Page 1

___________________________________________________________________
To:  Economy and Regeneration Board 
On:  18 March 2025
___________________________________________________________________
Report by: Chief Executive 
___________________________________________________________________
Heading: Town Centre Regeneration – Update 
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to update members on the delivery of projects
supporting town centre regeneration across Renfrewshire and to set out
emerging projects being developed over 2025.  
___________________________________________________________________ 
2. Recommendations
2.1 It is recommended that the Board:-  
(i) Notes progress and continuing actions to deliver town centre
regeneration projects across Renfrewshire.
_________________________________________________________
3. Background
3.1  Town centres play a vital role across Renfrewshire, offering a variety of
distinctive places with mixed uses, supporting economic activity, and serving
as hubs for community and social interactions.
3.2  The Renfrewshire Local Development Plan 2021 identifies a network of
centres, with strategies in place for Paisley, Renfrew, Johnstone, Erskine,
and Linwood. These strategies outline actions to help centres evolve into
diverse, thriving places that meet the needs of local communities.
___________________________________________________________________

Page 2

4. Town Centre Regeneration
4.1 Work has progressed in recent months on several projects supporting the
regeneration of town centres across Renfrewshire. These projects align with
centre strategies and include actions to repurpose underused land and
properties, enhance public realm, create new greenspaces, and deliver
activities that help drive footfall, such as heritage trails.
Erskine  
4.2 A review of the Erskine Centre Strategy in early 2024 identified the
opportunity for enhancements to underused land and public realm within the
town centre and riverfront.  The Economy and Regeneration Policy Board of
19 March 2024 noted that external funding from the Scottish Government
Place Based Investment Programme would support the development of a
landscape framework and future delivery of enhancements.  
4.3 A framework was produced over late 2024, informed by consultation with
local members, key stakeholders and the local community.  The framework
(see Appendix 1 of this report) sets out a series of short, medium and long
term measures, including a civic plaza, a new ‘linear park’ and the reimaging
of land adjacent to the River Clyde as recreational greenspace. 
4.4 Informed by the outcomes of consultation, development of a new civic plaza
and garden space within the town centre is identified within the framework as
the initial ‘early win’ project.  Detailed designs are being progressed in this
context and will be subject to further engagement, supporting delivery in late
2025.  
Johnstone 
4.5 The Economy and Regeneration Policy Board of 28 May 2024 approved the
Johnstone Vision Framework Adopted_Johnstone_Vision.pdf.  Developed with
the local community, the framework guides a place vision which supports the
future transformation and growth of Johnstone town centre.  
4.6 The Board noted opportunities to deliver a small number of project ideas
within the Vision as ‘early wins’.  Good progress has been made in relation
to each of these actions, including:- 
• Early feasibility of proposed enhancements at the civic squares has
been progressed.  This has identified opportunities to enhance the
role and function of the squares, their accessibility and connections to
the wider town centre, as well as improvements in relation to
landscaping, lighting and street furniture.  Concept designs are now
being developed and will be subject to consultation with local
members, key stakeholders and the local community later in 2025.   
• Specialist consultants have recently been appointed to consider
opportunities to enhance Johnstone Town Hall.  The study recognises
that the role of the Town Hall has evolved post pandemic and will
consider the potential for new and refreshed uses which support the
building in its role as a focus for civic and cultural activities.

Page 3

• Work to reflect opportunities which celebrate the history of Johnstone
will commence in spring 2025.  This is anticipated to focus on
development of a heritage trail, co-produced with local community
groups, which helps to strengthen local identity and supports footfall
within the town centre.     
Linwood 
4.7 Following a review of the Linwood Town Centre strategy, work is being
progressed to prepare a landscape framework for enhancements within the
Linwood Lade area, immediately south of the town centre (see Appendix 2 to
this report).   
4.8 The framework is anticipated to focus on biodiversity, footpath and heritage
enhancements within the Lade, as well as connections to the town centre
and the wider active travel network.  A key aim of the framework is to
enhance the Lade area for informal recreation while supporting the town
centre as a sustainable and thriving place.   
4.9 Initial proposals are anticipated in spring 2025 and will be the subject of
consultation with local members, key stakeholders and the local community,
informing next steps and detailed designs. 
Paisley 
4.10 In recent years Paisley town centre has benefitted from a series of place
strategies driving forward regeneration, including the UK City of Culture bid,
PaisleyUntoldStory.pdf and a 2030 Vision Paisley Vision Document.  
4.11 Funding unlocked by these strategies has supported investment in many of
the town’s key cultural attractions, including the refurbishment of Paisley
Town Hall and Paisley Arts Centre, construction of the new Paisley Central
Library and the ongoing transformation of Paisley Museum.  
4.12 To support this investment, work is underway to develop a refreshed
wayfinding strategy for the town centre, helping visitors and pedestrians
easily navigate key venues, public spaces, and travel connections. The
strategy’s outcomes will be shaped by consultation with local members, key
stakeholders, and communities, providing a series of costed options to
inform future funding considerations for implementation.
4.13 Work is also progressing to support Paisley West and Central Community
Council in relation to the development of a walking trail which explores the
heritage of the Oakshaw area of the town centre.  The trail, which is
anticipated to comprise of both a physical document and being available as
a free digital resource on a walking app, celebrates the heritage of this part
of Paisley and generates footfall, supporting the local economy and the town
centre as a destination.
4.14 In addition to supporting regeneration of the town centre, the trail will support
delivery of Renfrewshire’s Tourism Plan 2024-27, which sets out actions to
support Paisley as a tourist destination.   
4.15 Finally, Paisley town centre has been supported by the TH/CARS
(Townscape Heritage/Conservation Area Regeneration Scheme) project.

