Page 1

18/05/2023 
Notice of Meeting and Agenda
Economy and Regeneration Policy Board 
Date Time Venue
Tuesday, 23 May 2023 10:00 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN               
Membership 
Councillor Andy Steel (Convener):     Councillor Michelle Campbell (Depute Convener):    
Councillor Alison  Ann-Dowling:  Councillor Stephen Burns:  Councillor Graeme Clark:  Councillor
Andy Doig:  Councillor Neill Graham:  Councillor Lisa-Marie Hughes:  Councillor Colin McCulloch: 
Councillor Jamie McGuire:  Councillor Marie McGurk:  Councillor Iain McMillan:  Councillor John
McNaughtan:  Councillor Iain Nicolson:  Councillor Jim Paterson:   
Hybrid Meeting
Please note that this meeting is scheduled to be held in the Council Chambers.  However, it is a
hybrid meeting and arrangements have been made for members to join the meeting remotely
should they wish. 
Members of the Press and Public
Members of the press and public wishing to attend the meeting should report to the customer
service centre where they will be met and directed to the meeting. 
Webcasting of Meeting
This meeting will be filmed for live or subsequent broadcast via the Council’s internet site – at
the start of the meeting the Convener will confirm if all or part of the meeting is being filmed.  To
find the webcast please navigate to 
https://renfrewshire.public-i.tv/core/portal/home 
MARK CONAGHAN
Head of Corporate Governance

Page 2

18/05/2023 
Further Information
This is a meeting which is open to members of the public. 
A copy of the agenda and reports for this meeting will be available for inspection prior to the
meeting at the Customer Service Centre, Renfrewshire House, Cotton Street, Paisley and online
at http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx
For further information, please email
democratic-services@renfrewshire.gov.uk

Page 3

18/05/2023 
Items of business      
Apologies
Apologies from members. 
Declarations of Interest
Members are asked to declare an interest in any item(s) on the agenda
and to provide a brief explanation of the nature of the interest. 
1 Green/Freeports - update
Report by Chief Executive. 
1 - 6 
2 Levelling Up Fund Bid 2022 – Renfrew Community Hub
Update
Report by Chief Executive. 
7 - 14 
3 UK Shared Prosperity Fund – Year 1 Report
Report by Chief Executive. 
15 - 20 
4 Making of Ferguslie – Update
Report by Chief Executive. 
21 - 26 
5 Scotland Loves Local Update
Report by Chief Executive. 
27 - 36 
6 Town Centre Taskforce – update
Report by Chief Executive. 
37 - 42 
7 Proposed 2023/24 Regeneration funding bids
Report by Chief Executive. 
43 - 50

Page 4

No embedded text on this page.

Page 5

To: Economy and Regeneration Policy Board 
On: 23 May 2023
__________________________________________________________________ 
Report by:   Chief Executive 
___________________________________________________________________ 
Heading:        Green/Freeports - update 
1. Summary 
1.1 This report offers members an update on the recent bid (summer 2022) by Glasgow
City Region (GCR) partners to gain a Green/Freeport designation from the Scottish
and UK Governments. 
1.2 An announcement on two such designations in Scotland was made in early 2023
confirming the selected locations as Firth of Forth (Edinburgh / Grangemouth) and
Moray Firth (Inverness / Black Isle). 
1.3 Since the announcement further discussions have taken place with the governments
about the potential for an Investment Zone designation within GCR as part of an
allocation of such designations in Scotland. A decision on Scottish Investment Zones
is awaited.
__________________________________________________________________
2. Recommendations 
2.1 It is recommended that the Board: 
i. Note the outcome of the decision by the Scottish and UK Governments on
Green/Freeport designations in Scotland;
ii. Note that there is the potential for an Investment Zone designation being
confirmed within Glasgow City Region during 2023 and that the implications of
any such decision will be subject to a future Board report; 
Item 1
EAR230523 Page 1 of 50

Page 6

3. Background 
3.1 In June 2022 Board approved the submission of the GCR bid for a Green/Freeport
designation as it affected Renfrewshire. This included the designation of land around
Glasgow Airport, Netherton Farm, Inchinnan Business Park and Westway Industrial
Estate. 
3.2 The bid had been made by the eight GCR local authorities in conjunction with a
private sector consortium consisting of Glasgow Airport, Peel Ports and J&D Stirling
(Mossend rail freight hub). 
4.  Green/Freeport assessment 
4.1 Five Green Freeport bids were received on the closing date of 20 June 2022. These
were from:
 Clyde (GCR);
 Firth of Forth;
 Inverness and Cromarty Firth;
 North East Scotland (Aberdeen and Peterhead)
 Orkney 
4.2 Assessment of the bids was undertaken jointly by the Scottish Government (SG) and
UK Government (UKG). 
4.3 Although the Orkney bid failed on one of the Pass/Fail questions considered in their
application, the governments agreed the bid should proceed to full assessment
alongside the other four bids. 
4.4 The five bids were assessed against a range of criteria in accordance with the
published prospectus for Green/Freeport bids, including promotion of regeneration,
job creation and decarbonisation. A summary of how each of the five bidders fared
against these criteria is set out in Appendix 1 of this report. 
4.5 All four other bids (apart from Orkney) were considered deliverable and appointable
by the Assessment Panel. 
4.6 A cross-government group of senior officials (forming the Green Freeports
Programme Board) oversaw the process. They approved a list of appointable
candidates to be submitted to Ministers for final selection. 
4.7 Scotland’s Deputy First Minister met with the UK’s Secretary of State for Levelling
Up, Housing and Communities and the Secretary of State for Scotland to discuss the
appointable bids. 
4.8 Ministers agreed that the priorities for additional considerations were:
 prioritising proposals with a “high” assessment for the decarbonisation criterion
when choosing between similar appointable applications;
 reserving the right to ensure a fair spread across Scotland;  
4.9 Minister selected the Firth of Forth bid as the clear highest scoring bid overall.  They
noted that the Clyde and Inverness / Cromarty Firth bids achieved scores that were
comparable. 
Page 2 of 50

Page 7

However, when they took into account the additional considerations (see above) from
the published prospectus they decided to select Inverness / Cromarty Firth as their
second Green/Freeport location for Scotland. 
5. Investment Zones 
5.1. UKG Budget Statement (March 2023) stated that a minimum of 4 Investment Zone
designations were being considered for Scotland, Wales and Northern Ireland.
England already has a process for local authorities and regions to bid for such
designations. 
5.2. Meetings have taken place recently between SG and UKG about Investment Zone
designations for Scotland. 
5.3. Feedback to date is that there will be one or two in Scotland. The process for
confirming is these is likely to be allocative rather than competitive, with an agreed
set of metrics being applied to the selection process. 
5.4. There is some consideration being given by the Governments to whether a
geographic or thematic approach should be applied to such selections.  If thematic
then (for instance) it could be for net zero and cover multiple geographies, with
partnering between different regions. 
5.5.  The scale of such designations (circa 600 hectares) is like that for the allocated
Green/Freeports and the fiscal incentivisation on offer for potential investment in
these locations is also along similar lines. 
5.6. A decision on any such Scottish designations is likely to be made in summer 2023.
Any implications for Renfrewshire will be the subject of future reports to Board. 
Investment Zones in England 
5.7. So far, the UKG have shortlisted eight locations in England for potential Investment
Zones. All of these are based on city-regions. 
5.8. These city-regions and their constituent local authorities have been invited to
submit Investment Zone proposals for a specific area within their boundaries.
Zones are expected to be set across a “sensible economic geography” to facilitate
effective collaboration between industry and academia (universities). If proposals
choose to take up the government’s tax incentive offer, they must be located in
dedicated tax sites. 
5.9. This is a very similar approach to the one taken in Scotland for the (now
completed) bidding process for Gren/Freeport status. 
5.10. With the English Investment Zone proposals, the financial incentives offered to
investment in this location is comparable to that offered for Green/Freeports and
includes
:
 Stamp Duty Land Tax relief;
 Exemption from business rates 
 Enhanced Capital Allowances – 100% first year allowance
Page 3 of 50

Page 8

 Enhanced Structures and Buildings Allowance
 Lower employer National Insurance Contributions 
___________________________________________________________________ 
Implications of the Report 
1.  Financial - No financial implications. 
2.  HR and Organisational Development – None. 
3. Community Planning 
 Our Renfrewshire is thriving – The green/freeport and investment zone
concept offers an opportunity for increased economic activity and job
creation in Renfrewshire. 
 Reshaping our place, our economy, and our future – Renfrewshire already
has a significant cluster of manufacturing companies and an international
freight airport and therefore, the green/freeport concept and investment
zone offers the potential to attract additional manufacturers ad their supply
chain to the area; 
4.  Legal – None. 
5.  Property/Assets – The Council-owned AMIDS site was put forward for
inclusion in one of the tax sites included in the green/freeport bid for GCR. 
6.  Information Technology - None. 
7.  Equality & Human Rights 
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report because for example it is for noting only.   If required following
implementation, the actual impact of the recommendations and the mitigating
actions will be reviewed and monitored, and the results of the assessment
will be published on the Council’s website.  
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. COSLA Policy Position – None. 
13. Climate Risk – None. 
__________________________________________________________________
Page 4 of 50

Page 9

List of Background Papers 
(a) Freeports (Greenports) board report; Leadership Board; June 2021
(b) Green Freeports in Scotland: bidding prospectus; Department for Levelling Up,
Housing and Communities; UK Government; March 2022
(c) Clyde Green/Freeport bid - update; Economy & Regeneration Board; June 2022 
________________________________________________________ 
Author:  Alasdair Morrison, Head of Economy and Development 
Alasdair.morrison@renfrewshire.gov.uk 
(Tel: 0141 618 4664) 
Page 5 of 50

Page 10

Appendix 1
Assessment Matrix for Scottish Green/Freeport Bids; 2022 / 2023 
Policy Criteria Delivery Criteria
Green Freeport Criterion A:
Promote
regeneration and
high-quality job
creation
Criterion B: Promote
decarbonisation and
a just transition to a
net zero economy
Criterion C:
Establishing hubs
for global trade
and investment
Criterion D:
Fostering an
innovative
environment
Criterion E:
Deliverability
of proposal
effectively at
pace
Criterion
F:  Level of
private sector
involvement in
the proposal
Clyde Green Freeport HIGH MEDIUM MEDIUM MEDIUM/HIGH HIGH HIGH
Firth of Forth Green
Freeport
HIGH HIGH HIGH MEDIUM HIGH HIGH
Inverness and Cromarty
Firth Green Freeport HIGH MEDIUM/HIGH HIGH MEDIUM/HIGH MEDIUM MEDIUM
North East Scotland
Green Freeport
MEDIUM/HIGH MEDIUM MEDIUM MEDIUM HIGH MEDIUM
Orkney Green Freeport* MEDIUM/LOW MEDIUM LOW LOW/MEDIUM LOW LOW
Page 6 of 50

