31/10/2024 
Notice of Meeting and Agenda
Economy and Regeneration Policy Board 
Date Time Venue
Tuesday, 05 November
2024
10:00 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN               
Membership 
Councillor Andy Steel (Convener):     Councillor Michelle Campbell (Depute Convener):    
Councillor Alison  Ann-Dowling:  Councillor Stephen Burns:  Councillor Graeme Clark:  Councillor
Andy Doig:  Councillor Neill Graham:  Councillor Robert Innes:  Councillor Janis McDonald: 
Councillor Jamie McGuire:  Councillor Marie McGurk:  Councillor Iain McMillan:  Councillor John
McNaughtan:  Councillor Iain Nicolson:  Councillor Jim Paterson:   
Further Information
This is a meeting which is open to members of the public. 
A copy of the agenda and reports for this meeting will be available for inspection prior to the
meeting at the Customer Service Centre, Renfrewshire House, Cotton Street, Paisley and online
at http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx
For further information, please email
democratic-services@renfrewshire.gov.uk 
Members of the Press and Public
Members of the press and public wishing to attend the meeting should report to the customer
service centre where they will be met and directed to the meeting. 
Hybrid Meeting
Please note that this meeting is scheduled to be held in the Council Chambers.  However, it is a
hybrid meeting and arrangements have been made for members to join the meeting remotely
should they wish.
MARK CONAGHAN
Head of Corporate Governance

Page 2

31/10/2024 
Webcasting of Meeting
This meeting will be filmed for live or subsequent broadcast via the Council’s internet site – at
the start of the meeting the Convener will confirm if all or part of the meeting is being filmed.  To
find the webcast please navigate to 
https://renfrewshire.public-i.tv/core/portal/home

Page 3

31/10/2024 
Items of business      
Apologies
Apologies from members. 
Declarations of Interest and Transparency Statements
Members are asked to declare an interest or make a transparency
statement in any item(s) on the agenda and to provide a brief
explanation of the nature of the interest or the transparency statement. 
1 Revenue and Capital Budget Monitoring 2024/25 at 13
September 2024
Joint report by Chief Executive and Director of Finance and Resources. 
1 - 8 
2 Retail Improvement Scheme – Update
Report by Chief Executive. 
9 - 22 
3 Place Based Improvement Programme 2024/25
Report by Chief Executive. 
23 - 26 
4 Clyde Peatlands, West Tandlemuir – Update
Report by Chief Executive. 
27 - 30 
5 Steeple Buildings Kilbarchan - Update
Report by Chief Executive. 
31 - 98 
6 Scotland Loves Local Update 3
Report by Chief Executive. 
99 - 108 
7 Business Loans Scotland Ltd Update
Report by Chief Executive. 
109 - 114 
8 Shared Prosperity Fund Update
Report by Chief Executive. 
115 - 122 
9 Cultural Infrastructure Programme Update
Report by Chief Executive.         
123 - 138

Page 4

31/10/2024 
EXCLUSION OF PRESS AND PUBLIC
The Board may by resolution exclude the press and public from the
meeting during consideration of the following items of business as
it is likely, in view of the nature of the business to be transacted,
that if members of the press and public are present, there could be
disclosure to them of exempt information as defined in paragraph 9
of Part I of Schedule 7A of the Local Government (Scotland) Act,
1973.  
Exempt Item
Please note that exempt documents are no longer available in print
format.  You will require to log in to Economy & Regeneration Exempt
Items on CMIS to access the undernoted document.  Please note that
access to exempt documents is restricted. 
10  AMIDS - Potential New Occupier
Joint report by Chief Executive and City Deal and Infrastructure
Programme Director.

Page 5

___________________________________________________________________
To: Economy and Regeneration Policy Board
On: 5 November 2024
___________________________________________________________________
Report by: Chief Executive and Director of Finance and Resources
___________________________________________________________________
Heading: Revenue and Capital Budget Monitoring 2024/25 at 13 September
2024
___________________________________________________________________
1. Summary
1.1 At the close of reporting Period 6 on 13 September 2024, the projected
revenue outturn at 31 March 2025 for those services reporting to the
Economy and Regeneration Policy Board was an underspend position of
£0.076m (3.3%) against the revised budget for the year. 
1.2 The projected capital outturn at 31 March 2025 for projects reporting to the
Economy and Regeneration Policy Board is a break-even position. 
1.3  This is summarised in the table below and further analysis is provided in the
report and appendices. 
Revised
Annual
Budget
£000
Projected
Outturn
£000
Budget
Variance
(Adv)/Fav
£000
Budget
Variance
%
Revenue    
Economy and Development 2,306 2,230 76 3.3%
Capital    
Economy and Development 16,612  16,612  0  0.0% 
2. Recommendations
2.1 Members are requested to: 
a) Note the projected Revenue outturn underspend position of £0.076m;
Item 1
EAR051124 Page 1 of 138

Page 6

b) Note the projected Capital outturn break-even position; 
c) Agree to homologate the budget adjustments detailed at section 6.2; and
d) Note the budget adjustment detailed at section 6.3. 
3. Revenue Budget Projection – underspend of £0.076m by 31 March 2025
3.1 The tables in Appendix 1 present the projected year-end position for all
services reporting to this board, by both subjective analysis (what the budget
is spent on) and objective analysis (which division is spending the budget).
Significant variances affecting the projected position are analysed further
below. 
3.2 It should be noted that the projected outturn position reported here is based
on the latest information available, which is subject to change during the
financial year. The impact of any change on this projection will be updated at
each board cycle until the close of reporting Period 10. Budget holders are
obliged to seek mitigating action to minimise significant budget variances. 
4. Objective Analysis – Significant Variances
4.1 Regeneration - £0.076m underspend
This forecast position reflects the impact of vacancies within the team over
the course of the financial year. 
5. Subjective Analysis – Significant Variances
5.1 Employees - £0.075m underspend by 31 March 2025
This projected underspend represents vacancies in the Regeneration team
which are in the process of recruitment. 
6. Revenue Budget Virements
6.1. Under the Council’s financial regulations, Directors and their nominated
officers, in consultation with the Director of Finance and Resources, have
certain delegated authority to transfer sums between subjective budget
headings within a service division to enable budget management throughout
the financial year. This is known as ‘budget virement’. 
6.2. Transfers between divisions of the same service / department in excess of
£100,000, and transfers between services / departments must be authorised
by the respective service Director/Chief Executive and the Director of
Finance and Resources for submission to the relevant policy board for
approval.  
Page 2 of 138

Page 7

Since the last board reporting period, the Chief Executive now seeks
homologation from the Board for the following affected virements: 
Revenue Budget Adjustments
Service Amount
(£m)
Reason
Economy and
Development
0.078 Renfrewshire Council’s share of the
Scottish Government allocation for
Employability Child Poverty Co-ordinators 
6.3. The Council is delivering the third year of the 2022-2025 UK Shared
Prosperity Fund programme. The Board is therefore asked to note the
following virement to reflect the realignment of budgets required to deliver
the programme: 
Revenue Budget Adjustments
Objective
Heading
Subjective
Heading
Amount
(£m)
Reason
Economy and
Development
Employee Costs 1.141 Temporary realignment of costs
funded by external income
streams.
Project Costs* 1.858
Income (2.999)
* Project costs can include supplies and services contracts and payments to external bodies 
7. Capital Budget Projection – break-even position by 31 March 2025
7.1 The approved Capital Investment Programme 2024/25 to 2028/29 for
Economy and Regeneration was £22.862m. The revised capital spend for
2024/25 is £16.612m. 
7.2 The in-year Capital budget is forecast to break-even by 31 March 2025 after
a number of budget adjustments between years have taken place, to reflect
revised programming of some capital projects. Details of these adjustments,
which amount to £6.250m, are as follows: 
Project Amount
(£m)
Budget carried forward into 2025/26 for updated cashflows
Paisley Museum (4.000)
Place Based Investment Fund (1.527)
Budget Transfers in 2024/25 to Infrastructure, Land & Environment
Public Realm  (0.300)
Budget decrease to reflect reduced grant award in 2024/25
Place Based Investment Fund (0.423)
Total (6.250)
Page 3 of 138

Page 8

Implications of the Report
1. Financial
The projected budget outturn position for Finance, Resources and Customer
Services’ Revenue budget is an underspend of £0.076m (3.3%) at 31 March
2025.  Income and expenditure will continue to be monitored closely for the rest
of the financial year and as far as possible, steps will be taken to mitigate any
overspend.   
The projected outturn position for Economy and Regeneration Capital budget is
break-even, after the adjustments outlined at section 6.   
2. HR & Organisational Development 
While staffing budgets form a significant proportion of the Council’s revenue
budgets, there are no direct implications arising from the recommendations in
this report. 
3. Community/Council Planning
Community Plan
Our Renfrewshire is thriving The Council’s revenue and capital spend
ensures that its facilities are fit for
purpose and safe for the community, to
maximise accessibility.
Our Renfrewshire is well 
Our Renfrewshire is fair 
Our Renfrewshire is safe
Council Plan
Reshaping our place, our
economy and our future The Council’s revenue and capital spend
ensures that its facilities are fit for
purpose and safe for the community, to
maximise accessibility.
Building strong, safe and resilient
communities
Tackling inequality, ensuring
opportunities for all
Creating a sustainable
Renfrewshire for all to enjoy
Ongoing revenue and capital budget
monitoring is a tool to enable good
financial management so that the Council
has resources now and in the future for
continued service delivery.
Working together to improve
outcomes 
4. Legal 
There are no direct implications arising from the recommendations in this
report. 
Page 4 of 138

Page 9

5. Property/Assets 
The capital expenditure noted in this report will result in improvements to
Culture and Heritage assets and delivery of strategic place-shaping and
regeneration. 
6. Information Technology 
There are no direct implications arising from the recommendations in this
report. 
7. Equality & Human Rights 
While new areas of spend may impact on particular groups, any such impact
would be assessed prior to the spend being incurred, therefore there are no
direct implications arising from the recommendations in this report. 
8. Health & Safety 
There are no direct implications arising from the recommendations in this
report. 
9. Procurement 
While Procurement is an important consideration prior to the Council incurring
any revenue or capital spend, there are no direct implications arising from the
recommendations in this report. 
10. Risk 
The potential financial risk that the Council will overspend its approved revenue
budgets for the year is managed at a Council-wide level by the Chief Executive
and Directors. 
11. Privacy Impact 
There are no direct implications arising from the recommendations in this
report. 
12. Cosla Policy Position 
N/a 
13. Climate Change
The Council aims to reduce its carbon and other emissions to net zero by 2030,
however there are no direct implications arising from the recommendations in
this report. 
Page 5 of 138

Page 10

14. Children’s Rights
There are no direct implications arising from the recommendations in this
report. 
List of Background Papers 
• Revenue Budget and Council Tax 2024/25, Council 29 February 2024
• The Capital Investment Programme 2023/24 to 2027/28, Council 29
February 2024 
Author:           Valerie Howie, Finance Business Partner; and Geoff Borland,     
Finance Manager.
Page 6 of 138

Page 11

Appendix 1
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2024/25
1 April 2024 to 13 September 2024                  
POLICY BOARD:  ECONOMY AND REGENERATION                  
Objective Summary
Annual
Budget at
Period 3
Budget
Adjustments
Revised
Annual
Budget at
Period 6
Projected
Outturn
Budget Variance 
(Adverse) or
Favourable
Previous
Projected
Outturn
Variance
Movement  
£000 £000 £000 £000 £000 % £000 £000
Economy and Regeneration Management 35 0 35 35 0 0.0% 0 0
Economic Development 1,135 78 1,213 1,213 0 0.0% 0 0
Regeneration 1,058 0 1,058 982 76 7.2% 66 10
NET EXPENDITURE 2,228  78 2,306  2,230  76  3.3% 66  10                  
Subjective Summary
Annual
Budget at
Period 3
Budget
Adjustments
Revised
Annual
Budget at
Period 6
Projected
Outturn
Budget Variance 
(Adverse) or
Favourable
Previous
Projected
Outturn
Variance
Movement  
£000 £000 £000 £000 £000 % £000 £000
Employees 1,732 2,839 4,571 4,496 75 1.6% 66 9
Premises Related 22 62 84 83 1 1.2% 1 0
Transport Related 3 0 3 4 (1) (33.3%) (1) 0
Supplies and Services 23 104 127 127 0 0.0% (1) 1
Third Party Payments 0 0 0 0 0 0.0% 0 0
Transfer Payments 773 1,574 2,347 2,346 1 0.0% 1 0
Support Services 25 20 45 46 (1) (2.2%) (1) 0
Depreciation and Impairment Losses 0 0 0 0 0 0.0% 0 0
GROSS EXPENDITURE 2,578  4,599 7,177  7,102  75  (32.7%) 65 10 
Income (350) (4,521) (4,871) (4,872) 1 0.0% 1 0
NET EXPENDITURE 2,228  78 2,306  2,230  76  3.3% 66  10 
Page 7 of 138

Page 12

Appendix 2 
Prior Years Approved  Budget Revised Projected
Expenditure Budget Adjustments Budget Outturn Total Approved Projected
to 31/03/2024 2024-25 in 2024-25 2024-25 2023-24 Budget Outurn
Project Title to 31-Mar-29 to 31-Mar-29
£000 £000 £000 £000 £000 £000 £000
ECONOMY & DEVELOPMENT
Paisley Art Centre Redevelopment 2,881 869 0 869 869 0 0% 3,750 3,750 0 0%
Paisley Town Hall Redevelopment 24,747 1,000 0 1,000 1,000 0 0% 25,747 25,747 0 0%
Paisley Learning & Cultural Hub 6,654 346 0 346 346 0 0% 7,000 7,000 0 0%
Paisley Museum 39,228 12,893 (4,000) 8,893 8,893 0 0% 52,122 52,122 0 0%
Paisley Junctions and Charging Hub 431 194 0 194 194 0 0% 625 625 0 0%
Public Realm 494 300 (300) 0 0 0 0% 4,750 4,750 0 0%
Sports Development - St James Playing Fields Redevelopment 425 3,075 0 3,075 3,075 0 0% 3,500 3,500 0 0%
Sports Development - Ferguslie Pavillion Upgrade 531 460 0 460 460 0 0% 992 992 0 0%
Sports Development - Hockey Pitch at On-X 0 600 0 600 600 0 0% 600 600 0 0%
Place Based Investment Fund 1,842 2,585 (1,950) 635 635 0 0% 3,231 3,231 0 0%
Town Centre Capital Fund 766 109 0 109 109 0 0% 876 876 0 0%
Town Centre Regeneration 1 180 0 180 180 0 0% 2,050 2,050 0 0%
Shared Prosperity Fund 197 28 0 28 28 0 0% 225 225 0 0%
Townscape Heritage CARS 2 3,876 223 0 223 223 0 0% 4,099 4,099 0 0%
Total Economy & Development 82,073 22,862 (6,250) 16,612 16,612 0 0% 109,567 109,567 0 0%
TOTAL ECONOMY & DEVELOPMENT 82,073 22,862 (6,250) 16,612 16,612 0 0% 109,567 109,567 0 0%
*Rolling programmes have a prior year year expenditure of £0 as the expenditure is not directly linked from one year to the next as a singular project.
CAPITAL INVESTMENT STRATEGY - NON-HOUSING SERVICES
1 April 2024 to 13th September 2024
POLICY BOARD: ECONOMY & REGENERATION
Current Year 2024-25 Full Programme - All years
Budget Variance (Adverse) or
Favourable
Budget Variance (Adverse) or
Favourable
Page 8 of 138

Page 13

Page 1 of 4 
___________________________________________________________________
To: Economy and Regeneration Policy Board
On: 05 November 2024
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Retail Improvement Scheme – Update 
___________________________________________________________________
1. Summary
1.1 This report provides a summary of the Retail Improvement Scheme’s (RIS)
position since the last update to the Economy and Regeneration Policy Board
on 07 November 2023.
___________________________________________________________________
2. Recommendations
2.1 It is recommended that the Board:
(i) Note the contents of this report. 
(ii) Authorises the Head of Economy and Development to explore any potential
funding options for future rounds of the scheme. 
3. Background
3.1 The RIS has run annually since 2012 and supports Renfrewshire based
businesses to undertake external property improvements such as the creation
of new shopfront fascia signs and shutters.
3.2 Grants up to a maximum of £12,000 are made available with contributions up
to 70% of qualifying works. Larger awards have been offered to support
projects in exceptional circumstances which would likely result in significant
regeneration outcomes  e.g. the refurbishment of the James Maitland
designed former ‘Malatso’ unit on Paisley High Street.
Item 2
EAR051124 Page 9 of 138

Page 14

Page 2 of 4
3.3. Since its inception, the RIS has been a key element of the Council’s agenda
to improve town centres and build positive relationships with the local
business community.
3.4. Approximately £755k has been awarded to 106 different projects across
Renfrewshire since 2016. A spotlight report has been included in Appendix A,
which provides a more detailed review of the scheme between 2022/23 and
2024/25 and provides an overview of some of the current notable projects. 
___________________________________________________________________
4. Current Retail Improvement Scheme 2024/25
4.1. In February 2024, £70k was allocated to the Scheme as set out in Council
Motion 4 – ‘Commit £70k to supplement the Retail Improvement Fund’.
4.2 The first application window of the RIS relaunched in April 2024 for a six-week
period, closing in May. Fourteen applications were received from a good mix
of businesses across Renfrewshire’s towns and villages. The second
application window opened in September 2024 and will close on October 16
2024.
4.3 Applications from the first application window have been from businesses
located in Kilbarchan, Bishopton, Paisley, Johnstone and Renfrew. Thirteen of
these have received grant awards with one still awaited, owing to a further
information request from the applicant.
4.4 Applications include a vacant former hairdresser's on a prominent corner of
Renfrew (44 Canal Street), which will be converted into a cocktail bar, and the
former Royal Bank of Scotland unit on Church Street in Johnstone, which has
been converted into a fast food business. These RIS projects will have a
positive impact on the respective town centres.
4.5 The £70k budget was largely committed during the first application window.
The RIS will be supplemented by the Place-Based Investment Programme
(PBIP), which will allocate an additional £50k for the second application
window. Projects are set to be completed by spring 2025.
___________________________________________________________________
5. Next steps
5.1 Officers will now consider how to fund future rounds of the RIS, along with any
necessary adjustments to the grant process based on applicant feedback and
market conditions.
5.2 If funding can be secured for future rounds of the scheme, progress will
continue to be reported to the Board on a rolling basis.
Page 10 of 138

Page 15

Page 3 of 4 
__________________________________________________________________
Implications of the Report
1. Financial – None; as funding already forms part of Council’s approved budget.
2. HR & Organisational Development – None.
3. Community/Council Planning 
• Our Renfrewshire is thriving – regeneration projects result in a stimulus to the
local economy via contracts won, visitors and user numbers. The RIS
supports objectives to develop Renfrewshire’s economy, including its Town
Centres as thriving places, supporting local places, businesses, and
communities. 
• Reshaping our place, our economy, and our future - The projects secure the
productive re-use of a buildings and provide new facilities and services which
will contribute to supporting growth. Increased footfall offers potential benefits
to traders, assisting the economy of our town centres. 
• Working together to improve outcomes - Renfrewshire Council is working with
businesses and owners and providing support to maximise the opportunities
for regeneration in Renfrewshire’s settlements. 
4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights 
The recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have
been identified arising from the recommendations contained in the report. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact - None. 
12. Climate Risk – Not Applicable 
13.  Children’s Rights – None. 
14.  Cosla Policy Position – None. 
_________________________________________________________
Page 11 of 138

Page 16

Page 4 of 4 
List of Background Papers
a) Report to Economy and Regeneration Board, Retail Improvement Scheme –
Update and Next Steps. 7th November 2023
b) Report to Leadership Board, 20th April 2022, Spotlight Report on the Retail
Improvement Scheme – 2016 to 2022
c) Report to Leadership Board, 15th September 2021 - Place Based Investment
Fund 2021/22
d) Report to Leadership Board, 20 June 2018 – Invest in Renfrewshire Future
Funding and Services
e) Report to Economy and Jobs Policy Board, 25th May 2016 – Invest in
Renfrewshire: Retail Improvement Scheme Update
___________________________________________________________________ 
Author:   Euan Shearer, Regeneration and Place Manager.
Euan.shearer@renfrewshire.gov.uk 
Page 12 of 138

Page 17

1
Spotlight on…
Retail Improvement Scheme  2022/23 - 2024/25
Page 13 of 138

Page 18

2
RIS Overview
The Retail Improvement Scheme (RIS) supports owners and occupiers of
small business properties in retail areas throughout Renfrewshire with grant
assistance towards the cost of shopfront improvements.
Since its launch (circa 2012), the RIS has helped over  205 businesses
improve their commercial shop frontages and has contributed to a number of
vacant units being returned to beneficial use.
Outcomes of the scheme have supported the economic viability of our town,
local and village centres, supporting their role at the heart of communities
and the principle of the ‘20-minute neighbourhood’.  The scheme has also
supported a range of local businesses and contractors, generating wider
economic benefits across Renfrewshire.
Applications have achieved a wide geographical coverage and vary in both
type size and scale, from ‘conservation standard’ shop front enhancements to
simple gable repairs and replacement of solid roller shutters. Historically, RIS
rounds were split into two application phases over the year. This was changed
to a single round due to impacts of the pandemic. The phased approach has
now been reinstated for the current RIS round.
This report sets out the performance of the RIS over the last 3 years; including
the current round. 
Page 14 of 138

Page 19

3
Key Statistics 2022/23 - 2024/25
Number and spend
A total of 47 awards applications were made between the 2022/23
and 2024/25 rounds. 14 applicants have received awards in the
current (2024/25 round so far with further applications expected in
the second phase of this round (currently live at the time of writing).
It is likely that a further £50,000 will be released at the conclusion
of 2024/25 (part 2). This will bring the total invested over the last
three rounds to almost £300k.
20+8+24+4+15+4
18
7 2
2024
2025
2023
2024
2022 
2023
£ 95,000.00
Successful / Total Spend
Year of
Application
Unsuccessful / Withdrawn
19
1
£ 87,617.00
14
£ 87,558.00
1
Page 15 of 138

Page 20

4
Awards by area
The majority of successful applications received
were from businesses based in Paisley (21),
reflecting the role of the town as the strategic centre
for Renfrewshire.
A range of applications were received from other
large centres such as Johnstone (8) and Renfrew
(8), as well as with from smaller towns and villages
(10) across Renfrewshire. 
8
8
21
Lochwinnoch
£ 3,850
2
Bridge of Weir
£ 9,416
3
Elderslie
£ 12,000
1
Bishopton
£ 12,900
2
Paisley
£ 112,822
Johnstone
£48,120
Renfrew
£29,565
1
Houston
£ 2,600
1
Kilbarchan
£ 3,168
Page 16 of 138

Page 21

5
Number of vacant premises
brought into use
In the three-year period, 10 business premises were vacant
at the time of their RIS application. Following approval and
subsequent work undertaken on frontages, 6 premises have
been returned to beneficial use and are trading whilst 2 are
now either completing internal works or advertised for lease.
The remaining 2 vacant businesses are included in the
current 2024/25 round. These businesses have received
grant awards but are yet to undertake works. It is anticipated
that following completion, these premises will become
occupied.
Applications by use
The vast majority (55%) of applicants were retailers followed
by cafes, restaurants and drinking establishments (21%) ,
professional services (15%) and other (9%). 
55+21+15+9+K
Retailers
55%
Hospitality
21%
Services
15%
Other
9%
+6
Page 17 of 138

Page 22

6
Current RIS round (2024/25)
Part 1 of the current RIS round launched in April 2024, with a £70k budget
allocated at the Council budget meeting on 29 February 2024. Following
the grant deadline, a total of 16 applications were received, of which 14 were
awarded funding.
Part 2 of the round launched in early September 2024, with a £50k budget
provided by the Place Based Investment Programme (PBIP). This grant is
still active at the time of writing, and applications are being assessed toward
the end of October 2024. Together, Parts 1 and 2 will result in approximately
£120k being awarded to businesses by the conclusion of the current RIS
round.
Page 18 of 138

Page 23

7
2022 
2023
Lochwinnoch
Grant provided for new
retailer on the High St
specialising in natural health
and environmentally friendly
products.
Works included new signage
and electric shutters.
2023 
2024
Paisley
Support in the form of
completely new shopfront
(including handpainted sign) 
to a much loved independent
sewing school business in the
heart of Paisley Town Centre.
Before After
AfterBefore
Page 19 of 138

Page 24

8
2024
2025
Johnstone
Support in the form of  new
sinage, replacement shopfront
windows and door with new
security shutters.
The unit was previously vacant
in a prominent position in the
heart of Johnstone Town Centre.
2023 
2024
Elderslie
Support in the form of
completely new shopfront
(including handpainted sign)  to
a independent  florist business
on the Main Road in Elderslie.
Works include a complete
shopfront including new timber
windows and paintwork.
Before After
Before After
Page 20 of 138

