Notice of Meeting and Agenda
Communities and Housing Policy Board 
Date Time  Venue
Tuesday, 22 August
2023
13:00 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN 
MARK CONAGHAN
Head of Corporate Governance 
Membership 
Councillor Marie McGurk (Convener):   Councillor Robert Innes (Vice Convener):    
Councillor Jacqueline Cameron:  Councillor Carolann Davidson:  Councillor Gillian
Graham:  Councillor Lisa-Marie Hughes:  Councillor Alec Leishman:  Councillor Mags
MacLaren:  Councillor Colin McCulloch:  Councillor Janis McDonald:  Councillor Cathy
McEwan:  Councillor Jamie McGuire:  Councillor Iain McMillan:  Councillor John
McNaughtan:  Councillor Emma Rodden:   
Hybrid Meeting 
Please note that this meeting is scheduled to be held in the Council
Chambers.  However, it is a hybrid meeting and arrangements have been made for
members to join the meeting remotely should they wish. 
Members of the Press and Public 
Members of the press and public wishing to attend the meeting should report to the
customer service centre where they will be met and directed to the meeting. 
Further Information 
This is a meeting which is open to members of the public. 
A copy of the agenda and reports for this meeting will be available for inspection prior
to the meeting at the Customer Service Centre, Renfrewshire House, Cotton Street,
Paisley and online
at http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx
For further information, please email
democratic-services@renfrewshire.gov.uk

Page 2

Webcasting of Meeting 
This meeting will be filmed for live or subsequent broadcast via the Council’s internet
site – at the start of the meeting the Convener will confirm if all or part of the meeting
is being filmed.  To find the webcast please navigate to 
https://renfrewshire.public-i.tv/core/portal/home

Page 3

Apologies 
Apologies from members. 
Declarations of Interest and Transparency Statements 
Members are asked to declare an interest or make a
transparency statement in any item(s) on the agenda and to
provide a brief explanation of the nature of the interest or the
transparency statement. 
1 Police and Fire & Rescue Services Scrutiny Sub-
committee 
Minute of meeting of the Police and Fire & Rescue Services
Scrutiny Sub-committee held on 16 May 2023. 
1 - 6 
2 General Services Revenue, Housing Revenue Account
and Capital Budget Monitoring 
Report by Director of Finance & Resources. 
7 - 16 
3 Building Communities, Greenspaces, Parks & Play
Areas, and Villages Investment Fund Update 
Report by Chief Executive. 
17 - 28 
4 Scottish Social Housing Charter - Annual Return
2022/23 
Report by Director of Environment, Housing and Infrastructure. 
29 - 56 
5 Draft Renfrewshire Strategic Housing Investment Plan
2024/29 
Report by Director of Environment, Housing and Infrastructure. 
57 - 90 
6 Housing – Tackling Dampness, Mould and
Condensation 
Report by Director of Environment, Housing and Infrastructure. 
91 - 96 
7 Tenant Support Fund Policy 
Report by Director of Environment, Housing and Infrastructure.       
97 - 108

Page 4

8  Housing-led Regeneration and Renewal Programme for
Renfrewshire – Year 2 Update 
Report by Director of Environment, Housing and Infrastructure. 
109 - 124 
9 Housing Energy Efficiency and Carbon Reduction
Programmes:  2023/24 Award of Funding 
Report by Director of Environment, Housing and Infrastructure. 
125 - 130 
10  Business Regulation Service Plan 2023/24 
Report by Director of Environment, Housing and Infrastructure. 
131 - 170 
11  Housing (Scotland) Act 1987- Representation in
Respect of a House Failing to Meet the Tolerable
Standard 
Report by Director of Environment, Housing and Infrastructure. 
171 - 176 
12  Renfrewshire Anti-Social Behaviour Strategy 2022-2025
Progress Report 
Report by Director of Environment, Housing and Infrastructure. 
177 - 182

Page 5

Minute of Meeting
Police and Fire & Rescue Scrutiny Sub-Committee 
Date Time Venue
Tuesday, 16 May 2023 15:00 Council Chambers (Renfrewshire), Council
Headquarters, Renfrewshire House, Cotton
Street, Paisley, PA1 1AN 
PRESENT
Councillor Robert Innes, Councillor Janis McDonald, Councillor Marie McGurk, Councillor
Mags MacLaren and Councillor Iain McMillan. 
Chair
Councillor McGurk, Convener, presided. 
IN ATTENDANCE
G Hannah, Head of Climate, Public Protection and Roads; M Hendry, Resilience &
Deployment Manager (both Environment, Housing and Infrastructure); E Gray, Senior
Committee Services Officer, K O’Neill, Assistant Democratic Services Officer, J Barron,
Assistant Committee Services Officer and D Pole, End User Technician (all Finance &
Resources). 
ALSO IN ATTENDANCE
L Napier, Chief Inspector; W Graham, Area Commander and D Falconer, Superintendent
(all Police Scotland); and D McCarrey, Area Commander and M Hill, Group Manager (both
Scottish Fire & Rescue Service). 
WEBCASTING OF MEETING
Prior to the commencement of the meeting the Convener intimated that this meeting of the
Sub-committee would be filmed for live or subsequent broadcast on the Council’s internet
site.  
Item 1
CHPB220823 Page 1 of 182

Page 6

DECLARATIONS OF INTEREST
There were no declarations of interest intimated prior to the commencement of the
meeting. 
1 DRAFT ANNUAL POLICE PLAN 2023/24
There was submitted a report by the Director of Environment, Housing & Infrastructure
relative to the Draft Annual Police Plan 2023/24, attached as Appendix 1 to the report.
The report indicated that in accordance with the Police & Fire Reform (Scotland) Act
2012, Police Scotland had a responsibility to develop a strategic police plan for policing
that reflected the Scottish Government’s national outcomes, strategic police priorities
and justice strategy. 
The report detailed arrangements to deliver against the strategic police plan in the year
ahead. Police Scotland had prepared an Annual Police Plan which set out the proposed
arrangements for policing in the year ahead. Police Scotland had sought feedback from
CoSLA in March 2023 on the draft document. Given the strategic importance of the
Plan, CoSLA had taken a paper to the CoSLA Community Wellbeing Board meeting on
21 April 2023 to review the document in more detail and formally consider CoSLA’s
position on the plan. Police Scotland had advised that CoSLA’s submission would be a
key consideration as the plan was implemented throughout the year. Police Scotland
would ensure that CoSLA’s submission was highlighted through their internal
governance to enable them to continue to work closely with CoSLA and local authority
partners. 
Prior to publication, the plan had been laid before the Scottish Parliament and made
visible to the Scottish Police Authority (SPA). Upon publication, activities related to the
outcomes and objectives were monitored through Police Scotland’s quarterly
performance reports. A bi-annual report, specific to the progress of the Annual Police
Plan was presented to the SPA and made available online. Strong partnership working
was already well established in Renfrewshire which would help support police priorities
which were aligned to the Local Policing Plan 2023-2026 published on 1 April 2023 and
Renfrewshire Community Plan. 
DECIDED:       
(a) That the draft Annual Police Plan 2023/24, as attached as Appendix 1 to the
report, be noted; 
(b) That the Police and Fire & Rescue Scrutiny Sub-committee support the Chief
Executives response to CoSLA (as detailed in Section 3.10 – 3.13 of the report) which
welcomed the opportunity to comment on the draft Annual Police Plan; and 
(c) That the priorities and objectives set out in the proposed draft Annual Police Plan
2023/24 be agreed.   
Page 2 of 182

Page 7

2  POLICE SCOTLAND - PERFORMANCE REPORT
There was submitted a report by the Area Commander, Police Scotland, relative to
service performance and activities in the Renfrewshire area during the period 1 April
2022 to 28 February 2023. The report summarised the key performance indicators and
provided statistics relating to the specific key objectives detailed in Police Scotland’s
Policing Priorities 2022/23.  Comparisons were made against the preceding reporting
year.  The volume of recorded crime and offences had risen by 2.3% on the previous
year. 
The report provided updates in relation to Renfrewshire Policing Priorities 2023/26 of
violence, disorder and anti-social behaviour; protecting vulnerable people; acquisitive
and cyber/digital crime; serious and organised crime and road safety and road crime. 
Overall violent crime had fallen by 0.8% on the previous year. Protecting vulnerable
people category had seven fewer cases than the previous year with detection rates
increased by 9.1%. Overall crimes of dishonesty had increased by 13.9%, with common
theft, fraud and shoplifting (three of the highest volume acquisitive crimes) all on the
rise. A rise in the number of detected crimes resulted in the same detection rate being
achieved compared to the previous year (29.3%). Almost half of crimes tagged with the
‘cybercrime’ marker recorded in the current reporting year were acquisitive crimes, most
commonly online frauds.  Intelligence led policing resulted in 136 drugs detections in
the current year, a rise of two on the previous reporting year. In Renfrewshire &
Inverclyde Division, serious and organised criminals were deprived of £1,110,489 in
cash and assets through use of the Proceeds of Crime Act. Overall, road casualties
had increased by 15 to a total of 147. The detection rate for offences relating to motor
vehicles was 85.5%. Drink and drug driving offences had increased by 3.1% as a result
of local officers and Road Policing officers having carried out proactive checks on
motorists while on high visibility patrols. 
In the period April 22 to February 2023, there were 683 recorded missing persons
incidents, an increase from 552 on the previous year. Almost 13% of the total number
of incidents related to the five most frequent missing persons within Renfrewshire, all
of whom were young people aged 16 years or under.  Police Scotland remained
committed to reducing harm related to people who go missing and continued to develop
and implement key measures to ensure missing persons and their friends and family
received a consistently high level of service.  In Renfrewshire, over 73.2% of missing
people were traced within 24 hours of being reported as missing, with this proportion
rising to approximately 94% being traced within three days. 
DECIDED: That the report be noted   
3 SCOTTISH FIRE AND RESCUE SERVICE - QUARTERLY
PERFORMANCE REPORT
There was submitted a report by the Group Manager, Scottish Fire and Rescue Service
(SFRS) relative to SFRS performance and local fire and rescue service plan priorities
in the Renfrewshire area during period 1 January to 31 March 2023. 
The report provided updates in relation to Renfrewshire activity, accidental dwelling
fires and casualties, unintentional injury and harm, deliberate fire setting, non-domestic
fire safety and unwanted fire alarm signals. 
Page 3 of 182

Page 8

Accidental Dwelling Fires had increased by 44% (14 incidents) on the same period last
year.  An increase of 67% from three to five dwelling fire casualties, for this reporting
period, was recorded. Non-fire casualties remained static from the same period last
year with a total of 17 casualties, of which eight (47%) were as a result of road traffic
collisions.  Deliberate fire setting had decreased by 19% (25) incidents from Q4 last
year.  The report also provided information on Unwanted Fire Alarm Signals (UFAS)
which had shown an increase of 1% (two incidents) year on year, a breakdown of the
number of incidents, categories and where these occurred was also provided. 
DECIDED:  That the contents of the report be noted. 
4 SPOTLIGHT - ROADS POLICING WEST
L Napier, Road Policing Chief Inspector, gave a presentation in relation to Roads
Policing and Safety, which remained a significant priority for Police Scotland. 
The presentation provided information in relation to The Fatal 5:- Drink/Drug Driving,
Careless Driving, Speed, Mobile phone use and Seatbelt wearing which were widely
regarded and recognised as the main contributing and causation factors in all serious
and fatal road traffic collisions. The Road Policing department dedicated the majority of
road policing patrol time to targeting the Fatal 5 and detailed measures taken to address
and improve these were provided.  The number of officers together with their rank which
made up this service was also provided. 
Information was also provided on the National Calendar of Road Safety Activity;
Scotland’s Road Safety Framework to 2030 and Transport Scotland’s vision to have
the best road safety in the world.  These initiatives were all created with the aim to
improve road safety. 
DECIDED:   That the contents of the presentation be noted 
5 SPOTLIGHT - SCOTTISH FIRE AND RESCUE SERVICE - 'TIME FOR
CHANGE'
M Hill, Group Manager, Scottish Fire & Rescue Service, gave a presentation in relation
to ‘Time for Change’ which highlighted the changes Scottish Fire & Rescue Service
(SFRS) would implement in the procedures used for responding to Automatic Fire
Alarm System in particular Unwanted Fire Alarm Signals (UFAS).   
These changes would be implemented to reduce the number of UFAS. Currently SFRS
attended around 28,000 UFAS annually, around 30% of all operational activity, with
figures increasing year on year as more automatic fire alarm signals came
online.  Reducing this number would reduce unnecessary disruption to businesses;
improve availability of SFRS resources; reduce blue light journeys and disruption of
primary employers of on-call firefighters. 
Following extensive consultation; changes would be implemented with effect from 1
July 2023 to reduce the number of UFAS calls.  SFRS would no longer attend automatic
fire alarm calls to non-exempt premises which included factories, offices, shops and
leisure facilities, unless a fire had been confirmed.  This would not apply to sleeping
premises such as hospitals, care homes, hotels, sheltered housing or domestic
dwellings.  Communication from SFRS advising of the changes would be circulated to
Page 4 of 182

Page 9

those responsible who had automated fire alarm signals within the premises.  These
changes would result in a reduction of around 57% of attendance for UFAS which would
free up additional resources for SFRS. 
DECIDED:   That the presentation be noted. 
6 LOCAL ISSUES
There were no local issues raised by members of the Police and Fire & Rescue Scrutiny
Sub-committee. 
Page 5 of 182

Page 10

Page 6 of 182

Page 11

0 
To: Communities and Housing Policy Board
On: 22 August 2023 
Report by:  Director of Finance and Resources
Heading:  General Services Revenue, Housing Revenue Account (HRA) and
Capital Budget Monitoring as at 23rd June 2023 
1. Summary of Financial Position
1.1. The projected outturn at 31 March 2024 for all services reporting to the
Communities and Housing Policy Board, including the Housing Revenue
Account, is an underspend position of £0.343m (2.4%) against the revised
budget for the year. This can be further analysed as a projected underspend in
General Services activities of £0.343m and a break-even position in the HRA.
1.2. The projected capital outturn at 31 March 2024 for projects reported to the
Communities and Housing Policy Board is a break-even position against the
revised budget of £30.795m for the year.  
1.3. This is summarised over the relevant services in the table below and further
analysis is provided in the appendices. 
Table 1: Revenue
Division / Department Revised
Annual
Budget
£000
Projected
Outturn 
£000
Budget
Variance 
£000
Budget
Variance 
%
Housing Revenue Account (HRA) 0 0 0 0%
Housing – General Services (Not HRA) 4,906 4,906 0 0%
Communities and Public Protection 6,062 5,719 343 5.7%
Criminal Justice 3,190 3,190 0 0%
Board Total – Revenue 14,158 13,815 343 2.4%  
Item 2
CHPB220823 Page 7 of 182

Page 12

1 
Table 2: Capital
Division / Department Revised
Annual
Budget
£000
Projected
Outturn 
£000
Budget
Variance 
£000
Budget
Variance 
%
Housing Revenue Account (HRA) 29,678 29,678 0 0%
Other Housing PSHG 1,117 1,117 0 0%
Board Total – Capital 30,795 30,795 0 0% 
2. Recommendations 
2.1 Members are requested to: 
a) Note the projected Revenue outturn position detailed in Table 1 above; 
b) Note the projected Capital outturn position detailed in Table 2 above; and 
c) Approve the £0.300m reinstatement of HRA reserves from the recurring
saving option in section 4.2;
d) Approve the budget adjustments detailed at sections 4 and 6. 
3. Revenue 
3.1. The Revenue Budget Monitoring Statement at Appendix 1 identifies a projected
underspend of £0.343m (2.4% of total budget) for all services reporting to this
Policy Board. Detailed division service reports can also be found here, along
with an explanation of each significant projected variance.
3.2. The projected outturn is based on information currently available, and
assumptions made by service budget holders.  Projections are subject to
continuous review, and any changes will be detailed in future reports to the
Board.
3.3. The main reason for the projected outturn positions are indicated below the
Appendix tables, showing both the subjective analysis (what the budget is spent
on) and the objective analysis (which division is spending the budget).
3.4. The projected underspend is £0.343m, largely due to an underspend in
employee costs within the Public Protection Service, owing to a number of
vacancies. 
4. Revenue Budget Adjustments 
4.1. Members are requested to note, from Appendix 1, budget adjustments totalling
£0.591m have been processed since the budget was approved in March 2023.
These relate wholly to: 
Page 8 of 182

Page 13

2 
• £0.040m – Drawdown from Rapid Re-Housing Reserve
• £0.205m – Drawdown from Private Sector Housing Reserve
• £0.064m – Drawdown of Alcohol & Drug Funding from the Social Renewal
Plan
• £0.080m – Drawdown of Private Rented Sector Advocacy and Enforcement
Initiative Funding
• £0.142m – Drawdown of Environmental Task Force Funding
• £0.060m – Transfer of Duke of Edinburgh Funding from Children’s Services 
4.2. Members are also asked to approve an option which will allow the HRA
reserves budget to be reinstated by a £0.300m recurrent saving, as per the
agreed actions arising from the Council meeting of 2 March 2023. It is proposed
that a recurring saving of £0.300m can be achieved by redesigning the delivery
of elements of housing management services through management actions.
These proposals will result in no reduction on existing service levels delivered
to tenants. 
5. Communities and Housing Services Capital 
5.1. The Capital Investment Programme 2023/24 to 2027/28 was approved by the
Council on 2 March 2023. For Communities and Housing Services the approved
capital spend for 2023/24 is £30.795m.
5.2. The Capital Monitoring report at Appendix 2 indicates net budget adjustments
in the approved capital programme for Communities and Housing Services of
£0.517m, as explained in 6.1 below. 
6. Capital Budget Adjustments 
6.1. Since the budget was approved on 2 March 2023, budget changes totalling
£0.517m have arisen, which reflect the following:
• Budget increase of £0.517m in 2023/24, to reflect the Public Sector Housing
Grant (PSHG) Investment Project 23/24 approved by the Communities and
Housing Policy Board on 16 May 2023. 
___________________________________________________________________ 
Page 9 of 182

Page 14

3 
Implications of this report 
1.  Financial – The projected budget outturn position for Communities and
Housing Services Revenue budget is an underspend of £0.343m (2.4% of
total budget). Income and expenditure in all services within the department
will continue to be monitored closely for the rest of the financial year and,
where necessary, steps will be taken to mitigate any significant overspend.   
The projected outturn position for Communities and Housing Services’
Capital budget is break-even. The Capital programme will continue to be
monitored closely for the rest of the financial year and, where necessary,
steps will be taken to mitigate any significant overspend.   
Any changes to current projections in either Revenue or Capital budgets will
be reported to the Board as early as possible, along with an explanation for
the movement. 
2.  HR and Organisational Development 
None directly arising from this report. 
3. Community/Council Planning
None directly arising from this report. 
4.  Legal 
None directly arising from this report. 
5.  Property/Assets 
Capital projects will result in new build Council housing stock and
improvements to existing stock. 
6.  Information Technology 
None directly arising from this report.
7.  Equality and Human Rights 
None directly arising from this report.
8. Health and Safety
None directly arising from this report.
9. Procurement 
None directly arising from this report.
10. Risk 
The potential risk that the Council will overspend its approved budget for the
year will be managed at a Council-wide level by the Chief Executive and
Directors.
Page 10 of 182

Page 15

4 
11. Privacy Impact
None directly arising from this report. 
12. 
13.
Cosla Policy Position 
N/a. 
Climate Risk
None directly arising from this report.
__________________________________________________________________ 
List of Background Papers 
Housing Revenue Account Budget & Rent Levels 2023/24 and Housing Capital
Investment Plan 2023/24 to 2027/28, Council, 2 March 2023; 
Non-housing Capital Investment Programme, Prudential Framework and Treasury
Management Strategy, and Capital Strategy 2023/24 – 2027/28, Council, 2 March
2023. 
___________________________________________________________________ 
Authors: John Kilpatrick, Finance Business Partner 
Linsey Mcgregor, Capital Accountant 
Page 11 of 182

Page 16

Appendix 1   
Objective Summary
Approved Annual
Budget
Budget Adjustments Revised Annual
Budget at Period 3
Projected Outturn
£000 £000 £000 £000 £000 %
Housing Revenue Account (HRA) 0 0 0 0 0 0.0%
Housing - General Services (Not HRA) 4,539 367 4,906 4,906 0 0.0%
Communities and Public Protection (including Regulatory
Services) 5,838 224 6,062 5,719 343 5.7%
Criminal Justice 3,190 0 3,190 3,190 0 0.0%
NET EXPENDITURE 13,567 591 14,158 13,815 343 2.4%
Objective Heading
Housing Revenue Account (HRA)
Housing - General Services (Not HRA)
Communities and Public Protection
Criminal Justice
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2023/24
1 April 2023 to 23 June 2023
Budget Variance
(Adverse) or Favourable
POLICY BOARD :  COMMUNITIES AND HOUSING - All SERVICES
An underspend in employee costs is projected due to the timing of recruitment of vacancies within the service. Property costs are
projected to overspend, reflecting ongoing demands for repair and maintenance provision, particularly in void properties, as well as
additional Council Tax costs for these properties. Transfer payments are forecast to overspend, owing to the impact of repairs
pressures on void rent loss. These overspends are expected to be offset by additional interest income due to higher than budgeted
interest rates. Overall, the HRA is therefore still projected to break-even at year-end.
Key Reasons for Projected Variance
Within Property Costs there is increasing demand for homelessness accommodation, impacting on rental costs, Council Tax and
furniture for temporary accommodation units. This forecast overspend is expected to be offset by additional rental income
received in relation to these units. All budget lines are being closely monitored with an aim to mitigate the overspends anticipated
as a result of these demand pressures.
The projected underspend here relates to vacancies within the service, which are currently being reviewed by operational
management.
No significant projected year end variances to report.
Page 12 of 182

Page 17

Appendix 1   
Subjective Summary
Approved Annual
Budget
Budget
Adjustments
Revised Annual
Budget at Period 3
Projected Outturn
£000 £000 £000 £000 £000 %
Employees 11,503 876 12,379 12,244 135 1.1%
Premises Related 1,779 211 1,990 2,217 (227) (11.4%)
Transport Related 172 (2) 170 197 (27) (15.9%)
Supplies and Services 2,307 934 3,241 3,203 38 1.2%
Third Party Payments 87 0 87 84 3 3.4%
Transfer Payments 3,151 (516) 2,635 2,679 (44) (1.7%)
Support Services 55 1 56 28 28 50.0%
Depreciation and Impairment Losses (23) 0 (23) (18) (5) (21.7%)
GROSS EXPENDITURE 19,031 1,504 20,535 20,636 (101) (0.5%)
Income (5,464) (913) (6,377) (6,821) 444 7.0%
NET EXPENDITURE 13,567 591 14,158 13,815 343 2.4%
POLICY BOARD :  COMMUNITIES AND HOUSING - GENERAL SERVICES (excluding HRA)
Budget Variance
(Adverse) or Favourable
RENFREWSHIRE COUNCIL
REVENUE BUDGET MONITORING STATEMENT 2023/24
1 April 2023 to 23 June 2023
Page 13 of 182

Page 18

Appendix 1   
Subjective Summary
Approved Annual
Budget
Budget Adjustments Revised Annual
Budget at Period 3
Projected Outturn
£000 £000 £000 £000 £000 %
Employees 11,007 (241) 10,766 10,476 290 2.7%
Premises Related 20,397 0 20,397 21,322 (925) (4.5%)
Transport Related 103 0 103 51 52 50.5%
Supplies and Services 792 (59) 733 787 (54) (7.4%)
Third Party Payments 49 0 49 137 (88) (179.6%)
Transfer Payments 4,190 300 4,490 4,969 (479) (10.7%)
Support Services 2,492 0 2,492 2,447 45 1.8%
Depreciation and Impairment Losses 19,089 0 19,089 19,089 0 0.0%
GROSS EXPENDITURE 58,119 0 58,119 59,277 (1,158) (2.0%)
Income (58,119) 0 (58,119) (59,277) 1,158 2.0%
NET EXPENDITURE 0 0 0 0 0 0.0%
Budget Variance
(Adverse) or Favourable
RENFREWSHIRE COUNCIL
POLICY BOARD :  COMMUNITIES, HOUSING AND PLANNING SERVICES - Housing Revenue Account  (HRA) Only
REVENUE BUDGET MONITORING STATEMENT 2023/24
1 April 2023 to 23 June 2023
Page 14 of 182

Page 19

Appendix 2   
Prior Years Approved  Budget Revised Projected
Expenditure Budget Adjustments Budget Outturn Total Approved Projected
to 31/03/2023 2023-24 in 2023-24 2023-24 2023-24 Budget Outurn
Project Title to 31-Mar-27 to 31-Mar-27
£000 £000 £000 £000 £000 £000 £000
HOUSING(HRA)
Improvements To Existing Properties 0 13,390 0 13,390 13,390 0 0% 114,025 114,025 0 0%
Regeneration 7,045 9,378 0 9,378 9,378 0 0% 106,953 106,953 0 0%
Other Assets 0 1,815 0 1,815 1,815 0 0% 12,500 12,500 0 0%
Non Property Expenditure 0 1,550 0 1,550 1,550 0 0% 1,550 1,550 0 0%
Council House New Build 33,782 1,680 0 1,680 1,680 0 0% 74,599 74,599 0 0%
Professional Fees 0 1,865 0 1,865 1,865 0 0% 9,615 9,615 0 0%
Total Housing(HRA) Programme 40,827 29,678 0 29,678 29,678 0 0% 319,242 319,242 0 0%
HOUSING(PSHG)
Private Sector Housing Grant Programme 0 600 517 1,117 1,117 0 0% 1,117 1,117 0 0%
Total Housing(PSHG) Programme 0 600 517 1,117 1,117 0 0% 1,117 1,117 0 0%
TOTAL COMMUNITIES, HOUSING & PLANNING
BOARD 40,827 30,278 517 30,795 30,795 0 0% 320,359 320,359 0 0%
*Rolling programmes have a prior year year expenditure of £0 as the expenditure is not directly linked from one year to the next as a singular project.
Budget Variance (Adverse) or
Favourable
Budget Variance (Adverse) or
Favourable
RENFREWSHIRE COUNCIL
CAPITAL INVESTMENT STRATEGY
1st April to 23rd June 2023
POLICY BOARD: COMMUNITES & HOUSING
Current Year 2023-24 Full Programme - All years
Page 15 of 182

Page 20

Page 16 of 182

Page 21

___________________________________________________________________
To: Communities and Housing Policy Board 
On: 22 August 2023
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Building Communities, Greenspaces, Parks & Play Areas, and
Villages Investment Fund Update
___________________________________________________________________ 
1. Summary 
1.1 This report updates the Communities and Housing Policy Board on progress
made in supporting communities including projects funded through the
Greenspaces, Parks & Play Areas, and Villages Investment Fund(s). It
provides updates for the Board on projects awarded under delegated authority
over the last 3 months; and on other work undertaken to support active and
engaged communities.  
1.2 The key objective of the Green Spaces and Villages Investment funding is to
work with, and support, community groups to identify and deliver improvement
projects in their local communities, improve their local greenspaces (including
parks and play areas) and strengthen the identity, heritage, uniqueness, and
character of village life. 
1.3 The Funds are promoted to members of the relevant Local Partnerships and
through links with communities to encourage eligible groups and organisations
to submit applications for funding. Current funding available is as follows: 
• Villages Investment Fund:   £290,000
• Greenspaces:     £68,000 (£40,000 for small green
space projects and £20,000 ringfenced for school projects)
• Volunteer funding:    £28,000 
1.4 Since the last update to board in May 2023, 11 applications have been
submitted for approval under delegated authority for Greenspaces Funding
(listed in Appendix 1).   
1.5 An update on the status of previously awarded projects is provided in Section
3. 
1.6 This report further updates the Communities and Housing Policy Board on
progress of Team Up to Clean Up and the Environmental Taskforce. It
Item 3
CHPB220823 Page 17 of 182

Page 22

provides updates for the Board on key performance indicators, celebrates
growing mutually beneficial relations with communities, and details the
impacts Team Up to Clean Up and the Taskforce are having in Renfrewshire
in supporting active and engaged individuals and groups. 
________________________________________________________
2 Recommendations
2.1 It is recommended that the Communities and Housing Policy Board: 
(a) note the work currently being undertaken to support communities as
they develop and deliver projects funded using the Greenspaces,
Parks & Play Areas, and Villages Investment Fund. 
(b) note the impact of the funding and the benefits to the wider
communities delivered by the projects set out in section 3 of this
report. 
(c) Note the update on the wider Building Communities programme. 
________________________________________________________
3. Summary of Green Spaces Applications 
Applications Under Construction 
3.1 Renfrewshire Council has supported 108 community projects since October
2018. Further projects continue to be developed within communities, the
following potential applicants are currently active and expected to apply or
have only recently applied: 
• Lochwinnoch play area fencing.
• Langbank Swing Park Regeneration Group – Play Park surfacing. 
• Elderslie Community Council – Community Garden & Allotment
• Ralston Community Council – Play Park Surfacing   
3.2 Reports will be brought back for the consideration of the Board in relation to
these projects at future meetings of the Communities and Housing Policy
Board. 
Live Application(s) 
Langbank Swing Park Regeneration Group 
3.3 The #YouDecide project, together with the Environment, Housing and
Infrastructure Service’s Parks Team, will upgrade Langbank play area in early
2024. The Regeneration group’s application for an outdoor gym was also
successful and the facility will be installed alongside the new play area. The
group are in discussion regarding an application to improve the surface area
where the gym will be installed. 
Page 18 of 182

Page 23

Friends of Jenny’s Well 
3.4 The Friends of Jenny’s Well group continue to bring new volunteers and
biodiversity to the nature reserve using funding secured by the Green Spaces
Fund and other external organisations. This latest project saw the onsite tool
container painted by local artist BMore sketchy using Green Spaces Funding. 
3.5 The football changing area in situ at Jenny’s Well, has not been used for a
number of years. This structure will be dismantled and removed imminently to
make way for an onsite bicycle stop off and repair station the group have
managed to secure, funded by Sustrans. Renfrewshire Council worked
alongside SUSTRANS to renew the cycle path running through the nature
reserve. 
3.6 Elderslie Community Council 
Elderslie Community Council 
3.6 The Community Council successfully secured funding for an outdoor gym
around 18 months ago however were concerned about the installation being
on top of the previous surface which had previously been a play area prior to
the installation of the Green Spaces awarded play park in 2020. Working
alongside colleagues in #YouDecide, the Elderslie community voted for a new
surface on this area which has now been successfully laid and offers the
perfect surface for the new gym which was installed at the end of July 2023.  
Howwood Parent Council 
3.7 Howwood Parent Council were awarded funding for a multi-use games area
(MUGA) in 2022 in the grounds of Howwood Primary school. This was
installed at the end of May 2023 and local children have been making good
use of the area over the summer holidays. 
Page 19 of 182

Page 24

Houston Swing Park Group 
3.8   This group have worked hard to boost their awarded funding by almost
£12,000 through local race nights, cake sales and gala day stalls – the group
even created a Houston Cookbook and sold it at local events.  “Helicopter
Park” on the South Street Mound, was locally coined as such due to a popular
previous helicopter climbing frame. The group were keen to incorporate this
helicopter/sky theme in the park’s new design. Installation is due to
commence autumn/winter 2023. 
3.9 Again, delivery of this project has been complimented by a new path which
was instructed by the community via the #YouDecide project. Access to the
play area, which is situated at the top of the mound, may prove challenging for
some. The new path, leading to the play area from the South Street carpark,
will offer some additional support in this regard. 
Page 20 of 182

Page 25

Johnstone Community Council – Pump Track at Thomas Shanks Park 
3.10 A meeting was attended by representatives from the Green Spaces Fund,
Environment, Housing & Infrastructure’s Parks Team, and Johnstone
Community Council. Renfrewshire Council will oversee procurement of the
and installation of the proposed new pump track which is expected in
Spring/Summer 2024.
________________________________________________________
4.  Team Up to Clean Up 
4.1 Team Up to Clean Up member numbers and engagement levels continue to
grow with 4,700 group members currently engaging, this is an increase of 350
members since May 2023. Facebook Analysis illustrates increased
engagement statistics over the past 3 months evidencing a strong appetite
from communities for information, engagement, and participation in achieving
tidier, cleaner neighbourhoods. 
4.2 To show appreciation of Team Up’s volunteering efforts, prolific volunteers
were invited to attend the Community Development Volunteer Appreciation
event on Monday 5 June, part of national Volunteers Week. 26 Team Up to
Clean Up volunteers received a certificate, and a small gift. Team up to Clean
Up T-shirts and high-vis vests were distributed at the event. Further
opportunities to obtain a t-shirt have been made available from 6 local
libraries for a 3-week period, the locations are promoted on the Team Up
Facebook page. 
4.3 Team Up to Clean Up available volunteer funding facilitated the supply of a
fully equipped trolley with power tools and hand tools to volunteers in
Arkleston. The group are tackling litter, weeds, and flytipping in their
neighbourhood and are enjoying the warm responses and feedback they are
receiving from local residents. The group have enjoyed supporting their
community and are now arranging with Engage Renfrewshire to set up their
own Arkleston Tenants and Residents Association. 
The Conservation Volunteers – Wildflower Planting Workshops 
4.4 Team Up to Clean Up volunteers are enthused by improving and increasing
the appeal of their neighbourhoods and local green spaces. Many groups who
participate in the Campaign focus on biodiversity and wilding, a topic which
sits well with the wider volunteering network. As such bespoke workshops
were delivered in July by The Conservation Volunteers (TCV). The purpose of
the workshops was to educate those interested in creating their own
wildflower areas in their gardens or in their community spaces. 
4.5 Two community groups, Inchinnan Community Development Trust and
Friends of Jenny’s Well Nature Reserve, hosted TCV in local community halls.
Camilo delivered sessions, a Permaculturist, who advised attendees on the
best times to plant, which flowers work well in which areas, and how to
maintain and encourage growth. 
Page 21 of 182

