasingly trauma-informed and relationship
centred, aligning with The Promise’s call for a joined-up
system across services. Housing policy and practice are
being shaped to reflect the complex realities of Care
Experienced individuals, ensuring that services are
accessible as well as empathetic and empowering.
Page 289 of 347

Page 290

21Renfrewshire’s Promise
Renfrewshire has successfully delivered two projects
funded through the Scottish Government’s Promise
Partnership Fund, administered by Corra between
December 2022 and December 2025.
Both initiatives focus on the theme of Supportive
School Structures (Right to Education), aiming
to foster environments that promote support,
opportunity, and a strong sense of belonging for Care
Experienced pupils within schools.
Keep The Promise Funded Project 1
The Promise Partnership project at Johnstone High
School in Renfrewshire was developed to reduce
exclusion and improve outcomes for children and
young people with Care Experience. The central aim
was to ensure that every Care Experienced pupil had
a consistent and trusted adult who could advocate
for them throughout their educational journey. This
approach was co-produced with Care Experienced
pupils, ensuring that their voices shaped the design
and delivery of the support they received. This directly
reflects the Foundation of Voice, which emphasises
the importance of listening to children and involving
them meaningfully in decisions about their lives.
The school has delivered meaningful
and lasting change for Care Experienced
children and young people. Through
dedicated roles, inclusive spaces, data-
informed support, and strong partnerships,
the school has created an environment
where pupils feel seen, heard, and valued.
The creation of the Principal Teacher of The Promise
role and the Promise Key Worker role provided
dedicated advocacy and support. These roles were
designed in collaboration with pupils and focused on
improving attendance, participation, and wellbeing.
The presence of these trusted adults helped pupils
feel seen, heard, and valued, and contributed to a
more inclusive and nurturing school culture. The
development of these roles also influenced wider
practice across Renfrewshire, with other schools
exploring similar models of support.
A key feature of the project was the establishment
of The Cove, a safe and stigma-free space within the
school where Care Experienced pupils could access
support, build relationships, and engage in wellbeing
activities. The Cove became a central part of the
school’s trauma-informed approach and provided a
consistent environment where pupils felt secure and
supported. This initiative aligns with the Foundation
of Care, which calls for children who cannot live
with their families to be cared for in loving and
stable environments.
The project also included contextual safeguarding
activity delivered in partnership with Barnardo’s. This
approach recognises that young people may face
risks outside their home environment, such as in
school or the wider community. Barnardo’s worked
closely with the school leadership team to conduct a
safety audit and implement safeguarding strategies
tailored to the local context. These efforts contributed
to a safer and more responsive environment for all
pupils, particularly those with Care Experience. This
work reflects the Foundation of Scaffolding, which
emphasises the need for systems of support that are
ready and responsive when required.
Renfrewshire’s Promise Partnership Projects in Education
Page 290 of 347

Page 291

22Renfrewshire’s Promise
Renfrewshire’s Promise Partnership Projects in Education
The Corra Foundation provided highly positive
feedback on the final report, commending its
comprehensive and reflective approach. They
highlighted strong leadership, meaningful
co-production, and effective partnership
working, while recognising the development of
dedicated roles and data systems as thoughtful and
sustainable progress.
Despite its successes, the project faced challenges,
including rising costs due to inflation and national
pay awards. These financial pressures required careful
budget management and prioritisation. The school
responded by reallocating funds to sustain key roles
and activities, demonstrating strategic foresight and
commitment to the work. Staff transitions also posed
a barrier, particularly when the original Principal
Teacher of The Promise moved to a new role. However,
an internal recruitment process and a well-supported
handover ensured continuity of support for pupils.
and school. Flexible meeting formats and community-
based activities reduced barriers to engagement
and promoted a more inclusive approach. This
work aligns with the Foundation of Family, which
emphasises the importance of supporting families to
stay together and nurture loving relationships.
The project was overseen by the Promise Manager and
aligned strategically through the Promise Strategic
Oversight Group. Regular updates were provided
by the Head of Education for Inclusion, ensuring
that learning was shared across Renfrewshire’s
Children’s Services Partnership. The work was also
captured on Renfrewshire’s Promise Mapping Tool,
which links local activity to national priorities and
enables dissemination through the Promise Keeper
Network. These mechanisms reflect the Foundation
of Scaffolding by ensuring that systems of support are
coordinated, accountable, and responsive.
Learning from the project was shared through
various channels, including Education Managers,
School Senior Leadership Networks, and national
forums. Collaboration with Promise Scotland’s
Communications Team led to the inclusion of
Johnstone High School in the Stories of Change
Project, ensuring that insights and impact from
the initiative could be shared across Scotland.
This commitment to reflection and continuous
improvement is central to The Promise’s vision for a
system that listens, learns, and adapts.
To support early intervention and personalised
care, the school developed a Wellbeing Tracker
informed by SHANARRI indicators and the Glasgow
Motivation and Wellbeing Profile. This tool enabled
staff to monitor pupil wellbeing in real time, identify
emerging issues, and deliver timely support. The
tracker also provided a mechanism for pupils to
reflect on their own experiences and contribute
to the evaluation of support strategies. This data-
informed approach aligns with The Promise’s call for
improved data systems that focus on outcomes and
experiences rather than administrative processes.
Staff development was a key component of the
project. Training in trauma-informed practice,
contextual safeguarding, and inclusive pedagogy
increased staff confidence and capability. Teachers
and support staff reported feeling better equipped
to identify and respond to the needs of Care
Experienced pupils. The school leadership team
played a vital role in modelling a culture of care and
ensuring that staff wellbeing was prioritised alongside
pupil outcomes. This reflects the Foundation of
People, which calls for a workforce that is supported
to build nurturing and compassionate relationships.
Family engagement was enhanced through
inclusive events and the creation of Parent and Carer
Ambassador Groups. These groups provided families
with a platform to influence policy and practice and
helped to strengthen relationships between home
Page 291 of 347

Page 292

23Renfrewshire’s Promise
Renfrewshire’s Promise Partnership Projects in Education
The Promise Team, comprising a Principal Teacher
of Inclusion and a Project Leader for Enhanced
Transition Support, played a central role in reshaping
the school’s approach to transitions. Their work
focused on identifying what worked well within
existing practices and creatively amplifying those
elements to provide intensive, tailored support for
pupils allocated a secondary school place towards
the end of their primary seven year. This included the
development of enhanced transition programmes,
summer activities and one-to-one wellbeing sessions,
all designed to build trust, reduce anxiety and foster a
sense of belonging.
The project was underpinned by the principles and
foundations of The Promise, particularly those of
Voice, Family, Care, People and Scaffolding. The
Foundation of Voice was reflected in the school’s
commitment to listening to children and families.
Keep The Promise Funded Project 2
The recently concluded Promise Partnership project
at St Andrew’s Academy in Renfrewshire has been
a transformative initiative focused on improving
transitions for Care Experienced pupils. Transitions
are a natural part of school life, but for young people
with Care Experience, they can be particularly
challenging and destabilising. This project recognised
that late or unplanned transitions often result in
missed opportunities for emotional preparation,
relationship-building and continuity of support. In
response, the school established a dedicated Promise
Team to address these challenges and ensure that
every child, particularly those with Care Experience,
receives the support they need to thrive.
The Promise Partnership project at St
Andrew’s Academy has turned ambition
into action. It has built a caring, inclusive,
and rights-focused culture that is now at
the heart of the school.
Key lessons from the project include the importance
of strategic leadership, co-production, and flexible,
stigma-free engagement with families. The value
of dedicated advocacy roles and real-time data
systems was clearly demonstrated, as was the need
for succession planning and sustainability. The school
has already taken steps to embed aspects of the
Principal Teacher of The Promise role into a Project
Lead position and has secured additional funding to
extend the Promise Worker role until December 2025.
The school and wider Children’s Services in
Renfrewshire are committed to building on the
progress made. Successful practices are being
integrated into School Improvement Plans and the
Education Quality Improvement Framework, ensuring
they become embedded in the system rather
than remaining standalone projects. The culture
of reflection, openness, and adaptability fostered
through this work will continue to inform strategic
planning and operational delivery.
The work has influenced wider practice across
Renfrewshire and contributed to a national dialogue
on how to Keep The Promise. The legacy of this project
will continue to shape policy, practice, and culture,
ensuring that the needs and voices of Care Experienced
pupils remain at the heart of education and care.
Page 292 of 347

Page 293

24Renfrewshire’s Promise
Renfrewshire’s Promise Partnership Projects in Education
Learning from the initiative was shared with the
Children’s Services Partnership and Renfrewshire’s
Promise Strategic Oversight Group. This ensured that
insights were disseminated across internal and external
children’s services partners, fostering a collaborative
ecosystem that supports systemic change. The project
also informed Renfrewshire’s Education Improvement
Framework, with key messages communicated to
School Senior Management Teams and incorporated
into future planning.
The Head of Education (Inclusion) played a vital
role in supporting and sustaining the project.
Regular meetings with the Promise Manager and
the school’s leadership team ensured strategic
alignment and forward planning. Development
of School Improvement Guidance and associated
resources for sharing across Renfrewshire schools
has been planned and is fully supported by the Head
of Education (Inclusion). This next phase will focus
on policy development, resource creation and the
scaling of successful practices, ensuring that the
legacy of the project continues to inform and inspire.
Association extended the reach of support beyond the
classroom and into the wider community.
The Foundation of Scaffolding was realised through
the development of a centralised data dashboard
to monitor wellbeing, attendance and attainment.
This tool enabled the school to identify trends, target
interventions and make evidence-informed decisions.
The dashboard complemented the Renfrewshire
Promise Mapping Tool, which was used to capture
learning and monitor progress. The school also
maintained regular reporting to oversight groups
and fulfilled its contractual obligations with the Corra
Foundation, which provided funding and support
throughout the project.
Staff development was a key component of the
project and aligned with the Foundation of People.
Staff at St Andrew’s Academy reported feeling
empowered and supported, with professional
learning opportunities tailored to their needs.
The introduction of a Continuing Professional
Learning and Leadership programme for support
staff and plans for Non-Violent Resistance training
demonstrated a whole-school commitment to
relational practice.
The Pupil Parliament, with thematic committees such
as “Be Supported” and “Be Respectful,” played a key
role in shaping school policy and practice. Pupils
led initiatives to raise awareness of support services,
reduce stigma and promote rights-based approaches.
Similarly, the Parent and Carer Ambassador Group
co-produced communication materials and child-
friendly policies, ensuring that families were active
contributors to the school’s direction.
By valuing relationships, listening to
children and families, and staying true
to The Promise, the school has created a
space where Care Experienced pupils can
truly thrive.
The Foundation of Family was evident in the school’s
wraparound support model. The Promise Team
worked closely with cluster primary schools to ensure
continuity of care and smoother transitions. The
Home Link Summer Transition Programme, delivered
during the holidays, became a model of best practice.
It offered creative and relational activities that
strengthened family-school connections and helped
pupils feel more confident and prepared for secondary
school. Partnerships with organisations such as Who
Cares? Scotland, Barnardo’s and the Scottish Football
Page 293 of 347

Page 294

25Renfrewshire’s Promise
Renfrewshire’s Promise Partnership Projects in Education
Next Steps 
• Support the embedding of effective practices
within School Improvement Plans and the
Education Quality Improvement Framework to
ensure sustainability
• Strengthen partnerships with organisations
such as Barnardo’s and Who Cares? Scotland
to enhance support beyond the classroom
• Disseminate learning through the Children’s
Services Partnership, Strategic Oversight Group,
and relevant leadership networks
• Share outcomes and insights via national
platforms, including the Promise Keeper
Network and Stories of Change Project
• Influence national policy and practice by
promoting Renfrewshire’s inclusive
education model
Despite rising costs and recruitment delays, the
school remained on track to spend the investment in
line with the agreed budget. Internal contributions
were secured to supplement staffing costs and
sustain key interventions. The decision to extend the
project timeline to align with the academic year was
both pragmatic and impactful, allowing for coherent
delivery and maximised benefit.
Feedback from the Corra Foundation was
overwhelmingly positive. The Foundation recognised
the school’s commitment to trauma-informed
practice, pupil voice and family engagement.
Corra’s acknowledgement of the tangible impact for
children, families and staff affirms the value of the
work and opens the door for continued dialogue
and collaboration.
The development of a Promise Charter, led by
senior Care Experienced pupils, will further embed
the values and commitments of The Promise into
the school’s culture. The expansion of the school’s
Promise Ambassador roles, continued professional
development and strengthened partnerships will
ensure that the progress made is sustained. St
Andrew’s Academy remains committed to sharing its
learning across Renfrewshire and beyond, contributing
to the wider movement to ensure that all children in
Scotland grow up loved, safe and respected.
Page 294 of 347

