1 
To:  Education and Children’s Services Policy Board
On: 30 October 2025 
Report by:  Director of Children’s Services
__________________________________________________________________ 
Heading:  Learning Estate Strategy Update – Longlist Options 
1. Summary 
1.1 In 2024, Renfrewshire Council agreed a new learning estate strategy with the
overall aim of initiating a strategic programme of investment in schools
through detailed assessment of the entire learning estate. The ambition of the
investment programme is to ‘create the best possible learning estate to allow
children and young people to thrive’ 
1.2 A key output of the assessment was identification of a cohort of 14 priority
schools highlighted as requiring investment to ensure they meet the ambition
of the strategy.   
1.3 A decision to review provision at those schools resulted in commencement of
a business case process, setting out the Strategic Case for Change for the
Johnstone primary estate, Johnstone High School and Trinity High School.
These were presented to the Education and Children’s Services Policy Board
in August 2025. 
1.4 This paper notes the progress of the reviews, presenting the current long list
of routes forward for future investment in respect of the above areas.
Members should note that this paper is not the formal OBC document and is
simply an interim communication update on the considerations of options that
will form part of the OBC. Officers are working to compile the detailed analysis
supporting each option in the background, and as agreed, this will be
presented back to the March 2026 Policy Board for Members to decide on the
shortlist of options to proceed with.

Page 2

2 
2. Recommendations  
2.1 It is recommended that members of the Education and Children’s Services
Policy Board: 
a. Note the updates detailed within this report and consider the routes
forward for the future provision of primary education in Johnstone, at
Johnstone High School and at Trinity High School. 
b. Note that these routes forward will be further developed and assessed
in anticipation of submission of Outline Business Cases (OBC),
identifying the recommended way forward for each project and
presenting a shortlist of options for consideration. 
c. Note that informal stakeholder engagement on options for Johnstone
primary and secondary learning estate and Trinity High School will
continue and will inform development of the business cases. 
3. Background 
3.1 Renfrewshire Council published a new Learning Estate Strategy in 2024
setting out plans to improve its education infrastructure through a structured
approach to assessment of school buildings. 
3.2 Schools were assessed against numerous criteria including condition,
suitability for delivery of the curriculum, capacity and demand. 
3.3 Using a prioritisation framework, the strategy assessed the entire school
estate, identifying those areas most in need of consideration as part of long-
term investment planning, to ensure that the Council is best placed to: 
• Secure best value from strategic learning estate decisions around
investment 
• Meet the expected long-term demand for education provision across
Renfrewshire whilst delivering improvements in school buildings and
learning environments 
• Ensure that the delivery of any new infrastructure complements other key
strategic objectives being progressed by the Council to optimise the use of
assets for communities and support wider redesign of services that better
meet the needs of communities. 
3.4 At the Education and Children’s Services Policy Board of March 2025, 14
priority schools were agreed. As this included four schools in Johnstone
(Auchenlodment, St Margaret’s and Thorn Primaries, and Johnstone High
School), it was agreed officers would consider the school estate across the
town when developing and considering options for future investment and
change. This approach will ensure a holistic perspective is taken to the review

Page 3

3 
and option development, securing best use of existing capacity and that future
investment from the Council has the potential to benefit the whole Johnstone
community. 
3.5 As part of the Learning Estate Strategy, it was agreed that neighbouring
schools to those listed in the priorities could be considered as part of a project
to invest in the priority school, however, this should only be progressed if
there is a clear business, education, and social impact evidenced through a
detailed business case process. As a reminder, the agreed 14 priority schools
for investment were as follows: 
Priority
Ranking
Property
Score Establishment Condition Suitability Capacity Quartile
1 2.2 Paisley Grammar School 0.6 0.8 0.4 0.4
2 2.4 Trinity High School 0.9 0.8 0.1 0.6
3= 2.5 Auchenlodment Primary School 0.6 1.2 0.3 0.4
3= 2.5 Heriot Primary School 0.9 1.2 0.2 0.2
3= 2.5 Johnstone High School 0.6 1.2 0.3 0.4
3= 2.5 St Peter's Primary School 0.6 1.2 0.3 0.4
4= 2.6 Bridge of Weir Primary School 0.6 0.8 0.4 0.8
4= 2.6 Thorn Primary School 0.9 0.8 0.3 0.6
4= 2.6 West Primary School 0.9 1.2 0.3 0.2
4= 2.6 Castlehead High School 0.9 1.2 0.3 0.2
4= 2.6 St Margaret's Primary School 0.9 1.2 0.3 0.2
4= 2.6 Gallowhill Primary School 0.9 1.2 0.3 0.2
4= 2.6 Brediland Primary School 0.9 1.2 0.3 0.2
5= 2.7 St Catherine's Primary School 0.9 1.2 0.4 0.2 
3.6 Following the agreement of the priority school lists, in May 2025, members
agreed a standardised four-stage business process and outline timeline for
the priority schools. It was agreed the first projects to move through this
process would be the Johnstone primary estate, Johnstone High School and
Trinity High School. 
4. Business Case Development 
4.1 In August 2025 an update to the Learning Estate Strategy was presented at
the Education and Children’s Services Policy Board. This included a Strategic
Case for Change document for each of the Johnstone primary estate,
Johnstone High School and Trinity High School. 
4.2 The documents set out the factual operating context at the schools and
articulated the strategic need for change. These documents set out the
principal challenges faced by each of the schools, confirming the mandate for
a strategic justification for change, summarising key elements that need to be
addressed at each school/location, and why, which informs and supports
progressing future option development for consideration as part of the overall
business case process.

Page 4

4 
4.3 Members of the Policy Board agreed that the next stage in the process for
these projects would be development of the Outline Business Case (OBC)
stage which will focus on the development of proposed options for change,
supported by a robust analysis of whether such options are beneficial and
viable. The expectation is that the OBC’s will be presented back to this Policy
Board in March 2026 with a preferred route forward, and a short list of
associated options that can achieve this and which would form part of a more
detailed assessment through the Full Business Case stage. 
4.4 To assist with this, officers committed to returning to this Board in October
2025 with an interim update on the OBC options process in respect of each
priority project area. These documents are presented as appendices A, B, and
C, as follows: 
• Johnstone Primary School Estate – Routes Forward
• Johnstone High School – Routes Forward
• Trinity High School – Routes Forward 
4.5 At this stage officers have considered a range of broad options that are
typically involved in a best practice school option appraisal investment
programme to inform viable routes forward for the OBC process. This has
been informed through an understanding of the operating context of each
school set against the business needs, objectives and scope articulated in
critical success factors in the Strategic Case for Change. 
4.6 The critical success factors express criteria which act as a tool for providing
an initial triage assessment of the practicality, adaptability and desirability of
the longlist options. The critical success factors are included below in
Appendix D. 
4.7 As officers work to progress and develop the detail of the OBC stage, the key
routes forward identified in this interim report will be developed into a longlist
of associated options aligned with each potential route, and stakeholder
engagement is expected to play a part in this stage of business case
development. 
4.8 The broad options that are presented at this stage have been assessed with
initial triage level of analysis. The Board should note that at this stage, the
high-level triage analysis is principally supporting the identification of options
that cannot meet the critical success factors and have been noted as not non-
viable and will therefore not be subject to any further in-depth detailed work.
All other options will remain under consideration through the development of
the OBC process until March 2026 when the detailed findings will be
presented back.

