PUBLIC
___________________________________________________________________
To: Economy and Regeneration Policy Board
On: 20 January 2026
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Buildings at Risk Register (BARR) Update Report
___________________________________________________________________
1. Summary
1.1 The purpose of this report is to update members on the status of the Buildings
at Risk Register (BARR) and its relevance to buildings in Renfrewshire. The
BARR is currently paused pending evaluation; however, progress is being
made to secure the future of many heritage buildings in Renfrewshire that are
currently deemed at risk.
___________________________________________________________________
2. Recommendations
2.1 It is recommended that the Board:
(i) Notes the status of Renfrewshire’s BARR-listed buildings, including those
that remain ‘at risk,’ are under restoration, have been demolished, or have
active or recently approved planning applications for development.
(ii) Notes officer progress on the previous BARR listings within Renfrewshire
Council’s ownership.
_________________________________________________________
3. Background
3.1 The Historic Environment Scotland (HES) Buildings at Risk Register (BARR)
remains paused, pending consideration of the five options outlined in the last
update report presented to the Economy and Regeneration Policy Board on 18
March 2025. Members should note that, as the BARR is no longer being
updated, it cannot be relied upon as an accurate representation of building
status. Over time, it will become increasingly outdated until an alternative
system is adopted.

Page 2

PUBLIC
3.2
3.3
In the interim, Council officers have continued to use the BARR to monitor
Renfrewshire’s heritage buildings until HES decides on next steps for the
register.  Officers have maintained dialogue with HES regarding its future;
however, no further information on the preferred option has been released to
date.
As the BARR has been paused for some time, there have been no new
additions (or removals). Spiersfield House and the former Chivas Building are
two potential entries which would have likely been nominated for BARR
inclusion - due to their known condition and vacancy. Officers have included
them within the entries contained at Appendix A and will incorporate these
entries into reporting in the next update. Should the BARR be reactivated prior
to the next board report, officers would seek to nominate these buildings with
HES for inclusion.
_________________________________________________________
4. Renfrewshire’s Buildings at Risk Summary
4.1 Table 1 below provides a summary of the BARR by location, category, condition
and ownership. A more detailed summary of the status of Renfrewshire
buildings listed on BARR can be found in Appendix A of this report.
4.2 Two listings recommended for removal from the BARR (Former TA building in
Paisley and K6 Phonebox in Lochwinnoch) in the last update to Board have
now been removed from the update table.
Table 1: Summary of Renfrewshire BARR
4.3 It is important to note that of Renfrewshire’s BARR listings, 23 out of the 25
listings are privately owned. Only two properties - Kelvin House/Forbes Place
(former council social work offices) and the former Renfrew Police Station are
within Renfrewshire Council’s ownership. The latter is held as part of the
Renfrew Common Good Fund. Both have remained vacant for several years.
BARR listings within Renfrewshire Council’s ownership
4.4 Kelvin House and Forbes Place were marketed for sale in November 2024.
Despite a robust marketing campaign, no credible offers were received for the
property. This reflects the number of site constraints and the market’s
perception of its development value.

Page 3

PUBLIC
4.5 Officers instructed structural surveys of the buildings in late 2025 to support the
commissioning of a conservation-accredited architect. The architect is currently
appraising the site, and a report outlining potential development options is
expected in February 2026 for the Council’s consideration. It is hoped that this
appraisal and the proposed options will provide sufficient information to guide
an appropriate way forward for the site. The current intention is to report the
outcome of this analysis to the March 2026 Board cycle.
4.6 Renfrew Police Station was granted listed building consent in November 2024
for the demolition of the cells to the rear of the building as well as the removal
of rotten wood at the front of the building. Asbestos removal is currently
underway on site. 
Timber strip-out will commence early in the new year, and demolition of the
cells is expected early summer 2026, depending on the number of surveys
required. It is hoped that these works will make the building a more viable option
for refurbishment / development.
BARR listings in private ownership
4.7 Since the last update to the Board in March, three BARR listings ringfenced for
demolition—Leethland House (Elderslie), St Joseph’s Missionary College
(Lochwinnoch), and the partial demolition of the RAI main building (Paisley)—
remain in situ pending implementation of approved planning applications.
4.8 Since obtaining planning consents, work is awaited on the conversion of St
Joseph’s Missionary College Chapel (Lochwinnoch) into retirement flats, 44
High Street (Paisley) into flats, and Lochwinnoch Parish Church into a village
community hub. Furthermore, planning permission was granted for the
conversion of Priory Park on Main Road, Paisley, to form 17 flats, which has
not yet commenced.
_________________________________________________________
5. Assessment and Next Steps
5.1 A major challenge in addressing Renfrewshire’s BARR listings is that only two
are owned by Renfrewshire Council or Renfrew Common Good Fund, while the
vast majority are privately owned - some by multiple separate owners.
5.2 For privately owned buildings showing a poor state of repair in their external
appearance, officers have the following options in contacting the owner (if
known):
1. Informally ask the owner to consider maintenance to improve the
appearance.
2. Serve an Amenity Notice [authority delegated to officers] to the owner
of the building (if details known).
3. Compulsory purchase of the property - in practice this is a very length
process and is often the last resort.
5.3 As previously reported, the Council have continued to take positive steps to
influence change:

