Page 1

PUBLIC 
___________________________________________________________________
To: Communities and Housing Policy Board
On: 28 October 2025
___________________________________________________________________
Report by: Director of Environment, Housing, and Infrastructure
___________________________________________________________________
Heading: Housing Asset Management Strategy
___________________________________________________________________
1. Summary 
1.1 The Council has a wide range of responsibilities in relation to its housing stock
and associated assets which must be delivered in a manner which ensures
that resources associated with the assets are used in the most cost effective
way possible. An effective strategy for managing housing assets will ensure
that decisions relating to management and investment in the housing stock
are based on sound principles which take account of stock condition,
sustainability and value for money. 
1.2 This report presents the Housing Asset Management Strategy 2025 –2030
and associated Action Plan as attached at Appendix 1 and Appendix 2 to this
report. 
1.3 The Housing Asset Management Strategy sets out the strategic approach to
managing housing assets and seeks to provide direction for investment in
Council housing stock. 
___________________________________________________________________
2. Recommendations 
It is recommended that the Communities and Housing Policy Board: 
2.1 Approves the Housing Asset Management Strategy 2025-2030 and
associated Action Plan

Page 2

PUBLIC
3. Housing Asset Management Strategy 2025-2030 
3.1 The Housing Asset Management Strategy takes account of recommended
good practice and advisory guidance from the Scottish Housing Regulator
with the key aim of ensuring that our housing assets are sustainable and
remain fit for purpose in the short, medium, and long term. 
3.2 Key drivers of the Housing Asset Management Strategy are the current UK
and Scottish Government Acts and guidance on housing, energy efficiency
and fuel poverty, the most recent of these being the Scottish Social Housing
Net Zero Standard (SHNZS) which has yet to be finalised by the Scottish
Government and the Housing(Scotland) Bill 2025.  The strategy also takes
account of other key council strategies including Renfrewshire Council’s Local
Housing Strategy 2023-2028 and Renfrewshire Council’s Strategic Housing
Investment Plan (SHIP) 2025- 2030. 
3.3 The six core housing asset management objectives within the strategy are as
follows: 
• Ensure our housing stock and estates are suitable for current use and
supports efficient and effective service delivery both now and in the
future.
• Ensure homes are improved and maintained to a high standard, meet
tenant aspirations and are compliant with relevant legislation.
• Ensure future decisions about housing assets are based upon robust
data with reviews or option appraisals of stock causing concern.
• Develop the digital infrastructure to provide accurate management and
performance information.
• Demonstrate value for money in the delivery of our reactive repair
service, cyclical maintenance services and capital improvement
programmes.
• Ensure tenant involvement in the development and monitoring of our
services and improvement programmes. 
3.4      The Housing Asset Management Strategy Action Plan (Appendix 2) sets out
the key actions that Housing Services will take over the next 5 years to assist
in achieving these objectives. An annual update of the Action Plan will be
brought to the Communities and Housing Policy Board. 
3.5 Following policy board approval, the Housing Asset Management Strategy will
be circulated to key stakeholders and partners. 
___________________________________________________________________
Implications of the Report 
1. Financial – The Housing Asset Management Strategy will be a key driver for
the Business Plan and budget setting for future capital investment. 
2. HR & Organisational Development – None.

Page 3

PUBLIC
3. Community/Council Planning – 
• Our Renfrewshire is thriving – improving housing conditions
encouraging people to live in Renfrewshire. 
• Our Renfrewshire is well – improving housing conditions benefitting
tenants and private owners.  Addressing fuel poverty. 
• Reshaping our place, our economy, and our future – investment in the
refurbishment of social rented and private dwellings will create jobs and
contribute to the economy. 
4. Legal – None. 
5. Property/Assets – Ensuring assets are sustainable and fit for purpose. 
6. Information Technology – None.  
7. Equality & Human Rights - Following a comprehensive Equality Impact
Assessment (EQIA) of Renfrewshire Councils Housing Asset Management
Strategy, a detailed review of both primary and secondary data, stakeholder
engagement and consultation feedback has been found to suggest no
negative impacts on equality groups or indicate any potential for infringement
of individuals’ human rights. The assessment has considered possible
impacts on all protected characteristics groups in line with the Equality Act
2010 and upholds principles of fairness, diversity, and accessibility to ensure
the strategy promotes equal opportunities, prevents discrimination, and
supports the diverse needs of the Renfrewshire community. If required, a
monitoring process will be applied to review and address any unforeseen
impacts during the Housing Asset Management strategy implementation. The
results of this assessment will be published on the Council’s website. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk – None. 
11. Privacy Impact – None. 
12. COSLA Policy Position – None. 
13. Climate Risk – The Housing Asset Management Strategy aims to reduce
carbon emissions and improve energy efficiency in our social rented homes. 
14. Children’s Rights - 
______________________________________________________________
List of Background Papers
Appendix 1 – Housing Strategic Asset Management Strategy 2025- 2030
Appendix 2 – Housing Strategic Asset Management Strategy Action Plan
___________________________________________________________________

Page 4

PUBLIC
Author:        Mark Brown, Housing Asset & Energy Strategy Manager
Email: mark.brown@renfrewshire.gov.uk

Page 5

1 | P a g e
PUBLIC

Page 6

2 | P a g e
PUBLIC 
Contents
1.INTRODUCTION ............................................................................................................................... 4
1.1 Housing Asset Management Objectives ........................................................................... 4
2. BACKGROUND ............................................................................................................................... 4
3. ASSET PROFILE ............................................................................................................................ 7
3.1 Core Operational Assets ....................................................................................................... 8
3.2 Commercial Assets ............................................................................................................... 11
3.3 Environmental Assets .......................................................................................................... 12
3.4 Lockups and Ground sites.................................................................................................. 13
4. NET-ZERO CARBON & SUSTAINABILITY ............................................................................. 13
4.1 What is Climate Change ...................................................................................................... 14
4.2 Social Housing and Climate Change ................................................................................ 14
4.3 Net-Zero as the solution to Climate Change .................................................................. 14
4.4 What does net-zero mean for Social Housing ............................................................... 15
4.5 Renfrewshire Council Housing and Net-Zero ................................................................ 15
4.6 Economies of Scale and Financing of net-zero............................................................. 18
4.7 Net-zero and Fuel Poverty ................................................................................................... 19
4.8 Sustainability .......................................................................................................................... 20
5. ASSET CONDITION ..................................................................................................................... 20
5.1 Meeting the Scottish Housing Quality Standard (SHQS) ............................................ 21
5.2 Condition - Mixed Tenure Blocks ...................................................................................... 22
5.3 Condition – Multi Storey Blocks ........................................................................................ 23
5.4 Asset Condition Data ........................................................................................................... 24
5.5 Reinforced Autoclaved Aerated Concrete (RAAC) ....................................................... 25
6. DIGITAL ASSET MANAGEMENT.............................................................................................. 25
7. ASSET PERFORMANCE ............................................................................................................ 27
8. PROPERTY INVESTMENT ......................................................................................................... 28
8.1 Investment ............................................................................................................................... 28
8.2 Responsive Repairs .............................................................................................................. 30
8.3 Dampness & Mould ............................................................................................................... 31
8.4 Void works............................................................................................................................... 32
8.5 Cyclical Planned Maintenance ........................................................................................... 32
8.6 Compliance ............................................................................................................................. 34
8.7 Medical Adaptations ............................................................................................................. 35

Page 7

3 | P a g e
PUBLIC
9. TENANT CONSULTATION & PARTICIPATION ..................................................................... 35
10. GOVERNANCE & RISK ............................................................................................................. 36
10.1 Governance Arrangements .............................................................................................. 36
10.2 Risk Management ................................................................................................................ 37
11. STRATEGY IMPLEMENTATION & MONITORING .............................................................. 37

Page 8

4 | P a g e
PUBLIC
1.INTRODUCTION 
Renfrewshire Council’s housing assets are managed by Housing Services Asset and
Investment team, within the Environment, Housing and Infrastructure Directorate.
This Housing Asset Management Strategy aligns with other housing strategies within
the service, wider council strategies and national government aims and objectives. 
1.1 Housing Asset Management Objectives 
The housing asset management objectives have been aligned with the core aims
and objectives of housing services, the Council and with government policies.. They
have been translated into the following set of Core Asset Management Objectives
(CAO), also referred to in the Action Plan. 
Ensure homes are improved and maintained to a high standard, meet
tenant aspirations and are compliant with relevant legislation. 
Ensure future decisions are based on robust data with reviews or option
appraisals of cause for concern stock. 
Develop our digital infrastructure to provide accurate asset management
and performance information. 
Ensure our housing stock and estates are suitable for current use and
supports efficient and effective service delivery both now and in the future. 
Demonstrate value for money in the delivery of our reactive repair service,
cyclical maintenance services and capital improvement programmes. 
Ensure tenant involvement in the development and monitoring of our
services and improvement programmes. 
There are many areas of housing asset management that are evolving. The longer-
term strategies of government in respect of; net zero carbon, heating fuels and
taxation, will have a direct impact on this strategy over its five-year life.
2. BACKGROUND 
The Housing Asset Management Strategy was first formulated over ten years ago,
and an asset performance review was carried out in 2018/19, helping to identify
areas for regeneration. Since then, extensive work has been carried out on defining
housing archetypes with a high degree of accuracy, and on improving energy
efficiency data. 
CAO.2
CAO.3
CAO.4
CAO.5
CAO.6
CAO.1