Page 5

5 
5. Initial Triage Considerations 
5.1 Officers continue to undertake detailed assessments to develop a longlist of
options in the development of the OBC, however, an initial triage assessment
of the list of potential routes forward has supported an early determination that
some options can be ruled out at this initial stage. 
5.2 This initial triage process has been used to identify option(s)/routes forward
that would fundamentally fail to meet key aspects of the desired outcome
being targeted by the Council. 
5.3 In this context, consideration has been given at this early stage to the critical
success factors included in Appendix D, such as strategic fit, value for money,
and achievability of an option. By way of illustration initial broad options in
relation to Johnstone primary learning estate that promote investment in
buildings that would fail to support the strategic objective of moving school
capacities towards being more efficient and sustainable, have been triaged as
non-viable on the grounds of the evidence presented in the Strategic Case for
Change (presented to the Board in August 2025). The Strategic Case for
Change outlined that the clear and substantial over provision of primary
school capacity in Johnstone, with that excess capacity expected to
deteriorate further over future years as school rolls fall further, with school
capacity anticipated to operate close to 50% in the next 10 years. On that
basis, options that would fail to address this overcapacity would not align with
the agreed Learning Estate Strategy strategic planning objective of striving to
move the Council’s learning estate to have schools operating in an efficient
manner between 80-95% capacity. In this context options that would not
achieve this have been deemed as strategically non-viable at this stage. 
5.4 In addition to the critical success factors outlined at Appendix D, consideration
has also been given to the extent an option or route forward is likely to support
the Council to meet specific space standards that are expected to be met as
part of a modern school provision. given to an option is whether the proposed
development would be acceptable to modern space requirements of the
particular site. 
5.5 In this context there are two core metrics considered as part of this process.
The mandatory minimum site size which must align with the School Premises
(General Requirements and Standards) (Scotland) Act 1967. A clear space
metric is outlined in this legislation for what is the minimum size a site must
meet, depending on the intended number of pupils. It is however also
recognised that these mandatory minimum sizes, fall significantly short of
modern-day requirements and expectations in relation to modern learning
estates. For that reason, BB103 area guidelines for mainstream schools has
also been adopted as the optimal sizing metric when assessing the adequacy
of a site to meet current and future requirements. Use of the BB103 guidance
has provided the opportunity to assess options reflecting contemporary
expectations in respect to modern learning estate site deliverables which are
of particular importance when a local authority is potentially investing at scale

Page 6

6 
to deliver a modern facility that will support community needs for generations
to come. 
5.6 By way of illustration in respect to the application of these key space metrics
in the assessment process, this is clearly evidenced in Appendix C for Trinity
High School. The existing school site is significantly short of both the minimum
legislative requirements, and the BB103 metrics. On this basis alone, it cannot
be justified to rebuild or refurbish a building on the existing site where
legislation and best practice guidance suggests this is not appropriate for
current standards. This factor, along with key elements of the triage
assessment, has supported the early discounting of the existing school or
school site as being option that merit detailed development.   
5.7 According to the 1967 Regulations, a school of the capacity of Trinity High
School (1,032 pupils) shall require a minimum area of 56,656m2 of space to
account for the school and sports provision. The current extent of Trinity High
School site is just 19,516m2, falling significantly short of this metric. As a
comparison, the current Paisley Grammar School Community Campus is
being constructed on a site of over 60,000m2. 
5.8 A link to the School Premises (General Requirements and Standards)
(Scotland) Act 1967 can be found as follows: 
https://www.legislation.gov.uk/uksi/1967/1199/pdfs/uksi_19671199_en.pdf 
6. Value for Money and Affordability 
6.1 Throughout the business case development process, the value for money of
different options will be assessed as part of the overall appraisal criteria to
support the Council to achieve a decision that is best value informed. A value
for money assessment process provides the ability to financially assess
different options over the whole life period of a school, recognising that
different options can present quite different financial requirements both in
scale of initial and longer-term investment, the timing of that investment over
the whole life period as well as wider costs to operate and run the learning
facility. The value for money appraisal process creates a single comparable
measurement of overall cost between different options taking account of initial
investment, major lifecycle and reactive maintenance as well as operational
running costs over the whole life period, adjusting appropriately for the impact
of the time value of money on when those costs are expected to be incurred. 
6.2 It is however important to note that a value for money appraisal and
affordability assessment represent quite distinct financial considerations for
decision making purposes. For example, a particular option may present the
optimal value for money when assessed over the whole life period of a school
but could present challenges in respect to immediate financially affordability
and sustainability. In such circumstances the Council could take an informed
decision to select an alternative option which delivers similar education, social

