Page 1

16/01/2024 
Notice of Meeting and Agenda
Economy and Regeneration Policy Board 
Date Time Venue
Tuesday, 23 January 2024 10:00 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN               
Membership 
Councillor Andy Steel (Convener):     Councillor Michelle Campbell (Depute Convener):    
Councillor Alison  Ann-Dowling:  Councillor Stephen Burns:  Councillor Graeme Clark:  Councillor
Andy Doig:  Councillor Neill Graham:  Councillor Lisa-Marie Hughes:  Councillor Robert Innes: 
Councillor Janis McDonald:  Councillor Jamie McGuire:  Councillor Marie McGurk:  Councillor
Iain McMillan:  Councillor John McNaughtan:  Councillor Iain Nicolson:   
Hybrid Meeting
Please note that this meeting is scheduled to be held in the Council Chambers.  However, it is a
hybrid meeting and arrangements have been made for members to join the meeting remotely
should they wish. 
Further Information
This is a meeting which is open to members of the public. 
A copy of the agenda and reports for this meeting will be available for inspection prior to the
meeting at the Customer Service Centre, Renfrewshire House, Cotton Street, Paisley and online
at http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx
For further information, please email
democratic-services@renfrewshire.gov.uk 
Members of the Press and Public
Members of the press and public wishing to attend the meeting should report to the customer
service centre where they will be met and directed to the meeting.
MARK CONAGHAN
Head of Corporate Governance

Page 2

16/01/2024 
Webcasting of Meeting
This meeting will be filmed for live or subsequent broadcast via the Council’s internet site – at
the start of the meeting the Convener will confirm if all or part of the meeting is being filmed.  To
find the webcast please navigate to 
https://renfrewshire.public-i.tv/core/portal/home

Page 3

16/01/2024 
Items of business      
Apologies
Apologies from members. 
Declarations of Interest and Transparency Statements
Members are asked to declare an interest or make a transparency
statement in any item(s) on the agenda and to provide a brief
explanation of the nature of the interest or the transparency statement. 
1 Revenue and Capital Budget Monitoring Report
Joint report by Chief Executive and Director of Finance & Resources. 
1 - 8 
2 Renfrewshire Economic Profile (January 2024)
Report by Chief Executive. 
9 - 28 
3 Cultural Infrastructure Programme Update
Report by Chief Executive. 
29 - 46 
4 Steeple Buildings Kilbarchan - Update
Report by Chief Executive. 
47 - 52

Page 4

No embedded text on this page.

Page 5

To: Economy and Regeneration Policy Board
On: 23 January 2024 
Report by:  Chief Executive and Director of Finance and Resources
Heading:  Revenue and Capital Budget Monitoring as at 10 November 2023 
1. Summary of Financial Position
1.1. The projected revenue outturn at 31 March 2024 for those services reporting
to the Economy and Regeneration Board is an underspend position of £0.033
million (1.0%). 
1.2. The projected capital outturn at 31 March 2024 for projects reporting to the
Economy and Regeneration Policy Board is a breakeven position against the
revised budget for the year of £36.510 million.
1.3. This is summarised in the tables below and further analysis is provided in the
Appendices. 
Table 1: Revenue
Division
Revised
Annual
Budget
£000
Projected
Annual
Outturn
£000
Budget
Variance
(Adv) / Fav
£000
Budget
Variance 
%
Economy and Development 3,413 3,380 33 1.0% 
Table 2: Capital
Division
Revised
Annual
Budget
£000
Projected
Annual
Outturn 
£000
Budget
Variance
(Adv) / Fav
£000
Budget
Variance 
%
Economy and Development 36,510 36,510 0 0%
Item 1
EAR230124 Page 1 of 52

Page 6

2. Recommendations
2.1. Members are requested to:
(a) Note the projected Revenue outturn position detailed in Table 1 above; 
(b) Note the projected Capital outturn position detailed in Table 2 above; and 
(c) Note the budget adjustments detailed at sections 4 and 6. 
3. Revenue
3.1. The Revenue Budget Monitoring report at Appendix 1 identifies a projected
underspend of £0.033 million (1.0%) for all services reporting to this Policy
Board.  Detailed division service reports can also be found here, together with
an explanation of any significant projected variances.
3.2. The projected outturn is based on information currently available, and
assumptions made by service budget holders.  Any changes to these
projections will be detailed in future reports to the Board.
3.3. The main reasons for the projected outturn position are indicated below the
tables showing both the subjective analysis (what the budget is spent on) and
the objective analysis (which division is spending the budget).
4. Revenue Budget Adjustments
Members are requested to note, from Appendix 1, that budget adjustments
totalling £0.371 million have been processed since the previous report to
board.  The adjustment reflects funding transferred from Miscellaneous
Services for employability staffing resources as part of the Scottish
Government No One Left Behind Approach to Employability.  
5. Capital
5.1. The Capital Investment Programme 2023/24 to 2027/28 was approved by the
Council on 2 March 2023. For Economy and Regeneration the approved
capital spend for 2023/24 was £43.201m.
5.2. The Capital Monitoring report at Appendix 2 indicates a revised budget in
2023/24 for Economy and Regeneration of £36.510m. 
Further detail, including reasons for significant variances (where applicable),
can be found at Appendix 2. 
6. Capital Budget Adjustments
6.1. Since the last report, budget changes totalling £1.309m have arisen which
reflect the following:
Page 2 of 52

Page 7

Budget awarded in 2023/24 for £1.309m:
• Shared Prosperity Fund - £0.225m
• RCGF PACE Theatre - £1.084m, awarded from the Scottish
Government’s Regeneration Capital Grant Fund.
______________________________________________________________
Implications of this report 
1.  Financial – The projected budget outturn position for the revenue budget
reported to the Economy and Regeneration Policy Board is an underspend
of £0.033m.  Income and expenditure will continue to be monitored closely
for the rest of the financial year and, where necessary, steps will be taken
to mitigate any overspend.  
The projected outturn position for capital budgets reported to the Economy
and Regeneration Policy Board is breakeven.  The Capital programme will
continue to be monitored closely for the rest of the financial year.   
Any changes to current projections in either Revenue or Capital budgets
will be reported to the board as early as possible, along with an explanation
for the movement. 
2.  HR and Organisational Development 
None directly arising from this report.
3. Community/Council Planning
None directly arising from this report.
4.  Legal 
None directly arising from this report.
5.  Property/Assets 
The Capital expenditure in this board will result in improvements to Culture
and Heritage assets and delivery of strategic place-shaping and
regeneration. 
6.  Information Technology 
None directly arising from this report. 
7.  Equality and Human Rights 
None directly arising from this report.
8. Health and Safety
Page 3 of 52

Page 8

None directly arising from this report.
9. Procurement 
None directly arising from this report.
10. Risk 
The potential risk that the Council will overspend its approved budgets for
the year will be managed at a Council-wide level by the Chief Executive
and Directors.
11. Privacy Impact
None directly arising from this report.
12. 
13.
Cosla Policy Position 
N/a.
Climate Risk
None directly arising from this report.
__________________________________________________________________ 
List of Background Papers
__________________________________________________________________ 
Authors:  Valerie Howie, Finance Business Partner (Revenue) and 
Linsey McGregor, Senior Accountant (Capital)
Page 4 of 52

Page 9

Appendix 1   
Objective Summary
Annual
Budget at
Period 6
Budget
Adjustments
Revised
Annual
Budget at
Period 8
Projected
Outturn
Previous
Projected
Outturn
Variance
Movement
£000 £000 £000 £000 £000 % £000 £000
Economy and Regeneration Management 146 (65) 81 80 1 1.2% 1 0
Economic Development 1,759 371 2,130 2,130 0 0.0% 0 0
Regeneration 1,137 65 1,202 1,170 32 2.7% 29 3
NET EXPENDITURE 3,042 371 3,413 3,380 33 1.00% 30 3
Objective Heading Key Reasons for Projected Variance
Economy and Regeneration Management
Economic Development
Regeneration
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2023/24
1 April 2023 to 10 November 2023
Budget Variance
(Adverse) or Favourable
POLICY BOARD :  ECONOMY AND REGENERATION
No significant projected year end variances to report.
No significant projected year end variances to report.
The projected underspend relates mainly to a higher than expected level of staff turnover.
Page 5 of 52

Page 10

Appendix 1   
Subjective Summary
Annual
Budget at
Period 6
Budget
Adjustments
Revised
Annual
Budget at
Period 8
Projected
Outturn
Previous
Projected
Outturn
Variance
Movement
£000 £000 £000 £000 £000 % £000 £000
Employees 4,838 0 4,838 4,788 50 1.0% 62 (12)
Premises Related 80 0 80 87 (7) (8.8%) (7) 0
Transport Related 3 0 3 4 (1) (33.3%) (1) 0
Supplies and Services 316 0 316 318 (2) (0.6%) (2) 0
Transfer Payments 4,642 0 4,642 4,629 13 0.3% 12 1
Support Services 39 0 39 40 (1) (2.6%) (1) 0
GROSS EXPENDITURE 9,918 0 9,918 9,866 52 0.5% 63 (11)
Income (6,876) 371 (6,505) (6,486) (19) (0.3%) (33) 14
NET EXPENDITURE 3,042 371 3,413 3,380 33 1.0% 30 3
REVENUE BUDGET MONITORING STATEMENT 2023/24
1 April 2023 to 10 November 2023
Budget Variance
(Adverse) or Favourable
RENFREWSHIRE COUNCIL
POLICY BOARD :  ECONOMY AND REGENERATION
Page 6 of 52