Page 9

5 | P a g e
PUBLIC
This has resulted in a strong understanding of energy efficiency requirements and
the recognition to refer to PAS2035* when carrying out retrofit works1. 
Processes to provide detailed energy efficient net-zero designs for the housing
stock, have also been put in place. This strategy starts from that basis but is also
influenced by: 
Renfrewshire Councils Local Housing Strategy (LHS) 2023-2028 
Five strategic priorities identified. 
• The supply and delivery of housing is increased across all tenures to meet the
housing needs of different groups and create attractive and sustainable
places.
• People live in high quality, well managed homes in sustainable
neighbourhoods.
• Address the challenges of the climate emergency, delivering homes that are
warm, energy efficient and fuel poverty is minimised.
• Preventing and addressing Homelessness with vulnerable people getting the
advice and support they need; and 
• People can live independently for as long as possible in their own home and
the different housing needs of people across Renfrewshire are being met. 
Renfrewshire Strategic Housing Investment Plan (SHIP) 2026-2031 
Plan to increase housing supply in Renfrewshire with a focus on: 
• Affordability
• Regeneration and renewal
• Expanding supply for older people and those with complex needs
• Climate change and fuel poverty 
Local Heat and Energy Efficiency Strategy (LHEES) 
LHEES is a long-term strategic framework for: 
• The improvement of the energy efficiency of buildings in the local authority’s
area.
• The reduction of greenhouse gas emissions resulting from the heating of such
buildings. 
Renfrewshire Council have produced their initial LHEES plan, which will have an
impact on the delivery of heat and energy efficiency projects for council housing
stock. 
1 PAS2035 is a standard introduced in 2019 as part of the UK government’s initiative to enhance energy
efficiency in buildings. It outlines a whole building approach to retrofitting ensuring that specific standards are
met improving energy efficiency and reducing carbon emissions.

Page 10

6 | P a g e
PUBLIC
Scottish Government Heat in Buildings Strategy (HiBS) 
Sets out actions to decarbonise Scotland’s building stock in line with legislated
climate change targets. The strategy refers to owner occupied, private rented
housing stock and commercial buildings.  This strategy impacts mixed tenure council
housing stock and Housing Revenue Account (HRA) shops. 
Scottish Government Heat Networks Act 2021 
Aims to accelerate the deployment of heat networks in Scotland through the
introduction of a regulatory system. The 2021 Act sets statutory targets for the
amount of heat to be supplied by heat networks:
• 2.6 Terawatt hours (TWh) of output by 2027.
• 6 TWh of output by 2030. 
Scottish Government Climate Change (Emissions Reduction Targets) Act 2019 
Sets statutory obligation for Scotland to have net-zero carbon emissions by 2045
and is the overall framework for Energy Efficient Scotland and thus energy efficiency,
environmental impact and zero emission’s heating/hot water within homes. 
Scottish Government Energy Efficiency Standard for Social Housing (EESSH) 
The initial EESSH was to be attained by 2020, with a higher standard setting out
energy efficiency targets for social housing to be met by 2032. However, this has
been suspended since 2022, and the review of 2023/24 introduced the proposed
Scottish Housing Net Zero Standard. 
Social Housing Net Zero Standard (SHNZS) 
Proposed replacement for EESSH2, confirmation of the standard is expected to be
announced during 2025. Currently the draft proposals are: 
• Reduce space heating demand of each house by 2033 to under
121kWh/m2/year.
• Replace fossil fuel heating with clean heating alternatives by 2045. 
Scottish Government Fuel Poverty Act 2019 
Sets statutory obligation to effectively remove fuel poverty from Scotland by 2040,
with interim targets in 2030 and 2035. 
Scottish Government Housing to 2040 
Outlines a long-term vision for all housing in Scotland.

Page 11

7 | P a g e
PUBLIC
Recommended Practice Document from the Scottish Housing Regulator on
Integrated Asset Management (2023) 
Provides advisory guidance ensuring that the organisation can make strategic asset
decisions based on an understanding of Asset Performance. The principles are: 
• Principle 1 - Governing bodies and committees lead the strategic response to
asset management and should be assured that assets are managed
effectively.
• Principle2 - Social landlords should have a comprehensive understanding of
their assets.
• Principle 3 - Social landlords should develop an approach to understanding
the value of their assets.
• Principle 4 - Integrated asset management outcomes should be understood
and used as evidence to inform future investment decisions.
• Principle 5 - Social landlords should use the integrated asset management
outcomes to inform their asset management strategies. 
The following parts of this strategy examine typical housing asset management
areas and assesses our assets current position. Some recommended actions will be
made from the current identified position, taking into consideration the outlined asset
management approach, core asset management objectives, and the background
information. The recommendations are set out in an action plan covering the period
2025-2030, categorised by the core asset management objectives. 
3. ASSET PROFILE 
Assets held on the Housing Revenue Account (HRA) are categorised by the
following distinct types: 
Core Operational Assets 
This comprises the housing stock of currently 12,078 which directly supports the
delivery of a housing service. A more detailed breakdown can be found at point 3.1 
Non-Core Operational Assets 
This comprises a range of different asset classes such as: offices, homeless person
units (HPUs), launderettes, community centres. 
Commercial Assets 
These assets provide an income to the HRA outwith social rented homes. It
comprises a range of different assets, but the vast majority are shops. More detail
can be found at point 3.2.

Page 12

8 | P a g e
PUBLIC
Environmental Assets 
These assets can be development sites, open areas within housing estates or items
such as trees, car parking areas, pathways and retaining walls on HRA land. 
Lockups and Ground sites 
Lockups located within housing estates and rented by tenants or owner occupiers.
Ground sites are leased by tenants or owner occupiers, and they are responsible for
erecting and maintain any structures on their ground lease area. 
3.1 Core Operational Assets 
As of 2025, Renfrewshire Council has 12,078 domestic properties, spread over 10
main localities: 
Locality Number Percentage of stock
Paisley 6,986 57.85%
Johnstone 2,379 19.70%
Renfrew 1,626 13.46%
Linwood 453 3.75%
Bridge of Weir 208 1.72%
Lochwinnoch 168 1.39%
Bishopton 146 1.21%
Howwood 67 0.55%
Crosslee 44 0.36%
Erskine 1 0.01%
Total 12,078  100% 
The stock is mainly located in the towns of Paisley, Renfrew, and Johnstone with
91% of stock, and the remaining 9% in Linwood and villages. 
Renfrewshire council housing stock spans from pre first world war to the present new
build programme. The table below shows stock in age bands corresponding to major
housing legislation, as requested by the Scottish Housing Regulator (SHR) in the
Annual Charter Return (ARC). 
Age Band Number Percentage of stock
Before 1919         31  0.26%
1919 – 1929    1,331 11.02%
1930 – 1949    2,793 23.12%
1950 – 1964    4,046 33.50%
1965 – 1975    2,750  22.76%
1976 – 1983       477  3.95%
1984 – 1991       215  1.78%

Page 13

9 | P a g e
PUBLIC
Age Band Number Percentage of stock
1992 – 1998         84  0.70%
2008 – 2011         37  0.31%
2012 onwards       314  2.60%
Total 12,078 100% 
Over 90% of the stock is at least 50 years old. This impacts on likely condition, base
standards of energy efficiency, requirements to meet modern standards and
suitability for future tenants needs and demands. 
The built form of Renfrewshire’s stock is shown in the table below: 
Build Form Number Percentage of stock
4 in a block Flat    2,674  22.14%
Tenement Flat    4,578  37.91%
Multi-storey Flat    1,005  8.32%
Other Flat       712  5.90%
Bungalow       388  3.21%
House    2,359  19.53%
Maisonette       347  2.87%
Prefab         15  0.12%
Total 12,078  100% 
Over 77% of Renfrewshire’s council housing stock is in a common block of one form
of another, a particularly high figure, especially when compared with the Scottish
national figure of 36.4% and the average across all Local Authorities of 54%. 
Renfrewshire Council has demolished around 2500 properties over the last twenty
years and has currently designated a further 886 for demolition as part of approved
housing regeneration programmes. Whilst the Council’s new build programme will be
adding more houses over the next 5 years, the rate of demolition and new build will
still mean that the council will have a high percentage of common blocks to maintain. 
A high concentration of mixed tenure common blocks has a significant impact on the
council’s ability to manage its stock, as any owners need to be consulted on works
and can potentially block investment. The table below shows the number of blocks
and the breakdown of tenure within them. 
Tenure of
Blocks
Number of
Blocks
Percentage of
Blocks
Fully Council 716 25.53%
Council Majority 656 23.40%
50/50 Ownership 764 27.25%
Council Minority 668 23.82%

Page 14

10 | P a g e
PUBLIC
Tenure of
Blocks
Number of
Blocks
Percentage of
Blocks
Total 2804 100% 
The council fully controls only a quarter of its common blocks. Private ownership
within the remaining 75% of blocks amount to almost 5200 households (with a
proportion of those being private landlords). The Housing Investment Team (HIT)
has responsibility for consulting with private owners for repairs and major capital
programme works. The Tenements (Scotland) Act 2004 is the main legislation used
to manage mixed tenure stock. Other sections of this strategy; Net-zero, Asset
Condition, and Property Investment, will discuss the impact of mixed tenure and the
use of this Act. 
Through previous Right to Buy legislation almost 17,000 council homes were sold.
The vast majority of those being houses and bungalows rather than flats, resulting in
a high proportion of mixed tenure blocks remaining within the stock profile. 
Whilst the sold houses and bungalows are situated within housing estates, there is
little impact on the maintenance of our housing stock. However, there are potential
issues with common land, boundaries, common footpaths, and trees within the
estates which will be outlined later in this document. Future net-zero carbon
requirements is another issue with the sold houses and bungalows, that may impact
on future investment of Council stock, this will be discussed in section 4 on net-zero
carbon and sustainability. 
The council’s stock by accommodation size is shown below: 
No. of
Bedrooms
Number Percentage of
stock
0 (bedsit) 418 3.46%
1 3,597 29.78%
2 5,772 47.79%
3 2,077 17.20%
4 211 1.75%
5 or greater 3 0.02%
Total 12,078 100% 
The built construction type can impact on investment requirements. Below is a
breakdown of main wall type:

Page 15

11 | P a g e
PUBLIC
Main Wall
Construction
Number Percentage of
stock
Cavity    5,736 47.49%
Sandstone       462  3.83%
Solid Wall    2,908 24.07%
System Built    2,437 20.18%
Timber Frame       535  4.43%
Total 12,078 100% 
The solid wall, sandstone, timber frame and system-built construction types can
cause issues with attaining high energy efficiency levels. Net-zero carbon
requirements are likely to be challenging for all construction types but some of the
system built are of a particular concern. Excluding ‘No-Fines’ type, the system-built
category can be broken down into non-traditional constructions as shown below: 
Non- traditional build type Number
Athol 4
B.I.S.F 42
Blackburn 74
Lawrence 20
Miller 60
Orlit 40
Perm Aluminium 15
Scotcon 16
Swedish Timber 16
Weir 41
Whitson Fairhurst 40
Wimpey 163
Total 530 
These properties are of particular concern with some issues over long-term structural
integrity and potentially higher than normal cost to meet net-zero carbon targets.
This is further complicated by owners within non-traditional common blocks and in
adjoining properties in terraces or semi-detached properties. 
Re-evaluate non-trad stock for structural condition and investment
required to meet net-zero, considering mixed tenure or adjoining
owners 
3.2 Commercial Assets 
These assets generate an income for the HRA but are not directly involved with
provision of housing. These assets are currently managed on behalf of Housing
Services by the Principal Estates Surveyor within the Chief Executives Department.
Most of these assets are shops, generating an annual rental income of around £1m
per annum.

Page 16

12 | P a g e
PUBLIC
The shops are normally leased on commercial full repairing and insurance (FRI)
leases, where the shop tenant is made responsible for all maintenance and insuring. 
The majority of shops are situated within the ground floor of common blocks that
have council housing above them and many repairs are common to the block. These
assets will be incorporated into the housing asset management system (Apex) to
enable any planned investment requirements. These shops also need to meet net-
zero carbon by 2045 and as they are almost all within communal housing blocks, it is
recommended that they are invested in at the same time as the housing units. 
As well as generating income, the HRA’s 152 shops provide local facilities to
residents and could play a role in the Housing to 2040 vision. They also play a role in
a local economy and provide some local employment opportunities.   
Incorporate shops into cost base within Apex. An asset performance
review of these assets is underway, considering wider issues than net
present value alone 
3.3 Environmental Assets 
These assets are mainly located within the housing estates and play an important
role in providing amenity and improving the look of a local area. If not maintained,
they can diminish an area or even be a health and safety risk to residents. 
These assets are often seen as liabilities but with net-zero carbon requirements,
areas of grass and trees can be seen as a carbon positive. Areas of ground could
potentially be used as heat sinks in the future, to provide heating and hot water to
homes. 
When properties were sold under RTB, little cognisance was taken of the liabilities
within the housing estate that the owner should have been made aware of. 
Title feu plans only refer to the building and garden areas and this has resulted in
some housing schemes having limited numbers of tenants paying rent but the HRA
being responsible for maintaining the estate. 
There is potential to rectify some of this disparity if areas are used for net-zero
heating solutions and therefore benefit owners, via service charging. Information on
these assets is limited. Most HRA grounds maintenance areas have been captured
on our GIS (Geographic Information system) but trees, footpaths, roads, car parking,
retaining walls, railings have not. 
Trees require to be managed to ensure they don’t damage buildings or risk injuring
people if they fall or branches fall off, the Health and Safety Executive advises that a
tree management plan should be in place by owners to mitigate the risk of serious
injury or death, it is also a requirement from insurers. This applies to trees on
common HRA land in estates and within gardens of tenanted properties.   With the
increasing use of Solar PV on roofs, maintaining suitable tree heights and crown
width to prevent shading will be an increasing burden.

Page 17

13 | P a g e
PUBLIC 
Determine HRA tree information held by Neighbourhood Services,
consider carrying out a tree survey to create a tree management plan 
Footpaths, roads, car parking and retaining walls can often be adopted by the Roads
Service, thereby meaning although owned by the HRA, they will be maintained by
Roads. However, many areas within the housing estates are not adopted and the
HRA is liable to maintain them. The unadopted assets require to be captured using
GIS. These assets require to be added to APEX and managed on condition with
typical replacement spans and schedule of rates, producing cost projection outputs
as required. 
Capture extent of unadopted HRA assets on GIS and carry out a
condition survey to provide a baseline for adding to APEX 
Create a strategy to manage non-housing estate assets effectively 
Once survey information is collated, regular estate inspections will be required to
ensure the areas are maintained effectively. These inspections can identify issues
that require a reactive response and update condition data. 
3.4 Lockups and Ground sites 
These assets will be incorporated into the housing asset management system
(Apex) to enable any planned investment requirements. A review of lockups and
ground sites is currently underway. 
Act on outcomes from the lockup & ground sites review 
4. NET-ZERO CARBON & SUSTAINABILITY 
Net-zero carbon is an emerging area of policy that will affect housing asset
management. This section will not be an extensive explanation of climate change or
net-zero but instead will outline briefly why we have net-zero, what the term means
and what the impacts are for social housing. The remaining sections of this strategy
look at standard asset management areas and appropriate reference will be made in
each of them, of the influence that net-zero carbon will likely have.

Page 18

14 | P a g e
PUBLIC
4.1 What is Climate Change 
Climate change is the long-term shift in global temperatures and weather patterns.
High levels of greenhouse gases (mainly carbon dioxide and methane) in the
atmosphere are deemed to be driving current climate change, causing global
temperatures to rise sharply. Although climate change can occur from natural
sources, the rapid high level of greenhouse gases currently in the atmosphere can
be attributed to relatively recent human actions, with the burning of fossil fuels,
modern farming and deforestation being the main activities. 
4.2 Social Housing and Climate Change 
Social housing has been contributing to climate change through the use of fossil
fuels for heating and hot water (operational carbon) and from embodied carbon due
to the use of concrete, bricks, blocks, steel etc for construction and ongoing
maintenance. New social housing may also contribute to the loss of ‘green space’
which were once carbon sinks. Operational carbon emission from all UK housing
amount to around 15-20% of all emissions, although social housing is generally
considered more energy efficient. 
Social housing is also suffering some consequences due to climate change. Different
weather patterns are increasing the risk of flooding, overheating during summer,
fires, structural damage from soil shrinkage during droughts, increased fabric
weathering from wetter winters and damage from increasing wind speeds. 
4.3 Net-Zero as the solution to Climate Change 
Stopping the increase of greenhouse gases into the atmosphere is the solution
identified by science. ‘Net-zero’ is the ambition, where any man-made greenhouse
gases are offset by removing the same amount. Achieving net-zero globally is
expected to limit earth’s temperature increases and thereby limit climate change.
The Scottish Government has set the year 2045 as the target for Scotland to be net-
zero. 
Net-zero is easier to achieve if the amount of man-made greenhouse gases being
created are vastly reduced in the first place, making the offsetting of those gases a
less onerous and feasible task. The reduction and eventual elimination of using fossil
fuels is considered the primary concern. 
Fossil fuels will be replaced primarily by renewable energy such as wind, solar and
geothermal. 
As these sources increase, the amount of carbon required to produce electricity
decreases and will eventually be almost nil. Therefore, electricity is seen as the main
energy fuel to help achieve net-zero. Nuclear, hydro and possibly hydrogen will be
other forms of energy used.

Page 19

15 | P a g e
PUBLIC
4.4 What does net-zero mean for Social Housing 
Social housing needs to follow the same principle as other areas of the economy to
reach net-zero and reduce carbon output as much possible. 
Where any residual carbon output exists, it needs to be balanced by ‘negative
carbon’ from elsewhere, this could be from some homes creating more energy than
they use (new builds have potential in this area, although embodied carbon must be
accounted for) or offsetting by for example planting trees to capture carbon.
To remove carbon from social housing, fossil fuel based heating and hot, water
needs to be replaced by a renewable source. Renewable heating such as heat
pumps are seen as the primary method. District heating is also a viable option,
especially if the heat source is from a body of water or the ground. 
The additional capital cost of installing renewable heating and of increasing fabric
insulation to accommodate this form of heating, is a concern for possible future
borrowing levels and future rent levels. 
4.5 Renfrewshire Council Housing and Net-Zero 
Net-zero carbon has been an emerging government policy area, the Housing
Investment and Housing Regeneration teams have been adapting to these policy
announcements. 
The Housing Regeneration team are responsible for new build housing and created
a plan to gradually increase the specification of their new build to meet the exacting
passivhaus standard, and to have renewable heating/hot water. Recent policy
updates for new build housing in Scotland has resulted in the Scottish Government
looking to create a ‘Scottish Passivhaus’ standard. Future new build developments
will reflect new standards as they are announced. 
The Housing Regeneration team to follow policy announcements on
‘Scottish Passivhaus’ and determine impact on the council new build
programme 
Housing investment team to follow policy announcements on ‘Scottish
Passivhaus’ and determine the impact on components in Apex and
30yr cost profile 
The Housing Investment team have been increasing the quality of their retro fit
specification over the last few years. They were also early adopters of the PAS2035
standard to ensure that the retro fitting of energy measures is considered in a ‘whole
house’ approach, rather than one off standalone measures, which can lead to
performance issues and wasted efforts.