Page 295

26Renfrewshire’s Promise
The Communities that Care (CtC) programme,
delivered in partnership by Who Cares? Scotland
represents a transformative approach to supporting
Care Experienced children and young people in
Renfrewshire. Initially developed and piloted within
the local authority, the programme has grown into
a nationally recognised model for creating inclusive,
empathetic school environments.
The Communities that Care programme
has made a profound and lasting impact in
Renfrewshire. Through training, curriculum
integration, community engagement, and
pupil participation, it has created more
caring and inclusive school environments
for Care Experienced children and young
people. It has challenged stigma, fostered
empathy, and empowered pupils and staff
to become champions of care.
At its core, CtC is a whole-school approach designed
to nurture and support Care Experienced pupils
by educating entire school communities including
pupils, staff, and parents/carers about what Care
Experience is and why it matters. Through training,
curriculum integration, and community engagement,
the programme fosters an ethos of empathy,
understanding, and inclusion. It is a tangible way for
Renfrewshire to keep the Promise.
Addressing Stigma and Misunderstanding
Care Experienced people often face stigma and
discrimination within their communities, driven by
a lack of public understanding and harmful media
stereotypes that portray them as damaged or
troubled. These misconceptions can lead to exclusion,
isolation, and reduced opportunities. Schools, as
central institutions in young people’s lives, offer a
powerful platform to challenge these narratives and
build a more informed and compassionate society.
By educating pupils about Care Experience in a
developmentally appropriate and trauma-informed
way, CtC helps shift perceptions and attitudes. Pupils
who learn about care are more likely to become
empathetic adults, future employers, colleagues,
and corporate parents who understand and support
Care Experienced individuals. This ripple effect
extends beyond the classroom, influencing families,
communities, and future generations.
A Whole-School Approach to Inclusion
The CtC whole-school approach ensures that
Care Experienced children and young people are
acknowledged and actively supported within their
school environments. This is achieved through a
combination of staff training, curriculum delivery, and
community engagement. The programme creates
the conditions for Care Experienced pupils to thrive,
both academically and socially, by fostering a sense of
belonging and respect.
In Renfrewshire, the programme has been widely
adopted. By March 2025, all 63 schools in the
authority had completed Stage 1 “Care Aware”
training, equipping staff with the knowledge and
confidence to support Care Experienced pupils. A
further 61 schools progressed to Stage 2 “Curriculum
Delivery” training, and 43 schools were actively
delivering lessons using the CtC Curriculum Pack. An
additional 10 schools committed to delivery by the
end of the academic year, bringing the total to 85% of
schools engaged in lesson delivery.
Beyond schools, over 500 sector partners,
including newly qualified teachers and active
schools’ coordinators, received Care Aware training.
This extended the programme’s reach into the
wider educational ecosystem, reinforcing its impact
and sustainability.
Communities that Care: Building Inclusive School Communities
Page 295 of 347

Page 296

27Renfrewshire’s Promise
Communities that Care: Building Inclusive School Communities
Empowering Pupil Voice and
Participation
CtC places a strong emphasis on pupil voice, ensuring
that Care Experienced children and young people have
opportunities to express themselves, influence change,
and connect with others who share similar experiences.
Pupils participated in Who Cares? Scotland’s local
participation groups, supported by volunteers, and the
project team attended Pupil Council meetings to gather
feedback and refine the programme.
These participatory elements helped ensure that CtC
was responsive to pupils’ needs and aspirations. They
also empowered Care Experienced learners to take
pride in their identity, understand their rights, and
advocate for themselves and others.
Supporting Care Experienced Pupils
Beyond the Classroom
The CtC programme also provided direct support
to schools in responding to the complex needs of
Care Experienced pupils. This included guidance on
housing and education funding, advocacy referrals,
support for kinship carers, and assistance following
placement breakdowns and loss of mental health
services. These interventions ensured that pupils
received the right support at the right time, reinforcing
the programme’s holistic approach.
Schools embraced opportunities to celebrate
Care Experience through events such as Care Day
(February) and Care Experience Week (October).
Activities included love rallies, special assemblies, and
fundraising efforts for Who Cares? Scotland.
Curriculum Integration: Learning About
Care Experience
At the heart of the CtC approach are the “Learning
About Care Experience” PSE Curriculum Resource
Packs, which provide structured lessons for pupils
from Early Years through to S6. These resources
are designed to be age-appropriate, engaging,
and sensitive, helping children and young people
understand Care Experience as a different type of
family structure.
The curriculum encourages pupils to reflect on
empathy, inclusion, and respect, and to consider
how they can support their Care Experienced
peers. Teachers reported that the lessons prompted
meaningful discussions, with some pupils sharing
personal experiences and others expressing a desire
to help. Supplementary activities, such as exploring
Care Experienced celebrities and engaging with the
UNCRC, further enriched the learning experience.
Feedback from 783 pupils across seven secondary
schools showed a significantly positive impact. Pupils
reported increased knowledge, greater empathy, and
a stronger commitment to inclusion. Comments
such as “This will help me in the future” and “I feel
sympathetic towards the children experiencing this”
illustrate the depth of understanding fostered through
the CtC lessons.
Page 296 of 347

Page 297

28Renfrewshire’s Promise
Communities that Care: Building Inclusive School Communities
Next Steps
• Schools retain access to the Curriculum &
Resource Pack and will be encouraged to
continue lesson
Professional Growth and Cultural Change
Teachers and school staff reported that the
CtC programme had a positive impact on their
professional practice and personal understanding.
Some staff shared their own Care Experiences or
those of family members, reflecting on how the
programme helped them connect more deeply with
their pupils. This openness contributed to a culture
of authenticity and empathy within schools, further
strengthening the programme’s impact.
The CtC approach has helped shift school cultures
towards greater inclusivity, compassion, and
awareness. It has created environments where Care
Experienced pupils feel seen, heard, and supported,
and where all pupils learn the values of respect and
understanding.
As Renfrewshire continues its journey to Keep the
Promise, CtC stands as a model of what is possible
when education and advocacy come together to
support those who need it most. The programme’s
legacy will continue to shape attitudes, practices,
and outcomes for years to come ensuring that Care
Experienced learners have every opportunity to thrive.
Although Who Cares? Scotland’s direct involvement in
Renfrewshire schools has now concluded, the legacy
of CtC remains strong.
Page 297 of 347

Page 298

29Renfrewshire’s Promise
Stronger Start is a person-centred wrap-around
service that provides embedded Money Advice and
Advocacy to pregnant women and their families who
engage with maternity services across Renfrewshire,
Inverclyde, and West Dunbartonshire.
Co-located within the Royal Alexandra Hospital (RAH)
Maternity Unit, Stronger Start is designed to meet
vulnerable women where they are emotionally, and
socially offering timely, compassionate support that
reflects the principles of The Promise.
Stronger Start is more than a financial
advice service it is a transformational
model of early intervention, family support,
and rights-based advocacy that reflects the
values and ambitions of The Promise.
By embedding support within maternity services,
Stronger Start reaches families at a critical
juncture, offering help that is timely, compassionate,
and effective.
The Stronger Start service is a preventative and
person-centred intervention, recognising that
financial insecurity, housing instability, and lack
of advocacy are significant contributors to poor
maternal and infant outcomes. The service provides
comprehensive support in areas such as welfare
rights, debt management, income maximisation,
and financial capability, while also offering advocacy
to help families navigate complex systems and
access their entitlements. This holistic approach
addresses immediate needs and also builds resilience,
strengthens family units, and promotes
long-term wellbeing.
Stronger Start: Embedding The Promise in Maternity Support
Page 298 of 347

Page 299

30Renfrewshire’s Promise
Stronger Start: Embedding The Promise in Maternity Support
Alignment with The Promise
The Promise has a particular emphasis on early
intervention, family support, and trauma-informed
care. Stronger Start embodies these principles in
several key ways:
Early Intervention in Maternity Care
The Promise highlights the importance of universal
family support and early years parenting as critical
stages for intervention. Stronger Start engages with
women during pregnancy, a time of heightened
vulnerability and opportunity. By embedding support
within maternity services, Stronger Start ensures that
families receive help before crisis point, reducing
the likelihood of child protection involvement and
promoting positive parenting outcomes.
This approach reflects The Promise’s call for universal,
non-stigmatising support that is accessible to all
families, particularly those facing poverty, trauma, or
systemic barriers. Stronger Start’s integration with
Blossom Maternity Services ensures that support
is offered in a trusted setting, by professionals who
understand the complexities of maternal health and
family dynamics.
Supporting Infant Wellbeing and
Attachment
The Promise emphasises the importance of secure
attachments, co-regulation, and early childhood
development. Stronger Start contributes to these
outcomes by reducing stressors that undermine
parental capacity such as financial hardship, housing
insecurity, and poor health and wellbeing. . By
helping parents stabilise their circumstances, Stronger
Start creates the conditions for nurturing relationships
and healthy infant development.
The service recognises that poverty is a key
determinant of maternal and infant health,
contributing to increased risks of poor health
outcomes. Stronger Start’s money advice support
directly addresses this, helping families to afford
essentials, access entitlements, and plan for their
baby’s arrival. This includes support with baby items,
benefits applications, and budgeting, which are
crucial for families who may otherwise struggle to
meet their child’s basic needs.
Advocacy and Rights-Based Support
The Promise calls for children and families to be
heard, respected, and supported to access their rights.
Stronger Start’s advocacy component ensures that
women are actively supported to navigate systems
that may otherwise be inaccessible or intimidating, as
well as being supported to engage with services such
as social work or housing to overcome challenges
This is particularly important for Care Experienced
parents, who may face structural discrimination and
stigma when engaging with services. Stronger Start
provides a safe, non-judgemental space for these
parents to receive support, helping to break cycles of
trauma and prevent unnecessary family separation.
Page 299 of 347

Page 300

31Renfrewshire’s Promise
Stronger Start: Embedding The Promise in Maternity Support
Ongoing monitoring and evaluation will be
undertaken by the Steering Group in partnership with
RCAB to assess outcomes, enhance service delivery
and inform long term sustainability planning. An
external evaluation is currently underway to assess the
broader impact of the service, including its influence
on engagement with social work, housing stability,
homelessness prevention, and improvements in
maternal and infant health and wellbeing.
Next Steps 
• The Stronger Start project is committed to
deepening its alignment with The Promise
• Continued attendance of The Promise
Manager at the Steering Group to ensure
strategic alignment and shared learning
• Presentation of Stronger Start progress
to Renfrewshire’s Promise Strategic
Oversight Group.
Governance and Strategic Development
Stronger Start was developed through a multi-
agency Steering Group, chaired by the Renfrewshire
HSCP Health Improvement Team, and includes
representation from:
• Renfrewshire Council, including
The Promise Manager
• NHS Greater Glasgow and Clyde GC
Maternity Services
• Renfrewshire Citizens Advice Bureau (RCAB)
• Inverclyde and West Dunbartonshire HSCPs
This collaborative governance structure reflects The
Promise’s emphasis on joined-up working, shared
responsibility, and community-based support.
The Steering Group oversees the development,
implementation, monitoring, and evaluation of
the service, ensuring that Stronger Start remains
responsive to the needs of families and aligned with
national priorities.
Initial funding for the pilot was secured in September
2023 through the Improving Lives National Lottery
Community Fund, with a further two years of funding
awarded in November 2024, extending the service until
January 2027. This sustained investment demonstrates
confidence in the model and its potential to deliver
cost savings, cost avoidance, and positive outcomes.
Page 300 of 347