Page 25

9
Development of RIS
An online portal that simplifies the application process for both applicants
and assessing officers is now fully operational and functioning successfully.
Minor changes to the RIS Guidelines and processes have been
implemented, including clarifying the guidelines on eligible works,
reintroducing a double application window, and conducting more vigilant
checks on whether applicants owe debts to the Council.
Once this year’s RIS is complete, officers will review whether there is
potential for further improvements to the scheme. As of now, no future
funding has been secured for additional rounds of the scheme.
Page 21 of 138

Page 26

Page 22 of 138

Page 27

Page 1 of 4 
___________________________________________________________________
To:  Economy and Regeneration Board 
On:  5 November 2024
___________________________________________________________________
Report by: Chief Executive 
___________________________________________________________________
Heading: Place Based Improvement Programme 2024/25
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to update members on the 2024/25 allocation of
Scottish Government Place Based Investment Programme (PBIP) and the
projects being developed for delivery.  
___________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Board:  
(i) Approves the proposed projects for the 24/25 allocation for the Place
Based Investment Programme (PBIP) set out in this report;
(ii) Notes that progress on delivery of these projects will be reported to the
Board as appropriate.  
___________________________________________________________________
3. Background
3.1 The Economy and Regeneration Board of 19 March 2024 noted progress on
actions to deliver projects from a range of external funding sources and
approved projects to be funded through the 2023/24 allocation of the
Scottish Government’s Place-Based Investment Programme.
3.2 The Place-Based Investment Programme (PBIP) is a capital funding
programme directly allocated to local authorities, available to the Council in
various forms since 2019. This funding supports capital investment and the
delivery of actions within our town centre strategies, community-led
regeneration proposals, and community-led place plans, thereby
accelerating the Council’s broader placeshaping agenda.
Item 3
EAR051124 Page 23 of 138

Page 28

Page 2 of 4 
3.3 The 2023/24 allocation of the fund approved at Board has recently supported
a range of projects including delivery of landscape enhancements at the
Wallace Monument, Elderslie as well as the Retail Improvement Grant
Scheme and Historic Buildings in Villages Grant Scheme.
___________________________________________________________________
4. Place Based Investment Programme – 2024/25 
4.1 In early summer 2024 the Scottish Government announced that in view of
wider public finance constraints, national funding streams such as the
Regeneration Capital Grant Fund and Vacant and Derelict Land Fund were
to be paused.  
4.2 In respect of PBIP, the Scottish Government indicated that allocations would
be restricted to support projects already underway.  In addition, funding
would be limited to a maximum value of 50% of the allocation the Council
had anticipated (based on previous announcements) in order to protect the
value for money of projects already in progress. 
4.3 In view of the above, a strategic review was undertaken by officers to identify
those projects most advanced and at risk of stalling, in the event funding was
withdrawn.  Two projects were identified as those most at risk in this context,
as set out in Table 1 below.
Table 1:  Place Based Investment Fund Projects 2024/25 
Project summary Estimated
Cost
Estimated
Completion
Ferguslie Green Line:  Neighbourhood Centre
Activity Hub 
Transformation of 1.55 hectares of long term vacant
and derelict land to provide an active recreational
hub within the heart of Ferguslie Park, Paisley,
delivering a key element of the community led
Making of Ferguslie Local Place Plan.   
The project provides a new multi-use games area 
and community space as well as enhancing active
travel connections within the neighbourhood.   
£500,000 Autumn 2025
Castle Semple enhancements: Visitor Facility 
Demolition of an existing toilet block which is in a
poor state of repair and construction of a new cycle
hub facility as well as providing new accessible toilet
facilities. 
The project delivers a key element of the Strategic
Tourism Infrastructure Development Plan (STIPD)
for Clyde Muirshiel Regional and Castle Semple
Country Parks and aligns closely with
Renfrewshire’s Tourism Plan 2024-27. 
£500,000 Early Winter
2025 
Page 24 of 138

Page 29

Page 3 of 4 
4.4 Following the consideration of information provided by officers, the Scottish
Government has recently advised that an allocation of £300,000 will be
provided to the Council under PBIP for 2024/25. Subject to Board approval,
it is anticipated that this allocation will be used to match fund and support the
delivery of projects identified in Table 1.
___________________________________________________________________
5.   Next Steps  
5.1 Officers will continue to monitor national funding programmes and external
funding sources to support delivery of the variety of additional projects under
development and which align with the Council’s Placeshaping ambitions.
___________________________________________________________________
Implications of the Report
1. Financial – PBIP allocation will be utilised to match fund the projects
identified in Table 1 above. 
2. HR & Organisational Development – None 
3. Community/Council Planning –  
Creating a sustainable Renfrewshire for all to enjoy – The delivery of
projects supports the Council’s wider placeshaping agenda, improving
quality of place, our neighbourhoods and town centres. 
4. Legal – None 
5. Property/Assets – None 
6. Information Technology – None  
7. Equality & Human Rights - The Recommendations contained within this
report have been assessed in relation to their impact on equalities and
human rights. No negative impacts on equality groups or potential for
infringement of individuals’ human rights have been identified arising from
the recommendations contained in the report.  If required following
implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website. 
8. Health & Safety – None 
9. Procurement – None
10. Risk – None 
11. Privacy Impact – None 
Page 25 of 138

Page 30

Page 4 of 4 
12. Climate Risk – Implementation of the project within Renfrewshire will
support the Council’s Plan for Net Zero through enhanced active travel
linkages and supporting living well locally.
13. Children’s Rights – None
14. Cosla Policy Position – None 
_______________________________________________________
List of Background Papers 
(a) Regeneration Funding Bids Update.  Economy and Development Policy
Board, 19 March 2024 
___________________________________________________________________ 
Author: Euan Shearer, Regeneration and Place Manager
euan.shearer@renfrewshire.gov.uk Tel: 07483 136235 
Page 26 of 138

Page 31

Page 1 of 3 
___________________________________________________________________
To:  Economy and Regeneration Board 
On:  5 November 2024
___________________________________________________________________
Report by: Chief Executive 
___________________________________________________________________
Heading: Clyde Peatlands, West Tandlemuir – Update 
___________________________________________________________________
1. Summary
1.1 The purpose of this report is to update members on the Clyde Peatlands
initiative and delivery of the West Tandlemuir Restoration Project within
Renfrewshire.  
___________________________________________________________________ 
2. Recommendations
2.1 It is recommended that the Board: 
(i) Notes the role of the Clyde Peatlands initiative in contributing to the
Council’s response to climate change;
(ii) Notes development of the West Tandlemuir Farm Restoration Project
as part of Clyde Peatlands in Renfrewshire;
(iii) Approves acceptance by Renfrewshire Council of grant funding
totalling £297,498 from NatureScot Peatland Action, enabling delivery
of the West Tandlemuir project;
(iv) Notes that further progress on delivery of the West Tandlemuir project
will be reported to the Board as appropriate.
_________________________________________________________
3. Background
3.1 At the Planning and Climate Change Policy Board meeting on 7 November
2023, the development of the Clyde Peatlands initiative across the Glasgow
City Region was noted, as well as the opportunity for peatland restoration
within Renfrewshire at West Tandlemuir Farm, Clyde Muirshiel Regional
Park, Lochwinnoch.
Item 4
EAR051124 Page 27 of 138

Page 32

Page 2 of 3 
3.2 The Board delegated authority to the Head of Economy and Development to
develop and progress the implementation of the West Tandlemuir
Restoration Project, including the preparation of bids for capital funding.
___________________________________________________________________ 
4. West Tandlemuir Farm Restoration 
4.1 The development of a detailed programme of restoration works was carried
out in early 2024, in partnership with the Clyde Peatlands officer and a
working group consisting of relevant officers from the Chief Executive’s
Service and Environment, Housing, and Infrastructure Services.
4.2 Planning consent for the works was granted in February 2024 (ref.
24/0031/PA). To secure funding for the project, a formal application was
submitted to NatureScot’s Peatland Action fund in spring 2024. In parallel,
an exercise was conducted to procure an appropriate specialist contractor to
deliver the works, in the event the funding application was successful.
4.3 The Finance, Resources and Customer Services Policy Board of 13 June
2024 approved the award of a works contract for the Tandlemuir Peatland
Restoration to McGowan Environmental Engineering Ltd, subject to
confirmation of funding from NatureScot.
4.4 In late summer 2024 NatureScot advised that the Council’s Peatland Action
fund application had been successful and issued a grant offer of £297,498 to
support delivery of works.  The offer of grant represents 100% of the total
project works and the value of the contract approved at Board in June 2024.
___________________________________________________________________
5.   Next Steps 
5.1 Acceptance of the grant offer, pending legal review of its terms and
conditions, will enable the formal appointment of the contractor and the
delivery of the restoration project. Subject to Board approval, it is anticipated
that works will commence in December 2024 and continue for approximately
16 weeks
___________________________________________________________________
Implications of the Report
1. Financial – Project costs will be fully funded from a grant from the
NatureScot Peatland Action Fund. 
2. HR & Organisational Development – None 
3. Community/Council Planning –  
Creating a sustainable Renfrewshire for all to enjoy – The project will
support the Council’s response to climate change and delivery of
Renfrewshire’s Plan for Net Zero and Renfrewshire Biodiversity Strategy
2018-2022 through the storage of carbon emissions and works which
support, enhance and connect existing habitats.
Page 28 of 138

Page 33

Page 3 of 3 
4. Legal – None 
5. Property/Assets – None 
6. Information Technology – None  
7. Equality & Human Rights - The Recommendations contained within this
report have been assessed in relation to their impact on equalities and
human rights. No negative impacts on equality groups or potential for
infringement of individuals’ human rights have been identified arising from
the recommendations contained in the report.  If required following
implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website. 
8. Health & Safety – None 
9. Procurement – Acceptance of the grant offer from NatureScot will allow
award of the works contract approved at the Finance Board of 13 June 2024. 
10. Risk – None 
11. Privacy Impact – None 
12. Climate Risk – Implementation of the project within Renfrewshire will
support the Council’s Plan for Net Zero through storage of carbon and
reduction of emissions.
13. Children’s Rights – None
14. Cosla Policy Position – None 
_______________________________________________________
List of Background Papers 
(a) Clyde Peatlands – Update.  Planning and Climate Change Policy Board,
7 November 2023 
(b) Contract Award - Tandlemuir Farm Peatland Restoration (RC-CPU-23-
247).  Finance, Resources and Customer Services Policy Board, 13 June
2024. 
Appendices 
(a) Location Plan – West Tandlemuir Peatland Restoration Works
___________________________________________________________________ 
Author: Euan Shearer, Regeneration and Place Manager
euan.shearer@renfrewshire.gov.uk Tel: 07483 136235 
Page 29 of 138

Page 34

1:32,951
Author:
Ordnance Survey Mapping - © Crown Copyright and database right 2023. All rights reserved. Ordnance Survey Licence number 100023417. 
Aerial Photography 2009 - Cities Revealed ® copyright by The Geoinformation ® Group, 2009 and Crown Copyright © All rights reserved.
Aerial Photography 2004/6 - © 2004 Getmapping plc © 2006 Getmapping plc
Aerial Photography 2001 - Cities Revealed ® copyright by The Geoinformation ® Group, 2009 and Crown Copyright © All rights reserved.
Historic Map Data - © Crown Copyright and Landmark Information Group Limited 2012. All rights reserved.
I
Date: 22/08/2023ALAN BURGESS
LOCATION / CONTEXT PLAN
WEST TANDLEMUIR
- PEATLAND RESTORATION WORKS
Legend
Clyde Muirshiel Regional Park - Boundary
SELECTED TREATMENT
AREA
WEST TANDLEMUIR
FARM BOUNDARY
Page 30 of 138

Page 35

Page 1 of 7 
___________________________________________________________________
To:  Economy and Regeneration Policy Board
On:  5 November 2024
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Steeple Buildings Kilbarchan - Update
___________________________________________________________________
1. Summary
1.1 The purpose of this report is to provide members with an update on the
proposed refurbishment and potential reuse of the Steeple Buildings in
Kilbarchan. It offers an overview of a recent Options Appraisal and updates on
essential repairs scheduled for 2025.
___________________________________________________________________
2.       Recommendations
2.1 It is recommended that the Board: 
(i) Authorises the Head of Economy and Development to investigate the
recommendations from the options appraisal, undertaking feasibility
work to further explore in more detail the design and funding of the
preferred option;  
(ii) Authorises the Head of Economy and Development to offer further
support to stakeholders, specifically the 'Friends of the Steeple' group,
to help them explore governance options and determine whether any
transfer of ownership or management, potentially through a Community
Asset Transfer, may be viable;
(iii) Authorises the Head of Economy and Development to explore the
ecomuseum model as a way of framing the Kilbarchan Cultural Quarter
concept.
___________________________________________________________________
Item 5
EAR051124 Page 31 of 138

Page 36

Page 2 of 7 
3.    Background
3.1 The 18th-century Steeple Buildings, located in Kilbarchan's Conservation
Area and jointly owned by Renfrewshire Council and the Kilbarchan General
Society (KGS), hold cultural significance as a Category A listed property and
are the centre of the village's annual Lilias Day celebrations. OneRen
currently leases the building as a community hall, though it has remained
closed since the pandemic. While the building saw limited community use pre-
pandemic, other venues are available in Kilbarchan. Repairs have been
conducted as needed, with a report on the building's electrical condition due in
October 2024.
___________________________________________________________________
4 Stakeholder Engagement 
4.1 A report to the Economy and Regeneration Board on 23 January 2024
provided an update on the progress of Council Motion 9 from 4 May 2023 and
outlined how the £700k allocation would be spent. It emphasised the
significant stakeholder engagement that has taken place, including extensive
consultation with Kilbarchan Community Council (KCC) and their desire to
create a 'Friends of the Steeple' sub-group. Since then, officers have
facilitated the formation of this group. After a series of informal public
meetings with various stakeholders, it was agreed to formally establish the
'Friends of the Steeple' sub-group as part of KCC. The sub-group, consisting
of 12 members—including a KGS representative—who are interested in
playing a more active role in decision-making around the Steeple Buildings, is
a temporary measure under KCC. Depending on the findings of the attached
Options Appraisal, the sub-group will decide whether to establish itself as a
separate entity from KCC.
___________________________________________________________________
5 Options Appraisal
5.1 Also highlighted in the report to the Economy and Regeneration Board on 23
January 2024 was the intention of officers to appoint a consultant to conduct a
detailed Options Appraisal looking a future uses for the Steeple Buildings. 
The Options Appraisal is attached at Appendix 1 of this report. 
5.2 In February 2024, Glasgow Building Preservation Trust were appointed to
carry this appraisal. The objectives were to explore suitable uses for the
Steeple Buildings within the proposed "Kilbarchan Cultural Quarter," consider
various options such as a community museum, assess the viability and costs
of these options, and recommend the most viable one for Council approval.
5.3 The Options Appraisal has produced consensus on a preferred use for the
Steeple Buildings. This maintains the integrity of the main spaces and sees: 
(i) The ground floor hall being turned into a licensed café/restaurant. 
(ii) The original meal market room reinstated by extending the existing
kitchen into the adjacent storeroom.
Page 32 of 138

Page 37

Page 3 of 7 
(iii) The first floor Ladies Room maintained as a meeting room for KGS
with secure storage, but available for other groups to hire. 
(iv) The first floor hall maintained as a community hall for hire. 
(v) The entrance and toilet areas reconfigured on both floors to offer
accessible facilities, including a platform lift. 
(vi) Provision for display cases and interpretation panels in the ground floor
café/restaurant and first floor Ladies Room promoting Kilbarchan’s
heritage. 
5.4 The cost to internally refit and fully refurbish the Steeple Buildings’ interior for
this preferred use is estimated at £384,000+VAT. 
5.5 While continued ownership by Renfrewshire Council and KGS is preferred by
the community, the Options Appraisal has not reached a consensus on the
building’s future management and instead presents three alternatives for
further discussion. The key question the community now needs to address,
with a preferred option in hand, is what level of involvement—if any—the
community wish to have in the future management of the building. 
The 3 management options are: 
(i) Management Option A in which Renfrewshire Council retains
ownership (with KGS) and the Council, or OneRen, operate the
building, leasing halls/rooms to tenants and managing short and longer
term lets. In this scenario, the council is likely to retain full responsibility
for repairs and income from lets and commercial activities will go to the
council. This setup benefits from existing management structures
however capital funding options are more limited and use of the first
floor community space may be less tailored to the needs of the
community. 
(ii) Management Option B in which ownership (excluding KGS’s room) or
management of the building is transferred to a community group,
potentially via Community Asset Transfer (CAT). In this scenario, the
community group – most likely a Scottish Charitable Incorporated
Organisation (SCIO) or a Company Limited by Guarantee with
Charitable Status – is responsible for repair (possibly excluding the
Steeple itself) and leases the building to tenants. While this setup relies
far more on community volunteers, the community has more control
over the use of the building and benefits more directly from any
income. Compared to the council, a community body, such as a
charity, will be able to approach a greater range of funders. 
Page 33 of 138

Page 38

Page 4 of 7 
(iii) Management Option C where Renfrewshire Council leases the entire
building (excluding KGS’s room and possibly the Steeple itself) to a
commercial tenant. This scenario places the least strain on the
resources of the council, OneRen, and the local community. However,
under this option, community use of the main spaces may be limited to
specific functions, which could, in turn, restrict eligibility for funding. 
5.6 Revenue costs have been estimated for Management Options A and B for
Years 1 to 5. Option A enables the Council to operate the building at a small
annual surplus from Year 2, whereas Option B enables a community
organisation to operate the building at a marginally higher surplus from Year 1. 
5.7 Informal feedback from the Council’s Planning team has indicated they would
take a pragmatic approach to any change of use for the Steeple Buildings and
similarly, solutions for elements such as kitchen extraction, bin storage and an
air source heat pump. 
5.8 Over and above the standard requirements, there are currently no additional
restrictions on licensing in Kilbarchan. 
5.9 In response to the desire to refurbish the Steeple Buildings in the context of a
wider Kilbarchan Cultural Quarter, the Options Appraisal suggests that the
“ecomuseum” model could be explored as a way of framing and developing
the idea. 
5.10 The term "ecomuseum" is a blend of "eco-" from the Greek oikos (meaning
"house" or "environment") and "museum." This reflects the idea of a museum
that is closely linked to place and community - it is not a museum of ecology,
though it may incorporate elements of natural heritage.
5.11 An ecomuseum is a dynamic, community-based project focused on
preserving both tangible and intangible heritage in a way that benefits local
people and the environment. Unlike traditional museums, which are housed in
single buildings, ecomuseums are typically spread across multiple locations.
The core idea is to involve local communities in managing, protecting, and
showcasing their heritage and environment, creating a living, evolving
museum.
5.12 The ecomuseum model could provide a way to gather and promote the
diverse range of cultural and heritage offers in Kilbarchan, including for
example, the Steeple Buildings, the Weavers Cottage, Lilias Day, and the new
heritage trail.
___________________________________________________________________
6 Repairs Programme
6.1 The Economy and Regeneration Board (January 2024) approved the
implementation of a first phase of major repairs, valued at £308,000+VAT,
prioritising immediate and urgent work on the roof, leadwork, and rainwater
systems.
Page 34 of 138

Page 39

Page 5 of 7 
6.2 In September 2024, conservation specialists MAST Architects were appointed
to develop and oversee the delivery of the first phase of major repairs,
scheduled for 2025. In addition to conserving the main external fabric, this first
phase aims to explore the possibility of reopening the building in an interim
capacity. The findings of Building Services' upcoming electrical report will help
determine whether interim use will be feasible without further works.
___________________________________________________________________
7 Funding
7.1 The cost of the first phase of works to the Steeple Buildings plus the
estimated cost of the refit and full refurbishment of the interior for the
preferred option is £692,000+VAT – just short of the £700,000+VAT budget
allocated by the council.
7.2 The estimated cost of delivering the additional repairs identified in the
condition report, which have not been prioritised as part of the Phase 1 works,
is £232,000 +VAT. However, it should be noted that these repairs were not
classified as 'immediate' or 'urgent.'
7.3 In anticipation of any potential funding shortfall, initial conversations about
future applications to help refurbish the Steeple Buildings took place in 2023
with National Lottery Heritage Fund (NLHF) and Historic Environment
Scotland (HES): 
(i) Given its location, NLHF had expressed doubts that any proposed use
for the building would engage sufficiently with their target communities; 
(ii) HES were open to an application to their Historic Environment Grants
programme; however, any application was subject to Renfrewshire
Council being able to demonstrate that a sustainable, long-term use for
the building had been identified. 
7.3 Funders such as NLHF and HES are likely to be more in favour of a use
which maintains the integrity of the main spaces within a category A-listed
building.
___________________________________________________________________
8 Next Steps  
8.1 Officers will work with MAST Architects to finalise the repairs programme and
tender the contract for appointing a contractor to deliver the first phase of the
major repairs. The goal is to make a recommendation for the contract award
at the Finance Board meeting on June 12, 2025.
8.2 Officers will conduct further feasibility work to explore in more detail the
design and funding of the preferred option identified in the Options Appraisal.
They also plan to liaise with stakeholders regarding the findings of the Options
Appraisal, aiming to agree on a preferred management option. Additionally,
officers will investigate whether the concept of an ecomuseum model could be
viable in Kilbarchan as a way to frame the Kilbarchan Cultural Quarter
concept.
Page 35 of 138

Page 40

Page 6 of 7 
_________________________________________________________________
Implications of the Report
1. Financial - £700,000 has been allocated by Renfrewshire Council for the
refurbishment of the Steeple Buildings. Additional funds would need to be
sourced to carry out all the external repairs itemised in the 2023 condition
report and carry out a full refurbishment of the interior in accordance with the
costings calculated for the preferred option in the 2024 options appraisal. 
2. HR & Organisational Development – None 
3. Community/Council Planning –  
• Our Renfrewshire is thriving – The project supports development which will
protect and enhance the built heritage of Renfrewshire’s village centres,
contributing to the creation of thriving places which support individuals,
communities, and businesses. 
• Reshaping our place, our economy and our future – The project will help
support the restoration and productive re-use of a landmark building in the
centre of a Renfrewshire village, improving the built environment, helping
to create job opportunities and contribute to economic growth. 
• Working together to improve outcomes - The project is working in
partnership with local groups and organisations to achieve positive
outcomes. 
4. Legal – The Steeple Buildings are jointly owned with local charity, Kilbarchan
General Society (who own a single room on the first floor). 
5. Property/Assets - Property Services are acting as Client Advisor for the
Phase 1 repair programme 
6. Information Technology – None 
7. Equality & Human Rights - The Recommendations contained within this
report have been assessed in relation to their impact on equalities and human
rights. No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report because for example it is for noting
only.   If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website. 
(Report author to arrange this). 
8. Health & Safety – MAST Architects have been appointed as Principal
Designer for the Phase 1 repair programme. 
9. Procurement – The appointment of a main contractor for the Phase 1 repair
programme will be managed by CPU.
Page 36 of 138

Page 41

Page 7 of 7 
10. Risk – There is a need to stabilise the fabric of the building and an ambition to
bring the building back into a use which is sustainable. 
11. Privacy Impact - None 
12. Climate Risk – With cognisance of Historic Environment Scotland’s ‘A Guide
to Climate Change Impacts: On Scotland’s Historic Environment, Our Place in
Time, 2019’, the repair and maintenance of the Steeple Buildings will
contribute to the restoration and repair of Renfrewshire’s historic fabric and
will improve the performance of this property over time. 
13. Children’s Rights – None 
14. Cosla Policy Position - None
_______________________________________________________
List of Background Papers 
Appendix 1 -  Kilbarchan Steeple Options Appraisal October 2024 
___________________________________________________________________ 
Author: Euan Shearer; Regeneration and Place Manager
Email: euan.shearer@renfrewshire.gov.uk 
Page 37 of 138

Page 42

Kilbarchan Steeple Buildings
Options Appraisal
Appendix 1
Page 38 of 138

Page 43

2
Glasgow Building Preservation Trust
Wellpark Enterprise Centre, 120 Sydney St, Glasgow G31 1JF
web: www.gbpt.org | tel: 0141 554 4411
Document Version Date Author(s) Approved by
Kilbarchan Steeple Buildings Options Appraisal  1  26-09-24 N Gallacher/ Ingrid Shearer  N Gallacher
2 04-10-24 N Gallacher/ Ingrid Shearer N Gallacher
3 09-10-24 N Gallacher/ Ingrid Shearer N Gallacher
Page 39 of 138

Page 44

3
Contents
1.0 Introduction
2.0 Executive Summary
3.0 Context
4.0 The Building
5.0  Strategic Context
6.0 Consultation
7.0 Development of Options
8.0 Business Plan
9.0 Capital Costs
10.0 Revenue Costs 
11.0 Funding
12.0 Risk Analysis
13.0 Conclusion & Recommendations
14.0 Action Plan
Appendix A: Community Consultation Report & resources
Appendix B: Business Plan
Appendix C: 2023 Condition Survey, JGA Architects
Appendix D: 2023 Luths Services Appraisal 
Appendix E: 2024 NBM Cost Plan: Internal Refurbishment
Appendices
Page 40 of 138

