Page 1

Page 1 of 7 
___________________________________________________________________
To:  Economy and Regeneration Policy Board
On:  5 November 2024
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Steeple Buildings Kilbarchan - Update
___________________________________________________________________
1. Summary
1.1 The purpose of this report is to provide members with an update on the
proposed refurbishment and potential reuse of the Steeple Buildings in
Kilbarchan. It offers an overview of a recent Options Appraisal and updates on
essential repairs scheduled for 2025.
___________________________________________________________________
2.       Recommendations
2.1 It is recommended that the Board: 
(i) Authorises the Head of Economy and Development to investigate the
recommendations from the options appraisal, undertaking feasibility
work to further explore in more detail the design and funding of the
preferred option;  
(ii) Authorises the Head of Economy and Development to offer further
support to stakeholders, specifically the 'Friends of the Steeple' group,
to help them explore governance options and determine whether any
transfer of ownership or management, potentially through a Community
Asset Transfer, may be viable;
(iii) Authorises the Head of Economy and Development to explore the
ecomuseum model as a way of framing the Kilbarchan Cultural Quarter
concept.
___________________________________________________________________

Page 2

Page 2 of 7 
3.    Background
3.1 The 18th-century Steeple Buildings, located in Kilbarchan's Conservation
Area and jointly owned by Renfrewshire Council and the Kilbarchan General
Society (KGS), hold cultural significance as a Category A listed property and
are the centre of the village's annual Lilias Day celebrations. OneRen
currently leases the building as a community hall, though it has remained
closed since the pandemic. While the building saw limited community use pre-
pandemic, other venues are available in Kilbarchan. Repairs have been
conducted as needed, with a report on the building's electrical condition due in
October 2024.
___________________________________________________________________
4 Stakeholder Engagement 
4.1 A report to the Economy and Regeneration Board on 23 January 2024
provided an update on the progress of Council Motion 9 from 4 May 2023 and
outlined how the £700k allocation would be spent. It emphasised the
significant stakeholder engagement that has taken place, including extensive
consultation with Kilbarchan Community Council (KCC) and their desire to
create a 'Friends of the Steeple' sub-group. Since then, officers have
facilitated the formation of this group. After a series of informal public
meetings with various stakeholders, it was agreed to formally establish the
'Friends of the Steeple' sub-group as part of KCC. The sub-group, consisting
of 12 members—including a KGS representative—who are interested in
playing a more active role in decision-making around the Steeple Buildings, is
a temporary measure under KCC. Depending on the findings of the attached
Options Appraisal, the sub-group will decide whether to establish itself as a
separate entity from KCC.
___________________________________________________________________
5 Options Appraisal
5.1 Also highlighted in the report to the Economy and Regeneration Board on 23
January 2024 was the intention of officers to appoint a consultant to conduct a
detailed Options Appraisal looking a future uses for the Steeple Buildings. 
The Options Appraisal is attached at Appendix 1 of this report. 
5.2 In February 2024, Glasgow Building Preservation Trust were appointed to
carry this appraisal. The objectives were to explore suitable uses for the
Steeple Buildings within the proposed "Kilbarchan Cultural Quarter," consider
various options such as a community museum, assess the viability and costs
of these options, and recommend the most viable one for Council approval.
5.3 The Options Appraisal has produced consensus on a preferred use for the
Steeple Buildings. This maintains the integrity of the main spaces and sees: 
(i) The ground floor hall being turned into a licensed café/restaurant. 
(ii) The original meal market room reinstated by extending the existing
kitchen into the adjacent storeroom.

Page 3

Page 3 of 7 
(iii) The first floor Ladies Room maintained as a meeting room for KGS
with secure storage, but available for other groups to hire. 
(iv) The first floor hall maintained as a community hall for hire. 
(v) The entrance and toilet areas reconfigured on both floors to offer
accessible facilities, including a platform lift. 
(vi) Provision for display cases and interpretation panels in the ground floor
café/restaurant and first floor Ladies Room promoting Kilbarchan’s
heritage. 
5.4 The cost to internally refit and fully refurbish the Steeple Buildings’ interior for
this preferred use is estimated at £384,000+VAT. 
5.5 While continued ownership by Renfrewshire Council and KGS is preferred by
the community, the Options Appraisal has not reached a consensus on the
building’s future management and instead presents three alternatives for
further discussion. The key question the community now needs to address,
with a preferred option in hand, is what level of involvement—if any—the
community wish to have in the future management of the building. 
The 3 management options are: 
(i) Management Option A in which Renfrewshire Council retains
ownership (with KGS) and the Council, or OneRen, operate the
building, leasing halls/rooms to tenants and managing short and longer
term lets. In this scenario, the council is likely to retain full responsibility
for repairs and income from lets and commercial activities will go to the
council. This setup benefits from existing management structures
however capital funding options are more limited and use of the first
floor community space may be less tailored to the needs of the
community. 
(ii) Management Option B in which ownership (excluding KGS’s room) or
management of the building is transferred to a community group,
potentially via Community Asset Transfer (CAT). In this scenario, the
community group – most likely a Scottish Charitable Incorporated
Organisation (SCIO) or a Company Limited by Guarantee with
Charitable Status – is responsible for repair (possibly excluding the
Steeple itself) and leases the building to tenants. While this setup relies
far more on community volunteers, the community has more control
over the use of the building and benefits more directly from any
income. Compared to the council, a community body, such as a
charity, will be able to approach a greater range of funders.

Page 4

Page 4 of 7 
(iii) Management Option C where Renfrewshire Council leases the entire
building (excluding KGS’s room and possibly the Steeple itself) to a
commercial tenant. This scenario places the least strain on the
resources of the council, OneRen, and the local community. However,
under this option, community use of the main spaces may be limited to
specific functions, which could, in turn, restrict eligibility for funding. 
5.6 Revenue costs have been estimated for Management Options A and B for
Years 1 to 5. Option A enables the Council to operate the building at a small
annual surplus from Year 2, whereas Option B enables a community
organisation to operate the building at a marginally higher surplus from Year 1. 
5.7 Informal feedback from the Council’s Planning team has indicated they would
take a pragmatic approach to any change of use for the Steeple Buildings and
similarly, solutions for elements such as kitchen extraction, bin storage and an
air source heat pump. 
5.8 Over and above the standard requirements, there are currently no additional
restrictions on licensing in Kilbarchan. 
5.9 In response to the desire to refurbish the Steeple Buildings in the context of a
wider Kilbarchan Cultural Quarter, the Options Appraisal suggests that the
“ecomuseum” model could be explored as a way of framing and developing
the idea. 
5.10 The term "ecomuseum" is a blend of "eco-" from the Greek oikos (meaning
"house" or "environment") and "museum." This reflects the idea of a museum
that is closely linked to place and community - it is not a museum of ecology,
though it may incorporate elements of natural heritage.
5.11 An ecomuseum is a dynamic, community-based project focused on
preserving both tangible and intangible heritage in a way that benefits local
people and the environment. Unlike traditional museums, which are housed in
single buildings, ecomuseums are typically spread across multiple locations.
The core idea is to involve local communities in managing, protecting, and
showcasing their heritage and environment, creating a living, evolving
museum.
5.12 The ecomuseum model could provide a way to gather and promote the
diverse range of cultural and heritage offers in Kilbarchan, including for
example, the Steeple Buildings, the Weavers Cottage, Lilias Day, and the new
heritage trail.
___________________________________________________________________
6 Repairs Programme
6.1 The Economy and Regeneration Board (January 2024) approved the
implementation of a first phase of major repairs, valued at £308,000+VAT,
prioritising immediate and urgent work on the roof, leadwork, and rainwater
systems.

Page 5

Page 5 of 7 
6.2 In September 2024, conservation specialists MAST Architects were appointed
to develop and oversee the delivery of the first phase of major repairs,
scheduled for 2025. In addition to conserving the main external fabric, this first
phase aims to explore the possibility of reopening the building in an interim
capacity. The findings of Building Services' upcoming electrical report will help
determine whether interim use will be feasible without further works.
___________________________________________________________________
7 Funding
7.1 The cost of the first phase of works to the Steeple Buildings plus the
estimated cost of the refit and full refurbishment of the interior for the
preferred option is £692,000+VAT – just short of the £700,000+VAT budget
allocated by the council.
7.2 The estimated cost of delivering the additional repairs identified in the
condition report, which have not been prioritised as part of the Phase 1 works,
is £232,000 +VAT. However, it should be noted that these repairs were not
classified as 'immediate' or 'urgent.'
7.3 In anticipation of any potential funding shortfall, initial conversations about
future applications to help refurbish the Steeple Buildings took place in 2023
with National Lottery Heritage Fund (NLHF) and Historic Environment
Scotland (HES): 
(i) Given its location, NLHF had expressed doubts that any proposed use
for the building would engage sufficiently with their target communities; 
(ii) HES were open to an application to their Historic Environment Grants
programme; however, any application was subject to Renfrewshire
Council being able to demonstrate that a sustainable, long-term use for
the building had been identified. 
7.3 Funders such as NLHF and HES are likely to be more in favour of a use
which maintains the integrity of the main spaces within a category A-listed
building.
___________________________________________________________________
8 Next Steps  
8.1 Officers will work with MAST Architects to finalise the repairs programme and
tender the contract for appointing a contractor to deliver the first phase of the
major repairs. The goal is to make a recommendation for the contract award
at the Finance Board meeting on June 12, 2025.
8.2 Officers will conduct further feasibility work to explore in more detail the
design and funding of the preferred option identified in the Options Appraisal.
They also plan to liaise with stakeholders regarding the findings of the Options
Appraisal, aiming to agree on a preferred management option. Additionally,
officers will investigate whether the concept of an ecomuseum model could be
viable in Kilbarchan as a way to frame the Kilbarchan Cultural Quarter
concept.

Page 6

Page 6 of 7 
_________________________________________________________________
Implications of the Report
1. Financial - £700,000 has been allocated by Renfrewshire Council for the
refurbishment of the Steeple Buildings. Additional funds would need to be
sourced to carry out all the external repairs itemised in the 2023 condition
report and carry out a full refurbishment of the interior in accordance with the
costings calculated for the preferred option in the 2024 options appraisal. 
2. HR & Organisational Development – None 
3. Community/Council Planning –  
• Our Renfrewshire is thriving – The project supports development which will
protect and enhance the built heritage of Renfrewshire’s village centres,
contributing to the creation of thriving places which support individuals,
communities, and businesses. 
• Reshaping our place, our economy and our future – The project will help
support the restoration and productive re-use of a landmark building in the
centre of a Renfrewshire village, improving the built environment, helping
to create job opportunities and contribute to economic growth. 
• Working together to improve outcomes - The project is working in
partnership with local groups and organisations to achieve positive
outcomes. 
4. Legal – The Steeple Buildings are jointly owned with local charity, Kilbarchan
General Society (who own a single room on the first floor). 
5. Property/Assets - Property Services are acting as Client Advisor for the
Phase 1 repair programme 
6. Information Technology – None 
7. Equality & Human Rights - The Recommendations contained within this
report have been assessed in relation to their impact on equalities and human
rights. No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report because for example it is for noting
only.   If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website. 
(Report author to arrange this). 
8. Health & Safety – MAST Architects have been appointed as Principal
Designer for the Phase 1 repair programme. 
9. Procurement – The appointment of a main contractor for the Phase 1 repair
programme will be managed by CPU.