Page 4

PUBLIC
• Non-domestic rates relief previously offered to listed buildings has been
significantly reduced  by Renfrewshire Council (in 2023) from 100% to 10%
with an aim of stimulating market activity.
o Following agreement on a Council motion in December 2025, a
formal assessment of the effectiveness of non-domestic rates relief
will be carried out  Officers will carry out this assessment in 2026 and
report back to Board findings at a later date.
• Facilitating grants for historically important properties in the villages through
the Historic Buildings in Villages Grants Scheme, which supports numerous
owners in restoring and preserving listed buildings.
• There is also scope for owners of listed buildings to benefit from the new
Town Centre Regeneration Fund (an update on which was reported to the
Board on 20 May 2025). This fund will be promoted in the new year with the
aim of stimulating stalled projects.
• Continuing dialogue with private owners to stimulate development, including
site visits to understand future plans for important buildings and how the
Council can assist.
5.4 Officers will continue to engage with private owners to encourage positive
development, respond to potential grant opportunities as they arise, maintain
and preserve Renfrewshire’s historical assets, and monitor the BARR and all
of Renfrewshire’s listed buildings to ensure accuracy. Officers will also provide
timely reports to the relevant Council Boards.
_________________________________________________________________
Implications of the Report
1. Financial.  – None at present. Monitoring and engagement costs are met from
existing budgets.
2. HR & Organisational Development – None.
3. Community Planning –
• Our Renfrewshire is thriving / Reshaping our place, our economy and our
future – Restoration on buildings listed on the BARR supports significant
investment in Renfrewshire.
4. Legal – None.
5. Property/Assets – None.
6. Information Technology – None.
7. Equality & Human Rights - The Recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights.
No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the

Page 5

PUBLIC
recommendations contained in the report.  If required following implementation,
the actual impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be published
on the Council’s website.  
8. Health & Safety – None.
9. Procurement – None.
10. Risk – None.
11. Privacy Impact – None
.
12. Climate Risk – None.
13. Children’s Rights – None.
14. Cosla Policy Position – None.
________________________________________________________________
List of Background Papers
(a) Investment criteria for Renfrewshire Town Centre Regeneration Fund,
Economy and Regeneration Policy Board, 20 May 2025
(b) Built Heritage – Buildings at Risk Register (BARR) Update, Economy and
Regeneration Policy Board,18 March 2025
(c) Listed Buildings and Built Heritage; Communities, Housing and Planning
Board, 17 August 2021
___________________________________________________________________
Author: Euan Shearer, Regeneration and Place Manager

