5 - Levelling Up Fund Bid 2022 – Renfrew Community Hub

Renfrewshire Council · 14 June 2022
Back to Economy and Regeneration Policy Board — 14 June 2022 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

___________________________________________________________________ 
To: Economy and Regeneration Board 
On: 14 June 2022
___________________________________________________________________ 
Report by: Chief Executive and Director of Finance and Resources 
___________________________________________________________________ 
Heading: Levelling Up Fund 2022 – Renfrew Community Hub
___________________________________________________________________ 
1. Summary 
1.1 This report seeks approval to authorise the Chief Executive to submit an
application on behalf of the Council to the UK Government’s Levelling Up Fund
(LUF) to support the delivery of a new Community Hub within Renfrew,
focussed on  the Renfrew Victory Baths and former Police Chambers. The total
project costs  are estimated at £19.92m. Details of the proposal are set out
within this report. 
1.2 The Renfrew LUF bid application and strategic business case is not included
alongside the papers for this report, due to their scale and because the LUF is
a competitive process. However, the public consultation boards are available
to view at www.ironsidefarrar.com/renfrewluf/event.html#intro1 and members
can request to view a copy of the application in advance of the Board from the
report’s author. 
___________________________________________________________________ 
2. Recommendations 
2.1 The Board is asked to:- 
(i) Authorise the Chief Executive, in consultation with the Convenor, to make
any minor changes required following the Board meeting and submit a bid
to the UK Government’s Levelling Up Fund under the theme of
Regeneration and Town Centre investment, as outlined in this report, for
£17.92m of funding;

Page 2

(ii) To note that the draft final bid application and business case are available
to elected members for their review in advance of the Board meeting as
required, and in recognition of the tight timescales for their development, to
authorise the Chief Executive, in consultation with the Convenor, to make
any minor changes that may be necessary prior to submission to the UK
Government; 
(iii) To note and agree the requirement in submitting the bid for the Council to
commit to the provision of a local authority contribution as detailed in paras
5.7 and 5.8 of this report; 
(iv) To note the written support of Gavin Newlands MP, the constituency MP for
the area covered by the bid, in line with the bidding guidance; and the
support of a wide range of partners and the local Renfrew community as
detailed in paragraph 4.6; 
___________________________________________________________________ 
3. Background 
3.1. The Levelling Up Fund (LUF) was announced by the UK Government in 2020
to support investment in infrastructure and assets that improve everyday life
across the country.  The funds are targeted at high value, local investment
priorities including transport schemes, town centre regeneration and
cultural/heritage assets.   
3.2. In  2021 the Council were successful in securing £38.7m from the first round of
the fund, supporting delivery of the AMIDS South project in Paisley.  A report to
the Leadership Board on 1 December 2021 advised that officers were
considering additional proposals which could align with future calls for bids to
the fund.  The UK Government published a prospectus for the second round of
the LUF in March 2022, with a deadline of 6 July 2022 for submissions from
local authorities. 
4. Renfrew Community Hub Project 
4.1. Renfrewshire Council and its partners are delivering an ambitious regeneration
agenda focussed on positive, place based outcomes for Renfrewshire’s town
and villages centres.  Central to this approach is to advance the evolution of our
centres and to ensure that they can thrive as economic recovery from the
pandemic continues.   
4.2. In this context, officers considered a range of options in Renfrew for a bid to the
second round of LUF, concluding that the strongest opportunity lay with a focus
on the Victory Baths and the former Renfrew Police Chambers, in recognition
that both buildings need significant investment to secure their long-term legacy
and use.  A proposal has subsequently been developed for a new Community
Hub within Renfrew town centre.

Page 3

4.3. The proposals would return the former Renfrew Police Chambers back into use
and enhance facilities at Victory Baths. Potential options currently being
considered include:- 
 A swim centre, with enhanced pool facilities, spa, and wellness centre
 A dance, gymnastics and fitness centre for all ages and groups
 A relocated library and learning centre with digital facilities
 New community space across the hub 
4.4 A successful bid would address long term challenges of vacant and underused 
civic assets within the town, supporting their restoration, securing their long 
term legacy and acting as a catalyst for a wider transformation of Renfrew town 
centre as a modern, 21st century place which is central to the community. 
4.5 Significant work has been undertaken to support this ambitious proposal.  This
has involved working closely with key partners such as OneRen, the local
community and other stakeholders to inform the proposal and ensure a strong
case for intervention within the area.  To support the application a strategic
business case has been produced which provides the rationale for the proposal
as well as setting out formulation of options, economic benefits, costs, and
proposed timescales. 
Stakeholder Consultation 
4.6 Outcomes from the public consultation event informing the bid, which have
included online engagement and a public exhibition at Victory Baths between
23 May and 6 June 2022, demonstrate strong community support for the
proposals.  Letters of support for the proposal have been received by a range
of partners, including Renfrew Community Council and Renfrew Development
Trust. 
4.7 As part of the development of the project, officers undertook an initial
programme of consultation. This consultation took the form of an online survey
and a presentation day within the Victory Baths, at which officers were present
to answer questions with the community. The event and online consultations
generated 605 visits to the online portal, with 509 individual contacts and 235
feedback questionnaires completed and 35 written submissions. 
4.8 95% of respondents consider the proposals ‘positive’, with a further 71%
considering the project critical for Renfrew. 70% support the integration of the
library into the proposals, with 82% support for dance and gymnastics and a
further 90% supporting the pool restoration. 
4.9 In addition, 49 local Dance Schools have also been approached by email
questionnaire and a series of phone meetings are still underway. So far, 85%
feel there are ‘positive benefits and opportunities for a new dance facility”.
Respondents currently use a variety of spaces in the area and are mostly happy
with the quality and facilities. Regular classes usually receive between 30-100
participants per week, some are larger than that.