Page 11

Appendix 2   
Prior Years Budget Budget Revised Projected
Expenditure at P6 Adjustments Budget Outturn Total Approved Projected
to 31/03/2023 2023-24 0 2023-24 2023-24 Budget Outurn
Project Title to 31-Mar-27 to 31-Mar-27
£000 £000 £000 £000 £000 £000 £000
ECONOMY & DEVELOPMENT
Paisley Art Centre Redevelopment 1,170 1,839 0 1,839 1,839 0 0% 3,050 3,050 0 0%
Paisley Town Hall Redevelopment 17,132 4,668 0 4,668 4,668 0 0% 22,050 22,050 0 0%
Flexible Outdoor Facility/Travel & Accessibility Infrastructure 485 1,172 0 1,172 1,172 0 0% 7,050 7,050 0 0%
Playing Fields and Sports Development 783 4,818 0 4,817 4,817 0 0% 5,600 5,600 0 0%
Paisley Museum 23,624 14,970 0 14,971 14,971 0 0% 45,522 45,522 0 0%
Town Centre Capital Fund 759 167 0 167 167 0 0% 4,037 4,037 0 0%
Paisley Learning & Cultural Hub 4,737 2,197 0 2,197 2,197 0 0% 7,000 7,000 0 0%
Place Based Fund 859 1,400 0 1,400 1,400 0 0% 4,428 4,428 0 0%
Paisley Junctions and Charging Hub 390 2,956 0 2,956 2,956 0 0% 3,346 3,346 0 0%
Townscape Heritage CARS 2 3,086 1,014 0 1,014 1,014 0 0% 4,099 4,099 0 0%
Shared prosperity fund 0 0 225 225 225 0 0% 0 0 0 0%
RCGF PACE Theatre 0 0 1,084 1,084 1,084 0 0% 0 0 0 0%
Total Economy & Development 53,025 35,201 1,309 36,510 36,510 0 0% 106,182 106,182 0 0%
TOTAL ECONOMY & DEVELOPMENT 53,025 35,201 1,309 36,510 36,510 0 0% 106,182 106,182 0 0%
*Rolling programmes have a prior year year expenditure of £0 as the expenditure is not directly linked from one year to the next as a singular project.
RENFREWSHIRE COUNCIL
CAPITAL INVESTMENT STRATEGY - NON-HOUSING SERVICES
1st April to 10th November 2023
POLICY BOARD: ECONOMY & REGENERATION
Current Year 2023-24 Full Programme - All years
Budget Variance (Adverse) or
Favourable
Budget Variance (Adverse) or
Favourable
Page 7 of 52

Page 12

Page 8 of 52

Page 13

___________________________________________________________________
To: Economy and Regeneration Policy Board
On: 23 January 2024
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Renfrewshire Economic Profile (January 2024)
___________________________________________________________________
1. Summary 
1.1 This report contains the nineth edition of the Renfrewshire Economic Profile.
These updates allow members to track changes in the local economy through
a set of key statistical indicators. The last update on the Economic Profile was
brought to the board in January 2023. The report also provides a progress
update in respect of the Glasgow City Region Investment Zone and recent
investments announced in Renfrewshire.  
___________________________________________________________________
2. Recommendations 
2.1 It is recommended that the Board: 
(i) Notes the content of the January 2024 Renfrewshire Economic Profile
Update. 
(ii) Notes the update on the Glasgow City Region Investment Zone (GCR IZ)
and recent investments in Renfrewshire.
___________________________________________________________________
3. Background 
3.1 The purpose of the economic profile update is to describe and track local
demographics and economic indicators for Renfrewshire on an annual basis.
The data and analysis presented provides a context and a baseline to assess
how well the Renfrewshire economy has performed over time. 
3.2 In terms of the profile, as with previous versions of this reports, officers have
selected Scotland and the Glasgow City Region (GCR) as the most appropriate
comparators. The national average is a commonly used guide by most local
authorities in terms of relative performance. 
Item 2
EAR230124 Page 9 of 52

Page 14

3.3 Members comments are welcomed on the format and content of the economic
profile. The profile will be shared with stakeholders and become a key source
of data relating to the performance of the local economy. The profile aligns with
the Renfrewshire Economic Strategy. 
4. Key issues arising from the Renfrewshire Economic Profile. 
4.1 In previous version of these economic profile updates to Board, officers had
selected a range of the latest statistics to see progress against some of the
councils’ key objectives.  This has similarly been done in this year’s update. 
4.2 Renfrewshire’s population continues to grow at a steady rate with this trend
expected to continue until 2043. The 2022 census (superseding National
Records of Scotland data) reveals that the population has grown by 5%
between 2011 and 2022 to 183,800. 
4.3 In line with national records, deaths decreased (4.5%), births increased (6.5%)
but total deaths exceed births. Continued population growth is accounted for by
inflow migration into Renfrewshire’s towns and villages. 
4.4 Renfrewshire’s overall employment rate fell marginally in 2022/23 with a
subsequent slight increase in unemployment and claimant count rates.  At the
same time there has been a moderate increase in economic inactivity
rates. Female employment has decreased by 700 between July 2022 and 2023,
which is comparable to the decrease in male employment (600), because of an
overall decrease in the number of people who are economically active as a
percentage of the overall working age population.  However, both male and
female employment rates are higher than the national averages.
 
4.5 The average weekly income of Renfrewshire’s residents has increased
significantly since the last reporting period, rising from £634.80 to £715.70. A
large number of people continue to be employed in retail (13,000), business
administration (11,000) and manufacturing (8,000). 
4.6 In strategic economic terms, the Gross Value Added (see glossary for
definition) has increased by 11% since the previous reporting period and is now
estimated at £4 billion1. This includes a significant increase in manufacturing
output, the highest per capita in Scotland. 
4.7 Sustainable Tourism continues to grow in importance in Renfrewshire’s
Economy with the number employed in the sector having increased by 1,565 to
6,330 since the last reporting period. 
4.8 There was a significant increase (112%) in direct tourism expenditure from
£88.09m in 2021 to £187.11m in 2022. This is likely attributed to pre and post
pandemic differences and underreported information in 2021.
4.9 Town Centre Vacancy Rates have marginally increased in Renfrewshire’s
towns from 2022 potentially as a result of the pandemic, inflation and the cost-
of-living crisis.
 
1 The latest GVA results are provisional until the following year when they may be revised as a result of late 
returns or information received in the course of the following year's inquiry 
Page 10 of 52

Page 15

4.10 The rate of school leavers in positive destinations (96.6%) in 2021/22 is higher
than the national level and is the 4th highest in the City Region. 
4.11 The supply of new housing per 10,000 population marginally decreased
between 2021 and 2022. Renfrewshire’s rate is the 4th highest in the City
Region and is higher than the national average. 
4.12 The amount of urban vacant and derelict land in Renfrewshire has fallen by
71% since 2016. 
Conclusion 
4.13 Overall Renfrewshire’s economy appears to be performing well when
compared to regional and national rates for a number of key performance
indicators including, GVA, qualifications, employment and earnings.  This report
also highlights the importance of the manufacturing sector to the Renfrewshire
economy.   
4.14 The full economic profile for Renfrewshire is included in Appendix 1 of this
report. 
5.  Glasgow City Region Investment Zone Update (GCR IZ) 
5.1 In June 2023, following an agreement between the UK Government and        
Scottish Governments, it was announced that both the Glasgow City Region
and the North-East of Scotland had been awarded Investment Zones (IZ)
status, the first such zones in Scotland. This commitment has been backed by
funding, which can be used flexibly between capital investment and tax
incentives for investing companies.  The overall goal is to deliver economic
growth, secure more investment and create more high value jobs within the
Region. 
5.2 In the UK Government’s Autumn Statement (Wednesday 22 November 2023),
the Chancellor made a commitment to the expansion of the planned Investment
Zone programme in Scotland. These changes will mean extending the timeline
from five to ten years and doubling the grant to each Investment Zone from
£80m to £160m.   
5.3 Since the announcement, on-going activities between GCR’s Programme
Management Office and Member Authorities, as well as the Scottish and UK
Governments have identified three key priority sectors which will guide
investment, these are: 
 Advanced Manufacturing
 Health & Life Sciences
 Digital & Enabling Technology 
5.4 The next phase is to determine which areas/projects within the Region should
be eligible for IZ funding and support.  There will now be an ‘Open Call’ for sites
focussing on the three priority clusters identified above, aimed at private
businesses across GCR which have been highlighted by the individual
authorities in earlier work.  
Page 11 of 52

Page 16

This approach will incorporate the HM Treasury ‘Green Book’ business case
development guidance.  This phase will run until March 2024.  Officers will now
look to submit a bid for the site at Netherton Campus and wider AMIDS area
and will work with other businesses/organisations in the area on their respective
bids.   
5.5 It is expected that a further update on the outcome of the bid process will be
provided to members in summer 2024. 
6. Investment updates 
New Innovation Hub at Rolls Royce 
6.1. The University of Strathclyde has signed an agreement with Rolls-Royce to
develop an innovation facility at the companies Inchinnan plant. This will enable
the University to scale-up its wide-ranging collaboration activities with partners
across sectors including heat, transport and power electronics. 
6.2 The innovation hub will support the journey to delivering a sustainable net-zero
economy by accelerating the development and deployment of technology
supporting decarbonisation. 
New Oligonucleotide Manufacturing Centre 
6.3 Following the recent announcement of a multi-million-pound fund in the Autumn
Statement, the Centre for Process Innovation (CPI) has initiated a plan to
construct a new facility (the Oligonucleotide Manufacturing Innovation Centre
of Excellence) which will be located adjacent to the Medicines Manufacturing
Innovation Centre (MMIC) at AMIDS. 
6.4. The new facility will manufacture advanced medicines, focusing on
oligonucleotides - a class of molecules which hold the potential to address a
wide range of diseases, from cancer to Alzheimer’s. 
6.5  Construction operations are expected to commence in 2024 and be completed
by late 2025.
__________________________________________________________________
Implications of the Report 
1. Financial – No additional finance is sought.  All funding is accounted for within
existing Council budgets. 
2. HR & Organisational Development – None. 
3. Community/Council Planning – 
 Empowering our Communities – the new Economic Profile will enable
communities to have a clearer understanding of the relative performance of
the Renfrewshire economy. 
 Jobs and the Economy - the new Economic Profile will present a clearer
picture of the relative performance of the Renfrewshire economy. 
Page 12 of 52