Page 26

4.6 Bee Happy Houston have arranged for the final session in Houston, mid-
August. Free wildflower seeds are provided as well as refreshments offering
volunteers an opportunity to share experiences and information. The event,
and associated costs, were funded by Team Up to Clean Up (Green Spaces)
funding. 
Take the Lead 
4.7   Over 250 Renfrewshire dog owners have so far taken the pledge to be
responsible dog owners and pick up after their pets. ‘Take the Lead’
merchandise, and Team Up t-shirts, were promoted and available for dog
owners and volunteers at Barshaw and Robertson’s Park Gala days. 
4.8 The Environmental Taskforce further offered branded items to volunteers and
those signing the Pledge at various drop-in sessions across the summer. 
Sustainable Food Scheme 
4.9 Around 150 letters have been issued to businesses who either did not
participate in the sustainable business survey or were found to be non-
compliant with the Single Use Plastics (SUP) Regulations. A deadline of the
end of September has been issued to these businesses who have been
advised enforcement action may be considered where they continue to supply
SUPs after this time. The Environmental Taskforce and Environmental Health’s
Business Regulation Team will support visits to each of the identified premises.
Environmental Taskforce 
4.10 The Environmental Taskforce continues to work with Renfrewshire’s
communities to reduce flytipping. The Taskforce recently visited and spoke with
residents in Inchinnan in relation to increased numbers of flytipping reports in
the area. 
Page 22 of 182

Page 27

4.11 The Taskforce prioritises education, and further works closely with local
businesses, supporting them to reduce flytipping where possible. Three
commercial incidents have been reported this year directly outside a rural local
business. After speaking with the Taskforce, the business owner installed a
camera as a preventative measure and agreed to share future evidence
obtained with the Team. A local organisation further provided evidence for a
witnessed flytipping incident which resulted in the issue of a fixed penalty
Notice, and the Taskforce received thanks for their support and attention at the
Direct Parking site in Paisley which will reopen for business on 1 August after
being closed for 3 years and was subject to large scale flytipping. 
4.12 During a meeting with SEPA (Scottish Environmental Protection Agency), the
Taskforce learned of their recent Fixed Monetary Penalty powers (FMP). This is
a unique power to SEPA who can issue fines up to £40,000 for flytipping,
avoiding the need for a submission to the Procurator Fiscal. One of the cases
currently being prepared by the Taskforce for submission has been requested
by SEPA to take forward. The case relates to the practices of a private waste
removal service. SEPA have arranged for a block on all related social media
promoting the individual/company, rendering them unable to advertise
personally, or as the company name, for businesses. This is a useful tool going
forward. 
4.13 On 28th June, the Scottish Government, in partnership with Keep Scotland
Beautiful, Zero Waste Scotland and the Scottish Environmental Protection
Agency, released an updated National Litter and Flytipping Strategy. The
strategy aligns future action closely with Scotland’s circular economy and
considers the positive impacts upcoming changes in legislation will have in
tackling the current throw away culture. The strategy further links pollution,
caused by litter and flytipping, in with climate change and biodiversity loss as
recognised in the United Nations Making Peace with Nature report. 
4.14 The accompanying 2023-24 Action Plan outlines significant actions which will
be launched in the next 12 months: 
• Powers to issue fixed penalty notices on the drivers of vehicles from
which litter is discarded,
• Fixed penalty notices issued to householders who fail to take
responsibility for their household own waste, 
• Increased fixed penalty notice of £200 to £500 for flytipping, which may
increase to £1,000 in future, 
• Working with SEPA to improve their scrutiny and control over
applicants for a Waste Carriers License 
• Increased use of digital technologies to detect and disrupt unregistered
or rogue waste carriers advertising on online forums, and
• Powers to seize vehicles involved in flytipping. 
Page 23 of 182

Page 28

4.15 The table below offers some key statistics of the work delivered by the
Taskforce over this period: 
________________________________________________________
5. Youth Team – Working with Renfrewshire’s Young People
5.1 The Youth Team continue to work closely with Police Scotland, patrolling
hotspot areas where young people are known to congregate and exhibit
antisocial behaviour. Over the summer the Team’s focus is on wilful fire-
raising which occurs at identified pockets across Renfrewshire. The Youth
Team are ideally placed to speak to young people, most already well-known
to them and do not present in uniform. 
5.2 Home visits and referrals from the Early Intervention Screening Group have
increased from the previous year. During a home visit a plan is created, which
may incorporate a curfew, alongside the young person and their parent or
guardian. The aim of the plan is to support the young person, steering them
toward an alternative, more positive path as well as reducing the impact of the
antisocial behaviour presented. 
5.3 Feedback from Safe Kids 2023 demonstrates the event was well received.
Over 2,000 primary 6 pupils attended workshops with a focus on topics such
as cyber bullying, water safety, railway safety, drug and alcohol issue
awareness, the impact of antisocial behaviour, littering, dog fouling and
flytipping. Feedback and lessons learned will be reviewed prior to delivery of
the 2024 event. 
5.4 The Youth Team further supported the delivery of the Summer of Fun
activities over the summer period.
________________________________________________________
6 Summer Camps 2023
6.1 The Community Learning and Development team in partnership with Street
Stuff, delivered a programme of summer camps across Renfrewshire in
Action April – 22 June
2023
Cumulative from 1
December 2022
Proactive visits to identified hotspot
areas
632 1301
Number of reports investigated 585 1198
Tonnes of flytipping removed 165 380
Number of sites secured to prevent
further flytipping
2 8
Letters to private landowners 35 69
Visits to businesses to ensure Waste
Disposal Arrangements in place
41 86
Fixed Penalty Notices Issued 14 49
Page 24 of 182

Page 29

Ferguslie, Foxbar, Gallowhill, Johnstone, Linwood, and Renfrew. The camps
were funded this year by Fairer Renfrewshire and Scottish Government, with
access to places prioritised for low income families.
6.2 Young people from P1 to S3 were entertained through participation in football,
basketball, hand ball, hockey, badminton, tennis, dance, art, crafts, and
games. A healthy meal was also provided as part of the activity.
6.3 Attendance at the camps was free of charge with all spaces fully committed,
entertaining over 1,000 young people each week. 
6.4 Joint working with Children’s services has been key to ensure young people
from across Renfrewshire have access to activities on offer. A full update on
the summer camps will be provided to the next board. 
Celebrating Renfrewshire 
6.5 The participatory budgeting project, Celebrating Renfrewshire 2024 was
successfully delivered by this year’s newly appointed youth Steering Group,
supported by officers from across the Chief Executive’s Service. Young
people across the authority submitted a total of 126 projects, 47 of these were
awarded funding. Projects supported this year’s chosen themes which include
cost of living, employability and life skills, climate change, drug and alcohol
prevention and violence diversionary projects for young people. 
6.6 The Celebrating Renfrewshire Announcement Event was held in the Student
Union at the University of West of Scotland and was well attended. The
steering group were supported in organising and delivering this event where
successful applicant groups were announced and celebrated. 
6.7 The Steering Group are now working with Local Partnerships to deliver
successful projects. 
Page 25 of 182

Page 30

Implications of the Report 
1. Financial - Council approved the allocation of £2.420 million to establish the
Greenspaces, Parks & Play Parks, and Villages Investment Fund in March
2018. Due to the capital works being undertaken, Officers are ensuring that
there are minimal recurring revenue costs to Services in the coming years.
Council further approved £450,000 to establish the Taskforce in February
2022
2. HR & Organisational Development - None
3. Community/Council Planning – 
The Greenspaces, Parks & Play Parks and Village Investment Fund will be
important to achieving and assisting the Community Plan by ensuring that
Renfrewshire is thriving, well, fair and safe for residents, workers, and visitors.
4. Legal - All legislative requirements will be taken cognisance of during this
process wherever required e.g., health and safety requirements.
5. Property/Assets - There is the potential for property/assets to be included as
part of this fund.
6. Information Technology – none
7. Equality & Human Rights 
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report. If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored,
and the results of the assessment will be published on the Council’s website.
8. Health & Safety - Cognisance will be taken of health and safety requirements
wherever required e.g., for play park equipment.
9. Procurement - There is no potential for the Council to be procuring and
installing equipment of behalf of a community group as part of this grant
funding process.
10. Risk - Discussions with the Council Risk Manager are on-going to ensure that
the risk to the Council, as part of this grant funding process, is minimised.
11. Privacy Impact – Data Protection Impact Assessments have been completed
as part of this process  
12. COSLA Policy Position – Not Applicable
13. Climate Risk – Not Applicable
_________________________________________________________ 
List of Background Papers
None 
___________________________________________________________________ 
Author:  Laura McIntyre, Head of Policy and Partnerships, Chief Executive’s Service 
Page 26 of 182

Page 31

Appendix 1
Current Greenspace, Parks, and Play Areas & Villages Investment Funding 
Project Funding
proposed
External Funding (or other Council funding)
Lochwinnoch Arts Festival
Committee
£5,000 n/a
Lochwinnoch Community
Development Trust
£5,000 n/a
Elderslie Community Council £200 n/a
Elderslie Community Council £2,650 n/a
Elderslie Community Council £200 n/a 
Lochwinnoch Gala Day
Committee
£2,479 n/a
Friends of Howwood Park £1,660 n/a
Lochwinnoch Sustainable
Community Garden
£1,700 n/a
Bridge of Weir Community
Council
£490 n/a
Lochwinnoch Art Group £300 n/a
Kilbarchan Community Council £1,000 n/a 
Page 27 of 182

Page 32

Funding Allocated Budget Committed Budget Available Budget
Greenspaces, Parks, and
Play Areas 
£1,205,000 £1,148,000 £57,000
Green Spaces – Allocated
School Fund
£35,000 £8,000 £27,000
Green Space – Allocated
Team Up Fund
£40,000 £12,000 £28,000
Village Investment Fund £920,000 £630,000 £290,000
Staffing costs £220,000 £220,000 £0
Total £2,370,000 £2,018,000 £404,000 
Page 28 of 182

Page 33

0 
___________________________________________________________________ 
To:  Communities and Housing Policy Board 
On:  16 August 2023
___________________________________________________________________ 
Report by: Director of Environment, Housing and Infrastructure
___________________________________________________________________ 
Heading: Scottish Social Housing Charter - Annual Return 2022/23
___________________________________________________________________ 
1. Summary 
1.1 Local Authorities and Registered Social Landlords are required to submit an
Annual Return on the Charter relating to service performance to the Scottish
Housing Regulator by the end of May each year.   
1.2 This report provides details of the Council’s Annual Return on the Charter for
2022/23.  The general picture is a positive one, with improving or stable
performance across the majority of the indicators.  Where performance has
dipped, this reflects the challenges faced during the Covid recovery period,
some of which remain particularly in relation to areas where ongoing issues
within the construction industry affect service delivery and performance. 
1.3 The report also highlights the key priorities for the housing service for the year
ahead in terms of continuing to drive improved performance and sets out the
actions that will be taken to support this. 
___________________________________________________________________ 
2. Recommendations 
It is recommended that the Communities and Housing Policy Board: 
2.1 Note the submission made by the Head of Housing Services on the Scottish
Social Housing Charter for 2022/23 as summarised in Appendix 1. 
2.2 Note the specific indicators reported to Board as part of the Service
Improvement Planning process. 
Item 4
CHPB220823 Page 29 of 182

Page 34

1 
2.3 Note that this report also advises of the Service’s response to the Scottish
Housing Regulator’s consultation on the Single Regulatory Framework. 
3. Charter Report for 2022/23 and service priorities 
3.1. The report attached as Appendix 1 gives a summary of outturn performance
information for Renfrewshire Council for 2022/23. 
• Section 1 provides a summary of Renfrewshire Council’s performance
against the Charter indicators along with comparative information for the
last four years. 
• Section 2 gives details of some core contextual data submitted as part of
the Charter return. 
• Section 3 provides additional service and performance management
information for 2022/23. 
3.2. The Charter data for 2022/23 displays improved or stable performance in the
majority of indicators. Some of the key areas of improved performance are: 
• Non-emergency repairs average time (Indicator 9) has improved from 14.6
days to 6.1 days. A new system for raising and managing repairs was
introduced in March 2022. User errors and system issues have resulted in
some jobs showing as outstanding at the year end which will have an
impact on the volume of reported non-emergency repairs and
consequently the accuracy of the reported figures. We will continue to
closely monitor this indicator over the coming months to ensure that user
errors are minimised, jobs are updated promptly and corrections are made
to the data if found to be inaccurate as a result of system issues 
• The percentage of repairs completed right first time improved by five
percentage points to 90% (Indicator 10) 
• The percentage of stage 1 complaints responded to in full (up to 97.9%)
and the response times for both stage 1 (5.76 days) and Stage 2 (14.5
days) complaints improved this year, (indicators 3&4) 
• The percentage of stock meeting the Scottish Housing Quality Standard
(SHQS) (Indicator 8) increased to 67.9% from 57.0% last year. This
increase was achieved despite difficulties in completing our
comprehensive EICR programme and associated problems with the
construction industry, including resources and materials. We expect our
performance in SHQS to continue to improve 
• Percentage of new tenancies sustained for more than a year remained
stable, though the sustainment rate for homeless applicants has improved
Page 30 of 182

Page 35

2 
for each of the last 3 years, in line with our Rapid Rehousing Transition
Plan. The overall level of tenancy sustainment remains stable at around
95.3% (Indicator 16.) 
• Likewise, the percentage of lettable houses that became vacant over the
year reduced to 7.2% from 8.3% last year (indicator 17) 
• The percentage of rent lost due to voids reduced to 1.86% from 2.00%
(Indicator 18) 
• The average length of time taken to re-let properties in the last year
(Indicator 30) continues to improve at 60.6 days from 66.0 days. Whilst this
improvement in performance in welcome, this remains an area of special
focus for the service so that a further reduction in re-let times is achieved.
Work is currently underway to review the ‘end to end’ process of void
property management to identify specific areas for improvement, with
officers from all areas of the process contributing to this exercise. 
3.3. Within the 2022/23 data there are also areas where performance has
declined, reflecting the challenges faced by the Council in continuing to
provide core housing services throughout the period of Covid recovery.  Some
of the key areas of performance are: 
• The time taken to complete emergency repairs, increased to 9.8 hours
from 7.1 hours (Indicator 8).  As previously reported to this Policy Board, a
new system for raising and managing repairs was introduced in March
2022 which has resulted in the majority of emergency repairs being raised
and updated in real time. Prior to this, these were updated manually from
paper records. Whilst it is expected that the real time updates are
generally accurate, there have been some user errors and system issues
with the new technology that may have had an impact on the accuracy of
some of the data. We will continue to closely monitor this indicator over the
coming months to ensure that user errors are minimised, jobs are updated
promptly and that any corrections are made to the data if found to be
inaccurate as a result of system issues. 
• The number of times in the reporting year that a gas safety check was not
completed within 12 months of a gas appliance being fitted or its last check
(Indicator 11).  In 2022/23, there were 58 occasions where this was not
completed before the anniversary date.  These have now all been
completed. 
• Percentage of tenants satisfied with the repairs and maintenance service
dropped from 95% to 73%.  The methodology of collecting satisfaction
feedback changed last year from outbound telephone calls to automated
text messaging of a digital survey on completion of the repair.  This new
method of collating feedback only started in January 2023, therefore this
figure reflects only three months of surveys and a relatively small sample
size. (Indicator 12.) We will continue to closely monitor this indicator over
Page 31 of 182

Page 36

3 
the coming months and analyse feedback from tenants to identify where
improvements to service may be needed. 
• Expenditure on adaptations increased to almost £770,000 over the past
year. During 2022/23 the Service completed 184 adaptations. At the end of
March 2023 there were 177 households waiting for an adaptation
(Indicator 19) compared to 107 in the previous year. Despite the number of
referrals increasing this year to 363 from 291 last year – which appears to
be as a result of the Health and Social Care Partnership’s catching up on
its Covid-19 backlog of assessments – the average time to complete
adaptations (Indicator 21) also improved to 96 days from 142 days in
2021/22.  Adaptations work has been impacted by issues within the
construction sector, including material supply chain delays and increased
demand on labour resources, however management actions to increase
resource for this workstream through the use of additional external
contractual arrangements have helped mitigate this issue somewhat. 
• Gross rent arrears increased slightly to 8.6% from 8.0% of rent due at the
end of March 2023. (Indicator 27.) This is an area of key priority for
improvement and will continue to be closely monitored throughout the
coming year. 
3.4  Lets to people who are homeless dropped slightly to 41.0% from 42.9% last
year.  This remains below our 49.0% target. Similarly the percentage of
homeless households referred to RSLs also dropped to 28.2% from 32.0%,
although the actual number of RSL lets to homeless applicants saw a small
increase.  (Indicator 24). However, in response to the increase in
homelessness in Renfrewshire, which is in line with the national trend, there
has been an increase in the proportion of lets to homeless applicants during
the first 4 months of 2023/24, and we are now on schedule to meet the 49%
target this year. 
3.5 The Service continues to experience problems related to the construction
sector, such as supplies, materials and resources.  These issues are
widespread throughout the sector nationally.  This has an impact on repair
and maintenance, SHQS compliance and void property turnaround timescales
and the last-mentioned has a further challenge with the utilities sector thereby
causing further delays to returning empty houses to the letting pool.  This
issue is not unique to Renfrewshire and many landlords are experiencing
similar issues.
__________________________________________________________________ 
4. Service Improvement Plan, reporting performance to tenants and
benchmarking performance 
4.1 In May this year, the Communities and Housing Policy Board was presented
with the Environment, Housing and Infrastructure Services 2023-2026 Service
Improvement Plan.   Three indicators on service performance are included in
the plan and the performance of each is reported accordingly.  The indicators
are:
Page 32 of 182

Page 37

4 
a. percentage of reactive repairs carried out in the last year completed first
time, included in ARC report, Indicator 12 
b. percentage of overall repairs completed within target; included in the
management information appendix, table 7 and 
c. average length of time taken to complete non-emergency repairs (days),
included in the ARC report, Indicator 9 
4.2 The Scottish Housing Regulator publishes all social landlords’ performance on
its website in August each year.  In common with other Councils and RSLs,
the Council will be required to report its performance against the Charter to all
tenants in October. 
4.3 In accordance with guidance from the Scottish Housing Regulator and
practice over previous years, tenants will be consulted with on the preferred
format for the Tenants’ Report.  A report will be presented to a future meeting
of this Policy Board which benchmarks Renfrewshire Council’s performance in
2022/23 against other Social Landlords.
__________________________________________________________________ 
5. Single Regulatory Framework, Scottish Housing Regulator Review 
5.1. In June this year the Scottish Housing Regulator opened a consultation on the
Single Regulatory Framework.  The Service submitted a response to this. 
The consultation closed on 11 August 2023 and a copy of the consultation
and response is attached as Appendix 2 to this report. 
__________________________________________________________________ 
Implications of the Report 
1. Financial – None 
2. HR & Organisational Development – None 
3. Community/Council Planning - 
• Building strong, safe, and resilient communities – Improving and
maintaining neighbourhoods and homes.
• Working together to improve outcomes – Increasing resident satisfaction
with neighbourhoods and communities. 
4. Legal – None  
5. Property/Assets – None 
6. Information Technology – None 
Page 33 of 182

Page 38

5 
7. Equality & Human Rights – None 
8. Health & Safety – None 
9. Procurement – None 
10. Risks – None 
11. Privacy Impact – None 
12. Cosla Policy Position – N/A 
13. Climate Change – None 
___________________________________________________________________ 
List of Background Papers 
None.
___________________________________________________________________ 
Author: Ray Walkinshaw, Housing Regeneration and Development Manager
Email: ray.walkinshaw@renfrewshire.gov.uk  
Page 34 of 182

Page 39

1
Scottish Social Housing Charter
Outturn Report 2022/2023
Page 35 of 182

Page 40

Scottish Social Housing Charter Outturn Report 22/23   2
Table of Contents
1. Outturn Report ................................................................................... 3
1.1 Overall Satisfaction ............................................................................... 3
1.2 The Customer Landlord Relationship ................................................... 3
1.3 Housing Quality and Maintenance ........................................................ 4
1.4 Neighbourhood and Community ................................................................. 6
1.5 Access to Housing and Support .................................................................... 6
1.6 Getting Good Value from Rents and Service Charges ............................... 8
1.7 Other Customers; Gypsies/ Travellers ................................................... 9
2. Core Contextual Indicators .............................................................. 10
3. Management Information ................................................................ 11
4. Rent Arrears ...................................................................................... 16 
Page 36 of 182

Page 41

Scottish Social Housing Charter Outturn Report 22/23   3
1. Outturn Report
1.1 Overall Satisfaction
No. Indicator 18/19 19/20 20/21 21/22 22/23 Notes
1
Percentage of tenants
satisfied with the
overall service provided
by their landlord.
(a)88.0% (b)88.8% (b)88.8% (c)82.4% (c)82.4%
The most recent
data relate to the
2022 Tenant
Satisfaction Survey
Sources: (a) 2018 Tenant Satisfaction Survey (b) 2020 Tenant Satisfaction Survey (c) 2022 Tenant Satisfaction Survey
1.2 The Customer Landlord Relationship
Communication
No. Indicator 18/19 19/20 20/21 21/22 22/23 Notes
2
Percentage of tenants
who feel their landlord
is good at keeping them
informed about their
services and decisions.
(a)82.2 (b)88.4%  (b)88.4% (c)91.1% (c)91.1%
The most recent
data relate to the
2022 Tenant
Satisfaction Survey
Sources: (a) 2018 Tenant Satisfaction Survey (b) 2020 Tenant Satisfaction Survey (c) 2022 Tenant Satisfaction Survey
Complaints
No. Indicator 18/19 19/20 20/21 21/22 22/23 Notes
3/4
The percentage of all
complaints responded
to in full at Stage 1
N/A 99.7% 100% 95.1% 97.9%
There were 1,050
Stage 1 complaints
received. 1,028
were responded to
in full, in an
average of 5.76
days.
The average time in
working days for a full
response at Stage 1
N/A 3.6 days 4.97 days 6.56 days 5.76 days
The percentage of all
complaints responded
to in full at Stage 2.
N/A 94.1% 100% 96.2% 84.6%
There were 26
stage 2 complaints
received. 22 were
responded to in
full, in an average
of 14.5 days.
The average time in
working days for a full
response at Stage 2.
N/A 14.6 days 13.9 days 16.6 days 14.5 days
Note: The complaints indicators have been revised by the Scottish Housing Regulator 
Page 37 of 182

Page 42

Scottish Social Housing Charter Outturn Report 22/23   4
Participation
No. Indicator 18/19 19/20 20/21 21/22 22/23 Notes
5
Percentage of
tenants satisfied with
the opportunities
given to them to
participate in their
landlord’s decision-
making processes.
(a)87.8% (b)93.7% (b)93.7% (c)99.0% (c)99.0%
The most recent data
relate to the 2022
Tenant Satisfaction
Survey
Sources: (a) 2018 Tenant Satisfaction Survey (b) 2020 Tenant Satisfaction Survey (c) 2022 Tenant Satisfaction Survey
1.3 Housing Quality and Maintenance
Housing Quality
No. Indicator 18/19 19/20 20/21 21/22 22/223 Notes
6
Percentage of stock
meeting the Scottish
Housing Quality
Standard (SHQS).
94.5% 94.6% 80.1% 57.1% 67.9% See note below
SHQS compliance was lower than projected for 2022/23. This was mainly due to difficulties gaining access to
complete smoke detector upgrades and carry out EICR checks. There has been an increase in abeyances from
last year to this year due to collecting improved data on the ECIR and smoke detector programme.  Whilst we
have a comprehensive programme in place to complete these works, we continue to face issues where tenants
do not give access for these works. Our process for encouraging tenants to participate in these essential works
involves issuing 3 letters to attempt to agree access and where this fails, we have latterly taken the decision to
force entry to complete the works, which we anticipate will improve our compliance further in 2023/24. We do
continue to face issues of fluctuating contractor capacity with these work programmes, due to skilled labour
shortages, but we continue to monitor this and work closely with contractors to minimise the impact of this
where possible.
Smoke/heat detectors are compliant in 84.17% of stock and 81.93% of our stock have valid EICR certificates.
At the end of 2022/23, 8,229 of the stock of 12,216 met the standard SHQS standard.
7
Percentage of
tenants satisfied
with the quality of
their home.
(a)83.9% (b)86.1% (b)86.1% (c)79.9% (c)79.9%
The most recent
data relate to the
2022 Tenant
Satisfaction Survey
C10
Percentage of
homes meeting the
EESSH
73.6% 78.0% 86.6% 78.4% n/a
The SHR did not
collect these data
in 22/23
Sources: (a) 2018 Tenant Satisfaction Survey (b) 2020 Tenant Satisfaction Survey (c) 2022 Tenant Satisfaction Survey 
Page 38 of 182

Page 43

Scottish Social Housing Charter Outturn Report 22/23   5
Repairs, Maintenance and Improvements
No. Indicator 18/19 19/20 20/21 21/22 22/23 Notes
8
Average length of
time taken to
complete emergency
repairs. (hours)
5.1 5.5 6.2 7.1 9.8
Just over 16,500 emergency
repairs were completed in
2022/23. The average time
to complete increased from
7.1 to 9.8 hours.
9
Average length of
time taken to
complete non-
emergency repairs.
(days)
6.9 7.8 10.7 14.6 6.1
Just over 24,400 non-
emergency repairs were
completed in an average of
6.1 days. This is an
improvement in the length of
time taken to complete non-
emergency repairs.
10
Percentage of
reactive repairs
carried out in the last
year completed right
first time.
88.1% 82.6% 85.1% 84.9%  90.0%
Of the 22,357 reactive repairs
carried out in 22/23, 20,118
were completed right first
time.
11
How many times in
the reporting year
did you not meet
your statutory
obligations to
complete a gas
safety check within
12 months of a gas
appliance being
fitted or its last
check?
3 17  1471  142  58
Renfrewshire Council have at
all times followed the Scottish
Government guidance and
the more detailed guidance
from Gas Safe and HSE. All of
these services have been
completed and there are no
outstanding gas services.
12 (was 16)
Percentage of
tenants who have
had repairs or
maintenance carried
out in last 12 months
satisfied with the
repairs and
maintenance service. 
92.5%  90.8%  92.0%  95.0%  73.3%
Our methodology for
gathering repairs satisfaction
has changed in that a text
message is now sent after
each completed reactive
repair with a link to an online
survey. This enables a much
faster response and a higher
volume of returns to be
gathered. The reporting
system for tenant satisfaction
went live in January 2023 and
therefore only one quarter of
data has been gathered. The
level of satisfaction has
reduced compared to
previous years and it is
Page 39 of 182

Page 44

Scottish Social Housing Charter Outturn Report 22/23   6
thought that the new
methodology may have
contributed to this (because
any dissatisfaction may be
fresher in the customers’
minds). However, it is our
intention to analyse the data
over a longer time period to
highlight any patterns in the
returns which we hope will
identify potential areas of
improvement in service
delivery
(12) Source: Point of service survey
1.4 Neighbourhood and Community
Estate Management, Anti-Social Behaviour, Neighbour Nuisance and Tenancy Disputes
No. Indicator 18/19 19/20 20/21 21/22 22/23 Notes
13
Percentage of tenants
satisfied with the landlord’s
contribution to the
management of the
neighbourhood they live in.
(a)83.2% (b)84.5% (b)84.5
%
(c)87.0% (c)87.0
%
The most recent
data relate to the
2022 Tenant
Satisfaction Survey
14
Percentage of tenancy
offers refused during the
year.
46.5% 40.2% 24.1% 39.6% 39.3% From 1490 formal
offers there were
585 refusals.
15
Percentage of anti-social
behaviour cases reported in
the last year which were
resolved.
96.0% 99.4% 99.8% 99.7% 98.0% 390 of 398 cases
were resolved.
13) Sources: (a) 2015 Tenant Satisfaction Survey, (b) 2018 Tenant Satisfaction Survey (c) 2020 Tenant Satisfaction Survey
1.5 Access to Housing and Support
Tenancy Sustainment and Tenancy Turnover
No.
Indicator 18/19 19/20 20/21 21/22 22/23 Notes
Percentage of new tenancies sustained for more than a year,
by source of let.
These figures relate to tenancies which
Page 40 of 182

Page 45

Scottish Social Housing Charter Outturn Report 22/23   7
16
Existing tenants 94.2% 95.4% 95.5% 93.5% 95.2% commenced between April 2021 and
March 2022. Overall sustainment has
improved over this period. Tenancy
sustainment by homeless applicants
has improved in each of the last 3
years, in line with our Rapid Rehousing
Transition Plan.
Homeless
applicants 82.1% 80.4% 88.4% 89.4% 91.6%
Housing List
applicants 90.0% 91.7% 92.8% 94.5% 94.5%
Other 0.0% 0.0% 0.0% 0.0% 0.0%
Overall 88.5% 88.5% 92.0% 92.2% 95.3%
17
Percentage of
lettable houses
that became
vacant in the last
year.
9.7% 9.5% 6.6% 8.3% 7.2%
There was a decrease in the number of
lettable houses that became vacant in
the year, with 828 this year compared
to 964 last year. 
18
Percentage of
rent due lost
through
properties being
empty during the
last year.
1.4% 1.5% 1.58% 2.0% 1.9%
There was a decrease in the rent lost
through void properties this year. 
Housing Options and Access to Housing
No. Indicator 18/19 19/20 20/21 21/22 22/23 Note
s
19
Number of
households currently
waiting for
adaptations to their
home
N/A 46 129 107 177
During 22/23 the
Service completed
184 adaptations, at
the end of March
22/23 there were 177
households waiting
for an adaptation
(Indicator 19)
compared to 107 in
the previous year.
The average time to
complete adaptations
(Indicator 21) also
improved to 96
days
20
Total cost of
adaptations
completed in the
year by source of
funding (£)
N/A £402,000 £86,152 £608,555 £769,216
21 Average time
to complete
adaptations 56.8 36.2 79.4 141.9 96 
from 142 days.
Performance of this
indicator is severely
impacted by issues
with the
construction
industry, notably in
relation to supplies
and resources.
Page 41 of 182

Page 46

Scottish Social Housing Charter Outturn Report 22/23   8
22
Percentage of the
court actions
initiated which
resulted in eviction
and the reasons
for
eviction.
27.4
%
20.0% 0.0% 0.8% 5.0% In line with
legislation the
Service resumed a
full arrears recovery
service. Non-payment of rent 26.7% 20.0% 0.0% 0.0% 4.4%
Anti-social behaviour 0.7% 0.0% 0.0% 0.8% 0.6%
Other 0.0% 0.0% 0.0% 0.0% 0.0%
Homelessness
No Indicator 18/19 19/20 20/21 21/22 22/23 Notes
24
Homelessness (LAs
only) – the
percentage of
homeless households
referred to RSLs
under section 5 and
through other referral
routes.
N/A 26.3% 32.1% 32.0% 28.2%
The Council continues to work
with RSL partners to refer
households through the section 5
and Nomination Agreement
routes. The actual number of
houses let to homeless applicants
by RSLs increased in 2022/23 and
has improved in each of the last 4
years, in line with our Rapid
Rehousing Transition Plan.
Note: Indicator 23 is for RSLs only
1.6 Getting Good Value from Rents and Service Charges
Value for Money
No. Indicator 18/19 19/20 20/21 21/22 22/23 Notes
25
Percentage of
tenants who feel that
the rent for their
property represents
good value for
money.
(a)75.8% (b)78.2% (b)78.2% (c)83.4% (c)83.4%
The most recent data
relate to the 2022
Tenant Satisfaction
Survey where
satisfaction has
increased.
Sources: (a) 2018 Tenant Satisfaction Survey (b) 2020 Tenant Satisfaction Survey (c) 2022 Tenant Satisfaction Survey
Rents and Service Charges
No. Indicator 18/19 19/20 20/21 21/22 22/23 Notes
26 Rent collected as
percentage of total 100.0% 99.5% 99.0% 98.2% 100.0% Last year £48,250,667 of
rent was collected from a
Page 42 of 182