Page 7

7 
and community outcomes but which has lower but acceptable whole life value
for money, on the basis it is a more financially deliverable or affordable option
within the context of the Council’s financial planning and when set against the
very significant further investment needs in other schools over the long term.   
6.3 During this stage of the business case development process, viable options
will have relatively broad cost estimates applied to provide a contextual
assessment of how the option aligns with the Council’s affordability envelope.
As outlined as part of the initial Learning Estate Strategy, over a 20 - 25 year
strategic planning time horizon, it is likely that the Council will identify long
term investment need running into billions of pounds. To inform initial cost
projections, analysis has been undertaken of two current live Renfrewshire
Council projects (Paisley Grammar School – PGS - and Thistle Primary
School - TPS), to provide live market tested cost metrics that can be used to
inform forecast build rates for future. This process takes account of when
projects are broadly anticipated to reach on-site construction coupled with
published medium term construction market inflation projections.   
6.4 Assuming a mid-point construction in the 1st quarter of 2031 using published
inflation calculations and the projected costs of current projects, it has been
estimated that in a secondary school project of similar site conditions and
design parameters to PGS Campus, the cost metric per secondary pupil is
projected to be circa £76,000. 
6.5 Similarly for a primary school and utilising TPS, it is estimated that in a
primary school project of similar site conditions and design parameters, the
cost metric per primary pupil is projected to be circa £69,000. 
6.6 Whilst no project is the same, and bespoke costings require to be worked up
for each of the options included in the OBC, this information provides general
insight into future cost associated with the construction market and likely
affordability considerations and constraints for the Council when developing
and appraising business case options. To illustrate this point, the Council has
earmarked a further £170 million of investment capacity to support further
investment in the learning estate. Depending upon the mix of future projects
that are agreed, in terms of new build projects, £170m would support new
learning estate facilities of similar specification to PGS/TPS in broad terms for
between 2,200 – 2,450 pupils. That could for example be represented by 2
medium sized secondary schools, or one secondary and three medium sized
primary schools.  This demonstrates the relative constraints of £170 million
and therefore the business case process will consider as part of option
development if there are opportunities within options to deliver efficiencies that
will support both economies of scale in cost and or where the project drives
out revenue efficiencies that could be diverted to support addition borrowing
and expand the Council’s overall investment capacity.

Page 8

8 
7. Further Considerations 
7.1 All of the above information has allowed a first pass triage process to assess
the broad viability of potential routes forward, to allow officers to place full
focus on only viable options. For options that are considered viable, these
have been noted in the appendices of this document as requiring further
investigation and analysis. Officers will continue to assess these options and
will bring in more detailed assessments to inform the production of the OBC
prior to it being presented in March 2026. Examples of the data and further
assessments that will inform these options to allow a short list to be identified
are: 
• Cost estimates of the options 
• Disruption and operational assessments (such as decant strategies,
and school operations during construction)
• Travel considerations (such as school transport implications and
figures) 
• Detailed site assessments for options with alternative sites 
• Planning policy considerations 
• Roll projections and potential class configurations/school rolls for
options that consider merged schools
• Environmental sustainability 
• Wider community benefit, placemaking, and ability for options to
consider partner services 
7.2 The above information will be compiled to create more detailed assessments
of potential options and will supplement the summarised concise analysis of
options included in the appendices of this report. 
8. Land Identification and Assessment 
8.1 It is important to consider that whilst a list of options for routes forward are
presented in this report, there may be several associated sub options that
make up the longlist of options that will be assessed for viable routes forward.
This will include for example a range of alternative possible sites that could
locate a new build school where this has been identified as a viable option for
appraisal. 
8.2 Officers are currently working through a detailed process to identify and
appraise suitable land for relevant options that require it. This process is
considering many factors, and will focus on: 
• Ownership 
• Site area/size
• Active travel 
• Planning policy 
• Placemaking

Page 9

9 
• Flood risk, topography, and history 
• Budget considerations 
• Utilities connections and viability 
• Roads and transport connections and viability 
8.3 To support this process, this exercise is seeking to identify potential land
availability options within the overall catchment of the school or schools in
question and for High Schools in particular, which have much larger
catchments, this may include options which involve sites outwith the town or
immediate location the existing school is located. 
9. Communications & Engagement 
9.1 Since August, officers have started initial informal community and stakeholder
engagement and communication on the business case process. This has
included meetings with head teachers, ward members and parent councils in
the Johnstone and Trinity areas. 
9.2 A survey was also issued to all parents and staff of the agreed priority schools
progressing through the business case process currently (Johnstone Learning
Estate and Trinity High School). This invited their views on what they like
about the school’s condition, facilities and location now, what they would
improve, and what they think should be important to us as we move forward
with future school investment. 
9.3 Findings from this engagement will help to shape the final analysis of options,
and any further options that should be considered. As responses from initial
stakeholder engagement are analysed and understood, officers will carry out
further engagement to ensure awareness and understanding of the processes
the Council are undertaking and to fully capture the views and perspective of
the community and key stakeholders. 
10.  Next Steps 
10.1 Officers will continue to develop the OBC for consideration at the Education
and Children’s Services Policy Board in March 2026, in keeping with the
indicative high-level timeline previously presented to Policy Board in May
2025. 
10.2 It is expected at this point the longlisted options will be appraised and
assessed against the critical success factors and the analysis of those options
will be published for members as part of the OBC. Based on that analysis, the
OBC will recommend a preferred way forward and associated shortlisted
options linked to this would progress into the Full Business Case (FBC) stage
for detailed development and appraisal.

Page 10

10 
10.3 As part of the FBC there will be in-depth analysis of the preferred way forward
and the shortlisted options, including a whole life cost model and ongoing
engagement with relevant stakeholders. Each will be rigorously assessed in
terms of scope, solution, service delivery, implementation and funding. The
FBC are expected to be presented to Policy Board in January 2027. 
10.4 Throughout development of the FBC in 2026, the shortlisted options will begin
their initial design process. This will consider the first draft of building outputs,
including size and scale, as well as the more detailed requirements needed as
part of the development. 
Implications of the Report 
1.  Financial 
Council has agreed to make provision of £2.5m of revenue resource in
2025/26, with similar amounts being committed to on an annual basis each
year over the remaining years of the current Administration. The financial
model underpinning the strategy continues to be developed, along with the
framework and analysis required in the business case process. This financial
provision will fund the programme of work as it progresses through business
case development.  
2.  HR & Organisational Development 
None 
3. Community/Council Planning 
- Our Renfrewshire is thriving   New and improved learning estate
assets will allow our children and young
people to thrive with the best possible
infrastructure to support their school
experience. Staff and community users
will benefit from modern and inclusive
environments
- Reshaping our place, our
economy and our future  
The learning estate shall be
appropriately scaled and equipped to
meet curriculum expectations and
deliver an appropriate learning and
teaching experience for all. 
4.  Legal 
None 
5.  Property/Assets 
These projects will deliver significant improvements to the learning estate,
extending the life of assets and improving the experience of young people,
staff and the wider community.

