Indicator Responsible Person Reported Page
COI - Maximise distribution of Scottish Welfare Fund Fergus Walker A&B only 3
COI - Percentage of clients satisfied that they are better able to deal with their financial problems following
our support and intervention Lee Roberts A&B only 4
Number of parking penalty notices issued Hugh O'Neill Area 5
Car parking income to date (cumulative) Hugh O'Neill Area 6 - 7
Number of dog fouling complaints Tom Murphy Area 8
COI - Increase the percentage of our care experienced young people that have the recommended additional
tracking and monitoring plans in place Louise Chisholm A&B only 9
COI - Provide quality meals within cost margins to all pupils Christine Boyle A&B only 10
Maximise the percentage of 16-19 year olds participating in education, training or employment Jennifer Crocket Area 11
2024/25 FQ4 Oban, Lorn and the Isles Performance Report
The information presented is a summary of the agreed measures.
Unless stated otherwise, performance is presented at both Area and Council-wide levels.
The measure shows the performance against target for the current previous three reporting periods with an explanation of performance trend.
Where appropriate a trend line has been added to illustrate movement in 'Actual' over the reporting period.
Corporate Outcome: People live active, healthier and happier lives
Corporate Outcome: People live in safer and stronger communities
Corporate Outcome: Children and young people have the best possible start
Corporate Outcome: Education, skills and training maximises opportunities for all

Page 2

#
Indicator Responsible Person Reported Page
Number of affordable social sector new builds completed per annum Kelly Ferns Area 12
Percentage of pre-planning application enquiries processed within 20 working days Peter Bain Area 13 - 14
Average number of weeks to determine householder planning applications Peter Bain Area 15 - 16
COI - Number of new homeless applicants who required temporary accommodation this period Morven Macintyre A&B only 17
COI - Maintain the percentage of local suppliers that benefit from the award of contracts via the procurement
portal Anne MacColl-Smith A&B only 18
COI - Increase the number of community benefits that are delivered through contracts we award locally Anne MacColl-Smith A&B only 19
Percentage of street lighting faults repaired within 10 days Tom Murphy Area 20
Number of waste collection complaints Tom Murphy Area 21 - 22
COI (part) - Percentage of waste recycled, composted and recovered John Blake Area 23 - 24
COI - Number of tonnes of waste sent to landfill John Blake A&B only 25
COI - LEAMS (Local Environment Audit and Management System) Tom Murphy Area 26 - 27
COI - Teacher sickness absence Jennifer Crocket (B&C and MAKI)
Wendy Brownlie (H&L and OLI) Area 28
COI - LGE staff (including non-Teacher) sickness absence Carolyn Cairns Area 29
COI - Increase the percentage of all self-service automated contacts Robert Miller A&B only 30
Corporate Outcome: We have an infrastructure that supports sustainable growth
Corporate Outcome: Making it happen
Corporate Outcome: Our economy is diverse and thriving

Page 3

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B 95.3% 78.0% -17.3% Red - Actual
below Target
As at 31 March 2025, our expenditure for the year stands at £549,136. This represents an underspend of £159,148 of our
budgeted profiled amount. Comparing 2024/25 to 2023/24 we received 357 less applications for support and spend was
£113,014 less. This decline is part of a broader trend observed across Scotland. Recent statistics up to September 2024
indicate a general decrease in both applications and spending on SWF, encompassing both Crisis Grants and Community Care
Grants.
Period Actual FQ3 Commentary
2023/24 FQ4 128.6%
2024/25 FQ1 94.0%
2024/25 FQ2 72.9%
2024/25 FQ3 79.7%
2024/25 FQ4 78.0%
Corporate Outcome - People live active, healthier and happier lives
COI - Maximise distribution of Scottish Welfare Fund
Responsible Person: Fergus Walker
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ4 is lower than the target and performance has decreased since the last reporting period.
Actual trend line
As at 31 December 2024 , our expenditure stands at £423,302.  This represents an underspend of £107,914 of our budgeted
profiled amount.  To date the number of applications is down by 10% compared to the same period last year, however the
average award amount has increased by almost £50.  As in previous years we expect an increase in both applications and
awards in the final quarter of this year.
3

Page 4

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B 100% 100% 0% Green - Actual
meets Target
This is a voluntary survey with no obligation for clients to respond either in full or in part. It is also common for incomplete
returns to be received. In FQ4 2024/25, 11 survey forms were distributed to clients. 10 were returned. Of these 10 returns, 7
responded to the question relating to being better able to deal with their financial problems. Of these 7 respondents, 7
responded positively, whilst 0 responded negatively. Accordingly, 100% of clients that responded were positive about their
experience i.e. no negative comments or responses were reported.
Period Actual FQ3 Commentary
2023/24 FQ4 100%
2024/25 FQ1 100%
2024/25 FQ2 100%
2024/25 FQ3 100%
2024/25 FQ4 100%
Actual trend line
This is a voluntary survey with no obligation for clients to respond either in full or in part. It is also common for incomplete
returns to be received. In FQ3 2024/25, 17 survey forms were distributed to clients. 9 were returned. Of these 9 returns, 8
responded to the question relating to being better able to deal with their financial problems. Of these 8 respondents, 8
responded positively, whilst 0 responded negatively. Accordingly, 100% of clients that responded were positive about their
experience i.e. no negative comments or responses were reported.
Corporate Outcome - People live active, healthier and happier lives
COI - Percentage of clients satisfied that they are better able to deal with their financial problems following our support and intervention
Responsible Person: Lee Roberts
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ4 meets the target with no change in performance since the last reporting period.
4

