Notice of Meeting and Agenda
Economy and Regeneration Policy Board 
Date Time  Venue
Tuesday, 24 January
2023
10:00 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN 
MARK CONAGHAN
Head of Corporate Governance 
Membership 
Councillor Andy Steel (Convener):     Councillor Michelle Campbell (Depute Convener):    
Councillor Alison  Ann-Dowling:  Councillor Stephen Burns:  Councillor Graeme Clark: 
Councillor Andy Doig:  Councillor Neill Graham:  Councillor Lisa-Marie Hughes: 
Councillor Colin McCulloch:  Councillor Jamie McGuire:  Councillor Marie McGurk: 
Councillor Iain McMillan:  Councillor John McNaughtan:  Councillor Iain Nicolson: 
Councillor Jim Paterson:   
Webcasting of Meeting 
This meeting will be filmed for live or subsequent broadcast via the Council’s internet
site – at the start of the meeting the Convener will confirm if all or part of the meeting
is being filmed.  To find the webcast please navigate to 
https://renfrewshire.public-i.tv/core/portal/home 
Hybrid Meeting 
Please note that this meeting is scheduled to be held in the Council
Chambers.  However, it is a hybrid meeting and arrangements have been made for
members to join the meeting remotely should they wish. 
Members of the Press and Public 
Members of the press and public wishing to attend the meeting should report to the
customer service centre where they will be met and directed to the meeting.

Page 2

Further Information 
This is a meeting which is open to members of the public. 
A copy of the agenda and reports for this meeting will be available for inspection prior
to the meeting at the Customer Service Centre, Renfrewshire House, Cotton Street,
Paisley and online
at http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx
For further information, please either email
democratic-services@renfrewshire.gov.uk or telephone 0141 487 1117.

Page 3

Apologies 
Apologies from members. 
Declarations of Interest 
Members are asked to declare an interest in any item(s) on the
agenda and to provide a brief explanation of the nature of the
interest. 
Finance 
1 Revenue and Capital Budget Monitoring Report 
Joint report by Chief Executive and Director of Finance &
Resources. 
1 - 8 
Economy 
2 Renfrewshire Economic Profile Update (January 2023) 
Report by Chief Executive. 
9 - 28 
3 Net Zero Business Support and Grants 
Report by Chief Executive. 
29 - 34 
4 Cultural Infrastructure Projects - Update 
Report by Chief Executive. 
35 - 46 
5 Tourism Update 
Report by Chief Executive. 
47 - 52

Page 4

No embedded text on this page.

Page 5

To: Economy and Regeneration Policy Board
On: 24 January 2023 
Report by:  Chief Executive and Director of Finance and Resources
Heading:  Revenue and Capital Budget Monitoring as at 11 November 2022 
1. Summary of Financial Position
1.1. The projected revenue outturn at 31 March 2023 for those services reporting
to the Economy and Regeneration Board is a breakeven position. 
1.2. The projected capital outturn at 31 March 2023 for projects reporting to the
Economy and Regeneration Policy Board is a breakeven position against the
revised budget for the year of £30.818 million.
1.3. This is summarised in the table below and further analysis is provided in the
Appendices. 
Division
Revised
Annual
Budget
£000
Projected
Annual
Outturn
£000
Budget
Variance
(Adv) / Fav
£000
Budget
Variance 
%
Economy and Development 2,996 2,996 0 0.0% 
Division
Revised
Annual
Budget
£000
Projected
Annual
Outturn 
£000
Budget
Variance
(Adv) / Fav
£000
Budget
Variance 
%
Economy and Development 30,818 30,818 0 0% 
Item 1
EAR240123 Page 1 of 52

Page 6

2. Recommendations
2.1. Members are requested to:
(a) Note the projected Revenue outturn position detailed in Table 1 above; 
(b) Note the projected Capital outturn position detailed in Table 2 above; and 
(c) Note the budget adjustments detailed at sections 4 and 6. 
3. Revenue
3.1. The Revenue Budget Monitoring report at Appendix 1 identifies a projected
breakeven position for all services reporting to this Policy Board.  Detailed
division service reports can also be found here, together with an explanation
of any significant projected variances.
3.2. The projected outturn is based on information currently available, and
assumptions made by service budget holders.  Any changes to these
projections will be detailed in future reports to the Board.
3.3. The main reasons for the projected outturn position are indicated below the
tables showing both the subjective analysis (what the budget is spent on) and
the objective analysis (which division is spending the budget). 
4. Revenue Budget Adjustments
4.1. No budget adjustments have been processed since the previous report to
board.  
5. Capital
5.1. The Capital Investment Programme 2022/23 to 2026/27 was approved by the
Council on 3 March 2022. For Economy and Regeneration the approved
capital spend for 2022/23 is £30.818m
5.2. The Capital Monitoring report at Appendix 2 indicates net budget adjustments
to date in the 2022/23 approved capital programme for Economy and
Regeneration of £15.053m, largely as a result of reprofiling budget from
2022/23 into 2023/24 for Paisley Town Hall and Paisley Museum to reflect
updated cashflows. 
5.3. Further detail, including reasons for significant variances (where applicable),
can be found at appendix 2. 
6. Capital Budget Adjustments
6.1. Since the last report, budget changes totalling £2.664m have arisen which
reflect the following:
Page 2 of 52

Page 7

Budget carried forward into 2023/24 from 2022/23 for updated cashflows
(£2.464m):
• Paisley Art Centre (£0.444m);
• Paisley Town Hall (£1.500m);
• Paisley Learning & Cultural Hub (£0.520m);
Budget Transfers in 2022/23 (£0.200m):
• Town Centre Capital Fund (£0.200m) transfer to Village Improvement
Fund as approved by Council in March 2022.
______________________________________________________________ 
Implications of this report 
1.  Financial – The projected budget outturn position for the revenue budget
reported to the Economy and Regeneration Policy Board is breakeven. 
Income and expenditure will continue to be monitored closely for the rest of
the financial year and, where necessary, steps will be taken to mitigate any
overspend.   
The projected outturn position for capital budgets reported to the Economy
and Regeneration Policy Board is breakeven.  The Capital programme will
continue to be monitored closely for the rest of the financial year.   
Any changes to current projections in either Revenue or Capital budgets
will be reported to the board as early as possible, along with an explanation
for the movement. 
2.  HR and Organisational Development 
None directly arising from this report. 
3. Community/Council Planning
None directly arising from this report. 
4.  Legal 
None directly arising from this report. 
5.  Property/Assets 
The Capital expenditure in this board will result in improvements to Culture
and Heritage assets and delivery of strategic place-shaping and
regeneration. 
Page 3 of 52

Page 8

6.  Information Technology 
None directly arising from this report. 
7.  Equality and Human Rights 
The recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report because for example it is for noting only. If required following
implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.   
8. Health and Safety
None directly arising from this report. 
9. Procurement 
None directly arising from this report. 
10. Risk 
The potential risk that the Council will overspend its approved budgets for
the year will be managed at a Council-wide level by the Chief Executive
and Directors. 
11. Privacy Impact
None directly arising from this report. 
12. 
13.
Cosla Policy Position 
N/a. 
Climate Risk
None directly arising from this report.
__________________________________________________________________ 
List of Background Papers 
__________________________________________________________________ 
Authors: Valerie Howie (Revenue) and Geoff Borland (Capital)
Page 4 of 52

Page 9

Appendix 1   
Objective Summary
Approved
Annual
Budget at
Period 6
Budget
Adjustments
Revised
Annual
Budget at
Period 8
Projected
Outturn
Previous
Projected
Outturn
Variance
Movement
£000 £000 £000 £000 £000 % £000 £000
Economy and Regeneration Management 127 0 127 129 (2) (1.6%) (8) 6
Economic Development 1,932 (0) 1,932 1,921 11 0.6% 37 (26)
Regeneration 937 0 937 946 (9) (1.0%) 5 (14)
NET EXPENDITURE 2,996 (0) 2,996 2,996 0 0.00% 34 (34)
Objective Heading
Economy and Regeneration Management
Economic Development
Regeneration
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2022/23
1 April 2022 to 11 November 2022
Budget Variance
(Adverse) or Favourable
POLICY BOARD :  ECONOMY AND REGENERATION
Key Reasons for Projected Variance
No significant projected year end variances to report.
No significant projected year end variances to report.
No significant projected year end variances to report.
Page 5 of 52

Page 10

Appendix 1   
Subjective Summary
Approved
Annual
Budget at
Period 6
Budget
Adjustments
Revised
Annual
Budget at
Period 8
Projected
Outturn
Previous
Projected
Outturn
Variance
Movement
£000 £000 £000 £000 £000 % £000 £000
Employees 4,609 (0) 4,609 4,556 53 1.1% 72 (19)
Premises Related 52 0 52 53 (1) (1.9%) (1) 0
Transport Related 3 0 3 3 0 0.0% 0 0
Supplies and Services 29 0 29 30 (1) (3.4%) (1) 0
Third Party Payments 0 0 0 0 0 0.0% 0 0
Transfer Payments 721 0 721 720 1 0.1% 1 0
Support Services 39 0 39 40 (1) (2.6%) (1) 0
Depreciation and Impairment Losses 0 0 0 0 0 0.0% 0 0
GROSS EXPENDITURE 5,453 (0) 5,453 5,402 51 0.9% 70 (19)
Income (2,457) 0 (2,457) (2,406) (51) (2.1%) (36) (15)
NET EXPENDITURE 2,996 (0) 2,996 2,996 0 0.0% 34 (34)
REVENUE BUDGET MONITORING STATEMENT 2022/23
1 April 2022 to 11 November 2022
Budget Variance
(Adverse) or Favourable
RENFREWSHIRE COUNCIL
POLICY BOARD :  ECONOMY AND REGENERATION
Page 6 of 52