Page 301

32Renfrewshire’s Promise
Circuit is a pioneering initiative that reimagines
digital education and creative technology for young
people with Care Experience. Developed through a
collaborative partnership led by YMCA Scotland and
with Renfrewshire Council as one of the consortium
of partners. This initiative is shaped by young people
with lived experience of care, Circuit is more than a
physical space, it is a movement rooted in co-design,
empowerment, and inclusion.
Launched in Dundee and Renfrewshire, Circuit offers
12-week programmes that introduce participants to a
wide range of digital skills, from filmmaking and game
design to coding and creative media production.
These programmes are delivered in pop up maker
spaces equipped with innovative technology,
including high spec computers, industry standard
software, and digital fabrication tools.
Circuit is designed to be a safe, inclusive, and
inspiring environment where Care Experienced young
people can explore their interests, build confidence,
and develop skills for future employment in the tech
and creative sectors.
The ethos of Circuit aligns closely with
the principles of The Promise, ensuring
that Care Experienced young people are
supported to thrive, feel a sense
of belonging, and have access to
meaningful opportunities.
Every aspect of the programme from workshop
content to physical design has been co-created
with Project Consultants, young people with Care
Experience who are paid for their expertise and
insight. This approach ensures that Circuit reflects the
real needs and aspirations of its participants, and that
their voices are central to decision-making.
The first Circuit hub was launched in partnership
with NEoN Digital Arts in Dundee, where participants
progressed from basic digital literacy to advanced
creative projects, including packaging design using
Canva and vinyl sticker production. The second hub,
based at Paisley YMCA, continues this model, with
bookings available via the Circuit website.
In addition to YMCA Scotland and Renfrewshire
Council, Circuit is supported by a consortium
of partners including YouthLink Scotland, Mhor
Collective, Barnardo’s Scotland and previously
Scottish Tech Army.
The programme is funded by the National Lottery
Community Fund through the Life Changes Trust and
contributes to Renfrewshire Council’s work on The
Promise and its Digital Strategy, particularly around
digital inclusion and citizenship.
Peter Gilchrist, National Digital Project Lead at YMCA
Scotland, commented:
“Circuit is a testament to the power of collaboration
and community. With the support of all our partners
including Renfrewshire Council and the generosity
of the Life Changes Trust, we are paving the way for a
brighter future for young people with Care Experience.”
By embedding co-design, accessibility, and
empowerment at its core, Circuit is helping
to realise the ambitions of The Promise
ensuring that Care Experienced young
people grow up loved, safe, and respected,
with every opportunity to flourish.
Circuit: Reimagining Digital Education and Creative Technology
Page 301 of 347

Page 302

33Renfrewshire’s Promise
Circuit: Reimagining Digital Education and Creative Technology
In addition to supporting young people directly,
Circuit also provides training and confidence building
opportunities for foster carers, residential staff, and
social care professionals ensuring a holistic approach
to digital inclusion.
Renfrewshire Council, in partnership with the Circuit
Project, the Promise Team, and Invest in Renfrewshire,
has supported a Modern Apprentice placement within
Youth Services. This reflects our commitment to
creating a lasting legacy and enhancing opportunities
for Care Experienced young people.
Next Steps
• The Promise Manager and a representative
from Youth Services will continue to represent
Renfrewshire Council on the Steering Group
• Raise awareness of the programme
across Renfrewshire
Page 302 of 347

Page 303

34Renfrewshire’s Promise
Renfrewshire Promise Team:
Maurice Gilligan, Promise Manager
maurice.gilligan@renfrewshire.gov.uk
Sam Macrae, Promise Ambassador
samantha.macrae@renfrewshire.gov.uk
Promise Manager
My name is Maurice Gilligan, Renfrewshire’s
Promise Manager and a member of the Children’s
Services Senior Leadership Team. I lead the
strategic implementation of The Promise across
Renfrewshire, working in close partnership with
Scottish Government, COSLA, Promise Scotland,
and a range of statutory and third-sector agencies. I
hold responsibility for coordinating Renfrewshire’s
Children’s Services Partnership response, ensuring
alignment with national priorities and driving forward
transformational change.
I lead multi-agency planning and implementation
efforts aligned with The Promise, working in
close partnership with the Health and Social Care
Partnership, NHS Greater Glasgow and Clyde,
community organisations, and the third sector. My
role focuses on embedding The Promise across
services to ensure lasting, meaningful change. I also
contribute to Renfrewshire’s broader improvement
agenda, championing approaches that place children,
young people, and families at the centre of service
design and delivery.
Beyond my core role, I bring experience from senior
leadership positions at Skills Development Scotland
and I also serve as a non-executive Director at
Scotwest Credit Union, supporting ethical financial
inclusion and community empowerment.
Promise Ambassador
My name is Sam Macrae, and I am The Promise
Ambassador for Renfrewshire Council. I have been
in post since July 2021 and was involved in the
Independent Care Review during its discovery stage.
My role focuses on supporting individual teams
and services to consider how they can keep The
Promise and consider the needs of Care Experienced
children, young people and their families. I co-chair
the Supporting the Workforce group for The Promise
to ensure the council is providing employment
opportunities and support to people with Care
Experience. My role also supports staff to consider
how they can embed the voice of Care Experienced
people in their service provision and design.
In 2025, I was selected as a 30 Under 30 by the Young
Women’s Movement, recognising the achievements
of young women in Scotland. I spent five years
as a trustee, and more recently Vice Chair/ Acting
Chair of Outside ProjectChange, a charity focused
on supporting the creation of an inclusive and
supportive care community. I am also a trustee of the
Unite Foundation who provide free accommodation
and scholarships to Care Experienced and Estranged
young people at partner universities.
Promise Team Contact Information and Biographies
Sam and Maurice
Page 303 of 347

Page 304

35Renfrewshire’s Promise
Established in 2021 and chaired by John Trainer, Chief
Social Work Officer, this group oversees the delivery
of The Promise across Renfrewshire. It reports to
Renfrewshire’s Children’s Services Partnership and
meets three to four times a year.
With representation from Renfrewshire Council,
HSCP, third sector organisations, Promise Scotland,
and other community planning partners, the group
ensures a collaborative, cross-sector approach.
It drives forward Renfrewshire’s commitment to
Keeping The Promise, ensuring services are inclusive,
responsive, and shaped by Care Experienced voices.
Current membership of Promise
Oversight Group (correct as of
December 2025):
• Carolanne Moore, Strategic CLD Manager,
Connected Communities,
Renfrewshire Council (RC)
• Emma Henry - Head of Education, RC
• Felix Haggerty - Professional Training and
Development Manager, Renfrewshire
Children’s Services & Renfrewshire Health &
Social Care Partnership (RHSCP)
• Fiona Williams - Depute Principal Educational
Psychologist, RC
• Jamie Gardyne - Community Justice Lead
Officer, RC
• Jean Brierley - Education Officer (Inclusion), RC
• Joanne Byrne - Children’s Services Manager,
RHSCP
• Joanne Felvus - Children’s Service Manager
(Threads), Barnardo’s
• John Trainer - Head of Childcare and Criminal
Justice / Chief Social Work Officer, RC
• Kevin Smith - Children’s Services Manager, RC
• Lauren Johnston - Service Improvement
Manager, Children’s Services, RC
• Louise Bouchier-Hayes - Promise Delivery
Partner, Promise Scotland
• Louise Feely – Head of Housing, RC
• Martin Mathieson- Assistant Director,
Barnardos Scotland
• Maurice Gilligan – Promise Manager, RC
• Michelle McCargo - Children’s Services
Manager, Social Work
• Nicola Harkness - Locality Reporter Manager,
SCRA
• Pauline Robbie - Head of Service, RHSCP
• Ruth Wallace - Child Protection Advisor, RC
• Sam Macrae – Promise Ambassador, RC
• Scott Campbell- Head of Student Services,
West College Scotland
• Sharon Berrie – Advocacy & Participation
Manager, Who Cares? Scotland
• Suzie Scott – Area Manager,
Skills Development Scotland
• TBC - Whole Family Wellbeing Manager, RC
• Tom Irvine - Homeless & Housing Support
Services Manager, RC
• Victoria Hollows- Chief Executive, OneRen
Appendix 1 — Renfrewshire’s Promise Strategic Oversight Group
Page 304 of 347

Page 305

36Renfrewshire’s Promise
The Promise in brief:
Scotland’s ambition is that every child
and young person should grow up safe,
loved and respected. The conclusions
of Scotland’s Independent Care Review
set out the changes that need to take
place to achieve this for Care Experienced
children and young people. Scotland’s
promise is that these conclusions will be
implemented in full by 2030 at the latest.
What is The Promise?
Between 2017 and 2020, Scotland’s Independent Care
Review heard the experiences of over 5,500 people,
who included: 
• Care Experienced infants, children, young people
and adults
• members of the paid and unpaid workforce of
Scotland’s ‘care system.’
Their vision was set out in the Independent Care
Review’s conclusions. In 2020, the Scottish Parliament
agreed to keep these conclusions in full. And, when it
did, it made a promise.
Background to The Promise
Parenting does not stop at 18. Scotland must continue
to consider how to create Scotland’s ambition that
all children will grow up loved, safe and respected
so that they meet their full potential. However, in
Scotland, Care Experienced people are not always
as loved, safe and respected as they should be. In
2020, the conclusions of Scotland’s Independent Care
Review made a series of recommendations about
how this had to change. The Promise is that Scotland
will implement these recommendations in full by
2030 at the latest.
What was the Independent Care Review?
The Independent Care Review was a consultation into
how Scotland’s “care system” needed to change. It
came from a place of activism and voice, following
the work of a movement of Care Experienced
people across Scotland— who were determined to
improve the life chances of people with experience
of care. In 2016, this movement secured a cross-party
commitment to an Independent Care Review ahead of
elections to the Scottish Parliament. Following these,
the then First Minister pledged her support announcing
an independent root and branch review of care.
The process of the Independent
Care Review
The Independent Care Review commenced in 2017
and concluded in 2020. In that time, it listened to
what thousands of children, adults and families told
them about their experiences of the “care system.” It
also heard from thousands of others: parents, carers
and members of the paid and unpaid workforce.
And it heard from over 500 organisations, including:
schools and universities, think tanks, The Curious
Collaborative of Funders, corporate parents, and
national bodies. The scope was intentionally wide,
so that it could be a true reflection of what was
experienced for children and families as well as for
those working in and around the system. The aim was
to speak to everyone who would come into contact
with children and their families throughout their care
journeys and beyond.
Finally, over 150 volunteers used 943 research sources
to produce 56 outputs in areas including: education,
health, data, inspection, regulation, and justice.
Appendix 2 — What is The Promise
Page 305 of 347

Page 306

37Renfrewshire’s Promise
Appendix 2 — What is The Promise
Whose role is it to keep The Promise?
Scotland committed to The Promise, so people
and organisations throughout the public sector
are working to keep it. Among them are: Scottish
Government, COSLA, Local Authorities, The NHS,
Social workers, and Teachers. This is far from an
exhaustive list. As well as this, other people and
organisations may also do work to keep The Promise
including those in the third sector.
The Promise has five foundations which change is
centred around. These are:
• Voice: Children and young people must be
listened to and involved in decision making
about their care
• Family: Where children are safe with their families
and feel love, they should stay with them.
They should be given support to overcome
any difficulties
• Care: When it is not possible for children and
young people to remain with their family, children
must stay with their brothers and sisters wherever
it is safe to do so. They must also belong to a
loving home, where they are able to stay for as
long as needed
• People: The workforce must be supported to
develop trusting, compassionate relationships with
those they support. They must also be aware of the
importance of listening during decision making
• Scaffolding: Children, families and the workforce
must be supported by a system that is there
when it is needed: the scaffolding of help, support
and accountability
The Promise is formed from the
Independent Care Review’s conclusions.
The Care Review published its conclusions in
February 2020. These conclusions were made up of
seven reports:
• The Promise, which outlines the vision for a
Scotland where Care Experienced children and
young people can all grow up loved, safe and
respected
• The Pinky Promise, which explains this vision in a
child friendly way, follow the money, 
which tracked where investment went in the
“care system”
• The money, which reflected how any investment
in how we care for Scotland’s children and families
could be better spent to impact their lives
• The plan, which laid out that for Scotland to keep
The Promise, there needed to be a radical redesign
of care
• The rules, which highlighted the legislation,
policies, and organisations which govern the
care system
• Thank you, which aimed to acknowledge and
thank the thousands of people who made the
Independent Care Review happen
Page 306 of 347