Page 5

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 OLI No Target 490 N/A N/A No particular issues in area although Oban town centre lining continues to deteriorate.  Transport (Scotland) Act prohibitions
(pavement parking, dropped kerb & double parking) enforcement began on March 3rd.
Period Actual FQ3 Commentary
2023/24 FQ4 493
2024/25 FQ1 527
2024/25 FQ2 603
2024/25 FQ3 402
2024/25 FQ4 490
2024/25 FQ4 A&B No Target 1,253 N/A N/A
Recruitment and training of two new Amenity Wardens has resulted in them beginning enforcement through the quarter in
MAKI & H&L, tempered by loss of Warden in H&L area.  Transport (Scotland) Act prohibitions (pavement parking, dropped
kerb & double parking) enforcement began on March 3rd.
Period Actual FQ3 Commentary
2023/24 FQ4 1,196
2024/25 FQ1 1,763
2024/25 FQ2 2,302
2024/25 FQ3 968
2024/25 FQ4 1,253
This indicator for FQ4 shows the number of parking penalty notices has increased since the last reporting period.
Actual trend line
Up from last FQ3.  Oban has remained busy throughout and this has impacted breaches in the TROs
Corporate Outcome - People live in safer and stronger communities
Number of parking penalty notices issued
Responsible Person: Hugh O'Neill
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 shows the number of parking penalty notices has increased since the last reporting period.
Actual trend line
Decrease on previous FQ3 but within general range.
5

Page 6

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 OLI £613,041 £661,959 £48,918 Green - Actual
exceeds Target Over-recovery over the full year.  The success of OLI as a destination clearly having a significant impact on parking income.
Period Target Actual FQ3 Commentary
2023/24 FQ4 £685,489 £604,034
2024/25 FQ1 £135,968 £170,527
2024/25 FQ2 £374,563 £418,913
2024/25 FQ3 £534,793 £582,699
2024/25 FQ4 £613,041 £661,959
£1,537
£11,913
£1,118
£1,588
£30,564
£2,622
£3,539
£5,176
£3,344
£5,583
£10,498
£1,038
£417
£20
£304
£79,261
Corporate Outcome - People live in safer and stronger communities
Car parking income to date (cumulative)
Responsible Person: Hugh O'Neill
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 shows the cumulative amount of income has exceeded the cumulative target.
Actual trend line
There is no trend as this data is
cumulative as of FQ1 each financial year.
An increase in income but generally on track.
Albany Street, Oban
Oban
Tweedale Street, Oban
Market Street, Oban
Esplanade, Oban
Craignure, Mull
Income Collected During FQ4
Corran No.1, Oban
North Pier, Oban
Corran No.2 Oban
Longsdale, Oban
Non-trunk, Oban
Lochavullin, Oban
Ganavan, Oban
Trunk, Oban
Fionnphort, Mull
Total
6

Page 7

7

Page 8

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B £963,049 £1,011,360 £48,311 Green - Actual
exceeds Target
Income has exceeded forecast.  This may be due to focussed enforcement within the areas by the wardens, including the two
new wardens, in combination of the new machines allowing multiple payment modes.
Period Target Actual FQ3 Commentary
2023/24 FQ4 £968,262 £937,090
2024/25 FQ1 £289,219 £247,216
2024/25 FQ2 £373,922 £391,990
2024/25 FQ3 £237,910 £248,502
2024/25 FQ4 £963,049 £1,011,360
Car parking income to date (cumulative)
Responsible Person: Hugh O'Neill
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 shows the cumulative amount of income has exceeded the cumulative target.
Actual trend line
There is no trend as this data is
cumulative as of FQ1 each financial year.
An increase in income but generally on track with targets.
Corporate Outcome - People live in safer and stronger communities
8

Page 9

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 OLI No Target 14 N/A N/A A total of 14 dog fouling complaints were made this quarter for the OLI area, 13 being received for Lorn and 1 for Mull
Period Actual FQ3 Commentary
2023/24 FQ4 10
2024/25 FQ1 8
2024/25 FQ2 4
2024/25 FQ3 9
2024/25 FQ4 14
2024/25 FQ4 A&B No Target 75 N/A N/A Unfortunately the number of dog fouling complaints has risen this quarter with 75 received in total.  It is hoped that over the
next quarter this number will fall.  The Warden service will, when time allows. continue to monitor.
Period Actual FQ3 Commentary
2023/24 FQ4 65
2024/25 FQ1 57
2024/25 FQ2 33
2024/25 FQ3 65
2024/25 FQ4 75
This indicator for FQ4 shows the number of dog fouling complaints has increased since the last reporting period.
Corporate Outcome - People live in safer and stronger communities
Number of dog fouling complaints
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
Actual trend line
A total of 9 dog fouling complaints were received this quarter for the Oban, Lorn and Isles areas.  The 9 complaints were all
received for the Lorn area, there were no complaints received for Mull.
This indicator for FQ4 shows the number of dog fouling complaints has increased since the last reporting period.
Actual trend line
A total of 65 dog fouling complaints were received for the whole of Argyll and Bute this quarter.  This may seem high,
however it has been found that dog fouling can be seasonal with spikes in dark nights and dark mornings with a lot of dog
walkers refraining from walking their dogs off the beaten tracks in the winter months.  The warden service will continue to
monitor as and when time allows.
9