Page 45

4 
Page 41 of 138

Page 46

5
This Options Appraisal (the appraisal) has been
commissioned by Renfrewshire Council to consult with
the community and stakeholders to investigate and
assess the viability of options for the restoration and
adaptation of the Kilbarchan Steeple Buildings, with the
aim of identifying a sustainable future use for this
historic landmark.
1.0 Introduction 
Renfrewshire Council (the Council) is the client for the
appraisal and jointly own the building with the         
Kilbarchan General Society. The Council has                 
responsibility for the maintenance and future use of
the building.
Key Stakeholders
Kilbarchan General Society (KGS) was founded in 1765
and has been raising funds to support the people and
organisations of the village ever since. KGS retains
ownership of a first floor room in the building. As part
of their   philanthropic activities, KGS is in the process
of  restoring a vintage fire engine which was             
previously housed on the ground floor of the building. 
Kilbarchan Community Council  (KCC) is a voluntary          
organisation run by local  residents to act as a voice
on behalf of local people and improve quality of life,
civic pride, local amenities and services.
Friends of The  Steeple (The Friends) were formed in
2024 as a  sub-group of KCC, to focus on the future of
the building. The Friends include representation from
KCC  and KGS.
OneRen  is a charity and part of the Renfrewshire
Council family that provides culture, leisure and
sporting opportunities. OneRen managed the building
as a community hall on behalf of Renfrewshire  
Council prior to its closure . 
Aims
The aims of the study are:
• To undertake a consultation exercise to investigate and
understand the local need and demand for new uses in the
building.
• To provide a business plan covering  an analysis of existing
community facilities, the financial sustainability of proposals
and  the potential governance and funding options.  
• To obtain up to date condition surveys of the building along
with proposals for restoration and reuse.
• To produce a document which will be available to         
stakeholders to understand the context of the building 
when considering  how  to  proceed.  
• To provide information that will  assist fundraising should a
project be taken forward.
The Options Appraisal is funded by  
Client 
Project Coordinator   
Glasgow Building Preservation Trust 
Community Consultation 
Glasgow Building Preservation Trust 
Architect   
John Gilbert Architects 
Business Planner  
Community Enterprise 
Cost Consultant  
NBM 
Project Team 
Page 42 of 138

Page 47

6 
Source: canmore_image_SC02025374 Page 43 of 138

Page 48

7
This options appraisal, conducted between March and September 2024, consolidates reports,
consultation feedback and discussions on developing a vision for the future of the Steeple Buildings. 
Led by Glasgow Building Preservation Trust, the appraisal team carried out a comprehensive
engagement process involving Renfrewshire Council, local stakeholders, the Kilbarchan community,
Friends of the Steeple, and various local groups. Their goal was to explore the significance of the
Steeple Buildings from heritage and community perspectives, review the building's condition,
develop layout proposals, assess business case viability, and consider governance and management
strategies. 
Throughout this process, one key theme emerged: the community's deep affection for the Steeple
Buildings and their symbolic value for Kilbarchan. The community, alongside key stakeholders, has
shown strong support for restoring and adapting the building to a new use that complements the
village’s existing heritage and hospitality offerings. Given its central location, the Steeple Buildings
project is viewed as a potential catalyst for broader regeneration within Steeple Square, which in
turn would support ambitions for establishing a Kilbarchan Cultural Quarter that could encompass 
the Steeple Buildings, Kilbarchan Cross and the Weaver’s Cottage. 
The design team has proposed a hybrid model incorporating commercial and community uses that
can be accommodated within the building while preserving its principal spaces and historic
character. These plans would allow the Steeple Buildings to serve multiple functions without
requiring significant structural changes. The estimated cost for internal refurbishment is in the
region of £384,000. 
Renfrewshire Council has committed significant funds towards the refurbishment of the Steeple
Buildings. This appraisal is intended to support further discussions between the Council, the
community, and stakeholders to reach a consensus on the best way forward. A collective effort will
be essential in developing a project, business, and funding strategy that ensures the long-term
sustainability of the Steeple Buildings, allowing them to serve the Kilbarchan community for
generations to come.
2.0 Executive Summary
Page 44 of 138

Page 49

8 
Steeple
Buildings
The Old Library
Centre
Parish
Church Hall
Kilbarchan 
Performing
Arts Centre
Scout Hall
Masonic Hall
Lodge of      
St Barchans
Weaver’s
Cottage
Bobbins
Cafe
Guide
Hall
Habbies 
Pub & Grill
Trust Inn
Kilbarchan
Bowling Club
Key
Tourist attraction
Pub/ Restaurant/ Cafe
Hall/ venue for hire
Steeple Buildings: focus of this report
Page 45 of 138

Page 50

9
East building prior to restoration
Kilbarchan has a population of 4,653 per the 2022 Census. The village is home to 61
listed buildings, the highest profile of which is the National Trust Weaver’s Cottage. It
is part of the National Cycle Network routes 7 and 75 and features in the Paisley
Pattern visitor itinerary. There are several cafes, but little visitor accommodation.
Kilbarchan has other multi-use halls for community use, including the Performing Arts
Centre representatives of which have been consulted as part of research for this
report.
3.0 Context
Kilbarchan takes its name from the Gaelic "Cill Bhearcain," meaning "the church of
St. Barchan”, and first appears in the historical record in 1175 as ‘Kylberhan’ in the 
Registrum Monasterii de Passelet. The dedication to St Barchan,  an early eighth-
century Irish saint , suggests there was an ecclesiastical site predating the twelfth
century. The village lies at the centre of the wider parish of Kilbarchan.
In 1740, it had a modest population of around 200 people, primarily centred
around the village cross at the intersection of what are now known as Steeple
Street, Church Street, Shuttle Street, and New Street. The mid-1700s marked a
significant period of growth for Kilbarchan, driven by the booming handloom
weaving industry, along with other local enterprises such as candle factories,
bleachfields, and a brewery.
The village's development was closely tied to the Milliken family, wealthy local
landowners who had made their money in the slave trade and sugar plantations. In
1751, James Milliken II gifted land for a parish school and proposed the addition of
a steeple to house the village bell and a room for a meal market. Built in 1755 by
local mason David Kerr, the Steeple has since become a prominent landmark and a
symbol of civic pride. The north wing of the Steeple housed the meal market, while
the south wing served as the school.
The Kilbarchan General Society, founded in 1765, is one of the oldest charitable
organizations in Scotland. It has played a vital role in supporting local members in
need and has a long-standing association with the Steeple. Throughout the 19th
century, Kilbarchan expanded its public amenities, including the establishment of
the Front Committee in 1822, which managed local resources and maintained
public facilities like wells and the Steeple clock. The village became known for its
strong community ties and active participation in civic matters.
By the mid-20th century, Kilbarchan faced challenges regarding the maintenance
of its historic buildings. In response, a restoration campaign was initiated in the
3.1 Kilbarchan Village
3.2 Demographics
1950s, ensuring the Steeple and surrounding structures were preserved for future
generations. Recognized for its architectural and historical significance, Kilbarchan
was designated as an Outstanding Conservation Area in 1973. Today, Kilbarchan is
celebrated for its heritage, including the annual Lilias Day festival, which features
parades and community gatherings, linking the present to the village’s storied past.
The continued efforts to maintain and revitalize its historic buildings underscore
Kilbarchan’s commitment to preserving its unique character and sense of community.
Above: historic postcard with view to the Steeple Buildings; Source: eBay
Page 46 of 138

Page 51

10 
4.0 The Building
The Steeple Buildings have played a significant role in the social, cultural and business
life of Kilbarchan and dominate the village skyline, contributing to the exceptional
townscape of the conservation area, which has been classed as “outstanding” since
1973.
Category A listed, it occupies an elevated site in Steeple Square at the heart  of the
village. The buildings’ most prominent feature is the classical four storey tower,
designed in the manner of a Tolbooth. Constructed from roughly coursed sandstone
rubble, with dressed margins under a slate roof, the building would originally have been
lime harled. The tower has a carved ashlar belfry and spire (bell cast by Thomas Mears
of London 1811), a Gibbsian door surround, a third floor venetian window with arched
niche that houses a bronze statue of celebrated local piper Habbie Simpson (installed in
1932 replacing the 1821 wooden one) and a clock with balustraded parapet at belfry
level.
Originally planned as a small parish school, meal-market and steeple with village bell,
the first iteration of the building was completed by mason David Kerr in 1755. A room
above the meal-market was retained by local landowner, James Milliken of Milliken for
his family. The Milliken family were wealthy local landowners whose money came from
the slave trade and sugar. This room became known as the “Ladies Room” as it was used
by local ladies, between church services and during hunt meetings. 
The Kilbarchan General Society (KGS) was founded in 1765 to provide relief to local
members in need. A 1723 horse-drawn fire engine owned / operated by KGS was stored
in the meal-market. In 1782, to accommodate the growing population the south
building was demolished and replaced by a larger school room. In the late C18 the north
building was extended to create a strong room for the meal-market with additional
accommodation above.  
Ownership of parts of the building passed to The Kirk Session in 1765 then to John
Holmes who assigned the building to the Parochial Parish Board in 1892, which was
superseded by Kilbarchan Parish Council in 1894. Renfrewshire District Council united
4.1 History & Ownership
ownership of the building in 1930, with the exception of the first floor “Ladies
Room”, which was conveyed by the estate of Sir Robert John Milliken Napier to
the Kilbarchan General Society in 1869 (the Society retain ownership to this day). 
Fundraising after WWII enabled restoration works valued at £12,000 in memory
of the fallen. Completed in 1957, these works included a new entrance linking the
two wings. The ground floor was used as a village hall with council offices above. 
The old fire engine was relocated at this time to make space for a small kitchen. 
The significance of the Steeple Buildings was confirmed in 1971 with the award of
a ‘Category A listing for buildings of national or international architectural or
historic importance’.  
1902 view of the men's hot baths, this altered space still exists on the first floor
Above: phases of building development, GBPT
Page 47 of 138

Page 52

11
Collapsed roof in 1st floor room
As the village’s principal landmark, the Steeple has acted as gathering point for
the community, in particular  the annual Lilias Days celebrations, when the statue
of Habbie Simpson “comes to life” and leads a parade through the village playing
the bagpipes. 
Most recently the property has been managed as a community hall by OneRen on
behalf of the Council, being used around seven hours per week in 2019, which is
understandable when you consider the various competing venues available in
Kilbarchan. Like all venues, the building closed in 2020 due to the Covid-19
pandemic and has not reopened. The Council has carried our regular inspections
and maintenance while a comprehensive scheme of repair and proposals for a
new sustainable use are developed.
Above: archive view of first floor hall  © Crown Copyright: HES.
Right: Above: historic postcard with view to the Steeple Buildings; Source: eBay
Page 48 of 138

Page 53

12 
Existing  Ground Floor Plan 4.2 Existing Building Layout and Significance 
The Steeple Buildings have been altered by successive generations as
the needs of the village and community changed. Floor plans from
Canmore have been coloured by John Gilbert Architects to highlight
the various phases of development from the 18th Century to the 20th 
Century. The most significant areas contain the historic fabric. The
works undertaken in the 20th Century, are of less historical significance
and allow  scope for internal alterations to improve access.
On the ground floor the former school room now functions as a hall.
The old strong room was converted to WC’s in the 20th century. At the
same time a new stair to the first floor was added and the former meal
-market was subdivided into a kitchen and store.
The first floor contains  a large hall, with an elegant high coved ceiling
and originally featured a corner fireplace. The other principal space on
this level is the meeting room owned by the KGS, which also contains
original features and a fire place. The first floor also benefits from WCs
and stores.
The tower can only be accessed externally and has five floors with a
narrow spiral stair leading from first floor to the clock and belfry. 
https:// canmore.org.uk/site/43216/kilbarchan-steeple-square-steeple-and-steeple-buildings  
Hall
WC 
Kitchen Store
Main        
Entrance 
Steeple 
Access 
Key
1755
1782
Late 18th Century 
20th Century 
Access
WC
Page 49 of 138

Page 54

13 
Existing First Floor Plan 
Hall 
General Society
Room
Existing Second Floor Plan
Existing Third Floor Plan
Existing Fourth Floor Plan
WC
WC 
Page 50 of 138

Page 55

14 
4.3 Building Condition  Survey
John Gilbert Architects were commissioned in 2023 by the Council to survey the    
building, assess its condition and advise on the priority of repairs. 
The JGA report from October 2023 identified and categorised  the following items:
Immediate 
• Replace all lead work (finishes, upstands, flashings, sealant etc.) to steeple roof
and belfry roof and ensure stone finials and stone balustrade are properly    
dowelled and secured to the building. Lead gutter renewed and reconnected to
downpipes.
• Full re-slate of the roof with all associated flashings and fixings.
• Strip finishes and any damp substrate or structure below from flat roof area.
• Replace all three rooflights. Ensure watertight line is continuous from slate roofs
to flat roof and rooflights.
• Renewing all rainwater goods and soil / waste goods. 
Urgent 
• Repairs and sealing of chimneys with slate cappings. Reinstate like for like    
chimney pots throughout.
• Stone indents to west elevation at junction with steeple.
• Removal of all external wiring to allow for works. Ideally no external wiring would
be returned to the building.
• Cut out and replace rotten sections of some windows. 
Necessary
• Replace external lighting to steeple. 
• All stonework to be DOFF cleaned, cement mortar raked out and full
repointing of the whole building, including the spire and belfry. 
• Remove all paint to corner profiles, opening surrounds, feature bands,
clock surrounds etc. as it is flaking in many areas and looks to be     
trapping moisture in the stone behind. Repaint with a natural mineral
based exterior paint, colour to match existing. 
• Most windows are in good condition but require sanding, repainting,
cleaning, checking of opening mechanisms and weights to sashes and a
reapplication of putty and / or burnt sand mastic. 
• Some external doors require repairs, sanding and repainting. Internal
repairs and redecoration to floors, walls and ceilings generally. 
• Sanding and repainting all internal doors and windows but generally
retaining ironmongery. 
Desirable 
• Cleaning and conservation of weathervane.
• Some external doors require only a sand and repaint.
• Cleaning and conservation of clock faces and mechanisms, wall   
mounted streetlights and statue of Habbie Simpson. 
Page 51 of 138

Page 56

15
Slate roof, lead flashings and clips in need of repair / some       
replacement. Flat roof and rooflights in poor condition and leaking.
Stone belfry, balustrade and leadwork in poor condition generally Existing stone spire and finials in need of repair and
new restraint fixings
Rainwater goods need to be replaced.
External stone requires 100% cleaning
and repointing
Timber windows with areas of rot, flaking paint-
work and missing burnt sand mastic. Repairs  
required to windows and doors
Painted quoin stones flaking throughout Evidence  of lime harling on stonework
Page 52 of 138

Page 57

16 
First floor hall: existing floor warped  due to moisture and
decoration affected by water ingress
Kitchen is small and would require    
upgrading to allow a commercial use
Ground floor hall: interior requires attention due to lack of  use,
heating and ventilation
Kilbarchan General Society meeting room 
Ground floor changes in level restricts          
accessibility 
Stair only access to first floor limits   
accessibility
WC’ fittings are serviceable but would
benefit from refurbishment
Page 53 of 138

Page 58

17
Luths Services Ltd were also commissioned by the Council in 2023 to survey and
report on the condition of the following existing services installations: 
Mechanical  
• Heating
• Ventilation
• Domestic hot water
Electrical
• LV Distribution – Main Switchgear and Sub-Distribution 
• Wiring installations
• Lighting installations
• Emergency lighting installations
• Small power sockets
• Fire alarm 
• Clock mechanism
The main issues identified in the survey were: 
No/Natural Ventilation
There is a lack of ventilation which has resulted in poor  indoor air quality and
mould collection. Installing mechanical ventilation systems would vastly improve
air circulation. 
Damaged Gutters: 
The chimney and gutter are damaged leading to rainwater  accumulating in the
walls of the building. This has caused potential mould growth and structural      
damage. Promptly repair or replace the gutters to maintain the building’s integrity. 
Mould on Ceilings
Due to lack of ventilation and proper heating there is mould on most ceilings
and especially in the ground floor hall. Ceiling mould indicates excessive    
moisture. Identify the moisture sources and remediate mould to ensure a
healthy indoor environment and structural integrity. 
Electric Heaters
Old electric space heaters are inefficient and costly. Upgrade to heat pumps
or new heating for improved performance and energy savings. 
Distribution
There is a potentially damaged conduit in the electrical cupboard from the
general distribution board. This risks electrical hazards. Repair or replace dam-
aged conduit to protect wiring and ensure electrical safety. 
Lighting
All lighting fixtures are CFLs. Replace CFLs with LED fixtures to reduce energy
consumption and maintenance costs whilst improving lighting quality. 
4.5  Current works to the  building
The Council appointed MAST Architects to implement a package of repair
works in September 2024. 
4.4 Building Services Survey
Page 54 of 138

Page 59

18 
Collapsed roof in 1st floor room East building prior to restoration
In this section Community Enterprise sets out the key national, regional and local
policies and strategies which will influence the project, and identifies the existing
priorities it may support. It also summarises other wider factors that have been
taken into consideration in the options appraisal. 
• Place: the plan emphasises access to facilities (including places to eat and
cultural opportunities) within communities, and states that “we will continue to
celebrate the arts, culture and our heritage in Renfrewshire”. The plan
references a whole-place approach. This has been prioritised in this project,
seeking a future use for the Steeple Buildings which complements Kilbarchan’s
existing heritage and community assets, in particular the presence of various
other community halls and large gathering spaces. 
• Economy: one of the priorities is creating sustainable employment
opportunities, which a commercial tenancy at the Steeple will provide. 
5.3 Economic Development 
Renfrewshire’s Economic Strategy 2020-2030 recognises that attracting people of
working age to live and work in the region is key. Under this objective, interventions
including levering investment into town centres. The strategy also seeks “to foster an
entrepreneurial culture and support the creation of new and growing businesses”,
including in the creative industries. 
Flexible business space at other units such as Start Up Street has been in high demand,
and consultation with Business Gateway Renfrewshire and local businesses in
Kilbarchan showed that there was demand for customer-facing premises. 
5.4 Tourism 
Renfrewshire’s Tourism Today is Renfrewshire’s tourism plan for 2024-27, and seeks
to grow the value of tourism in Renfrewshire and enhance its benefits, including to
businesses and communities. One of the projects identified is to support the Villages’
tourism offer, leading to increased capacity to attract and accommodate visitors.
Preventing future deterioration of the Steeple, a high-profile heritage building among
Kilbarchan’s many historic sites, will support the village’s tourism appeal. Meanwhile,
commercial use of the ground floor as a bistro has the potential to increase visitor
dwell time and spend in the area. 
5.0 Strategy and Context
The National Planning Framework 4 (NPF4) is the long-term plan for Scotland to
2045 and sets out where development and infrastructure is needed. Within this,
Local Authorities must also prepare a Local Development Plan. Renfrewshire’s
most recent Plan was adopted in 2021. This sets out a practice of continued
support for the redevelopment and regeneration of brownfield and previously
used sites, recognising opportunities for the historic environment to contribute
positively to placemaking. Policy Env 3 on Built and Cultural Heritage states that
Renfrewshire’s built and cultural heritage will be safeguarded, conserved and
enhanced. It also notes that the sympathetic restoration of listed buildings will be
supported when it allows a building to remain in  active use, although the design
should be sensitive to the building’s character, appearance and setting. There is a
presumption against demolition or other works that would actively affect listed
buildings. 
Renfrewshire Council licensing and planning representatives have been consulted
and have confirmed that there would be a pragmatic approach to any application
for a change of use for the Steeple Buildings, and to minor changes needed to the
building to put in kitchen extraction, bin stores and air source heat pumps as
needed. 
5.2 Council Plan
Renfrewshire Council’s Plan for 2022-2027 (refreshed in 2024) is the overarching
plan setting out how the Council will work towards “creating a fairer Renfrewshire
built on innovation, wellbeing and opportunity”. The project aligns particularly
with the following high-level priorities of the plan: 
5.1 Planning  Policy
Page 55 of 138

Page 60

19
5.5 Community planning 
Kilbarchan forms part of Renfrewshire’s Local Partnership for the Villages area.
Priorities identified for this area are connectivity and transport (including public
transport and green routes), environment and parks, access to services, facilities
and assets, and village identity and character. Finding sustainable future use for
the Steeple contributes strongly to the last two of these. 
5.6 National heritage strategy 
Our Past, Our Future: The Strategy for Scotland’s Historic Environment 
Scotland’s national strategy for the historic environment for 2023-2028.
Developing Kilbarchan Steeple Buildings fits well with all three priorities: 
• Priority 1: Delivering the transition to net zero. Reduced emissions
(outcome 1) and climate resilience (outcome 2). Although this is not
primarily a project with an environmental focus, the Steeple Buildings have
historically had high energy usage indicating inefficient heating and lighting.
Energy efficiency, reuse of materials (reducing embodied carbon) and
design for future climate conditions will be integral to regeneration plans. 
• Priority 2: Empowering resilient and inclusive communities and places. The
strategy seeks to ensure that organisations that care for the historic
environment have the right skills and are more resilient. It is not yet clear
who will manage the Steeple Buildings, but the options appraisal
undertaken has aimed to identify a financially viable usage for the building,
avoiding a scenario where its future is dependent on funding in the long
term. 
• Priority 3: Building a wellbeing economy. The strategy seeks to promote fair
work, responsible contributions to Scotland’s economy and increasing
engagement with the historic environment, particularly through activities
that enhance wellbeing. 
In addition to this strategy, the Options Appraisal has also taken into consideration the
economic pressures facing the heritage sector. Rising operating costs have affected
many organisations managing heritage assets: see for example a recent statement
from Museums and Galleries Scotland, in which they state that 11% of accredited
museums participating in a recent study feel that their organisations are at risk of
closure in the next 12 months. 
5.7 Community engagement 
Community and stakeholder consultations carried out by GBPT, Community Enterprise
and John Gilbert Architects revealed several key insights regarding the future of the
Steeple Buildings. Findings are summarised in section 6.0. 
In brief, key points relevant to the business case were: 
• There was strong support overall for the restoration and reuse of Kilbarchan
Steeple Buildings that maintains community access.
• People recognised that Kilbarchan has enough community halls and gathering
spaces, so any future development should complement these rather than
compete. 
• Commercial usage was generally not seen as a concern, and people were open
to the inclusion of some commercial activities in line with the community’s
values and needs. 
• Many participants did want to see elements of heritage interpretation, but this
could take the form of exhibitions or displays integrated into the building (and
potentially spread out across the village), rather than entire rooms dedicated to
heritage. 
Page 56 of 138

Page 61

20 
5.8 Non-displacement and Partnership Working 
A priority for the options appraisal has been to identify a future use for the
Steeple Buildings  which will not duplicate or take business away from other
businesses and community spaces in the village. Community Enterprise reached
out to local businesses, including other community halls, to find out how what
opportunities they saw, and how regeneration of the Steeple Buildings would
affect them.
Interviews were carried out with the Performing Arts Centre, the Parish Church,
and the owner of Habbies and the Trust Inn. We contacted Old Library Centre, the
Scout and Guide Halls and Masonic Hall, but they did not respond or were not able
to take part in an interview within the research period. In addition, we interviewed
Business Gateway and a local commercial Estate Agent about the demand for
commercial property. 
Key findings were: 
• There was general agreement that there are enough halls in the village
without bringing the main hall at the Steeple Buildings back into community
use. 
• Hospitality is profitable in Kilbarchan, existing pub/restaurants are busy 7
days per week. There was consensus among participating businesses that
there was a gap in the hospitality market for somewhere to go in the
evening outside of a pub setting, rather than a café open in the daytime. 
• The cost of rent is a major barrier for people starting a business in the area.
Flexible business space, where available, has been popular. Outside of the
hospitality sector, it is uncommon for a business to take on a long lease in
the area. 
• There are a lot of lifestyle business start-ups in the area – these types of
businesses don't need office space and often operate from home, but some are
interested in customer-facing premises. 
• There is not much visitor accommodation in Kilbarchan, and the three rooms
above Habbies pub are well used. However, some of the organisations consulted
were unsure of the practicalities of managing a holiday let and how compatible
it would be with other use of the rest of the building. 
• As part of consultation, Renfrewshire Museums were consulted about the
potential for use of the Steeple Buildings as a heritage centre, possibly as an
outreach space for Paisley Museum Reimagined. The Museums team confirmed
that they did not have capacity or budget to manage another site. If the Steeple
Buildings were developed into a standalone museum, Renfrewshire Museums
would be open to co-producing programming as part of their outreach strategy
(in development at the time of the consultation). They advised, however, that a
heritage centre at the Steeple Buildings would need a collection appealing to
people beyond the local area to have a chance of being viable. Similarly, the
National Trust for Scotland were consulted by Glasgow Building Preservation
Trust (see section 6.0), and have suggested there may be potential to display
items from the Weavers Cottage collections within the Steeple Buildings, if
insurance, environmental, and display standards were acceptable to the
collections care team at NTS. There is also potential for reciprocity in terms of
joint events and cross-promotion. NTS requested that they be kept up to date as
plans evolve. 
Page 57 of 138

Page 62

21 
Above: Consultation poster displayed on community notice board 
Left: Consultation poster prepared to publicise project and event
Page 58 of 138