Page 11

11 
6.  Information Technology  
Digital improvements will be delivered through the learning estate strategy,
where access to technology for all will be a key priority for projects. 
7.  Equality & Human Rights 
The recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report. If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website. 
8.  Health & Safety 
None 
9.  Procurement 
Any procurement work required will be conducted in collaboration with the
Council’s Procurement team and adhere to appropriate regulations. By
developing the business case framework outlined in this report, procurement
and commercial considerations will be conducted throughout. 
10.  Risk 
All projects are bound by rigorous governance and supported by detailed risk
registers. Risk is reported and managed at various levels with scrutiny applied
to ensure mitigations and contingency plans are in place. The business case
framework set out in Learning Estate Strategy updates will directly work to
identify, manage and reduce risk. 
11.  Privacy Impact 
None 
12.  Children’s Rights 
When considering any future school provision, the impact this will have on
children is key consideration and any work will be based around the direct
needs of children to allow their education experience to thrive. Whilst children
have a right to choose where they wish to attend school in collaboration with
their parents, the Council’s admission policy applies, to ensure that schools
that are oversubscribed can be managed. 
13.  Climate Risk  
New and improved learning estate assets will directly contribute to the
Council’s journey towards net zero. Sustainability is a key concept of all
projects. 
14. COSLA Policy Position 
None

Page 12

12 
List of Background Papers - None 
Author: Jack Lochans, Strategic Learning Estate Manager –
jack.lochans@renfrewshire.gov.uk

Page 13

13 
Appendix A – Johnstone Primary School Estate Routes Forward 
Option 1: Do nothing 
Continue to operate all primary schools in Johnstone as they currently are. This
includes: Auchenlodment, St Margaret’s and Thorn Primary Schools which have
been identified as priorities for investment, as well St Anthony’s, St David’s,
Cochrane Castle, and Fordbank Primary Schools. 
Main Advantages 
Value for money  • No capital outlay required, however significant future
capital outlay will be required on building maintenance with
no improvement to configuration or suitability for delivering
the curriculum. 
Main Disadvantages 
Strategic Fit  • Does not achieve ambition of Learning Estate Strategy with
regards to condition or suitability of schools. 
• Underestimates the challenges posed by the current
condition and layout of the school buildings and the
challenge of improving the learning environments.
• Although St Margaret’s predates minimum space
requirements under School Premises (General
Requirements and Standards) (Scotland) Act 1967, and
BB103 Area Guidelines for Mainstream Schools, it should
be stressed that the site is severely constrained, with little
usable outdoor space and the school would not be built to
its current size and extent if planned now.
• No benefit to the wider community can be derived from this
option. 
Value for Money  • Will create an additional burden on the ongoing
maintenance required of these buildings. 
• Schools in Johnstone will continue to operate below
optimal occupancy offering poor value for money in the
long term.
• This option would continue to see a very high standard of
PPP school estate in Johnstone continue to be
underutilised with significant financial outgoings associated
with the ongoing operation of these schools.

Page 14

14 
Conclusions
With the disadvantages outlined above, this is not a viable option and will be
discounted as a route forward. This option would bring no benefit to the
school or wider community and would not serve to improve the education
experience of anyone involved. The primary school estate in Johnstone
would continue to operate at inefficient levels, with roll projections showing
a further decline is to be expected across the area. With regards to the PPP
estate (Fordbank, Cochrane Caste, and St David’s – significant financial
outlay is required each year to operate these, and this option would not work
to make best use of these very high standard buildings.

Page 15

15 
Option 2: Retrofit of all Priority Schools Identified 
Carry out a comprehensive retrofit of the current buildings of Auchenlodment, St
Margaret’s and Thorn primary schools to bring them up to Net Zero Public Sector
Building Standards (NZPSBS) or better, whilst improving the overall condition and
suitability of the environments. 
Main Advantages 
Strategic Fit • Contributes towards net zero ambitions through retention of
embodied carbon and significant improvements in energy
consumption.
• Will allow buildings to be fully reconsidered to improve both
condition and suitability. 
Value for Money  •  Subject to detailed costing it is likely to involve a lower
capital outlay
• Lower operating costs from a more energy efficient building 
Main Disadvantages 
Strategic Fit • Improvements to the site and external learning will be
limited as any improvements need to work with and around
the existing site. 
• This option to retrofit would not address the over-provision
of school capacity in Johnstone and would result in the
school capacity in operation with a declining population.
• Although St Margaret’s predates minimum space
requirements under School Premises (General
Requirements and Standards) (Scotland) Act 1967, and
BB103 Area Guidelines for Mainstream Schools, it should
be stressed that the site is severely constrained, with little
usable outdoor space and the school would not be built to
its current size and extent if planned now. 
Value for Money  • A deep retrofit is a complex and demanding project
requiring careful planning and execution. Although capital
costs would be less in comparison to an equivalent new
build, the costs will still be significant, and will carry
significant inherent risk associated with refurbishing an
existing building and it would have to be evidenced through
whole life cost modelling that a retrofit was better overall
value than new build. 
Affordability  • The full extent of work required, and therefore cost, may
only become fully apparent as areas of the internal fabric of
the building are exposed and a full understanding of the
buildings condition is apparent. This could result in the

Page 16

16 
divergence between refurbishment cost and new build cost
being marginal and ultimately impacting negatively on the
whole life value for money appraisal. 
Achievability  • This option would involve significant disruption to the
Johnstone primary school estate with decants required for
all schools during the extent of the works, or for a very
elongated and costly route to construction by working
around current building users. 
Conclusions 
Whilst this option is more attractive in terms of retaining embodied carbon through
the reprovision of current assets, the overall cost and challenges associated may
represent poor value for money, particularly when considered over a whole life
basis. The scale of school capacity in Johnstone would remain broadly unaffected,
and this option would therefore see significant excess school capacity continue to
be provided across Johnstone, delivering poor long term value for money. It is not
proposed that the option of retrofitting these three priority schools, in their
current context, is a viable option on the grounds of strategic fit whereby it
would not address the clear over provision of school capacity in the area.
Further, it is noted that St Margaret’s Primary School does not meet current
minimum space requirements as per legislation and would therefore be
questionable as to why a significant investment in such a school would be
taken forward given it  is too small for modern standards..

