Page 1

___________________________________________________________________
To: Economy and Regeneration Policy Board
On: 23 January 2024
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Steeple Buildings Kilbarchan - Update
___________________________________________________________________
1. Summary 
1.1 This report provides an update on the amendment to Council Motion 9 of 4 May
2023 which restated Renfrewshire Council’s “commitment to the refurbishment
of the Steeple Hall with the allocation of the £700,000, as agreed at the 2021/22
Council Budget and instructs officers to bring forward an investment proposal
with timescales for consideration at the next appropriate board.” In support of
that process, Council agreed to: 
 Consult with OneRen, the National Trust for Scotland, Kilbarchan
Community Council, Kilbarchan General Society and the wider community
in Kilbarchan on the future use of the Steeple Buildings (specifically an
outreach museum linked to Paisley Museum which would complement
Kilbarchan Weaver’s Cottage); 
 As part of that consultation, examine the viability of a “Kilbarchan Cultural
Quarter”; 
 Work towards a prospective bid to Historic Environment Scotland’s Historic
Environment Grants Programme at the end of the consultation period; 
 Develop a concept for the Steeple Buildings that reinforces Renfrewshire
Council’s Tourism Action Plan. 
___________________________________________________________________
2. Recommendations 
2.1 It is recommended that the Board: 
(i) Approve an initial repair programme for the Steeple Buildings at an
estimated cost of £310,000+VAT.

Page 2

This will deal with all immediate and urgent external repairs, plus some
additional high-level repairs, and reinstate the electricity and water
supplies internally.
 
(ii) Authorise the Head of Economy and Development to continue stakeholder
engagement and commission an options appraisal for the Steeple
Buildings with the aim of bringing forward a viable, preferred long-term use
for consideration at the next appropriate board.
___________________________________________________________________
3. Background 
3.1 Prominently situated within Kilbarchan’s Conservation Area, the Category A-
listed Steeple Buildings date from the 18th Century and are jointly owned by
Renfrewshire Council and local charity the Kilbarchan General Society (who
own a room on the first floor of the main halls building). 
3.2 Though joint owners, Kilbarchan General Society are not a key holder for the
building, nor are they responsible for any share of repair costs. 
3.3 The property has additional symbolic significance to the village as a focus for
its annual Lilias Day celebrations during which the statue of Habbie Simpson
“comes to life” to lead a parade through Kilbarchan with his bagpipes. 
 
3.4 The property is currently managed by OneRen as a community hall on behalf
of Renfrewshire Council. Pre-pandemic the property was being used by the
community for around 7 hours per week. Post-pandemic, the property has not
reopened. Several other community spaces are available for hire in Kilbarchan,
including: the Old Library Centre; Kilbarchan Parish Church Hall; Kilbarchan
Guide Hall; Kilbarchan Scout Hall; Kilbarchan Bowling Club; and Kilbarchan
Performing Arts Centre. 
3.5 Repairs have typically been undertaken as issues have arisen. In December
2022, a flood caused significant water damage internally. 
4. Stakeholder Engagement 
4.1 Throughout 2023, officers from the Regeneration & Place and Facilities &
Property Services teams - as well as OneRen - have met regularly with
Kilbarchan Community Council to understand their concerns and ambitions for
the Steeple Buildings, and to keep them updated on actions resulting from the
amendment to the May 2023 Council motion. 
4.2 Meetings have also taken place, and dialogue is ongoing, with Kilbarchan
General Society and the National Trust for Scotland. 
4.3 An online questionnaire inviting local groups and individuals to share their
previous experiences of the Steeple Buildings, and their hopes for its future,
was distributed in October 2023 (please see Appendix A). From this, a wider
database of stakeholders has been generated, which has been further
augmented with the help of Kilbarchan Community Council.

Page 3

4.4 Kilbarchan Community Council has asked officers to help facilitate the creation
of a “Friends of the Steeple” working group. This would be a separate entity
from the community council, likely with an ability to fundraise, and potentially
taking an active interest in Kilbarchan’s wider heritage. Engage Renfrewshire
has agreed to offer input on possible models and governance options for this
group. 
5. Condition Survey 
5.1 In September 2023, conservation specialists John Gilbert Architects (JGA)
were appointed to carry out a non-intrusive external and internal condition
survey of the Steeple Buildings, using a drone and cherry picker. Collaborating
with a mechanical engineer, stone specialist, and quantity surveyor, JGA
returned an illustrated report which itemised repairs as “immediate”, “urgent”,
“necessary” and “desirable”. Estimates for the cost of each repair were also
provided, as well as a summary of indicative project costs. JGA’s costings
assumed the building’s return to its pre-pandemic use. 
5.2 Using JGA’s report as a reference, and allocating additional estimated costs for
surveys, site investigations, fees and inflation, costs for 7 alternative, initial
repair programmes were generated: from Option A “immediate repairs only”, at
an estimated cost of £238,000, to Option F “all repairs, including more
expensive refurbishment options”, at an estimated cost of £1,088,000. 
5.3 This Board are being asked to approve Option C2, at an estimated cost of
£308,000, as the initial repair programme. This focuses on roof repairs and
deals with all immediate and urgent repairs which JGA advised should be
undertaken within 18 months of their survey being carried out. With scaffolding
erected for roof repairs, this programme also includes less urgent repairs to
windows above first floor level, and repairs to the steeple’s weathervane and
clockfaces. It reinstates the electricity supply, which will enable both the clock
and the heating to be switched back on, which in turn enables the water supply
to be turned back on. 
6. Options Appraisal
6.1 Following on from the condition survey and online community consultation,
Renfrewshire Council is seeking to appoint an external consultant to carry out
a detailed Options Appraisal for the Steeple Buildings in early 2024. This
involves further stakeholder engagement and will: 
(i) Consider appropriate uses for the building in the context of the proposed
“Kilbarchan Cultural Quarter”; 
(ii) Consider a range of options for future use of the building, including
community museum; 
(iii) Assess the viability of options and explore the business case, and
associated costs, for the most viable options; 
(iv) Recommend a preferred option to take forward for approval by
Renfrewshire Council.