Page 4

This regeneration initiative was aimed at preserving and enhancing historic
fabric within the town centre.  It has seen millions of pounds of investment
into historic building restoration, public realm improvements and community
engagement and skills training.  
Renfrew 
4.16 The Planning and Climate Change Policy Board approved the retrospective
demolition of the Category B listed Brown Institute on 27 August 2024,
recognising it as a regrettable loss to Renfrew’s heritage.
4.17 Despite this loss, the Board acknowledged opportunities for redevelopment
to benefit the wider community. Consideration was given to architectural
salvage and plans to honour the building’s legacy in the site's future use.
4.18 In this context, work is being progressed to consider a landscape solution for
the site and the development of a garden space which reflects the heritage
of the building and supports wider community activity within the town centre. 
Initial designs developed for the site include opportunities for a space which
provides for community events with seating and a wildlife area, supporting
biodiversity in the heart of the town centre.   
4.19 Several architectural elements were salvaged from the building, including
red sandstone, a cupola, carved panel stonework, and plaques. It is
anticipated that some of these elements will be incorporated into the design
of the new garden space, ensuring the site's heritage is preserved.
4.20 Designs will be subject to consultation with local members, key stakeholders,
and the local community, with delivery expected in late 2025.
4.21 Officers are also seeking funding for a series of essential repair and
maintenance works at the former police station in Renfrew. This includes the
removal of rot and asbestos from the building, as well as the demolition of
the former cells and offices at the rear. These works are necessary for
safety, future development, and to prevent further deterioration. The ultimate
goal is to find a viable and sustainable use for the building to secure its
future.
___________________________________________________________________ 
5. Funding and Next Steps 
5.1  The Council meeting on 3 March 2022 approved an investment package for
town and village centres across Renfrewshire to support their ongoing
regeneration. This included £1m for Renfrew, £0.5m for Johnstone, and
£0.3m for Erskine. It is anticipated that this funding will support the delivery of
the projects outlined above in these centres.
5.2 For Paisley and Linwood, opportunities will be explored to identify appropriate
funding sources to enable the delivery of ongoing projects.
5.3 Progress on project delivery will be reported back to the Board on a rolling
basis, with future projects brought forward for the Board’s consideration in due
course.

Page 5

________________________________________________________________
Implications of the Report
1. Financial – Projects within Renfrew, Johnstone and Erskine centres will be
funded/part funded from the allocation agreed at the Council meeting of 3
March 2022.  External sources of funding may be required to deliver some of
these projects.  Funding opportunities will continue to be explored for
delivery of projects within Paisley and Linwood. 
2. HR & Organisational Development – None 
3. Community/Council Planning –  
Creating a sustainable Renfrewshire for all to enjoy – The projects
identified within this report will support the empowerment of local
communities to become more involved in shaping their places. 
4. Legal – None 
5. Property/Assets – None 
6. Information Technology – None  
7. Equality & Human Rights - The Recommendations contained within this
report have been assessed in relation to their impact on equalities and
human rights. No negative impacts on equality groups or potential for
infringement of individuals’ human rights have been identified arising from
the recommendations contained in the report.  If required following
implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website. 
8. Health & Safety – None 
9. Procurement –  None
10. Risk – None 
11. Privacy Impact – None 
12. Climate Risk – Projects identified in this report will encourage sustainable
neighbourhoods, sustainable links and enhancements to greenspace 
13. Children’s Rights – None
14. Cosla Policy Position – None 
_______________________________________________________
List of Background Papers 
(a) Planning application 24/0362/LB – Demolition of the Brown Institute,
Renfrew (retrospective), Planning and Climate Change Policy Board, 27
August 2024

Page 6

(b) Johnstone Vision Framework – Economy and Regeneration Policy
Board, 28 May 2024 
(c) Regeneration Funding Bids Update 2024 – Economy and Regeneration
Policy Board, 19 March 2024 
(d) Revenue Budget 2022/23 - Council Meeting, 3 March 2022 
Appendices 
1. Erskine Town Centre Enhancements – Framework Summary 
2. Linwood Lade Framework – Location Plan 
___________________________________________________________________ 
ES
06/03/2025 
Author: Euan Shearer, Regeneration and Place Manager
euan.shearer@renfrewshire.gov.uk 
Tel: 07483 136235

