Democracy Spraffa

1 - Retail Improvement Scheme Board Paper - AM reviewed

Renfrewshire Council · 5 November 2024
Back to Economy and Regeneration Policy Board — 5 November 2024 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Page 1 of 4 
___________________________________________________________________
To: Economy and Regeneration Policy Board
On: 05 November 2024
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Retail Improvement Scheme – Update 
___________________________________________________________________
1. Summary
1.1 This report provides a summary of the Retail Improvement Scheme’s (RIS)
position since the last update to the Economy and Regeneration Policy Board
on 07 November 2023.
___________________________________________________________________
2. Recommendations
2.1 It is recommended that the Board:
(i) Note the contents of this report. 
(ii) Authorises the Head of Economy and Development to explore any potential
funding options for future rounds of the scheme. 
3. Background
3.1 The RIS has run annually since 2012 and supports Renfrewshire based
businesses to undertake external property improvements such as the creation
of new shopfront fascia signs and shutters.
3.2 Grants up to a maximum of £12,000 are made available with contributions up
to 70% of qualifying works. Larger awards have been offered to support
projects in exceptional circumstances which would likely result in significant
regeneration outcomes  e.g. the refurbishment of the James Maitland
designed former ‘Malatso’ unit on Paisley High Street.

Page 2

Page 2 of 4
3.3. Since its inception, the RIS has been a key element of the Council’s agenda
to improve town centres and build positive relationships with the local
business community.
3.4. Approximately £755k has been awarded to 106 different projects across
Renfrewshire since 2016. A spotlight report has been included in Appendix A,
which provides a more detailed review of the scheme between 2022/23 and
2024/25 and provides an overview of some of the current notable projects. 
___________________________________________________________________
4. Current Retail Improvement Scheme 2024/25
4.1. In February 2024, £70k was allocated to the Scheme as set out in Council
Motion 4 – ‘Commit £70k to supplement the Retail Improvement Fund’.
4.2 The first application window of the RIS relaunched in April 2024 for a six-week
period, closing in May. Fourteen applications were received from a good mix
of businesses across Renfrewshire’s towns and villages. The second
application window opened in September 2024 and will close on October 16
2024.
4.3 Applications from the first application window have been from businesses
located in Kilbarchan, Bishopton, Paisley, Johnstone and Renfrew. Thirteen of
these have received grant awards with one still awaited, owing to a further
information request from the applicant.
4.4 Applications include a vacant former hairdresser's on a prominent corner of
Renfrew (44 Canal Street), which will be converted into a cocktail bar, and the
former Royal Bank of Scotland unit on Church Street in Johnstone, which has
been converted into a fast food business. These RIS projects will have a
positive impact on the respective town centres.
4.5 The £70k budget was largely committed during the first application window.
The RIS will be supplemented by the Place-Based Investment Programme
(PBIP), which will allocate an additional £50k for the second application
window. Projects are set to be completed by spring 2025.
___________________________________________________________________
5. Next steps
5.1 Officers will now consider how to fund future rounds of the RIS, along with any
necessary adjustments to the grant process based on applicant feedback and
market conditions.
5.2 If funding can be secured for future rounds of the scheme, progress will
continue to be reported to the Board on a rolling basis.

Page 3

Page 3 of 4 
__________________________________________________________________
Implications of the Report
1. Financial – None; as funding already forms part of Council’s approved budget.
2. HR & Organisational Development – None.
3. Community/Council Planning 
• Our Renfrewshire is thriving – regeneration projects result in a stimulus to the
local economy via contracts won, visitors and user numbers. The RIS
supports objectives to develop Renfrewshire’s economy, including its Town
Centres as thriving places, supporting local places, businesses, and
communities. 
• Reshaping our place, our economy, and our future - The projects secure the
productive re-use of a buildings and provide new facilities and services which
will contribute to supporting growth. Increased footfall offers potential benefits
to traders, assisting the economy of our town centres. 
• Working together to improve outcomes - Renfrewshire Council is working with
businesses and owners and providing support to maximise the opportunities
for regeneration in Renfrewshire’s settlements. 
4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights 
The recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have
been identified arising from the recommendations contained in the report. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact - None. 
12. Climate Risk – Not Applicable 
13.  Children’s Rights – None. 
14.  Cosla Policy Position – None. 
_________________________________________________________

Page 4

Page 4 of 4 
List of Background Papers
a) Report to Economy and Regeneration Board, Retail Improvement Scheme –
Update and Next Steps. 7th November 2023
b) Report to Leadership Board, 20th April 2022, Spotlight Report on the Retail
Improvement Scheme – 2016 to 2022
c) Report to Leadership Board, 15th September 2021 - Place Based Investment
Fund 2021/22
d) Report to Leadership Board, 20 June 2018 – Invest in Renfrewshire Future
Funding and Services
e) Report to Economy and Jobs Policy Board, 25th May 2016 – Invest in
Renfrewshire: Retail Improvement Scheme Update
___________________________________________________________________ 
Author:   Euan Shearer, Regeneration and Place Manager.
Euan.shearer@renfrewshire.gov.uk

