Argyll and Bute Council · 10 September 2025
Back to Oban Lorn & The Isles Area Committee — 10 September 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Argyll and Bute Council
Comhairle Earra-Ghàidheal Agus Bhòid 
Executive Director:  Douglas Hendry 
Kilmory, Lochgilphead, PA31 8RT
Tel:  01546 602127  Fax:  01546 604435
DX 599700 LOCHGILPHEAD
3 September 2025 
NOTICE OF MEETING 
A meeting of the OBAN LORN & THE ISLES AREA COMMITTEE will be held in the IN
DALAVICH VILLAGE HALL, DALAVICH BY TAYNUILT AND BY MICROSOFT TEAMS on
WEDNESDAY, 10 SEPTEMBER 2025 at 11:00 AM, which you are requested to attend. 
Douglas Hendry
Executive Director 
BUSINESS 
1. APOLOGIES FOR ABSENCE 
2. DECLARATIONS OF INTEREST 
3. MINUTES 
(a) Oban, Lorn and the Isles Area Committee -11 June 2025 (Pages 3 - 12) 
(b) Oban, Lorn and the Isles Area Community Planning Group - 13 August 2025
(Pages 13 - 20) 
4. PUBLIC QUESTION TIME 
5. CULTURAL HERITAGE AND ARTS ASSEMBLY FOR ARGYLL AND ISLES
(CHARTS) (Pages 21 - 30)  
Presentation by Chair of Cultural Heritage and Arts Assembly for Argyll and Isles. 
6. AREA PERFORMANCE REPORT - FQ1 2025/26 (Pages 31 - 66)  
Report by Executive Director with responsibility for Customer Support Services 
7. ROADS AND INFRASTRUCTURE UPDATE (Pages 67 - 70)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
8. RECYCLING AND RECOVERY PERFORMANCE REPORT (Pages 71 - 78)  
Report by Executive Director with responsibility for Roads and Infrastructure Services 
9. DISTRIBUTION OF FUNDS - AGNES ANGUS BEQUEST (TO FOLLOW) 
Report by Executive Director with responsibility for Roads and Infrastructure Services
Public Document Pack

Page 2

10. APPOINTMENT TO OBAN AND LORN COMMUNITY ENTERPRISE - ATLANTIS
LEISURE (Pages 79 - 82)  
Report by Executive Director with responsibility for Legal and Regulatory Support. 
11. SUPPORTING COMMUNITIES FUND 2025/26 (Pages 83 - 96)  
Report by Chief Executive 
REPORTS FOR NOTING 
12. SUPPORTING COMMUNITIES FUND - MONITORING OF PROJECTS FUNDED
2023/24 (Pages 97 - 104)  
Report by Executive Director 
13. CHARITABLE TRUST AND BEQUEST FUNDS REPORT 
Report by Executive Director with responsibility for Legal and Regulatory Support 
(a) John of Lorn Bequest Fund (Pages 105 - 108) 
Report by Executive Director with responsibility for Legal and Regulatory Support
E1  (b) Exempt Appendix for John of Lorn Bequest Fund (Pages 109 - 110) 
14. DRAFT OBAN, LORN AND THE ISLES AREA COMMITTEE WORKPLAN (Pages
111 - 116)
The Committee will be asked to pass a resolution in terms of Section 50(A)(4) of the Local
Government (Scotland) Act 1973 to exclude the public for items of business with an “E” on the
grounds that it is likely to involve the disclosure of exempt information as defined in the
appropriate paragraph of Part I of Schedule 7a to the Local Government (Scotland) Act 1973. 
The appropriate paragraph is:-
Paragraph 6  Information relating to the financial or business affairs of any particular person
(other than the authority). 
Oban Lorn & The Isles Area Committee 
Councillor Kieron Green Councillor Amanda Hampsey
Councillor Willie Hume Councillor Andrew Kain (Vice-Chair)
Councillor Jim Lynch Councillor Luna Martin
Councillor Julie McKenzie (Chair) Councillor Andrew Vennard   
Contact: Karen Campbell, Senior Committee Assistant - 01631 567855

Page 3

MINUTES of MEETING of OBAN LORN & THE ISLES AREA COMMITTEE held ON A HYBRID
BASIS ON MICROSOFT TEAMS AND IN AN ROTH, CRAIGNURE, ISLE OF MULL 
on WEDNESDAY, 11 JUNE 2025 
Present: Councillor Andrew Kain (Chair) 
Councillor Kieron Green
Councillor Amanda Hampsey
Councillor Willie Hume 
Councillor Luna Martin
Councillor Andrew Vennard 
Attending: Douglas Hendry, Executive Director
David Logan, Head of Legal and Regulatory Support
Melissa Stewart, Democratic Services Manager
Tom Murphy, Operations Manager
Brendan Docherty, Education Manager
Peter Bain, Head Teacher, Oban and Tiree High School(s)
Shelley Carmichael, Head Teacher, Tobermory High School 
1. APOLOGIES FOR ABSENCE 
The Chair welcomed everyone to the meeting. 
Apologies for absence were intimated on behalf of Councillors Jim Lynch and Julie
McKenzie.   
2. DECLARATIONS OF INTEREST 
There were no declarations of interest intimated.   
3. MINUTES 
(a) Oban, Lorn and the Isles Area Committee - 12 March 2025 
The Minute of the meeting of the Oban, Lorn and the Isles Area
Committee, held on 13 March 2025, was approved as a correct record
subject to the following amendment:- 
Item 4 – Public Question Time (Question 4 – Ross Wilson) 
To amend the spelling of Councillor Kain’s name at the second last
paragraph on page 3 of the Minute from Kane to Kain. 
(b) Oban, Lorn and the Isles Area Community Planning Group - 14 May
2025 
The Minute of the meeting of the Oban, Lorn and the Isles Area
Community Planning Group, held on 14 May 2025 was noted.   
Page 3 Agenda Item 3a

Page 4

(c) Oban Common Good Fund - 17 March 2025 
The Minute of the meeting of the Oban Common Good Fund, held on 17
March 2025 was noted.   
Councillors Amanda Hampsey and Luna Martin joined the meeting during
discussions of the following item of business.  
.
4. PUBLIC QUESTION TIME 
The Chair advised that a number of public questions had been submitted in advance
of the meeting.  He also noted that there were a number of members of the public in
attendance who had intimated that they wished to ask a question.  He advised that
his intention was to take the questions submitted in advance first and then open the
floor to those in attendance.  
The questions were submitted in the following order:-
Question 1 – Jennifer Evans
Evans Funfair submitted an application to hold their annual Fun Fair at Blaze Pitch
Mossfield in February 2025 to Amenity Services, they have not received an
acknowledgement or any confirmation.  They have heard that the Waterboard are
working on the site and do not know how long that is going to go on for, therefore is
there an alternative site available for September or can they have confirmation that
the works will be complete and they are able to use the Blaze Pitch as normal?
The Operations Manager advised that Scottish Water were carrying out works at the
blaze pitch on Mossfield and that it was anticipated that they would still be on-site in
September.  He advised that he was currently awaiting confirmation from the
Network and Standards Manager as to whether Lochavullin Carpark would be
available to use as an alternative to site the annual fun fair and he would confirm the
position with Mrs Evans in due course. 
Question 2 – Frank Roberts 
On 24 January Storm Eowyn caused significant damage to the pontoon berths
adjacent to the North Pier, particularly to sections of the floating breakwater. 
Consequently, the outer two sections of the breakwater are now closed “until further
notice", and the inner section subject to restrictions for the time being of the number
and size of vessels which may use them.  (EDI Committee, March 2025: Notice to
Mariners # 04/25, May 2nd 2025).  The breakwater being out of commission is
having severe adverse effects on both commercial and leisure users of it.
At a recent meeting of the Oban Bay Management Group, it was stated that it was
not possible to say when repairs might be completed and full use of the breakwater
restored, but that it was not likely before an as yet indeterminate date in 2026.
Page 4

Page 5

It is now four months since the storm, and surveys of the damage are reported to
have been conducted.  Therefore, can the Area Committee respond to the following
questions, please:
1. Has the full extent of the damage and necessary repairs been
determined?
2. Has an initial schedule of those repairs been developed?
3. Do either of the outer sections of breakwater require to be rebuilt and
replaced?
4. What is the anticipated latest date for completion of repairs, and the
breakwater to be fully re-opened for use?
5. Will the EDI Committee be given a full report on progress at its meeting
later this month?
The Democratic Services Manager confirmed that the question(s) had been
forwarded to the Council’s Roads and Infrastructure Service and enquired as to
whether the Operations Manager was able to provide an update in this regard.  Mr
Murphy confirmed that he was unaware of the position in relation to the questions. 
He undertook to take forward with the Council’s Marine Operations Manager
following the meeting and ensure a response was provided to Mr Roberts directly. 
Question 3 – Terry Hegarty
How exactly does Argyll and Bute Council reconcile the legal rights of children to
enjoy the benefits of family life and equality of educational opportunity with
continuing reliance upon mainland hostel arrangements for children resident in SW
Mull attending High School in Oban?
The Democratic Services Manager advised that as this question related to the Mull
Campus Project, she had taken advice from the Council’s Legal Services.  Mrs
Stewart confirmed that a Judicial Review had been served on the Council, in regard
to that project and as the matter is now subject to Court Proceedings it would not be
appropriate to provide a response or have any discussion on the matter, or any other
question that may arise at the meeting relating to the Mull Campus Project. 
Question 4 – Nigel Burgess
1. What was the procurement process for awarding the contract to build Iona
Breakwater?
2. Why was the contract awarded to a dredging Company when the EIA report
clearly stated that dredging would be required subsequent to the construction due
to sedimentation?
3. Where is the £14.8 million budget coming from? This does not appear in the
Transport Scotland infrastructure budget
Page 5

Page 6

4. Why was the advice of the Planning Statutory Consultee Naturescot not followed
to investigate and mitigate for seagrass?
5. What will be the addition cost of the seagrass investigation, subsequent to the
contract preliminaries?
6. What will be the increase to the contract price as a consequence of these
delays?
The Democratic Services Manager confirmed that the questions raised by Mr
Burgess were more aligned to a Freedom of Information request.  She undertook to
signpost Mr Burgess to the process for lodging a Freedom of Information request. 
Question 5 – Mary Braithwaite
Why has there been a change to care at home provision on Luing, with the care
provider no longer willing to work with family carers? This was introduced with no
notice, and it has so far been impossible to obtain any information on this change in
policy. It has already impacted care and the situation of families on Luing and is of
significant concern to the community in terms of current and future care.
The Chair confirmed that this was an issue which was felt across the Council area
and was also a concern for Elected Members.  
Councillor Green, Chair of the Argyll and Bute HSCP Audit and Risk Committee
advised that he was looking to progress this matter with the appropriate personnel
within the HSCP and would work with Committee Services to avoid a duplication of
questions. 
Question 6 – Tracy Mayo
Ms Mayo sought clarification in relation to the platform the meeting was taking place
on.  She advised that she was aware of members of the public who were not in a
position to attend the meeting but had anticipated watching the live stream via the
Council’s Public-i portal.  
Councillor Green indicated that only meetings hosted from the Council Chamber
were livestreamed but that officers would confirm the position.  The Democratic
Services Manager confirmed that meetings of the Area Committee are not webcast
live due to a restriction of the mobile equipment utilised to facilitate meetings that are
not held within the Council Chamber.  She further clarified that the teams link
provided in respect of the meeting would allow members of the public to participate
in public questions or simply watch proceedings in the same way that a webcast
would.   
Question 7 – Tracy Mayo
Page 6

Page 7

Referring to an invite extended to the Council by Jenni Minto MSP to attend an
online roundtable discussion on Mull Campus on Friday, 13 June 2025, Ms Mayo
enquired as to why the Council had declined the invitation.
The Chair referred to the earlier advice provided by the Democratic Services
Manager in relation to any question on the Mull Campus Project and reiterated that,
as there was a legal process in place, no discussion would be had in any regard to
the Mull Campus Project.   
Question 8 – Roddy McCuish
Mr McCuish advised that he was in attendance in his capacity as both Director of the
Camanachd Association and as President of the Macaulay Association.  Referring to
the decision of the Committee at their meeting on 12 March 2025 to allocate funding
available from the Agnes Angus Bequest for use at Mossfield Stadium, he took the
opportunity to thank the Committee and sought clarity that the funding would be
utilised for improvements at Mossfield Stadium and not the wider area. 
The Operations Manager referred to discussions that had taken place with the
Rugby Club and others in the town as well as colleagues in Property Services
around the possibility of linking amenity areas, such as reinstating the bridge and
other possible uses.  He advised that a further report would be brought to a future
meeting of the Area Committee before the end of the year which would outline
proposals that related specifically to Mossfield Stadium.  Mr Murphy offered to meet
with Mr McCuish in person to discuss further.   
Question 9 – Emily Greenhalgh
Referring to the earlier question raised by Tracy Mayo on the roundtable discussion
with Jenni Minto MSP, Ms Greenhalgh advised that the invitation had been extended
to the Council on 5 June 2025 and the Council were not notified of legal action until 7
June 2025.  She asked why the invite to the roundtable discussion was refused
before the Council were aware of the legal action.
The Executive Director outlined the nature of the invitation to the roundtable
discussion on 13 June 2025.  He advised that following consultation with the Political
Leadership and the Chief Executive, he had been asked to write to the MSP
confirming that the Council would not be attending.  He advised that it was his
understanding that the event had now been cancelled and at no point had he
intimated that the invite had been declined as a consequence of the legal action
having been notified.   
Question 10 – Frank Roberts on behalf of Alison Rennie
Page 7

Page 8

Having noted an email exchange between Alison Rennie and the Council’s Roads
and Infrastructure Services, Mr Roberts read out the most recent email from Ms
Rennie to the Service and asked that answers be sought.
“Dear Roads and Infrastructure
Your recent e-mail raises a number of questions which require to be clarified, please.
In December 2024 you informed me that you had identified Oban as a proposed
Flood Protection Scheme. At that time the Council had not secured funding for this.
In the meantime you were progressing temporary mitigations under the Flood Risk
Management team’s available revenue funding and proposed to carry out a list of
identified works and advised me regarding the proposed timescale for these works.
Your latest email tells me that your in-house flood event modelling now shows that
no works need to be done. This is contrary to what you said would happen in your
December email and is not consistent with the advice given in the Enviro Centre
2019 report. This report even included a recommended list of specific priority
maintenance actions.
Can you clarify whether you intend to carry out the routine maintenance as listed in
your December email?
Can you specifically clarify whether work is to be carried out on the eradication of
Japanese Knotweed in Q3?
Can you tell me what steps have been taken to secure funding from the Scottish
Government for the proposed Flood Protection Scheme, particularly in light of the
commitment made at the ED&I Committee meeting in June 2024?
Note that no screenshots were attached to your email to demonstrate the modelling
of the flood water level difference within the Lochavullin area before and after
dredging.
Regards
Alison Rennie”
The Democratic Services Manager referred to the response that she had been
copied into from the Service in relation to the email referred to.  She undertook to
forward this email to both Ms Rennie, Mr Roberts and the Operations Manager and
sought further comments from the Operations Manager in relation to the Japanese
Knotweed issue referred to. 
Mr Murphy advised that he would take forward the issues relating to the flood risk in
Oban to his colleagues within the Design and Infrastructure team and advised that
he had organised for additional training to be provided in relation to the management
of Japanese Knotweed.   
Question 11 – Tracy Mayo
Page 8

Page 9

Referring back to the invitation from Jenni Minto MSP for the Council to attend a
roundtable discussion on the Mull Campus Project, Ms Mayo asked whether the
decision to decline the invite was taken by all 36 Elected Members; the 4 Ward
Councillors or simply by the Council’s Executive Leadership Team.  
The Chair reiterated that as this matter is now subject of a legal action, no discussion
could take place in this regard. 
5. AREA PERFORMANCE REPORT - FQ4 2024/25 
The Committee gave consideration to the Area Performance Report for financial
quarter 4 of 2024/25 (January to March 2025) which illustrated the agreed
performance measures for this period.   
Decision 
The Oban, Lorn and the Isles Area Committee noted the performance and
supporting commentary as presented.   
(Reference:  Report by Executive Director with responsibility for Customer Support
Services, dated 8 May 2025, submitted) 
6. ROADS AND INFRASTRUCTURE UPDATE 
Consideration was given to a report which provided links to the recent activities of
Roads and Infrastructure Services. 
Decision 
The Oban, Lorn and the Isles Area Committee noted the contents of the report. 
(Reference:  Report by Executive Director with responsibility for Roads and
Infrastructure Services, dated May 2025, submitted) 
7. ARGYLL AND BUTE COUNCIL SECONDARY SCHOOLS ATTAINMENT
REPORTS 
(a) Oban High School 
The Committee gave consideration to a report relating to Oban High
School  which provided information on S3 ACEL attainment in literacy and
numeracy; the pass rates of national qualifications; data from Insight
Scotland; wider achievement qualifications; equity and attainment and
Pupil Equity Funding.   
Decision 
Page 9

Page 10

The Oban, Lorn and the Isles Area Committee noted the information
provided within the report.   
(Reference:  Report by Executive Director with responsibility for
Education, submitted) 
(b) Tiree High School 
Consideration was given to a report relating to Tiree High School  which
provided information on S3 ACEL attainment in literacy and numeracy; the
pass rates of national qualifications; data from Insight Scotland; wider
achievement qualifications; equity and attainment and Pupil Equity
Funding.   
Decision 
The Oban, Lorn and the Isles Area Committee noted the information
provided within the report.   
(Reference:  Report by Executive Director with responsibility for
Education, submitted) 
(c) Tobermory High School 
The Committee gave consideration to a report relating to Tobermory High
School  which provided information on S3 ACEL attainment in literacy and
numeracy; the pass rates of national qualifications; data from Insight
Scotland; wider achievement qualifications; equity and attainment and
Pupil Equity Funding.   
Decision 
The Oban, Lorn and the Isles Area Committee noted the information
provided within the report.   
(Reference:  Report by Executive Director with responsibility for
Education, submitted) 
8. ARGYLL & BUTE HEALTH AND SOCIAL CARE PARTNERSHIP
PERFORMANCE REPORT 
The Committee gave consideration to the Health and Social Care Partnership
(HSCP) Performance Report for financial quarter 3 of 2024/25 (October to December
2024). 
Decision 
The Oban, Lorn and the Isles Area Committee: 
1. acknowledged the performance for FQ3 2024/25 (October – December); 
Page 10