Page 307

38Renfrewshire’s Promise
Appendix 2 — What is The Promise
Who nationally helps make sure The
Promise is kept?
The Promise Scotland: The organisation established
by Scottish Ministers to drive and support the change
required for Scotland to keep The Promise.
• The Oversight Board: The Oversight Board
monitors the pace and performance of the change
required for Scotland to keep The Promise
• The Promise Collective: A group that has been
brought together to support the development of
assessment of change
• Independent Strategic Advisor: Fiona Duncan
is Independent Strategic Advisor for The Promise,
appointed by the Scottish Government
• Corra Foundation: Corra Foundation has the
responsibility in disseminating and monitoring
The Promise Partnership Fund
(Appendix 2 produced by Promise Scotland and used
with their permission.)
Page 307 of 347

Page 308

39Renfrewshire’s Promise
• Care Experience: The Care Experienced
community is made up of anyone who is or has
been in care or is from a looked-after background
at any stage in their life. That is anyone who is
or has been in foster care, adopted, kinship care
(looked after by a relative), resident in a children’s
home or have been looked after at home under a
Supervision Order for any length of time. 
It also includes anyone who is or has been on the
edges of care (in contact with social work and the
wider care sector) at any point.
• Children (Care, Care Experience and Services
Planning) (Scotland) Bill: Proposed legislation to
strengthen rights and simplify the legal landscape
for Care Experienced individuals
• Communities That Care (CtC): A whole-
school approach by Who Cares? Scotland to
reduce stigma and promote inclusion for Care
Experienced pupils
• Renfrewshire Community Justice Partnership:
A multi-agency group aligning justice work
with The Promise, focusing on early intervention
and rehabilitation
• Contextual Safeguarding: An approach to
understanding harm in environments outside the
home, used in school-based projects
• Convention of Scottish Local Authorities
(COSLA): COSLA is the national association
of Scottish councils and acts as an employers’
association for its 32 member authorities.
• Corporate Management Team (CMT): The
Corporate Management Team comprises the Heads
of Service from across the Council, along with senior
officers from OneRen and Renfrewshire Health
and Social Care Partnership (HSCP). This group
meets regularly to discuss strategic and operational
priorities affecting the Council and its partners
• FORT System: A case management and referral
tracking platform used to improve service
coordination and evaluation
• Getting It Right For Every Child (GIRFEC): GIRFEC
is Scotland’s national approach to promoting,
supporting, and safeguarding the wellbeing
of all children and young people. It provides a
consistent framework, shared language and
common understanding of wellbeing
• Guaranteed Interview Scheme: A policy offering
guaranteed interviews to Care Experienced
applicants who meet job criteria
• Health and Social Care Partnership (HSCP):
HSCPs are organisations formed to integrate
services provided by Health Boards and Councils
in Scotland. The NHS and local authority jointly
run each partnership. Renfrewshire HSCP delivers
adult social care services and all community
health services for adults and children in the
Renfrewshire area
• Human Library: A mentoring initiative matching
Care Experienced young people with professionals
for career insights
• Independent Care Review: A national review
(2017–2020) that gathered experiences from over
5,500 people to inform The Promise
• Lived/living Experience: Lived/living experience
is the knowledge and understanding you get when
you have personally lived through something
• Our Hearings, Our Voice (OHOV): OHOV is an
independent board for children and young people
from across Scotland between the ages of 8-18, who
have experience of the Children’s Hearings System
Glossary
Page 308 of 347

Page 309

40Renfrewshire’s Promise
Glossary
• United Nations Convention on the Rights of
the Child (UNCRC): UNCRC is the base standard
for children’s rights and sets out the fundamental
rights of all children. The UNCRC is the most widely
ratified human rights treaty in the world and sets
out the specific rights that all children have to
help fulfil their potential, including rights relating
to health and education, leisure and play, fair and
equal treatment, protection from exploitation and
the right to be heard
• Whole Family Wellbeing Approach: A holistic,
preventative model of support for families, rooted
in GIRFEC and The Promise
• YouthyFest: A youth-led festival celebrating Care
Experienced voices and promoting inclusion
• The Promise: Scotland’s ambition is that every
child and young person should grow up safe,
loved, and respected. See Appendix 2.
• Promise Champs: Renfrewshire Promise Champs
Group is a youth club run by Renfrewshire
Council’s Youth Services for Care Experienced
young people. The club aims to provide a
supportive environment where participants can
build confidence, develop skills through activities
like arts, cooking, and games, and have their
voices heard to improve services.
• The Scottish Children’s Reporter Administration
(SCRA): SCRA is responsible for supporting
children and young people at risk through the
Children’s Hearings System.
• Pinky Promise: A child-friendly version of The
Promise explaining its vision and commitments
• Promise Keeper Network: A community of
Promise Keepers across Renfrewshire promoting
awareness and action around The Promise
• Promise Keeper: Individuals across sectors who
commit to advocating for and implementing The
Promise in their work
• Promise Progress Framework: A national
framework to track progress in implementing The
Promise, using data and lived experience
• Promise Scotland: The organisation established
by Scottish Ministers to drive and support the
change required for Scotland to Keep The Promise
• Ren10: A network of people who work or volunteer
in the Renfrewshire area. There is a variety of early
help services for your mental health and wellbeing
• Renfrewshire Promise Strategic Oversight
Group: Renfrewshire’s governance body
overseeing delivery of The Promise across services
• Request for Assistance (RfA): RfA is a digital system
allowing families and professionals to seek support
from Renfrewshire’s Family Wellbeing Service
Page 309 of 347

Page 310

Renfrewshire’s Promise
Page 310 of 347

Page 311

Renfrewshire’s Pinky Promise
Keeping The Promise
in Renfrewshire
Report on Keeping The Promise to Renfrewshire’s
Infants, Children, Young People and Families.
March 2026
Page 311 of 347

Page 312

Renfrewshire’s Promise
Contents
1
4
5
6
7
8
9
9
10
11
12
14
16
17
18
19
The Promise in Renfrewshire
Youth Voice Leading Change
Renfrewshire’s Promise Keeper Network
Promise Keeper Conference 2025
Renfrewshire Language Policy
Supporting the Workforce — Spotlight on Employability
Whole Family Wellbeing Approach in Renfrewshire
Keeping The Promise in Children’s Hearings
Community Justice and The Promise: Working Together
Renfrewshire Council’s Housing Services: Delivering on The Promise
Renfrewshire’s Promise Partnership Projects in Education
Communities that Care: Building Inclusive School Communities
Stronger Start: Embedding The Promise in Maternity Support
Circuit: Reimagining Digital Education and Creative Technology
Promise Team Contact Information and Biographies
Glossary
Page 312 of 347

Page 313

Renfrewshire’s Promise
The Promise in Renfrewshire
This report reflects our work to Keep the
Promise in Renfrewshire from February 2025 to
February 2026.
Thank you to all who continue to champion
this work.
Page 313 of 347

Page 314

1Renfrewshire’s Promise
The Promise in Renfrewshire
Our Commitment
The Promise is recognised as being important for
Renfrewshire’s Children’s Services Partnership. We
want to work together to support children and
families when they need help. The Promise is
included in lots of council plans and is linked to other
areas of work such as poverty, trauma and inequality.
We want children, young people and their families
to feel safe and heard. They should be able to ask
questions, talk about things they are worried about,
and help to design services. It is important that we
listen to people who have lived experience, and that
we make the changes they tell us about.
Loving and Nurturing Principles:
Central to our approach is a commitment to loving,
nurturing relationships and listening to children,
young people and families. We strive to create a
culture where people feel safe and empowered
to ask questions and shape the services they
receive. We recognise that children experience the
care system through relationships, and that those
relationships must be grounded in compassion,
trust, and respect.
Page 314 of 347

Page 315

2Renfrewshire’s Promise
The Promise in Renfrewshire
Governance and Oversight
The Promise Strategic Oversight Group is a group
of staff who check the work of The Promise in
Renfrewshire. There are also three other groups of
staff who look at areas of The Promise which are:
• Whole Family Wellbeing Steering Group
• Supporting the Workforce
• Renfrewshire Children’s Hearings
Improvement Partnership
Each group is led by senior staff from the council and
the partnership, and lots of other staff members are
part of the groups.
We use a Promise Mapping and Planning Tool to track
the work of the Promise in Renfrewshire. This has been
recognised as a good example of tracking progress.
Supporting the Workforce
People who work in our services can sometimes
feel stressed due to increased workload and
less support. We need to make sure they are
supported and able to access training.
Data, Measurement and Reporting
We should gather high quality data across
different areas to make sure that Care
Experienced people are doing well.
Resources and Funding
We want better funding for changes that need to
be made, across longer periods of time.
Legislative Reform
There is lots of changes taking place in the
Scottish Government to create laws to increase
support for Care Experienced people including
the Children (Care, Care Experience and Services
Planning) (Scotland) Bill and the UNCRC.
Guided by National Priorities
There are important areas within The Promise
which must happen both in Renfrewshire, and
across Scotland by 2030.
Voice and Participation
We must speak to people who have experiences
of using our services. We must work with them to
design services and make decisions.
Governance and Accountability
Everyone should know their role to Keep the
Promise and their work should be checked.
We want services to work together to deliver on
the Promise.
Strategic Planning and Direction
The Promise Plan 24-30 of The Promise focuses
on making real changes that can be seen and
felt by people who use services. This must
be measured to check that the changes are
happening across the country.
Whole Family Support
Families must be able to access support when
they need it in a judgement free way.
Page 315 of 347

Page 316

3Renfrewshire’s Promise
The Promise in Renfrewshire
Next Steps
• Continue to work with partners 
across Scotland
• Check that we are up to date with changes
in the law
• Help to design plans to support
Promise changes 
• Share examples of good work from
Renfrewshire
Community Planning and Strategic
Engagement
The Promise Team support other groups of staff such
as Renfrewshire’s Children’s Services Partnership, the
Community Planning Partnership Executive Group,
and the Forum for Empowering Communities to
consider The Promise
The Promise Manager supports other leaders in the
Council and the HSCP to include The Promise in
plans, reports and discussions.
National Engagement and Influence
The Promise Team regularly meets with The Promise
Scotland, the Scottish Government and COSLA to
share work which is happening in Renfrewshire.
The Promise Team have also given information on
Government consultations including:
• The Children (Care, Care Experience and Services
Planning) (Scotland) Bill
• Developing a universal definition of
Care Experience
• Future of Fostering Consultation
• Children’s Hearings Redesign
Strategic Drivers and Alignment
The most recent Promise and Scottish Government
plans say the following:
• It must be clear who is responsible for
different changes 
• We must be able to measure the changes
that happen
• We must work together, and fund the changes to
continue in the future
In Renfrewshire, we connect the Promise with other
areas of work in Scotland:
• The United Nations Conventions on the Rights
of the Child
• Getting it Right for Every Child (GIRFEC) 
• National Trauma Transformation Programme
• Equalities legislation and approaches
Page 316 of 347

