ARGYLL AND BUTE COUNCIL                           OBAN, LORN AND THE ISLES
AREA COMMITTEE 
ROADS AND INFRASTRUCTURE                      10 DECEMBER 2025                       
OBAN FLOODING UPDATE 
1.0 EXECUTIVE SUMMARY 
1.1 This report provides an update on the works that have been planned and 
undertaken by Argyll and Bute Council as part of the 2022-20287 Cycle 2 
Plans. Funding remains the primary barrier to the implementation of the 
identified schemes to in Oban. 
1.2 Argyll and Bute Council has identified a number of short, medium and long 
term actions to help mitigate flooding issues in Oban that are identified and 
discussed within this report. 
Coastal, fluvial and pluvial issues are present, and the identified measures 
that have been identified are means to alleviate surface water issues. Whilst 
tidal levels can be predicted in advance, when spring tides, or high   
astronomical tides, are combined with storm surges then the risk of coastal 
flooding is heightened. The tide level also has an effect on the fluvial 
flooding. 
The effect of surface water issues in Oban affects a number of local 
businesses directly, as well as the local economy overall. 
Whilst Argyll and Bute Council has identified and is working to implement the 
schemes identified as part of this report, it must be acknowledged that 
available budget and resources play a major role in our ability to undertake 
these works.

Page 2

ARGYLL AND BUTE COUNCIL                           OBAN, LORN AND THE ISLES
AREA COMMITTEE 
ROADS AND INFRASTRUCTURE                      10 DECEMBER 2025                       
OBAN FLOODING UPDATE 
INTRODUCTION 
2.1 Historically there have been numerous flooding events within Oban. The sources
of the flooding consist of water from coastal, fluvial (water course), surface water
and combined sewer overflows. In some cases, the combined effects of these
flooding sources has increased severity of the flood hazard in Oban. One
localised flood hotspot affected by combined source flooding is centred on the
Council’s Lochavullin Road Car Park bounded by Soroba Road, Tesco and
Lochavullin Road. 
2.2 Preventing future flooding will require significant works, currently unfunded.
Through this report it is proposed that all funding opportunities are explored
including lobbying Scottish Government to seek to secure funding to implement
flood prevention works as well as exploring any additional external funding
opportunities. 
2.3      A number of short, medium and long term actions and works identified to help to    
mitigate flooding are detailed in this report. 
RECOMMENDATIONS 
3.1 It is recommended that the Environment, Development and Infrastructure
Committee: 
i. Consider and note this report.
ii. Endorse the proposals by officers to lobby for funding and to explore
external funding opportunities, and
iii. to agree that quarterly progress updates be provided to future meetings
of the Oban, Lorn and the Isles Area Committee.

Page 3

4.0 DETAIL 
4.1 SEPA’s Flood maps (Appendices 1,2 and 3) show areas susceptible to
Coastal, Fluvial (watercourse) and Surface Water flooding in Oban. In
December 2024 SEPA substantially increased the area of Oban that they
believe to be susceptible to pluvial (surface water) flooding. Full map
coverage is available at  Flood Maps | SEPA - Flood Maps | SEPA 
4.2 Coastal flooding is influenced by high astronomical tides and tidal surges caused
by low atmospheric pressure and storm events. In certain conditions, when high
spring tides are worsened by tidal surge, sea water will flood into the tidal reach
of the Black Lynn burn. The combination of tidal effects and high flows in the Black
Lynn burn cause flooding in adjacent areas. Subject to the necessary permissions
it is proposed that some clearance work is carried out.  Whilst these works will
provide some additional water storage capacity, they are not expected to mitigate
against any significant weather event. 
4.3 The appropriate flood events, including climate change factors, have been 
modelled to establish whether clearance or repair works would substantially 
reduce the risk of flooding at Lochavullin, Black Lynn Burn and associated 
tributaries. No further clearance or repair works have been identified which 
would significantly reduce the risk of flooding. The works considered include 
dredging the river downstream of Lynn Road culvert and upstream of Soroba 
Road Bridge. This could change should a Flood Protection Scheme be 
progressed which would address the flood risk across the water network. 
4.3 In addition to this the Scottish Water combined sewers (drains that contain both
storm water and foul sewerage) can also surcharge adding raw sewage to the
combined source flood waters. The Lochavullin car park has a pumping system
which copes with low levels of water, however, above a certain level there is
nowhere to pump water to and the pumps become ineffective.   
4.4 The consequences of these flooding events can often result in roads having to be
closed for safety resulting in significant diversions and significant flood damage to
adjacent businesses. 
4.5 Climate change is very likely to increase the severity and frequency of flood
events. Current guidance (SEPA Climate change allowances for flood risk
assessment in land use planning) points to the following changes: 
• By 2100 Peak River Flows in Argyll increase by 59% of the 2017 values 
• By 2080 Peak Rainfall Intensities increase by 46% of the 2017 values
• By 2100 cumulative rise in sea level above 2017 levels will be 0.86m