Page 7

Page 7 of 7 
10. Risk – There is a need to stabilise the fabric of the building and an ambition to
bring the building back into a use which is sustainable. 
11. Privacy Impact - None 
12. Climate Risk – With cognisance of Historic Environment Scotland’s ‘A Guide
to Climate Change Impacts: On Scotland’s Historic Environment, Our Place in
Time, 2019’, the repair and maintenance of the Steeple Buildings will
contribute to the restoration and repair of Renfrewshire’s historic fabric and
will improve the performance of this property over time. 
13. Children’s Rights – None 
14. Cosla Policy Position - None
_______________________________________________________
List of Background Papers 
Appendix 1 -  Kilbarchan Steeple Options Appraisal October 2024 
___________________________________________________________________ 
Author: Euan Shearer; Regeneration and Place Manager
Email: euan.shearer@renfrewshire.gov.uk

Page 8

Kilbarchan Steeple Buildings
Options Appraisal
Appendix 1

Page 9

2
Glasgow Building Preservation Trust
Wellpark Enterprise Centre, 120 Sydney St, Glasgow G31 1JF
web: www.gbpt.org | tel: 0141 554 4411
Document Version Date Author(s) Approved by
Kilbarchan Steeple Buildings Options Appraisal  1  26-09-24 N Gallacher/ Ingrid Shearer  N Gallacher
2 04-10-24 N Gallacher/ Ingrid Shearer N Gallacher
3 09-10-24 N Gallacher/ Ingrid Shearer N Gallacher

Page 10

3
Contents
1.0 Introduction
2.0 Executive Summary
3.0 Context
4.0 The Building
5.0  Strategic Context
6.0 Consultation
7.0 Development of Options
8.0 Business Plan
9.0 Capital Costs
10.0 Revenue Costs 
11.0 Funding
12.0 Risk Analysis
13.0 Conclusion & Recommendations
14.0 Action Plan
Appendix A: Community Consultation Report & resources
Appendix B: Business Plan
Appendix C: 2023 Condition Survey, JGA Architects
Appendix D: 2023 Luths Services Appraisal 
Appendix E: 2024 NBM Cost Plan: Internal Refurbishment
Appendices

Page 11

4

Page 12

5
This Options Appraisal (the appraisal) has been
commissioned by Renfrewshire Council to consult with
the community and stakeholders to investigate and
assess the viability of options for the restoration and
adaptation of the Kilbarchan Steeple Buildings, with the
aim of identifying a sustainable future use for this
historic landmark.
1.0 Introduction 
Renfrewshire Council (the Council) is the client for the
appraisal and jointly own the building with the         
Kilbarchan General Society. The Council has                 
responsibility for the maintenance and future use of
the building.
Key Stakeholders
Kilbarchan General Society (KGS) was founded in 1765
and has been raising funds to support the people and
organisations of the village ever since. KGS retains
ownership of a first floor room in the building. As part
of their   philanthropic activities, KGS is in the process
of  restoring a vintage fire engine which was             
previously housed on the ground floor of the building. 
Kilbarchan Community Council  (KCC) is a voluntary          
organisation run by local  residents to act as a voice
on behalf of local people and improve quality of life,
civic pride, local amenities and services.
Friends of The  Steeple (The Friends) were formed in
2024 as a  sub-group of KCC, to focus on the future of
the building. The Friends include representation from
KCC  and KGS.
OneRen  is a charity and part of the Renfrewshire
Council family that provides culture, leisure and
sporting opportunities. OneRen managed the building
as a community hall on behalf of Renfrewshire  
Council prior to its closure . 
Aims
The aims of the study are:
• To undertake a consultation exercise to investigate and
understand the local need and demand for new uses in the
building.
• To provide a business plan covering  an analysis of existing
community facilities, the financial sustainability of proposals
and  the potential governance and funding options.  
• To obtain up to date condition surveys of the building along
with proposals for restoration and reuse.
• To produce a document which will be available to         
stakeholders to understand the context of the building 
when considering  how  to  proceed.  
• To provide information that will  assist fundraising should a
project be taken forward.
The Options Appraisal is funded by  
Client 
Project Coordinator   
Glasgow Building Preservation Trust 
Community Consultation 
Glasgow Building Preservation Trust 
Architect   
John Gilbert Architects 
Business Planner  
Community Enterprise 
Cost Consultant  
NBM 
Project Team

Page 13

6 
Source: canmore_image_SC02025374

Page 14

7
This options appraisal, conducted between March and September 2024, consolidates reports,
consultation feedback and discussions on developing a vision for the future of the Steeple Buildings. 
Led by Glasgow Building Preservation Trust, the appraisal team carried out a comprehensive
engagement process involving Renfrewshire Council, local stakeholders, the Kilbarchan community,
Friends of the Steeple, and various local groups. Their goal was to explore the significance of the
Steeple Buildings from heritage and community perspectives, review the building's condition,
develop layout proposals, assess business case viability, and consider governance and management
strategies. 
Throughout this process, one key theme emerged: the community's deep affection for the Steeple
Buildings and their symbolic value for Kilbarchan. The community, alongside key stakeholders, has
shown strong support for restoring and adapting the building to a new use that complements the
village’s existing heritage and hospitality offerings. Given its central location, the Steeple Buildings
project is viewed as a potential catalyst for broader regeneration within Steeple Square, which in
turn would support ambitions for establishing a Kilbarchan Cultural Quarter that could encompass 
the Steeple Buildings, Kilbarchan Cross and the Weaver’s Cottage. 
The design team has proposed a hybrid model incorporating commercial and community uses that
can be accommodated within the building while preserving its principal spaces and historic
character. These plans would allow the Steeple Buildings to serve multiple functions without
requiring significant structural changes. The estimated cost for internal refurbishment is in the
region of £384,000. 
Renfrewshire Council has committed significant funds towards the refurbishment of the Steeple
Buildings. This appraisal is intended to support further discussions between the Council, the
community, and stakeholders to reach a consensus on the best way forward. A collective effort will
be essential in developing a project, business, and funding strategy that ensures the long-term
sustainability of the Steeple Buildings, allowing them to serve the Kilbarchan community for
generations to come.
2.0 Executive Summary

Page 15

8 
Steeple
Buildings
The Old Library
Centre
Parish
Church Hall
Kilbarchan 
Performing
Arts Centre
Scout Hall
Masonic Hall
Lodge of      
St Barchans
Weaver’s
Cottage
Bobbins
Cafe
Guide
Hall
Habbies 
Pub & Grill
Trust Inn
Kilbarchan
Bowling Club
Key
Tourist attraction
Pub/ Restaurant/ Cafe
Hall/ venue for hire
Steeple Buildings: focus of this report

Page 16

9
East building prior to restoration
Kilbarchan has a population of 4,653 per the 2022 Census. The village is home to 61
listed buildings, the highest profile of which is the National Trust Weaver’s Cottage. It
is part of the National Cycle Network routes 7 and 75 and features in the Paisley
Pattern visitor itinerary. There are several cafes, but little visitor accommodation.
Kilbarchan has other multi-use halls for community use, including the Performing Arts
Centre representatives of which have been consulted as part of research for this
report.
3.0 Context
Kilbarchan takes its name from the Gaelic "Cill Bhearcain," meaning "the church of
St. Barchan”, and first appears in the historical record in 1175 as ‘Kylberhan’ in the 
Registrum Monasterii de Passelet. The dedication to St Barchan,  an early eighth-
century Irish saint , suggests there was an ecclesiastical site predating the twelfth
century. The village lies at the centre of the wider parish of Kilbarchan.
In 1740, it had a modest population of around 200 people, primarily centred
around the village cross at the intersection of what are now known as Steeple
Street, Church Street, Shuttle Street, and New Street. The mid-1700s marked a
significant period of growth for Kilbarchan, driven by the booming handloom
weaving industry, along with other local enterprises such as candle factories,
bleachfields, and a brewery.
The village's development was closely tied to the Milliken family, wealthy local
landowners who had made their money in the slave trade and sugar plantations. In
1751, James Milliken II gifted land for a parish school and proposed the addition of
a steeple to house the village bell and a room for a meal market. Built in 1755 by
local mason David Kerr, the Steeple has since become a prominent landmark and a
symbol of civic pride. The north wing of the Steeple housed the meal market, while
the south wing served as the school.
The Kilbarchan General Society, founded in 1765, is one of the oldest charitable
organizations in Scotland. It has played a vital role in supporting local members in
need and has a long-standing association with the Steeple. Throughout the 19th
century, Kilbarchan expanded its public amenities, including the establishment of
the Front Committee in 1822, which managed local resources and maintained
public facilities like wells and the Steeple clock. The village became known for its
strong community ties and active participation in civic matters.
By the mid-20th century, Kilbarchan faced challenges regarding the maintenance
of its historic buildings. In response, a restoration campaign was initiated in the
3.1 Kilbarchan Village
3.2 Demographics
1950s, ensuring the Steeple and surrounding structures were preserved for future
generations. Recognized for its architectural and historical significance, Kilbarchan
was designated as an Outstanding Conservation Area in 1973. Today, Kilbarchan is
celebrated for its heritage, including the annual Lilias Day festival, which features
parades and community gatherings, linking the present to the village’s storied past.
The continued efforts to maintain and revitalize its historic buildings underscore
Kilbarchan’s commitment to preserving its unique character and sense of community.
Above: historic postcard with view to the Steeple Buildings; Source: eBay

Page 17

10 
4.0 The Building
The Steeple Buildings have played a significant role in the social, cultural and business
life of Kilbarchan and dominate the village skyline, contributing to the exceptional
townscape of the conservation area, which has been classed as “outstanding” since
1973.
Category A listed, it occupies an elevated site in Steeple Square at the heart  of the
village. The buildings’ most prominent feature is the classical four storey tower,
designed in the manner of a Tolbooth. Constructed from roughly coursed sandstone
rubble, with dressed margins under a slate roof, the building would originally have been
lime harled. The tower has a carved ashlar belfry and spire (bell cast by Thomas Mears
of London 1811), a Gibbsian door surround, a third floor venetian window with arched
niche that houses a bronze statue of celebrated local piper Habbie Simpson (installed in
1932 replacing the 1821 wooden one) and a clock with balustraded parapet at belfry
level.
Originally planned as a small parish school, meal-market and steeple with village bell,
the first iteration of the building was completed by mason David Kerr in 1755. A room
above the meal-market was retained by local landowner, James Milliken of Milliken for
his family. The Milliken family were wealthy local landowners whose money came from
the slave trade and sugar. This room became known as the “Ladies Room” as it was used
by local ladies, between church services and during hunt meetings. 
The Kilbarchan General Society (KGS) was founded in 1765 to provide relief to local
members in need. A 1723 horse-drawn fire engine owned / operated by KGS was stored
in the meal-market. In 1782, to accommodate the growing population the south
building was demolished and replaced by a larger school room. In the late C18 the north
building was extended to create a strong room for the meal-market with additional
accommodation above.  
Ownership of parts of the building passed to The Kirk Session in 1765 then to John
Holmes who assigned the building to the Parochial Parish Board in 1892, which was
superseded by Kilbarchan Parish Council in 1894. Renfrewshire District Council united
4.1 History & Ownership
ownership of the building in 1930, with the exception of the first floor “Ladies
Room”, which was conveyed by the estate of Sir Robert John Milliken Napier to
the Kilbarchan General Society in 1869 (the Society retain ownership to this day). 
Fundraising after WWII enabled restoration works valued at £12,000 in memory
of the fallen. Completed in 1957, these works included a new entrance linking the
two wings. The ground floor was used as a village hall with council offices above. 
The old fire engine was relocated at this time to make space for a small kitchen. 
The significance of the Steeple Buildings was confirmed in 1971 with the award of
a ‘Category A listing for buildings of national or international architectural or
historic importance’.  
1902 view of the men's hot baths, this altered space still exists on the first floor
Above: phases of building development, GBPT

Page 18

11
Collapsed roof in 1st floor room
As the village’s principal landmark, the Steeple has acted as gathering point for
the community, in particular  the annual Lilias Days celebrations, when the statue
of Habbie Simpson “comes to life” and leads a parade through the village playing
the bagpipes. 
Most recently the property has been managed as a community hall by OneRen on
behalf of the Council, being used around seven hours per week in 2019, which is
understandable when you consider the various competing venues available in
Kilbarchan. Like all venues, the building closed in 2020 due to the Covid-19
pandemic and has not reopened. The Council has carried our regular inspections
and maintenance while a comprehensive scheme of repair and proposals for a
new sustainable use are developed.
Above: archive view of first floor hall  © Crown Copyright: HES.
Right: Above: historic postcard with view to the Steeple Buildings; Source: eBay