Page 63

22 
6.1 Community Consultation
Community and stakeholder consultations carried out by GBPT, Community Enterprise,
and John Gilbert Architects revealed several key insights regarding the future of
Kilbarchan Steeple Buildings. The following points summarize the findings: 
• Support for Building Restoration
There was overwhelming support for the restoration and reuse of the Steeple
Buildings. Participants expressed strong interest in seeing the building repaired and
made functional again.
• Existing Community Halls 
Participants acknowledged that Kilbarchan already has sufficient community halls and
gathering spaces. Therefore, any future development should aim to complement
rather than compete with existing facilities and local businesses.
• Accessibility
Improving accessibility within the building was identified as a priority. Ensuring that the
building is accessible to all, especially for those with disabilities, was a consistent
theme throughout the consultations.
• Potential Commercial Uses
Commercial uses for the Steeple were generally not viewed as a concern, indicating  an
openness to the inclusion of some commercial activities as long as they align with the
community’s values and needs.
• Mixed-Use Preferences
Participants favoured a mixed-use approach, combining different functions and uses
within the Steeple Buildings which could serve various segments of the community
while maintaining the historical and cultural value of the building.
• Heritage Interpretation
Many participants expressed a desire to see the building incorporate elements of
heritage interpretation, with a particular focus on Kilbarchan's history, especially its
rich textile heritage. This could take the form of exhibitions, interpretive displays, or
other educational features celebrating local history.
6.0 Consultation
• Visitor Engagement
The need for additional activities, attractions, and better signposting for visitors
was frequently mentioned. This would help to promote the area to visitors and
improve overall engagement with the village’s heritage and support current and
planned initiatives such as Kilbarchan Smile’s heritage garden and trail.
• Crafts and Creative Workshops
There was a recurring suggestion to create a space within the Steeple Buildings for
the sale of high-quality crafts, coupled with creative workshops that could attract
both locals and visitors, whilst supporting local artisans and promoting Kilbarchan's
craft traditions.
Aims and Audiences
The community engagement process, led by GBPT, took place from July to
September 2024 and ran concurrently with business planning and architectural
design work. The main aims of this community engagement programme were: 
• To raise awareness of the Steeple Buildings historical significance and
current conservation needs.
• To understand community perceptions of the Steeple Buildings and its
surrounding environment.
• To involve local residents in the decision-making process, ensuring that
community voices influenced the project direction.
• To gather views on the best future uses for the Steeple Buildings, considering
the local context and community needs.
• To assess potential impacts of the proposed restoration and development
plans on the community.
• To identify additional stakeholder groups, ensuring that voices from various
communities of interest were included.
• To gauge appetite  within the community for taking a more  active role in
the future management of the Steeple Buildings.
Page 59 of 138

Page 64

23 
Community consultation event in August 2024
Page 60 of 138

Page 65

24 
Primary Audiences
The engagement primarily targeted residents of Kilbarchan and those with a
connection to the village. Specific stakeholder consultations were held with local
interest groups such as the Friends of the Steeple, Community Council, NTS Weavers
Cottage, businesses, and craftspeople to ensure that all relevant perspectives were
considered.
These findings and community insights will guide the next steps in developing the
Steeple Buildings to ensure it serves as a valuable, accessible, and multifunctional
space that is useful to the local community and visitors alike. 
Engagement Approaches
To gather input from the community, a variety of engagement methods were utilized,
ensuring broad participation and feedback. The primary methods included:
Consultation Event: A key event where community members were invited to share
their views, learn more about the project, and discuss potential future uses of the
Steeple Buildings.
Surveys (Online and Hard Copy): Both online and hard copy surveys were distributed,
allowing people to submit their thoughts in the format most convenient for them.
One-to-One Conversations: Individual conversations were held with key stakeholders
and community members to ensure that in-depth feedback and specific concerns
could be addressed.
Focus Group Session: A focus group was organized to facilitate more detailed
discussions on the building's future, targeting a smaller group of participants for         
in-depth engagement.
Follow-Up Feedback Event: A final feedback event was held to present the findings of
the consultation and allow the community to comment on the proposed options.
The consultation events and survey were widely promoted by Renfrewshire Council
using various platforms:
• A dedicated page on the Council's website which provided updates and
information on the project.
• Social media channels, such as local Facebook groups, were leveraged to
reach a broader audience, encouraging participation in the survey and
events.
• Local news outlets, including the, Daily Record, Paisley Gazette and Gryffe
Advertiser, helped to raise awareness.
• Hard copy posters were placed in key locations such as local businesses,
churches, and community noticeboards to reach those without internet
access. 
Additional Engagement Tools
• GBPT produced a short video (https://youtu.be/WxM1sFzgcHc) detailing the
history of the Steeple Buildings and an interactive timeline                        
(https://www.gbpt.org/kilbarchan.html )to engage the community and promote
both the survey and events.                        
• Posters and Interpretative Materials: Posters and materials covering topics
like the Steeple's history, architecture, and conservation were developed to
inform attendees. These resources explained the building's phases,
ownership, governance, legal protections, and the options appraisal process. 
Promotion and Publicity
Page 61 of 138

Page 66

25
Page 62 of 138

Page 67

26 
Events
The initial public consultation event was originally planned to take place on June 1st
to coincide with Lilias Day, a local celebration, but had to be rescheduled due to the
pre-General Election period. The event was moved to August 3rd and was held as a
drop-in information session. A follow-up feedback session was undertaken on
September 7th to present findings and gather further community input. Both events
were hosted at the Kilbarchan Parish Church Hall, located directly across from the
Steeple Buildings, making it a convenient location for attendees. 
No formal attendee profiling was conducted during the public consultation events,
and only a few photographs were taken during the sessions. This approach was
intentional, as the events were designed to foster an open and informal atmosphere,
encouraging participants to discuss issues freely without feeling observed or intruded
upon.
At the conclusion of each event, staff made a series of general observations. These
included an informal analysis of the attendee profile, along with notes and comments
from individual conversations. This allowed the team to capture insights and
feedback while maintaining the relaxed and approachable nature of the sessions.
Survey
An anonymous, online survey was designed to gather information on people's
awareness of the Steeple Buildings conservation needs,  perceptions of and values
associated with the buildings and surrounding area, and their views on potential
future uses of the complex. It also gathered information on respondents'
demographics.
The survey was circulated via Smart Survey and promoted at events and through the
publicity campaign. It was also available as hard copies. The questions and responses
are reproduced in Appendix A. 
Page 63 of 138

Page 68

27
Awareness of the Steeple Buildings
Most respondents and attendees had visited the Steeple Buildings at some point.
It was clear that the Steeple Buildings had, historically, been used for a wide range
of activities and functions catering to all ages and interests. This included hosting
community council meetings, ballet and dance classes, playgroups, art classes,
public lectures, exhibitions and concerts and private functions such as birthday
parties. 
Perceptions of the Area Around the Steeple Buildings
The public realm around the Steeple Buildings was generally considered adequate,
but there is significant room for improvement in aesthetics, comfort, accessibility,
and functionality. The Square is recognized as a historic, civic, and cultural focal
point for the village. Many attendees emphasized the need for improved access
for prams, pushchairs, and wheelchairs. While parking in the Square is deemed
essential for residents and users of local facilities, there is a desire for measures to
deter opportunistic parking and to re-establish the Square as a vibrant civic space
rather than a car park. There was also a general aspiration to see the Square used
more often. 
Community Needs
The answers to questions around what is missing from the community, and the
types of activities and events people would like to see in the buildings, produced
mixed and often contradictory responses. Social/gathering spaces and
performance/exhibition spaces were highlighted by around half of respondents as
being something they would like to see within the buildings, but many
Page 64 of 138

Page 69

28 
subsequently acknowledged the abundance of lettable halls in the village. Through
deeper conversations with attendees at events, we have interpreted this as
representing a desire to see the Steeple Buildings used as a community resource, and
an appetite for a new or different offer, rather than highlighting a lack of facilities in
the village. A desire for greater flexibility in booking arrangements was also
mentioned, including the potential for longer-term block bookings across multiple
days or weeks. Others felt that the previous booking system, which required a
minimum hire of two hours, was too proscriptive and expensive for small, short-term
hires.
Additionally, there was a call for spaces to support local craftspeople, makers, artists,
and small businesses. Participants identified a need for studio and workshop spaces,
as well as venues for exhibiting and selling work. Parallels were drawn with nearby
Lochwinnoch, which is emerging as a thriving artist community and visitor destination. 
Implicit in many conversations was a recognition of the heritage value of the building
in terms of its architectural and historical significance, its function as the civic heart of
the village, and memories of past events and offers in the buildings. Somewhere to
celebrate the heritage of the village, and attract visitors was also seen as a priority,
and unsurprisingly, many felt that the Steeple Buildings would be an appropriate
venue for hosting a heritage offer. 
Several respondents flagged the potential for a café or restaurant offer, with the
caveat that any new offer should be distinct and not compete with existing
businesses. Other suggestions included the creation of a holiday let or
accommodation offer on the upper floor. 
It should be borne in mind that the community needs outlined above represent the
desires of the demographic who engaged with the consultation, who were
predominantly older.  The needs of the younger cohort should be identified as the
project progresses. 
Page 65 of 138

Page 70

29
Page 66 of 138

Page 71

30 
Page 67 of 138

Page 72

31
Management and Ownership
Two questions were posed in the survey in relation to future management
and governance of the Steeple Buildings. When asked ‘Who should manage
the Steeple Building, many (41%) of respondents selected ‘not sure’ and
comments revealed a mixed level of understanding of the relevant
organisations and their roles and responsibilities. For those who expressed
a preference,  the responsibility for management of the Steeple Buildings 
was split fairly evenly between  OneRen and the formation of a new
charity. There was concern that OneRen may not have the capacity to
manage the facility, but equally there was an understanding that a new
charity would require community support. A few people suggested that the
National Trust for Scotland could manage and/or take ownership of the
buildings, but this was tempered with an acknowledgement that the NTS
may be reluctant to take on additional properties. 
Responses to the ownership question showed a clear preference for
Renfrewshire Council and Kilbarchan General Society retaining ownership,
however, over 30% of respondents were unsure how to answer the
question. As one respondent pointed out “This is difficult to address at
present. And needs more consideration”. While there was a general
consensus around a preference for ownership retention by Renfrewshire
Council and Kilbarchan General Society, many people expressed
dissatisfaction with the current management of the building. 
We can conclude that while there is a strong interest in the building and
potential future uses from within the community, they are reluctant to
express their opinions on long-term management and ownership until they
are fully appraised of the potential options and the implications and
considerations involved. 
Heritage
Preservation and celebration of local heritage, particularly textile heritage,  was
frequently mentioned, both as a source of local pride  and identity, and as a way
to attract visitors to the area. Options for a heritage centre were explored as part
of the consultation and business plan. 
The National Trust for Scotland (NTS), who own and operate the Weavers Cottage
in Kilbarchan, were consulted as a key local stakeholder. The Weavers Cottage
achieved 3,583 visitors in 2023 (source: Association of Leading Visitor Attractions:
ALVA | Association of Leading Visitor Attractions ). 
Discussion with Stuart MacKinnon, Operations Manager at NTS on the 5th
September indicated broad support for the preferred option at the Steeple
Buildings. Mr MacKinnon also suggested there may be potential to display items
from the Weavers Cottage collections within the Steeple Buildings, if insurance,
environmental, and display standards were acceptable to the collections care
team at NTS. There is also potential for reciprocity in terms of joint events and
cross-promotion. NTS requested that they be kept up to date as plans evolve.
Kilbarchan Museum Without Walls
A useful option to explore is the ‘ecomuseum’ model. The term "ecomuseum" is a
blend of "eco-" from the Greek oikos (meaning "house" or "environment") and
"museum." This reflects the idea of a museum that is closely linked to place and
community, rather than just a building displaying objects. It is not a museum of
ecology or the environment, though it may incorporate elements of natural
heritage.
An ecomuseum is a dynamic, community-based heritage project, focused on
preserving both tangible and intangible heritage in a way that benefits local
Page 68 of 138

Page 73

32 
people and the environment. Unlike traditional museums, which are typically
housed in a single building, ecomuseums are more integrated into the
environment and often spread across multiple locations within a community. The
core idea is to involve local communities in managing, protecting, and showcasing
their heritage and environment, making it a living and evolving museum. 
An ecomuseum could provide an umbrella project to gather and promote the
diverse range of cultural and natural heritage offers around the village. The
Steeple Buildings would naturally form part of the eco-museum, but without the
financial and administrative burden of a traditional-style heritage or interpretation 
centre. This approach would also align with proposals to develop a cultural
quarter for Kilbarchan and support emerging and current heritage initiatives such
as Kilbarchan Smile’s heritage trail, Lilias Day and other local events and traditions.
Key features of an ecomuseum include:
Community Involvement: The local community plays a central role in the
ecomuseum, helping to manage, develop, and present their heritage. It
emphasizes participation and collaboration, making it a shared project.
Cultural and Natural Heritage: Ecomuseums are not limited to artefacts or
exhibitions. They encompass cultural traditions such as annual fairs and events
(e.g. Lilias Day), historical sites and buildings, landscapes, biodiversity, local crafts,
oral histories and traditional practices.
Decentralized Structure: Unlike traditional museums which have centralized
buildings an ecomuseum often encompasses a variety of outdoor sites, including
villages, monuments, farms, and natural areas, thus creating a museum without
walls.
Education and Experience: Instead of presenting objects or exhibits, ecomuseums
encourage interactive and immersive experiences. Visitors often engage directly
with the surrounding environment (streets, buildings, greenspaces etc) and local
practices, deepening their understanding of the culture and history of the area. 
Sustainability and Conservation: Ecomuseums focus on the sustainable development
of the region or place they represent. They aim to protect both the natural
environment and cultural heritage, promoting conservation efforts and fostering an
understanding of the relationship between people and their environment.
The concept originated in France in the 1970s and is seen as a way to revitalise
communities and strengthen local identity by connecting people with their
surroundings and their past. The idea is well-established, with over 300 operating
worldwide, mostly in rural France, Spain, Italy and Poland. There are several recent
additions in Scotland, including:
• Moffat Ecomuseum: https://moffatmuseum.co.uk/moffat-ecomuseum/
• Flodden 1513 Ecomuseum: https://www.flodden1513ecomuseum.org/
Page 69 of 138

Page 74

33 
Memories, Perceptions and General Observations               
(selected quotes)
• ‘I used to come here for ballet classes and the tufty club when I was
young. Aerobics classes and discos as a teen. ‘
• ‘Attending meetings of the local beekeepers association. ‘
• ‘I have lived in Kilbarchan for 20 years but have never been in the 
Steeple  Buildings. I am aware of occasional functions in the early time
but nothing that attracted my attention. ‘
• ‘Attended numerous Glasgow University extra-mural classes over a
period of 6-7 years. Wine circle met regularly in upper hall. Various
dances and parties held in the Steeple Hall.’
• ‘Needs tidying up and some benches and flowers and signage. ‘
• ‘Token disabled accommodations and no separation of the hall and
the   surrounding car parking. Vehicles can and have parked across the
doors to the steeple preventing access. Seating between the building
and Steeple Street, with access, would improve things. A waste bin like
the one outside the Library would be nice.’
• ‘It's ok for me but I can't think it's an easy space to access if you have
mobility  issues. It would be really nice if there were planters/flower
baskets during the summer months to make it more attractive.’
• ‘As a resident of Steeple Square I am happy about the access and use
of the square.’ 
• ‘The public space is ideally placed within the conservation area and
can link to the Weavers Cottage, Kirk creating a cultural quarter. Space
- buildings speak to each other aesthetically generally - space for cafe/
bistro ??? - farmers markets.‘                   
Community Needs and Potential Use Options                               
(selected quotes)
• 'Uses that support and enhance existing services - Bobbin's Cafe, Arts 
Centre, Weavers Cottage.'
• ‘Flexible social/gathering spaces for events, exhibitions etc. Plus a
kitchen for self-catering or use by caterers booked for events. Kilbar-
chan only has 1 cafe and 2 pubs where snacks/meals are available.
No catering will  reduce interest and demand in using the refurbished
steeple for parties, shows etc. ‘
• ‘With bowling club, scout hall, guide hall, church hall and Masonic
hall, Kilbarchan has more than enough venues, all of which are better
suited to the above than a renovated steeple.  Renovated suitable for
some small local business to use or share is likely to be cost effective.'
• 'Would like to see a permanent exhibition about Kilbarchan’s weaving
heritage. Then space for a monthly craft fair/ farmers market and for
pop-up exhibitions/craft courses.'
• 'No objection to a business owning or managing provided the build-
ing is used and not left empty, access still needed for lilias day.  Pref-
erence is to the one who can commit best to the future after renova-
tion.'
• 'Need to fill a gap. Lots of crafters and artists in the area could be
brought together for arts, crafts, music etc as a creative centre. Repli-
cate or partner with success of Made in Paisley, Loud and Proud,
PACE, etc. Probably consider more dance provision as so many dance
schools and teachers looking for premises. '
Page 70 of 138

Page 75

34 
Event / Activity Description No.
Attendees
Attendee/Respondent Profile 
Drop-in Information Session at Kilbarchan Parish Church Halls
Date: O3/08/2024 11am—3pm 
The event, held at the Kilbarchan Parish Church Halls, was facilitated by two staff members from
GBPT, alongside representatives from John Gilbert Architects, Community Enterprise and Ren-
frewshire Council. The session aimed to provide attendees with detailed information about the
Kilbarchan Steeple Buildings and gather community feedback. Catering was provided by Bobbins
Café, offering refreshments for attendees. Children’s activities were run by Habbie Crafts, ensur-
ing families could participate while their children were engaged in creative activities.
Materials and Presentations:
• Information Posters: Six A0 posters were displayed, offering insights into the history of
the buildings, the options appraisal process, and key considerations for the project.
• Architectural Plans: John Gilbert Architects presented four potential options for the future
of the Steeple Buildings, giving attendees a visual and conceptual understanding of the
possibilities.
• Case Studies: Community Enterprise showcased three case studies of similar heritage and
community projects, discussing the pros and cons of each to encourage thoughtful dis-
cussion.
• Surveys and Feedback: Hardcopy surveys were available for attendees to fill out on-site,
and materials were provided for feedback and memory gathering, allowing participants
to share personal stories or reflections related to Kilbarchan and the Steeple.
51 Attendee Profile and Engagement Summary
The attendees of the drop-in information session were primarily older individuals,
with most being 40 years or older. Almost all participants were residents of       
Kilbarchan, and showed strong local interest in the project.
Key Observations:
• Intentional Attendance: The majority of attendees had come specifically for the
event, demonstrating a keen interest in the future of the Steeple Buildings.
• Familiarity with the Steeple: Most attendees had visited the Steeple Buildings in
the past, indicating a personal connection to the site.
• Awareness and Concern: There was a high level of awareness among partici-
pants regarding the issues facing the building, with most expressing concern
for its future.
• Survey Participation: Most attendees had already completed the online survey
prior to the event, and an additional 16 completed hardcopy surveys during the
session.
• High Engagement Levels: Attendee dwell time was notably high, with most indi-
viduals staying for at least 30 minutes and engaging deeply with staff and the
materials. This level of interest and participation exceeded expectations. 
Update and consultation meeting with the Friends of The Steeple, representatives of the Kilbar-
chan Community Council and Renfrewshire Council. 
Date: 20/08/2024 6pm—8pm 
The session at Kilbarchan Performing Arts Centre, facilitated by GBPT staff and a Renfrewshire
Council representative, provided an update on progress and initial findings from the August 3rd
event. An informal discussion followed, focusing on suitable end uses, potential end-users, and
long-term governance of the Steeple. The heritage of the building and village was also dis-
cussed, including the old fire engine, which, while significant to the village’s history, was consid-
ered unsuitable for display in the Steeple due to space constraints. 
8 8 individuals drawn from the local community, with an interest in the Steeple Build-
ings. All attendees bar two were members of the Friends of Kilbachan Steeple, a
sub-group of the Kilbarchan Community Council. 
Key Observations:
• Familiarity with the Steeple: Most attendees had visited the Steeple Buildings in
the past, indicating a personal connection to the site.
• High levels of local knowledge. Attendees were from a mix of backgrounds but
had an extensive overview of local businesses, cultural activities, community
organisations and heritage.
Page 71 of 138

Page 76

35 
Event / Activity Description No.
Attendees
Attendee/Respondent Profile 
Online and hard-copy survey—’Finding A New Future For Kilbarchan Steeple Buildings’ (Smart
Survey)
Date: Open from 15/07/24 to 12/09/2024
106 A total of 106 respondents participated in the survey, with the following demo-
graphic breakdown:
• Gender ratio: 70% female, 30% male.
• Age profile: Skewed towards an older demographic, with 75% of respondents
aged 40 or older.
• Residency: Almost 90% of respondents were residents of Kilbarchan, and 92%
lived within the PA10 postcode. 
A full breakdown of findings is included in Appendix A.
Drop-in Information and Feedback Session at Kilbarchan Parish Church Halls
Date: 07/09/2024 (1pm-3pm) 
The event, held at the Kilbarchan Parish Church Halls, was facilitated by two staff members
from GBPT, alongside representatives Community Enterprise and Renfrewshire Council. 
This session included all previous interpretation and consultation materials, along with updated
panels providing feedback on initial findings drawn from survey responses and consultation.
Plans and drawings of the preferred option were presented 
The session was advertised as part of Renfrewshire Doors Open Days weekend and included
two tours of the Steeple Buildings. 
26 The attendee profile for this session was similar to the first drop-in event, with
around half having attended the August 3rd session. Others were aware of the pro-
ject but had missed the initial meeting, while a few had booked the tour of the
Steeple Buildings without realizing it was part of a consultation.
Key Observations: 
• High Engagement Levels: Attendee dwell time was notably high, as in the previ-
ous event.
• Concerns About Competition: A small number of attendees raised concerns
about potential competition with local businesses, but overall responses to the
preferred option were positive.
• Condition of Interiors: Several tour attendees noted that the building interiors
were in worse condition than they had anticipated.
Total attendees and respondents 191 
Page 72 of 138

Page 77

36 
7.0 Development of Options 
Based on the 2023 and 2024 online community survey feedback and discussions
with stakeholders, JGA Architects developed  four mixed use options for discus-
sion at the August community consultation event. 
These uses covered a variety of ideas including  commercial lets, multi-use halls, a
museum / heritage space, a holiday let, a workshop / office space and a market
hall/ exhibition spaces.
Each of the four options incorporated the following general improvements  
• External doors to incorporate accessible thresholds.
• Install a new platform lift giving access to upper floor.
• New WCs and an accessible WC with baby changing facilities.
• Install a new platform lift giving access to all levels.
• Existing stair and landing redecorated and new rooflights installed.
• New sanitaryware in WC's where needed.
• Secure storage added for Kilbarchan General Society in first floor meeting
room
• All upper floor areas redecorated where needed. 
7.1 Brief
Illustration: Clyde Valley Regional Plan 1946
Page 73 of 138

Page 78

37
7.2 Option 1
Ground Floor Plan : Restaurant and hospitality
This option is based on the refurbishment of
the Steeple building including fabric repairs
with small scale internal changes. The key 
interventions include a lift to enable full     
accessibility and changes to the kitchen      
layout. The lift is positioned to allow access
from the reception to a ground floor Bistro
style restaurant and to a first floor multi use
venue. A new larger kitchen is provided which
has its own external  access and a servery to
the bistro. 
On the first floor the existing layout is retained
and refurbished, maintaining the historic      
integrity of the former schoolroom and          
General Society Room. The General  Society
Room will have additional secure storage.
Both of these spaces would be available for
hire by the community and others. 
Page 74 of 138

Page 79

38 
The benefits with this approach are:
• An Internal reconfiguration which allows    
access throughout
• Public access to both ground and first floors
• External fabric repairs which will protect and
preserve a  building of heritage value 
• An upgrade of essentials such as redecoration,
kitchen, toilets, heating and other services 
• Income generated by ground floor business
• Principal spaces retain their current form 
The main issues with this approach are:
• Ensuring the bistro style restaurant doesn’t     
compete with existing offerings in the village.
• A more commercial use in a building that has     
previously been community focused
• Programming events that will attract people to
visit  Kilbarchan.
First Floor Plan: Multi-use Hall & meeting room
Page 75 of 138

Page 80

39
7.3 Option 2
Ground Floor Plan : Multi-use Hall & Kilbarchan Fire Engine 
This option was informed by suggestions
about developing a holiday let in the      
building. It  considered how to incorporate
a residential element in the confines of the
A-listed structure whilst still maintaining a
community space and storage for the    
historic fire engine with the associated         
interpretation.
The building would be refurbished and 
repaired with a new lift. The ground floor
would contain a reception area,                   
a multi-purpose hall, a new accessible WC
and a dedicated heritage room for the    
historic fire engine and local memorabilia.
The first floor would be converted into a
holiday flat, accessed from a landing shared
with the General Society Room. The       
creation of the flat in the former school
room would be the most physically invasive
option and would result in the loss of the
historic volume. The flat would have 2 
double bedrooms, a kitchen/living room
with a coved ceiling and family bathroom. 
Page 76 of 138

