11. Housing Asset and Investment Programme 2024-25 Update

Renfrewshire Council · 13 May 2025
Back to Communities and Housing Policy Board — 13 May 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

___________________________________________________________________
To: Communities and Housing Policy Board
On: 13 May 2025
___________________________________________________________________
Report by: Director of Environment, Housing, and Infrastructure
___________________________________________________________________
Heading: Housing Asset and Investment Programme 2024/25 Update
___________________________________________________________________
1. Summary 
1.1 The Housing Revenue Account (HRA) Capital Investment Plan is approved
each year by the Council and sets out a range of investment programmes for
our housing assets. 
1.2 Renfrewshire Council’s Housing Asset and Investment Team is responsible for
the implementation and management of the Housing Asset Management
Strategy and the delivery of housing capital investment projects throughout
Renfrewshire. 
1.3 In April 2024 a Housing Asset and Investment Programme Board was
established to provide strategic oversight, governance and scrutiny, ensuring
programme objectives align with corporate initiatives and housing investment
works comply with the relevant legislative and regulatory standards for social
housing. 
1.4 The policy board are provided with regular updates on the capital investment
programme in the service update reports throughout the course of the year.
This report is the first annual report which provides an overview of the projects
delivered within the housing asset and investment programme in 2024/25 and
also provides information around the governance structure in place with
regards to officer membership and reporting methods for the Programme
Board. 
1.5 The report also outlines the plans for the 2025/26 investment programme. 
1.6 Appendix A provides some photos of completed works.

Page 2

___________________________________________________________________
2. Recommendations 
It is recommended that the Communities and Housing Policy Board: 
2.1  Notes the progress made in the housing asset and investment programme
2024/2025. 
2.2 Notes the establishment of the Housing Asset and Investment Programme
Board and the associated governance structure that has been put in place. 
2.3     Notes the proposed plans for the 2025/26 housing asset and investment
programme.
___________________________________________________________________
3.   Background Programme Governance 
3.1     The HRA Capital Investment Plan is approved by the Council each year as part
of the annual budget and rent level setting process. Significant amounts of
expenditure are set out within the capital plan, both for new build housing and
investment in existing housing stock. 
3.2  Financial monitoring of the capital plan is reported to the policy board
throughout the year and the board also receives an annual update on the
Housing-Led Regeneration and Renewal Programme, as well as regular
updates within the service update report throughout the year. 
3.3 It was recognised that the significant level of investment in our existing housing
stock, which has increased in recent years, and which will continue at similar
high levels in the future, required a governance and reporting structure similar
to that which was already in place for the Regeneration and Renewal
programme. 
4. Housing Asset and Investment Programme Governance 
4.1 Renfrewshire Council’s Housing Asset and Investment Programme Board was
established in April 2024 to oversee the performance and delivery of the
Housing Asset Management Strategy and investment projects within the
Housing Revenue Account (HRA) capital investment portfolio. Although still in
its early stages, the board provides a central governance structure to guide
investment decisions and monitor programme delivery. As it matures, the
programme board will take on an expanded remit to incorporate other aspects
of the Housing Capital Programme. 
4.2   A structured framework has been established that defines decision making
authority, accountability and oversight of the Housing Asset and Investment
Programme chaired by the Director of Environment, Housing and Infrastructure
and comprising of Chief Officers and Senior Officers. Clear roles and
responsibilities are assigned across the project team and regular governance
reviews, risk management and performance monitoring are embedded within
each project.

Page 3

It should be recognised that the Housing Asset and Investment Team are also
responsible for the delivery of regeneration projects in existing housing stock
within the designated regeneration areas, and these are governed by the
Regeneration and Renewal Programme Board. 
4.3 The governance structure incorporates thematic groups, bringing together
representatives from various council departments, serving as a collaborative
forum designed to facilitate and promote discussion. The housing asset
management thematic group’s primary role is to ensure that all relevant
perspectives, expertise, and resources are considered in the planning and
implementation of improvements A mixed tenure block thematic group was
established by the Housing-led Regeneration and Renewal Programme Board
and due to the shared interest in this area, it is now a joint thematic group. 
4.4    There are currently three key housing investment programme workstreams which
are reviewed by the programme board: 
 External Housing Investment 
 Internal Housing Investment 
 Investment in High-Rise Blocks 
4.5     This annual report presents an overview of the progress and performance of the
Housing Asset and Investment Programme for 2024/25 and an outline of the
plans for the 2025/26.