Page 47

Scottish Social Housing Charter Outturn Report 22/23   9
No. Indicator 18/19 19/20 20/21 21/22 22/23 Notes
rent due in the
reporting year.
total of £48,238,167 rent
due.
27
Gross rent arrears (all
tenants) as at 31 March
each year as a
percentage of rent due
for the reporting year.
5.8% 5.7% 6.4% 8.0% 8.6%
There has been an increase
in the level of gross rent
arrears over the past year.
28
Average annual
management fee per
factored property.
£90 £108 £0 £58 £108
The level of charge has
returned to pre pandemic
level.
29
Percentage of factored
owners satisfied with
the factoring service
they receive.
61.0% 60.8% 62.4% 60.4% 71.2% This indicator has improved.
30
Average length of time
taken to re-let
properties in the last
year. (days)
38.0 45.0 85.7 66.0 60.6
There were 868 re-lets in
22/23. Despite issues with
utilities suppliers and
ongoing labour supply
shortages within the
construction industry there
has been improvement in
the average re-let times.
Our void turnaround times
and processes remain an
area of primary focus for
the service and we will
continue to look for
improved ways of working.
(33) Source: Annual owners services survey
1.7 Other Customers; Gypsies/ Travellers
No. Indicator 18/19 19/20 20/21 21/22 22/23
31 Gypsies/travellers –Average weekly rent per pitch.
Currently there are no gypsy/traveller sites in
Renfrewshire. 32
For those who provide sites - percentage of
gypsies/travellers satisfied with the landlord’s
management of the site.
Page 43 of 182

Page 48

Scottish Social Housing Charter Outturn Report 22/23   10
2. Core Contextual Indicators
2.1 Last year the Scottish Housing Regulator reduced the number of contextual indicators from
32 to 6, these relate to the stock and profile of our service users. Not all of these are reported
by local authorities. The core contextual indicators are included in the table below:
No. Indicator 18/19 19/20 20/21 21/22 22/23
C2
Number of lets during the reporting year, by source of let
Existing tenants 194 265 154 228 270
Housing List applicants 509 523 200 343 291
Mutual Exchanges 0 17 2 15 10
Other sources 0 0 0 0 66
Homeless applicants 357 352 245 369 318
Total number excluding
exchanges 1,060 1,140 599 940 945
C3
Number of lets during the reporting year
General Needs 1,030 1,101 571 902 898
Supported Housing * 30 39 28 38 47
C14
Types of tenancies granted for the reporting year
Occupancy agreements 0 0 0 0 0
Short SST 2 4 3 6 4
SST 1,058 1,136 596 934 941
C15
Housing Lists
New applicants 4,450 3,015 2,464 2,976 2,694
Applicants on list at end of
year 5,553 5,253 5,901 5,347 4,951
Suspensions 94 98 99 61 46
Cancelled 3,232 3,464 1,646 3,271 3,163
C4 Abandoned properties 155 125 49 122 101
C30
Number of notices of
proceedings issued 1,802 1,494 4 112 622
The number of orders for
recovery of possession
granted during the reporting
year
127 87 0 6 38
C29
Average number of reactive
repairs completed per
occupied property
4.5 5.1 3.2 3.7 3.6
C16 The Landlords wholly owned
stock 12,002 12,066 12,212 12,216 12,216
Stock by house type
House 2,561 2,612 2,695 2,696 2,755
Page 44 of 182

Page 49

Scottish Social Housing Charter Outturn Report 22/23   11
C17
High Rise 1,001 1,000 1,000 1,000 1,002
Tenement 4,609 4,602 4,635 4,637 4,601
4 in block 2,781 2,802 2,831 2,832 2,795
Other flat/maisonette 1,050 1,050 1,051 1,051 1,063
C20
Number of self-contained
properties void at the year
end
358 391 641 619 546
Void for more than 6 months 9 2 209 196 207
C5 Rent increase 2.0% 2.0% 1.5% 2.0% 5.5%
* Sheltered housing only
3. Management Information
3.1 Allocations and Managing Tenancy Change
There were just under 5,000 applicants applying for housing in 2022/23 (Graph 1). This is down
slightly from 21/22 but the origins of their applications remained proportionally similar to the
previous year (Graph 2). 
Graph 1 (Applicants on housing list) Graph 2 (Source of application)
In 2022/23, 945 properties were let by the Council. Most of these lets (81%) were made through the
group system (Graph 3). There has been a significant increase in lets associated with the
Regeneration programme (Graph 4)  
Page 45 of 182

Page 50

Scottish Social Housing Charter Outturn Report 22/23   12
Graph 3 (Number of lets) Graph 4 (Lets out with the Group system)
Within the group system, 41% of lets went to Group 1 (Homeless) applicants (Graph 5). 
Graph 5 (Lets and targets)
Last year saw a percentage increase in lets in tenement flats and houses. The increase in house lets
relates to new build properties (Graph 6). 
Graph 6 (percentage of lets by property type)
Page 46 of 182

Page 51

Scottish Social Housing Charter Outturn Report 22/23   13
Council nominations for RSLs reduced from 74 in 2021/22 to 48. The number and percentage of
Section 5 Lets was broadly the same as 2021/22 (Table 1, Graph 7).
Nomination & S5 Lets
Council nomination lets % of overall lets
to Council
nominations
Section
5 lets
% lets to
Section 5 % overall
lets to
Council General
stock
Specialist/sheltered/supported Total stock
18/19 75 17 12.20% 130 20.9% 29.40%
19/20 47 9 6.90% 134 19.7% 23.40%
20/21 19 1 3.25% 165 31.8% 30.00%
21/22 74 3 8.58% 174 24.2% 27.98%
22/23 48 11 7.59% 171 26.5% 29.60%
Table 1: Nominations and Section 5 = general stock only (excludes specialist) 
Graph 7 Nominations and Section 5 = general stock only (excludes specialist) 
3.2 Repairs 
In 2022/2023 over 43,700 repairs were carried out and 93.1% were completed within the target
timescale. This is a very slight decrease on 2021/22 where over 45,000 repairs were complete with
93.6% completed within the target timescale.
Table 2 outlines repairs performance completed by category of repair and graph 8 illustrates the
performance trend of all repairs completed over the past few years. 
• an emergency repair is classed as one where there is a threat to health and safety
or where we need to take quick action to prevent damage
• ‘right to repair’ qualifying repairs are urgent repairs which must be
carried out within a specified timescale in terms of the Housing
(Scotland) Act 2001
Page 47 of 182

Page 52

Scottish Social Housing Charter Outturn Report 22/23   14
• routine repairs are everyday repairs which are required as a result of normal
wear and tear of the property
• programmed repairs are generally non-urgent general maintenance repairs
which are carried out on a programmed basis rather than carrying out
individual responsive repairs (usually larger scale repairs within common
ownership) 
Repairs % completed in target time
Category of
Repair 19/20 20/21 21/22 22/23
Emergency
Completed 98.0% 98.7% 97.0% 95.0%
Right to Repair
Completed 100.0% 99.5% 100.0% 95.0%
Urgent
Completed 94.0% 87.0% 86.0% 61.0%
Routine
Completed 90.0% 90.0% 87.0% 92.0%
Programmed
Completed 97.0% 98.8% 100.0% 99.0%
Total Repairs
Completed 95.0% 96.2% 93.6% 93.1%
Table 2 – Repairs % completed in target time                                           Graph 8 Total repairs completed in target time
Graph 9 provides information on Customer Contact Centre performance in relation to housing
repairs calls. This shows the volume of calls in 2022/23 and the outcomes for calls received. Over
75,000 calls were made to report repairs and 89% of these were answered. This is the same as
2021/22 performance when 89% of calls were answered, although there were around 9,000 fewer
calls, at 66,000. We received 8,959 Repairs via email. Ren Repairs app is no longer in use. 
60% of answered calls were answered within the 40 second target and of all attempted calls 55% of
these were answered within the 40 second target time. The data for graph 10 relates to data from
April to October 2022. The new system that was introduced in November 2022 did not have call
waiting statistics. This information will be available for future reports. 
Page 48 of 182

Page 53

Scottish Social Housing Charter Outturn Report 22/23   15
Graph 9 (CCC Calls answered/abandoned) Graph 10 (CCC Calls answered in 40 seconds) 
3.3 Homelessness and Housing Advice 
During 2022/23 the number of people presenting as homeless that require assessment, those who
were looking for housing advice and the number of applications where the Council has a statutory
duty to re-house all increased slightly. The proportion of assessments completed within 28 days
remains very high at 99.7% from 100% last year (Graph 11). 
Graph 11 (Homelessness, applications and decision making)
Page 49 of 182

Page 54

Scottish Social Housing Charter Outturn Report 22/23   16
Satisfaction with the quality of advice, the quality of temporary accommodation and the overall
quality of service received remains high, with the last-mentioned at almost 95% in 2022/23 (Graph
12). 
Graph 12 (Homeless Services satisfaction)
4. Rent Arrears 
Graph 13 that the annual rental income due to be collected is over £48.2m. At the end of March
2022, £2.32 million was owed in arrears which is slightly lower than last year’s figure of £2.33million. 
Page 50 of 182

Page 55

Scottish Social Housing Charter Outturn Report 22/23   17
Graph 13 Rent arrears value
Graph 14 shows the recovery action taken, with the return to normal arrears recovery activity there
is an increase to cases being called to court. Graph 15 also shows average calling times increasing. 
Graph 14 Recovery action                                                                                      Graph 15 Court calling time
Graph 16 highlights the status of debt from post and pre court. The amount of debt pre court has
increased due to no court activity during the pandemic. 
Graph 16 Status of rent debt
Graph 17 provides a profile of arrears by value. There has been some reduction in total arrears with
specific reductions in the bands £250 to £500 and £500 to £1000, the other arrears values have
remained relatively stable. Graph 18 shows the amount owed by tenants by age profile which shows
that the main group with the majority of arrears are those in the 25 to 49 age band. 
Page 51 of 182

Page 56

Scottish Social Housing Charter Outturn Report 22/23   18
Graph 16 Arrears by value                                                                                 Graph 17 Arrears age bands
Graph 19 provides summary information on benefit levels comparing with previous years. Benefit
uptake remains high with 76% of our tenants in receipt of some form of benefit. 
Graph 19 Housing Benefit 
Page 52 of 182

Page 57

19
Environment, Housing and Infrastructure
Renfrewshire Council
Renfrewshire House
Cotton Street
Paisley
PA1 1BR 
Page 53 of 182

Page 58

1
Appendix 2 
Our regulation of social housing in Scotland 
Discussion questions 
We welcome your general feedback on our proposals as well as answers to the specific questions we have
raised. You can read our discussion paper on our website at www.housingregulator.gov.scot
Please do not feel you have to answer every question unless you wish to do so. 
Send your completed questionnaire to us by 11 August 2023. 
By email @: regulatoryframeworkreview@shr.gov.scot 
Or post to:  Scottish Housing Regulator 
2nd floor , George House 
36 North Hanover Street, G1 2AD 
Name/organisation name 
Louise Feely, Renfrewshire Council 
Address
Renfrewshire House
Cotton Street
Paisley
Postcode PA1 1JD Phone 03003000280 Email
louise.feely@renfrewshire.gov.uk 
How you would like your response to be handled 
To help make this a transparent process we intend to publish on our website the responses we
receive, as we receive them. Please let us know how you would like us to handle your response.  If
you are responding as an individual, we will not publish your contact details. 
Are you happy for your response to be published on our website? 
Yes  x             No     
If you are responding as an individual … 
Please tell us how you would like your response to be published.  Pick 1
Publish my full response, including my name   
Please publish my response, but not my name  
Page 54 of 182

Page 59

2 
1. We believe that our regulatory priorities should be:
• listening and responding effectively to tenants and service users
• providing good quality and safe homes
• keeping homes as affordable as possible
• doing all they can to reduce the number of people who are experiencing homelessness 
We are keen to hear your feedback on these priorities. Are they the right ones? 
The regulatory priorities outlined appear reasonable. 
2. What are your views on amending the Statutory Guidance on Annual Assurance Statements to
include provisions on specific assurance?
We agree that a provision for a requirement for explicit assurance may be required in certain
circumstances.  We welcome such an approach but would suggest that the assurance sought
should not be prescriptive and that each landlord should provide appropriate assurance. 
3. Do you think that we need to change any of the indicators in the ARC or add to these?
The ARC indicators generally remain useful and would suggest that it is possibly more appropriate
to review indicators as part of a review of the Charter.  That said we consider that Indicator 10,
(Percentage of reactive repairs carried out in the last year completed right first time) serves a
limited purpose.  It may be more meaningful to split this indicator with two indicators:  Percentage
of reactive repairs completed within target and Percentage of reactive repairs that required more
than one visit to complete.  If there are proposals to alter any indicators, we would welcome the
opportunity to participate in such discussions. 
4. Are the proposed areas of focus for tenant and resident safety indicators the right ones, and
what should those indicators be?
We agree that the priorities appear proportionate and reasonable, but would suggest that
monitoring tenant and resident safety by indicators alone is not the most appropriate vehicle. 
Some of the areas regarding tenant and resident safety are considerably easier than others to
meaningfully measure by way of indicators.  We would welcome discussions on what any future
indicators are likely to be. It may be more appropriate that some of the areas are reliant on the
landlord providing assurance through other means, such as evidence of appropriate process and
policies. 
5. What do you think would be the most effective and appropriate way to monitor the effectiveness
of landlords’ approach to managing reports and instances of mould and dampness?
The Council has a policy on damp and mould with appropriate procedures.  Our stock condition
survey (100% over five years) will gather data on mould issues by property.  Combined with
appropriate policies and procedures on mould and dampness, we would suggest that these
methods are an effective way to monitor damp and mould. 
6. What are your views on strengthening the Framework further on landlords listening to tenants
and service users? 
We have methods for tenants and service users to provide feedback and consequently have no
issue with these proposals.  Our new Tenant Participation Strategy will increase the ways in which
tenants and stakeholders can provide feedback 
7. How do you think we could streamline the requirements for landlords in the Notifiable Events
statutory guidance? 
Notifiable events apply only to RSLs and consequently we will not comment here. 
Page 55 of 182

Page 60

3
8. Do you think there is value in using more direct language in the working towards compliance
status, or in introducing an intermediary regulatory status between compliant and working
towards compliance? 
This appears to apply to RSLs only 
9. Are there any changes we should make to the Significant Performance Failures approach,
including how we define these?
We publicise the SHR Significant Performance Failure leaflet, it is a useful route for tenants who
do may want to raise issues directly with the landlord for particular reasons (for example
whistleblowing).  The Significant Performance Leaflet therefore compliments our established
complaints process. 
10. Are there any other changes to the Regulatory Framework and associated guidance that you
would suggest?
We look forward to the Scottish Government’s EESSH Review Groups findings being published
and would welcome an early indication of any changes to the standard to help inform investment
decisions at as early a stage as possible.   
We are satisfied with the current Regulatory Framework and the approach to reporting and would
welcome any future consultation on it. 
Thank you for taking the time to give us your feedback!
Page 56 of 182

Page 61

___________________________________________________________________
To: Communities and Housing Policy Board
On: 22 August 2023
___________________________________________________________________
Report by: Director of Environment, Housing and Infrastructure
___________________________________________________________________
Heading: Draft Renfrewshire Strategic Housing Investment Plan 2024/25 –
2028/29
___________________________________________________________________
1. Summary
1.1 The draft Strategic Housing Investment Plan 2024-2029, attached at
Appendix 1, sets out the housing priorities for investment in projects across
Renfrewshire that will benefit from the Scottish Government’s Affordable
Housing Supply Programme support. 
1.2  Renfrewshire’s Strategic Housing Investment Plan is reviewed and updated
each year in consultation with developing Housing Associations and the
Scottish Government.
1.3  The draft Strategic Housing Investment Plan for the period 2024 to 2029 is
attached and will be subject to a four-week consultation.
___________________________________________________________________
2. Recommendations 
It is recommended that the Communities and Housing Policy Board:
2.1 approves the draft Renfrewshire Strategic Housing Investment Plan 2024 to
2029, as set out in Appendix 1, for consultation, before a finalised plan is
presented to the Communities and Housing Policy Board. 
_________________________________________________________
3. Background
3.1 The Strategic Housing Investment Plan outlines how Scottish Government
funding for affordable housing will be targeted to achieve the priorities set out
Item 5
CHPB220823 Page 57 of 182

Page 62

in Renfrewshire’s Local Housing Strategy and supports the delivery of a range
of affordable housing projects across Renfrewshire. 
3.2  Through the Affordable Housing Supply Programme, the Scottish Government
allocates grant funding (known as Resource Planning Assumptions) to local
authority areas.
3.3  The Scottish Government has confirmed the level of funding allocated to
Renfrewshire to support the delivery of affordable homes for the three-year
period to 2026, as set out below:
• £17.140M in grant support for the financial year 2023/24; 
• £17.200M in grant support for the financial year 2024/25; and
• £17.485M in grant support for the financial year 2025/26 
3.4  Resource Planning Assumptions support the delivery of new affordable
homes across Renfrewshire by providing grant support at a benchmark rates.
The Scottish Government benchmark grant rates were recently increased to
£83,584 for new Council homes and £91,182 for new social rented homes
delivered by housing association partners. 
3.5  Additional grant funding is also available on top of the grant benchmark rates,
where affordable housing developers include design features related to zero
emissions; the installation of automatic fire suppression systems; electric
vehicle charging points; space for home working; provision of balconies and
digital connectivity. 
4.  Draft Renfrewshire Strategic Housing Investment Plan 2024 – 2029
4.1 The range of housing projects contained in the draft Strategic Housing
Investment Plan vary in size and location across Renfrewshire. The draft plan
highlights a healthy and ambitious affordable housing programme being
delivered by the Council and Housing Associations which is supported by the
Scottish Government.
4.2 In accordance with current Scottish Government guidance, the draft Strategic
Housing Investment Plan 2024 to 2029 takes a flexible approach to
programme management. By being ambitious and including a degree of over-
programming, affordable housing projects can be brought forward within the
programme, taking advantage of any additional resources that may become
available to Renfrewshire over the financial year.
4.3  The draft Strategic Housing Investment Plan also contains funding provision
for newbuild Council housing in the Housing Regeneration and Renewal
areas where newbuild housing is proposed. 
___________________________________________________________________ 
Page 58 of 182

Page 63

5. Next Steps
5.1 Consultation on the draft Renfrewshire Strategic Housing Investment Plan will
take place between August and September 2023. This will involve further
engagement with all housing associations operating in Renfrewshire, local
stakeholder groups such as Community Councils and tenants and residents’
associations, community planning partners, other stakeholder groups and
Renfrewshire’s residents. 
5.2 Following consultation and taking account of feedback, the Strategic Housing
Investment Plan 2024-2029 will be finalised and presented to this Policy
Board for consideration.
__________________________________________________________________________________
Implications of the Report
1. Financial - Provision has been made within the Housing Revenue Account
(HRA) Budget in relation to the projects where the Council is the developing
organisation.
2. HR & Organisational Development – None.
3. Community/Council Planning – 
• Building strong, safe and resilient communities - Increasing the supply of
affordable housing and regenerating communities 
4. Legal – Conveyancing work associated with land disposals
5. Property/Assets – None.
6. Information Technology – None. 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report.   If required following implementation, the actual
impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be
published on the Council’s website.  
8. Health & Safety – None.
9. Procurement – None.
10. Risk – None.
11. Privacy Impact – None. 
Page 59 of 182

Page 64

12. COSLA Policy Position – None.
13. Climate Risk – The Draft Strategic Housing Investment Plan aims to deliver
high quality, energy efficient homes in sustainable locations across
Renfrewshire. 
__________________________________________________________________________________
Appendix 1 - Draft Strategic Housing Investment Plan 2024 to 2029
__________________________________________________________________________________
Author:  Sharon Marklow, Place Strategy Manager. 
Tel: 07534 076364; Email: sharon.marklow@renfrewshire.gov.uk 
Page 60 of 182

Page 65

1   
Renfrewshire Draft Strategic Housing Investment
Plan 2024-2029 
Page 61 of 182

Page 66

Draft Strategic Housing Investment Plan 2024-2029 2
Preparation and Consultation
This draft Renfrewshire Strategic Housing Investment Plan
2024/25 to 2028/29has been prepared for consultation and
engagement following on-going discussions with the Scottish
Government and Registered Social Landlords operating in
Renfrewshire.
All interested parties are encouraged to shape, comment and
provide feedback on the Strategic Housing Investment Planto
ensure that itreflects the views of Renfrewshire’s communities
and stakeholders.
The finalised Strategic Housing Investment Planwill be submitted
to the Council’s Communities and Housing Policy Boardon the
31st October 2023, it will alsobe submitted to the Scottish
Government. 
Following submissionof the finalised Strategic Housing
Investment Planto the Scottish Government, a Strategic Local
Programme Agreement for Renfrewshire will form the basis of
individual agreements between the Scottish Government,
Renfrewshire Council and Registered Social Landlords on funding
for specific affordable housing projects as outlined in the finalised
Strategic Housing Investment Plan.
New build social rented housing, Albert Road, Renfrew (Williamsburgh Housing Association) 
This Draft Strategic Housing Investment Plan is to be
published for consultation from 23rd August 2023 to
25th September 2023.
Comments should be returned by email or by post to:
Email: strategyandplace@renfrewshire.gov.uk
Economy and Development Team, Chief Executives
Service, Renfrewshire Council, Renfrewshire House,
Cotton Street, Paisley, PA1 1WB
Page 62 of 182

Page 67

Draft Strategic Housing Investment Plan 2024-2029 3
Renfrewshire’s Draft Strategic Housing Investment Plan 
The Scottish Government’s Affordable Housing Supply
Programme (AHSP)sets out a national framework to provide
affordable homes across Scotland.
The Scottish Government allocate grant funding to Councils who
then direct this support towards the development of
predominantly new affordable homes, delivered by either the
Council or one of its housing association partners.
As part of the Affordable Housing Supply Programme process,
local authorities are required to prepare a Strategic Housing
Investment Planeach year.
Renfrewshire’s draft Strategic Housing Investment Planidentifies
affordable housing projects which are to be supported by
Scottish Government funding and sets out how this investment
will be targeted to meet the strategic priorities of Renfrewshire’s
Local Housing Strategy.
Projects included within the draft Strategic Housing Investment
Planaim to support the delivery of the right homes in the right
places and assist in providing safe,warm and energy efficient
homes that meet people’s housing needs and contribute to the
creation of sustainable thriving communities.
The Scottish Government’s Housing Programme 
The Scottish Government published their ‘Housing to 2040
Strategy’ in March 2021 with the strategy setting out the Scottish
Government’s approach to increasing the supply of homes across
all tenures in the period to 2040.
In terms of affordable housing, the ‘Housing to 2040 Strategy’
includes a target to provide 110,000 affordable homes by 2032
with at least 70% of these homes to be developed for social rent.
The ambitious ‘Housing to 2040 Strategy’ requires ongoing
partnership working between the Council, affordable housing
providers, private developers, the construction industry and the
Scottish Government.
Continued financial support in terms of future funding
commitments from the Scottish Government and an
understanding of rising development and tender costs will also
be essential to support the ongoing delivery of new affordable
homes across Renfrewshire.
Page 63 of 182

Page 68

Draft Strategic Housing Investment Plan 2024-2029 4
The Scottish Government’s Housing and Planning
Delivery Framework (HPDF)
This draft Strategic Housing Investment Plantakes account of the
Scottish Government’s Housing and Planning Delivery Framework
(HPDF) which promotes more efficient collaboration between
Housing and Planning Services in relation to the Local Housing
Strategy, Housing Need and Demand Assessmentand national
planning policies.
Renfrewshire's Strategic Housing Investment Plan, Local Housing
Strategyand the Renfrewshire Development Plan(including
Renfrewshire’s Local Development Plan 2021and National
Planning Framework 4) support the implementation of the
Housing and Planning Delivery Frameworkand aim to increase
the supply of housing; make the housing system more responsive
to demand; improve long term housing affordability and
contribute to reducing volatility in the housing market.
Development Plan for Renfrewshire
Renfrewshire’s Development Plan consists of National Planning
Framework 4and the Renfrewshire Local Development Plan 2021.
Renfrewshire’s Development Plansupports the development of
new homes that improve affordability and choice as well as
increasing access to homes for all which are accessible and
adaptable, including wheelchair accessible homes.
When the Council is assessing development projects included
within this draft Strategic Housing Investment Plan, it will
consider these proposals against the policies in the National
Planning Framework 4and the Renfrewshire Local Development
Plan 2021.
Affordable Homes for Renfrewshire
Renfrewshire Council continue to work with local authorities
across the Glasgow City Region to finalise a Housing Need and
Demand Assessment(HNDA 3) that will assist in identifying the
number of new homes required across Renfrewshire.
In addition to HNDA3, a comprehensive local affordable housing
study of the Renfrewshire area is currently being prepared. This
detailed local research will complement the wider HNDA3as well
as provide a robust and credible evidence base by identifying
housing need ata lower level geography across Renfrewshire’s
towns and villages. This comprehensive evidence base will also
inform the application of Renfrewshire’s Affordable Housing
Policy.
Page 64 of 182

Page 69

Draft Strategic Housing Investment Plan 2024-2029 5
Following the publication of HNDA3 and the completion of the
local affordable housing study, the Council will identify Housing
Supply Targets to meet the needs for both private and affordable
housing. These targets will be included in new Renfrewshire Local
Housing Strategydue to be published later in 2023.
Resources for Housing Delivery
It is essential that a healthy, flexible and ambitious affordable
housing development programme is maintained to ensure that
sites can be progressed to meet local needs while making best
use of available funding and resources.
The Scottish Government provide local authorities with multi-year
Resource Planning Assumptions (RPA’s) to support the longer term
planning and delivery of projects within the Strategic Housing
Investment Plan.
For the three-year period 2023/24 to 2025/26, the following
minimum levels of grant funding have been confirmed by the
Scottish Government:
▪ £17.140Min grant support for the financial year 2023/24;
▪ £17.200Min grant support for the financial year 2024/25; and
▪ £17.485Min grant support for the financial year 2025/26
Scottish Government Grant Benchmarks
Resource Planning Assumptions provide grant support at
benchmark rates for each affordable home developed.
In June 2023, the Scottish Government increased the benchmark
grant rates for a social rented new build home to £83,584 for new
Council homes and £91,182 for housing association partners.
Thesegrant rates are flexible which means that projects may be
eligible for a higher grant award per property following a detailed
assessment of project viability and development costs.
In recent years, tender costs have been significantly higher due to
increased labour and material costs. This has had an adverse
impact on development costs, levels of grant requirement and
timescales for the delivery of projects. The recent uprating of
grant levels is intended to assist in mitigating these higher
development costs.
Following the recent uprating of Scottish Government grant
benchmarks in June 2023, discussions will now take place with
affordable housing providers as part of the draft Strategic
Housing Investment Plan consultation process to determine any
consequential impact on the level of grant to be made available
Page 65 of 182

Page 70

Draft Strategic Housing Investment Plan 2024-2029 6
to affordable housing providers from current Resource Planning
Assumptions to support delivery of projects identified within
appendix 3 of this draft Strategic Housing Investment Plan.
Following these discussions, appendix 3 of the finalised Strategic
Housing Investment Plan will be updated to reflect any eligible
increase in the level of grant funding for each project.
New Affordable Housing Design Features
Additional grant funding is available from existing Resource
Planning Assumptionsfor affordable housing related to specific
quality and design features, including:
▪ The delivery of homes to Silver Level of the 2019 Building
Regulations in respect of Energy for Space Heating;
▪ The provision of balconies within flatted developments
where the provision of private or communal outdoor space is
not possible;
▪ The provision of space for home working or study where it is
not possible to incorporate such space within the design of
the homes under current space standards;
▪ Digitally enabled homes with tenants able to arrange for an
internet connection without the internet service provider
having to provide additional cabling to the premises;
▪ The installation of ducting infrastructure for electric vehicle
charge point connectors; 
▪ Installation of electric vehicle charge points;
▪ The installation of automatic fire suppression systems; and 
▪ Installation of heating systems which produce zero direct
emissions at the point of use. 
The flexible benchmark rates of grant as well as any additional
grant being made available to affordable housing developers who
incorporate enhanced design elements, is being met from current
known Resource Planning Assumptions. This may have an impact
on the number of new affordable homes being delivered as the
level of grant for each property increases.
New build Council housing, Auchengreoch Road, Johnstone
Page 66 of 182

Page 71

Draft Strategic Housing Investment Plan 2024-2029 7
Renfrewshire’s Local Housing Strategy
A new LocalHousing Strategyfor Renfrewshire that will cover the
next five year period is currently being finalised following
consultation with local communities, housingassociations,
tenants and resident’s associations, community councils, the
third sector, Renfrewshire’sHealthand Social CarePartnership
and other key stakeholders.
It is anticipated that new Local Housing Strategywill be submitted
for approval to the Communities and Housing Policy Boardin late
2023.
The new LocalHousing Strategytakesaccount of currentlocal
and national policypriorities, as well as newresearch and
evidence andlooksto builduponpastsuccesses whilst aimingto
meet need and demand for both housing and housing related
services.
The new draft LocalHousing Strategyincludes 5 strategic
priorities as shown opposite. 
New Local Housing Strategy Draft Strategic Priorities
1. The supply and delivery of housingis increased across all
tenures to meet the housing needs of different groups
and create attractive and sustainable places.
2. Peoplelive in high quality,well managedhomes in
sustainable neighbourhoods.
3. Address the challenges of the climate emergency,
delivering homes that are warm, energy efficient and
fuel poverty is minimized.
4. Preventing and addressing Homelessness with
vulnerable people getting the advice and support they
need.
5. People can live independently for as long as possible in
their own home and the different housing needs of
people across Renfrewshire are being met.
Page 67 of 182

Page 72

Draft Strategic Housing Investment Plan 2024-2029 8
Meeting Renfrewshire’s Housing Need
When developing proposals for new buildprivate and affordable
housing, development proposals require to promote balanced
mixed communities that include a range of property types and
sizes to meet a range of housing needs, including the provision of
accessible homes and homes designed to wheelchair standard.
All affordable housing must be built to Housing for Varying Needs
standard and should have flexibility built into its design to allow
for future adaptation and reconfiguration to meet on-going
tenant and resident’s future needs.
▪ In 2021,Renfrewshire’s had a population of179,940people
living across 87,910 different households with an average
household size of just over two people (National Records of Scotland).
▪ By 2028, the number of households is expected to increase to
around 90,600 through small projected increases in the
population combined with an increasing number of people
living alone (National Records of Scotland).
▪ Renfrewshire’s population like Scotland’s is ageing with
people living longer. In 2021, almost one fifth (19.6%) of
Renfrewshire’s population was 65 years of age or older (National
Records of Scotland).
Renfrewshire Affordable Housing Investment Priorities
All projects included within this Strategic Housing Investment
Planhave clear links to the Strategic Priorities of the new draft
Local Housing Strategy.
Affordable homes delivered through theStrategic Housing
Investment Planrequireto be of a high quality, be energy efficient
and be able to meets people’s needs and aspirations both now
and in the future, with homes able to adapt to meet people’s
changing needs over time.
This draft Strategic Housing Investment Planrecognises that
good quality affordablehomes enhance Renfrewshire’s towns
and villages and encourages a sense of community and place.
The delivery of highquality homes can have a positive impact on
peoples’ lives. The projects identified within thisplan support the
provision of a range and choice of affordable housing of the right
type and size to meets the housing needs of different groups
throughout Renfrewshire.
The projects included in this plan will help meet the needs of
individuals, familiesand those who require accommodation to
Page 68 of 182

Page 73

Draft Strategic Housing Investment Plan 2024-2029 9
meet a particular housing need such as housing for older people
and housing to meet the needs of those with physical disabilities.
Projects for both general and particular needs provision are
included as both standalone purpose-built accommodation as
well as within mainstream general needs developments.
Particular needs provision alongside appropriate support, will
assist people to live independently and successfully for as long as
possible in their own homes and communities.
In recent years, affordable homes delivered through the Strategic
Housing Investment Planhave primarily focused on adding to the
supply of new build affordable homes for social rent. There is also
a recognised ongoing need for shared equity provision, as well as
some limited open market acquisitions where such acquisitions
meet an identified housing need in line with the new Local
Housing Strategy.
The delivery of new affordable homes on private sector sites is
also supported by making use of Renfrewshire’s Affordable
Housing Policyto promote the creation of mixed tenure
communities.
As well as new build affordable housing, this draft Strategic
Housing Investment Planplaces a strong emphasis on making
best use of existing stock where possible and addressing issues in
terms of housing quality and sustainability. This includes
progressing the Council’s ambitious regeneration plans through
new build Council development and/or significant investment
and improvements to existing homes.
The draft Strategic Housing Investment Plan supports the
delivery of the Local Housing Strategy by:
1. Supporting local housing regeneration programmes;
2. Including new affordable housing provision to replace social rented
housing no longer fit for purpose;
3. Addressing mismatch between the current supply of social rented
housing and the housing people need and want to live in, taking
account of type, size, quality and location;
4. Increasing the supply of affordable housing in areas where there is
demand but limited provision;
5. Supporting the development of sustainable mixed communities by
including affordable provision on private sector development sites;
6. Expanding the supply of housing for older people and those with
particular and complex needs, including those who are homeless or
on a repeat and persistent cycle of homelessness; and
7. Continuing to support town centre regeneration through
residential development.
Page 69 of 182