Page 11

Appendix 2   
Prior Years Approved  Budget Revised Projected
Expenditure Budget Adjustments Budget Outturn Total Approved Projected
to 31/03/2022* 2022-23 in 2022-23 2022-23 2021-22 Budget Outurn
Project Title to 31-Mar-27 to 31-Mar-27
£000 £000 £000 £000 £000 £000 £000
ECONOMY & DEVELOPMENT
Paisley Art Centre Redevelopment 574 1,774 230 2,004 2,004 0 0% 3,050 3,050 0 0%
Paisley Town Hall Redevelopment 8,284 11,729 (4,469) 7,260 7,260 0 0% 22,050 22,050 0 0%
Flexible Outdoor Facility/Travel & Accessibility Infrastructure 447 1,283 (1,223) 60 60 0 0% 7,050 7,050 0 0%
Playing Fields and Sports Development 779 1,040 (860) 180 180 0 0% 5,600 5,600 0 0%
Paisley Museum 12,117 20,109 (6,042) 14,067 14,067 0 0% 45,522 45,522 0 0%
Town Centre Capital Fund 1,793 2,250 (2,007) 243 243 0 0% 4,037 4,037 0 0%
Paisley Learning & Cultural Hub 2,755 3,642 (1,244) 2,398 2,398 0 0% 7,000 7,000 0 0%
Place Based Fund 25 0 1,195 1,195 1,195 0 0% 4,427 4,427 0 0%
Paisley Junctions and Charging Hub 211 2,520 (185) 2,335 2,335 0 0% 3,346 3,346 0 0%
Townscape Heritage CARS 2 2,523 1,524 (448) 1,076 1,076 0 0% 4,099 4,099 0 0%
Total Economy & Development 29,508 45,871 (15,053) 30,818 30,818 0 0% 106,181 106,181 0 0%
TOTAL ECONOMY & DEVELOPMENT 29,508 45,871 (15,053) 30,818 30,818 0 0% 106,181 106,181 0 0%
*Rolling programmes have a prior year year expenditure of £0 as the expenditure is not directly linked from one year to the next as a singular project.
RENFREWSHIRE COUNCIL
CAPITAL INVESTMENT STRATEGY - NON-HOUSING SERVICES
1st April to 11th November 2022
POLICY BOARD: ECONOMY & REGENERATION
Current Year 2022-23 Full Programme - All years
Budget Variance (Adverse) or
Favourable
Budget Variance (Adverse) or
Favourable
Page 7 of 52

Page 12

Page 8 of 52

Page 13

___________________________________________________________________
To: Economy and Regeneration Policy Board
On: 24 January 2023
___________________________________________________________________
Report by: Chief Executive 
___________________________________________________________________
Heading: Renfrewshire Economic Profile Update (January 2023)
___________________________________________________________________ 
1. Summary 
1.1 This report contains the eighth edition of the Renfrewshire Economic Profile. 
These Economic Profile updates allow members to track changes in the local
economy through a set of key statistical indicators. The last update on the
Economic Profile was brought to Board in December 2021. 
2.  Recommendations 
2.1 It is recommended that the Board: 
(i) notes the content of the January 2023 Renfrewshire Economic Profile
Update.
___________________________________________________________________
3. Background 
3.1 The purpose of the economic profile update is to describe and track local
demographics and economic indicators for Renfrewshire on an annual basis.
The data and analysis presented provides a context and a baseline to assess
how well the Renfrewshire economy over time.   
3.2 In terms of the profile, as with previous versions of this report, officers have
selected Scotland and Glasgow City Region (GCR) as the most appropriate
comparators. The national average is a commonly used guide by most local
authorities in terms of relative performance. 
3.3 Members comments are welcomed on the format and content of the economic
profile. The profile will be shared with stakeholders and become the key source
of data relating to the performance of the local economy. The profile aligns with
the Renfrewshire Economic Strategy.
Item 2
EAR240123 Page 9 of 52

Page 14

4. Key issues arising from the Renfrewshire Economic Profile 
4.1 In previous version of these economic profile updates to Board, officers had
selected a range of the latest statistics against Renfrewshire Council Plan and
Community Plan strategic objectives to allow members to see progress against
some of the Council’s key priorities. 
Economic indicators dashboard 
4.2 Officers have selected a number of key statistics and have displayed them in
the Dashboard below: 
Page 10 of 52

Page 15

4.3 These indicators show that Renfrewshire’s population is growing, and
employment levels have increased in 2022. Female employment in particular
has seen a significant increase in Renfrewshire (8.9%); far higher than the
national average and the highest in the GCR. The Gender Employment Gap in
2021 also changed so that on average a higher proportion of women were in
employment in comparison to men in Renfrewshire.   
4.4 Unemployment rates have fallen between 2021 and 2022 and Renfrewshire’s
claimant count has also continued to fall over the same period. This highlights
that more people have attained employment coming out of the pandemic. 
4.5 Following the CityFibre / Commsworld fibre roll out, the % of households with
access to full fibre connections has further increased from 8% in September
2018 to over 73% in November 2022. 
4.6 The rate of school leavers in positive destinations of 96.5% in 2019/20 is higher
than the national level and is the 3rd highest in the City Region.  
4.7 Following the covid pandemic, Town Centre Vacancy Rates have increased
and is more pronounced in Renfrewshire’s largest towns. 
Page 11 of 52

Page 16

4.8 There was a significant increase (£40m) in direct tourism expenditure in 2021 -
£88m compared to 48m in 2020. The significant difference is likely attributed to
restrictions related to the pandemic which were in place during 2020 and
resultant capacity issues for the whole year. 
4.9 The supply of new housing per 10,000 population increased between 2020 and
2021. Renfrewshire’s rate is still the 3rd highest in the City Region and is higher
than the national average.   
4.10 The rate of manufacturing jobs as a % of the total workforce has remained
stable between 2019 and 2021 but has declined by 11% from the 2017 figure.
Renfrewshire has the highest proportion of employment in manufacturing
(9.5%) in the City Region. 
4.11 GVA in Renfrewshire fell between 2019 and 2020 by 23% highlighting the
impacts of the pandemic on the local economy. This is broadly in line with the
Scottish national average (19% decrease). Renfrewshire still generates the 4th
highest amount of GVA amongst the GCR authorities. 
Conclusion 
4.12 Overall Renfrewshire’s economy appears to be performing well when compared
to regional and national rates for a number of key performance indicators
including employment, unemployment, qualifications and earnings. 
4.13 Of particular note is the significant increase in female employment in
Renfrewshire – both higher than the national average and City Region.  
4.14 Manufacturing, Retail and Transport and Storage continue to be important
sectors for Renfrewshire in terms of jobs and GVA generated. 
4.15 The full economic profile for Renfrewshire is included at Appendix 1 to this
report.
__________________________________________________________________ 
Implications of the Report 
1. Financial – No additional finance is sought.  All funding is accounted for within
existing Council budgets. 
2. HR & Organisational Development – None. 
3. Community/Council Planning – 
 Empowering our Communities – the new Economic Profile will enable
communities to have a clearer understanding of the relative performance of
the Renfrewshire economy. 
 Jobs and the Economy - the new Economic Profile will present a clearer
picture of the relative performance of the Renfrewshire economy. 
Page 12 of 52

Page 17

4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact - None. 
12. COSLA Policy Position – Not Applicable. 
13. Climate Risk – Not Applicable.
___________________________________________________________________
List of Background Papers
None. 
___________________________________________________________________ 
Author:  Alasdair Morrison; Head of Economy and Development; Tel 0141 6184664.
Email:    Alasdair.morrison@renfrewshire.gov.uk
Page 13 of 52

Page 18

Appendix 1 
Renfrewshire Economic Statistics (Eighth Edition: January 2023) 
1.  Population 
Renfrewshire Scotland Glasgow City Region 
Population 2021
179,940 
Increase of 4% on
2010 
5,479,900 
Increase of 4% on 2010 
1,849,070 
Increase of 4% on 2010 
Population
projection (at 2043,
2018 based) 
185,360 
3.0% increase on 2021
5,574,819 
1.7% increase on 2021
1,885,826 
2.0% increase on 2021
Births (2021)
1,647 
This is a decrease of
17% from 1,995 births
in 2010
47,786 
This is a decrease of
19% from 58,791 births
in 2010
17,043 
This is a decrease of 17%
from 58,791 births in
2010 
Birth Rate per 1,000
Population (2021)
9.5 
In Renfrewshire, the
standardised birth
rate increased from
8.9 per 1,000
population in 2020 to
9.5 in 2021
8.7 
The rate in Scotland
overall increased from
8.6 to 8.7 between
2020 and 2021.
In 2021, Renfrewshire
was the council area
with the 5th highest
standardised birth rate in
Scotland. Between 2020
and 2021. 
Deaths (2021)
2,232 
This is an increase of
17% from 1,910
deaths in 2010
63,587 
This is an increase of
18% from 53,967
deaths in 2010
21,704 
This is an increase of
16% from 18,791 deaths
in 2010 
Page 14 of 52

Page 19

Renfrewshire Scotland Glasgow City Region 
Male Life
Expectancy 2019-21 
75.5 76.6 Male life expectancy at
birth has increased more
rapidly than female life
expectancy at birth
between 2001-03 and
2019-21. 
Female Life
Expectancy 2019-21
80.0 80.8 
Net Migration
(2020-21)
1230 
Renfrewshire had the
2nd highest level of
net migration in the
GCR, with an increase
of 380 from 850
people in 2019-20.
27,800 
This is an increase of
10,900 people from
16,900 in 2019/20.
6,500 
This is a decrease of 250
people from 6,750 in
2019/20. 
% of population
that is of the
working age (16-
64yrs) (at 2021) 
64%  64%  65% 
Page 15 of 52