Page 11

2. acknowledged the performance update on the National Health & Wellbeing
Outcomes and Ministerial Steering Groups Integration Indicators, as at Appendix
1; and 
3. noted Delayed Discharge Sitrep as of 6 January 2025, as at Appendix 2. 
(Reference:  Report by Interim Head of Strategic Planning, Performance and
Technology, Argyll and Bute Health and Social Care Partnership, dated 4 June 2025,
submitted) 
9. AREA COMMITTEE MEETINGS 2025-26 
Consideration was given to a report which asked Members to agree to the suggested
locations for meetings up until June 2026.   
Decision 
The Oban, Lorn and the Isles Area Committee agreed that the meetings until June
2026 would be held as follows:- 
10 September 2025 – Dalavich
10 December 2025 – Oban
11 March 2026 – Taynuilt
10 June 2026 – Tiree 
(Reference:  Report by Executive Director with responsibility for Legal and
Regulatory Support, dated 1 May 2025, submitted) 
10. CHARITABLE TRUSTS, BEQUEST AND TRUST FUNDS 
Consideration was given to a report which provided information regarding a number
of applications that had been received for support from several funds.  The report
also reviewed the distribution arrangements of the MacKinnon Ledingham Bequest,
the Archibald Dow Bequest and Coals for the Poor Oban, following the first 12
months of distribution arrangements for these funds. 
The Democratic Services Manager advised of an error contained within the
recommendations at paragraph 2.1 of the report.  She advised that there were three
individual applications to the MacKinnon Ledingham Bequest, as outlined within the
body of the report and not two as outlined within the recommendations.   
Decision 
The Oban, Lorn and the Isles Area Committee:- 
1. noted the awards made from the John of Lorn Bequest since March 2025; 
2. agreed to award £50 to the three individual applicants who meet the criteria of the
MacKinnon Ledingham Bequest; 
3. agreed to award £50 to the two individual applicants who meet the criteria of the
Archibald Dow Bequest; 
Page 11

Page 12

4. agreed to award £50 to one individual applicant who meets the criteria of the
Coals for the Poor Oban; and 
5. noted that the charitable trusts, bequests and trust funds annual report will be
considered in December 2025 and that further promotion of the availability of the
funds will be undertaken. 
(Reference:  Report by Executive Director with responsibility for Legal and
Regulatory Support, dated May 2025, submitted) 
11. DRAFT OBAN, LORN AND THE ISLES AREA COMMITTEE WORKPLAN 
The Committee gave consideration to the Oban, Lorn and the Isles Area Committee
workplan for future meetings. 
Decision 
The Oban, Lorn and the Isles Area Committee noted the contents of the workplan. 
(Reference:  Oban, Lorn and the Isles Area Committee Workplan, dated 11 June
2025, submitted) 
Page 12

Page 13

MINUTES of MEETING of OBAN LORN & THE ISLES COMMUNITY PLANNING GROUP held
in the OBAN COMMUNITY FIRE STATION, SOROBA ROAD, OBAN, PA34 4JY AND
MICROSOFT TEAMS 
on WEDNESDAY, 13 AUGUST 2025 
Present: Colin Buchanan  (Chair)
Stuart McLean, Committee Manager, Argyll and Bute Council
Councillor Kieron Green, Argyll and Bute Council
Councillor Luna Martin, Argyll and Bute Council
Kirsty McLuckie, CommunityPlanning, Argyll and Bute Council
Gordon Curran, Scottish Fire and Rescue
Robert MacKay, ACHA
Jim Tolmie, Oban District Access Panel
Theresa Bain, UHI Argyll (Oban)
Duncan Martin, Oban Community Council
Kirsten Johnston, Argyll and Bute Third Sector Interface
Andy MacPherson, Argyll and Bute Climate Action Network 
Jane Metcalf, Coll Community Council
Aideen Shields, Oban Communities Collective
Judith Hawcroft, North Argyll Carers
Joan Best, Crossroads 
Attending: Stuart Green, Corporate Manager, Argyll and Bute Council 
Lucy Dunbar, Area Plans, Argyll and Bute Council
Rona Gold, Community Planning, Argyll and Bute Council
John McLuckie, Community Planning Argyll and Bute Council
Matt Mulderigg, Community and Housing Development Manager, Argyll and
Bute Council
Deirdre MacKenna, The Ardchattan Centre 
1. WELCOME AND APOLOGIES 
The Chair welcomed everyone to the meeting.. 
Apologies for absence were intimated on behalf of: 
Councillor Julie McKenzie, Argyll and Bute Council
Councillor Willie Hume, Argyll and Bute Council
Inspector Matthew Shaw, Police Scotland
Maureen Evans, Live Argyll Community Learning
Petra Pearce, Argyll and Bute Third Sector Interface (TSI) 
2. DECLARATIONS OF INTEREST 
There were no declarations of interest intimated. 
3. MINUTES 
Page 13 Agenda Item 3b

Page 14

(a) Oban, Lorn and the Isles Community Planning Group 14 May 2025 
The Minute of the Oban, Lorn and the Isles Area Planning Group meeting
held on 14 May 2025 was approved as a correct record. 
4. ASPIRING PLACES: COMMUNITY PROJECTS IN ARGYLL AND BUTE -
EVALUATION AND OPTIONS ON FUTURE RETENTION 
The Group gave consideration to a presentation by the Project Manager and Project
Officer from Argyll and Bute Council, in relation to the Council’s Aspiring Places;
Community Project in Argyll and Bute. The presentation provided background
information in relation to the previous project approach; the Launch of the Argyll and
Bute Voices & Aspiring Places Platform in March 2025; the Funding Connections
Roadshow that was delivered during in various locations throughout April – May; the
available funding streams; the number of expressions of interest and next steps. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group considered and
noted the contents of the presentation. 
(Reference: Presentation by, Corporate Support Manager and Area Plans Officer,
dated 13th August 2025, submitted) 
5. COMMUNITY PLANNING PARTNERSHIP MANAGEMENT COMMITTEE
MEETING HIGHLIGHTS 
The Group gave consideration to a report which outlined matters discussed during a
meeting of the Community Planning Partnership (CPP) Management Committee
held on 6 June 2025. The report also provided information on the CPP Climate
Change Strategy and Action Plan; CPP Community Wealth Building (CWB) Charter;
Community Planning’s Priorities Transport and Introduction to Housing; Scottish Fire
and Rescue’s – Service Review and also an update on changes of office bearers of
the Area Community Planning Groups.
Decision 
The Oban, Lorn and the Isles Area Community Planning Group considered and
noted the contents of the report. 
(Reference: Report by John McLuckie, Partnerships Lead, dated 13 August 2025,
submitted) 
6. COMMUNITY PLANNING PRIORITIES 
(a) Transport 
The Group gave consideration to a presentation from the Community
Planning Team, Argyll and Bute Council which highlighted information on
how the Argyll and Bute Community Planning Partnership will improve
Page 14

Page 15

transport infrastructure. The presentation also highlighted the ABOIP
agreed Objectives 2024-2034; the work by the CPP Management
Committee and information on the actions of the Transport Integration
Working Group and Community Active Travel Network.
Decision
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the contents of the presentation.
(Reference: Presentation by Rona Gold, Community Development
Manager, dated 13 August 2025) 
(b) Introduction to Housing 
The Group gave consideration to a presentation from the Community
Planning Team, Argyll and Bute Council which advised how the Argyll and
Bute Community Planning Partnership will improve housing. The
presentation also highlighted the ABOIP agreed Objectives 2024-2034.
Following the presentation, there was a question and answer session with
the following statements made: 
• Are you aware of any funding, training or opportunities locally for
construction skills development?
• What data is available for housing locally and what data is missing?
• Do you know of any land and assets belonging to your organisation
or group that could be used for housing?
• What local information could be shared with those at risk of
homelessness?
• What information do you have about workforce needs for local
accommodation? 
The Community Development Team thanked Partners for their comments,
advising that this was the start of an ongoing conversation on housing at
Area Community Planning Groups. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group noted the
presentation. 
(Reference: Presentation by Rona Gold, Community Development
Manager, dated 13 August 2025) 
(c) Housing Emergency Update 
Matt Mulderrig, Development Policy and Housing Manager, Argyll and
Bute Council highlighted some of the recent activities within the housing
system, following the emergency housing action plan put in place in June
2024; these activities included working with the Scottish Government;
developing Strategic Development Frameworks to facilitate long-term
Page 15

Page 16

delivery and securing national funding investment into housing projects in
the area. 
Mr Mulderrig also advised of various developments within the locality
including Tobermory Worker Housing; exploring the feasibility of a 4 unit
re-development in Campbell Street and West Highland developing a
planning application for 16 social rent units at Dalmally. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the contents of the update. 
(Reference: Report by Report by Housing Strategy Manager, Argyll and
Bute Council, 13th August 2025) 
7. CLIMATE CHANGE 
(a) Climate Change Resilience Group Update (Short Life Working
Group) 
Colin Buchanan gave an update on progress made by the Short Life
Working Group. The Chair confirmed that he was struggling to get
Community Councils within the locality to engage.  He advised that he
would contact each Community Council again and invite them to a
TEAMS meeting later in the month. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the contents of the update. 
(Reference: Verbal Update from Chair of the Oban, Lorn and the Isles
Area Community Planning Group, 13 August 2025) 
(b) Opportunity for Verbal Updates on Community Based Initiatives 
Andy MacPherson advised the group that his post, ACT Climate Project
Manager, had been extended to July 2026 with the emphasis on working
with Communities. Mr Macpherson confirmed that he is looking to build
Community Resilience across Argyll and Bute and will be exploring
options to establish pilot groups within each of the administrative areas. 
Mr MacPherson further advised that there will be a meeting of Tiree
Integrated on 26th August; he will be meeting with the Oban Climate Café
on 27th August to discuss flooding, where communities can help
themselves. 
(Reference: Presentation by Andy Macpherson, ACT Climate Project
Manager dated 12 August 2025, submitted) 
Page 16

Page 17

8. COMMUNITY FOCUS - ARDCHATTAN CENTRE 
The Group heard a presentation from Deirdre MacKenna, a Trustee of the
Ardchattan Centre, who advised that the Centre was previously the local primary
school that was bought out by the Community.  The focus of the Trustees is
developing community, social and cultural wealth; the programme of events
organised by the Trustees and Community Groups are reinstating of the ferry to
Taynuilt to reunite the communities; guided walks; seasonal events within the centre;
courses in arts and crafts; playgroup, coffee/tea/cake mornings/afternoons; learning
about the local flora and fauna; wellbeing; cinema nights, games nights and craft
fayres. Trustees are currently working with the Council’s Development Officer on
developing a Strategic plan; place partnership plan; capital plan; commercial income
and a programme of funding.   
Decision 
The Oban, Lorn and the Isles Area Community Planning Group noted the
presentation, which will be distributed to all the partners with the minutes. 
(Reference: Presentation by Deirdre MacKenna, The Ardchattan Centre, dated 13
August 2025) 
9. PARTNERS UPDATE 
(a) Police Scotland Update 
There was no one in attendance from Police Scotland to speak to the
report highlighting Police Scotland’s priorities for the Oban, Lorn and Isles
area which covered serious and organised crime; crimes of theft and
dishonesty; road safety and road crime; violent crime and public
protection. 
Partners were encouraged to send questions pertaining to the update, to
the Committee Manager who would forward them to the Police Scotland
for a response. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group noted the
report. 
(Reference: Report by Police Scotland, dated August 2025, submitted) 
(b) Scottish Fire and Rescue Update 
The Group gave consideration to a report highlighting the Scottish Fire
and Rescue Service’s (SFRS) FQ1 review of local performance across
Oban, Lorn and the Isles for the period April to June 2025. The report
gave a breakdown of the 77 incidents within that period for fires and
special incidents. 
Mr Curran also gave a presentation in respect of the Service Delivery
Page 17

Page 18

advising that the public consultation runs until September. Following the
closure of the public consultation the responses will be reviewed with a
decision being made at the Scottish Fire and Rescue Board meeting in
December.  Partners are encouraged to share and respond to the
consultation. 
There was a discussion surrounding the recruitment and training of
volunteer fire fighters, and the need for them to be away from home and
their main place of work for 4 days.  Mr Curran advised that the Modular
Task and Task Management had arranged training to take place at local
stations, which was exclusive to Argyll and Bute. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
considered and noted the contents of the report. 
(Reference: Report by Scottish Fire and Rescue Service dated April to
June 2025, submitted and Service Review Presentation, dated August
2025) 
(c) Argyll and Bute Health and Social Care Partnership Update 
Consideration was given to an update from Argyll and Bute Health and
Social Care Partnership’s Public Health Team which included information
on Community Link Workers; Community Link Working – remote and
island evaluation; Suicide Prevention Training; Argyll and Bute Living Well
– Art of Hosting at the Living Well Programme; launch of Population
Health Framework and Working Well with Communities Update. 
Partners were encouraged to send questions pertaining to the update, to
the Committee Manager who would forward them to the Health and Social
Care Partnership for a response. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group noted the
information provided. 
(Reference: Report by Health Improvement Lead, Argyll and Bute Health
and Social Care Partnership, dated August 2025, submitted) 
(d) Argyll and Bute Third Sector Interface (TSI) Update 
Consideration was given to an update from Argyll and Bute TSI. The
update provided information on the Scottish Government, TSI landscape
and policy activity; public service reform and population health; work of
the wellbeing development manager; ABTSI strategy review 2026-2031;
and the Communities Mental Health and Wellbeing Fund;   
Decision 
The Oban, Lorn and the Isles Area Community Planning Group
Page 18

Page 19

considered and noted the information provided. 
(Reference: Report by Argyll and Bute TSI, dated August 2025,
submitted) 
(e) Health and Wellbeing Network Update 
An update was received from the Oban, Lorn and the Islands Health and
Wellbeing Network which highlighted information on the next Health and
Wellbeing Meeting which will be held on 4th September from 10.30am –
12.30pm; Funding has been applied for from the Supporting Communities
Fund and if successful this will allow events to be organised for 2026 and
face to face meetings in Oba and that there is a webinar scheduled for
21st August in respect of the digital switchover. 
Decision 
The Oban, Lorn and the Isles Area Community Planning Group noted the
update. 
(Reference:  report by the Health and Wellbeing Network, dated August
2025, submitted) 
(f) Opportunity for verbal updates by Community Planning Partners 
North Argyll Carers 
Judith Hawcroft advised the Group on the various groups available
through the North Argyll Carers, including the bereavement group and
primary and secondary after school groups;  activities provided for adult
carers and young carers; a consultation is open until the end of August in
relation to Fair Access to Care and a public meeting is scheduled for 19th
August at Fuiran Gaelic Centre in Corran Halls. 
Crossroads 
Joan Best advised there will be a lot of pressure on unpaid carers if care
package support is to be reduced and that funding is becoming more
difficult to obtain. Joan advised that Crossroads have 28 staff and are
providing 350 hours respite care and there is a waiting list for Oban, Mull
and Tiree for support. 
Connecting Communities Collective 
Aideen Shields gave an update on the Re-Store Shop in George Street,
Oban which has been providing workshops, reusing upcycled materials
and delivering  food rescue provision. Aideen confirmed that a
development trust has been established to organise a community buy out
of the building and that the trust will be holding a meeting in Rockfield
Centre on 28th August from 7pm-9pm to discuss the buyout. On 18th
October there is a table top event of children’s toys and preparation is
underway for next year’s fashion show in April 2026.  Anyone wishing to
contact or ask questions can do so on hello@obancollective.org 
Page 19

Page 20

10. DATE OF NEXT MEETING - WEDNESDAY 12 NOVEMBER 2025 
The date of the next meeting is scheduled for Wednesday, 12th November 2025 and
will be held by Microsoft Teams. 
Page 20

Page 21

Page 21
Agenda Item
5

Page 22

Page 22

Page 23

Page 23

Page 24

Page 24

Page 25

Page 25

Page 26

Page 26

Page 27

Page 27

Page 28

Page 28

Page 29

Page 29

Page 30

Page 30

Page 31

ARGYLL AND BUTE COUNCIL     OBAN, LORN AND THE ISLES AREA         
COMMITTEE                                                 
CUSTOMER SUPPORT SERVICES          10 SEPTEMBER 2025 
AREA COMMITTEE QUARTERLY PERFORMANCE REPORTS – FQ1 2025/26 
1.0 EXECUTIVE SUMMARY 
Performance data is recorded and reported quarterly for each Council department as
well as for the Council as a whole. Each of the Council’s four administrative areas is
represented by an Area Committee. The performance information presented to these
committees is tailored to address topics of particular relevance and importance to the
respective area. 
Area committee are requested to note and consider the performance and supporting
commentary as presented. 
Page 31 Agenda Item 6

Page 32

ARGYLL AND BUTE COUNCIL  OBAN, LORN AND THE ISLES AREA
COMMITTEE 
CUSTOMER SUPPORT SERVICES        10 SEPTEMBER 2025 
AREA COMMITTEE QUARTERLY PERFORMANCE REPORTS – FQ1 2025-26 
2.0 INTRODUCTION 
2.1 This paper presents the Area Performance Report for Financial Quarter 1 2025/26
(April – June 2025) and illustrates the agreed performance measures. 
3.0 RECOMMENDATIONS 
3.1 It is recommended that the Area Committee –
a) Notes and considers the performance and supporting commentary as
presented. 
4.0 DETAIL
4.1 This paper presents the Area Performance Report for Financial Quarter 1
2025/26 (April – June 2025) and illustrates the agreed performance measures.
4.2 The features of the Performance Report are as follows: -
 Indicators are grouped by Corporate Outcome.
 The data table for each indicator is colour coded to identify the level of
reporting.
o Area level measures are blue
o Council level measures are grey
o COI measures are white 
 Each indicator details the
o Target, Actual and Performance status (Green / Red / No Target) for
the current and four previous financial quarters.
o Commentary for the current financial quarter only.
o Narrative explaining the performance trend e.g. This indicator is
above Target and performance has improved since the last reporting
period.
Page 32