Page 20

16 | P a g e
PUBLIC
Our Housing Investment team took the decision to look at deep retrofit design using
PAS2019 and PAS2035 on an archetypal basis and appointed a consultant to design
around 3500 ‘blocks’ to a high quality retrofit standard. The designs will have high
thermal efficiency, airtight with cold bridging minimised and designed using a
software tool called the Passivhaus Planning Package (PHPP). 
This approach is more accurate than using SAP or RdSAP or Energy Performance
Certificates (EPC’s). As a result, the modelled energy and carbon savings from
PHPP help close the performance gap between design and reality.   
It is expected the above approach will ensure our housing stock meets SHNZS,
however once the exact requirements of SHNZS are confirmed our specification of
works will be reviewed. 
Analyse costs from early projects, to determine impact on cost
projections for stock to meet SHNZS 
Housing Investment Team to follow policy announcements on net-zero
and energy efficiency to adapt designs and plan progress to 2045 
We are adopting a fabric first approach to net-zero. The main reasons for this
approach are: 
1. Although heat pumps are very efficient, if the houses are not insulated to a
high standard, there is a danger of increasing heating costs for tenants and
increasing fuel poverty, due to the cost differential between electricity and
gas. 
2. Heat pumps have a high capital cost compared to renewing a gas boiler
however costs may reduce in the future as the market matures and there is an
increase in the number of competent installers. 
3. Renfrewshire’s housing stock being 78% communal block, makes it more
difficult to install air source heat pumps, due to lack of outdoor space and
complexities around ownership. 
4. Communal air source heat pumps are an alternative option, but they would
still require communal garden space, and the council may then need to bill
each flat in a block for the energy used. The regulatory implications for being
a major heat provider with billing responsibilities need to be considered. 
5. Heat pumps perform better as a low water temperature system, rather than
‘flash’ heating a property like gas systems, they work to maintain an even
temperature throughout the day. Tenants who are in fuel poverty often opt not
to heat or they are on pre-payment meters and may often go through periods
of no credit.

Page 21

17 | P a g e
PUBLIC
This results in a heat pump not being used, the temperature dropping inside
the home and when the heat pump is eventually turned on, it is at its least
efficient trying to heat a home from cold and end up costing tenants more to
run. 
6. Over 90% of Renfrewshire’s housing stock is on the mains gas grid and as a
result many have gas cooking facilities. One of the benefits of removing gas is
the saving of a standard charge on a gas meter but if a gas cooker is present,
then it may need to remain, or the tenant may be required to purchase an
electric cooker. 
7. A mass switching to electric heating would require the Distribution Network
Operator (DNO), SP Energy Networks, to upgrade the electric network to
meet that demand. Currently the Council would need to pay for that to be
done. 
Currently there is no obligation on the DNO to upgrade an area to meet our
proposed projects and there is no plan available from the DNO to show their
intentions. 
Heat pump types can be air, ground, or water sourced. They all use electricity but
exchange heat via those three different elements. Ground and water heat pumps are
considered more efficient than air source but have a higher capital cost. As
Renfrewshire’s housing stock is mainly urban, concentrated in three main towns and
there are two large rivers nearby, there is potential for consideration of large district
wide communal water heat pumps. 
The Council’s Local Heat and Energy Efficiency Strategy (LHEES) was approved in
early 2024 and has identified possible Heat Network Zones. The Housing Investment
team contributed to the development of LHEES and ensured the council housing
stock was considered as part of the initial plan. 
Although electrification is considered the most likely strategy to replace fossil fuels,
there are potential options to use other sources, utilising the current mains gas
network with other gases, such as hydrogen. 
The UK and Scottish Governments are currently funding trials and the blending of
some hydrogen into the mains gas may start relatively soon. The UK government is
set to decide on the viability of using hydrogen within the main gas network in 2026,
but its own Climate Change Committee is clear they don’t see widespread use of
hydrogen for domestic heating and the Scottish Government’s draft Energy Strategy
and Just Transition Plan of 2023, indicated a similar position. 
This is an emerging area with many decisions yet to be made by governments, local
authorities and the DNO’s. Changes to legislation, regulation, taxation policies and
external events may all converge to change the current thinking and result in
changes to any initial strategies.

Page 22

18 | P a g e
PUBLIC 
Create a strategy for energy efficiency and ‘clean’ heating & hot water 
Liaise with the LHEES team to provide input from a council housing
perspective, to help shape their LHEES action plan 
4.6 Economies of Scale and Financing of net-zero 
The cost of achieving net-zero for our housing stock cannot be fully determined until
the requirements of SHNZS are confirmed and a clearer plan emerges from the
LHEES strategy, but early indications are that costs will be substantially higher than
current investment levels. The extra investment will be due to the higher standard of
building components, greater complexity levels of workmanship and the higher
capital cost of renewable clean heating alternatives, compared to existing fossil fuel
heating. It is also evident that the costs to maintain the standard over a normal 30-
year life cycle, will be greater than previous business assumptions. 
Those predicted extra costs could be reduced by economies of scale and tackling
whole streets or even estates at the one time. Net-zero is a requirement for all
homes, irrespective of tenure and it would be cost effective to include all homes in a
project. The map below shows a typical council estate within Renfrewshire and the
mix of council stock shown as cyan squares, in amongst private owners shown as
blue points. 
© Crown Copyright and database Rights 2024. Licence number AC0000815792 
For this model to operate, owners would have to fund their own costs, which could
be substantial. The Scottish Government has set up the Green Heat Finance
Taskforce, which is looking at options for private finance to provide capital to owners.

Page 23

19 | P a g e
PUBLIC
The Scottish Government has also setup a national energy agency, Heat & Energy
Efficiency Scotland (HEES), where one of its main roles is to co-ordinate the delivery
of clean heat and energy efficiency across Scotland. 
Renfrewshire Council are part of the Glasgow City Region Housing Retrofit Delivery
Group, which is investigating the possibility of an area-based scheme throughout the
region. The Council’s LHEES remit includes improving the energy efficiency of
housing of all tenures throughout the local authority area. 
To follow and report on the Green Heat Finance Taskforce findings to
help determine future investment policy within mixed tenure estates 
Make applications to the Social Housing Net Zero fund for retrofit  
projects and EES:Abs for owners, aiming for at least £10m over the life              
of the asset management strategy 
Investigate the support available from the Heat & Energy Efficiency   
Scotland agency to help determine future investment strategies 
Where the Council still retains an interest in a common block, we will look to invest in
the block to meet net-zero and owners within the block will be asked to contribute
their share of costs. All funding opportunities will be explored to support and
encourage owner participation; however, it is expected owners will need to pay a
contribution. The Tenements (Scotland) Act does not have the powers to force
owners to pay for all net-zero works. The Scottish Government would need to
provide a framework which assists the Council to proceed with net-zero investment
to mixed tenure blocks. 
Most of the income generated for the HRA is via rental charges, so any increased
investment will put pressure on the level of rent charged to tenants. Rent increases
are a sensitive area of social housing policy and decisions on rent levels take in
many factors. Increased capital will be required to meet net-zero, the Housing
Investment Team will continue to apply for grant funding to compliment the current
investment budget, but additional funds will be required. Renfrewshire Council
Housing Services must determine how that will be achieved and plan to meet the net
zero by the backstop date of 2045. 
Renfrewshire Council Housing to consider net-zero within an updated
30-year business plan 
4.7 Net-zero and Fuel Poverty 
The Scottish Governments Fuel Poverty Act 2019 sets a statutory obligation to
effectively eliminate fuel poverty from Scotland by 2040.

Page 24

20 | P a g e
PUBLIC
In terms of housing asset management, our fabric first approach to investment is
helping to reduce energy costs for our tenants and contributing to the elimination of
fuel poverty 
If renewable district heating is introduced in the future, this combined with the lower
heat demand due to deep retrofit, will help protect tenants from high energy costs
and contribute to eliminating fuel poverty. 
Monitor deep retrofit projects and determine actual fuel usage and
costs for heating and hot water. Information provided to assist meeting
the Fuel Poverty Act 
4.8 Sustainability 
When considering net-zero as well as operational carbon, whole life carbon (WLC)
has also to be taken into account. This includes elements such as- 
• Mining of base material such as aggregates, cement etc
• Manufacturing of insulation products
• Transporting materials to site
• Machinery and energy used to carry out works 
Although WLC has not been mandated, it seems inevitable that this will come in from
the UK or Scottish Government. The Council will require to ensure its processes
reflect sustainability. It is likely the procurement process will require contractors to
demonstrate they are working towards carbon neutrality. As a result, it is anticipated
that natural products will be increasingly used for insulation, and this may increase
the costs of retrofit further. 
Consider WLC in HRA projects and operations, developing an initial
plan to achieve full sustainability 
5. ASSET CONDITION 
Regulatory standard of asset condition is measured through the Scottish
Government’s Scottish Housing Quality Standard (SHQS). The SHQS has five main
criteria that social rented properties must satisfy, plus sub-criteria within each. It
states our properties must- 
• Meet the tolerable standard
• Be free from serious disrepair
• Be energy efficient
• Have modern facilities and services
• Be healthy, safe, and secure