Page 20

2.  Employment 
Renfrewshire Scotland Glasgow City Region 
Employment rate -
aged 16-64 (Jul
2021-Jun 2022)
77.4% 
The rate has increased
by 3.9% compared to
the previous 2021
figure.  
74.4% 
The rate has increased
by 2.2% in comparison
to the previous 2021
figure.
Renfrewshire has the
2nd highest employment
rate in the GCR. 
South Lanarkshire has
the highest (78.2%) and
North Lanarkshire has
the lowest (68.1%). 
Employment rate -
Male (Jul 2021-Jun
2022)
72.5%
The male employment
rate has marginally
fallen by 1.2%
compared to the
previous 2021 figure. 
77%
The national
employment rate for
males is significantly
higher than the
Renfrewshire rate. 
Renfrewshire has the
second lowest male
employment rate in the
GCR. 
South Lanarkshire has
the highest (84.8%) and
North Lanarkshire has
the lowest (67%). 
Employment rate -
Female 16-64 (Jul
2021-Jun 2022)
82.3%
The female
employment rate has
increased significantly
by 8.9% compared to
the previous 2021
figure.
72%
The national
employment rate for
females is significantly
lower than the
Renfrewshire rate.
Renfrewshire has the
highest female
employment rate in the
GCR, with Glasgow City
having the lowest
(66.2%) 
Unemployment
Rate 16-64
(Jul 2021-Jun 2022)
2.7% 
Renfrewshire’s
unemployment rate
has fallen by 3.4%
from the previous
2021 figure. 
3.5% 
1.3% decrease in
comparison to the
overall 2021 figure 
Renfrewshire has the 5th
highest unemployment
rate in the GRC. 
North Lanarkshire has
the lowest (1.8%) and
East Renfrewshire the
highest (3.7%) 
Claimant Count (Nov
2022) 
3,490 
Encouragingly the
claimant count in
Renfrewshire has
decreased by 23%
compared to the
November 2021 figure
109,585 
The national claimant
count figure has
decreased by 23% since
November last year
45,370 
When compared to the
November 2021 figure,
the GCR claimant count
has decreased by 22%
Page 16 of 52

Page 21

Renfrewshire Scotland Glasgow City Region
Claimants as a
proportion of
residents aged 16-64
(September 2021) 
3.0% 
This proportion has
decreased from 3.9%
back in November
2021 
3.1% 
This proportion has
decreased from 4.1%
back in November
2021. 
3.3% 
Renfrewshire has the 
6th highest proportion in
the GCR. 
Glasgow City has the
highest proportion
(4.8%) whereas East
Renfrewshire has the
lowest (1.7%) 
Occupations
(Workplaces in
Renfrewshire; at
2021)
Renfrewshire has
above average
employment in:
 Manufacturing
(8,000)
 Business
administration
(10,000)
 Retail (10,000)
 Transport and
Storage
(6,000) 
Scotland is closer to
Renfrewshire in terms
of the proportion for
health and
construction
employment but is
lower in the other
sectors such as
Manufacturing and
business administration 
Renfrewshire has much
higher proportions of
employment than the
GCR in: 
• Manufacturing
• Transportation and
Storage; and
• Business
administration 
Earnings (at 2022)
Median weekly
earnings for full-time
employees living in
Renfrewshire are
£634.80 
Median weekly
earnings for full-time
employees working in
Renfrewshire are
£612.80
Median weekly
earnings for full-time
employees living in
Scotland are £640.30 
Median weekly
earnings for full-time
employees working in
Scotland are £640.50
Renfrewshire has the 5th
highest resident earnings
in the GCR with East
Renfrewshire the highest
(£804.90) and West
Dunbartonshire the
lowest (£616.00). 
Renfrewshire has the 5th
highest workplace
earnings in the GCR with
Glasgow the highest
(£670.80) and East
Dunbartonshire the
lowest (£582.10).
Employment in low
pay sectors (%) 2020
35.1% 
0.7% decrease from
2017
28.7% 
1.1% decrease from
2017
30.8% 
Renfrewshire has the
highest rate in the GCR.
North Lanarkshire has
the lowest rate at 25.5%.
Page 17 of 52

Page 22

Renfrewshire Scotland Glasgow City Region 
Gender Employment
Gap (full-time, %
points) 2021 
-6.0% 
-11.1% change from
2018, which highlights
that  a higher
proportion of woman
were in employment
in 2021 in comparison
to men
5.0% 
2.7% decrease from
2018
6.2% 
Renfrewshire has the 2nd
lowest gap in the GCR. 
Glasgow City has the
largest gap at 13.9%.
Inverclyde has the
lowest rate at -8.0%. 
Qualifications NVQ4
and above % of pop
16-64yrs (2021)
50.4% 
9.9% increase from
2018
50.1% 
5.9% increase from
2018
Renfrewshire has the 4th
highest rate of
qualification at this level
in the GCR with East
Renfrewshire the highest
(63.6%) and West
Dunbartonshire the
lowest (36.2%). 
No Qualifications %
of pop 16-64yrs
(2021)) 
7.1% 
3.1% decrease from
2018
7.7% 
2.0% decrease from
2018
10.7% 
Renfrewshire has the 2nd
lowest level of residents
with no qualifications in
the GCR.  North
Lanarkshire has the
highest % at 18.6%,
whilst East Renfrewshire
has the lowest at 4.4% 
% of School Leavers
in Positive
Destinations
2020/21 
96.5% 
3.2% increase from
2017/18
95.5% 
0.9% increase from
2017/18
93.6% 
Renfrewshire has the 3rd
highest attainment level
in the GCR .  East
Dunbartonshire has the
highest % at 98.6%, with
Page 18 of 52

Page 23

Renfrewshire Scotland Glasgow City Region 
West Dunbartonshire
the lowest 91.0%. 
% of Households
that are Workless
2020 
16.5% 
0.4% increase from
2017
21.5% 
3.4% increase from
2017
24.8% 
Renfrewshire has the 2nd
lowest % of households
that are workless in the
GCR .  Glasgow City has
the highest % at 22.5%,
with East
Dunbartonshire the
lowest at 15.8%. 
Travel to Work
Survey SHS (2016) 
3.1% 
73.0%  
2.1% 
19.5% 
12.3% 
67.0% 
2.6% 
15.6%
Renfrewshire has the 4th
highest % driving to
work in the GCR with
Glasgow City the lowest
(55.1%) and North
Lanarkshire the highest
(79.9%). 
Renfrewshire has the 4th
lowest % taking bus/rail
services to work in the
GCR with Glasgow City
the highest (28%) and
North Lanarkshire the
lowest (12.7%). 
Page 19 of 52

Page 24

3. Business 
Renfrewshire Scotland Glasgow City Region 
Private Enterprises
(2022)
4,680 private
enterprises in
Renfrewshire. 
87% are micro
businesses with less
than 10 employees. 
11% are small
businesses (10 to 49). 
2% have been 50 and
250 employees. 
Less than 1% are classed
as large businesses  with
more than 250
employees. 
This figure is for VAT
and/or PAYE registered
enterprises
Generally, an
equivalent split to
that of Renfrewshire’s
with around 98% of
businesses being
classed as either
micro or small.
Renfrewshire has a
higher proportion of
larger sized
organisations
compared to areas such
as East Dunbartonshire
and East Renfrewshire 
Business Start Ups
(per 10,000 working
age population,
2020)
49.5 
7.6% decrease from
2017
50.9 
8.5% decrease from
2017 
53.5 
Renfrewshire had the
4th largest number of
start-ups (570) with
Glasgow City the most
with 2,795 and
Inverclyde the fewest
with 180. 
Business Closures
(per 10,000 working
age population,
2020)
48.7 
1.8% decrease from
2017
53.4 
2.6% decrease from
2017 
50.4 
Renfrewshire had the
fifth largest number of
closures in GCR at 560 
with Glasgow City the
most with 2,440 and
Inverclyde the fewest
with 200. 
Page 20 of 52

Page 25

Renfrewshire Scotland Glasgow City Region 
GVA (2020)
£2.7 billion 
GVA fell by 23%
between 2019 and 2020
highlighting the impacts
of the pandemic on the
local economy. 
£80.8 billion 
Similarly, GVA in
Scotland fell by 19%
between 2019 and
2020. 
GVA in Renfrewshire
accounts for 3.3% of
Scotland’s total GVA.
£24.3 billion 
Glasgow City (£11.2
accounts for 46% of the
overall region’s GVA. 
Renfrewshire generates
the fourth largest GVA
(11%) in the GCR with
East Renfrewshire the
smallest at £419 million
(2%). 
Town Centre
Vacancy Rates
(2022) 
Paisley – 20%
Renfrew – 14%
Johnstone – 19%
Erskine – 0%
Braehead – 14%
Linwood – 0% 
Town Centre Vacancy
Rates have increased in
Renfrewshire’s largest
towns between 2019
and 2022 – up 6.4% in
Paisley, 6% in Renfrew
and 9.2% in Johnstone.   
Page 21 of 52

Page 26

4.  Manufacturing 
Renfrewshire Scotland Glasgow City Region 
Number Employed
in Manufacturing
Sector (2021)
8,000 
This figure has remained
stable between 2019
and 2021 but is a 11%
decrease from the 2017
figure (9,000).
176,000 
The total number of
jobs in Manufacturing
in Scotland has fallen
by 4% from the 2017
figure. 
56,250 
Glasgow City has the
highest number of
manufacturing jobs in
the GCR (19,000) and
East Renfrewshire the
lowest (500). 
Number Employed
in Manufacturing
Sector per 10,000
working age
population (2021)
692.2 
Renfrewshire has a
higher rate of
employment in
manufacturing than the
GCR and Scottish rates. 
503.7 464.7 
Only Renfrewshire,
North Lanarkshire and
South Lanarkshire have
higher rates than the
Scottish average rate.   
Manufacturing as %
of total
employment (2021)
9.5% 
This figure is down
slightly on the 2017
figure (10.8%) due to a
reduction in the
manufacturing
workforce.
7.0% 
Moray has the highest
proportion of
employment in
manufacturing in
Scotland (16.7%) and
Edinburgh City the
lowest (2.2%).
6.5% 
The proportion of
manufacturing jobs in
the GCR is lower than
the national rate. 
Renfrewshire has the
highest proportion of
employment in
manufacturing in the
GCR (9.5%) and East
Renfrewshire the
lowest (2.3%). 
% of Scottish
Manufacturing GVA
(2020)
6.3% 
Renfrewshire
contributes a higher
proportion to Scottish
manufacturing GVA than
its overall contribution
to Scottish GVA (3.3%).
100% 
Glasgow City produces
the highest proportion
of Scottish
manufacturing GVA
(8.7%) and East
Renfrewshire the
lowest (0.2%).
30.8% 
The GCR contributes 
around a third of
Scotland’s
manufacturing GVA 
Page 22 of 52