Page 33

o Where appropriate a Performance Trend Line has been added.
o The name of the Responsible Officer.
o Where possible performance is presented at both Area and Council
level. 
4.3 The commentary for each indicator helps ‘Tell Our Story’ and enables Elected
Members to put the performance data into perspective and understand if an issue
is local in nature or should be escalated up to a Strategic Committee. 
4.4 As part of our improvements to performance reporting and making best use of the
digital technology available to us, the information contained in this report is also
available in your online scorecard which can be accessed via the Members area
on The Hub. If support is required to navigate the online scorecard, please
contact lorna.gillies@argyll-bute.gov.uk
4.5 To improve the response to performance queries, it is requested that should there
be any queries that either the Responsible Person or Kay Owen are contacted.
This should enable some queries being resolved or clarified prior to the Area
Committee meeting and therefore being carried forward as Actions at a
subsequent meeting 
5.0 CONCLUSION
5.1 Area Committee are asked to note and consider the performance and
supporting commentary as presented. 
6.0 IMPLICATIONS 
6.1 Policy     All of the indicators in this report are based on 
agreed Council policy. 
6.2 Financial    All indicators with financial implications are actively     
managed through agreed budget monitoring 
processes. 
6.3 Legal All appropriate legal implications are complied
with. 
6.4 HR    All HR implications are actively managed 
through agreed Wellbeing and Management 
monitoring processes.
6.5 Customer Service   All activities with customer feedback or insight are     
rigorously monitored for improvement.
6.6 Risk    Without this information Elected Members are less     
informed of activities within their area
Page 33

Page 34

6.7 Climate Change   The Council is committed to working towards net     
zero. 
6.8 Fairer Scotland Duty  None arising directly from this report. An IIA is not
required for performance reporting. 
6.9 Equalities -protected
characteristics  None arising directly from this report. All activities
monitored in this report comply with the council’s
equality policies and obligations. An IIA is not
required for performance reporting. 
6.10 Consumer Duty None arising directly from this report. An IIA is not
required for performance reporting. 
6.11 Island Communities None arising directly from this report. An IIA is not
required for performance reporting. 
6.12 Children’s Rights and 
Wellbeing  None arising directly from this report. An IIA is not
required for performance reporting. This report
highlights examples of how the Council is
committed to and working towards reducing child
poverty and improving outcomes for every child. 
Kirsty Flanagan 
Executive Director  
12th August 2025 
For further information contact:  
Jane Fowler 
Head of Customer Support Services 
APPENDICES 
Appendix 1 FQ1 2025/26 All Areas Performance Report 
Page 34

Page 35

#
Indicator Responsible Person Reported Page
COI - Maximise distribution of Scottish Welfare Fund Fergus Walker A&B only 3
COI - Percentage of clients satisfied that they are better able to deal with their financial problems following
our support and intervention Lee Roberts A&B only 4
Number of parking penalty notices issued Hugh O'Neill Area 5
Car parking income to date (cumulative) Hugh O'Neill Area 6 - 7
Number of dog fouling complaints Tom Murphy Area 8
COI - Increase the percentage of our care experienced young people that have the recommended additional
tracking and monitoring plans in place Louise Chisholm A&B only 9
COI - Provide quality meals within cost margins to all pupils Christine Boyle A&B only 10
Maximise the percentage of 16-19 year olds participating in education, training or employment Jennifer Crocket Area 11
2025/26 FQ1 Oban, Lorn and the Isles Performance Report
The information presented is a summary of the agreed measures.
Unless stated otherwise, performance is presented at both Area and Council-wide levels.
The measure shows the performance against target for the current previous three reporting periods with an explanation of performance trend.
Where appropriate a trend line has been added to illustrate movement in 'Actual' over the reporting period.
Corporate Outcome: People live active, healthier and happier lives
Corporate Outcome: People live in safer and stronger communities
Corporate Outcome: Children and young people have the best possible start
Corporate Outcome: Education, skills and training maximises opportunities for all
Page 35

Page 36

#
Indicator Responsible Person Reported Page
Number of affordable social sector new builds completed per annum Kelly Ferns Area 12
Percentage of pre-planning application enquiries processed within 20 working days Peter Bain Area 13 - 14
Average number of weeks to determine householder planning applications Peter Bain Area 15 - 16
Number of empty properties Jonathan Welch Area 17
COI - Number of new homeless applicants who required temporary accommodation this period Morven Macintyre A&B only 18
COI - Maintain the percentage of local suppliers that benefit from the award of contracts via the procurement
portal Anne MacColl-Smith A&B only 19
COI - Increase the number of community benefits that are delivered through contracts we award locally Anne MacColl-Smith A&B only 20
Percentage of street lighting faults repaired within 10 days Tom Murphy Area 21
Number of waste collection complaints Tom Murphy Area 22 - 23
COI (part) - Percentage of waste recycled, composted and recovered John Blake Area 24 - 25
COI - Number of tonnes of waste sent to landfill John Blake A&B only 26
COI - LEAMS (Local Environment Audit and Management System) Tom Murphy Area 27 - 28
COI - Teacher sickness absence Jennifer Crocket (B&C and MAKI)
Wendy Brownlie (H&L and OLI) Area 29
COI - LGE staff (including non-Teacher) sickness absence Carolyn Cairns Area 30
COI - Increase the percentage of all self-service automated contacts Robert Miller A&B only 31
Corporate Outcome: We have an infrastructure that supports sustainable growth
Corporate Outcome: Making it happen
Corporate Outcome: Our economy is diverse and thriving
Page 36

Page 37

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 A&B 95.3% 119.0% 23.7% Green - Actual
exceeds Target
In FQ1 2025/26, we received a total of 510 applications to the Scottish Welfare Fund, comprising 347 Crisis Grant applications
and 163 Community Care Grant applications. We made 312 awards in total to the value of £135,819. 227 Crisis Grant awards
and 85 Community Care Grant awards reflecting a 13% increase compared to the same period last year. Our allocated budget
from the Scottish Government for 2025/26 is £458,284. Our expenditure of £135,819 at the end of FQ1 is £21,249 above the
profiled budget for the quarter. This higher spend indicates the growing pressure on the fund and highlights the ongoing
importance of the Scottish Welfare Fund in providing vital support to individuals and families facing financial hardship. The
Council currently provides support for both medium and high priority cases under SWF and DHP. This is subject to ongoing
review, and should circumstances require a recommendation will be made to restrict support to high-priority cases only.
Period Actual FQ4 Commentary
2024/25 FQ1 94.0%
2024/25 FQ2 72.9%
2024/25 FQ3 79.7%
2024/25 FQ4 119.8%
2025/26 FQ1 119.0%
Corporate Outcome - People live active, healthier and happier lives
COI - Maximise distribution of Scottish Welfare Fund
Responsible Person: Fergus Walker
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ1 exceeds the target however performance has decreased since the last reporting period.
Actual trend line
The Scottish Welfare Fund has continued to provide vital support to vulnerable households across our community during
2024/25. Despite significant budgetary pressures, we maintained a strong focus on delivering high-quality, needs-based
assistance through both Crisis Grants and Community Care Grants. A total of 1,134 households were supported, enabling
individuals to remain safely in their communities and avoid crisis situations. Managing the fund within a constrained budget
was a key challenge. While additional Council funding was required early in the year due to a projected overspend, prudent
financial management and effective prioritisation reduced the actual draw on Council resources to £90,000. A one-off
additional allocation from the Scottish Government in January 2025, although unused during the year, highlighted the
inadequacy of the initial funding and has been carried forward to support demand in 2025/26. Overall, the service has
performed strongly under pressure, maintaining a high standard of delivery and responsiveness.
3
Page 37

Page 38

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 A&B 100% 100% 0% Green - Actual
meets Target
This is a voluntary survey with no obligation for clients to respond either in full or in part. It is also common for incomplete
returns to be received. In FQ1 2025/26, 7 survey forms were distributed to clients. 7 were returned. Of these 7 returns, 6
responded to the question relating to being better able to deal with their financial problems. Of these 6 respondents, 5
responded positively, whilst 0 responded negatively. Accordingly, 100% of clients that responded were positive about their
experience i.e. no negative comments or responses were reported.
Period Actual FQ4 Commentary
2024/25 FQ1 100%
2024/25 FQ2 100%
2024/25 FQ3 100%
2024/25 FQ4 100%
2025/26 FQ1 100%
Actual trend line
This is a voluntary survey with no obligation for clients to respond either in full or in part. It is also common for incomplete
returns to be received. In FQ4 2024/25, 11 survey forms were distributed to clients. 10 were returned. Of these 10 returns, 7
responded to the question relating to being better able to deal with their financial problems. Of these 7 respondents, 7
responded positively, whilst 0 responded negatively. Accordingly, 100% of clients that responded were positive about their
experience i.e. no negative comments or responses were reported.
Corporate Outcome - People live active, healthier and happier lives
COI - Percentage of clients satisfied that they are better able to deal with their financial problems following our support and intervention
Responsible Person: Lee Roberts
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ1 meets the target with no change in performance since the last reporting period.
4
Page 38

Page 39

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 OLI No Target 686 N/A N/A Slightly higher than previous FQ1. This is due to the periods of good weather which tend to encourage greater visitor numbers
in and around Oban, longside the impact of the enforcement of the pavement parking prohibitions.
Period Actual FQ4 Commentary
2024/25 FQ1 527
2024/25 FQ2 603
2024/25 FQ3 402
2024/25 FQ4 490
2025/26 FQ1 686
2025/26 FQ1 A&B No Target 2,536 N/A N/A Numbers tracking higher than previous FQ1.  Impacted by both the period of good weather and the introduction of the
pavement parking prohibitions.
Period Actual FQ4 Commentary
2024/25 FQ1 1,763
2024/25 FQ2 2,302
2024/25 FQ3 968
2024/25 FQ4 1,253
2025/26 FQ1 2,536
This indicator for FQ1 shows the number of parking penalty notices has increased since the last reporting period.
Actual trend line
No particular issues in area although Oban town centre lining continues to deteriorate. Transport (Scotland) Act prohibitions
(pavement parking, dropped kerb and double parking) enforcement began on March 3rd.
Corporate Outcome - People live in safer and stronger communities
Number of parking penalty notices issued
Responsible Person: Hugh O'Neill
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ1 shows the number of parking penalty notices has increased since the last reporting period.
Actual trend line
Recruitment and training of two new Amenity Wardens has resulted in them beginning enforcement through the quarter in
MAKI and H&L, tempered by loss of Warden in H&L area. Transport (Scotland) Act prohibitions (pavement parking, dropped
kerb and double parking) enforcement began on March 3rd.
5
Page 39

Page 40

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 OLI £190,631 £190,248 -£383 Red - Actual
below Target Despite target being rasied compared to previous FQ1, target has been largely met (99.8% achieved).
Period Target Actual FQ4 Commentary
2024/25 FQ1 £135,968 £170,527
2024/25 FQ2 £374,563 £418,913
2024/25 FQ3 £534,793 £582,699
2024/25 FQ4 £613,041 £661,959
2025/26 FQ1 £190,631 £190,248
£14,397
£27,883
£9,198
£3,310
£61,264
£9,612
£2,408
£7,300
£6,211
£7,998
£23,816
£3,482
£943
£1,022
£11,404
£190,248
Corporate Outcome - People live in safer and stronger communities
Car parking income to date (cumulative)
Responsible Person: Hugh O'Neill
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ1 shows the cumulative amount of income is lower than the cumulative target.
Actual trend line
There is no trend as this data is
cumulative as of FQ1 each financial year.
Over-recovery over the full year. The success of OLI as a destination clearly having a significant impact on parking income.
Albany Street, Oban
Oban
Tweedale Street, Oban
Market Street, Oban
Esplanade, Oban
Craignure, Mull
Income Collected During FQ1
Corran No.1, Oban
North Pier, Oban
Corran No.2 Oban
Longsdale, Oban
Non-trunk, Oban
Lochavullin, Oban
Ganavan, Oban
Trunk, Oban
Fionnphort, Mull
Total
6
Page 40

Page 41

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 A&B £309,143 £309,660 £517 Green - Actual
exceeds Target Despite target being rasied compared to previous FQ1, target has been met (over 100% achieved).
Period Target Actual FQ4 Commentary
2024/25 FQ1 £220,210 £247,216
2024/25 FQ2 £594,132 £639,207
2024/25 FQ3 £832,042 £887,707
2024/25 FQ4 £963,049 £1,011,360
2025/26 FQ1 £309,143 £309,660
Car parking income to date (cumulative)
Responsible Person: Hugh O'Neill
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ1 shows the cumulative amount of income has exceeded the cumulative target.
Actual trend line
There is no trend as this data is
cumulative as of FQ1 each financial year.
Income has exceeded forecast. This may be due to focussed enforcement within the areas by the wardens, including the two
new wardens, in combination of the new machines allowing multiple payment modes.
Corporate Outcome - People live in safer and stronger communities
7
Page 41

Page 42

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 OLI No Target 10 N/A N/A 10 dog fouling complaints were received this quarter for the OLI area, there were no complaints received for the Isle of Mull.
Period Actual FQ4 Commentary
2024/25 FQ1 8
2024/25 FQ2 4
2024/25 FQ3 9
2024/25 FQ4 14
2025/26 FQ1 10
2025/26 FQ1 A&B No Target 44 N/A N/A The number of dog fouling complaints have dropped significantly this quarter compared to last. The Warden service will
continue to monitor and patrol when time allows.
Period Actual FQ4 Commentary
2024/25 FQ1 57
2024/25 FQ2 33
2024/25 FQ3 65
2024/25 FQ4 75
2025/26 FQ1 44
This indicator for FQ1 shows the number of dog fouling complaints has decreased since the last reporting period.
Corporate Outcome - People live in safer and stronger communities
Number of dog fouling complaints
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
Actual trend line
A total of 14 dog fouling complaints were made this quarter for the OLI area, 13 being received for Lorn and 1 for Mull.
This indicator for FQ1 shows the number of dog fouling complaints has decreased since the last reporting period.
Actual trend line
Unfortunately the number of dog fouling complaints has risen this quarter with 75 received in total. It is hoped that over the
next quarter this number will fall. The Warden service will, when time allows. continue to monitor.
8
Page 42

Page 43

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 A&B 100% 100% 0% Green - Actual
meets Target
Each care experienced child and young person (CECYP) enrolled in an authority school has tracking and monitoring in place via
our education management system, known as Seemis. Data collected includes attendance, exclusions, progress and
attainment and wellbeing information. The Virtual School adds an additional layer of scrutiny to this process through a series
of attainment meets and partnership working, helping to ensure our CECYP have the supports required. Our bespoke care
experience application testing phase will begin in the new academic year. We continue to work with partner agencies and
other local authorities to support our CECYP hosted out with Argyll and Bute.
Period Actual FQ4 Commentary
2024/25 FQ1 100%
2024/25 FQ2 100%
2024/25 FQ3 100%
2024/25 FQ4 100%
2025/26 FQ1 100%
Actual trend line
Each care experienced child and young person (CECYP) enrolled in an authority school has tracking and monitoring in place via
our education management system, known as Seemis. Data collected includes attendance, exclusions, progress and
attainment and wellbeing information. We work alongside schools and partner agencies to ensure care experienced status is
accurate, ensuring our CECYP have additional supports in place via the Virtual School and wider agencies as appropriate. Our
bespoke care experience application which will further enhance our monitoring for our CECYP is currently in the final stage
before testing phase begins. We continue to work with partner agencies and other local authorities to support CECYP hosted
out with Argyll and Bute.
Corporate Outcome - Children and young people have the best possible start
COI - Increase the percentage of our care experienced young people that have the recommended additional tracking and monitoring plans in place
Responsible Person: Louise Lawson
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ1 meets the target with no change in performance since the last reporting period.
9
Page 43

Page 44

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 A&B +/-5.00% 3% 2% Green - Actual
exceeds Target
We will continue to monitor schools not achieving the +/-5% target.
B&C 5.18%, H&L 3.04%, MAKI -1.67, OLI 7.57%
Period Actual FQ4 Commentary
2024/25 FQ1 0.48%
2024/25 FQ2 -1.37%
2024/25 FQ3 0.14%
2024/25 FQ4 -2.25%
2025/26 FQ1 3.17%
Corporate Outcome - Children and young people have the best possible start
COI - Provide quality meals within cost margins to all pupils
Responsible Person: Christine Boyle
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ1 within the +/5.00% variance and performance has increased since the last reporting period.
Actual trend line
We will continue to monitor schools that are not achieving the +/- 5% target.
B&C 3.93%, H&L -4.48%, MAKI -7.51%, OLI 1.09%
10
Page 44