Page 11

___________________________________________________________________
To: Economy and Regeneration Policy Board
On: 23 May 2023
___________________________________________________________________
Report by: Chief Executive 
___________________________________________________________________
Heading: Levelling Up Fund Bid 2022 – Renfrew Community Hub Update
___________________________________________________________________ 
1. Summary 
1.1 This report provides an update on feedback received on the Council’s unsuccessful bid to the
UK Government’s Levelling Up Fund, which focussed on the delivery of a community hub
within Renfrew town centre. 
2.  Recommendations 
2.1 It is recommended that the Board:
(i) Notes the content of this report and associated appendices.
______________________________________________________________________________
3. Background 
3.1 The Levelling Up Fund (LUF) was announced by the UK Government in 2020 to support
investment in infrastructure and assets that improve everyday life across the country.  The
funds are targeted at high value, local investment priorities including transport schemes, town
centre regeneration and cultural / heritage assets. 
3.2 In late 2021 the Council were successful in securing £38.7m from the first round of the fund,
supporting delivery of the AMIDS South project.  A report to the Leadership Board on 1
December 2021 advised that officers were considering additional proposals which could align
with future calls for bids to the fund.  The Board of 14 June 2022 subsequently approved the
submission of an application to the second round of the fund, supporting the delivery of a new
community hub within Renfrew, focussed on the Renfrew Victory Baths and former Police
Chambers.  The application was submitted on 28 July 2022.   
3.3 The outcome of the Round 2 LUF process was announced on 19 January 2023 and the
Council received confirmation that the Renfrew bid had been unsuccessful.  The UK
Government subsequently provided feedback on 10 March 2023, a summary of which is
provided in section 7 below.     
Item 2
EAR230523 Page 7 of 50

Page 12

4 Renfrew Community Hub Project 
4.1 The Round 2 LUF bid was developed in line with the ambitious regeneration agenda of
Renfrewshire Council and its partners, focussed on positive place-based outcomes for
Renfrewshire’s town and villages centres.  Central to this approach is to advance the
evolution of our centres, ensuring that they thrive as the economic recovery from the
pandemic continues.   
4.2 In this context officers considered a range of options for a bid in Renfrew, concluding that the
strongest opportunity lay with a focus on the Victory Baths and the former Renfrew Police
Chambers, in recognition that both buildings are in need of significant investment to secure
their long-term legacy and use.  A proposal was subsequently developed for a new
community hub within Renfrew town centre.   
4.3 The proposals focussed on returning the former Renfrew Police Chambers to positive use
and enhancing facilities at Victory Baths, including:- 
 A Swim centre, with enhanced pool facilities, spa and wellness centre
 A dance, gymnastics and fitness centre for all ages and groups
 A relocated library and learning centre with digital facilities
 New community space across the hub 
4.4 The key objective of the project was to address the long-term challenges of vacant and
underused civic assets within the town, supporting their restoration, securing their long-term
legacy and acting as a catalyst for a wider transformation of Renfrew town centre as a
modern, 21st century place which is central to the community.  
4.5 The Board of 14 June 2022 noted that significant work was undertaken by officers to support
the ambitious proposal, alongside key partners such as OneRen, the local community and
other stakeholders.  This included public consultation events which demonstrated strong
community support. 
4.6 In total the project was costed at £21.3m, £19.2m of which was asked from LUF to support
the delivery of the project.   
5 Levelling Up Fund 
5.1 LUF is a competitive fund established by the UK Government, with funding distributed to
places across the UK on the basis of successful project selection. The Fund has set aside at
least £800 million across Scotland, Wales and Northern Ireland over four years from 2021-
2022 to 2024-2025.  LUF aims to invest in local infrastructure that has a visible impact on
people and their communities. 
5.2 The Renfrew Community Hub proposal was submitted under the “Regeneration and Town
Centres” theme, which closely aligned with the funding requirement to upgrade vacant and
underused buildings, regenerate sites and bring public services and accessible community
spaces into town centres. 
6 Round 2 LUF Decision 
6.1 Successful bids to Round 2 of LUF were announced on 19 January 2023 and it was confirmed
that the Council had been unsuccessful in receiving funding for the Renfrew Community Hub
project.  
Page 8 of 50

Page 13

6.2 In total, 111 areas across the UK were awarded a share of £2.1 billion from Round 2.  This
included £177.2 million for projects in Scotland over 10 local authority areas.  In Round One,
a total of £171 million was allocated to 8 Local Authorities for Scottish projects (including
AMIDS South in Renfrewshire).  Cumulatively, 18 Local Authorities in Scotland have received
funding so far from LUF, totalling £348.9m. 
6.3 The assessment and decision-making process was based on a sequential approach which
took account of other investment in local areas, including grants from the first round of the
fund, to encourage a spread of funding.  In this context no Local Authority in Scotland who
received funding in Round 1, including Renfrewshire Council, was successful in Round 2.  A
full list of all Scottish Local Authorities who received funding in Rounds 1 & 2 are detailed in
Appendix 1.   
6.4 A full explanatory note on the assessment and decision-making process was published by
the UK Government at the same time as the bid announcements.  Full details can be found
here:  Levelling Up Fund Round 2: explanatory note on the assessment and decision‐making process ‐ GOV.UK 
(www.gov.uk) 
7 Round 2 Feedback 
7.1 The UK Government provided feedback on the Council’s Round 2 bid on 10 March 2023. 
Full details of the feedback can be found in Appendix 2.  In summary the following key points
were identified: 
 The assessors highlighted that the Council had submitted a strong bid that built upon
a comprehensive and well thought out stakeholder engagement process, scoring
highly on a number of key elements.  In particular, the strategic rationale for the
development was noted as being particularly strong, as a clear case for investment
was presented, which was backed-up by comprehensive engagement with key
stakeholders. 
 Some areas of the Economic Case were highlighted as those where additional
information and analysis may have been beneficial, for example in highlighting local
issues that the project sought to address such as economic, social and health benefits. 
 Overall the bid was noted as being well-presented and providing confidence over the
project’s deliverability, however further information in relation to the outcomes, outputs
and impacts may have been beneficial. 
7.2 Officers recently met with representatives of the Scottish Team of the Department for
Levelling Up, Housing and Communities (DLUC) to discuss the feedback, clarify areas for
improvement and to consider opportunities for future bids.  DLUC representatives again
indicated that the Council had submitted a strong bid which aligned strongly with the key aims
of LUF.   
8 Next Steps 
8.1 Given the feedback outlined above, it is considered that the project may still have potential to
be successful in a future LUF round bid.  Such a bid will however be subject to the parameters
of any future LUF rounds.   
8.2 Currently the UK Government have not indicated whether there will be a further round of
funding for LUF or timescales for this.  
Page 9 of 50

Page 14

The DLUC have however indicated that there is approximately £1 billion of LUF funding left
to be allocated and it is expected that Scotland could receive around £90m of this allocation. 
It is anticipated that any future LUF bidding rounds would be subject to one of the following
parameters: 
1. Open funding i.e. any local authority can apply regardless of whether they received
LUF money in either Rounds 1 or 2
2. The funding round would only be open to those local authorities who were
unsuccessful in Round 2 (including Renfrewshire).
3. The funding round would only be open to those local authorities who did not receive
funding in either Rounds 1 or 2. 
8.3 The Council will continue to liaise with DLUC in respect of any updates on whether Round 3
is proceeding and associated guidelines.  Once any announcement is made, Officers will
consider future options in respect of the Renfrew CommunityHub and whether it would be
prudent to apply again.  A future paper to the Board will be presented to receive approval on
any future course of action.
______________________________________________________________________________
Implications of the Report 
1. Financial – No additional finance is sought at this stage. 
2. HR & Organisational Development – None. 
3. Community/Council Planning – None. 
4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed in relation to their
impact on equalities and human rights. No negative impacts on equality groups or potential
for infringement of individuals’ human rights have been identified arising from the
recommendations contained in the report. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact - None. 
12. COSLA Policy Position – Not Applicable. 
13. Climate Risk – Not Applicable.
___________________________________________________________________ 
Page 10 of 50

Page 15

Appendices 
(a) Local Authorities Receiving Funding from LUF Rounds 1 and 2 
(b) UK Government LUF Bid Feedback – Renfrew Community Health and Learning Hub 
List of Background Papers
(a) Levelling Up Announcement. Leadership Board, 1 December 2021 
(b) Levelling Up Fund 2022 – Renfrew Community Hub.  Economy and Regeneration Board, 14
June 2022.
___________________________________________________________________ 
Author:  Euan Shearer; Regeneration and Place Manager; Tel 0141 6184664.
Email:    euan.shearer 
Page 11 of 50

Page 16

Appendix 1: Local Authorities Receiving LUF funding in either Rounds 1 or 2 
Local Authority  Project title   Amount  
LUF 
category 
Renfrewshire   AMIDS South (Travel Links Project)   £38,725,218  1  
Shetland Islands Council   Fair Isle Ferry Infrastructure Project   £26,762,313  3  
North Ayrshire   Infrastructure Improvement B714   £23,693,443  1  
Aberdeenshire Council  
Cultural  Tides:  North  Sea 
Connections in Aberdeenshire   £20,000,000  3  
East Ayrshire Council   Cultural Kilmarnock   £20,000,000  1  
Aberdeen City   Aberdeen City Centre Masterplan   £20,000,000  2  
Falkirk   Westfield Roundabout   £20,000,000  1  
West Dunbartonshire  
Artizan  Shopping  Centre,  Glencairn 
House and connecting Dumbarton   £19,900,000  1  
Highland  
Inverness  Zero  Carbon  Cultural 
Regeneration   £19,856,253  3  
Fife Council  
River  Leven  Regeneration, 
Glenrothes and Central Fife   £19,410,000  2  
Inverclyde Council   Greenock Central   £19,390,000  1  
Stirling Council   Stirling Forthside Redevelopment   £19,052,300  2  
Dumfries and Galloway Council   Reactivating Galloway   £17,698,660  1  
City of Edinburgh  
Granton  Gasholder  (Waterfront 
Cultural Regeneration)   £16,482,845  3  
Dundee City Council   Green Transport Hub and Spokes   £14,400,000  1  
Glasgow City  
Pollock Stables and Sawmill (Heritage 
and community Centre)   £13,050,500  1  
East Lothian Council  
Former Cockenzie Power Station Site 
Remediation and Preparation Works   £11,267,841  2  
North Lanarkshire Council  
Delivering  on  Cumbernauld's  Town 
Vision   £9,225,000  1  
Total    £348,914,373   
Page 12 of 50