Page 7

framework summary
Erskine Town Centre Enhancements
v.1:  08/01/2025
Appendix 1

Page 8

Erskine Town Centre Enhancements
0
Contents
1. Introduction ............................................................................ 1
2. Site Appraisal .......................................................................... 2
Context & Location .................................................................. 2
Site Features ........................................................................... 2
Key Principles ......................................................................... 3
3. Landscape Framework ............................................................ 4
Key Projects and Features........................................................ 5
Civic Plaza & Garden ............................................................... 6
Destination Play ...................................................................... 8
Linear Park ............................................................................ 10
Gateways ............................................................................. 12
4. Next Steps ............................................................................ 14 
Erskine Town Centre Enhancements
0
Contents
1. Introduction ............................................................................ 1
2. Site Appraisal .......................................................................... 2
Context & Location .................................................................. 2
Site Features ........................................................................... 2
Key Principles ......................................................................... 3
3. Landscape Framework ............................................................ 4
Key Projects and Features........................................................ 5
Civic Plaza & Garden ............................................................... 6
Destination Play ...................................................................... 8
Linear Park ............................................................................ 10
Gateways ............................................................................. 12
4. Next Steps ............................................................................ 14 
Erskine Town Centre Enhancements
0
Contents
1. Introduction ............................................................................ 1
2. Site Appraisal .......................................................................... 2
Context & Location .................................................................. 2
Site Features ........................................................................... 2
Key Principles ......................................................................... 3
3. Landscape Framework ............................................................ 4
Key Projects and Features........................................................ 5
Civic Plaza & Garden ............................................................... 6
Destination Play ...................................................................... 8
Linear Park ............................................................................ 10
Gateways ............................................................................. 12
4. Next Steps ............................................................................ 14   
Erskine Town Centre Enhancements
0
Contents
1. Introduction ............................................................................ 1
2. Site Appraisal .......................................................................... 2
Context & Location .................................................................. 2
Site Features ........................................................................... 2
Key Principles ......................................................................... 3
3. Landscape Framework ............................................................ 4
Key Projects and Features........................................................ 5
Civic Plaza & Garden ............................................................... 6
Destination Play ...................................................................... 8
Linear Park ............................................................................ 10
Gateways ............................................................................. 12
4. Next Steps ............................................................................ 14

Page 9

were appointed in 
epare a landscape 
ports a review of  
tre Strategy for 
aim of re imagining
and enhancing   
the town centre 
Erskine Town Centre Enhancements 
Ironside Farrar were appointed in
Spring 2024 to prepare a landscape 
The framework supports a review of
the existing Centre Strategy for
Erskine, with the aim of re imagining
underused land and enhancing
public spaces within the town centre 
1. IInnttrroodduuccttiioonn 
Ironside Farrar were appointed in
Spring 2024 to prepare a landscape 
The framework supports a review of
the existing Centre Strategy for
Erskine, with the aim of re imagining
underused land and enhancing
public spaces within the town centre 
Ironside Farrar were appointed in Spring 2024
to prepare a landscape framework for Erskine
Town Centre.
The framework supports a review of the existing
Centre Strategy for Erskine, with the aim of re-
imagining underused land and enhancing public
spaces within the town centre and Riverfront.
Informed by consultation with the local community
and key stakeholders, the framework sets out
short, medium and long term enhancements as
a basis for future development, funding bids
and delivery.