Page 17

4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact - None. 
12. COSLA Policy Position – Not Applicable. 
13. Climate Risk – Not Applicable.
___________________________________________________________________
List of Background Papers
None. 
___________________________________________________________________ 
Author: Euan Shearer; Regeneration and Place Manager
Email: euan.shearer@renfrewshire.gov.uk 
 
Page 13 of 52

Page 18

Renfrewshire Economic Statistics (Nineth Edition: January 2024) 
1.  Population 
 
 
 
Renfrewshire   Scotland  Glasgow City Region 
 
 
Population 2022 
183,800 
 
Increase of 5% from 
2011. 
 
5,436,600 
 
Increase of 3% from 
2011. 
1,845,300 
 
Increase of 3% from 
2011. 
 
 
Population 
projection (at 2043, 
2018 based) 
 
185,360 
 
Increase of 4.3% from 
2018. 
5,574,819 
 
Increase of 2.5% from 
2018. 
1,882,792 
 
Increase of 2.7% from 
2018. 
Births (2022) 
1,754 
 
Increase of 6.5% from 
1,647 in 2021. 
46,959 
 
Decrease of 1.7% from 
47,786 in 2021. 
17,324 
 
Increase of 1.6% from 
17,043 in 2021. 
 
 
 
 
 
 
 
Deaths (2022) 
2,130 
 
Decrease of 4.6% 
from 2,232 in 2021. 
 
62,941 
 
Decrease of 1.0% from 
63,587 in 2021. 
20,786 
 
Decrease of 4.2% from 
21,704 in 2021. 
Page 14 of 52

Page 19

Male Life 
Expectancy 2020‐
2022 
75.5  76.5  Female life expectancy 
has increased at a higher 
rate in the 2020‐2022 
period. 
 
Female Life 
Expectancy 2020 ‐ 
2022 
80.72  80.1 
 
 
 
Net Migration 
(2020‐21) 
1,230 
 
2nd highest level of 
net migration in the 
GCR, with an increase 
of 380 from 850 
people in 2019‐20. 
27,800 
 
Increase from 16,900 in 
2019‐20. 
6,500 
 
Decrease of 250 people 
from 6,750 in 2019/20. 
 
 
% of population 
that is of the 
working age (16‐
64yrs) (at 2021) 
 
64% 
 
  64% 
  65% 
 
 
Page 15 of 52

Page 20

2.  Employment 
 
Renfrewshire  Scotland  Glasgow City Region 
 
Economic Inactivity 
Rate (July 2022 – 
2023) 
 
 
23.3% 
26,100 people 
 
 
Rate has increased 2.8% 
between 21/22 and 
22/23 with 3,200 people 
moving from 
economically active to 
inactive. This is reflected 
in the reduced 
employment rates below. 
 
Renfrewshire’s increase 
is primarily due to ill 
health. Figures have 
started to fall again in the 
last quarter. 
22.6% 
 
Rate has decreased 
0.3% between 21/22 
and 22/23.   
Renfrewshire has the 
third lowest inactivity 
rate in the GCR. 
North Lanarkshire has 
the highest inactivity 
rate at 26.8% and 
South Lanarkshire has 
the lowest at 17.3%. 
 
 
Employment rate ‐ 
aged 16‐64 (July 22 – 
June 23) 
75.5%  
88,000 people 
 
This rate has decreased 
by 1.9% (1,200 people) 
compared to the 
previous 2021‐ 2022 
figure.   
74.8% 
 
Rate has increased by 
0.4% in comparison 
to the previous 2021 
‐2022 figure. 
Renfrewshire has had 
the second highest 
employment rate in 
the GCR after South 
Lanarkshire (80.8%). 
North Lanarkshire has 
the lowest (70.6%). 
 
 
Employment rate – 
Male 16‐64 (Jul 
2022‐Jun 2023) 
77.7% 
42,000 men 
 
This rate has increased 
(5.2%) compared to the 
previous 2021‐ 2022 
figure however the 
number of men in work 
actually reduced by 600.  
76.9% 
 
The national 
employment rate for 
males is lower than 
the Renfrewshire 
rate.  
Renfrewshire has the 
fourth highest male 
employment rate in 
the GCR. 
 
South Lanarkshire has 
the highest (85.2%) 
and Inverclyde has the 
lowest (65.7%). 
 
 
 
Employment rate ‐ 
Female 16‐64 (Jul 
2022‐June 2023) 
73.7% 
45,900 women 
 
Rate has decreased 
(8.6%) compared to the 
previous 2021 ‐ 2022 
figure representing 700 
less women in work. 
 
72.8% 
 
The national 
employment rate for 
females is lower than 
the Renfrewshire 
rate. 
Renfrewshire has the 
4th highest female 
employment rate in 
the GCR, with North 
Lanarkshire having the 
lowest (61.5%). 
Page 16 of 52

Page 21

Renfrewshire  Scotland  Glasgow City Region 
 
 
Unemployment Rate 
16‐64 
(July 22 – June 23) 
3.0% 
2,700 people 
 
An increase of 0.3% from 
2021 – 2022. 
3.3% 
 
0.2% decrease since 
2021 – 2022. 
 
Renfrewshire has the 
fifth lowest 
unemployment rate in 
the GCR.  
 
Glasgow City has the 
highest at 4.40% 
Claimant Count (Nov 
2023) 
 
3.0% 
3,510 people 
 
The percentage remains 
the same at 3% from a 
year ago (Nov 22) with an 
increase of 60 people 
claiming benefits. 
 
3.0% 
 
Decrease of 0.1% 
compared to 
November 2022 
figure. 
3.2% 
 
Renfrewshire has the  
3rd lowest proportion 
in the GCR.  
 
Glasgow City has the 
highest proportion 
(4.6%) whereas East 
Renfrewshire and East 
Dunbartonshire have 
the joint lowest (1.8%). 
 
 
 
Occupations 
(Workplaces in 
Renfrewshire; at 
2022) 
Renfrewshire has above 
average employment in: 
 Manufacturing 
(8,000) 
 Retail (13,000) 
 Business 
administration 
(11,000) 
 Transport and 
Storage (6,000) 
 
Scotland is closer to 
Renfrewshire in 
terms of the 
proportion for 
construction and 
health but is lower in 
other sectors, such as 
manufacturing and 
transport and 
storage. 
 
Renfrewshire has 
much higher 
proportions of 
employment than the 
GCR in:  
• Manufacturing 
• Transportation and 
Storage; and 
• Business 
administration  
 
 
 
 
Earnings (at 2023) 
Median weekly earnings 
for full‐time employees 
living in Renfrewshire are 
£715.70. 
 
 
Median weekly 
earnings for full‐time 
employees living in 
Scotland are £702.40. 
 
 
Renfrewshire’s Median 
weekly earnings are 
slightly lower than the 
GCR average of 
£739.30. 
 
GCR figures are 
skewed by outlier 
performances from 
East Dunbartonshire & 
East Renfrewshire 
which have median 
incomes of £822.80 & 
£858.70 respectively. 
Page 17 of 52

Page 22

Renfrewshire  Scotland  Glasgow City Region 
Employment in low 
pay sectors (%) 2021 
34.9% 
 
Decrease from 35.1% in 
2020. 
29.6% 
 
Increase of 0.9% from 
2020. 
31.4% 
 
Renfrewshire has the 
highest rate in the 
GCR. North Lanarkshire 
has the lowest rate at 
26.9% 
 
 
Qualifications NVQ4 
and above % of pop 
16‐64yrs (Jan‐Dec 
2021) 
50.4% 
 
9.9% increase from 2018. 
50.0% 
 
5.8% increase from 
2018. 
Renfrewshire has the 
4th highest rate of 
qualification at this 
level in the GCR with 
East Renfrewshire the 
highest (63.5%) and 
West Dunbartonshire 
the lowest on (36.0%). 
 
 
 
No Qualifications % 
of pop 16‐64yrs (Jan‐
Dec 2020) 
 
7.1% 
 
3.1% decrease from 
2018. 
7.8% 
 
1.9% decrease from 
2018. 
10.8% 
 
East Renfrewshire has 
the lowest percentage 
of residents with no 
qualifications in the 
GCR.  North 
Lanarkshire has the 
highest  at 18.6% 
 
% of School Leavers 
in Positive 
Destinations 
2021/2022 
 
 
96.6 
 
1.7% increase from 
2018/2019. 
95.7% 
 
0.7% increase from 
2018/2019. 
96.1% 
 
Renfrewshire has the 
4th highest attainment 
level in the GCR.  East 
Dunbartonshire has 
the highest % at 98.9%, 
with Inverclyde the 
lowest 94.0% 
 
 
 
% of Households 
that are Workless 
2022 
17.9% 
 
Increase of 1.6% from 
2018. 
18.6% 
 
Increase of 1.5% 
since 2018. 
22.1% 
 
North Lanarkshire has 
the highest % in the 
Page 18 of 52

Page 23

Renfrewshire  Scotland  Glasgow City Region 
 
 
GCR at 27.1%. 
Inverclyde has the 
lowest at 15%. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 19 of 52

Page 24

3. Business 
 
Renfrewshire  Scotland  Glasgow City Region 
 
 
 
Private Enterprises 
(2023) 
4,630 
 
86% are micro 
businesses with less 
than 10 employees. 
 