Page 317

4Renfrewshire’s Promise
Renfrewshire Council Youth Services are responsible
for raising the voices of Care Experienced young
people in Renfrewshire. They promote children’s
rights and the UNCRC. They make sure they follow the
National Youth Work Outcomes to get young people
involved in local decision making.
Youth Services do this by hosting groups for young
people to give them the chance to have their voices
heard. One of these groups is the Promise Champs,
who regularly have new members and share their work.
Youth-Led Campaigns and Events
The Promise Champs are involved in making change.
They have hosted events such as the Promise
Present Drive which gave over 300 parcels to Care
Experienced young people across Renfrewshire. The
Promise Champs have hosted other events such as a
Festive Lunch and WinterFest. This brought together
young people and families for activities.
Summer Programme and
Residential Experiences
With funding from the Corra Foundation, Youth
Services hosted six weeks of summer activities led
by the Promise Champs. This included youth clubs,
drama workshops and trips to Edinburgh Zoo and
Glasgow’s Splatter Art Studio. The activities created
safe spaces for young people to make friends, learn
new skills and access support.
“This year we were encouraged to be more
independent as a group and plan and
decide on things ourselves. It was cool that
we got to choose exactly what we wanted to
do without the worry of money restrictions.”
Creative Projects and Visual Identity
The Promise Champs have also taken part in creative
projects. They created logos and branding with the
artist Rachel Jardine. The group created hoodies
and posters.
This also involved working with pupils involved in
the Promise in St Andrew’s Academy to create logos,
badges and keyrings.
Youth-Led Redesign of Community Spaces
The Promise Champs have been involved in
redesigning community spaces, including the
Throughcare meeting room at the St James Centre,
the Methodist Halls, outdoor space at Johnstone High
School and Paisley YMCA. This created welcoming,
youth-friendly spaces for young people.
“Redesigning the space made me feel like it
was ours, it’s somewhere I want to be.”
Promise YouthyFest 2025
The Promise YouthyFest 2025 was attended by 189
participants and was designed and delivered by the
Promise Champs. The event included music, funfair
activities and creative zones. Families described the
event as “inclusive, uplifting and fun”.
“Planning the summer Youth Festival was my
favourite part of this year, it was super fun
with lots of things to do and I got to do it all
with my friends from club.”
Next Steps
• Work with Care Experienced young people to
improve services
• Support youth-led projects that include the
voices of young people
• Learn from the activities
Youth Voice Leading Change
Page 317 of 347

Page 318

5Renfrewshire’s Promise
Renfrewshire’s Promise Keeper Network is a group
of local champions for The Promise. They raise
awareness of the issues that affect Care Experienced
people. There are currently 407 Promise Keepers
in Renfrewshire, and this will continue to grow.
Promise Keepers make sure that The Promise is being
included in services and that staff are aware of it.
Care Experienced people have told us that they want
real and genuine people to champion The Promise.
There are lots of different services included in the
Promise Keeper Network such as Social Work,
Education, Elected Members and Health. In the past
year, there have been 100 new Promise Keepers and
lots of new teams and services are involved. Glenvale
FC and Basketball Paisley are two local sports teams
involved in the network.
The Promise Keeper Network has helped to create
long term change in St Andrew’s Academy, with senior
teachers in the school thinking about changes they
can make.
The Council’s Corporate Management Team have
committed to becoming Promise Keepers including
the Chief Executive.
The Promise Keeper Network have also welcomed
volunteers from Home-Start to who are aware of Care
Experience when supporting children and their families.
Promise Keepers are supported to share what they
have learned with their colleagues. We support this
through discussions, inputs and presentations to
share their work.
We have hosted several Promise Keeper Catch-Up
sessions in 2025 focusing on employability and
language. We continue to listen to Promise Keepers to
make sure we can support them to learn from us and
each other.
Renfrewshire’s Promise Keeper Network is informed
by our Care Experienced community, they are at the
very heart of what we do.
Next Steps: 
• Continue to raise awareness and grow
the network
• Celebrate success and share case studies
• Support our current Promise Keepers
Renfrewshire’s Promise Keeper Network
Page 318 of 347

Page 319

6Renfrewshire’s Promise
On the 4th of December 2025, we hosted our third
annual Promise Keeper Conference with a theme
focused on employability – “How Can We Strive
for Renfrewshire to be the Best Place for Care
Experienced People to Work?”. The event involved
different speakers, showing videos and having
discussions with colleagues. Over 100 Promise
Keepers attended.
The conference was opened by the Chief Executive
of Renfrewshire Council who spoke about his
commitment to The Promise.
Speakers included OneRen, Career Ready and Invest
in Renfrewshire sharing information about how the
work that they do supports Care Experienced people
in Renfrewshire around employability.
Before the conference, the Promise Ambassador
worked with three Care Experienced members of
staff to create a short film sharing their experience of
being Care Experienced and working in Renfrewshire.
This film highlighted the importance of ensuring
that we consider the needs of Care Experiences adults
and colleagues.
The final item of the day was a session called “In
Conversation With…” which was chaired by Pauline
Moss. This involved a short interview which each
participant including Thomas Seisay from Haus
of Seisay, Mary Cumming from Glenvale FC and
Raymond Cree and Eddie Simpson from People & OD
in Renfrewshire Council.
“Thank you so much for an amazing and
inspiring event.”
“Great speakers and a lovely mix of
different perspectives.”
“My first Promise Keeper Conference and
was a great experience”
“It felt the speakers came from a diverse
number of services and backgrounds. In
the previous Promise Conference, there
were a diverse group of speakers but mostly
from Social work and universal services. I
think this year’s speakers demonstrates
the progress made in highlighting the role
of the wider council staff, communities
and partners in understanding and
implementing the Promise.”
“From listening to others, I have came
away with both some ideas and renewed
motivation, especially in respect of our
recruitment processes.”
“All speakers were brave and inspiring.”
“Speakers were all very engaging with
interesting and varied speeches - great to
hear more about what is going on, there is
so much more than we knew about on our
door step.”
Next Steps: 
• Reflect on evaluation and learning
• Plan for Conference 2025
Promise Keeper Conference 2025
Page 319 of 347

Page 320

7Renfrewshire’s Promise
The Renfrewshire Language Policy was launched in
April 2022. It was created by working together with
Care Experienced young people and staff from the
Promise Keeper Network.
The language policy helps services to use positive,
non-stigmatising language when talking about Care
Experienced people. Staff are asked to change their
language where needed. 
We will work with our Care Experienced Community,
Promise Keeper Network and colleagues to review
the Language Policy in 2026/2027. This will allow us
to check that the policy is up to date and includes any
legal changes which are happening in Scotland. This
work has started, and a survey has been shared to get
initial feedback about the policy.
The Promise Ambassador regularly supports services
to consider their language use in their work.
Next Steps: 
• In 2026/27 we will progress the review of the
language policy in consultation with the Care
Experienced community and with partners
• Produce and promote an updated policy
Renfrewshire Language Policy
Page 320 of 347

Page 321

8Renfrewshire’s Promise
The Supporting the Workforce working group is
co-chaired by Felix Haggerty and Sam Macrae.
Lots of different people attend this group from the
council, partnership and third sector to discuss ways
that the council can support Care Experienced people
in with employment.
The Promise Human Library
The Promise Keeper Network has lots of people
from a range of career backgrounds and experiences.
We want to make sure that our Care Experienced
community can benefit from this. In July 2025, we
launched the “Promise Human Library” which
matches young people with Promise Keepers who
work in a career area that they might be interested
in. They would be able to access information through
a phone call, email exchange or office visit. There
are over 100 staff members signed up to the Promise
Human Library.
To sign up, young people fill out a Microsoft Forms
page and tell us about their career interests or ideas.
We will then find a Promise Keeper who matches this
and help them to arrange their meeting.
We are currently working to promote the Promise
Human Library.
“The young person did confirm that she
found this meeting to be extremely
helpful and informative, and she would
recommend this type of shared knowledge
for career minded young people.”
Next Steps: 
• Continue to recruit staff to the Human Library
• Raise awareness of the Human Library to
ensure young people are able to access 
iLearn Module for all Staff
An iLearn course has been created to help staff across
the council to learn about The Promise. This includes
basic information about The Promise and how they
can get more involved.
This course can be accessed by all council staff. Other
organisations can access it by requesting a link.
In 2026, the course will be reviewed to make sure it is
up to date and relevant. 
Next Steps:
• Continue to promote the iLearn module across
the council and partners
Care Experienced Staff Network
In May 2025, we launched the Care Experienced Staff
Network. It aims to share the living experiences of
Care Experienced staff to help the council learn and
improve how it supports Care Experienced colleagues
in the council. The network is a safe space for Care
Experienced staff and creates a sense of community
and belonging.
The network is for people with direct and indirect
Care Experience. We will work to find balance with the
group to make sure everyone is given space to share
their views. Those with indirect experiences act as
allies to Care Experienced people.
Next Steps: 
• Continue to work with Marketing and
Communications to ensure that all staff are
aware of the network
• Continue to expand on the membership of
the network 
• Continue to develop the work and scope of
the network
Supporting the Workforce  — Spotlight on Employability
Page 321 of 347

Page 322

9Renfrewshire’s Promise
Supporting the Workforce  —
Spotlight on Employability
Guaranteed Interviews for Care
Experienced People who meet Minimum
Job Requirements
In July 2025, the Corporate Management Team
approved a Guaranteed Interview scheme for Care Expe-
rienced people who meet the essential job requirements.
This scheme aims to address some of the barriers
that Care Experienced people might face when
applying for jobs.
Care Experienced people will be able to tick a box
on the application form to share that they are Care
Experienced if they want.
We are working to ensure that Care Experienced people
get good quality feedback if they do not get the job after
the interview. The support that can be offered before or
after an interview will also be clearly explained.
Next Steps:
• Continue to liaise with HR and CMT colleagues
to launch this work.
• We will be working closely with hiring
managers around the time of the launch to
ensure they are educated about this and
understand the significance.
Renfrewshire is a part of the Whole Family Wellbeing
approach which changes how support is offered
to children, young people and families. It is rooted
in GIRFEC and The Promise focusing on early help,
working together and collaboration.
The Whole Family Wellbeing Service in Renfrewshire
works together with third sector organisations.
This allows families to access support to help them
with challenges.
In 2024, over 1000 families have accessed support
which helped them with child wellbeing, parenting
and family life.
This work helps Renfrewshire to reduce crisis in
families, promote resilience and outcomes for
children and families.
Next Steps
• The Family Wellbeing Manager will continue
to attend Renfrewshire’s Promise Strategic
Oversight Group
Whole Family Wellbeing
Approach in Renfrewshire
The Paisley Children’s Hearings Improvement
Partnership have been working together to make
changes in Children’s Hearings across three areas.
The group are committed to The Promise and work
together to ensure Hearings are rights-based, trauma
informed and work for children and young people.
The group involves staff from lots of
different organisations.
The group have worked to build on Child Friendly
Scheduling to make sure that children and young
people are able to have a say in the timing, place and
structure of their Hearing.
The group are also considering how current changes
to the law will impact this work, with more focus on
early intervention and rights.
The Chair of the group gives regular updates to the
Renfrewshire Strategic Oversight Group
Next Steps
• The Promise Manager will continue to attend
the group
• The group will look at changes to the law and
share learning across Scotland
Keeping The Promise in
Children’s Hearings
Page 322 of 347

Page 323

10Renfrewshire’s Promise
Renfrewshire’s Community Justice Partnership works
to promote community justice. It works to embed The
Promise with a key focus on children, young people
and families who are affected by involvement with
the justice system. The group works to promote early
help, prevention and support. The group aims to
reduce reoffending and support people to rebuild
their lives.
This work is linked to the Renfrewshire Promise
Strategic Oversight Group with their child-centred
vision and embedding lived experience.
The structure of the work embeds The Promise by:
• Having the same Chair to ensure the work is linked 
• Working to share lived experience when
making decisions
• Working together with other groups such as the
Local Employability Partnership to make sure
people can access support.
It is important that families are supported during and
after justice involvement and have access to housing,
health and employability services.
The group are also working to reduce stigma
around justice. They work to make sure a more
compassionate understanding of justice is promoted.
Next Steps
• Improve links between The Promise Strategic
Oversight Group and the Community Justice
Strategic Group
• Promote the needs of justice-involved families
• Working closely with children and families
affected by imprisonment 
• Promote a compassionate message
about justice
• Provide regular updates on progress
Community Justice and The Promise: Working Together
Page 323 of 347