Page 45

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 OLI 94.00% 95.28% 1.28% Green - Actual
exceeds Target
As of 2nd July 2025 the participation figure (16–19-year-olds in employment, training or education) in Oban, Lorn and the Isles
was 1089 young people, which equates to 95.28%. This is 1.28% above the target and 0.98% above the annual Argyll and Bute
participation figure of 94.3% which was released by Skills Development Scotland at the end of August 2024. The participation
figure of 95.28% for FQ1 of 2025/26 is an increase of 1.88% on the participation figure for FQ4 of 2024/25, and represents an
decrease of 0.29% on the equivalent FQ1 figure from 2024/25.
Period Actual FQ4 Commentary
2024/25 FQ1 95.57%
2024/25 FQ2 96.14%
2024/25 FQ3 95.07%
2024/25 FQ4 93.40%
2025/26 FQ1 95.28%
2025/26 FQ1 A&B 94.00% 94.71% 0.71% Green - Actual
exceeds Target
As of 2nd July 2025 the participation figure (16–19-year-olds in employment, training or education) across the whole of Argyll
and Bute was 4175 young people, which equates to 94.71%. This is 0.71% above the target and 0.41% above the annual Argyll
and Bute participation figure of 94.3% which was released by Skills Development Scotland at the end of August 2024. The
participation figure of 94.71% for FQ1 of 2025/26 is an increase of 1.21% on the participation figure for FQ4 of 2024/25, and
represents an decrease of 0.28% on the equivalent FQ1 figure from 2024/25.
Period Actual FQ4 Commentary
2024/25 FQ1 94.99%
2024/25 FQ2 95.80%
2024/25 FQ3 94.19%
2024/25 FQ4 93.50%
2025/26 FQ1 94.71%
This indicator for FQ1 exceeds the target and performance has increased since the last reporting period.
Corporate Outcome - Our economy is diverse and thriving
Maximise the percentage of 16-19 year olds participating in education, training or employment
Responsible Person: Jennifer Crocket
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
Actual trend line
As of 11th April 2025 the participation figure (16–19-year-olds in employment, training or education) across the whole of
Argyll and Bute was 3408 young people, which equates to 93.50%. This is 0.5% below  the target and 0.8% below the annual
Argyll and Bute participation figure of 94.3% which was released by Skills Development Scotland at the end of August 2024.
The participation figure of 93.50% for FQ4 of 2024/25 is a decrease of 0.69% on the participation figure for FQ3 of 2024/25.
Actual trend line
As of 11th April 2025 the participation figure (16–19-year-olds in employment, training or education) in Oban, Lorn and the
Isles was 906 young people, which equates to 93.40%. This is 0.6% belowthe target and 0.9% below the annual Argyll and Bute
participation figure of 94.3% which was released by Skills Development Scotland at the end of August 2024. The participation
figure of 93.40% for FQ4 of 2024/25 is a decrease of 1.67% on the participation figure for FQ3 of 2024/25.
This indicator for FQ1 exceeds the target and performance has increased since the last reporting period.
11
Page 45

Page 46

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 OLI 0 0 0 Green - Actual
meets Target No completions FQ1.
Period Actual FQ4 Commentary
2024/25 FQ1 0
2024/25 FQ2 6
2024/25 FQ3 0
2024/25 FQ4 1
2025/26 FQ1 0
2025/26 FQ1 A&B 0 0 0 Green - Actual
meets Target No completions in FQ1. There are some projects on site to complete later in year.
Period Actual FQ4 Commentary
2024/25 FQ1 12
2024/25 FQ2 26
2024/25 FQ3 6
2024/25 FQ4 9
2025/26 FQ1 0
Corporate Outcome - Our economy is diverse and thriving
This indicator for FQ1 meets the target however performance has decreased since the last reporting period.
Actual trend line
West Highland Housing Assoication completed new supply open market purchase of property in Kilmelford.
Number of affordable social sector new builds completed per annum
Responsible Person: Kelly Ferns
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ1 meets the target however performance has decreased since the last reporting period.
Actual trend line
There was no Strategic Housing Investment Plan (SHIP) completions in FQ4, however West Highland Housing Association
(WHHA) concluded on new supply open market purchase in Kilmelford which increases supply of affordable housing. There
has been delays to West Highland Housing Association  developments at Port Charlotte (phase 1) and Imerval (Phase 5) on
Islay due to issues with bringing hot tar to the Island to complete roads, bad weather, ferry disruption  and issues with
Scottish Southern Energy Networks. 
12
Page 46

Page 47

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 OLI 75.0% 100.0% 25.0% Green - Actual
exceeds Target
Performance across the Development Management Service is still being recovered and impacted upon by the management of
a significant backlog of casework. Overall output and performance across the service is improving as staff resource issues have
been resolved. However, timeliness measures continue to be adversely impacted through the prioritisation of older statutory
'legacy' casework for determination. The target for the handling of pre-application enquiries has been set to 30 days although
this change has not yet been reflected in the format of corporate reporting. During FQ1 39 pre-applications were responded
to within Oban, Lorn and the Isles. All were issued within 20 days. The performance of the OLI team in regularly exceeding the
performance target is commendable.
Period Actual FQ4 Commentary
2024/25 FQ1 87.5%
2024/25 FQ2 84.6%
2024/25 FQ3 84.2%
2024/25 FQ4 83.3%
2025/26 FQ1 100.0%
This indicator for FQ1 exceeds the target and performance has increased since the last reporting period.
Corporate Outcome - Our economy is diverse and thriving
Percentage of pre-planning application enquiries processed within 20 working days
Responsible Person: Peter Bain
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
Actual trend line
Performance across the Development Management Service is still being recovered and impacted upon by the management of
a significant backlog of casework. Overall output and performance across the service is improving as staff resource issues have
been resolved. However, timeliness measures continue to be adversely impacted through the prioritisation of older statutory
'legacy' casework for determination. The target for the handling of pre-application enquiries has been set to 30 days although
this change has not yet been reflected in the format of corporate reporting. During FQ4 42 pre-applications were responded
to within Oban, Lorn and the Isles. 35 responses (83.3%) were issued within 20 days; 41 responses (98%) were issued within
the revised target of 30 days. The performance of the OLI team in regularly exceeding the performance target is
commendable.
13
Page 47

Page 48

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 A&B 75.0% 63.5% -11.5% Red - Actual
below Target
Performance across the Development Management Service is still being recovered and impacted upon by the management of
a significant backlog of casework. Overall output and performance across the service is improving as staff resource issues have
been resolved. However, timeliness measures continue to be adversely impacted through the prioritisation of older statutory
'legacy' casework for determination. The target for the handling of pre-application enquiries has been set to 30 days although
this change has not yet been reflected in the format of corporate reporting. During FQ1 137 pre-applications were responded
to across Argyll and Bute. 87 responses (63.5%) were issued within 20 days; 93 responses (67.9%) were issued within the
revised target of 30 days.
Period Actual FQ4 Commentary
2024/25 FQ1 49.5%
2024/25 FQ2 49.2%
2024/25 FQ3 48.3%
2024/25 FQ4 58.5%
2025/26 FQ1 63.5%
Actual trend line
Performance across the Development Management Service is still being recovered and impacted upon by the management of
a significant backlog of casework. Overall output and performance across the service is improving as staff resource issues have
been resolved. However, timeliness measures continue to be adversely impacted through the prioritisation of older statutory
'legacy' casework for determination. The target for the handling of pre-application enquiries has been set to 30 days although
this change has not yet been reflected in the format of corporate reporting. During FQ4 118 pre-applications were responded
to across Argyll and Bute. 69 responses (58.5%) were issued within 20 days; 75 responses (64.1%) were issued within the
revised target of 30 days.
This indicator for FQ1 is lower than the target however performance has increased since the last reporting period.
Corporate Outcome - Our economy is diverse and thriving
Percentage of pre-planning application enquiries processed within 20 working days
Responsible Person: Peter Bain
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
14
Page 48

Page 49

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 OLI 8.0 5.9 -2.1 Green - Actual
below Target
Performance across the Development Management Service has been impacted by a significant backlog of casework. Whilst
issues relating to staff resource availability have been resolved and output has significantly improved it is highlighted that
KPI's measuring average time taken remain adversely affected by the resolution of increasing volumes of 'legacy' casework.
The Council's target for 'householder' applications has been revised to 10 weeks although this is not yet reflected in the
format of corporate reports. During FQ1 only a handful of 'householder' 'legacy' items remained, this has resulted in a general
improvement across this particular performance measure. During FQ1 15 'householder' applications were determined in
Oban, Lorn and the Isles, none of which were 'legacy' items. This is reflected in the excellent performance reported for this
period.
Period Actual FQ4 Commentary
2024/25 FQ1 7.9
2024/25 FQ2 6.1
2024/25 FQ3 7.5
2024/25 FQ4 7.9
2025/26 FQ1 5.9
This indicator for FQ1 is lower than the target however performance has increased since the last reporting period.
Actual trend line
Performance across the Development Management Service has been impacted by a significant backlog of casework. Whilst
issues relating to staff resource availability have been resolved and output has significantly improved it is highlighted that
KPI's measuring average time taken remain adversely affected by the resolution of increasing volumes of 'legacy' casework.
The Council's target for 'householder' applications has been revised to 10 weeks although this is not yet reflected in the
format of corporate reports. During FQ4 only a handful of 'householder' 'legacy' items remained, this has resulted in a general
improvement across this particular performance measure. During FQ4 19 'householder' applications were determined in
Oban, Lorn and the Isles and did not include any 'legacy' items and is reflected in the excellent performance reported for this
period.
Corporate Outcome - Our economy is diverse and thriving
Average number of weeks to determine householder planning applications
Responsible Person: Peter Bain
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
15
Page 49

Page 50

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 A&B 8.0 10.4 2.4 Red - Actual
exceeds Target
Performance across the Development Management Service has been impacted by a significant backlog of casework. Whilst
issues relating to staff resource availability have been resolved and output has significantly improved it is highlighted that
KPI's measuring average time taken remain adversely affected by the resolution of increasing volumes of 'legacy' casework.
The Council's target for 'householder' applications has been revised to 10 weeks although this is not yet reflected in the
format of corporate reports. During FQ1 only a handful of 'householder' 'legacy' items remained, this has resulted in a general
improvement across this particular performance measure. During FQ1 62 'householder' applications were determined across
Argyll and Bute including 3 'legacy' items and is reflected in the significant improvement in performance reported for this
period. Excluding 'legacy' items, the remaining 59 applications were determined within an average time of 8.1 weeks.
Period Actual FQ4 Commentary
2024/25 FQ1 16.1
2024/25 FQ2 26.1
2024/25 FQ3 15.9
2024/25 FQ4 14.2
2025/26 FQ1 10.4
Corporate Outcome - Our economy is diverse and thriving
Average number of weeks to determine householder planning applications
Responsible Person: Peter Bain
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ1 exceeds the target however performance has increased since the last reporting period.
Actual trend line
Performance across the Development Management Service has been impacted by a significant backlog of casework. Whilst
issues relating to staff resource availability have been resolved and output has significantly improved it is highlighted that
KPI's measuring average time taken remain adversely affected by the resolution of increasing volumes of 'legacy' casework.
The Council's target for 'householder' applications has been revised to 10 weeks although this is not yet reflected in the
format of corporate reports. During FQ4 only a handful of 'householder' 'legacy' items remained, this has resulted in a general
improvement across this particular performance measure. During FQ4 68 'householder' applications were determined across
Argyll and Bute including 8 'legacy' items and is reflected in the significant improvement in performance reported for this
period. Excluding 'legacy' items, the remaining 60 applications were determined within an average time of 9.9 weeks.
16
Page 50

Page 51

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 OLI 59 60 1 Red - Actual
exceeds Baseline
OLI's 'empty' vacancy rate is 2.24%. Since the Empty Business Property Grant Scheme was approved in June 2025, no Empty
Business Property Grants have been approved. However, Empty Property Officer has helped facilitate contacts or sign-post
enquiries without further intervention. There are 2 x live enquiries/projects which involve proposals for properties to be
converted to residential. This is a priority for the local area so grant applications are being supported. Work is ongoing to
explore methods to monitor 'demand' in our town centres as that data is vital to regeneration and socio-economic
development.
Period Actual FQ4 Commentary
2024/25 FQ1 -
2024/25 FQ2 -
2024/25 FQ3 -
2024/25 FQ4 -
2025/26 FQ1 60
2025/26 FQ1 A&B 277 276 -1 Green - Actual
below Baseline
A&Bs 'empty' vacancy rate is currently 3.37%. Although the measure against baseline is positive, this % does represent a
slightly higher figure (0.5%) versus historic analysis. The suite of empty business property policy changes implemented by the
council are positive and the market is responding to the new extended property relief and the business grant scheme. The role
of town centres is multi-faceted so they are impacted by many externalities. These can be an acute in rural economies already
facing challenges with depopulation, declining workforce, accessibility and macro-economic factors. Ongoing work is required
to diagnose the issues currently affecting each of our town centres, and provide a framework of approaches/interventions to
support their revival.
Period Actual FQ4 Commentary
2024/25 FQ1 -
2024/25 FQ2 -
2024/25 FQ3 -
2024/25 FQ4 -
2025/26 FQ1 276
Corporate Outcome - Our economy is diverse and thriving
Reduction in number of empty properties
Responsible Person: Jonathan Welch
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ1 shows the cumulative number of empty properties has exceeded the baseline.
Actual trend line
-
This indicator for FQ1 shows the cumulative number of empty properties is lower than the baseline.
Actual trend line
-
17
Page 51

Page 52

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 A&B No Target 27 N/A N/A
During FQ1, the housing service took 110 homeless applications and provided temporary accommodation for 27 new
homeless households.
B&C: Out of 26 Homeless Applications, 8 new households went in to temporary accommodation (4 x Serviced
Accommodation, 1 x Bed & Breakfast, 2 x Registered Social Landlord, 1 Private Sector Lease).
H&L: Out of 36 Applications, 8 new households went in to temporary accommodation (3 x Serviced Accommodation, 4 x Bed
& Breakfast, 1 x Private Sector Lease).
MAKI: Out of 31 Homeless Applications, 5 new households went in to temporary accommodation (3 x Private Sector Lease, 1 x
Serviced Accommodation 1 x Supported Accommodation).
OLI: Out of 17 Homeless Applications, 6 new households went in to temporary accommodation (5 x Supported
Accommodation, 1 x Serviced Accommodation).
Period Actual FQ4 Commentary
2024/25 FQ1 26
2024/25 FQ2 40
2024/25 FQ3 27
2024/25 FQ4 30
2025/26 FQ1 27
Corporate Outcome - Our economy is diverse and thriving
COI - Number of new homeless applicants who required temporary accommodation this period
Responsible Person: Morven Macintyre
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ1 shows the number of applicants has decreased since the last reporting period.
Actual trend line
During FQ4, the housing service took 108 homeless applications and provided temporary accommodation for 30 new
homeless households.
B&C: Out of 28 Homeless Applications, 10 new households went in to temporary accommodation (4 x Serviced
Accommodation, 4 x Bed & Breakfast, 2 Private Sector Lease).
H&L: Out of 30 Applications, 8 new households went in to temporary accommodation (1 x Serviced Accommodation, 7 x Bed
& Breakfast).
MAKI: Out of 31 Homeless Applications, 4 new households went in to temporary accommodation (4 x Private Sector Lease).
OLI: Out of 19 Homeless Applications, 8 new households went in to temporary accommodation (3 x Supported
Accommodation, 1 x Private Sector Lease, 1 x Registered Social Landlord, 3 x Bed & Breakfast).
Please note:
•  The Registered Social Landlord and Private Rented Sector properties are leased by the Council and sub-let to homeless households as temporary accommodation.
•  Serviced Accommodation is available in Cowal and Helensburgh and is for single people providing an en-suite bedroom and shared kitchen facilities.
• Supported accommodation is provided in Lorn by Blue Triangle Housing Association.
•  Emergency accommodation may on occasion be provided out with the location of the original presentation due to the pressure on the availability of temporary accommodation
18
Page 52

Page 53

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 A&B 20.0% 0.0%  FQ1 data expected from Spikes Cavell (Scottish Government data base) in mid September.
Period Actual FQ4 Commentary
2024/25 FQ1 36.0%
2024/25 FQ2 10.5%
2024/25 FQ3 23.6%
2024/25 FQ4 15.2%
2025/26 FQ1
COI - Maintain the percentage of local suppliers that benefit from the award of contracts via the procurement portal
Responsible Person: Anne MacColl-Smith
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for...
Actual trend line
FQ4 - 15.2%. There were 66 tender/quick quote contract awards during FQ4. 10 were awarded to local suppliers, with a total
estimated value of £78k. From the 66 awards, only 15 received local bids. The nature of the types of contracts awarded can
impact on submission of local bidders. The % of tenders won by a local supplier, where a local supplier placed a bid during FQ4
was 66.7%.
Corporate Outcome - Our economy is diverse and thriving
19
Page 53

Page 54

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 A&B No Target 0 N/A N/A The number of achieved community benefits during FQ1 was 37.
Period Actual FQ4 Commentary
2024/25 FQ1 -
2024/25 FQ2 31
2024/25 FQ3 -
2024/25 FQ4 44
2025/26 FQ1
Actual trend line
The number of achieved community benefits during FQ3 and FQ4 is 44. Showing an increase from the previous year.
Corporate Outcome - Our economy is diverse and thriving
COI - Increase the number of community benefits that are delivered through contracts we award locally
Responsible Person: Anne MacColl-Smith
This indicator is a Corporate Outcome Indicator that is reported in FQ2 and FQ4. The performance presented is Council-wide only.
This indicator for...
20
Page 54

Page 55

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 OLI 75% 83% 8% Green - Actual
exceeds Target
Performance has been good as it is the lighter months and works can be inspected and fixed in a timely manner. Works can
also be planned around contractual works which also helps with the timescales of attendance.
Period Actual FQ4 Commentary
2024/25 FQ1 81%
2024/25 FQ2 96%
2024/25 FQ3 97%
2024/25 FQ4 98%
2025/26 FQ1 83%
2025/26 FQ1 A&B 75% 90% 15% Green - Actual
exceeds Target
Performace has improved, however we are still requiring some contractor assistance especially in the Helensburgh area, some
requiring Scottish Powers attendance along with the support of civil contractors. We hope to have these works carried out
prior to the clocks changing.
Period Actual FQ4 Commentary
2024/25 FQ1 93%
2024/25 FQ2 97%
2024/25 FQ3 92%
2024/25 FQ4 92%
2025/26 FQ1 90%
This indicator for FQ1 exceeds the target however performance has decreased since the last reporting period.
Actual trend line
Performance is good and exceeding the target.
Corporate Outcome - We have an infrastructure that supports sustainable growth
Percentage of street lighting faults repaired within 10 days
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ1 exceeds the target however performance has decreased since the last reporting period.
Actual trend line
Performance has improved in 3 of the 4 geographical settings. A number of cable faults and works requiring contractor or
power company assistance in Lomond is reflected in this quarter's figures. These works take time to program and deliver. All
Areas appear to benefiting from the street lighting Capital Program Works which are improving reliability of lighting in areas
that were previously experiencing a higher number of faults.
21
Page 55