Page 17

17 
Option 3: New Build Schools for all Priority Schools Identified 
Rebuild Thorn, Auchenlodment and St Margaret’s primary schools on their current
sites, to a reduced capacity, to continue as standalone primary schools. Retain St
David’s, Cochrane Castle, Fordbank and St Anthony’s primary schools as they are
now. 
Main Advantages 
Strategic Fit • Ensures that all pupils in Johnstone will be educated in
modern, good condition schools, capable of meeting the
aspirations of the Learning Estate Strategy with regards to
the condition and suitability.
•  
Main Disadvantages 
Strategic Fit • Provision of 3 new schools and disposal of their
predecessors may not be as sustainable as retrofitting
current structures. However, it is recognised that new
buildings would be designed and constructed in a manner
that significantly contributes to the net zero plan with
energy efficiency at the forefront. It is also possible that
material from demolished buildings could be used on new
sites as in fill or for levelling land.  
• Constructing three new schools would not address the
ongoing over provision of school places in Johnstone. To
be able to deliver schools to ‘optimal capacity’ would
require all three new build schools to be smaller than a
single stream primary school (i.e. a school with 1 class
from primary 1 to primary 7 which equals a capacity of 217
places). Roll projections show that all three schools are
expected to fall well below this figure of 217 therefore to
build these schools at an ‘optimal’ capacity would require
very small schools with combined year groups in less than
7 classes. This would be a significantly limiting factor for
schools in such a tight urban geography.
• A new build project on the existing St. Margaret’s site
would not meet minimum space requirements under
School Premises (General Requirements and Standards)
(Scotland) Act 1967, or BB103 Area Guidelines for
Mainstream Schools, and is therefore not a viable option –
a new site would be required. 
Value for Money  • Existing high-quality facilities at the West Johnstone Joint
Campus, and Fordbank, would remain underutilised,
operating below optimal capacity, therefore presenting poor
value for money from the significant financial outlay on
PPP contracts.

Page 18

18 
Affordability  • This option would require considerable capital investment
for single-stream schools and would not offer best value for
money given current and projected demand across
Johnstone as a whole and the wider commitments of the
Learning Estate Strategy.
• The investment required would limit council’s readiness to
address other priority schools identified through the
learning estate strategy
Achievability  • This option would involve significant disruption to the
Johnstone primary school estate with decants required for
all schools during the extent of the works. 
Conclusions 
Providing a new build property for each of the schools would require a significant
capital cost and would leave existing high-quality facilities underutilised and
operating below optimal capacity and would still leave excess capacity across the
whole Johnstone Primary School Estate. Committing to the replacement of three
existing primary schools in like-for-like fashion may impact Renfrewshire Council’s
ability to maintain the necessary pace of investment in the Learning Estate
Strategy. It is proposed that this option is not considered further as part of the
preferred way forward on the basis that this would see the delivery of brand
new very small schools which cannot evidence any form of best value with
such close proximities of schools. Further, with St Margaret’s site not
meeting modern minimum space requirements, it would require a new site to
be identified for a new build school.

Page 19

19 
Option 4: Redesign of the Primary School Estate in Johnstone 
This option would see the development of a wider master plan review and
associated proposals that would deliver a  reduced number of establishments and
right-sized overall school capacity across Johnstone This masterplan approach
would secure the  ambition of accommodating all primary school children in
Johnstone in a good quality school accommodation, with high suitability for delivering
the curriculum, that will sustainably meet the educational needs across Johnstone
over the long term and support wider community needs. This option must consider
the priority establishments that require intervention as part of the Learning Estate
Strategy prioritisation matrix. These schools are Thorn, Auchenlodment, and St
Margaret’s and options will consider: 
• Making best use of capacity of existing high-quality buildings including St
Anthony’s, West Johnstone Joint Campus, and Fordbank. 
• Consider the location of any proposed new build school facility that would look to
combine more than one existing school on the same site
• Consider the most appropriate catchment area configurations to support overall
efficiency and capacity to support the delivery of the best educational outcomes. 
Main Advantages 
Strategic Fit • Ensures that every pupil in Johnstone will be educated in
modern, high-quality condition schools. 
• Meets the requirements of Renfrewshire Council’s vision
for education and the objectives of the Learning Estate
Strategy
• Contributes towards net zero ambitions through provision
of a new school built to NZPBS standard or better, with
significant improvements in energy consumption to the
existing schools.
• Ensures all schools can work at optimal occupancy,
reflecting changing school rolls and demand.
• The sale of disused sites could bring capital receipts to the
council. 
Value for Money • Makes the most of existing high condition facilities
including PPP estate which attracts a high financial output
each year to operate, offering better value for money from
the learning estate in Johnstone
• Offers opportunities to improve Early Years and additional
support needs provision in Johnstone through better use of
existing space.
• Increased value for money through a reduction in operating
costs associated with the operation of combined schools,
and a school built to modern standards.

Page 20

20 
Affordability • Appropriate levels of capital spend required through the
provision of a whole area master planned new build
option(s), and making better use of existing high-quality
assets provides the best opportunity to strategically
develop and identify the most effective solution to meet the
long term needs of Johnstone in a manner that consider
need across the whole geography and will minimise
unnecessary spend. 
Main Disadvantages 
Achievability • Potential need to decant pupils during new build element if
a current school site was selected, could bring disruption
during this period, albeit the scale of disruption of this
option is significantly lower than alternative options
presented.
• Proposals to merge schools and or catchments areas
present concerns linked to the expectations and aspirations
of parts of the school community. 
Conclusions 
This holistic master planned option provides the opportunity to identify a more
efficient use of existing quality learning environments, whilst addressing
overprovision of capacity in Johnstone as a whole. The implementation of a new
build school option to accommodate more than one existing school will also
directly support addressing all objectives of the Learning Estate Strategy and
works to significantly improve the experience of all users of current poor condition
buildings. 
This option would see current high-quality buildings utilised in an efficient way,
making best use of the assets, and ultimately will work to ensure that every
primary pupil in Johnstone is educated in a high-quality building, suitable for
delivering the modern curriculum. 
This option and specific configurations within it should be further
considered in the OBC process as part of the preferred way forward.

Page 21

21 
Summary of Options for Johnstone Primary School Estate 
Option  Description Viable
1 Do nothing 
Continue to operate all primary schools in Johnstone as they currently are. This includes:
Auchenlodment, St Margaret’s and Thorn Primary Schools which have been identified as
priorities for investment, as well St Anthony’s, St David’s, Cochrane Castle, and Fordbank
Primary Schools. 
NO
2 Retrofit of all Priority Schools Identified. 
Carry out a comprehensive retrofit of Auchenlodment, St Margaret’s and Thorn primary schools
to bring them up to Net Zero Public Sector Building Standards (NZPBS) or better, whilst improving
the overall condition and suitability of the environments.
NO
3 New Build Schools for all Priority Schools Identified 
Rebuild Thorn, Auchenlodment and St Margaret’s primary schools on their current sites, to a
reduced capacity, to continue as standalone primary schools. Retain St David’s, Cochrane
Castle, Fordbank and St Anthony’s primary schools as they are now.
NO
4 Redesign of the Primary School Estate in Johnstone 
This option would deliver the implementation of a wider master plan review resulting in a reduced
number of establishments across Johnstone, with the ultimate ambition of accommodating all
primary school children in Johnstone into a good quality school, with high suitability for delivering
the curriculum and supporting wider community needs. This option must consider the priority
establishments that require intervention as part of the Learning Estate Strategy prioritisation
matrix. These schools are Thorn, Auchenlodment, and St Margaret’s. This option will consider
the following: 
YES

Page 22

22 
• Making best use of capacity of existing high-quality buildings including St Anthony’s, West
Johnstone Joint Campus, and Fordbank. 
• The location of any new build school facility that would look to combine more than one existing
school on the same site
• Consider the most appropriate catchment area configurations to support efficiency and
capacity.