12% are small 
businesses (10 to 49). 
 
2% have been 50 and 
250 employees. 
 
Less than 1% are 
classed as large 
businesses with more 
than 250 employees. 
 
This figure is for VAT 
and/or PAYE 
registered enterprises 
171,350 
 
Generally, an 
equivalent split to 
that of 
Renfrewshire’s with 
around 98% of 
businesses being 
classed as either 
micro or small. 
Renfrewshire has a higher 
proportion of larger sized 
organisations compared 
to areas such as East 
Dunbartonshire and East 
Renfrewshire. 
 
 
 
 
 
 
 
 
Business Start Ups 
(per 10,000 working 
age population, 
2021) 
55.4 
 
 
16.9% increase from 
2020. 
54.1 
 
 
12.2% increase from 
2020. 
 
57.7 
 
Renfrewshire had the 4th 
largest number of start‐
ups (640) with Glasgow 
City the most with 2,960 
and Inverclyde the fewest 
with 160. 
 
 
 
 
 
 
Business Closures 
(per 10,000 working 
age population, 
2021) 
50.2 
 
 
 
 
 
2.2% increase from 
2020. 
56.4 
 
 
 
 
 
8.3% increase from 
2020. 
 
 
 
53.7 
 
Renfrewshire had the 3rd 
lowest Business Death 
Rate in the GCR, with East 
Renfrewshire the highest 
(64%) and Inverclyde the 
lowest (40.8%). 
 
 
 
 
 
 
Page 20 of 52

Page 25

Renfrewshire  Scotland  Glasgow City Region 
 
 
 
 
GVA (2021) 
 
 
£4 billion 
 
GVA has grown by 11% 
between 2020 and 
2021.  
 
 
£99.3 billion 
 
GVA has grown by 
21.9% nationally from 
£81.5 billion reported 
between 2020 and 
2021.  
 
 
 
£29.9 billion 
 
Glasgow City (£13.6 
billion) accounts for 
45.6% of the GCR. 
 
 
Renfrewshire accounts 
for the third highest 
amount of GVA – 13.5%. 
East Renfrewshire has the 
lowest at 1.7% 
 
 
Town Centre 
Vacancy Rates 
(2023) 
 
 
Paisley – 21% 
Renfrew – 16% 
Johnstone – 19% 
Erskine – 0% 
Braehead – 15% 
Linwood – 0% 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page 21 of 52

Page 26

4.  Manufacturing 
 
Renfrewshire  Scotland  Glasgow City Region 
 
Number Employed 
in Manufacturing 
Sector (2022) 
8,000 
This figure has remained 
stable on the 2019 figure 
but is an 11% decrease 
from the 2018 figure 
(9,000). 
171,000 
The total number of 
jobs in Manufacturing 
in Scotland has fallen 
by 4% from the 2018 
figure. 
 
 
 
54,000 
Glasgow City has the 
highest number of 
manufacturing jobs in 
the GCR (18,000) and 
East Renfrewshire the 
lowest (500). 
 
 
 
Number Employed 
in Manufacturing 
Sector per 10,000 
working age 
population (2022) 
664.5 
 
Renfrewshire has a 
higher rate of 
employment in 
manufacturing than the 
GCR and Scottish rates.  
501  458.77 
 
Only Renfrewshire, 
North Lanarkshire and 
South Lanarkshire have 
higher rates than the 
Scottish average rate 
and Renfrewshire is the 
highest in the GCR.   
 
 
 
 
 
 
 
 
Manufacturing as % 
of total 
employment (2021) 
9.3% 
 
Down slightly on the 
2021 figure (9.5%). 
6.8% 
 
Moray has the highest 
proportion of 
employment in 
manufacturing in 
Scotland (16.2%) and 
East Renfrewshire the 
lowest (2.4%). 
6.2% 
 
Renfrewshire has the 
highest proportion of 
employment in 
manufacturing in the 
GCR (9.3%) and East 
Renfrewshire has the 
lowest (2.4%). 
 
 
 
 
% of Scottish 
Manufacturing GVA 
(2021) 
11.2% 
 
Renfrewshire 
contributes a higher 
proportion to Scottish 
manufacturing GVA than 
its overall contribution 
to Scottish GVA (4.0%). 
100% 
 
Renfrewshire has the 
highest manufacturing 
GVA in Scotland.  
35.3% 
 
Glasgow City Region 
collectively accounts 
for around £5 billion 
GVA in manufacturing 
to the Scottish 
economy. 
Page 22 of 52

Page 27

Renfrewshire  Scotland  Glasgow City Region 
 
Manufacturing as a 
% of GVA (2021) 
 
 
39.6% 
 
Renfrewshire has the 
fourth highest 
manufacturing % of GVA 
in Scotland. 
14.3% 
 
Angus has the highest 
manufacturing % of 
GVA in Scotland 
42.3%. Aberdeen City 
has the lowest at 4.8% 
 
 
16.88% 
 
West Dunbartonshire 
has the highest 
manufacturing % of 
GVA in the GCR 40.1% 
East Renfrewshire has 
the lowest 6.5% 
 
 
 
Page 23 of 52

Page 28

5. Tourism 
 
Renfrewshire  Scotland  Glasgow City Region 
 
 
 
Sustainable 
employment in 
tourism (at 2023) 
6,330 
 
Increase of 1,565 
employees on the figure 
of 2022. 
235,500 
 
 
Increase of 56,050 on 
the figure of 2022. 
67,635 
This accounts for 28% of 
Scottish sustainable 
tourism employment.  
Renfrewshire has the 
fourth highest level of 
sustainable tourism 
employment (11%) in the 
Region. Glasgow has the 
largest with 34,130 (58%) 
and East Renfrewshire 
the smallest with 1,920 
(3%). 
 
 
 
Direct expenditure 
(visitors, 2022) 
£187.11m 
This is an increase of 
112.4% on the 2021 figure 
of £88.09m  
 
 
 
n/a 
 
STEAM is commissioned 
at a local authority level 
and therefore does not 
provide a Scotland or 
city‐region wide figure 
n/a 
 
Visitors to Events 
(2023) 
16,731 
Visitors from outwith 
Renfrewshire are reported 
for 2 events in 2023 
(Paisley Food and Drink 
Festival and Paisley 
Halloween Festival). The 
Spree did not take place in 
2023, and numbers have 
not yet been recorded for 
Paisley Christmas Lights 
Switch On. 
‐  ‐ 
 
 
 
All Visits to 
Attractions (2022) 
 
1.03m 
 
An increase of 1.7% from 
2021 figures. 
 
_  _ 
 
 
Page 24 of 52

Page 29

6. Housing  
 
Renfrewshire  Scotland  Glasgow City Region 
 
 
Supply of New 
Housing – 
Rate per 10,000 
Population (2022) 
45.3 
 
There was a slight 
decrease in house 
building completions in 
Renfrewshire between 
2021 and 2022 from 897 
to 832. 
43.6 
 
There was an increase 
in house building in 
Scotland between 
2021 and 2022 from 
22,596 to 23,692. 
36.5 
 
Renfrewshire has the 
3rd highest rate of new 
house building per 
10,000 population in 
the GCR. East 
Renfrewshire has the 
highest (58.0) and East 
Dunbartonshire the 
lowest (13.4). 
 
 
 
 
 
 
 
Supply of New 
Housing – Rate per 
10,000 Population 
(average 2018 to 
2022) 
 
44.0  37.5  31.5 
 
Renfrewshire has the 
second highest 5‐year 
rate of new house 
building in the Glasgow 
City Region. South 
Lanarkshire has the 
highest (47.2) and East 
Dunbartonshire the 
lowest (21.5). 
 
 
 
 
 
 
% premises with 
available Fibre 
broadband 
connection (2022) 
73.5% 
 
 
59.5% increase from 
January 2021. 
39.7% 
 
 
  35.4% 
Renfrewshire has the 
highest rate in the 
GCR. West 
Dunbartonshire the 
lowest 4.9%. 
 
 
254ha 
 
Renfrewshire has 
experienced a 71% 
reduction in Urban VDL 
between 2016 and 2022. 
9,236 ha 
 
Overall Urban VDL has 
reduced by 27% 
between 2016 and 
2022. 
3,184 ha 
 
This is 34% of the 
Scottish total. 
Renfrewshire has the 
4th highest total area 
of vacant and derelict 
Page 25 of 52

Page 30

Renfrewshire  Scotland  Glasgow City Region 
 
Urban Vacant and 
Derelict Land 
(Hectares; 2022) 
land in the GCR with 
North Lanarkshire the 
highest with 1,302 
hectares and East 
Renfrewshire the 
lowest with 47 
hectares. 
 
 
 
 
Urban Vacant and 
Derelict Land as % 
of all Scottish V&D 
land (2022) 
2.7% 
 
  100%  34.5% 
 
Renfrewshire has the 
4th highest % of 
Scottish V&D land in 
the Glasgow City 
Region with North 
Lanarkshire the highest 
(14.1%) and East 
Renfrewshire the 
lowest (0.5%). 
 
