8. Housing Landlord Compliance – Bi-annual Performance Report

Renfrewshire Council · 13 May 2025
Back to Communities and Housing Policy Board — 13 May 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

___________________________________________________________________
To:  Communities and Housing Policy Board
On:  13 May 2025
___________________________________________________________________
Report by: Director of Environment, Housing, and Infrastructure
___________________________________________________________________
Heading: Housing Landlord Compliance – Bi-annual Performance Report
___________________________________________________________________
1. Summary 
1.1 All social landlords must ensure they meet all duties in relation to tenant and
resident safety and have an effective system in place to ensure compliance
with statutory, legislative and regulatory responsibilities. 
1.2 The Housing Landlord Compliance Strategy 2025-2028 was approved by the
Policy Board on 11th March 2025 and Section 7 of the strategy provided
details of the internal governance arrangements for performance
management, which includes a bi-annual report to be presented to the
Communities and Housing Policy Board. 
1.3 This report is the first bi-annual performance report for the twelve-month
period from April 2024 to March 2025.
___________________________________________________________________
2. Recommendations 
It is recommended that the Communities and Housing Policy Board: 
2.1 Notes the content of the Landlord Compliance Performance Report and the
suite of Key Performance Indicators (KPIs) at Appendix 1 of the report.

Page 2

_________________________________________________________
3. Background 
3.1 The Housing Landlord Compliance Strategy 2025-2028, which sets out the
strategic approach to compliance across the six key areas of compliance
relating to Council Housing assets (gas safety, electrical safety, fire safety, lift
safety, asbestos management and water safety) was approved by the
Communities and Housing Policy Board on 11th March 2025. 
3.2 There are six landlord compliance policies in place to support the Housing
Landlord Compliance Strategy, each with a suite of key performance
indicators and detailed performance reporting arrangements which include a
bi-annual report to the Communities and Housing Policy Board.  Each of the
policies is reviewed on a regular basis and further policies will be created for
any new areas of compliance regulation that are introduced.   
3.3 Following a review of housing compliance which was undertaken by Savills
consultancy in 2020/21, it was recommended that a dedicated compliance
team be established within Housing Services. Prior to this team being created,
responsibility for housing compliance was complex, with various services
across the Council having different elements of responsibility. The housing
compliance team structure was developed and the majority of posts filled
during 2023/24. The Statutory Compliance Data Officer post is vacant and
expected to be filled in 2025. The structure of the team is set out below: 
3.4  Staying informed about changes in legislation or regulations in relation to
housing compliance is essential and this is achieved through subscribing to
industry newsletters, participating in training sessions and workshops,
engaging with other local authorities and utilizing online resources that provide
updates on legislation and best practice.

Page 3

Renfrewshire Council joined the Social Housing Safety Network (Scotland) in
November 2023 which, as an organisation dedicated to tenant and resident
safety in Scotland, provides a forum for keeping members updated and aware
of changes to legislation, regulations or regulator requirements with the
opportunity to share resources and knowledge. The housing compliance team
also actively engage with the Council’s Health and Safety Team and
participate in corporate compliance related working groups.   
3.5 Data management is a key aspect of the statutory compliance team and due
to the multiple systems in place for recording information and a reliance on
manual record keeping for some data, it is essential that robust audit
arrangements are in place.  The Housing Innovations Project (HIP) to replace
the housing management system is expected to significantly enhance and
assist the data management for compliance with this phase of the system
anticipated to go live in mid-2027. The compliance team carry out their own
audits on data and are seeking to engage external agencies to carry out
further audit checks. 
4. Housing Landlord Compliance Performance Report 
4.1 The first bi-annual housing Landlord Compliance Performance Report
2024/25 is set out in Appendix 1 of this report. 
There are 26 key performance indicators covering the six compliance areas. 
23 indicators showing greater than 85% compliance. Of these 18 (69%) are
indicating greater than 99% compliance. 5 we have designated as amber
status showing compliance between 85-98% compliance and 3 (12%)
designated as a red status indicating a compliance level lower than 85%. 
All compliance indicators rated amber or red have actions in place for
improvement.  The 3 indicators with red status are:
 Common area Electrical Installation Condition Report (EICR)
 Re-inspections of common areas with asbestos containing materials 
 Actions outstanding from notices received from Scottish Fire and
Rescue Services 
These areas are prioritised for improvement during 2025/26 with actions
already underway to achieve full compliance which are set out in each of the
relevant paragraphs below in section 4.2. 
All indicators will be continually reviewed and it is expected that additional
indicators will be added in line with recommended practice. 
4.2 The key points to note for each area of compliance are as follows: 
 Gas Safety 
The Council are required to carry out annual gas safety inspections on all
10469 residential properties that have a gas supply.