Page 10

Erskine Town Centre Enhancements 
SSiittee  AApppprraaiissaall 
&&   
Located between the main residential areas of the town and
the River Clyde, an accessible focal point for residents and
visitors 
Supported by a retail centre and key amenities such as a
swimmng pool, library, Sports Hall and doctor's surgery
which provide a civic focus 
Benefits from established networks of pathways, many of
which are segregated from traffic. 
Bus Interchange provides public transport hub and ongoing
connections both within the town and surrounding 
Offers opportunities to enhance connectivity, support local
businesses, and strengthen the town’s identity as a 
SSiittee  FFeeaattuurreess 
Located adjacent to green network resources such as
Newshot Island Nature Reserve and Boden Boo Community
Woodland, with opportunities for recreation. 
Surrounded by mature trees, which contribute to a green,
natural outlook and potential biodiversity enhancements. 
Located adjacent to green network resources such as
Newshot Island Nature Reserve and Boden Boo Community
Woodland, with opportunities for recreation. 
Offers potential for elevated views of the surrounding
landscape, enhancing its visual appeal. 
Range of underused sites provide opportunities for recreation               
SSiittee  AApppprraaiissaall 
&&   
Located between the main residential areas of the town and
the River Clyde, an accessible focal point for residents and
visitors 
Supported by a retail centre and key amenities such as a
swimmng pool, library, Sports Hall and doctor's surgery
which provide a civic focus 
Benefits from established networks of pathways, many of
which are segregated from traffic. 
Bus Interchange provides public transport hub and ongoing
connections both within the town and surrounding 
Offers opportunities to enhance connectivity, support local
businesses, and strengthen the town’s identity as a 
SSiittee  FFeeaattuurreess 
Located adjacent to green network resources such as
Newshot Island Nature Reserve and Boden Boo Community
Woodland, with opportunities for recreation. 
Surrounded by mature trees, which contribute to a green,
natural outlook and potential biodiversity enhancements. 
Located adjacent to green network resources such as
Newshot Island Nature Reserve and Boden Boo Community
Woodland, with opportunities for recreation. 
Offers potential for elevated views of the surrounding
landscape, enhancing its visual appeal. 
Range of underused sites provide opportunities for recreation               
SSiittee  AApppprraaiissaall 
&&   
Located between the main residential areas of the town and
the River Clyde, an accessible focal point for residents and
visitors 
Supported by a retail centre and key amenities such as a
swimmng pool, library, Sports Hall and doctor's surgery
which provide a civic focus 
Benefits from established networks of pathways, many of
which are segregated from traffic. 
Bus Interchange provides public transport hub and ongoing
connections both within the town and surrounding 
Offers opportunities to enhance connectivity, support local
businesses, and strengthen the town’s identity as a 
SSiittee  FFeeaattuurreess 
Located adjacent to green network resources such as
Newshot Island Nature Reserve and Boden Boo Community
Woodland, with opportunities for recreation. 
Surrounded by mature trees, which contribute to a green,
natural outlook and potential biodiversity enhancements. 
Located adjacent to green network resources such as
Newshot Island Nature Reserve and Boden Boo Community
Woodland, with opportunities for recreation. 
Offers potential for elevated views of the surrounding
landscape, enhancing its visual appeal. 
Range of underused sites provide opportunities for recreation               
2. SSiittee  AApppprraaiissaall 
CCoonntteexxtt  &&  LLooccaattiioonn 
Located between the main residential areas of the town and
the River Clyde, an accessible focal point for residents and
visitors 
Supported by a retail centre and key amenities such as a
swimmng pool, library, Sports Hall and doctor's surgery
which provide a civic focus 
Benefits from established networks of pathways, many of
which are segregated from traffic. 
Bus Interchange provides public transport hub and ongoing
connections both within the town and surrounding 
Offers opportunities to enhance connectivity, support local
businesses, and strengthen the town’s identity as a 
SSiittee  FFeeaattuurreess 
Located adjacent to green network resources such as
Newshot Island Nature Reserve and Boden Boo Community
Woodland, with opportunities for recreation. 
Surrounded by mature trees, which contribute to a green,
natural outlook and potential biodiversity enhancements. 
Located adjacent to green network resources such as
Newshot Island Nature Reserve and Boden Boo Community
Woodland, with opportunities for recreation. 
Offers potential for elevated views of the surrounding
landscape, enhancing its visual appeal. 
Range of underused sites provide opportunities for recreation               
SSiittee  AApppprraaiissaall 
&&   
Located between the main residential areas of the town and
the River Clyde, an accessible focal point for residents and
visitors 
Supported by a retail centre and key amenities such as a
swimmng pool, library, Sports Hall and doctor's surgery
which provide a civic focus 
Benefits from established networks of pathways, many of
which are segregated from traffic. 
Bus Interchange provides public transport hub and ongoing
connections both within the town and surrounding 
Offers opportunities to enhance connectivity, support local
businesses, and strengthen the town’s identity as a 
SSiittee  FFeeaattuurreess 
Located adjacent to green network resources such as
Newshot Island Nature Reserve and Boden Boo Community
Woodland, with opportunities for recreation. 
Surrounded by mature trees, which contribute to a green,
natural outlook and potential biodiversity enhancements. 
Located adjacent to green network resources such as
Newshot Island Nature Reserve and Boden Boo Community
Woodland, with opportunities for recreation. 
Offers potential for elevated views of the surrounding
landscape, enhancing its visual appeal. 
Range of underused sites provide opportunities for recreation
Located between the main residential areas of the town and
the River Clyde, an accessible focal point for residents and
visitors.
Supported by a retail centre and key amenities such as a
swimming pool, library, Sports Hall and doctor’s surgery
which provide a civic focus.
Benefits from established networks of pathways, many of
which are segregated from traffic.
Bus Interchange provides public transport hub and
ongoing connections both within the town and surrounding
settlements.
Offers opportunities to enhance connectivity, support
local businesses, and strengthen the town’s identity as a
community hub.
Located adjacent to green network resources such as
Newshot Island Nature Reserve and Boden Boo Community
Woodland, with opportunities for recreation.
Surrounded by mature trees, which contribute to a green,
natural outlook and potential biodiversity enhancements.
Offers potential for elevated views of the surrounding
landscape, enhancing its visual appeal.
Range of underused sites provide opportunities for recreation
and civic space supporting activities within the town centre.

Page 11

Erskine Town Centre Enhancements
3
KKeeyy  PPrriinncciipplleess 
Theme Framework Proposal
RRoollee  Enhance town centre environment
as a destination/place to visit.
✓ Introduce play, leisure, recreation, other outdoor activities
IIddeennttiittyy  Development of new civic and green spaces.
✓ Develop civic space for community activities
✓ Create greenspace, with play/seating etc
SSeennssee  ooff  PPllaaccee  Develop a well-connected accessible public realm network.
✓ Connect to river
✓ Integrate with greenspace
✓ Signal entrances and arrival
✓ Enhance pedestrian and cycle movement
GGrreeeennssppaaccee  &&  BBiiooddiivveerrssiittyy  Better integrate greenspace into town centre, enhancing biodiversity
✓ Introduce elements of play/ leisure and recreation to increase value & use
✓ Develop role of greenspace in climate mitigation and habitat creation
The table below sets out key issues and how proposals have been developed in response.
Erskine Town Centre Enhancements
3
KKeeyy  PPrriinncciipplleess 
Theme Framework Proposal
RRoollee  Enhance town centre environment
as a destination/place to visit.
✓ Introduce play, leisure, recreation, other outdoor activities
IIddeennttiittyy  Development of new civic and green spaces.
✓ Develop civic space for community activities
✓ Create greenspace, with play/seating etc
SSeennssee  ooff  PPllaaccee  Develop a well-connected accessible public realm network.
✓ Connect to river
✓ Integrate with greenspace
✓ Signal entrances and arrival
✓ Enhance pedestrian and cycle movement
GGrreeeennssppaaccee  &&  BBiiooddiivveerrssiittyy  Better integrate greenspace into town centre, enhancing biodiversity
✓ Introduce elements of play/ leisure and recreation to increase value & use
✓ Develop role of greenspace in climate mitigation and habitat creation
Erskine Town Centre Enhancements
3
KKeeyy  PPrriinncciipplleess 
Theme Framework Proposal
RRoollee  Enhance town centre environment
as a destination/place to visit.
✓ Introduce play, leisure, recreation, other outdoor activities
IIddeennttiittyy  Development of new civic and green spaces.
✓ Develop civic space for community activities
✓ Create greenspace, with play/seating etc
SSeennssee  ooff  PPllaaccee  Develop a well-connected accessible public realm network.
✓ Connect to river
✓ Integrate with greenspace
✓ Signal entrances and arrival
✓ Enhance pedestrian and cycle movement
GGrreeeennssppaaccee  &&  BBiiooddiivveerrssiittyy  Better integrate greenspace into town centre, enhancing biodiversity
✓ Introduce elements of play/ leisure and recreation to increase value & use
✓ Develop role of greenspace in climate mitigation and habitat creation