Page 19

12 
Existing  Ground Floor Plan 4.2 Existing Building Layout and Significance 
The Steeple Buildings have been altered by successive generations as
the needs of the village and community changed. Floor plans from
Canmore have been coloured by John Gilbert Architects to highlight
the various phases of development from the 18th Century to the 20th 
Century. The most significant areas contain the historic fabric. The
works undertaken in the 20th Century, are of less historical significance
and allow  scope for internal alterations to improve access.
On the ground floor the former school room now functions as a hall.
The old strong room was converted to WC’s in the 20th century. At the
same time a new stair to the first floor was added and the former meal
-market was subdivided into a kitchen and store.
The first floor contains  a large hall, with an elegant high coved ceiling
and originally featured a corner fireplace. The other principal space on
this level is the meeting room owned by the KGS, which also contains
original features and a fire place. The first floor also benefits from WCs
and stores.
The tower can only be accessed externally and has five floors with a
narrow spiral stair leading from first floor to the clock and belfry. 
https:// canmore.org.uk/site/43216/kilbarchan-steeple-square-steeple-and-steeple-buildings  
Hall
WC 
Kitchen Store
Main        
Entrance 
Steeple 
Access 
Key
1755
1782
Late 18th Century 
20th Century 
Access
WC

Page 20

13 
Existing First Floor Plan 
Hall 
General Society
Room
Existing Second Floor Plan
Existing Third Floor Plan
Existing Fourth Floor Plan
WC
WC

Page 21

14 
4.3 Building Condition  Survey
John Gilbert Architects were commissioned in 2023 by the Council to survey the    
building, assess its condition and advise on the priority of repairs. 
The JGA report from October 2023 identified and categorised  the following items:
Immediate 
• Replace all lead work (finishes, upstands, flashings, sealant etc.) to steeple roof
and belfry roof and ensure stone finials and stone balustrade are properly    
dowelled and secured to the building. Lead gutter renewed and reconnected to
downpipes.
• Full re-slate of the roof with all associated flashings and fixings.
• Strip finishes and any damp substrate or structure below from flat roof area.
• Replace all three rooflights. Ensure watertight line is continuous from slate roofs
to flat roof and rooflights.
• Renewing all rainwater goods and soil / waste goods. 
Urgent 
• Repairs and sealing of chimneys with slate cappings. Reinstate like for like    
chimney pots throughout.
• Stone indents to west elevation at junction with steeple.
• Removal of all external wiring to allow for works. Ideally no external wiring would
be returned to the building.
• Cut out and replace rotten sections of some windows. 
Necessary
• Replace external lighting to steeple. 
• All stonework to be DOFF cleaned, cement mortar raked out and full
repointing of the whole building, including the spire and belfry. 
• Remove all paint to corner profiles, opening surrounds, feature bands,
clock surrounds etc. as it is flaking in many areas and looks to be     
trapping moisture in the stone behind. Repaint with a natural mineral
based exterior paint, colour to match existing. 
• Most windows are in good condition but require sanding, repainting,
cleaning, checking of opening mechanisms and weights to sashes and a
reapplication of putty and / or burnt sand mastic. 
• Some external doors require repairs, sanding and repainting. Internal
repairs and redecoration to floors, walls and ceilings generally. 
• Sanding and repainting all internal doors and windows but generally
retaining ironmongery. 
Desirable 
• Cleaning and conservation of weathervane.
• Some external doors require only a sand and repaint.
• Cleaning and conservation of clock faces and mechanisms, wall   
mounted streetlights and statue of Habbie Simpson.

Page 22

15
Slate roof, lead flashings and clips in need of repair / some       
replacement. Flat roof and rooflights in poor condition and leaking.
Stone belfry, balustrade and leadwork in poor condition generally Existing stone spire and finials in need of repair and
new restraint fixings
Rainwater goods need to be replaced.
External stone requires 100% cleaning
and repointing
Timber windows with areas of rot, flaking paint-
work and missing burnt sand mastic. Repairs  
required to windows and doors
Painted quoin stones flaking throughout Evidence  of lime harling on stonework

Page 23

16 
First floor hall: existing floor warped  due to moisture and
decoration affected by water ingress
Kitchen is small and would require    
upgrading to allow a commercial use
Ground floor hall: interior requires attention due to lack of  use,
heating and ventilation
Kilbarchan General Society meeting room 
Ground floor changes in level restricts          
accessibility 
Stair only access to first floor limits   
accessibility
WC’ fittings are serviceable but would
benefit from refurbishment

Page 24

17
Luths Services Ltd were also commissioned by the Council in 2023 to survey and
report on the condition of the following existing services installations: 
Mechanical  
• Heating
• Ventilation
• Domestic hot water
Electrical
• LV Distribution – Main Switchgear and Sub-Distribution 
• Wiring installations
• Lighting installations
• Emergency lighting installations
• Small power sockets
• Fire alarm 
• Clock mechanism
The main issues identified in the survey were: 
No/Natural Ventilation
There is a lack of ventilation which has resulted in poor  indoor air quality and
mould collection. Installing mechanical ventilation systems would vastly improve
air circulation. 
Damaged Gutters: 
The chimney and gutter are damaged leading to rainwater  accumulating in the
walls of the building. This has caused potential mould growth and structural      
damage. Promptly repair or replace the gutters to maintain the building’s integrity. 
Mould on Ceilings
Due to lack of ventilation and proper heating there is mould on most ceilings
and especially in the ground floor hall. Ceiling mould indicates excessive    
moisture. Identify the moisture sources and remediate mould to ensure a
healthy indoor environment and structural integrity. 
Electric Heaters
Old electric space heaters are inefficient and costly. Upgrade to heat pumps
or new heating for improved performance and energy savings. 
Distribution
There is a potentially damaged conduit in the electrical cupboard from the
general distribution board. This risks electrical hazards. Repair or replace dam-
aged conduit to protect wiring and ensure electrical safety. 
Lighting
All lighting fixtures are CFLs. Replace CFLs with LED fixtures to reduce energy
consumption and maintenance costs whilst improving lighting quality. 
4.5  Current works to the  building
The Council appointed MAST Architects to implement a package of repair
works in September 2024. 
4.4 Building Services Survey

Page 25

18 
Collapsed roof in 1st floor room East building prior to restoration
In this section Community Enterprise sets out the key national, regional and local
policies and strategies which will influence the project, and identifies the existing
priorities it may support. It also summarises other wider factors that have been
taken into consideration in the options appraisal. 
• Place: the plan emphasises access to facilities (including places to eat and
cultural opportunities) within communities, and states that “we will continue to
celebrate the arts, culture and our heritage in Renfrewshire”. The plan
references a whole-place approach. This has been prioritised in this project,
seeking a future use for the Steeple Buildings which complements Kilbarchan’s
existing heritage and community assets, in particular the presence of various
other community halls and large gathering spaces. 
• Economy: one of the priorities is creating sustainable employment
opportunities, which a commercial tenancy at the Steeple will provide. 
5.3 Economic Development 
Renfrewshire’s Economic Strategy 2020-2030 recognises that attracting people of
working age to live and work in the region is key. Under this objective, interventions
including levering investment into town centres. The strategy also seeks “to foster an
entrepreneurial culture and support the creation of new and growing businesses”,
including in the creative industries. 
Flexible business space at other units such as Start Up Street has been in high demand,
and consultation with Business Gateway Renfrewshire and local businesses in
Kilbarchan showed that there was demand for customer-facing premises. 
5.4 Tourism 
Renfrewshire’s Tourism Today is Renfrewshire’s tourism plan for 2024-27, and seeks
to grow the value of tourism in Renfrewshire and enhance its benefits, including to
businesses and communities. One of the projects identified is to support the Villages’
tourism offer, leading to increased capacity to attract and accommodate visitors.
Preventing future deterioration of the Steeple, a high-profile heritage building among
Kilbarchan’s many historic sites, will support the village’s tourism appeal. Meanwhile,
commercial use of the ground floor as a bistro has the potential to increase visitor
dwell time and spend in the area. 
5.0 Strategy and Context
The National Planning Framework 4 (NPF4) is the long-term plan for Scotland to
2045 and sets out where development and infrastructure is needed. Within this,
Local Authorities must also prepare a Local Development Plan. Renfrewshire’s
most recent Plan was adopted in 2021. This sets out a practice of continued
support for the redevelopment and regeneration of brownfield and previously
used sites, recognising opportunities for the historic environment to contribute
positively to placemaking. Policy Env 3 on Built and Cultural Heritage states that
Renfrewshire’s built and cultural heritage will be safeguarded, conserved and
enhanced. It also notes that the sympathetic restoration of listed buildings will be
supported when it allows a building to remain in  active use, although the design
should be sensitive to the building’s character, appearance and setting. There is a
presumption against demolition or other works that would actively affect listed
buildings. 
Renfrewshire Council licensing and planning representatives have been consulted
and have confirmed that there would be a pragmatic approach to any application
for a change of use for the Steeple Buildings, and to minor changes needed to the
building to put in kitchen extraction, bin stores and air source heat pumps as
needed. 
5.2 Council Plan
Renfrewshire Council’s Plan for 2022-2027 (refreshed in 2024) is the overarching
plan setting out how the Council will work towards “creating a fairer Renfrewshire
built on innovation, wellbeing and opportunity”. The project aligns particularly
with the following high-level priorities of the plan: 
5.1 Planning  Policy

Page 26

19
5.5 Community planning 
Kilbarchan forms part of Renfrewshire’s Local Partnership for the Villages area.
Priorities identified for this area are connectivity and transport (including public
transport and green routes), environment and parks, access to services, facilities
and assets, and village identity and character. Finding sustainable future use for
the Steeple contributes strongly to the last two of these. 
5.6 National heritage strategy 
Our Past, Our Future: The Strategy for Scotland’s Historic Environment 
Scotland’s national strategy for the historic environment for 2023-2028.
Developing Kilbarchan Steeple Buildings fits well with all three priorities: 
• Priority 1: Delivering the transition to net zero. Reduced emissions
(outcome 1) and climate resilience (outcome 2). Although this is not
primarily a project with an environmental focus, the Steeple Buildings have
historically had high energy usage indicating inefficient heating and lighting.
Energy efficiency, reuse of materials (reducing embodied carbon) and
design for future climate conditions will be integral to regeneration plans. 
• Priority 2: Empowering resilient and inclusive communities and places. The
strategy seeks to ensure that organisations that care for the historic
environment have the right skills and are more resilient. It is not yet clear
who will manage the Steeple Buildings, but the options appraisal
undertaken has aimed to identify a financially viable usage for the building,
avoiding a scenario where its future is dependent on funding in the long
term. 
• Priority 3: Building a wellbeing economy. The strategy seeks to promote fair
work, responsible contributions to Scotland’s economy and increasing
engagement with the historic environment, particularly through activities
that enhance wellbeing. 
In addition to this strategy, the Options Appraisal has also taken into consideration the
economic pressures facing the heritage sector. Rising operating costs have affected
many organisations managing heritage assets: see for example a recent statement
from Museums and Galleries Scotland, in which they state that 11% of accredited
museums participating in a recent study feel that their organisations are at risk of
closure in the next 12 months. 
5.7 Community engagement 
Community and stakeholder consultations carried out by GBPT, Community Enterprise
and John Gilbert Architects revealed several key insights regarding the future of the
Steeple Buildings. Findings are summarised in section 6.0. 
In brief, key points relevant to the business case were: 
• There was strong support overall for the restoration and reuse of Kilbarchan
Steeple Buildings that maintains community access.
• People recognised that Kilbarchan has enough community halls and gathering
spaces, so any future development should complement these rather than
compete. 
• Commercial usage was generally not seen as a concern, and people were open
to the inclusion of some commercial activities in line with the community’s
values and needs. 
• Many participants did want to see elements of heritage interpretation, but this
could take the form of exhibitions or displays integrated into the building (and
potentially spread out across the village), rather than entire rooms dedicated to
heritage.