Page 81

40 
The benefits with this approach include:
• An internal reconfiguration which allows access
throughout 
• Public access to ground floor and General Society
Room
• External fabric repairs which will protect and 
preserve a building of heritage value 
• An upgrade of essentials such as redecoration,
kitchen, toilets heating and other services 
• Income generated by the first floor holiday let 
The main issues with this approach are:
• First floor historic space is considerably altered 
• Residential change of use  - greater interventions
may suggest Listed Building Consent could be
more difficult to obtain
• Management of a holiday let
• Managing public access and rental priorities 
• Issues with mixed use building and noise         
potentially affecting the flat
• The floor space occupied by the fire engine and
heritage items which will not generate significant
income or repeat visits
• Loss of public access to a principal space  First Floor Plan: Holiday Let  
Page 77 of 138

Page 82

41
7.4 Option 3
Ground Floor Plan : Exhibition & Market Hall 
This option took on board  feedback that there
could be a need for spaces for artists, makers
and creative workers along with dedicated
heritage space.  
The building would be refurbished and           
repaired with a new lift. The ground floor
would contain a reception area,  a multi-
purpose hall and a new accessible WC. The
hall would be renovated to become a            
multi-use space with dedicated storage for
market stalls and exhibition equipment. The
existing kitchen and store would be combined
as a space for the historic fire engine with new
double doors  added for access. The main
structural change would be the insertion of
the new opening and folding partition          
between the heritage space and market
space.
The first floor hall would be upgraded to       
provide flexible workspace or studio space
with associated breakout, meeting area and
storage. The General Society room would be
available for the community when not used by
the General Society. 
Page 78 of 138

Page 83

42 
The benefits with this approach include:
• An internal reconfiguration which allows access
throughout 
• An upgrade of essentials such as redecoration,
kitchen, toilets, heating and other services 
• A dedicated heritage space for the fire engine 
• Public access to the market hall and General Society
Room
• A multi-functional ground floor room with new stor-
age.
• A new co-working / studio space for creative and
arts practitioners
• The historic fire engine is returned to its home 
The main issues with this approach are:
• The loss of public access to the first floor hall, which
is one of the nicest spaces in the building
• The fire engine and heritage items are unlikely to 
generate significant income or repeat visits
• The size of the fire engine won’t allow for flexibility
or other temporary uses
• Responsibility for the insurance and maintenance of
the fire engine would need to be investigated
• Greater number interventions may suggest Listed
Building Consent could be more difficult to obtain
• Management and programming of the market hall
with events that attract people to visit Kilbarchan 
First Floor Plan: Flexible Studio/work space 
Page 79 of 138

Page 84

43 
7.5 Option 4
The focus of this option was the provision of
a dedicated museum/ heritage space and
cafe on the ground floor, with a multi-use
hall on the first floor alongside the General
Society room. A lift would be installed and
the building would be  refurbished and  
upgraded. 
The ground floor would contain a reception
area leading to the lift and accessible WC. A
museum and heritage space would occupy
part of the existing lower hall. 
The major change with this option is the 
creation of an opening between the existing
kitchen/store and hall to create a café that
opens out onto and activates the  Steeple
Square elevation. 
The upper floor would maintain the existing
arrangement with the large hall and Gen-
eral Society meeting room, supported by
toilets and a store. 
Ground Floor Plan : Museum/ Heritage Space  and Cafe 
Page 80 of 138

Page 85

44 
The benefits with this approach include:
• An internal reconfiguration which allows access
throughout 
• An upgrade of essentials such as redecoration,
kitchen, toilets, heating and other services 
• Public access is maintained to the ground floor
and first floor
• Food offering would provide some income to
support heritage offering
• A dedicated heritage space to showcase the      
history and crafts of the village 
The main issues with this approach are:
• A new café would compete with Bobbins Café
next door and would need to be pitched at a
different  market
• Any working relationship with the Weavers
Cottage and OneRen would have to be                  
negotiated
• Management, maintenance and insurance of
heritage items
• How will the heritage offering generate          
sustainable income or repeat visits
• Greater number interventions may suggest Listed
Building Consent could be more difficult to     
obtain First Floor Plan: Flexible Multi-use Hall 
Page 81 of 138

Page 86

45
7.6 Preferred Option
The draft options were presented to the community at a consultation event and
shared online. Feedback from this event and the survey was discussed with The
Friends of the Steeple group, the Council and stakeholders to develop a preferred
option.
It was agreed that Option 1, which combines a commercial use (licensed bistro
style food offering with seating for around 40 guests)  on the ground floor and
multi-purpose use on the first floor, will reintroduce public access to the building
and provide a source of revenue to  support activity in the building. It is important
to the community that the history of the  Steeple Buildings and their role in the
development of Kilbarchan is  recognised and threaded throughout the
refurbished building (rather than concentrated in one room), allowing  visitors to
engage as they pass through different areas. This could take the form of
interpretation developed with the  community and curation of objects and
ephemera  for display which relate to weaving and other crafts.
The preferred option recognises the significance and constraints of the existing
building and its layout reflects its original use with larger spaces on each floor, 
supported by  smaller ancillary and service areas. The proposals seek to preserve
and enhance the most significant elements of the building whilst altering and     
replacing the least significant elements in order to improve and upgrade the      
existing accommodation and generate regular activity and income. 
A welcoming accessible reception area will greet visitors from Steeple Square  
enhancing the route to the ground floor commercial space and up to the first floor.
Accessibility in the building will be improved by the new lift, which links all floors. 
The WCs and kitchen will be refurbished  and upgraded to provide modern        
facilities required. 
The ground floor hall, first floor hall and General Society Room will retain their
historic volumes. On the first floor, the larger meeting room (former schoolroom)
will remain as one large space to allow maximum flexibility for functions,
events, workshops  and other community or income-generating events.
The first floor can also act as an “overflow” function space for the bistro
to host larger events and allow it to be hired as one venue if required.
The spaces of less historical significance (toilets and kitchen) will remain
in their existing locations, albeit refurbished and upgraded to meet      
modern requirements and visitor expectations.  
The General Society room will be repaired, retaining  the original        
features, but incorporating heritage items and new secure storage. When
not being used by KGS, the room will be available for hire for smaller
meetings and or one to one therapeutic services.
There is an opportunity to review and enhance the immediate                  
surroundings of the building and take full advantage of the unique nature
of  Steeple Square providing outdoor seating and services for               
complimentary outdoor events like farmers markets.
The internal refurbishment  cost of this proposal is estimated at
£384,000. Please refer Section 9.0 of this report and the NBM cost plan
in Appendix E for further information.  
Page 82 of 138

Page 87

46 
Col-
lapsed 
The Steeple Buildings are Category A Listed which means that any           
proposed alterations will require to be justified in terms of their impact on
the historic significance of the building and will require Listed Building
Consent from Historic Environment Scotland and  Planning Consent from
Renfrewshire Council. 
Any alterations will also require a Building Warrant from the Council. In
terms of technical compliance, the preferred option is an improvement on
the existing sanitary facilities and building accessibility.
The preferred option has been discussed by the Design Team and Council
representatives internally, but no formal discussions have yet taken place
with Statutory Authorities.  
Informal feedback notes that  planners would take a pragmatic approach to
any application for a change of use for the Steeple Buildings, and similarly
solutions for kitchen extraction, bin stores, air source heat pumps, etc. A
suggestion to potentially lease spaces as artists’ studios as an interim use
would probably not require a change of use application. 
7.7 Statutory Approvals
Some key items we have considered that would be developed further in
a future phase include: 
Ventilation 
The east elevation of the building would be preferable for ventilation
and extract  given it is of least significance / prominence and there is an 
existing vent terminating on that elevation from the toilet extracts and a
minimal number of windows for the extract to interact with.
Refuse 
Provision of refuse storage could be  sensitively incorporated on the
Steeple Square side  of the building as part of improvements to the
immediate public realm and creation of some outdoor seating space.
Public Realm
There is an opportunity to enhance Steeple Square with carefully
considered works which could landscaping, lighting, outdoor seating
services for markets and lighting.  
Licensing
An application for a new liquor license would have to be submitted to
and approved by the Council. 
Page 83 of 138

Page 88

47
8.0 Business Plan
Although the preferred use has been identified, this could be managed in
different ways. Options for management are referred to as A, B and C. These
management options are described in the tables on the following pages.
Developing the preferred option for the Steeple as outlined has the potential to
deliver the following benefits: 
Social Benefits
• The project will prevent deterioration of a high-profile Category  A-listed
building at the heart of the village. There is potential to tie in with
improvements to the public realm around the Steeple Buildings. Revitalising
the village centre and developing the cultural life of the village will
contribute to making Kilbarchan a better place to live and foster a sense of
pride in the community.
Environmental Benefits
• In line with current Historic Environment strategy, preserving and adapting
the building will reduce the need for new construction materials, thereby
reducing embodied carbon and construction waste to landfill. Building
services will be upgraded to maximise energy efficiency. 
Economic Benefits
• Employment opportunities will be available during the refurbishment work,
and the potential for partnership with training providers such as West
College Scotland could be explored. 
• Once the refurbishment is complete, commercial use of the ground floor as
a bistro will provide ongoing employment opportunities. A licensed bistro of
this size open four to five evenings a week could be expected to employ a
chef and kitchen assistant as well as two to three front-of-house staff,
creating four to five new jobs in total. 
• A higher-end bistro in Kilbarchan will encourage visitors to stay longer and
spend more, in line with Renfrewshire Tourism Today’s strategy for the
Villages. 
8.1 Building management options
Page 84 of 138

Page 89

48 
Management Option A 
Process  Pros Cons
• Further discussion with OneRen as to whether they
would relinquish the ground floor only (for lease to a
commercial tenant) or the whole building.
• Renfrewshire Council carries out refurbishment
work.
• OneRen has existing staff and systems to take,
manage and invoice for bookings. The costs of
these resources, along with office costs and
accountancy fees, are split across multiple
sites. The costs to OneRen of continuing to
manage the Steeple Buildings in addition to
other      venues would presumably be          
relatively low, although this would require 
further discussion.
• OneRen is a charity, and as such qualifies for
80% mandatory relief on non-domestic rates.
This does not apply if the Council manages the
building, as local authorities do pay non-
domestic rates. 
• OneRen has a track record of managing        
buildings, including historic sites. Some       
funders may be more receptive to an               
application from the larger, more established      
council-linked charity.
• Capital funding options are more limited.
• In community consultation, there was recognition that  
OneRen may not have the capacity to manage and      
promote the building as actively as a local community
group might.  This may mean that the local community
gets less use from the first-floor space, and that income is
lower. 
Renfrewshire Council retain ownership while either its Estates team or OneRen
continue to manage the building and lease it to tenants. No tenant has a full repairing
lease, so the council has responsibility for repair.
Page 85 of 138

Page 90

49
Management Option B 
Process  Pros Cons
• The new organisation prepares its governing document: liaise with Engage
Renfrewshire and use the Scottish Government’s Model Documents to meet
criteria for CAT. Registration with OSCR and/or Companies House; recruit-
ment of at least three  unrelated trustees/directors; bank account setup. 
• Submit expression of interest to Renfrewshire Council: see Process Guide.
Support available from the Community Ownership Support Service. 
• The new organisation should do its own research and develop its business
case. At this stage, the organisation may also need to raise funds for tech-
nical fees, particularly  legal fees (given that it will be entering into leases).
Renfrewshire Council and the new community organisation will need to
come to an agreement as to how much of the refurbishment works will take
place prior to transfer, and how much (if any) fit-out will be undertaken by
the community organisation.
• Proceed to formal Community Asset Transfer Request.
• CAT request validation period (up to 6 months). 
• CAT Decision-making Process. At this stage, OneRen's board discuss whether
to approve the relinquishing of the building/part of a building back to       
council to allow council to progress with Asset Transfer or leasing. 
• Assuming CAT request is approved, building handover takes place.          
Possibility of some internal fit out being undertaken by the community
group  
• Gives the local community control
over usage of the first floor of the
building, which is likely to enable a
wider range of use and higher        
occupancy. 
•  Assuming the community                  
organisation is a charity, it would
qualify for 80% mandatory relief on
non-domestic rates. 
• If the community organisation takes
on ownership and management, then
undertakes the final portion of the
refurbishment work, it will be able to
access a wider range of grant funding
than the local authority. 
• A community organisation may be
able to raise a proportion of funds for
any capital work it undertakes
through local fundraising or     
crowdfunding. 
• Reliant on volunteers to act as directors/
trustees, manage bookings, monitor       
finances (including maintaining a             
sufficient reserve to cover unexpected
costs) and  commission ongoing repairs. 
• Requires setup and maintenance of a
website and booking system. A          
community organisation that is a charity
must also produce externally verified 
annual accounts. Within a larger             
organisation, these costs are spread
across many properties, whereas a      
community organisation set up solely to
manage the Steeple would have to cover
these operating costs from income from
this property alone. 
• Some funders will not fund  organisations
which are less than a year old and have
not produced annual accounts. This will
limit the organisation’s  access to funds to
pay for final fit-out of the spaces it will        
operate.
Transfer of ownership or management of the full building to a community group, potentially via Community Asset Transfer (CAT). The community
group is responsible for repair and leases the building to tenants. It is likely that this community group would be a charity: either a Scottish Charitable
Incorporated Organisation (SCIO) or a Company Limited by Guarantee with Charitable Status.
Page 86 of 138

Page 91

50 
Management Option C 
Process  Pros Cons
•  OneRen discuss whether to relinquish the site, as in option B).  • This option places the least strain on the
resources of OneRen and the local                
community. 
• A successful operator may be able to market
the first-floor space for a variety of events,
maximising the economic impact of the
business (more employment, attracting visi-
tor spend, etc.) 
• Given the listing of the building, a
full repairing lease may not appeal
to prospective tenants, so RC may
have to retain some or all                 
responsibility
• Uncertain whether affordable       
community access to the first-floor
space could be guaranteed under
this model. 
• Lack of open access may affect     
eligibility for funding 
• Single income stream is less          
resilient to loss of tenant. 
Renfrewshire Council leases the entire building (possibly excluding the Steeple itself) to a
commercial tenant. The tenant would then manage the upper floor as well as the ground
floor. 
Page 87 of 138

Page 92

51
A capital cost schedule has been prepared based on the preferred option by NBM
Quantity Surveyors. A copy of the full NBM cost report is included in Appendix E.
A summary of estimated costs are shown in the table to the right. We have
included contingencies as required by a number of funders for this type of project,
along with design team fees at an indicative rate of 14% at this stage. 
The summary costs in the table exclude:
• Concept and Project Development Fees
• Site Acquisition
• Business Plan
• Legal Fees
• Finance Charges
• Insurances
• Clients Furniture, Fixtures & Equipment
• VAT
• Inflation Assessment 
Further design development or interventions within the building may significantly
affect these estimated costs. 
Estimated Capital Costs
9.0 Capital Project Costs 
Element Cost £
Works Cost 237,109
Preliminaries (15%) 35,570
Contingencies  (10%) 27,270
Inflation uplift  Oct 23—Oct 24 (2%) 5,999
Works Sub Total  305,948
Design Team Fees 14%  42,833
Clerk of Works  5,000
Surveys & Site investigations 15,000
Client held contingency 15,000
Total Capital Costs   383,781
Page 88 of 138

Page 93

52 
10.0 Revenue Costs 
Operational cash flow projections have been produced for the first two
management options outlined in Section 8.0. An overview of each is below.
Under each option, the Steeple Buildings operates at a small annual surplus
after the initial year. 
The differences between cost and income estimates for each option are set
out in the following sections, but in brief, the main differences are the
inclusion of non-domestic rates in option A, and higher marketing,
accountancy and professional costs in Option B (offset by a slightly higher
occupancy)
10.2 Running costs 
The following assumptions on major ongoing costs have been made in order
to prepare our financial projections: 
Gas and electricity 
OneRen has provided past energy usage data from 2020-21 up to midway
through 2023-24. In the last two full years, energy usage has averaged 93,612
KWH per year, with the building closed. Cost over these two years averaged
£15,242 a year. Given that the building has been empty and underheated
(according to the 2023 Services Condition Appraisal by Luths), these costs
reflect a heating system that is inefficient, relying solely on electric space
heaters. The report also notes that inefficient fluorescent lighting has been
used. It is assumed that new, more efficient heating and lighting will be
installed. 
The Luths report provides estimated annual heating costs for various heat
pump systems, ranging between £6,000 and £7,000. These are for the full site.
Assuming that the ground floor is rented to a tenant, the building occupant
would only be responsible for energy bills for the first floor: we have
Option A: Management by Renfrewshire Council and/or OneRen 
Option B: Management by a community organisation 
Year  Year 1  Year 2  Year 3  Year 4  Year 5 
Total income  £ 16,459  £ 21,717  £ 23,758  £ 24,308  £ 24,874 
Expenditure      
Salaries and wages  £ 1,844  £ 4,153  £ 4,278  £ 4,406  £ 4,538 
All other expenditure  £ 15,515  £ 14,295  £ 15,402  £ 15,020  £ 15,899 
Total expenditure  £ 17,359  £ 18,448  £ 19,680  £ 19,426  £ 20,437 
Net cash surplus (deficit)  -£ 900  £ 3,269  £ 4,079  £ 4,882  £ 4,437 
Opening bank balance  0  -£ 900  £ 2,369  £ 6,447  £ 11,329 
Closing bank balance  -£ 900  £ 2,369  £ 6,447  £ 11,329  £ 15,766 
Year Year 1  Year 2  Year 3  Year 4  Year 5 
Total income  £ 16,459  £ 21,717  £ 24,103  £ 24,663  £ 25,240 
Expenditure      
Salaries and wages  £ 1,844  £ 4,153  £ 4,278  £ 4,406  £ 4,538 
All other expenditure  £ 12,895  £ 13,717  £ 14,824  £ 14,442  £ 15,320 
Total expenditure  £ 14,739  £ 17,870  £ 19,101  £ 18,847  £ 19,859 
Net cash surplus (deficit)  £ 1,720  £ 3,847  £ 5,002  £ 5,816  £ 5,381 
Opening bank balance  0  £ 1,720  £ 5,568  £ 10,570  £ 16,385 
Closing bank balance  £ 1,720  £ 5,568  £ 10,570  £ 16,385  £ 21,766 
10. 1 Overview 
Page 89 of 138

Page 94

53
estimated 50% of the full building figure with air source heat pump, plus a 20%
allowance for other energy costs (lighting, small amount of office equipment etc). 
Water rates 
OneRen data provided also includes water usage and rates for the same period. This
shows a lot of fluctuation, with higher water usage and cost in 2022-23. The average
water usage over the last three years was 595 M3, and the average cost was £1,203
per year. 
A future owner of the building would receive reduced water and sewerage charges
through the Water and Sewerage Charges Exemption Scheme only if: 
• it has charitable status 
• its income is below £300,000 per year 
• it has no permanent alcohol license, charity shop or public café on the
premises 
Given the preferred use and management options identified, it is unlikely that these
criteria will be met under either option, so water usage at an increased level is
included in financial projection. 
Business rates 
Ratable value of the site is £4,800 but it is likely that it would need to be revalued
following a change of use of the ground floor, after which the ground floor tenant
would assume responsibility for non-domestic rates on that part of the site. The
amount of rates to be paid depends on the management model: 
• Assuming that the new rateable value of the first floor is no more than the
current rateable value of the entire site, the first floor would qualify for 100%
relief under the Small Business Bonus Scheme, if it is the only property
occupied. This would apply only if the building is occupied by a new
community body. 
• Charities qualify for 80% mandatory rates relief on non-domestic property
occupied primarily for charitable purposes, and the council may award
discretionary relief to remove the remaining 20% of rates. This would only be
applicable if the building is occupied either by OneRen or by a new community
body which is a charity. 
• Renfrewshire Council offers a Fresh Start Scheme giving 100% rates relief for 12
months for properties which have been empty for 6 months or more. 
Given the uncertainty at this stage, we have assumed that the liability remains
unchanged, and that 80% relief is granted under Option B. 
Insurances 
The building occupant would need buildings insurance on the entire site. This is likely to
be higher given the proposed use of the ground floor as a restaurant. Assuming that
the building occupant also manages spaces on the upper floor which are hired out for
short-term use and used for occasional community and heritage events, public liability
cover for this part of the building would also be needed. 
The tenant on the ground floor would be responsible for maintaining suitable insurance
policies for their business and leased premises. 
Maintenance 
An allowance for routine maintenance tasks such as cleaning gutters, checking
electrical systems, repainting and refinishing as well as periodic larger repairs has been
included in financial projections. 
Staffing 
When open under OneRen, the building had a caretaker present for just under 15
hours a week, working mostly in the evenings. 
Given the plan for the ground floor to be under a commercial lease, we have assumed
Page 90 of 138

Page 95

54 
that there would be a reduced need for staffing at around 7 hours a week. This
depends on access to the hall space and KGS room on the first floor being available
without the staff member being on site to let people in, e.g. via a code access system
and CCTV. The estimated cost of installing and maintaining these systems has been
built into financial projections. 
Marketing and customer relations 
Marketing costs for the spaces on the first floor will depend on the management
model chosen. If OneRen continues to manage the building (option A), the first-floor
venue can be promoted via the organisation’s existing channels. There is an existing
venue hire team to manage bookings. There would be some initial setup costs:
updated photography and staff resource to create a venue profile and update online
listings. In the longer term, the additional cost of marketing one more venue is
assumed to be marginal. 
If a new community organisation manages the top floor (option B), they will need a
way to promote the venue and manage bookings. The cost of setting up and
maintaining a basic website has been built into this version of the cash flow
projection. Similarly, this version includes a subscription to venue management
software, which would simplify the work of taking bookings, monitoring availability
and invoicing clients as much as possible. We assume that volunteers would be
willing to take on these tasks. 
Accountancy, professional and office costs 
If the Steeple is managed by a larger organisation (option A), a certain amount of its
internal resources will be dedicated to managing the building. However, further
consultation with the Estates team at Renfrewshire Council and/or OneRen would
be required to arrive at a realistic estimate. These costs are excluded in this version
of the financial projections. 
If the building is managed by a community organisation (option B), this organisation will
be required to produce annual accounts. An allowance of £1,500 for accountancy fees
and independent examination has been included in this version of the financial
projections. 
10.3 Income streams 
The following assumptions have been made in order to prepare financial projections: 
Tenancies 
The Estates team at Renfrewshire Council have provided the following detail on rental
rates for commercial premises in Johnstone (£110 - £140 per square metre) and
smaller village centres (£95 - £110 per square metre). The Estates team estimate that
Kilbarchan would be on the lower end given location and associated demand. 
Taking an estimate of £105 per square metre for lease of a refurbished shell suitable
for use as a licensed restaurant, the 135-square-metre ground floor (excluding the
Steeple itself) would bring in rent of £14,175 per year. 
Hall rent 
Taking an estimate of £100 per square metre, the 69-square-metre hall space would
bring in rent of up to £6,900 per year. However, this may be made available on more
flexible terms suited to small businesses and creative professionals, so an allowance for
50-60% occupancy is made in the financial projections (increasing from year 1 to year
3). 
Because a local community body may be better connected with potential users of the
space, the financial projections for Option B include slightly higher occupancy in later
years. 
Occasional use of Kilbarchan General Society room 
Kilbarchan General Society have indicated that they intend to continue using the room
Page 91 of 138

Page 96

55 
they own on an occasional basis, and permanently for storage. Outside of this use,
the room will be available for hire for small meetings. 
Assuming that this room can be rented at £15/hr (comparable to similar venues) for
around 4 hours a week (0.5% occupancy, based on 12 usable hours a day), this will
generate just over £3,400 a year. 
10.4 VAT and Corporation Tax 
Most repair and improvement work on existing buildings, regardless of listed status,
is subject to VAT at the standard rate. 
Renting property and short-term hire of rooms, are usually exempt from VAT. This
assumes that no additional services (e.g. catering) are provided by the building
manager. Opportunities to reclaim VAT may therefore be limited. 
If any of the regeneration work is undertaken by new community body, this group
should seek a VAT assessment identifying which of the planned income streams are
subject to VAT and how much (if any) VAT paid out on construction may be
reclaimed once the building is in use. If necessary, this body could seek to become
VAT registered even if it is not otherwise required to do so, in order to reclaim VAT
and therefore reduce the amount of external funding needed. However, this would
lead to more complex financial management. 
Under management options A or B, the building will be managed by an entity that is
exempt from corporation tax: the local authority, OneRen, which is a charity, or a
local organisation (which would be likely to seek charitable status). 
Page 92 of 138