Page 27

Renfrewshire Scotland Glasgow City Region 
Manufacturing as a
% of GVA (2020) 
25.5% 
Renfrewshire
contributes the 8th
highest proportion of
local GVA through
manufacturing in
Scotland.
13.6% 
Angus produces the
highest proportion of
local GVA through
manufacturing
(36.2%) and City of
Edinburgh the lowest
(4.6%).
13.9% 
West Dunbartonshire
produces the highest
proportion of local GVA
through manufacturing
in the GCR (35.6%) and
East Renfrewshire the
lowest (4.7%) 
Expenditure (£) on
R&D within
businesses per head
of population
(2020)
£199
Renfrewshire has the
9th highest R&D spend
per head of population
in Scotland.
£262
West Lothian has the
highest spend per
head (£972) and East
Dunbartonshire the
lowest (£22) of the
reported figures. 
Note: 2 councils had
figures too low to
disclose
£209
Renfrewshire has the
4th highest per head
expenditure on R&D in
the GCR area. Glasgow
City has the highest
(£322) in the GCR area
and East
Dunbartonshire the
lowest (£22). 
Manufacturing
sector expenditure
(£m) on R&D
expenditure (2020)
£19.0m
Renfrewshire has the
8th highest spend on
manufacturing R&D in
Scotland.
£668.4m
Edinburgh City has the
highest spend
(£181m) and the
Shetland Islands the
lowest (£0.2m) of the
reported figures. 
Note: 11 councils had
figures too low to
disclose.
£126.7m
Renfrewshire has the
4th highest expenditure
on manufacturing R&D
in the GCR area. 
North Lanarkshire has
the highest (£54m) has
the highest spend.
Only five LAs reported
figures 
Manufacturing R&D
expenditure as % of
total R&D
Expenditure (2020)
53% 
Renfrewshire spends a
higher % of its R&D
expenditure on
manufacturing than the
Scottish and GCR figures
46% 33% 
North Lanarkshire has
the highest % spend of
R&D on manufacturing
R&D in the GCR area
(77%). 
Page 23 of 52

Page 28

5. Tourism 
Renfrewshire Scotland Glasgow City Region 
Sustainable
employment in
tourism (at 2022)
5,695  196,700 
A decrease of almost
19,000 employees since
2019.
58,690
This accounts for 30% of
Scottish sustainable
tourism employment. 
Renfrewshire has the
fourth highest level of
sustainable tourism
employment (10%) in the
Region. Glasgow has the
largest with 29,350 (50%)
and Inverclyde the
smallest with 1,795 (3%). 
Direct expenditure
(visitors, 2021)
£88.09m
This is an increase of 83.4%
on the 2020 figure of
£48.03m 
STEAM data was re-
commissioned during 2022,
and is a year in arrears (i.e.
giving 2021 data).
Headline data in
comparison with 2020
should be understood with
the caveat that COVID and
related restrictions had a
significant impact on the
tourism industry
n/a 
STEAM is commissioned
at a local authority level
and therefore does not
provide a Scotland or
city-region wide figure
n/a 
Visitors to Events
(2022)
15,273
This figure represents
visitors to events who
came from outwith
Renfrewshire and does not
include the Christmas
events programme . Note
that the events
programme has had to
pivot due to COVID-
related  impacts 
Page 24 of 52

Page 29

All Visits to
Attractions (2021) 
1.01m 
A decrease of 4.1% from
2020 figures. 
It should be noted that a
number of attractions
Renfrewshire remained
closed for the duration of
2021, including some that
had been open in early
2020.
In addition, outdoor spaces
saw a big increase in 2020
which then decreased
during 2021. 
29.5m 6.04m 
6. Housing 
Renfrewshire Scotland Glasgow City Region 
Workforce lives and
works in their Local
Authority area (at
2011)
52.6% 67.5% 
(of Scottish people
live and work in their
own local authority
area)
Renfrewshire has the
4th lowest proportion
of its workforce living
and working in the GCR
area with Inverclyde
the highest (75%) and
East Renfrewshire the
lowest (45.2%). 
Supply of New
Housing –
Rate per 10,000
Population (2021)
49.8 
There was a increase in
house building
completions in
Renfrewshire between
2020 and 2021 from 579
to 725.
41.2 
There was an increase
in house building in
Scotland between
2020 and 2021 from
14,928 to 20,448.
36.5 
Renfrewshire has the
3rd highest rate of new
house building per
10,000 population in
the GCR. South
Lanarkshire has the
highest (59.2) and
Inverclyde the lowest
(12.9). 
Page 25 of 52

Page 30

Renfrewshire Scotland Glasgow City Region 
Supply of New
Housing – Rate per
10,000 Population
(average 2017 to
2021) 
44.0 34.9 28.8 
Renfrewshire has the
highest 5-year rate of
new house building in
the Glasgow City
Region. South
Lanarkshire has the
next highest (43.2) and
Glasgow City the
lowest (19.8). 
% premises with
available Fibre
broadband
connection (2022)
73% 
59% increase from
January 2021
39%  30%
Renfrewshire has the
highest rate in the
GCR. West
Dunbartonshire the
lowest 5%. 
Urban Vacant and
Derelict Land
(Hectares; 2021)
205 ha 
Renfrewshire has
experienced a 78%
reduction in Urban VDL
between 2015 and 2021
9,459 ha 
Overall Urban VDL has
reduced by 27%
between 2015 and
2021
3,221 ha 
This is 29% of the
Scottish total.
Renfrewshire has the
4th highest total area
of vacant and derelict
land in the GCR with
North Lanarkshire the
highest with 1,354
hectares and East
Renfrewshire the
lowest with 47
hectares. 
Urban Vacant and
Derelict Land as %
of all Scottish V&D
land (2021)
2.1%  100% 34.1% 
Renfrewshire has the
4th highest % of
Scottish V&D land in
the Glasgow City
Region with North
Lanarkshire the highest
(14.3%) and East
Page 26 of 52

Page 31

Renfrewshire Scotland Glasgow City Region
Renfrewshire the
lowest (0.5%). 
Urban Vacant and
Derelict Land as %
of total land area
(2021)
0.5%  0.1% 0.7%
Renfrewshire has the
4th highest % of its
total area classed as
urban vacant or
derelict in the GCR,
with Glasgow City the
highest (2.9%) and
South Lanarkshire the
lowest (0.2%). 
Total Vacant &
Derelict Land (Ha) in
bottom 15% SIMD
areas (2021) 
36.1 ha 
14.9% decrease from
2018
1,049.5 ha 
31.2% decrease from
2018
280.6 ha 
Renfrewshire has the
3rd lowest amount in
the GCR. Glasgow City
has the highest amount
at 515.8, with East
Dunbartonshire the
lowest with 0.5 
Breakdown of
Tenure Type (2020)
Total Dwellings: 88,355
Owner Occupied – N/A
Private vacant/second
homes – 2%
Private Rented – N/A
Socially Rented – 24%
Total Dwellings:
2,645,298
Owner Occupied –
58%
Private vacant/second
homes – 4%
Private Rented –15%
Socially Rented – 23%
Total Dwellings:
885,555
Owner Occupied – N/A
Private vacant/second
homes – 2%
Private Rented –N/A
Socially Rented – 28% 
Effective Housing
Land Supply %
Brownfield (2021) 
88% 
This figure is from
Renfrewshire's Housing
Land Audit. It represents
the % of the land supply
that will produce units in
the next 7 years that is
classed as brownfield   
Page 27 of 52

Page 32

Glossary:
Claimant Count:  The Claimant Count is a measure of the number of people claiming benefits principally for
the reason of being unemployed, based on administrative data from the benefits system.
Employment in low pay sectors: These include employment in the retail and hospitality sectors.
Gender Employment Gap:  The percentage point difference between the employment rates for men and
women (aged 16-64). This is calculated by subtracting the employment rate for women from the
employment rate for men. A positive employment gap indicates a higher employment rate for men
compared with women, while a negative employment gap indicates a higher employment rate for women.
Employment rate is the number of people in employment (aged 16-64) divided by the overall population
(aged 16-64).
School Leavers in Positive Destinations:  Includes higher education, further education, training,
employment, voluntary work, Personal Skills Development and (Activity Agreements.
Sustainable Tourism:  Sustainable Tourism sector was identified in Scotland’s Economic Strategy as one of
the growth sectors in which Scotland can build on existing comparative advantage and increase
productivity and growth. Scotland’s tourism sector is a diverse industry, with a range of sub-sectors such as
hotels, camping sites and other provision of short stay accommodation, restaurants, bars, travel agents,
museums and other recreational and cultural activities.
Vacant and Derelict Land: Vacant land is defined as land within a settlement that has been previously
developed, without physical constraint, and which the planning authority has indicated is available for
redevelopment. Derelict land is defined as land 'damaged by development, so that it is incapable of
development for beneficial use without some remedial works'. 
Page 28 of 52

Page 33

To: Economy and Regeneration Policy Board
On: 24 January 2023 
Report by: Chief Executive 
Heading: Net Zero Business Support and Grants 
1. Summary 
1.1 This report updates Board on the Green Economy workstream, including the
Net Zero Business Grant fund launched in May 2022 and wider support to
businesses. 
1.2 The grant fund has garnered significant interest however conversions to
successful applications have been limited. This paper provides an overview of
the fund to date, next steps to increase successful applicants, as well as the
wider green economy support package being progressed with City Region
Partners. 
2. Recommendations 
2.1 Board members are asked to: 
(i) Note the contents of the report. 
3. Background 
3.1 Green Economy was a new area of work for the Council in 2022 and a new post
was created within Economic Development to progress this. The purpose of the
role is to promote sustainable economic growth, support businesses to achieve
net zero and support the delivery of a just transition as Renfrewshire Council
moves towards achieving its net zero ambitions.
Item 3
EAR240123 Page 29 of 52