Page 17

Appendix 2: Renfrewshire LUF Feedback 
LUF20456 - Renfrew Community Health & Learning Hub 
Renfrewshire │Scotland │Cultural │ £19,208,167 
Bid Summary: 
The Renfrew Community Health & Learning Hub comprises the re-development and extension of 2
no Listed Buildings into a new Town Centre Community Health & Learning Hub incorporating a
range of community facilities including: provision for swimming, dance-gymnastics, library,
community space. 
The project is developed to put the ‘heart’ back into Renfrew Town Centre, restore civic pride, build
confidence and social cohesion, rejuvenate and re-purpose two prominent and at risk Listed
Buildings and promote a more participatory, inclusive, and successful place. It will be a catalyst for
regeneration and transformation of Renfrew as a destination town within the metropolitan area. 
Headline: 
This was a strong bid across all areas assessed. Key elements that could be strengthened include;
providing a “do nothing” option and giving more clarity on its impact on addressing local problems.
We have provided more specific feedback below. This has been drafted to be as clear and helpful
as possible to inform future funding applications. 
Assessment Overview   
Strategic Fit: 
This was a strong bid that built upon a comprehensive and well thought out stakeholder engagement
process. 
It was positive to see that the team had taken time to work with relevant stakeholders on identifying
the challenges, agreeing the optimum set of facilities within the hub, and then converting this into a
set of practical deliverables that enjoy widespread support. 
Similarly, the case for investment was very detailed and persuasive clearly setting out the rationale
for the proposals and their anticipated outputs, outcomes, and impact
.
The alignment with national and local context was also comprehensive covering all the key policies,
strategies and plans that were relevant to this proposal. 
Overall, the strategic fit section of the bid was very strong with minimal weaknesses. 
Economic Case: 
The evidence used gave quite a comprehensive of coverage of the bid and came from trusted date
sources. However, some evidence had not been compared to national and other regional averages,
which would have provided a clearer image of local issues and in particular, the scale of local issues. 
The bid provided a Theory of Change (TOC), however, to improve, outputs could have been
quantified along with some outcomes and impacts. A counterfactual option of do nothing was
provided and explored and a full business case with an appraisal of long list options provided. 
Page 13 of 50

Page 18

Evidence of the demand for a dance/activity centre was well demonstrated, however the analysis
and evidence directly linking the bid to the local problems faced was slightly limited and unclear.
This could have been strengthened. HMT Green book guidance was followed, however the inclusion
of additional evidence to support the assumptions made would have strengthened the bid. 
Costs for each option and year were outlined, along with the specific costs for the preferred options.
However, the bid incorrectly assumed 0% inflation for the year 22/23, inflation figures were sourced
from multiple sources and methodology was unclear and inconsistent with the inflation forecast
presented in the table. 
Although displacement may be low for the dance studio wellbeing value, it was assumed that 60%
of UK adults were active and thus already gaining this wellbeing benefit, as the specific value was
not just for dance participation but being active.  There also was a risk of double counting using the
wellbeing benefit for two activities; this should have been discussed but there was no framework to
remove this. 
Deliverability: 
Overall, this was a thorough and mostly well-presented bid which helped give confidence over the
project's deliverability. There were some key issues to highlight, however. 
There were no financial projections for when the facility became operational in its new form which
would have been beneficial to see, above and beyond the chief financial officer commitment of the
council to the scheme. 
The timetable for moving from the project's current status to having the construction contractors on
site appeared ambitious, which would pose a risk to the grant conditions being met by 31 March
2025. 
Approximately 40% of the capital cost envelope and therefore 36% of the grant requested was
attributable to risk, contingency and inflation allowances. Although this did not appear unreasonable
given the heritage nature of the buildings, the relatively early stage of the project, and the prevailing
economic environment, the mechanics of how the assumptions were applied to the costs were not
particularly transparent. 
The Monitoring and Evaluation (M&E) section explored the outputs, outcomes, and impacts.
Governance and resourcing high-level summaries were provided. Potential data sources were
slightly unclear but were explained more in the M&E plan specific document, whilst potential data
collection methods were fully explored. To improve, the objectives of the M&E activity could have
been more clearly outlined. 
Page 14 of 50

Page 19

___________________________________________________________________
To: Economy and Regeneration Policy Board
On: 23 May 2023
___________________________________________________________________
Report by: Chief Executive 
___________________________________________________________________
Heading: UK Shared Prosperity Fund – Year 1 Report 
___________________________________________________________________
1. Summary 
1.1 This report provides an update on the first official year of the UK Shared
Prosperity Fund (UK SPF) in Renfrewshire. The plan for the UK SPF was
previously outlined in the Board Report of 22nd August 2022.
1.2 As planned, Renfrewshire Council commenced activity in 2 of the 4 thematic
areas (Local Business and Multiply) in January 2023 with the other two themes
commencing 1st April 2023 (Communities and Place and People and Skills). 
1.3 The report summarises the UK Shared Prosperity Fund activity to the end of
the financial year 22/23 and provides details of the ‘credible plan’, to the UK
Government requesting carry forward of 22/23 underspend into 23/24. 
2.  Recommendations 
2.1 It is recommended that the Board notes the content of this report and: 
(i) the request to carry forward year 1 underspends into year 2;
(ii) the request to move £220,000 from Multiply underspends in 22-23 to
People and Skills in 23-24;
(iii) the new requirements to support the Clyde Climate Forest project at the
sum of £19,400 over two years (2023-25)
___________________________________________________________________
3. Background 
3.1 The Shared Prosperity Fund is a UK wide programme to replace EU funded
programmes and to help the levelling up of the UK economy. Three years of
funding have been announced for 2022-25 and Renfrewshire Council have
been awarded £6,290,987 phased over three years. Within this figure
£1,086,395 is specifically allocated to the Multiply Programme. 
3.2 At the Economy and Regeneration Board meeting on 23rd August 2022 the
board agreed: 
Item 3
EAR230523 Page 15 of 50

Page 20

 that the SPF Regional Investment Plan will be developed as a Glasgow City
Region (GCR) plan in conjunction with all 8 Member Authorities and with all
necessary approvals at both regional and local level being in place prior to
final submission at the end of August 2022. 
 To approve an outline set of SPF funded proposals at Renfrewshire level
which met the Fund’s objectives. 
3.3 Formal approval of the GCR plan was received in December 2022 with funding
released to Glasgow City Council, on behalf of the City Region, thereafter. 
3.4 As part of the conditions of grant a report on activity and finance to the end of
the financial year 22/23 is required. The report should also provide the UK
Government (UKG) with the details of the ‘credible plan’, requesting carry
forward of 22/23 underspend into 23/24. 
4. Activity and Finance 2022-23 (Renfrewshire) 
4.1 Renfrewshire Council activity is running to plan with the Multiply and Local
Business (themes) commencing activity in January 2023 and People and Skills
and Communities and Place commencing in April 2023. 
4.2 During the first quarter £57,046 has been spent and claimed from SPF. The
balance is requested to be accrued and spent in the 23-24 financial year.
Progress includes: 
 People & Skills: Started on 1st April 2023, all staff in post and all activity
now being delivered. No expected issues or delays, expect 100% spend. 
 Local Business: two staff still to be recruited, but otherwise all running to
plan. Possible slight underspend on staffing but will increase grants as a
result. 
 Communities and Place: key projects all identified and staff recruitment in
process. 
 Multiply: The Multiply Co-ordinator is in post; college programmes have
commenced (although with lower interest than expected); and a wide range
of community-based provision has been co-commissioned through the
Local Employability Partnership with delivery already started.                         
4.3 With only a few months to spend in the 2022-23 financial year then the
remaining Renfrewshire allocation has been requested to move into the 2023-
24 financial year as outlined below: 
Table 1: SPF underspends 2022-23 Renfrewshire 
Underspend (capital) £ £66,000.00
Underspend (revenue) £ £545,328.00
Underspend (Multiply) £ £291,694.00
Reprofile  £66,000.00
Reprofile  £545,328.00
Reprofile (Multiply) £291,694.00
Page 16 of 50

Page 21

4.4 A number of amendments have been outlined in the critical plan:
 Communities and Place: 
Projects were previously listed under 7 interventions, this has now been
streamlined to 4 (removing S5, S6, S8). All budgets and outcomes /
outputs have also changed to reflect this.
 Multiply:
Given the additional flexibility offered by UKG in relation to Yr1 Multiply
underspend, Renfrewshire Council will allocate £220k underspend to
People and Skills as follows: 
S48: Remove £20k underspend and allocate to People and Skills S32
S51: Remove £200k underspend and allocate to People and Skills S32
The overall outputs and outcomes for Multiply have been reduced
accordingly.
 Reduction of match funding from £2,496,000 to £1,733,000 – primarily the
removal of place-based investment match and a slight downsizing of the
employability and business match funds. 
5. Clyde Climate Forest and ‘Ninth’ Partner 
5.1 The Clyde Climate Forest (CCF) will see 18 million trees planted in both urban
and rural parts of Glasgow City Region over the next decade. The Clyde
Climate Forest covers the eight regional local authorities of East
Dunbartonshire, East Renfrewshire, Inverclyde, Glasgow, North Lanarkshire,
Renfrewshire, South Lanarkshire and West Dunbartonshire. 
5.2 The CCF has been endorsed by the Council Leaders of all eight authorities and
will connect and enhance the woodland network across local authority
boundaries benefiting people, wildlife and climate. 
5.3 Following the instruction of the GCR CEOs’ (16 March ’23) options have been
developed for UKSPF to fund the ongoing delivery of the Clyde Climate Forest
(CCF) project. The £200,000 budget required has been allocated on a pro-rata
basis (based on City Deal methodology) across the MAs and been remitted to
the GCR Programme Management Office (PMO) to manage. 
Member Authority Percentage split £200k funding (2 years)
East Dunbartonshire Council 5.90% £11,800
East Renfrewshire Council 5.20% £10,400
Glasgow City Council 34.10% £68,200
Inverclyde Council 4.30% £8,600
North Lanarkshire Council 18.50% £37,000
Renfrewshire Council 9.70% £19,400
South Lanarkshire Council 17.40% £34,800
West Dunbartonshire Council 4.90% £9,800    
Table 2. CCF funding split by GCR Member Authority 
Page 17 of 50