Page 97

56 
Availability of funding will depend on which entity is to manage the building, and
the conditions of their tenure. Many funders will only fund applicants with
charitable status or purposes, or have an upper limit on applicant turnover. 
The Council has had previous discussion with Historic Environment Scotland and
the National Lottery Heritage Fund. Both could be approached about funding the
preferred option regardless of the management model. 
The following funds would not be open to Renfrewshire Council, but a community
body taking on management of the building would be eligible to apply. These
would be relevant if a community group takes on ownership or management of
the Steeple Buildings and completes some of the fit-out work. In general, funders
will require that the group has secure tenure, i.e. a long lease or ownership. Some
of these funds require charitable status. 
• Screwfix Foundation provides small grants of up to £5,000 for capital
projects. Examples of projects funded include installation of a new kitchen
or bathroom, painting or decorating, improving building safety or efficiency.
This small grant should cover the majority of project costs, so this is best
suited to small renovations or upgrades at an early stage. (Does not require
charitable status) 
• Barcapel Foundation: grants up to £20,000 (occasionally up to £100,000) for
charities working in areas including heritage (built environment and cultural
heritage). (Requires charitable status) 
• Wolfson Foundation will fund charities carrying out conservation/restoration
work to listed buildings of historical significance, generally £15,000-
£100,000. However, Grade A-listed sites will be prioritised, so an application
at the lower end of this scale may have better chances. (Requires charitable
status) 
• Hugh Fraser Foundation: grants for charities working in areas including arts
11.0 Funding 
& culture. A few major awards over £100,000 each year, with others averaging
£5,000. (Requires charitable status) 
• Barrack Charitable Trust, £500 - £5,000. Arts, heritage and culture and provision
of recreational facilities are among its core purposes. (Requires charitable status) 
• Dalrymple Donaldson Fund, up to £5,000 for restoration of buildings of historic
interest (including many church buildings). Best fit would be small repairs, in
sympathy with the building’s past e.g. using traditional material). (Does not
require charitable status). 
• Awards for All is the National Lottery Communities Fund’s small, open
programme: grants up to £20,000. This could cover start-up costs or operating
costs in the first year. The lottery’s larger funding programmes (including grants
for community-led activity and wellbeing) are currently closed for review. (Does
not require charitable status). 
• The project location is within the required 10-mile distance of landfill sites for the
Scottish Landfill Communities Fund. Grants of up to £50,000 are distributed by
various bodies; applications can be made to more than one (list available here).
Projects involving “the maintenance, repair or restoration of a historic building”
are eligible, but only if the site will be open to the public: at least 4 evenings or 2
days per week or at least 104 days in any year – under the preferred use, this
may not be the case.
Other funds of interest: 
• The Architectural Heritage Fund does not currently provide capital funding
(outside of its William Grant Tailored Support Fund, which aims to meet specific
needs of projects not meeting other grant criteria). However, its Project Viability
Grants (up to £10,000; average £6,000) may be a useful source of funding if a
community organisation comes forward that is interested in taking on ownership
or management of the building, to cover expenses such as legal fees. 
Page 93 of 138

Page 98

57
12.0 Risk Analysis & Mitigation
As in any significant development of this nature there are a number of risks that need to be identified along with appropriate action points and strategies. These key risks and
mitigating strategies are tabulated below: 
Risk  Impact  Probability  Existing Controls  Action Required  Lead Responsibility 
Preparation, Development and Construction phases 
Difficulty securing
capital funding 
Medium  Medium  Discussions with funders underway  If required, develop a phased approach to upgrades
with most urgent and beneficial works prioritised. 
Renfrewshire Council
Delivery phases 
Difficulty securing
ground floor tenancy 
High  Low  Input from Estates team on market rates  Suitable marketing of the tenancy opportunity  Renfrewshire Council 
High-profile historic village centre location
has previously attracted attention. 
Low levels of        
volunteer availability 
Low  High  Low reliance on volunteers for day-to-day
running of the preferred usage option. 
Develop heritage offering in consideration of levels
of volunteer availability 
Dependent on                
management model 
Under option B, ensure that community group has
sufficient skill and capacity. 
Loss of ground floor
or first floor tenants
High Medium For first floor, a lower occupancy rate has
been built into financial projections under
the assumption that tenancies will be more
flexible. 
Flexibility of spaces allow for different con-
figurations and adaptation to future market
conditions
Consideration of lease terms and conditions with
Renfrewshire Council’s legal team 
Under option B, the community group may need
support to develop suitable lease agreements, book-
ing terms and conditions and cancellation policy
Dependent on                       
management model
Page 94 of 138

Page 99

58 
13.0 Conclusion & Recommendations
The Steeple Buildings are the most significant historic building in Kilbarchan and a
key part of the village’s identity and heritage. The buildings have been vacant since
their closure in 2020, and a new use needs to be found to ensure they are secured
for future generations. The Council is undertaking a proactive scheme of repair
works to address the immediate condition issues and consolidate the buildings for
potential meanwhile uses and regeneration projects. 
Through consultation, it is clear the local community have a strong interest in
potential plans, however, there is uncertainty about how much involvement the
community wishes to take in managing and maintaining the buildings. The
consultation process demonstrated that the community understand that Council-
subsidised, under-used community spaces are unviable and alternative options
need to be explored. 
The proposed vision for the Steeple Buildings has the potential to deliver
economic, social and environmental benefits. It is a mixed-use solution that
restores the landmark building and balances public access with income-generating
activities.  The preferred option includes hospitality services (high end bistro) on
the ground floor, while the first floor would feature flexible rooms available for
hire. This approach retains the historic character of the building, ensures it
remains a hub for community activity whilst also being carefully balanced with an
income generating use. A new bistro could potentially create up to four or five
new jobs and encourage visitors to stay longer and spend more, in line with
Renfrewshire Tourism Today’s strategy for the Villages. 
In addition to this, the Steeple Buildings could play a vital role in the regeneration
of Steeple Square. By enhancing the outdoor spaces with landscaping, seating, and
lighting, the square could become a lively venue for outdoor markets, festivals,
and events, complementing nearby attractions such as the Weavers Cottage and
the Kilbarchan Performing Arts Centre. 
In order to develop this outline proposal further, a key issue which must be
addressed is whether an existing or new organisation can be identified that can
manage and maintain the building whilst also balancing the need for public
access against income generation to support the maintenance of the site.
Community ownership or management could  provide more funding
opportunities  and ensure that any commercial function directly supports
community use. 
It is recommended that Renfrewshire Council continue the discussions around
governance and management with the community, Friends of the Steeple and
potentially interested parties to understand if there is an appetite for more
community responsibility in the development, management and programming of
the rejuvenated Steeple Buildings. 
Page 95 of 138

Page 100

59
14.0 Action Plan 
The table below outlines the next steps that can be taken by the Council and Stakeholders to develop the vision for the Steeple Buildings 
Action Plan Lead
Oct-24
Nov-24
Dec-24
Jan-25
Feb-25
Mar-25
Apr-25
May-25
Jun-25
Jul-25
Aug-25
Sep-25
Oct-25
Nov-25
Dec-25
1 Council review of options appraisal Council                              
2 Review with Community and stakeholders on Options Appraisal Council                              
2 Agree aspirations for Steeple Buildings including, ownership, tenure, governance, funding Council                              
3 Develop funding and brief for Steeple Rejuvenation Feasibility Study Council                              
4 Council approval (Elected members) Council                              
5 Procurement of Feasibility Team (Project Organiser, Arch, QS, Business Planner, Services Engineer, Engagement)  Council                               
6 Project Organiser (PO) and Team for feasibility study appointed RC                              
7 Inception, mobilisation and commence study DT                              
8 Develop detailed design of preferred option DT                              
9 Develop & deliver stakeholder & community consultation plan DT                              
10 Develop preferred option business case DT                              
11 Cost plan information DT                              
12 Develop detailed funding plan & initial discussions with funders PO                              
13 Conclude feasibility & business plan DT/PO                              
14 Council review and decision to proceed with Capital Works Council                              
Page 96 of 138

Page 101

60 
Appendix A: Community Consultation Report & resources
Appendix B: Business Plan
Appendix C: 2023 Condition Survey, JGA Architects
Appendix D: 2023 Luths Services Appraisal 
Appendix E: 2024 NBM Cost Plan: Internal Refurbishment
14.0 Appendices
Page 97 of 138

Page 102

Page 98 of 138

Page 103

Page 1 of 9 
___________________________________________________________________
To: Economy and Regeneration Policy Board
On: 05 November 2024
___________________________________________________________________
Report by: Chief Executive 
___________________________________________________________________
Heading: Scotland Loves Local Update 3
___________________________________________________________________ 
1 Summary 
1.1 This report provides an update on the Scotland Loves Local scheme in
Renfrewshire, focusing on take-up and spend since the last update to the
Economy and Regeneration Policy Board in November 2023. 
2 Recommendations
2.1 It is recommended that the Board:
(i) Notes the content of the content of this report and associated appendices.
___________________________________________________________________ 
3 Background
3.1 As outlined in previous updates to the Economy and Regeneration Board, The
Scotland Loves Local campaign is a national initiative aimed at encouraging
residents to support local businesses and keep money within their
communities. Participants can load any amount onto a gift card that can only
be spent within their local authority area, promoting local spending.
Businesses must sign up to be eligible for participation in the scheme.
___________________________________________________________________
4 Renfrewshire Context 
4.1 The Council joined the scheme in May 2021. Initially funded by the Scottish
Government for a pilot period until December 2022, it has since been financed
by Renfrewshire Council. The subscription has been renewed twice (for the
financial years 2023/24 and 2024/25) at an annual cost of approximately
£7,000, using appropriate funding from the Council’s Economic and
Development team budgets.
Item 6
EAR051124 Page 99 of 138

Page 104

Page 2 of 9 
4.2 Currently there are 158 Renfrewshire vendors signed up to the scheme - an
increase of 21 since the last update to Board in November 2023. A full list is
provided at Appendix 1.
4.3 Since the scheme's inception, a total of £67,166 has been spent in
Renfrewshire as a direct result of the gift card. This represents an increase of
£22,556 in additional spending from October 2023 to October 2024
(approximately a 35% increase). Over half of this spending (65%) was made
in supermarket chains. A full breakdown of spending per retailer can be found
in Appendix 2.
___________________________________________________________________
5  Outcomes 
5.1 Since the last update to the Board, elements of the marketing and
communications plan has been implemented. This included the delivery of a
webinar in October 2023, specifically targeting Renfrewshire’s larger
employers. Furthermore, the gift cards have been promoted through the Retail
Improvement Scheme, Paisley First, social media, and a 'Spend Local'
consumer competition in November 2023, which targeted direct users of the
card. 
5.2 Target outcomes cited in the previous Board update included: 
• Grow the amount spent on the card by at least 150% over the next two
years;
• Sign up an additional 30 SMEs to the scheme over the next two years. 
5.3 In the last year, 21 new merchants have signed up for the scheme, indicating
that the target of 30 additional SMEs is on track. However, while total
spending has increased by over a third since October last year, it is
recommended that further promotion of the card in the lead-up to Christmas
could help boost spending and enhance this target.
5.4 To ensure businesses across Renfrewshire join the Scotland Loves Local
initiative and maximise card spending, resources will be allocated from the
Regeneration & Place and Marketing & Communications Teams, who will
continue to work with Miconex to facilitate business engagement and promote
the benefits of the Renfrewshire Gift Card. Activities may include:
• Further collaboration with Paisley First and the Johnstone Business
Consortium to promote the scheme and encourage continued buy-in from
merchants in the Paisley BID area and Johnstone Town Centre.
• Ongoing communication with Braehead and X-Site to promote the scheme
and encourage onboarding within these centres.
• Promotion of the scheme through our social media channels and via the
Retail Improvement Scheme (RIS) and Renfrewshire Town Centre
Premises Grant Scheme.
• Engagement with other significant stakeholders, such as the Chamber of
Commerce and UWS, to promote the benefits of the gift card to users,
SMEs, and larger employers as a staff benefit.
___________________________________________________________________
Page 100 of 138

Page 105

Page 3 of 9 
6        Next Steps
6.1 Council officers are supportive of the Scotland Loves Local Scheme and are  
keen to see it grow significantly across Renfrewshire. Further officer capacity
will be committed to continue to progress the scheme.
6.2 Further reports will be brought to Board to update members on its uptake as
appropriate.
__________________________________________________________________
Implications of the Report 
1. Financial – No additional finance is sought.  All funding is accounted for within
existing Council budgets.
2. HR & Organisational Development – None
3. Community/Council Planning – 
• Jobs and the Economy - the scheme has the potential to secure additional
income for Renfrewshire based businesses, which in turn could support more
investment and jobs within the local economy.
4. Legal – None
5. Property/Assets – None
6. Information Technology – None.
7. Equality & Human Rights The Recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights.
No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the recommendations
contained in the report.
8. Health & Safety – None
9. Procurement – None
10. Risk – None
11. Privacy Impact - None.
12. Climate Risk – Not Applicable
13. Children’s Rights – None
14. COSLA Policy Position – Not Applicable
___________________________________________________________________
List of Background Papers
a) Report to Economy and Regeneration Board, Scotland Loves Local Update
2. 7th November 2023
b) Report to Economy and Regeneration Board, Scotland Loves Local Update
2. 7th May 2023
___________________________________________________________________ 
Author:  Euan Shearer; Regeneration and Place Manager Tel 07483 136235
Email:    euan.shearer@renfrewshire.gov.uk
Page 101 of 138

Page 106

Page 4 of 9 
Appendix 1: Renfrewshire Retailers currently signed up to Scotland Loves Local Scheme 
Business Name Merchant Address
Adom Afro Paisley 46 High Street Paisley
Aldi 009 - Paisley 4 Fulbar Rd, Paisley PA2 9AP, UK
Aldi 012 - Erskine 1A, Bridgewater Shopping Centre, Erskine PA8 7AA, UK
Aldi 055 - Renfrew 41 High St, Renfrew PA4 8QP, UK
Aldi 085 - Johnstone Patons Mill Rp, High St, Johnstone PA5 8FB, UK
Anderson’s Jewellery Workshop 38 High Street,Renfrewshire,PA7 5HR
Aspire Academy  17 Kelvin Avenue Hillington Industrial Estate Glasgow
G52 4LT 
Bailey’s Antiques 34 High Street Paisley
Barrhead Travel service - Braehead Shopping
Centre
Unit 1, Intu Braehead Shopping Centre, King's Inch
Road, Glasgow G51 4BN
Baru Paisley 7 Moss Street Paisley Renfrewshire  PA1 1BG 
Bears by Sue Quinn Threadbear, 25 Lawn Street, Paisley PA1 1HD
Bianco e Nero 27 Gauze Street Paisley
Body Beautiful 172 Braehead road paisley Paisley Pa2 9qd
Brick Lane Studios/The Diane Mitchell Music
School/Brick lane Studios
Brick Lane Studios 7-9 Weir Street  Paisley
Renfrewshire  Pa34dw 
Cafe Fairfull 12A High Street Paisley
Caffe Lusso  4 School Wynd, Paisley PA1 2DB
Caleb Outlet 14B New St, Paisley PA1 1XY, UK
CANCER RESEARCH UK GBR - Greenock 32 W Blackhall St, Greenock PA15 1UE, UK
CANCER RESEARCH UK GBR - Johnstone Units 1&2, 40-41 Houston Court, Johnstone, PA5 8DL
CANCER RESEARCH UK GBR - Paisley 43 Causeyside Street, Paisley, Renfrewshire, PA1 1YL
Cardbox  Cardbox15 5 Hairst Street Renfrew  Renfrewshire PA4
8QU 
Castelvecchi 10 New Street Paisley
Caulders Garden Centres Erskine Caulders Erskine Erskine Bridge Bishopton Erskine PA7
5PU 
Claire Reid Hairdressing 7 Mill Street Paisley
Comicrazy 45 Old Sneddon Street Paisley
Coop 4247 Paisley Road - Renfrew 93 Paisley Road, , Renfrew, PA4 8LH
Coop 5825 Kilbarchan 20 High Barholm, Kilbarchan, Johnstone, PA10 2EQ
Coop 7472 Houston 63 Crosslee Crescent, Houston, Johnstone, PA6 7DT
Coop 8769 Bishopton New 26-30 Greenock Road, , Bishopton, PA7 5JN
Coop 9093 Paisley - Neilston Road 60-62 Neilston Road, , Paisley, PA2 6NE
Coop 9094 Bridge Of Weir Main Street, , Bridge Of Weir, PA11 3NR
Domino's Pizza - Bridgewater Shopping
Centre
Erskine Domino's Pizza Unit 9 Bridgewater Shopping
Centre Erskine Scotland PA8 7AA 
Domino's Pizza - Gauze Street Paisley Domino's Pizza 41 Gauze Street  Paisley
Scotland PA1 1 1EX 
Domino's Pizza - Johnstone 11 Laighcartside Street Johnstone PA5 8BY 
Domino's Pizza - Renfrew 9 High Street  Renfrew PA4 8QL 
Ecigarette Outlet 35 Causeyside Street Paisley
Elixir Lounge Upper Floor 12 New Street Paisley  Renfrewshire PA1
1XY 
Ellen Adams Hair 24 Glasgow Road Paisley
Exotic kitchen paisley 23 Causeyside Street Paisley Scotland PA1 1UH 
Page 102 of 138

Page 107

Page 5 of 9 
FARMFOODS HILLINGTON 249 UNIT 1 EARL HAIG ROAD, HILLINGTON RETAIL
PARK G52 4LY
FARMFOODS PAISLEY 255 29 CAUSEYSIDE STREET PA1 1UL
FARMFOODS RENFREW 250 5/6 HIGH STREET PA4 8QL
Finishing Touches 7 Johnston Street  Paisley Renfrewshire  PA1 1XQ 
Food 46 46 High St, Paisley PA1 2AH
Food At Underwood  Unit 1A 35 Underwood Road Paisley Paisley PA3 1TQ 
Framing Art 60 High St,   Johnstone Renfrewshire PA5 8SG 
Francis hair salon 3 Johnston Street Paisley
Gael Home Interiors  4 Orchard Street, Paisley, Renfrewshire, PA1 1UZ
Gantry 12 New St, Paisley, PA1 1XY
Gillan Green Grocers The Paisley Centre, 23 High Street, Paisley
Golddust House Fashion & Accessories 26 High Street Paisley
Grand Fusion Paisley First floor, 8 Moss Street Paisley Renfrewshire PA1 1BL 
H. Samuel - Braehead 38, Braehead Shopping Centre, Glasgow G51 4BP,
HandCrafted Coffee 5 High Street Lochwinnoch PA12 4DB 
Harrods Drycleaners 8 Castle Terrace, Bridge of Weir, PA11 3EF
Harvies Tobacconist 20 Moss St, Paisley PA1 1BL, UK
Helen's Alterations Ltd 7 Lochleven Road
Hiltons Hair & Beauty 8A St Mirren St, Paisley PA1 1UA, UK
HMV/Sunrise Records and Entertainment
Limited trading as HMV
UNIT 167, BRAEHEAD CENTRE, KINGS INCH ROAD,
GLASGOW, G51 4BN
HOT Tanning Salon - 25199664 1470 Paisley Road West Glasgow G521sr 
Houston Kiltmakers 67 High Street , Paisley, Renfrewshire, PA12AY
Iceland 782-Paisley  86/74 Glasgow Road, Paisley, Strathclyde PA1 3PN
ICELAND JOHNSTONE 1 Houston Square, 56/61 High St Johnstone, Paisley
PA5 8QG
ICELAND PAISLEY PIAZZA 1330 Unit 55, Piazza Shopping Centre, Paisley PA1 1EH
Indian By Nature Paisley/Obsession of India 32 Moss Street Paisley
IVAD Gifts 29 Gauze Street Paisley
Jewelfare 44 High Street Paisley
John Marshall & Son Butchers 65 High St Johnstone Renfrewshire  PA5 8QG 
John Mckay Jewellers Paisley 53 Moss Street Paisley
Johnstone Convenience Store 19 high street Johnstone  Glasgow  UK PA58JU  
Justyna Bespoke Tailoring & Alterations Ltd 150 Fenwick Road
Katy hair&beauty salon 27 Wellmeadow Street
Kenneth Edward Hair Salon 45 Causeyside Street, Paisley PA1 1YN
Kiddie Boutique Unit 106 Braehead shopping Centre G51 4BS
Kiddie Boutique /Baby boutique by Claire  Unit 106 Braehead Shopping centre  Kings inch road 
Glasgow  Glasgow  G51 4bs 
Kilts 4 u 2 Erskine Square Hillington Glasgow Glasgow G52 4BJ 
Kooks Hairdressing 22 New Street Paisley
Lidl GB JOHNSTONE 1270 10 High Street, Johnstone PA5 8JX
Lidl GB PAISLEY NORTH 1725 Renfrew Road Retail Park, Wallneuk Road, Paisley PA3
4BF
Luna Rossa 1-3 Canal Street  Renfrew Renfrew Renfrewshire
Pa48QE 
mackenzie property and building services 18 oldhall rd, ralston, paisley pa1 3hl
Marks and Spencer - Odstock Road - Paisley Odstock Road, Paisley PA3 2ST, UK
Page 103 of 138

Page 108

Page 6 of 9 
Marks and Spencer Foodhall - Renfrew Retail
Park - Paisley
Unit 1, Renfrew Retail Park, Wallneuk Rd, Paisley PA3
4BF, UK
Marks and Spencer Simply Food - Braehead
Shopping Centre
King's Inch Road Braehead Shopping Centre, Ripley,
By-Pass, Glasgow G51 4BP, UK
Marks and Spencer Simply Food - Glasgow
Airport 
Glasgow Airport Priority Security, Glasgow Airport,
Paisley PA3 2SW, UK
McLaughlan and Co Jewellers 22 New Street Paisley
Moongemz Baby & Gifts 30b High Street Paisley Renfrewshire PA1 2BZ 
Morrisons Bed Centre 24 Lawn Street Paisley
Mrs Party Ltd 5 Johnston Street Paisley
MULTAN Business ltd 21  Causeyside street  Paisley  Renfrewshire  Scotland  
MULTAN Business ltd  16f Bridge street  Linwood  Renfrewshire  Scotland  
Musclebound 14A New Street Paisley
New Look 1657 Paisley 14 The Piazza Shopping Centre, Paisley , PA1 1EL
New Look 2019 Braehead 1B Braehead Shopping Centre, Renfrewshire, G51 4BP
Newsrack Paisley 69 High Street Paisley
Noah Home and Gifts Ltd Braehead Shopping Centre Kings Inch Road Glasgow
G51 4BN 
Nomads Coffee Shop 63 High Street Paisley.
NTS - Weavers Cottage The Cross, Kilbarchan, PA10 2JG
O'Neills Services Unit 43B The Piazza Centre, Paisley
One O One 32 Kilbarchan Road  32 Kilbarchan Rd, Johnstone PA5 8RF
Orchard Clinic Paisley 16 Orchard Street  Paisley  Renfrewshire PA1 1UZ 
Paisley Craft Beer Co 25 Lawn Street  Paisley Renfrewshire PA1 1HD 
Paisley Gift Cart Co- Moongemz Baby 30b High Street Paisley  Renfrewshire PA1 2BZ 
Paisley Photoshop 10 Silk Street Paisley
Paisley Picture Framers 56 Causeyside Street
Paisley Trophy Centre 5 George Place Paisley
Piccolo Mondo - Renfrew  63-65 Hairst St, Renfrew PA4 8QU
Print and Copy It 61 High Street Paisley
Print Centre (GREENLAW GRAPHICS LTD) 31 Gauze Street Paisley
PROFIX 67 Causeyside Street PROFIX Paisey Renfrewshire
PA1 1YT 
Pure Spa and Beauty- Renfrew Pure Spa and Beauty David Lloyds Arkleston Road
Renfrew Renfrewshire PA4 0RA 
Rainbow Turtle 7 Gauze Street Paisley
Restoration & Creation 8 Browns Lane  Paisley Renfrewshire  PA1 2JH 
Riverside Beauty Crowne Plaza, Congress Road Glasgow Renfrewshire
G3 8QT 
RSA Your Local Shop 27 Moss Street Paisley
Sainsburys - Kings Inch Road 110 Kings Inch Dr, Glasgow G51 4BT, UK
SEMI CHEM 003319 - Johnstone Unit 1, 9 William Street, Johnstone
SEMI CHEM 3479 - Paisley 44-46 Central Way Piazza
SEMI CHEM 003517 - Renfrew 93 Paisley Road 
Sinclair's of Paisley 30A High Street Paisley
Skystar Stores 225-229 Saracen Street Glasgow Glasgow City Council
G22 5JW 
Smyths Toys Unit 22 Phoenix retail park Linwood Linwood road
Glasgow Paisley PA12AB 
Snappy Shopper - Online Only 
Snt scot ltd trading as ice & cream 38A east Hamilton street Pa15 2td
Page 104 of 138