Page 34

3.2 There are over 4,500 businesses operating in Renfrewshire and each
generates carbon emissions through their use of buildings and transport as well
as industrial or farming processes. 
3.3 Businesses are being encouraged to reduce the impacts of climate change by
determining the size of their carbon footprint, identifying which parts of the
business contribute most to the production of greenhouse gas emissions and
strategically planning what actions are needed to take to make the business
more sustainable. 
3.4 This workstream is being progressed principally through the delivery of a
package of green business support, including the net zero business grant, an
approach which is now being developed with City Region partners to ensure
consistency throughout the region. 
4. Net Zero Business Grant 
4.1 An initial action within the Green Economy remit was the design and
implementation of a Net Zero Business Grant for Renfrewshire. 
4.2 The Net Zero Business Grant was established via resources secured through
the Climate Change Action Fund and Local Authority Covid Economic Recovery
Fund earlier this year and was launched in June 2022. Since then additional
funding has been identified through the Business Theme of the UK Shared
Prosperity Fund. The total fund available to end of March 2025 is around
£500,000. 
4.3 The fund was launched in June 2022 and is open to small and medium sized
enterprises with premises within Renfrewshire. Local businesses can apply for
up to £10,000, to a maximum of 50% grant rate, towards eligible projects which
will reduce their carbon emissions. 
4.4 In order to measure emission reductions, the application process requires
potential applicants to gather baseline carbon footprint information for their
organisation and to demonstrate how the proposed project will reduce their
future emissions. 
4.5 The fund has attracted a significant number of enquires however, thus far there
has been only one successful application resulting in a funding award. 
4.6 It is considered that there are multiple factors contributing to the low conversion
rate, including:
 The fund requires an initial carbon footprint assessment however there is a
lack of knowledge and capacity to undertake carbon reviews of
organisations;
 Technology is still developing and there is a lack of access to technical skills
and trades required to develop feasible projects;
Page 30 of 52

Page 35

 Increasing cost of doing business reduces capital available for businesses
to invest in improvements. The grant fund currently requires 50% match
funding which could be prohibitive to some. 
4.7 A survey of Renfrewshire businesses is currently underway. This survey
provides a platform for businesses to communicate the obstacles and
challenges they face on the road to achieving net zero. Feedback from this
survey will be used to inform our approach to green business support provision. 
5. Challenges & Next Steps 
5.1 In the last two months there have been a number of meetings at City Region
level to share expertise and to work collectively on the Green Economy agenda.
Every area has committed to using UK Shared Prosperity Funding to bolster
Net Zero activities for businesses across the eight local authorities. Some
areas, such as Renfrewshire and North Lanarkshire, have already started
providing services and grants and are learning from each other in terms of what
is working well and where a different approach is required. 
5.2 Across the City Region there is a new commitment to:
 provide a business grant programme in every local authority area to
reduce carbon emissions;
 co-ordinate and deliver training to upskill business advisors and to equip
them with the ability to support businesses to mainstream sustainability
into business models and assist organisations to address new climate
regulations as they come into force.
 Consider jointly funding additional technical support to carry out
assessments across the city region. 
5.3 To address the obstacles identified to date within the Renfrewshire Net Zero
fund a range of changes are proposed: 
 Upskilling and Awareness: To raise awareness and promote climate
literacy, a series of Net Zero events will be held throughout 2023,
bringing together speakers and workshops from organisations who have
positively engaged in the green agenda to share experience and best
practice. 
 Technical Support: consultancy services will be procured to provide the
technical support required to deliver carbon baselining for a few
businesses. This service will be available to SMEs based within
Renfrewshire, identified through the Net Zero Grant process. Eligible
SMEs will be provided access to consultancy services to deliver a carbon
baseline review for their organisation. This baseline can then be used
inform investment decisions, set carbon reduction targets, monitor
impacts and encourage on-going evaluation of their net zero journey. In
addition, baselining will not always be required in advance of grant
applications and can be carried out as the project progresses where it is
clear that the activities are more carbon efficient and will make a saving.
Page 31 of 52

Page 36

 Business Training: funding for sustainability training will be allocated to
support businesses to build knowledge and capacity within their
organisation and promote the appointment of “green champions” to take
forward this agenda. 
6. Conclusion 
6.1 The Green Economy is still a relatively new and evolving area of work.
Technical skills and expertise are not always available and businesses are
apprehensive about the effectiveness and efficiencies of new technologies.
There is an enthusiasm for the agenda but a reluctance to be the pilot / tester
business. 
6.2 The move to greater collaboration with City Region partners and the
development of City Region approaches will reinforce the importance of the
agenda and will provide shared good practise and experiences that should
support improved services in green business support. 
6.3 Specifically for Renfrewshire Council, the recommended combination of staff
training, interactive events and consultancy services will provide a package of
support to allow prospective applicants to explore the green options available
to them. It will also provide sufficient knowledge and expertise for organisations
to make informed investment decisions in relation to the sustainability of their
organisation. Subsequently, organisations will be in a better position to access
grant support for feasible and significant carbon reducing projects. 
Implications of the Report 
1. Financial - No additional finance sought. Resources from the existing Climate
Change Action Fund, the Local Authority Covid Economic Recovery Fund and the
UK Shared Prosperity Fund would ensure that business support is available. 
2. HR & Organisational Development – None. 
3. Community/Council Planning 
 Jobs and the Economy –  progresses net zero agenda and green business
support. 
4. Legal – None. 
5. Property/Assets- None. 
6. Information Technology – None. 
7. Equality & Human Rights- The Recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights.
No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the recommendations
contained in the report. 
Page 32 of 52

Page 37

8. Health & Safety- None. 
9. Procurement – None. 
10. Risk- None. 
11. Privacy Impact- None. 
12. Cosla Policy Position- Not Applicable. 
Author: Mhairi Gardner; Green Economy Officer
m hairi.gardner@renfrewshire.gov.uk
Page 33 of 52

Page 38

Page 34 of 52

Page 39

___________________________________________________________________
To: Economy & Regeneration Policy Board
On: 24 January 2023
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Cultural Infrastructure Programme Update
___________________________________________________________________
1. Summary 
1.1. This report is to update the Board on the progress of Renfrewshire Council’s
Cultural Infrastructure Programme, being delivered on behalf of the Council by the
City Deal & Infrastructure Team (with project management expertise from the
Council’s Property Services team) with the Paisley Museum Project being
delivered by OneRen. 
1.2. The Cultural Infrastructure Programme investment in Paisley town centre will use
our internationally significant cultural and heritage story to transform our future for
visitors and events within Scotland. This programme of work will bring new footfall
and life to the town centre, new homes for top class events and life-changing
cultural experiences whilst preserving the heritage of the town. 
1.3. Since the beginning of the Cultural Infrastructure Programme, the scale of the
economic shock we have since experienced from global events such as the
pandemic and war in Ukraine has been unforeseeable introducing significant
pressure on the Council and its contractor’s in delivering these ambitious plans.
Completion of these projects are central to the recovery and inclusive growth of
the Renfrewshire economy and Paisley Town Centre. 
1.4. Given the very significant scale of the cultural infrastructure programme a
managed programme of phased venue openings over a defined period has been
planned since the commencement of the construction phase. Delivering a
managed and coordinated opening programme is key to securing a successful go
live phase where each venue is provided with the opportunity to be launched in its
own right and contribute both individually and collectively to maximise the impact
on Renfrewshire’s cultural, events and heritage opportunities. 
Item 4
EAR240123 Page 35 of 52

Page 40

1.5. In addition, there are significant operational demands involved in planning,
preparing and delivering each venue opening and consequently there is a need to
actively manage the opening programme to ensure organisational capacity of both
the Council and OneRen is able to appropriately support the associated demands
of each individual venue opening. 
1.6. The very significant scale of the construction phase, coupled with the
unprecedented challenges faced across the wider construction sector over the
past number of years, has meant there has been an inevitable shift in the
construction completion dates of each venue in contrast to that planned at the
outset of the programme.  Notwithstanding, greater confidence is being
increasingly secured in relation to anticipated construction completion dates which
will allow a firm opening schedule to be finalised and in line with the planning
principles outlined above it this will not necessarily be directly driven by the
completion dates of each individual construction contractor.  A paper outlining the
detail of the planned opening programme will be brought to the next board.
2. Recommendations 
2.1  The Economy & Regeneration Board is asked to: 
i) Note the progress and current stage of construction of the projects
outlined in this paper.
ii) Note that OneRen will bring details of the cultural infrastructure opening
programme and marketing plans to the next meeting of this board as
detailed in paragraph 13.
________________________________________________________________________
3. Project Updates 
3.1. Whilst each of the Cultural Infrastructure projects individually contribute to
economic growth in Renfrewshire, it is important to note that the combined social
and economic outcomes from across these investments are greater than the sum
of the individual parts. Coupled with the Councils wider economic investments in
City Deal, AMIDS, housing and other regeneration projects these social and
economic outcomes for our local residents and visitors is enhanced further. 
3.2. On all project sites planned progress has been difficult to maintain in line with
programmes whilst contractors manage the ongoing difficulties of construction
materials and supply chain with current global issues outing significant pressure
on costs. The Council continues to work closely with contractors to monitor and
provide any reasonable support to ensure the successful delivery of these
important projects. 
3.3. The Council and OneRen teams are currently working together to finalise opening
plans for these venues and an update will be brought to the next meeting of this
board. 
4. Paisley Town Hall Redevelopment 
4.1. Paisley Town Hall is being transformed into a landmark entertainment venue for
the West of Scotland, to preserve its place at the heart of life in Paisley for future
generations. 
Page 36 of 52