Page 12

4
LLaannddssccaappee 
A refreshed town centre framework sets out a long term plan to guide the future of Erskine as a diverse, sustainable and thri
Erskine Town Centre Enhancements 
3.LLaannddssccaappee  FFrraammeewwoorrkk
A refreshed town centre framework sets out a long term plan to guide the future of Erskine as a diverse, sustainable and thriving place.

Page 13

Erskine Town Centre Enhancements
5
KKeeyy  PPrroojjeeccttss  aanndd  FFeeaattuurreess 
Four key projects have been identified to underpin delivery of the framework and are set out below.  The projects align with the key principles and reflect the outcomes of
consultation with the local community.
- Civic Plaza:
A new civic space which provides a focal point for the
local community and supports a range of uses,
including events, markets or simply a place to meet and
relax.
- Destination Play:
A destination area for play within the town, offering a
unique family attraction for the local community and
those in surrounding areas, drawing visitors and
supporting footfall within the wider town centre.
- Linear Park:
A new greenspace which enhances connections
between the town centre and the Riverfront, supporting
positive reuse of vacant land within the town centre.
- Gateways:
Improvements to key town centre arrival points and
travel connections.

Page 14

Civic Plaza & Garden
Location: Vacant space at entrance to Erskine Sports Centre
Project Overview: Creation of a plaza and garden to create a multi-functional
civic space which can offer a location for recreation or a place
to meet and gather.
Key Features: Key features would offer a multifunctional civic plaza, with the
flexibility to accommodate events or to simply provide a place
to meet and gather; whilst providing town centre public realm
which strengthens the town centre role and identity 
Area for markets & place to host events, markets, and
gatherings. 
Focal point for community interaction
Flexible and designed to accommodate multiple uses year-
round 
Encourage public engagement
Meeting and Rest Area – a place to pause and gather
Civic Purpose – a focal point for formal civic events &
celebrations
Framework
Context:
Provides a usable civic space which Erskine does not presently
have 
Offers opportunity to develop crossings of Kilpatrick Dr, to
better connect the town centre to the riverside
Offers opportunity to develop stronger path connection
between retail area of the town centre and the sports centre
with improved public realm
Potential synergy with emerging community led plans for a
garden area within the town centre, as well as footfall from 
Community  Outcomes from consultation indicated community views that
Erskine lacks a Civic Space for events and that the project 
ace at entrance to Erskine Sports Centre  
plaza and garden to create a multi
which can offer a location for recreation or a place   
gather.   
would offer a , with the 
accommodate events or to simply provide a place  
gather; whilst providing town centre public realm
thens the town centre role and identity 
markets, and      
designed to accommodate 
ublic engagement   
a focal point for formal civic events & 
sable civic space which Erskine ot presently   
rtunity to develop crossings of Kilpatrick Dr, to 
ct the town centre to the riverside 
ortunity to develop stronger path connection 
tail area of the town centre and the sports centre 
d public realm
nergy with emerging community led plans for a
within the town centre, as well as footfall from 
from consultation indicated community views that
s a Civic Space for events and that the project 
Civic 
Vacant space at entrance to Erskine Sports Centre
Project Overview: Creation of a plaza and garden to create a multi
civic space which can offer a location for recreation or a place
to meet and gather. 
Key features would offer a , with the
flexibility to accommodate events or to simply provide a place
to meet and gather; whilst providing town centre public realm
which strengthens the town centre role and identity 
markets, and
gatherings. 
and designed to accommodate 
round 
ncourage public engagement   
a focal point for formal civic events & 
Context:
Provides a usable civic space which Erskine ot presently  
Addresses key underused site within the town centre
Offers opportunity to develop crossings of Kilpatrick Dr, to
better connect the town centre to the riverside
Offers opportunity to develop stronger path connection
between retail area of the town centre and the sports centre
with improved public realm
Potential synergy with emerging community led plans for a
garden area within the town centre, as well as footfall from 
Community  Outcomes from consultation indicated community views that
Erskine lacks a Civic Space for events and that the project 
Erskine Town Centre Enhancements 
Civic 
Vacant space at entrance to Erskine Sports Centre
Project Overview: Creation of a plaza and garden to create a multi
civic space which can offer a location for recreation or a place
to meet and gather. 
Key features would offer a , with the
flexibility to accommodate events or to simply provide a place
to meet and gather; whilst providing town centre public realm
which strengthens the town centre role and identity 
markets, and
gatherings. 
and designed to accommodate 
round 
ncourage public engagement   
a focal point for formal civic events & 
Context:
Provides a usable civic space which Erskine ot presently   
Offers opportunity to develop crossings of Kilpatrick Dr, to
better connect the town centre to the riverside
Offers opportunity to develop stronger path connection
between retail area of the town centre and the sports centre
with improved public realm
Potential synergy with emerging community led plans for a
garden area within the town centre, as well as footfall from 
Community  Outcomes from consultation indicated community views that
Erskine lacks a Civic Space for events and that the project 
Civic 
Vacant space at entrance to Erskine Sports Centre
Project Overview: Creation of a plaza and garden to create a multi
civic space which can offer a location for recreation or a place
to meet and gather. 
Key features would offer a , with the
flexibility to accommodate events or to simply provide a place
to meet and gather; whilst providing town centre public realm
which strengthens the town centre role and identity 
markets, and
gatherings. 
and designed to accommodate 
round 
ncourage public engagement   
a focal point for formal civic events & 
Context:
Provides a usable civic space which Erskine ot presently   
Offers opportunity to develop crossings of Kilpatrick Dr, to
better connect the town centre to the riverside
Offers opportunity to develop stronger path connection
between retail area of the town centre and the sports centre
with improved public realm
Potential synergy with emerging community led plans for a
garden area within the town centre, as well as footfall from
Sports Hall.
Community
response:
Outcomes from consultation indicated community views that
Erskine lacks a Civic Space for events and that the project
would be strongly supported.
Civic Plaza & GardenCivic Plaza & GardenCivic Plaza & Garden