Page 10

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B 100% 100% 0% Green - Actual
meets Target
Each care experienced child and young person (CECYP) enrolled in an authority school has tracking and monitoring in place via
our education management system, known as Seemis.  Data collected includes attendance, exclusions, progress and
attainment and wellbeing information.  We work alongside schools and partner agencies to ensure care experienced status is
accurate, ensuring our CECYP have additional supports in place via the Virtual School and wider agencies as appropriate.  Our
bespoke care experience application which will further enhance our monitoring for our CECYP is currently in the final stage
before testing phase begins. We continue to work with partner agencies and other local authorities to support CECYP hosted
out with Argyll and Bute.
Period Actual FQ3 Commentary
2023/24 FQ4 100%
2024/25 FQ1 100%
2024/25 FQ2 100%
2024/25 FQ3 100%
2024/25 FQ4 100%
Actual trend line
Each care experienced child and young person (CECYP) enrolled in an authority school has tracking and monitoring plans in
place via our education management information system known as Seemis.  Data collated includes attendance, exclusion,
progress and attainment and wellbeing information.  We are continouosly working alongside schools and partner agencies to
ensure the CE status is accurately reflected.  Enhanced reporting and scrutinising of data, alongside greater awarness of our
CECYP, has led to earlier and positive intervention.  This is evidenced through our attainment data which shows a reduced
learning gap between CE and non-CE learners since 2021 -22 (with both cohorts showing increased attainment).  We continue
to work with partner agencies to support cross authority tracking and monitoring to support CECYP hosted out with Argyll and
Bute.
Corporate Outcome - Children and young people have the best possible start
COI - Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring plans in place
Responsible Person: Louise Lawson
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ4 meets the target with no change in performance since the last reporting period.
10

Page 11

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B +/-5.00% -2% -3% Green - Actual
exceeds Target
We will continue to monitor schools that are not achieving the +/- 5% target.
B&C 3.93%, H&L -4.48%, MAKI -7.51%, OLI 1.09%)
Period Actual FQ3 Commentary
2023/24 FQ4 -3.44%
2024/25 FQ1 0.48%
2024/25 FQ2 -1.37%
2024/25 FQ3 0.14%
2024/25 FQ2 -2.25%
Corporate Outcome - Children and young people have the best possible start
COI - Provide quality meals within cost margins to all pupils
Responsible Person: Christine Boyle
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ4 within the +/-5.00% variance however performance has decreased since the last reporting period.
Actual trend line
We continue to monitor schools that are not achieving the +/- 5% target.
B&C 6.21, H&L -3.88%, MAKI -4.58%, OLI 1.68%
11

Page 12

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 OLI 94.00% 93.40% -0.60% Red - Actual
below Target
As of 11th April 2025 the participation figure (16–19-year-olds in employment, training or education) in Oban, Lorn and the
Isles was 906 young people, which equates to 93.40%. This is 0.6% belowthe target and 0.9% below the annual Argyll and Bute
participation figure of 94.3% which was released by Skills Development Scotland at the end of August 2024. The participation
figure of 93.40% for FQ4 of 2024/25 is a decrease of 1.67% on the participation figure for FQ3 of 2024/25.
Period Actual FQ3 Commentary
2023/24 FQ4 94.43%
2024/25 FQ1 95.57%
2024/25 FQ2 96.14%
2024/25 FQ3 95.07%
2024/25 FQ4 93.40%
2024/25 FQ4 A&B 94.00% 93.50% -0.50% Red - Actual
below Target
As of 11th April 2025 the participation figure (16–19-year-olds in employment, training or education) across the whole of
Argyll and Bute was 3408 young people, which equates to 93.50%. This is 0.5% below  the target and 0.8% below the annual
Argyll and Bute participation figure of 94.3% which was released by Skills Development Scotland at the end of August 2024.
The participation figure of 93.50% for FQ4 of 2024/25 is a decrease of 0.69% on the participation figure for FQ3 of 2024/25.
Period Actual FQ3 Commentary
2023/24 FQ4 93.59%
2024/25 FQ1 94.99%
2024/25 FQ2 95.80%
2024/25 FQ3 94.19%
2024/25 FQ4 93.50%
This indicator for FQ4 is lower than the target and performance has decreased since the last reporting period.
Corporate Outcome - Our economy is diverse and thriving
Maximise the percentage of 16-19 year olds participating in education, training or employment
Responsible Person: Jennifer Crocket
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
Actual trend line
As of 3rd February 2025 the participation figure (16–19-year-olds in employment, training or education) across the whole of
Argyll and Bute was 3921 young people, which equates to 94.19%. This is 0.19% above the target and 0.11% below the annual
Argyll and Bute participation figure of 94.3% which was released by Skills Development Scotland at the end of August 2024.
The participation figure of 94.19% for FQ3 of 2024/25 is a decrease of 1.61% on the participation figure for FQ2 of 2024/25.
Actual trend line
As of 3rd February 2025 the participation figure (16–19-year-olds in employment, training or education) in Oban, Lorn and the
Isles was 1023 young people, which equates to 95.07%. This is 1.07% above the target and 0.77% above the annual Argyll and
Bute participation figure of 94.3% which was released by Skills Development Scotland at the end of August 2024. The
participation figure of 95.07% for FQ3 of 2024/25 is a decrease of 1.07% on the participation figure for FQ2 of 2024/25.
This indicator for FQ4 is lower than the target and performance has decreased since the last reporting period.
12

Page 13

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 OLI 1 1 0 Green - Actual
meets Target West Highland Housing Assoication completed new supply open market purchase of property in Kilmelford.
Period Actual FQ3 Commentary
2023/24 FQ4 0
2024/25 FQ1 0
2024/25 FQ2 6
2024/25 FQ3 0
2024/25 FQ4 1
2024/25 FQ4 A&B 1 1 0 Green - Actual
meets Target
There was no Strategic Housing Investment Plan (SHIP) completions in FQ4, however West Highland Housing Association
(WHHA) concluded on new supply open market purchase in Kilmelford which increases supply of affordable housing.  There
has been delays to West Highland Housing Association  developments at Port Charlotte (phase 1) and Imerval (Phase 5) on
Islay due to issues with bringing hot tar to the Island to complete roads, bad weather,  ferry disruption  and issues with
Scottish Southern Energy Networks. 
Period Actual FQ3 Commentary
2023/24 FQ4 0
2024/25 FQ1 12
2024/25 FQ2 26
2024/25 FQ3 6
2024/25 FQ4 1
Corporate Outcome - Our economy is diverse and thriving
This indicator for FQ4 meets the target and performance has increased since the last reporting period.
Actual trend line
There were no completions in OLI in FQ3.
Number of affordable social sector new builds completed per annum
Responsible Person: Kelly Ferns
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 meets the target however performance has decreased since the last reporting period.
Actual trend line
Fyne Homes completed 6 x 3 bed general needs properties at Baddens, Lochgilphead in FQ3
13