Page 23

23 
Appendix B – Johnstone High School Routes Forward 
Option 1: Do nothing 
Retain the building as-is and continue to operate the high school in its current format 
Main Advantages 
Value for money  • No capital outlay required, however significant future
capital outlay will be required on building maintenance with
no improvement to configuration or suitability for delivering
the curriculum. 
Main Disadvantages 
Strategic Fit  • Maintaining the current building will not help ensure
delivery of the best possible learning environments for all
users, nor would it meet the objectives of the Learning
Estate Strategy or help future proof against further
developments in technology or curriculum. 
Value for Money  • The most recent condition report in 2022 assessed the
buildings a ‘C- Poor’ (exhibiting major defects/not operating
efficiently) with a maintenance cost of £10.5m over the
next 18 years to maintain the building as it is now at a poor
standard.
• The building is, and would remain in future, too big for its
current and projected roll, making operation less efficient
and more expensive 
Conclusions
With the disadvantages outlined above, this is not a viable option and will be
discounted as a route forward. This option would bring no benefit to the
school or wider community and would not serve to improve the education
experience of anyone involved. Johnstone High School would continue to
operate at inefficient levels.

Page 24

24 
Option 2: Retrofit of Johnstone High School 
Carry out a comprehensive retrofit of Johnstone High School in order to bring it up to
Net Zero Public Sector Building Standards (NZPSBS) or better, whilst improving the
overall condition and suitability of the environments. 
Main Advantages 
Strategic Fit  • Contributes towards net zero ambitions through retention
of embodied carbon and significant improvements in
energy consumption.
• Spaces within the building can be redesigned to reduce
overall capacity of school to meet decline in demand,
making better use of the asset in a layout reconfiguration. 
Value for Money • Lower operating costs from a more energy efficient building
of a size that allows for optimal occupancy 
• Subject to detailed costing it is likely to involve a lower
capital outlay 
Affordability  • Continued use of existing sports facilities at the adjacent
sports hub and therefore fewer design considerations 
Main Disadvantages 
Strategic Fit  • The most appropriate location and provision within the
asset could be compromised by being constrained with
current configuration and location of building on site. 
Value for Money  • A deep retrofit is a complex and demanding project
requiring careful planning and execution. Although capital
costs would be less in comparison to an equivalent new-
build, the costs will still be significant, and will carry
significant inherent risk associated with refurbishing an
existing building and it would have to be evidenced through
whole life cost modelling that a retrofit was better overall
value than new build.
• Due to the design of current building and inefficient layout,
large portions of the building may require to be demolished
and rebuilt as part of a retrofit, leading to the question of
whether better overall value would be gained in a new
build. 
Affordability • The full extent of work required, and therefore cost and
timeline, may only become fully apparent as areas of the
internal fabric of the building are exposed and a full
understanding of the buildings condition is apparent. This
could result in the divergence between refurbishment cost

Page 25

25 
and new build cost being marginal and ultimately impacting
negatively on the whole life value for money appraisal. 
Achievability  • A decant would be required for pupils of the school over a
long spanning construction period. In a secondary school
this would pose significant challenge in terms of
maintaining curriculum delivery and retaining access to
specialist equipment or workshops. This would add a level
of complexity and cost to the project. 
Conclusions 
This option is more attractive in terms of making the most of existing assets,
retaining embodied carbon and addressing Council commitments on net zero. The
overall cost and challenges associated may represent poorer whole life value for
money if the building cannot meet critical success factors and the ambition of the
Learning Estate Strategy around longevity, for example, if the super structure even
with a deep retrofit, would have a limited lifespan. This option could simply delay
the inevitable requirement of a new build school being required when considered
over a whole lifetime period. 
Although the option can facilitate layout and configuration changes which would
deliver improved suitability and capacity in line with the Learning Estate Strategy, it
would unlikely offer an optimal outcome as the existing building would provide a
level of constraint on flexibility. 
Whilst challenges exist with this option, it is proposed to be retained and
investigated further, particularly around potential decant logistics, and
associated costings of the project. This can then be compared against
alternative options to determine the options with overall best value.

Page 26

26 
Option 3: New Build Johnstone High School on Current Site 
Rebuild Johnstone High School at the current site, with the potential for decanting
current pupils during building works, depending on school placement on site. 
Main Advantages 
Strategic Fit • This would deliver a new school built to modern
educational and building standards, of a size that allows for
optimal occupancy.
• Meets the requirements of Renfrewshire Council’s vision
for education and the objectives of the Learning Estate
Strategy
• Contributes towards net zero ambitions through provision
of a new school built to NZPBS standard or better, with
significant improvements in energy consumption to the
existing school. 
Affordability • Continued use of existing sports facilities at the adjacent
sports hub meaning lower design and build costs 
Main Disadvantages 
Strategic Fit • Strategic Fit - the short-term disruption associated with a
decant may outweigh longer term gain for all stakeholders. 
• Affordability – Decanting pupils and staff may not align
with resourcing constraints especially around available
space or demand for modular classrooms and could
therefore attract significant costs to provide a suitable
decant facility. 
Achievability • A decant could be required depending where new build
was located on the existing site and if the continued
operation of the existing school could not be
accommodated over the full construction period. In a
secondary school this would pose significant challenge in
terms of maintaining curriculum delivery and retaining
access to specialist equipment or workshops. This would
add a level of complexity and cost to the project. 
Conclusions   
This option would be able to deliver on all objectives associated with the Learning
Estate Strategy with the ability to offer an enhanced education experience and
much improved asset with reduced operating costs in a more sustainable fashion.
However, as this option could involve decanting of the school community to

Page 27

27 
facilitate a rebuild of the school, careful consideration of the decant strategy would
have to be undertaken to determine overall impact of this option on the learning
and teaching experience for the period of the decant. The viability of this option
will become clearer in the investigation of a decant strategy, which will
inform costs and disruption. This option should continue to be assessed
further and can then be compared against alternative options to determine
the options with overall best value.

