Page 1

PUBLIC 
___________________________________________________________________
To: Communities and Housing Policy Board
On: 28 October 2025
__________________________________________________________________
Report by: Director of Environment, Housing and Infrastructure
___________________________________________________________________
Heading: Social Housing Charter Performance: 2025/26 Six Month Update 
___________________________________________________________________
1. Summary 
1.1 Local Authorities and Registered Social Landlords are required to submit an
Annual Return on the Charter relating to service performance to the Scottish
Housing Regulator (SHR) by the end of May each year. 
1.2 This report provides an update on performance against the Charter indicators
for the first six months of 2025/26 and includes the new indicators as
determined by the Regulator. 
1.3 We only report on seventeen indicators for the six-month report, as opposed
to 33 for the Annual Return on the Charter. Three of these are new indicators
and as such there is no trend information for comparison, and in another case
comparison is not applicable (in connection with court actions leading to
eviction).  Of the remainder ten have improved since April 2024, whilst three
have remained relatively stable. 
1.4 This report also provides a summary of benchmarking performance for the
2024/25 ARC return.
___________________________________________________________________
2. Recommendations 
2.1 It is recommended that the Policy Board: 
(i) notes the 2025/26 Six Month Update Report on Scottish Social Housing
Charter Performance attached as Appendix 1.

Page 2

PUBLIC
3. Six Month Update on Charter Report for 2025/26 
3.1 The six month update on Scottish Social Housing Charter Performance
provides information on the first two quarters of 2025/26: 
• Section 1 provides performance information against the Charter
indicators along with comparative data for the last three years. For ease
of reference, indicators which are only reported on an annual basis are
not included in this report (these annual indicators were reported to the
Policy Board in May 2025). This report contains three new indicators to
be reported to the SHR for the first time in May next year, these are: 
• Indicator 29: The number of times in the reporting year did you not
meet the requirement to complete an electrical installation condition
report (EICR) within five years of the last EICR. 
• Indicator 30: Number of homes that do not have ‘satisfactory
equipment for detecting fire and giving warning in the event of fire or
suspected fire installed at the year end. 
• Indicator 31: Average length of time taken to resolve cases of damp
and/or mould. 
There are two additional damp and mould indicators which will be reported on
an annual basis, and as such are not included in this report: 
• Indicator 32: Percentage of cases of damp and/or mould resolved
during the reporting year that were reopened by cause.
• Indicator 33: Number of open cases of damp and/or mould at the
year end. 
3.2 The six-month data for 2025/26 displays improved performance in ten of the
indicators, the key areas of improved performance being: 
• The average time to complete emergency repairs has improved from 5.2
hours to 4.9 hours (Indicator 8).
• The average time to complete non-emergency repairs has also improved
to 6.1 days from 6.9 days (Indicator 9).
• Repairs Satisfaction has improved to 79.7% from 77.2% (Indicator 12).
• Percentage of rent lost to properties becoming empty continues to
improve (Indicator 17).
• Sustainment levels have improved across all categories from the year
end position. (Indicator 15).
• Percentage of lettable houses that became vacant in the last year, has
improved compared to the same point last year. (Indicator 16)
• Letting activity, there is further improvement in the average days to re-let
a property, which is now sitting at 30.1 days, which reflects the ongoing
focus on this service area (Indicator 26).
• Percentage of anti-social behaviour cases resolved has improved slightly 
and is better than this time last year, (Indicator 14).