Page 14

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 OLI 75.0% 83.3% 8.3% Green - Actual
exceeds Target
Performance across the Development Management Service is still being recovered and impacted upon by the management of
a significant backlog of casework. Overall output and performance across the service is improving as staff resource issues have
been resolved. However, timeliness measures continue to be adversely impacted through the prioritisation of older statutory
'legacy' casework for determination. The target for the handling of pre-application enquiries has been set to 30 days although
this change has not yet been reflected in the format of corporate reporting. During FQ4 42 pre-applications were responded
to within Oban, Lorn and the Isles. 35 responses (83.3%) were issued within 20 days; 41 responses (98%) were issued within
the revised target of 30 days. The performance of the OLI team in regularly exceeding the performance target is
commendable.
Period Actual FQ3 Commentary
2023/24 FQ4 87.5%
2024/25 FQ1 87.5%
2024/25 FQ2 84.6%
2024/25 FQ3 84.2%
2024/25 FQ4 83.3%
This indicator for FQ4 exceeds the target however performance has decreased since the last reporting period.
Corporate Outcome - Our economy is diverse and thriving
Percentage of pre-planning application enquiries processed within 20 working days
Responsible Person: Peter Bain
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
Actual trend line
Performance across the Development Management Service is still being recovered and impacted upon by the management of
a significant backlog of casework. Overall output and performance across the Service is improving as staff resource issues have
been resolved, however timeliness measures continue to be adversely impacted through the prioritisation of older statutory
'legacy' casework for determination. In order to assist with managing customer expectations the target response period has
been temporarily extended to 6 weeks. During FQ3 38 pre-apps were closed in OLI with over 80% being issued within 6 weeks
continuing a period of impressive performance from the OLI team.
14

Page 15

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B 75.0% 58.5% -16.5% Red - Actual
below Target
Performance across the Development Management Service is still being recovered and impacted upon by the management of
a significant backlog of casework. Overall output and performance across the service is improving as staff resource issues have
been resolved. However, timeliness measures continue to be adversely impacted through the prioritisation of older statutory
'legacy' casework for determination. The target for the handling of pre-application enquiries has been set to 30 days although
this change has not yet been reflected in the format of corporate reporting. During FQ4 118 pre-applications were responded
to across Argyll and Bute. 69 responses (58.5%) were issued within 20 days; 75 responses (64.1%) were issued within the
revised target of 30 days.
Period Actual FQ3 Commentary
2023/24 FQ4 55.0%
2024/25 FQ1 49.5%
2024/25 FQ2 49.2%
2024/25 FQ3 48.3%
2024/25 FQ4 58.5%
Actual trend line
Performance across the Development Management Service is still being recovered and impacted upon by the management of
a significant backlog of casework. Overall output and performance across the Service is improving as staff resource issues have
been resolved, however timeliness measures continue to be adversely impacted through the prioritisation of older statutory
'legacy' casework for determination. In order to assist with managing customer expectations the target response period has
been temporarily extended to 6 weeks. There continues to be a backlog of pre-application enquiries within the BCHL team
which is impacting upon overall Service performance although many of the open enquiries are in fact progressing with
ongoing dialogue. During FQ3 123 pre-apps were closed aross ABC.
Please find links below for supplementary information on performance in this area:
PPSL Committee - Development Management Performance Update: https://www.argyll-
bute.gov.uk/moderngov/documents/s215679/DM%20Performance%20Update%202024-25%20FQ3%20PB%2010.01.2025.pdf
Appendix 1: https://www.argyll-
bute.gov.uk/moderngov/documents/s215680/Appendix%201%20DM%20Performance%20Update%20FQ3%202425.pdf
This indicator for FQ4 is lower than the target however performance has increased since the last reporting period.
Corporate Outcome - Our economy is diverse and thriving
Percentage of pre-planning application enquiries processed within 20 working days
Responsible Person: Peter Bain
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
15

Page 16

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 OLI 8.0 7.9 -0.1 Green - Actual
below Target
Performance across the Development Management Service has been impacted by a significant backlog of casework. Whilst
issues relating to staff resource availability have been resolved and output has significantly improved it is highlighted that
KPI's measuring average time taken remain adversely affected by the resolution of increasing volumes of 'legacy' casework.
The Council's target for 'householder' applications has been revised to 10 weeks although this is not yet reflected in the
format of corporate reports. During FQ4 only a handful of 'householder' 'legacy' items remained, this has resulted in a general
improvement across this particular performance measure. During FQ4 19 'householder' applications were determined in
Oban, Lorn and the Isles and did not include any 'legacy' items and is reflected in the excellent performance reported for this
period.
Period Actual FQ3 Commentary
2023/24 FQ4 5.2
2024/25 FQ1 7.9
2024/25 FQ2 6.1
2024/25 FQ3 7.5
2024/25 FQ4 7.9
This indicator for FQ4 is lower than the target and performance has decreased since the last reporting period.
Actual trend line
Performance across the Development Management Service has been impacted by a significant backlog of casework. Whilst
issues relating to staff resource availability have been resolved and output has significantly improved it is highlighted that
KPI's measuring average time taken are adversely affected by the resolution of increasing volumes of 'legacy' casework which
significantly skew reporting, particularly at area level where this relates to a small number of applications. During FQ3 13
'householder' applications were determined in OLI; however none of of these were 'legacy' items. The average time period of
7.5 weeks is a positive reflection of the efforts of the OLI team during this reporting period.
Corporate Outcome - Our economy is diverse and thriving
Average number of weeks to determine householder planning applications
Responsible Person: Peter Bain
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
16

