4. Environment, Housing and Infrastructure - 2025-2028 Service Improvement Plan

Renfrewshire Council · 13 May 2025
Back to Communities and Housing Policy Board — 13 May 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

___________________________________________________________________ 
To:   Communities and Housing Policy Board 
On:  13 May 2025 
___________________________________________________________________ 
Report by:  Director of Environment, Housing and Infrastructure 
___________________________________________________________________ 
Heading:  Environment, Housing and Infrastructure - 2025-2028 Service
Improvement Plan 
___________________________________________________________________ 
1. Summary    
1.1 The Service Improvement Plan for Environment, Housing and Infrastructure is a
three-year plan covering the period 2025-2028. The purpose of the Plan is to
identify the priorities being addressed, the key tasks to be implemented, the
implementation timetable and our measures of success.   
1.2 The Service Improvement Plan is part of a suite of documents which describe the
strategic direction for the Service and the Council, and also includes the Council
Plan, Community Plan, Risk Management Plan, and the Workforce Plan. 
1.3 The Service Improvement Plan is appended to this report and includes performance
indicators, and an action plan grouped under the Council Plan themes.  A mid-year
progress update on the Service Improvement Plan will be submitted to the
Communities and Housing Policy Board in the autumn of 2025.  
___________________________________________________________________ 
2. Recommendations 
It is recommended that the Communities and Housing Policy Board:   
2.1 Approves the attached Service Improvement Plan; and 
2.2 Notes that mid-year progress of this Service Improvement Plan will be reported to
this Board in the Autumn of 2025, with updates to the performance indicators and
action plan. 
___________________________________________________________________

Page 2

3. Background 
3.1 Environment, Housing, Infrastructure delivers a wide range of vital services to the
people, communities and businesses of Renfrewshire, including environmental
health services, trading standards and public protection. We manage 12,078
Council houses and support vulnerable people experiencing homelessness and
those threatened by homelessness. Our service has also played a critical role in
supporting the Council’s response to the asylum and refugee programmes over the
last three years.   
4. Service Improvement Plan 2025-2026:  What do we want to achieve? 
4.1 Council services continue to operate in a challenging context. The Council and
services remain ambitious for our people and our place, and the Service
Improvement Plan process ensures a clear focus on delivering our priorities.  The
Service Improvement Plans process allows us to describe where activity is targeted,
and through the 6-monthly updates described below, provide a balanced view on
progress. 
4.2 Our Service Improvement Plan sets out actions for the next three years, and in
2025/26 our particular areas of focus for those areas under the remit of the board
will be: 
• Continue to deliver the £400m housing investment including a £100m
Housing-led regeneration programme across 8 areas in Renfrewshire. 
• Invest in current housing stock to ensure that stock continues to meet SHQS
and other legislative or regulatory standards. 
• We will support and advice on the new Housing (Scotland) Bill which will be
introduced during 2025/2026 with new duties in relation to homeless
prevention, ‘ask and act’. 
• Develop and implement the range of measures in place to mitigate the
impacts from the increased homeless pressures, especially in relation to
changes in national migration and resettlement policies and programmes. 
• We will ensure the lessons learned from the independent assessment of
MyLA (My Life Ahead) are incorporated to the support provided to those
whose settled housing may be affected by drug/alcohol use. 
• Deliver repairs and maintenance to 12,078 Council housing properties,
including re-letting/void properties and produce a robust business plan that
looks at the short, medium and long term. 
• Support Council services to implement the proposed Protect Duty once it
becomes law. The proposed legislation will ensure parties are prepared,
ready to respond and know what to do in the event of a terrorist attack. 
• Further develop training and communications in which tenants can choose to
report Anti-Social Behaviour using the ASB App online reporting accessible
24 hours a day, 7 days a week.

