Democracy Spraffa

Investment criteria for Town Centre Regeneration Fund 20 05 25- AM reviewed

Renfrewshire Council · 20 May 2025
Back to Economy and Regeneration Policy Board — 20 May 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

___________________________________________________________________
To:  Economy and Regeneration Policy Board 
On:  20 May 2025
___________________________________________________________________
Report by: Chief Executive 
___________________________________________________________________
Heading: Investment criteria for Renfrewshire Town Centre Regeneration
Fund
___________________________________________________________________
1. Summary 
1.1 The Renfrewshire Council budget for 2025/26 has allocated £0.5 million to
help unlock further regeneration in town centres, specifically targeting
projects where the redevelopment of significant local buildings or sites has
stalled. 
1.2 This report sets out the investment criteria for the fund and outlines the types
of projects it is intended to support.
___________________________________________________________________ 
2. Recommendations
2.1 It is recommended that the Board: 
(i) Approves the investment criteria for the £0.5m grant funding aimed at
town centre regeneration. 
_________________________________________________________
3. Background
3.1  At the Council meeting on 27th of February 2025, the Council committed
£0.5m to unlock town centre regeneration proposals where market
conditions and other circumstances are such that the redevelopment of
significant buildings or sites are currently stalled; with the criteria for
investment being the subject of a future report to the Economy and
Regeneration Policy Board. This paper sets out the proposed criteria for
funding bids.

Page 2

___________________________________________________________________
4. Investment Criteria  
4.1 The redevelopment of significant buildings or sites can stall for various
reasons, often due to a combination of financial, planning, technical and
social factors. These may include a lack of funding to secure necessary
investment, cost overruns resulting from rising construction expenses, the
complexities of working with older buildings and refurbishing them in
accordance with current building regulations, and economic downturns or
shifts in demand that impact a project’s viability. Regulatory challenges—
such as obtaining planning consent, particularly whilst maintaining the
integrity of historic or listed buildings—can also present significant barriers to
development.
4.2 The £0.5 million Council fund will be used by officers as a catalyst to unlock
regeneration activity that is currently stalled due to viability or investment
gaps. The Council is seeking opportunities to work collaboratively with
owners of vacant, underused or derelict properties across Renfrewshire’s
town centres to bring them back into viable use. It is hoped that the grant
funding will boost private sector confidence and leverage additional
investment by demonstrating the Council’s proactive role.
4.3 The following set of key criteria for investment is being proposed to guide
how the grant funding will be administered:
Eligibility of Property
• The property must be located within a town centre.
• Eligible properties include those that are currently either vacant,
underused, or derelict.
• The property must be of strategic importance, the assessment of which
will include heritage value, scale, visibility, or potential to stimulate wider
regeneration and growth.
Nature of the redevelopment proposal
• Any proposal must aim to bring the property back into viable and
productive use.
• Acceptable end uses may include commercial, cultural, community,
residential, or mixed-use developments, subject to compliance with
planning policies.
• Projects that preserve or sensitively adapt heritage or listed structures
will be prioritised.
Demonstratable Market Failure
• Potential grant recipients must provide clear evidence of market failure
which has prevented redevelopment to date. 
• Evidence should also be provided outlining the actions taken to date to
try and bring the building back into reuse.

Page 3

• Owners should demonstrate that, without public sector intervention, the
project would not proceed due to a funding gap or issues affecting
commercial viability.
Leverage and Additionality
• Preference will be given to projects that can demonstrate:
o Match funding or co-investment from the private sector or other public
sources.
o A clear ability to attract additional economic activity or investment as a
result of the intervention.
Eligible Costs
• The grant funding can be used for a variety of costs, including:
Capital works
o Essential structural repairs to make the building safe or usable
o Roof repairs or replacement
o External fabric repairs, including windows, masonry, and façades
o Internal adaptations or refurbishments to enable new use
Heritage and Conservation Works
o Restoration of historically significant architectural features
o Works required to comply with conservation or listed building
consent
o Sensitive adaptations to allow modern use while retaining heritage
value
Enabling Works
o Site clearance or demolition of non-heritage structures
o Temporary works to stabilise or secure a building
o Asbestos removal or remediation of contaminated land
Accessibility and Compliance
o Improvements to meet building regulations (e.g. fire safety,
accessibility, energy efficiency)
o Installation of ramps, lifts, or accessible toilets
Project Management and Oversight
o Reasonable project management or contract administration costs