Page 22

5.4 With the approval of GCR Cabinet (9 May ’23) the GCR PMO will operate as
the ‘ninth’ partner in GCR UKSPF and will be responsible for the management
and reporting of the CCF project. 
5.5 A grant agreement is being developed with The Green Action Trust (GAT), as
the agent for the ongoing delivery of the CCF. 
6. Next Steps 
6.1 The Renfrewshire 2022-23 report has been submitted to GCR to be combined
with the other 7 reports from the other Managing Authorities. With the
approval of the GCR CEG and GCR Cabinet, the 6-monthly report will be
submitted to UKG on Tuesday 9 May. 
6.2 UKG have indicated the GCR UKSPF Year 2 allocation (£19,284,451) will be
transferred to GCR on approval of the ‘credible plan’ after which funds can be
released to the local authorities. 
6.3 Further reports on the progress of the UK SPF will be brought back to board
in due course as the delivery plan proceeds. 
__________________________________________________________________ 
Implications of the Report 
1. Financial – No additional finance is sought.  All funding is accounted for within
existing Council budgets. The report provides an update on the UK SPF. 
2. HR & Organisational Development – SPF Funding will support a number of
Council posts. 
3. Community/Council Planning – 
 Jobs and the Economy – Implementation of the recommendations of the
report could support more investment and jobs within the local economy. 
4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report. 
8. Health & Safety – None. 
9. Procurement – None.
Page 18 of 50

Page 23

10. Risk – Risk Action plans are in place for UK SPF. 
11. Privacy Impact - None. 
12. COSLA Policy Position – Not Applicable. 
13. Climate Risk – UK SPF will support the councils Net Zero Business Grants
programme
___________________________________________________________________
List of Background Papers
UK Shared Prosperity Fund Update; Economy and Regeneration Board, 23rd August
2022
___________________________________________________________________ 
Author:  Ruth Cooper, Economic Development Manager 
Email: ruth.cooper@renfrewshire.gov.uk
Page 19 of 50

Page 24

Page 20 of 50

Page 25

___________________________________________________________________ 
To: Economy and Regeneration Policy Board 
On: 23 May 2023
___________________________________________________________________ 
Report by: Chief Executive
___________________________________________________________________ 
Heading: Making of Ferguslie – Update 
___________________________________________________________________ 
1. Summary 
1.1 The purpose of this report is to inform the Economy and Regeneration Board of
progress on delivery of the ‘Making of Ferguslie Park’ framework and Place
Plan, including preparation of the Ferguslie ‘Green Line’ study which further
develops the future place vision for the neighbourhood.   
1.2 A copy of the Ferguslie Green Line Study can be viewed on the Renfrewshire
Council webpage at https://www.renfrewshire.gov.uk/themakingof. 
___________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Board: 
(i) Notes strong progress in ‘early win’ actions supporting delivery of the
Making of Ferguslie, as set out in section 4. 
(ii) Approves the Ferguslie ‘Green Line’ study as the basis for further
development and delivery of the plan, including the preparation of bids for
major capital funding streams, as set out in section 6. 
(iii) Authorises the Head of Economy and Development to undertake
appropriate consultation and publicity with the local community and
stakeholders to support further delivery of the plan. 
(iv) Notes that further progress on delivery of the plan will be reported to the
Board as appropriate. 
Item 4
EAR230523 Page 21 of 50

Page 26

3. Background 
3.1  The Communities, Housing and Planning Board of 30 October 2018 approved 
the preparation of a development framework for Ferguslie Park, supporting 
wider housing investment within the area.   
3.2 The ‘Making of Ferguslie’ framework and Place Plan was subsequently
developed in partnership with the local community and stakeholders through a
series of consultation workshops and events over 2020 and 2021, with the
finalised document approved by the Leadership Board on 1 December 2021. 
3.3 The plan provides the basis for collaborative action by local residents,
community groups and stakeholders, supported by the Council and Community
Planning Partners, to deliver aspirations for Ferguslie Park over the next five to
ten years. 
3.4 The plan sets out a vision for Ferguslie Park as a ‘20’ minute neighbourhood -
well connected with a variety of local greenspaces, facilities and activities which
support a healthy and sustainable place.  In this context it sets out a range of
actions to reimagine underused land, enhance greenspaces, encourage
creativity and support existing community initiatives.   
4. Making of Ferguslie – Progress 
4.1 Strong progress has been made on the delivery of initial phases of the plan and
in particular actions which support ‘early wins’ to demonstrate progress.  These
include:- 
 New Homes for the Community – Work is nearing completion on the
construction of 101 new Council homes at the site of the former St
Fergus Primary School at Blackstoun Road.  The investment provides
new modern, energy efficient homes for the neighbourhood and is an
early signal of positive change for the area. 
 Sculpture House – The refurbishment of Craigelea House at Blackstoun
Road as an artist-in-residence studio and social space responds directly
to the community priority of a space for arts, crafts and events within the
plan.  The project has returned an underused property to a positive use
and led by the Sculpture House Collective, a group of artists who worked
with local residents during the place planning work over 2020 and 2021,
builds upon established relationships to provide inclusive cultural
activities and opportunities for learning across the neighbourhood. 
 Darkwood Community Growing Space – A new growing space on
underused land adjacent to the ‘Village Green’ at Darkwood Crescent. 
Providing 20 raised beds, the project will create a space to learn,
socialise and grow food that will enhance the capacity of community
meals and market initiatives being run by local groups.  Construction of
the space is anticipated in late spring 2023, supported by the Scottish
Government Place Based Investment Fund being delivered by the
Regeneration and Place Team. 
Page 22 of 50

Page 27

 Candren Burn Feasibility Study – SEPA have identified Candren Burn
as a water body which could offer potential for improvement and through
their Water Environment Fund are supporting Council officers to develop
an initial feasibility study.  The study aligns strongly with the place
making aspirations of the plan and outcomes could provide multiple
benefits, including improvements to the physical and ecological condition
of water body and enhanced climate resilience.  The study is anticipated
to commence later this year and will be subject to consultation with local
residents.   
 Community Assets – Work has been progressed to consider further
opportunities for community use of Council owned buildings within the
neighbourhood, such as St Ninian’s Church Hall, including condition
surveys to ensure that buildings are fit for purpose.  While at an early
stage, work is ongoing with local groups to consider these opportunities
through the Community Asset Transfer process. 
 ‘You Decide’ – Two projects within Ferguslie Park were successful as
part of the Council’s ‘You Decide’ initiative, supporting local communities
to identify capital projects within their neighbourhoods.  The projects,
which focus on improving access at Glencoats Park and the provision of
additional play equipment at South Candren play area, align closely with
the plan and complement ongoing delivery. 
5. Ferguslie ‘Green Line’ 
5.1 The Green Line is the key placemaking intervention within the Making Of
framework and the central spine for the neighbourhood.  A multi-functional
space and green corridor, a key role of the Green Line is to support the reuse
of vacant and derelict land within the neighbourhood, providing for high quality
public realm and a focal point for activities.  The Green Line will also support
active travel routes enhancing connections within the neighbourhood and
beyond.   
5.2 Initial proposals for the Green Line have been developed to progress this key
intervention and to further develop the place vision for the neighbourhood. 
Informed by the guiding principles and actions within the Making of Ferguslie
plan, the Ferguslie Green Line study identifies designs for a series of character
areas which include:- 
 Neighbourhood Centre – Reuse of existing vacant land for active
recreational uses, including a cycle ‘pump’ track and new games area,
with enhanced connections to existing facilities around the Tannahill
Centre; 
 Sports Centre – Reimagining of land for informal recreation, aligning with
existing sports uses within this area, including formalising existing
designated Core Path Routes, creating a ‘trim trail’ and opportunities for
outdoor exercise, with environmental enhancements and management
of land for biodiversity; 
Page 23 of 50

Page 28

 Candren – Reuse of vacant land as a nature reserve with environmental
enhancements and management for biodiversity.  Proposals include the
potential to investigate the feasibility for ‘daylighting’ the Candren Burn,
as set out in section 4 above; 
 Belltrees – Reuse of area for ‘natural play’, with environmental
enhancements and management for biodiversity.  The opportunity may
also exist to introduce additional residential uses to provide active
frontage and surveillance for the area, with enhancements to key
gateways at Millarston.   
5.3 The study sets out a phased approach to delivery with a focus on the
Neighbourhood Centre and Belltrees character areas as initial priorities.  This
aligns with the outcomes of the Making of Ferguslie in tackling long term areas
of vacant and underused land within the neighbourhood. 
6. Funding     
6.1 Opportunities for future delivery of the plan have been informed by a review of
major Scottish and UK capital funding programmes.  These were reported to
the Board on 14 June 2022 and include the Place Based Investment Fund,
Vacant and Derelict Land Fund and Shared Prosperity Fund. 
6.2 In particular, the report of 14 June 2022 highlights the opportunity for the
submission of bids to the Vacant and Derelict Land Fund to support delivery of
the Making of Ferguslie.  In this context it is anticipated that a bid will be
submitted to the next round of the Fund in June 2023 to support delivery of
projects identified within the Green Line Study. 
6.3 Budgets from the Council’s 2022/23 PBIF allocation have supported the
delivery of early actions set out in section 4 above and an indicative budget of
£100,000 from the Council’s 2023/24 Shared Prosperity Fund allocation has
been identified to further support the positive outcomes to date.  It is anticipated
that the opportunity for further allocations from SPF and PBIF to support
delivery of the plan will be explored over the coming years. 
6.4 Positive discussions have also progressed with external funding partners and
key agencies on potential opportunities to support delivery.  As identified in
section 4 above, funding has been secured from SEPA’s Water Environment
Fund to explore the feasibility of enhancements at Candren Burn and early
engagement with Sustrans is underway in respect of active travel opportunities. 
6.5 Opportunities for private sector investment to support delivery of the plan, for
example to provide residential or other appropriate land uses within the
Tannahill area, will also continue to be explored.   
7. Next Steps 
7.1 To support further progress and delivery of actions from the Making Of
Ferguslie, detailed designs are being progressed for the priority character areas
of the Neighbourhood Centre and Belltrees identified in the Green Line study,
in consultation with local residents, community groups and key stakeholders.  
Page 24 of 50

Page 29

7.2 Outcomes from this process will support further delivery of community priorities
using allocated funding streams and providing the basis for preparation of bids
to the major capital funding programmes identified in section 6 above,
presenting the opportunity to deliver the plan at scale.  Delivery will continue to
be progressed in partnership with the local community and key stakeholders. 
8. Progress and Reporting 
8.1 Progress on delivery of the framework will be reported to the Board on a rolling
basis and future projects brought forward for the Board’s consideration.
___________________________________________________________________
Implications of the Report 
1. Financial – None.   
2. HR & Organisational Development – None. 
3. Community Planning – 
Creating a sustainable Renfrewshire for all to enjoy – The plan supports the
empowerment of local communities to become more involved in shaping their
places. 
4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report.  If required following implementation, the actual
impact of the recommendations and the mitigating actions will be reviewed
and monitored, and the results of the assessment will be published on the
Council’s website.   
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. Cosla Policy Position – None.  
13. Climate Risk – The framework will encourage sustainable neighbourhoods,
sustainable links and enhancements to green space.
Page 25 of 50

Page 30

________________________________________________________________ 
Appendices 
(a) The Making of Ferguslie (https://www.renfrewshire.gov.uk/themakingof) 
(b) Ferguslie Green Line Study (https://www.renfrewshire.gov.uk/themakingof) 
List of Background Papers 
(a)  Housing Investment Strategy for the Tannahill Area, Ferguslie Park. 
Communities, Housing and Planning Policy Board, 30 October 2018. 
(b) Tannahill Area, Ferguslie Park – Update.  Communities, Housing and Planning
Policy Board, 27 October 2020.
 