Page 4

Within 2024/25 there were 5 properties where the gas service was not
completed within the 12-month timescale. All five are now complete. Instances
where services are not complete within the 12-month timescale are always
investigated to determine the reason and assess whether any lessons can be
learned to prevent similar cases re-occurring. 
All communal heating systems with gas boilers have had their annual safety
checks completed within timescale. 
 Electrical Safety  
The focus of attention in the past year has been to continue with the
programme of domestic electrical checks (EICRs) that became overdue as a
result of the change from a 10-year cycle to a 5-year cycle and to ensure that
any checks due in 2024/25 were carried out prior to the anniversary date. 
2911 EICRs were completed during 2024/25 and there were 252 tenanted
properties with EICRs overdue at 31st March, all of which are scheduled to be
carried out in April. Following this, there may be a small number of cases
which will require forced access which will be arranged in May, in line with our
usual procedures. 
There are currently 44 cases which cannot be completed due to
environmental issues, for example in cases where significant hoarding has
been identified.  The compliance team are engaging with colleagues across
housing services and other service areas to support tenants to ensure the
EICR can be completed as quickly as possible. 
Any follow on work identified during the inspection which is classed as
C1(danger present) is always addressed immediately to make safe. Where
follow on work is identified and classed as C2 (potentially dangerous), in the
majority of cases this is carried out at the same appointment as the electrical
check with just a small number that require a new appointment to be
arranged. There were two properties with outstanding C2 work at the end of
March requiring additional appointments. 
The housing compliance team have developed robust record keeping systems
to ensure that data and monitoring is accurate and this will be further
improved with the introduction of the new housing management system in
2027. 
With the position for domestic electrical checks having improved significantly,
it was possible to commit resources to commencing a programme of common
area electrical checks.  This programme started in November 2024 and at the
end of March approximately 21% of the 953 common areas had been
completed.  The remainder are programmed for completion over the course of
2025/26 to ensure full compliance with this indicator by March 2026.

Page 5

 Fire Safety 
Fire Risk Assessments (FRAs) are required for multi-storeys, sheltered
complexes, HMOs and common areas of flatted blocks.  All FRAs are in
place, apart from 2 Homeless Person Units which have appointments
arranged. Ongoing review will continue in line with the legislative
requirements and any actions identified from fire risk assessments are
followed up promptly with repairs instructed where required.  
Ongoing review will continue with some requiring 6 monthly review and others
12 monthly.  Where actions are identified from FRAs, these are followed up
promptly with repairs instructed where required.   
In addition to the internal FRAs, Scottish Fire and Rescue Service aim to carry
out quarterly inspections of all high-rise blocks providing us with any
notifications of defects for consideration.  There were 7 defects outstanding at
the end of March all of which have been instructed for repair and will be
completed to ensure full compliance.   
Along with the EICR programme, the rollout of the fire safety detection
interlinked alarms in domestic properties has been ongoing with only those
with outstanding EICRs still to be completed.  Robust processes have been
introduced to ensure that these are checked during the annual gas service
and that expiry dates are updated to enable future replacement programmes
to be programmed. 
The Head of Housing Services chairs a quarterly meeting with Strathclyde
Fire and Rescue Service and other Council teams to discuss fire safety.  The
compliance team are currently reviewing the Grenfell recommendations from
the UK Government’s response to the Grenfell Tower Inquiry published in
February 2025 to consider any actions that may be required. 
There are major capital investment works planned within the multi storey
blocks over the next five years, which will include considering what, if any,
further fire safety measures should be introduced. A cross departmental
thematic group is being established to consider and prioritise the future
investment requirements. 
The compliance team have assisted in developing a fire safety ILearn module
for staff which has been rolled out across the Council.  They also deliver fire
safety training to staff across Housing Services. 
 Lift Safety 
All lifts within multi storeys have recently been upgraded. The compliance
team have been pro-active in ensuring that access is ensured for all
regulatory lift examinations carried out by our appointed insurance contractor.
Examinations and maintenance are ongoing, up to date and fully compliant.