Page 27

20 
5.8 Non-displacement and Partnership Working 
A priority for the options appraisal has been to identify a future use for the
Steeple Buildings  which will not duplicate or take business away from other
businesses and community spaces in the village. Community Enterprise reached
out to local businesses, including other community halls, to find out how what
opportunities they saw, and how regeneration of the Steeple Buildings would
affect them.
Interviews were carried out with the Performing Arts Centre, the Parish Church,
and the owner of Habbies and the Trust Inn. We contacted Old Library Centre, the
Scout and Guide Halls and Masonic Hall, but they did not respond or were not able
to take part in an interview within the research period. In addition, we interviewed
Business Gateway and a local commercial Estate Agent about the demand for
commercial property. 
Key findings were: 
• There was general agreement that there are enough halls in the village
without bringing the main hall at the Steeple Buildings back into community
use. 
• Hospitality is profitable in Kilbarchan, existing pub/restaurants are busy 7
days per week. There was consensus among participating businesses that
there was a gap in the hospitality market for somewhere to go in the
evening outside of a pub setting, rather than a café open in the daytime. 
• The cost of rent is a major barrier for people starting a business in the area.
Flexible business space, where available, has been popular. Outside of the
hospitality sector, it is uncommon for a business to take on a long lease in
the area. 
• There are a lot of lifestyle business start-ups in the area – these types of
businesses don't need office space and often operate from home, but some are
interested in customer-facing premises. 
• There is not much visitor accommodation in Kilbarchan, and the three rooms
above Habbies pub are well used. However, some of the organisations consulted
were unsure of the practicalities of managing a holiday let and how compatible
it would be with other use of the rest of the building. 
• As part of consultation, Renfrewshire Museums were consulted about the
potential for use of the Steeple Buildings as a heritage centre, possibly as an
outreach space for Paisley Museum Reimagined. The Museums team confirmed
that they did not have capacity or budget to manage another site. If the Steeple
Buildings were developed into a standalone museum, Renfrewshire Museums
would be open to co-producing programming as part of their outreach strategy
(in development at the time of the consultation). They advised, however, that a
heritage centre at the Steeple Buildings would need a collection appealing to
people beyond the local area to have a chance of being viable. Similarly, the
National Trust for Scotland were consulted by Glasgow Building Preservation
Trust (see section 6.0), and have suggested there may be potential to display
items from the Weavers Cottage collections within the Steeple Buildings, if
insurance, environmental, and display standards were acceptable to the
collections care team at NTS. There is also potential for reciprocity in terms of
joint events and cross-promotion. NTS requested that they be kept up to date as
plans evolve.

Page 28

21 
Above: Consultation poster displayed on community notice board 
Left: Consultation poster prepared to publicise project and event

Page 29

22 
6.1 Community Consultation
Community and stakeholder consultations carried out by GBPT, Community Enterprise,
and John Gilbert Architects revealed several key insights regarding the future of
Kilbarchan Steeple Buildings. The following points summarize the findings: 
• Support for Building Restoration
There was overwhelming support for the restoration and reuse of the Steeple
Buildings. Participants expressed strong interest in seeing the building repaired and
made functional again.
• Existing Community Halls 
Participants acknowledged that Kilbarchan already has sufficient community halls and
gathering spaces. Therefore, any future development should aim to complement
rather than compete with existing facilities and local businesses.
• Accessibility
Improving accessibility within the building was identified as a priority. Ensuring that the
building is accessible to all, especially for those with disabilities, was a consistent
theme throughout the consultations.
• Potential Commercial Uses
Commercial uses for the Steeple were generally not viewed as a concern, indicating  an
openness to the inclusion of some commercial activities as long as they align with the
community’s values and needs.
• Mixed-Use Preferences
Participants favoured a mixed-use approach, combining different functions and uses
within the Steeple Buildings which could serve various segments of the community
while maintaining the historical and cultural value of the building.
• Heritage Interpretation
Many participants expressed a desire to see the building incorporate elements of
heritage interpretation, with a particular focus on Kilbarchan's history, especially its
rich textile heritage. This could take the form of exhibitions, interpretive displays, or
other educational features celebrating local history.
6.0 Consultation
• Visitor Engagement
The need for additional activities, attractions, and better signposting for visitors
was frequently mentioned. This would help to promote the area to visitors and
improve overall engagement with the village’s heritage and support current and
planned initiatives such as Kilbarchan Smile’s heritage garden and trail.
• Crafts and Creative Workshops
There was a recurring suggestion to create a space within the Steeple Buildings for
the sale of high-quality crafts, coupled with creative workshops that could attract
both locals and visitors, whilst supporting local artisans and promoting Kilbarchan's
craft traditions.
Aims and Audiences
The community engagement process, led by GBPT, took place from July to
September 2024 and ran concurrently with business planning and architectural
design work. The main aims of this community engagement programme were: 
• To raise awareness of the Steeple Buildings historical significance and
current conservation needs.
• To understand community perceptions of the Steeple Buildings and its
surrounding environment.
• To involve local residents in the decision-making process, ensuring that
community voices influenced the project direction.
• To gather views on the best future uses for the Steeple Buildings, considering
the local context and community needs.
• To assess potential impacts of the proposed restoration and development
plans on the community.
• To identify additional stakeholder groups, ensuring that voices from various
communities of interest were included.
• To gauge appetite  within the community for taking a more  active role in
the future management of the Steeple Buildings.

Page 30

23 
Community consultation event in August 2024

Page 31

24 
Primary Audiences
The engagement primarily targeted residents of Kilbarchan and those with a
connection to the village. Specific stakeholder consultations were held with local
interest groups such as the Friends of the Steeple, Community Council, NTS Weavers
Cottage, businesses, and craftspeople to ensure that all relevant perspectives were
considered.
These findings and community insights will guide the next steps in developing the
Steeple Buildings to ensure it serves as a valuable, accessible, and multifunctional
space that is useful to the local community and visitors alike. 
Engagement Approaches
To gather input from the community, a variety of engagement methods were utilized,
ensuring broad participation and feedback. The primary methods included:
Consultation Event: A key event where community members were invited to share
their views, learn more about the project, and discuss potential future uses of the
Steeple Buildings.
Surveys (Online and Hard Copy): Both online and hard copy surveys were distributed,
allowing people to submit their thoughts in the format most convenient for them.
One-to-One Conversations: Individual conversations were held with key stakeholders
and community members to ensure that in-depth feedback and specific concerns
could be addressed.
Focus Group Session: A focus group was organized to facilitate more detailed
discussions on the building's future, targeting a smaller group of participants for         
in-depth engagement.
Follow-Up Feedback Event: A final feedback event was held to present the findings of
the consultation and allow the community to comment on the proposed options.
The consultation events and survey were widely promoted by Renfrewshire Council
using various platforms:
• A dedicated page on the Council's website which provided updates and
information on the project.
• Social media channels, such as local Facebook groups, were leveraged to
reach a broader audience, encouraging participation in the survey and
events.
• Local news outlets, including the, Daily Record, Paisley Gazette and Gryffe
Advertiser, helped to raise awareness.
• Hard copy posters were placed in key locations such as local businesses,
churches, and community noticeboards to reach those without internet
access. 
Additional Engagement Tools
• GBPT produced a short video (https://youtu.be/WxM1sFzgcHc) detailing the
history of the Steeple Buildings and an interactive timeline                        
(https://www.gbpt.org/kilbarchan.html )to engage the community and promote
both the survey and events.                        
• Posters and Interpretative Materials: Posters and materials covering topics
like the Steeple's history, architecture, and conservation were developed to
inform attendees. These resources explained the building's phases,
ownership, governance, legal protections, and the options appraisal process. 
Promotion and Publicity

Page 32

25

Page 33

26 
Events
The initial public consultation event was originally planned to take place on June 1st
to coincide with Lilias Day, a local celebration, but had to be rescheduled due to the
pre-General Election period. The event was moved to August 3rd and was held as a
drop-in information session. A follow-up feedback session was undertaken on
September 7th to present findings and gather further community input. Both events
were hosted at the Kilbarchan Parish Church Hall, located directly across from the
Steeple Buildings, making it a convenient location for attendees. 
No formal attendee profiling was conducted during the public consultation events,
and only a few photographs were taken during the sessions. This approach was
intentional, as the events were designed to foster an open and informal atmosphere,
encouraging participants to discuss issues freely without feeling observed or intruded
upon.
At the conclusion of each event, staff made a series of general observations. These
included an informal analysis of the attendee profile, along with notes and comments
from individual conversations. This allowed the team to capture insights and
feedback while maintaining the relaxed and approachable nature of the sessions.
Survey
An anonymous, online survey was designed to gather information on people's
awareness of the Steeple Buildings conservation needs,  perceptions of and values
associated with the buildings and surrounding area, and their views on potential
future uses of the complex. It also gathered information on respondents'
demographics.
The survey was circulated via Smart Survey and promoted at events and through the
publicity campaign. It was also available as hard copies. The questions and responses
are reproduced in Appendix A.

Page 34

27
Awareness of the Steeple Buildings
Most respondents and attendees had visited the Steeple Buildings at some point.
It was clear that the Steeple Buildings had, historically, been used for a wide range
of activities and functions catering to all ages and interests. This included hosting
community council meetings, ballet and dance classes, playgroups, art classes,
public lectures, exhibitions and concerts and private functions such as birthday
parties. 
Perceptions of the Area Around the Steeple Buildings
The public realm around the Steeple Buildings was generally considered adequate,
but there is significant room for improvement in aesthetics, comfort, accessibility,
and functionality. The Square is recognized as a historic, civic, and cultural focal
point for the village. Many attendees emphasized the need for improved access
for prams, pushchairs, and wheelchairs. While parking in the Square is deemed
essential for residents and users of local facilities, there is a desire for measures to
deter opportunistic parking and to re-establish the Square as a vibrant civic space
rather than a car park. There was also a general aspiration to see the Square used
more often. 
Community Needs
The answers to questions around what is missing from the community, and the
types of activities and events people would like to see in the buildings, produced
mixed and often contradictory responses. Social/gathering spaces and
performance/exhibition spaces were highlighted by around half of respondents as
being something they would like to see within the buildings, but many

Page 35

28 
subsequently acknowledged the abundance of lettable halls in the village. Through
deeper conversations with attendees at events, we have interpreted this as
representing a desire to see the Steeple Buildings used as a community resource, and
an appetite for a new or different offer, rather than highlighting a lack of facilities in
the village. A desire for greater flexibility in booking arrangements was also
mentioned, including the potential for longer-term block bookings across multiple
days or weeks. Others felt that the previous booking system, which required a
minimum hire of two hours, was too proscriptive and expensive for small, short-term
hires.
Additionally, there was a call for spaces to support local craftspeople, makers, artists,
and small businesses. Participants identified a need for studio and workshop spaces,
as well as venues for exhibiting and selling work. Parallels were drawn with nearby
Lochwinnoch, which is emerging as a thriving artist community and visitor destination. 
Implicit in many conversations was a recognition of the heritage value of the building
in terms of its architectural and historical significance, its function as the civic heart of
the village, and memories of past events and offers in the buildings. Somewhere to
celebrate the heritage of the village, and attract visitors was also seen as a priority,
and unsurprisingly, many felt that the Steeple Buildings would be an appropriate
venue for hosting a heritage offer. 
Several respondents flagged the potential for a café or restaurant offer, with the
caveat that any new offer should be distinct and not compete with existing
businesses. Other suggestions included the creation of a holiday let or
accommodation offer on the upper floor. 
It should be borne in mind that the community needs outlined above represent the
desires of the demographic who engaged with the consultation, who were
predominantly older.  The needs of the younger cohort should be identified as the
project progresses.