Page 25

21 | P a g e
PUBLIC
Until recently the Energy Efficiency Standard for Social Housing (EESSH), was
another Scottish Government standard which social housing had to meet but it has
now been incorporated into the SHQS, element 35 within the energy efficient criteria.
EESSH was enhanced beyond initial 2020 targets, with a 2032 target of social
housing needing to meet an energy performance certificate (EPC) rating of Band B
for energy efficiency (or as high as practically possible within the limits of cost,
technology, and necessary consent). 
The EESSH 2032 target however is currently suspended pending review to ensure it
aligns with net-zero carbon. 
5.1 Meeting the Scottish Housing Quality Standard (SHQS) 
Having achieved compliance with the SHQS in 2015, compliance rates declined in
2020/21 across the social housing sector due to the inclusion of EESSH into the
standard. Compliance also fell dramatically in 2021/22 with the introduction of new
standards for smoke and heat detectors and electrical testing being included within
the assessment of SHQS compliance. 
Those changes adversely affected the majority of social landlords and whilst works
to comply with the new standards were introduced, the pandemic was a factor which
affected landlords’ ability to access properties at volume.  In Renfrewshire, a
remedial plan was put in place during 2023/24 for both smoke/heat detector
upgrades and electrical testing and significant progress has made in this area. 
The EESSH figure included within the SHQS is the original standard which was to be
achieved by 2020. The Social Housing Net Zero Standard (SHNZS) is expected to
be announced during 2025 and may replace EESSH within the SHQS, which would
lead to an initial increase in fails. 
Most other cases of non-compliances are covered by abeyance or exemption in line
with published guidance. The majority of them are due to no access or refusal to
allow works to be carried out. Due to the council having a high proportion of common
blocks with mixed tenure, many of those SHQS failures are due to owners refusing
to engage or participate in common works. 
Over the life of this strategy, aim for SHQS compliance to be a
minimum of 90% (excluding the possible inclusion of the SHNZS into
the SHQS) 
SHQS Compliance over previous 5 years 
2020/21 2021/22 2022/23 2023/24 2024/25
80.10% 57.10% 67.90% 68.55% 80.02%

Page 26

22 | P a g e
PUBLIC
5.2 Condition - Mixed Tenure Blocks 
For component condition and state of dis-repair, the SHQS is not an exacting
standard and although a property is compliant, it may not meet tenant expectations.
In mixed tenure blocks where the council is a minority owner, the council cannot
enforce works to common areas unless the building is considered a health and
safety risk. Even then, the council can only carry out remedial works to make it safe.
Over time, this is leading to common blocks not having major component parts like
roof or wall finishes replaced and it has a detrimental effect on the look and
performance of the building. More reactive repairs need carried out over time as a
result of these blocks being missed from planned programmes due to lack of owner
participation. 
This goes against the principle of good asset management practice, as planned
preventative maintenance is not possible in these situations, which can be to the
detriment of council tenants within these blocks. When Right to Buy legislation was
enacted, the division of owner responsibilities was not always detailed in the titles
and as a result, the Council must try and force common works, via the Tenements
(Scotland) Act 2004. 
The council does offer some financial support to private owners through the
provision of Private Sector Housing Grant (PSHG) and can provide credit facilities to
owners in order to encourage works, however the grant levels do not meet the full
cost of works, and many owners refuse to commit to contributing to the balance. The
Scottish Government’s Energy Efficiency Area Based Scheme (EES:Abs) funding
provides grants to owners in connection with energy works, but this funding stream is
limited to certain archetypes and there is a disconnect between need for major
investment and a block being eligible for area based grant. 
Within the Council’s approved eight regeneration areas, an enhanced percentage of
PSHG is being offered to owners, with additional options to help owners pay their
share of investment works as well as the option of transferring ownership of their
property to the Council in some limited circumstances. Whilst the regeneration areas
account for less than 10% of Council stock, any increased success of owner uptake
within these areas could be a model for expanding into non regeneration areas,
should funding become available to support this. 
The Scottish Government is aware of the difficulties all local authority landlords are
facing in maintaining mixed tenure blocks and has previously indicated their intention
to bring forward legislation to support landlords, however to date this has not been
delivered. With net-zero being a statutory requirement, it could mean that net-zero
will be the vehicle to provide a legal framework that forces owners to agree to
investment works. 
The Communities and Housing Policy Board approved a ‘last in block’ policy where
council stock that is alone amongst owners in a block is considered for sale when
void, and the receipts from any such sales are then used to purchase a privately
owned property in blocks where the purchase leads to the council gaining a majority
or outright ownership of the block.

Page 27

23 | P a g e
PUBLIC
This policy does assist the council to maintain stock levels and address the balance
of ownership in some mixed tenure blocks, the policy will be considered within the
lifetime of this strategy, with consideration of whether it should be extended to
increase the rate of sales and purchases to help the council maintain more of its
stock or amended to consider net-zero and the needs of the council’s LHEES
strategy. 
Last in block policy to be reviewed for possible extension, must
consider net-zero and the council’s LHEES plan 
The Scottish Government has published some proposed policies around mixed
tenure and has recognised the issue of fabric condition. A tenement working group
looking at maintenance and energy efficiency has made recommendations, and the
government has announced proposals about compulsory owners’ associations being
formed for each common block. The potential for legislation to impact this area is
noted and the Council will continue to monitor developments. 
Housing Services to keep abreast of Scottish Government policy
announcements in relation to mixed tenure 
5.3 Condition – Multi Storey Blocks 
Renfrewshire Council has fourteen multi storey blocks, constructed between 1959
and 1976. All have had external cladding added, with the majority of them installed
within the last fifteen years. In 2020/21 detailed condition surveys were completed on
all the blocks, and these identified a range of short-, medium- and long-term works
required to maintain the blocks and update them to meet current fire safety and
energy efficiency requirements. As a result, £27m has been allocated within the
capital investment programme over the life of this strategy. 
Deliver investment of at least £27m on the multi storeys over the life of
this strategy 
After the Grenfell Tower fire in 2017, there has been increased scrutiny and
legislation in relation to fire safety within multi storey blocks. The detailed surveys in
2020/21 of Renfrewshire Councils multi’s only commented on certain elements of fire
safety related to condition, they were not fire safety surveys completed by a fire
safety engineer. The Scottish Government has accepted all the recommendations
from the public enquiry into the Grenfell Tower and this signals significant changes
ahead for building and fire safety regulations. As part of the Housing (Cladding
Remediation) (Scotland) Act 2024, the Scottish Government established a Cladding
Safe Building Register, this will be populated with information gathered through
Single Building Assessments (SBAs). The SBAs are fire safety surveys carried out
by specialist fire engineers that will also appraise the external walls to PAS 9980.
The Scottish Government has offered funding to carry out SBAs and Renfrewshire
Council has been awarded funding in principle for all fourteen multi storey blocks and
two further blocks between 11m-18m in height that have external cladding.

Page 28

24 | P a g e
PUBLIC 
Complete SBA’s and assess any resulting recommendations as part of
the multi storey investment programme 
As a result of the projected investment levels and the increasing fire safety
requirements, the council has created a thematic working group for the multi storeys.
Bringing together representatives from various departments, the Multi Storey
Thematic Group serves as a collaborative forum designed to facilitate and promote
discussion surrounding the refurbishment of multi storey housing across the asset
estate. Its primary role is to ensure that all relevant perspectives, expertise, and
resources are considered in the planning and implementation of improvements. 
Five of the multi’s are currently heated by mains gas and Scottish Gas have recently
made the council aware for the need to replace the gas supply pipes to all five. Net-
zero will require the eventual replacement of mains gas with a renewable form of
heating. Two of the multi’s, Gallowhill Court and Glencairn Court, will have gas
removed in 2025/26, having a ground source loop array heat pump system installed.
This will be the largest such system in Scotland when it is completed in 2026. Two
other multi’s, Camphill Court and Speirsfield Court, have been zoned in the first
proposed district heating network from Local Heat and Energy Efficiency Strategy
(LHEES). The Housing Asset & Investment team are part of the LHEES Officer
Working Group and will monitor progress towards the proposed district heating
network. 
Asset & Investment team to progress net-zero heating proposals for the
multi storeys 
5.4 Asset Condition Data 
Stock condition data is the basis for evidencing compliance with the SHQS, providing
information to the Annual Return on the Charter (ARC) of the Scottish Housing
Regulator (SHR) and deriving the investments plans required over a thirty-year
period. The SHR expects social landlords to complete a full SHQS compliant survey
of 100% of its stock, at least every five years. 
Renfrewshire Council carried out a full stock condition survey over a decade ago,
using external surveyors, and maintained the data thereafter using their own internal
surveyors. A decision was taken in 2023/24 to carry out another full stock condition
survey by external consultants. In 2024 John Martin Partnership Surveyors were
appointed on a five-year contract, with a third of stock to be surveyed for the first
three years and the last two optional years used to try and access refusals from the
first three years. Data is being interfaced into Apex at the end of each survey year. 
To enable costed investment projections to be produced, the stock condition data
requires to be paired with an accurate cost base, known as a schedule of rates
(SOR), based on typical costs to replace components.