Page 17

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B 8.0 14.2 6.2 Red - Actual
exceeds Target
Performance across the Development Management Service has been impacted by a significant backlog of casework. Whilst
issues relating to staff resource availability have been resolved and output has significantly improved it is highlighted that
KPI's measuring average time taken remain adversely affected by the resolution of increasing volumes of 'legacy' casework.
The Council's target for 'householder' applications has been revised to 10 weeks although this is not yet reflected in the
format of corporate reports. During FQ4 only a handful of 'householder' 'legacy' items remained, this has resulted in a general
improvement across this particular performance measure. During FQ4 68 'householder' applications were determined across
Argyll and Bute including 8 'legacy' items and is reflected in the significant improvement in performance reported for this
period. Excluding 'legacy' items, the remaining 60 applications were determined within an average time of 9.9 weeks.
Period Actual FQ3 Commentary
2023/24 FQ4 20.0
2024/25 FQ1 16.1
2024/25 FQ2 26.1
2024/25 FQ3 15.9
2024/25 FQ4 14.2
Corporate Outcome - Our economy is diverse and thriving
Average number of weeks to determine householder planning applications
Responsible Person: Peter Bain
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 exceeds the target however performance has increased since the last reporting period.
Actual trend line
Performance across the Development Management Service has been impacted by a significant backlog of casework. Whilst
issues relating to staff resource availability have been resolved and output has significantly improved it is highlighted that
KPI's measuring average time taken are adversely affected by the resolution of increasing volumes of 'legacy' casework which
significantly skew reporting, particularly at area level where this relates to a small number of applications. During FQ3 60
'householder' applications were determined across all of ABC; these included 7 'legacy' items. Excluding the'legacy' items the
average time taken to determine the other 53 applications was 10.2 weeks.
Please find links below for supplementary information on performance in this area:
PPSL Committee - Development Management Performance Update: https://www.argyll-
bute.gov.uk/moderngov/documents/s215679/DM%20Performance%20Update%202024-25%20FQ3%20PB%2010.01.2025.pdf
Appendix 1: https://www.argyll-
bute.gov.uk/moderngov/documents/s215680/Appendix%201%20DM%20Performance%20Update%20FQ3%202425.pdf
17

Page 18

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B No Target 30 N/A N/A
During FQ4, the housing service took 108 homeless applications and provided temporary accommodation for 30 new
homeless households.
B&C: Out of 28 Homeless Applications, 10 new households went in to temporary accommodation (4 x Serviced
Accommodation, 4 x Bed & Breakfast, 2 Private Sector Lease).
H&L: Out of 30 Applications, 8 new households went in to temporary accommodation (1 x Serviced Accommodation, 7 x Bed
& Breakfast).
MAKI: Out of 31 Homeless Applications, 4 new households went in to temporary accommodation (4 x Private Sector Lease).
OLI: Out of 19 Homeless Applications, 8 new households went in to temporary accommodation (3 x Supported
Accommodation, 1 x Private Sector Lease, 1 x Registered Social Landlord, 3 x Bed & Breakfast).
Period Actual FQ3 Commentary
2023/24 FQ4 30
2024/25 FQ1 26
2024/25 FQ2 40
2024/25 FQ3 27
2024/25 FQ4 30
Corporate Outcome - Our economy is diverse and thriving
COI - Number of new homeless applicants who required temporary accommodation this period
Responsible Person: Morven Macintyre
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ4 shows the number of applicants has increased since the last reporting period.
Actual trend line
During FQ3, the housing service took 90 homeless applications and provided temporary accommodation for 27 new homeless
households.
B&C: Out of 25 Homeless Applications, 8 new households went in to temporary accommodation (4 x Serviced
Accommodation, 4 x Bed & Breakfast).
H&L: Out of 22 Homeless Applications, 8 new households went in to temporary accommodation (4 x Serviced
Accommodation, 2 x Bed & Breakfast, 1 x Private Sector Lease, 1 x Council Retained).
MAKI: Out of 23 Homeless Applications, 7 new household went in to temporary accommodation (3 x Private Sector Lease, 4 x
Bed & Breakfast).
OLI: Out of 20 Homeless Applications, 4 new households went in to temporary accommodation (3 x Supported
Accommodation, 1 x Serviced Accommodation).
Please note:
•  The Registered Social Landlord and Private Rented Sector properties are leased by the Council and sub-let to homeless households as temporary accommodation.
•  Serviced Accommodation is available in Cowal and Helensburgh and is for single people providing an en-suite bedroom and shared kitchen facilities.
• Supported accommodation is provided in Lorn by Blue Triangle Housing Association.
•  Emergency accommodation may on occasion be provided out with the location of the original presentation due to the pressure on the availability of temporary accommodation
0
18

Page 19

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B 20.0% 15.2% -4.8% Red - Actual
below Target
FQ4 - 15.2%. There were 66 tender/quick quote contract awards during FQ4. 10 were awarded to local suppliers,
with a total estimated value of £78k. From the 66 awards, only 15 received local bids. The nature of the types of
contracts awarded can impact on submission of local bidders. The % of tenders won by a local supplier, where a
local supplier placed a bid during FQ4 was 66.7%.
Period Actual FQ3 Commentary
2023/24 FQ4 14.3%
2024/25 FQ1 36.0%
2024/25 FQ2 10.5%
2024/25 FQ3 23.6%
2024/25 FQ4 15.2%
COI - Maintain the percentage of local suppliers that benefit from the award of contracts via the procurement portal
Responsible Person: Anne MacColl-Smith
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ4 is lower than the target and performance has decreased since the last reporting period.
Actual trend line
From the 44 tender/quick quote contract awards during FQ3, 55 suppliers were successful, 13 of which were local suppliers.
However, only 18 received local bids. The nature of the types of contracts awarded can impact on submission of local bidders.
Of the 18 contracts, 13 were awarded to local suppliers (72.2%) with an estimated total contract value of £9.6m. The
Procurement, Commercial and Contract Management Team will continue to support local suppliers by providing useful
information on the Council's website.
Corporate Outcome - Our economy is diverse and thriving
19