Page 4

4.6 In Cycle 1 of the Highland and Argyll Local Flood Risk Management Plan 2016-
22, Oban was identified as a Potentially Vulnerable Area (PVA) for flooding and
an Action was placed on the Council to carry out a Flood Study and Surface Water
Management Plan. 
4.7   A detailed Flood Study and Surface Water Management Plan (SWMP) was
completed in 2019. The Oban Flood Study and SWMP identified a number of
mitigation and adaptation measures. These measures will require significant
infrastructure and are likely to require attenuation (creating storage capacity for
water either via a reservoir(s) or in underground tanks) for storm water as well as
creating sea defences to prevent flooding from tidal surge. At present detailed
design has not been progressed. However it is reasonable to assume that works
to deal with the flooding issues would run to several millions of pounds. In the
recent past, the Council has been successful in securing funding for flood studies
and physical works such as those underway in Campbeltown. These studies and
physical works have been 80% funded by Scottish Government and 20% by the
Council. At the time of writing, the next round of flood funds has not been released,
and it is currently unknown as to what, if any, funding will be available and over
what period of time. 
4.8 On 7-9 October 2023, the flooding in Oban was significant.  Connectivity including
access to hospitals and healthcare, residential property, light industry, commercial
and retail premises were all affected.  Access to shops and food stores was cut
off and general disruption including flooding of the underground fuel tanks at
Tesco superstore resulted in no fuel being available from this site for a number of
weeks. In addition, there were a number of commercial properties, some Council
owned, that were affected on the Lochavullin site. 
Future/Completed Actions 
4.9  Short term actions during a flood event:- 
The Council will continue to respond as required in assisting emergency services
and others where possible to do so.  In addition to ensuring the pumping system
for Lochavullin car park is functioning, the Council’s input during a flood event is
likely to include providing the necessary signage, posting service disruption
notices via the website and working closely with partners through the Local
Resilience Partnership and responding and assisting where possible.

Page 5

4.10 An Oban Local Flood Resilience Group has been established by volunteers 
with an initial meeting held with Council officers. The Group is a community- led
initiative aimed at reducing the impact of flooding in Oban. The group is  working to
increase community awareness and education of the impacts of  flooding and the
preventative measures that can be taken by residents and  businesses. The
activities of the Group include 
• collecting information on properties at risk and gather first-hand accounts
of flooding experiences
• Work with the Scottish Flood Forum to establish and train local volunteers
for emergency response and recovery support
• promoting self-help and resilience within the community, including setting
up local flood action plans.
• The council will work closely with the group and other partners to lobby for
funding and consult on our flood prevention plans. 
4.10 Medium term actions completed in 2024/25 include:- 
• Watercourse inspection of Black Lynn Burn and its tributaries;
• Clearance of obstructions (trees, trolleys etc) noted during inspection;
• Hydrologic modelling carried out for the Black Lynn Burn which has
determined the inefficacy of dredging or removing vegetation, to reduce
overtopping of the Black Lynn Burn north of Soroba Road Bridge; 
• Repair/upgrade the existing pumping system at Lochavullin car park:
o Existing control unit replaced as required and raised on a plinth to
reduce risk of future water damage;
o Existing pumps repaired as required; 
• Survey for invasive non-native species from Soroba Lane bridge to
Jackson’s Quarry culvert to establish extents and cost associated with
treatment. Following the results of hydrologic modelling the treatment will
not be taken forward by the Flood Risk Management team as it does not
decrease the risk of flooding. However, invasive non-native species will be
addressed by other Council services through the Nature Restoration Fund. 
4.11 Medium term actions include:- 
• Secure quotes for proposed works to identify if funding can be identified
within available budgets or otherwise secured;
• Further collaboration with Scottish Water regarding sewer flooding and
identify options to share resources and reduce this source of flooding;
• Make representations to Scottish Government seeking to make available
funding to accelerate flood prevention works at Oban;
• Explore all opportunities for securing any available funding to accelerate
flood prevention works at Oban. 
4.12 Long term actions - Long term works will be significant and likely to run into tens
of millions of pounds. Potential works would include providing attenuation/water
storage and general climate change adaptation measures aimed at mitigating