Page 4

The programme continues to focus on enhancing the external fabric of
properties, improving energy efficiency and extending the lifespan of
Renfrewshire Council’s homes, in addition to ensuring internal components are
modernised and continue to meet regulatory standards. Appendix 1 of this
report contains photographs of some examples of works which have been
completed over the course of the last year. 
5.     2024/25 Housing Investment Programme Progress Summary: 
5.1  The HRA Budget and Rent Level paper approved by the Council on 29th Feb
2024 set out the following targets for housing investment in 2024/25. 
 External Fabric Upgrade      700 properties
 Kitchen, bathroom & rewiring replacement  220 properties
 Heating Renewals       300 properties 
5.2     External Housing Investment 
The external housing investment programme continues to focus on improving
energy efficiency across Renfrewshire homes with the installation of External
Wall Insulation (EWI) that reduces heat loss and lower carbon emissions,
contributing to the national Net-Zero ambitions set out by the Scottish
Government. Properties within Renfrewshire have received EWI that aligns with
the Scottish Governments Energy Efficiency Standard for Social Housing
(EESSH) and Scottish Housing Quality Standard (SHQS) . 
This programme also involves essential works that may include all or some of
the following’ roof and gutter replacement, replacement rendering, solar PV, loft
insulation and common windows and doors. 
ECD Architects were appointed in May 2022 as a multi-disciplinary design team
responsible for the design and specification of retrofit and regeneration works
for the Housing Asset and Investment Programme. They have responsibility for
submitting building warrant applications to ensure that work specifications and
drawings meet required building standards. 
From April 2024 to March 2025, the external investment, retrofit works
programme has successfully delivered the work elements in the below number
of properties across Renfrewshire.

Page 5

Main Works – Retrofit Programme 24/25
Upgrade
Element
Johnstone &
Villages
Paisley  Renfrew
Council Owner Council Owner Council Owner
External Wall
Standard Render
6 6 3 1 6 2
Cavity Wall
InsulaƟon (CWI) &
Solar PV    
9 
External Wall
InsulaƟon (EWI)
Only
44 12 3 7  
EWI full envelope &
chimney removal
20 14    
EWI full envelope &
chimney render
33 31 14 10 8 6
EWI full envelope &
chimney render,
Including Common
Windows and Doors
1 1 4 4  
EWI full envelope &
chimney render, PV,
Including Common
Windows and Doors  
2 2  
EWI Full envelope,
PV & chimney
removal
17  2 8 1 
EWI Full envelope,
PV & chimney
removal, Including
Common Windows
and Doors 
22 2 8  28 
EWI Full Envelope,
PV & chimney
render
3 1    
EWI full envelope,
PV & Including
Common Windows
and Doors 
2 2    
EWI Full envelope,
PV & Comm
windows, stair wall
removal and rebuild 
8   
Roof Only      1 3
Total: 146 69 50 25 52 11 
Total Council Properties Benefited from Upgrades 248
Total Owner Properties Benefited from Upgrades 105
Total Benefited Properties 353