Page 56

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 Lorn No Target 4 N/A N/A Lorn received 4 waste collection complaints this quarter.
Period Actual FQ4 Commentary
2024/25 FQ1 7
2024/25 FQ2 4
2024/25 FQ3 3
2024/25 FQ4 6
2025/26 FQ1 4
2025/26 FQ1 Mull No Target 0 N/A N/A There were no waste collection complaints received on the Isle of Mull.
Period Actual FQ4 Commentary
2024/25 FQ1 2
2024/25 FQ2 0
2024/25 FQ3 0
2024/25 FQ4 0
2025/26 FQ1 0
Corporate Outcome - We have an infrastructure that supports sustainable growth
Number of waste collection complaints
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ1 shows the number of waste collection complaints has remained the same since the last reporting period.
Actual trend line
There were no waste collection complaints received for the Isle of Mull this month, showing excellent service by our team on
the Island.
This indicator for FQ1 shows the number of waste collection complaints has decreased since the last reporting period.
Actual trend line
Lorn received 6 waste complaints for the months January, February, March.
22
Page 56

Page 57

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 A&B No Target 34 N/A N/A
A total of 34 waste collection complaints were received this quarter for the whole of Argyll and Bute. The Isles of Mull and
Bute received no waste collection complaints this quarter which shows the waste teams on the islands are delivering a high
level of service.  In the Helensburgh and Lomond area there are 12,437 properties from which refuse is collected, quarterly
this equates to residual 49,748, recycling 74,622, food waste 149,244 and glass 37,311 giving a total of 310,925 bins collected
per quarter.  The number of complaints made as a percentage of the bins collected equates to 0.0067%.
Period Actual FQ4 Commentary
2024/25 FQ1 38
2024/25 FQ2 26
2024/25 FQ3 36
2024/25 FQ4 31
2025/26 FQ1 34
Corporate Outcome - We have an infrastructure that supports sustainable growth
Number of waste collection complaints
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ1 shows the number of waste collection complaints has increased since the last reporting period.
Actual trend line
In total 31 waste collection complaints were received for the whole of Argyll and Bute. Again the majority of the complaints
were received in Helensburgh, due to vehicle breakdowns and resources. The waste team continue to deliver a very high level
of service across the whole area.
23
Page 57

Page 58

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 A&B 45.0% 66.6% 21.6% Green - Actual
exceeds Target
66.6% recycling,composting and recovery (39.3% recycling and composting plus 27.3% recovery). Recovery percentage is high
mainly due to Helensburgh and Lomond residual waste going for refuse derived fuel (RDF)/energy from waste (EFW).
Recycling and composting are slighter higher than previous quarter mainly due to increased levels of green garden waste sent
for composting.
Period Actual FQ4 Commentary
2024/25 FQ1 68.4%
2024/25 FQ2 70.5%
2024/25 FQ3 65.4%
2024/25 FQ4 63.2%
2025/26 FQ1 66.6%
2025/26 FQ1 Renewi No Target 51.5% N/A N/A 51.5% recycling,composting and recovery (34.6% recycling and composting plus 16.9% recovery). Recycling and composting
are slighter higher than previous quarter mainly due to the increased levels of green garden waste sent for composting .
Period Actual FQ4 Commentary
2024/25 FQ1 56.2%
2024/25 FQ2 61.3%
2024/25 FQ3 52.4%
2024/25 FQ4 46.8%
2025/26 FQ1 51.5%
Actual trend line
63.2% recycling, composting and recovery (35.9% recycling/composting plus 27.3% recovery). Recovery percentage high
mainly due to Helensburgh and Lomond residual waste going for refuse derived fuel/energy from waste.
Recycling/composting slightly lower as reduced garden waste tonnages sent for composting during winter months. 2024/25
financial year overall figures are 67.2% recycling, composting and recovery (40.3% recycling/composting plus 26.9% recovery)
which is an improvement on previous f/year which was 58.2% .
This indicator for FQ1 shows the percentage of waste recycled has increased since the last reporting period.
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - Percentage of waste recycled, composted and recovered
Responsible Person: John Blake
This indicator is reported quarterly. The performance presented is by Council-wide service provision.
This indicator for FQ1 exceeds the target and performance has increased since the last reporting period.
Actual trend line
46.8% recycling, composting and recovery (31.5% recycling/composting plus 15.3% recovery). Recycling/composting slightly
lower as reduced garden waste tonnages sent for composting during winter months. 2024/25 financial year overall figures are
54.9% recycling, composting and recovery (38.5% recycling/composting plus 16.4% recovery).
24
Page 58

Page 59

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 Islands No Target 52.5% N/A N/A 52.5% recycling,composting and recovery (42.5% recycling and composting plus 10.0% recovery). Recycling and composting
are slighter higher than previous quarter mainly due to the increased levels of green garden waste sent for composting .
Period Actual FQ4 Commentary
2024/25 FQ1 45.8%
2024/25 FQ2 51.8%
2024/25 FQ3 44.2%
2024/25 FQ4 49.2%
2025/26 FQ1 52.5%
2025/26 FQ1 H&L No Target 100.0% N/A N/A
100% recycling,composting and recovery (46.9% recycling and composting plus 53.1% recovery). Recovery percentage is high
mainly due to Helensburgh and Lomond residual waste going for refuse derived fuel (RDF)/energy from waste (EFW).
Recycling and composting slighter higher than previous quarter mainly due to increased levels of green garden waste sent for
composting.
Period Actual FQ4 Commentary
2024/25 FQ1 100.0%
2024/25 FQ2 100.0%
2024/25 FQ3 100.0%
2024/25 FQ4 100.0%
2025/26 FQ1 100.0%
This indicator for FQ1 shows the percentage of waste recycled has increased since the last reporting period.
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - Percentage of waste recycled, composted and recovered
Responsible Person: John Blake
This indicator is reported quarterly. The performance presented is by Council-wide service provision.
Actual trend line
100% recycling, composting and recovery (43.7% recycling/composting plus 56.3% recovery). Recovery percentage high mainly
due to Helensburgh and Lomond residual waste going for refuse derived fuel/energy from waste. Recycling/composting
slightly lower than in spring/summer as reduced garden waste tonnages sent for composting during winter months. 24/25
financial year overall figures are 100% recycling, composting and recovery (45.1% recycling/composting plus 54.9% recovery).
Actual trend line
49.2% recycling, composting and recovery (38.7% recycling/composting plus 10.5% recovery). 2024/25 financial year overall
figures are 48.1% recycling, composting and recovery (37.3% recycling/composting plus 10.8% recovery).
This indicator for FQ1 shows the percentage of waste recycled has remained the same since the last reporting period.
25
Page 59

Page 60

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 A&B 5,850 3,267 -2,583 Green - Actual
below Target
Well within landfill target mainly due to Helensburgh and Lomond residual general waste going for refuse derived fuel
(RDF)/energy from waste (EFW).
Period Target Actual FQ4 Commentary
2024/25 FQ1 5,850 3,200
2024/25 FQ2 5,550 3,225
2024/25 FQ3 5,100 2,846
2024/25 FQ4 5,000 3,103
2025/26 FQ1 5,850 3,267
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - Number of tonnes of waste sent to landfill
Responsible Person: John Blake
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ1 is lower than the target (lowest is best).
Actual trend line
Well within landfill limit target mainly due to Helensburgh and Lomond residual waste going for refuse derived fuel/energy
from waste.
26
Page 60

Page 61

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 Lorn 73 84 11 Green - Actual
exceeds Target The Lorn area has been well maintained  this quarter showing an overall figure of 84, which exceeds the actual target.
Period Actual FQ4 Commentary
2024/25 FQ1 89
2024/25 FQ2 87
2024/25 FQ3 88
2024/25 FQ4 81
2025/26 FQ1 84
2025/26 FQ1 Mull 73 96 23 Green - Actual
exceeds Target The Isle of Mull continues to deliver a high score of 96  for street cleanliness, which exceeds the actual target.
Period Actual FQ4 Commentary
2024/25 FQ1 93
2024/25 FQ2 94
2024/25 FQ3 96
2024/25 FQ4 96
2025/26 FQ1 96
This indicator for FQ1 exceeds the target and performance has increased since the last reporting period.
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - LEAMS (Local Environment Audit and Management System)
Responsible Person: Tom Murphy
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
Actual trend line
The LEAMS scores for the Isle of Mull for this quarter show, January 96, February 95 and March 96, this is excellent to see the
high standards being kept.
Actual trend line
The teams again are proving that the Lorn area may only show small amounts of detritus, litter etc with a score of 81 for the
months of January, February and March.
This indicator for FQ1 exceeds the target with no change in performance since the last reporting period.
27
Page 61

Page 62

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 A&B 73 84 11 Green - Actual
exceeds Target
A street cleanliness score of 84 has been achieved for the whole of Argyll and Bute this quarter, which shows the street
cleanliness remains high on both the mainland and Islands. These figures show very little litter visible on the streets and or
open spaces checked. This high score reflects well on the teams who are providing a good service, by ensuring they work
efficiently and effectively to keep the areas clean.
Period Actual FQ4 Commentary
2024/25 FQ1 84
2024/25 FQ2 85
2024/25 FQ3 84
2024/25 FQ4 83
2025/26 FQ1 84
January, February and March figures show that again this quarter the street cleanliness across the whole of Argyll and Bute
remains high. These figures show very little or no litter visible in the streets and or open spaces checked. This high score
reflects well on the teams on the islands and mainland who are providing a good service by ensuring they work efficiently and
effectively to keep the areas clean.
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ1 exceeds the target and performance has increased since the last reporting period.
Corporate Outcome - We have an infrastructure that supports sustainable growth
COI - LEAMS (Local Environment Audit and Management System)
Responsible Person: Tom Murphy
Actual trend line
28
Page 62

Page 63

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 OLI No Target 1.92 N/A N/A Reduction in working days lost this quarter from previous, as well as a slight reduction from the data in the same quarter last
year.
Period Actual FQ4 Commentary
2024/25 FQ1 2.11
2024/25 FQ2 1.96
2024/25 FQ3 2.87
2024/25 FQ4 2.75
2025/26 FQ1 1.92
2025/26 FQ1 A&B No Target 2.49 N/A N/A
Slight increase from last quarter and from the same quarter, last year. The HR&OD team continue to monitor absence, with
targeted work aiming to improve this. They are also preparing to review the Supporting Attendance at Work procedures in
the next 12 months.
Period Actual FQ4 Commentary
2024/25 FQ1 2.14
2024/25 FQ2 1.77
2024/25 FQ3 2.89
2024/25 FQ4 3.23
2025/26 FQ1 2.49
Work days lost has increased by 0.41 of a day on the same quarter last year and has increased by 0.34 of a day from the
previous quarter.
This indicator for FQ1 shows the number of sickness absence days has decreased since the last reporting period.
Actual trend line
Work days lost has remained the same as  a day on the same quarter last year and has decreased by 0.12 of a day from the
previous quarter.
Corporate Outcome - Making it happen
COI - Teacher sickness absence
Responsible Person: Jennifer Crocket (B&C and MAKI) / Wendy Brownlie (H&L and OLI)
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
This indicator for FQ1 shows the number of sickness absence days has decreased since the last reporting period.
Actual trend line
29
Page 63

Page 64

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 OLI No Target 3.70 N/A N/A Reduction in working days lost this quarter. The figure is further reduced from reporting figures from the same quarter, last
year.
Period Acutal FQ4 Commentary
2024/25 FQ1 4.19
2024/25 FQ2 3.85
2024/25 FQ3 4.53
2024/25 FQ4 4.31
2025/26 FQ1 3.70
2025/26 FQ1 A&B No Target 4.08 N/A N/A
Slight reduction overall. However, there is still an increase from the same quarter last year.  The HR&OD team continue to
monitor absence, with targeted work aiming to improve this. They are also preparing to review the Supporting Attendance at
Work procedures in the next 12 months.
Period Actual FQ4 Commentary
2024/25 FQ1 3.85
2024/25 FQ2 3.43
2024/25 FQ3 4.40
2024/25 FQ4 4.66
2025/26 FQ1 4.08
Actual trend line
Work days lost has increased by 0.54 of a day on the same quarter last year and has increased by 0.26 of a day from the
previous quarter.
Actual trend line
Work days lost has decreased by 0.45 of a day on the same quarter last year and has decreasedby 0.22 of a day from the
previous quarter.
This indicator for FQ1 shows the number of sickness absence days has decreased since the last reporting period.
This indicator for FQ1 shows the number of sickness absence days has decreased since the last reporting period.
Corporate Outcome - Making it happen
COI - LGE staff (including non-Teacher) sickness absence
Responsible Person: Carolyn Cairns
This indicator is reported quarterly. The performance presented is at area level and Council-wide.
30
Page 64

Page 65

Period Area Target Actual Variance Status FQ1 Commentary
2025/26 FQ1 A&B 70.0% 76.1% 6.1% Green - Actual
exceeds Target
In FQ1 2025/26 there were 40,513 customer transactions dealt with by Customer Service Agents (23.9%) and
129,292 were automated/self-service transactions (76.1%) so the 70.0% target was substantially bettered. This
was also better than the same quarter of 2024/25, where 71.7% of transactions were handled through
automation/self-service.
Period Actual FQ4 Commentary
2024/25 FQ1 71.6%
2024/25 FQ2 72.7%
2024/25 FQ3 82.7%
2024/25 FQ4 74.8%
2025/26 FQ1 76.1%
Actual trend line
In FQ4 there were 39,517 customer transactions dealt with by Customer Service Agents (25.2%) and 117,568 were automated
or self-service transactions (74.8%) so the 70.0% target was substantially bettered. 
Corporate Outcome - Making it happen
COI - Increase the percentage of all self-service automated contacts
Responsible Person: Robert Miller
This indicator is a Corporate Outcome Indicator that is reported quarterly. The performance presented is Council-wide only.
This indicator for FQ1 exceeds the target and performance has increased since the last reporting period.
31
Page 65

Page 66

This page is intentionally left blank

Page 67

ARGYLL AND BUTE COUNCIL                                    OBAN, LORN AND THE ISLES
AREA COMMITTEE                                                                                                         
ROADS AND INFRASTRUCTURE                  10 SEPTEMBER 2025
SERVICES                     
ROADS AND INFRASTRUCTURE SERVICES UPDATE 
1.0 INTRODUCTION 
1.1 A Roads and Infrastructure standing report was a fixture on Area Committee
agendas throughout the life of the last Council. In the first two rounds of Area
Committee meetings in the new Council feedback was sought on the value of
these updates, and their format and frequency. Generally Members felt having a
standard item was beneficial and it was acknowledged that the Roads and
Infrastructure weekly briefings issued to all members each Friday afternoon
provide for the main sources of live information on current activities. On top of
these briefings there is a bank of resources on the new Member Zone system
which include the weekly briefings, subject specific briefings, ad hoc short
briefings on issues, relevant previous committee reports, operational service
procedures, legislation and Council policies. 
1.2 In the last Council the purpose of these reports was to provide an update on
service activities but since weekly briefings these have largely superseded the
original stated purpose of these reports. 
1.3 On the basis of the above this new format has been agreed through the
December 2022 round of area committees for this standing item. This format
removes duplication for Officers and rather links to existing published
information, with additional updates only in the body of the reports if these are
specifically requested/noted from previous meetings. The report remains as a
standing item and continues to provide the opportunity for Officer engagement at
the committee meetings.   
2.0 RECOMMENDATIONS 
It is recommended that the Area Committee: 
2.1 Note and consider the contents of this report. 
3.0 DETAIL 
3.1 Roads and Infrastructure Services provides Members with weekly briefings on
topical service activities which are all available here.  
Page 67 Agenda Item 7

Page 68

3.2 As part of the resources on the new Member Zone system there are various key
documents available in an online library here. 
3.3 There are also additional online resources covering the streetlighting, footway,
surface dressing and roads reconstruction programmes available on the website
here. 
4.0 CONCLUSION 
4.1 This report provides links to existing published information on service activities
and provides for the opportunity for officer attendance and engagement at
committee meetings. 
5.0 IMPLICATIONS 
5.1 Policy – Roads and Infrastructure work to a number of agreed policies across
the range of service areas. 
5.2 Financial – revenue and capital budgets are in place to deliver projects and
cyclic work. 
5.3  Legal – Roads and Infrastructure Services work to a number of different pieces
of legislation such as the Roads Scotland Act 1984 and the Environmental
Protection Act 1990. 
5.4  HR – none known. 
5.5  Customer Service – none known. 
5.6. Risk – risk managed through toolbox talks, safety briefings and where
appropriate risk registers – all of the above are monitored through the RIS
leadership and management teams. 
5.7  Climate Change - due regard will be given to climate change with a view to
minimising any climate change impact and these are considered as and when
they arise. 
5.8  Fairer Scotland Duty – none known. 
5.9  Equalities - protected characteristics – where appropriate EqSEIAs will be
carried out to identify any implications. 
5.10  Consumer Duty – where appropriate EqSEIAs will be carried out to identify any
implications. 
5.11    Islands – where appropriate Island impacts assessments will be carried out to
identify any implications.
Page 68

Page 69

5.12    Children’s Rights and Wellbeing – none known. 
Executive Director with responsibility for Roads and Infrastructure Services,
Kirsty Flanagan 
Policy Lead for Roads, Transport and Amenity Services, Councillor John
Armour 
11 August 2025 
For further information contact: 
Andy Summers, Head of Roads and Infrastructure Services 
andrew.summers@argyll-bute.gov.uk 
Mark Calder, Project Manager 
mark.calder@argyll-bute.gov.uk 
Page 69