Page 41

The Paisley Town Hall Redevelopment project includes replacement of all
mechanical, electrical and plant, as well as a full fit out and redecoration of the
existing building. In addition, internal modernisation to increase the quality and
range of services offered by improving the main hall auditorium, increased
dressing room provision, acoustic and lighting improvements, new function suite,
extended kitchen and new bar provision, additional toilets, and all-round
improvements to the landmark building are currently being constructed. 
4.2. The design preserves the same classic look and grand features which make the
town hall so distinctive – but creates the 21st century facilities required for a
successful modern venue. 
4.3. Redevelopment of significant and historic buildings is always challenging, and the
team are ensuring that quality and care is taken to deliver the building to the high
standards to meet the vision and expectations for this building. The contractor,
Morrison Construction, has now completed most of the required internal structural
changes and is transitioning to the fit-out works. One of the most prominent areas
of construction has been the erection of an 18m high scaffolding structure that
covered the entirety of the main hall, used to completely refurbish the historic
ceiling decoration, and install new machinery in the attic space above the main
hall. This scaffold has now largely dropped, marking the completion of a significant
area of work, and showcasing the ornate ceiling that brings the main hall to life. 
4.4. Work will continue at pace into 2023 where mechanical and electrical upgrades
will complete in the early part of the year and will see the finalisation of a new
heating and water system as well as new accessible lift installations. Along with
the full electrical replacement, the building will also have new fibre installed to
bring improved network capacity and allow the installation of a new Wi-Fi service
that will provide connectivity for both staff and the public. 
4.5. Finishing works will then take place across all rooms including kitchens, toilets,
office spaces and event rooms which will conclude the construction works. It is
anticipated that construction works will be complete at the end of May 2023. This
will then be followed by an intense period of internal fit out of items including
furniture, ICT, and high-quality stage sound and lighting equipment to ensure
Paisley Town hall can deliver top class entertainment events. 
4.6. OneRen are preparing an operational readiness programme concurrently for the
internal fit out works, involving staff training and implementation of operating
procedures. The PTH venue will be marketed by OneRen through a pre-planned
strategy to attract events, performers, and bookings. The operational readiness
programme will be implemented commencing in spring 2023, with the building
opening in advance of the Royal National Mòd 2023, which will take place in
Paisley from 13th to 21st of October. 
5. Paisley Learning and Cultural Hub 
5.1. Paisley Learning and Cultural Hub is a 21st century community hub and a modern
home for library services at the heart of Paisley High Street, bringing new footfall
into the town centre. The construction of this building is taking place in a previously
vacant and derelict building in the centre of the High Street and will become a
modern educational resource for people of all ages to learn and be inspired.
Page 37 of 52

Page 42

5.2. Construction of the building has seen a significant amount of the existing building
stripped out whilst preserving the historic characteristics of the building. The
building has been transformed with a complex network of new steel installed to
create the foundation of what will be four floors of learning and collaboration
space. On site, steelwork and structural changes are largely complete with the
final new staircases being installed imminently to allow the works to progress to
the fitout phase. 
5.3. Early in 2023 the front of the building will be installed which will be a significant
milestone towards completion. Work has already commenced to prepare the fitout
of the building with mechanical and electric works started, and internal walls now
being constructed. Every element of this building will be newly installed, and this
will include new fibre and Wi-Fi to the building for both staff and the public who
use the building. 
5.4. Construction works are scheduled to complete by the end of May 2023, and this
will deliver; a children’s library including a new play structure integrated with digital
learning mechanisms, various touch down spaces to work and learn, meeting
rooms and event space, ICT suites, all combined with the Paisley Central Library
collection throughout. 
5.5. OneRen will deliver an operational readiness programme that will involve the
transition of the temporary Paisley Central Library from its existing location in the
Lagoon car park, to the new building on Paisley High Street. This transition will
take place in the second half of 2023 after which the PLCH will be opened to the
public. 
6. Paisley Arts Centre 
6.1. Paisley Arts Centre is being extended and upgraded into a unique and intimate
performance venue and creative hub, driving new life and footfall into the heart of
the town centre. This refurbishment project includes a complete replacement of
the building’s mechanical, electrical and plant equipment, a full refurbishment
throughout, new retractable seating, accessibility improvements and a new
extension to improve the number of covers in the bar. These improvements will be
further supplemented by the creation of a new public realm space externally to
provide event space. 
6.2. The existing historic building has been stripped inside to enable the main works to
take place. This is enabling the contractor to make final structural alterations and
complete the removal of existing material no longer required. Work is beginning to
pick up now with reinforcements to the internal structure taking place and progress
being made on the strengthening of the roof. Foundations are in place for the new
extension to the front of the building which will then progress to the construction
of the additional space. 
6.3. Construction will then move to internal fit out works in early 2023, bringing the
refurbishment of all spaces. The final element will see the installation of a ‘tensile
wire grid’ which is a permanent working platform that will allow access to the audio-
visual equipment including stage lighting. 
Page 38 of 52

Page 43

This structure will allow ease of access to an otherwise hard to reach area, to
ensure performances can receive the best technical support available, resulting in
higher demand for using the venue. This building will also benefit from the
installation of new fibre and Wi-Fi for the use of staff and public. 
6.4. It is anticipated that construction work will complete in summer 2023, where the
venue will then progress into a OneRen led operational readiness programme.
This will include the training of staff and implementation of operating procedures,
as well as readying for performances, and marketing the venue. The operational
readiness and marketing programme by OneRen will be delivered in advance of
the building opening which is expected to be late 2023 / early 2024. 
7. Paisley Museum Reimagined 
7.1. Paisley Museum Reimagined will deliver a world-class destination telling the
inspirational stories of Paisley’s people and pattern and showcasing its
internationally significant collections. This project includes repairing and
renovating all buildings on the museum campus delivering a 20% increase in the
overall area. The construction also includes a new extension housing a visitor
reception and café, the installation of new mechanical, electrical and plant
systems, as well as the introduction of a public courtyard. Importantly, this work
enables an increase in the interpretation of the collections and number of objects
on display, with a strong focus on digital interpretation. 
7.2. Construction work is well underway and bulk excavation to form Level 0 and the
new entrance courtyard is nearing completion. Temporary steelwork previously
supporting the corner of the new gable opening has been removed and the
building is now supported by the permanent columns. Roof works are ongoing at
the main museum building and Oakshaw with completion of the main south roofs
now largely complete. The new west extension steelwork has been erected on
Level 3 and 2 and roof decking is progressing well. 
7.3. Work has now begun on planning the exhibition fitout for the museum with award-
winning specialist consultants ‘The Hub’ appointed to lead this piece of work. Work
is taking place to design and create samples and mock-ups of the show cases and
displays with this work progressing well. 
7.4. With the project moving into the final part of delivery, work is ongoing with content
and interactive development with three digital companies appointed to work on the
following: 
 Joi Polloi – a double BAFTA award winning independent studio has been
commissioned to produce digital interactives for the museum. 
 Media Co-op - a multi award winning company has been contracted to co-
produce films working with local communities.
 Freakworks Ltd - one of Scotland’s leading film making companies has been
commissioned to produce films and animations for museum displays. 
7.5. Work to conserve the collection is well underway in readiness for redisplay.
Conservation treatment of all Paisley Pattern shawls, sculptures and works on
paper, selected for display is already complete. Conservation work continues on
paintings, ship models, frames, costume, natural history and looms. 
Page 39 of 52

Page 44

To assist with conservation treatments, we have been successful in securing
external grants including contributions from the Art Fund, National Museums
Scotland’s National Fund for Acquisitions, Museums Galleries Scotland and the
Pilgrim Trust. As part of the conservation works programme, we have also
established partnerships with organisations such as Centre for Textile
Conservation at University of Glasgow and the Natural History Museum in New
York. 
7.6. A Museum Careers Day at Paisley Lagoon has also taken place to highlight the
benefits of a career in museums and show potential new colleagues, what the new
venue will bring when it re-opens in 2024. The target audience included school
children and adults with additional support needs. Participants were offered
interactive activities, competitions, films, slideshows, and hands-on experiences
as well as opportunities to discuss skills and qualifications associated with various
roles within the sector. In total there were 224 attendances, of which, 151 were
school children. 
7.7. Construction work on site is due to be complete late summer 2023 which will then
transition to the building and exhibition fitout process over a number of months
which will see the building open to the public in summer 2024. 
8. Abbey Quarter 
8.1. Abbey Quarter is a high quality public realm project to support the investment in
the Town Hall facilities and provide an accessible outdoor events space for our
Town Centre. The project extends over the area in front of the Town Hall across
the grass area adjacent to the Abbey to Cotton St and includes the grass area to
the side of the Town Hall in front of the Abbey to the bridge at Cotton St. 
8.2. Design of the area in front of the Town Hall extending into the Green is at RIBA
Stage 3 (ready for planning). This area also incorporates the entrance to the
Abbey to ensure this is fully accessible. It had previously been anticipated that this
area could be undertaken as part of the Town Hall project and so a public
consultation was carried out for this element November and December 2021 which
obtained wide public support. However, when undertaking investigative
archaeological surveys in the area potential human remains were encountered
and so a court order will be sought in order to deal with this in an appropriate and
sympathetic manner. Historical ownership of this area is also being reviewed. The
paperwork required for the court order has now been prepared and is being
reviewed for our in-house lawyers, before being submitted to the Sheriff Court
early in the New Year. 
8.3. The design of the garden area adjacent to the river is also at RBA Stage 3 (ready
for planning). No public consultation has yet been carried out in this area. This
consultation is being prepared and will be launched in March 2023. 
8.4. The area around the Cotton Street/Gauze Street junction forms part of the aim to
create an additional town centre event space. The design proposals in this area
are also at RIBA Stage 3 (ready for planning). The design is currently being
reviewed with the Council’s roads team to ensure alignment with their Bus
Partnership project. This consultation is being prepared and will be launched in
March 2023.
Page 40 of 52