 
Derelict Land as % 
of total land area 
(2022) 
0.5% 
 
 
  0.1%  0.7% 
Renfrewshire has the 
4th highest % of its 
total area classed as 
urban vacant or 
derelict in the GCR, 
with Glasgow City the 
highest (2.9%) and 
South Lanarkshire the 
lowest (0.2%). 
 
 
 
Total Vacant & 
Derelict Land (Ha) in 
bottom 15% SIMD 
areas (2022) 
 
 
49 ha 
 
6.8% increase from 2021. 
976.4 ha 
 
7.7% decrease from 
2021. 
280.6 ha 
 
Renfrewshire has the 
5th highest amount in 
the GCR. Glasgow City 
has the highest amount 
at 501.4, with East 
Renfrewshire the 
lowest with 0.5. 
Page 26 of 52

Page 31

Renfrewshire  Scotland  Glasgow City Region 
 
Breakdown of 
Tenure Type (2020) 
Total Dwellings: 88,355 
Owner Occupied – N/A 
Private vacant/second 
homes – 2% 
Private Rented – N/A 
Socially Rented – 24% 
Total Dwellings: 
2,645,298 
Owner Occupied – 
58% 
Private vacant/second 
homes – 4% 
Private Rented –15% 
Socially Rented – 23% 
Total Dwellings: 
885,555 
Owner Occupied – N/A 
Private vacant/second 
homes – 2% 
Private Rented –N/A 
Socially Rented – 28% 
 
 
 
Effective Housing 
Land Supply % 
Brownfield (2021) 
 
88%  
 
This figure is from 
Renfrewshire's Housing 
Land Audit. It represents 
the % of the land supply 
that will produce units in 
the next 7 years that is 
classed as brownfield. 
 
 
 
Glossary: 
Claimant Count:  The Claimant Count is a measure of the number of people claiming
benefits principally for the reason of being unemployed, based on administrative data
from the benefits system. 
Employment in low pay sectors: These include employment in the retail and hospitality
sectors. 
Gender Employment Gap:  The percentage point difference between the employment
rates for men and women (aged 16-64). This is calculated by subtracting the
employment rate for women from the employment rate for men. A positive employment
gap indicates a higher employment rate for men compared with women, while a
negative employment gap indicates a higher employment rate for women.
Employment rate is the number of people in employment (aged 16-64) divided by the
overall population (aged 16-64). 
Gross Value Added (GVA): Gross Value Added measures the value generated in the
production of goods and services. It is one measure of overall economic performance.
School Leavers in Positive Destinations:  Includes higher education, further education,
training, employment, voluntary work, Personal Skills Development and (Activity
Agreements. 
Sustainable Tourism:  Sustainable Tourism sector was identified in Scotland’s
Economic Strategy as one of the growth sectors in which Scotland can build on
existing comparative advantage and increase productivity and growth. 
Page 27 of 52

Page 32

Scotland’s tourism sector is a diverse industry, with a range of sub-sectors such as
hotels, camping sites and other provision of short stay accommodation, restaurants,
bars, travel agents, museums and other recreational and cultural activities. 
Vacant and Derelict Land: Vacant land is defined as land within a settlement that has
been previously developed, without physical constraint, and which the planning
authority has indicated is available for redevelopment. Derelict land is defined as land
'damaged by development, so that it is incapable of development for beneficial use
without some remedial works'.
 
Page 28 of 52

Page 33

___________________________________________________________________
To: Economy & Regeneration Policy Board
On: 23 January 2024
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Cultural Infrastructure Programme Update
___________________________________________________________________
1. Summary 
1.1. This report is to update the Board on the progress of Renfrewshire Council’s
Cultural Infrastructure Programme, being delivered on behalf of the Council by
the City Deal & Infrastructure Team (with project management expertise from the
Council’s Property Services team) with the Paisley Museum Project being
delivered by OneRen.
 
1.2. The Cultural Infrastructure Programme investment in Paisley town centre will use
our internationally significant cultural and heritage story to transform our future
for visitors and events within Scotland. This programme of work will bring new
footfall and life to the town centre, new homes for top class cultural events, whilst
preserving the heritage of the town. 
1.3. As noted previously, the Cultural Infrastructure Programme has experienced
significant impact from recent global events including the pandemic and war in
Ukraine which has resulted in an economic challenge, particularly noticed in the
construction industry. Completion of these projects are central to the recovery
and inclusive growth of the Renfrewshire economy and Paisley Town Centre. As
a result of these global issues, all projects have been re-baselined and plan to
deliver as per the latest update included in this paper. 
1.4. The Cultural Infrastructure Programme has seen a successful 2023 with the
opening of both Paisley Town Hall, and Paisley Learning & Cultural Hub. Paisley
Town Hall has successfully hosted several events since opening, including the
Royal National Mòd. The programme of work continues into 2024 where the
Paisley Arts Centre will be the next venue completed, ahead of the flagship
Paisley Museum. This report also outlines other works included in the wider
spectrum of the programme including external sports and public realm and the
successful TH.CARS2 regeneration scheme. 
Item 3
EAR230124 Page 29 of 52

Page 34

________________________________________________________________________
2. Recommendations 
2.1. The Economy & Regeneration Policy Board is asked to: 
i) Note the progress and current stage of construction of the projects outlined
in this paper. 
ii) Note the areas being considered in relation to the operating model of
Paisley Museum as outlined in section 7.9 – 7.14 
________________________________________________________________________
3. Project Updates 
3.1. Whilst each of the Cultural Infrastructure projects individually contribute to
economic growth in Renfrewshire, it is important to note that the combined social
and economic outcomes from across these investments are greater than the sum
of the individual parts. Coupled with the Councils wider economic investments in
City Deal, AMIDS, housing, and other regeneration projects, these social and
economic outcomes for our local residents and visitors is enhanced further. 
4. Paisley Town Hall Redevelopment 
4.1. Paisley Town Hall has been transformed into one of the top class entertainment
venues in Scotland. The completion of the major refurbishment has brought this
venue high onto the cultural map with the benefits already being realised. 
4.2. Paisley Town Hall main works construction contract successfully completed on
10th July 2023. The building has now been operating since September 2023 with
several events having taken place. The programme of events so far included the
successful Royal National Mòd, hosted in October 2023 which was a great
success for Renfrewshire and the local community followed by a series of high
profile sell out events. OneRen, as the venue operator continue to plan the
programme of events for the coming year and beyond with marketing of the
venue continuing to increase.  
4.3. Due to the scale of construction in Paisley Town Hall, a period of snagging and
defect management has been ongoing and is drawing to a close with no
significant issues. This difficult process has been compounded by the historic
nature of the building and the constraints on very specific material requirements
and methods of construction. 
4.4 A review is currently underway of the lifecycle and maintenance requirements for
the Town Hall which will in time be widened to include the Paisley Arts Centre
and the Museum as it is imperative that the ambitious investment in these venues
is safeguarded in the coming years. When concluded this will be the subject of a
future report. 
Page 30 of 52

Page 35

Page 31 of 52

Page 36

5. Paisley Learning and Cultural Hub 
5.1. Paisley Learning and Cultural Hub is a 21st century community hub and a
modern home for library services at the heart of Paisley High Street, bringing
new footfall into the town centre. Construction and fit out of this building have
recently completed, making it the latest milestone to be achieved in the cultural
investment programme. The venue opened its doors to the public in November
2023 following the construction, fit out, and relocation of the temporary Paisley
Central Library which was based within the boundaries of the Lagoon Leisure
Centre.   
5.2. Having taken over a previously vacant and derelict building on Paisley’s High
Street, the new home of library services has seen a flurry of interest with one of
the most positive public reactions from both social media and direct public
contact. This building is offering the public a new destination and reason to visit
the town centre, attracting new and increased footfall which will have a direct
benefit to all local businesses. 
5.3. The inclusion of a large bespoke children’s play structure has brought a first of
its kind initiative to a library in Scotland where play will be directly linked to
education through literacy and digital mechanisms. A substantial digital fit out
has taken place with the building being fully connected to free Wi-Fi, a number
of publicly accessible PCs, printers, and a host of audio visual and sensory
systems to cater to all and make the Central Library one of the best in the country.
A number of visits have taken place by neighbouring local authorities with each
of them expressing an ambition to be able to build a library of the standard that
Renfrewshire has achieved. This feedback has further bolstered the position that
Renfrewshire is at the forefront of library service provision with this new facility.   
Page 32 of 52

Page 37

Page 33 of 52

Page 38

6. Paisley Arts Centre 
6.1. Paisley Arts Centre is being extended and upgraded into a unique and intimate
performance venue and creative hub, driving new life and footfall into the heart
of the town centre. This refurbishment project includes a complete replacement
of the building’s mechanical, electrical and plant equipment, a full refurbishment
throughout, new retractable seating, accessibility improvements and a new,
modern, extension to improve the number of covers in the bar. These
improvements are further supplemented by the creation of a new external public
realm space to provide additional event capacity. 
6.2. The contractor aims to deliver this building in early 2024 following a number of
challenges due to the historic nature of the building and the confined working
space. Risk does remain to the timeline, however expectations are that
construction will complete in the first quarter of 2024, followed by an extensive fit
out phase before formal opening. 
6.3. The building is moving to the finishing stage of construction with internal finishing
now taking place. Final structural elements are being finalised and the majority
of work is transitioning to decoration and final fix activities. The implementation
of a tension wire grid system has been a significant milestone for construction.
This structure is fully supported at ceiling height of the auditorium and provides
safe access for technicians to support audio-visual equipment for performances. 
6.4. Alongside the construction on site work has also commenced for the fit out of the
building with all audio-visual equipment procured. A sequencing and
procurement process is now underway to support the fit out including furniture,
catering, ICT and all building provisions. Alongside this exercise, OneRen are
beginning the planning of operational activities including procedures, licencing,
insurance, and resourcing. OneRen are also considering the events programme
for the venue with more detail being confirmed in early 2024. 
Page 34 of 52