Page 29

25 | P a g e
PUBLIC
The initial SOR was based on costs from the stock condition of over a decade ago
and although some costs have been amended, there is a danger that future cost
projections will not be sufficiently robust if costs aren’t reviewed on a more regular
basis. 
The scope of component and attribute data currently held in the housing asset
management database (Apex), will need reviewed to ensure it covers all elements of
HRA assets. 
Complete Stock Condition Survey and interface data into Apex 
Review scope of components in APEX, ensure its SOR is updated 
5.5 Reinforced Autoclaved Aerated Concrete (RAAC) 
RAAC is a lightweight form of concrete which may have been used in buildings
between the 1950’s to the1980’s. The concrete has limited durability, especially
when exposed to water and is now of an age where failure of the product is possible.
A desktop survey of our housing construction and archetype data was undertook in
2023, to identify stock where RAAC may be more likely to be present. From the
results, intrusive site surveys were undertaken and no RAAC was identified. The
desktop survey method and site surveys were validated by an external structural
engineer. We continue to be vigilant to identify any possible RAAC in our housing
stock during surveys and whilst carrying out repairs or investment works. 
6. Digital Asset Management 
Digital asset management in social housing is crucial for storing, organising, and
processing stock condition data to prove compliance with regulations or standards. It
also helps to make effective decisions on investment. 
Renfrewshire Council’s Housing Systems- 
• Open Housing Management System (OHMS) – Used for lettings, tenant
information, rental charges, historic repairs, some cyclical maintenance
regimes, void management, and holds component information. Accessed by
all of Housing Services. 
• Apex housing asset management – Used for detailed component storage,
costs, investment projections, SHQS compliance, document storage and
energy information for EPC’s. Accessed by the asset management team
within Housing Services.

Page 30

26 | P a g e
PUBLIC
• Enterprise document management System (NECDM) – Used to store and
manage documents. Accessed by all of Housing Services. 
• ArcGIS – Geographic Information System used to display housing assets and
associated information spatially. Other council departments data can also be
displayed at the same time as Housing Services and the GIS can be
interrogated to provide new data. Accessed by a small number in Housing. 
• AutoCAD – Computer aided drawing tool mainly used in Housing for creating
basic house floor plans. Accessed by a small number in Housing. 
• Workhub – Used for repairs. Accessed by housing staff involved in repairs. 
• CAMIS – A corporate asset management system for non-domestic properties
but some housing information is contained within CAMIS that traditionally
Property Services maintained on behalf of Housing Services 
An integrated single housing and asset management system has been procured,
and implementation is scheduled on a phased basis from 2026 to replace OHMS,
Apex and Workhub. 
The new system will have the ability to directly access the document management
system and play a role in project management of investment delivery. 
Asset & Energy team to take responsibility for accuracy of property
data within Apex and associated data in OHMS 
ArcGIS provides enhanced ways to interrogate property data and display information
to others. It can also be used remotely for survey work, such as estate management
and there will be opportunities to expand the use of this with the introduction of the
new housing and asset management IT system. 
Asset & Energy team to explore increasing the use of GIS and expand
the users accessing it for information 
Digital asset management is an evolving area. Building Information Modelling (BIM)
is becoming increasingly popular with asset management. BIM merges CAD and
GIS capabilities to provide a 3D model of a building with a database of attributes,
enabling users to track changes to a building and its services easily, ensuring data is
maintained very accurately. 
New build housing could see BIM becoming standard use within the lifetime of this
strategy; however, it is larger residential buildings that could see the most benefit.
Building such as high rises and sheltered housing complexes have many communal
areas, complicated and varied mechanical & electrical components and often greater
health and safety requirements, that can be better asset managed in BIM systems.

Page 31

27 | P a g e
PUBLIC
The Internet of Things (IoT) is another emerging area of digital asset management.
IoT for housing asset management can currently be used for monitoring component
failures before they fail, such as lifts and boilers, and for environmental condition
monitoring within homes. It will be increasingly used for monitoring the performance
of energy efficiency, net-zero products and identifying fuel poverty. 
As of 2025, the Housing Investment team currently have around 8% of stock with
environmental sensors. The sensors collect data on temperature, humidity and
carbon dioxide levels within a home.  The data is used to monitor the success of
energy projects, and an Energy Advocate is directed by the data to try and intervene
where fuel poverty is suggested or high levels of condensation are present, that may
indicate a damp and mould risk. Our reactive repairs service can also request the
installation of sensors where a tenant has raised concerns over damp or mould in a
property without existing sensors. The sensors will provide additional data for
possible reasons leading to damp conditions and provide evidence of the efficacy of
any subsequent intervention. 
The Council is investigating opportunities for funding towards ‘Smart Social Housing’,
where a mass install of sensors using fibre broadband in their housing stock is
proposed. This could be in partnership with Health and Social Care. 
Asset & Energy team to explore increasing the use of environmental
sensors across the stock 
Asset & Energy team to explore developments of BIM and IoT within
housing asset management and make recommendations 
7. Asset Performance 
Asset performance for social housing is normally based on two metrics, financial
value expressed as a net present value (NPV) and non-financial social value. 
NPV is determined by taking 30 years of rental income, less 30 years of projected
costs in the form of planned, cyclical, servicing, reactive repairs, an allowance for
void periods, and a housing management cost. 
Social value elements can vary but normally revolve around tenant perception of
house quality, estate quality and type of housing provision on offer in an area. 
Renfrewshire council carried out an asset performance review (APR) in 2018, using
the findings to identify stock with concerns. Regeneration areas were created to deal
with underperforming stock and those areas make up the majority of the current
demolition and new build programme. 
The asset management guidance of 2023 issued by the Scottish Housing Regulator,
placed a high importance on carrying out an APR to inform asset management
decisions.

Page 32

28 | P a g e
PUBLIC
Construction costs have greatly increased since the last APR exercise and combined
with the new stock condition survey, which is underway, another APR will be carried
out. The impact of net-zero and whole life carbon will also need to be considered
within the APR and any option appraisal process thereafter. 
Asset Performance Review to be undertaken 
8. Property Investment 
This strategy is primarily focussed on managing and maintaining our social rented
housing stock. To meet standards and regulations, other areas in addition to planned
investment are required. The following section outlines all those areas, and the
projected capital spend estimated over the life of this strategy. 
8.1 Investment 
Total capital investment in the housing stock over the life of this strategy is projected
to be over £290m. A breakdown of the of the investment is shown in the following
table – 
Please refer to section10 of this document for governance arrangements of the HRA
capital investment plan. 
Deliver at least £292m of HRA capital investment, over the life of this
strategy 
Regeneration and Renewal Investment Programme 
As previously outlined, special regeneration areas were created as a result of the
last asset performance review. 
HOUSING INVESTMENT  2025-26 2026-27 2027-28 2028-29 2029-30 5 Year
Totals
£m £m £m £m £m £m
Total Existing Housing
Stock 34.431 31.375 33.225 21.522 26.481 147.034
Regeneration and
Renewal Investment
Programme 19.147 24.682 31.999 16.976 20.773 113.577
New Supply Programme
Excluding Regeneration
Projects 7.758 11.563 2.500 4.000 6.000 31.821
Capital Expenditure
Total 61.336 67.620 67.724 42.498 53.254 292.432

Page 33

29 | P a g e
PUBLIC
These areas are Housing Services led but do involve other departments within the
Council and liaison with the Renfrewshire Health and Social Care Partnership. The
Housing stock in these areas will be offered retrofit investment of a high standard to
help eradicate fuel poverty for the residents and increase the desirability of the area,
with increased incentives for owners to participate. Demolition and new build housing
are also part of the regeneration project. As well as investing in the housing stock,
improvements to the surrounding environment are being made with landscaping
works, new ideas around communal refuse storage and visual improvements to
communal areas such as stairwells. 
New Supply Programme 
Our new builds will be designed to meet future net zero requirements, with very high
energy efficiency, high levels of air tightness, MVHR and clean heating.
Over the life of this strategy, circa 340 new homes are projected to be built. 
Existing Housing Stock 
There are currently three key housing investment programme workstreams
• External Housing Investment
• Internal Housing Investment
• Investment in High-Rise Blocks 
External Housing Investment 
The external housing investment programme continues to focus on improving
energy efficiency across Renfrewshire homes with the installation of External
Wall Insulation (EWI) that reduces heat loss and lower carbon emissions,
contributing to the national Net-Zero ambitions set out by the Scottish
Government. 
This programme also involves essential works that may include all or some of
the following: roof and gutter replacement, replacement rendering, solar PV, loft
insulation and common windows and doors. 
Over the life of this strategy, over 2000 homes are projected to receive external
investment. The current contract with our external contractor ends in 2026 and a new
contractor will be procured covering the remaining life of this strategy. 
Internal Housing Investment 
Internal investment in Renfrewshire’s housing stock includes the replacement
of kitchens, bathrooms, heating systems and electrical rewiring where required. 
Kitchen, bathroom, heating replacements and rewires may also be carried out
by Building Services and external appointed contractors on a reactive basis
through the void works programme and other ad hoc reactive works including
because of fire damage, rot works or heating failures.