Page 15

Civic Plaza & GardenCivic Plaza & GardenCivic Plaza & Garden

Page 16

Erskine Town Centre Enhancements
8
Destination Play
Location: Possible locations within town centre identified to provide
synergy with and support existing facilities such as the Sports
Hall.
Project Overview: A destination scale play area could assist in expanding the
variety of uses within the town centre, supporting footfall and
drawing visitors from the local community and beyond.   
Priority: Medium-long term
Key Features: Key features of a destination-scale natural play area could
include:
Natural Climbing Structures – Boulder walls, tree trunks, and
rope nets inspired by local landscape (e.g. NNR).
Interactive Trails – Winding paths with sensory stations,
textures, and natural obstacles for open-ended play.
Sand and Mud Play – Areas for building, digging, and
experimenting with earth materials.
Wildlife Observation Points – Hides and stations to safely
observe local flora and fauna.
Art and Discovery Areas – Spaces for creative activities using
natural and found objects.
Quiet Reflection Zones – Sheltered, quiet nooks to rest or
reflect, blending play with tranquillity.
Native Plant Gardens – Integrating local plant species for
environmental education and natural beauty.
Framework
Context:
Town centre destination with role in creating footfall
Potential connection to the leisure centre / co-location with a
‘hub’, potentially served by a café and toilets would strengthen
the overall proposal
Sustainability &
Innovation
Nature and biodiversity-oriented play offers a distinctive play
experience with potential to enhance biodiversity, promote
learning, exploration, and engagement with the natural
environment and sustainability  
Community
response:
Outcomes from consultation indicated a desire for additional
play facilities and a destination use within the town centre.
Erskine Town Centre Enhancements
8
Destination Play
Location: Possible locations within town centre identified to provide
synergy with and support existing facilities such as the Sports
Hall.
Project Overview: A destination scale play area could assist in expanding the
variety of uses within the town centre, supporting footfall and
drawing visitors from the local community and beyond.   
Priority: Medium-long term
Key Features: Key features of a destination-scale natural play area could
include:
Natural Climbing Structures – Boulder walls, tree trunks, and
rope nets inspired by local landscape (e.g. NNR).
Interactive Trails – Winding paths with sensory stations,
textures, and natural obstacles for open-ended play.
Sand and Mud Play – Areas for building, digging, and
experimenting with earth materials.
Wildlife Observation Points – Hides and stations to safely
observe local flora and fauna.
Art and Discovery Areas – Spaces for creative activities using
natural and found objects.
Quiet Reflection Zones – Sheltered, quiet nooks to rest or
reflect, blending play with tranquillity.
Native Plant Gardens – Integrating local plant species for
environmental education and natural beauty.
Framework
Context:
Town centre destination with role in creating footfall
Potential connection to the leisure centre / co-location with a
‘hub’, potentially served by a café and toilets would strengthen
the overall proposal
Sustainability &
Innovation
Nature and biodiversity-oriented play offers a distinctive play
experience with potential to enhance biodiversity, promote
learning, exploration, and engagement with the natural
environment and sustainability  
Community
response:
Outcomes from consultation indicated a desire for additional
play facilities and a destination use within the town centre.
Erskine Town Centre Enhancements
8
Destination Play
Location: Possible locations within town centre identified to provide
synergy with and support existing facilities such as the Sports
Hall.
Project Overview: A destination scale play area could assist in expanding the
variety of uses within the town centre, supporting footfall and
drawing visitors from the local community and beyond.   
Priority: Medium-long term
Key Features: Key features of a destination-scale natural play area could
include:
Natural Climbing Structures – Boulder walls, tree trunks, and
rope nets inspired by local landscape (e.g. NNR).
Interactive Trails – Winding paths with sensory stations,
textures, and natural obstacles for open-ended play.
Sand and Mud Play – Areas for building, digging, and
experimenting with earth materials.
Wildlife Observation Points – Hides and stations to safely
observe local flora and fauna.
Art and Discovery Areas – Spaces for creative activities using
natural and found objects.
Quiet Reflection Zones – Sheltered, quiet nooks to rest or
reflect, blending play with tranquillity.
Native Plant Gardens – Integrating local plant species for
environmental education and natural beauty.
Framework
Context:
Town centre destination with role in creating footfall
Potential connection to the leisure centre / co-location with a
‘hub’, potentially served by a café and toilets would strengthen
the overall proposal
Sustainability &
Innovation
Nature and biodiversity-oriented play offers a distinctive play
experience with potential to enhance biodiversity, promote
learning, exploration, and engagement with the natural
environment and sustainability  
Community
response:
Outcomes from consultation indicated a desire for additional
play facilities and a destination use within the town centre.
Erskine Town Centre Enhancements
8
Destination Play
Location: Possible locations within town centre identified to provide
synergy with and support existing facilities such as the Sports
Hall.
Project Overview: A destination scale play area could assist in expanding the
variety of uses within the town centre, supporting footfall and
drawing visitors from the local community and beyond.   
Priority: Medium-long term
Key Features: Key features of a destination-scale natural play area could
include:
Natural Climbing Structures – Boulder walls, tree trunks, and
rope nets inspired by local landscape (e.g. NNR).
Interactive Trails – Winding paths with sensory stations,
textures, and natural obstacles for open-ended play.
Sand and Mud Play – Areas for building, digging, and
experimenting with earth materials.
Wildlife Observation Points – Hides and stations to safely
observe local flora and fauna.
Art and Discovery Areas – Spaces for creative activities using
natural and found objects.
Quiet Reflection Zones – Sheltered, quiet nooks to rest or
reflect, blending play with tranquillity.
Native Plant Gardens – Integrating local plant species for
environmental education and natural beauty.
Framework
Context:
Town centre destination with role in creating footfall
Potential connection to the leisure centre / co-location with a
‘hub’, potentially served by a café and toilets would strengthen
the overall proposal
Sustainability &
Innovation
Nature and biodiversity-oriented play offers a distinctive play
experience with potential to enhance biodiversity, promote
learning, exploration, and engagement with the natural
environment and sustainability  
Community
response:
Outcomes from consultation indicated a desire for additional
play facilities and a destination use within the town centre.
Destination PlayDestination PlayDestination Play