Page 6

or minimising disruption from severe weather events. Currently SEPA prioritise
residential property above businesses in terms of assessment and allocation of
funding. The Council will lobby to seek to secure funding to accelerate flood
prevention works at Oban. It should be noted that no funding has been identified
for major works. 
4.13 The impact of revised PVAs on future LFRMP Actions is uncertain at present. 
Updates will be brought forward to Members as information becomes available
further. It should be noted that PVAs highlight the potential risk of flooding. This
will enable any development to take flooding into consideration and ‘build in’
flood mitigation by raising levels, adding in flood defence etc.  PVAs also help
in seeking external funding to mitigate against flooding. 
Impact on Local Businesses and Council Tenants 
4.14 Some of the properties in Oban which have been affected by the recent flooding
are owned by the Council and are leased to commercial tenants. These
properties are located within the Lochavullin area where the Council leases
premises in Mill Lane, Millpark Road and Crannog Lane.  Some of the
properties have been affected by flooding before, but the tenants have reported
that the recent flooding events have been worse than previously experienced. 
4.15  A number of tenants have contacted the Council to seek compensation or rent
reductions to reflect the impact of the flooding on their businesses.  However,
there are also businesses in the same area who either own or privately lease
their premises, and it would not be fair if compensation or rent reductions were
only offered to Council tenants. Accordingly, it is considered that only a
centralized support scheme made available through the Scottish Government
would offer an equitable response to the impact of the recent flooding events. 
4.16  As part of the wider flood prevention works being investigated and undertaken
by the Council, additional survey work on the drainage systems around the
Lochavullin area has been instructed by the Estates Section. This is to assess
if there are any short-term measures which could be taken to make
improvements to address specific issues some tenants are having. The
drainage systems have been altered over the years by a number of tenants and
understanding how this impacts on the wider network will assist to determine if
any short-term measures will improve matters. There may also be a role in this
exercise for Scottish Water depending on the outcome of the surveys. It should
be noted that these works will not address the larger scale flooding events
which require a larger flood prevention scheme as outlined elsewhere within
the report. 
Other Affected Locations 
4.17  There are a number of sites already included within a list of potential flood
prevention schemes that may receive funding from future Scottish
Government allocations.  There are also additional sites that have been prone

Page 7

to recent flooding that are not included in Scottish Government’s list of
schemes. These include Ledaig car park at Tobermory and Kilmichael Glen.
Both of these locations have been subject to recent flooding. 
5.0 CONCLUSION 
5.1 This report provides the OLI Area Committee with an update on flooding in Oban
with completed actions to date along with potential medium and long term
adaptation options.  The report also proposes to seek external funding with the
intention of bringing flood prevention works forward whilst also recognising that
the works required to mitigate flooding in Oban will be significant. 
6.0 IMPLICATIONS 
6.1 Policy – In line with existing Council policies and in line with the Flood Risk
Management (Scotland) Act 2009. 
6.2 Financial – No funding identified for long term solution, this report proposes that
lobbying is taken forward with a view to securing funding. 
6.3  Legal – The Council has four key responsibilities under the Flood Risk
Management (Scotland) Act 2009:
• Prepare maps of bodies of water etc
• Assess bodies of water
• Prepare local flood risk management plans and carry out the Actions
identified in the LFRMP
• Carry out clearance and repair works. 
6.4  HR – None known. 
6.5      Customer Service – None known. 
6.6      Risk – None known. 
6.7    Climate Change - Due regard will be given to climate change with a view to
minimising any climate change impact and these will be considered as and
when they arise.   
6.8      Fairer Scotland Duty – None known. 
6.9  Equalities – protected characteristics – An EqSEIA will be required as and
when long term solutions can be progressed. 
6.10    Consumer Duty – None know. 
6.11   Islands – None known. 
6.12   Children’s Rights and Wellbeing – None known.