Page 6

OFFICIAL#
# Settlement Settlement Cat. of
Listing Ownership Condition Category
of Risk BARR Status RC Opinion Development Status Action
1 Mannequins II (Former), 13, Old Sneddon
Street
Paisley N/A Private Poor Low REST. REST. Phase 1 works complete. Seeking funding for next phase. Retain as REST.
2 11 Lawn Street Paisley N/A Private Fair Low AT RISK AT RISK No recent planning activity and further degradation. Retain as AT RISK
3 Old Paisley Fire Station, 10-14, Gordon Street Paisley B Private Fair Low REST. REST. Development started with internal works, sandstone restoration
to outside and new windows. Development now stalled.
Retain as REST.
4 1  High Street Paisley B Private Fair Low AT RISK AT RISK No recent planning or development activity Retain as AT RISK
5 18, High Street Paisley B Private Fair Low REST. REST. Recent planning activity for internal alterations to groundfloor
and shopfront.
Retain as REST.
6 20, High Street Paisley B Private Fair Low AT RISK AT RISK No recent planning activity or evidence or development to upper
floors.
Retain as AT RISK
7 44 High Street Paisley N/A Private Fair Moderate AT RISK AT RISK Recent planning consent acquired for conversion to five flats. Retain as AT RISK.
Change to REST on
start of works8 44 Causeyside Street Paisley N/A Private Fair Moderate REST. REST. Façade renovations completed in October 2023. Building
warrant for interior fit out approved July 24.
Retain as REST.
Remove on completion
of works9 13 Moss Street Paisley Paisley N/A Private Fair Low AT RISK REST. Ground floor commercial completed,  units occupied. Consents
acquired for upper floor conversion to residential.
Change to REST.
10 Kelvin House, 15-17 Marshall's Lane Paisley C RC Poor High AT RISK AT RISK Recently remarketed for sale. The Council is currently working
with a conservation architect to consider options for the site.
Retain as AT RISK
11 Paisley Coats Girls Club (Former), 27,
Ferguslie
Paisley B Private Poor Low REST. REST. Planning approved for residential conversion. Works started. Retain as REST.
12 Royal Alexandra Infirmary: Main Building,
Calside
Paisley B Private Poor High AT RISK REST. Planning and building warrant approved for partial demolition
and conversion to residential. Some works have been
undertaken - demolition of entrance building (not listed) and
some site clearance albeit works appears to have halted again.
Changed to REST. Due
to commencement of
works.
13 Dykebar Hospital Superintendant's House
(Former)
Paisley B Private Ruinous Moderate AT RISK AT RISK No recent planning or development activity. Retain as AT RISK
14 Hawkhead House Farm Steading, Ben Alder
Drive
Paisley B Private Very poor High AT RISK AT RISK No recent planning or development activity. Retain as AT RISK
15 Hawkhead House Farmhouse, Ben Alder Drive Paisley C Private Poor Moderate AT RISK AT RISK No recent planning or development activity. Retain as AT RISK
16 Priory Park, 21 Main Road, Paisley Paisley N/A Private Fair Low AT RISK AT RISK Recently attained consents for conversion to form 17 flats with
associated parking and landscaping. Currently being marketed
with consents.
Retain as AT RISK.
Change to REST on
start of works
17 Sanctuary House, 8, Stanely Road, Paisley Paisley B Private Poor Moderate AT RISK REST. Some works carried out to shore up the building. Change to REST.
18 Leethland House, Glenpatrick Road Elderslie N/A Private Ruinous High AT RISK AT RISK Recent consents attained for the demolition of Leethland House
and replacement dwelling subject to conditions.
Retain as AT RISK and
remove following
demolition.
19 Kilbarchan Old Parish Church, Church Street Kilbarchan B Private Fair Low AT RISK REST. Works underway including new window repairs, replacement
and recent planning application for solar panels.
Change to REST.
20 St Joseph's Missionary College (Former):
Chapel, Kilbirnie Road
Lochwinnoch C Private Poor Moderate AT RISK AT RISK Recent planning permission attained for conversion of the formal
chapel to form 5 retirement flats (part of 30 on wider site).
Retain as AT RISK.
Change to REST on
start of works21 St Joseph‘s Missionary College (Former):
Dormitory Building, Kilbirnie Road
Lochwinnoch C Private Poor Moderate AT RISK AT RISK Planning and listed building was recently granted for the
redevelopment of the site. If implemented, former dormitory
building would be demolished to make way for a walled garden
relating to the development of retirement flats on wider site.
Retain as AT RISK.
Remove following
demolition.
22 Calderhaugh House Stables, Main Street Lochwinnoch B Private Fair Low AT RISK AT RISK No recent planning or development activity. Retain as AT RISK
23 Lochwinnoch Parish Church, Church Street Lochwinnoch A Private Fair Moderate AT RISK AT RISK Local community recently received two grants to assist with
purchase, building restoration and conversion to community hub.
Nocurrent development activity.
Retain as AT RISK.
Change to REST on
start of works.
24 Renfrew Police Station (Former), Inchinnan
Road,
Renfrew B RC Fair Low AT RISK AT RISK Recent listed building consent approved for demolition of cells
and clearance or dry rot. Asbestos removal on site. Timber strip
starts in new year. Demolition will  be sometime after May
dependant on required wildlife surveys .
Retain as AT RISK
25 Renfrew Equitable Cooperative Society, 24,
High Street,
Renfrew B Private Poor Low AT RISK AT RISK No recent planning or development activity. Retain as AT RISK
# Speirsfield House, Stevenson Street Paisley B Private Poor High N/A AT RISK Recently granted LBC consent for demolition. Retain as AT RISK
# Chivas Building, Renfrew Road Paisley C RC Poor High N/A AT RISK Currently being marketed for sale Retain as AT RISK