Page 324

11Renfrewshire’s Promise
Housing and Homelessness services are important in
Renfrewshire’s Promise to ensure young people and
families have access to housing and support.
The Promise says that every child and young person
should grow up in a safe, stable and loving home.
Poor housing and homelessness can affect the
wellbeing, development and relationships of Care
Experienced people.
Renfrewshire Council’s Environment, Housing and
Infrastructure’s Plan includes work on The Promise.
This aims to prevent youth homelessness and make
sure that Care Experienced people can access safe
and affordable housing.
This includes:
• Creating personalised housing pathways for Care
Experienced young people
• Ensuring Care Experienced people are at the
centre of their work
• Promoting The Promise and Promise work
• Keeping lived experience at the centre 
• Creating opportunities for Care Experienced
people to provide feedback
• Supporting the Guaranteed Interview Scheme
during hiring processes.
The Promise says that housing challenges can be a
factor for children entering care. Renfrewshire Council
has early help in place to support families who are at
risk of poor housing conditions.
Housing Services work to support kinship and foster
carers to keep siblings together and ensure they have
enough space in their homes to do this. This helps
to provide safe and loving homes for Care
Experienced children.
Housing Services are committed to The Promise and
ensuring that children, young people and families
are able to access compassionate and inclusive
housing services.
Next Steps 
• The Promise Manager and Promise
Ambassador will continue to support
Housing and Homelessness services in relation
The Promise
• Support the wider E, H&I around all aspects in
relation to The Promise 
Renfrewshire Council’s Housing Services: Delivering on The Promise
Page 324 of 347

Page 325

12Renfrewshire’s Promise
Renfrewshire has delivered two projects with funding
from the Scottish Government Promise Partnership
Fund. Two projects were completed in Education and
worked to improve belonging and support for Care
Experienced pupils.
Keep The Promise Funded Project 1
The project at Johnstone High School aimed to
reduce school exclusions and improve results for Care
Experienced young people. The project funded a
trusted adult who could support pupils in the school.
The voices and views of Care Experienced young
people helped to design this project.
The school has delivered meaningful and
lasting change for Care Experienced children
and young people. Through dedicated roles,
inclusive spaces, data-informed support,
and strong partnerships, the school has
created an environment where pupils feel
seen, heard, and valued.
The Principal Teacher of The Promise and Promise
Key Worker provided advocacy and support to
improve attendance, participation and wellbeing
within the school. These roles in the school helped
pupils to feel seen, heard and valued.
The Cove was created which is a safe and stigma-free
space for Care Experienced pupils to get support,
build relationships and improve their wellbeing.
This work also included contextual safeguarding work
which was delivered by Barnardo’s. Young people face
many risks outside of their home, including in school
and in their communities. Barnardo’s worked with
the school to put in place safety strategies for Care
Experienced pupils in the school.
A Wellbeing Tracker was created which allowed pupil
wellbeing to be checked. Pupils were also able to
reflect on their feelings.
Staff were trained in trauma-informed practice,
contextual safeguarding and inclusive teaching.
Staff said they felt more able to support Care
Experienced pupils. Parent and Carer groups were
created for families to make changes in the school
and improve relationships.
The Promise Manager supported the work and
made sure the Promise Strategic Oversight Group
and Senior Managers were kept updated. It was
also important to share what we learned during this
project. This work was shared as an example of good
practice in the Promise Scotland’s Stories of Change
Project. The project received very good feedback from
the Corra Foundation.
The project had some challenges too, such as an
increase to costs which had to be managed well.
There were also changes to staffing during this time.
This project showed the importance of leadership,
working with young people and reducing stigma.
Moving forward, the learning from this project
will shape policy, work and culture to make sure Care
Experienced pupils have a good experience
of education.
Keep The Promise Funded Project 2
The Promise Partnership project at St Andrew’s
Academy focused on improving transitions for Care
Experienced pupils. Care Experienced pupils can find
transitions more challenging. This project aimed to
improve transitions and make sure young people are
prepared for them and supported. This involved having
a Promise Team in the school to provide this support.
Renfrewshire’s Promise Partnership Projects in Education
Page 325 of 347

Page 326

13Renfrewshire’s Promise
Renfrewshire’s Promise Partnership Projects in Education
We will work to make sure that this positive change
continues and that other schools can learn from it.
The project spent the right amount of money, even
though there were challenges around increasing
costs. The project ran longer than expected, to make
sure that it lined up with the school year and was able
to achieve its goals.
The Corra Foundation gave positive feedback about the
project. It noted the school’s work on trauma-informed
practice, pupil voice and working with families.
Senior Care Experienced pupils at St Andrew’s
Academy created a Promise Charter. This includes the
values of The Promise in school culture.
Next Steps 
• Include learning in School Improvement
Plans and Education Quality Improvement
Framework 
• Work together with organisations such as
Barnardo’s and Who Cares? Scotland to
improve support
• Share learning across key groups of staff
• Share learning across Scotland
The Promise Partnership project at St
Andrew’s Academy has turned ambition into
action. It has built a caring, inclusive, and
rights-focused culture that is now at the
heart of the school. 
The Promise Team included a Principal Teacher of
Inclusion and a Project Leader to change the
school’s approach to transitions. This involved finding
what worked well already and building on this to
work directly with P7 pupils. This included
transition programmes, summer activities and
wellbeing sessions.
By valuing relationships, listening to children
and families, and staying true to The Promise,
the school has created a space where Care
Experienced pupils can truly thrive.
Staff were able to improve their skills during this work
and access learning and training to improve their
understanding of Care Experience and the needs of
Care Experience young people.
Learning from this project was shared with staff and
senior leaders. The Promise Manager worked with
the Head of Education to create guidance for schools.
Page 326 of 347

Page 327

14Renfrewshire’s Promise
The Communities that Care programme was delivered
in partnership with Who Cares? Scotland. It aimed to
change the way Care Experienced children and young
people are supported in schools in Renfrewshire. This
project started in Renfrewshire and has now been put
in place across Scotland.
The Communities that Care programme
has made a profound and lasting impact in
Renfrewshire. Through training, curriculum
integration, community engagement, and
pupil participation, it has created more
caring and inclusive school environments
for Care Experienced children and young
people. It has challenged stigma, fostered
empathy, and empowered pupils and staff
to become champions of care.
Aommunities that Care uses a whole school approach
to nurture and support Care Experienced pupils.
It does this by educating everyone in a school,
including pupils, staff and parents and carers about
Care Experience. It makes sure that schools are
inclusive and understanding.
Addressing Stigma and Misunderstanding
Care Experienced people often face stigma because
people do not understand what it means to be Care
Experienced. This can make Care Experienced people
feel excluded and isolated. Schools have the power to
educate young people who will grow up to be kinder
and more compassionate about Care Experience. This
will influence change in families, communities and for
the future.
A Whole-School Approach to Inclusion
The whole school approach happens through staff
training, teaching for children and engaging with
local communities. It aims to make sure that Care
Experienced pupils can do well in school and feel like
they belong.
The Communities that Care programme has been
used in lots of Renfrewshire schools. By March 2025,
all 63 schools had completed the first stage of training,
and 61 schools had completed the second stage. 43
schools were delivering lessons in classes for children
and young people.
Curriculum Integration: Learning About
Care Experience
Communities that Care give teachers resource
packs that they can use to teach lessons about Care
Experience. There are different resources for different
ages of children. Teaches said that the lessons created
good discussions about Care Experience.
783 pupils gave positive feedback about the resources,
and shared they felt more aware of Care Experience
and how they can support or challenge stigma.
Supporting Care Experienced Pupils
Beyond the Classroom
The project also helped schools to support their Care
Experienced pupils. This happened by making them
aware of different supports that are available for Care
Experienced people.
Schools also celebrated Care Experience through
events such as Care Day in February and Care
Experienced Week in October.
Communities that Care: Building Inclusive School Communities
Page 327 of 347

Page 328

15Renfrewshire’s Promise
Communities that Care: Building Inclusive School Communities
Empowering Pupil Voice and Participation
The project also made sure that Care Experienced
pupils are able to express themselves, make change
and meet other Care Experienced people. This also
helped Care Experienced pupils to feel pride in their
identities and to be aware of their rights.
Professional Growth and Cultural Change
Teachers are school staff were able to improve their
knowledge and skills. This will help Care Experienced
pupils to feel more seen and heard.
We will work to make sure that the learning and change
from this project can continue in Renfrewshire schools.
Next Steps
• Schools keep access to the Curriculum &
Resource Pack and will be encouraged to
continue lesson
Page 328 of 347

Page 329

16Renfrewshire’s Promise
Stronger Start is a service which provides support to
pregnant women and their families in Renfrewshire,
Inverclyde and West Dunbartonshire. It is located in
the Royal Alexandra Hospital (RAH) Maternity Unit.
Stronger Start is more than a financial
advice service it is a transformational model
of early intervention, family support, and
rights-based advocacy that reflects the
values and ambitions of The Promise.
By embedding support within maternity
services, Stronger Start reaches families at a
critical juncture, offering help that is timely,
compassionate, and effective.
Stronger Start is a preventive support which
understands the impact of finance, housing and
other factors on infant wellbeing. It provides support
around rights, managing debt, improving income
and financial skills before families reach crisis point.
This will reduce the chances of families having child
protection or social work involvement later. This
reflects the Promise’s values of universal and non-
stigmatising support.
The services recognise the harm that poverty can
cause for infants and their health. The service can
support families with basic items for their baby and
help them to budget their money.
It is important that families are listened to and can
access their rights. Stronger Start supports women to
access services that they need. This is more important
for Care Experienced parents who may face stigma or
not know what they are able to access.
There is a working group to support the work of
Stronger Start which includes services such as the
council, NHSGGC, Citizens Advice and local HSCP’s.
The service currently has funding in place until 2027.
Next Steps 
• Ensuring the work is linked to The Promise
• The Promise Manager to attend the
Steering Group
• Updates to be provided to the Promise
Strategic Oversight Group
Stronger Start: Embedding The Promise in Maternity Support
Page 329 of 347

Page 330

17Renfrewshire’s Promise
The Circuit project gives Care Experienced people
access to digital learning and technology. It is
developed in partnership with YMCA Scotland
and Renfrewshire Council. It is rooted in co-design
and inclusion.
Circuit runs in Dundee and Renfrewshire and offers
12-week programmes where young people can
improve their digital skills in filmmaking, coding and
media. It is a safe, inclusive and inspiring place for
Care Experienced young people to improve their skills.
The ethos of Circuit aligns closely with
the principles of The Promise, ensuring
that Care Experienced young people
are supported to thrive, feel a sense of
belonging, and have access to meaningful
opportunities.
The project has been created with Care Experienced
young people who are paid for their time. The Paisley
project can be accessed through the Circuit website.
The project is funded by the National Lottery
Community Fund and links to Renfrewshire’s work on
The Promise by promoting digital inclusion.
By embedding co-design, accessibility, and
empowerment at its core, Circuit is helping
to realise the ambitions of The Promise
ensuring that Care Experienced young
people grow up loved, safe, and respected,
with every opportunity to flourish.
Circuit also gives training to foster carers,
residential staff and social care professionals to
support digital inclusion.
This work has also supported a Modern Apprentice
within Youth Services to support opportunities for
Care Experienced people.
Next Steps
• The Promise Manager and a representative
from Youth Services will continue to represent
Renfrewshire Council on the Steering Group
• Raise awareness of the programme across
Renfrewshire
Circuit: Reimagining Digital Education and Creative Technology
Page 330 of 347