Page 39

Page 35 of 52

Page 40

7. Paisley Museum Reimagined 
7.1 Paisley Museum Reimagined will be a world-class destination telling the
inspirational stories of Paisley’s people and pattern and showcasing its
internationally significant collections. This project includes repairing and
renovating all buildings on the museum campus delivering a 20% increase in the
overall usable area. The construction also includes a new extension housing a
visitor reception and café, the installation of new mechanical, electrical and plant
systems, as well as the introduction of a public courtyard. Importantly, this work
enables an increase in the interpretation of the collections and number of objects
on display, with a strong focus on digital interpretation. 
Construction Work 
7.2 Construction is expected to complete next Autumn and discussions are ongoing
to secure earlier beneficial access for exhibition fitout and object install
programmes to mitigate the extended completion date. Construction has been
hampered by historic maintenance issues and therefore more extensive work
than was previously anticipated has been necessary. 
7.3 Despite pressures to the overall programme there is significant progress on site: 
 Approximately 90% of work on the roofs are now complete and new rooflights
installed. 
 The installation of the red glass panes at the new entrance is now complete as
well as the west extension aluminium façade. 
 The new West extension goods lift installation has commenced and the East lift
steelwork has been installed.   
 Plaster preparation and repairs are complete on level 3 and high level
decoration has now commenced in Galleries 2-5. Internal repairs preparatory
work is progressing elsewhere in the main building. 
 External landscaping work has commenced at the top of the site in front of the
Observatory, Oakshaw buildings, Transit House and rear of Gallery 1. 
Exhibition Fitout 
7.4 Fabrication of all display cladding panels and standard/bespoke skirtings is
complete and in offsite storage awaiting install. 
Digital Interactives 
7.5 All digital software contracts are awarded and production is well underway. A
stop-motion animation film produced in collaboration with Kairos Women+ Group
has been nominated for a Smiley Charity Film Award. 
7.6 Approval was given to award the AV/Hardware contract at the Finance,
Resources and Customer Services Policy Board 26 November 2023.
Appointment is to be confirmed on 19 December after standstill period.
Page 36 of 52

Page 41

Collections and Conservation Work 
7.7 Archival material not selected for redisplay in the Museum has been removed
from the Heritage Centre’s temporary location at the Abbey Mill, frozen and
returned to the Secret Collection for storage. 
7.8 New photography of all works is currently underway with 90% of objects
photographed and approximately 8000 images of project work including
construction captured to date. 
Looking forward 
7.9 Paisley Museum Reimagined is the central project of the Council’s cultural
regeneration strategy. It will be the fourth project to be concluded following the
completion of Paisley Town Hall, Paisley Central Library and Paisley Arts Centre.
As with Renfrewshire’s City Deal and Levelling Up Fund investments, collectively
these projects are part of a long-term commitment to define a new, thriving future
for Renfrewshire. 
7.10 The scale of investment has enabled the Council to attract additional funding to
protect significant historic assets, including Scotland’s first public observatory. 
The project has addressed historic maintenance issues, brought the buildings up
to code, created a fully accessible building alongside greater access to and
understanding of our internationally significant collections. The world-class
refurbishment of Paisley Museum provides for a significantly larger public
campus with galleries, observatory, heritage centre, public gardens, events,
learning suites and more, for community use and to attract visitors to the region.
Designed as a social hub at the heart of our local communities for everyone to
learn, discover, create and connect, Paisley Museum is also of national
importance to Scotland’s tourism and heritage sectors. 
7.11 The design and construction of the site is increasing the indoor footprint by 20%,
indoor public access areas by 27% and overall indoor and outdoor spaces by
138%.  The business case for Paisley Museum Reimagined envisaged the
museum core opening hours being increased from 28 to 49 hours per week to
allow for a year-round, seven-day week public opening to accommodate greater
visitor numbers estimated at 128,000 per annum alongside a 73% increase in
formal educational visits. The provision of a more accessible, interactive visitor
experience is also supported by a 1240% increase in digital provision. Paisley
Museum Reimagined is not simply a refurbishment of an existing venue, but a
transformational design of an entirely new visitor experience and Renfrewshire-
wide museum service. 
7.12 Consequently, the associated revenue budget will require to be uplifted to reflect
the additional operating costs of the expanded public space as well as how the
ongoing community co-production of displays and public programme will be
managed and cared for. These are required to meet grant conditions that are
part of the overall funding package for the project. 
Page 37 of 52

Page 42

Utility and property costs are predicted to be one of the more substantial
expenditures, recognising the challenges of today’s economic climate. At the
same time, income assumptions have been refined by learning from other
museum services’ commercial and fundraising activity, especially in the wake of
the pandemic. 
7.13 Whilst additional costs will need to be carefully managed as part of the Council’s
financial sustainability, the overall investment is about realising the longer-term
economic benefits in unlocking Renfrewshire’s cultural capital. Recent research
by Museums Galleries Scotland shows visitors to Scotland’s museums and
galleries have a notable impact on, and make a clear contribution to, the
economy. The vast majority of spend by visitors (92%) takes place off-site,
showing the scale of contribution of museums to the wider economy. 
7.14 Nevertheless, mitigations are being considered based on research within the
museums and tourism sectors. These include moving away from the proposed
seven-day week operation to a six-day or combined seasonal model to help
reduce costs, with the potential to retain access on weekdays for organised
educational visits. Further refinement will be considered in Year 2 as the
regularity of visits and numbers of visitors becomes clearer and can be reviewed.
Staff costs to safely run the expanded campus at Paisley Museum Reimagined
will by necessity be an increase from the previous museum offer in Paisley.
However, specialist staffing will be designated flexibly for Renfrewshire
Museums Service, rather than solely Paisley Museum, thereby ensuring that the
project’s development will benefit the region as a whole.
Page 38 of 52

Page 43

8. Abbey Quarter 
8.1. Abbey Quarter is a high-quality public realm project to support the investment in
the Town Hall facilities and provide an accessible outdoor events space for our
Town Centre. The project extends over the area in front of, and to the side of the
Town Hall. An important component of this project will be to remove stepped
levels of paving and small boundary walls to green space to fully open up the
area and make it more accessible encourage wider use. 
8.2. Historic records and recent trial excavations indicates that there could be a risk
of finding human remains in carrying out the public realm works at the identified
locations. To allow these works to proceed, the Council submitted a Disinterment
Application to Paisley Sheriff Court. This has now been granted with approval to
proceed with the works, and in the unlikely event any human remains are
discovered, these will be treated with care and compassion in accordance with
the Council’s Code of Practice on Exhumations and reinterred into Hawkhead
Cemetery. 
8.3. Design of the area in front of the Town Hall extending into the green area at the
White Cart river is finalising, to be ready for planning. 
Page 39 of 52

Page 44

Within this area, consideration has been given to Paisley Abbey which is
captured in this area of design. The overall design is being driven by the
successful public consultation event held in 2021 which confirmed the support
for the plans. 
8.4. The project team are planning the next phase of the project which will include
submitting planning application, and mapping out the sequence of construction
to ensure that local access can be maintained at all times to Paisley Town Hall
and Paisley Abbey. It is expected that this will allow the team to proceed with a
tender exercise to secure a contractor in summer 2024. Due to the external
nature of the works, it is likely that it will be beneficial to target a spring 2025
construction commencement period to avoid elongated delays due to weather
disruption. 
9. Townscape Heritage and Conservation Area Regeneration Scheme 2
(TH.CARS2) 
9.1. Paisley TH.CARS2 is nearing completion with grant support for external repairs
awarded to ten large building repair projects in Paisley Town Centre with nine
projects completed. 
9.2. Works to the final project, 32 High St (Liberal Club), are currently on site.
However, the project  has been delayed largely due to significant additional rot
works discovered on site. 
Page 40 of 52

Page 45

TH.CAR2 grant funded external works are expected to complete by
January  2024 which will allow the completion of the TH.CARS2 scheme. 
However the current works on site are not anticipated to complete until May 2024
due to additional rot works required and additional structural works to compete
the window installation. 
9.3. An extension to the TH.CARS2 completion date until March 2024 has been
discussed with the funders to allow completion of the Liberal Club and
submission of final reports and evaluation. A formal request has been submitted
which is being considered.   
9.4. The TH.CARS2  programme has delivered Building Repair projects, Shopfront
improvements and a Small Grant programme to historic properties in Paisley
Town Centre. The project is funded by the National Lottery Heritage Fund
(NLHF), Historic Environment Scotland (HES) and Renfrewshire Council, with
combined project funding of over £4.1 million, and additional contributions from
owners. The project is also delivering public realm improvements and a
successful programme of heritage related activities and events has now
completed. 
9.5. A significant difference has been made to the condition and appearance of a
number of prominent properties in Paisley Town Centre including: 2/3 County
Place opposite Paisley Gilmour St, now restored and converted to flats, 20 New
St (Vienna’s night club), 41 High St (Right Way Credit Union offices), Sma
Shot  Cottages, 9 Gilmour St (Walker Laird’s offices), 28 High St, 18 Georges
Gate, 10 Shuttle St and 5 George Place, (Paisley Trophy Centre) which was
recently used as a set location for a BBC Agatha Christie production. 
9.6. Shopfront Improvements grants have supported ten projects in the High Street.
These include:  30 High St (White Cart Company and Sinclair Jewellers), 36 High
St, (Shelter), 61 High St (Print and Copy it), 41 High St (Right Way Credit Union),
44 High St (Uptown Barbers), 63A High Street (Nomads), 18 High Street, (Right
and Left) and 67 High St (Houston’s Kilts). The TH.CARS2 project has also
supported a Small Grants programme mainly for traditional window repair
projects in the Town Centre. 
9.7. Public realm works have also been funded through the project with works
completed at George Place. Public Realm works to pavements in the High Street
area opposite the Museums are also now complete. This has been a complex
project with private basements below the High Street pavements and additional
structural repairs required. However, the works have made a significant
difference to the quality of the public realm in this area and support the
improvements to the Museum. Works to resurface Weighhouse Close where it
meets the High Street have also completed. 
9.8. TH.CARS2’s community engagement programme of Heritage Education,
Training and events has also now concluded. Comprising 42 projects, it has seen
delivery of 630 workshops and over 115 separate events. Over 2,500
participants, trainees and volunteers have been engaged and estimated
audiences of over 50,000 reached. 
Page 41 of 52