Page 4

6.2 Initial conversations about potential future funding applications to help refurbish
the Steeple Buildings have taken place with National Lottery Heritage Fund
(NLHF) and Historic Environment Scotland (HES): 
(i) Given its location, NLHF have expressed doubts that any proposed use for
the building would engage sufficiently with their target communities; 
(ii) HES are open to an application to their Historic Environment Grants
programme; however, any application would be subject to Renfrewshire
Council being able to demonstrate that a sustainable, long-term use for the
building has been identified. 
7. Next Steps   
7.1 Subject to receiving approval from the Board, officers will instruct the initial
repair programme. 
7.2 Subject to the outcome of the Options Appraisal, the ambition is to return to
Council on 28 May 2024 with a recommendation for a preferred use for the
Steeple Buildings.
___________________________________________________________________
Implications of the Report
1. Financial – £700,000 has been allocated by Renfrewshire Council for the
refurbishment of the Steeple Buildings. It’s likely that additional funds would need
to be sourced to fully refurbish the building, with further funds required to refit the
building if a change of use was identified as the most viable option. 
2. HR & Organisational Development – None. 
3. Community/Council Planning – 
 Our Renfrewshire is thriving – The project supports development which will
protect and enhance the built heritage of Renfrewshire’s village centres,
contributing to the creation of thriving places which support individuals,
communities, and businesses. 
 Reshaping our place, our economy and our future – The project will help
support the restoration and productive re-use of a landmark building in the
centre of a Renfrewshire village, improving the built environment, helping to
create job opportunities and contribute to economic growth. 
 Building strong, safe, and resilient communities: The project works in
partnership with local groups and organisations to achieve positive outcomes. 
4. Legal – The Steeple Buildings are jointly owned with local charity, Kilbarchan
General Society. 
5. Property/Assets – The intention is for Property Services to project manage the
initial repair programme.

Page 5

6. Information Technology – None. 
7. Equality & Human Rights – The Recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights. No
negative impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations contained in
the report. 
8. Health & Safety – None. 
9. Procurement – A main contractor will need to be appointed to deliver the intial
repair programme. 
10. Risks – The initial repair programme is just the first step on a longer process which
aims to bring the Steeple Buildings back into use. 
11. Privacy Impact – None. 
12. COSLA Policy Position – None. 
13. Climate Risk – With cognisance of Historic Environment Scotland’s ‘A Guide to
Climate Change Impacts: On Scotland’s Historic Environment, Our Place in Time,
2019’, the repair and maintenance of Steeple Buildings will contribute to the
restoration and repair of Renfrewshire’s historic fabric and will improve the
performance of this property over time.
_________________________________________________________
Author: Euan Shearer; Regeneration and Place Manager
Email: euan.shearer@renfrewshire.gov.uk

Page 6

Appendix A – Summary of Responses to October 2023 Online Questionnaire 
 The questionnaire received 54 responses – 8 on behalf of local groups, and
46 from individuals
 65% of respondents had been previous users of the Steeple Buildings – the
most common uses had been for: meetings; events; parties; classes; and
groups
 85% of respondents shared their suggestions about potential future uses.
Continued community use was the most common theme. Uses which
highlighted Kilbarchan’s history and heritage – particularly weaving - were
also popular.
 In terms of specific functions, the following were mentioned:
o wedding venue
o village museum/outreach museum
o heritage centre
o community hub with halls and meeting rooms for hire
o gallery/exhibition space
o indoor bowling
o youth club
o men’s shed
o music venue
o cafe
o wine bar
o craft venue/market
o farmers’ market
o business hub
o social enterprise hub
o residential
 Other comments: 
o highlighted the architectural and symbolic importance of the building to
the village
o highlighted the need for external repair, internal upgrade, and more
sustainable heating
o questioned whether spending money to modernise the building might
be better spent elsewhere
o flagged the poor disabled access
o highlighted the potential use of the square for associated events
o suggested the building needed to have a distinctly different function
from the other public access halls in the village 
o questioned whether the council was the best custodian of the building
 80% of respondents asked to be kept informed about how plans for the
buildings progress.