Page 3

PUBLIC
• Complaints performance has remained stable with regard to the
percentage responded to at Stage 1, and there was a slight
improvement in the average length of time to respond for Stage 1.  For
Stage 2 complaints the percentage responded to improved slightly and
there was a ten day improvement in the average number of days to
respond (Indicators 3 & 4).  Whilst marginal improvements are noted
here, we are continuing to target complaints as an area for further
improvement. 
3.4 The following indicators have remained stable since April or this point last
year: 
• There were five occasions where the gas service was not carried out
before the anniversary date (Indicator 11).  All of these have
subsequently been carried out and there are no further outstanding
services.
• Rent collected as a percentage of rent due, (Indicator 22)
• Gross rent arrears as a percentage of rent due, same as this point last
year. (Indicator 23). 
3.5 2024/25 Annual return on the ARC, Benchmarking 
In May 2025 we submitted our return to the Scottish Housing Regulator to
demonstrate our performance against the Annual Return on the Scottish
Social Housing Charter.  Following publication of all the data from all local
authorities and RSLs, our performance demonstrated improvements in rent
collection, arrears management, repairs, and re-let times. Rent collection
reached 100.7%, and arrears dropped to 7.1%, outperforming most local
authorities. Re-let times improved significantly to 37.3 days, placing
Renfrewshire among the top ten performers nationally. Emergency and non-
emergency repair times also improved, with non-emergency repairs
completed in just 6.9 days—well ahead of national averages. 
The Council’s compliance with the Scottish Housing Quality Standard rose to
80%, and satisfaction with repairs increased slightly. Medical adaptations
were completed more quickly, and tenancy sustainment improved to 91.5%.
Notably, referrals of homeless households to Registered Social Landlords
(RSLs) rose to 31.6%, more than double the national average.
However, some areas require attention, notably complaints, where volumes
were high, with response times above national averages. This could be
attributed to a robust complaints system that ensures all issues are logged
and addressed. 
Looking ahead, the service will focus on enhancing complaints handling,
streamlining repairs processes, and continuing efforts to improve anti-social
behaviour responses (we have recently introduced a new reporting app to
improve engagement and outcomes in this area).

Page 4

PUBLIC
These priorities aim to build on the year’s successes and address areas
where performance has dipped. 
___________________________________________________________________
Implications of the Report 
1. Financial – None. 
2. HR & Organisational Development – None. 
3. Community/Council Planning 
Building strong, safe, and resilient communities – Improving and maintaining
neighbourhoods and homes. 
Working together to improve outcomes – Increasing resident satisfaction with
neighbourhoods and communities. 
4. Legal – None.  
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights – 
The Recommendations contained within this report have been assessed in
relation to their impact on equalities and human rights. No negative impacts on
equality groups or potential for infringement of individuals’ human rights have
been identified arising from the recommendations contained in the report
because it is for noting only.   If required following implementation, the actual
impact of the recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the Council’s
website. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risks – None. 
11. Privacy Impact – None. 
12. COSLA Policy Position – N/A. 
13. Climate Risk – None. 
14. Childrens Rights – None.
_________________________________________________________

Page 5

PUBLIC 
Background Papers 
• Report to the Communities and Housing Policy Board on 19 August 2025,
‘Scottish Social Housing Charter: Annual Return 2024/25’. 
The foregoing background papers will be retained within Housing Services for
inspection by the public for the prescribed period of four years from the date of the
meeting.   
Author: Ray Walkinshaw, Housing Regeneration and Development Manager 
E Mail:  ray.walkinshaw@renfrewshire.gov.uk 
___________________________________________________________________

Page 6

1
PUBLIC 
Scottish Social Housing Charter 2025 – 2026 
Six Month Update

Page 7

Scottish Social Housing Charter 2024/25 Six Month Update  2
PUBLIC
OUTTURN REPORT (April-September 2025-2026) 
No. Indicator 23/24
24/25 Six
Month
position
24/25
25/26 Six
Month
position
Notes
Complaints
3/4
The percentage of all
complaints responded to
in full at Stage 1 
93.1% 84.6% 90% 89.2% Out of 619 Stage 1
complaints received, 552
were responded to in full, in
an average of 
13.3 days
The average time in
working days for a full
response at Stage 1
7.6
days 10.9 days 14.4
days 13.3 days
The percentage of all
complaints responded to
in full at Stage 2.
71.7% 70.7% 88% 89.4% Out of 94 Stage 2 complaints
received, 84 were responded
to in full, in an average of 
18.4 days.  The average time in
working days for a full
response at Stage 2.
18.9
days 30.2 days 28.9
days 18.4 days
Repairs, maintenance, improvements and Tenant Safety
8 
Average length of time
taken to complete
emergency repairs. (hours)
5.6 4.65 5.2 4.9
This indicator has improved
since year end.
5 month position
9
Average length of time
taken to complete non-
emergency repairs. (days) 
7.9 6.25 6.9 6.1
This indicator has improved
since year end.
5 month position
11
How many times in the
reporting year did you not
meet your statutory
obligations to complete a
gas safety check within 12
months of a gas appliance
being fitted or its last
check?
11 1 5 5
Renfrewshire Council has at
all times followed the
Scottish Government
guidance and the more
detailed guidance from Gas
Safe and HSE.   All the cases
have been completed.
5 month position
12
Percentage of tenants who
have had repairs or
maintenance carried out
in last 12 months satisfied
with the repairs and
maintenance service. 
76.7% 76.63% 77.2% 79.7%
This indicator has improved
since year end.
5 month position
29
The number of times in the
reporting year did you not
meet the requirement to
complete an electrical
installation condition
N/A N/A N/A 45
This is ongoing and the
compliance team are
working with the housing
officers to gain access to
address the outstanding
installations.