Page 45

9. Townscape Heritage and Conservation Area Regeneration Scheme 2
(TH.CARS2) 
9.1. Paisley TH.CARS2 is now entering its final year and is delivering Building Repair
projects, Shopfront improvements and a Small Grant programme to historic
properties in Paisley Town Centre. The project is funded by the National Lottery
Heritage Fund (NLHF), Historic Environment Scotland (HES) and Renfrewshire
Council, with combined project funding of over £4.1 million, and additional
contributions from owners. The project is also delivering public realm
improvements with a successful programme of heritage related activities and
events now completed. NLHF and HES have agreed an extension to the project
completion date to the end of September 2023, to allow the completion of the final
projects and evaluation. 
9.2. Grant support for external repairs has been awarded to ten larger building repair
projects with eight projects completed, one project on site at 5 George Place and
works to the final project, 32 High St, (the former Liberal Club), due to commence
in January 2023. This has made a significant difference to the condition and
appearance of a number of prominent properties in Paisley Town Centre including:
2/3 County Place opposite Paisley Gilmour St, now restored and converted to flats;
20 New St (Viennas night club), 41 High St, (Right Way Credit Union offices), Sma
Shot Cottages, 9 Gilmour St (Walker Laird’s offices), 28 High St, 18 Georges Gate
and 10 Shuttle St. The works to 5 George Place are due to complete in February
2023. The external works to the Liberal Club are expected to complete by August
2023 and will greatly improve the condition and appearance of this prominent town
centre property.   
9.3. Shopfront Improvements grants have been awarded to eleven projects in the High
St with five projects completed at 30 High St (White Cart Company and Sinclair
Jewellers), 36 High St, (Shelter), 61 High St (Print and Copy it), 41 High St (Right
Way Credit Union) and 44 High St (Uptown Barbers). A further four projects are
programmed to start in the New Year. The TH.CARS2 project has also supported
a Small Grants programme mainly for traditional window repair projects in the
Town Centre. 
9.4. Public realm works have also been funded through the project with works
completed at George Place. Public Realm works to pavements opposite the High
St are currently on site. Works at Weighhouse Close are almost complete and
footpath works have also been carried out at Storie Street.  The High Street
pavement works have been a complex project with private basements below the
pavements and additional structural repairs required. However, the works will
make a significant difference to the quality of the public realm in this area and
support the improvements to the Museum.   
9.5. TH.CARS2’s community engagement programme of Heritage Education, Training
and Events has also now concluded. Comprising 42 projects, it has seen delivery
of 630 workshops and over 115 separate events. Over 2,500 participants, trainees
and volunteers have been engaged and estimated audiences of over 50,000
reached. More than 100 partners have been involved locally and nationally, and
over 150 job opportunities have been created for consultants and freelancers. 
Page 41 of 52

Page 46

Final projects included: ‘Paisley Pioneers’ a short film made with Pachedu,
exploring historical and contemporary stories of migration to and from
Renfrewshire; ‘Monumental’, a project with ReMode for International Women’s
Day 2022 in which participants worked with a costume designer to make
historically accurate costumes for significant women from Paisley’s past;   and a
paid work placement for a Renfrewshire 16 year old with a stone sub-contractor
at Paisley Museum who has recently progressed to a permanent job with a civil
engineering company. 
10. St James Playing Fields & Ferguslie Sports Centre 
10.1. These projects will work towards delivering Renfrewshire’s vision to ‘make sport
a way of life’. In 2018, Council approved the upgrading of changing facilities at
Ferguslie Sports Centre and for the demolition and replacement of the existing
pavilion at St James Playing Fields. When the Covid-19 pandemic hit, a decision
was made to put these projects on hold until such time that it was appropriate to
proceed. 
10.2. In July 2022, approval was given to resume the planning of the Ferguslie Sports
Centre upgrades. This work has now gathered pace with designs now agreed
and progressing through the appropriate stages. This work will completely
refurbish all existing changing facilities to the sports centre, bringing a greater
experience to the already well utilised facility. It is currently projected that
procurement for a contractor to complete these works can be completed and
presented to the August 2023 Finance, Resources and Customer Services Policy
Board for approval. This will then allow a contractor to complete the works during
the first half of 2024. 
10.3. With regards to St James Playing Fields, a design was previously approved for
the construction of a new pavilion to accommodate changing facilities for four
existing football pitches, with the aim of making this a desirable destination for
football bookings within Renfrewshire. The tender process unfortunately resulted
in only one bid being received and this was significantly over budget and
therefore not viable as no best value obligations could be met. The project team
are currently considering options to de-risk the tender in light of the current
market volatility and a new tender process will be conducted. It is envisaged that
following completion of redesign work in early 2023, and the development of
construction planning stages, this project can go back out to tender for a
contractor in the first half of 2023. 
11. Programme Community Benefits 
11.1. Across the cultural infrastructure programme, we have secured 207 community
benefit commitments of which 95 have been delivered. Benefits delivered include
new entrant jobs, modern apprenticeships and graduate roles at Paisley Museum
and Town Hall as well as supply chain development events and training.
Community Engagement has been delivered through training sessions, financial
donations and support from contractors and professional services for local social
enterprises and third sector organisations. Educational support has included site
visits, career events, specific have been supported through site visits, work
experience placements for school leavers, support with CVs and applications,
donations of PPE and support to secure CSCS cards. 
Page 42 of 52

Page 47

The contractors and design teams will continue working with the Council’s
community benefit forum to deliver the remaining benefits before completion of
the programme. 
12. Programme Marketing, Communications and Engagement 
12.1. With the significant capital investment being made across the cultural
programme, and the benefits this will bring to Renfrewshire, it is important that
marketing, communication, and engagement is delivered in a timely and effective
manner. To achieve this, the following activities are being delivered: 
12.2. A communications strategy has been developed by the Council’s marketing and
communication service and continues to inform key stakeholders about
construction progress and end-dates for the cultural programme. Public
communication is also taking place to notify on relevant progress for other
projects until such time that they progress further. 
12.3. Marketing, communication, and business engagement to support the reopening
and programming of the new cultural venues will be delivered by OneRen and is
expected to commence in early 2023. To supplement this process, a programme
of business engagement to drive town readiness for the scheduled reopening of
the venues will begin in January 2023. 
13. Operational Readiness 
13.1. For the four Paisley Town Centre cultural buildings (Paisley Town Hall, Paisley
Arts Centre, Paisley Learning & Cultural Hub, and Paisley Museum), a joint
operational readiness process is required between Renfrewshire Council and
OneRen. The Council will assist in the fit out of all furniture, fixtures and
equipment required to meet the operational needs of these buildings. It is
however, for OneRen to deliver a detailed operational readiness programme for
each of these buildings. Plans are currently under development and will be used
to define a managed and achievable opening schedule for the four buildings. 
13.2. This process of operational readiness will comprise of elements such as: 
 Furniture and equipment installation with some of the specific requirements
including: 
o Bespoke library equipment and shelving for the Learning & Cultural Hub.
o For the Town Hall and Arts Centre, the technical fit out of all theatre and
performance audio visual equipment.
o Finally, for the Museum, this will include the bespoke exhibition fit out. 
 ICT fit out including all devices, network access, staff and public Wi-fi. There are
also a number of new digital interactions being installed in particular in the
Learning & Cultural Hub and Museum. 
 Confirmation of operational procedures and policies.
 Recruitment and training of OneRen staff.
 Specific venue marketing and bookings. 
Page 43 of 52

Page 48

13.3. The operational readiness process for each venue requires time and resource to
ensure it is a success. The planning of this process is also the key component to
confirming exact opening dates. In early 2023, a detailed plan will be finalised
which will show the opening programme for each of the cultural venues in a
staggered way. Details of this opening programme, supplemented with
operational readiness information and a marketing plan by OneRen will be
brought to the next Economy and Regeneration Policy Board. 
_____________________________________________________________ 
Implications of the Report 
1. Financial – None. 
2. HR & Organisational Development – None. 
3. Community/Council Planning –  
 Our Renfrewshire is thriving – These projects will link our communities and
facilitate a significant increase in footfall to Paisley and surrounding areas. The
infrastructure will enable Renfrewshire to host world class performances and
attract new footfall from far beyond the local area. 
 Our Renfrewshire is well - The outputs of these projects will enable safe and
inspiring locations for all. From arts and performances to learning and
educational space, Renfrewshire will offer anyone the ability to engage and
take interest in either a new subject matter or an existing passion that is now
much more accessible. Driving world class performances to the area and
having 21st century work and education spaces will support people from
Renfrewshire to engage in beneficial activities that will in turn support
education and interest. 
 Reshaping our place, our economy and our future – These infrastructure
projects allow access to new and existing jobs for people in our communities.
Significant increase in footfall will benefit local businesses who can grow as a
result and in turn support their ongoing viability in the area. An increase in arts
and performances will allow a platform for Paisley becoming a cultural hub in
Scotland which can be used to drive new educational agendas with greater
access to this subject matter. 
 Tackling inequality, ensuring opportunities for all – A specific focus has been
applied to the redevelopment and construction of these projects to ensure
accessibility is a key feature. A significant amount of thought has gone into
making historic, and predominantly inaccessible buildings, available for
anyone to enjoy and utilise. There are no barriers to utilising any of these
buildings, and One Ren will continue to deliver an events programme that
caters for everyone including those in more deprived areas. 
 Creating a sustainable Renfrewshire for all to enjoy – With these buildings
being in the heart of Paisley Town centre, it means they are accessible by
train, on foot, or by bus thanks to the well-connected nature of the town centre. 
Page 44 of 52