Page 8

Executive Director with responsibility for Roads and Infrastructure Services:
Kirsty Flanagan 
Policy Lead for Roads, Transport and Amenity Services: Councillor John Armour

Page 9

For further information contact: 
Andy Summers, Head of Roads and Infrastructure Service 
Andy.Summers@argyll-bute.gov.uk 
Elsa Simoes, Infrastructure Design Manager 
elsa.simoes@argyll-bute.gov.uk 
APPENDICES 
Appendix 1 - Plan shows the SEPA River flood hazard. 
Appendix 2 - Plan shows the SEPA Coastal flood hazard 
Appendix 3 -   Plan shows the SEPA Surface Water flood hazard 
Appendix 4 – Oban PVA Actions

Page 10

Appendix 1 - Plan shows the SEPA river flood map  - Search Location - Tesco PA34 4HP
0.1% = 1 in 1000 year chance of flooding 
0.5% = 1 in 200 year chance of flooding
10% = 1 in 10 year chance of flooding

Page 11

Appendix 2 - Plan shows the SEPA coastal flood map Search Location – Tesco PA34 4HP
0.1% = 1 in 1000 year chance of flooding 
0.5% = 1 in 200 year chance of flooding
10% = 1 in 10 year chance of flooding

Page 12

Appendix 3 - Plan shows the SEPA coastal flood map Search Location – Tesco PA34 4HP
0.1% = 1 in 1000 year chance of flooding 
0.5% = 1 in 200 year chance of flooding
10% = 1 in 10 year chance of flooding

Page 13

Appendix 4 - OBAN PVA Actions
1. Oban LFRMP PVA Actions
2. Oban LPD Wide Actions
3. Oban ABC approach to carrying out ‘The Act’
1. Oban LFRMP PVA Actions
1.1. Oban PVA Cycle 1 (2016-22) Output:
Oban’s Potentially Vulnerable Area (PVA) Actions are defined in the Local Flood Risk Management Plans (LFRMPs).  The Final
Report from the Cycle 1 Plan which covered Oban until 2022 can be viewed here:
Highland & Argyll 
• Local Flood Risk Management Plan Final Report (Cycle 1)
1.1.1. Oban Flood Study including Surface Water Management Plan
The following technical and economic assessment reports were completed in 2019 and submitted to SEPA as part of the national
prioritisation of flood schemes process:
• Oban 1A Main Report
• Oban 2C Surface Water Management Plan
• Oban 3A Options Appraisal Part A Part One
• Oban 3A Options Appraisal Part A Part Two
• Oban 3B Options Appraisal - Economic Appraisal
• Oban 3C Conceptual Designs and Factsheets
2. Oban PVA Cycle 2 (2022-28) Actions:
Oban’s Potentially Vulnerable Area (PVA) Actions are defined in the Highland and Argyll Local Flood Risk Management Plan
(LFRMP).  The Cycle 2 Plan which has covered Oban since 2022 can be viewed here:
Highland & Argyll 
• Local Flood Risk Management Plan (Cycle 2)
• S37 Interim Update (Cycle 2)
1.2.1. Action Type: FLOOD SCHEME OR WORKS DESIGN (Oban PVA Action 1)
General description
The selected preferred approach for managing flood risk is to be designed following the completion of the flood study, including
consideration of the long-term impacts of climate change. These can include small scale works or works to improve catchment
management. This should guide adaptive planning to allow for the impacts of climate change to be monitored, understood and
managed.
Description of Action for Cycle 2 
Develop the detailed design of the Oban Flood Protection Scheme based on the preferred option from the flood study. The
preferred option consists of a combined flood storage and direct defence solution to protect against flooding from the Black Lynn
and property flood resilience to protect against coastal flooding. Some more work is required on the surface water element. 
The responsible authority proposes this action as the best viable option for managing flood risk in this community. The delivery of
this action is subject to capital funding being made available.
In accordance with the flood risk management plan, as part of the scheme or works, the responsible authority should aim to ensure
the action will not have an adverse effect on the integrity of the Inner Hebrides and the Minches Special Area of Conservation.
Indicative Delivery 
To be confirmed - progression dependent upon budget availability
Co-ordination 
Argyll and Bute Council will work with Scottish Water, Oban Community Council, Forestry and Land Scotland,  land and property
owners to deliver the scheme.
Funding