Page 74

Draft Strategic Housing Investment Plan 2024-2029 10
Renfrewshire Council Regeneration and Renewal
Programme
Renfrewshire Council have approved an investment of at least
£100 million over the next 10 years to support the delivery of
modern, high quality energy efficient Council homes.
In addition to adding to the supply of new build Council housing,
the investment programme will target enhanced investment to
the existing housing stock, including works to the external fabric
of properties and environmental improvements.
Following consultation, detailed plans are now being progressed
for newbuild housing in the regeneration areas or where
redevelopment is not possible, on alternative sites nearby.
This draft Strategic Housing Investment Planincludes new build
Council development projects for social rent with available grant
support from the Affordable Housing Supply Programme being
used to supplement the Council’s £100 million investment.
New build projects included within this draft Strategic Housing
Investment Planthat will provide new build Council housing for
social rent include:
▪ Broomlands Area, Paisley;
▪ Carbrook Street, Paisley;
▪ Foxbar, Paisley;
▪ Garthland Lane, Paisley;
▪ Gallowhill, Paisley;
▪ Thrushcraigs Area, Paisley;
▪ Springbank Area, Paisley; and
▪ Howwood Road, Johnstone. 
More information on the Council’s Regeneration and Renewal
Programme can be found on the Council’s website by visiting:
Housing regeneration in Renfrewshire -Renfrewshire Website
Addressing the Climate Crisis in Renfrewshire
Tackling the Climate Crisis is a major priority for Renfrewshire
Council with work currently being progressed as part of
Renfrewshire’s Plan forNet Zero,with actions to achieve Net Zero
to be embedded in related Council plans and strategies.
It is recognised that the changing climate has a direct impact on
Renfrewshire’s current housing stock and that some residents will
be more vulnerable to this than others. 
Page 70 of 182

Page 75

Draft Strategic Housing Investment Plan 2024-2029 11
The Council’s £1 million Climate Change Action Fund, which
funds innovative projects and initiatives, also supports
engagement and partnership working across Renfrewshire and
accelerates the pace of change of existing projects in order to
tackle the climate crisis.
Climate Change Adaptations
Both Renfrewshire Council and housing association partners are
incorporating additional energy efficiency measures as part of
new build design which will actively target reduced carbon
emissions from new build development.
Projects included within this draft Strategic Housing Investment
Planaim to tackle fuel poverty by maximising opportunities for
innovative energy efficient development, with greener measures
included within new build developments.
Particular Housing Needs
The draft Renfrewshire Local Housing Strategyhighlightsthe
need for housing that meets the particular housing needs of a
range of client groups with a particular focus on homelessness
prevention as well as enabling people to live independently for as
long as possible in their own home with their different housing
needs being met.
This draft Strategic Housing Investment Planincludes a range of
projects to address identified particular needs, with these
projects having been refined since the last Strategic Housing
Investment Plan.
▪ Abbey Quarter Phase IV, Paisley - 20 amenity standard homes
and 5 fully wheelchair accessible homes for social rent that
will sit alongside general needs housing;
▪ Older Persons housing at Station Road, Paisley - around 45
homes being developed to meet the particular needs of older
people for social rent;
▪ Older Persons housing reprovisioning, Erskine – around 24
new older persons homes being developed to replace existing
provision.
Regular discussions take place withRenfrewshire Health and
Social Care Partnership (HSCP) when planning new
developments to investigate the requirements for particular
needs developments at an early stage to ensure that projects are
viable, sustainable and capable of meetings tenants and
residents’ needs.
Page 71 of 182

Page 76

Draft Strategic Housing Investment Plan 2024-2029 12
Wheelchair Accessible Housing
All affordable housing providers in Renfrewshire aim to deliver a
range of property types and sizes to meet people’s different
housing needs-this includes the development of homes that
meet wheelchair accessible standards.
When preparing new build development proposals, developers
will be required to design homes that are able to meet occupants
changing needs over time and the needs of an ageing
population, by looking to incorporate design features that
promote accessible and adaptable homes.
Targets for the delivery of wheelchair accessible homes as part of
new build developments have been identified as part of the
development of the new Renfrewshire Local Housing Strategy.
The draft Local Housing Strategy proposes that:
▪ New residential proposals must provide a minimum 10% of
all dwellings designed to be easily adaptable for residents
who are wheelchair users; and
▪ 5% of all new homes must be designed to wheelchair
accessible standard.
Rapid Rehousing Transition Plans
Renfrewshire Council and partners worked together to prepare a
Rapid Rehousing Transition Plan (RRTP) covering the 5-year
period to 2024. The Rapid Rehousing Transition Plan details how
those who are homeless will be provided with settled
accommodation more quickly; spend reduced time in temporary
accommodation and have more access to up-scaled support.
The strategic housing priorities contained within this draft
Strategic Housing Investment Planalign with the Rapid
Rehousing Transition Plan, supporting the delivery of homes to
meet the requirements of different needs groups, household
types and sizes.
Child Poverty (Scotland) Act 2017
This draft Strategic Housing Investment Planrecognises the
fundamental role housing has in tackling child poverty and aims
to support the delivery of a range of property types and sizes that
meet the needs of families of all sizes through the creation of high
quality energy efficient homes in sustainable communities that
support health, wellbeing and educational attainment.
Page 72 of 182

Page 77

Draft Strategic Housing Investment Plan 2024-2029 13
Early discussionswith affordable housing providers ensures that
the housing mix proposed for each project takes account of
housing waiting lists with this information reflected in terms of
any agreed property mix and household sizes.
Refugee Resettlement
Renfrewshire Council have been working with the Scottish
Government and Convention of Scottish Local Authorities
(COSLA) to determine what Renfrewshire can provide in terms of
the housing stock of the Council and our housing association
partners to support the matching of refugee arrivals from the
Ukraine to properties in Renfrewshire.
To date, most accommodation required has been smaller with
one or two bedrooms being used due to the arriving household
size.
The extent of ongoing support in terms of the number of homes
required to support Renfrewshire’s contribution towards this
national resettlement scheme is unclear and will be reviewed
when preparing future Strategic Housing Investment Plans.
Gypsy/Travellers
The Council continue to review the need to allocate land to meet
the housing needs of Gypsy/Travellers taking account of the Joint
Action Plan published by the Scottish Government and
Convention of Scottish Local Authorities (COSLA).
The Council will also await the outcome of the additional Scottish
Government research into Gypsy/Travellers and use the proposed
toolkit which is intended to assist local authorities build an
understanding of the changing needs of Gypsy/Travellers in our
area, in particular in relation to accommodation, services and
supporting travel throughout Renfrewshire and beyond.
Once the toolkit is made available this will inform the current
Gypsy/Travellers assessment work that has been undertaken by
Renfrewshire Council and will allow for both a strategic and local
insight into the Gypsy/Traveller community and the implications
for Renfrewshire.
This work will be undertaken as an on-going action in the new
Renfrewshire Local Housing Strategy. This on-going work will
identify the potential needs and support requirements of the
Gypsy/Traveller community and whether site provision is
Page 73 of 182

Page 78

Draft Strategic Housing Investment Plan 2024-2029 14
required. If accommodation is required, this could be in the form
of seasonal, transit, permanent or stopping places.
Cross boundary and regional implications continue to be
explored in partnership with neighbouring authorities as part of
the Glasgow City Region Housing Market Partnership and will look
at the potential of utilising negotiated stopping in defined areas
to meet transient needs.
If there is a need to allocate land to meet the accommodation
need of Gypsy/Travellers, this will be addressed through the
Renfrewshire Local Development Plan and its associated Delivery
Programme.
Should a requirement for accommodation/sites be identified to
meet the needs of Gypsy/Travellers, future updates of the
Strategic Housing Investment Planwill include details of these
projects with funding potentially also being sought from the
Gypsy/Traveller Accommodation Fund where appropriate.
Travelling Showpeople
There are currently no permanent Travelling Showpeople sites in
Renfrewshire. Over the course of the new Local Housing Strategy,
the Council will identify if there is a need to allocate land to meet
the housing needs of Travelling Showpeople and this will be
addressed through the Renfrewshire Local Development
Plan/Action Delivery Programme. 
Council Tax on Empty and Second Homes
At present, there is no direct funding allocated to the affordable
housing programme in Renfrewshire from revenue raised from
empty homes. However, the Council actively use other
mechanisms available to promote the delivery of affordable
homes.
This includes the role of the Council’s dedicated ‘More Homes
Officer’ who works with owners of long-term empty properties to
provide advice and assistance with a view of bringing long term
empty properties back into productive use.
The More Homes Officer manages the Councils Buy
back/Acquisition scheme where properties that meet strategic
objectives may be purchased and added to the Council’s lettable
housing stock, with Council funding and/or Scottish Government
grant used to support these strategic acquisitions.
The Council continues to monitor developments in terms of the
Scottish Government’s ‘Housing to 2040’ Strategy proposals to
Page 74 of 182

Page 79

Draft Strategic Housing Investment Plan 2024-2029 15
support bringing empty homes back into productive use through
enhanced powers for Councils and funding potentially being
made available to support Councils in bringing empty homes
back into use, or to convert suitable vacant commercial premises
in town centre locations.
In recent years, the Council’s Empty Homes Officer (now called
More Homes Officer) successfully helped to bring 63 long term
empty homes back into the effective housing supply (2018/19: 14
homes, 2019/20: 26 homes and 2020/21: 23 homes).
New build social rented housing, Millarston, Paisley, (Link Group)
Acquisition of Private Housing (Rental Off the Shelf)
Provision is included for a small proportion of available resources
to be used to assist social housing providers -both the Council
and housing association partners -to purchase appropriate
properties for social rent on the open market, where this would
help to meet identified housing need or enable social landlords
to undertake pro-active management and maintenance of
housing stock.
This provision will support the acquisition of a range of property
types including empty homes and other types of property where
the acquisition of these properties align with Local Housing
Strategyand the Council’s Acquisitions Strategy.
Available resources will continue to be prioritised to support the
delivery of new build affordable housing with open market
acquisitions permitted where there is slippage in the programme
in any given year and funding may therefore be available, with
cognisance to the quality standards that require to be met when
purchasing second-hand residential dwellings with vacant
possession.
Page 75 of 182

Page 80

Draft Strategic Housing Investment Plan 2024-2029 16
Subject to the availability of funding, grant support may be made
available to support strategic acquisitions for up to £35,000 per
property.
Consideration will only be given to properties in line with the
Council’s Acquisitions Strategy with properties required to:
▪ meet an identified need in terms of stock type, size and
location;
▪ meet particular needs which may be difficult to address
within the existing stock base;
▪ represent good value for money, taking account of repair and
investment requirements as well as purchase price;
▪ located close to the stock base of the acquiring landlord, for
management and maintenance purposes; and
▪ assist in allowing common works to be progressed on mixed
tenure blocks.
To be eligible for grant support, affordable housing providers will
be expected to investigate all other available funding options
alongside grant support from the Council’s Resource Planning
Assumption/Affordable Housing Supply Programme.
Delivering New Affordable Homes in Renfrewshire
Detailed information on the ongoing and proposed affordable
new build developments can be found in Appendix 1.
Appendix 3 outlines the ambitious new build programme
proposed throughout Renfrewshire over the next 5 years. 
The significance of strategic regeneration is reflected in the
projects currently on site or proposed to be taken forward over
the next five years as shown in Appendices 1 and 3.
New build social rented housing, St Ninian’s Crescent, Paisley (Link Group)
Page 76 of 182

Page 81

Draft Strategic Housing Investment Plan 2024-2029 17
Renfrewshire Council New Build Programme
This draft Strategic Housing Investment Planrolls forward the
Council’s own ambitious new build programme. This follows the
completion of new build Council homes at Dargavel Village,
Bishopton, at Johnstone Castle in Johnstone at Auchengreoch
Road in Johnstone and more recently with new homes at
Ferguslie Park in Paisley.
The Council are also progressing new build plans at both
Gallowhill and at Garthland Lane in Paisley, with the Council’s
regeneration programme including additional new Council
homes in the Howwood Road area of Johnstone, Thrushcraigs
area of Paisley, Broomlands area of Paisley, Springbank area of
Paisley and Foxbar area of Paisley.
New build Council housing, Ferguslie Park, Paisley
Programme Management and Project Prioritisation
This draft Strategic Housing Investment Plansplits projects in to
two groups through the use of a ‘core’ and ‘shadow’ programme.
Projects within each group are shown in Appendix 3.
The methodology used to prioritise project delivery is based on
the ability to progress each project at key milestones in terms of
an assessment of project viability, site acquisition, design work,
procurement and potential site start with these milestones
considered against availability of Scottish Government grant.
This approach allows for the programming of individual projects
as part of the ‘core’ and ‘shadow’ programme which together
outline the on-going 5 year affordable housing supply
programme delivered through the Strategic Housing Investment
Plan.
Projects within the ‘core’ group will be progressed in the earlier
years of the programme (normally years 1-3) where there is grant
availability and where developers finances allow.
Projects included in the ‘shadow’ programme will be progressed
as ‘core’ projects complete or when additional funding becomes
available or where there is the ability to ‘front fund’ projects to
Page 77 of 182

Page 82

Draft Strategic Housing Investment Plan 2024-2029 18
allow projects to proceed earlier. This means that project
timescales may be subject to change.
In terms of front funding, the Council or the housing association
partner may initially fund the early stages of project development
costs from their own resources, with grant being paid to
developing organisations at the first available opportunity as
funding becomes available.
The use of a ‘core’ and ‘shadow’ programme supports the
effective management of available resources whilst permitting
some flexibility that assists in addressing any slippage of projects
in any given year.
Projects in the shadow programme may require extended lead in
times to allow for site investigative works, site assembly or to
arrange the necessary private finance to enable a development to
proceed –all of which may influence how projects are prioritised
within the programme with all projects subject to regular review.
Additional new projects may be added to the programme should
appropriate opportunities arise over the next 12 months prior to
the next update of the Strategic Housing Investment Plan. Any
additional projects brought forward need to align with the Local
Housing Strategy.
Due to current high tender and development costs, timescales for
the progression of projects may change depending on the
developing organisations financial position and ability to proceed
in a high inflationary environment. This may cause movement
within the development programme with projects moving
between the core andshadow programme to ensure all funding
available to Renfrewshire can be fully utilised.
Delivery
Both the Council and our housing association delivery partners
will continue to look for efficiencies in construction methods and
will work with the construction industry and design teams to
determine the suitability of non-traditional construction methods
for projects included with the Strategic Housing Investment Plan.
The Council will continue to explore options for joint working
around innovative delivery mechanisms that support the delivery
of affordable housing throughout Renfrewshire.
Page 78 of 182

Page 83

Draft Strategic Housing Investment Plan 2024-2029 19
Housing Infrastructure Fund
As part of theScottish Government’s Housing to 2040
strategy,Scottish Ministers have agreed to continue with the
Housing Infrastructure Fund (HIF) in the period up to 2026.
The Housing Infrastructure Fund provides both Councils and
housing association partners with additional grant to support the
unlocking of challenging siteswhere the scale and nature of
infrastructure costs would prevent these sites from being
progressed as part of the Strategic Housing Investment Plan
where projects can deliver affordable homes in line with the
Council’s strategic priorities. The funding allocated to the
Housing Infrastructure Fund nationally is expected to be around
£50 million in the 2021-2026 period.
In recent years, a number of Renfrewshire projects have
successfully accessed the Housing Infrastructure Fund with
housing association partners continuing to look at options to bid
for support from the Housing Infrastructure Fund as and when
required.
At present, no project developer within this draft Strategic
Housing Investment Planis looking to access Housing
Infrastructure Fund support, however this may change as
developments move on site.
Heat Network Fund
Developing partners that are considering the installation of large-
scale heat networks may now be eligible for support through the
Scottish Government’s Heat Network Fund. This Fund provides
grant funding for the installation of zero emissions communal
anddistrict heating systems.
Applications should be made to the Heat Network Fund prior to
applying for grant assistance through the Affordable Housing
Supply Programme.
Monitoring Progress
A range of project management activities are used to ensure
resources are managed effectively and projects are progressing as
planned. These project management activities include:
▪ Ongoing liaison between services within the Council and
between the Council and Registered Social Landlord partners
on specific projects;
▪ Multi-agency project group meetings;
▪ Quarterly tripartite meetings involving the Council, individual
developing Registered Social Landlord partners and the
Scottish Government; and
▪ Six weekly internal officer group meetings to review
progress.
Page 79 of 182

Page 84

Draft Strategic Housing Investment Plan 2024-2029 20
Draft Strategic Housing Investment Plan Appendices
Appendix 1details progress with projects currently on site as well
as future proposed projects over the lifetime of the draft Strategic
Housing Investment Plan. 
Appendix 2showsrecent affordable housing completions.
Appendix 3 lists projects that are currently progressing and/or
expected to draw down grant funding and/or be completed
during the lifetime of this draft Strategic Housing Investment
Plan.
Appendix 4 gives details of sub-areas and settlements within
Renfrewshire.
Equalities
This draft Strategic Housing Investment Planincludes housing
provision for a range of different needs groups including housing
for older people and those with physical disabilities.
The development programme includes clustered
accommodation projects to meet an identified need as well as
blended projects that provide both general and particular need
accommodation at the same location to support inclusive and
independent living.
This draft Strategic Housing Investment Planhas been prepared
in consultation with the Health and Social Care Partnership to
ensure that projects take account of opportunities to deliver
housing that meets the needs of a range of households with
specific needs.
In line with The Equality Act 2010 and the associated protected
characteristics, an Equality and Human Rights Impact Assessment
has been prepared alongside the preparation of the draft
Strategic Housing Investment Plan to identify the likely or actual
effects of it on people.
Page 80 of 182

Page 85

Draft Strategic Housing Investment Plan 2024-2029 21
The assessment includes identifying where there will be a positive
impact and further opportunities to promote equality. The
assessment did not identify any negative impacts on people in
relation to this draftStrategic Housing Investment Plan.
Should any unforeseen negative impacts arise during the
finalisation of plan, we will take action to eliminate or mitigate
these.
Viewing the draft Strategic Housing Investment Plan
This draft Strategic Housing Investment Plancan be viewed on
the Council’s website by visiting:
https://www.renfrewshire.gov.uk/article/4232/Strategic-Housing-
Investment-Plan
Following the end of the consultation period, a revised draft of
the Strategic Housing Investment Planwill be prepared which will
also be available on the Council’s website by visiting:
https://www.renfrewshire.gov.uk/article/4232/Strategic-Housing-
Investment-Plan
If you require a printed copy of the draft Strategic Housing
Investment Plan,please email:
strategyandplace@renfrewshire.gov.uk
or please write to:
Economy and Development Team, Chief Executives Service,
Renfrewshire Council, Renfrewshire House, Cotton Street, Paisley,
PA1 1WB
Page 81 of 182

Page 86

22
Environment, Housing and Infrastructure
Renfrewshire Council
Renfrewshire House
Cotton Street
Paisley
PA1 1BR
Page 82 of 182

Page 87

Appendix 1: Renfrewshire Affordable Housing Project Updates  
 
1A: Projects completed in 2023/24 or currently on site and expected to complete in full during 2023/24  
Development  Units  Status  Comment 
Ferguslie Park, 
Paisley  101 
On site, due to 
complete July 
2023 
These 101 new homes being developed by Renfrewshire Council will contribute to the 
regeneration of the Ferguslie Park area. This project is being completed in phases with the final 
homes handed over by the end of July 2023.  
Abbey Quarter Phase 
IV, Paisley Town 
Centre  
81 
On site, due to 
complete 
November 
2023 
Link Group are on site delivering 81 new homes for social rent. This fourth phase of 
development will complete the redevelopment of the former Arnott’s site which is a key 
strategic location in Paisley Town Centre. This development is being completed in phases with 
the final homes due to be handed over by the end of November 2023.  
Woodend House, 
Houston, West 
Renfrewshire 
14 
On site, due to 
complete 
November 
2023 
Link Group are providing 14 new homes for social rent within a larger private sector 
development in Houston, West Renfrewshire as part of the Council’s Affordable Housing Policy. 
These affordable homes will add to the supply of affordable homes in West Renfrewshire with 
the project expected to complete by the end of November 2023. 
Napier Street, 
Linwood   51 
On site, due to 
complete 
March 2024 
This social rented development of around 51 homes by Sanctuary Scotland Housing Association 
will add to the affordable housing supply in Linwood. This project is expected to be completed 
by the end of March 2024. 
 
 
 
 
 
 
Page 83 of 182

Page 88

1B: Projects currently on site or due to start on site in 2023/24 (includes phased completions in 2023/24 and beyond)  
Development  Units  Status  Comment 
East Lane, Paisley 
Town Centre   48 
On site May 
2023, Due to 
complete 
August 2024 
This social rented development of 48 homes by Loretto Housing Association will add to the 
affordable housing supply in central Paisley. 
Paisley West End, 
Sutherland Street  35 
On site May 
2023, Due to 
complete 
October 2024 
Sanctuary Scotland are now on site developing 35 new homes for social rent as part of the 
regeneration of Paisley’s West End.  
Orchard Street, 
Paisley    50 
Due to start 
on site in 
September 
2023 
Plans are progressing for a Comprehensive Tenement Improvement (CTI) project at Orchard 
Street/Causeyside Street, Paisley following 5 blocks of flats being designated as a Housing 
Renewal Area (HRA) in March 2017. The overall development is expected to complete in 2024/25. 
Cartha Crescent, 
Paisley  33 
Due to start 
on site in 
September 
2023 
This social rented development of around 33 homes by Williamsburgh Housing Association will 
add to the affordable housing supply in central Paisley.  
Phase 3A, Bishopton, 
North Renfrewshire  46 
Due to start 
on site in 
September 
2023 
This third phase of development at Bishopton Community Growth Area (CGA) (Dargavel Village) 
by Loretto Housing Association will provide 46 new homes for social rent. These initial 46 homes 
are expected to be completed in March 2025 with a further 16 new homes (Phase 3B, Bishopton) 
expected to be completed in Spring 2026).  
Johnstone Castle 
Phase II  68 
Due to start 
on site in 
October 2023 
Link Group are progressing plans for a second phase of affordable housing in Johnstone Castle. 
This development will provide around 68 new homes for social rent as well as infrastructure and 
green spaces. This development will complete in phases during 2024/25 and 2025/26. 
Page 84 of 182

Page 89

Carbrook Street, 
Paisley  18 
Due to start 
on site in 
January 2024 
Renfrewshire Council regeneration area. Following public consultation, plans are being 
progressed to deliver 18 new Council homes in the Carbrook Street Area of Paisley. 
 
 
 
1C: Projects expected to start on site in 2024/25 or later or when a projected site start date has still to be confirmed  
Development  Units  Status  Comment 
Gallowhill, Paisley  60 
Due to start 
on site in May 
2024 
This social rented development of around 60 homes by Renfrewshire Council will add to the 
affordable housing supply in the Gallowhill area.  
Howwood Road, 
Johnstone (Site 1 of 2)  55 
Due to start 
on site in 
October 2024 
Renfrewshire Council regeneration area. Following public consultation, plans are being 
progressed to deliver 55 new Council homes in this first phase of development in the Howwood 
Road Area of Johnstone. 
Stirling Drive, Linwood   64 
Due to start 
on site in 
January 2025 
This social rented development of around 64 homes by Linstone Housing Association will add to 
the affordable housing supply in Linwood. 
Phase 3B, Bishopton, 
North Renfrewshire  16 
Due to start 
on site in 
March 2025 
This phase of development at Bishopton Community Growth Area (CGA) (Dargavel Village) by 
Loretto Housing Association will provide an additional 16 new homes next to the 46 new social 
rented homes completed for Loretto at the Phase 3A Bishopton project. Completion is 
anticipated in Spring 2026.  
Springbank, Paisley 
(Phase 1 of 2)  65 
Due to start 
on site in April 
2026 
Renfrewshire Council regeneration area. Following public consultation, plans are being 
progressed to deliver around 65 new Council homes in this first phase of development in the 
Springbank Road Area of Paisley. 
Page 85 of 182

Page 90

Thrushcraigs, Paisley  50 
Due to start 
on site in July 
2026 
Renfrewshire Council regeneration area. Following public consultation, plans are being 
progressed to deliver around 50 new Council homes in the Thrushcraigs Area of Paisley. 
Station Road, Paisley  45 
Due to start 
on site in 
August 2026 
This development by Linstone Housing Association will provide around 45 amenity standard 
homes for older people.  
Gibson Crescent, 
Johnstone  28 
Due to start 
on site in 
October 2026 
This social rented development of around 28 homes by Williamsburgh Housing Association will 
add to the affordable housing supply in Johnstone.  
Broomlands (West 
Campbell Street), 
Paisley 
25 
Due to start 
on site in April 
2027 
Renfrewshire Council regeneration area. Following public consultation, plans are being 
progressed to deliver around 25 new Council homes in the Broomlands Area of Paisley. 
Howwood Road, 
Johnstone (Site 2 of 2)  80 
Due to start 
on site in April 
2027 
Renfrewshire Council regeneration area. Following public consultation, plans are being 
progressed to deliver around 80 new Council homes in this second phase of development in the 
Howwood Road Area of Johnstone. 
Springbank, Paisley 
(Phase II)  35 
Due to start 
on site in 
September 
2029 
Renfrewshire Council regeneration area. Following public consultation, plans are being 
progressed to deliver around 35 new Council homes in this second phase of development in the 
Springbank Road Area of Paisley. 
Paisley West End, 
Remaining sites  111  Site start date 
tbc 
Sanctuary Scotland are updating the Regeneration Masterplan for Paisley’s wider West End and 
will progress plans for approximately 111 affordable new homes developed as part of the 
regeneration of Paisley’s West End.  
Row Avenue, Renfrew  63  Site start date 
tbc 
Sanctuary Scotland are progressing plans for approximately 63 affordable new homes in 
Renfrew.  
Ryefield, Johnstone  36  Site start date 
tbc 
This social rented development of approximately 36 homes by Linstone Housing Association will 
add to the affordable housing supply of houses in the Johnstone area. 
Page 86 of 182

Page 91

Older Persons Housing 
Reprovisioning, Erskine   24  Site start date 
tbc 
Bridgewater Housing Association are progressing plans for a new purpose built older persons 
housing development of around 24 units that will replace existing scattered older persons 
housing provision across Erskine.  
Foxbar Rivers, Paisley  40  Site start date 
tbc 
This social rented development of around 40 homes by Paisley Housing Association will add to 
the affordable housing supply in the Foxbar area of Paisley and bring vacant sites back in to use. 
Foxbar Rivers, Paisley  40  Site start date 
tbc 
This social rented development of around 40 homes by Renfrewshire Council will add to the 
affordable housing supply in the Foxbar area of Paisley and bring vacant sites back in to use. 
Garthland Lane, 
Paisley  32  Site start date 
tbc 
This social rented development of around 32 homes by Renfrewshire Council will add to the 
affordable housing supply in central Paisley. 
Westburn 
Avenue/Blackstoun 
Road, Ferguslie Park, 
Paisley 
22  Site start date 
tbc 
This social rented development of around 22 homes by a developer still to be identified will add 
to the affordable housing supply in the Ferguslie Park area of Paisley and bring a vacant site 
back in to use. 
Paisley Town Centre  48  Site start date 
tbc 
Efforts will continue to identify a potential site for affordable housing in Paisley Town Centre to 
promote mixed tenure communities and the growth of the resident town centre population.  
Bishopton Phase IV & 
Future Phases  136  Site start date 
tbc 
Additional sites will be identified and progressed for affordable housing within Bishopton 
Community Growth Area (CGA) (Dargavel Village).  
West Renfrewshire 
Villages   59  Site start date 
tbc 
Efforts will continue to identify potential sites for affordable housing in West Renfrewshire to 
meet affordable housing need in this area.  
MacDowall Street, 
Johnstone   35  Site start date 
tbc 
Discussions will take place to identify an affordable housing provider to develop this gap site for 
affordable housing.  
Private Sector Acquisitions that meet identified 
Housing Need  
An allowance will be made within the programme for private sector ‘off the shelf’ acquisitions 
where such purchases meet a specified criteria and contribute to meeting local housing need. 
Local Development Plan Affordable Housing 
Policy Future Requirements 
An allowance will be made within the programme for new affordable homes within new 
development sites as part of the new Affordable Housing Policy in Renfrewshire. 
 
Page 87 of 182

Page 92

2018/2019
Sanctuary Inchinnian Road (Western Park) Renfrew 67
Sanctuary Andrew Avenue Phase II Renfrew 60 127
2019/2020
Sanctuary Paisley West End (Phase I (Co-op) Paisley & Linwood 39
Sanctuary Love Street Paisley & Linwood 132
Link New Sneddon Street Paisley & Linwood 24 195
2020/21
Link Smithhills Street Paisley & Linwood 26
Renfrewshire Council Bishopton Phase I North Renfrewshire 80
Williamsburgh HA Milliken Road, Kilbarchan West Renfrewshire 18 124
2021/22
Renfrewshire Council Johnstone Castle Johnstone & Elderslie 95
Link Group Amochrie Road, Foxbar Paisley & Linwood 36
Link Group Thrushcraigs Phase II (St Ninians) Paisley & Linwood 23
Paisley HA Westerfield House Paisley & Linwood 16 170
2022/23
Sanctuary/Paisley HA Glenburn Paisley & Linwood 131
Link Group Millarston Paisley & Linwood 99
Renfrewshire Council Auchengreoch Road Johnstone & Elderslie 39
Loretto Bishopton Phase II North Renfrewshire 58
Williamsburgh HA Albert Road Renfrew 42 369
985
Renfrewshire Council Ferguslie Park Paisley & Linwood 101
Link Group Abbey Quarter Phase 4 (AQP4) Paisley & Linwood 81
Link Group Woodend House, Houston West Renfrewhire 14
Sanctuary Napier Street, Linwood Paisley & Linwood 51 247
1232
Completions between 2018 and 2023 & estimated completions 2023/24 Appendix 2
2023/2024 - Estimated Completions 
Page 88 of 182

Page 93

Appendix 3 ‐ Core & Shadow Programme
Projects in the Affordable Housing Supply Programme
Ferguslie Park, Paisley  101 £6.112 £6.112 £0.000 £0.000
Abbey Quarter Phase 4, Paisley 81 £7.893 £7.893 £0.000 £0.000
Woodend House, Houston  14 £1.230 £1.230 £0.000 £0.000
Napier Street, Linwood  51 £4.280 £4.280 £0.000 £0.000
East Lane, Paisley  48 £5.766 £5.766 £0.000 £0.000
West End, Paisley (Sutherland Street/UWS)  35 £4.838 £4.838 £0.000 £0.000
Cartha Crescent, Paisley 33 £2.806 £2.806 £0.000 £0.000
Phase 3A, Bishopton 46 £5.536 £1.716 £3.820 £0.000
Orchard St/Causeyside St, Paisley (HRA) 50 £5.241 £3.891 £1.350 £0.000
Johnstone Castle Phase II, Johnstone 68 £12.653 £5.064 £7.589 £0.000
Phase 3B, Bishopton  16 £1.920 £0.000 £1.920 £0.000
West End, Paisley ‐ Remaining Sites 111 £7.994 £3.171 £3.600 £1.223
Gallowhill, Paisley 60 £4.290 £1.106 £3.185 £0.000
Older Person's Housing Reprovisioning, Erskine 24 £2.004 £0.750 £1.254 £0.000
Carbrook Street, Paisley 18 £1.287 £0.287 £1.000 £0.000
Howwood Road, Johnstone (Site 1 of 2) 55 £3.933 £0.240 £3.693 £0.000
Thrushcraigs, Paisley 50 £3.575 £0.000 £3.575 £0.000
Springbank, Paisley (Phase 1 of 2) 65 £4.648 £0.655 £2.800 £1.193
Foxbar Rivers, Paisley (Housing Association) 40 £3.120 £0.100 £3.020 £0.000
Foxbar Rivers, Paisley (Council) 40 £2.860 £0.500 £2.360 £0.000
Stirling Drive, Linwood  64 £6.936 £1.109 £4.384 £1.443
Row Avenue, Renfrew 63 £4.914 £1.950 £2.964 £0.000
Broomlands (West Campbell Street), Paisley  25 £1.788 £0.000 £0.500 £1.288
Howwood Road, Johnstone (Site 2 of 2) 80 £5.720 £0.000 £1.200 £4.520
ROTS (Rental Off the Shelf) 2024 to 2029* 50 £1.750 £0.000 £1.050 £0.700
LDP Affordable Housing Policy Future Reqs tbc tbc tbc tbc tbc
* Subject to funding availability each year 1288 £113.094 £53.464 £49.264 £10.367
Shadow Programme  
Projects in the Affordable Housing Supply Programme
Gibson Crescent/North Road, Johnstone 28 £2.381 £0.000 £1.381 £1.000
Ryefield, Johnstone 36 £3.664 £0.300 £2.343 £1.021
Station Road, Paisley 45 £4.591 £0.758 £1.361 £2.472
Springbank, Paisley (Phase 2 of 2) 35 £2.503 £0.000 £0.350 £2.153
Westburn Avenue/Blackstoun Road, Ferguslie Park, Paisley 22 £1.716 £0.143 £1.573 £0.000
Garthland Lane, Paisley 32 £2.288 £0.225 £1.032 £1.032
Town Centre, Paisley  48 £3.744 £0.000 £1.872 £1.872
Phase 4 & Future Phases, Bishopton 136 £10.608 £0.000 £3.536 £7.072
West Renfrewshire Villages ‐ (3 potential sites) 59 £4.602 £0.000 £2.886 £1.716
MacDowall Street, Johnstone 35 £2.730 £0.000 £2.730 £0.000
476 £38.827 £1.426 £19.064 £18.338
Sub‐Areas
1.  Paisley & Linwood All Units Core + Shadow Core + Shadow Core + Shadow Core + Shadow
2. Renfrew 1764 £151.921 £54.890 £68.328 £28.705
3. Johnstone & Elderslie
4. North Renfrewshire
5. West Renfrewshire
Core Programme 
Number of 
Affordable 
Units
Total Grant 
Requirement (£M)
Estimated Total 
Spend by End 
March 2024
Estimated Grant 
Requirement (Yrs 1‐3) 
2024/25‐2026/27
Estimated Grant 
Requirement (Yrs 4‐5) 
2027/28‐2028/29
Number of 
Affordable 
Units
Total Grant 
Requirement (£M)
Estimated Total 
Spend by End 
March 2024
Estimated Grant 
Requirement (Yrs 4‐5) 
2027/28‐2028/29
Estimated Grant 
Requirement (Yrs 1‐3) 
2024/25‐2026/27
£ Million
Page 89 of 182