Page 6

A separate programme of investment was also delivered to properties which
required a reduced number of external fabric measures including the
installation of windows, Solar PV and loft insulation. From April 2024 to March
2025, the external windows, solar PV and loft insulation programme has
successfully completed various combinations of the following elements in the
properties listed below. 
Window Replacement/Solar PV/Loft Insulation Programme 24/25 
Investment Area Upgrade
Element:
Windows
Upgrade
Element:
Loft Insulation
Upgrade
Element:
Solar PV
Johnstone & Villages 211 120 235
Paisley North 21 1 7
Gallowhill 33 4 18
Paisley South 181 35 86
Renfrew 19 15 21
Total: 465 175 367 
Total upgrades complete:  1007
Total No of Properties Benefited from Upgrades 568  
5.3    Internal Housing Investment 
Internal investment in Renfrewshire’s housing stock includes the replacement
of kitchens, bathrooms, heating systems and electrical rewiring where required. 
Kitchen, bathroom, heating replacements and rewires have been carried out
by Building Services and external appointed contractors on a reactive basis
through the void works programme and other adhoc reactive works including
as a result of fire damage, rotworks or heating failures. 
The numbers carried out in 2024/25 through these work programmes are
noted below: 
Upgrade Element: No of Upgrades:
Kitchens 174
Bathrooms 104
Rewires 91
Gas Boiler only 64
Full GCH systems 249  
Total upgrades complete: 682
Total Properties Benefited from Upgrades 449

Page 7

In addition to this, Bell Group UK were appointed for one year in October 2024
to undertake internal housing investment works with property survey activities
commencing in November 2024 and running concurrently with installs which
started in January 2025. This project is anticipated to complete in September
2025 consisting of 179 new kitchens; 107 new bathrooms; 80 electrical rewire
and 20 boiler replacements. 
Whilst this contact is in the early stages, there has been positive progress with
76 property surveys carried out and 18 properties completed to date. 
A small number of pilot projects for air source heat pumps have also been
carried out with 3 installed in 2024/25. 
5.4 Contractor Performance 
The Housing Asset and Investment Programme Board recognise the need for
effective management of contractors involved in the programme’s delivery.
Each contract is managed by the Housing Asset & Investment Team in
conjunction with procurement and performance is reported to the Project
Board. The inclusion of key performance indicators enables the assessment
of contractor performance against clearly defined standards, ensuring works
are delivered on time, within budget and to the expected quality. Community
benefits are also monitored to ensure social value and support economic
growth within Renfrewshire including job creation job opportunities. Contractor
performance meetings are held quarterly, attended by senior officers and
contractor stakeholders to assess contractor performance. 
Tenant and resident satisfaction is a key measure in determining the success
of the external programme. The project team are committed to a resident
focussed approach, collaborating with tenants and owners in identifying
potential areas of improvement and encouraging feedback on contractor
performance. This is conducted through dedicated Liaison Officer resources
within the housing investment team. Regular on-site visits by Clerk of Works
and Liaison Officer staff ensure that residents are fully informed, supported
and engaged throughout the duration of the improvement works. 
From April 2024 to March 2025, levels of tenant satisfaction associated with
the external improvement works carried out by the MP Group continue to be
high with a cumulative 92% overall satisfaction score. 
6. 2025/26 Housing Investment Programme 
6.1     External Investment Programme
MP Group UK Limited were appointed in July 2022 to support the delivery of
the external programme and are now entering the final year of their contract.
Officers are currently working with procurement colleagues to consider the best
method of procuring contractors for future programmes of work to ensure
continuity of programme delivery and to take account of the scale of work which
is planned for the coming years.

Page 8

The external investment programme will continue in 2025/26 with a target of
500 properties for improvements. Some of these improvements will be in the
housing-led regeneration areas. 
The Housing Asset and Investment Team are responsible for the delivery of
housing investment works across the entire housing estate including within the
£100m ten-year housing-led regeneration and renewal programme. 
Within the eight regeneration areas across Paisley, Renfrew and Johnstone,
improvement works to council and owner occupier homes are in various stages
of progress. Design works have been completed for the majority of projects and
works have commenced in Auchentorlie and Seedhill areas.  A more detailed
report of progress will be included in the housing-led regeneration and renewal
annual report due in August this year. 
A programme of window replacement to council housing will also commence in
the regeneration areas during 2025/26. 
6.2     Internal Investment Programme 
The internal investment programme will continue in 2025/26 with the following
targets: 
 Kitchen, bathroom and rewiring – 600 properties
 Heating Renewals – 750 properties 
Delivery of the internal housing investment programme will be a combination of
in-house and contractor support, with Building Services delivering 720 boiler
replacements and 360 kitchen installations annually. This work is due to
commence in quarter 2 of 2025. 
Additional tenders are in preparation, one to appoint a contractor to deliver a
further 3000 kitchens, bathroom, rewire installations and the other to deliver a
further 3400 full heating installs and 1200 boiler installs by 2030.  
6.3     Installation of Ground Source Heat Pumps 
Funding has been confirmed from Scotland's Heat Network Fund (SHNF) in
April 2024 to support the removal of gas from the blocks at Gallowhill and
Glencairn Court and replace this with a ground source heating system. 
This project will commence in 2025 and is expected to take 12 months to   
complete. It is anticipated that engagement with tenants in this block will
commence in May 2025. 
6.4     Multi-storey Retrofit Project 
Renfrewshire Council has fourteen high rise blocks. A review of the
repairs/maintenance and improvements required at these blocks is currently
underway.