Page 36

29

Page 37

30

Page 38

31
Management and Ownership
Two questions were posed in the survey in relation to future management
and governance of the Steeple Buildings. When asked ‘Who should manage
the Steeple Building, many (41%) of respondents selected ‘not sure’ and
comments revealed a mixed level of understanding of the relevant
organisations and their roles and responsibilities. For those who expressed
a preference,  the responsibility for management of the Steeple Buildings 
was split fairly evenly between  OneRen and the formation of a new
charity. There was concern that OneRen may not have the capacity to
manage the facility, but equally there was an understanding that a new
charity would require community support. A few people suggested that the
National Trust for Scotland could manage and/or take ownership of the
buildings, but this was tempered with an acknowledgement that the NTS
may be reluctant to take on additional properties. 
Responses to the ownership question showed a clear preference for
Renfrewshire Council and Kilbarchan General Society retaining ownership,
however, over 30% of respondents were unsure how to answer the
question. As one respondent pointed out “This is difficult to address at
present. And needs more consideration”. While there was a general
consensus around a preference for ownership retention by Renfrewshire
Council and Kilbarchan General Society, many people expressed
dissatisfaction with the current management of the building. 
We can conclude that while there is a strong interest in the building and
potential future uses from within the community, they are reluctant to
express their opinions on long-term management and ownership until they
are fully appraised of the potential options and the implications and
considerations involved. 
Heritage
Preservation and celebration of local heritage, particularly textile heritage,  was
frequently mentioned, both as a source of local pride  and identity, and as a way
to attract visitors to the area. Options for a heritage centre were explored as part
of the consultation and business plan. 
The National Trust for Scotland (NTS), who own and operate the Weavers Cottage
in Kilbarchan, were consulted as a key local stakeholder. The Weavers Cottage
achieved 3,583 visitors in 2023 (source: Association of Leading Visitor Attractions:
ALVA | Association of Leading Visitor Attractions ). 
Discussion with Stuart MacKinnon, Operations Manager at NTS on the 5th
September indicated broad support for the preferred option at the Steeple
Buildings. Mr MacKinnon also suggested there may be potential to display items
from the Weavers Cottage collections within the Steeple Buildings, if insurance,
environmental, and display standards were acceptable to the collections care
team at NTS. There is also potential for reciprocity in terms of joint events and
cross-promotion. NTS requested that they be kept up to date as plans evolve.
Kilbarchan Museum Without Walls
A useful option to explore is the ‘ecomuseum’ model. The term "ecomuseum" is a
blend of "eco-" from the Greek oikos (meaning "house" or "environment") and
"museum." This reflects the idea of a museum that is closely linked to place and
community, rather than just a building displaying objects. It is not a museum of
ecology or the environment, though it may incorporate elements of natural
heritage.
An ecomuseum is a dynamic, community-based heritage project, focused on
preserving both tangible and intangible heritage in a way that benefits local

Page 39

32 
people and the environment. Unlike traditional museums, which are typically
housed in a single building, ecomuseums are more integrated into the
environment and often spread across multiple locations within a community. The
core idea is to involve local communities in managing, protecting, and showcasing
their heritage and environment, making it a living and evolving museum. 
An ecomuseum could provide an umbrella project to gather and promote the
diverse range of cultural and natural heritage offers around the village. The
Steeple Buildings would naturally form part of the eco-museum, but without the
financial and administrative burden of a traditional-style heritage or interpretation 
centre. This approach would also align with proposals to develop a cultural
quarter for Kilbarchan and support emerging and current heritage initiatives such
as Kilbarchan Smile’s heritage trail, Lilias Day and other local events and traditions.
Key features of an ecomuseum include:
Community Involvement: The local community plays a central role in the
ecomuseum, helping to manage, develop, and present their heritage. It
emphasizes participation and collaboration, making it a shared project.
Cultural and Natural Heritage: Ecomuseums are not limited to artefacts or
exhibitions. They encompass cultural traditions such as annual fairs and events
(e.g. Lilias Day), historical sites and buildings, landscapes, biodiversity, local crafts,
oral histories and traditional practices.
Decentralized Structure: Unlike traditional museums which have centralized
buildings an ecomuseum often encompasses a variety of outdoor sites, including
villages, monuments, farms, and natural areas, thus creating a museum without
walls.
Education and Experience: Instead of presenting objects or exhibits, ecomuseums
encourage interactive and immersive experiences. Visitors often engage directly
with the surrounding environment (streets, buildings, greenspaces etc) and local
practices, deepening their understanding of the culture and history of the area. 
Sustainability and Conservation: Ecomuseums focus on the sustainable development
of the region or place they represent. They aim to protect both the natural
environment and cultural heritage, promoting conservation efforts and fostering an
understanding of the relationship between people and their environment.
The concept originated in France in the 1970s and is seen as a way to revitalise
communities and strengthen local identity by connecting people with their
surroundings and their past. The idea is well-established, with over 300 operating
worldwide, mostly in rural France, Spain, Italy and Poland. There are several recent
additions in Scotland, including:
• Moffat Ecomuseum: https://moffatmuseum.co.uk/moffat-ecomuseum/
• Flodden 1513 Ecomuseum: https://www.flodden1513ecomuseum.org/

Page 40

33 
Memories, Perceptions and General Observations               
(selected quotes)
• ‘I used to come here for ballet classes and the tufty club when I was
young. Aerobics classes and discos as a teen. ‘
• ‘Attending meetings of the local beekeepers association. ‘
• ‘I have lived in Kilbarchan for 20 years but have never been in the 
Steeple  Buildings. I am aware of occasional functions in the early time
but nothing that attracted my attention. ‘
• ‘Attended numerous Glasgow University extra-mural classes over a
period of 6-7 years. Wine circle met regularly in upper hall. Various
dances and parties held in the Steeple Hall.’
• ‘Needs tidying up and some benches and flowers and signage. ‘
• ‘Token disabled accommodations and no separation of the hall and
the   surrounding car parking. Vehicles can and have parked across the
doors to the steeple preventing access. Seating between the building
and Steeple Street, with access, would improve things. A waste bin like
the one outside the Library would be nice.’
• ‘It's ok for me but I can't think it's an easy space to access if you have
mobility  issues. It would be really nice if there were planters/flower
baskets during the summer months to make it more attractive.’
• ‘As a resident of Steeple Square I am happy about the access and use
of the square.’ 
• ‘The public space is ideally placed within the conservation area and
can link to the Weavers Cottage, Kirk creating a cultural quarter. Space
- buildings speak to each other aesthetically generally - space for cafe/
bistro ??? - farmers markets.‘                   
Community Needs and Potential Use Options                               
(selected quotes)
• 'Uses that support and enhance existing services - Bobbin's Cafe, Arts 
Centre, Weavers Cottage.'
• ‘Flexible social/gathering spaces for events, exhibitions etc. Plus a
kitchen for self-catering or use by caterers booked for events. Kilbar-
chan only has 1 cafe and 2 pubs where snacks/meals are available.
No catering will  reduce interest and demand in using the refurbished
steeple for parties, shows etc. ‘
• ‘With bowling club, scout hall, guide hall, church hall and Masonic
hall, Kilbarchan has more than enough venues, all of which are better
suited to the above than a renovated steeple.  Renovated suitable for
some small local business to use or share is likely to be cost effective.'
• 'Would like to see a permanent exhibition about Kilbarchan’s weaving
heritage. Then space for a monthly craft fair/ farmers market and for
pop-up exhibitions/craft courses.'
• 'No objection to a business owning or managing provided the build-
ing is used and not left empty, access still needed for lilias day.  Pref-
erence is to the one who can commit best to the future after renova-
tion.'
• 'Need to fill a gap. Lots of crafters and artists in the area could be
brought together for arts, crafts, music etc as a creative centre. Repli-
cate or partner with success of Made in Paisley, Loud and Proud,
PACE, etc. Probably consider more dance provision as so many dance
schools and teachers looking for premises. '

Page 41

34 
Event / Activity Description No.
Attendees
Attendee/Respondent Profile 
Drop-in Information Session at Kilbarchan Parish Church Halls
Date: O3/08/2024 11am—3pm 
The event, held at the Kilbarchan Parish Church Halls, was facilitated by two staff members from
GBPT, alongside representatives from John Gilbert Architects, Community Enterprise and Ren-
frewshire Council. The session aimed to provide attendees with detailed information about the
Kilbarchan Steeple Buildings and gather community feedback. Catering was provided by Bobbins
Café, offering refreshments for attendees. Children’s activities were run by Habbie Crafts, ensur-
ing families could participate while their children were engaged in creative activities.
Materials and Presentations:
• Information Posters: Six A0 posters were displayed, offering insights into the history of
the buildings, the options appraisal process, and key considerations for the project.
• Architectural Plans: John Gilbert Architects presented four potential options for the future
of the Steeple Buildings, giving attendees a visual and conceptual understanding of the
possibilities.
• Case Studies: Community Enterprise showcased three case studies of similar heritage and
community projects, discussing the pros and cons of each to encourage thoughtful dis-
cussion.
• Surveys and Feedback: Hardcopy surveys were available for attendees to fill out on-site,
and materials were provided for feedback and memory gathering, allowing participants
to share personal stories or reflections related to Kilbarchan and the Steeple.
51 Attendee Profile and Engagement Summary
The attendees of the drop-in information session were primarily older individuals,
with most being 40 years or older. Almost all participants were residents of       
Kilbarchan, and showed strong local interest in the project.
Key Observations:
• Intentional Attendance: The majority of attendees had come specifically for the
event, demonstrating a keen interest in the future of the Steeple Buildings.
• Familiarity with the Steeple: Most attendees had visited the Steeple Buildings in
the past, indicating a personal connection to the site.
• Awareness and Concern: There was a high level of awareness among partici-
pants regarding the issues facing the building, with most expressing concern
for its future.
• Survey Participation: Most attendees had already completed the online survey
prior to the event, and an additional 16 completed hardcopy surveys during the
session.
• High Engagement Levels: Attendee dwell time was notably high, with most indi-
viduals staying for at least 30 minutes and engaging deeply with staff and the
materials. This level of interest and participation exceeded expectations. 
Update and consultation meeting with the Friends of The Steeple, representatives of the Kilbar-
chan Community Council and Renfrewshire Council. 
Date: 20/08/2024 6pm—8pm 
The session at Kilbarchan Performing Arts Centre, facilitated by GBPT staff and a Renfrewshire
Council representative, provided an update on progress and initial findings from the August 3rd
event. An informal discussion followed, focusing on suitable end uses, potential end-users, and
long-term governance of the Steeple. The heritage of the building and village was also dis-
cussed, including the old fire engine, which, while significant to the village’s history, was consid-
ered unsuitable for display in the Steeple due to space constraints. 
8 8 individuals drawn from the local community, with an interest in the Steeple Build-
ings. All attendees bar two were members of the Friends of Kilbachan Steeple, a
sub-group of the Kilbarchan Community Council. 
Key Observations:
• Familiarity with the Steeple: Most attendees had visited the Steeple Buildings in
the past, indicating a personal connection to the site.
• High levels of local knowledge. Attendees were from a mix of backgrounds but
had an extensive overview of local businesses, cultural activities, community
organisations and heritage.