Page 94

Appendix 4 Renfrewshire sub-areas
Page 90 of 182

Page 95

1 
___________________________________________________________________
To: Communities and Housing Policy Board
On:  22 August 2023
___________________________________________________________________
Report by: Director of Environment, Housing and Infrastructure 
___________________________________________________________________
Heading: Housing: Tackling Dampness, Mould and Condensation
___________________________________________________________________
1. Summary 
1.1 A report to the Communities and Housing Policy Board on 17th January 2023
outlined the processes in place to deal with reports of dampness and mould,
and detailed the actions which were taken to review these, as well as setting
out further actions to be undertaken. 
1.2 This report provides the Policy Board with an update on changes that have
been implemented since January 2023 and sets out further actions to be
undertaken.
___________________________________________________________________
2. Recommendations 
It is recommended that that Communities and Housing Policy Board:
2.1 Note the actions taken to date and the proposed future actions to ensure the
effective management of dampness, mould and condensation cases within
Renfrewshire Council housing stock.
_________________________________________________________
3. Background
3.1  A report to the Policy Board on 17th January 2023 noted the measures in place
to ensure the effective management of dampness, mould and condensation
Item 6
CHPB220823 Page 91 of 182

Page 96

2 
cases within Renfrewshire Council housing stock.  The report also noted the
Cost of Living Crisis and the Energy Crisis were expected to result in an
increasing number of tenants being unable to adequately heat their homes with
the potential consequence of increased problems with damp, mould and
condensation.
3.2 The report detailed the actions taken which were taken to review the Council’s
existing processes and also set out further actions to be undertaken.  This
review took account of the recommendations set out in the Housing
Ombudsman’s report entitled “Spotlight on: Damp and Mould”.
4. Renfrewshire actions to tackle Damp, Mould and Condensation
4.1 Renfrewshire Council’s revised process for dealing with cases of dampness
and mould, incorporating the changes and improvements made in the last 6
months, is as follows:
• Dampness, mould, and condensation problems are reported by tenants or
other parties through the customer contact centre.
• New scripts have been provided to the customer contact centre to ensure
that any underlying issues such as broken or missing extractor fans, faulty
heating or window ventilation can be picked up at the initial call and repairs
instructed immediately. An offer of energy advice referral is also made.
This allows an early intervention for any underlying issues in advance of
the inspection visit.
• A new inspection category specifically for dampness and mould has been
created to allow easier monitoring of cases.
• A Repairs and Maintenance Officer (RMO) will attend and assess any
repair requirements.  Inspection appointments for dampness and mould
have increased from 30 minutes to 60 minutes to ensure there is sufficient
time to fully assess all potential issues within the property.  
• All RMOs attended a training session in February 2023 on dampness and
mould, delivered by an external consultant with expertise in this field.
• A new electronic checklist has been created which is completed for each
inspection providing a detailed record of the inspection and actions taken. 
This also has automated links to initiate referrals to our rotworks contractor
and/or to our property sensor installation team. The automation ensures a
quick response and provides an audit trail for each case.
• Moisture meters have been upgraded to a more sophisticated model which
enable moisture, humidity and temperature to be checked. 
• Repair lines are issued to Building Services for any issues identified or
referred to a specialist contractor where this is required.
• Anti-fungal paint application is carried out by Building Services. The
supplier has carried out further training to Building Services on the
application of the paint.  Normally at least 2 visits are required for
paintwork. Anti mould treatment kits have been made available for issue to
tenants.
Page 92 of 182

Page 97

3 
• Dampness and Condensation leaflets have been reviewed and continue to
be issued where appropriate.
• Severe cases or cases where there is no obvious cause are passed to our
specialist rot works contractor who will provide a detailed report, identifying
factors contributing to the dampness problem and recommendations for
works to be carried out.  The contractor will offer advice to the tenant
where appropriate.
• Sensors which monitor humidity levels within a property can now be
installed by our in-house team as well as our external provider. Following
installation and a period of monitoring, reports are returned to RMOs for
follow up with tenants.
• Sensors continue to be pro-actively installed in properties council wide
with a focus on areas where stock improvement works are not scheduled
in the near future. This will ensure that early intervention is undertaken for
any properties flagged up as at risk.
• Consultation is underway with a specialist decontamination and
disinfecting company. Their process deals with mould contamination on
surfaces and airborne spores. Properties with severe cases of mould have
been identified for a pilot to be undertaken.
• The Housing Investment Team continue to participate in any working
groups and forums where dampness and mould is on the agenda to learn
and share good practice.
4.2 The processes and procedures will be subject to an ongoing review but
further actions that have already been identified are as follows:
• Pilot projects for decontamination and disinfection to be reviewed.
• The dampness checklist to be rolled out to the void property team.
• The void property team to review any history of damp to ensure potential
problems can be rectified whilst the property is empty.
• Robust process to be put in place to ensure any instances of ‘no access’
for mould treatment works are followed up.
• Liaise with Corporate Energy Team and Cost of Living Crisis Team in
relation to energy advice and fuel poverty issues.
• A strategy for managing dampness, mould and condensation to be
finalised and presented to a future meeting of this Policy Board.
• Further refinement to contact centre scripts following review of changes
implemented.
• An assessment of additional training requirements.
• Creation of management reports to monitor damp and mould cases. 
4.3 Challenges that continue to be monitored on an ongoing basis are as follows:
• Energy crisis – tenants unable to afford to heat their homes is likely to
result in an increase in damp/mould/condensation cases.
Page 93 of 182

Page 98

4 
• Resource Capacity – internal and external resources require to be
monitored in line with demand.  Prioritisation of workload to ensure most
severe cases are dealt with. 
4.4 Officers will continue to proactively manage any reports of damp, mould or
condensation, and to improve practice in line with the actions outlined in
paragraph 4.1.
___________________________________________________________________
Implications of the Report
1. Financial – None – Provision included within existing HRA Repairs budget
allocation. 
2. HR & Organisational Development – None 
3. Community/Council Planning – 
• Building strong, safe and resilient communities – the range of measures
that are in place help to ensure tenants are safe. 
4. Legal – None 
5. Property/Assets - None. 
6. Information Technology - None
7. Equality & Human Rights - The Recommendations contained within this
report have been assessed in relation to their impact on equalities and human
rights. No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report. If required following
implementation, the actual impact of the recommendations and the mitigating
actions will be reviewed and monitored, and the results of the assessment will
be published on the Council’s website.   
8. Health & Safety - None
9. Procurement - None
10. Risk - None
11. Privacy Impact - None
12. Cosla Policy Position – N/A
13. Climate Risk - None
_________________________________________________________
Page 94 of 182

Page 99

5 
List of Background Papers 
(a) Report to Communities and Housing Policy Board on 17 January 2023 –
Housing: Tackling Dampness, Mould and Condensation 
___________________________________________________________________ 
Author:          Karen Sillars, Housing Maintenance Manager - 07946 435240 
Email: karen.sillars@renfrewshire.gov.uk 
Page 95 of 182

Page 100

Page 96 of 182

Page 101

0 
___________________________________________________________________ 
To:  Communities and Housing Policy Board 
On:  22 August 2023
___________________________________________________________________ 
Report by: Director of Environment, Housing and Infrastructure
___________________________________________________________________ 
Heading: Tenant’s Support Fund Policy
___________________________________________________________________ 
1. Summary 
1.1 At its meeting on 2 March 2023, Council approved a rent increase of 5.5%. It
was acknowledged that additional income is needed to continue planned
expenditure including significant investment and regeneration initiatives
together with funding the annual costs of maintaining the housing stock and all
annual operating costs. 
1.2 As part of the approved Housing Revenue Account budget in March 2023, a
fund was approved to provide additional support to tenants in financial
hardship. Council also agreed to fund additional service provision in the form
of Specialist Income Advice to allow for exclusive support to tenants
experiencing financial hardship.  The Tenant’s Support Fund policy has now
been developed and is presented for the Policy Board’s consideration and
approval. 
___________________________________________________________________ 
2. Recommendations 
It is recommended that the Communities and Housing Policy Board: 
2.1 Approve the Tenant Support Fund policy, as set out in Appendix 1 of this
report. 
2.2 Subject to approving the policy, agree that the Tenant’s Support Fund is
processed as a weekly payment into the qualifying tenant’s rent account in
line with the charging frequency. 
Item 7
CHPB220823 Page 97 of 182

Page 102

1 
2.3 Agree that the fund will be applicable from 3rd April 2023 - the effective date
of the rent increase and awards will be backdated to that date if qualifying
criteria is met. 
2.4 Agree the arrangements in place for assessing and managing requests for
funding from the Tenant’s Support Fund as outlined in Appendix 1 of this
report. 
2.5 Note that updates on support for tenants to make rent payments and the
Tenant’s Support Fund will be included in Service Improvement Plan outturn
reports and reported to this board.
___________________________________________________________________ 
3. Background 
3.1 The cost of delivering housing services to Council tenants and capital
investment in existing homes and new Council homes is funded from tenants’
rental income. 
3.2 The “cost of living crisis” has increased financial pressures on people. 
Renfrewshire has close to 75% of tenants in receipt of some form of support
for their housing costs.  Following the rent increase, tenants on partial benefit
may need to make a minimal additional contribution and some tenants who
may not have previously qualified for help with rent, may now be eligible for
financial support through Housing Benefit or the housing element of Universal
Credit.  For those tenants who do not qualify for support with their housing
costs, the rent increase is due in full. 
3.3 Council agreed to introduce the Tenant’s Support Fund to provide additional
support to tenants in financial hardship, application conditions and qualifying
criteria have now been developed and included within the draft policy attached
to this report.
___________________________________________________________________ 
4. Tenant’s Support Fund 
4.1 The Tenant’s Support Fund, is intended to supplement the current rent
collection process and is a temporary measure to alleviate existing and
emerging financial stress, prevent and reduce escalating rent arrears and
contribute to sustaining Council tenancies in Renfrewshire. The Fund is
intended to support tenants experiencing financial difficulty, through no fault of
their own, where it has been identified that financial challenges exist due to a
change of circumstances including, but not limited to: 
• Increase in household costs / cost of Living (eg. energy, food, fuel,
rent).
• Reduction in income (eg. loss of employment, reduced hours, loss of a
Page 98 of 182

Page 103

2 
household member).
• Changes to Welfare benefit, Housing Benefit and/or Universal Credit. 
4.2 As part of our existing rent collection process, tenants are encouraged to
engage with the housing team at the earliest opportunity if they are
experiencing difficulties in paying rent.  A wide range of advice and support is
available to help tenants to meet their rent payment responsibilities and to
manage household budgets that will be under increased pressure at this time. 
4.3 In recognition of these continuing pressures, in addition to the introduction of
the Tenant’s Support Fund, as part of the budgetary process on 2 March
2023, Council agreed to fund additional service provision in the form of
Specialist Income Advice to allow for exclusive support to tenants in hardship. 
4.4 The specialist Income Advisors and Housing Staff will be able to make a
referral to the local Housing Team to consider the appropriateness or
otherwise of making a payment to a tenant’s rent account from the Tenant’s
Support Fund. An officer will contact the tenant to check that they are in
receipt of all the benefits that they may be entitled to and to establish if an
application has been made for assistance from the Scottish Welfare Fund and
or discretionary housing payment if applicable. A decision on the award of
Tenant’s Support Fund will be made as soon as possible following
engagement with the tenant and it is proposed that a payment will be made
directly into the tenant’s rent account. Income maximisation assessments will
be carried out to support tenants to meet their long-term rent payment
responsibilities. 
4.5 The Tenant’s Support Fund will not be used to address arrears accrued prior
to 3rd April 2023. However, it could assist or prevent a tenant falling into
further rent arrears with an income maximisation assessment. 
4.6  The impact of the Tenant’s Support Fund in relation to outcomes for tenants
and the impact on the HRA financial position will be monitored by officers
within the Council’s Finance & Resources team. At this early stage of
introduction of the Tenant’s Support Fund, it is difficult to estimate how many
tenants might require support from the Fund. Outcomes from monitoring will
be reported as part of Service Improvement Plan outturn reports and reported
to this Policy Board. 
________________________________________________________________ 
Implications of the Report 
1. Financial - The implications of these proposals are included within the HRA
2023/24 Budget approved by Council on 2 March 2023 
2. HR & Organisational Development - None 
3. Community/Council Planning -
Page 99 of 182

Page 104

3 
The Tenant’s Support Fund will contribute towards achieving the ‘Fair’
strategic outcome and theme within the Council Plan, focusing on supporting
our tenants through the cost-of-living crisis and making connections across
the Council and partners to maximise support available aiming to improve
outcomes for households.
4. Legal – None  
5. Property/Assets – None 
6. Information Technology – None 
7. Equality & Human Rights – 
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights
have been identified arising from the recommendations contained in the
report because it is for noting only.   If required following implementation, the
actual impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be published
on the Council’s website 
8. Health & Safety – None 
9. Procurement – None 
10. Risks –  None 
11. Privacy Impact – None 
12. Cosla Policy Position – N/A 
13. Climate Change - None
___________________________________________________________________ 
List of Background Papers 
(a) Background Papers - None 
___________________________________________________________________ 
Author: Derek Murray, Area Housing Manager
Email: derek.murray@renfrewshire.gov.uk 
Page 100 of 182

Page 105

1
Tenant’s Support Fund Policy
Environment, Housing & Infrastructure
September 2023
Page 101 of 182

Page 106

Roads Adoption Policy  2
Contents
1. Introduction ....................................................................................... 3
2. Tenant Support Fund ........................................................................ 3
3. Method of Payment ........................................................................... 4
4. Period of Payment and Level of Award .............................................. 4
5. Change of Circumstances .................................................................. 4
6. Cancellation and Ending an Award ................................................... 5
7. Overpayments .................................................................................... 5
8. Eligibility for TSF ................................................................................ 5
9. Dispute Procedures ........................................................................... 6
10.      Applications and Administration Process ......................................... 6
11. Outcomes ........................................................................................... 7 
Page 102 of 182

Page 107

Roads Adoption Policy  3
1. Introduction
1.1 Renfrewshire Council’s Tenant’s Support Fund (TSF) aims to assist Council tenants
experiencing acute financial hardship and finding it challenging to keep up to date with
payments of rent. 
1.2 The Council currently aim to assist with the impacts of the cost of living crisis for tenants –
for example Discretionary Housing Payments (DHP) and the Scottish Welfare Fund. We also
advise/assist our tenants how to access other funding routes which may be available. 
1.3 It is acknowledged that the cost-of-living crisis combined with the rent increase in 2023/24
may have placed further financial pressure on tenants and in some circumstances
impacting on their ability to maintain rent payments. 
1.4 The TSF, is intended to supplement the current Rent Collection process and is a temporary
measure to alleviate existing and emerging financial stress, prevent and reduce escalating
rent arrears and contribute to sustaining Council tenancies in Renfrewshire. The Fund is
intended to support tenants experiencing financial difficulty, through no fault of their own,
where it has been identified that financial challenges exist due to a change of
circumstances including, but not limited to:
• Increase in household costs / cost of Living (eg. energy, food, fuel, rent).
• Reduction in income (eg. loss of employment, reduced hours, loss of a
• household member).
• Changes to Welfare benefit, Housing Benefit and/or Universal Credit.
2. Tenant Support Fund
2.1 A TSF award may be granted when it is considered that a Council tenant requires further
financial assistance towards paying rental payments. This includes tenants already in
receipt of a Housing Benefit (HB) or Universal Credit (UC) housing element which would
qualify them for Discretionary Housing Payment (DHP).  An award may also be made to
tenants experiencing financial hardship but not currently eligible for HB, UC or DHP.
2.2 A TSF award would be considered where a tenant can demonstrate they are unable to
meet their rent payments from their available income. Council officers will determine this
by taking into consideration the tenant’s financial circumstances and any other relevant
factors. As well as this, all alternative sources of financial assistance will be reviewed. An
Page 103 of 182

Page 108

Roads Adoption Policy  4
income maximisation assessment will be undertaken to ensure all state and local welfare
benefits are in payment where there is an entitlement. 
2.3 Only 1 application will be eligible per household.  All decisions will be made only after all
other routes of financial assistance have been exhausted and each case will be decided on
its own merits.
3. Method of Payment
3.1 TSF awards will be delivered via credits to the tenants rent account in all cases. There will
be a clear audit trail of payments and a clear coding system to distinguish between awards
of HB, UC housing costs, DHP and tenant contribution. 
4. Period of Payment and Level of Award
4.1 A TSF award will not be intended to meet ongoing rental liability - it will be a weekly
payment into the rent account in line with the charging frequency. The adjustment will be
the equivalent of 5 % of gross rental charge – please see example below: 
A tenant lives in a 2 bedroomed flat, the weekly gross rent charge is £93.78. They have
missed rent payments due and following their interview with a Specialist Income Advisor,
the officer is satisfied that the tenant meets the criteria outlined in section 8 below and
concludes that they are unable to meet the full rental payments due from available
income – therefore TSF application will be approved. A discount will be applied of 5%
resulting in a weekly credit to the Tenant’s rent account of £4.69.
5. Change of Circumstances
5.1 A tenant receiving a TSF award is required to notify the Council of any changes in
circumstances which may be relevant to their award as soon as is reasonably practicable.
Most change of circumstances that tenants have a duty to report to Housing Benefit or
Universal Credit may also be relevant to their TSF award. It will be expected that changes
will be reported to housing to allow a review of the level of award, and this will be agreed
with the tenant as part of the conditions of payment of TSF.
Page 104 of 182

Page 109

Roads Adoption Policy  5
6. Cancellation and Ending an Award
6.1 A TSF award may be cancelled and or stopped early if there is a change in circumstances
that reduces entitlement or requirement for assistance. Also, if it is decided the award is
being or has been made because a tenant has misrepresented or failed to disclose a
material fact fraudulently or otherwise or when a tenant has been paid as a result of error.
7. Overpayments
7.1 Whilst every effort will be made to minimise TSF award overpayments, where an
overpayment occurs, the decision maker will decide if it is appropriate to recover the
award by taking into consideration whether the tenant contributed or could reasonably
have been expected to realise that an overpayment was occurring. Any credit on a tenants
rent account, as a result of an overpayment of a TSF award may be recovered.
8. Eligibility for TSF
8.1 Prior to approving an award the decision maker must be satisfied that the tenant: Has
current rent arrears on their active rent account, and/or, has maintained rental payments
while experiencing financial hardship. 
• Has clarity over the accuracy of the amount of rent arrears that has accrued, length of time
arrear is expected to continue and whether a previous payment arrangement has been
made and adhered to by the tenant. 
• Has exhausted all other forms of financial assistance available to them (Discretionary
Housing Payment, Scottish Welfare Fund or any other qualifying benefit). 
• Is unable to meet in full the rental payments due from available income.
8.2 The following are not eligible:
• Service charges. 
• Legacy rent arrears that are not subject to the rent collection escalation processes.
• Certain sanctions and reductions in benefit such as housing benefit / universal credit. 
• Former Tenant arrears.  
Page 105 of 182

Page 110

Roads Adoption Policy  6
9. Dispute Procedures
9.1 There is no statutory right of appeal in respect of a TSF award. The Council can review a
TSF decision in the event of a dispute or where the tenant asks for reconsideration. An
officer not involved in the original decision will consider the request for review. 
10.     Applications and Administration Process
10.1  Applications for the TSF will primarily be generated from officers within the Council’s
Housing Service and Income Advisors.  
10.2 Staff will complete a Tenant’s Support Fund Application Form providing details of tenant’s
contact information, income and reasons for application. 
10.3 The officer making the application on behalf of the tenant will refer the tenant to relevant
advice workers (eg. income / energy / employability) to make sure their income is
maximised. The tenant is responsible for engaging with sources of advice  and making any
claim for a qualifying benefit or housing costs associated with UC. 
10.4 The officer can also, where appropriate, refer a tenant to Housing Support through the
normal process where engagement with housing support will assist the tenant
experiencing financial difficulty. 
10.5 The officer will update the housing computer system to maintain a complete record of the
Support Fund application, related referrals to ensure effective monitoring of the Fund. 
10.6 The credit to rent accounts and any related adjustments will be administered by rent
accounting staff to maintain integrity within the rent account and facilitate monitoring of
payments. 
10.7 The financial impact on the Housing Revenue Account with be monitored by Service
Finance Partners and monitoring reports will be submitted to the Housing Services Senior
Management Team and outcomes reported as part of the Service Improvement Plan
outturn reports. 
Page 106 of 182

Page 111

Roads Adoption Policy  7
11. Outcomes
11.1  This fund builds on the Council’s Fairer Renfrewshire programme; considering household
challenges in relation to financial insecurity and the cost of living crisis.  
• Continued early and proactive contact with tenants in arrears.
• Maximising connections made to support tenants and signpost to all available advice; such
as income, energy, employability.
• Contributes to alleviating existing and emerging financial stress for tenants in managing the
impact of increased living costs including rent.
• Supports tenancy sustainment. 
• Helps prevent homelessness and the additional resource and cost pressures that
homelessness brings. 
• Reduces the numbers of cases escalating through the court system, ensuring management
of rent arrears is fair and proportionate. 
• Increasing tenant confidence in the council as a supportive landlord. 
• Increased numbers of tenants benefitting from specialist income advice. 
• Reducing financial stress, helping health and wellbeing. 
Page 107 of 182

Page 112

Roads Adoption Policy  8
Environment, Housing& Infrastructure
Renfrewshire Council
Renfrewshire House
Cotton Street
Paisley
PA1 1BR 
Page 108 of 182

Page 113

___________________________________________________________________
To: Communities and Housing Policy Board
On: 22 August 2023
___________________________________________________________________
Report by: Director of Environment, Housing and Infrastructure
___________________________________________________________________
Heading: Housing-led Regeneration and Renewal Programme for
Renfrewshire – Year 2 Update
___________________________________________________________________
1 Summary 
1.1 Renfrewshire Council’s Housing Led Regeneration and Renewal Programme
will deliver modern, high quality, energy efficient, affordable Council housing
that will not only significantly enhance the Council’s housing stock but will also
contribute to the wider transformation of communities and will be central to the
economic and social recovery of Renfrewshire. 
1.2 This ambitious programme was approved by the Communities, Housing and
Planning Policy Board on 18 January 2022 with amended proposals for three
of the eight regeneration areas also approved on 15 March 2022. The
programme is being taken forward as a key Council priority, designed to
deliver maximum benefits for residents and with the active involvement of
services across the Council and Community Planning partners. 
1.3 This report provides members with an update on the progress made to date in
year two of the Regeneration and Renewal programme and provides a re-
profiled timeline for the delivery of works scheduled throughout this ten-year
strategy.
__________________________________________________________________________________
2. Recommendations 
It is recommended that the Communities and Housing Policy Board: 
2.1 Approve the updated timescale for delivery of works across all eight areas in
the ten-year Regeneration and Renewal Programme (Appendix 1) and note
the Director of Environment, Housing and Infrastructure will provide regular
updates on progress to the Policy Board.
__________________________________________________________________________________ 
Item 8
CHPB220823 Page 109 of 182

Page 114

3. Progress to Date
3.1 Following the approval of the ten-year programme by the Policy Board in
January and March 2022 significant work has been undertaken to progress
the ambitious regeneration plans.  The scope and complexity of the
Regeneration and Renewal Programme required a phasing strategy to be
developed, which takes account of a range of factors including delivery
timescales, rehousing requirements, contractor availability, maximising grant
support for owner participation and consideration of wider development
constraints. 
3.2 In line with the phasing strategy, the majority of work to date has been
focussed mainly in the area of re-housing tenants and acquiring privately-
owned property where this is required to facilitate the demolition programme.
To date, of the 664 properties identified for demolition, 230 (35%) are now
vacant and of the 89 private properties that are to be acquired within the
demolition properties, we have now acquired 25 (28%), with negotiations
underway with many other private owners.  This work is progressing at
varying pace across the eight areas, with demolition blocks at Auchentorlie
now 94% vacant and Waverley Road now 69% vacant.   
3.3 Keeping residents engaged and informed has been a key priority over the
course of the last year and tenants, residents and owners have been issued
with regular updates advising them of the approved plans for each area. The
Council’s website has a dedicated Housing Regeneration and Renewal
section, which is updated regularly to ensure that residents are kept informed
of progress and, most recently, newsletters have been delivered to tenants,
residents and owners in most areas over the course of June, July and August.
3.4 Officers from our Regeneration and Renewal team have been actively
engaging with tenants and residents to ensure they know who they are and
how they can be contacted.  Officers carry out home visits and regularly visit
the areas to have an on site presence and to ensure any matters raised or
identified are quickly addressed.  Weekly surgeries have also been
established in two of the eight areas (Howard Street and Springbank/
Mossvale) with arrangements being made to set up similar surgeries in the
other areas in line with the phasing of works for each area. 
3.5 Feedback from tenants and residents has been utilised to ensure matters 
raised about property condition and the wider environment are addressed as  
surrounding their homes. 
3.6 Initial Community Neighbourhood Renewal Group meetings have taken place
in two of the eight areas, with plans being developed with community
representatives and across Council services to operate in parallel with the
physical regeneration plans. Each Neighbourhood Renewal Group will be
tailored to the needs and circumstances of the local area, going beyond
housing and the immediate external environment and taking account of
broader issues such as links to health and wellbeing, access to outdoor
space, sustainable travel and employment or training opportunities to
maximise the benefits achievable for local residents. There will be ongoing
engagement with residents across all areas. 
Page 110 of 182

Page 115

4. Timescales for Delivery of the Investment Programme.
4.1  Throughout the course of an ambitious programme of this size and
complexity, it is to be expected that the project timelines may need to be re-
profiled to reflect progress.  An exercise has been undertaken to review the
project timelines which were approved by Policy Board on 16 August 2022
and sections 4.4 to 4.11 of this report provide an update on progress to date,
with information on the anticipated timeline for the investment, demolition,
newbuild and rehousing initiatives where this is relevant for each individual
area. 
4.2 For each of the eight areas, an extract of the Milestones document
reproduced in Appendix 1 shows the latest proposed timelines (the coloured
arrows) and the previously-approved timelines (the grey bars). In all cases the
Stakeholder Engagement and Benefits Realisation activities have been
extended to last throughout the programme. There is no change or no
significant change in five areas (Auchentorlie, Waverley Road,
Ferguslie/Broomlands, the Howwood Road Area and Thrushcraigs), a minor
change in one (the Howard Street Area, where the completion of demolition is
a year later than previously proposed) and a larger change in two areas
(Moorpark and Springbank/Mossvale, in both of which the completion of
investment work is up to two years later than previously proposed).
4.3 Where newbuild housing is proposed, a key objective of the regeneration
programme will be to deliver homes of a suitable type and size to meet
current and future needs and to enable existing households to remain in the
area where possible. All Council tenants affected by demolition will be offered
suitable alternative accommodation in line with the Council’s housing
allocation policy and will be entitled to apply for home-loss and disturbance
payments subject to qualification criteria where the move is in accordance
with the phasing strategy that facilitates this regeneration initiative.
4.4 Howard Street Area, Paisley
• This is an area of three-storey tenemental housing in Paisley’s East End,
surrounded by older four-storey stone tenements which are generally
managed by Williamsburgh Housing Association Ltd. Our proposals
comprise the demolition of some blocks in order to reduce the density and
investment in the blocks that remain. 
Addresses Council Private Total 
Investment – on site target date Q2 2024–25
Clarence Street 19, 20, 21, 22 and 24
Howard Street 11, 13, 15 and 17  
Ladyburn Street 10, 12 and 14
Lang Street 11, 13, 15 and 17
Violet Street 2 and 4 
Demolition:
McKerrell Street 35, 37, 39, 41 and 43
Ladyburn Street 9
Howard Street 8, 10, 12, 14 and 16 
81 
59 
27 
7
108 
66 
Page 111 of 182

Page 116

Total  140  34  174 
• Subject to owner participation, this regeneration area will see up to
eighteen blocks receiving a package of enhanced capital investment to
include improvements to the external environment and common areas,
including closes, backcourts, bin stores and recycling facilities as well as
the external fabric of the buildings. The Council has so far acquired two
properties from owners who were looking to sell their properties in blocks
identifed for invetsment, increasing its majority or giving it full ownership in
further blocks. 
• The plans for the Howard Street Area will also see eleven blocks being
demolished to provide a new area of amenity open space and to reduce
the overall building density. The first Neighbourhood Renewal Group
meeting took place for this area on 11 July 2023 and was attended by a
number of Council tenants and representatives from the local community. 
• Following liaison with tenants and residents regarding their housing
options, Rehousing priority has been applied to several blocks in this area
with twelve tenants successfully rehoused to date.  Liaison with private
owners has also been established and four properties have successfully
been acquired by the Council with other owners at various stages of the
voluntary acquisition process. 
• In the latest proposed timelines completion of all activities is re-profiled.
There is a minor change in this area in that the completion of demolition
work is now scheduled to be at the end of 2025, a year later than
previously proposed. This is because this work cannot be done in the
eleven closes concerned until all tenants have been re-housed and all
privately-owned flats acquired and, based on progress to date, this will
take longer than originally anticipated, however, this will not delay the
investment in the remaining stock or any newbuild. We will work with the
Neighbourhood Renewal Group to improve the former footprint of the
eleven closes but have no plans to build new housing there.     
Demolition
Investment On-site
2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32
Ownership Consolidation
Inv Pre-contract
RehousingStrategy
Stakeholder Engagement
Benefits Realisation
Page 112 of 182

Page 117

4.5 Auchentorlie, Paisley
• Like the Howard Street Area, this is an area of three-storey tenemental
housing in Paisley’s East End and our proposals comprise the demolition
of some blocks in order to reduce the density and investment in the blocks
that remain. 
Addresses Council Private Total 
Investment – on site target date Q4 2023–24
Auchentorlie Quadrant 1, 2, 3, 4, 6, 8, 10, 11
and 13
Seedhill Road 74 
Demolition: 
Auchentorlie Quadrant 5, 7 and 9 
Total 
44 
17 
61 
16 
1
17 
60 
18 
78 
• Subject to owner participation, this regeneration area will see up to ten
blocks receiving a package of enhanced capital investment to include
improvements to the external environment and common areas, including
closes, backcourts, bin stores and recycling facilities as well as the
external fabric of the buildings.  Fabric works will be tailored to the
buildings in each area and will adopt a whole house retrofit approach with
measures to improve energy efficiency and help reduce energy costs for
tenants and residents. 
• This area has a pilot project block where investment work has
commenced and,on completion, this block will be a showcase for tenants
and owners to see the high specification of works being delivered.   
• The first Neighbourhood Renewal meeting took place for this area on 27
June 2023 and was well received by those who attended.  This event
gave tenants and residents the opportunity to speak to Council officers
and our appointed landscape architects about the developing plans for the
area which includes the removal of three tenement blocks to reduce the
overall density and improvements being made to the surrounding
environment.  Some suggested ideas for consideration from the event
include possible opportunities for Growing Grounds/Allotments on the site
being cleared and reconfiguration of garden space to make it more user-
friendly. 
• Rehousing of tenants from the properties identified for demolition in the
Auchentorlie area is complete. There is no other significant re-profiling in
the latest timelines. 
Rehousing Strategy
Demolition
Investment Pilot Project
Investment On-site
2029/30 2030/31 2031/322021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29
OwnershipConsolidation
Inv Pre-Contract
Stakeholder Engagement
Benefits Realisation`
Page 113 of 182

Page 118

4.6 Waverley Road, Paisley
• This is an area of three-storey tenemental housing in Foxbar, Paisley, and
our proposals comprise demolition of some blocks and investment in the
blocks that remain, with separate re-provisioning at Foxbar Rivers. 
Addresses Council Private Total 
Investment – on site target date Q4 2024–25
Waverley Road 18, 20, 22, 24, 26, 28, 30 and
32 
Demolition:
Waverley Road 34, 36, 38, 40, 42, 44, 46, 48,
50, 52, 54 and 56 
Total 
47 
70 
117 
1
2
3
48 
72 
120 
• This regeneration area will see eight blocks receiving a package of
enhanced capital investment to include improvements to the external
environment and common areas, including closes, back courts, bin stores
and recycling facilities as well as the external fabric of the buildings.
Fabric works will be tailored to adopt a whole house retrofit approach with
measures to improve energy efficiency and help reduce energy costs for
tenants and residents. 
• The plans for the Waverley Road area will also see twelve blocks being
demolished to reduce the overall density in the area and improvements
made to the surrounding environment.  To enable demolition, two of the
four private properties have been acquired by the Council and
negotiations for the voluntary acquisition of the remaining two private
properties are ongoing. 
• Officers have been liaising with tenants in the properties highlighted for
demolition in line with the rehousing phasing strategy. 
• As previously detailed to the Board, replacement housing will be built on
nearby sites in the Foxbar Rivers area which were previously identified for
housing in the Local Development Plan and Strategic Housing Investment
Plan.  Feasibility studies are underway and detailed proposals will be
presented to the Board as matters progress. 
• There is no re-profiling of completion dates in the latest timelines. 
Investment On-site
2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32
Ownership Consolidation
Demolition
RehousingStrategy
Stakeholder Engagement
Benefits Realisation
Page 114 of 182