Page 331

18Renfrewshire’s Promise
Renfrewshire Promise Team:
Maurice Gilligan, Promise Manager
maurice.gilligan@renfrewshire.gov.uk
Sam Macrae, Promise Ambassador
samantha.macrae@renfrewshire.gov.uk
Promise Manager
My name is Maurice Gilligan, Renfrewshire’s
Promise Manager and a member of the Children’s
Services Senior Leadership Team. I lead the
strategic implementation of The Promise across
Renfrewshire, working in close partnership with
Scottish Government, COSLA, Promise Scotland,
and a range of statutory and third-sector agencies. I
hold responsibility for coordinating Renfrewshire’s
Children’s Services Partnership response, ensuring
alignment with national priorities and driving forward
transformational change.
I lead multi-agency planning and implementation
efforts aligned with The Promise, working in
close partnership with the Health and Social Care
Partnership, NHS Greater Glasgow and Clyde,
community organisations, and the third sector. My
role focuses on embedding The Promise across
services to ensure lasting, meaningful change. I also
contribute to Renfrewshire’s broader improvement
agenda, championing approaches that place children,
young people, and families at the centre of service
design and delivery.
Beyond my core role, I bring experience from senior
leadership positions at Skills Development Scotland,
and I also serve as a non-executive Director at
Scotwest Credit Union, supporting ethical financial
inclusion and community empowerment.
Promise Ambassador
My name is Sam Macrae, and I am The Promise
Ambassador for Renfrewshire Council. I have been
in post since July 2021 and was involved in the
Independent Care Review during its discovery stage.
My role focuses on supporting individual teams
and services to consider how they can keep The
Promise and consider the needs of Care Experienced
children, young people and their families. I co-chair
the Supporting the Workforce group for The Promise
to ensure the council is providing employment
opportunities and support to people with Care
Experience.  My role also supports staff to consider
how they can embed the voice of Care Experienced
people in their service provision and design.
In 2025, I was selected as a 30 Under 30 by the Young
Women’s Movement, recognising the achievements
of young women in Scotland.  and I spent five years
as a trustee, and more recently Vice Chair/ Acting
Chair of Outside ProjectChange, a charity focused
on supporting the creation of an inclusive and
supportive care community. I am also a trustee of the
Unite Foundation who provide free accommodation
and scholarships to Care Experienced and Estranged
young people at partner universities.
Promise Team Contact Information and Biographies
Sam and Maurice
Page 331 of 347

Page 332

19Renfrewshire’s Promise
• Care Experience: The Care Experienced
community is made up of anyone who is or has
been in care or is from a looked-after background
at any stage in their life. That is anyone who is
or has been in foster care, adopted, kinship care
(looked after by a relative), resident in a children’s
home or have been looked after at home under a
Supervision Order for any length of time 
It also includes anyone who is or has been on the
edges of care (in contact with social work and the
wider care sector) at any point
• Children (Care, Care Experience and Services
Planning) (Scotland) Bill: Proposed legislation to
strengthen rights and simplify the legal landscape
for Care Experienced individuals
• Communities That Care (CtC): A whole-
school approach by Who Cares? Scotland to
reduce stigma and promote inclusion for Care
Experienced pupils
• Renfrewshire Community Justice Partnership:
A multi-agency group aligning justice work
with The Promise, focusing on early intervention
and rehabilitation
• Contextual Safeguarding: An approach to
understanding harm in environments outside the
home, used in school-based projects
• Convention of Scottish Local Authorities
(COSLA):  COSLA is the national association
of Scottish councils and acts as an employers’
association for its 32 member authorities
• Corporate Management Team (CMT): The
Corporate Management Team comprises the Heads
of Service from across the Council, along with senior
officers from OneRen and Renfrewshire Health
and Social Care Partnership (HSCP). This group
meets regularly to discuss strategic and operational
priorities affecting the Council and its partners
• FORT System: A case management and referral
tracking platform used to improve service
coordination and evaluation
• Getting It Right For  Every Child (GIRFEC):
GIRFEC is Scotland’s national approach to
promoting, supporting, and safeguarding the
wellbeing of all children and young people. It
provides a consistent framework, shared language
and common understanding of wellbeing
• Guaranteed Interview Scheme: A policy offering
guaranteed interviews to Care Experienced
applicants who meet job criteria
• Health and Social Care Partnership (HSCP):
HSCPs are organisations formed to integrate
services provided by Health Boards and Councils
in Scotland. The NHS and local authority jointly
run each partnership. Renfrewshire HSCP delivers
adult social care services and all community
health services for adults and children in the
Renfrewshire area
• Human Library: A mentoring initiative matching
Care Experienced young people with professionals
for career insights
• Independent Care Review: A national review
(2017–2020) that gathered experiences from over
5,500 people to inform The Promise
• Lived/living Experience: Lived/living experience
is the knowledge and understanding you get when
you have personally lived through something
• Our Hearings, Our Voice (OHOV): OHOV is an
independent board for children and young people
from across Scotland between the ages of 8-18, who
have experience of the Children’s Hearings System
Glossary
Page 332 of 347

Page 333

20Renfrewshire’s Promise
Glossary
• United Nations Convention on the Rights of
the Child (UNCRC): UNCRC is the base standard
for children’s rights and sets out the fundamental
rights of all children. The UNCRC is the most widely
ratified human rights treaty in the world and sets
out the specific rights that all children have to
help fulfil their potential, including rights relating
to health and education, leisure and play, fair and
equal treatment, protection from exploitation and
the right to be heard
• Whole Family Wellbeing Approach: A holistic,
preventative model of support for families, rooted
in GIRFEC and The Promise
• YouthyFest: A youth-led festival celebrating Care
Experienced voices and promoting inclusion
• The  Promise: Scotland’s ambition is that every
child and young person should grow up safe,
loved, and respected. See Appendix 2
• Promise Champs: Renfrewshire Promise Champs
Group is a youth club run by Renfrewshire
Council’s Youth Services for Care Experienced
young people. The club aims to provide a
supportive environment where participants can
build confidence, develop skills through activities
like arts, cooking, and games, and have their
voices heard to improve services
• The Scottish Children’s Reporter
Administration (SCRA): SCRA is responsible
for supporting children and young people at risk
through the Children’s Hearings System
• Pinky Promise: A child-friendly version of The
Promise explaining its vision and commitments
• Promise Keeper Network: A community of
Promise Keepers across Renfrewshire promoting
awareness and action around The Promise
• Promise Keeper: Individuals across sectors who
commit to advocating for and implementing The
Promise in their work
• Promise Progress Framework: A national
framework to track progress in implementing The
Promise, using data and lived experience
• Promise Scotland: The organisation established
by Scottish Ministers to drive and support the
change required for Scotland to Keep The Promise
• Ren10:  A network of people who work or
volunteer in the Renfrewshire area. There is a
variety of early help services for your mental health
and wellbeing
• Renfrewshire Promise Strategic Oversight
Group: Renfrewshire’s governance body
overseeing delivery of The Promise across services
• Request for Assistance (RfA): RfA is a digital system
allowing families and professionals to seek support
from Renfrewshire’s Family Wellbeing Service
Page 333 of 347

Page 334

Renfrewshire’s Promise
Page 334 of 347

Page 335

Page 1 of 4 
To:  Education and Children’s Services Policy Board
On: 12 March 2026
__________________________________________________________________ 
Report by:  Director of Children’s Services
__________________________________________________________________ 
Heading:  Inspection of Castlehead High School by His Majesty’s
Inspectorate in Scotland
__________________________________________________________________
1. Summary
1.1. In November 2025, a team of HM inspectors of education visited Castlehead
High School. Inspectors assessed the school with a focus on four quality
indicators which are referenced in How Good is our School? 4.
1.2. This was a very positive inspection which evaluated quality indicators in the
school as follows:
Leadership of change     very good 
Learning, teaching and assessment   good 
Ensuring wellbeing, equality and inclusion  good
Raising attainment and achievement   good
1.3. The inspection team found the following strengths in the school’s work:
• Young people are a considerable strength of the school. They are
confident, welcoming and very proud of their school. They have a strong
sense of belonging to their school community and actively seek
opportunities to make meaningful improvements. 
• The headteacher’s authentic, strong and compassionate leadership, ably
supported by his depute headteachers, has fostered a culture of ambition,
kindness and respect. This is evident in the strong, supportive
relationships across the school. Staff at all levels are empowered to lead
change. 
• Teachers work well together to improve how young people learn. This is
leading to greater consistency and higher-quality learning experiences
across the school for young people. This results in more young people
engaging well in their learning. 
Item 7
Page 335 of 347

Page 336

Page 2 of 4 
• Partners work very effectively with staff to enrich young people’s
experiences and achievements. They contribute well to supporting staff to
meet the needs of young people. This leads to many young people
achieving qualifications from within and outwith the school environment. 
• Staff in the FLR support young people and their families very well. Young
people benefit from bespoke approaches to their learning and nurturing
relationships with staff and each other. This leads to them engaging better
in their learning, developing confidence and gaining important skills for life. 
1.4. The following area for improvement was identified and discussed with the
head teacher and a representative from Renfrewshire Council
• Continue to develop high-quality teaching and learning across the school.
This includes all teachers continuing to work together to develop a shared
understanding of each aspect of the Castlehead lesson cycle. 
• Continue to promote aspects of equality and diversity across the school.
This should help develop young people’s understanding of, and ability to,
challenge discrimination, prejudice and intolerance when they come
across it. 
• Continue to raise attainment for young people, with a focus on young
people in S5 and S6. 
__________________________________________________________________
2. Recommendations
2.1. Members of the Education and Children’s Services Policy Board are asked to
note and celebrate the key strengths and recognise the areas for further
improvement in the inspection report for Castlehead High School.
__________________________________________________________________
3. Background
3.1. Children’s Services welcomes the process of audit undertaken by HMI as
supportive to continuous improvement in Renfrewshire’s education
establishments. The school team at Castlehead High School approached the
inspection in a positive manner and embraced it as a professional learning
opportunity in partnership with colleagues at His Majesty’s Inspectorate of
Education in Scotland.
3.2. The report includes one area for further improvement, and progress in
addressing this will be monitored by Children’s Services staff through the
Quality Improvement Framework.
3.3. The inspection report will inform planned improvement activity and will enable
the school to build on the recognised strengths and focus further development
on areas for improvement to enable the school to continue to deliver a quality
educational provision.
___________________________________________________________________ 
Page 336 of 347

Page 337

Page 3 of 4 
Implications of this report 
1.  Financial 
None. 
2.  HR and Organisational Development 
None. 
3. Community/Council Planning - engaging with, and learning from external
inspection, ensures that our Renfrewshire is thriving. High standards of 
education provision ensure that children and young people are given the
best start in life so that they promote and contribute to a more prosperous,
fairer society. It also ensures our Renfrewshire is well – by providing an
environment which encourages care, welfare and development,
establishments play a crucial role in developing children and young people
so that they become responsible citizens. 
The inspection process also supports delivery of the Council Plan
crosscutting theme of improving outcomes for children and families as well
as other Council Plan key strategic outcomes. 
4.  Legal 
HM Inspectors evaluate the school’s Fulfilment of Statutory Duties related
to attendance, exclusions, ASL Act and Associated Code of Practice,
Bullying, Equality Act, Health and Nutrition, and Gaelic education.   
5.  Property/Assets 
None. 
6.  Information Technology 
None. 
7.  Equality and Human Rights 
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report. If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the
Council’s website. 
8. Health and Safety
None. 
9. Procurement 
None. 
10. Risk 
None. 
11. Privacy Impact
None.
Page 337 of 347

Page 338

Page 4 of 4
12. Climate Risk
None.
13. Children’s Rights
This links to, Article 12 (respect for the views of the child) Every child has the
right to express their views, feelings and wishes in all matters affecting them,
and to have their views considered and taken seriously. This right applies at
all times, for example during immigration proceedings, housing decisions or
the child’s day-to-day home life. Article 28 (right to education) Every child has
the right to an education. Primary education must be free and different forms
of secondary education must be available to every child. Discipline in schools
must respect children’s dignity and their rights. Richer countries must help
poorer countries achieve this. Article 29 (goals of education) Education must
develop every child’s personality, talents and abilities to the full. It must
encourage the child’s respect for human rights, as well as respect for their
parents, their own and other cultures, and the environment.
14. Cosla Policy Position
None.
List of Background Papers
The inspection report and additional evidence is published on the Education
Scotland website.
__________________________________________________________________
Children’s Services
EH/LG/JO’N
17 February 2026
Author:  Emma Henry, Head of Education, emma.henry@renfrewshire.gov.uk
Page 338 of 347