Page 70

This page is intentionally left blank

Page 71

ARGYLL AND BUTE COUNCIL  OBAN, LORN AND THE ISLES
AREA COMMITTEE 
ROADS AND INFRASTRUCTURE
SERVICES 
10 SEPTEMBER 2025 
RECYCLING AND RECOVERY PERFORMANCE 
1.0 EXECUTIVE SUMMARY 
1.1 Argyll and Bute Council is both a waste collection and waste disposal authority. 
1.2 Waste disposal is dealt with by 3 separate models across the council as follows: 
• Island sites e.g. on Mull and Islay where landfill sites are operated directly
by the council;
• Helensburgh and Lomond area where waste is disposed of at sites outside
of Argyll and Bute;
• A 25 year (2001 – 2026) Waste PPP contract which covers the rest of
Argyll and Bute. 
1.3 Waste figures for these 3 waste disposal areas have been summarised within
this report.  Due to the way the reporting is carried out it is not possible to
accurately break down the information on an administrative area by area
basis for all data.  
1.4 National policy decisions, guidance and regulations e.g. relating to the
Biodegradable Municipal Waste landfill ban will have a significant impact on
future recycling, composting and recovery performance. 
1.5 It is recommended that Members note and give consideration to the details as
outlined in this report and the national policy drivers that will likely impact over
the coming years. 
Page 71 Agenda Item 8

Page 72

ARGYLL AND BUTE COUNCIL  OBAN, LORN AND THE ISLES
AREA COMMITTEE 
ROADS AND INFRASTRUCTURE
SERVICES 
10 SEPTEMBER 2025 
RECYCLING AND RECOVERY PERFORMANCE 
2.0 INTRODUCTION 
2.1 Argyll and Bute Council is both a waste collection and waste disposal authority. 
Recycling, composting and recovery (i.e. other landfill diversion) statistics are
reported quarterly within the council’s performance management system. 
Statutory returns to SEPA e.g. licensed site tonnage, landfill tax and waste data
flow vary from quarterly to annual. 
2.2 This report provides details on the council’s recycling and recovery landfill
diversion performance along with national policy, targets and regulations which
are likely to impact on future performance. 
3.0 RECOMMENDATIONS 
3.1 It is recommended that Members note and give consideration to the details as
outlined in this report and the national policy drivers that will likely impact over
the coming years. 
4.0 DETAILS 
4.1 The council’s waste strategy was approved by the Environment, Development
and Infrastructure Committee in September 2019. Whilst this strategy will
emerge in line with government guidance, regulation, legislation, and contractual
requirements, the Strategy is predicated on the model shown below in Figure 1. 
Page 72

Page 73

4.2 Argyll and Bute Council operates a performance management system. 
Quarterly recycling/composting, recovery and landfill percentages are included
split between the Islands waste disposal sites, Waste Management PPP and
Helensburgh/Lomond areas.  These details include: 
• percentage of waste recycled and composted;
• percentage of waste recovered e.g. other landfill diversion;
• combined percentage of waste recycled, composted and recovered; 
• percentage of waste to landfill; 
• tonnes of biodegradable municipal waste to landfill. 
Percentages Summary of Landfill, Recycling, Composting and Recovery
2023 and 2024 
2023 2024
Argyll & Bute
wide
% of waste recycled, composted and
recovered
53.0% 69.8%
% waste recycled and composted 43.3% 42.3%
% waste recovered 9.7% 27.5%
% waste landfilled 47.0% 30.2%
Tonnes of municipal waste to landfill 30,872 18,791    
Waste PPP % of waste recycled, composted and 61.2% 59.6%
Page 73

Page 74

recovered
% waste recycled and composted 46.0% 42.2%
% waste recovered 15.2% 17.4%
% waste landfilled 38.8% 40.4%    
Helensburgh &
Lomond
% of waste recycled, composted and
recovered
39.5% 100%
% waste recycled and composted 39.3% 44.1%
% waste recovered 0.2% 55.9%
% waste landfilled 60.5% 0%    
Islands
% of waste recycled, composted and
recovered
36.3% 48.5%
% waste recycled and composted 36.3% 38.0%
% waste recovered 0% 10.5 %
% waste landfilled 63.7% 51.5% 
4.3 Some points to note are as follows: 
• There was a slight overall reduction in recycling performance in 2024
which was mainly due to a significant amount of stockpiled soils and rubble
tonnages being recycled by Biffa from the PPP area in 2023 compared to
lower stockpiles of such materials in 2024. 
• There was a significant overall increase in recovery performance in 2024
compared to 2023. This was mainly due to the fact that all the general
residual waste from the Helensburgh and Lomond area in 2024 went for
refuse derived fuel (RDF) / energy from waste (EFW) whereas in 2023 this
had all been sent to landfill. 
• The increase in recovery performance was also partly due to Tiree and
Coll’s general residual waste going for refuse derived fuel (RDF) / energy
from waste (EFW) using the same contractors as used for Helensburgh
and Lomond. 
• The overall combined recycled, composted and recovery rate increased
from 53% in 2023 to 69.8% in 2024.  This is mainly due to the increased
recovery in the Helensburgh and Lomond area described in the second
bullet point above. 
Page 74

Page 75

• The recovery in the Waste PPP area is carried out by Biffa mainly through
residual waste mechanical biological treatment plants based at their waste
facilities near Oban, Dunoon and Lochgilphead. In 2024 Biffa sent some
residual bulky waste items i.e. waste upholstered domestic seating
(WUDS) to an energy from waste (EFW) plant as required by SEPA’s
statutory guidance. Waste sent for energy from waste is also classed as
recovery. 
• The recovery in the Helensburgh and Lomond area was carried out via
new waste disposal contracts with waste contractors from the
Renfrewshire area i.e. Enva (Linwood) and J&M Murdoch (Paisley)
following the closure of the Barr Environmental Landfill at Auchencarroch,
near Alexandria. Since January 2024, Helensburgh and Lomond’s general
waste has been going for refuse derived fuel (RDF)/energy from waste
instead of landfill which has seen a significant increase in recovery
tonnages for 2024. 
• Cardboard is consistently the most prominent recycling material in the blue
recycling bin (previously paper which was the highest proportion pre
pandemic). The on-going significant cardboard proportion in recent years is
likely due to significant levels of on-line purchasing while newspapers are
not as widely purchased in hard copy compared to previous years. 
• The overall percentage of waste to landfill in 2024 (30.2%) was a
significantly lower percentage than 2023 (40.7%) which was mainly due to
the much increased recovery levels in the Helensburgh and Lomond area. 
• The tonnage of municipal waste to landfill, in 2024 decreased as a result
from 30,872 tonnes in 2023 to 18,791 tonnes in 2024. 
• Recycling and composting is mainly from recycling collections to
households and businesses, bring sites and segregated wastes from
recycling/civic amenity sites. Recovery is predominantly moisture/process
loss and compost like output from mixed waste treatment plants operated
by Biffa and refuse derived fuel (RDF) / energy from waste (EFW) from
Helensburgh and Lomond’s general waste. In addition there was also
recovery from waste upholstered domestic seating (WUDS) items as they
have to be sent for high temperature incineration in line with SEPA
guidance, which was introduced in October 2023. 
• SEPA published annual recycling, recovery and landfill data for local
authorities focuses mainly on recycling/composting from household waste
and less on recovery in line with the waste hierarchy. 
Landfill Ban 
4.4 The Waste (Scotland) Regulations were introduced by the Scottish Government
in 2012 and included a landfill ban of biodegradable municipal waste initially
from 2021.
Page 75

Page 76

4.5 The landfill ban was subsequently delayed by The Scottish Government until the
1st of January 2026.  An update report on the Landfill Ban was included in the
June 2025 Environment, Development and Infrastructure Committee. 
Deposit Return Scheme (DRS) 
4.6 The UK Government have indicated a planned start date of October 2027 for a
UK wide deposit return scheme, however the Welsh Government have indicated
that they will not take part in the UK wide scheme as it does not include glass
and they intend to introduce their own scheme. 
4.7 A UK wide DRS scheme may result in an overall increase in recycling including
other environmental benefits e.g. current non-recyclers may use the scheme
plus there should be much less littering of such items. The scheme may
however see a slight reduction in Council recycling performance if plastic drinks
bottles and cans are no longer handled by Council recycling collections, albeit
they should still be recycled in future via the UK wide DRS scheme. 
Scottish Government Circular Economy Bill 
4.8 The Scottish Government in 2024 published details of its Circular Economy Bill
which was subsequently passed by the Scottish Parliament. Further details on
the Circular Economy Bill have been and will be reported at future ED&I
Committees as they progress. Some of the main proposals which relate to local
authorities recycling are as follows: 
• A Duty of Care on households regarding their waste and recycling with
new powers given to local authorities for the issuing of fixed penalties to
enforce this.
• Local Authorities will be required to comply with a statutory code of
practice on recycling. This co-design process involves Local Authorities
and the statutory code of practice is expected to be published by The
Scottish Government sometime during 2026. 
• The Scottish Government will have the powers to set mandatory recycling
targets on Local Authorities from 2030 onwards.           
5.0 CONCLUSION 
5.1 Progress was made on overall recycling, composting and recovery performance
during 2024. Recovery performance increased which resulted in significantly
reduced tonnages to landfill in 2024. National Policy drivers such as the
upcoming ban on municipal waste to landfill, the deposit return scheme and the
circular economy bill will have significant implications for future recycling,
composting and recovery performance. 
6.0 IMPLICATIONS 
Page 76

Page 77

6.1 Policy National policies and regulations will likely impact
on future recycling, composting and recovery
performance. The council’s policy is to reduce
landfill.   
6.2 Financial  Compliance with the landfill ban from end of
2025 has financial implications for the Council.
An update report was included in the June 25
ED&I Committee.   
6.3 Legal The landfill ban is a legal requirement under the
Waste (Scotland) Regulations 2012. Other legal
requirements may likely result following The
Scottish Government Circular Economy Bill e.g.
statutory code of practice for recycling.   
6.4 HR None known 
6.5 Customer Service  None known.
6.6 Risk  Risks to the council on the landfill ban and any
other future statutory requirements are mainly
financial. A future UK wide deposit return
scheme for plastic drinks containers and cans
will hopefully have an overall environmental
benefit although it may impact on council
recycling rates. 
6.7 Climate Change The landfill ban will significantly reduce methane
gas emissions from landfill sites in Argyll and
Bute. Additional transport miles incurred taking
waste to energy from waste markets will partly
offset the carbon reductions achieved through
not landfilling. 
6.8 Fairer Scotland Duty None known. 
6.9 Equalities: Protected
Characteristics
None known.   
6.10 Customer Duty None known. 
6.11 Island Communities The landfill ban will require increased transport of
waste off the islands of Mull and Islay to the
central belt. 
6.12 Children’s Rights and
Wellbeing
None known. 
Page 77

Page 78

Executive Director with Responsibility for Roads and Infrastructure Services:
Kirsty Flanagan 
Head of Roads and Infrastructure Services: Andy Summers 
Policy Lead for Roads, Transport and Amenity Services: Councillor John Armour 
For further information contact: 
John Blake – Fleet, Waste & Transport Manager
John.Blake@argyll-bute.gov.uk 
Page 78

Page 79

ARGYLL AND BUTE COUNCIL  OBAN, LORN & THE ISLES AREA
COMMITTEE
LEGAL & REGULATORY SUPPORT 10 SEPTEMBER 2025 
APPOINTMENT TO OBAN & LORN COMMUNITY ENTERPRISE LTD (ATLANTIS
LEISURE) 
1.0 EXECUTIVE SUMMARY 
The lease arrangement with Oban & Lorn Community Enterprise Board Ltd
(OLCEB) in respect of Atlantis Leisure Centre sets out provision for two elected
member representatives to serve on the Board of Directors.  Those appointments
have previously been made by the Oban, Lorn and the Isles Area Committee with
Councillor Vennard being appointed on 13 September 2023 and Councillor Martin
being appointed on 12 June 2024.
Councillor Martin has tendered her resignation and this report invites the Oban,
Lorn and the Isles Area Committee to fill the vacancy which has arisen.
In considering the report, the committee should bear in mind that an Internal Audit
report concluded that a second elected member is required to be nominated to
ensure the Council have sufficient oversight of the operational activity of OLCEB. 
Page 79 Agenda Item 10

Page 80

ARGYLL AND BUTE COUNCIL     OBAN, LORN & THE ISLES AREA     
COMMITTEE 
LEGAL & REGULATORY SUPPORT 10 SEPTEMBER 2025 
APPOINTMENT TO OBAN & LORN COMMUNITY ENTERPRISE LTD (ATLANTIS
LEISURE) 
2.0 INTRODUCTION 
2.1 The Area Committee previously appointed Councillor Vennard and Councillor
Martin to be their representative on the Oban & Lorn Community Enterprise
Board (OLCEB) on 13 September 2023 and 12 June 2024 respectively. 
Councillor Martin has since intimated her resignation and the Area Committee is
invited to consider filling the vacancy on the board. 
3.0 RECOMMENDATIONS 
3.1 The Area Committee is invited to nominate an additional representative to serve
on the Board of Oban & Lorn Community Enterprise Ltd. 
4.0 DETAIL 
4.1 The original lease arrangement with OLCEB states that “the Landlords shall be
represented on the Board of Directors of the Tenants by no less than two
elected members of the District Council”.  While there are some modifications
over the years, and the lease has been extended, this provision remains
unchanged.  The current lease is in place until 30 September 2037. 
4.2 While the Board had indicated previously their preference to have one appointed
representative when appointments were made to outside bodies following the
last Local Government Elections in 2022 an Internal Audit report has concluded
Page 80

Page 81

that a second elected member is required to be nominated to ensure the Council
have sufficient oversight of the operational activity of OLCE.  Councillor Vennard
and subsequently Councillor Martin were appointed to fulfil this responsibility. 
5.0 CONCLUSION
5.1 This report advises the Area Committee of the current arrangements in place
regarding the lease agreement with OLCEB and invites the committee to
consider nominating a second representative to serve on the Board, following
the resignation of Councillor Martin. 
6.0 IMPLICATIONS
6.1 Policy - None
6.2 Financial - None
6.3  Legal – The lease agreement in place requires a minimum of two elected
members to serve on the Board of Directors
6.4  HR - None
6.5 Customer Service - None
6.6 Risk – Internal Audit have concluded that a second representative is required
to have sufficient oversight of operational activities
6.7 Climate Change  - None
6.8  Fairer Scotland Duty - None
6.9 Equalities - protected characteristics - None
6.10 Consumer Duty - None
6.11 Island Communities - None
6.12 Children’s Rights and Wellbeing - None 
Douglas Hendry
Executive Director with responsibility for Legal and Regulatory Support
Councillor Mark Irvine - Policy Lead for Community Planning and Corporate
Services
7 July 2025                                                  
For further information contact: Melissa Stewart, Democratic Services Manager –
Tel: 01546 604331
Page 81

Page 82

This page is intentionally left blank

Page 83

ARGYLL AND BUTE COUNCIL     OLI AREA COMMITTEE
CHIEF EXECUTIVE UNIT 10 SEPTEMBER 2025 
SUPPORTING COMMUNITIES FUND 2025/26 
1.0 EXECUTIVE SUMMARY 
1.1 The purpose of this report is to decide on the allocation of the Council’s
Supporting Communities Fund (SCF) for Oban Lorn and the Isles.
1.2  The total Supporting Communities Fund budget made available by the Council
for allocation in Oban Lorn and the Isles for distribution in 2025/26 is £22,500.
1.3 It is recommended that 16 applicants are awarded funding.
1.4 Applicants awarded funds from the Council’s SCF have 18 months in which to
spend the funds. 
Page 83 Agenda Item 11

Page 84

ARGYLL AND BUTE COUNCIL     OLI AREA COMMITTEE 
CHIEF EXECUTIVE UNIT 10 SEPTEMBER 2025 
SUPPORTING COMMUNITIES FUND 2025/26 
2.0 INTRODUCTION 
2.1 The report details recommendations for the award of the Council’s Supporting
Communities Fund (SCF). The Supporting Communities Fund budget made
available by Council in Oban Lorn and the Isles for 2025/26 is £22,500.   
2.2 Organisations applying to the fund were able to request up to £1,500. The SCF
is popular, and this year has attracted 25 applications from the Oban Lorn and
the Isles area, requesting a total of over £35,000.
2.3 Applications have been scored by the Council’s Community Development Team
against criteria set out in the  SCF Application Guidance on the councils
webpages. Projects are scored by officers, based on a scoring matrix which can
be found here. The fund is oversubscribed each year and funds are distributed
based on scores, with partial funding being awarded, where insufficient funding
remains to fully fund, and no award when no further funding is available. 
2.4 A summary of all applications is appended to this report.  16 are recommended
to be funded.   
3.0 RECOMMENDATIONS 
3.1 Members are asked to agree that the 16 applications, marked as ‘Award’ or
‘Partial Award’ within Appendix 1 are awarded funding from the Supporting
Communities Fund totalling £22,500. Detailed information about these projects is
contained within Appendix 2.   
Page 84