Page 34

30 | P a g e
PUBLIC
Over the life of this strategy, over 5000 homes are projected to receive some form of
internal investment. 
Investment in High Rise Blocks 
Refer to section 5.3 for details of the investment requirements to the multi storey
blocks. 
8.2 Responsive Repairs 
Repairs are a crucial part of asset management, ensuring we maintain standards
and helping to retain or extend the expected life span of components. The majority of
responsive repairs are undertaken by Renfrewshire Council’s own internal service
provider, Building Services, supplemented by external contractors where required or
for works of a specialist nature.   
Where repairs are no longer viable and a major component needs replaced urgently,
such as a failing roof finish, it is not always possible to have that roof added to an
existing planned contract. As a result, there can be delays in progressing with these
major repairs, leading to more decants and increased void loss. A review of
alternative options for progressing such works should be undertaken. 
Agree a process in the Housing Investment Team where urgent major
repairs are dealt with effectively 
Performance, satisfaction and best value with our reactive repairs service, can be
shown by some key performance indicators and benchmarking performance against
other Local Authorities. (source: Scottish Housing Network – benchmarking data) 
Repairs Right First Time

Page 35

31 | P a g e
PUBLIC 
Average Days to Complete Non-Emergency Repairs 
Although these two important KPI’s shows an improving reactive repairs service, with
KPI’s better than our peer group, tenant satisfaction levels with the service have
been falling. 
Over the life of this strategy improve tenant satisfaction with the
repairs service 
8.3 Dampness & Mould 
Dealing with dampness and mould is a key priority for all social housing landlords
and monitoring performance in this area will be a requirement for the annual return to
the Scottish Housing Regulator from 2025/26. In line with other landlords,
Renfrewshire has experienced an increase in the volume of reports for dampness
and mould from tenants, and our procedures have been updated to reflect this. 
The Housing (Scotland) Bill introduces Awaab’s Law which mandates social
landlords to address damp and mould within a set timeframe to ensure tenants’
health and safety. It is expected to be implemented from March 2026 subject to
Parliament’s agreement. 
As deep retrofit progresses with suitable ventilation measures, and with the
increasing use of environmental sensors (please refer to section 6 on Digital Asset
Management), the likelihood of dampness and mould occurring is expected to
decrease. However, a review of the ventilation in the housing stock, across all the
main archetypes prior to a retrofit, is recommended. 
Monitor mould and damp frequency and the use of environmental
sensor data

Page 36

32 | P a g e
PUBLIC 
Review ventilation currently used and develop a ventilation strategy
that is integrated with retrofit and SHQS requirements 
8.4 Void works 
General void works are carried out by Building Services, supplemented by external
contractors for SHQS works. 
The impact of Net zero requirements needs to be considered in reviewing the Void
Property Standard with additional works such as underfloor insulation or changing
heat/hot water provision, likely to be required. 
Review void letting standard to include requirements to meet the
SHNZS 
Improving the void process and reducing the void turnaround timescales has been a
key priority for Housing Services and a pilot of a new ‘Single Voids Team’ has been
underway since March 2024. 
Review impact of single voids team pilot 
Performance, satisfaction and best value with our voids service, can be shown by
key performance indicators and benchmarking performance against other Local
Authorities. (source: Scottish Housing Network – benchmarking data) 
Void Re-Let Days 
8.5 Cyclical Planned Maintenance 
Cyclical maintenance is required to help ensure asset components attain or exceed
their expected life span. This should lead to improved business planning and enable
efficient use of resources.

Page 37

33 | P a g e
PUBLIC
Current cyclical regimes include – 
• Gutter Cleaning
• Door and Window Servicing
• Lift Servicing
• Boiler Servicing
• Communal Boilers and Controls
• Fire Alarm Panel Servicing
• Fire Detection and Suppression systems
• Roof Anchor Checks
• Emergency Lighting Servicing
• Decoration within Sheltered Complexes
• CCTV Servicing
• Timber Painting
• Cleaning
• Smoke Vent Servicing
• Laundry Servicing 
The introduction of new technologies to support meeting net zero requirements
mean there are a range of planned programmes to be developed to service these
new components, these include- 
• Heat Pump Servicing
• Mechanical Ventilation & Heat Recovery Servicing
• Solar Panel Array Inspections
• Battery Storage Inspections
• Ventilation Filter Replacements 
Consideration should also be given to extending planned maintenance regimes to
include the following, subject to analysis of cost / benefits. 
• Decoration of Common Areas
• Door Entry System Servicing
• Hot Water Cylinder Inspections
• External Wall Insulation Inspections
• Multi Storey Inspections
• Defect Period Inspections
• Estate Inspections 
Add new cyclical maintenance regimes within the lifetime of this
strategy for new technologies 
Conduct cost/benefit analysis of extending planned maintenance
regimes

Page 38

34 | P a g e
PUBLIC
8.6 Compliance 
Housing asset management compliance is the process of following laws, rules,
regulations, and industry standards to manage assets. The main areas of
compliance for social housing are: 
• Asbestos Management
• Gas Safety
• Legionella and Water Hygiene
• Electrical Safety
• Fire Safety
• Mechanical and Lifting Equipment Safety 
Compliance is a key social landlord responsibility, with a risk to the organisation of
reputational damage. Following a review of housing compliance which was
undertaken by Savills consultancy in 2020/21, it was recommended that a dedicated
compliance team be established within Housing Services. Prior to this team being
created, responsibility for housing compliance was complex, with various services
across the Council having different elements of responsibility. The housing
compliance team structure was developed and the majority of posts filled
during 2023/24. 
Renfrewshire Council joined the Social Housing Safety Network (Scotland) in
November 2023 which, as an organisation dedicated to tenant and resident
safety in Scotland, provides a forum for keeping members updated and aware
of changes to legislation, regulations or regulatory requirements, with the
opportunity to share resources and knowledge. The housing compliance team
also actively engage with the Council’s Health and Safety Team and
participate in corporate compliance related working groups. 
The introduction of a new housing management system within the life of this strategy
is expected to significantly enhance and assist the data management for compliance
with this phase of the system anticipated to go live in mid-2027. The compliance
team carry out their own audits on data and are seeking to engage external agencies
to carry out further audit checks. 
The Housing Landlord Compliance Strategy 2025-2028 was approved by the
Policy Board in March 2025, which contains a commitment to provide a compliance
performance report bi-annually. 
Compliance team to ensure all Policies, Procedures and Guidance is in
place for each compliance regime 
Compliance team to ensure effective monitoring and reporting is in
place

Page 39

35 | P a g e
PUBLIC
8.7 Medical Adaptations 
Housing Investment carry out disabled adaptations to Council homes, enabling
tenants to stay in their homes longer. Total spend in 2024/25 was around £750k. 
Performance, satisfaction and best value with our adaptations service, can be shown
by key performance indicators and benchmarking performance against other Local
Authorities. (source: Scottish Housing Network – benchmarking data). 
Medical Adaptations – Average days to complete 
Average days to complete approved adaptations to be under 30 days
within the lifetime of this strategy 
9. Tenant Consultation & Participation 
Our current Tenant Participation Strategy was adopted in 2022.  In that we
acknowledge that when consulting with tenants, we will listen to tenants and make
sure their views and priorities are considered before decisions are reached. To
accommodate this, we have a wide range of consultative methods that makes it easy
for tenants and residents to give their views, these are: 
• Tenants and Residents Associations
• The Tenants Scrutiny Panel
• Tenant Quality Circles
• The Council Wide Form 
The Service carries out surveys to ascertain tenants’ views on service delivery and
general satisfaction. In addition to this a Service Development Officer specialises in
tenant participation and supports and encourages tenants to be involved in service
delivery decisions.

Page 40

36 | P a g e
PUBLIC
Our Regeneration Team also provide a wide range of consultation events for
residents within the regeneration areas. 
To help deliver the new Investment programme, the Housing Investment Team will
work with colleagues and tenants in line with the principles of our Tenant
Participation Strategy to shape investment priorities and the delivery of these
priorities over the next five years.   
Working with the Development Officers and tenant groups we will establish a
monitoring system whereby tenants can review the progress of the Investment
programme 
Establish a process where tenants can review proposed investment
programmes 
10. Governance & Risk 
10.1 Governance Arrangements 
Renfrewshire Council Communities and Housing Policy Board is where housing
strategy and performance is reported to the council’s elected members. Decisions on
policy and scrutiny of performance are presented to the policy board, with senior
officers available to answer questions from elected members. 
Contract awards for housing investment related works are presented for approval by
procurement to the Finance, Resources and Customer Services Policy Board.
In addition to the Policy Boards, two programme boards chaired by the Director of
Environment, Housing and Infrastructure meet regularly to oversee the delivery of
investment in the housing stock and the regeneration areas. A structured framework
has been established that defines decision making authority, accountability and
oversight of the Housing Asset and Investment Programme chaired by the Director
of Environment, Housing and Infrastructure and comprising of Chief Officers and
Senior Officers. Clear roles and responsibilities are assigned across the project team
and regular governance reviews, risk management and performance monitoring are
embedded within each project. 
It should be recognised that the Housing Asset and Investment Team are also
responsible for the delivery of regeneration projects in existing housing stock within
the designated regeneration areas, and these are governed by the Regeneration and
Renewal Programme Board. 
The governance structure incorporates thematic groups, bringing together
representatives from various council departments, serving as a collaborative forum
designed to facilitate and promote discussion. The housing asset management
thematic group’s primary role is to ensure that all relevant perspectives, expertise,
and resources are considered in the planning and implementation of improvements

Page 41

37 | P a g e
PUBLIC
A mixed tenure block thematic group was established by the Housing-led
Regeneration and Renewal Programme Board and due to the shared interest in this
area, it is now a joint thematic group. 
10.2 Risk Management 
The large levels of investment involved in the housing investment programme and
the regeneration area programme, led to a risk register being created for both work
streams. The risk registers highlight risk areas that could affect the programmes,
with each risk scored according to impact and likelihood. Any mitigations to lower or
eliminate risk are also outlined. At each Programme Board, the risk registers are
updated and scrutinised. 
11. Strategy Implementation & Monitoring 
Each action created within the strategy document has been added to an Action Plan,
with target dates, leads identified and expected outcomes. Action plan progress will
be reported annually to the Housing Investment Programme Board and to the
Communities and Housing Policy Board.