Page 17

Destination PlayDestination Play

Page 18

Erskine Town Centre Enhancements
10
Linear Park
Location: Vacant sites adjacent to Kilpatrick Drive at the western edge of
the town centre.  Site extends towards the River Clyde, with
potential to help in addressing the level differences between
the upper and lower parts of the town centre.
Project Overview: Reuse of vacant land to create a new park area, enhancing town
centre connectivity and providing greenspace while preserving
future development potential. The space could include new
pathways with stronger connections to the riverfront, planting
to enhance biodiversity and opportunities for informal play.
Priority: Medium-long term
Key Features: Pathway Network – Accessible, well-lit walkways or active
travel paths that connect the town centre, nearby areas, and
the river.
Green Landscaping – Combination of formal and low-
maintenance planting using native species for safe and
attractive open spaces, low costs and increased biodiversity.
Seating and Gathering Spaces – Benches, tables, and small
gathering areas for community use.
Multi-use Open Spaces – Flexible spaces for community
events, markets, natural play, or picnics.
Rain Gardens and Bio-swales – Sustainable drainage features
to manage stormwater while adding greenery.
Future Development Buffers – Designated zones that
preserve options for future development or expansion.
Framework
Context:
Link which helps to address level differences and enhances
connections between the upper and lower parts of the town
centre, towards the riverfront.
Greenspace which provides place for recreation, supports
biodiversity and is safe and attractive 
Enhances underused sites to provide an attractive setting
ahead of future development
Sustainability &
Innovation
By supporting diverse species and integrating sustainable
technologies, the project promotes a healthy ecosystem and
showcases environmentally conscious urban design.
Community
response:
Outcomes from consultation indicated that the principles of
the project were supported, but there was significant concern
over long term maintenance of a new greenspace area. These
concerns will require to be addressed as further detailed
proposals are developed. 
Linear Park Linear Park Linear Park