Page 46

More than 100 partners have been involved locally and nationally, and over 150
job opportunities have been created for consultants and freelancers. 
10. St James’ Playing Fields & Ferguslie Sports Centre 
10.1. These projects will work towards delivering Renfrewshire’s vision to ‘make sport
a way of life’. In 2018, Council approved the upgrading of changing facilities at
Ferguslie Sports Centre and for the demolition and replacement of the existing
pavilion at St James Playing Fields. When the Covid-19 pandemic hit, a decision
was made to put these projects on hold until such time that it was appropriate to
proceed. 
Ferguslie Sports Centre 
10.2. In July 2022, approval was given to resume the planning of the Ferguslie Sports
Centre upgrades. This work will completely refurbish all existing changing
facilities to the sports centre, bringing a greater experience to the already well
utilised facility. The work will also ensure that the building is future proofed by
fixing all issues with the roof to ensure no leaks, which has been an ongoing
issue. The building will also receive upgraded boilers as part of this process
making it more efficient and of better quality to customers and staff. 
10.3. Following a successful tender period, a contractor was appointed in late summer
2023 and has now commenced on site. The site remains operational for bookings
and completion is expected by late spring 2024. 
St James’ Playing Fields 
10.4. St James’ Playing Fields project will reconstruct the previously demolished
pavilions into modern and attractive changing facilities hosting 8 changing rooms
and appropriate staff accommodation. This will support 4 football pitches that will
be brought back into use to allow this nostalgic and widely known sporting ground
to become a football destination as it has been in years gone by. 
10.5. An update was provided at the January 2023 Economy & Regeneration Policy
Board to note that it was not viable to proceed with the single bid that was
previously received to construct the new pavilions at St James’ Playing Fields
due to being significantly over budget. 
10.6. A value engineering exercise was carried out on the design and procurement
options and the project retendered in May 2023. Unfortunately, tenders have
again been received over the allocated budget. 
10.7. At the Council meeting on 14 December 2023 members voted to make available
a further £600k to enable this project to proceed as planned. A report will be
taken to FRCS in February for approval to appoint a Contractor. Works are
expected thereafter to commence at Easter 2024. 
Page 42 of 52

Page 47

10.8. Following engagement with the Paisley North Community Council, and local
elected members, further regeneration and community engagement activities are
being considered for this area. Discussion is ongoing regarding the feasibility of
implementing an outdoor community gym and community growing
garden/allotment space. 
These initiatives are not part of this project and will be discussed with the relevant
officers from Environment, Housing, and Infrastructure. 
Images of previous pavilion now demolished vs layout and vision of new design. 
Page 43 of 52

Page 48

________________________________________________________________________
Implications of the Report 
1. Financial – There are a number of significant risks associated with capital
investment on the scale outlined in the report, many of which have been
previously advised to members. Construction and refurbishment works in
historic buildings are intrinsically subject to a higher degree of cost volatility due
to the nature of the works and the fact that the complexity and detail of the
works required are in many instances not fully known until the works are in
progress and the building condition is fully understood. The existing capital
budgets for those works in progress – Paisley Town Hall, Paisley Museum and
Paisley Arts Centre – are under considerable pressure due to these issues and
also due to the extended timescales of the works which were severely affected
by the pandemic closedown and subsequent modified working practice period.
Council agreed in June 2023 to pause elements of the wider cultural venues
and town centre infrastructure programme in order to release funding towards
those projects whose budgets are under pressure; and as these projects
conclude and final costs are clarified, further updates to Board will be provided.
It should be noted however that even with the above Council decision there
remains a significant degree of risk and potential cost which could place further
pressure on total capital resource. 
There has been ongoing discussion and updating of the business cases for
each of the cultural venue with colleagues in OneRen, including critically the
updating of base assumptions in terms of operating costs and potential income
generation. While core assumptions and the projected revenue operating
position of Paisley Town Hall and the Arts Centre currently remain broadly
consistent with original projections, they continue to be refined as the venues
become operational.  The updating of assumptions is indicating that there is
likely to be revenue funding pressures associated with Paisley Museum which
are above original business case assumptions. These predominantly relate to
a revised catering offer and emerging clarity on potential income from touring
exhibitions; as well as updated projections of utilities, maintenance and soft FM
costs. The Council will continue to discuss with OneRen options to mitigate
these additional costs, however it would also be prudent for the Council to build
these updated cost projections into future revenue plans. 
2. HR & Organisational Development – None. 
3. Community/Council Planning –  
 Our Renfrewshire is thriving – These projects will link our communities
and facilitate a significant increase in footfall to Paisley and surrounding
areas. The infrastructure will enable Renfrewshire to host world class
performances and attract new footfall from far beyond the local area. 
 Our Renfrewshire is well - The outputs of these projects will enable safe
and inspiring locations for all. 
Page 44 of 52

Page 49

From arts and performances to learning and educational space,
Renfrewshire will offer anyone the ability to engage and take interest in
either a new subject matter or an existing passion that is now much more
accessible. Driving world class performances to the area and having 21st
century work and education spaces will support people from
Renfrewshire to engage in beneficial activities that will in turn support
education and interest. 
 Reshaping our place, our economy and our future – These infrastructure
projects allow access to new and existing jobs for people in our
communities. Significant increase in footfall will benefit local businesses
who can grow as a result and in turn support their ongoing viability in the
area. An increase in arts and performances will allow a platform for
Paisley becoming a cultural hub in Scotland which can be used to drive
new educational agendas with greater access to this subject matter. 
 Tackling inequality, ensuring opportunities for all – A specific focus has
been applied to the redevelopment and construction of these projects to
ensure accessibility is a key feature. A significant amount of thought has
gone into making historic, and predominantly inaccessible buildings,
available for anyone to enjoy and utilise. There are no barriers to utilising
any of these buildings, and One Ren will continue to deliver an events
programme that caters for everyone including those in more deprived
areas. 
 Creating a sustainable Renfrewshire for all to enjoy – With these buildings
being in the heart of Paisley Town centre, it means they are accessible
sustainably due to the well-connected nature of the town centre. Limited
town centre parking will force the use of public transport which will work
towards the net zero ambitions of the Council. Recently completed
infrastructure through AMIDS, including the shared cycle and walkway,
also enhances the connectivity, and in future years with the opening of
the Clyde Waterfront and Renfrew Riverside bridge, Paisley will become
a vastly accessible route by sustainable travel. 
 Working together to improve outcomes - Officers and contractors
continue to work closely with local businesses and a business
engagement programme will commence shortly to bring this to focus.
Throughout the development of these projects, several organisations
were engaged to design the outputs including accessibility groups, the
Scottish Government, Historic Environment Scotland, multiple private
sector organisations and the local community. 
4. Legal – None. 
5. Property/Assets – Note the improvements being delivered to current assets. 
6. Information Technology – None. 
Page 45 of 52

Page 50

7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. 
No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report because it is for noting only. If
required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the
Council’s website. 
8. Health & Safety – None. 
9. Procurement – all contracts are tendered in accordance with Council
procurement procedures and where relevant taken to FRCS Board for approval. 
10. Risk – Project specific and Programme level risk registers have been
established for all projects. These are kept under regular review and reported
to the Council’s internal City Deal and Infrastructure Programme Board. 
11. Privacy Impact – None. 
12. COSLA Policy Position – Not applicable. 
13. Climate Risk – these projects will significantly improve all mechanical,
electrical and plant systems within existing and new buildings affected. This,
coupled with improved efficiency in windows and doors will drive down the
requirement for heating, in turn lowering the carbon footprint from key council
buildings. 
_________________________________________________________
List of Background Papers 
None.
__________________________________________________________________ 
BW 
December 2023 
Author: Barbara Walker, City Deal and Infrastructure Programme Director; Email
Barbara.walker@renfrewshire.gov.uk
Page 46 of 52

Page 51

___________________________________________________________________
To: Economy and Regeneration Policy Board
On: 23 January 2024
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Steeple Buildings Kilbarchan - Update
___________________________________________________________________
1. Summary 
1.1 This report provides an update on the amendment to Council Motion 9 of 4 May
2023 which restated Renfrewshire Council’s “commitment to the refurbishment
of the Steeple Hall with the allocation of the £700,000, as agreed at the 2021/22
Council Budget and instructs officers to bring forward an investment proposal
with timescales for consideration at the next appropriate board.” In support of
that process, Council agreed to: 
 Consult with OneRen, the National Trust for Scotland, Kilbarchan
Community Council, Kilbarchan General Society and the wider community
in Kilbarchan on the future use of the Steeple Buildings (specifically an
outreach museum linked to Paisley Museum which would complement
Kilbarchan Weaver’s Cottage); 
 As part of that consultation, examine the viability of a “Kilbarchan Cultural
Quarter”; 
 Work towards a prospective bid to Historic Environment Scotland’s Historic
Environment Grants Programme at the end of the consultation period; 
 Develop a concept for the Steeple Buildings that reinforces Renfrewshire
Council’s Tourism Action Plan. 
___________________________________________________________________
2. Recommendations 
2.1 It is recommended that the Board: 
(i) Approve an initial repair programme for the Steeple Buildings at an
estimated cost of £310,000+VAT.  
Item 4
EAR230124 Page 47 of 52

Page 52

This will deal with all immediate and urgent external repairs, plus some
additional high-level repairs, and reinstate the electricity and water
supplies internally.
 