Page 42

35 
Event / Activity Description No.
Attendees
Attendee/Respondent Profile 
Online and hard-copy survey—’Finding A New Future For Kilbarchan Steeple Buildings’ (Smart
Survey)
Date: Open from 15/07/24 to 12/09/2024
106 A total of 106 respondents participated in the survey, with the following demo-
graphic breakdown:
• Gender ratio: 70% female, 30% male.
• Age profile: Skewed towards an older demographic, with 75% of respondents
aged 40 or older.
• Residency: Almost 90% of respondents were residents of Kilbarchan, and 92%
lived within the PA10 postcode. 
A full breakdown of findings is included in Appendix A.
Drop-in Information and Feedback Session at Kilbarchan Parish Church Halls
Date: 07/09/2024 (1pm-3pm) 
The event, held at the Kilbarchan Parish Church Halls, was facilitated by two staff members
from GBPT, alongside representatives Community Enterprise and Renfrewshire Council. 
This session included all previous interpretation and consultation materials, along with updated
panels providing feedback on initial findings drawn from survey responses and consultation.
Plans and drawings of the preferred option were presented 
The session was advertised as part of Renfrewshire Doors Open Days weekend and included
two tours of the Steeple Buildings. 
26 The attendee profile for this session was similar to the first drop-in event, with
around half having attended the August 3rd session. Others were aware of the pro-
ject but had missed the initial meeting, while a few had booked the tour of the
Steeple Buildings without realizing it was part of a consultation.
Key Observations: 
• High Engagement Levels: Attendee dwell time was notably high, as in the previ-
ous event.
• Concerns About Competition: A small number of attendees raised concerns
about potential competition with local businesses, but overall responses to the
preferred option were positive.
• Condition of Interiors: Several tour attendees noted that the building interiors
were in worse condition than they had anticipated.
Total attendees and respondents 191

Page 43

36 
7.0 Development of Options 
Based on the 2023 and 2024 online community survey feedback and discussions
with stakeholders, JGA Architects developed  four mixed use options for discus-
sion at the August community consultation event. 
These uses covered a variety of ideas including  commercial lets, multi-use halls, a
museum / heritage space, a holiday let, a workshop / office space and a market
hall/ exhibition spaces.
Each of the four options incorporated the following general improvements  
• External doors to incorporate accessible thresholds.
• Install a new platform lift giving access to upper floor.
• New WCs and an accessible WC with baby changing facilities.
• Install a new platform lift giving access to all levels.
• Existing stair and landing redecorated and new rooflights installed.
• New sanitaryware in WC's where needed.
• Secure storage added for Kilbarchan General Society in first floor meeting
room
• All upper floor areas redecorated where needed. 
7.1 Brief
Illustration: Clyde Valley Regional Plan 1946

Page 44

37
7.2 Option 1
Ground Floor Plan : Restaurant and hospitality
This option is based on the refurbishment of
the Steeple building including fabric repairs
with small scale internal changes. The key 
interventions include a lift to enable full     
accessibility and changes to the kitchen      
layout. The lift is positioned to allow access
from the reception to a ground floor Bistro
style restaurant and to a first floor multi use
venue. A new larger kitchen is provided which
has its own external  access and a servery to
the bistro. 
On the first floor the existing layout is retained
and refurbished, maintaining the historic      
integrity of the former schoolroom and          
General Society Room. The General  Society
Room will have additional secure storage.
Both of these spaces would be available for
hire by the community and others.

Page 45

38 
The benefits with this approach are:
• An Internal reconfiguration which allows    
access throughout
• Public access to both ground and first floors
• External fabric repairs which will protect and
preserve a  building of heritage value 
• An upgrade of essentials such as redecoration,
kitchen, toilets, heating and other services 
• Income generated by ground floor business
• Principal spaces retain their current form 
The main issues with this approach are:
• Ensuring the bistro style restaurant doesn’t     
compete with existing offerings in the village.
• A more commercial use in a building that has     
previously been community focused
• Programming events that will attract people to
visit  Kilbarchan.
First Floor Plan: Multi-use Hall & meeting room

Page 46

39
7.3 Option 2
Ground Floor Plan : Multi-use Hall & Kilbarchan Fire Engine 
This option was informed by suggestions
about developing a holiday let in the      
building. It  considered how to incorporate
a residential element in the confines of the
A-listed structure whilst still maintaining a
community space and storage for the    
historic fire engine with the associated         
interpretation.
The building would be refurbished and 
repaired with a new lift. The ground floor
would contain a reception area,                   
a multi-purpose hall, a new accessible WC
and a dedicated heritage room for the    
historic fire engine and local memorabilia.
The first floor would be converted into a
holiday flat, accessed from a landing shared
with the General Society Room. The       
creation of the flat in the former school
room would be the most physically invasive
option and would result in the loss of the
historic volume. The flat would have 2 
double bedrooms, a kitchen/living room
with a coved ceiling and family bathroom.

Page 47

40 
The benefits with this approach include:
• An internal reconfiguration which allows access
throughout 
• Public access to ground floor and General Society
Room
• External fabric repairs which will protect and 
preserve a building of heritage value 
• An upgrade of essentials such as redecoration,
kitchen, toilets heating and other services 
• Income generated by the first floor holiday let 
The main issues with this approach are:
• First floor historic space is considerably altered 
• Residential change of use  - greater interventions
may suggest Listed Building Consent could be
more difficult to obtain
• Management of a holiday let
• Managing public access and rental priorities 
• Issues with mixed use building and noise         
potentially affecting the flat
• The floor space occupied by the fire engine and
heritage items which will not generate significant
income or repeat visits
• Loss of public access to a principal space  First Floor Plan: Holiday Let

Page 48

41
7.4 Option 3
Ground Floor Plan : Exhibition & Market Hall 
This option took on board  feedback that there
could be a need for spaces for artists, makers
and creative workers along with dedicated
heritage space.  
The building would be refurbished and           
repaired with a new lift. The ground floor
would contain a reception area,  a multi-
purpose hall and a new accessible WC. The
hall would be renovated to become a            
multi-use space with dedicated storage for
market stalls and exhibition equipment. The
existing kitchen and store would be combined
as a space for the historic fire engine with new
double doors  added for access. The main
structural change would be the insertion of
the new opening and folding partition          
between the heritage space and market
space.
The first floor hall would be upgraded to       
provide flexible workspace or studio space
with associated breakout, meeting area and
storage. The General Society room would be
available for the community when not used by
the General Society.

Page 49

42 
The benefits with this approach include:
• An internal reconfiguration which allows access
throughout 
• An upgrade of essentials such as redecoration,
kitchen, toilets, heating and other services 
• A dedicated heritage space for the fire engine 
• Public access to the market hall and General Society
Room
• A multi-functional ground floor room with new stor-
age.
• A new co-working / studio space for creative and
arts practitioners
• The historic fire engine is returned to its home 
The main issues with this approach are:
• The loss of public access to the first floor hall, which
is one of the nicest spaces in the building
• The fire engine and heritage items are unlikely to 
generate significant income or repeat visits
• The size of the fire engine won’t allow for flexibility
or other temporary uses
• Responsibility for the insurance and maintenance of
the fire engine would need to be investigated
• Greater number interventions may suggest Listed
Building Consent could be more difficult to obtain
• Management and programming of the market hall
with events that attract people to visit Kilbarchan 
First Floor Plan: Flexible Studio/work space

Page 50

43 
7.5 Option 4
The focus of this option was the provision of
a dedicated museum/ heritage space and
cafe on the ground floor, with a multi-use
hall on the first floor alongside the General
Society room. A lift would be installed and
the building would be  refurbished and  
upgraded. 
The ground floor would contain a reception
area leading to the lift and accessible WC. A
museum and heritage space would occupy
part of the existing lower hall. 
The major change with this option is the 
creation of an opening between the existing
kitchen/store and hall to create a café that
opens out onto and activates the  Steeple
Square elevation. 
The upper floor would maintain the existing
arrangement with the large hall and Gen-
eral Society meeting room, supported by
toilets and a store. 
Ground Floor Plan : Museum/ Heritage Space  and Cafe

Page 51

44 
The benefits with this approach include:
• An internal reconfiguration which allows access
throughout 
• An upgrade of essentials such as redecoration,
kitchen, toilets, heating and other services 
• Public access is maintained to the ground floor
and first floor
• Food offering would provide some income to
support heritage offering
• A dedicated heritage space to showcase the      
history and crafts of the village 
The main issues with this approach are:
• A new café would compete with Bobbins Café
next door and would need to be pitched at a
different  market
• Any working relationship with the Weavers
Cottage and OneRen would have to be                  
negotiated
• Management, maintenance and insurance of
heritage items
• How will the heritage offering generate          
sustainable income or repeat visits
• Greater number interventions may suggest Listed
Building Consent could be more difficult to     
obtain First Floor Plan: Flexible Multi-use Hall

Page 52

45
7.6 Preferred Option
The draft options were presented to the community at a consultation event and
shared online. Feedback from this event and the survey was discussed with The
Friends of the Steeple group, the Council and stakeholders to develop a preferred
option.
It was agreed that Option 1, which combines a commercial use (licensed bistro
style food offering with seating for around 40 guests)  on the ground floor and
multi-purpose use on the first floor, will reintroduce public access to the building
and provide a source of revenue to  support activity in the building. It is important
to the community that the history of the  Steeple Buildings and their role in the
development of Kilbarchan is  recognised and threaded throughout the
refurbished building (rather than concentrated in one room), allowing  visitors to
engage as they pass through different areas. This could take the form of
interpretation developed with the  community and curation of objects and
ephemera  for display which relate to weaving and other crafts.
The preferred option recognises the significance and constraints of the existing
building and its layout reflects its original use with larger spaces on each floor, 
supported by  smaller ancillary and service areas. The proposals seek to preserve
and enhance the most significant elements of the building whilst altering and     
replacing the least significant elements in order to improve and upgrade the      
existing accommodation and generate regular activity and income. 
A welcoming accessible reception area will greet visitors from Steeple Square  
enhancing the route to the ground floor commercial space and up to the first floor.
Accessibility in the building will be improved by the new lift, which links all floors. 
The WCs and kitchen will be refurbished  and upgraded to provide modern        
facilities required. 
The ground floor hall, first floor hall and General Society Room will retain their
historic volumes. On the first floor, the larger meeting room (former schoolroom)
will remain as one large space to allow maximum flexibility for functions,
events, workshops  and other community or income-generating events.
The first floor can also act as an “overflow” function space for the bistro
to host larger events and allow it to be hired as one venue if required.
The spaces of less historical significance (toilets and kitchen) will remain
in their existing locations, albeit refurbished and upgraded to meet      
modern requirements and visitor expectations.  
The General Society room will be repaired, retaining  the original        
features, but incorporating heritage items and new secure storage. When
not being used by KGS, the room will be available for hire for smaller
meetings and or one to one therapeutic services.
There is an opportunity to review and enhance the immediate                  
surroundings of the building and take full advantage of the unique nature
of  Steeple Square providing outdoor seating and services for               
complimentary outdoor events like farmers markets.
The internal refurbishment  cost of this proposal is estimated at
£384,000. Please refer Section 9.0 of this report and the NBM cost plan
in Appendix E for further information.

Page 53

46 
Col-
lapsed 
The Steeple Buildings are Category A Listed which means that any           
proposed alterations will require to be justified in terms of their impact on
the historic significance of the building and will require Listed Building
Consent from Historic Environment Scotland and  Planning Consent from
Renfrewshire Council. 
Any alterations will also require a Building Warrant from the Council. In
terms of technical compliance, the preferred option is an improvement on
the existing sanitary facilities and building accessibility.
The preferred option has been discussed by the Design Team and Council
representatives internally, but no formal discussions have yet taken place
with Statutory Authorities.  
Informal feedback notes that  planners would take a pragmatic approach to
any application for a change of use for the Steeple Buildings, and similarly
solutions for kitchen extraction, bin stores, air source heat pumps, etc. A
suggestion to potentially lease spaces as artists’ studios as an interim use
would probably not require a change of use application. 
7.7 Statutory Approvals
Some key items we have considered that would be developed further in
a future phase include: 
Ventilation 
The east elevation of the building would be preferable for ventilation
and extract  given it is of least significance / prominence and there is an 
existing vent terminating on that elevation from the toilet extracts and a
minimal number of windows for the extract to interact with.
Refuse 
Provision of refuse storage could be  sensitively incorporated on the
Steeple Square side  of the building as part of improvements to the
immediate public realm and creation of some outdoor seating space.
Public Realm
There is an opportunity to enhance Steeple Square with carefully
considered works which could landscaping, lighting, outdoor seating
services for markets and lighting.  
Licensing
An application for a new liquor license would have to be submitted to
and approved by the Council.