(c) Tannahill Area, Ferguslie Park – Housing Regeneration Update. Communities,
Housing and Planning Policy Board, 18 May 2021. 
(d) The Making of Ferguslie Park – Development Framework.  Leadership Board,
1 December 2021. 
(e) Regeneration Funding Bids Update.  Economy and Regeneration Board, 14
June 2022. 
(f) Lease of Craigielea House, Blackstoun Road, Paisley.  Infrastructure, Land and
Environment Board, 15 June 2022. 
___________________________________________________________________ 
Author: Euan Shearer, Regeneration and Place Manager
Page 26 of 50

Page 31

___________________________________________________________________
To: Economy and Regeneration Policy Board
On: 23 May 2023
___________________________________________________________________
Report by: Chief Executive 
___________________________________________________________________
Heading: Scotland Loves Local Update
___________________________________________________________________ 
1. Summary 
1.1 This report provides an update on the Scotland Loves Local scheme in
Renfrewshire in respect of take-up and spend since its launch in 2021 and the
Council’s recent decision to fund the scheme for financial year 23/24. 
2.  Recommendations 
2.1 It is recommended that the Board: 
(i) notes the content of this report;
___________________________________________________________________
3. Background 
3.1 The Scotland Loves Local campaign is a national initiative designed to
encourage all those who live in Scotland to think and spend local. It was
conceived as a way of ensuring that money in communities stays local for
longer in regions across Scotland. Like any other gift card, users can choose
the amount of money to load on the card. The only difference with this scheme
is that it can only be spent within the recipient’s own local authority area – giving
them an opportunity to support the businesses around them. Businesses in the
local area need to sign up to be eligible for the scheme. 
4 The Scheme in Renfrewshire 
4.1 The Council signed up to the scheme in May 2021, which provided the Council
with access to 5,000 physical gift cards, funded by the Scottish Government for
a pilot period until December 2022. 
Item 5
EAR230523 Page 27 of 50

Page 32

4.2 Cards have been used to support various Council initiatives and promotions,
including the Council’s support of Renfrewshire’s Business Awards, the
Roccos. 
4.3 Currently there are 123 businesses signed up to the scheme. These include a
wide range of retailers including supermarkets, cafes, restaurants and
pharmacies. A full list is provided within Appendix 1. 
4.4 The scheme is administered by Miconex (who oversee the scheme nationally)
who fully manages all operational functions of the gift card scheme. This
includes fulfilling orders, managing Renfrewshire’s Loves Local website,
managing merchants and providing customer service. 
4.5 In total to date, £31,873 has been spent within Renfrewshire as a result of the
scheme. Over half (54%) was spent in supermarket chains. A full break down
of spend per retailer is found within Appendix 2. 
4.6 The pilot period ended on 31st March 2023 (with Miconex subsidising the
scheme between January and March 2023). To keep the scheme running in
Renfrewshire, the Council’s Economic Development Team has provided
funding from existing budgets for the annual licence fee of £9,000 to Micronex
for financial year 2023/24.  This will give the Council access to 5,000 physical
cards per annum to distribute, as well as allowing people to purchase e-cards
online.  There is scope for the Council to purchase additional physical cards if
required. 
4.7 The fee also covers platform and operating costs as well as access to Miconex’s
Customer Success Team who will work with the Council to support and grow
the scheme.  The Council also have the ability to veto certain operators and can
target specific retailers to join up. To ensure businesses across Renfrewshire
join Scotland Loves Local, internal resource from the Regeneration & Place and
Economic Development Teams will work with Miconex to facilitate business
engagement.  To generate continued buy-in and an even spread across
Renfrewshire’s towns and villages, a programme of active engagement will be
required and will need to be sustained long-term. Organisations such as Paisley
First and the Johnstone Business Consortium will be encouraged to actively
promote the scheme in their respective areas. 
5 Conclusion 
5.1 The Council is fully supportive of the Scotland Loves Local Scheme and are
keen to see it grow significantly across Renfrewshire.   
5.2 A further report will be brought to Board to update members on its uptake and
spend over this current financial year and whether there is value in continuing
the scheme into financial year 2024/25.  
__________________________________________________________________
Implications of the Report 
1. Financial – No additional finance is sought.  All funding is accounted for within
existing Council budgets. 
Page 28 of 50

Page 33

2. HR & Organisational Development – None. 
3. Community/Council Planning – 
 Jobs and the Economy - the scheme has the potential to secure additional
income for Renfrewshire based businesses, which in turn could support more
investment and jobs within the local economy. 
4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact - None. 
12. COSLA Policy Position – Not Applicable. 
13. Climate Risk – Not Applicable.
___________________________________________________________________
List of Background Papers
None. 
___________________________________________________________________ 
Author:  Euan Shearer; Regeneration and Place Manager; Tel 0141 6184664.
Email:    euan.shearer@renfrewshire.gov.uk
Page 29 of 50

Page 34

Appendix 1: Renfrewshire businesses currently signed up to Scotland Loves Local Scheme 
Merchant Name  Merchant Address 
Adom Afro Paisley 46 High Street Paisley
Aldi 009 - Paisley 4 Fulbar Rd, Paisley PA2 9AP, UK
Aldi 012 - Erskine
1A, Bridgewater Shopping Centre, Erskine PA8
7AA, UK
Aldi 055 - Renfrew 41 High St, Renfrew PA4 8QP, UK
Aldi 085 - Johnstone Patons Mill Rp, High St, Johnstone PA5 8FB, UK
Anderson’s Jewellery Workshop 38 High Street,Renfrewshire,PA7 5HR
Argos A4155 Paisley Linwood
Unit D, The Phoenix Retail Park, Linwood Road
Paisley PA1 2AB
Aspire Academy 
17 Kelvin Avenue Hillington Industrial Estate
Glasgow G52 4LT 
Aspire Academy Glasgow/Aspire
Ind Services
17 Kelvin Avenue Hillington Industrial Estate
Glasgow Glasgow City G52 4LT 
Aspire Industrial Services Ltd
17 Kelvin Avenue Hillington Glasgow Scotland
G52 4LT 
Bailey’s Antiques 34 High Street Paisley
Barrhead Travel service -
Braehead Shopping Centre
Unit 1, Intu Braehead Shopping Centre, King's Inch
Road, Glasgow G51 4BN
Baru Paisley 7B Moss Street Paisley
Bears by Sue Quinn Threadbear, 25 Lawn Street, Paisley PA1 1HD
Bella by Bella Beauty 26 Glasgow Road Paisley
Bianco e Nero 27 Gauze Street Paisley
Body Beautiful 172 Braehead road paisley Paisley Pa2 9qd
Boots - Braehead Shopping Ctr -
Kings Inch Road
68 Braehead Shopping Ctr, King's Inch Rd,
Glasgow G51 4BP, UK
Boots - High Street - Paisley 23 High St, Paisley PA1 2AF, UK
Boots - Kings Inch Road -
Glasgow  68 King's Inch Rd, Glasgow G51 4BP, UK
Boots - Neilston Road - Paisley 6 Neilston Rd, Paisley PA2 6LN, U
Boots - Netherhill Road - Paisley 66 Netherhill Rd, Paisley PA3 4RL, UK
Boots Pharmacy - 142 Paisley
Road - Renfrew 142, 144 Paisley Rd, Renfrew PA4 8DA, UK
Boots Pharmacy - Central Road -
Paisley 28 Central Rd, Paisley PA1 1EH, UK
Boots Pharmacy - Clippens Road
- Linwood  Clippens Rd, Linwood, Paisley PA3 3PU, UK
Boots Pharmacy - High St -
Johnstone 52C High St, Johnstone PA5 8AN, UK
Boots Pharmacy - Livery Walk  15 Livery Walk, Bridge of Weir PA11 3NN, UK
Boots Pharmacy - Penilee Road -
Paisley 5 Penilee Rd, Paisley PA1 3ES, UK
Brew 3 County Sq, Paisley PA1 1BN, UK
Brick Lane Studios Paisley 7 Weir St, Paisley PA1 1HJ, UK
Brick Lane Studios/The Diane
Mitchell Music School/Brick lane
Studios
Brick Lane Studios 7-9 Weir Street  Paisley
Renfrewshire  Pa34dw 
Cafe Fairfull 12A High Street Paisley
Page 30 of 50

Page 35

Merchant Name  Merchant Address 
Cafe Su
Cafe Su Unit4 InShops ThePaisley Cemtre 23
High St PA1 2AF
Caffe Lusso  4 School Wynd, Paisley PA1 2DB
Caleb Outlet 14B New St, Paisley PA1 1XY, UK
CANCER RESEARCH UK GBR -
Greenock 32 W Blackhall St, Greenock PA15 1UE, UK
CANCER RESEARCH UK GBR -
Johnstone
Units 1&2, 40-41 Houston Court, Johnstone, PA5
8DL
CANCER RESEARCH UK GBR -
Paisley
43 Causeyside Street, Paisley, Renfrewshire, PA1
1YL
Caprice Cafe Paisley 11 Gilmour Street Paisley
Castelvecchi 10 New Street Paisley
Cathay cuisine Chinese take away
16C  Broomlands street  Paisley  Scotland  PA1 2
LU 
Caulders Garden Centres Erskine
Caulders Erskine Erskine Bridge Bishopton
Erskine PA7 5PU 
Claire Reid Hairdressing 7 Mill Street Paisley
Comicrazy 45 Old Sneddon Street Paisley
Coverstitch The Paisley Centre, 23 High Street, Paisley
Domino's Pizza - Bridgewater
Shopping Centre
Erskine Domino's Pizza Unit 9 Bridgewater
Shopping Centre Erskine Scotland PA8 7AA 
Domino's Pizza - Gauze Street
Paisley Domino's Pizza 41 Gauze Street  Paisley
Scotland PA1 1 1EX 
Domino's Pizza - Johnstone 11 Laighcartside Street Johnstone PA5 8BY 
Domino's Pizza - Renfrew 9 High Street  Renfrew PA4 8QL 
Ecigarette Outlet 35 Causeyside Street Paisley
Elixir Lounge Upper Floor, 12 New Street, Paisley
Ellen Adams Hair 24 Glasgow Road Paisley
Exotic kitchen paisley 23 Causeyside Street Paisley Scotland PA1 1UH 
Exotic kitchen Paisley 
Exotic kitchen paisley  23 causeyside streeet
Paisley Scotland PA1 1UH 
FARMFOODS HILLINGTON 249
UNIT 1 EARL HAIG ROAD, HILLINGTON RETAIL
PARK G52 4LY
FARMFOODS PAISLEY 255 29 CAUSEYSIDE STREET PA1 1UL
FARMFOODS RENFREW 250 5/6 HIGH STREET PA4 8QL
Finishing Touches 7 Johnston Street Paisley
Food At Underwood 
Unit 1A 35 Underwood Road Paisley Paisley PA3
1TQ 
Francis hair salon 3 Johnston Street Paisley
Frangelinos Family Fish & Chip
Shop 26 High Street Paisley
Gael Home Interiors 4 Orchard Street Paisley
Gantry 12 New St, Paisley, PA1 1XY
Gillan Green Grocers The Paisley Centre, 23 High Street, Paisley
Golddust House Fashion &
Accessories 26 High Street Paisley
H. Samuel - Braehead
38, Braehead Shopping Centre, Glasgow G51
4BP,
HandCrafted Coffee 5 High Street Lochwinnoch PA12 4DB 
Harrods Drycleaners 8 Castle Terrace, Bridge of Weir, PA11 3EF
Page 31 of 50