Page 28

28 
Option 4: New Build Johnstone High School on Alternative Site 
Build a new Johnstone High School elsewhere in the catchment on a suitable site;
on completion, demolish the current building and sell or develop the land. 
Main Advantages 
Strategic Fit • This would deliver a new school built to modern
educational and building standards, of a size that allows for
optimal occupancy.
• Meets the requirements of Renfrewshire Council’s vision
for education and the objectives of the Learning Estate
Strategy
• Contributes towards net zero ambitions through provision
of a new school built to NZPBS standard or better, with
significant improvements in energy consumption to the
existing school.
• Would allow repurposing of the existing site for Council use
or sale. 
Achievability  • Flexibility of timescale through the continued operation of
the existing school during the design and build process 
• Avoids decanting of the school community with all
associated cost and upheaval 
Main Disadvantages 
Value for Money • The cost of buying suitable land for the new school if
suitable Council-owned land cannot be identified.
• The potential for increased school transport budgets due to
increased travel distances for pupils
Achievability • The challenge of finding a suitable site for a new school. 
Conclusions 
This option would address condition, sufficiency and suitability and would be able
to meet most of the objectives of the Learning Estate Strategy. The current
unknown of this option is whether the objective could meet active travel objectives
if appropriate land cannot be sourced in an appropriate location of the catchment
area, which would transition too many young people into requiring home to school
transport. This will become clearer through specific site assessments. However,
this option should continue to be assessed further and can then be
compared against alternative options to determine the options with overall
best value.

Page 29

29 
Summary of Options for Johnstone High School 
Option  Description Viable
1 Do nothing 
Retain the building as-is and continue to operate the high school in its current format 
NO
2 Retrofit of Johnstone High School 
Carry out a comprehensive retrofit of Johnstone High School in order to bring it up to Net Zero
Public Sector Building Standards (NZPSBS) or better, whilst improving the overall condition and
suitability of the environments. 
YES
3 New Build Johnstone High School on Current Site 
Rebuild Johnstone High School at the current site, with the potential for decanting current pupils
during building works, depending on school placement on site. 
YES
4 New Build Johnstone High School on Alternative Site 
Build a new Johnstone High School elsewhere in the catchment on a suitable site; on completion,
demolish the current building and sell or develop the land. 
YES

Page 30

30 
Appendix C – Trinity High School Routes Forward 
Option 1: Do nothing 
Retain the building as-is and continue to operate the high school in its current format 
Main Advantages 
Value for money  • No capital outlay required, however significant future
capital outlay will be required on building maintenance with
no improvement to configuration or suitability for delivering
the curriculum. 
• Demand on places for Trinity could be managed through
strict application of Renfrewshire Council admissions policy
for schools. 
Main Disadvantages 
Strategic Fit  • Maintaining the current building will not help ensure
delivery of the best possible learning environments for all
users, nor would it meet the objectives of the Learning
Estate Strategy or help future proof against further
developments in technology or curriculum.
• Although Trinity predates minimum space requirements
under School Premises (General Requirements and
Standards) (Scotland) Act 1967, and Area Guidelines for
Mainstream Schools (BB103) it should be stressed that the
site is severely constrained, with little usable outdoor space
and the school would not be built to its current size and
extent if planned now.
• School capacity is not sufficient for demand, making
operation less efficient and more expensive
• The current building does not meet the ambition of the
Learning Estate Strategy in that it will not help ensure
delivery of the best possible learning environments for all
users or help future proof against further developments in
technology and curriculum. 
• Does not contribute to Renfrewshire Council ambitions for
sustainability and energy efficiency. 
Value for Money  • The most recent condition report shows that remedial
maintenance cost of at least £10m over the next 20 years
will be required to simply maintain the building as it is now.
This would not bring any improvement to the overall
suitability and layout of the building or its grounds to
support curriculum delivery.

Page 31

31 
• The building is, and would remain in future, too big for its
current and projected roll, making operation less efficient
and more expensive 
Conclusions 
With the disadvantages outlined above, this is not a viable option and will be
discounted as a route forward. This option would bring no benefit to the
school or wider community and would not serve to improve the education
experience of anyone involved.

Page 32

32 
Option 2: Retrofit of Trinity High School 
Carry out a comprehensive retrofit of Trinity High School in order to bring it up to Net
Zero Public Sector Building Standards (NZPSBS) or better, whilst improving the
overall condition and suitability of the environments. 
Main Advantages 
Strategic Fit  • Contributes towards net zero ambitions through retention
of embodied carbon and significant improvements in
energy consumption.
• Spaces within the building can be redesigned to reduce
overall capacity of school to meet decline in demand,
making better use of the asset in a layout reconfiguration. 
Value for Money • Lower operating costs from a more energy efficient
building.
• Potentially, less capital outlay required than for a new-build
option. 
Main Disadvantages 
Strategic Fit  • Although Trinity predates minimum space requirements
under School Premises (General Requirements and
Standards) (Scotland) Act 1967, and Area Guidelines for
Mainstream Schools (BB103) it should be stressed that the
site is severely constrained, with little usable outdoor space
and the school would not be built to its current size and
extent if planned now.
• The site constrains would limit the design in being able to
deliver the full ambition of the Learning Estate Strategy. 
Value for Money  • A deep retrofit is a complex and demanding project
requiring careful planning and execution. Although capital
costs would be less in comparison to an equivalent new-
build, the costs will still be significant.
• Due to the design of current building and inefficient layout,
large portions of the building may require to be demolished
and rebuilt as part of a retrofit, leading to the question of
whether better overall value would be gained in a new
build.
Affordability • The full extent of work required, and therefore cost and
timeline, may only become fully apparent as areas of the
internal fabric of the building are exposed and a full
understanding of the buildings condition is apparent. 
Achievability  • A decant would be required for pupils of the school over a
long spanning construction period. In a secondary school

Page 33

33 
this would pose significant challenge in terms of
maintaining curriculum delivery and retaining access to
specialist equipment or workshops. This would add a level
of complexity and cost to the project. 
Conclusions 
This option is more attractive in terms of making the most of existing assets,
retaining embodied carbon and addressing Council commitments on net zero.
However, the option would fail to address challenges around suitability and
sufficiency, with the footprint of the current site falling significantly short of current
required space metrics for a secondary school of this size. This option should
therefore not be considered as part of the preferred way forward.