Page 119

4.7 Moorpark, Renfrew
• This is an area of three-storey tenemental housing in Renfrew. Uniquely in
this area our proposals comprise no demolition, only investment in the
stock. 
Addresses Council Private Total 
Investment – on site target date Q3 2027–28
Barclay Square
Birmingham Road
Jessiman Square
Knockhill Road
Mitchell Avenue
Paisley Road 168–170, 200–208, 214, 220–224,
236, 242 and 248–254 
170  147  317 
• The Moorpark area has a high proportion of private owners and
participation of owners will be essential to ensure the successful delivery
of the investment programme.  Given that investment work is not
scheduled until well into this ten-year programme, officers are reviewing
the Council’s ownership and block make up to identify any ownership
consolidation opportunities to assist in the future delivery of investment
works. 
• Subject to owner participation, this regeneration area will see blocks
receiving a package of enhanced capital investment to include
improvements to the external environment and common areas, including
closes, backcourts, bin stores and recycling facilities as well as, where
possible, the external fabric of the buildings. Fabric works will be tailored
to the buildings in each area and will adopt a whole house retrofit
approach with measures to improve energy efficiency and help reduce
energy costs for tenants and residents. 
• There is significant re-profiling in the latest proposed timelines in that the
completion of Investment works is two years later than previously, due to
the complexities presented in an area of such high level of private
ownership.   
• The Council will seek to maximise owners’ opportunities to obtain grant
funding and officers are continuing to explore opportunities for external
funding support which may be available to assist in reducing the cost of
participation for owners. 
D Investment Pre-contract Investment On-site
2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32
Ownership Consolidation
Stakeholder Engagement
Benefits Realisation
Page 115 of 182

Page 120

4.8 Ferguslie/Broomlands, Paisley
• This is an area mainly of three-storey housing and our proposals comprise
the demolition of some blocks and investment in the blocks that remain,
with reprovisioning firstly on an adjacent brownfield site and secondly on
the former footprints of some of the blocks demolished. There is also an
area of pre-1919 tenemental housing (Ferguslie Walk). 
Addresses Council Private Total 
Investment – on site target date Q2 2023–24 
Broomlands Street 56–62 and 64–70
Carbrook Street 1–7
Ferguslie 1, 3, and 2–8  
Ferguslie Walk 21–25 and 16–28
West Campbell Street 2–8 
Demolition:
Ferguslie 18–20 and 22–24 
Knox Street 2–8
West Campbell Street 1–7 and 10–16 
Total 
77 
64 
141 
82 
16 
98 
159 
80 
239 
Newbuild: 
Ph 1 – site at Carbrook St (18 units) – on site target date Q2 2024–25 
Ph 2 – brownfield site (approx 25 units) – on site target date Q1 2027–28 
• The Ferguslie/Broomlands area has a large number of private owners and
owner participation will be necessary if we are to deliver the investment
required successfully.   
• This regeneration area will see mixed tenure blocks (subject to owner
participation) receiving a package of enhanced capital investment to
include improvements to the external environment, bin storage and
recycling facilities as well as the external fabric of the buildings. Fabric
works will be tailored to adopt a whole house retrofit approach with
measures to improve energy efficiency and help reduce energy costs for
tenants and residents. 
• Procurement is underway for a suitable contractor to provide ‘design and
build’ services for the first newbuild housing phase in this area (the former
Carbrook Nursery site).   
• This area will be further transformed with the later removal of five deck-
access blocks and the development of a further mix of newbuild Council
homes on some of the cleared sites. 
• The community will be invited to contribute to development plans for this
area, including the future of the communal laundries and, possibly, a
Page 116 of 182

Page 121

proposed new entrance to Ferguslie Gardens as neighbourhood plans
develop. 
• There is no change in the latest timelines to the overall completion dates, 
however, the demolition works have now been split into two phases, to
reflect the fact that two deck-access blocks at 18–20 and 22–24 Ferguslie
can be left in situ until completion of the newbuild on the footprints of 2–8
Knox Street and 1–7 and 10–16 West Campbell Street. 
4.9 Howwood Road Area, Johnstone
• This is an area of four-in-a-block housing in Johnstone. Our proposals
comprise demolition of most blocks and investment in those that remain,
with reprovisioning firstly on the site of a former primary school and later
on the former footprints of some of the blocks demolished.  
Addresses Council Private Total 
Investment – on site target date Q4 2024–25
Craigbog Avenue
Craigview Avenue 
Craigview Terrace
Duncraig Crescent
Dundonald Avenue
Greenend Avenue
Highcraig Avenue 
Demolition:
Craigenfeoch Avenue 1–47
Dundonald Road 52–122 
Greenend Avenue 34–64, 121–199, 211–289 
Highcraig Avenue 1–23, 2–24 and 41 & 47 
Plus 4no commercial properties in Highcraig
Avenue (2no Council, 2no Private) 
Total 
122 
167 
289 
73 
11 
84 
195 
178 
373 
Newbuild: 
Ph 1 – former school (70 units) – on site target date Q2 2024–25 
Demolition (Phase 1) Demolition (Phase 2)
Investment On-site
New Build (Phase 1)
Pre-contract (Phase 2) New Build (Phase 2)
2024/25 2030/31 2031/322025/26 2026/27 2027/28 2028/29 2029/302021/22 2022/23 2023/24
Stakeholder Engagement
Benefits Realisation
OwnershipConsolidation
RehousingStrategy
Pre-Contract (Phase 1)
Page 117 of 182

Page 122

Ph 2 – brownfield site (approx 75 units) – on site target date Q3 2027–28 
• A technical assessment has been carried out to assess the viability and
potential costs of newbuild homes on the site of the former Cochrane
Castle Primary School and the central area across from the shops on
Highcraig Avenue.  Early indications show that around 70 newbuild
Council homes of varying sizes could be delivered across both sites in this
first phase of development.   
• As plans are developing for this area, community events will take place to
gather the views, needs and preferences of people who currently live in
the area and are affected by the regeneration plans. 
• As originally reported to Board, rehousing of tenants displaced in this area
will take place on a phased basis following completion of the first set of
newbuild homes, with two phases of demolition and at least one phase of
newbuild thereafter. The first phase of demolition comprises properties
between Craigbog and Highcraig Avenue; and the second demolition
phase will be properties between Highcraig Avenue and Craigenfeoch
Avenue. 
• To date, four of the fifteen privately-owned properties identified for
demolition in the Howwood Road area have been successfully acquired
by the Council.  Officers continue discussions with the remaining private
owners to identify any re-housing needs and coordinate the voluntary
acquisition of the remaining properties. 
• Subject to owner participation, this regeneration area will also see
significant investment in existing stock with a package of enhanced capital
investment including improvements to the external environment, garden
areas, bin storage and recycling facilities as well as the external fabric of
the buildings.  Fabric works will be tailored to adopt a whole house retrofit
approach with measures to improve energy efficiency and help reduce
energy costs for tenants and residents. 
• Procurement is underway for a suitable contractor to provide ‘design and
build’ services for the first newbuild housing phase in this area (the former
Cochrane Castle Primary School site).  In the latest proposed timelines it
is proposed that both phases of newbuild (and rehousing) will be delivered
slightly earlier than previously reported. There is no change to the
investment timeline. 
Demo (Ph 1)
Investment Pre-contract
New Build (Phase 1)
Pre-contract (Ph 2) New Build (Phase 2)
2031/322026/27 2027/28 2028/29 2029/30 2030/312021/22 2022/23 2023/24 2024/25 2025/26
OwnershipConsolidation
Rehousing(Ph 1)
Investment On-site
Pre-Contract(Ph 1)
Demo (Ph2)
Stakeholder Engagement
Benefits Realisation
Rehousing(Ph 2)
Page 118 of 182

Page 123

4.10 Springbank/Mossvale, Paisley
• This is an area of three-storey deck-access housing and our proposals
comprise the demolition of some blocks and investment in the blocks that
remain, with reprovisioning in phases on the former footprints of the
blocks demolished. 
Addresses Council Private Total 
Investment – on site target date Q3 2025–26
Russell Street 1–19
Mossvale Street 24–38, 40–52, 54–66, 31–35
and 37–55 
Demolition:
Springbank Road 47–53, 55–61, 63–69 and 71–
77
Russell Street 6–20
Mossvale Square 1–19, 2–20 and 22–48
Mossvale Street 2–22
(Plus 16no lockups at 1-16 Russell St) 
Total 
31 
126 
157 
66 
28 
94 
97 
154 
251 
Newbuild: 
Ph 1 – brownfield site (approx 65 units) – on site target date Q3 2026–27 
Ph 2 – brownfield site (approx 35 units) – on site target date Q4 2029–30   
• The Springbank/Mossvale area has the largest number of private owners
where acquisition is required to facilitate demolition.  To date, eight of the
36 privately-owned properties identified for demolition in the Springbank
area have been successfully acquired by the Council.  Officers continue
discussions with the remaining private owners to identify any re-housing
needs and coordinate the voluntary acquisition of the remaining
properties. 
• Due to the size and scale of development for the Springbank area,
rehousing of tenants and private acquisitions have been phased to allow
the clearance of land for each phase of newbuild development.  This area
currently has three blocks with rehousing priority and to date 25 tenants
have moved. 
• Housing options advice is offered to tenants and residents of demolition
properties in line with the rehousing strategy for the area.  Displaced
tenants will be provided with a permanent tenancy elsewhere while
reserving their rights to be considered for the newbuild homes following
their completion if desired. This process is necessary to enable the
Page 119 of 182

Page 124

Council to clear the sites for the development of the newbuild homes on
the footprint of the flats being demolished. 
• This area will be further transformed with the investment in the remaining
stock (subject to owner participation in mixed tenure blocks) including
surrounding environmental improvements which will be discussed with the
community as the Neighbourhood Renewal Groups are established for
this area. 
• The latest proposed timelines include re-profiling of the completion of
ownership consolidation, newbuild, rehousing and demolition. It is also
proposed that the completion of investment be re-profiled, again due to
the high level of private ownership and the fact that the Council will seek
to maximise owners’ opportunities to obtain grant funding. Officers are
continuing to explore opportunities for external funding support which may
be available to assist in reducing the cost of participation for owners. The
later completion of investment will not delay any of the demolition and
newbuild. 
4.11 Thrushcraigs, Paisley
• This is an area of three-storey tenemental housing and uniquely in this
case our proposals comprise the demolition of all blocks and
reprovisioning of new housing on the former footprints of the blocks
demolished. 
Addresses Council Private Total 
Demolition:
Thrushcraig Crescent 12, 14, 16, 18, 20, 22, 24,
26, 28, 30, 32, 34, 51 and 53
Rowan Street 101 and 103 
91  5  96 
Newbuild – brownfield site (approx 50 units) – on site target date Q2 2027–28 
• The plans for the Thrushcraigs area involve the demolition of sixteen
blocks to make way for new affordable housing on the cleared sites. The
Rehousing (Ph 1) RH (Ph 2)
Demolition (Ph 1) Demolition (Ph 2)
Pre-contract (Ph 1) New Build (Ph 1)
Pre-contract (Ph 2) NB (Ph 2)
2031/322026/27 2027/28 2028/29 2029/30 2030/312021/22 2022/23 2023/24 2024/25 2025/26
OwnershipConsolidation
InvestmentOn-site
Rehousingstrategy
InvestmentPre-contract
Stakeholder Engagement
Benefits Realisation
Page 120 of 182

Page 125

newbuild housing to be delivered will be planned taking account of the
views, needs and preferences of people affected by the regeneration of
this area. 
• Rehousing priority has been given to several blocks within this area and
liaison with private owners continues where voluntary acquisition is being
sought. To date, the Council have successfully acquired one of the six
private properties in this area. 
• No significant change to the timelines is proposed. 
_________________________________________________________________
Implications of the Report
1. Financial – the financial background to this investment programme was
detailed in the report to Council on 17 December 2020 by the Chief Executive,
Director of Communities and Housing and Director of Finance and Resources
highlighting that it will be funded through financial sustainable borrowing on
the HRA. A strategic review of the 30-year HRA business plan model
confirmed there was sufficient headroom to support this investment
programme. The review identified £100 million of additional investment
capacity which can be relied upon for long term planning and investment
purposes and this is subject to ongoing review as part of the annual update of
the HRA 30-year business plan.   
2. HR & Organisational Development – none.
3. Community/Council Planning 
• Our Renfrewshire is well – this investment programme is contributing to
improved wellbeing and quality of life for residents.
• Our Renfrewshire is thriving – this investment programme will deliver a
diverse range of economic and community benefit packages over the
lifetime of the project
• Our Renfrewshire is safe – ensuring our neighbourhoods are safe and
attractive 
4. Legal – work will be required with respect to acquisitions, disposals,
conveyancing and title changes as necessary. 
5. Property/Assets – as we progress through the phases of the investment
programme, there is an element of property acquisitions and disposals and
demolition of some existing properties as approved by the Board.   
Demolition
Pre-contract New Build
2030/31 2031/322025/26 2026/27 2027/28 2028/29 2029/302021/22 2022/23 2023/24 2024/25
Ownership Consolidation
RehousingStrategy
Stakeholder Engagement
Benefits Realisation
Page 121 of 182

Page 126

6. Information Technology – N/A 
7. Equality & Human Rights –
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report. If required following implementation, the actual
impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be
published on the Council’s website.
8. Health & Safety – N/A
9. Procurement – a Procurement Strategy has been developed to ensure the
delivery of the investment, demolition and newbuild programmes include
locally deliverable community benefits from each contract.
10. Risk – a risk register has been developed to consider various risks including
those relating to financial and procurement as referred to in the implications
section of this report. This risk register will be monitored and maintained
throughout the delivery of the Housing led Regeneration and Renewal
programme. 
11. Privacy Impact – N/A 
12. COSLA Policy Position – N/A
13. Climate Risk – the investment programme will contribute towards meeting
the Council’s targets on climate change.
_________________________________________________________
List of Background Papers
Report to the Communities, Housing and Planning Policy Board, 15 August 2022,
‘Housing-led Regeneration and Renewal Programme for Renfrewshire – Year 1
Update’
Report to the Communities, Housing and Planning Policy Board, 15 March 2022,
‘Housing-led Regeneration and Renewal Programme for Renfrewshire’
Report to the Communities, Housing and Planning Policy Board, 18 January 2022,
‘Housing-led Regeneration and Renewal Programme for Renfrewshire’
Report to the Communities, Housing and Planning Policy Board, 18 May 2021,
‘Housing-led Regeneration and Renewal Programme for Renfrewshire’
Report to Council, 17 December 2020, ‘Housing-led Regeneration and Renewal
Programme for Renfrewshire’   
Report to Communities, Housing and Planning Policy Board, 20 August 2019,
‘Acquisition of Private Housing’
Page 122 of 182

Page 127

Report to Housing and Community Safety Policy Board, 13 May 2014, ‘Single Council
Dwellings in Larger Common Blocks’    
___________________________________________________________________ 
Author: Ray Walkinshaw, Housing Regeneration and Development Manager
Email ray.walkinshaw@renfrewshire.gov.uk - 07483 146814  
Page 123 of 182

Page 128

Appendix 1 – Implementation Timeline 
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Staff and resources
Demolition (Phase 1) Demolition (Phase 2)
Investment On-site
New Build (Phase 1)
Pre-contract (Phase 2) New Build (Phase 2)
Rehousing Strategy
Demolition
Investment Pilot Project
Investment On-site
Demolition
Investment On-site
Demo (Ph 1)
Investment Pre-contract
New Build (Phase 1)
Pre-contract (Ph 2) New Build (Phase 2)
D Investment Pre-contract Investment On-site
Demolition
Pre-contract New Build
Investment On-site
Rehousing (Ph 1) RH (Ph 2)
Demolition (Ph 1) Demolition (Ph 2)
Pre-contract (Ph 1) New Build (Ph 1)
Pre-contract (Ph 2) NB (Ph 2)
2024/25
2031/32
Springbank/Mossvale
Investment, Demolition & New Build
2026/27 2027/28 2028/29 2029/30 2030/312021/22 2022/23 2023/24 2024/25 2025/26
2025/26
2030/31 2031/32
Waverley Road
Investment & Demolition
2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32
2025/26 2026/27 2027/28 2028/29 2029/30
Thrushcraig
Demolition & New Build
2021/22 2022/23 2023/24
2023/24
2031/32
Howwood Road Area
Investment, Demolition & New Build (including on school sites)
2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32
Moorpark
Investment
2026/27 2027/28 2028/29 2029/30 2030/312021/22 2022/23 2023/24 2024/25
2028/29
2030/31 2031/32
Ferguslie/Broomlands
Investment (inc pre-1919 tenements), Demolition & New Build
2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32
Howard Street Area
Investment & Demolition
2025/26 2026/27 2027/28 2028/29 2029/30
Auchentorlie
Investment & Demolition
2021/22 2022/23
2029/30 2030/31 2031/32
2029/30 2031/32
Baseline June 2022
2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29
Applicable to all areas
2030/31
2024/25
2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28
OwnershipConsolidation
Inv Pre-Contract
Ownership Consolidation
Inv Pre-contract
OwnershipConsolidation
Ownership Consolidation
Ownership Consolidation
OwnershipConsolidation
InvestmentOn-site
Demolition
RehousingStrategy
Rehousing(Ph 1)
Ownership Consolidation
RehousingStrategy
RehousingStrategy
Rehousingstrategy
Investment On-site
Pre-Contract(Ph 1)
InvestmentPre-contract
Demo (Ph2)
Stakeholder Engagement
Benefits Realisation
Stakeholder Engagement
Benefits Realisation`
Stakeholder Engagement
Benefits Realisation
Stakeholder Engagement
Benefits Realisation
Stakeholder Engagement
Benefits Realisation
Stakeholder Engagement
Benefits Realisation
Stakeholder Engagement
Benefits Realisation
Stakeholder Engagement
Benefits Realisation
Rehousing(Ph 2)
OwnershipConsolidation
RehousingStrategy
Pre-Contract (Phase 1)
Page 124 of 182

Page 129

___________________________________________________________________
To: Communities and Housing Policy Board
On: 22 August 2023
___________________________________________________________________
Report by: Director of Environment, Housing and Infrastructure
___________________________________________________________________
Heading: Housing Energy Efficiency and Carbon Reduction Programmes:
2023/24 Award of Funding
___________________________________________________________________
1. Summary 
1.1 Renfrewshire Council has been awarded up to £2,061,138 for qualifying
projects under the Scottish Government’s Energy Efficient Scotland Area
Based Schemes (EES: ABS) programme for 2023/24. 
1.2 The report updates members on the funding process that has secured this
investment and the projects which will be supported.
___________________________________________________________________
2. Recommendations 
It is recommended that the Communities and Housing Policy Board:
2.1 Homologates the action taken by the Head of Housing Services in accepting
the funding of up to £2,061,138 that has been awarded for qualifying projects
within the Renfrewshire Council area for 2023/24 under the Scottish
Government’s EES: ABS programme; and   
2.2 Authorises the Head of Housing Services to oversee the delivery and
operational management of the programme and notes an update on the
outcomes delivered from the programme will be provided to a future meeting
of the Policy Board 
Item 9
CHPB220823 Page 125 of 182

Page 130

3. Energy Efficient Scotland: Area Based Schemes (EES:ABS) 2023/24
3.1 The Scottish Government’s EES: ABS programme was formerly known as the
Home Energy Efficiency Programme Scotland: Area Based Schemes
(HEEPS: ABS) which was introduced in 2013/14. The programme is targeted
at private sector homeowners to assist their participation and ensure projects
to improve energy efficiency can proceed. The key objectives are to address
fuel poverty, reduce carbon emissions and demonstrate an appropriate
strategic fit and approach to improving energy efficiency. 
3.2 The potential benefits of EES: ABS support a wide range of social housing
initiatives including maintaining stock at the levels required by the Scottish
Housing Quality Standard (SHQS) as well as the requirements of the Energy 
Efficiency Standard for Social Housing (EESSH) and local authorities act as
coordinating agents for all EES: ABS programmes for their area. 
3.3 The Council applied for funding of up to £2,061,138 for 2023/24 and was
awarded the full amount.  Details of the projects included within the bid are set
out below: 
3.4      As in previous years, the projects within the bid focussed on mixed tenure
blocks of solid wall construction type to support social landlords in meeting the
requirements of the Energy Efficiency Standard for Social Housing (EESSH),
as well as an allocation of funding to support private homeowners in houses
or wholly private blocks which will be delivered through a Managing Agent.   
3.5 The Council has again secured the services of a Managing Agent with the
intention of offering this support to private homeowners in areas where the
Council has previously carried out investment programmes, where houses
and/or blocks were not included in our programme due to them being wholly
privately owned.  The costs of the Managing Agent role will be met by the
EES: ABS funding. 
4. EES: ABS Programme 2022/23 
4.1 In 2022/23 the Council was awarded £1,675,500 in EES:ABS grant funding. 
The delivery of the 2022/23 EES:ABS programme was impacted by a range of
issues which continue to affect the construction industry, including material
supply delays, increased costs, and fluctuating labour supply, as the demand
for construction work is exceeding the availability of labour resource. 
Project Value of
HEEPS:ABS
Renfrewshire Council Mixed Tenure Blocks
External Wall Insulation and Solar PV  £1,472,238 
Managing Agent for Wholly Privately Owned Properties £502,800 
Linstone Housing Association Project  £86,100
Total  £2,061,138
Page 126 of 182

Page 131

4.2 Notwithstanding the complexity of these challenges, the Council successfully
drew down £1,259,033 of EES:ABS funding to support the delivery of energy
efficiency works to eligible private owners.  
4.3 The Council’s mixed tenure blocks investment project delivered external
improvement works including, external wall insulation and associated
measures to 115 flatted properties in the areas of Howwood, Kilbarchan,
Bridge of Weir, Inchinnan, Kilbarchan, Bishopton, Johnstone, Elderslie,
Gallowhill and Blackstoun Oval. The EES:ABS  funding allowed 57 private
owners to benefit from these works, whilst the works to a further 58 Council
homes were funded by the Council through the Housing Revenue Account
(HRA) capital programme. 
4.4 In addition, in 2022/23 the Council appointed the Wise Group to act as a
managing agent to offer EES:ABS funded energy efficiency improvement
works to residents in fully privately owned blocks and individual houses.
Targeting eligible residents in the Lochfield and Whitehaugh areas of Paisley,
where the Council has previously carried out investment programmes,
measures including external wall Insulation and solar PV panels were
installed to 34 fully private houses and flats and funded by EES:ABS.
4.5 Whilst a notable recovery has been made in 2022/23 compared to the
previous two years, with a significant amount of work being complete, there
has been the need to reprofile the timetable for the EES:ABS investment
programme with some works being rescheduled into 2023/24. 
5. EES:ABS Programme 2023/24 
5.1 Members should note there continues to be complexity and a degree of
uncertainty around the programming schedule due to the ongoing issues
being faced by the construction industry.  This may impact on the scheduling
of works for 2023/24 and the timetable for drawing down EES:ABS funding,
which may result in works being rescheduled over the course of 2023/24 and
into 2024/25, however, this will be managed by the Head of Housing Services
in line with the Scottish Government’s funding criteria timescales. 
5.2 An update on the outcomes of the 2023/24 programme will be provided to the
Policy Board on completion of the programme. 
___________________________________________________________________
Implications of the Report
1. Financial – EES:ABS allocation of £2,061,138 for 2023/24 to support owner
participation in a range of energy efficiency projects within the Renfrewshire
area
2. HR & Organisational Development - None  
Page 127 of 182

Page 132

3. Community/Council Planning – 
• Our Renfrewshire is thriving – assisting private owners to participate in
programmes to improve housing conditions, making Renfrewshire a great
place to live 
• Our Renfrewshire is well – improving housing conditions benefitting
tenants and private owners.  Addressing fuel poverty. 
• Reshaping our place, our economy, and our future – investment in the
refurbishment of social rented and private dwellings will create jobs and
contribute to the economy. 
4. Legal - None
5. Property/Assets – Improvements in the energy performance of both social
rented and private dwellings 
6. Information Technology - None 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report.  If required following implementation, the actual
impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be
published on the Council’s website.
8. Health & Safety - None
9. Procurement – Procurement of suppliers to deliver some elements of this
programme of work.
10. Risk - None
11. Privacy Impact - None
12. COSLA Policy Position – None
13. Climate Risk – Projects will contribute to reducing carbon emissions and
improving energy efficiency of both social rented and private dwellings.
___________________________________________________________________
List of Background Papers
(a)       Report to Communities, Housing and Planning Policy Board on 16 August 2022 –
Home Energy Efficiency and Carbon Reduction Programmes: 2022/23 Award of
Funding 
Page 128 of 182

Page 133

(b)       Report to Communities, Housing and Planning Policy Board on 17 August 2021 –
Home Energy Efficiency and Carbon Reduction Programmes: 2020/21 Award of
Funding 
(c) Report to Communities, Housing and Planning Policy Board on 20 August 2020 –
Home Energy Efficiency and Carbon Reduction Programmes: 2020/21 Award of
Funding 
(d) Report to Communities, Housing and Planning Policy Board on 20 August 2019 –
Home Energy Efficiency and Carbon Reduction Programmes: 2019/20 
(e)  Report to Communities, Housing and Planning Policy Board on 12 March 2019 –
Home Energy Efficiency and Carbon Reduction Programmes: 2019/20 
___________________________________________________________________
Author:        Mark Brown, Housing Asset & Energy Strategy
Email: mark.brown@renfrewshire.gov.uk 
Page 129 of 182

Page 134

Page 130 of 182

Page 135

To:  Communities and Housing Policy Board 
On:  22 August 2023 
Report by: Director of Environment, Housing and Infrastructure 
Heading: Business Regulation Service Plan 2023/2024 
1. Summary 
1.1 Renfrewshire Council is required by Food Standards Scotland (FSS) to
produce a Service Plan to provide detail on the work being undertaken in
Food Law across Renfrewshire Council. 
1.2 The team who cover this for Renfrewshire Council (Business Regulation
Team within Environment, Housing and Infrastructure) also lead on workplace
health and safety and other areas of Environmental Health work which are
included within the plan. 
1.3 The Service Plan sets out the objectives, what work is undertaken, service
delivery, resources and quality assurance. 
1.4 The Business Regulation Service Plan 2023/24 is attached to this report as an
appendix. 
2. Recommendations 
It is recommended that the Communities and Housing Policy Board: 
2.1 Approves the Business Regulation Service Plan 2023/24. 
3. Background 
3.1 Business Regulation forms part of the Climate, Public Protection and Roads
Service within Environment, Housing and Infrastructure.  
Item 10
CHPB220823 Page 131 of 182

Page 136

3.2 The team provide an effective regulatory service for food law, and
occupational health and safety at work on behalf of Renfrewshire Council,
ensuring the Council’s statutory responsibilities are met. The objective of the
service is to improve the quality and effectiveness of these regulatory
activities, and in doing so ensure public health and safety are maintained. 
3.3 In terms of food law enforcement, Renfrewshire Council is a statutory food
authority under the Food Safety Act 1990 for all food businesses within
Renfrewshire. The Council is also an enforcing authority in terms of Section
18 of the Health & Safety at Work etc. Act 1974, the Service is the enforcing
authority for health & safety legislation in certain types of premises within
Renfrewshire. This is determined by the main activity being undertaken at the
premises as laid down in the Health and Safety (Enforcing Authority)
Regulations 1998. 
3.4 Section 18 of the Health and Safety at Work etc Act 1974 puts a duty on the
HSE and Local Authorities (LAs), as Enforcing Authorities, to make adequate
arrangements for enforcement. The Section 18 Standard sets out the
arrangements that LAs and HSE’s Field Operation Directorate should put in
place to meet this duty. 
3.5 The Business Plan 2023/24 highlights the work undertaken by the Business
Regulation Team, the current position with regards to premises (as of 1 April
2023) and the planned work for the coming 12 months. 
3.6 Due to the Covid-19 pandemic, the Minister for Public Health and Sport
granted local authorities a deviation from the Food Law Code of Practice
(Scotland) The deviation was reviewed and extended several times
throughout 2020 and 2021 and ended on 1 September 2021. 
3.7 As a result, and in agreement with Food Standards Scotland, all local
authorities were required to produce and submit an updated Service Plan
detailing how they were going to inspect premises and recover from the Covid
pandemic in the coming years. 
3.8 The Board should note that whilst some programmed interventions at lower
risk groups ceased over the 18 months from 1 September 2021 to 31 March
2023, a risk-based approach was taken to ensure higher risk premises such
as approved premises, those in Group 1 and newly registered businesses,
maintained a high standard. 
3.9 In addition, intelligence driven interventions at all food business
establishments continued where possible. Intelligence included information
that suggested fraudulent activity or risk to public health, e.g. consumer
complaints, or credible allegations of food poisoning. 
Implications of the Report 
1. Financial – none 
2. HR & Organisational Development - none
Page 132 of 182

Page 137

3. Community Planning
Renfrewshire is safe – By implementing the attached Service Plan,
Environment, Housing and Infrastructure will ensure that food that is prepared
and consumed in Renfrewshire is safe and that workplace Health & Safety is
regulated. 
4. Legal – none 
5. Property/Assets - none 
6. Information Technology - none 
7. Equality & Human Rights - The Recommendations contained within this
report have been assessed in relation to their impact on equalities and human
rights.  No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report 
8. Health & Safety – where staff are required to visit premises, all risk
assessments and safe working procedures have been developed. 
9. Procurement - none 
10. Risk - none 
11. Privacy Impact - none 
12. CoSLA Policy Position - None 
13. Climate Risk - None 
List of Background Papers   
None 
Author:   Robert Marshall, Environmental Health (Business Regulation) Manager           
e-mail:  Robert.marshall@renfrewshire.gov.uk 
Page 133 of 182

Page 138

1
A
Business Regulation 
Service Plan 2023-2024
Environment, Housing and Infrastructure
Page 134 of 182

Page 139

Business Regulation
Service Plan 2023-2024 
2
Contents
1.  Service Aims and Objectives .............................................................. 4 
1.1.  Aims and Objectives .............................................................................. 4 
1.2.  Links to Corporate Objectives and Plans .............................................. 4 
1.3.  Overview ................................................................................................ 5 
2.  Background ........................................................................................ 5 
2.1.  Organisational Structure ....................................................................... 5 
Role of Public Protection within Climate, Public Protection and Roads .................. 5 
Environment, Housing and Infrastructure ............................................................... 6 
2.2.  Scope of the Service .............................................................................. 6 
2.3.  Local Authority Covid-19 Recovery Project ........................................... 7 
2.4.  Demands on the Service ....................................................................... 8 
2.5.  Performance Management ................................................................. 12 
2.6.  Enforcement Policy & Procedures ....................................................... 12 
3.  Service Delivery ................................................................................ 13 
3.1.  Food and Health & Safety Premises Inspections ................................ 13 
3.2.  Food and Health and Safety Service Requests ................................... 16 
3.3.  Investigation of Accidents ................................................................... 17 
3.4.  Enforcement Management Model (EMM) ............................................ 17 
3.5.  Home Authority Principle & Primary Authority Scheme...................... 17 
3.6.  Advice to Business ............................................................................... 19 
Page 135 of 182

Page 140

Business Regulation
Service Plan 2023-2024 
3
3.7.  FHIS & EatSafe ..................................................................................... 19 
3.8.  Sampling ............................................................................................. 20 
3.9.  Control and Investigation of Outbreaks and Food Related Infectious
Diseases ............................................................................................... 21 
3.10.  Food Incidents ..................................................................................... 22 
3.11.  Liaison with Other Organisations ........................................................ 22 
4.  Resources ......................................................................................... 23 
4.1.  Financial Allocation ............................................................................. 23 
4.2.  Staffing Allocation ............................................................................... 23 
4.3.  Employee Development Plan .............................................................. 24 
5.  Quality Assessment .......................................................................... 25 
5.1.  Quality Assessment & Internal Monitoring .......................................... 25 
6.  Review 2021-23 ................................................................................ 25 
6.1.  Review of Food Law Activity ................................................................ 25 
6.2.  Review of Health and safety activity. ................................................... 27 
6.3.  Areas for Improvement ........................................................................ 29 
7.  Emerging Issues 2023/24 ................................................................. 29 
Appendix:   Climate, Public Protection and Roads Staff Structure 
Page 136 of 182