Page 54

47
8.0 Business Plan
Although the preferred use has been identified, this could be managed in
different ways. Options for management are referred to as A, B and C. These
management options are described in the tables on the following pages.
Developing the preferred option for the Steeple as outlined has the potential to
deliver the following benefits: 
Social Benefits
• The project will prevent deterioration of a high-profile Category  A-listed
building at the heart of the village. There is potential to tie in with
improvements to the public realm around the Steeple Buildings. Revitalising
the village centre and developing the cultural life of the village will
contribute to making Kilbarchan a better place to live and foster a sense of
pride in the community.
Environmental Benefits
• In line with current Historic Environment strategy, preserving and adapting
the building will reduce the need for new construction materials, thereby
reducing embodied carbon and construction waste to landfill. Building
services will be upgraded to maximise energy efficiency. 
Economic Benefits
• Employment opportunities will be available during the refurbishment work,
and the potential for partnership with training providers such as West
College Scotland could be explored. 
• Once the refurbishment is complete, commercial use of the ground floor as
a bistro will provide ongoing employment opportunities. A licensed bistro of
this size open four to five evenings a week could be expected to employ a
chef and kitchen assistant as well as two to three front-of-house staff,
creating four to five new jobs in total. 
• A higher-end bistro in Kilbarchan will encourage visitors to stay longer and
spend more, in line with Renfrewshire Tourism Today’s strategy for the
Villages. 
8.1 Building management options

Page 55

48 
Management Option A 
Process  Pros Cons
• Further discussion with OneRen as to whether they
would relinquish the ground floor only (for lease to a
commercial tenant) or the whole building.
• Renfrewshire Council carries out refurbishment
work.
• OneRen has existing staff and systems to take,
manage and invoice for bookings. The costs of
these resources, along with office costs and
accountancy fees, are split across multiple
sites. The costs to OneRen of continuing to
manage the Steeple Buildings in addition to
other      venues would presumably be          
relatively low, although this would require 
further discussion.
• OneRen is a charity, and as such qualifies for
80% mandatory relief on non-domestic rates.
This does not apply if the Council manages the
building, as local authorities do pay non-
domestic rates. 
• OneRen has a track record of managing        
buildings, including historic sites. Some       
funders may be more receptive to an               
application from the larger, more established      
council-linked charity.
• Capital funding options are more limited.
• In community consultation, there was recognition that  
OneRen may not have the capacity to manage and      
promote the building as actively as a local community
group might.  This may mean that the local community
gets less use from the first-floor space, and that income is
lower. 
Renfrewshire Council retain ownership while either its Estates team or OneRen
continue to manage the building and lease it to tenants. No tenant has a full repairing
lease, so the council has responsibility for repair.

Page 56

49
Management Option B 
Process  Pros Cons
• The new organisation prepares its governing document: liaise with Engage
Renfrewshire and use the Scottish Government’s Model Documents to meet
criteria for CAT. Registration with OSCR and/or Companies House; recruit-
ment of at least three  unrelated trustees/directors; bank account setup. 
• Submit expression of interest to Renfrewshire Council: see Process Guide.
Support available from the Community Ownership Support Service. 
• The new organisation should do its own research and develop its business
case. At this stage, the organisation may also need to raise funds for tech-
nical fees, particularly  legal fees (given that it will be entering into leases).
Renfrewshire Council and the new community organisation will need to
come to an agreement as to how much of the refurbishment works will take
place prior to transfer, and how much (if any) fit-out will be undertaken by
the community organisation.
• Proceed to formal Community Asset Transfer Request.
• CAT request validation period (up to 6 months). 
• CAT Decision-making Process. At this stage, OneRen's board discuss whether
to approve the relinquishing of the building/part of a building back to       
council to allow council to progress with Asset Transfer or leasing. 
• Assuming CAT request is approved, building handover takes place.          
Possibility of some internal fit out being undertaken by the community
group  
• Gives the local community control
over usage of the first floor of the
building, which is likely to enable a
wider range of use and higher        
occupancy. 
•  Assuming the community                  
organisation is a charity, it would
qualify for 80% mandatory relief on
non-domestic rates. 
• If the community organisation takes
on ownership and management, then
undertakes the final portion of the
refurbishment work, it will be able to
access a wider range of grant funding
than the local authority. 
• A community organisation may be
able to raise a proportion of funds for
any capital work it undertakes
through local fundraising or     
crowdfunding. 
• Reliant on volunteers to act as directors/
trustees, manage bookings, monitor       
finances (including maintaining a             
sufficient reserve to cover unexpected
costs) and  commission ongoing repairs. 
• Requires setup and maintenance of a
website and booking system. A          
community organisation that is a charity
must also produce externally verified 
annual accounts. Within a larger             
organisation, these costs are spread
across many properties, whereas a      
community organisation set up solely to
manage the Steeple would have to cover
these operating costs from income from
this property alone. 
• Some funders will not fund  organisations
which are less than a year old and have
not produced annual accounts. This will
limit the organisation’s  access to funds to
pay for final fit-out of the spaces it will        
operate.
Transfer of ownership or management of the full building to a community group, potentially via Community Asset Transfer (CAT). The community
group is responsible for repair and leases the building to tenants. It is likely that this community group would be a charity: either a Scottish Charitable
Incorporated Organisation (SCIO) or a Company Limited by Guarantee with Charitable Status.

Page 57

50 
Management Option C 
Process  Pros Cons
•  OneRen discuss whether to relinquish the site, as in option B).  • This option places the least strain on the
resources of OneRen and the local                
community. 
• A successful operator may be able to market
the first-floor space for a variety of events,
maximising the economic impact of the
business (more employment, attracting visi-
tor spend, etc.) 
• Given the listing of the building, a
full repairing lease may not appeal
to prospective tenants, so RC may
have to retain some or all                 
responsibility
• Uncertain whether affordable       
community access to the first-floor
space could be guaranteed under
this model. 
• Lack of open access may affect     
eligibility for funding 
• Single income stream is less          
resilient to loss of tenant. 
Renfrewshire Council leases the entire building (possibly excluding the Steeple itself) to a
commercial tenant. The tenant would then manage the upper floor as well as the ground
floor.

Page 58

51
A capital cost schedule has been prepared based on the preferred option by NBM
Quantity Surveyors. A copy of the full NBM cost report is included in Appendix E.
A summary of estimated costs are shown in the table to the right. We have
included contingencies as required by a number of funders for this type of project,
along with design team fees at an indicative rate of 14% at this stage. 
The summary costs in the table exclude:
• Concept and Project Development Fees
• Site Acquisition
• Business Plan
• Legal Fees
• Finance Charges
• Insurances
• Clients Furniture, Fixtures & Equipment
• VAT
• Inflation Assessment 
Further design development or interventions within the building may significantly
affect these estimated costs. 
Estimated Capital Costs
9.0 Capital Project Costs 
Element Cost £
Works Cost 237,109
Preliminaries (15%) 35,570
Contingencies  (10%) 27,270
Inflation uplift  Oct 23—Oct 24 (2%) 5,999
Works Sub Total  305,948
Design Team Fees 14%  42,833
Clerk of Works  5,000
Surveys & Site investigations 15,000
Client held contingency 15,000
Total Capital Costs   383,781

Page 59

52 
10.0 Revenue Costs 
Operational cash flow projections have been produced for the first two
management options outlined in Section 8.0. An overview of each is below.
Under each option, the Steeple Buildings operates at a small annual surplus
after the initial year. 
The differences between cost and income estimates for each option are set
out in the following sections, but in brief, the main differences are the
inclusion of non-domestic rates in option A, and higher marketing,
accountancy and professional costs in Option B (offset by a slightly higher
occupancy)
10.2 Running costs 
The following assumptions on major ongoing costs have been made in order
to prepare our financial projections: 
Gas and electricity 
OneRen has provided past energy usage data from 2020-21 up to midway
through 2023-24. In the last two full years, energy usage has averaged 93,612
KWH per year, with the building closed. Cost over these two years averaged
£15,242 a year. Given that the building has been empty and underheated
(according to the 2023 Services Condition Appraisal by Luths), these costs
reflect a heating system that is inefficient, relying solely on electric space
heaters. The report also notes that inefficient fluorescent lighting has been
used. It is assumed that new, more efficient heating and lighting will be
installed. 
The Luths report provides estimated annual heating costs for various heat
pump systems, ranging between £6,000 and £7,000. These are for the full site.
Assuming that the ground floor is rented to a tenant, the building occupant
would only be responsible for energy bills for the first floor: we have
Option A: Management by Renfrewshire Council and/or OneRen 
Option B: Management by a community organisation 
Year  Year 1  Year 2  Year 3  Year 4  Year 5 
Total income  £ 16,459  £ 21,717  £ 23,758  £ 24,308  £ 24,874 
Expenditure      
Salaries and wages  £ 1,844  £ 4,153  £ 4,278  £ 4,406  £ 4,538 
All other expenditure  £ 15,515  £ 14,295  £ 15,402  £ 15,020  £ 15,899 
Total expenditure  £ 17,359  £ 18,448  £ 19,680  £ 19,426  £ 20,437 
Net cash surplus (deficit)  -£ 900  £ 3,269  £ 4,079  £ 4,882  £ 4,437 
Opening bank balance  0  -£ 900  £ 2,369  £ 6,447  £ 11,329 
Closing bank balance  -£ 900  £ 2,369  £ 6,447  £ 11,329  £ 15,766 
Year Year 1  Year 2  Year 3  Year 4  Year 5 
Total income  £ 16,459  £ 21,717  £ 24,103  £ 24,663  £ 25,240 
Expenditure      
Salaries and wages  £ 1,844  £ 4,153  £ 4,278  £ 4,406  £ 4,538 
All other expenditure  £ 12,895  £ 13,717  £ 14,824  £ 14,442  £ 15,320 
Total expenditure  £ 14,739  £ 17,870  £ 19,101  £ 18,847  £ 19,859 
Net cash surplus (deficit)  £ 1,720  £ 3,847  £ 5,002  £ 5,816  £ 5,381 
Opening bank balance  0  £ 1,720  £ 5,568  £ 10,570  £ 16,385 
Closing bank balance  £ 1,720  £ 5,568  £ 10,570  £ 16,385  £ 21,766 
10. 1 Overview

Page 60

53
estimated 50% of the full building figure with air source heat pump, plus a 20%
allowance for other energy costs (lighting, small amount of office equipment etc). 
Water rates 
OneRen data provided also includes water usage and rates for the same period. This
shows a lot of fluctuation, with higher water usage and cost in 2022-23. The average
water usage over the last three years was 595 M3, and the average cost was £1,203
per year. 
A future owner of the building would receive reduced water and sewerage charges
through the Water and Sewerage Charges Exemption Scheme only if: 
• it has charitable status 
• its income is below £300,000 per year 
• it has no permanent alcohol license, charity shop or public café on the
premises 
Given the preferred use and management options identified, it is unlikely that these
criteria will be met under either option, so water usage at an increased level is
included in financial projection. 
Business rates 
Ratable value of the site is £4,800 but it is likely that it would need to be revalued
following a change of use of the ground floor, after which the ground floor tenant
would assume responsibility for non-domestic rates on that part of the site. The
amount of rates to be paid depends on the management model: 
• Assuming that the new rateable value of the first floor is no more than the
current rateable value of the entire site, the first floor would qualify for 100%
relief under the Small Business Bonus Scheme, if it is the only property
occupied. This would apply only if the building is occupied by a new
community body. 
• Charities qualify for 80% mandatory rates relief on non-domestic property
occupied primarily for charitable purposes, and the council may award
discretionary relief to remove the remaining 20% of rates. This would only be
applicable if the building is occupied either by OneRen or by a new community
body which is a charity. 
• Renfrewshire Council offers a Fresh Start Scheme giving 100% rates relief for 12
months for properties which have been empty for 6 months or more. 
Given the uncertainty at this stage, we have assumed that the liability remains
unchanged, and that 80% relief is granted under Option B. 
Insurances 
The building occupant would need buildings insurance on the entire site. This is likely to
be higher given the proposed use of the ground floor as a restaurant. Assuming that
the building occupant also manages spaces on the upper floor which are hired out for
short-term use and used for occasional community and heritage events, public liability
cover for this part of the building would also be needed. 
The tenant on the ground floor would be responsible for maintaining suitable insurance
policies for their business and leased premises. 
Maintenance 
An allowance for routine maintenance tasks such as cleaning gutters, checking
electrical systems, repainting and refinishing as well as periodic larger repairs has been
included in financial projections. 
Staffing 
When open under OneRen, the building had a caretaker present for just under 15
hours a week, working mostly in the evenings. 
Given the plan for the ground floor to be under a commercial lease, we have assumed