Page 14

Capital/ Revenue plus any available external funding
Current Status
Argyll and Bute Council:
1. Scope, timescales and funding arrangements for Cycle 2 and 3 externally capital funded schemes are
not yet confirmed.  Previous (Cycle 1) capital funding was 80% Scottish Government with Council
being responsible for 20% (plus any additional spend over budget estimate).
2. Scheme was submitted to SEPA for prioritisation in 2019. 
3. Benefit Cost Ratio classification is 2 = High. 
4. Unlikely to progress in Cycle 2 (2022-2028) due to capital funding not being secured.
1.2.2. Action Type: FLOOD SCHEME OR WORKS IMPLEMENTATION (Oban PVA Action 2)
General description
The flood scheme/works is to be built following agreement of the design, costs and timescales.
Description of Action for Cycle 2 
Progress the Oban Flood Protection Scheme based on the detailed design. As built drawings should be made available to SEPA,
for consideration in the Scottish Flood Defence Asset Database, flood map updates and flood warning scheme updates.
The responsible authority proposes this action as the best viable option for managing flood risk in this community. The delivery of
this action is subject to capital funding being made available.
Indicative Delivery 
To be confirmed - progression dependent upon budget availability
Co-ordination 
Argyll and Bute Council will work with Scottish Water, Oban Community Council, Forestry and Land Scotland, land and property
owners to deliver the scheme. As Built drawings will be provided to SEPA to support any flood map or flood warning updates.
Funding 
Capital/ Revenue plus any available external funding
Current Status
Argyll and Bute Council:
1. Scope, timescales and funding arrangements for Cycle 2 and 3 externally capital funded schemes are not
yet confirmed.  Previous (Cycle 1) capital funding was 80% Scottish Government with the Council being
responsible for 20% (plus any additional spend over budget estimate).
2. Scheme was submitted to SEPA for prioritisation in 2019. 
3. Benefit Cost Ratio classification is 2 = High. 
4. Unlikely to progress in Cycle 2 (2022-2028) due to capital funding not being secured.
1.2.3. Action Type: COMMUNITY ENGAGEMENT (Oban PVA Action 3)
General description
Community engagement is to continue to be carried out in the area by the responsible authorities to raise awareness of flood risk. 
Description of Action for Cycle 2 
The responsible authorities to continue to engage with the community, with particular focus on the detailed design of the flood
protection scheme.
Indicative Delivery 
Ongoing
Co-ordination 
Argyll and Bute Council liaises with Oban Community Council and land and property owners
Funding 
Revenue

Page 15

Current Status
Argyll and Bute Council:
1. Various ABC teams involved including:
• Flood Risk Management Team (Infrastructure Design), 
• Roads Operations, 
• Community Resilience and 
• Estates
1.2.4. Action Type: SURFACE WATER MANAGEMENT PLAN (Oban PVA Action 4)
General description
Areas at risk of heavy or prolonged rainfall causing flooding due to water ponding on man-made surfaces or overwhelming the
drainage system have been identified. Next steps in managing such water ponding or over-whelmed drainage systems have been
identified and should be implemented. The plan is to be reviewed and updated as needed.  
Description of Action for Cycle 2 
Implement the surface water management plan. The plan should be reviewed and updated regularly.
Indicative Delivery 
Ongoing
Co-ordination 
Scottish Water along with Land and Property Owners
Funding 
Capital/ Revenue plus any available external funding
Current Status:
Argyll and Bute Council:
1. Maintenance and improvements works carried out at Lochavullin Car Park surface water pump system,
2. Larger projects in the SWMP are dependent on securing additional capital funding.
3. Recording of surface water flood events through public reporting using floodingenquiries@argyll-
bute.gov.uk to develop understanding of surface water flooding in Oban. 
2. LPD Wide Actions 
Cycle 2 (2022-28) LPD Wide Actions
2.1.1. LPD Wide Action: AWARENESS RAISING
General description
SEPA, the Responsible Authorities and other organisations such as the Scottish Flood Forum work together through national and
local initiatives to help communities understand the risk of flooding and what actions individuals can take. Improved awareness of
flood risk and actions that prepare individuals, homes and businesses for flooding can reduce the overall impact of flooding.
Local authorities will undertake additional awareness raising activities when developing any specific project proposals and will
engage with community resilience groups and local communities. 
Scottish Flood Forum support flood risk communities by raising community awareness, promoting self-help, developing community
groups and establish a recovery support programme after a flood.
Current Status – Argyll and Bute Council:
1. Argyll and Bute Council have promoted flood advice for property owners and landowners on our website
https://www.argyll-bute.gov.uk/transport-and-streets/flood-advice.  
2. In addition, we are now working with our Climate Change Officer and ABCAN to support communities in
carrying out area-based risk assessments and, where possible, implementing local mitigation measures.