Page 5

1
Spotlight on…
Retail Improvement Scheme  2022/23 - 2024/25

Page 6

2
RIS Overview
The Retail Improvement Scheme (RIS) supports owners and occupiers of
small business properties in retail areas throughout Renfrewshire with grant
assistance towards the cost of shopfront improvements.
Since its launch (circa 2012), the RIS has helped over  205 businesses
improve their commercial shop frontages and has contributed to a number of
vacant units being returned to beneficial use.
Outcomes of the scheme have supported the economic viability of our town,
local and village centres, supporting their role at the heart of communities
and the principle of the ‘20-minute neighbourhood’.  The scheme has also
supported a range of local businesses and contractors, generating wider
economic benefits across Renfrewshire.
Applications have achieved a wide geographical coverage and vary in both
type size and scale, from ‘conservation standard’ shop front enhancements to
simple gable repairs and replacement of solid roller shutters. Historically, RIS
rounds were split into two application phases over the year. This was changed
to a single round due to impacts of the pandemic. The phased approach has
now been reinstated for the current RIS round.
This report sets out the performance of the RIS over the last 3 years; including
the current round.

Page 7

3
Key Statistics 2022/23 - 2024/25
Number and spend
A total of 47 awards applications were made between the 2022/23
and 2024/25 rounds. 14 applicants have received awards in the
current (2024/25 round so far with further applications expected in
the second phase of this round (currently live at the time of writing).
It is likely that a further £50,000 will be released at the conclusion
of 2024/25 (part 2). This will bring the total invested over the last
three rounds to almost £300k.
20+8+24+4+15+4
18
7 2
2024
2025
2023
2024
2022 
2023
£ 95,000.00
Successful / Total Spend
Year of
Application
Unsuccessful / Withdrawn
19
1
£ 87,617.00
14
£ 87,558.00
1

Page 8

4
Awards by area
The majority of successful applications received
were from businesses based in Paisley (21),
reflecting the role of the town as the strategic centre
for Renfrewshire.
A range of applications were received from other
large centres such as Johnstone (8) and Renfrew
(8), as well as with from smaller towns and villages
(10) across Renfrewshire. 
8
8
21
Lochwinnoch
£ 3,850
2
Bridge of Weir
£ 9,416
3
Elderslie
£ 12,000
1
Bishopton
£ 12,900
2
Paisley
£ 112,822
Johnstone
£48,120
Renfrew
£29,565
1
Houston
£ 2,600
1
Kilbarchan
£ 3,168

Page 9

5
Number of vacant premises
brought into use
In the three-year period, 10 business premises were vacant
at the time of their RIS application. Following approval and
subsequent work undertaken on frontages, 6 premises have
been returned to beneficial use and are trading whilst 2 are
now either completing internal works or advertised for lease.
The remaining 2 vacant businesses are included in the
current 2024/25 round. These businesses have received
grant awards but are yet to undertake works. It is anticipated
that following completion, these premises will become
occupied.
Applications by use
The vast majority (55%) of applicants were retailers followed
by cafes, restaurants and drinking establishments (21%) ,
professional services (15%) and other (9%). 
55+21+15+9+K
Retailers
55%
Hospitality
21%
Services
15%
Other
9%
+6

Page 10

6
Current RIS round (2024/25)
Part 1 of the current RIS round launched in April 2024, with a £70k budget
allocated at the Council budget meeting on 29 February 2024. Following
the grant deadline, a total of 16 applications were received, of which 14 were
awarded funding.
Part 2 of the round launched in early September 2024, with a £50k budget
provided by the Place Based Investment Programme (PBIP). This grant is
still active at the time of writing, and applications are being assessed toward
the end of October 2024. Together, Parts 1 and 2 will result in approximately
£120k being awarded to businesses by the conclusion of the current RIS
round.

Page 11

7
2022 
2023
Lochwinnoch
Grant provided for new
retailer on the High St
specialising in natural health
and environmentally friendly
products.
Works included new signage
and electric shutters.
2023 
2024
Paisley
Support in the form of
completely new shopfront
(including handpainted sign) 
to a much loved independent
sewing school business in the
heart of Paisley Town Centre.
Before After
AfterBefore

Page 12

8
2024
2025
Johnstone
Support in the form of  new
sinage, replacement shopfront
windows and door with new
security shutters.
The unit was previously vacant
in a prominent position in the
heart of Johnstone Town Centre.
2023 
2024
Elderslie
Support in the form of
completely new shopfront
(including handpainted sign)  to
a independent  florist business
on the Main Road in Elderslie.
Works include a complete
shopfront including new timber
windows and paintwork.
Before After
Before After

Page 13

9
Development of RIS
An online portal that simplifies the application process for both applicants
and assessing officers is now fully operational and functioning successfully.
Minor changes to the RIS Guidelines and processes have been
implemented, including clarifying the guidelines on eligible works,
reintroducing a double application window, and conducting more vigilant
checks on whether applicants owe debts to the Council.
Once this year’s RIS is complete, officers will review whether there is
potential for further improvements to the scheme. As of now, no future
funding has been secured for additional rounds of the scheme.