Page 85

Page 85

Page 86

4.0 DETAIL 
4.1 Changes to the SCF in 2025/26 include an online application form and a
reduced maximum award per project. These were implemented following a
review after last year’s round of SCF, which  included feedback from community
groups, officers and  comments from  area committees.
4.2 The SCF is assessed through a robust process which involves Community
Development Team contact with the applicant to verify any information where
required. All applicants need to provide satisfactory essential information on
governance and finance to be eligible. Scoring is based on a set of criteria outlined
in the guidance and made available on the council’s website: SCF Application
Guidance.  Applications to the fund must be for projects that come under one or
more of these categories:
• Fairer Communities – tackling poverty by sharing opportunities.   
• Resilient Communities – community capacity building/rebuilding and
repairing from a pandemic
• Greener, Cleaner Communities – environmental action to support
addressing climate change 
• Creative Communities – creativity for health and wellbeing 
4.3 Of the 25 applications received 1 was withdrawn or ineligible and of the 24
eligible applications, 20 are new applicants to the fund. 
4.4 Of the eligible applications to the SCF, 16 are recommended to be awarded
funding. 4 of these are for island based projects. The applications
recommended for funding are labelled as ‘Award’ or ‘Partial award’ in the
recommendation column in Appendix 1. The detail of the projects are in
Appendix 2. 
4.5 The projects recommended will deliver a wide range of activities from a program
of craft skills workshops for island residents to badminton tournaments for
young people. 
4.6 Unsuccessful applications are marked as ‘No award’ in Appendix 1.  These
applicants will be offered support from the Community Development Team and
provided with information on alternative sources of funding.
4.7 This year the total of £22,500 available for allocation is comprised of:
• £22,500 from the Council’s Supporting Communities Fund.
4.8  Projects awarded funding complete a report at the end to evidence the impact of
the funded project. The results of this are brought to Area Committee in Summer
2027, if not before depending on project duration. 
Page 86

Page 87

5.0 CONCLUSION
5.1 The Supporting Communities Fund application and assessment process has
been completed as set out within its guidance SCF Application Guidance  
5.2 The recommendations made fully allocate the funding available for financial year
2025/26.
5.3 The 16 projects being put forward for an award will help communities to deliver
priority activities in their area in 2025/26.
5.4 All applicants to the fund are supported throughout the process and beyond by
the Community Development Team. 
6.0 IMPLICATIONS
6.1 Policy - none
6.2 Financial: Recommendations in the report are limited to the budget allocation
available in 2024/25 for the Supporting Communities Fund in Oban Lorn and
the Isles.
6.3  Legal: Applications are initially assessed to ensure that groups are constituted
with managed accounts.
6.4  HR - none
6.5 Customer Service - none
6.6 Risk: risk to the public pound is managed through the assessment and
scoring, and through end of project monitoring process.
6.7 Climate Change - none
6.8  Fairer Scotland Duty: The Supporting Communities Fund supports community
groups in tackling poverty, reducing inequality, and building a fairer and more
inclusive Scotland.
6.9 Equalities - protected characteristics: Applicants are given the options of
receiving the application in large print and other languages and support with
online applications.
6.10 Consumer Duty - none
6.11 Island Communities: 6 of the applicant projects are island based. 4 of these
are being recommended funding.
6.12 Children’s Rights and Wellbeing - none
Page 87

Page 88

Pippa Milne
Chief Executive
Policy Lead Cllr Mark Irvine
28 July 2025                                                  
For further information contact: 
Ailie Law – Community Development Officer
Tel: 01546 604707
Email: Ailie.Law@argyll-bute.gov.uk 
Julie Fish – Community Development Officer
Tel: 01369 708669
Email: Julie.Fish2@argyll-bute.gov.uk 
Suzanne Mason- Engagement and Communities Lead
Tel. 01436 658933
Email. suzanne.mason@argyll-bute.gov.uk 
APPENDICES
Appendix 1 – Assessment and Recommendations
Appendix 2 – Project Summary Sheet
Page 88

Page 89

Appendix 1 – Assessment Score and Recommendations 
Page 89

Page 90

Appendix 2 – Project Summary Sheet         
Applications Received (in order of scoring by Community Development Officer)
For submission to Oban, Lorn and the Isles Area Committee for final decision
(maximum value £1,500).
Ref:  1
Applicant: The Ardchatten Centre
Project Summary:
Application to cover venue operating costs, advertising costs and materials; to
provide a core programme of monthly activities and events. 
Activities include popup tearoom, up-skill and exchange craft and repair classes,
new knowledge classes, walking groups, reading groups and cinema nights.
Recommendation: Award 
Ref:  2
Applicant: Oban Connecting Communities Collective/ Oban Youth Café
Project Summary:
Application to cover venue, travel, and accommodation costs to enable Oban
Connecting Communities Collective in partnership with the Health and Wellbeing
Network to hold 2 public events: 1 in Oban and 1 in Mull. 
The public events are free, aiming to bring the 57 members of the Health and
Wellbeing Network together in one place to increase the health and wellbeing of
people in the community.
Recommendation: Award 
Ref:  3
Applicant: Isle of Lismore Art Group
Project Summary:
Funding is requested to support a program of craft skills workshops at a
subsidised cost to island residents.  This will provide opportunities to learn new
craft skills associated with the island.
Funding to support venue hire, tutors, materials, and refreshments. 
The activities will include:
3 x 6 session blocks, thematic focus, led by island artists/makers 
1 x 4 session blocks, thematic focus, led by island artists/makers
2 sessions per block delivered by a guest tutor.
4 full days focused on crafts connected with the Lismore landscape.
1 showcase exhibition in the Island Hall 
Recommendation: Award 
Page 90

Page 91

Ref:  4
Applicant: Appin Community Development Trust
Project Summary:
The community transport scheme enables access to medical care, food shopping
and transportation to social events enhancing mental wellbeing and reducing the
impact of social isolation. 
Funding is requested to run a promotional campaign, including marketing materials
and venue hire for a social event to showcase the community transport scheme and
raise donations.
Recommendation: Award 
Ref:  5
Applicant: Dalmally Community Company
Project Summary:
The community website needs updating and to be running smoothly. Local people
will develop digital skills contributing to their community and for personal benefit.
The training course will be delivered in person at the community center, enabling
social interaction. 
Funding is requested for 12 training sessions with a professional website designer.
Recommendation: Award 
Ref:  6
Applicant:  Tiree Makery CIC
Project Summary:
Funding to support the project ‘Creative Connections: Art and Crafts for Wellbeing
in Later Life.’  This is a visual arts and crafts project designed to engage elderly
people living in rural remote areas. 
Funding is requested for, materials, tutor/course co-ordinator, venue hire,
advertising costs, refreshments.
The activities will include: 4 x half days workshops. 
Recommendation: Award 
Ref:  7
Applicant: Avich and Kilchrenan Community Heritables (AKCH)
Project Summary:
Website build and design to create a ‘What’s On’ calendar of events to improve
inclusion within the community with a particular focus on local walking and cycling
paths. 
The Project aims to increase the awareness of local events to help tackle social
isolation, particularly in the older generations. It would provide information on
walking and cycling paths in local area as highlighted in the Community Action
Plan.
Recommendation: Award 
Page 91

Page 92

Ref:  8
Applicant: An Iodhlann
Project Summary:
Tiree History Ceilidhs aim to create an impact, inviting presenters to perform a
spinning demonstration, create a sheep and wool guidebook, hosting crofting
conversations and archive talks, bringing the rich local Gaelic heritage to life and
reinstating the museum at the heart of the community. 
Funding is requested towards the provision of 4 events with refreshments including
the presenters' fee and transport.
Recommendation: Award 
Ref:  9
Applicant: Dalmally Primary Parent Council
Project Summary:
Funding to support the launch of a Parent Council-led afterschool gardening club,
initially for P5–P7 pupils. The club will offer weekly sessions during term time, giving
children free access to hands-on, outdoor activities focused on growing food,
learning about nature, and engaging in creative, practical tasks. 
Funding requested for plants, seeds, garden equipment, compost, craft materials
and volunteer travel expenses.
Recommendation: Award 
Ref:  10
Applicant: Oban Badminton Club
Project Summary:
The club would like to offer free badminton tournaments for young people, hosted
across the local authority area, removing barriers and increasing participation and
training volunteers to strengthen and sustain local clubs. 
Funding is requested towards the provision of venue hire, prizes, stationery and
shuttlecocks for 6 badminton tournaments.
Recommendation: Award 
Ref:  11
Applicant: Appin Agricultural Show
Project Summary:
This year the agricultural show’s focus is mental health and wellbeing within the
farming community. 
Funding is requested towards the provision of running costs of the agricultural event,
including marquee hire and purchase of tables to reduce future hire costs. 
Recommendation: Award 
Page 92

Page 93

Ref:  12
Applicant: Lismore Historical Society
Project Summary:
The wider archaeological project included a published book about the monastery
and cathedral. The archaeological discoveries boost visitors to Lismore, improving
the wellbeing of the community, raising their profile and helping secure the island’s
economic future. 
Funding is requested towards hosting an open day celebration of the archaeological
finds with an educational conference at the heritage centre to include venue hire,
advertising, travel expenses, refreshments, and publicity.
Recommendation: Award 
Ref:  13
Applicant: Oban Pride
Project Summary:
Funding is requested to support the Oban Pride festival event. Oban Pride
provides a safe space for the LGBTQ+ community to come together to talk, feel
supported, to celebrate and to promote equal rights. 
Funding is requested to support the venue hire, security, insurance costs, stage,
light and sound technicians, march band, publicity, performers, and venue
décor/signage.
The festival will include, a stall village, karaoke, music, storytelling, evening events
and Pride March.
Recommendation: Award 
Ref:  14
Applicant: Kilmelford and Kilninver Community SCIO
Project Summary:
A Christmas concert will bring people together over a wide geographical rural area
to have fun after the challenges of the pandemic, cost of living struggles and isolation
in the rural community. It will be a chance to showcase what is on offer at the hall
and opportunities to participate throughout the year. 
Funding is requested for musicians, festive food and transport to the event.
Recommendation: Award 
Ref:  15
Applicant: Spotlight Musical Theatre Group
Project Summary:
Spotlight Musical Theatre Group is looking for funding towards rental of
microphones for an upcoming production of Jack and the Beanstalk. 
Funding is requested for 1 week hire of 24 microphones and a sound technician
hire for 1 week.
Recommendation: Award 
Page 93

Page 94

Ref:  16
Applicant: Oban Bowling Club
Project Summary:
Bowling green maintenance by skilled volunteer members is needed to address the
rising costs in the use of contractors, improving playing surface quality and attract
more and diverse membership, increasing wider participation in the sport. 
Funding is requested towards the provision of 3 tons of top-dressing sand mixture;
a levelling drag mat and dressing brush tool to improve the quality of the green
playing surface. 
Recommendation: Partial award 
Ref:  17
Applicant: Police Scotland Youth Volunteers
Project Summary:
PSYV program aims to strengthen the relationship with the Police and young
people, breaking down barriers and promoting positive role models. PSYV
promotes a practical way for young people to understand policing by supporting
the Police in their local area through volunteering. 
Funding is requested to support the running of the group and the costs of uniforms
and boots.
Recommendation: No award 
Ref:  18
Applicant: Lismore Community Trust
Project Summary:
A social media presence and improved website will raise the profile of the Trust's
work including promoting opportunities to involve residents in local projects,
promoting events and providing volunteer opportunities. Electronic surveys will
gather community feedback and ideas for future projects. 
Funding is requested towards the provision of administrator time and volunteer
expenses to develop and administer existing website and social media pages.
Recommendation: No award 
Ref:  19
Applicant: Comunn Gàidhealach an Òbain (Mod Acadamaidh an Òbain)
Project Summary:
The project aims to support the development of the Gaelic language through the
teaching of songs and conversations to children. 
Funding is requested to support, tutor fees, musical admin and travel costs.
Recommendation: No award 
Page 94

Page 95

Ref:  20
Applicant: Isle of Seil Coastal Rowing Club
Project Summary:
Rowing skills, seamanship and navigation are taught in the 5-person skiff. Free or
low-cost membership benefits include exercise and mental health. 
Funding is requested towards the provision of 5 automatic lightweight rowing
lifejackets.
Recommendation: No award
Conditions: 
Ref:  21
Applicant: Oban Festival Lights
Project Summary:
Application to cover the storage of lights and insurance costs for the Oban
Christmas lights festival. This a free event in the Oban community. 
Festival activities include entertainment, food, tree lighting, reindeer, and a Santa
parade.
Recommendation: No award 
Ref:  22
Applicant: Oban Camanachd Club
Project Summary:
Oban Camanachd Club is applying for funding to support the running costs of four
community shinty teams (U14, U17, Junior, and Senior) from September 2025 to
March 2027. 
Funding is requested to support the costs of training equipment, kit, travel costs for
youth teams, hire of training facilities, Pitch hire and first aid supplies.
Recommendation: No award 
Ref:  23
Applicant: Anamcara Fas Gadh
Project Summary:
Poppy’s Place is a sanctuary offering emotional respite and compassionate
support to bereaved families, locally and from elsewhere, grieving the loss of a
baby, child, or young person. 
Funding to help subsidise short restorative breaks for families across Argyll and
Bute. These costs include cleaning, gas and electricity,
Recommendation: No award 
Page 95

Page 96

Ref:  24
Applicant: Oban Youth Shinty Club
Project Summary:
Funding is requested towards a container to store shinty equipment in a central
location to be accessed by all coaches on the days they train.
Also, towards 6 x helmets and 5 x shinty sticks to enable those with no equipment
of their own to participate. 
Recommendation: No award 
Page 96

Page 97

ARGYLL AND BUTE COUNCIL  OBAN, LORN AND THE ISLES
COMMITTEE 
CHIEF EXECUTIVES UNIT  10 September 2025   
SUPPORTING COMMUNITIES FUND - Monitoring of Projects Funded 2023/24 
1.0 EXECUTIVE SUMMARY 
1.1 The purpose of this report is to provide information on the impact and spend of
funding awarded to community projects from the council’s Supporting
Communities Fund in 2023/24. 
1.2 18 constituted, not-for-profit community organisations were awarded funding in
2023/24 from the Supporting Communities Fund.  Projects were required to
spend their funds within 18 months and to submit an end of project report
outlining the benefits of the fund to the project and providing information on any
remaining funds at end of project. 
1.3 Members are asked to consider the contents of this report which contains
highlights of the information supplied by organisations. 
1.4 Members are asked to note that no funds have been identified as remaining at
end of projects. 
Page 97 Agenda Item 12

Page 98

ARGYLL AND BUTE COUNCIL  OBAN, LORN AND THE ISLES
AREA COMMITTEE 
CHIEF EXECUTIVES UNIT  10 September 2023 
SUPPORTING COMMUNITIES FUND - Monitoring of Projects Funded 2023/24 
2.0 INTRODUCTION 
2.1 This report highlights the positive outcomes for communities in Oban,
Lorn and the Isles through the allocation of the Council’s Supporting
Communities Fund in the 2023/24 round of funding. 
2.2 A total of £28,343 (£35,843 including Levelling Up monies specifically
for climate change focused projects) was awarded to 18 organisations
in 2023/4. Organisations have 18 months to spend the funds and up to
two months from the end of the project to complete and return a project
monitoring report.   
2.3 No funds were identified as remaining at the end of projects. 
3.0 RECOMMENDATIONS 
It is recommended that the Oban, Lorn and the Isles Area Committee note: 
3.1      The positive contribution of the Supporting Communities Fund detailed
in section 4 and within the attached table. 
3.2 That no funds are due to be returned. 
4.0 DETAIL  
4.1 The funded projects supported a total of approximately 8,000 people
within Oban, Lorn and the Isles area to participate in a varied range of
of activities with many benefits including outdoor activities, sports, music
and mental health. For example: 
• Mull and Iona Community Trust - delivered a new outdoor
educational programme including reflection on emotional and practical
responses to climate change. They worked with 6 Mull primary schools.
A total of 94 school children attended both a workshop day and a
performance.  
Page 98

Page 99

• Oban Pride – hosted a monthly film showing at Phoenix cinema
providing a safe space for LGBTQ+ people and allies to come
together. 
• Ross of Mull and Iona Community Transport Scheme (RoMICTS)
- 499 Trips were undertaken, covering over 13,900 Miles.  Trips
included NHS appointments, prescription pick-ups, social trips, vet
trips and taking people to work.   
It keeps the community connected, and supports the very old, the
vulnerable and the very young. 
• Kilmore and Kilbride Public Hall Committee – improved
groundworks and appearance of the hall including installation of an
outdoor seating and garden area. 
Many of the projects supported noted increased community participation and
increased numbers of volunteers. Feedback from projects showed the benefits
experienced by particular groups in the community: 
• “…important in assisting elderly people or those with no computer access to get
involved and capture their views.”
• “…reduced the isolation and loneliness of mothers and provided stimulation
and physical activity for children…”. 
• “…a breakfast club for our children at no additional cost to parents.”
• “…generated a strong sense of community and newly found information about
the history of our area and the people who lived here.”
• “…able to run regular scheduled services… to travel for shopping, appointments
and social events which [residents] may have been unable to do if the
community bus was not there.” 
4.2 The attached table provides more detail from individual projects
funded. 
4.3 18 grant recipients have submitted an End of Project Monitoring
Report. 
4.4 No funds have been identified as remaining from the projects spend. 
Page 99

Page 100

2022/23 SCF Round of Funding
No Organisation Project Funded Award End of Project Achievements
No. of people in
communities
benefitting 
1 Argyll Wellbeing Hub 100 reduced cost CBT
therapy sessions
£2,500.00 We were able to provide 100 counselling and CBT sessions over the
6 months of our planned project. We provided 64 counselling
appointments to 4 different people and 36 CBT appointments to 4
different people.
8
2 Isle of Luing Community
Trust
an independent housing
survey for the island by
Communities Housing Trust
£2,500.00 This project expanded the number of people in the community
who got involved in progressing new housing ideas.  The key
outcome has been a joint campaign with Luing Community Council
under the banner ‘Homes For Luing’.  This has continued to
generate new ideas and links across the community to work on
option to create affordable housing.   We now have a core group of
Trust members and Community Councillors who are continuing to
work together on this project.
208
3 Kilmore and Kilbride
Public Hall Committee
Treasure away back end
March
groundworks and installation
of an outdoor seating and
garden area
£2,200.00 The improvements to the grounds and appearance of the hall has
been well appreciated by the community.
120
4 Lorn and Oban Healthy
Options
30 free creative themed
classes (art / singing / music
based) 
£2,500.00 Our goal was to provide the community with health and wellbeing
classes. During the grant term (Aug 2023 – Dec 2024) we held 1741
different classes, attended by 721 unique attendees a total of
23,571 times. Classes included movement classes, education, gym,
staff-led rewild walks and singing classes.
1361
5 Lorn Toy Library  a website with an online
booking/hiring service for
Lorn Toy Library
£2,500.00 The website development required the creation of a digital
inventory.
The inventory has helped drive toy hires, the photographs,
descriptions and the processes necessitated by
the website aid the staff with making recommendations and
providing toy bundles for other children’s
groups.
405
6 Mull and Iona Community a 2 day outdoor arts £2,500.00 We delivered a new outdoor educational programme including 124
Page 100