Page 6

 Water Safety 
Statutory legislation requires Legionella Risk Assessments (LRAs) to be in
place with water safety management plans and monitoring in place for those
identified as high risk.  This includes carrying out temperature checks where
communal water tanks or heating cylinders are present such as in sheltered
complexes and multi-storeys. 
Responsibility for management of water safety responsibilities was transferred
from Facilities Management Services to Housing Services in April 2025.
Current performance indicators show full compliance with water safety
management and a review of the data held on remedial works will be
undertaken.   
There is a contract in place for water sampling and LRAs. Building Services
carry out the monthly, quarterly, six-monthly and annual monitoring of all sites
as prescribed within the guidance. 
The water safety policy is undergoing review and will be brought to a future
Policy Board. 
 Asbestos Management 
Landlords managing common areas have a responsibility to ensure there are
comprehensive surveys, routine monitoring, safe management practices and
good record keeping to comply with UK asbestos regulations. Surveys are in
place for common areas and where asbestos has been identified and is in
good condition or encapsulated routine checks must be carried out.  A
contract for common area asbestos management is in the process of being
procured which will engage a suitably qualified contractor to carry out the
common area asbestos monitoring. To mitigate any risks whilst this contract is
procured, Housing Services have ensured that common areas known to have
asbestos containing materials have been visited and checked to ensure
appropriate measures are in place to maintain safety such as restricting
access and labelling.   
For domestic properties Housing Services have contracts in place with
specialist and suitably qualified contractors for the provision of asbestos
surveying, asbestos removal and analytical services within domestic
properties. 
Properties due to have internal or external investment works and all void
properties that do not have an existing suitable refurbishment survey have a
survey arranged prior to works commencing. The surveys are held on a
database accessible to all staff that require them. Asbestos removals are
arranged where required and survey data updated accordingly.

Page 7

The Housing Innovations Project (HIP) to replace the housing management
ICT system will incorporate a new asbestos management database which will
assist in streamlining the internal asbestos processes and it is anticipated this
will be available mid-2027.  In advance of this, an action plan is in
development to identify where there may be scope for improvements in
relation to asbestos management. 
Housing Services participate in a corporate Health and Safety-led asbestos
working group which oversees the Council’s approach to asbestos to ensure
consistency and good practice. 
The housing compliance team have assisted in developing a corporate online
ILearn course for staff on asbestos awareness. There is an ongoing training
programme to ensure that staff who are likely in the course of their duties to
encounter asbestos, or who may have responsibility for managing it, are
appropriately trained.   
The asbestos safety policy is undergoing review and will be brought to a
future Policy Board. 
5. 2025/26 Key Actions 
5.1 The Scottish Housing Regulator engagement plan for 2024/25 required us to
provide regular updates on progress with domestic EICRs and fire detection. 
We have provided this monthly and have met with representatives from the
Scottish Housing Regulator to discuss progress.   
5.2 The 2025/26 Scottish Housing Regulator engagement plan notes that in October
2024 in our annual assurance statement that we said were taking steps to review
and consolidate our tenant and resident safety responsibilities. In addition to
further updates on EICR and fire detection compliance, the Regulator is seeking
further information and assurance about our asbestos management processes
and planned improvements. Further information will be provided to the Regulator
during 2025/26 in line with their requirements. 
5.3 Key priority actions for landlord compliance during 2025/26 include: 
 The Water Safety and Asbestos Safety Policies will be brought to a future
Policy Board in 2025. 
 Procurement of suitably qualified contractor for common area asbestos
management. 
 Completion of all common areas electrical checks 
 Establishment of an asbestos management action plan. 
 Completion of the outstanding EICR and smoke detection installations.

Page 8

 Ongoing engagement with the HIP team to ensure the new ICT system
reflects the requirement for more electronic record keeping linked to each
property 
 Review of the Grenfell recommendations and participation in the Housing
Asset and Investment Thematic group reviewing multi-storey investment. 
 Ongoing review of policies, procedures and processes including the
identification of new policy requirements such as a Damp and Mould
policy which will be developed in 2025. 
___________________________________________________________________
Implications of the Report 
1. Financial – Compliance costs are met from the HRA budget. 
2. HR & Organisational Development – None. 
3. Community/Council Planning –  
 Our Renfrewshire is safe – ensuring tenants have a safe place to live. To
manage risk to for staff, contractors or members of the public within council
housing properties. 
4. Legal – None. 
5. Property/Assets - Ensuring assets are protected from risk.   
6. Information Technology - None. 
7. Equality & Human Rights - 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report.  If required following implementation, the actual
impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be
published on the Council’s website. 
8. Health & Safety - The strategy and policies align with the Council’s Corporate
Health and Safety Policy. 
9. Procurement – None.  
10. Risk -  Failing to meet KPIs could put the Council at risk of failing to comply
with statutory duties for landlord compliance and could be reputationally
damaging. 
11. Privacy Impact – None.