Page 4

4.10 One contributor suggested, “The extreme lack of venues that are willing to take
a booking for a dance performance show [is the main challenge]. Facilities that
are built new a few years ago were never designed to cater for dance schools
or performance shows even though older venues were demolished. Therefore,
schools are having to travel further afield and spend thousands of £ elsewhere
that isn’t benefiting their local community” 
4.11 Consultees from the community/professional dance sector have been very
positive regarding the benefits of having bespoke new spaces – “there is a
dearth of rehearsal spaces for companies in the greater Glasgow area”. All
have offered to help with advice or more direct usage if the project develops.
Some suggest the wellbeing element should be a key strategic driver, others
note the long history of community dance development in Renfrewshire and
see this as a natural next step, greatly enhancing the creative and cultural
infrastructure of the area. One saw it as an opportunity to brand the area as the
most culture-friendly area for young people in Scotland (along with PACE and
right2dance). 
5. Levelling Up Fund 
5.1 LUF is a competitive fund established by the UK Government, with funding
distributed to places across the UK on the basis of successful project selection.
The Fund has set aside at least £800 million across Scotland, Wales and
Northern Ireland over four years from 2021-2022 to 2024-2025. 
5.2 LUF aims to invest in local infrastructure that has a visible impact on people 
and their communities.  The Fund is jointly managed by HM Treasury (HMT), 
the Department for Levelling Up, Housing and Communities (DLUHC) and the 
Department for Transport (DfT). The funds are targeted at high value, local 
investment priorities under the themes of transport, town centre regeneration 
and cultural/heritage assets.   
5.3 A local authority can bid under one of the three themes and can be awarded up
to £20m per each MP constituency within the area, plus one transport bid which
may be up to £50m. The Council were successful in securing £38.7m from the
first round of the fund under the transport theme, supporting delivery of the
AMIDS South project in Paisley. 
Therefore, the Council would, optimally, have the ability to be successful with
one award in each of the two parliamentary constituencies that cover
Renfrewshire. 
5.4 The Renfrew Community Hub proposal is a bid under the Regeneration and
Town Centres theme of the LUF programme and closely aligns with the funding
requirement to upgrade vacant and underused buildings, regenerate sites and
bring public services and accessible community spaces into town centres. 
5.5 Members of Parliament, as democratically elected representatives, may choose
to endorse one bid they consider to be a priority within their constituency.

Page 5

Officers have discussed the proposal with Mr Gavin Newlands MP, who has
provided his priority written support to the Renfrew Community Hub bid.   
5.6 A successful application to LUF will provide £17.92m of funding for this project,
representing approximately 90% of the total estimated project costs.  The
Council require to confirm a commitment to provide the remaining 10% of
project costs (£2.0m) as part of the bid.   
5.7 The capital budget agreed at the Council meeting of 3 March 2022 identified
the commitment of £1m of existing town centre resources to Renfrew as part of
a wider package of investment across Renfrewshire’s town centres.  The
allocation within Renfrew is to support development of options for key sites and
buildings within the town centre such as the former Police Chambers.  It is
anticipated that this allocation will form part of the Council’s element of the
project costs for the LUF bid.   
5.8 If the bid is successful, it would be proposed that the Council would meet this
additional £1m contribution via prudential borrowing by the Council.  Owing to
the very long-life infrastructure assets being delivered, this would result in an
annual revenue budget commitment of approximately £0.05 million,
representing a relatively minor annual revenue commitment when set against
the overall level of potential investment. There would be a requirement for this
annual revenue commitment to be appropriately planned for and
accommodated within the Council’s future financial planning and budget
arrangements 
6. Next Steps 
6.1 Subject to Board approval, the LUF bid will be formally submitted to the UK
Government by the deadline of 6 July 2022.  In the event that the bid is
successful, proposals will be developed in further detail and reported to the
Economy and Regeneration Board as appropriate.   
6.2 In addition, officers will continue to consider proposals which could be
developed to align with future rounds of the Levelling Up fund.   
______________________________________________________________ 
Implications of the Report 
1. Financial – The financial implications arising from a successful bid are set out
in paragraph 5.7 and 5.8 of the report.   
2. HR & Organisational Development – None. 
3. Community Planning – 
Our Renfrewshire is Thriving – a successful bid will support restoration of key 
civic assets within the town, providing a catalyst for a  wider transformation of

Page 6

Renfrew town centre as a modern, 21st century place which is at the heart of 
the local community. 
Our Renfrewshire is Well – a successful bid will support the development of 
strong community based services that respond to local need. 
4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report.  If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the
Council’s website.    
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. COSLA Policy Position – None. 
13. Climate Change – If successful, the project will be designed to reduce carbon
demand through repurposing existing built assets, energy efficient building
specification, and reducing carbon usage by supporting active travel, reducing
car dependency, and promoting town centre facilities accessible by public
transport. 
________________________________________________________________ 
List of Background Papers 
(a)  Executive Summary – LUF Bid available on request
___________________________________________________________________ 
Author: George Hunter, Chief Economic and Regeneration Officer 
george.hunter@renfrewshire.gov.uk Tel: 07483947410