Page 141

Business Regulation
Service Plan 2023-2024 
4
1. Service Aims and Objectives
1.1. Aims and Objectives 
The Food and Health & Safety Service is provided by Environment, Housing and
Infrastructure, Climate, Public Protection and Roads. This function is delivered by the
Environmental Health, Business Regulation Team. Which is based within the Climate,
Public Protection and Roads area of the Service. The aim is to provide an effective
regulatory service for food law, and occupational health and safety at work on behalf of
Renfrewshire Council, ensuring the Council’s statutory responsibilities are met. The
objective of the service is to improve the quality and effectiveness of these regulatory
activities, and in doing so ensure public health and safety are maintained. 
In order to achieve this aim, Environment, Housing and Infrastructure will:
o Apply the relevant legislation at premises regulated by the Local Authority in line
with the Scottish regulators’ strategic code of practice.
o Work in partnership with agencies such as Food Standards Scotland (FSS) and the
Health and Safety Executive (HSE) to achieve nationally agreed strategic aims,
o Ensure that all staff undertaking enforcement activity are properly qualified and
competent to undertake their duties,
o Operate a risk based approach to inspection and regulation,
o Carry out a programme of specific, targeted and appropriate interventions in order
to improve food safety, quality and health & safety standards,
o Work with local businesses in an open and transparent manner,
o Investigate and take appropriate action upon receipt of accident notifications,
service requests, food borne infection notifications and complaints.
1.2. Links to Corporate Objectives and Plans 
The Environmental Health, Business Regulation Service Plan 2023-24 contributes to
Climate, Public Protection and Roads outcomes as well as Renfrewshire Council’s
Corporate Objectives and Plans. In particular, the service has a critical role to play in
supporting sustainable economic development, ensuring the health and safety of the
public, addressing the impact of poverty and the protection of both the public and
legitimate businesses from criminal activities.  
Page 137 of 182

Page 142

Business Regulation
Service Plan 2023-2024 
5
1.3. Overview 
In terms of food law enforcement, Renfrewshire Council is a statutory food authority under
the Food Safety Act 1990 for all food businesses within Renfrewshire. The Council is also an
enforcing authority in terms of Section 18 of the Health & Safety at Work etc. Act 1974, the
Service is the enforcing authority for health & safety legislation in certain types of premises
within Renfrewshire. This is determined by the main activity being undertaken at the
premises as laid down in the Health and Safety (Enforcing Authority) Regulations 1998. 
Section 18 of the Health and Safety at Work etc Act 1974 puts a duty on the HSE and Local
Authorities (LAs), as Enforcing Authorities, to make adequate arrangements for
enforcement. The Section 18 Standard sets out the arrangements that LAs and HSE’s Field
Operation Directorate should put in place to meet this duty.
2. Background
2.1. Organisational Structure 
The Food Safety and Health & Safety service is delivered by suitably qualified officers
within the Business Regulation Team operating in Environment, Housing and
Infrastructure as part of the Climate, Public Protection and Roads service. (Appendix 2)
Role of Public Protection within Climate, Public Protection and Roads 
Public Protection within Climate, Public Protection and Roads, consists of the Business
Regulation, Community Safety, Public Health and Trading Standards teams. Their
combined role is to protect the health, safety and welfare of the local community and to
safeguard public health, the quality of the local environment and to enhance economic,
social and environmental welfare by improving and maintaining standards of fair trading in
terms of safety, quality, quantity and price. 
Page 138 of 182

Page 143

Business Regulation
Service Plan 2023-2024 
6
Environment, Housing and Infrastructure 
The Service is based at: 
Climate, Public Protection and Roads 
Renfrewshire House 
Cotton Street 
Paisley 
PA1 1BR 
The Service can be contacted by: 
email:   b-serv.es@renfrewshire.gov.uk, or phone:   0300 300 0380
2.2. Scope of the Service 
The main role of Environmental Health, Business Regulation is to undertake regulatory
functions of relevant legislation in terms of Food Law and Occupational Health and Safety
at Work on behalf of Renfrewshire Council.  The aim is to secure compliance with the
standards laid down in primary legislation, associated regulations and codes of practice.
The key activities of Environmental Health Business Regulation are based on the
implementation of inspection/intervention, survey and sampling programmes and other
appropriate monitoring and investigative activities, including responding to, and learning
from food complaints, accidents and incidents at work. 
Under Section 5 of the Food Safety Act 1990, Renfrewshire Council is a statutory Food
Authority, responsible for delivery of official controls under the Act and associated
Regulations.  Statutory appointments of Head of Food Service and Lead Officer for Food
Safety are detailed in the Council’s Scheme of Delegated Functions. 
Enforcement of the legislation, under Section 6 of the Food Safety Act 1990, includes food
hygiene and food standards covering the safety, quality, presentation and labelling of food. 
To this end, a programme of food business inspections and the surveillance of food is
carried out by co-ordinated food sampling and a food standards inspection programme.   
Food and premises hygiene complaints are investigated where required. The investigation
and control of food-borne infections within food premises is carried out in conjunction
with NHS Greater Glasgow and Clyde. The Service acts as the originating authority to those
large-scale food manufacturers within the area, co-ordinating and assisting in complaints
and enquiries from other Food Authorities within the UK and third Countries.
Page 139 of 182

Page 144

Business Regulation
Service Plan 2023-2024 
7
As an Enforcing Authority, the Service also has responsibility for the provision of health &
safety enforcement services in a range of business activities covering approximately 2500
premises and an estimated 10,000 employees. The enforcement of health & safety
legislation is split between the Local Authority (Renfrewshire Council) and the Health &
Safety Executive (HSE), depending on the main activity being undertaken at the premises
as laid down in the Health & Safety (Enforcing Authority) Regulations 1998. The HSE are
responsible for the more traditional “factory” or industrial premises. The premises within
the remit of the Council include: offices, shops, warehouses, leisure, hotel and catering
premises. 
The principal activities of the service, outlined above, have relevance to the Planning,
Building Standards, Civic Licensing and Alcohol Licensing services of the Council.  The
service also delivers official controls in relation to food law in all Renfrewshire Council food
operations.   
The Service provides advice and guidance to all businesses to ensure compliance with
statutory requirements. 
2.3. Local Authority Covid-19 Recovery Project 
The measures taken by UK and Scottish Governments in March 2020 in response to the
Covid-19 pandemic resulted in the closure of a large proportion of food establishments.
Additionally, physical distancing requirements meant that Local Authority Authorised
Officers were prevented from conducting routine, programmed interventions/Official
Controls at most of those businesses who continued trading. 
Food Standards Scotland (FSS) secured Ministerial agreement to allow a relaxation from
the Food Law Code of Practice and the Interventions Code of Practice. This relaxation
ended on 31 August 2021. 
Food Standards Scotland acknowledged that Local Authorities intervention programmes
would be adversely affected as numerous interventions would not be undertaken when
due and create a backlog of ‘missed’ interventions. In Renfrewshire this figure was around
1012 missed inspections at the time the programme re-started.  
Page 140 of 182

Page 145

Business Regulation
Service Plan 2023-2024 
8
It was, consequently, agreed that measures to address this situation should be considered
and a project should be delivered in order to enable all Local Authorities to rectify the
position. This had the principle aim of delivering a clear and accurate Local Authority and
national view of the food establishment profile – including the Food Law Rating System
(FLRS) risk-rating of all establishments and the Local Authority capacity to undertake the
necessary Official Controls therein. 
The backlog of inspections in all but the lower risk Group 3B category have been
completed. These will be done within the 48-month period (end September 2025) as
agreed with Food Standards Scotland and will be incorporated into the annual inspection
programmes going forward from April 2023. 
The 2023/24 Business Regulation Service plan provides data and information for the
period 1 September 2021 to 31 March 2023. 
2.4. Demands on the Service 
Table 1: Profile of food businesses in Renfrewshire
Premises Number
Caring Establishment 179
Hotels and Guest Houses 26
Mobile Traders 54
Primary Food Producers 10
Pubs/Clubs 154
Restaurant/ Caterer 407
Takeaway Premises 219
Retail 357
Schools and Colleges 82
Manufacturers and Packers 46
Importers/Exporters 8
Distributors/Transporters 23
TOTAL 1563 
Page 141 of 182

Page 146

Business Regulation
Service Plan 2023-2024 
9
Table 2: Profile of Businesses for Health & Safety Enforcement
Premises Number
Retail 757
Wholesale 119
Offices 323
Catering 565
Hotels etc 26
Residential Care 19
Leisure 195
Consumer Services 424
Others 64
Total 2429 
The Food law and Health & Safety Services provided by Renfrewshire Council operate
solely from Renfrewshire House, Cotton Street, Paisley, PA1 1BR. The Service’s standard
working day is 8.45am - 4.45pm Monday to Thursday, and 8.45am - 3.55pm on Friday, with
an out of hour’s service also being provided in cases of emergency. Officers operate a
hybrid model where they are operating from home, in the office and in the field e.g.
inspecting premises and investigating incidents.
The Service works in a number of complex areas, which include: 
Glasgow International Airport
As Glasgow International Airport lies within the Authority, this adds further elements of
work to the Environmental Health, Business Regulation Team. Consignments of food,
particularly fruit and vegetables come through Glasgow Airport from third Countries. These
foods are subject to controls administered by Environmental Health, Business Regulation.
The Service is also involved in the surveillance of exports from the Airport and provides
export certificates to those businesses exporting foodstuffs from Renfrewshire. 
The Business Regulation Team provides a port health role at the airport. Renfrewshire Port
Health Authority was originally set up with the primary objective of preventing dangerous
epidemic diseases entering the country. Although this can still occur, if a person is patently
unwell, this function is now more realistically aimed at contacting and monitoring persons
who may be carrying a communicable disease and preventing further cases arising from
environmental contamination of aircraft. 
Page 142 of 182

Page 147

Business Regulation
Service Plan 2023-2024 
10
There are also currently 2 businesses which operate flight catering within the airport estate
and these are subject to inspection by the service.
EHOs operate on a rota basis, with one officer allocated for each day of the working week.
The officer carries out all imported food functions at the airport on his/her allocated day. In
addition, on weekends and public holidays an emergency call out service is in place to deal
with port health incidents and any other Environmental Health related emergencies. 
Communication and Language 
The Council area has several food businesses operating for whom English is not a first
language. This can introduce communication challenges during the course of inspection
and enforcement visits. In order to address this issue, information leaflets translated into
other languages have been produced. A translation service is available to officers if
required during inspections and other meetings. 
Council Operated Food Businesses 
The control of food enforcement in Local Authority catering operations provided by
Facilities and Property Services is a complex and sensitive area of work. These premises
include catering in residential establishments such as those run by the Council’s Social
Work Services as well as schools and nurseries. The service employs the same approach to
enforcement in these premises.
Approved/Authorised Premises
There are 9 approved/Authorised Businesses operating within Renfrewshire, all of which
are approved/authorised under Regulation (EC) 853/2004. 
These are: 
DNATA Airline Catering Arran Avenue, Paisley, PA3 2AY
Gate Gourmet Airline catering Campsie Drive, Paisley, PA2 8DP
Gormack Foods Sandyford Road, Paisley, PA3 3HP
CFPU RAH Hospital Corsebar Road, Paisley, PA2 9PJ
Scottish Leather Group Seedhil Road, Paisley, PA1 1JL
Scottish Leather Group Baltic Works, Bridge of Weir
Gleddoch Family Butchers Glasgow Road, Paisley, PA1 3PW
Lomond Cold Store Blackstoun Road, Paisley, PA3 3AF
Rice and Spicy Eddison street, Hillington, G524JW 
Page 143 of 182

Page 148

Business Regulation
Service Plan 2023-2024 
11
Events
A significant number of events are held throughout Renfrewshire on an annual basis,
particularly, but not exclusively, during the summer months. These events require a food
law enforcement presence in response to the level of external food retailers and caterers
providing food for the large number of visitors and this can result in a minor short-term
impact on the food service.
The Service also works closely with Renfrewshire Councils Events Team.
Health & Safety Enforcement
The review of Health & Safety enforcement activities by the UK Government has influenced
the approach in this area. HSE priority planning guidance directs the work of Local
Authorities in relation to Health & Safety, with an emphasis on targeting resources on
higher risk activities and reducing the number of routine inspections. 
An Intervention Plan based on this guidance has been developed which takes into account
local conditions and priorities. 
Enforcement within Arm’s Length Organisations – OneRen 
Health & Safety enforcement in arm’s length organisations connected with Renfrewshire
Council presents a challenge to the Local Authority.
In 2019, the Health & Safety Executive (HSE) advised Renfrewshire Council that
enforcement within Council owned leisure facilities operated by arm’s length
organisations, are: in accordance with The Health and Safety at Work Act 1974, the
enforcement responsibility of the Local Authority.
This presents significant challenges and burdens as there are close relationships between
the Council and One Ren including the corporate control as the Council is the sole
shareholder of the Company. The Council does not have outright control of One Ren, as
the charity has an independent board of directors, but it does have the right to appoint
and remove some of the directors.  As a result, strategic decisions affecting the operation
of One Ren are at the very least influenced, and could (in some instances) be directed, by
the Council.  
Page 144 of 182

Page 149

Business Regulation
Service Plan 2023-2024 
12
Further to this, staff from Renfrewshire Council Facilities and Property Services may be
involved in the maintenance of buildings and installations. The buildings and assets
themselves are still within the ownership of the Council and although the liabilities reside
with One Ren, should an incident/accident occur this could cause a further conflict of
interest.
In addition, the transfer of enforcement responsibility has the potential to add a significant
burden to the workload of the Environmental Health Business Regulation Team.
2.5. Performance Management 
Elected Members receive quarterly reports on performance in key areas including Food
Safety/Health & Safety enforcement and Managers provide an operational update at a bi-
monthly Management Meeting. Certificates of Compliance and formal notices are reported
to elected members via the Regulatory Functions Board and Information Bulletin reports.
Performance reviews are carried out on a six-monthly basis with staff involved in Food
Safety and Health & Safety enforcement, to maintain performance.
2.6. Enforcement Policy & Procedures
An Integrated Enforcement Policy is in place to ensure the consistency of enforcement
across all areas of Environment, Housing and Infrastructure. The Policy sets standards
clearly outlining the level of service which the public and businesses can expect to receive.
It encourages fair and open regulation and commits the Service to ensuring our
enforcement service works with businesses to assist them in complying with the law.
Information Systems 
Premises records are held on the Authority Public Protection (APP) system, which is used
to manage the inspection programme and record details of inspections, accidents,
complaints and enquiries.  The database is regularly reviewed and updated to facilitate the
planning of inspection programmes and production of management reports.
Progress towards local, regional and national outcomes is monitored on a monthly basis
using the reporting functions of the system. Statutory returns are made using data from
the APP system. 
Page 145 of 182

Page 150

Business Regulation
Service Plan 2023-2024 
13
3. Service Delivery
3.1. Food and Health & Safety Premises Inspections
In accordance with the Food Law Code of Practice (Scotland), all food premises are risk-
assessed for food law. Risk assessments are entered in the Services database, which
generates a target inspection date. A report is generated from the database of visits due for
each officer. The Service undertakes a full inspection programme based on the risk
category of premises. Regulatory activity in relation to Health and Safety at Work is
determined in accordance with the HSE priority planning guidance.
The tables below illustrate the number of premises in Renfrewshire in each risk category
for Food Law and Health & Safety.
Table 3 - Total premises (Food Law) with Group & Rating
GROUP RATING NUMBER
1 A 7
1 B 11
1 C 6
1 D 0
1 E 0 
TOTAL 24
GROUP RATING NUMBER
2 A 27
2 B 532
2 C 292
2 D 24
2 E 0 
TOTAL 875
GROUP RATING NUMBER
3 A 38
3 B 432
3 C 139
3 D 1
3 E 0 
TOTAL 610 
Page 146 of 182

Page 151

Business Regulation
Service Plan 2023-2024 
14
Table 4: Premises per group Rating Category
Group Number of Premises
1 24
2 875
3 610
Food Standards Only 3
Approved 9
Farms 8
Sub Total 1529
Unrated 45
Total 1574 
The food Law risk rating of a food business is based on a number of elements. Hygiene,
structure, food safety management and food standards are assessed to determine the risk
posed by an establishment and the frequency of intervention by the local authority. These
are numerically scored and used to derive the rating that is presented as the 'score', A-E;
Category E posing the highest risk. Where a business have registered with the service but
are awaiting inspection, these are listed as “unrated”.
Table 5: Profile by Health & Safety risk category 
Risk Category Total number in category
A 1
B1 33
B2 764
C 1565
Unrated 465
Total 2828 
The tables below illustrate the number of inspections programmed for 2023/24 in each risk
category for Food Law. 
A total of 903 food law programmed interventions are projected for the 12 months
commencing 1 April 2023.  
Page 147 of 182

Page 152

Business Regulation
Service Plan 2023-2024 
15
Table 6: Food Law Programmed Interventions for 2023/2024
GROUP RATING NUMBER
1 A 3
1 B 10
1 C 6
1 D 0
1 E 0 
TOTAL 19
GROUP RATING NUMBER
2 A 9
2 B 399
2 C 284
2 D 19
2 E 0 
TOTAL 711
GROUP RATING NUMBER
3 A 1
3 B 105
3 C 66
3 D 1
3 E 0 
TOTAL 173 
The inspection programme for 2023/24 has been developed to comply fully with the Food
Law Code of Practice (Scotland) and LAC Circular 67/2 (Rev 7) Health & Safety priority
planning.
So far as the inspection of premises outwith normal working hours is concerned, our policy
is to ensure that, where premises are only open outwith normal hours, then appropriate
provision is made for them to be visited in accordance with at least the minimum number
of visits determined by their risk rating.
7.0 full time equivalent officers carry out the work of the Business Regulation team,
including the Business Regulation Manager. The staffing allocation to food law
enforcement is 75% of 7.0 FTE’s, with the other 25% allocated to Health & Safety
enforcement. Officers are allocated premises within specific geographical areas. 
Page 148 of 182

Page 153

Business Regulation
Service Plan 2023-2024 
16
It is considered that the Service has adequate expertise to provide a competent and full
portfolio of enforcement and educational roles in relation to Food Law and Health &
Safety. However, where necessary, we are able to draw on expertise from Food Standards
Scotland, Glasgow Scientific Services – the Public Analyst, Health Protection Scotland, the
Director of Public Health, Animal and Plant Health Authority (APHA), The Health & Safety
Executive and other local authorities.
3.2. Food and Health and Safety Service Requests
Complaints and Service Requests are dealt either by the duty Business Regulation Officer
or by the officer responsible for the premises which are the subject of the
complaint/request.  All service requests are logged in the APP database against the
premises concerned. The Service has documented policies relating to the investigation
and handling of complaints and service requests which ensure that all complaints are
investigated in accordance with the appropriate Code of Practice. All complaints are
recorded and their risk evaluated to distinguish between those which require an on-site
investigation and others which may be resolved by telephone or written advice. The
numbers of complaints and service requests, detailed by category, estimated for the year
2023/24 are shown in the table below:   
Table 7 - Estimated Complaints and Service Requests 2023/2024
Service Request Category Requests   Sept.01 /21 -
March 31 /2023
Estimated Requests 2023/2024
Advice to Consumer 14 40
Advice to Business 81 100
Food Hygiene Complaint 65 60
Food premises Complaint 51 50
Food Standards 29 30
Section 50 Certificates/ Building
warrant
8 10
Licensing Consultation 75 250
Imported Food 2 2
H&S Enquiries 32 
other 3 
Total  329 540 
Page 149 of 182

Page 154

Business Regulation
Service Plan 2023-2024 
17
The number of service requests received in the period Sept.1/2021 to March 31/2023
appear lower than predicted. It is likely that service requests remain an area where there is
under reporting by officers, and this has been addressed at team meetings.  
3.3. Investigation of Accidents
A procedure is in place for the investigation of notified accidents designed to ensure
consistency and quality of the accident investigation service. It is not possible or
appropriate to investigate all incidents and a systematic approach has been adopted to
ensure that the more serious incidents are investigated. 
3.4. Enforcement Management Model (EMM)
The Guidance in the LAC22/18 along with detailed guidance that was issued for use by
EHOs is used to promote consistency of enforcement between individual officers, LAs and
with HSE.
All officers in the team have been trained in the use of the Enforcement Management
Model. The model is used by officers when considering the most appropriate action to take
in more complex situations which are occasionally encountered, including serious
accident investigations.  It is also used as a monitoring tool by management.
3.5. Home Authority Principle & Primary Authority Scheme
For companies operating under two or more local council jurisdictions, Primary Authority
provides reliable and consistent regulatory advice from a single source when dealing with
key aspects of environmental health, trading standards, health & safety, and licensing
services. Renfrewshire Council currently has no partnerships in relation to health & safety
advice and enforcement. 
The Primary/Home authority principle is applied when dealing with food complaint
investigations and also routinely in relation to food standards and labelling issues.  It is
considered to be an aid to good enforcement practice. 
The Council has no formal agreements in place to act as a Home Authority with any
specific business, but has listed the following significant establishments as ones which are
considered as home authority/originating authority premises:
Page 150 of 182

Page 155

Business Regulation
Service Plan 2023-2024 
18
Table 8- - Originating Authority Businesses
A&A Bakers Moss Road Linwood PA3 3HR
DNATA Arran Avenue Paisley PA3 2AY
AP Jess Sandyford Road Paisley PA3 4HP
Aulds Delicious Desserts Barnsford Avenue Inchinnan PA4 9RG
Big Bear Bakery 15 Edison Street Hillington Park G52 4JW
Buon Giorno 11A Queen Street Renfrew PA4 8TR
Davidson Butcher Mossedge Paisley PA3 3HR
Diageo Global Supply 1 Argyll Avenue Renfrew PA4 9EA
Diageo Global Supply 500 Renfrew Road Renfrew G51 4SP
Faodail Foods Westway Renfrew PA4 8DJ
G Porrelli & Co Ltd 25 Lacy Street Paisley PA1 1QN
G&A McHarg Dalziel Road Hillington Park G52 4NN
Gate Gourmet Glasgow Airport Paisley PA2 8DP
Gleddoch Family Butchers 60 Glasgow Road  Paisley PA1 13W
Hannah's of Johnstone 18-20 Walkinshaw Street Johnstone PA5 8AB
Henderson Meats Hillington Glasgow PA8 6BS
Ingram Brothers 15 East Lane Paisley PA1 1QA
Jenier Limited Earl Haig Road Hillington G52 4JU
John Scott Meats Sandyford Paisley PA3 3HR
Kismet Lyon Road Linwood PA3 3BQ
Kerry Foods (UK) Ltd) 55-59 Kelvin Avenue Hillington Park G52 4LT
MacSpice/McAusland
Crawford
79/81 Abercorn Street Paisley PA3 4AS
Linburn Farm Linburn Erskine PA8 6AW
Scottish Leather Ltd Kilbarchan Road Bridge Of Weir PA11 3RL
Rice 'n' Spicy 15 Edison Street Hillington Park G52 4JW
Sutherland Cakes 15-17 Earl Haig Road Hillington G52 5JU
Glasgow Distillery Company Deanside Road Renfrew G52 4XB
The Elderslie Scottish Tablet
Co
37 Glenpatrick Road Elderslie PA5 9AE
W P Tulloch 22a Skye Crescent Paisley PA2 8EL
Dargavel Brewery West Glen Farm Langbank PA146YL
Rise and Grind Roastery 104 Abercorn Street Paisley PA34AY
Page 151 of 182

Page 156

Business Regulation
Service Plan 2023-2024 
19
3.6. Advice to Business
The Environmental Health, Business Regulation Team undertakes an on-going advisory
role to all businesses in Renfrewshire.  A range of information and promotional material is
made available for businesses by Environmental Health Officers during visits.  
3.7. FHIS & EatSafe
The Food Hygiene Information Scheme continues to operate in Renfrewshire with around
1500 food premises who sell food to the public being included. 
Currently 98% of premises within Renfrewshire have a pass certificate. 
The scheme is currently under review by Food Standards Scotland. The review will take
account of the changes to the food law code of practice and the introduction of the risk
rating scheme for food law.
There are 12 premises with Eat Safe Awards within Renfrewshire. This is the highest award
in the scheme. These are: 
Table 7 -Eat Safe Award Recipients
Premises Name Premises Address
Accord Hospice Morton Avenue, Paisley, PA2 7BW
Mosswood Care Home Moss Road, Linwood, PA3 3FA
Capability Scotland Wallace Court, 191 Main Road, Elderslie, PA5
9EJ
Erskine mains Care Home Meadow drive, Erskine, PA8 7ED
Hanover(Scotland) Housing
Association Newton Court 23 Maree Road, Paisley, PA2 9DH
Hanover(Scotland) Housing
Association, Ailsa Court 1 Ailsa Drive, Paisley, PA2 8HE
Hanover(Scotland) Housing
Association Orchard Court
"Orchard Court", Orchard Street, Renfrew, PA4
8RZ
Hanover(Scotland) Housing
Association, Walikinshaw Court Walkinshaw street, Johnstone, PA5 8AF
Kibble Education & Care Centre Goudie Street, Paisley, PA3 2LG
Holiday Inn Caledonia Way, Glasgow Airport PA3 2TE
Leaps and Bounds Nursery 23 Clarence Street, Paisley, PA1 1PU
Rashilee Care Home Little Inch, 8 Rashilee Avenue, Erskine, PA8 6HA
Page 152 of 182

Page 157

Business Regulation
Service Plan 2023-2024 
20
3.8. Sampling     
Renfrewshire Council, along with 9 other local authorities have a Service Level Agreement
with Glasgow City Council for the provision of analytical services. The analyst service is
provided by Glasgow Scientific Services, Colston Laboratory, 64 Everard Drive, Glasgow
G21 1XG. Glasgow Scientific Services are this Authority’s appointed Public Analyst for
chemical analyses of all food samples, Food Examiner for all microbiological examination
of food samples and Agricultural Analyst for all feeding stuffs samples taken.
The sampling programme for 2023/24 is attached as Appendix 1 to this Service Plan. The
programme will focus on high-risk premises in Renfrewshire, whilst reflecting national
priorities recommended by FSS and the Scottish Food enforcement Liaison Committee
(SFELC).
Food sampling will also be undertaken at Glasgow International Airport to monitor the
quality, composition and labelling of foods imported through the airport as part of the
Service’s imported food controls. It is not possible to estimate sample numbers or types
for this sampling at present.
The Health and Safety programme for 2023/24 has been drawn up with reference to Local
Authority Circular, LAC 67/2 (Rev 12) Health & Safety priority planning. (See Table 8) The
LAC provides LAs with guidance and tools for priority planning and targeting of
interventions taking a proportionate and consistent risk-based approach to, enable
Renfrewshire Council to meet the requirements of the National Local Enforcement
Authority Code (hse.gov.uk) (the Code). Planned regulatory activity is focussed on
improved outcomes and reduced injuries to employees or members of the public. The
Code provides flexibility for LAs to address local priorities alongside the national priorities
set by HSE.  
Page 153 of 182

Page 158

Business Regulation
Service Plan 2023-2024 
21
Table 8 Health and Safety Priorities 2023/24
Special Interventions
Carry out special interventions at animal visitor attractions in an effort to reduce
the risk of contamination especially to children.
Carry out special interventions for safety in swimming pools and spas where
Health & Safety is enforced by the Local Authority to reduce the risk to employees
and the public from Health & Safety and Public Health incidents.
Carry out special interventions at children’s indoor soft play visitor attractions in
an effort to reduce the risk of accidents to children.
Carry out special interventions at commercial catering establishments to assess
gas safety and where the risk of carbon monoxide may be present.
Carry out special interventions at premises, especially licensed premises that use
stored gas to minimise the risk of explosion. 
Proactive inspection of industrial retail/wholesale premises to ensure adequate
control of work at height, workplace transport and loading and unloading of
vehicles. 
Intervention to ensure that Cellar Safety is being adhered to in licensed premises.
Intervention to ensure Legionella controls are in place.
Carry out special interventions in relation to Crowd management at large scale
events.
3.9. Control and Investigation of Outbreaks and Food Related
Infectious Diseases 
Environment, Housing and Infrastructure works closely with NHS Greater Glasgow and
Clyde Health Board Consultants in Public Health Medicine in outbreak control situations
and the routine investigation of infectious disease. In addition, the Health Board has
produced an outbreak control plan for dealing with major outbreaks of food related illness
to which this authority has had a major input.
The Business Regulation Team work in partnership with the Public Health Protection Unit
at NHS Greater Glasgow and Clyde Health Board to ensure the plan is adhered to. In
addition, an outbreak control and investigation of notifications of food borne disease
procedure is in place. 
Present resources within Environment, Housing and Infrastructure are adequate to meet
current levels of notification; however, in the event of a major outbreak, any required
additional resources would be made available by seconding Environmental Heath Officers
from other service areas.  
Page 154 of 182

Page 159

Business Regulation
Service Plan 2023-2024 
22
3.10. Food Incidents
Food incidents are dealt with in accordance with the relevant codes of practice the Food
Law Code of Practice (Scotland) Notifications of incidents are received from Food
Standards Scotland (FSS) by e-mail or telephone. In case of emergencies, an Officer is on
stand-by and has contact details for all relevant members of staff. Procedures for food
safety incidents are in place and are available to all staff. This allows for alerts to be
appropriately actioned, investigations set in motion and warnings issued if necessary. Any
enforcement activity which is required in support of an incident is carried out within the
terms of the relevant legislation and the Council’s enforcement policy for assuring the
safety of food.
In addition to responding to notified incidents, Renfrewshire Council will, where necessary,
initiate Food Alerts in accordance with Code of Practice Guidance and will liaise with Food
Standards Scotland in such situations.
3.11. Liaison with Other Organisations 
To ensure enforcement and other activities carried out by the Service are consistent with
neighbouring Authorities and to ensure best practice, Renfrewshire Council actively
participates in the West of Scotland Food and Health & Safety Liaison Groups.  The groups
meet regularly throughout the year and comprise representatives from the 14 authorities,
which previously made up Strathclyde Regional Council, together with representatives
from Glasgow Scientific Services, Food Standards Scotland and the Health & Safety
Executive. The groups are attended by the Business Regulation Manager or a suitable
deputy. 
The Service also has formal and informal links to a range of other organisations and
agencies. These Include:
 NHS Greater Glasgow and Clyde Health Board
 Association of Port Health Authorities
 Royal Environmental Health Institute for Scotland
 Society of Chief Officers of Environmental Health in Scotland
 Society of Chief Officers of Trading Standards in Scotland
 Scottish Food Enforcement Liaison Committee
 Health Protection Scotland 
 Food Standards Scotland
 Health & Safety Executive
 Glasgow Scientific Services
Page 155 of 182

Page 160

Business Regulation
Service Plan 2023-2024 
23
 Animal and Plant Health Agency
 Marine Scotland
 Border Force
 H.M. Revenue and Customs
 APP Scottish Users Group
4. Resources
4.1. Financial Allocation
The budget detailed below indicates the level of resources available 2023/24 to deliver the
necessary services. As highlighted at 3.1 above the resource allocation within the Business
Regulation Team is 75% of Food Law enforcement and 25% on Health & Safety
enforcement. This split is at the discretion of the Environmental Health - Business
Regulation Manager and can be amended where there is a service demand.
Budget 2023/24
Employee Costs £520,140
Supplies and Services £173,347
Travel and Subsistence £0
Training £1600
Total £695,087 
Projected Income Source 2023/24
Export Health Certificates £300
Sales, Fees and Charges £0
Miscellaneous Income £5000
Total £5,300
4.2. Staffing Allocation
Within the context of this plan, the allocation of staff is designed to provide an effective
enforcement service for food law and occupational health and safety at work on behalf of
Renfrewshire Council.  
Page 156 of 182

Page 161

Business Regulation
Service Plan 2023-2024 
24
All food enforcement officers are authorised in accordance with the Food Law Code of
Practice (Scotland) commensurate with their training and experience. A range of additional
relevant qualifications are held including: the REHIS Advanced Food Hygiene Diploma, the
REHIS Certificate in the Inspection of Meat and Other Foods, Certificate in Nutrition &
Health and the RIPHH Certificate in HACCP Principles. Three officers have completed the
ISO 9000 Lead Assessors course and All current Food Law officers have attended and
passed the Official Controls verification Course.
The Service secures administrative support from a pool of administrative and support staff
in the Council’s Business Support Service.   
4.3. Employee Development Plan
The Service is committed to ensuring all officers are suitably qualified, trained and remain
competent in terms of the Food Law Code of Practice (Scotland) and in terms of Section 18
of the Health & Safety at Work Act 1974. 
This is facilitated by the provision of in-house training, and all employees have the
opportunity on a rotation basis to attend relevant external training events. Any employee
attending such a course is required to “cascade” the relevant information accrued as a
result of their attendance to other officers. 
Business Regulation Team meetings are held weekly, where performance, enforcement
and other relevant issues are discussed. Matters arising from the quality assessment model
for inspections, consistency issues and interpretation issues are discussed. 
Liaison Group minutes are stored in the staff manual for all officers to use. Relevant points
from the Liaison Groups are also discussed at Team meetings.
In addition, all staff have full access to, and are trained in the application of, policies and
procedures, which are a requirement of the framework agreement on local authority food
law enforcement. Training records are maintained for each officer.
All officers have completed a training needs analysis and will have individual development
plans prepared for 2023/24.
Page 157 of 182