Page 9

12. Climate Risk – None. 
13. Children’s Rights – None. 
14. COSLA Policy Position – None.
_____________________________________________________
List of Background Papers 
(a)  Appendix A – Housing Landlord Compliance Performance Report 2024/25 
___________________________________________________________________ 
Author:        Karen Sillars, Housing Asset & Investment Manager
Email: karen.sillars@renfrewshire.gov.uk

Page 10

P a g e | 1 
Performance Monitoring Report 
Housing Landlord Compliance 
2024/25

Page 11

P a g e | 2
Contents
1. Position summary at year end 2024 - 2025. ........................................................................................................................................................................... 3
2. GAS .......................................................................................................................................................................................................................................... 4
3.      ELECTRICAL .............................................................................................................................................................................................................................. 5
4. ASBESTOS ................................................................................................................................................................................................................................ 7
5. FIRE .......................................................................................................................................................................................................................................... 8
6. WATER ..................................................................................................................................................................................................................................... 9
7. LIFTS ...................................................................................................................................................................................................................................... 10

Page 12

P a g e | 3 
1. Position summary at year end 2024 - 2025. 
Category
Total
Number
of KPI’s
Gas 3 3 0 0
Electrical 8 5 2 1
Asbestos 3 1 0 1
Fire 4 1 2 1
Water 4 4 0 0
Lifts 5 4 1 0 
26 18 5 3 
>99% Pass rate
85-99% Pass rate
<85% Pass rate

Page 13

P a g e | 4
2. GAS 
Cat Indicator Q1 Q2 Q3 Q4 24/25      23/24 Notes
KPI
G.01
Number of times in current reporting year
Housing failed to meet statutory obligation to
complete a Gas Safety Check within 12
months of a gas appliance being fitted or last
checked 
(Charter Indicator 11)
1 0 1 3 5 11 Q1 Decant Property
Q3 Police Crime Scene
Q4 Dog behind door
Q4 Barricaded door to
prevent access.
Q4 Eng attended
wrong property         
KPI
G.02
Landlord’s Gas Installations with a valid
LGSR (CP12) within its due date in the last 12
months as a % of Total Landlord Requirement 
99.9%  99.9%  99.9%  99.9%  99.9% 99.9% 
KPI
G.03
Number of Communal / District Boilers with
valid certification as a % of Total Landlord
Requirement 
100% 100% 100% 100% 100% 100%

Page 14

P a g e | 5
3.     ELECTRICAL 
Indicator Q1 Q2 Q3 Q4 24/25 23/24 Notes
KPI
E.01
Domestic properties with a satisfactory EICR
within its due date as % of total dwellings
requiring an EICR.(Electrical Installation
Condition Report)
80%  80%  89%  94%  94% 82%  Of those outstanding,
3% are due for
demolition, 2% are
tenanted properties
and 1% are void
properties.  All
tenanted properties
due for completion by
end of May. All void
properties will have
EICR carried out
during the void period. 
KPI
E.02
Non-domestic properties (including Common
Areas) with a satisfactory EICR within its due
date as % of total non-dwellings requiring an
EICR
- -  4% 21% 21% 0% Programme
commenced in
November 2024 and is
scheduled for
completion by March
2026.         
KPI
E.03
Percentage of domestic properties with No
outstanding C1, C2, F1 works. 
99.9% 99.9% - Data only available
from Quarter 4. 
2 properties have
outstanding C2s.         
KPI
E.04
Percentage of non-domestic properties with
no outstanding C1, C2, F1 works 
100%  100%  100%  100%  100%  95%  Sheltered Housing,
High Rise and
Laundrettes.

Page 15

P a g e | 6
Indicator Q1 Q2 Q3 Q4 24/25 23/24 Notes
KPI
E.05
Percentage of Sites with Portable Appliance
Tests (PAT) completed.
100% 100% 100% 100% 100%  100%  Covers Housing
owned appliances in
Sheltered Housing &
High Rise.         
KPI
E.06
Percentage of properties with Lightning
Protection Systems (LPS) inspected and
tested.
100% 100% 100% 100% 100%  100% 
KPI
E.07
Percentage of properties with automated
doors, gates, and barriers with a valid Risk
Assessment.
100% 100% 100% 100% 100%  82.14%  FRA takes account of
equipment         
KPI
E.08
Percentage of properties with automated
doors, gates, and barriers where Maintenance
visits have been completed.
96%  96%  96%  96%  96%  96%  One domestic property
outstanding – tenant
engagement ongoing.