Page 20

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B No Target TBA N/A N/A The number of achieved community benefits during FQ3 and FQ4 is currently being gathered and data should be available at
the end of April 2025.
Period Actual FQ3 Commentary
2023/24 FQ4 37
2024/25 FQ1 -
2024/25 FQ2 31
2024/25 FQ3 -
2024/25 FQ4 TBA
Actual trend line
The next report covering FQ3 & FQ4 2024/25 will be available in April 2025.
Corporate Outcome - Our economy is diverse and thriving
COI - Increase the number of community benefits that are delivered through contracts we award locally
Responsible Person: Anne MacColl-Smith
This indicator is a Corporate Outcome Indicator that is reported in FQ2 and FQ4. The performance presented is Council-wide only.
This indicator for FQ4 shows the number of community benefits has increased since the last reporting period.
20

Page 21

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 OLI 75% 98% 23% Green - Actual
exceeds Target Performance is good and exceeding the target.
Period Actual FQ3 Commentary
2023/24 FQ4 20%
2024/25 FQ1 81%
2024/25 FQ2 96%
2024/25 FQ3 97%
2024/25 FQ4 98%
2024/25 FQ4 A&B 75% 92% 17% Green - Actual
exceeds Target
Performance has improved in 3 of the 4 geographical settings . A number of cable faults and works requiring contractor or
power company assistance in Lomond is reflected in this quarters figures . These works take time to program and deliver. All
Areas appear to benefiting from the street lighting Capital Program Works which are improving reliability of lighting in areas
that were previously experiencing a higher number of faults.
Period Actual FQ3 Commentary
2023/24 FQ4 49%
2024/25 FQ1 93%
2024/25 FQ2 97%
2024/25 FQ3 92%
2024/25 FQ4 92%
This indicator for FQ4 exceeds the target and performance has increased since the last reporting period.
Actual trend line
Continued Progress with the new tablets and software has seen a marked improvement across the service area.       126 faults
reported in total this quarter - a high number. At what is generally busy period for the Service and at a time when staff do
take annual leave. Some assistance was provided from other areas to help with the high number of faults reported in the OLI
Area.
Corporate Outcome - We have an infrastructure that supports sustainable growth
Percentage of street lighting faults repaired within 10 days
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 exceeds the target and performance has increased since the last reporting period.
Actual trend line
Continued Progress with the new tablets and software has seen a marked improvement across the service area. 341 faults
reported in total this quarter - a high number but in general we deal with more faults in FQ3 and FQ4 each year.                                                                                                                                                                                                  
This has been a busy quarter for the Service and at a time when staff do take annual leave. Capital Improvement Schemes will
have helped deal with lighting that was that was previously unrealiable.
21

Page 22

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 Lorn No Target 6 N/A N/A Lorn received 6 waste complaints for the months January, February, March.
Period Actual FQ3 Commentary
2023/24 FQ4 2
2024/25 FQ1 7
2024/25 FQ2 4
2024/25 FQ3 3
2024/25 FQ4 6
2024/25 FQ4 Mull No Target 0 N/A N/A There were no waste collection complaints received for the Isle of Mull this month, showing excellent service by our team on
the Island.
Period Actual FQ3 Commentary
2023/24 FQ4 0
2024/25 FQ1 2
2024/25 FQ2 0
2024/25 FQ3 0
2024/25 FQ4 0
Corporate Outcome - We have an infrastructure that supports sustainable growth
Number of waste collection complaints
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 shows the number of waste collection complaints has remained the same since the last reporting period.
Actual trend line
Another excellent service provided by our team on the Isle of Mull, there were no waste collection complaints received this
quarter.
This indicator for FQ4 shows the number of waste collection complaints has increased since the last reporting period.
Actual trend line
There were only 3 waste collection complaintes received for Lorn in October, November and December, this is very good given
the number of properties.
22

Page 23

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B No Target 31 N/A N/A
In total 31 waste collection complaints were received for the whole of Argyll and Bute.  Again the majority of the complaints
were received in Helensburgh, due to vehicle breakdowns and resources.  The waste team continue to deliver a very high level
of service across the whole area.
Period Actual FQ3 Commentary
2023/24 FQ4 7
2024/25 FQ1 38
2024/25 FQ2 26
2024/25 FQ3 36
2024/25 FQ4 31
Corporate Outcome - We have an infrastructure that supports sustainable growth
Number of waste collection complaints
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 shows the number of waste collection complaints has decreased since the last reporting period.
Actual trend line
In total there were 36 waste collection complaints received for the whole Argyll and Bute Council area for the months of
October, November and December.  The majority of which were received in the Helensburgh and Lomond area due to vehicle
breakdowns and resourcing.  The teams are still delivering a very high level of service to the many properties throughout the
areas ensuring the domestic, recycling, glass and food waste is uplifted.
23