Page 162

Business Regulation
Service Plan 2023-2024 
25
5. Quality Assessment
5.1. Quality Assessment & Internal Monitoring
The Service has a documented “Internal Monitoring Procedure – Internal Checks” quality
assessment model for inspections.  The Business Regulation Manager has primary
responsibility for carrying out quality assessments within the Service. The Head of Climate,
Public Protection and Roads has a secondary responsibility to oversee the performance of
the Business Regulation Manager and to ensure that quality assessments are being carried
out consistently throughout the Service.
The Internal checks include file checks, one-to-one discussions, team discussions and
accompanied inspections. Records of these are retained by the Business Regulation
Manager and the Head of Climate, Public Protection and Roads.
This quality assessment model facilitates the Service’s requirement in accordance with
annex 2 of the Food Law Code of Practice (Scotland) and the Section 18 guidance issued by
the HSE to ensure that all staff engaged in enforcement activities retain their competence.
The Business Regulation Manager reviews a monthly report on the performance indicators
to ensure that the targets are met. The monthly report also details performance
information relating to inspection deadlines, complaints and service requests received and
food sampling activity are also monitored.
6. Review 2021-23
6.1. Review of Food Law Activity
Group Band Estimated Total Interventions Actual Interventions
1 A 1 5
1 B 12 23
1 C 6 9
1 D 4 2
1 E 0 0
Total  23 39 
Page 158 of 182

Page 163

Business Regulation
Service Plan 2023-2024 
26
Group Band Estimated Total Interventions Actual Interventions
2 A 7 23
2 B 420 400
2 C 370 402
2 D 102 69
2 E 0 0
Total  899 894
Group Band EstimatedTotal Interventions Actual Interventions
3 A 6 25
3 B 350 156
3 C 164 45
3 D 32 2
3 E 0 0
Total  552 228 
Group Estimated Total
Interventions
Actual Interventions
Food Standards Only N/A 5 0
Farms N/A 11 5
Approved Premises N/A 9 5
New Business
Inspections
Group1-3
Group2-167
Group3-44 
214
Businesses Ceased
Trading
Group1-3
Group2-123
Group3-39 
165
REVISITS  ~254 194
Table 9 - Estimated Formal Enforcement Notices 
Programmed Food Hygiene Inspections: 
The Food Law Code of Practice (Scotland) states that” Intervention programmes should be
planned so that establishments receive an intervention no later than 28 days after the
scheduled date as detailed in Annex 5”.
Type of Notice Estimated Number Actual
Remedial Action Notice 6 16   
Hygiene Improvement Notice 11 24
Voluntary Closure 12 5
H&S Improvement Notice 8 28
H&S Prohibition Notice 4 21
Page 159 of 182

Page 164

Business Regulation
Service Plan 2023-2024 
27
During the period 1/9/21 to 31.3.23 1171 Food Law interventions were carried out. 92%
(1081) interventions were completed within the 28 days specified in the code of practice.
8% (90) Interventions were not completed within the 28 and this was mainly due to access
difficulties brought about by the pandemic where businesses changed their operating
model such as, operating only at weekends or temporary closure. In additional some
seasonal businesses were included within this grouping. A total of 12 visits are outstanding
from this grouping however, it is likely that some of this number have permanently closed
and officers are attempting to contact the business operators.
Sampling: The review against sampling is included in the Sampling Programme attached
at Appendix 1.
6.2. Review of Health and safety activity.
In the year 1 September 2021 to 31 March 2023, the following Health and Safety
interventions were undertaken:
Intervention Category 1 September 2021 to
31 March 2023
Estimated work to be
undertaken 2023/24
Accident / incident/Complaint investigations 16 10
New Premises Interventions 149 100
Advice visits to Businesses 10 10
Interventions 85 60
Revisits 25 25
Licensing Visits 51 30
RIDDOR reportable notifications received 111 100
Total 336 235 
Specific Health and Safety Projects/Interventions carried out 1 September 2021 to 31
March 2023:
Gas Safety Interventions
Special interventions at commercial catering establishments to assess gas safety and
where the risk of explosion or carbon monoxide may be present were carried out. As well
as being a National priority theme, this was an important local intervention due an
incident where on call Environmental Health Officers were called by the gas provider
following a gas leak into a tenemental property. Investigations established that the owner
of a takeaway beneath the residential properties had previously been disconnected and
had his meter removed. He had then by-passed the system from the emergency cut off
Page 160 of 182

Page 165

Business Regulation
Service Plan 2023-2024 
28
valve with garden hose and adhesive tape and reconnected his gas equipment. A report
was prepared for the procurator fiscal but the owner disappeared before the case could be
progressed. As can be seen from the results of the interventions, this is an area of concern.
A total of 37 interventions were carried out with 22 businesses being found non-compliant.
10 Prohibition, 13 Improvement Notices and 9 written warnings were issued as a result. 2 of
the businesses were found to have forged gas safety certificates. The businesses
concerned received follow up checks to ensure compliance.
Animal visitor attractions Intervention
An intervention was carried out at an animal visitor attraction to reduce the risk of
contamination especially to children. Some recommendations were made to the
management and these were put in to place.
Golf Course Intervention
11 interventions were carried out at all private Golf courses within Renfrewshire to ensure
safety in golf course operations. 1 prohibition notice was issued to one business and no
other formal warnings were issued. Recommendations and advice were issued to all of the
businesses.
Legionella Intervention
The interventions focused on premises providing hot tubs or spa baths within a hotel
setting or those with multiple lodge style accommodation and individual hot tub. A total of
5 businesses were visited.
One business received a written warning for structural defects and 2 for inappropriate
cleaning regimes and use of chemicals. Recommendations and advice were given to all
businesses and follow up checks where defects were noted, were carried out.
Health & Safety in Care Homes  
Three interventions were carried out at care homes, triggered by RIDDOR reports where
service users had sustained fractures from falling. Although the interventions concentrated
on moving and handling of service users, all aspects of Health and Safety were examined
during the visits. No issues were found and no warning letters were issued as a result.
Page 161 of 182

Page 166

Business Regulation
Service Plan 2023-2024 
29
6.3. Areas for Improvement
Further development of the APP electronic database will take place during 2023/24. In
addition, the power BI system will be used to assist in performance monitoring and review.
An electronic filing system for Business Regulation premises files has been initiated and
this is expected to be complete by year ending 2023/24
7. Emerging Issues 2023/24
Food Crime
This continues to be a focus for FSS and Food Authorities. It is expected that due to the
challenges post pandemic, Brexit and the cost-of-living crisis that there will be an increase
in Food Fraudulent activity. This in turn will have resource implications for the service.
Food Crime erodes confidence and disempowers consumers. This leads in turn to financial
losses, negative economic impact and poses a threat to jobs and exports. Tackling food
crime is so Nationally/Internationally important that The Scottish Food Crime and
Incidents Unit (SFCIU) was established and the Business Regulation Team already work
closely with this team and will continue to build on the established working relationships
with them and other partner Agencies.
Brexit
The challenges and uncertainties relating to the UK exit from the EU remain. Officers
regularly attend meetings in relation to port issues and discussions continue into inland
import checks and the impacts that this may have on the service.
Page 162 of 182

Page 167

30
Environment, Housing and Infrastructure
Renfrewshire Council
Renfrewshire House
Cotton Street
Paisley
PA1 1BR 
Page 163 of 182

Page 168

Appendix 1 
Climate, Public Protection and Roads 
BUSINESS REGULATION 
FOOD SAMPLING PROGRAMME 
2023/24 
Page 164 of 182

Page 169

1. Introduction
1.1 The annual sampling programme for 2023-24 is designed to fulfil aims and objectives in
line with the Services Food Sampling Policy. The programme outlines the sampling
priorities for the year, however it is recognised that circumstances and priorities may
change, which require the programme to be flexible in order to respond to these changing
circumstances.
1.2 Most samples are taken informally for the purpose of monitoring, surveillance and
information gathering however; formal samples will be taken where enforcement action is
anticipated. Environmental Health Officers, Food Safety Officers and other authorised
officers are responsible for undertaking the food sampling functions of the Council. 
1.3 At present there is a Service Level Agreement in place with Glasgow City Council to provide
analytical services to Renfrewshire Council. The analyst is: Glasgow Scientific Services,
Colston Laboratory, 64 Everard Drive, Glasgow, G21 1XG.
2. Approach to Sampling
Renfrewshire Council complies with the requirements of the Food Safety (Sampling and
Qualifications) Regulations 1990 and the Food Law Code of Practice. The sampling
programme for 2023/24 is designed to be more focused on high risk/high value products
which are manufactured in Renfrewshire. Focussing on these items will ensure that those
which pose the greatest risk to the public of Renfrewshire are adequately controlled. 
2.1 Informal Samples
An informal sample may be taken covertly, however; the food business operator will
always be informed of the results of the sample where this fails. For enforcement purposes
formal sampling must be undertaken overtly.
2.2 Formal Samples
In accordance with the Renfrewshire Council Integrated Enforcement Policy, which
promotes action which is consistent, fair and proportionate, formal samples will generally
be taken after routine samples have been found to fail statutory requirements and no
satisfactory remedial action has been taken.
Page 165 of 182

Page 170

2.3 Sampling Priorities
Food Standards Scotland and The Scottish Food Enforcement Liaison Committee have
identified, through intelligence, the areas deemed to be priorities in terms of sampling. The
priority plan considers the Scottish perspective but also takes account of the UK. FSA.
priorities. In addition to National priorities, Renfrewshire Council will focus on areas of
particular interest to the authority.
2.4 Manufacturing/Approved Premises
Renfrewshire Council will continue to concentrate on sampling from manufacturers and
approved premises in our area. These premises will be sampled at least annually. Where
possible, samples will be taken in advance of Food Hygiene/Food Standards inspections in
order to discuss sample results with the food business operator.
2.5 Sampling Plan 2023/24
The sampling plan for 2023/24 outlines the project work to be undertaken by Renfrewshire
Council in high-risk areas. The sampling plan is outlined at point 4.0.
3. Complaints and Food Borne Disease Investigations
In response to complaints and notifications of food borne disease received the service may
opt to take samples in order to resolve any issues arising as a result of any investigations.
3.1 Co-ordinated Sampling
Where appropriate, the Service will participate in food surveillance programmes arranged
by regional and national bodies such as Food Standards Scotland, SFELC and the West of
Scotland Food Liaison Group.
3.2 Imported Food
In order to monitor the quality, composition and labelling of imported foods, samples of
foods imported through Glasgow Airport will be submitted to the Public analyst for
examination. 
Page 166 of 182

Page 171

3.3 Special Investigations
There may be circumstances whereby an incident will require special investigation and
resources may have to be directed towards dealing with the investigation. In addition, this
may involve liaison with other partners including Health Protection Scotland and Greater
Glasgow & Clyde Health Board. 
4. Priority Actions
The following topics have been identified as priority actions by FSS and will be the subject
of sampling activity during 2023/24, along with other local surveillance activities.
Food Type Premises Type Testing parameters Number of
Samples
Dry spices and spice
mixes Retailers Salmonella 3
Cultivated 'exotic', fresh
mushrooms (e.g. Enoki
mushrooms)
Retailers
Listeria monocytogenes
detection and
enumeration, generic E.coli
3
Cooked and cured sliced
meats and smoked fish Retailer
Listeria monocytogenes
detection and
enumeration, generic
E.coli,
3
Blue veined and mould-
ripened cheese Retailers
Listeria monocytogenes
detection and
enumeration, generic
E.coli,
3
Cooked shellfish Retailers 
Listeria monocytogenes
detection and
enumeration, generic
E.coli,
3
Pate  Retailers
Listeria monocytogenes
detection and
enumeration, generic E.coli
3
Flour
Manufacturers
Retailers
Bake houses
STEC, generic E. coli
3
Rice and noodle dishes Catering Bacillus cereus 3
Dried figs Retailers Aflatoxins, Ochratoxin A 3
Domestic, fresh fin-fish,
cephalopods and
crustacean
Manufacturers
Processors
Retailers
Heavy metals, PFAS, iAs
3
Spinach  Retailers Heavy metals (lead,
cadmium, mercury)
3
Pre-packed beef mince Retail Fat & Connective tissue 3
Page 167 of 182

Page 172

Naan bread and other
flat breads Retail Propionic acid 3
Frozen processed pork
products Retailers Meat Speciation 3
Frozen processed beef
products Retailers Meat Speciation 3
Coffee (drink) Caterers Milk 3
Egg-free take away meals Caterers Egg 3
4.1 Routine Sampling
The project sampling initiatives listed above will be the focus of sampling activities
however, in the course of routine work, officers will take samples as appropriate.
Review 
A total of 187 samples were taken during the period of 1st September 2021 – 31st March
2023: 63 for microbiological examination of which, 13 failed for high numbers of
bacteria including pathogens such as E.coli and 124 for chemical/ compositional
analysis of which 6 failed to meet compositional standards including; undeclared
allergens, low meat content, substitution and additive levels above legal maximum. 
Where samples were found to be unsatisfactory, visits to the businesses concerned were
undertaken by officers, the results discussed, and advice given in respect of how the
sample may have failed and how to ensure compliance in future. Where available,
resamples were taken. 
Page 168 of 182

Page 173

Appendix 2 
Page 169 of 182

Page 174

Page 170 of 182

Page 175

___________________________________________________________________
To: Communities and Housing Policy Board 
On: 22 August 2023
_________________________________________________________________________
Report by: Director of Environment, Housing & Infrastructure
_________________________________________________________________________
Heading: Housing (Scotland) Act 1987- Representation in Respect of a House
Failing to Meet the Tolerable Standard
_________________________________________________________________________
1. Summary 
1.1 Following approval by the Housing and Community Safety Policy Board in 2014 for
properties to be demolished as part of the Johnstone Castle Housing Regeneration
programme, one property within the approved area at 26E Cedar Avenue, Johnstone
remains under private ownership with no voluntary agreement in place to purchase,
with the late owner’s estate. 
1.2 It has been determined that the property, 26E Cedar Avenue fails to meet the
Tolerable Standard, as defined within the Housing (Scotland) Act 1987, as amended
and approval is being sought from the Board to issue a Demolition Order in terms of
Section 115 of the Housing (Scotland) Act 1987 for the whole blocks at 24 and 26
Cedar Avenue, Johnstone, including 26E. 
1.3 Authorisation is also sought to promote a Compulsory Purchase Order to
complement the Demolition Order process and bring the remaining privately owned
property into Council ownership once the block, including 26E has been demolished.
_________________________________________________________________________
2. Recommendations 
It is recommended that the Communities and Housing Policy Board:
2.1 approves a Demolition Order being issued for the properties at 24A – 24F and 26A –
26F Cedar Avenue, Johnstone, PA5 9TH.
2.2 approves the Council carrying out the demolition of the blocks at 24A – 24F and 26A
– 26F Cedar Avenue, Johnstone, PA5 9TH in the event that, subject to their right to
appeal, the owners fail to demolish the block with the prescribed period. 
2.3 authorises the Director of Environment, Housing & Infrastructure to promote a
Compulsory Purchase Order to compulsorily acquire the property at 26E Cedar
Avenue, Johnstone. 
___________________________________________________________________________
Item 11
CHPB220823 Page 171 of 182

Page 176

3. Background
3.1 The Housing and Community Safety Policy Board at its meeting on 26 August 2014
approved the demolition of properties within the Johnstone Castle Regeneration Area
including the properties at 67 – 109 and 155-157 Elm Drive, 2 – 26 Cedar Avenue,
45 Sycamore Avenue, 18 – 22 Tower Road and 1 – 13 Maple Drive. 
3.2 The blocks at 24 and 26 Cedar Avenue are, apart from 26E, under full ownership of
the Council (all are vacant), however the death of the owner of 26E Cedar Avenue,
Johnstone in 2015 has resulted in the voluntary purchase of this property stalling,
with the outcome that the demolition of these blocks has also stalled. 
3.3 The Housing Regeneration team have repeatedly attempted to engage with the
family of the deceased, without being able to secure agreement to purchase the
property. Accordingly, authorisation is sought to promote a Compulsory Purchase
Order to compulsorily acquire the property at 26E Cedar Avenue, Johnstone to
complement the promotion and service of the Demolition Order and, subject to the
rights of appeal, subsequent demolition of the blocks at 24 and 26 Cedar Avenue,
Johnstone.
3.4 The Housing (Scotland) Act 1987 places a duty on local authorities to secure that all
houses within their district are closed, demolished or brought up to the Tolerable
Standard within a period which is reasonable in the circumstances.
3.5 Section 115 of the Housing (Scotland) Act 1987, as amended makes provision for a
local authority to issue a Demolition Order where it is satisfied that a house, or
houses, do not meet the Tolerable Standard and ought to be demolished, further
requiring that the building shall be demolished within six weeks after the expiration of
a 28 day period (which is to allow for the properties to be vacated). The owner of any
property has a period of 21 days to appeal to the Sheriff Court against the Demolition
Order.
3.6 All properties within the building are vacant and there is no requirement to specify
within the Demolition Order any period for the properties to be vacated.
3.7  The Tolerable Standard, as defined within Section 86 of the Housing (Scotland) Act
1987 is a basic minimum standard which all properties are required to meet and is
reproduced for information within Appendix 1.  As this is a condemnatory standard a
property only requires failing to meet one element of it to fail the Tolerable Standard
overall.
3.8 The flats within 24 and 26 Cedar Avenue generally are in a very poor condition and in
respect of 26E it is noted that the roof is failing to prevent water ingress (ceilings can
be seen to have fallen in), there is no supply of electricity or water to the building and
Officers are therefore satisfied that the property 26E Cedar Avenue fails the
Tolerable Standard on the following grounds: 
 It is not substantially free from penetrating damp;
 It does not have satisfactory provision for artificial lighting and heating (due to
there being no electricity supply);
 It does not have an adequate supply of wholesome water available within the
house;
 It does not have a sink provided with a satisfactory supply of both hot and cold
water;
 It does not have a satisfactory supply of hot and cold water at any fixed bath,
shower and wash hand basin;
Page 172 of 182

Page 177

 It does not have satisfactory facilities for the cooking of food (due to there
being no electricity supply)
 It does not have satisfactory equipment installed for detecting, and for giving
warning of, fire or suspected fire.
3.9 Authorisation is therefore sought to issue a Demolition Order in respect of numbers
24A – 24F and 26A – 26F Cedar Avenue, Johnstone and to demolish the block.
Demolition of this block is in accordance with the approved Johnstone Castle
Regeneration strategy. 
3.10 The Council would seek to recover the expenses of demolition via the statutory
powers available to it. 
___________________________________________________________________
Implications of the Report
1. Financial These recommendations will be funded within the Housing Capital
Investment Plan 2023/24 to 2027/28 as approved by Council on 2 March 2023
 
2. HR & Organisational Development - None 
3. Community/Council Planning –
Creating a sustainable Renfrewshire for all to enjoy- Improving and maintaining
neighbourhoods and homes. 
4. Legal – The Demolition Order may require input from Legal Services in relation to
valid service and promotion of the Order and any appeal. There will be a requirement
for Legal Services to carry out conveyancing work to voluntarily or compulsorily
acquire the property at 26E Cedar Avenue. 
 
5. Property/Assets – Eleven of the twelve flats in the blocks at 24 and 26 Cedar
Avenue are Council owned. 
6. Information Technology - None
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed in relation to
their impact on equalities and human rights. No negative impacts on equality groups
or potential for infringement of individuals’ human rights have been identified arising
from the recommendations contained in the report because for example it is for
noting only.   If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored, and the
results of the assessment will be published on the Council’s website.  
8. Health & Safety - None
9. Procurement - None
10. Risk – The owner of the property 26E has a right of appeal against the Demolition
Order which, if exercised, could delay the works for a significant period.
11. Privacy Impact - None 
12. Cosla Policy Position – not applicable.
13. Climate Risk - None
Page 173 of 182

Page 178

_________________________________________________________________________
List of Background Papers 
(a)  Background Paper 1 Report to the Housing and Community Safety Policy Board
entitled, Housing Regeneration: Johnstone Castle, on 26 August 2014
_________________________________________________________________________ 
Author:          Gerard Hannah, Head of Climate, Public Protection and Roads
Email:           Gerard.hannah@renfrewshire.gov.uk
 
Page 174 of 182

Page 179

Appendix 1 – Tolerable Standard Definition 
Tolerable Standard as Defined in S86 of the Housing (Scotland) Act 1987, as
amended. 
(1) Subject to subsection (2), a house meets the tolerable standard for the purposes
of this Act if the house—
(a) is structurally stable;
(b) is substantially free from rising or penetrating damp;
(c) has satisfactory provision for natural and artificial lighting, for ventilation and for
heating;
(ca) has satisfactory thermal insulation;
(d) has an adequate piped supply of wholesome water available within the house;
(e) has a sink provided with a satisfactory supply of both hot and cold water within
the house;
(f) has a water closet, or waterless closet available for the exclusive use of the
occupants of the house and suitably located within the house;
(fa) has a fixed bath or shower and a wash-hand basin, each provided with a
satisfactory supply of both hot and cold water and suitably located within the
house;
(g) has an effective system for the drainage and disposal of foul and surface water;
(ga) in the case of a house having a supply of electricity, complies with the relevant
requirements in relation to the electrical installation for the purposes of that
supply;
“the electrical installation” is the electrical wiring and associated components and
fittings, but excludes equipment and appliances;
“the relevant requirements” are that the electrical installation is adequate and safe to
use;
(h) has satisfactory facilities for the cooking of food within the house;
(i) has satisfactory access to all external doors and outbuildings;
(j) has satisfactory equipment installed for detecting, and for giving warning of, fire or
suspected fire;
(k) has satisfactory equipment installed for detecting, and for giving warning of,
carbon monoxide present in a concentration that is hazardous to health,
and any reference to a house not meeting the tolerable standard or being brought up
to the tolerable standard shall be construed accordingly. 
Page 175 of 182

Page 180

Page 176 of 182

Page 181

To:  Communities and Housing Policy Board 
On:  22 August 2023
_________________________________________________________________________ 
Report by: Director of Environment, Housing, and Infrastructure
_________________________________________________________________________ 
Heading: Renfrewshire Anti-Social Behaviour Strategy 2022 – 2025  
Progress report 
1 Summary   
1.1 The Communities, Housing & Planning Policy Board on 15 March 2022, approved
the Renfrewshire Antisocial Behaviour (ASB) Strategy 2022-2025 and the
associated Action plan. 
1.2 The board also agreed that an update on the progress of the Antisocial Behaviour
Strategy and delivery of the Action Plan would be reported to the Communities,
Housing and Planning Policy Board. 
1.2 This paper also addresses the council motion of 28 April 2022 in relation to
Community Warden Powers and Anti-Social Behaviour where it was agreed the
results be brought to the most appropriate board. 
2 Recommendations    
It is recommended that members of the Communities and Housing Policy Board: 
2.1 Note the progress on the implementation of the ASB Strategy and delivery of the
Action Plan to date, 
2.2 Note that each area of the action plan will be taken forward through the existing
Community Safety Partnership forum’s which involve key partners, including Police
Scotland and local housing providers, and 
2.3 Note the update in relation to the Council Motion in relation to ASB. 
________________________________________________________________________ 
Item 12
CHPB220823 Page 177 of 182

Page 182

3 Background     
3.1 Dealing with anti-social behaviour is a collective effort and is delivered through a
multi-agency approach, including the Council, Police Scotland, Scottish Fire and
Rescue and other partners. 
3.2 The Renfrewshire ASB Strategy 2022-2025 was developed with a range of
statutory, voluntary and community partners whilst taking account of the legislative
requirements set out in the Antisocial Behaviour etc (Scotland) Act 2004. The
outcomes / priorities detailed in the Strategy were developed drawing on evidence
reported through various channels including the Renfrewshire Public Services Panel
as well as consultation workshops with elected members. 
3.4 The Action Plan reflects improvements that were identified during the review and
will be used as the basis for continuous improvement across the partnership.         
3.5 The statistical comparison over the preceding year has shown a reduction in the
number of serious or persistent cases escalated to Anti-Social Behaviour
Investigations with an increase in the Mediation referrals.  This represents the pattern
which the partnership had hoped to see where mediation is being utilised at the early
stages of dispute. 
In terms of the wider ASB categories a reduction is evident across most areas other
than abandoned vehicles and reported disturbances to the wardens service. 
The action plan for the ASB Strategy is attached at Appendix 1 and provides an
update on each of the actions detailed in the plan. There has been positive progress
with 13 of the 16 actions being completed so far. The other 3 actions are ongoing
with progress being made in each area, albeit 2 of the actions are longer term IT
based solutions. 
Referrals 2020/21 2021/22 2022/23
Mediation 206 131 164
Investigation 159 182 141
Complaint Category 2018/19 2019/20 2020/21 2021/22 2022/23
Noise-Domestic 1285 1058 576 548 408
Fly Tipping 433 441 437 366 232
Abandoned Vehicle
complaint  364 341 447 409 466
Illegal Parking 252 337 4 0 3
Parking Disputes 72 29 105 19 4
Youths Congregating 39 89 45 43 42
Youths Rowdy
Behaviour 51 86 35 67 50
Disturbance (Wardens) 41 63 22 17 64
Underage Drinking 26 26 24 32 12
TOTAL 2563 2470 1695 1501 1281
Page 178 of 182

Page 183

4. Council Motion
4.1  Council agreed to examine best practice in other local authorities, in terms of
increasing the powers of community wardens to eradicate anti-social behaviour,
including looking at closer co-operation with Police Scotland and developing the
authority and powers of community wardens to deal with anti-social behaviour, and
resolved to report back and make a recommendation to the appropriate policy board. 
4.2 Consultation has taken place with the Scottish Community Safety Network and the
Antisocial Behaviour Officers Forum (ASBOF) neither of which have identified
additional powers available to Community Safety Wardens nationally other than those
held currently in Renfrewshire. 
4.3 Renfrewshire Wardens have the powers available to them under many different
pieces of legislation including parking enforcement, environmental crime and animal
control and are trained to support conflict resolution. In Scotland, some Anti-Social
Behaviour offences/powers fall solely to Police. While Wardens do have some powers
when it comes to issuing fixed penalty notices these relate primarily to environmental
anti-social behaviour. Powers for Wardens to intervene in relation to community or
neighbour disputes are limited. 
Implications of the Report     
1. Financial - none       
2. HR & Organisational Development – none      
3. Community/Council Planning – A range of statutory, voluntary and community
partners were consulted to develop Renfrewshire’s Antisocial Behaviour Strategy
2022-2025     
4. Legal – Renfrewshire Antisocial Behaviour Strategy 2022-2025 has been seen to
meet the requirements of the Antisocial Behaviour etc. (Scotland) Act 2004     
5. Property/Assets – none       
6. Information Technology – none 
7. Equality & Human Rights –  
The Recommendations contained within this report have been assessed in relation
to their impact on equalities and human rights. No negative impacts on equality
groups or potential for infringement of individuals’ human rights have been identified
arising from the recommendations contained in the report. If required following
implementation, the actual impact of the recommendations and the mitigating
actions will be reviewed and monitored, and the results of the assessment will be
published on the Council’s website.   
8. Health & Safety – none     
9. Procurement – none     
10. Risk – none     
11. Privacy Impact - none   
Page 179 of 182

Page 184

12. COSLA Policy Position – none     
13. Climate Risk - none    
_________________________________________________________________________ 
List of Background Papers:     
Communities, Planning and Housing Policy Board report 15 March 2022: Renfrewshire
Anti-Social Behaviour Strategy 2022 – 2025
_________________________________________________________________________ 
Author:      Gerard Hannah, Head of Climate, Public Protection and Roads
Email:        gerard.hannah@renfrewshire.gov.uk
 
 
 
Page 180 of 182

Page 185

Appendix 1 
What will we do? What difference
will this make?
Who is leading on
this?
UPDATE July 23 STATUS
Continue the review of operational
procedures including housing landlords and
create a generic process reflecting the links
and referral pathways between all members
of the community safety partnership 
Provide a consistent
referral process for
the community
regardless of tenure
Environment, Housing
and Infrastructure
Services / RSLs
Operational Procedures in relation to ASB have been reviewed and updated taking
account of the ASB strategy.  RSL’s remain part of the Community Safety Partnership and
there is consistency with the Council’s ASB procedures. Agreed RSL’s will comply with
Generic ASB procedures and publish when review due. 
The review of the procedures will be ongoing to reflect any new legislation or government
direction for investigating ASB. 
Complete
Maximise the use of all digital technology
available to assist those reporting ASB – eg
Noise App and video images
Ensure
communities have
access to new and
emerging
technology to
challenge ASB
Environment, Housing
and Infrastructure
Services / Digital First
Team 
Review ongoing re Noise App with National Antisocial Behaviour Officers Forum (ASBOF)
to establish other council areas experience with App. 
Local neighbourhood office in process of arranging a trial of the ‘ASB app’ which differs
from the ‘Noise App’ but allows for wider reporting of ASB issues as well as noise issues. 
Liaison with partnership RSL who are doing a trial of the ‘noise app’ and whilst it could not
be relied upon in its entirety for court proceedings has thus far been useful in
understanding the extent of the noise disturbance being experienced by tenants.   
Ongoing
Explore enhanced reporting tools through
online channels
Provide clear
reporting
procedures
Environment, Housing
and Infrastructure
Services / Finance
and Resources
Service 
Review completed of Renfrewshire Council external webpages to provide clear direction
and links for members of the public to report ASB to the appropriate service which includes
RSL’s, area housing offices, Noise enforcement team and Police Scotland where
appropriate. 
Engagement with Police Scotland to access and contribute to the ‘Partnership Intelligence
Portal’ ensuring residents uncorroborated complaints contribute to the Intelligence Profile
of a particular person or address.
Complete
Update website/comms with reporting
information to provide clarity on who to
contact in relation to Anti-social Behaviour.
Provide pathways
for reporting
Environment, Housing
and Infrastructure
Services 
Review of website / comms completed and referral pathways updated on website. Complete
Produce a FAQ to assist customer
understanding of what is and is NOT ASB –
the Truths and myths
Provide a clear
understanding of
available actions
Environment, Housing
and Infrastructure
Services
Renfrewshire council web page updated to reflect FAQ in relation to ASB and co located
on page with link to referral pathways
Complete
Improve communications on the supports
available through mediation / victim support
etc.
Impact on early
resolution
Environment, Housing
and Infrastructure
Services
 Police, Housing officer and RSL inputs completed by Investigation and Mediation
Officers to encourage referrals at the earliest stages.  
 Increased referrals to Mediation to encourage early intervention.
 Mediation / Victim Support explanation and benefits added to website.
Complete
Continue to liaise with other Council areas
and RSL’s in relation to the use of
professional witnesses.
Ensure procedures
adhere to best
practice
Environment, Housing
and Infrastructure
Services.
Experience of professional witnesses continues to be investigated. Ongoing
Page 181 of 182

Page 186

Review opportunities and resources available
to tackle neighbour disputes and ASB
Improve potential
available resources
to tackle ASB
Environment, Housing
and Infrastructure
Services
New Environmental Task Force established to impact on public space litter and flytipping.
Joint action plans developed with Police Scotland, youth Officers, Wardens to utilise the 2
x Quad Bikes to impact on harder to reach areas of disorder and reports of illegal Quad
bike usage
Complete
Invest in officers across the partnership
through joint training and development
including Trauma Informed Practice
Increase knowledge
to promote
reduction of ASB
Environment, Housing
and Infrastructure
Services 
Trauma Informed Training undertaken by all housing officers and Senior manager trained
in Scottish Trauma Informed Leadership Training (STILT). Ongoing training for new
officers 
Complete
Make available guidance and information in
different languages to engage with our
multilingual community.
Ensure equality and
access for the wider
community
Environment, Housing
and Infrastructure
Services 
Engagement with IT to implement a Renfrewshire wide language translator to the website.   Ongoing
Continue to engage with professionals who
can contribute expertise to addressing ASB.
Continuous
improvement for
partnership working
Environment, Housing
and Infrastructure
Services
The Harm reduction team attend areas at identified times and locations to offer harm
reduction advice and divert ASB from the communal areas.  
Complete
Improve mediation referrals as an initial
resolution
Encourage early
resolutions
Environment, Housing
and Infrastructure
Services / RSL’s
 Police, Housing officer and RSL inputs completed by Mediation Officers to share and
encourage referrals at the earliest stages to reduce the potential for escalation.  
 Mediation explanation and benefits added to website
Complete
Ensure opportunities within the partnership
hub are explored to support the Business
Community and night time economy as it
returns to pre covid levels
Improve public
safety
Environment, Housing
and Infrastructure
Services
 New Environmental Task Force established to impact on public space litter and
flytipping. 
 Public Space CCTV operators briefed and engaged to report and provide early
intervention for potential ASB utilising the town centre radiolink as well as Police
Scotland Community Policing officers.
Complete
Engage with neighbouring local authorities to
improve joint responses to transient ASB
Continuous
improvement and
reduction of ASB
Environment, Housing
and Infrastructure
Services
Intelligence arrangements agreed through National Anti Social Behaviour Officers Forum
(ASBOF) as well as higher level issues through the Community Protection PREVENT
steering group and Contest SAOC group.
Complete
Develop improved links with Community
Learning and Development and Youth
Officers 
Improve
diversionary
response for youth
ASB
Environment, Housing
and Infrastructure
Services
Youth ASB officers now embedded within CLAD and providing conduit between CLAD and
Community Safety Partnership. 
Complete
Deliver Elected Members workshops which
inform on Antisocial Behaviour practices 
Provide a clear
understanding of
procedures
Environment, Housing
and Infrastructure
Services
Workshops delivered  Complete 
Page 182 of 182