Page 16

P a g e | 7
4. ASBESTOS 
Cat Indicator Q1 Q2 Q3 Q4 24/25 23/24 Notes
KPI
A.01
Non-Dwellings (common areas) with a valid
asbestos survey and re-inspections of all Asbestos
Containing Materials (ACMs) where required, within
its due date as a % of non-dwellings requiring one. 
75%  75%  75%  75%  75%  72% Common area surveys
have been undertaken
and are in place for all
sites.  
Re-inspections are
required for some sites
and will be undertaken on
appointment of a suitably
qualified contractor.         
KPI
A.02
Number of safety occurrences - including any 
reported asbestos related occurrence reporting
(e.g., to the HSE or Regulator) during the reporting
period. 
0 0  0  0  0  0

Page 17

P a g e | 8
5. FIRE 
Cat Indicator Q1 Q2 Q3 Q4 24/25 23/24 
KPI
F.01
% Of Properties with a Completed and In Date
Fire Risk Assessment (FRA) where required. 
99%  99%  99%  99%  99%  100%
All High flats, Sheltered,
and common areas for
all blocks are completed
and reviews ongoing.
Access being arranged
for 2 outstanding
Homeless Person units.         
KPI
F.02
Total No. of Fire Risk Assessment Actions
Outstanding
2 2 9 15 15 
(94%)
252  258 repair actions were
identified through the fire
risk assessments during
2024/25. Of these 243
are complete with 15 still
in progress.         
KPI
F.03
% of Buildings with Fire Safety
Systems/Equipment present where all
Systems/Equipment has been Tested/Maintained
in accordance with Policy
100% 100% 100% 100% 100%  All fire safety equipment
tested by certified
appointed contractors.         
KPI
F.04
Number of Notices received from the Fire and
Rescue Services 
Actions outstanding.
3
1
20 
4
2
0
3
2
28 
7
10 75% of defects have
been rectified. Repairs
have been raised for the
remainder and are
targeted be completed
within the first quarter of
2025/26.

Page 18

P a g e | 9
6. WATER 
Cat Indicator Q1 Q2 Q3 Q4 24/25 23/24 
KPI
W.01
% of Priority Scheme Properties (against the
stated Total Landlord Requirement) with a valid
Legionella Risk Assessment 
100%
(41/41)
100%
(41/41)
100%
(41/41)
100%
(41/41)
100% 100% 
KPI
W.02
% of General Needs Properties (against the stated
Total Landlord Requirement) with a valid desktop
Risk Assessment.
100% 100% 100% 100% 100% 100% 
`KPI
W.03
% of Properties (against the stated Total Landlord
Requirement) with a valid Written Scheme where
a requirement has been identified.
100% 100% 100% 100% 100% 100% 
KPI
W.04
% of Properties (against the stated Total Landlord
Requirement) within a Legionella Maintenance
Regime 
100%
(41/41)
100%
(41/41)
100%
(41/41)
100%
(41/41)
100% 100%

Page 19

P a g e | 10
7. LIFTS 
Cat Indicator Q1 Q2 Q3 Q4 24/25 23/24 
KPI
L.01
Assets with a Passenger Lift having valid Thorough
Examination within its Due Date as a % of total assets
with a Passenger Lift
100%  100%  100%  100%  100% 100% 
KPI
L.02
Assets with a Passenger Lift where all Maintenance and
Inspection activity is within its Due Date as a % of total
assets where a Passenger Lift is present
100%  100%  100%  100%  100% 100% 
KPI
L.03
Assets with Vertical Through Floor Lifts having valid
Thorough Examination within its Due Date as a % of
total assets with other Lifts
100% 100% 100% 100% 100% 100% 
KPI
L.04
Assets with Vertical Through Floor Lifts where all
Maintenance and Inspection activity is within its Due
Date as a % of total assets where other Lifts are present
100% 100% 100% 100% 100%  100% 
KPI
L.05
Assets with Actions arising from Thorough
Examinations, Inspection or Maintenance activity that
are Overdue as a % of total assets where a Lift is
present
10% 33/34
97%
32/34
94%
32/34
94%
94%  20.5% Contractor
awaiting
materials to
complete
outstanding
actions