Page 24

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B 45.0% 63.2% 18.2% Green - Actual
exceeds Target
63.2% recycling, composting and recovery (35.9% recycling/composting plus 27.3% recovery). Recovery percentage high
mainly due to Helensburgh and Lomond residual waste going for refuse derived fuel/energy from waste.
Recycling/composting slightly lower as reduced garden waste tonnages sent for composting during winter months. 2024/25
financial year overall figures are 67.2% recycling,composting and recovery (40.3% recycling/composting plus 26.9% recovery)
which is an improvement on previous f/year which was 58.2% .
Period Actual FQ3 Commentary
2023/24 FQ4 74.0%
2024/25 FQ1 68.4%
2024/25 FQ2 70.5%
2024/25 FQ3 65.4%
2024/25 FQ4 63.2%
2024/25 FQ4 Renewi No Target 46.8% N/A N/A
46.8% recycling, composting and recovery (31.5% recycling/composting plus 15.3% recovery). Recycling/composting slightly
lower as reduced garden waste tonnages sent for composting during winter months. 2024/25 financial year overall figures are
54.9% recycling,composting and recovery (38.5% recycling/composting plus 16.4% recovery).
Period Actual FQ3 Commentary
2023/24 FQ4 66.5%
2024/25 FQ1 56.2%
2024/25 FQ2 61.3%
2024/25 FQ3 52.4%
2024/25 FQ4 46.8%
Actual trend line
65.4% recycling, composting and recovery (37.2% recycling/composting plus 28.2% recovery) . Target exceeded mainly due to
high recovery levels for Helensburgh and Lomond's residual waste which now goes for refuse derived fuel (RDF) instead of
landfill. Less garden waste  composted during this quarter than FQ2 which is expected as green waste composting is higher
during spring/summer periods. Recycling and composting rate of 37.2% is marginally higher than same quarter in previous
year (which was 36.1%).
This indicator for FQ4 shows the percentage of waste recycled has decreased since the last reporting period.
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - Percentage of waste recycled, composted and recovered
Responsible Person: John Blake
This indicator is reported quarterly. The performance presented is by Council-wide service provision.
This indicator for FQ4 exceeds the target however performance has decreased since the last reporting period.
Actual trend line
52.4% recycling, composting and recovery (35.3% recycling/composting plus 17.1% recovery) . Less garden waste  composted
during this quarter than FQ2 which is expected as green waste composting is higher during spring/summer periods. Recycling
and composting rate of 35.3% is marginally higher than same quarter in previous year (which was 33.9%).
24

Page 25

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 Islands No Target 49.2% N/A N/A 49.2% recycling, composting and recovery (38.7% recycling/composting plus 10.5% recovery). 2024/25 financial year overall
figures are 48.1% recycling,composting and recovery (37.3% recycling/composting plus 10.8% recovery).
Period Actual FQ3 Commentary
2023/24 FQ4 41.5%
2024/25 FQ1 45.8%
2024/25 FQ2 51.8%%
2024/25 FQ3 51.8%
2024/25 FQ4 49.2%
2024/25 FQ4 H&L No Target 100.0% N/A N/A
100% recycling, composting and recovery (43.7% recycling/composting plus 56.3% recovery). Recovery percentage high mainly
due to Helensburgh and Lomond residual waste going for refuse derived fuel/energy from waste. Recycling/composting
slightly lower than in spring/summer as reduced garden waste tonnages sent for composting during winter months.24/25
financial year overall figures are 100% recycling,composting and recovery (45.1% recycling/composting plus 54.9% recovery).
Period Actual FQ3 Commentary
2023/24 FQ4 100.0%
2024/25 FQ1 100.0%
2024/25 FQ2 100.0%
2024/25 FQ3 100.0%
2024/25 FQ4 100.0%
This indicator for FQ4 shows the percentage of waste recycled has decreased since the last reporting period.
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - Percentage of waste recycled, composted and recovered
Responsible Person: John Blake
This indicator is reported quarterly. The performance presented is by Council-wide service provision.
Actual trend line
100% recycling, composting and recovery (43.1% recycling/composting plus 56.9% recovery) . High recovery levels for
Helensburgh and Lomond's residual waste which now goes for refuse derived fuel (RDF) instead of landfill. Less garden waste 
composted during this quarter than FQ2 which is expected as green waste composting is higher during spring/summer
periods. Recycling and composting rate of 43.1% is marginally higher than same quarter in previous year (which was 40.8%).
Actual trend line
44.2% recycling, composting and recovery (31.9% recycling/composting plus 12.3% recovery) . Less garden waste  composted
during this quarter than FQ2 which is expected as green waste composting is higher during spring/summer periods. Recovery
rate of 12.3% in quarter is higher than same quarter in previous year (which was 0%) as residual waste from Coll and Tiree
now goes for refuse derived fuel (RDF) instead of landfill.
This indicator for FQ4 shows the percentage of waste recycled has remained the same since the last reporting period.
25

Page 26

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B 5,000 3,103 -1,897 Green - Actual
below Target
Well within landfill limit target mainly due to Helensburgh and Lomond residual waste going for refuse derived fuel/energy
from waste.
Period Target Actual FQ3 Commentary
2023/24 FQ4 5,000 2,567
2024/25 FQ1 5,850 3,200
2024/25 FQ2 5,550 3,225
2024/25 FQ3 5,100 2,846
2024/25 FQ4 5,000 3,103
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - Number of tonnes of waste sent to landfill
Responsible Person: John Blake
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ4 is lower than the target (lowest is best).
Actual trend line
Well within biodegradable municpal waste target for the quarter mainly due to the residual waste from Helensburgh and
Lomond area now all going for refuse derived fuel (RDF)/ energy from waste (EFW) whereas this was previously sent to landfill
in same quarter in 2023.
26