Page 339

1   |   Castlehead High School, Renfrewshire Council, 8628939 © Crown Copyright
20 January 2026
Dear Parent/Carer 
In November 2025, a team of HM Inspectors of Education visited Castlehead High School.
During our visit, we talked to parents/carers and young people and worked closely with the
headteacher and staff.
The inspection team found the following strengths in the school’s work. 
• Young people are a considerable strength of the school. They are confident, welcoming
and very proud of their school. They have a strong sense of belonging to their school
community and actively seek opportunities to make meaningful improvements. 
• The headteacher’s authentic, strong and compassionate leadership, ably supported by his
depute headteachers, has fostered a culture of ambition, kindness and respect. This is
evident in the strong, supportive relationships across the school. Staff at all levels are
empowered to lead change. 
• Teachers work well together to improve how young people learn. This is leading to greater
consistency and higher-quality learning experiences across the school for young people.
This results in more young people engaging well in their learning.
• Partners work very effectively with staff to enrich young people’s experiences and
achievements. They contribute well to supporting staff to meet the needs of young people.
This leads to many young people achieving qualifications from within and outwith the
school environment.
• Staff in the FLR support young people and their families very well. Young people benefit from
bespoke approaches to their learning and nurturing relationships with staff and each other. This
leads to them engaging better in their learning, developing confidence and gaining important
skills for life. 
The following areas for improvement were identified and discussed with the headteacher
and a representative from Renfrewshire Council. 
• Continue to develop high-quality teaching and learning across the school. This includes all
teachers continuing to work together to develop a shared understanding of each aspect of the
Castlehead lesson cycle.  
Page 339 of 347

Page 340

2   |   Castlehead High School, Renfrewshire Council, 8628939 © Crown Copyright
• Continue to promote aspects of equality and diversity across the school. This should help develop
young people’s understanding of, and ability to, challenge discrimination, prejudice and
intolerance when they come across it. 
• Continue to raise attainment for young people, with a focus on young people in S5 and S6.  
Page 340 of 347

Page 341

3   |   Castlehead High School, Renfrewshire Council, 8628939 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using four quality indicators
from How good is our school (4th edition). Quality indicators help schools, local authorities
and inspectors to judge what is working well and what needs to be improved. Following the
inspection of each school, the Scottish Government gathers details of our evaluations to keep
track of how well Scottish schools are doing. 
Here are HMIE’s evaluations for Castlehead High School 
Quality indicators Evaluation
Leadership of change  very good
Learning, teaching and assessment good
Ensuring wellbeing, equality and inclusion good
Raising attainment and achievement good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on
the HMIE website at Castlehead High School | Inspection Report | His Majesty’s Inspectorate
of Education in Scotland 
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. Renfrewshire Council will inform
parents/carers about the school’s progress as part of its arrangements for reporting on the
quality of its schools. 
Frances E. Graham
HM Inspector 
On behalf of His Majesty’s Chief Inspector of Education in Scotland 
Page 341 of 347

Page 342

Page 1 of 4 
To:  Education and Children’s Services Policy Board
On: 12 March 2026
___________________________________________________________________ 
Report by:  Director of Children’s Services
___________________________________________________________________ 
Heading:  Inspection of Glencoats Primary School by Education
Scotland
___________________________________________________________________
1. Summary
1.1 Glencoats Primary School was inspected by a team of inspectors from
Education Scotland in October 2025 as part of a national sample of education.
Inspectors uses different models of inspection and at Glencoats Primary
School the short model approach was deployed. Inspectors assessed the
school with a focus on two quality indicators which are referenced in How
Good is our School? 4 
Quality Indicator 2.3  Learning, teaching and assessment.
Quality Indicator 3.2  Raising attainment and achievement. 
1.2 This was a very positive inspection which evaluated all quality indicators as
follows: 
Quality Indicator 2.3  Excellent
Quality Indicator 3.2   Very Good 
1.3 The inspection report in the form of a letter to parents, published by Education
Scotland on 16 December 2025, is attached as an appendix to this report and
is also available from the Director of Children’s Services or from the Education
Scotland website. Please note that the inspectorate has since been separated
from Education Scotland as part of the Education (Scotland) Act 2025 and
therefore this information may also be found on His Majesty’s Inspectorate of
Education in Scotland’s new website. 
1.4 The letter to parents identified four key strengths of the school: 
• In the school and Flexible Learning Resource, children are very happy,
motivated and well-behaved across the day. They are thriving as a result
of highly positive relationships with staff and outstanding nurturing
personalised support. All children feel valued, included and ready to learn
each day. 
Item 8
Page 342 of 347

Page 343

Page 2 of 4 
• The inspirational leadership of the headteacher empowers skilled teaching
and support staff to deliver a very high standard of learning and teaching
across the school. Planning and assessment are used very well to meet
the needs of all children. 
• In the school and Flexible Learning Resource, staff and partners have
embedded highly successful learning experiences and innovative
approaches that ensure success and achievement for all children. This
includes areas such as skills development, play, digital technologies,
learning outdoors and cross-curricular lessons. 
• In the school, teaching and support staff deliver very high-quality focused
and targeted work in literacy, numeracy and health and wellbeing. This is
raising attainment and accelerating progress in learning significantly for all
children across the curriculum. 
1.5 The inspection report also identified two areas for further improvement.  
• Staff should continue to provide high-quality learning experiences that
prepare children very well for life and support them to attain and achieve. 
• Staff in the Flexible Learning Resource should continue to work regularly
with colleagues in similar settings and partners to develop further shared
standards and planning. 
1.7 There is an agreed set of procedures for responding to inspection reports
which will support the school and Children’s Services to plan how these areas
for further improvement will be addressed. Actions are detailed within the
school improvement plan which is shared with parents and carers. In addition,
the school will be supported in its improvement journey by Children’s
Services.
___________________________________________________________________
2. Recommendations
2.1. Members of the Education and Children’s Services Policy Board are asked to
note and celebrate the key strengths and recognise the areas for further
improvement in the Education Scotland report for Glencoats Primary School.
___________________________________________________________________
3. Background
3.1. Children’s Services welcomes the process of audit undertaken by Education
Scotland as supportive to continuous improvement in Renfrewshire’s
education establishments. The school team at Glencoats Primary School
approached the inspection in a positive manner and embraced it as a
professional learning opportunity in partnership with colleagues at Education
Scotland.  This inspection report is particularly notable as Glencoats Primary
School has received an excellent grade for learning, teaching and
assessment which at the time of writing is the first excellent grade achieved in
Scotland for this Quality Indicator for a number of years, as well as receiving a
Page 343 of 347

Page 344

Page 3 of 4 
very good grade for raising attainment and achievement, making this one of
the most positive short model inspection reports in the country. 
___________________________________________________________________ 
Implications of the Report 
1.  Financial – No financial implications 
2.  HR & Organisational Development – No HR implications 
3.  Community/Council Planning – engaging with, and learning from external
inspection, ensures that our Renfrewshire is thriving. High standards of
education provision ensure that children and young people are given the best
start in life so that they promote and contribute to a more prosperous, fairer
society. It also ensures our Renfrewshire is well – by providing an
environment which encourages care, welfare and development,
establishments play a crucial role in developing children and young people so
that they become responsible citizens. 
The inspection process also supports delivery of the Council Plan crosscutting
theme of improving outcomes for children and families as well as other
Council Plan key strategic outcomes. 
Economy
Equipping all children and young people to achieve success in life 
Fair
Creating inclusive and supportive learning environments for children and
young people. 
Embedding children’s rights in our decision-making processes 
4. Legal - The short inspection includes a focus on QI 2.1 Safeguarding. In
evaluating this QI, one of the themes that HM Inspectors evaluate is the
school’s Fulfilment of Statutory Duties related to attendance, exclusions, ASL
Act and Associated Code of Practice, Bullying, Equality Act, Health and
Nutrition, and Gaelic education.   
5.  Property/Assets – No risks to property/assets. 
6.  Information Technology – No information and technology risks. 
7.  Equality & Human Rights –
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report. If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website. 
8.  Health & Safety – No negative impacts on health and safety. 
Page 344 of 347

Page 345

Page 4 of 4 
9.  Procurement – No procurement risks 
10.  Risk – No risks identified. 
11.  Privacy Impact – No impact on privacy. 
12.  Cosla Policy Position – N/A 
13.  Climate Risk – None. 
14. Children’s Rights – This links to, Article 12 (respect for the views of the
child) Every child has the right to express their views, feelings and wishes in
all matters affecting them, and to have their views considered and taken
seriously. This right applies at all times, for example during immigration
proceedings, housing decisions or the child’s day-to-day home life. Article 28
(right to education) Every child has the right to an education. Primary
education must be free and different forms of secondary education must be
available to every child. Discipline in schools must respect children’s dignity
and their rights. Richer countries must help poorer countries achieve this.
Article 29 (goals of education) Education must develop every child’s
personality, talents and abilities to the full. It must encourage the child’s
respect for human rights, as well as respect for their parents, their own and
other cultures, and the environment. 
List of Background Papers - The inspection report and additional evidence is
published on the Education Scotland website.
_________________________________________________________
Children’s Services
EH/LG/JO’N
17 February 2026 
Author::
Emma Henry, Head of Education, emma.henry@renfrewshire.gov.uk 
Page 345 of 347

Page 346

1   |    Glencoats Primary School, Renfrewshire Council, 8620024 © Crown Copyright
16 December 2025
Dear Parent/Carer 
In October 2025, a team of inspectors from Education Scotland visited Glencoats Primary
School. During our visit, we talked to parents/carers and children and worked closely with
the headteacher and staff. 
The inspection team found the following strengths in the school’s work. 
• In the school and Flexible Learning Resource, children are very happy, motivated and
well-behaved across the day. They are thriving as a result of highly positive
relationships with staff and outstanding nurturing personalised support. All children feel
valued, included and ready to learn each day. 
• The inspirational leadership of the headteacher empowers skilled teaching and support
staff to deliver a very high standard of learning and teaching across the school.
Planning and assessment are used very well to meet the needs of all children. 
• In the school and Flexible Learning Resource, staff and partners have embedded
highly successful learning experiences and innovative approaches that ensure success
and achievement for all children. This includes areas such as skills development, play,
digital technologies, learning outdoors and cross-curricular lessons. 
• In the school, teaching and support staff deliver very high-quality focused and
targeted work in literacy, numeracy and health and wellbeing. This is raising
attainment and accelerating progress in learning significantly for all children across
the curriculum. 
The following areas for improvement were identified and discussed with the headteacher and a
representative from Renfrewshire Council. 
• Staff should continue to provide high-quality learning experiences that prepare children
very well for life and support them to attain and achieve. 
• Staff in the Flexible Learning Resource should continue to work regularly with colleagues
in similar settings and partners to develop further shared standards and planning. 
Page 346 of 347

Page 347

2   |    Glencoats Primary School, Renfrewshire Council, 8620024 © Crown Copyright
We gathered evidence to enable us to evaluate the school’s work using quality indicators from
How good is our school? (4th edition). Quality indicators help schools, local authorities and
inspectors to judge what is working well and what needs to be improved. Following the
inspection of each school, the Scottish Government gathers details of our evaluations to keep
track of how well Scottish schools are doing. 
Here are Education Scotland’s evaluations for Glencoats Primary
School 
Quality indicators Evaluation
Learning, teaching and assessment excellent
Raising attainment and achievement very good
Descriptions of the evaluations are available from:
How good is our school? (4th edition), Appendix 3: The six-point scale 
A more detailed document called Summarised Inspection Findings (SIF) will be available on the
Education Scotland website at: 
Glencoats Primary School | Inspection Report | His Majesty’s Inspectorate of Education in
Scotland 
What happens next? 
We are confident that the school has the capacity to continue to improve and so we will make
no more visits in connection with this inspection. Renfrewshire Council will inform parents/carers
about the school’s progress as part of its arrangements for reporting on the quality of its
schools. 
Lisa Marie McDonnell
HM Inspector 
Page 347 of 347