Page 1

___________________________________________________________________
To: Economy and Regeneration Policy Board
On: 7 November 2023
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Paisley Centre redevelopment - update
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to provide an update on the proposed
redevelopment of the Paisley Shopping Centre since grant of planning
permission in principle in March 2022. The report highlights aspects such as
deliverability, cost and funding of the proposals and overall commercial viability
challenges that have been assessed to deliver the scheme. 
 
1.2 The currently proposed development by Beyond Retail is not considered viable
for 100% private sector funding, therefore the suggested approach is for a
detailed business case to be prepared by the shopping centre owner which
would highlight any potential role for the public sector in supporting a viable
proposal.
___________________________________________________________________
2. Recommendations 
2.1 It is recommended that the Board: 
i. Notes the content of this report; 
ii. Agrees that the Council will continue to work in conjunction with Beyond
Retail to further develop a full business case for the proposed
redevelopment of the Paisley Centre site; 
iii. Notes that regular update reports will be brought back to board as the
business case is progressed.; and 
iv. Notes that in due course Beyond Retail’s business case will be brought to
board for consideration; 
_________________________________________________________

Page 2

3. Background 
3.1 The Paisley Centre was opened in 1992 and became the second principal
shopping mall in Paisley Town Centre, after the Piazza Centre at Gauze Street.
Like all shopping malls it has gone through periods of transition as shopping
habits and formats have changed. In recent years as footfall has moved away
from town centre to other locations and to online purchasing, the Centre has
seen significantly reduced demand for its available units. 
3.2 Currently the Centre runs with approximately 50% vacancy, with the former Co-
op Department Store occupied on a temporary basis by both Outspoken Arts
(Big Art Show) and PACE Youth Theatre. 
3.3 In 2020, Beyond Retail purchased the shopping centre with the purpose of
exploring repurposing and redevelopment options. They engaged early with
Council officers in pre-application discussions which led to the submission of a
“masterplan application” in November 2021. This application for a mixed-use
redevelopment, including residential, hotel, health centre, offices, retail and
leisure was approved by the Council’s Planning Board in March 2022. 
4.  What has happened since March 2022 
4.1.  Over the last 18 months Beyond Retail have further developed their plans and
involved the Council in various discussions about how the proposal (both
collectively and for the various individual elements) may be funded. Both parties
agree that a comprehensive approach to the redevelopment of the space will
result in more positive outcomes for the town centre than that delivered via an
incremental approach which looked at parts of the site in isolation. 
4.2 During discussions and following supplementary research undertaken by both
the Council and Beyond Retail, it has become clear that the proposals suffer
from “market failure” and would not support a viable commercially led
development approach. This is not an uncommon challenge in town centre
contexts where the costs of delivering the development proposed is significantly
higher than the commercial value that would be placed on the resulting product
rendering the development proposal commercially unviable to deliver. This
presents a set of circumstances where deliverability of the development will not
take place without some form of public sector intervention to support
deliverability and wider regeneration objectives.   
Hotel proposal 
4.3 Beyond Retail are seeking to refurbish part of the Paisley Centre (building
fronting New Street) for a 129-bed hotel which would be operated by a national
hotel brand. This would include refurbishing the existing property as well as
adding a storey to the top of the building. The existing restaurant unit at New
Street (currently Barga) would be retained as would the pend vehicle access
into the centre of the development (currently service yard access). 
4.4 Both Beyond Retail and the Council have commissioned financial appraisals
from specialist sectoral consultants of the viability for the proposed hotel.