Page 27

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 Lorn 73 81 8 Green - Actual
exceeds Target
The teams again are proving that the Lorn area may only show small amounts of detritus, litter etc with a score of 81 for the
months of January, February and March.
Period Actual FQ3 Commentary
2023/24 FQ4 85
2024/25 FQ1 89
2024/25 FQ2 87
2024/25 FQ3 88
2024/25 FQ4 81
2024/25 FQ4 Mull 73 96 23 Green - Actual
exceeds Target
The LEAMS scores for the Isle of Mull for this quarter show, January 96, February 95 and March 96, this is excellent to see the
high standards being kept.
Period Actual FQ3 Commentary
2023/24 FQ4 93
2024/25 FQ1 93
2024/25 FQ2 94
2024/25 FQ3 96
2024/25 FQ4 96
This indicator for FQ4 exceeds the target however performance has decreased since the last reporting period.
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - LEAMS (Local Environment Audit and Management System)
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
Actual trend line
96 is an excellent score for the Isle of Mull with regards street cleanliness, we hope to see this standard kept up throughout
the year.
Actual trend line
October, November and December in the Lorn area shows a high score of street cleanliness, the teams are working to ensure
the area is well maintained
This indicator for FQ4 exceeds the target with no change in performance since the last reporting period.
27

Page 28

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B 73 83 10 Green - Actual
exceeds Target
January, February and March figures show that again this quarter the street cleanliness across the whole of Argyll and Bute
remains high.  These figures show very little or no litter visible in the streets and or open spaces checked.  This high score
reflects well on the teams on the islands and mainland who are providing a good service by ensuring they work efficiently and
effectively to keep the areas clean.
Period Actual FQ3 Commentary
2023/24 FQ4 83
2024/25 FQ1 84
2024/25 FQ2 85
2024/25 FQ3 84
2024/25 FQ4 83
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 exceeds the target however performance has decreased since the last reporting period.
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - LEAMS (Local Environment Audit and Management System)
Responsible Person: Tom Murphy
Actual trend line
The street cleanliness figure for the months of October, November and December for the whole of the Argyll and Bute Council
area remains high.  This means the areas scored show no or a very small amount of litter visible but not detracting from the
look of the area.  The teams on both the mainland and islands are providing a good service by ensuring weeds, detritus, litter,
fly posting, grafitti etc are being dealt with timeously.
28

Page 29

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 OLI No Target 2.75 N/A N/A Work days lost has remained the same as  a day on the same quarter last year and has decreased by 0.12 of a day from the
previous quarter.
Period Actual FQ3 Commentary
2023/24 FQ4 2.75
2024/25 FQ1 2.11
2024/25 FQ2 1.96
2024/25 FQ3 2.87
2024/25 FQ4 2.75
2024/25 FQ4 A&B No Target 3.23 N/A N/A Work days lost has increased by 0.41 of a day on the same quarter last year and has increased by 0.34 of a day from the
previous quarter.
Period Actual FQ3 Commentary
2023/24 FQ4 2.82
2024/25 FQ1 2.14
2024/25 FQ2 1.77
2024/25 FQ3 2.89
2024/25 FQ4 3.23
This indicator for FQ4 shows the number of sickness absence days has decreased since the last reporting period.
Actual trend line
Work days lost has increased by 0.83 of a day on the same quarter last year and has increased by 0.91 of a day from the
previous quarter. 
Corporate Outcome - Making it happen
COI - Teacher sickness absence
Responsible Person: Jennifer Crocket (B&C and MAKI) / Wendy Brownlie (H&L and OLI)
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ4 shows the number of sickness absence days has increased since the last reporting period.
Actual trend line
Work days lost has increased by 0.07 of a day on the same quarter last year and has increased by 1.12 of a day from the
previous quarter.
29

Page 30

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 OLI No Target 4.31 N/A N/A Work days lost has decreased by 0.45 of a day on the same quarter last year and has decreasedby 0.22 of a day from the
previous quarter.
Period Acutal FQ3 Commentary
2023/24 FQ4 4.76
2024/25 FQ1 4.19
2024/25 FQ2 3.85
2024/25 FQ3 4.53
2024/25 FQ4 4.31
2024/25 FQ4 A&B No Target 4.66 N/A N/A Work days lost has increased by 0.54 of a day on the same quarter last year and has increased by 0.26 of a day from the
previous quarter.
Period Actual FQ3 Commentary
2023/24 FQ4 4.12
2024/25 FQ1 3.85
2024/25 FQ2 3.43
2024/25 FQ3 4.40
2024/25 FQ4 4.66
This indicator for FQ4 shows the number of sickness absence days has decreased since the last reporting period.
Corporate Outcome - Making it happen
COI - LGE staff (including non-Teacher) sickness absence
Responsible Person: Carolyn Cairns
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
Actual trend line
Work days lost has increased by 0.67 of a day on the same quarter last year and has increased by 0.97 of a day from the
previous quarter. 
Actual trend line
Work days lost has increased by 0.09 of a day on the same quarter last year and has increased by 0.68 of a day from the
previous quarter. 
This indicator for FQ4 shows the number of sickness absence days has increased since the last reporting period.
30

Page 31

Period Area Target Actual Variance Status FQ4 Commentary
2024/25 FQ4 A&B 70.0% 74.8% 4.8% Green - Actual
exceeds Target
In FQ4 there were 39,517 customer transactions dealt with by Customer Service Agents (25.2%) and 117,568
were automated or self-service transactions (74.8%) so the 70.0% target was substantially bettered. 
Period Actual FQ3 Commentary
2023/24 FQ4 70.1%
2024/25 FQ1 71.6%
2024/25 FQ2 72.7%
2024/25 FQ3 82.7%
2024/25 FQ4 74.8%
Corporate Outcome - Making it happen
COI - Increase the percentage of all self-service automated contacts
Responsible Person: Robert Miller
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ4 exceeds the target however performance has decreased since the last reporting period.
Actual trend line
In FQ3 there were 33,666 customer transactions dealt with by Customer Service Agents (17.3%) and 160,491 were automated
or self-service transactions (82.7%) so the 70.0% target was substantially bettered.  This was largely due to the significant
increase in customers using the improved Bin Day Uplift online resources.
31