Page 34

34 
Option 3: New Build Trinity High School at Current Site 
Rebuild Trinity High School at the current site on its existing footprint with
consideration for partner/community facilities, while decanting pupils elsewhere for
the duration of the demolition and building works. 
Main Advantages 
Strategic Fit  • This would deliver a new school built to modern
educational and building standards, of a size that allows for
optimal occupancy.
• Contributes towards net zero ambitions through provision
of a new school built to NZPBS standard or better, with
significant improvements in energy consumption to the
existing school.
• Spaces within the building can be redesigned to reduce
overall capacity of school to meet decline in demand,
making better use of the asset in a layout reconfiguration. 
Value for Money • Lower operating costs from a more energy efficient
building. 
Main Disadvantages 
Strategic Fit  • Although Trinity predates minimum space requirements
under School Premises (General Requirements and
Standards) (Scotland) Act 1967, and Area Guidelines for
Mainstream Schools (BB103) it should be stressed that the
site is severely constrained, with little usable outdoor space
and the school would not be built to its current size and
extent if planned now.
• The site constrains would limit the design in being able to
deliver the full ambition of the Learning Estate Strategy. 
Achievability  • A decant would be required for pupils of the school over a
long spanning construction period. In a secondary school
this would pose significant challenge in terms of
maintaining curriculum delivery and retaining access to
specialist equipment or workshops. This would add a level
of complexity and cost to the project.
• Finding suitable premises in which to base the school
during decant may be an onerous task, whilst the option of
decanting the school community throughout other
secondary schools in Renfrewshire risks additional
upheaval for other school communities

Page 35

35 
Conclusions 
The current site of Trinity High School is unsuitable for construction of a modern
school due to the footprint of the current site falling significantly short of required
space metrics for a secondary school of this size. Any option involving decanting
of the school community to facilitate a rebuild or refurbishment of the school would
bring considerable challenges and disbenefits. This option would fail to achieve
improvements to the suitability of the school environment due to constrained
space. This option should not be considered as part of the preferred way
forward.

Page 36

36 
Option 4: New Build Trinity High School at Alternative Site 
a) Build a new High School elsewhere in the catchment on a suitable site with
consideration for partner/community facilities; on completion, demolish the
current building and sell or develop the land. 
While each individual option will be assessed on its own merits, particular
attention will be given to those that offer the most advantageous and cost-
effective solutions for the wider Learning Estate, maximising opportunities and
delivering benefits for the broader community and estate. 
b) One specific option that will be brought back as part of the OBC, is that in the
consideration of sites, King George V Playing Fields will be explored. Given the
proximity of this site to Renfrew High School, this will warrant as part of this
specific site option appraisal the consideration and implications for the long-term
requirements associated with Renfrew High School and the potential of a joint
campus solution. 
Main Advantages 
Strategic Fit  • This would deliver a new school built to modern
educational and building standards, of a size that allows for
optimal occupancy.
• Contributes towards net zero ambitions through provision
of a new school built to NZPBS standard or better, with
significant improvements in energy consumption to the
existing school.
• Spaces within the building can be redesigned to reduce
overall capacity of school to meet decline in demand,
making better use of the asset in a layout reconfiguration. 
Value for Money • Lower operating costs from a more energy efficient
building. 
Achievability  • Flexibility of timescale through the continued operation of
the existing school during the design and build process
• Avoids decanting the school community with all associated
cost and complication.
• A secondary school building project on a new site would
prove attractive to the market. 
Main Disadvantages 
Achievability  • The challenge of finding a suitable site for a new school.
• The cost of buying suitable land to house the new school if
suitable Council-owned land cannot be identified.

Page 37

37 
Conclusions 
This option would address condition, sufficiency and suitability and would be able
to meet most of the objectives of the Learning Estate Strategy. The current
unknown of this option is whether the objective could meet active travel objectives
if appropriate land cannot be sourced in an appropriate location of the catchment
area, which would push too many young people into requiring home to school
transport. This will become clearer through specific site assessments. However,
this option should continue to be assessed further and can then be
compared against alternative options to determine the options with overall
best value.

Page 38

38 
Option  Description Viable
1 Do nothing 
Retain the building as-is and continue to operate the high school in its current format 
NO
2 Retrofit of Trinity High School 
Carry out a comprehensive retrofit of Trinity High School in order to bring it up to Net Zero Public
Sector Building Standards (NZPSBS) or better, whilst improving the overall condition and
suitability of the environments. 
NO
3 New Build Trinity High School at Current Site 
Rebuild Trinity High School at the current site on its existing footprint with consideration for
partner/community facilities, while decanting pupils elsewhere for the duration of the demolition
and building works. 
NO
4 New Build Trinity High School at Alternative Site 
c) Build a new High School elsewhere in the catchment on a suitable site with consideration for
partner/community facilities; on completion, demolish the current building and sell or develop
the land. 
While each individual option will be assessed on its own merits, particular attention will be
given to those that offer the most advantageous and cost-effective solutions for the wider
Learning Estate, maximising opportunities and delivering benefits for the broader community
and estate. 
d) One specific option that will be brought back as part of the OBC, is that in the consideration of
sites, King George V Playing Fields will be explored. Given the proximity of this site to
Renfrew High School, this will warrant as part of this specific site option appraisal the
YES

Page 39

39 
consideration and implications for the long-term requirements associated with Renfrew High
School and the potential of a joint campus solution.

Page 40

40 
Appendix D – Critical Success Factors 
Critical Success Factors for Learning Estate Projects 
The following factors will be considered when assessing the detail of all options. 
Strategic fit and business needs
• That options meet the objective of providing proposed investment priorities to
complement and enhance the quality of school provision.
• That options overcome the strategic challenges identified of operating schools
which are in poor condition with excess capacity and high operational costs.
• That options fit Renfrewshire Council’s Learning Estate Strategy and other
Council and Scottish Government policies and ambitions for education. 
Potential Value for Money
• That options optimise the social, economic and environmental value to the
community in terms of potential costs, benefits and risks. 
Supplier capacity and capability
• That options match the ability of providers to deliver any required design and
construction services.
• That options are attractive to potential suppliers of design and construction
services. 
Potential affordability
• That options can be funded from available sources of finance.
• That options will align with resourcing constraints recognising the Council will
continue to face affordability constraints over the long term in relation to the scale
of investment that is both affordable in the short term but also financially
sustainable in the long term. 
Potential achievability
• That options will match Renfrewshire Council’s ability to respond to and facilitate
the required changes.
• That options match the skills of Council Officers, Consultants and Contractors
required for successful delivery.
• That options seek to address the aspiration, need and ambition of the school and
wider community.