Page 3

Both appraisals independently conclude that although strong demand for a
quality hotel offering within central Paisley is achievable, it is not sufficiently
attractive to achieve commercially investable status that would attract a private
sector led development and would require public intervention to be deliverable. 
4.5 Council led intervention in similar non-commercially investable hotel
developments have been undertaken across the UK. Although not exclusively,
typically, this has involved an approach generally known as an “income strip”
funding model.  This involves the Council agreeing to a long lease of the
completed hotel with ownership transferring (to the Council) at the end of a
typically a 35-year lease period, with an operator running the hotel on behalf of
the Council. During the lease period the Council would be liable to pay the
annual lease costs to an investor with the year 1 lease cost typically set at 50%
of projected stabilised income levels and adjusted annually for inflation
throughout the life of the lease. The annual lease payments would be funded
from the operating profits of the hotel facility which would flow to the Council
with any excess being retainable by the Council to establish a fund to manage
the commercial and financial risk over the long-term period of the lease. A
strong business case would be expected to provide a significant lease coverage
ratio to demonstrate confidence that throughout the life of the development the
income streams to the Council would materially exceed the lease costs, would
provide acceptable outcomes within sensitivity scenarios and provide the
opportunity to establish a long term fund to protect against commercial and
financial risk given the long term nature of the project.   
Residential & Retail proposal 
4.6 The proposal emerging from Beyond Retail is to construct 80 high quality
residential apartments in the centre of the current shopping mall site, extending
from High Street to the existing service yard. This would also involve
demolishing the former M&S unit, which is also owned currently by Beyond
Retail. 
4.7 Normally, on a cleared site, the development of this number of residential units
would be economically viable for either sale or as is increasingly being
witnessed across the UK as part of a long term private rental portfolio. However,
in this instance the estimated demolition and site preparation costs are acting
as a major commercial inhibitor which undermines the commercial viability of a
residential development of this nature. Due to this, Beyond Retail have
approached the Council to explore opportunities for a form of public sector led
residential development that could support a range of range of potential mix of
tenures, including potentially social rented (through housing association) and
or a privately rented model. 
4.8 In order to fully understand the market context and potential demand for the
proposed uses, Council officers commissioned a residential development
expert to advise on the viability and likely demand for such properties in this
location for rent.

Page 4

This report confirmed that although market analysis would indicate an
expectation of strong demand for 80 quality flats within a private rented model,
the level of sustainable long term rental income within the context of the Paisley
private rental market would generate an associated commercial value which
would be significantly less than the cost to deliver the residential development. 
4.9 This reflects the high costs associated with the demolition, site assembly and
associated public realm in addition to the core construction costs as set against
the level of rents within the Paisley area. This work confirmed that if residential
development was to be deliverable as part of an overall development it would,
like the hotel proposal, require some form of Council led public sector
involvement and or intervention utilising for example an income strip style of
model. 
4.10 The proposed development also consists of a significant floorspace for retail,
leisure and food & drink units (circa 3,000 sqm), primarily at ground floor across
the residential development, including at Paisley High Street. This is considered
preferable from a planning and design perspective as it will keep ground floor
frontages active throughout the day and evening. No specifics are determined
yet for these aspects, but the developer’s preference would be to introduce an
element of convenience (food) shopping to this mix and would be targeting a
pre-let ahead of construction delivery. It would be expected that the retail
element would potentially form part of any income strip model developed albeit
financially this would be on a much smaller scale than either the hotel or
residential elements of the development. 
4.11 Another aspect discussed with the developer has been the introduction of an
open plaza / square to the rear of the existing Paisley Arts Centre as part of the
public realm space and the costs to deliver this would require to be underpinned
across each element of the overall masterplan development. 
Health Centre proposal 
4.12 Circumstances surrounding the health centre proposal remain unchanged from
2022. Beyond Retail held initial discussions with NHS Greater Glasgow and
Clyde in 2021 about the potential for a new health centre investment in Paisley
Town Centre. The outcome of these has been that the NHS are still undertaking
reviews of current service provision and are not yet able to reach a decision on
the Paisley context. 
4.13  The health centre proposal is planned to front the St Mirren Brae / Causeyside
Street aspect of the development site. The footprint would essentially cover the
former Co-op Department Store. This remains within Beyond Retail’s current
plans but will be monitored and reviewed as required going forward. 
5. Business Case Development 
5.1. During exploratory high-level discussions to date with Beyond Retail and work
progressed by officers, it has been established that the site exhibits strong
market failure characteristics.

Page 5

This reflects the specific complexities and high anticipated costs associated
with redeveloping this site coupled with the inherent ceilings of market values
deliverable within Paisley’s commercial and housing sectors. As such,
successfully delivering a commercially led redevelopment is unlikely to be
achievable and it is highly probable that some form of public sector intervention
would be required to create circumstances that would support a deliverable
masterplan.   
5.2 The proposed models suggested by Beyond Retail that could underpin a
potential partnership approach to redevelop the site have been utilised in other
similar redevelopment projects within the UK, including within Scotland.
Notwithstanding the precedent of such models being utilised elsewhere, a
detailed and robust business case would require to be developed to support a
more complete assessment of the option(s) specifically deliverable within the
context of the Paisley Centre and allow the Council to consider and undertake
appropriate due diligence on the benefits and risks of potentially moving forward
with a partnership approach to progress delivery.   
5.3 In this context, Beyond Retail are seeking a commitment from the Council to
work in conjunction with them to support the development of a full and
comprehensive business case that would allow the Council to assess,
undertake appropriate due diligence to inform a decision on whether to move
forward to deliver through a joint arrangement a redevelopment masterplan
project. The costs to develop and deliver the full business case proposal would
be borne by Beyond Retail and are anticipated to represent a significant at-risk
investment. The Council would incur expenditure securing appropriate external
sectoral commercial expertise to support the Council to ensure appropriate
independent oversight, challenge and influence was applied to the business
case development process. 
5.4 High level objectives from the Council’s perspective would be to deliver a full
business case that: - 
 Supports a robustly assessed, technically deliverable and market fundable
development project, 
 requires no capital funding or investment directly by the Council, 
 is projected to be fully self-financing over the life of the project requiring no
anticipated annual financial support, 
 is projected to generate strong financial coverage ratios throughout the life of
the project to provide confidence on the financial capacity and resilience of the
project to self-manage financial and commercial risks and the impact of
uncertainties over the life of the project without requiring any direct Council
support, 
 provides additional and appropriate commercial / financial protections and or
guarantees of substance to further mitigate the Council from financial risk.