Page 109

Page 7 of 9 
Spar - Erskine Bargarran Shopping Centre, Erskine PA8 6BS
Spar - Lochwinnoch The Cross, Main St, Lochwinnoch PA12 4AH
Spar Glenburn spar 170 BREAHEAD ROAD Paisley Renfrewshire PA2
8QD 
Specsavers Opticians 110 Kings inch Drive, Sainsburys , Glasgow,
Strathclyde, G51 4BT
Spoons Coffee House  Spoons Coffee House  71 Causeyside Street  Paisley 
Renfrewshire  PA1 1YT 
St Vincent's Hospice 11a Moss Street, Paisley, PA1 1BE
Stack and Still Braehead Shopping Centre Unit 1C, King's Inch Rd
Glasgow Scotland G51 4BP 
Subway - Paisley Subway  20 High street  Paisley Renfrewshire  PA12BS 
Summits outdoor 36 moss street paisley PA1 1BA
Sunset Beach - Hairst Street 59 Hairst Street Renfrew PA4 8QU 
Sunshine Electrical 3 Johnston Street Paisley
Taste Buds  22b Lawn Street, Paisley, Paisley, Renfrewshire,  PA1
1HF
The Bankhouse 7 Gilmour Street Paisley
The Grumpy Monkey Coffee House 22 Moss Street Paisley
The keg shack 46 Hairst St Renfrew  Renfrew Renfrewshire  PA4 8QY 
The Lion’s Paw 1 Morrison Place, Main Street, Bridge of Weir, pa11 3nu
The Nail and Beauty Zone LTD/PURE Spa &
Beauty
PURE Spa & Beauty, David Lloyd, Arkleston Road,
Cockleshill Park, Renfrew PA4 0RA
The Perfume Shop 66 Kings Inch Road  Perfume Shop , Unit 160 Braehead Shopping Centre ,
Kings Inch Road G51 4BS
The Pet Shop Units 3 & 4 Houston Court Johnstone Renfrewshire  PA5
8DL 
The Ugly Duck  38 High Street Paisley Renfrewshire PA1 2DQ 
ThreadEx 33b causeyside street, paisley pa11ul
ThreadEx Beauty Salon Paisley Centre, 23 High Street, Unit 19k, Paisley pa12aq
ThreadEx Nail & Beauty Piazza Centre, 15 Central Road, Kisok E, Paisley pa11el
Tom Baird Opticians 5 High Street Paisley Paisley Renfrewshire PA1 2AE 
Tresspass - Braehead UNIT 103  BRAEHEAD SHOPPING CENTRE  KINGS
INCH ROAD G51 4BN
What IF Paisley 25 Moss Street Paisley
Wholesale Domestic Bathrooms 50 Montrose Avenue Hillington Park Renfrewshire  g52
4LA 
Wholesale Domestic Equipment company 400-406 Hillington Road, Hillington Estate, G52 4BL
With Love Flowers 48 Causeyside St, Paisley PA1 1YH, UK
WM Morrisons Ltd - Erskine Bridgewater SC
GBR
Bridgewater Shopping Centre, Renfrew PA8 7AA
WM Morrisons Ltd - Johnstone GBR 30 Napier Street, Johnstone PA5 8SF
WM Morrisons Ltd - Paisley Anchor Mills GBR Anchor Mill, Paisley PA1 1GZ
WM Morrisons Ltd - Paisley Falside Rd GBR Falside Road, Paisley  PA2 6JE
Zambretto Italian 42-46 Old Sneddon Street, Paisley, Renfrewshire, PA3
2AP  
Page 105 of 138

Page 110

Page 8 of 9 
Appendix 2: Spend per Retailer 
Merchant Transactions Amount
WM MORRISONS STORE 94 £3,293.88
W M MORRISON STORE 115 £2,538.48
MARKS&SPENCER PLC SACA 61 £2,437.81
BOOTS UK ECOMM 34 £1,969.28
ARGOS LTD 18 £1,279.66
MARKS&SPENCER PLC SF 35 £1,269.28
SAINSBURYS SUPERMA 20 £1,064.46
SAINSBURYS S/MKTS 16 £970.37
ALDI 55 777 31 £869.95
ICELAND 21 £865.00
ALDI STORES 20 £569.36
ALDI 9 777 14 £419.01
Snappy Shopper 10 £395.97
ALDI 12 777 11 £371.01
SPECSAVRS 2 £330.00
ivad gifts 13 £304.98
SUNSETBEACH 12 £300.07
SMYTHS TOYS LINWOOD PA 4 £257.41
LIDL GB PAISLEY NORTH 8 £219.20
SPAR 2 £199.00
DOMINOS 5 £197.30
CAULDERS ERSKINE 3 £165.02
ZAMBRETTO ITALIAN 3 £158.80
LIDL GB JOHNSTONE 6 £158.21
Fairfull 7 £154.75
GAEL HOME INTERIORS 2 £144.99
SEMI CHEM 3479 6 £144.08
HMV-BRAEHEAD 5 £107.95
THE PERFUME SHOP 1 £106.00
HOUSTON KILTMAKERS 1 £100.00
SEMI CHEM 3517 6 £97.25
RIVERSIDE BEAUTY 1 £95.00
NEW LOOK 1657 4 £87.01
MOONGEMZ BABY 3 £83.48
HARVIES 4 £82.70
SEMI CHEM 3319 2 £74.17
ELIXIR LOUNGE 2 £70.00
GRAND FUSION LTD 1 £65.00
ROWCOT LTD 1 £62.00
BIANCO NERO 4 £57.25
FARMFOODS 255 3 £52.42
SQ *HANDCRAFTED COFFEE 2 £45.00
THE KEG SHACK 2 £43.98
With Love Flowers 1 £40.00
Luna Rossa 1 £37.00
Taste Buds 2 £32.05
Page 106 of 138

Page 111

Page 9 of 9 
FARMFOODS 250 1 £24.75
CANCER RESEARCH UK 2 £23.00
RAINBOW TURTLE 2 £20.00
WM Phelps Butchers 1 £20.00
NOAH HOME AND GIFT BOU 1 £15.00
The Grumpy Monkey 2 £15.00
SQ *HARRISONS FINE WIN 1 £13.50
FARMFOODS 249 1 £10.00
MCLAUCHLAN & CO 1 £10.00
THE KEG 1 £10.00
ALDI 39 777 1 £9.52
Total 633 £22,556.36 
Page 107 of 138

Page 112

Page 108 of 138

Page 113

Page 1 of 6 
___________________________________________________________________
To: Economy and Regeneration Board
On: 5th November 2024
___________________________________________________________________
Report by:  Chief Executive
___________________________________________________________________
Heading: Business Loans Scotland Ltd Update
___________________________________________________________________ 
1. Summary 
1.1 This is a report on Renfrewshire Council funds held by Business Loans
Scotland Ltd and previously reported to Leadership Board on 19th June 2019. 
1.2 At that time Board approved plans for the wind up of the West of Scotland
Loan Fund (WSLF) in favour of the new Scotland-wide Business Loans
Scotland (BLS) and the transfer of any excess funds back to Renfrewshire
Council. At that point around £525k was transferred back to the Council for
economic development uses. 
1.3 The new BLS would continue to collect loan payments on behalf of the
Council for loans via the previous West of Scotland Loan Fund. From 2019
Scottish Government became the sole funder of BLS. 
1.4 All loans are now repaid and Renfrewshire Council has a balance figure of
£393,607.49 with BLS. 
1.5 This report updates Board on a recent options paper on the future of BLS and
requests a Council decision on whether to reinvest the remaining funds or
transfer back to the Council.
___________________________________________________________________ 
2.  Recommendations 
2.1 It is recommended that the Board: 
a) Note the contents of the report and 
b) Agree that Option 3 for the future of BLS is preferred with the
remaining Renfrewshire Council funds being returned to the
Council for local business grant and loan support. 
Item 7
EAR051124 Page 109 of 138

Page 114

Page 2 of 6 
___________________________________________________________________
3. Background 
3.1 The West of Scotland Loan Fund Ltd (WSLF) was a consortium of the twelve
West of Scotland local authorities and was incorporated as a company limited
by guarantee in June 1996, following local government reorganisation. The
fund provided loan finance in individual amounts up to £100k and successfully
operated across the West of Scotland as a loan fund for more than 18 years
filling the funding gap to both new and growing, small and medium sized
enterprises. 
3.2  To support this activity, each participating local authority had an allocation of
ring-fenced loan funding based on its individual budget commitment matched
by European Regional Development Fund (ERDF) monies. 
3.3  In 2014, the Scottish Government indicated its desire to move away from
regional loan funds (such as WSLF) to a national loan fund and advised that
such a mechanism would be required to access any further EU resources.
The Economy and Jobs Policy Board 28 January 2015 approved
Renfrewshire Council’s support for a proposal to create a Scotland-wide local
authority business loan fund. Business Loans Scotland Ltd (BLS) was created
as the vehicle to take this forward. 
3.4  Business Loans Scotland was formed with Scotland’s 32 local authorities (27
Full Members and 5 Associate Members), incorporated as a company limited
by guarantee in March 2015 to provide loan finance up to £100,000 to both
new and growing, small and medium-sized businesses (SMEs) across
Scotland.
3.5 The WoSLF company was wound down in 2019 at which point Renfrewshire
Council had combined assets of £723,795 in the fund. This was broken down
as: 
• loan portfolio to the value of £86,236; 
• ring-fenced residual European Development Funding (ERDF) of £111,914;
and 
• excess funds of £525,645. 
3.6 The Council’s Leadership Board 19th June 2019 agreed to 
• Withdraw the excess funds of £525,645 and transfer to Invest in
Renfrewshire to support local business development grants and loans. 
• Transfer the loan portfolio (£86,236) plus ring fenced ERDF (£111,914) to
Business Loans Scotland to continue to administer on behalf of the
council. The loan funding (once paid in full from loan recipients) could then
be transferred back to the local authority at some point in the future.
3.7 From 2019 BLS were funded solely by the Scottish Government but were
managing the previous portfolio of loans for Scottish local authorities. 
Page 110 of 138

Page 115

Page 3 of 6 
3.8 BLS recently wrote to all local authority Chef Executives to indicate that, after
5 years of support, BLS was no longer receiving Scottish Government funding
and that three options were being considered for its future. The Council was
asked for a preference of the options which are outlined in section 4 below.
3.9 BLS also confirmed the finance levels (repaid loans) in their account for each
local authority totaled around £10M and for Renfrewshire specifically this is
£393,607.49
3.10 All Renfrewshire Council funded loans are now complete and the balance
figure can be returned to the Council under one of the options presented by
BLS or reinvested under the other two options.
___________________________________________________________________ 
4. Business Loans Scotland Future Options 
4.1 In a recent letter, to all local authority Chief Executives, Business Loans
Scotland reported that the Scottish Government had decided not to
recapitalise the BLS Scottish Growth Scheme for 2024 - 25 and currently
there is no further lending by BLS to businesses for this financial year and
potentially beyond. 
4.2 BLS have provided 3 options to local authorities around their future lending
capacity. Two of these options look for local authorities, once again, to
reinvest funding for a new loan fund and the third looks at the “no further
lending” option. 
4.3 The three options are: 
Option 1-  allocate 35% of all Council funding to be top sliced; thereby
creating a £3.5 million fund to allow lending to continue to SMEs based in
Scotland on a demand led, first come first served basis. 
Option 2 – leave local authority ringfenced cash within BLS to allow
continued lending to SMEs in the Renfrewshire area. 
Option 3 – transfer the Council funding back to each Council for use locally
for business development, BLS will cease any new lending to SMEs but
continue until 2029 to manage the current loans funded via previous Scottish
Government funding.
___________________________________________________________________ 
5. Officers recommended way forward 
5.1 There are now a better range of loan funds available to SMEs across
Scotland. Not least the new £60M Investment Fund for Scotland (more
information in Appendix 1) created earlier in 2024 for loans from £25k to £2M
for Scottish businesses. 
Page 111 of 138

Page 116

Page 4 of 6 
5.2 The proposal from BLS to establish a new fund (whether national or by
individual local authority -L/A- area) is difficult to justify. Initially the L/A funded
loan funds were not commercial and there was a justification for local
authority intervention on the grounds of risk, local need and gaps in the
market. This is no longer seen to be the case. 
5.3 In addition to the comments on the need for a new loan fund: 
• Option 1 (national approach) would mean only some L/As contributing
funds to be distributed across Scotland. 
• Option 2 (local approach) would mean programmes only being delivered in
some L/As and (mostly) at a relatively small scale. 
Neither of these options are particularly strong and officer opinion is that an
additional business loan fund (at this time) is not required. 
5.3 The recommendation would therefore be Option C, no further lending, and
to withdraw Renfrewshire Council’s ring fenced funds of £393,607.49 and use
them to support the creation, growth and sustainability of local businesses in
Renfrewshire through council grants and loans. 
5.4 It should be noted that the previous loan funds have been well managed and
there is no criticism at all regarding BLS in this recommendation.  
_________________________________________________________________ 
Implications of the Report 
1. Financial – the report requires a decision on £393,607.49 of Council funds
which can either be reinvested to form a new loan fund or can be returned to
Renfrewshire Council. 
2. HR & Organisational Development –no impact 
3. Community/Council Planning –none 
4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights - The Recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights.
No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the recommendations
contained in the report. 
8. Health & Safety – None. 
9. Procurement – None. 
Page 112 of 138

Page 117

Page 5 of 6 
10. Risk – None. 
11. Privacy Impact - None. 
12. Childrens Rights - None 
13. COSLA Policy Position – Not Applicable. 
14. Climate Risk – Not Applicable.
__________________________________________________________________
List of Background Papers 
Leadership Board, 19th June 2019 “West of Scotland Loan Fund (WSLF) and
Business Loans Scotland (BLS)”
___________________________________________________________________ 
Author:  Ruth Cooper, Economic Development Manager;  Email:  ruth.cooper@renfrewshire.gov.uk 
Page 113 of 138

Page 118

Page 6 of 6 
Appendix 1: New Loan Funds for Scotland launched in the last year 
Investment Fund for Scotland (Smaller Loan Fund) 
The British Business Bank appointed DSL Business Finance Ltd in October 2023 as
the Fund Manager to deliver the £20 million allocation within the Investment Fund for
Scotland for “smaller loans”.
• Loans from £25,000 to £100,000 
• Interest rate from 10% to 14% (average expected to be 12%) 
• Repayment period up to 5 years 
• Arrangement Fee of 2% 
• Expect to leverage 25% from the private sector 
• Security – minimum of a Personal Guarantee and a Bond and Floating Charge
(B&FC). 
Investment Fund for Scotland (Debt Fund) 
The British Business Bank appointed The FSE Group Ltd in October 2023 as the
Fund Manager to deliver the £40 million allocation within the Investment Fund for
Scotland for the “Debt Fund”. 
• Loans from £100,000 to £2 million (average loan likely to be £250k - £500k) 
• Interest rate Base plus 7% to 14% 
• Repayment period up to 5 years 
• Arrangement Fee of 2.5% 
• Leverage - can provide 100% finance for “right” client 
• Security – Personal Guarantee, Bond and Floating Charge (B&FC) and
assignation of assignation of Key Person cover 
• Legal costs from £795 - £1,600 depending on complexity 
Growth Guarantee Scheme 
The British Business Bank launched the Growth Guarantee Scheme on 1 July 2024.
This replaced the Recovery Loan Scheme and is offered by various accredited
lenders. 
• Growth Guarantee Scheme covers asset finance, invoice finance, asset based
lending, term loans & overdrafts 
• Loans up to £2 million 
• Repayment period from 3 months to 6 years 
• Interest rate varies and is at lenders discretion 
• Arrangement Fee 
• Security - scheme provides lender with 70% government backed guarantee. 
Personal guarantee at discretion of lender
Page 114 of 138

Page 119

___________________________________________________________________
To: Economy and Regeneration Board
On: 5th November 2024
___________________________________________________________________
Report by:  Chief Executive
___________________________________________________________________
Heading: Shared Prosperity Fund Update
___________________________________________________________________ 
1. Summary 
1.1 This report builds on previous overviews to Board on the progress and plans
for the Shared Prosperity Fund programme in Renfrewshire and now updates
Board on the progress to end September 2024 as reported to Glasgow City
Region as managers of the region-wide approach. 
1.2 UK SPF is currently funded until end March 2025 and an announcement is
anticipated in the Autumn Statement on 30th October 2024 on the future of the
funds. Section 7 of the report provides comment on any further extension or
conclusion of the programme.
___________________________________________________________________ 
2.  Recommendations 
2.1 It is recommended that the Board: 
a) Note the content of the report and the progress of UK SPF funding
to date across Renfrewshire. 
b) Note the considerations around the future direction of the
programme which should be clearer after the UKG Autumn
Statement scheduled for 30th October.
___________________________________________________________________
3. Background 
3.1 The UK Shared Prosperity Fund (SPF) was the UK Government response to
the decision by the UK to leave the European Union. Previously, as part of the
EU, parts of the UK (including Renfrewshire) were eligible for economic
development funding as part of continent-wide support programmes.
Item 8
EAR051124 Page 115 of 138

Page 120

3.2 SPF provides £2.6 billion of funding across the UK for local investment by
March 2025, with all areas of the UK receiving an allocation from the Fund via
a funding formula rather than a competition.     
3.3 There are three core SPF investment priorities: 
• Communities and Place; 
• Supporting Local Business; 
• People and Skills. 
3.4 In addition, the “Multiply” programme has a specific budget to support
numeracy skills across all areas. This is the only Portfolio with a set budget
and separate accountability, with monitoring through the UK Government’s
Department of Education.
3.5 Renfrewshire Council were awarded £6,290,987 for the first 3 year
programme from 2022-25. The programme was phased to increase financially
over the 3 years with (approximately) 12% of the budget in year 1, 24% in
year 2 and 64% in year 3. It was anticipated that the year 3 budgets would
continue in future years.
3.6 An announcement on the future of the fund is expected in the Autumn
Statement on 30th October.
3.7 UKSPF guidance states that any budget underspend by programme
conclusion (31 March 2025) must be returned to Treasury. This was
confirmed by UKG in September 2025:
“Funding paid to third parties, or retained by lead local authorities to
meet costs associated with activities that take place after the 31 March
2025 is not eligible for UKSPF or Multiply.   
Any UKSPF or Multiply underspends at the end of 2024/25 must be
repaid to MHCLG. Regardless of the outcome of the Budget on 30
October, there will be no mechanism to carry forward any UKSPF
underspends into future years.”
___________________________________________________________________ 
4. Renfrewshire Performance in UK SPF to date – Core Programme 
4.1 The three core SPF investment priorities are performing well and no
underspend is anticipated at this stage. 
Communities and Place 
4.2 The SPF Communities and Place programme commenced in April 2023 and
has provided the opportunity to fund a wider range of projects through the
Council’s Regeneration and Place team. Funding supports Renfrewshire’s
local communities through investment in activities that enhance access to
amenities and improvements to the built and natural environment to make
Renfrewshire a place that people want to live, work, play and learn in.  SPF
has also provided a useful opportunity to support feasibility work around future
activity.  
Page 116 of 138

Page 121

4.3 The 4 key interventions for UK SPF in Renfrewshire are: 
• Place based investments regeneration and town centre improvements,
which could include better accessibility for disabled people, including
capital spend and running costs. 
7 projects improving local facilities and amenities have been funded to-
date (3 capital and 4 revenue funded) 
• Support and improvement of community assets and infrastructure
projects.  This could include support for decarbonisation of facilities,
energy efficiency audits, and installation of energy efficiency and
renewable measures in community buildings (including capital spend and
running costs). 
16 community led projects have received grants  (10 capital and 6
revenue) with 5 neighbourhood improvements being completed 
• Design and management of the built and landscaped environment. 
6 projects which includes a range of surveys and restoration work have
been funded and are being undertaken (2 capital and 4 revenue) 
• Funding to support relevant feasibility studies. 
To date 7 feasibility studies have been supported and being carried out
with an additional 3 scheduled to start 
4.4 No underspends are envisaged for this theme. 
Supporting Local Business 
4.5 The SPF supporting local business funding commenced in April 2023 when
ERDF funding ceased. It supports the Council’s overall business development
approach and co-finances both staff and services through Business Gateway
and business grants. 
4.6 The focus for UK SPF in Renfrewshire is: 
• Support for expert business advice and support programmes at the local
and regional level (2023-25); 
• Support for growing the local social economy (2024-25). 
4.7 In 2024-25 £500k was allocated to a business challenge fund and 7 new and
additional business support programmes were funded to support local
businesses in key areas such as Net Zero, Innovation in Manufacturing, AI
and exporting. 
4.8 The Social Economy Officer has supported 39 local enterprises this year with
four, to date, having received grants and another 12 involved in a programme
of wider support to build capacity and innovation.
Page 117 of 138

Page 122

4.9 Outputs and outcomes for this theme are good with 605 local businesses
receiving advice and support and 439 new businesses started up and trading
to date. No underspends have been declared to date. 
People and Skills 
4.10 The SPF people and skills funding commenced in April 2023 and is a two year
programme. It effectively replaced (in part) previous ESF resources and has
co-funded the Council employability service and the commissioned
programmes delivered through the Local Employability Partnership for the last
18 months. Regular reports are brought to Board on employability and the
service will again this year support around 2,000 local people. No underspend
is expected. 
4.11 SPF provides around £2.144M to employability over 2 years (including around
£200K from the Multiply Year 1 underspend) and to date (Sept 2024) this has
directly supported 541 people into work and 533 people to gain qualifications. 
4.12 29 different partners have been commissioned to work together to provide a
joined up employability pathway for people looking for work. 
4.13 Alongside co-funding a wide range of services UK SPF is specifically used for
two priority groups: 
• Vulnerable young people leaving school: key worker / transition support
with specialist training provision (2023-25); 
• Economically inactive people: Intensive and wrap-around one-to-one
support to move people closer towards mainstream provision and
employment (2024-25). 
4.15 Outcomes across the board are strong for employability and all targets will be
met for this theme.
___________________________________________________________________ 
5. Renfrewshire Performance - Multiply Programme 
5.1 The Renfrewshire Multiply programme has offered three types of numeracy
and math support programmes across the area over the last 20 months: 
• New intensive and flexible courses targeted at people without Level 2
maths in Scotland, leading to an equivalent qualification; 
• Courses designed to help people use numeracy to manage their money; 
• Activities, courses or provision developed in partnership with community
organisations and other partners aimed at engaging the hardest to reach
learners. 
Page 118 of 138

Page 123

5.2 Provision for Multiply was commissioned by the Renfrewshire Local
Employability Partnership to a wide range of local organisations already
dealing with learners (West College Scotland and Community Learning and
Development) or involved in community based work. Fourteen different local
organisations have been involved in delivery. 
5.3 Multiply was completely new to the area in 2022, with provision commencing
in 2023, and has performed well overall although it has declared underspends
in all years (as have all GCR Multiply programmes). 
5.4 To date, in Renfrewshire, 588 people have been supported via 107 different
courses / activities running in the community. Programmes of support have
included: 
• Supporting parents to increase confidence and skills to enable them to
support children with homework.
• Cooking a nutritional healthy meal on a budget.
• Supporting people with learning difficulties and autism to understand
money.
• Helping women from diverse backgrounds improve their numeracy skills
and confidence.
• A life skills-based budgeting programme for young people who have
recently left the care system.
• Providing numeracy skills courses to support people into employment
including understanding wages and payslips.
___________________________________________________________________ 
6. Financial Spend and Claims 
6.1 Programmes across the board are performing well and spend is broadly on
target across all areas except Multiply (which is underspending across all L/As
in Scotland). The claims submitted, and the figures below, reflect grant fund
paid out by the Council. 
6.2 All four SPF programmes have developed to involve a local grant fund as part
of the programme so that services can be delivered by a range of partners.
While a lot of the activity is on track, the spend does not reflect the full
activities due to slow invoicing by partners. 
Priority 
Spend to date by
Investment
Priority (end Sept
2024)
Forecast Spend
at end of
Financial Year 
Brief note on
expected spend 
Communities & Place £911,833.27 £1,539,548.10 On track, full spend
Local Business £771,033.95 £1,537,976.32 On track, full spend
People & Skills £1,318,126.35 £2,144,361.16 On track, full spend
Multiply £326,171.00 £532,080.00 Underspend
Management and 
Administration (4% of
spend)
£133,085.96 £251,639.90 On track, slight
underspend relating
to final figures for
Multiply
Page 119 of 138

Page 124

___________________________________________________________________ 
7. UK SPF Programme conclusion / extension 
7.1 As noted in section 3.7, UKG have confirmed there will be no opportunity to
carry-forward any UKSPF budget into the new financial year. The UKG
Autumn Budget Statement is scheduled for 30 October 2024. GCR and other
stakeholders have made representations to UKG regarding the requirement
for a one-year funded extension. UKG civil servants have also indicated this
has been their advice to Ministers.  
7.2 If a positive announcement is made in the Autumn Budget Statement, it is
proposed to provide the next available Economy & Regeneration Policy Board
with an updated UKSPF report explaining the detail and implications of any
extension. The figures below provide a summary of the Year 3 UKSPF
allocation and officers are currently scenario planning for any extension of
UKSF funded activity at the same or lower level. 
Core Multiply Total
Renfrewshire £3,309,716 £378,975 £3,688,691 
7.3 It is not expected that UKG will require a ‘full’ Investment Plan for any one-
year extension to the current programme, more than likely it will be a version
of the ‘credible plan’ that was submitted to UKG at the end of Year 1, detailing
any significant changes from current activity. 
7.4 It is anticipated that if a one year extension is announced, a new UKG (SPF)
programme for the following 3 years will be announced during 2025.
_________________________________________________________________ 
Implications of the Report 
1. Financial – the report outlines the current spend against budget. The
underspend in multiply has no effect on council as the programme is 100%
funded through SPF. 
2. HR & Organisational Development –no impact in current programme however
the UKG budget announcement for future years could have a significant impact if
funding is reduced. 
3. Community/Council Planning – UK SPF supports 4 different challenge funds
across Renfrewshire. 
4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None. 
Page 120 of 138

