Page 1

___________________________________________________________________
To: Economy and Regeneration Policy Board
On: 7 November 2023
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Retail Improvement Scheme – Update and Next Steps
___________________________________________________________________
1. Summary 
1.1 This report provides a summary of the Retail Improvement Scheme’s (RIS)
position since the last update to Leadership board in April 2022. 
___________________________________________________________________
2. Recommendations 
2.1 It is recommended that the Board: 
(i) Note the contents of this report. 
(ii) Authorises the Head of Economy and Development to explore potential
funding options for future rounds of the scheme. 
3. Background 
3.1 The RIS has run annually since 2012 and supports Renfrewshire based
businesses to undertake external property improvements such as the creation
of new shopfront fascia signs and shutters. 
3.2 Grants are made available for up to 70% of qualifying works to a current
maximum of £12,000. In exceptional circumstances, larger awards have been
offered to support projects which would likely result in significant regeneration
outcomes e.g., high value conservation shopfronts in prominent areas. 
3.3 Since its inception, the RIS has been an important aspect of the Council’s
agenda for improving its town centres and building positive relationships with
the local business community. 
3.4 Since 2016, approximately £690k has been awarded to 97 different projects
across Renfrewshire. Some of the notable projects supported by the RIS are
included in Appendix A.

Page 2

3.5 Variations of the RIS are run by Local Authorities across the country and form
part of the Council’s interconnected series of grants and assistance available
to Renfrewshire’s businesses. The RIS could also be used as a tool by the
recently formed Town Centre Task Force to enhance the quality of
Renfrewshire’s town centres and potentially reduce vacancies. 
3.6 A spotlight report has been included in Appendix A, which provides a more
detailed review of the scheme between 2021 and 2024.   
4.  Current Retail Improvement Scheme 2023/24 
4.1 Initially no funds were allocated for the Retail Improvement Scheme in 2023/24. 
However, in recognising the importance of the RIS in supporting local
businesses and making town centres more attractive and vibrant places,
officers launched a further round (using underspend from preceding years) in
August 2023. 
4.2 19 applications were received from businesses located in Houston, Elderslie,
Bishopton, Bridge of Weir, Paisley, Johnstone, Renfrew and Lochwinnoch. 
4.3 Several of these applications were from notable town and village centre
properties which are currently vacant; including, 31 & 24 Causeyside Street, 50
High Street in Paisley & the former Farmers Market situated at 17-19 High
Street Lochwinnoch. This highlights how the RIS can be used strategically to
reduce the number of commercial vacancies across Renfrewshire. 
4.4 Interest this year was high and exceeded the original budget of £70k. As the
applications were to a high standard and had both a wide geographical spread
and would assist in bringing vacant units into active use, the decision was taken
to allocate an additional £30k from the 22/23 Place-Based Investment
Programme (PBIP) budget to meet the funding gap for the current scheme.
Projects are underway and set to be completed by spring 2024. 
5. Next steps 
5.1 Officers will now consider how to fund future rounds of the RIS.  There is
potential to use further funding from the PBIP (as was done previously in
2021/22).  Officer will also explore whether there are any other external funding
options available. 
5.2 If funding can be secured for future rounds of the scheme, progress will be
reported to the Board on a rolling basis.   
___________________________________________________________________
Implications of the Report 
1. Financial – None. 
2. HR & Organisational Development – None.