Page 36

Merchant Name  Merchant Address 
Harvies Tobacconist 20 Moss St, Paisley PA1 1BL, UK
Helen's Alterations Ltd 7 Lochleven Road
Hiltons Hair & Beauty 8A St Mirren St, Paisley PA1 1UA, UK
HMV/Sunrise Records and
Entertainment Limited trading as
HMV
UNIT 167, BRAEHEAD CENTRE, KINGS INCH
ROAD, GLASGOW, G51 4BN
HOT Tanning Salon - 25199664 1470 Paisley Road West Glasgow G521sr 
Houston Kiltmakers 67 High Street Paisley
Iceland 782-Paisley 
86/74 Glasgow Road, Paisley, Strathclyde PA1
3PN
ICELAND JOHNSTONE
1 Houston Square, 56/61 High St Johnstone,
Paisley PA5 8QG
ICELAND PAISLEY PIAZZA 1330
Unit 55, Piazza Shopping Centre, Paisley PA1
1EH
InCube Shop 9b Gilmour Street
Indian By Nature
Paisley/Obsession of India 32 Moss Street Paisley
IVAD Gifts 29 Gauze Street Paisley
Jewelfare 44 High Street Paisley
John Mckay Jewellers Paisley 53 Moss Street Paisley
Johnstone Convenience Store 19 high street Johnstone  Glasgow  UK PA58JU  
Justyna Bespoke Tailoring &
Alterations Ltd 150 Fenwick Road
Katy hair&beauty salon 27 Wellmeadow Street
Kenneth Edward Hair Salon 45 Causeyside Street, Paisley PA1 1YN
Kiddie Boutique Unit 106 Braehead shopping Centre G51 4BS
Kiddie Boutique /Baby boutique by
Claire 
Unit 106 Braehead Shopping centre  Kings inch
road  Glasgow  Glasgow  G51 4bs 
Kilts 4 u
2 Erskine Square Hillington Glasgow Glasgow G52
4BJ 
Kooks Hairdressing 22 New Street Paisley
Lidl GB JOHNSTONE 1270 10 High Street, Johnstone PA5 8JX
Lidl GB PAISLEY NORTH 1725
Renfrew Road Retail Park, Wallneuk Road,
Paisley PA3 4BF
mackenzie property and building
services 18 oldhall rd, ralston, paisley pa1 3hl
Marks and Spencer - Odstock
Road - Paisley Odstock Road, Paisley PA3 2ST, UK
Marks and Spencer Foodhall -
Renfrew Retail Park - Paisley
Unit 1, Renfrew Retail Park, Wallneuk Rd, Paisley
PA3 4BF, UK
Marks and Spencer Simply Food -
Braehead Shopping Centre
King's Inch Road Braehead Shopping Centre,
Ripley, By-Pass, Glasgow G51 4BP, UK
Marks and Spencer Simply Food -
Glasgow Airport 
Glasgow Airport Priority Security, Glasgow Airport,
Paisley PA3 2SW, UK
McLaughlan and Co Jewellers 22 New Street Paisley
Meat In The Middle 4 New Street Paisley
Menace Continental Children's
Wear 56B Causeyside Street Paisley
Page 32 of 50

Page 37

Merchant Name  Merchant Address 
Metalworx Paisley 42 High Street Paisley
Morrisons Bed Centre 24 Lawn Street Paisley
Mrs Party Ltd 5 Johnston Street Paisley
Mrs Party Ltd  5 Johnston St, Paisley PA1 1XQ
MULTAN Business ltd
21  Causeyside street  Paisley  Renfrewshire 
Scotland  
MULTAN Business ltd  16f Bridge street  Linwood  Renfrewshire  Scotland  
Munchies at Leisureland 57 High Street Paisley
Musclebound 14A New Street Paisley
News Express Paisley 39 Causeyside Street Paisley
Newsrack Paisley 69 High Street Paisley
Noah Home and Gifts Ltd
Braehead Shopping Centre Kings Inch Road
Glasgow G51 4BN 
Nomads Coffee Shop 63 High Street Paisley.
O'Neills Services Unit 43B The Piazza Centre, Paisley
One O One 32 Kilbarchan Road  32 Kilbarchan Rd, Johnstone PA5 8RF
Orchard Clinic
Orchard Clinic 16 Orchard Street Paisley
Renfrewshire PA1 1UZ 
Paisley Photoshop 10 Silk Street Paisley
Paisley Picture Framers 56 Causeyside Street
Paisley Trophy Centre 5 George Place Paisley
Perfume Shop 66 Kings Inch
Road 
Perfume Shop , Unit 160 Braehead Shopping
Centre , Kings Inch Road G51 4BS
Piccolo Mondo - Renfrew  63-65 Hairst St, Renfrew PA4 8QU
Print and Copy It 61 High Street Paisley
Print Centre (GREENLAW
GRAPHICS LTD) 31 Gauze Street Paisley
PROFIX
67 Causeyside Street PROFIX Paisey
Renfrewshire PA1 1YT 
Pure Spa and Beauty- Renfrew
Pure Spa and Beauty David Lloyds Arkleston Road
Renfrew Renfrewshire PA4 0RA 
Rainbow Turtle 7 Gauze Street Paisley
Remode 43b High Street Paisley
Riverside Beauty
Crowne Plaza, Congress Road Glasgow
Renfrewshire G3 8QT 
RSA Your Local Shop 27 Moss Street Paisley
Sainsburys - Kings Inch Road 110 Kings Inch Dr, Glasgow G51 4BT, UK
Schuh Braehead, Glasgow 
SEMI CHEM 003319 - Johnstone Unit 1, 9 William Street, Johnstone
SEMI CHEM 3479 - Paisley 44-46 Central Way Piazza
SEMI CHEM 003517 - Renfrew 93 Paisley Road 
Sinclair's of Paisley 30A High Street Paisley
Skystar Stores
225-229 Saracen Street Glasgow Glasgow City
Council G22 5JW 
Smyths Toys
Unit 22 Phoenix retail park Linwood Linwood road
Glasgow Paisley PA12AB 
Snappy Shopper - Online Only 
Snt scot ltd trading as ice & cream 38A east Hamilton street Pa15 2td
Spar - Erskine Bargarran Shopping Centre, Erskine PA8 6BS
Spar - Lochwinnoch The Cross, Main St, Lochwinnoch PA12 4AH
Page 33 of 50

Page 38

Merchant Name  Merchant Address 
Specsavers - Braehead 110 Kings Inch Drive, Glasgow, G51 4BT
St Vincent's Hospice
Midton Road Howwood Johnstone Renfrewshire
PA9 1AF 
Stack and Still
Braehead Shopping Centre Unit 1C, King's Inch
Rd Glasgow Scotland G51 4BP 
Star 84 Leisureland, 57 High Street, Paisley PA1 2AN
Subway - Paisley
Subway  20 High street  Paisley Renfrewshire 
PA12BS 
Summits outdoor 36 moss street paisley PA1 1BA
Sunset Beach - Hairst Street 59 Hairst Street Renfrew PA4 8QU 
Sunshine Electrical 3 Johnston Street Paisley
Taste Buds 22A Lawn Street Paisley
The Bankhouse 7 Gilmour Street Paisley
The Grumpy Monkey Coffee
House 22 Moss Street Paisley
The Keg 15B Gilmour Street Paisley
The Lane Paisley 7 Shuttle Street Paisley
The Lion’s Paw
1 Morrison Place, Main Street, Bridge of Weir,
pa11 3nu
The Nail and Beauty Zone
LTD/PURE Spa & Beauty
PURE Spa & Beauty, David Lloyd, Arkleston Road,
Cockleshill Park, Renfrew PA4 0RA
The Ugly Duck 38 High Street Paisley
ThreadEx 33b causeyside street, paisley pa11ul
ThreadEx Beauty Salon
Paisley Centre, 23 High Street, Unit 19k, Paisley
pa12aq
ThreadEx Nail & Beauty
Piazza Centre, 15 Central Road, Kisok E, Paisley
pa11el
Tom Baird Opticians
5 High Street Paisley Paisley Renfrewshire PA1
2AE 
Tresspass - Braehead
UNIT 103  BRAEHEAD SHOPPING CENTRE 
KINGS INCH ROAD G51 4BN
TURNER RETAIL LTD/spar
Glenburn
spar 170 BREAHEAD ROAD Paisley Renfrewshire
PA2 8QD 
What IF Paisley 25 Moss Street Paisley
White Cart Co 30B High Street Paisley
Wholesale Domestic Equipment
compnay
400-406 Hillington Road, Hillington Estate, G52
4BL
With Love Flowers 48 Causeyside St, Paisley PA1 1YH, UK
WM Morrisons Ltd - Erskine
Bridgewater SC GBR Bridgewater Shopping Centre, Renfrew PA8 7AA
WM Morrisons Ltd - Johnstone
GBR 30 Napier Street, Johnstone PA5 8SF
WM Morrisons Ltd - Paisley
Anchor Mills GBR Anchor Mill, Paisley PA1 1GZ
WM Morrisons Ltd - Paisley
Falside Rd GBR Falside Road, Paisley  PA2 6JE
WM Phelps Butchers 41 Causeyside Street Paisley
Yellow Slate Design 8 Browns Lane Paisley
Zambretto Italian 42-46 Old Sneddon St, Paisley 
Page 34 of 50