Page 16

3. This work highlights the importance of embedding community resilience, particularly in areas where flood
risk has been identified 
2.1.2. LPD Wide Action: EMERGENCY PLANS
General description
Many organisations, including local authorities, the emergency services and SEPA provide an emergency response to flooding.
Emergency plans are prepared and maintained under the Civil Contingencies Act 2004 by Category 1 and 2 Responders and are
coordinated through regional and local resilience partnerships, often supported by voluntary organisations. They set out the steps
to be taken to maximise safety and minimise impacts during flooding. Emergency plans may also be prepared by individuals,
businesses, organisations or communities. Scottish Water is a Category 2 responder under the Civil Contingencies Act 2004 and
will support regional and local resilience partnerships as required 
Current Status – Argyll and Bute Council:
1. Argyll and Bute benefits from a highly effective and well-established Local Resilience Partnership, which
works collaboratively to ensure strong preparedness and coordinated responses to disruptive challenges. Its
capabilities are regularly tested and proven in real situations. We take reassurance in knowing that,
regardless of the cause of any incident, the consequences are effectively managed through this partnership
and the tactical response groups within the Council and HSCP. 
2.1.3. LPD Wide Action: FUTURE FLOOD RISK MANAGEMENT PLANNING 
General description
The years covered by the lifetime of this plan are crucial. Radical progress is needed in how we reduce our impact on the climate
and respond to the effects of climate change. How we plan to manage flooding to our communities is on the front line of the
challenges of this decade. The 2027 flood risk management plans will be more ambitious than ever before. The plans will look to
develop long term plans for more flood resilient communities prepared for the impacts of climate change. 
The priority areas which will be the focus points of the next flood risk management plans will be identified in 2024 with the
designation of PVAs. A 3-month public consultation will be held to inform the PVA designation. 
We will plan for a better future by publishing our flooding services strategy in 2023 with a clear and measurable delivery plan. We
will put greener, fairer communities at the heart of our ambitions. 
SEPA has set its own target to be a regenerative organisation by 2030 and the next set of plans will further this ambition.  
During this plan cycle, SEPA will work to develop new partnerships with a wider range of stakeholders, including businesses and
commercial sectors. We will investigate alternative sources of finance to tackle flooding and drive forward practical options for
adaptation. 
Current Status – Argyll and Bute Council:
1. Argyll and Bute Council and The Highland Council reaffirms their commitment to supporting SEPA in the
development of Flood Risk Management Plans. The Councils will work closely with communities through
consultation on the preparation of Local Flood Risk Management Plans during 2026 and 2027. 
2.1.4. LPD Wide Action: LAND USE PLANNING 
General description
Local authorities, SEPA and Scottish Water all have a responsibility under the Flood Risk Management (Scotland) Act 2009 to
support sustainable flood risk management through the land use planning process. National planning policies set out the Scottish
Ministers’ priorities for the development and use of land. Under this approach, new development in areas with medium to high
likelihood of flooding should generally be avoided. 
Current national planning policies aim to restrict development within the floodplain and limit exposure of new receptors to flood risk,
promote flood reduction via natural and structural flood management measures and restoration of natural features, and avoid
increased surface water flooding through sustainable drainage and the minimisation of impermeable surfaces. 
Locally determined planning policies place further requirements within their area of operation to restrict inappropriate development
and prevent unacceptable risk.
Current Status – Argyll and Bute Council:

Page 17

1. Argyll and Bute Council Flood Risk Management Team continue to work closely with the Local Development
Plan team and assess minor planning applications to ensure compliance with National Planning Framework 4
(NPF4) and to confirm that new developments do not increase flood risk to communities or existing
infrastructure. The Team also assist ABC Planning to ensure that Strategic Flood Risk Assessments address
known risks within Argyll and Bute. 
2.1.5. LPD Wide Action: MAINTENANCE
General description
Local authorities have a duty to assess bodies of water and to carry out clearance and repair works where such works would
substantially reduce flood risk.
Local authorities are also responsible for the drainage of roads. In addition, local authorities may also be responsible for
maintenance of any existing flood protection schemes or works.
Scottish Water will continue to undertake risk-based inspection, maintenance and repair on the public sewer network.
Asset owners and riparian landowners are responsible for the maintenance and management of their own assets including those
which help to reduce flood risk.
Current Status – Argyll and Bute Council:
1. Argyll and Bute Council are developing the WDM WebFRMS asset management system for recording the
assessment and clearing of relevant bodies of water. The system will allow the publication of a schedule of
clearance and repair works online. The WebFRMS system is being effectively built from the ground up of the
basic operating framework, rather than implementing any existing system and is therefore expected to be
significantly more aligned with Council requirements, but take longer to finalise.  Development of the system
is progressing well during 2025 and it is expected that a full implementation will be in place by early 2026. 
2.1.6. LPD Wide Action: SCOTTISH FLOOD DEFENCE ASSET DATABASE
General description
The Scottish Flood Defence Asset Database provides information on existing flood protection schemes. National data on flood
protection infrastructure is needed to understand flood risk and to develop adaptation planning for Scotland. SEPA will continue to
host SFDAD and look for opportunities to support the development of our understanding of how and when Scotland’s flood defence
assets should be adapted to continue to maintain protection from flooding in the future.
Current Status – Argyll and Bute Council:
1. SFDAD is now closed.  SEPA is working on a national project, funded by the Scottish Government, to create
a comprehensive user driven foundational dataset for flood defence assets in Scotland. Infrastructure Design
will support this project by providing technical information we hold on existing Flood Protection Schemes
and other flood defence projects.
2. Argyll and Bute Council will store asset information on all flood protection and alleviation works in the
WebFRMS asset register.  The development of this new The WebFRMS system is being effectively built from
the ground up of the basic operating framework, rather than implementing any existing system and is
therefore expected to be significantly more aligned with Council requirements, but take longer to finalise. 
Development of the system is progressing well during 2025 and it is expected that a full implementation will
be in place by early 2026. 
2.1.7. LPD Wide Action: SELF HELP
General description
Everyone is responsible for protecting themselves and their property from flooding. People can take steps to reduce damage and
disruption to their homes and businesses should flooding happen. This includes preparing a flood plan and flood kit, installing
property flood resilience measures, signing up to Floodline, engaging with their local flood group, and ensuring that properties and
businesses are insured against flood damage. The following places offer help with taking steps to protect yourself:
https://www.floodre.co.uk/
Current Status – Argyll and Bute Council:

Page 18

1. Argyll and Bute Council continue to sign post communities and individuals to sources of help with respect to
improving property resilience through its Flood Advice webpage, answering public enquiries regarding flood
issues
2. The council works with the Scottish Flood Forum. It encourages those affected by flooding to contact the
SFF and utilise their expertise.
3. Oban PVA – Argyll and Bute Council relevant Sections in the Flood Risk Management (Scotland) Act 2009
(The Act) 
Section 17 -Local authorities to prepare maps of bodies of water 
Infrastructure Design will carry out the duty to develop a mapping layer using our WDM WebFRMS asset
management system. This layer will identify relevant bodies of water such as burns, surface water drains, diches and
SuDS within the Oban PVA  
Section 18 - Local authorities to assess bodies of water
Infrastructure Design 
• Have carried out an inspection of the Black Lynn Burn and its tributaries to inform a waterbody assessment, 
• Have consulted with SEPA on the necessary consents required for any scheduled clearance and/or repair
works
• Will schedule clearance of foreign bodies from waterbodies in the Oban PVA based on flood risk and
available resources.
• Have carried out hydrological modelling to ascertain whether dredging would substantially reduce the risk of
flooding.  The modelling informed that it would not, and therefore no dredging is scheduled for waterbodies
in the Oban PVA.
• Carry out assessments to other relevant bodies of water in the Oban PVA
• Using our WDM WebFRMS asset management system and, based on flood risk, will publish a schedule of
clearance and repair
Sections 56-58 – General Powers to manage flood risk
Argyll and Bute Council will continue to use these permissive powers to manage flood risk in the Oban PVA depending on
availability of resources.     
Section 59 - Duty to carry out clearance and repair works:
Infrastructure Design will continue carrying out clearance and repair works based on the assessed flood risk from the
relevant bodies of waterterbody, dependent on the assessed flood risk and availability of resources