Page 9

The asset management thematic group is established and is currently
focussed on agreeing the specification of works required to these blocks both
internally and externally. Elements to be considered for maintenance or
replacement are windows, external cladding, roofing, electrical installations
and fire compliance elements as well as communal area improvements. 
The approved HRA budget includes an allowance of £28.5m for investment in
high rise properties and the thematic group will review the investment
requirements for each of the blocks.   Work is underway with procurement
colleagues to seek to appoint an experienced contractor to progress works at
these multi storey blocks during 2026. 
7. Housing Asset Management Strategy 
7.1     The Housing Asset Management Strategy is currently being reviewed and will
be brought to a future meeting of this board in due course.   
7.2      This will set out an effective strategy for managing housing assets, the
strategy will ensure that decisions relating to management and investment in
the housing stock are based on sound principles which take account of stock
condition, sustainability and value for money. 
7.3  The Housing Asset Management Strategy will have an associated action plan
which will be monitored, and updates reported within future annual Housing
and Asset Investment reports to Board. 
__________________________________________________________________
Implications of the Report 
1. Financial – Costs are met from HRA capital budget. 
2. HR & Organisational Development – None. 
3. Community/Council Planning – 
 Our Renfrewshire is safe – ensuring tenants have a safe place to live. To
manage risk to for staff, contractors or members of the public within
council housing properties. 
4. Legal – None. 
5. Property/Assets – Ensuring assets are modernised and meet legislative and
regulatory standards. 
6. Information Technology – None. 
7. Equality & Human Rights 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights.

Page 10

No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report.  If required following
implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website. 
8. Health & Safety – None. 
9. Procurement – None. 
10. Risk -  Risk is monitored at project and programme board level.   
11. Privacy Impact – None. 
12. COSLA Policy Position – None. 
13. Climate Risk – None. 
14. Children’s Rights – None.
___________________________________________________________________
List of Background Papers 
None.
___________________________________________________________________
Author:        Karen Sillars, Housing Asset & Investment Manager
Email: karen.sillars@renfrewshire.gov.uk

Page 11

Housing Asset and
Investment Programme :
External & Internal Completions
Gallery Sample 2025

Page 12

Before and after of External Wall Insulation
(Full envelope) and Solar PV  -House Upgrade.
Before
Before
After After

Page 13

Before and after of External Wall Insulation
(Full envelope) Solar PV and Chimney
Removal –Block Upgrade.
Before
After
Before
After

Page 14

Before and after of External Wall
Insulation (Full envelope) and
Chimney Render
Block Upgrade. Finished example of External Wall Insulation (Full
envelope) Solar PV, and Chimney  -Block Upgrade.Before
After
Before and after of External Wall Insulation (Full envelope) Solar
PV, and Chimney -Block Upgrade.
Before
After

Page 15

Before and after of External Wall
Insulation (Full envelope) Solar PV and
Chimney Removal –Block Upgrade.
Before
After
Before
After

Page 16

Finished example of External Wall Insulation (Full envelope) Solar PV, Chimney Removal and
Windows replaced –House Upgrade.

Page 17