Page 39

Appendix 2: Scotland Loves Local (Renfrewshire) - Spend per business to date 
Retailer
Number of
times used Spend
W M MORRISON STORE 203 £4,880.60
ALDI 9 777 77 £2,902.82
BOOTS UK ECOMM 67 £2,846.48
ONE O ONE CONVENIENCE 135 £2,259.13
MARKS&SPENCER PLC SF 49 £2,108.86
Snappy Shopper 68 £1,949.67
SAINSBURYS SUPERMA 40 £1,740.75
ICELAND 40 £1,314.15
Zambretto Italian 17 £1,245.99
MARKS&SPENCER PLC SACA 33 £1,042.18
ALDI 45 777 23 £906.58
ARGOS LTD 10 £671.48
ALDI 12 777 23 £622.50
DOMINOS 13 £529.17
ALDI 55 777 14 £517.70
SMYTHS TOYS LINWOOD PA 14 £516.94
FARMFOODS 249 13 £467.91
FARMFOODS 255 13 £441.72
WHITE CART 13 £429.60
SP SUNSET BEACH STOR 10 £424.39
BOOTS 15 £388.54
SAINSBURYS S/MKTS 25 £383.83
SEMI CHEM 3479 13 £381.41
The Ugly Duck 7 £272.10
ALDI 14 777 4 £259.16
FARMFOODS 250 9 £217.03
BOOTS 0583 11 £200.80
DOMINOS PIZZA 6 £166.13
ROWCOT LTD 2 £150.00
The Bankhouse 2 £105.90
WHOLESALE DOMESTIC 1 £105.00
HILTONS HAIR AND BEAUT 1 £100.00
MORRISONS BED CENTRE 1 £100.00
WITH LOVE FLOWERS 1 £100.00
ALDI 29 777 1 £96.74
IVAD GIFTS 6 £94.32
GAEL HOME INTERIORS 1 £88.96
ALDI 33 777 2 £87.73
CAFE FAIRFULL 5 £87.40
Claire Reid Hairdress 2 £85.00
GREENLAW GRAPHICS LTD 1 £84.00
ALDI 76 777 3 £72.95
M AND A CASTLEVECCHI 4 £70.00
SQ *WHAT IF 2 £56.00
Page 35 of 50

Page 40

Retailer
Number of
times used Spend
LIDL GB PAISLEY NORTH 2 £54.77
BREW 4 £43.25
The Grumpy Monkey 2 £31.00
PRINT & COPY I.T. 3 £30.00
CAULDERS ERSKINE 1 £27.00
Taste Buds 1 £19.45
SQ *HANDCRAFTED COFFEE 1 £15.00
BOOTS 5723 1 £14.97
BIANCO NERO 2 £11.70
BOOTS 5719 2 £10.98
ALDI 20 777 1 £10.59
HMV-BRAEHEAD 1 £10.00
TOM BAIRD 1 £10.00
SumUp *ReMode Renfrew 1 £5.00
THE KEG 2 £5.00
LIDL GB JOHNSTONE 1 £2.77  
£31,873.10 
 
Page 36 of 50

Page 41

To: Economy and Regeneration Policy Board 
On: 23 May 2023
__________________________________________________________________ 
Report by:   Chief Executive 
___________________________________________________________________ 
Heading:        Town Centre Vacancy Taskforce - update 
1. Summary 
1.1 The report outlines current officer thinking on this initiative and recommends next
steps for Board approval 
__________________________________________________________________
2. Recommendations 
2.1 It is recommended that the Board: 
i. Approve the Taskforce scope and remit as outlined in the report and agree the
next steps as set out in section 8; 
ii. Notes that the recommendations of the Taskforce will report back to a future
Council Board; 
3. Background 
3.1 In January 2023 the Economy and Regeneration Board was presented with an
amendment seeking that: 
“a Town Centre Vacancy Taskforce, consisting of relevant officers, be
formed with a specific remit to examine the barriers to occupancy and letting,
bringing forward potential policy changes that assist in removing identified
barriers, promoting vacancies which were market ready and identifying actions
for those which were not.” 
3.2 This amendment was agreed by the Board and the Head of Economy &
Development was asked to consider the amendment and report back to the
Board in due course. 
Item 6
EAR230523 Page 37 of 50

Page 42

3.3 When it comes to defining “town centres”, Renfrewshire’s adopted Local
Development Plan (2021) has the following planning policy allocations: 
 Strategic Centres – Paisley and Braehead;
 Core Town Centres – Linwood; Renfrew; Johnstone; Erskine 
4. Objectives of Town Centre Vacancy Taskforce 
4.1 The following objectives have been drawn up by officers in response to the
Board’s decision to create a Taskforce: 
 Agree the principal challenges facing Renfrewshire town centres (listed
above) in 2023, noting that this will almost certainly differ between
centres;
 Identify the barriers to occupancy / letting of currently vacant ground floor
commercial units;
 Produce a strategy for the promotion of occupiable vacant units for each
centre, noting that interventions may vary between the six centres;
 Produce an action plan for those vacancies which are not market ready
[action plans may need to vary by centre] 
 Establish “task and finish” bespoke groups for each of six centres,
reporting to a core Steering Group of senior officers; 
5. Taskforce Steering Group and Stakeholder participation 
5.1 The intention would be to keep the Steering Group of the relevant officers for
the Taskforce to a small number to ensure it can maximise ability to liaise and
co-ordinate outputs. 
5.2 The proposed Steering Group membership is outlined below, and all these
officers have been made aware of this request and indicated their support for
the initiative. Other officers can be asked to contribute as and when required
as the initiative develops.
 Head of Economy and Development (lead officer)
 Head of Finance;
 Streetscene Manager
 Regeneration and Place Manager;
 Principal Estates Surveyor;
 Housing Regeneration and Development Manager; 
5.3 The list of stakeholders which the Steering Group will engage with to meet the
objectives set out above include: 
 Paisley First
 Johnstone Business Consortium
 a selection of agents currently marketing vacant premises in each centre
(for Braehead and Erskine, which are principally in single ownership, this
would be one agent);
 a selection of potential occupiers (including some engaged in Start-Up
Street initiatives in Renfrewshire);
 a sample of owners of property not yet in occupiable condition in terms
of barriers to their investment; 
Page 38 of 50

Page 43

6. Potential incentivisation 
6.1 Members may recall that Board agreed a report in March 2023 seeking to set
aside £250,000 from the Local Authority Covid Economic Recovery Fund to
invest in vacant town centre property across Renfrewshire. 
6.2 Our intention would be for the Taskforce to come forward with
recommendations as to how this funding should be directed to assist in meeting
the objectives outlined. This would be the subject of a future report to Board for
their approval. 
7. Scale of vacant properties by Renfrewshire centre 
7.1 At March 2023 it is estimated that there are approximately 40 ground floor
commercial units across Renfrewshire’s town centres which are vacant and
immediately available to occupy. A summary of these by centre is set out in
Table 1 (below). Members will appreciate these numbers are reflective of the
date of last survey, as units may have been occupied or become vacant since
this data was gathered. 
7.2 It is estimated that there will be a similar number (or more) which are vacant but
not in a condition to be occupied. This latter statistic will need to be confirmed
during the work of the Taskforce. 
7.3 This assessment only includes those premises in public street facing premises
within designated town centres. It does not include those within purpose-built
shopping centres such as Piazza Centre, Paisley Centre or Braehead. The
Taskforce in due course will have to reach a view on whether to recommend
that any incentivisation proposals apply to such centres. It also does not include
any properties owned by the Council as the Council is already aware of all the
issues regarding those. Most Council owned ground floor commercial
properties are located in Johnstone town centre. 
Centre Number of vacant and immediately available to occupy
ground floor premises
JOHNSTONE 11 properties
PAISLEY 23 properties
RENFREW 6 properties
ERSKINE No applicable properties in town centre as all occupiable
properties currently operating as such
LINWOOD No applicable properties in town centre as all occupiable
properties currently operating as such 
8. Next steps 
8.1 An initial meeting of the Taskforce Steering Group has taken place and
stakeholder consultation is expected to commence shortly. 
8.2 A report will be brought back to the August 2023 meting of the Board to confirm
the proposed strategy and recommendations for how the incentivisation
process could operate. At the same time, we will be able to update on the
outcome of the stakeholder consultation and the latest position regarding the
vacancies for each centre.
___________________________________________________________________ 
Page 39 of 50

Page 44

Implications of the Report 
1.  Financial – Any financial implications would be within existing approved
budgets.
. 
2.  HR and Organisational Development – None. 
3. Community Planning 
 Our Renfrewshire is thriving – delivering more vibrant town centres will
increase economic activity reduce vacancy. This will improve perceptions
and increase footfall in centres. 
 Reshaping our place, our economy, and our future – by facilitating
investment in our town centres we will help create new businesses with
employment opportunities for our residents and potential supply chain
connections for our existing businesses; 
4.  Legal – None. 
5.  Property/Assets – Any Council owned vacant commercial properties that
are immediately available for occupation are marketed by the Council on an
ongoing basis. It is not expected that these will be included in any
incentivization initiative. 
6.  Information Technology - None. 
7.  Equality & Human Rights 
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report because for example it is for noting only.   If required following
implementation, the actual impact of the recommendations and the mitigating
actions will be reviewed and monitored, and the results of the assessment
will be published on the Council’s website.  
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. COSLA Policy Position – None. 
13. Climate Risk – None. 
__________________________________________________________________ 
Page 40 of 50

Page 45

List of Background Papers 
(a) Local Authority Covid Economic Recovery Funding; Economy & Regeneration
Board; 14 March 2023
________________________________________________________ 
Author:  Alasdair Morrison, Head of Economy and Development 
Alasdair.morrison@renfrewshire.gov.uk 
(Tel: 0141 618 4664) 
Page 41 of 50

Page 46

Page 42 of 50

Page 47

___________________________________________________________________
To: Economy and Regeneration Policy Board
On: 23 May 2023
___________________________________________________________________
Report by: Chief Executive 
___________________________________________________________________
Heading: Regeneration Funding Bids Update 2023
___________________________________________________________________ 
1. Summary 
1.1 This report updates the Board on progress in respect of external funding bids
and delivery of key regeneration projects and presents the programmes being
developed in 2023.   
2. Recommendations 
2.1 It is recommended that the Board: 
(i) Approves the list of proposed RCGF bids for 2024 for Renfrewshire;
(ii) Notes the progress and continuing actions to deliver projects from the range
of regeneration funds identified in the report. 
3. Background 
3.1 In recent years the funding of regeneration projects has been reliant on support
from national government (and other external sources), often with ‘match-
funding’ coming from the Council.  A report to the Economy and Regeneration
Board of 14 June 2022 outlined the range of external capital funds available
and programmes under development. 
3.2 In this context and over the past year officers have continued to progress
various regeneration projects, programmes and strategies with the support of
external funding from the UK and Scottish Governments as well as statutory
bodies such as Visit Scotland and SEPA.  This has supported our efforts to
regenerate and revitalise our town centres, support our communities and
promote sustainable economic growth and development across Renfrewshire.   
3.3 This report details the various funding streams which the Council have
accessed and applied to over the past 12 months.
Item 7
EAR230523 Page 43 of 50

Page 48

4 Regeneration Capital Grant Fund (Scottish Government) 
4.1 The Regeneration Capital Grant Fund (RCGF) is one of the longest running
funds available to local authorities having been offered annually since 2014.
Renfrewshire Council has previously secured support from this fund for the
Russell Institute, Paisley Learning and Cultural Hub and Paisley Museum.  
4.2 The RCGF has also supported projects led by community led organisations
(with the grant being passed to the Council to manage), such as those promoted
by Linwood Community Development Trust, Active Communities, Johnstone
and most recently the PACE Youth Theatre in Paisley. 
4.3 The RCGF is an annual competitive fund open to all 32 Scottish local
authorities. The fund is always heavily subscribed, meaning that many projects
that are put forward are not funded. 
4.4 Officers are now considering applications to Stage 1 of the 2024 scheme.  The
projects proposed are shown below and have been identified on a similar basis
to those previously reported to Board for the Place Based Investment
Programme (PBIP), again seeking to align with existing Council strategies and
community led proposals and plans. 
 
