___________________________________________________________________
To: Communities and Housing Policy Board
On: 16 August 2022
___________________________________________________________________
Report by: Director of Communities and Housing Services
___________________________________________________________________
Heading: Land at Maple Drive, Johnstone Castle - Regeneration Phase 2
___________________________________________________________________
1. Summary 
1.1 This report updates the Board on a proposed disposal of land at Maple Drive,
Johnstone to Link Housing Association for the development of affordable
housing. 
___________________________________________________________________ 
2. Recommendations 
2.1 It is recommended that the Policy Board:   
(i) Declares the area of land at Maple Drive, Johnstone, outlined and
hatched on appendix 1 (drawing E3228A), extending to 2.24 hectares
or thereby, as surplus to requirements; 
(ii) Authorise the Head of Economy and Development and the Head of
Corporate Governance to negotiate terms for the disposal of the site to
a housing association for development of affordable housing; and 
(iii) note that the proposed sale terms would be either submitted to the
Infrastructure Land & Environment Board for approval or approved in
terms of the Scheme of Delegated Functions, as appropriate, prior to
completion of the sale.  
___________________________________________________________________

Page 2

3. Background
3.1  Renfrewshire’s Strategic Housing Investment Plan sets out how investment in
affordable housing will be targeted to achieve the objectives of the Local
Housing Strategy. 
3.2 The Communities, Housing & Planning Board of August 21st 2018 identified
an area of land in Johnstone Castle extending to 2.02 Ha as suitable for
development by a housing association. The site was declared surplus
following the demolition of existing Council housing on Cedar Avenue, Elm
Drive and Maple Drive and Council officers were given authority to negotiate
disposal to a housing association for affordable housing. 
3.3 Discussions have been ongoing with Link Group Limited for a number of
months and these discussions have highlighted the requirement to adjust the
boundaries of the site to accommodate the planned development layout. 
4. Updated Proposal   
4.1 The Council has demolished all but one of the former housing properties on
Elm Drive and Cedar Avenue but seven blocks of flats remain on Maple Drive,
which will be demolished as part of this proposal. The remaining block on
Cedar Avenue will be demolished following acquisition of the last remaining
privately owned property in the block. (Please note that the block in question
is not within the curtilage of the land being declared surplus.)   
4.2 The site boundaries have been adjusted to reflect: (a) the adjoining land
ownerships (the route to the sub-station between 13 and 17 Maple Drive has
been excluded); (b) the design layout produced by Link following consultation
with planning officers (the Cedar Avenue and Maple Drive carriageways, layby
parking and footways are now included); and (c) best practice asset
management avoiding small strips of isolated land remaining in Council
ownership (the solum under the footways and carriageways up to the centre
line of the road is included where appropriate). The site now extends to 2.24
Ha or thereby and is shown on Appendix 1 (drawing E3228A). The plan
attached to the 2018 Board paper is Attached as appendix 2 for comparison
purposes. 
4.3 Council officers will continue to negotiate terms for the sale of the land to Link
and the subsequent agreement will be referred to the Infrastructure, Land and
Environment Policy Board or approved under the Scheme of Delegated
Functions dependant on the value of the transaction.
___________________________________________________________________ 
Implications of the Report
1.  Financial – Subject to valuations and negotiations by the Head of Economy
and Development, there may a capital receipt for the sale of the site.   
2.    HR & Organisational Development – None.

Page 3

3. Community/Council Planning – 
 Building strong, safe and resilient communities – Increasing the supply
of affordable housing and regenerating communities. 
4. Legal – Conveyancing work associated with land transfers. 
5. Property/Assets – Transfer of HRA land to General Services for disposal. 
6. Information Technology – None. 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report. If required following implementation, the actual
impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be
published on the Council’s website. 
8. Health & Safety – None. 
9. Procurement – Small one-off instructions for valuation and QS advice in
relation to the value and developability of the site. 
10. Risk – Risks will be identified and managed for individual projects.  
11. Privacy Impact – None. 
12. COSLA Policy Position – Not applicable. 
13. Climate Risk – None.
___________________________________________________________________
List of Background Papers 
(a) Report to Communities Housing & Planning Policy Board, 21 August 2018:
‘Draft Strategic Housing Investment Plan 2019/20 to 2023/24.’ 
___________________________________________________________________ 
Author: Ray Walkinshaw, Housing Regeneration and Development Manager,
ray.walkinshaw@renfrewshire.gov.uk, 07483 143814.

Page 4

C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
CEDAR
610
61.2m
8
El
175
4
1
171
153
Sports
Facility
182
Sta
63.8m
184
169
9
LARCH PLACE
170
166
68.7m
67.9m
13
139
Play Area
24
166
2
22
19
64.7m
Shelter
18
143
13
164
10a
Sub
23
17
RANNOCH ROAD
15
MAPLE DRIVE
173
ELM DRIVE
1
176
10b
Ordnance Survey Mapping - © Crown Copyright and database right 2022. All rights reserved. Ordnance Survey Licence number 100023417.  Aerial
Photography 2009 - Cities Revealed ® copyright by The Geoinformation ® Group, 2009 and Crown Copyright © All rights reserved. Aerial Photography
2004/6 - © 2004 Getmapping plc © 2006 Getmapping plc Aerial Photography 2001 - Cities Revealed ® copyright by The Geoinformation ® Group, 2009
and Crown Copyright © All rights reserved. Historic Map Data - © Crown Copyright and Landmark Information Group Limited 2012. All rights reserved.
1:1,250
I
Land at Johnstone Castle
Report Plan Ref. E3228A
Notes:
Date: 12/05/2022
Legend
Area extends to 2.24 hectares or thereby
JW
Appendix 1

Page 5

Appendix 2