Page 3

3. Community/Council Planning 
 Our Renfrewshire is thriving – regeneration projects result in a stimulus to the
local economy via contracts won, visitors and user numbers. The RIS supports
objectives to develop Renfrewshire’s economy, including its Town Centres as
thriving places, supporting local places, businesses, and communities. 
 Reshaping our place, our economy, and our future - The projects secure the
productive re-use of a buildings and provide new facilities and services which
will contribute to supporting growth. Increased footfall offers potential benefits
to traders, assisting the economy of our town centres. 
 Working together to improve outcomes - Renfrewshire Council is working with
businesses and owners and providing support to maximise the opportunities for
regeneration in Renfrewshire’s settlements. 
4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights 
(a) The recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact - None. 
12. COSLA Policy Position – Not Applicable. 
13. Climate Risk – Not Applicable
_________________________________________________________ 
List of Background Papers 
a) Report to Leadership Board, 20th April 2022, Spotlight Report on the Retail
Improvement Scheme – 2016 to 2022
b) Report to Leadership Board, 15th September 2021 - Place Based Investment
Fund 2021/22

Page 4

c) Report to Leadership Board, 20 June 2018 – Invest in Renfrewshire Future
Funding and Services
d) Report to Economy and Jobs Policy Board, 25th May 2016 – Invest in
Renfrewshire: Retail Improvement Scheme Update
___________________________________________________________________ 
Author:   Euan Shearer, Regeneration and Place Manager.
Euan.shearer@renfrewshire.gov.uk

Page 5

1
Spotlight on…
Retail Improvement Scheme  2021 - 2024

Page 6

2
RIS Overview
The Retail Improvement Scheme (RIS) supports owners and occupiers of
small business properties in retail areas throughout Renfrewshire with grant
assistance towards the cost of shopfront improvements.
Since its launch (circa 2012), the RIS has helped approximately 200
businesses improve their commercial shop frontages and has contributed to
a number of vacant units being returned to beneficial use.
Outcomes of the scheme have supported the economic viability of our town,
local and village centres, supporting their role at the heart of communities
and the principle of the ‘20-minute neighbourhood’.  The scheme has also
supported a range of local businesses and contractors, generating wider
economic benefits across Renfrewshire.
Applications have achieved a wide geographical coverage and vary in both
type size and scale, from ‘conservation standard’ shop front enhancements
to simple gable repairs and replacement of solid roller shutters.
This report sets out the performance of the RIS over the last 3 years; including
the current 2023/24 round.

Page 7

3
Key Statistics 2021 - 2023/4
Number and spend
A total of 52 awards applications were made between the 2021/22 –
2023/24 period, including 19 in the current round.   This represents
some £280,000 of grant funding supporting local businesses
across Renfrewshire.
15+6+18+8+20+1
15
6 2
2023
2024
2022
2023
2021 
2022
£ 
99,460.00
£ 
95,000.00
(Indicative)
Applicant & Awards Per Year
Successful / Total Spend
Year of
Application
Unsuccessful / Withdrawn
18
7
£ 
87,617.00
19

Page 8

4
Awards by area
The majority of successful applications received
were from businesses based in Paisley (25),
reflecting the role of the town as the strategic centre
for Renfrewshire. 
8
9
25
Lochwinnoch
£ 5,810
3
Erskine
£ 1,760
1
Bridge of Weir
£ 9,416
3
Elderslie
£ 12,000
1
Bishopton
£ 9,400
1
Paisley
£ 158,726
Johnstone
£ 34,765
Renfrew
£ 46,500
1
Houston
£ 2,600

Page 9

5
Number of vacant premises
brought into use
In the three-year period, 13 business premises were vacant
at the time of their RIS application. Following approval and
subsequent work undertaken on frontages, 5 premises have
been returned to beneficial use and are trading whilst 3 are
now either completing internal works or advertised for lease.
The remaining 5 vacant businesses are included in the
current 2023/24 round. These businesses have received
grant awards but are yet to undertake works. It is anticipated
that following completion, these premises will become
occupied.
Year of
application
Applications by use
The vast majority (66%) of applicants were retailers followed
by cafes, restaurants and drinking establishments (21%) ,
professional services (9%) and other (4%). 
66+21+9+4+K
Retailers
66%
Hospitality
21%
Services
9%
Other
4%
+5

Page 10

6
Current RIS round (2023/24)
RIS 2023/24 was launched in August 2023 operating with a total budget of
£70k allocated from RIS funds previously unspent. Due to the quality and
number of applications, a further £30k was allocated from the Place Based
Investment Programme (PBIP). Following the close of the grant deadline, a
total of 19 applications were received with all applications receiving grant
awards.
Final consents, checks and paperwork are currently in process, with projects
anticipated to be complete by spring/summer 2024.