Table 2 Proposed 24/25 RCGF Application Projects
Potential RCGF 
Projects 
 
 
Location  Summary 
Erskine TC
Improvements 
Erskine Creator of incubator / business space within Erskine TC.
Foxbar
Community
Growing Space -
£240K
Foxbar, Paisley Development of a new community growing space at the site of
the former St Paul’s PS site in Foxbar, supporting delivery of a
key priority from the community led Foxbar Local Place Plan.
The project supports wider regeneration outcomes in relation to
promoting active lifestyles, contribution to net zero targets and
community food growing. 
Castle Semple –
Extension to
visitor centre 
Lochwinnoch Applied for previously but not successful. Application to be
tweaked and consider recent consultation / visioning. 
Ferguslie Park –
The Making Of 
Ferguslie,
Paisley
Development at ‘Neighbourhood Centre’ zone including Pump
(cycle) Track, supporting delivery of a key priority from the
community led ‘Making of Ferguslie’ Local Place Plan.
Page 44 of 50

Page 49

4.5 In addition, officers are currently progressing work to review and refresh the
Council’s town centre strategies, with an initial focus on Johnstone and Erskine.
Officers are also continuing to work with the owner of the Paisley Centre in
terms of their plans for redevelopment.  Outcomes from this work will support a
series of priorities, actions and projects which are anticipated to form the basis
of applications to future rounds of RCGF.   
5 Place Based Investment Programme (Scottish Government) 
5.1 Since 2019 the Council have used funding from the PBIP (and its previous
iteration, the Town Centre Regeneration Fund) to accelerate capital investment,
supporting delivery of actions within our town centre strategies, community led
regeneration proposals and community led place plans such as the Making of
Ferguslie, to accelerate the Council’s overall placeshaping agenda. 
5.2 Through this fund the Council have supported and delivered a wide range of
projects across Renfrewshire including community led projects such as the
creation of a community well-being hub and bike shop, restoration of various
listed buildings and vacant commercial units as well as enhancements to public
realm. 
5.3 The Council’s 22/23 PBIP funding totalled £1.038m, with £720k expected for
2023/24.   The following table sets out the projects allocated for 2022/23, which
continue to closely align with progressing the Council’s placeshaping strategy
as identified above. 
Table 1 Place Based Investment Fund Projects 2022/23 awards, summary update at May
2023
 
Project summary Design Tender On-site Complete
1. Dunlop Crescent, Renfrew – refit
of vacant shop unit   June 2023 September
2023
2. Future Paisley – Sculpture House
- Support for restoration of
Craigielea House in Ferguslie to
create an artist in residence studio
and community social space 
3. Prominent Building Repair –
Urgent repairs to former Renfrew
Police Station 
4. Lighting Programme - extending
work on town centre lighting -
buildings, lanes and spaces using
LED technology    
i. Paisley Abbey  June 2023 August 2023 September
2023
November
2023
ii. Tweedie Hall June 2023 August 2023 September
2023
November
2023
Page 45 of 50

Page 50

Project summary Design Tender On-site Complete
5. Houston Arcade - refit of vacant
shop units   June 2023 September
2023
6. Ferguslie Park – Delivery of early
actions from Making of Ferguslie
Local Place Plan, including
development of new community
growing space  
May 2023 June 2023
7. Public Realm - new pavements on
Paisley High Street as part of the TH
CARS heritage programme  June 2023
8. PACE Youth Theatre – Works to
redevelop former Mannequins night
club into a new community theatre 
June 2023 September
2023
 
6 Rural Tourism Infrastructure Fund (Visit Scotland) 
6.1 In March 2022, the Council successfully applied to Visit Scotland to receive
funding from the Rural Tourism Infrastructure Fund (RTIF) to produce an
infrastructure plan for Clyde Muirshiel Regional Park. The plan focuses primarily
on Castle Semple but also includes Muirshiel Country Park and strategic
linkages to Renfrewshire’s towns and villages. 
6.2 The plan (expected to be completed in May 2023) will be used as the basis for
funding applications and delivery of future infrastructure to alleviate visitor
pressure points, enhance experience and bolster Renfrewshire’s rural
destination offer. Key projects within the plan include potential new bike hub
and changing space at the Castle Semple Visitor Centre and a play space at
the Muirshiel Country Park Visitor Centre. 
7 Water Environment Fund (SEPA) 
7.1 SEPA have identified Candren Burn within Ferguslie Park as a water body
which could offer potential for improvement and are keen to work with the
Council to develop an initial feasibility study, with financial support from their
Water Environment Fund (WEF).  The role of the Regeneration and Place team
in supporting development of such a study was noted by the Board on 14 June
2022.   
7.2 The feasibility study aligns strongly with the place making aspirations of the
‘Making of Ferguslie’ Local Place Plan and outcomes could provide multiple
benefits, including improvements to the physical and ecological condition of
water body and enhanced climate resilience.  The study is anticipated to
commence later this year and will be subject to consultation with local residents.   
Page 46 of 50

Page 51

8 Vacant and Derelict Land Investment Programme (Scottish Government) 
8.1 The Vacant and Derelict Land Investment Programme (VDLIP) is a multi-year
Scottish Government fund which supports the transformation and reuse of long
term vacant and derelict sites. 
8.2 A report to Board of 14 June 2022 noted the opportunity for the submission of
a bid to the fund to support delivery of the Making of Ferguslie Local Place Plan,
in view of the significant areas of vacant and underused land within the
Ferguslie Park area.   
8.3 A separate paper to the 23 May 2023 Economy and Regeneration Board
provides an update on the Making of Ferguslie and in this context it is
anticipated that a bid will be submitted to the next round of the fund in June
2023 to support delivery of the plan. 
9 Levelling Up Fund (UK Government) 
9.1 Last year the Council submitted a Round 2 bid to the UK Government’s
Levelling Up Fund (LUF) to develop a community hub in Renfrew.  This was
ultimately unsuccessful and further details on the bid and next steps can be
found in the Levelling Up Fund Bid 2022 – Renfrew Community Hub Update
paper which has been submitted under separate cover to the Economy &
Regeneration Board. 
10 Heritage funding (Historic Environment Scotland, National Lottery
Heritage Fund) 
10.1 Last year the Council submitted applications to the National Lottery Heritage
Fund (NLHF) and Historic Environment Scotland (HES) to fund the
development phase of the ‘Renfrewshire Villages Loop: Kilbarchan to
Johnstone. Reviving Dynamic Heritage’ project.  Unfortunately, these
applications were unsuccessful with the funders having concerns over the scale
and deliverability of a two-centre vision for the project.  
10.2 Officers have subsequently held discussions with both funders, who have
indicated that Johnstone could benefit from an area-based scheme to
complement the emerging review and refresh of the Johnstone Centre Strategy. 
In this context HES have encouraged the Council to consider submitting an
Expression of Interest for Johnstone to the next round of Heritage & Place
Programme funding, the dates of which are due to be announced in May 2023. 
10.3 In Kilbarchan, subject to further investigation of the works required and a
sustainable end use for the building being identified, HES have indicated scope
for the Council to submit an Expression of Interest for the Steeple Buildings to
their newly launched Historic Environment Grants Programme.   
This would potentially align with the recent Council motion to investigate further
the feasibility of the transformation of the Steeple Hall into an outreach Museum
linked to Paisley Museum which will complement activities at the Weavers
Cottage.
Page 47 of 50

Page 52

11 Shared Prosperity Fund (UK Government) 
11.1 The Council have received funding from the UK Government’s Shared
Prosperity Fund (SPF). Further details can be found in the UK Shared
Prosperity Fund – Year 1 Report paper which is dealt with in a separate Board
report.   
11.2 The Regeneration and Place Team are leading on the Communities and Place
element of the fund, and it is planned to use funding to supplement the
Councill’s new Sustainable Communities Fund; to fund strategy and feasibility
work; and help deliver elements of projects such as the Ferguslie “Making Of”
neighbourhood plan. 
12 Next Steps 
12.1 The range of projects and funding applications identified within this report will
be progressed by officers to support the Council’s wider placeshaping agenda
and associated strategies, plans and community led regeneration activity, as
set out above.  Additional sources of external funding will also continue to be
investigated as they become available.   
12.2 Progress on funding applications and delivery of associated actions will be
reported to Board at regular intervals and as appropriate. 
_____________________________________________________________ 
Implications of the Report 
1. Financial – No additional finance is sought.  All funding is accounted for within
existing Council budgets and external funding. 
2. HR & Organisational Development – None. 
3. Community/Council Planning – 
Creating a Sustainable Renfrewshire for all to enjoy – delivery of projects and
submission of funding applications supports the Council’s wider placeshaping
agenda, improving quality of place, our neighbourhoods and town centres. 
4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
Page 48 of 50

Page 53

have been identified arising from the recommendations contained in the
report. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact - None. 
12. COSLA Policy Position – Not Applicable. 
13. Climate Risk – Not Applicable.
___________________________________________________________________
List of Background Papers 
(a) Regeneration Funding Bids Update 2022.  Economy and Regeneration Policy
Board, 14 June 2022. 
___________________________________________________________________ 
Author:  Euan Shearer; Regeneration and Place Manager; Tel 0141 6184664.
Email:    euan.shearer@renfrewshire.gov.uk 
 
Page 49 of 50

Page 54

Page 50 of 50