Page 61

54 
that there would be a reduced need for staffing at around 7 hours a week. This
depends on access to the hall space and KGS room on the first floor being available
without the staff member being on site to let people in, e.g. via a code access system
and CCTV. The estimated cost of installing and maintaining these systems has been
built into financial projections. 
Marketing and customer relations 
Marketing costs for the spaces on the first floor will depend on the management
model chosen. If OneRen continues to manage the building (option A), the first-floor
venue can be promoted via the organisation’s existing channels. There is an existing
venue hire team to manage bookings. There would be some initial setup costs:
updated photography and staff resource to create a venue profile and update online
listings. In the longer term, the additional cost of marketing one more venue is
assumed to be marginal. 
If a new community organisation manages the top floor (option B), they will need a
way to promote the venue and manage bookings. The cost of setting up and
maintaining a basic website has been built into this version of the cash flow
projection. Similarly, this version includes a subscription to venue management
software, which would simplify the work of taking bookings, monitoring availability
and invoicing clients as much as possible. We assume that volunteers would be
willing to take on these tasks. 
Accountancy, professional and office costs 
If the Steeple is managed by a larger organisation (option A), a certain amount of its
internal resources will be dedicated to managing the building. However, further
consultation with the Estates team at Renfrewshire Council and/or OneRen would
be required to arrive at a realistic estimate. These costs are excluded in this version
of the financial projections. 
If the building is managed by a community organisation (option B), this organisation will
be required to produce annual accounts. An allowance of £1,500 for accountancy fees
and independent examination has been included in this version of the financial
projections. 
10.3 Income streams 
The following assumptions have been made in order to prepare financial projections: 
Tenancies 
The Estates team at Renfrewshire Council have provided the following detail on rental
rates for commercial premises in Johnstone (£110 - £140 per square metre) and
smaller village centres (£95 - £110 per square metre). The Estates team estimate that
Kilbarchan would be on the lower end given location and associated demand. 
Taking an estimate of £105 per square metre for lease of a refurbished shell suitable
for use as a licensed restaurant, the 135-square-metre ground floor (excluding the
Steeple itself) would bring in rent of £14,175 per year. 
Hall rent 
Taking an estimate of £100 per square metre, the 69-square-metre hall space would
bring in rent of up to £6,900 per year. However, this may be made available on more
flexible terms suited to small businesses and creative professionals, so an allowance for
50-60% occupancy is made in the financial projections (increasing from year 1 to year
3). 
Because a local community body may be better connected with potential users of the
space, the financial projections for Option B include slightly higher occupancy in later
years. 
Occasional use of Kilbarchan General Society room 
Kilbarchan General Society have indicated that they intend to continue using the room

Page 62

55 
they own on an occasional basis, and permanently for storage. Outside of this use,
the room will be available for hire for small meetings. 
Assuming that this room can be rented at £15/hr (comparable to similar venues) for
around 4 hours a week (0.5% occupancy, based on 12 usable hours a day), this will
generate just over £3,400 a year. 
10.4 VAT and Corporation Tax 
Most repair and improvement work on existing buildings, regardless of listed status,
is subject to VAT at the standard rate. 
Renting property and short-term hire of rooms, are usually exempt from VAT. This
assumes that no additional services (e.g. catering) are provided by the building
manager. Opportunities to reclaim VAT may therefore be limited. 
If any of the regeneration work is undertaken by new community body, this group
should seek a VAT assessment identifying which of the planned income streams are
subject to VAT and how much (if any) VAT paid out on construction may be
reclaimed once the building is in use. If necessary, this body could seek to become
VAT registered even if it is not otherwise required to do so, in order to reclaim VAT
and therefore reduce the amount of external funding needed. However, this would
lead to more complex financial management. 
Under management options A or B, the building will be managed by an entity that is
exempt from corporation tax: the local authority, OneRen, which is a charity, or a
local organisation (which would be likely to seek charitable status).

Page 63

56 
Availability of funding will depend on which entity is to manage the building, and
the conditions of their tenure. Many funders will only fund applicants with
charitable status or purposes, or have an upper limit on applicant turnover. 
The Council has had previous discussion with Historic Environment Scotland and
the National Lottery Heritage Fund. Both could be approached about funding the
preferred option regardless of the management model. 
The following funds would not be open to Renfrewshire Council, but a community
body taking on management of the building would be eligible to apply. These
would be relevant if a community group takes on ownership or management of
the Steeple Buildings and completes some of the fit-out work. In general, funders
will require that the group has secure tenure, i.e. a long lease or ownership. Some
of these funds require charitable status. 
• Screwfix Foundation provides small grants of up to £5,000 for capital
projects. Examples of projects funded include installation of a new kitchen
or bathroom, painting or decorating, improving building safety or efficiency.
This small grant should cover the majority of project costs, so this is best
suited to small renovations or upgrades at an early stage. (Does not require
charitable status) 
• Barcapel Foundation: grants up to £20,000 (occasionally up to £100,000) for
charities working in areas including heritage (built environment and cultural
heritage). (Requires charitable status) 
• Wolfson Foundation will fund charities carrying out conservation/restoration
work to listed buildings of historical significance, generally £15,000-
£100,000. However, Grade A-listed sites will be prioritised, so an application
at the lower end of this scale may have better chances. (Requires charitable
status) 
• Hugh Fraser Foundation: grants for charities working in areas including arts
11.0 Funding 
& culture. A few major awards over £100,000 each year, with others averaging
£5,000. (Requires charitable status) 
• Barrack Charitable Trust, £500 - £5,000. Arts, heritage and culture and provision
of recreational facilities are among its core purposes. (Requires charitable status) 
• Dalrymple Donaldson Fund, up to £5,000 for restoration of buildings of historic
interest (including many church buildings). Best fit would be small repairs, in
sympathy with the building’s past e.g. using traditional material). (Does not
require charitable status). 
• Awards for All is the National Lottery Communities Fund’s small, open
programme: grants up to £20,000. This could cover start-up costs or operating
costs in the first year. The lottery’s larger funding programmes (including grants
for community-led activity and wellbeing) are currently closed for review. (Does
not require charitable status). 
• The project location is within the required 10-mile distance of landfill sites for the
Scottish Landfill Communities Fund. Grants of up to £50,000 are distributed by
various bodies; applications can be made to more than one (list available here).
Projects involving “the maintenance, repair or restoration of a historic building”
are eligible, but only if the site will be open to the public: at least 4 evenings or 2
days per week or at least 104 days in any year – under the preferred use, this
may not be the case.
Other funds of interest: 
• The Architectural Heritage Fund does not currently provide capital funding
(outside of its William Grant Tailored Support Fund, which aims to meet specific
needs of projects not meeting other grant criteria). However, its Project Viability
Grants (up to £10,000; average £6,000) may be a useful source of funding if a
community organisation comes forward that is interested in taking on ownership
or management of the building, to cover expenses such as legal fees.

Page 64

57
12.0 Risk Analysis & Mitigation
As in any significant development of this nature there are a number of risks that need to be identified along with appropriate action points and strategies. These key risks and
mitigating strategies are tabulated below: 
Risk  Impact  Probability  Existing Controls  Action Required  Lead Responsibility 
Preparation, Development and Construction phases 
Difficulty securing
capital funding 
Medium  Medium  Discussions with funders underway  If required, develop a phased approach to upgrades
with most urgent and beneficial works prioritised. 
Renfrewshire Council
Delivery phases 
Difficulty securing
ground floor tenancy 
High  Low  Input from Estates team on market rates  Suitable marketing of the tenancy opportunity  Renfrewshire Council 
High-profile historic village centre location
has previously attracted attention. 
Low levels of        
volunteer availability 
Low  High  Low reliance on volunteers for day-to-day
running of the preferred usage option. 
Develop heritage offering in consideration of levels
of volunteer availability 
Dependent on                
management model 
Under option B, ensure that community group has
sufficient skill and capacity. 
Loss of ground floor
or first floor tenants
High Medium For first floor, a lower occupancy rate has
been built into financial projections under
the assumption that tenancies will be more
flexible. 
Flexibility of spaces allow for different con-
figurations and adaptation to future market
conditions
Consideration of lease terms and conditions with
Renfrewshire Council’s legal team 
Under option B, the community group may need
support to develop suitable lease agreements, book-
ing terms and conditions and cancellation policy
Dependent on                       
management model

Page 65

58 
13.0 Conclusion & Recommendations
The Steeple Buildings are the most significant historic building in Kilbarchan and a
key part of the village’s identity and heritage. The buildings have been vacant since
their closure in 2020, and a new use needs to be found to ensure they are secured
for future generations. The Council is undertaking a proactive scheme of repair
works to address the immediate condition issues and consolidate the buildings for
potential meanwhile uses and regeneration projects. 
Through consultation, it is clear the local community have a strong interest in
potential plans, however, there is uncertainty about how much involvement the
community wishes to take in managing and maintaining the buildings. The
consultation process demonstrated that the community understand that Council-
subsidised, under-used community spaces are unviable and alternative options
need to be explored. 
The proposed vision for the Steeple Buildings has the potential to deliver
economic, social and environmental benefits. It is a mixed-use solution that
restores the landmark building and balances public access with income-generating
activities.  The preferred option includes hospitality services (high end bistro) on
the ground floor, while the first floor would feature flexible rooms available for
hire. This approach retains the historic character of the building, ensures it
remains a hub for community activity whilst also being carefully balanced with an
income generating use. A new bistro could potentially create up to four or five
new jobs and encourage visitors to stay longer and spend more, in line with
Renfrewshire Tourism Today’s strategy for the Villages. 
In addition to this, the Steeple Buildings could play a vital role in the regeneration
of Steeple Square. By enhancing the outdoor spaces with landscaping, seating, and
lighting, the square could become a lively venue for outdoor markets, festivals,
and events, complementing nearby attractions such as the Weavers Cottage and
the Kilbarchan Performing Arts Centre. 
In order to develop this outline proposal further, a key issue which must be
addressed is whether an existing or new organisation can be identified that can
manage and maintain the building whilst also balancing the need for public
access against income generation to support the maintenance of the site.
Community ownership or management could  provide more funding
opportunities  and ensure that any commercial function directly supports
community use. 
It is recommended that Renfrewshire Council continue the discussions around
governance and management with the community, Friends of the Steeple and
potentially interested parties to understand if there is an appetite for more
community responsibility in the development, management and programming of
the rejuvenated Steeple Buildings.

Page 66

59
14.0 Action Plan 
The table below outlines the next steps that can be taken by the Council and Stakeholders to develop the vision for the Steeple Buildings 
Action Plan Lead
Oct-24
Nov-24
Dec-24
Jan-25
Feb-25
Mar-25
Apr-25
May-25
Jun-25
Jul-25
Aug-25
Sep-25
Oct-25
Nov-25
Dec-25
1 Council review of options appraisal Council                              
2 Review with Community and stakeholders on Options Appraisal Council                              
2 Agree aspirations for Steeple Buildings including, ownership, tenure, governance, funding Council                              
3 Develop funding and brief for Steeple Rejuvenation Feasibility Study Council                              
4 Council approval (Elected members) Council                              
5 Procurement of Feasibility Team (Project Organiser, Arch, QS, Business Planner, Services Engineer, Engagement)  Council                               
6 Project Organiser (PO) and Team for feasibility study appointed RC                              
7 Inception, mobilisation and commence study DT                              
8 Develop detailed design of preferred option DT                              
9 Develop & deliver stakeholder & community consultation plan DT                              
10 Develop preferred option business case DT                              
11 Cost plan information DT                              
12 Develop detailed funding plan & initial discussions with funders PO                              
13 Conclude feasibility & business plan DT/PO                              
14 Council review and decision to proceed with Capital Works Council

Page 67

60 
Appendix A: Community Consultation Report & resources
Appendix B: Business Plan
Appendix C: 2023 Condition Survey, JGA Architects
Appendix D: 2023 Luths Services Appraisal 
Appendix E: 2024 NBM Cost Plan: Internal Refurbishment
14.0 Appendices