Page 19

Linear Park Linear Park Linear Park

Page 20

Erskine Town Centre Enhancements
12
Gateways
Location: Arrival points and connecting spaces within the town centre.
Project Overview: Improvements to key town centre arrival points and travel
connections to support an enhanced sense of arrival into the
town centre and improve links to key town centre destinations.
3 Gateway Projects have been explored 
Site Area: Gateway A: 150²
Gateway B: 150²
Gateway C: 600²
Key Features: Circulation Space improved links to key destinations
Street Furniture enhanced signage, seating and public art
Arrival Points landscaping to support enhanced sense of
arrival into the town centre
Framework
Context:
Enable arrival at key destinations in the town centre
Support crossing of busy road 
Promote walking, cycling & wheeling 
Build connection between important town centre destinations
(including key projects in this framework) 
Sustainability &
Innovation
Support, and makes more appealing, options for walking,
wheeling or cycling into the town centre, through strengthened
routes into the town centre, improved bus stance area and
enhanced public realm. 
Community
response:
Outcomes from consultation indicated a view that
enhancements to gateways into the town centre and
connections would be supported. The need to support public
transport, particularly the bus interchange was also
highlighted.
GatewaysGatewaysGateways
Erskine Town Centre Enhancements
12
Gateways
Location: Arrival points and connecting spaces within the town centre.
Project Overview: Improvements to key town centre arrival points and travel
connections to support an enhanced sense of arrival into the
town centre and improve links to key town centre destinations.
3 Gateway Projects have been explored 
Site Area: Gateway A: 150²
Gateway B: 150²
Gateway C: 600²
Key Features: Circulation Space improved links to key destinations
Street Furniture enhanced signage, seating and public art
Arrival Points landscaping to support enhanced sense of
arrival into the town centre
Framework
Context:
Enable arrival at key destinations in the town centre
Support crossing of busy road 
Promote walking, cycling & wheeling 
Build connection between important town centre destinations
(including key projects in this framework) 
Sustainability &
Innovation
Support, and makes more appealing, options for walking,
wheeling or cycling into the town centre, through strengthened
routes into the town centre, improved bus stance area and
enhanced public realm. 
Community
response:
Outcomes from consultation indicated a view that
enhancements to gateways into the town centre and
connections would be supported. The need to support public
transport, particularly the bus interchange was also
highlighted.
Erskine Town Centre Enhancements
13

Page 21

Erskine Town Centre Enhancements 
nd travel 
al into the     
ns    
sense of         
stinations   
lking,     
a and   
iew that
ntre and  
ort  
was also 
arrival into the town centre
Context:
Enable arrival at key destinations in the town centre
upport crossing of busy road 
Promote walking, cycling & wheeling 
Build connection between important town centre destinations
(including key projects in this framework) 
options for walking,
wheeling or cycling into the town centre, through 
routes into the town centre, improved bus stance area and
enhanced public realm. 
Community  Outcomes from consultation indicated a view that
enhancements to gateways into the town centre and 
The need to support
transport, particularly the bus interchange was also 
GatewaysGatewaysGateways

Page 22

Erskine Town Centre Enhancements
14
4.NNeexxtt  SStteeppss
The outcomes of this study provide a framework for the delivery of actions and physical interventions which support a range of landscape and public realm
enhancements within Erskine Town Centre, supporting delivery of the Centre Strategy for the town. 
The approach is based around the reactivation and reuse of areas of underused land within the town centre, enhancing connections to wider greenspaces
and the River Clyde, supporting the development of a stronger identity and sense of place. 
The phasing and delivery of proposals should be seen as flexible in response to funding opportunities and community aspirations.
Outcomes from consultation have indicated that community aspirations centre on the Civic Square project and this is anticipated to be the focus of the
next stages of work.
Erskine Town Centre Enhancements
14
4.NNeexxtt  SStteeppss
The outcomes of this study provide a framework for the delivery of actions and physical interventions which support a range of landscape and public realm
enhancements within Erskine Town Centre, supporting delivery of the Centre Strategy for the town. 
The approach is based around the reactivation and reuse of areas of underused land within the town centre, enhancing connections to wider greenspaces
and the River Clyde, supporting the development of a stronger identity and sense of place. 
The phasing and delivery of proposals should be seen as flexible in response to funding opportunities and community aspirations.
Outcomes from consultation have indicated that community aspirations centre on the Civic Square project and this is anticipated to be the focus of the
next stages of work.
The outcomes of this study provide a framework for the delivery of actions and physical interventions which support a range of landscape and
public realm enhancements within Erskine Town Centre, supporting delivery of the Centre Strategy for the town.
The approach is based around the reactivation and reuse of areas of underused land within the town centre, enhancing connections to wider
greenspaces and the River Clyde, supporting the development of a stronger identity and sense of place.
The phasing and delivery of proposals should be seen as flexible in response to funding opportunities and community aspirations.
Outcomes from consultation have indicated that community aspirations centre on the Civic Square project and this is anticipated to be the focus
of the next stages of work.

Page 23

0

Page 24

Renfrewshire Council,
1:15,000
Author:
Ordnance Survey Mapping - © Crown Copyright and database right 2023. All rights reserved. Ordnance Survey Licence number 100023417.
Aerial Photography 2009 - Cities Revealed ® copyright by The Geoinformation ® Group, 2009 and Crown Copyright © All rights reserved.
Aerial Photography 2004/6 - © 2004 Getmapping plc © 2006 Getmapping plc
Aerial Photography 2001 - Cities Revealed ® copyright by The Geoinformation ® Group, 2009 and Crown Copyright © All rights reserved.
Historic Map Data - © Crown Copyright and Landmark Information Group Limited 2012. All rights reserved.
I
%Title%
Date: 13/07/2023%Author%
Notes:
%Notes%
Plan 2  -  Linwood Town Centre
Linwood Lade Enhancements
Ordnance Survey Mapping - © Crown Copyright and database right 2024. All rights reserved. Ordnance Survey Licence number 100023417
Foodstore
Retail
Unit
Tweedie Hall
Health Centre
Linwood Lades
Black Cart Water
Bridge Street
Napier Street
Hart Street
Key Themes
Enhance Greenspace
Enhanced Public Realm
Improve Core Path Connections
Core Path
Linwood Town Centre: C1
Enhanced Greenspace A761
Appendix 2