(ii) Authorise the Head of Economy and Development to continue stakeholder
engagement and commission an options appraisal for the Steeple
Buildings with the aim of bringing forward a viable, preferred long-term use
for consideration at the next appropriate board.
___________________________________________________________________
3. Background 
3.1 Prominently situated within Kilbarchan’s Conservation Area, the Category A-
listed Steeple Buildings date from the 18th Century and are jointly owned by
Renfrewshire Council and local charity the Kilbarchan General Society (who
own a room on the first floor of the main halls building). 
3.2 Though joint owners, Kilbarchan General Society are not a key holder for the
building, nor are they responsible for any share of repair costs. 
3.3 The property has additional symbolic significance to the village as a focus for
its annual Lilias Day celebrations during which the statue of Habbie Simpson
“comes to life” to lead a parade through Kilbarchan with his bagpipes. 
 
3.4 The property is currently managed by OneRen as a community hall on behalf
of Renfrewshire Council. Pre-pandemic the property was being used by the
community for around 7 hours per week. Post-pandemic, the property has not
reopened. Several other community spaces are available for hire in Kilbarchan,
including: the Old Library Centre; Kilbarchan Parish Church Hall; Kilbarchan
Guide Hall; Kilbarchan Scout Hall; Kilbarchan Bowling Club; and Kilbarchan
Performing Arts Centre. 
3.5 Repairs have typically been undertaken as issues have arisen. In December
2022, a flood caused significant water damage internally. 
4. Stakeholder Engagement 
4.1 Throughout 2023, officers from the Regeneration & Place and Facilities &
Property Services teams - as well as OneRen - have met regularly with
Kilbarchan Community Council to understand their concerns and ambitions for
the Steeple Buildings, and to keep them updated on actions resulting from the
amendment to the May 2023 Council motion. 
4.2 Meetings have also taken place, and dialogue is ongoing, with Kilbarchan
General Society and the National Trust for Scotland. 
4.3 An online questionnaire inviting local groups and individuals to share their
previous experiences of the Steeple Buildings, and their hopes for its future,
was distributed in October 2023 (please see Appendix A). From this, a wider
database of stakeholders has been generated, which has been further
augmented with the help of Kilbarchan Community Council. 
Page 48 of 52

Page 53

4.4 Kilbarchan Community Council has asked officers to help facilitate the creation
of a “Friends of the Steeple” working group. This would be a separate entity
from the community council, likely with an ability to fundraise, and potentially
taking an active interest in Kilbarchan’s wider heritage. Engage Renfrewshire
has agreed to offer input on possible models and governance options for this
group. 
5. Condition Survey 
5.1 In September 2023, conservation specialists John Gilbert Architects (JGA)
were appointed to carry out a non-intrusive external and internal condition
survey of the Steeple Buildings, using a drone and cherry picker. Collaborating
with a mechanical engineer, stone specialist, and quantity surveyor, JGA
returned an illustrated report which itemised repairs as “immediate”, “urgent”,
“necessary” and “desirable”. Estimates for the cost of each repair were also
provided, as well as a summary of indicative project costs. JGA’s costings
assumed the building’s return to its pre-pandemic use. 
5.2 Using JGA’s report as a reference, and allocating additional estimated costs for
surveys, site investigations, fees and inflation, costs for 7 alternative, initial
repair programmes were generated: from Option A “immediate repairs only”, at
an estimated cost of £238,000, to Option F “all repairs, including more
expensive refurbishment options”, at an estimated cost of £1,088,000. 
5.3 This Board are being asked to approve Option C2, at an estimated cost of
£308,000, as the initial repair programme. This focuses on roof repairs and
deals with all immediate and urgent repairs which JGA advised should be
undertaken within 18 months of their survey being carried out. With scaffolding
erected for roof repairs, this programme also includes less urgent repairs to
windows above first floor level, and repairs to the steeple’s weathervane and
clockfaces. It reinstates the electricity supply, which will enable both the clock
and the heating to be switched back on, which in turn enables the water supply
to be turned back on. 
6. Options Appraisal
6.1 Following on from the condition survey and online community consultation,
Renfrewshire Council is seeking to appoint an external consultant to carry out
a detailed Options Appraisal for the Steeple Buildings in early 2024. This
involves further stakeholder engagement and will: 
(i) Consider appropriate uses for the building in the context of the proposed
“Kilbarchan Cultural Quarter”; 
(ii) Consider a range of options for future use of the building, including
community museum; 
(iii) Assess the viability of options and explore the business case, and
associated costs, for the most viable options; 
(iv) Recommend a preferred option to take forward for approval by
Renfrewshire Council. 
Page 49 of 52

Page 54

6.2 Initial conversations about potential future funding applications to help refurbish
the Steeple Buildings have taken place with National Lottery Heritage Fund
(NLHF) and Historic Environment Scotland (HES): 
(i) Given its location, NLHF have expressed doubts that any proposed use for
the building would engage sufficiently with their target communities; 
(ii) HES are open to an application to their Historic Environment Grants
programme; however, any application would be subject to Renfrewshire
Council being able to demonstrate that a sustainable, long-term use for the
building has been identified. 
7. Next Steps   
7.1 Subject to receiving approval from the Board, officers will instruct the initial
repair programme. 
7.2 Subject to the outcome of the Options Appraisal, the ambition is to return to
Council on 28 May 2024 with a recommendation for a preferred use for the
Steeple Buildings.
___________________________________________________________________
Implications of the Report
1. Financial – £700,000 has been allocated by Renfrewshire Council for the
refurbishment of the Steeple Buildings. It’s likely that additional funds would need
to be sourced to fully refurbish the building, with further funds required to refit the
building if a change of use was identified as the most viable option. 
2. HR & Organisational Development – None. 
3. Community/Council Planning – 
 Our Renfrewshire is thriving – The project supports development which will
protect and enhance the built heritage of Renfrewshire’s village centres,
contributing to the creation of thriving places which support individuals,
communities, and businesses. 
 Reshaping our place, our economy and our future – The project will help
support the restoration and productive re-use of a landmark building in the
centre of a Renfrewshire village, improving the built environment, helping to
create job opportunities and contribute to economic growth. 
 Building strong, safe, and resilient communities: The project works in
partnership with local groups and organisations to achieve positive outcomes. 
4. Legal – The Steeple Buildings are jointly owned with local charity, Kilbarchan
General Society. 
5. Property/Assets – The intention is for Property Services to project manage the
initial repair programme. 
Page 50 of 52

Page 55

6. Information Technology – None. 
7. Equality & Human Rights – The Recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights. No
negative impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations contained in
the report. 
8. Health & Safety – None. 
9. Procurement – A main contractor will need to be appointed to deliver the intial
repair programme. 
10. Risks – The initial repair programme is just the first step on a longer process which
aims to bring the Steeple Buildings back into use. 
11. Privacy Impact – None. 
12. COSLA Policy Position – None. 
13. Climate Risk – With cognisance of Historic Environment Scotland’s ‘A Guide to
Climate Change Impacts: On Scotland’s Historic Environment, Our Place in Time,
2019’, the repair and maintenance of Steeple Buildings will contribute to the
restoration and repair of Renfrewshire’s historic fabric and will improve the
performance of this property over time.
_________________________________________________________
Author: Euan Shearer; Regeneration and Place Manager
Email: euan.shearer@renfrewshire.gov.uk 
Page 51 of 52

Page 56

Appendix A – Summary of Responses to October 2023 Online Questionnaire 
 The questionnaire received 54 responses – 8 on behalf of local groups, and
46 from individuals
 65% of respondents had been previous users of the Steeple Buildings – the
most common uses had been for: meetings; events; parties; classes; and
groups
 85% of respondents shared their suggestions about potential future uses.
Continued community use was the most common theme. Uses which
highlighted Kilbarchan’s history and heritage – particularly weaving - were
also popular.
 In terms of specific functions, the following were mentioned:
o wedding venue
o village museum/outreach museum
o heritage centre
o community hub with halls and meeting rooms for hire
o gallery/exhibition space
o indoor bowling
o youth club
o men’s shed
o music venue
o cafe
o wine bar
o craft venue/market
o farmers’ market
o business hub
o social enterprise hub
o residential
 Other comments: 
o highlighted the architectural and symbolic importance of the building to
the village
o highlighted the need for external repair, internal upgrade, and more
sustainable heating
o questioned whether spending money to modernise the building might
be better spent elsewhere
o flagged the poor disabled access
o highlighted the potential use of the square for associated events
o suggested the building needed to have a distinctly different function
from the other public access halls in the village 
o questioned whether the council was the best custodian of the building
 80% of respondents asked to be kept informed about how plans for the
buildings progress. 
Page 52 of 52