Page 6

5.5 It is also recognised that there are several fundamental and challenging issues
that the business case process will be required to address that specifically arise
from the complex characteristics of this redevelopment proposal. These include
but would not be restricted to: 
Technical challenges and complexity of the proposed scheme 
5.6 There are many buildings occupying the existing Paisley Centre site. The site
has also been developed over multiple levels (5 storeys) and has relationships
with several surrounding buildings in prominent town centre locations. The
demolition process would consequently be complex, and a business case will
require a substantial level of developed technical understanding and due
diligence of the approach to be taken and the costs associated with the
demolition and site assembly process and how existing users will continue to
operate during and after this process.  
How to achieve the desired development quality withing a site of this nature 
5.7 Given the type of development proposed and the indicated occupiers of the
space (retail, hotel, leisure and residential) the physical product and
surrounding spaces / vicinity and linkages with the town centre would
necessarily require to be to be of a high quality, at least on par with the best
alternative areas within Paisley town centre. 
5.8 The Council recognise the characteristics of this specific site will present added
challenges and complexities to achieve this and some key questions that need
to be considered will be:  
a. The residential aspects and amenity from all floors of each residential block; 
b. The public spaces and public realm in and around the hotel and through the
development i.e. feel, quality, degree of natural lighting etc; 
c. The pedestrian transition from Arts Centre to High Street; 
d. How the hotel and residences would be serviced and accessed; 
e. How will this relate to any retention of the former Co-op Dept Store building. 
The cost of delivering the completed scheme 
5.9 Given the site complexities, both for the demolition, site assembly and
construction process, estimating the cost to deliver the development, within a
challenging and volatile economic period, will require a significant and careful
degree of development and will require significant input from suitable sectoral
expertise. The Beyond Retail business case process will be required to
demonstrate confidence in the predicted build cost for all aspects of the
development which are inextricably linked to the overall viability of the proposal.

Page 7

6.  Next steps 
6.1 It is recommended that Council officers are instructed to continue to work in
conjunction with Beyond Retail to develop a detailed business case proposal to
support the redevelopment of the site and officers be delegated approval to
engage the required commercial sectoral expertise to be funded from existing
town centre regeneration resources to ensure the Council is appropriately
supported in this process. 
6.2 Reports will be brought back to the board as the business case process
progresses and, once completed, a full report be brought back to board for
detailed consideration and decision on whether to move forward to deliver the
regeneration ambition.
___________________________________________________________________
Implications of the Report 
1. Financial – At this point there is no formal financial commitment required from
the Council beyond up to an estimated £0.1 million funding from existing
regeneration resources to support the commissioning of relevant expertise and
advice for the Council. However, the developer is committing to funding
significant consultancy, design, and development costs with an expectation that
the Council is committing to full and appropriate consideration of the completed
business case and a decision to progress with a delivery phase should the
business case satisfy the Council’s requirements and assessment in full. 
2. HR & Organisational Development – None. 
3. Community/Council Planning – 
Jobs and the Economy - the scheme has the potential to secure additional
income for Renfrewshire based businesses, which in turn could support more
investment and jobs within the local economy. 
4. Legal – None at present. Any changes to this would be the subject of
subsequent reports to Board. 
5. Property/Assets – None at present. Any changes to this would be the subject
of subsequent reports to Board. 
6. Information Technology - None. 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report. 
8. Health & Safety – None. 
9. Procurement – None.

Page 8

10. Risk – None. 
11. Privacy Impact – None. 
12. COSLA Policy Position – Not applicable. 
13. Climate Risk – Not applicable.
_________________________________________________________
List of Background Papers
None. 
Author:   Alasdair Morrison; Head of Economy and Development;