Page 42

38 | P a g e
PUBLIC
Overall progress with the action plan will be commented upon in the next asset
management strategy of 2030-2035, and its effectiveness in achieving the core asset
management objectives. 
Action plan progress to be reported annually to the Housing
Investment Programme Board

Page 43

PUBLIC

Page 44

PUBLIC 
CORE ASSET OBJECTIVE 1 - Ensure our housing stock and estates are suitable for current use and supports efficient and effective service
delivery both now and in the future: 
ACTION LHS
PRIORITIES
SHR
GUIDANCE
PRIORITIES
TARGET
DATE OUTPUTS
Determine HRA tree information held by
Neighbourhood Services, consider
carrying out a tree survey to create a tree
management plan
SP2 P2 2026 -2027 Recommendation if HRA tree survey is required
Tree asset and condition on GIS
Tree management plan
Capture extent of unadopted HRA assets
on GIS and carry out a condition survey to
provide a baseline for adding to APEX 
SP2 P2 2025-2026 Dataset on GIS
Information provided to the Roads Section on roads and
paths
Create a strategy to manage non-housing
estate assets effectively
SP2 P3 2026-2027 Plan for maintaining and developing to meet resident
needs
Act on outcomes from the lockup & ground
sites review
SP2 P2 2026 Data amended in Apex
Planned maintenance regime in place
Increased demand for lockups 
Housing Investment team to follow policy
announcements on ‘Scottish Passivhaus’
and determine impact on Repairs (main
contractor training), components in Apex
and 30yr cost profile
SP2 P2 2025-2030 Report on Policy announcements
Determine impacts
Last in block policy to be reviewed for
possible expansion, must consider net-
zero and the Councils LHEES plan 
SP2 P4 2026-2027 Review and report with recommendations made
Asset & Investment team to progress net-
zero heating proposals for the multi
storeys
SP2  2026-2028 Report provided recommending clean heating solution for
each block

Page 45

PUBLIC
Review void letting standard to include
requirements that help meet the SHNZS 
SP3  2025 New lettings standard integrated into retrofit
requirements for SHNZS
Average days to complete approved
adaptations to be under 30 days within the
lifetime of this strategy 
SP5  2025-2030 Top quartile of Local Authorities for days to complete
adaptations.
Increased tenant satisfaction with homes
Action plan progress to be reported
annually to the Housing Investment
Programme Board 
P1 2025-2030 Annual report showing progress 
CORE ASSET OBJECTIVE 2 - Ensure homes are improved and maintained to a high standard, meet tenant aspirations and are compliant
with relevant legislation: 
ACTION LHS
PRIORITIES
SHR
GUIDANCE
PRIORITIES
TARGET
DATE OUTPUTS
Deliver at least £292m of HRA capital
investment
SP2, SP3  2025-2030 Existing standards met.
Working towards new standards
Legislative compliance
High tenant satisfaction of quality of home
Deliver investment of £27m to the multi
storey flats
SP2, SP3  2025-2030 High tenant satisfaction of quality of home
Legislative compliance
Re-evaluate non-trad stock for structural
condition and investment required to meet
net-zero, considering mixed tenure or
adjoining owners
SP2 P2 2027-2028 Condition Report and evaluation
Net-zero design cost and evaluation
Over the life of this strategy, aim for SHQS
compliance to be over 90% (excluding the
possible inclusion of the SHNZS into the
SHQS)
SP2  2025-2030 Existing standards met
High satisfaction from tenants
Housing Services to keep abreast of
Scottish Government policy
announcements in relation to mixed tenure
SP2 P4 2025-2030 Report on any changes of ability to maintain mixed
tenure blocks

Page 46

PUBLIC
Agree a process in the Housing
Investment Team where urgent major
repairs are dealt with effectively
SP2  2025-2026 Process created for Delivery team to follow
Monitor mould and damp frequency and
the use of environmental sensor data. 
SP2  2025-2030 Mould and damp cases falling.
Less severe instances of mould and damp
Service Standards met
Review ventilation currently used and
develop a ventilation strategy that is
integrated with retrofit and SHQS
requirements
SP2  2025-2026 Strategic ventilation plan covering all archetypes for
repairs, void, retrofit and new build
Compliance team to ensure all policies,
procedures and guidance is in place for
each compliance regime 
SP2 P1 2025-2030 Policies, Procedure and Guidance in place for review 
CORE ASSET OBJECTIVE 3 - Ensure future decisions are based on upon robust data with reviews or option appraisals of cause for concern
stock: 
ACTION LHS
PRIORTIES
SHR
GUIDANCE
PRIORITIES
TARGET
DATE OUTPUTS
Incorporate shops into cost base within
Apex.
Asset performance review of these assets
considering wider issues than net present
value alone
SP2, SP3 P2 2025-2027 Shops integrated into APEX.
Cost base added to APEX SOR.
Net-zero design/cost of blocks with shops
Evaluate costs with income and plan
Analyse costs from early projects, to
determine impact on cost projections for
stock to meet SHNZS
SP3 P3 2026-2027 Report provided on ramifications of costs for future years
Housing Investment Team to follow policy
announcements on net-zero and energy
efficiency to adapt designs and plan
progress to 2045 
SP3 P2 2025-2030 Updates provided yearly on any changes and horizon
scan for future

Page 47

PUBLIC
Regeneration Team to follow policy
announcements on ‘Scottish Passivhaus’
and determine impact on the council’s new
build programme
SP1, SP3 P2 2025-2030 Evaluation provided of impact on new build programme
Create a strategy for energy efficiency and
‘clean’ heating & hot water
SP3  2026-2027 Plan produced for stock that meets SHNZS requirements
Liaise with the LHEES team to provide
input from a council housing perspective,
to help shape their LHEES action plan 
SP3  2025-2030 Attend LHEES meetings and provide Social Housing
Perspective to LHEES delivery
Report on progress and any changes required to
investment plan.
To follow and report on the Green Heat
Finance Taskforce findings to help
determine future investment policy within
mixed tenure estates
SP3  2025-2030 Report on findings and any changes required to
investment plan.
Renfrewshire Council Housing to consider
net-zero within an updated 30-year
business plan
SP3  2025-2030 Updated Business Plan.
Monitor deep retrofit projects and
determine actual fuel usage and costs for
heating and hot water. Information
provided to assist meeting the Fuel
Poverty Act 
SP3  2025-2030 Produce report to evidence findings
Assist Council to meet Fuel Poverty Act
Consider WLC in HRA projects and
operations, developing an initial plan to
achieve full sustainability
SP3  2027-2028 Report recommending changes to operation,
procurement, and specifications
Complete full stock condition survey and
interface data into APEX 
SP2 P2 2025-2029 Report on findings and any changes required to
investment plan.
Asset Performance Review to be
undertaken 
P3 2026-2027 Asset Performance Review report provided.
APR model should be a tool to allow yearly updates in-
house
Complete SBA’s and assess any resulting
recommendations as part of the multi
storey investment programme 
SP2 P2 2025-2027 SBAs completed and blocks on safe cladding register.
Any actions added to the investment programme

Page 48

PUBLIC 
CORE ASSET OBJECTIVE 4 - Develop the digital infrastructure to provide accurate asset management and performance information: 
ACTION LHS
PRIORTIES
SHR
GUIDANCE
PRIORITIES
TARGET
DATE OUTPUTS
Review scope of components in APEX,
ensure SOR is updated 
P3 2025-2029 Apex provides all HRA property data for complete and
accurate cost projections
Asset & Energy team to take responsibility
for accuracy of property data within Apex
and associated data in OHMS 
P2 2025-2027 Apex and OHMS aligned and ready for replacement
system
Asset & Energy team to explore increasing
the use of GIS and expand the users
accessing it for information  
2025-2030 GIS used by wider number of Housing staff
GIS applications created for service improvement 
GIS awareness sessions
Asset & Energy to explore increasing the
use of environmental sensors across the
stock 
SP3  2025-2027 Report on current usage and advise on improvements
Asset & Energy team to explore
developments of BIM and IoT within
housing asset management and make
recommendations 
P2 2026-2030 Yearly update and horizon scan report 
CORE ASSET OBJECTIVE 5 - Demonstrate value for money in the delivery of our reactive repair service, cyclical maintenance services and
capital improvement programmes: 
ACTION LHS
PRIORITIES
SHR
GUIDANCE
PRIORITIES
TARGET
DATE OUTPUTS
Make applications to Social Housing Net
Zero funds for retrofit projects and
EES:Abs for owners, aiming for at least
£10m over the life of this strategy
SP5 SP3 2025-2030 Report on successful funding bids
Over the life of this strategy improve
tenant satisfaction with the repairs service.
SP2  2025-2030 Renfrewshire to be in top quartile for this KPI amongst
other authorities

Page 49

PUBLIC
Review impact of the single voids team
pilot
SP2  2025-2026 Void targets achieved with cost savings
Increased satisfaction in home quality for new tenancies
Add new cyclical maintenance regimes
within the lifetime of this strategy for new
technologies
SP2  2025-2030 New cyclical programmes created
Conduct cost/benefit analysis of extending
planned maintenance regimes 
SP2  2026-2027 Report produced with recommendations
Compliance team to ensure effective
monitoring and reporting is in place 
SP2  2026 Reports to SMT provided on overall compliance
OHMS replacement system utilised 
CORE ASSET OBJECTIVE 6 - Ensure tenant involvement in the development and monitoring of our services and improvement programmes: 
ACTION LHS
PRIORITIES
SHR
GUIDANCE
PRIORITIES
TARGET
DATE OUTPUTS
Investigate the support available from the
Heat & Energy Efficiency Scotland agency
to help determine future investment
strategies
SP3  2025-2026 Report on contact with agency 
Establish a process where tenants can
review proposed investment programmes 
2025-2026 Output from tenants involvement shown to impact
investment decisions