Page 8

Scottish Social Housing Charter 2024/25 Six Month Update  3
PUBLIC
No. Indicator 23/24
24/25 Six
Month
position
24/25
25/26 Six
Month
position
Notes
report (EICR) within five
years of the last EICR 
30
Number of homes that do
not have ‘satisfactory
equipment for detecting
fire and giving warning in
the event of fire or
suspected fire’ installed at
the year end 
N/A N/A N/A 45
Work to install this
equipment is being
undertaken at the same time
as the EICR works.
31
Average length of time taken to resolve cases of damp and/or mould (working days) by
Structural issues N/A N/A N/A 34.1 5 month position
Condensation issues      N/A N/A N/A 32 5 month position
Other issues   N/A N/A N/A 32 5 month position
Total Resolved Cases  N/A N/A N/A 75 5 month position
Estate management, anti-social behaviour, neighbour nuisance and tenancy disputes
14 
Percentage of anti-social
behaviour cases which
were resolved.
98.0% 94.9% 96.8% 97.5% 197 cases of ASB were
resolved from a total of 202
Tenancy sustainment and tenancy turnover
15
Percentage of new tenancies sustained for more than a year, by source of let.
Existing tenants 94.1% 95.0% 95.6% 95.7% Overall, 1039 properties let
with 946 having sustained for
more than a year. These
figures relate to tenancies
which commenced between
October 2023 and September
2024. Sustainment across all
tenant types has increased
over this period by 0.7
percentage points.
Homeless applicants 86.5% 87.4% 85.4% 86.1%
Housing List applicants 91.8% 92.5% 91.6% 93.8%
Other 0.0% 0.0% 0.0% 0.0%
OVERALL 90.5% 91.4% 90.3% 91.0%
16  Percentage of lettable
houses that became
vacant in the last year.  
7.8% 3.99% 7% 3.46% This is a slight improvement
on the same point last year. 
17
Percentage of rent due lost
through properties being
empty during the last year. 
1.45% 1.53% 1.3% 0.92%
Improvement in this
indicator reflects
improvement in voids
performance.
20
Percentage of the court actions initiated which resulted in eviction and the reasons for eviction.
Non-payment of rent 34.0% 21.4% 21.3% 30.43% The increase in court
booking can be attributed to
removing the arrears
threshold before a case goes
to court.
Anti-social behaviour 1.4% 0 2.2% 0%
Other  0.0% 0 0 0
All 35.5% 21.4% 23.5% 30.43%

Page 9

Scottish Social Housing Charter 2024/25 Six Month Update  4
PUBLIC
No. Indicator 23/24
24/25 Six
Month
position
24/25
25/26 Six
Month
position
Notes
Rents and service charges
22
Rent collected as
percentage of total rent
due in the reporting year. 
100.4% 98.4% 100.7% 98.9% Performance in this remains
similar to this point last year.
23
Gross rent arrears (all
tenants) as at 31 March
each year as a percentage
of rent due for the
reporting year. 
8.3% 8.89% 7.1% 7.34%
Gross Arrears are £4,306,175
as a percentage of rent due
of £58,694,728
26
Average length of time
taken to re-let properties
in the last year. (days)
50.4 38.5  37.3 30.1
There were a total of 387 re-
lets between April and the
end of September.