Page 11

7
2021 
2022
Renfrew
Longstanding Renfrew interiors
shop.
Works included new signage,
new shop front and replacement
of existing roller shutters.
2022 
2023
Johnstone
Uplifted grant provided due
to quality of proposal and
prominence of unit for this new
Johnstone Salon.
Works included new fascia,
repairs to stonework, improved
entrance and windows.
Before After
AfterBefore

Page 12

8
Drawing
Scale
Drawing
Originator
Revision
ARCAPELLA ltd.       
50 High Street
Paisley
PD
Purpose: PLANNING
PLANNING DRAWING
This drawing is not intended to be used for
fabrication purposes or quantities.
All content for planning purpose only.
For accurate measures conduct independent surveys.
0 0.5 1 1.5 2 3m
1:50
0 0.2 0.4 0.6 0.8 1m
1:20
1:50@A3
2023-07-15
Stainless glass
feature, to match stainless
glass feature to curved
elevation
Steel band feature to
match existing
curved elevation
300
m
m
300 mm
223
m
m
60 mm
Built-up Rim & Return PPC Aluminium Letters
with face illumination (60mm deep), Font TBC
Proprietary LED
illumination
Signage Text
PPC Aluminium frame
with self coloured acrylic
with face illumination
PPC alluminium box sign with backlight illumination, 30mm deep
Indicative fixing only
All fixing to structural
engineer's specification /
manufacturers installation
Painted steel band
with proprietary
metal paint RAL 3013
(Tomato Red), satin finish
Painted masonry façade
with proprietary masonry
paint Light Grey, flat matt
finish
Detail elevation Scale 1:20
Proposed elevation South Scale 1:50
Existing three windows to be replaced with new
timber framed windows. Tall frame (left hand side) only to be an inward opening
casement for sale of food for take-away. Factory painted to RAL6015
New glass feature (to replicate historical feature)
Existing stained glass feature to be refurbished by specialist
Existing timber cladding replaced with smooth sheet / smooth render, colour to match
façade, material TBC
Existing steel band painted to RAL3013
Repairs to existing projecting cornice
Signage detail Scale 1:20
Original No. 50 sign reinstated (paint over removed, repaired if necessary)
Section B-B Scale 1:20 Section A-A Scale 1:20
Shutter to be reconditioned,
painted to harmonise with facade
LOGO TBC
Proposed elevation South Scale 1:50 005-ACP-B1-DR-EL14
Proposed Elevation South and Detail
2023 
2024
Paisley
Uplifted grant provided due
to a conservation standard
proposal and restoration of a
James Maitland designed listed
building.
Works include a complete
shopfront including new timber
windows and restoration of
stained glass.
2023 
2024
Paisley
Support in the form of new
signage provided to a new
independent beauty business in
the heart of Paisley Town Centre.
Unit was previously vacant.
Applicant relocated to Scotland
due to the ongoing crisis in the
Ukraine
Before After
Before After

Page 13

9
Development of RIS
A review of the RIS format, guidelines and criteria was undertaken ahead
of the 2022/23 RIS to allow greater flexibility in number of rounds in any
given RIS year and the development of an online portal to simplify the
application process for applicants and assessing officers.
Upon completion of this year’s RIS, officers will review whether there is
scope for further improvements to the scheme including:
Whether the current guidelines accurately explain eligibility and
what the scheme intends to achieve.
How we can better market the scheme across Renfrewshire and
whether there is merit in actively encouraging applications from
selected buildings in our town centres.
Whether there is merit in having two pots; one focussed on
smaller scale improvements (open at specific times during
the year and another year-round pot dealing specifically with
assisting longer term vacant buildings).