Page 101

2022/23 SCF Round of Funding
Trust performance delivered by
Rowanbank Environmental
Arts and Education
(rowanbank.org.uk)
reflection on our emotional and practical responses to climate
change. We worked with 6 Mull primary schools. (Iona school
intended to join in but unfortunately were prevented from
attending by cancelled ferries). During the week beginning 25th
September 2023, a total of 94 school children attended both a
workshop day and a performance day (spread across 4 days to fit
everyone in) and we held an additional performance day open to
the public which attracted 30 participants.
7 Mull and Iona Community
Trust 2
vehicle maintenance costs
and driver / vehicle permit
fees (funding is ring-fenced
for this purpose)
£2,500.00 The aim of Ulva Ferry Community Transport is to provide a
bus service to the people living in the North West of Mull to
allow them to access services such as medical care, work and
being able to go shopping. We have been able to run regular
scheduled services which allow holders of Transport Scotland
travel cards to travel for shopping, appointments and social
events which they may have been unable to do if the
community bus was not there. 
1472
8 Northwest Mull
Community Woodland
Company
cleaning and maintenance
costs of a new public toilet 
£610.96 Provide a disabled access toilet, a safe and convenient public
amenity which is also a basic necessity. Greater access to public
toilets means greater access to the community, something our
Charity promotes. Thanks to this fund we have a donation box
which helps with the running costs.
Unknown
9 Oban Mod Academy
(Comunn Gàidhealach an
Òbain )
PVG registered tutors for
reduced cost Gaelic language
and singing sessions
£2,000.00 The aims of the Project were met by tutoring over 100 children
from both Gaelic and non gaelic speaking backgrounds. The aims of
the Project are to tutor children to be able to enter both Provincial
and National Mods and to encourage them to know about their
Heritage and Culture.
104
10 Oban Pride a monthly film showing at
Phoenix cinema, costs for
venue and film licences and
additional hire for
partnership event at Corran
Halls
£2,500.00 Our project met the aims set out by Oban Pride of providing a safe
space for LGBTQ+ people and allies to come together. We met our
aims of our Film Club project by showing a series of LGBTQ+ films,
which reflected LGBTQ+ people in a positive light as well as
reflecting on the history of LGBTQ+ people and the issues faced by
LGBTQ+ people.
850
Page 101

Page 102

2022/23 SCF Round of Funding
11 Ross of Mull and Iona
Community Transport
Scheme (RoMICTS)
vehicle running costs,
namely insurance costs and
8 weekly servicing of vehicles
(funding is ring-fenced for
this purpose)
£2,500.00 499 Trips were undertaken, covering over 13,900 Miles.  Trip
included NHS appointments, prescription pick-ups, Social trips,
vets trips, taking people to work etc.   It keeps the community
connects, and supports the very old, the vulnerable, the very
young.  It allows those without transport to keep their own
independence, helps small business and works with local transport
to take people to and from Iona.
861
12 SOROBA Community
Enterprise Ltd
an amplifier and projector
for community activities,
plus costs to refurbish 6
community centre laptops
with increased memory and
relevant software
£1,030.00 We now have a very active youth club and children’s club, elderly
bingo group.   Zumba keep fit group restarting.   
68
13 Soroba Young Family
Group
extra staff hours to facilitate
the delivery of a breakfast
club, ingredient costs and
small appliances
£1,343.14 Our project ensures that all our children start off their day with a
full tummy in a relaxed environment. Children have been able to
develop their independence, learn about healthy recipes and the
benefits of healthy eating habits.   We have continued to provide a
breakfast club for our children at no additional cost to parents. Our
children have daily access to a warm breakfast option (toast,
sausages, beans, French toast, home-made pancakes, porridge)
fruit and cereal.
55
14 The Ardchattan Centre venue hire, staff and
materials
£2,442.00 Our programme comprised 81 opportunities for 1,890 attenders
who engaged in events including Pop Up Tearooms, exhibition-
days, playgroup meet-ups, games clubs, fibre clubs (textile-crafts),
creative workshops, home education group meetings,
climate/enviro/place meetings/research, hire of premises,
Hogmanay bashes, Craft fairs, green hub meetings, bonfire nights,
cinema screenings, a wedding, a raffle, a community council
meeting, a walk, a ferry crossing, and an AGM.
1890
15 The Victory Hall
Benderloch
new LED light fixtures and
fittings by hire of cherry
picker and competent
electrician for installation
£606.00 The replacement lighting is brighter, which has improved the
conditions in the hall for all users. The lighting also uses a fraction
of the electricity of the original lighting, so has much lower running
costs. It all contributes to the larger plan to make improvements to
the hall, for the benefit of users in the local community. 
Unknown
Page 102

Page 103

2022/23 SCF Round of Funding
16 Tiree Community
Business
contractor costs to complete
groundworks and installation
(only) for picnic benches and
a seating shelter in playpark
£2,500.00 The impact of this project allowed both local and visiting families
to enjoy a safer environment in which to spend time.  
650
17 Tiree Tots a programme of 7 of free
activity sessions for 0-5 age
group on Tiree
£2,500.00 The project reduced the isolation and loneliness of mothers on the
Island and provided stimulation and physical activity for children
on the Island. 
‘Without the weekly coffee and chat meetings I wouldn’t leave the
house most weeks’  Mother of a young child.
‘The stay and play sessions being incorporated with the Health
Visiting Team meant I could access advice and support that
otherwise I wouldn’t have been able to.’  
65
18 Wildcat Explorer Scouts
Argyll
activity costs during
residential trip to Aberfeldy
(white water rafting  /
mountain biking)
£610.97 We cooked communally and prepared the Explorer Scouts each evening for the following days activities. The activities were provided
by a Qualified mountain Guide who was assisted by a leader on the mountains. Using boots, ice axes and crampons hire from Ellis
Brighams we used the Nevis Range Gondola on Saturday to access high level winter conditions where the Explorers were taught winter
mountaineering skills. Sunday we used those newly acquired skills to ascent a munro top in Glencoe, quite an experience for all of the
Explorer Scouts. 
8 Page 103

Page 104

5.0 CONCLUSION 
5.1 The project monitoring form has a section asking for comments on the
grant process.  Not all applicants have completed this section but of
those received, the comments have largely been very positive.   
6.0 IMPLICATIONS 
6.1 Policy: None 
6.2 Financial:  The report sets out the expenditure from the Oban, Lorn and
the Isles area 2023/24 budget for the allocation of Supporting
Communities Fund 
6.3 Legal: None 
6.4 HR: None 
6.5 Customer Service: None 
6.6 Risk: None 
6.7 Climate Change: None   
6.8 Fairer Scotland Duty: Compliant with policy   
6.9 Equalities - protected characteristics: 2 of the funded projects 
6.10 Consumer Duty: None 
6.11 Island Communities:  7 of the funded projects were on islands 
6.12 Children’s Rights and Wellbeing: 5 of the projects were delivered for
children and young people 
Chief Executive – Pippa Milne
Policy Lead - Cllr Mark Irvine
Communities and Partnership Manager – Rona Gold
10 September 2025                                                  
For further information contact: Community Development Officer 
Kirsty McLuckie on 01631572192 / Kirsty.McLuckie@argyll-bute.gov.uk. 
Page 104

Page 105

ARGYLL AND BUTE COUNCIL  OBAN, LORN AND THE ISLES AREA
COMMITTEE 
LEGAL & REGULATORY SUPPORT 10 September 2025 XX MARCH 2021 
JOHN OF LORN BEQUEST AWARD RECOMMENDATIONS 
1.0 APPLICATIONS 
1.1 This report gives Members information regarding a number of applications that
have been received and processed for support from the John of Lorn Bequest. 
2.0 RECOMMENDATIONS 
2.1 The Oban, Lorn and the Isles Area Committee are asked to consider the
number of awards made since June 2025. 
3.0 DETAIL 
3.1 The Oban, Lorn and the Isles Area Committee on 09 September 2020 agreed
new distribution arrangements for the John of Lorn Bequest, which had been
established to support ‘poor persons resident in the Burgh of Oban’. In order to
be considered for an award applicants must: 
3.1.1 be in receipt of a qualifying benefit (Jobseekers Allowance, Employment
Support Allowance, Income Support, or Universal Credit) and for those
people who are employed/self-employed, they must be in receipt of
some amount of Universal Credit as well (a nil payment due to
deductions for earned income would mean they do not qualify); 
3.1.2 live within the Burgh of Oban; and 
3.1.3 be over the age of 16. 
3.2 Furthermore, it was agreed that successful individual applicants would receive
£50 while those applying on behalf of their family would receive £100. 
3.3 The Area Committee on 14 September 2022 agreed to delegate to the Executive
Director with responsibility for Legal and Regulatory Support or officers nominated
by him, in consultation with the Chair, the authority to make awards from the John
of Lorn Bequest using the criteria agreed in September 2020 and that reports be
submitted to subsequent Area Committees to update trustees on awards made
under this delegation. 
3.4 Prior to this delegation those in need of support could wait up to 14 weeks for
payment. Applications are now processed on receipt with payments made once
applicants submit their banking details. 
Page 105 Agenda Item 13a

Page 106

3.5 A total of 4 applications have been received since the June 2025 meeting of the
Area Committee. Officers, in consultation with the Chair have confirmed awards
for 3 family and a single individual application, with a total of £350 being awarded
to individuals living within the Burgh. 
3.6 The total funds available for distribution from the John of Lorn Bequest at the time
of preparing this report is around £1k. It is anticipated that the funds from this
Bequest will become exhausted before the end of 2025 at which point Trustees
will be asked to place a moratorium on it. 
4.0 CONCLUSION 
4.1 Members are asked to consider the applications that have received support from
the John of Lorn Bequest. 
5.0 IMPLICATIONS 
5.1 Policy None 
5.2 Financial None, the Council acts as trustee for the Fund, it
does not represent assets of the Council.
However, there is a risk that the Council would
have to repay the Trust if an objection was raised
as to the use of the funds.
5.3 Legal Area Committees, as Trustees, must ensure that
the distribution arrangements comply with the
terms of the funds, failure to do so would result in
the Council being liable. 
5.4 HR None
5.5 Fairer Scotland Duty None
5.5.1 Equalities –protected
characteristics
None
5.5.2 Socio-economic Duty None
5.5.3 Islands None
5.6 Climate change None
5.7 Risk None
5.8 Customer Service None
5.9 The Rights of the Child  
(UNCRC)
None 
Douglas Hendry - Executive Director with responsibility for Legal and
Regulatory Support 
Policy Lead – Councillor Mark Irvine 
August 2025                                                  
For further information contact: 
Stuart McLean, Committee Manager
Tel. No: 01436 658717
Page 106

Page 107

Email: Stuart.Mclean@argyll-bute.gov.uk 
APPENDICES: 
Appendix 1: Table of applications (exempt) 
Page 107

Page 108

This page is intentionally left blank

Page 109

Document is Restricted
Page 109 Agenda Item 13bNOT FOR PUBLICATION by virtue of paragraph(s) 6
of Schedule 7A of the Local Government(Scotland) Act 1973

Page 110

This page is intentionally left blank

Page 111

Oban, Lorn and the Isles Area Committee
Workplan 2025-26 
Committee
Date
Report Description Lead Service and contact officer Regularity of
occurrence/consideration
Date for Reports
to Committee
Services
Additional
Comment
10 September 2025
10 September
2025
Area Performance
Report FQ1 25/26
HR & Organisation Development –
Claire McAlister
Quarterly Report 18 August 2025 
10 September
2025
Roads and
Infrastructure
Service Update
Roads & Infrastructure Services 
- Andy Summers
Quarterly Report 18 August 2025 
10 September
2025
End of Project
Reporting -
Supporting
Communities Fund
Applications
2024/25
Community Planning &
Development - Rona Gold/Aileen
Cameron
Annual Report 18 August 2025 
10 September
2025
Supporting
Communities Fund
Applications
2025/26
Community Planning &
Development - Rona Gold/Julie
Fish/Ailie Law/ Chief Executive
Annual Report 18 August 2025 
10 September
2025
Annual Recycling
Performance
Report
Roads & Infrastructure Services –
Andy Summers
Annual Report 18 August 2025 
10 September
2025
Charitable Trusts
and Bequests
Legal & Regulatory Support - 
Stuart McLean 
As required  18 August 2025 Cut off for
applications 18
August 2025
10 September
2025
Vacancy on Oban &
Lorn Community
Enterprise Ltd
Legal & Regulatory Support – 
Melissa Stewart
One off 18 August 2025 
Page 111
Agenda Item
14

Page 112

Oban, Lorn and the Isles Area Committee
Workplan 2025-26 
Committee
Date
Report Description Lead Service and contact officer Regularity of
occurrence/consideration
Date for Reports
to Committee
Services
Additional
Comment
10 September
2025
Area Committee
Workplan
Legal & Regulatory
Support- Melissa Stewart
For updating 18 August 2025 
10 September
2025
Distribution of
Funds – Miss
Agnes Angus
Bequest
Roads & Infrastructure -
Tom Murphy 
18 August 2025 Agreed to come
back with proposals
prior to the end of
2025 
10 September
2025
CHARTS (Argyll
and Isles)
CHARTS - Seymour Adams Annual Report 18 August 2025 
10 December 2025
10 December
2025
Area Performance
Report FQ2 25/26 
HR & Organisation Development –
Claire McAlister
Quarterly report 17 November
2025 
10 December
2025
Roads and
Infrastructure
Service Update
Roads & Infrastructure Services 
- Andy Summers
Quarterly report 17 November
2025 
10 December
2025
ACHA Annual
Update
ACHA - Chief Executive Annual Report 17 November
2025 
10 December
2025
HSCP Performance 
Report FQ1 25/26
Apr-Jun
Argyll and Bute
HSCP - Charlotte Craig/Evan
Beswick 
Annual 17 November
2025 
10 December
2025
Charitable Trusts
and Bequests
Legal & Regulatory
Support – Stuart
McLean
As required  17 November
2025
Cut off for
applications 17
November 2025
Page 112

Page 113

Oban, Lorn and the Isles Area Committee
Workplan 2025-26 
Committee
Date
Report Description Lead Service and contact officer Regularity of
occurrence/consideration
Date for Reports
to Committee
Services
Additional
Comment
10 December
2025 
Area Committee
Workplan
Legal & Regulatory
Support-
Melissa Stewart 
For updating 17 November
2025 
11 March 2026
11 March
2026
Primary School
Update
Learning & Education – 
Wendy Brownlie, 
Annual Report 16 February
2026 
11 March
2026
Area Performance
Report FQ3 25/26
HR & Organisation Development –
Claire McAlister 
Quarterly Report 16 February
2026 
11 March
2026
Roads and
Infrastructure
Service Update
Roads & Infrastructure Services 
- Andy Summers
Quarterly Report 16 February
2026 
11 March
2026
Housing Services
Activity Update-
Strategic Housing
investment plan
Update (SHIP)
Development
& Economic Growth – 
Douglas Whyte
Annual Report 16 February
2026 
11 March
2026
Active Travel
Progress Report
2025-26
Development &
Economic Growth - Colin Young 
Annual Report 16 February
2026 
11 March
2026
Charitable Trusts
and Bequests
Legal & Regulatory Support – 
Stuart McLean 
When required 16 February
2026
Cut off for
applications 16
February 2026
11 March
2026
Area Committee
Workplan
Legal & Regulatory Support -
Melissa Stewart 
For updating 16 February
2026 
Page 113

Page 114

Oban, Lorn and the Isles Area Committee
Workplan 2025-26 
Committee
Date
Report Description Lead Service and contact officer Regularity of
occurrence/consideration
Date for Reports
to Committee
Services
Additional
Comment
10 June 2026
10 June 2026 Area Performance
Report FQ4 25/26
HR & Organisation Development –
Claire McAlister
Quarterly Report 18 May 2026 
10 June 2026 Roads and
Infrastructure
Service Update
Roads & Infrastructure Services 
- Andy Summers
Quarterly Report 18 May 2026 
10 June 2026 HSCP Bi-Annual
Update Report
Argyll and Bute
HSCP - Charlotte Craig/Evan
Beswick   
Bi-Annual Report 18 May 2026 
10 June 2026 Secondary School
Reports - Oban
High School
Head Teacher
Peter Bain
Annual Report 18 May 2026 
10 June 2026 Secondary School
Reports - Tiree
High School
Head Teacher
Peter Bain
Annual Report 18 May 2026 
10 June 2026 Secondary School
Reports -
Tobermory High
School
Head Teacher
Shelly Carmichael
Annual Report 18 May 2026 
10 June 2026 Charitable Trusts
and Bequests 
Legal & Regulatory Support –
Stuart McLean
As required 18 May 2026 Cut off for
applications 18 May
2026
10 June 2026 Charitable Trusts,
Bequests & Trust
Funds – Review of
Distribution
Arrangements
Legal & Regulatory Support –
Stuart McLean
Review following initial 12 
Months’ operation
18 May 2026 To be combined
with above report
Page 114

Page 115

Oban, Lorn and the Isles Area Committee
Workplan 2025-26 
Committee
Date
Report Description Lead Service and contact officer Regularity of
occurrence/consideration
Date for Reports
to Committee
Services
Additional
Comment
10 June 2026 Area Committee
Meeting Venues
Legal & Regulatory Support – 
Melissa Stewart 
Annually 18 May 2026 
10 June 2026 Area Committee
Workplan
Legal & Regulatory Support 
- Melissa Stewart 
For updating 18 May 2026 
Page 115

Page 116

This page is intentionally left blank