Page 49

Limited town centre parking will force the use of public transport which will
work towards the net zero ambitions of the Council. Recently completed
infrastructure through AMIDS, including the shared cycle and walkway, also
enhances the connectivity, and in future years with the opening of the Clyde
Waterfront and Renfrew Riverside bridge, Paisley will become a vastly
accessible route by sustainable travel. 
 Working together to improve outcomes - Officers and contractors continue to
work closely with local businesses and a business engagement programme
will commence shortly to bring this to focus. Throughout the development of
these projects, several organisations were engaged to design the outputs
including accessibility groups, the Scottish Government, Historic Environment
Scotland, multiple private sector organisations and the local community. 
4. Legal – None. 
5. Property/Assets – Note the improvements being delivered to current assets. 
6. Information Technology – None. 
7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report because it is for noting only. If required following
implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website. 
8. Health & Safety – None. 
9. Procurement – all contracts are tendered in accordance with Council
procurement procedures and where relevant taken to FRCS Board for approval. 
10. Risk – Project specific and Programme level risk registers have been established
for all projects. These are kept under regular review and reported to the Council’s
internal City Deal and Infrastructure Programme Board. 
11. Privacy Impact – None. 
12. COSLA Policy Position – Not applicable. 
13. Climate Risk – these projects will significantly improve all mechanical, electrical
and plant systems within existing and new buildings affected. This, coupled with
improved efficiency in windows and doors will drive down the requirement for
heating, in turn lowering the carbon footprint from key council buildings. 
_________________________________________________________ 
Page 45 of 52

Page 50

List of Background Papers 
None.
__________________________________________________________________ 
Author: Barbara Walker, City Deal and Infrastructure Programme Director; Email
Barbara.walker@renfrewshire.gov.uk
Page 46 of 52

Page 51

___________________________________________________________________
To: Economy and Regeneration Policy Board
On: 24 January 2023
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Tourism Update
___________________________________________________________________
1. Summary
1.1 The Renfrewshire Visitor Plan concluded in 2021. There is now an opportunity
to develop a new Tourism Action Plan. 
1.2 Work has been carried out to consider the key strengths and opportunities of
the tourism sector. 
1.3 A series of key themes have been identified: Collaboration, Infrastructure, Rural
Renfrewshire, Paisley, Events, and Business Tourism. 
1.4 Work will continue in the development of these themes to deliver a new
industry-led Tourism Action Plan by March 2023.
___________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Board:- 
(i) Notes the work undertaken and progress to date in engaging industry and
key stakeholders around a series of key themes for progression. 
(ii) Notes the intent to develop a new Tourism Action Plan by March 2023
which will be led by a new tourism industry group, aligned to the Economic
Leadership Panel.
_________________________________________________________
3. Background 
3.1 The Renfrewshire Visitor Plan came to an end in 2021, with annual reports and
a final report previously submitted to the Leadership Board in December 2020. 
Item 5
EAR240123 Page 47 of 52

Page 52

This plan was produced within the context of a live bid for the ‘UK City of Culture
2021’. There is now an opportunity to refresh Renfrewshire’s approach to
supporting tourism in the context of an ‘action’ plan that sets out a number of
key themes. 
3.2  Investment in Paisley’s cultural infrastructure worth £113m will have a
significant impact on the visitor economy in the region, expanding
Renfrewshire’s tourism product and appeal significantly.  The region is also
home to a national gateway in the form of Glasgow International Airport. It is
vital that Renfrewshire builds on this success to support wider tourism
ambitions across the region. 
4. Strategic links 
4.1 Recently the Council have commissioned EKOS to provide an analysis of the
growth sectors in Renfrewshire, identifying future opportunities and providing
recommendations on which industry sectors should be prioritised and targeted
for future investment.  This research highlighted that tourism, hospitality and
the visitor economy should be a priority growth opportunity for Renfrewshire. 
Across the region there are assets that have yet to realise their full potential,
which in turn can unlock wider growth and investment.  The analysis highlighted
that there are opportunities to develop a positive impact on tourism image and
perception, create new jobs and increase visitor dwell time and spend.   
4.2 As a key identified growth sector there are opportunities to link outcomes and
drivers, and support investment. For example, Ingliston Country Club have just
launched their new £500,000 motorhome / RV park, the first in the county. This
not only opens a new market but also supports motorhome hire businesses in
Paisley by offering clients a first stop/last stop before arriving or leaving via
Glasgow Airport. 
4.3  There are also opportunities to build on the success of Future Paisley. The
ongoing partnership supporting Future Paisley has driven forward £113m
investment in cultural infrastructure revitalising key assets including Paisley
Museum, Paisley Town Hall, and Paisley Arts Centre. It is vital that the new
tourism action plan builds on this success, supporting these key assets and
linking to the ongoing events programme and wider regional opportunities.   
4.4 Renfrewshire Council has a strong partnership with VisitScotland, both at a
strategic level with the Regional Director as well as through the marketing
teams. This has enabled the Council in the past to determine the direction of
joint marketing campaigns with VisitScotland.  The Council has also been
successful in securing funding from VisitScotland for infrastructure
development around Castle Semple and RSPB Lochwinnoch within the last
three months. Through the development of the tourism action plan we will work
with VisitScotland to promote wider Renfrewshire assets and tourism
businesses. 
Page 48 of 52

Page 53

4.5 Renfrewshire Council are a member of the Scottish Tourism Alliance, who are
the coordinating body on the national tourism strategy, Tourism Outlook 2030.
The strategy sets out four key priorities that will be considered in developing
our tourism action plan: 
• Thriving places
• Memorable experiences
• Passionate People
• Diverse businesses 
5. Review of current position and future focus 
5.1 Business Pointer were appointed to undertake a review of the current position
of Renfrewshire’s tourism economy and support the development of the
Renfrewshire Tourism Action Plan. 
5.2 For phase one, Business Pointer undertook desk research and interviews with
key stakeholders as well as workshops and engagement with the Economic
Leadership Panel and wider industry. This resulted in a detailed report
identifying key areas for future focus as well as noting successes of the
previous Renfrewshire Visitor Plan. 
5.3 Successes included: 
 Increasing destination marketing to grow opportunities to see or hear
something positive about Renfrewshire, from a baseline of 15m per year in
2017 to 236m by 2019/20.
 Enhancing the visitor experience in Renfrewshire by building capacity and
developing a quality product – in particular the award-winning events
programme, with the Paisley Halloween Festival winning Best Cultural
Event or Festival at the national Scottish Thistle Awards in March 2020,
against the Edinburgh Festival Fringe. 
5.4 The report also identified numerous points of consensus around opportunities
for future direction:- 
 The importance of tourism to the region.
 Paisley as a driver to promote wider Renfrewshire, and also the opportunity
to capitalise on the £113m town centre investment.
 Incorporating the rural and outdoor activity assets of the region more
cohesively.  Our rural areas have “stunning potential” through countryside
and the regional parks, green spaces, sports, outdoor activities, the
Sustrans routes and long-distance walks and the villages.
 Castle Semple was identified as a key asset that could be a major regional
attraction in the future. Castle Semple, together with Paisley, has the
potential to create a regional destination offering urban and rural
experiences for the benefit of all our towns and villages.
 Build on the success of our existing events programme to heighten profile
and reputation.
Page 49 of 52

Page 54

 Build the green tourism agenda and incorporate the drive to Destination Net
Zero in our work with tourism businesses.
 An opportunity to further capitalise on the Glasgow city region through
engagement of the City Region Tourism Portfolio. The city region is a
significant target market, with over 3.5m people within a 1.5 hour drivetime
 There are opportunities to build on the linkages between Glasgow Airport
and the significant capital investment in key buildings. Specifically within the
conference market.
 It is crucial that our approach to tourism is driven by the industry, for the
industry. 
5.5 For phase two, engagement with external stakeholders and the industry via an
online survey and workshops resulted in the following thematic areas:- 
i) Collaboration 
 Public, private and third sectors working together to support tourism
across the region. 
 A desire for a tourism network that allows operators and organisations
to create potential partnerships and opportunities. 
ii) Infrastructure 
 Whilst the rail links were seen as positive assets there remain
opportunities around public transport and active travel provision
linking our key tourism destinations. 
iii) Rural Renfrewshire 
 Outdoor activities and the landscape have been highlighted as assets
that present a significant opportunity around product / experience
development and promotion. 
 Castle Semple and related activities and attractions offer a diverse
range of experience that complement the developments in Paisley. 
iv) Paisley 
 Continuing to build on the strengths of Paisley as a destination in its
own right, capitalising on its strong regional appeal, signposting to our
other regional destinations, assets and experiences. 
v) Events 
 Building on our fantastic programme of events to drive additional
visitor numbers and highlight further opportunities for the regeneration
of our communities. 
Page 50 of 52

Page 55

vi) Business tourism 
 Conferences, events and the corporate market are of importance to a
number of local organisations and operators and there is an
opportunity to grow this sector significantly across the region. 
6. Next steps 
6.1  Following the considerable work that has been undertaken, it is now proposed
that officers work with key industry stakeholders to build on the key themes and
develop a new tourism action plan by March 2023. This will enable the tourism
industry to build on the identified themes and priority actions. This will be
developed further through a series of workshops. Once complete the tourism
action plan will be brought to board for approval. 
___________________________________________________________________ 
Implications of the Report 
1. Financial – None.   
2. HR & Organisational Development – None. 
3. Community Planning – 
 Reshaping our place, our economy and our future: Renfrewshire Council is
working with stakeholders to maximise the opportunities for regeneration and
economic recovery/growth. 
 Building strong, safe and resilient communities: working in partnership with
local groups and organisations to achieve positive outcomes. 
4. Legal – None. 
5. Property/Assets - None. 
6. Information Technology – None. 
7. Equality and Human Rights - The Recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights. No
negative impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations contained in
the report. 
8. Health and Safety – None. 
9. Procurement – None. 
10. Risks - None. 
11. Privacy Impact – None.
Page 51 of 52

Page 56

12. Cosla Policy Position – Recognising Tourism Outlook 2030. 
13. Climate Risk - No identified impacts at present. 
Author: George Hunter, Chief Economic and Regeneration Officer 
george.hunter@renfrewshire.gov.uk Tel: 07483947410 
Page 52 of 52