Page 4

Ineligible Costs
• Acquisition of land or property
• Marketing and promotional costs
• General maintenance not linked to redevelopment
• VAT (unless it is non-recoverable)
• Feasibility studies and option appraisals
• Professional fees (e.g. architect, engineer, surveyor, planning consultant)
• Planning application and other statutory consent fees
• Building surveys and site investigations (e.g. structural, ecological, or
contamination assessments)
Deliverability and Readiness
• Grant recipients must demonstrate that they have a deliverable project,
including detailed designs which are fully costed.  
• A robust delivery plan and timeline must be provided which is realistic
and capable of commencing within 12 months of grant award.
• Grant recipients must demonstrate planning status (e.g., permission
granted or initial discussions held with planning officers on acceptability
of proposals).
• Before any grant funding is released, a project delivery team must be in
place including main contractor, project manager etc.
Community and Economic Impact
• Proposals should demonstrate how they will:
o Contribute to local economic growth (e.g., job creation, increased
footfall).
o Enhance the vitality and attractiveness of the town centre or local
area.
o Align with local regeneration strategies and community priorities.
Ownership and Legal Status
• Grant recipients must have legal ownership of the property or site, or a
long-term leasehold interest (minimum 10 years).
• There must be no outstanding legal disputes or encumbrances that would
delay redevelopment.
Value for Money
• Clear explanation of how the grant will be used, including a detailed
breakdown of costs which will be covered by the grant

Page 5

• Evidence that the amount requested is proportionate to the overall costs
and impact.
• Grants will typically not exceed a certain percentage of the total project
cost (e.g., 30–50%), match funding is expected.  
___________________________________________________________________ 
5. Next Steps 
5.1  Officers will carry out a review of each town centre to produce a list of priority
target buildings. They will then engage with property owners to discuss their
regeneration plans and assess whether these align with the investment
criteria of the fund. Where alignment is identified, officers will conduct further
engagement to determine the level of grant funding required and assess
whether it represents best value for money for the fund.
5.2 Progress on the grant will be reported back to the Board on a rolling basis,
with an update on the projects which have been funded.
________________________________________________________________
Implications of the Report
1. Financial – £0.5m has been allocated as part of the approved budget
motion at the Council meeting of 27 February 2025 
2. HR & Organisational Development – None 
3. Community/Council Planning –  
• Our Renfrewshire is thriving – The project supports development which
will protect and enhance the built heritage of Renfrewshire’s town
centres, contributing to the creation of thriving places which support
individuals, communities, and businesses. 
• Reshaping our place, our economy and our future – The project will
help support the restoration and productive re-use of landmark
buildings in Renfrewshire’s town centres, improving the built
environment, helping to create job opportunities and contribute to
economic growth. 
4. Legal – None 
5. Property/Assets – None 
6. Information Technology – None  
7. Equality & Human Rights - The Recommendations contained within this
report have been assessed in relation to their impact on equalities and
human rights. No negative impacts on equality groups or potential for
infringement of individuals’ human rights have been identified arising from
the recommendations contained in the report.  If required following
implementation, the actual impact of the recommendations and the

Page 6

mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website. 
8. Health & Safety – None 
9. Procurement –  None
10. Risk – None 
11. Privacy Impact – None 
12. Climate Risk – Potential projects identified in this report will encourage
sustainable neighbourhoods, sustainable links and enhancements to
greenspace 
13. Children’s Rights – None
14. Cosla Policy Position – None 
_______________________________________________________
List of Background Papers 
(a) Council Budget as agreed at Full Meeting of Renfrewshire Council; 27
February 2025 
__________________________________________________________________ 
Author: Euan Shearer; Regeneration and Place Manager
Email: euan.shearer@renfrewshire.gov.uk