Page 125

7. Equality & Human Rights - The Recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights.
No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the recommendations
contained in the report. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact - None. 
12. Childrens Rights - None 
13. COSLA Policy Position – Not Applicable. 
14. Climate Risk – Not Applicable. 
___________________________________________________________________
List of Background Papers 
Economy and Regeneration Policy Board, 23rd August 2022, “UK Shared Prosperity
Fund Update” 
Economy and Regeneration Policy Board, 23rd May 2023, “UK Shared Prosperity
Fund – Year 1 Report” 
Economy and Regeneration Board, 7 November 2023, “Shared Prosperity Funding:
Business Challenge Fund” 
___________________________________________________________________ 
Author:  Ruth Cooper, Economic Development Manager; 
Email:    ruth.cooper@renfrewshire.gov.uk 
Page 121 of 138

Page 126

Page 122 of 138

Page 127

___________________________________________________________________
To: Economy & Regeneration Policy Board
On: 05 November 2024
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Cultural Infrastructure Programme Update
___________________________________________________________________
1. Summary 
1.1. This report is to update the Board on the progress of Renfrewshire Council’s
Cultural Infrastructure Programme, being delivered on behalf of the Council by
the City Deal & Infrastructure Team (with project management expertise from the
Council’s Property Services team) with the Paisley Museum Project being
delivered by OneRen. 
1.2. The Cultural Infrastructure Programme investment in Paisley town centre will use
our internationally significant cultural and heritage story to transform our future
for visitors and events within Scotland. This programme of work will bring new
footfall and life to the town centre, new homes for top class cultural events, whilst
preserving the heritage of the town. 
1.3. The Cultural Infrastructure Programme has seen continued success in 2024 with
the completion of Paisley Arts Centre. The programme of work continues with
the flagship Paisley Museum well underway. This report also outlines other works
included in the wider spectrum of the programme including external sports and
the successful TH.CARS2 regeneration scheme. 
________________________________________________________________________ 
Item 9
EAR051124 Page 123 of 138

Page 128

2. Recommendations 
2.1. The Economy & Regeneration Policy Board is asked to: 
i) Note the progress and current stage of construction of the projects outlined
in this paper. 
________________________________________________________________________ 
3. Project Updates 
3.1. Whilst each of the Cultural Infrastructure projects individually contribute to
economic growth in Renfrewshire, it is important to note that the combined social
and economic outcomes from across these investments are greater than the sum
of the individual parts. Coupled with the Council’s wider economic investments
in City Deal, AMIDS, housing, and other regeneration projects, these social and
economic outcomes for our local residents and visitors are enhanced further. 
4. Paisley Town Hall Redevelopment 
4.1. Paisley Town Hall has been transformed into one of the top class entertainment
venues in Scotland. The completion of the major refurbishment has brought this
venue high onto the cultural map with the benefits already being realised. The
building has now been operating since September 2023 with several events
having taken place. 
4.2. Due to the scale of construction in Paisley Town Hall, a period of snagging and
defect management was undertaken.  This has now been drawn to a close with
no significant issues. 
4.3 A review is currently underway of the lifecycle and maintenance requirements for
the Town Hall which will in time be widened to include the Paisley Arts Centre
and the Museum as it is imperative that the ambitious investment in these venues
is safeguarded in the coming years. When concluded this will be the subject of a
future report. 
5. Paisley Learning and Cultural Hub 
5.1. Paisley Learning and Cultural Hub is a 21st century community hub and a
modern home for library services at the heart of Paisley High Street, bringing
new footfall into the town centre. The venue opened its doors to the public in
November 2023. 
5.2. The transformation of an empty shop unit on Paisley High Street into a learning
and cultural hub, which has Paisley Central Library at its heart, has been
recognised with a number of awards nominations. The project has won the ESG
Refurbishment of the Year at the Scottish Property Awards, Judges’ Special
Recognition Award at the Herald Property Awards for Scotland, and the Physical
category at the EDGE Awards, as well as taking home silver in the Regeneration
Category at the Scottish Design Awards. It is also nominated for an AJ
Architecture Award which will be announced in December 2024.
Page 124 of 138

Page 129

5.3. Herald Property Awards for Scotland Judging Panel Chair Tom Barclay said:
"There has often been an awards project that has captured the judge’s
imagination, sometimes for their bravery and often for the determination of the
partners involved, to succeed. This year was one of those years. As one of the
judges who visited this project, I couldn't fail to be blown away, not just by the
technical challenge and architectural solution, but by the human stories that
emerged from this venture, taking a building that dates back to the 1870's and
creating a 'public living room', promoting a safe space for all generations to come
together, to play, to learn, or simply to engage." 
6. Paisley Arts Centre 
6.1. The modernisation of Paisley Arts Centre into a unique and intimate performance
venue and creative hub has been completed and is open to the public. Work was
undertaken to transform the performance facilities, audience experience and
venue space and includes new back-of-house and performance facilities,
improved sound and lighting, upgraded dressing rooms for artists, and enhanced
workshop space for rehearsals and other events. The main auditorium has been
refurbished with new retractable seating to improve the audience experience and
there is an expanded bar area for pre-and post-show drinks. The public space at
the front of the building has also been redesigned, removing the railings and
adding new paving and seating, and a small extension has been added to the
entrance of the building on New Street. Year-round activity of music, comedy and
theatre has been programmed following the success of the first test event, When
Mountains Meet, which took place on 31 May. 
7. Paisley Museum Reimagined 
7.1 Paisley Museum Reimagined will be a world-class destination telling the
inspirational stories of Paisley’s people and pattern and showcasing its
internationally significant collections. This project includes repairing and
renovating all buildings on the museum campus delivering a 20% increase in the
overall usable area. The construction also includes a new extension housing a
visitor reception and café, the installation of new mechanical, electrical and plant
systems, as well as the introduction of a public courtyard. Importantly, this work
enables an increase in the interpretation of the collections and number of objects
on display, with a strong focus on digital interpretation. 
7.2 The project consists of three key phases – Main Contract dealing with
construction, followed by Exhibition Fitout to prepare the infrastructure for the
display systems, completed by Object Install. 
7.3 International Award for Cultural Regeneration 
7.4 Paisley Museum’s redesign has been recognised as internationally award
winning. Our Architect AL_A won the Cultural Regeneration category at the AR
Future Projects 2024 Awards in March 2024, organised by the global architecture
magazine The Architectural Review. The museum was on a shortlist of 13
Page 125 of 138

Page 130

projects including the Prado Museum in Madrid, the Shanghai Opera House and
the Bilbao Fine Arts Museum. 
7.5 Construction 
7.6 A revised programme to completion was received from our Main Contractor, Kier
Construction Ltd on 25 October 2024. They are currently reporting progress
against construction programme forecasting contract completion in July 2025.
Once the main contract is complete, this will allow the second and third stages
of the project (exhibition fitout and object install) to be completed. 
7.7    As is expected in a heritage building such as the museum, years of neglect and
lack of maintenance has resulted in the uncovering of many unforeseen site
conditions, including rotted roof joists, dry rot, wet rot, asbestos, extensive
plasterwork repairs that have hampered and delayed progress on site and for
which Keir have been entitled to additional time to remedy and complete the
project.  This is further compounded by other contractor issues and delays to
progress on site.  The OneRen PMR project team including external Project
Managers Currie & Brown are working with Kier to establish mitigation measures
to try to bring in this date by including suggested improvements to resource and
sequencing of works. Completed display structures are in offsite storage awaiting
installation in the museum next year once construction is complete as part of the
exhibition fitout. This then enables the final stage of object installation.
7.8 Consultants Gardiner & Theobald and Currie & Brown have completed a
strategic, commercial and programme project review to address these
challenges in completing the main contract. 
7.9  In the reporting period there has been progress in the following areas on site: 
• All roof works on the main museum building and Oakshaw properties
including Observatory are practically complete.                                                                                                                                                         
• The new mains gas, water and electricity services are live with meters
installed and pre-commissioning work is progressing.                                                         
• Wall-lining, historic plaster, and cornice repairs are complete in the upper
galleries and decoration is nearing completion. Plaster repairs continue to
progress in most other areas. 
• Floor screeding works in the new West Extension and Entrance have been
completed and the new entrance doors have been installed. 
• Work in the Oakshaw buildings is nearing completion with final decoration
in areas ahead of new floor finishes. 
• External hard and soft landscaping work is practically complete at the
Oakshaw buildings and Transit House with the formation of footpaths and
steps to the new bin store and café terrace. The new sandstone paving to
Page 126 of 138

Page 131

the external courtyard is complete and grading of the landscape gardens
to the east and west is progressing. 
• Building Warrants 1-23 are approved. 
7.10 Exhibition Fitout 
7.11 Our Exhibition Fit-out Contractor, The Hub, and their sub-contractors have now
manufactured 95% of the exhibition components including aluminium display
units, showcases and mounts. The remaining displays to be produced mostly
include joinery items which will be manufactured nearer the time of install.  All
completed displays are in offsite storage awaiting installation in the museum next
year. 
7.12  Digital Interactives 
7.13 Smiley Charity Film Award - One of the museum’s digital productions, The Guild
film, which is a co-produced stop-motion animation with Kairos Women+ Group,
won Bronze in the People's Choice category at the Smiley Charity Film Awards
in London on 20th March 2024. The film, about the suffragette Molly Mercer and
the Scottish Cooperative Women’s Guild, was created with Media Co-op. The
Guild film was also entered into the Paisley HB film Festival 2-6 October 2024,
giving the group an opportunity to view the film in front of a public audience. 
7.14 The Audio Visual & Information Communication Technology Systems Integration
Contract was formally awarded to Heritage Interactive Ltd on 30th July 2024.
They are responsible for the purchasing, installation and commissioning of the
digital AV hardware equipment in the museum displays. 
7.15 All other digital software contracts including interactives, film, animation and AV
shows are progressing well. 
7.16 Collections and Conservation Work   
7.17 The survey of the conservation work required to the paintings confirmed for
replacing the PAI work has been completed and following a procurement process
Sylvia Krauss Painting Conservation was identified as the preferred bidder. All
conservation work to the paintings is expected to be completed by the end of
December 2024.   
7.18 Paisley Museum Reimagined Collections Install Coordinator has developed a
detailed programme and identified the necessary resource required to install the
collections into the museum as the Exhibition Fit-out Contract completes. This
programme has been discussed with The Hub and their object mount-maker
Orbis. 
7.19 Paisley Museum Reimagined project photographer has to date taken 2081 site
photos, 695 location images and 1550 objects photos, resulting in a total of 4976
images. In addition, there have been 1012 project photographs (groups action
and portraiture). Overall, there have been 10314 photographs with 3991 photos
uploaded to the collections management system, AdLib.
Page 127 of 138

Page 132

7.20 Signage & Wayfinding Design 
7.21 Signage & Wayfinding icons testing was undertaken on 11 May 2024 and the
consultant, DNCO is since finalised Icons and Maps for further testing. External
museum signage is being coordinated with AL_A and a prototype package is
being prepared and tender preparation work is underway. 
7.22 Economy & Regeneration Board Members Briefing and Site Visit   
7.23 On April 30th members of the Economy & Regeneration Board were hosted at
Paisley Town hall for a special briefing on the Museum progress, followed by a
site visit, with insights from industry experts including Gordon Morrison, CEO,
Association of Cultural Enterprises, Dr. Mark O’Neill, Former Head of Museums
& Arts Glasgow, and Research Fellow, Research Centre for Museums and
Galleries, University of Leicester, Amanda Levete MBE, Principal Architect,
AL_A Architects. 
7.24 Gordon Morrison reflected the UK wide interest in Paisley’s economic
development through culture and the importance of the museum in building
secondary spend in the wider economy through domestic and international
visitation, while Mark O’Neill provided insights from research on the socio-
economic case for renewal through culture and the benefits to population health.
Both contributors applauded the ambition of the Council’s investment as part of
a longer-term plan for Renfrewshire. 
7.25 Amanda Levete’s contribution placed the Council’s plans and vision for the
museum on a global stage and this has been endorsed through the Museum’s
first award, being internationally recognised for its design in delivering to Cultural
Regeneration. 
7.26 Aileen Strachan, Content Delivery Manager for the project showcased the scale
and impact of the life-changing work that has been going on while the museum
has been closed and how this work is supporting the design of displays and
programmes. 
7.27 Renfrewshire Council is creating a world-class museum with community at its
core. We believe that as well as the museum’s design the ‘community’ aspect of
our work is truly world-class that will bring our museum to life. That by working
with people and communities, we are bringing fresh perspectives to the treasures
we hold, creating real and vibrant connections that allows our museum to reflect
on the past, but very much look forward to the future. A truly contemporary, world-
class museum that has active rather than passive displays, that bring joy and
challenge in equal measure. A museum that will never stand still, evolving stories
and connections to build and engage with audiences in the years ahead. 
7.28 Participation and co-production   
7.29 We have Co-created the Schools Learning Programme through work with every
Primary school in Renfrewshire, so we know it meets the needs of local teachers
and pupils: 
Page 128 of 138

Page 133

• 18 Primary Schools directly involved in the creation of new experiences for
the museum.
• A further 32 Primary schools peer reviewed of resources and experiences.
• Over 500 primary & secondary pupils involved in the testing and
development of activities. 
7.30 For our public programme, we spoke to over 70 local services, organisations
and groups about how the museum could serve their needs: 
• 27 community and partner organisations were then involved in creating
and testing new approaches to and creation of resources for audience
engagement.
• Over 500 participants have been attending test events, workshops and
coproduction activities. 
7.31  We have prioritised consulting and testing at every stage from ideas for themes
through to testing the specifics of content produced with over 600 people. We
have tested text for 25 stories with audiences and sense checked six. For four of
those we have also done digital testing. 
7.32 The story or interpretation is co-produced, or based on substantial partnership
work, for 19 displays. There has been further, extensive participation around
designing the Introductory Gallery. 
7.33 50 of the 88 stories have been co-produced, text tested or there has been some
kind of significant consultation with experts. 
Page 129 of 138

Page 134

Page 130 of 138

Page 135

Page 131 of 138

Page 136

8. Townscape Heritage and Conservation Area Regeneration Scheme 2
(TH.CARS2) 
8.1. The Paisley Townscape Heritage, Conservation Area Regeneration Scheme 2 -
better known as Paisley TH.CARS2 – sought to preserve and improve the town’s
history and make it a better place to live, work and visit now. Led by Renfrewshire
Council, with significant funding from National Lottery Heritage Fund and Historic
Environment Scotland, plus additional contributions from property owners, Paisley
TH.CARS2 has been hugely successful and supported the wider town centre
strategy. Delivered between 2016 and 2024, this multi-million pound project has
given grants to restore historic buildings, supported local businesses to improve
shopfronts, and made identifiable improvements to the town centre’s paths, roads
and streetlights. 
8.2. Grants totalling more than £1.6 million have been invested in 10 historic buildings
within Paisley’s town centre Conservation Area. 
8.3. Nine were listed buildings and include local landmarks such as Sma’ Shot
Cottages and the former Liberal Club. Works included roof restorations,
refurbished façades and window repairs and replacements to match originals, and
hidden repairs like rot and drainage works. 
8.4. Investment in Paisley TH.CARS2 has encouraged private investment elsewhere
in the town centre, with 6 buildings within the Conservation Area now removed
from the Buildings at Risk Register and others currently undergoing refurbishment. 
8.5. Paisley TH.CARS2 has also enhanced the visual of the town centre for residents
and visitors by reinstating historic shopfronts through the Shopfront Improvement
Scheme. 10 projects have been supported through Paisley TH.CARS2 with a
grant total of over £400,000. Investments in shopfronts improve the perception of
the town centre painting it as a vibrant, exciting place to live, work and visit. 
8.6. A Small Building Grants scheme aimed to repair and reinstate striking architectural
features in the town centre. 
8.7. In total, 12 small grants with a total value of approximately £60,000 were awarded.
Refurbishments included traditional sash and case timber windows, with Nomads
a particular example thanks to its etched deco-styled travel symbols. In addition,
specialist work was supported at 26 New Street to reinstate cast iron railings and
lighting columns to the original 1894 design. 
8.8. Improving the pavements, roads and streetlights in the town centre has been an
important focus of the programme. Areas improved include George Place, the
southside of the High Street, between Storie Street and the University of the West
of Scotland, and Weighhouse Close. To maintain the integrity and character of the
streets, recycling of cobblestones and kerbstones has taken place wherever
possible. 
8.9. A parallel programme of community engagement was delivered between 2017
and 2022. Delivered in collaboration with over 100 local and national partners,
more than 2,700 people took part in training and activities across 630 workshops. 
Page 132 of 138

Page 137

8.10 An estimated audience of more than 65,000 people were reached through 40
exhibitions, 32 performances and 30 conferences, talks and demonstrations. 
8.11 The programme created a legacy of over 70 digital resources - including films,
maps and learning packs for schools - and 360 young people from Renfrewshire
took part in traditional building skills workshops and training, and construction site
visits. 
8.12 Paisley TH.CARS2 invested in not only the town’s historic buildings, but in its
people too. Celebrating and showcasing and the town’s heritage remains a
fundamental part of the future vision for Paisley as we continue to offer people
new reasons to visit the town centre and create a Paisley that residents,
businesses and visitors can be proud of. 
9 St James’ Playing Fields & Ferguslie Sports Centre 
9.1 These projects will work towards delivering Renfrewshire’s vision to ‘make sport a
way of life’. In 2018, Council approved the upgrading of changing facilities at
Ferguslie Sports Centre and for the demolition and replacement of the existing
pavilion at St James Playing Fields. When the Covid-19 pandemic hit, a decision
was made to put these projects on hold until such time that it was appropriate to
proceed. 
9.2 Ferguslie Sports Centre     
9.3 Work to completely refurbish all existing changing facilities within the sports
centre have been completed. Additional works have also been undertaken on
the roof, while the boilers in the building have also been upgraded. The contractor
is working through a final snagging list with the facility set to reopen in the near
future with an enhanced visitor experience at the well utilised facility in Ferguslie.  
9.4 St James’ Playing Fields 
9.5 New modern changing facilities hosting eight changing rooms and office space
for staff are being installed the playing fields, known locally as ‘The Racecourse’,
as part of a £2.7million investment by Renfrewshire Council. In addition to the
new changing facilities, four football pitches will be brought back into use and
new walking path around the perimeter will be installed. Work is currently
underway and is due to be completed before the end of the year.     
10 On-X - world-class running track and hockey pitch 
10.1 A World-Athletics standard running track has been installed at the On-X which
will benefit hundreds of athletes of all ages and abilities on a weekly basis. The
£450,000 investment, which includes £100,000 from Kilbarchan AAC, will allow
the club to host league meetings, championship events and any records set on
the track can be ratified by Scottish Athletics. The installation of the new track
was hailed by Scottish athletics whose Chief Executive said: “We recognise and
appreciate the challenging financial climate that Councils are operating within
and are delighted that Renfrewshire Council value so highly the importance of
investment in their sports facility infrastructure."
Page 133 of 138

Page 138

10.2 A world-class hockey pitch has also been installed which meets Federation for
International Hockey (FIH) standards. The £456,000 investment allows Scottish
Men’s and Women’s Premiership and Scottish Women’s National League
matches to be played in Renfrewshire on the new pitch now it meets governing
body regulations. We are delighted to strengthen ties with our local University as
the UWS hockey moves to On X to train and compete with a further seven senior
teams from Renfrewshire club Kelburne all now able to relocate from their
previous bases in Glasgow. A further two Renfrewshire senior teams from
Anchor and Ferguslie Ladies take the total number to 11 all looking to train and
compete at this exciting new facility. The facility will also support Kelburne’s youth
section which currently supports approximately 130 under 18’s to learn and play
hockey at all levels as well as Anchor’s Centurions who support a further 15, with
all ability levels supported to immerse themselves in the sport. Kelburne’s
ongoing schools programme is also set to be enhanced working with the
Council’s leisure, culture and sport partner OneRen’s Active Schools. 
________________________________________________________________________
Implications of the Report 
1. Financial – There are a number of significant risks associated with capital
investment on the scale outlined in the report, many of which have been
previously advised to members. Construction and refurbishment works in
historic buildings are intrinsically subject to a higher degree of cost volatility due
to the nature of the works and the fact that the complexity and detail of the
works required are in many instances not fully known until the works are in
progress and the building condition is fully understood. The existing capital
budgets for those works in progress –Paisley Museum – are under considerable
pressure due to these issues and also due to the extended timescales of the
works which were severely affected by the pandemic closedown and
subsequent modified working practice period. 
Council agreed in June 2023 to pause elements of the wider cultural venues
and town centre infrastructure programme in order to release funding towards
those projects whose budgets are under pressure; and as these projects
conclude and final costs are clarified, further updates to Board will be provided.
It should be noted however that even with the above Council decision there
remains a significant degree of risk and potential cost which could place further
pressure on total capital resource. 
There has been ongoing discussion and updating of the business cases for
each of the cultural venue with colleagues in OneRen, including critically the
updating of base assumptions in terms of operating costs and potential income
generation. While core assumptions and the projected revenue operating
position of Paisley Town Hall and the Arts Centre currently remain broadly
consistent with original projections, they continue to be refined as the venues
become operational.  The updating of assumptions is indicating that there is
likely to be revenue funding pressures associated with Paisley Museum which
are above original business case assumptions. These predominantly relate to
a revised catering offer and emerging clarity on potential income from touring
exhibitions; as well as updated projections of utilities, maintenance and soft FM
costs. The Council will continue to discuss with OneRen options to mitigate
Page 134 of 138

Page 139

these additional costs, however it would also be prudent for the Council to build
these updated cost projections into future revenue plans. 
2. HR & Organisational Development – None. 
3. Community/Council Planning –  
• Our Renfrewshire is thriving – These projects will link our communities
and facilitate a significant increase in footfall to Paisley and surrounding
areas. The infrastructure will enable Renfrewshire to host world class
performances and attract new footfall from far beyond the local area. 
• Our Renfrewshire is well - The outputs of these projects will enable safe
and inspiring locations for all. 
From arts and performances to learning and educational space,
Renfrewshire will offer anyone the ability to engage and take interest in
either a new subject matter or an existing passion that is now much more
accessible. Driving world class performances to the area and having 21st
century work and education spaces will support people from
Renfrewshire to engage in beneficial activities that will in turn support
education and interest. 
• Reshaping our place, our economy and our future – These infrastructure
projects allow access to new and existing jobs for people in our
communities. Significant increase in footfall will benefit local businesses
who can grow as a result and in turn support their ongoing viability in the
area. An increase in arts and performances will allow a platform for
Paisley becoming a cultural hub in Scotland which can be used to drive
new educational agendas with greater access to this subject matter. 
• Tackling inequality, ensuring opportunities for all – A specific focus has
been applied to the redevelopment and construction of these projects to
ensure accessibility is a key feature. A significant amount of thought has
gone into making historic, and predominantly inaccessible buildings,
available for anyone to enjoy and utilise. There are no barriers to utilising
any of these buildings, and One Ren will continue to deliver an events
programme that caters for everyone including those in more deprived
areas. 
• Creating a sustainable Renfrewshire for all to enjoy – With these buildings
being in the heart of Paisley Town centre, it means they are accessible
sustainably due to the well-connected nature of the town centre. Limited
town centre parking will force the use of public transport which will work
towards the net zero ambitions of the Council. Recently completed
infrastructure through AMIDS, including the shared cycle and walkway,
also enhances the connectivity, and in future years with the opening of
the Clyde Waterfront and Renfrew Riverside bridge, Paisley will become
a vastly accessible route by sustainable travel. 
• Working together to improve outcomes - Officers and contractors
continue to work closely with local businesses and a business
Page 135 of 138

Page 140

engagement programme will commence shortly to bring this to focus.
Throughout the development of these projects, several organisations
were engaged to design the outputs including accessibility groups, the
Scottish Government, Historic Environment Scotland, multiple private
sector organisations and the local community. 
4. Legal – None. 
5. Property/Assets – Note the improvements being delivered to current assets. 
6. Information Technology – None. 
7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. 
No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report because it is for noting only. If
required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the
Council’s website. 
8. Health & Safety – None. 
9. Procurement – all contracts are tendered in accordance with Council
procurement procedures and where relevant taken to FRCS Board for approval. 
10. Risk – Project specific and Programme level risk registers have been
established for all projects. These are kept under regular review and reported
to the Council’s internal City Deal and Infrastructure Programme Board. 
11. Privacy Impact – None. 
12. COSLA Policy Position – Not applicable. 
13. Climate Risk – these projects will significantly improve all mechanical,
electrical and plant systems within existing and new buildings affected. This,
coupled with improved efficiency in windows and doors will drive down the
requirement for heating, in turn lowering the carbon footprint from key council
buildings. 
_________________________________________________________
List of Background Papers 
None.
__________________________________________________________________ 
BW 
October 2024
Page 136 of 138

Page 141

Author: Barbara Walker, City Deal and Infrastructure Programme Director;
Email Barbara.walker@renfrewshire.gov.uk
Page 137 of 138

Page 142

Page 138 of 138