Page 3

• Implement the NEC Housing Management System as part of the Housing
Innovations Project in 2 phases – which will incorporate Rents, Repairs,
Service Charges, Allocations, Tenancy Management, ASB, Customer
Relationship, Customer Services, Property Lifecycle, Servicing,
Homelessness and Support Services modules. 
• Complete the review of animal licence conditions across all licences. 
• Supporting the local economy towards Net Zero; ensuring proper and
informed consumer choice, both through effective advice and regulation. 
• Continue to support the Council's various refugee and asylum programmes
including the provision of settled accommodation. 
• Through workforce and succession planning, we will support our staff to
ensure they have the right skills to deliver our services now, and in the future.   
• Modernisation of business processes and more efficient use of management
data, steering the focus of service delivery. 
• Explore how modern technologies and innovations could improve service
delivery, such as the use of robotics.   
5. Monitoring progress 
5.1 Progress on the implementation of the Service Improvement Plan is regularly
monitored by the Senior Management Team and will be reported to the
Communities and Housing Policy Board on a six-monthly basis.  A mid-year review
of progress will be brought to this Board in Autumn 2025 and an annual outturn
report in Spring 2026.   
Implications of the Report 
1. Financial – Any financial elements referenced in this report will be progressed
through the Council’s financial & budget planning process.   
2. HR & Organisational Development – None. 
3. Community/Council Planning – Service Improvement Plans reflect the
contribution of each service to the Council and Community Plans. 
4. Legal – None. 
5. Property/Assets – None. 
6. Information Technology – None. 
7. Equality & Human Rights – The recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights.  No
negative impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations contained in
the report.

Page 4

If required following implementation, the actual impact of the recommendations and
the mitigating actions will be reviewed and monitored, and the results of the
assessment will be published on the Council’s website.   
8. Health & Safety – None.   
9. Procurement – None.   
10. Risk – None.   
11. Privacy Impact – None. 
12. Climate Risk – there are a range of actions and activities throughout the Service
Improvement Report which support the Council’s Plan for Net Zero.   
13. Children’s Rights – None. 
14. Cosla Policy Position – None. 
__________________________________________________________________
List of Background Papers: None.   
_______                                                __________________________________ 
Author:          Gordon McNeil, Director of Environment, Housing & Infrastructure  
Email:            Gordon.mcneil@renfrewshire.gov.uk

Page 5

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Environment, Housing,
Infrastructure
Service Improvement Plan 2025 -28

Page 6

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Welcome to our Service Improvement Plan
As Director of Environment, Housing & Infrastructure,I’mdelighted to introduceour new Service Improvement
Plan which covers the period 2025 to 2028. This plan describes how our team will focus our efforts to deliver
thestrategic outcomes described in the Council Plan of Place, Economy, Fair,Green and LivingOur Values.
Environment, Housing & Infrastructure delivers a wide range of vital services to the people, communities and
businesses of Renfrewshire. This includes universal provision such as waste collection, road maintenance,
environmental health services and facility management across our housing stock and public buildings. We
manage 12,078 Council houses and support vulnerable people experiencing homelessness and those threatened
by homelessness. Our service has also played a critical role in supporting the Council’s response to the asylum
and refugee programmes over the last three years.
This is a challenging time for local governmentand we are committed to delivering the Reshaping Renfrewshire transformation
programme and financial savings required to support the Council achieve to maintain financial sustainability. 
However, we are still ambitious for Renfrewshire and our service lead on the over £100m Housing led regeneration programme,
which forms part of our £400m investment in our housing stock across all of Renfrewshire over the next 30 years. We will alsoinvest
£90m in our roadsinfrastructure over the next ten years and we lead on the council’s Plan for Net Zero, which sets out how the area
will work towards net zero by 2030. Environment, Housing & Infrastructure  also supports strategic Council projects such as the City
Deal programme, the refurbishment and new school build programmes and town centre projects including the new museum.
We will have a particular focus on Workforce development during 2025/26 and I know the dedication of our colleagues across all
areas of the  service will ensure the ambitious agenda outlined within the Service Improvement Plan is delivered to support
individuals, communities and businesses across Renfrewshire to flourish.

Page 7

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
About us
• Climate, Public Protection & Roads responsibilities include
the Council’s Roads, Public Transport, Parking & Active Travel
services, as well as leading the response to Climate Change
and Ren Zero, along with Energy Management, Regulatory &
Public Protection services. This includes partnership working
with police, fire and other multiagency partners.
• Operations & Service Development responsibilities
include Waste Services, Fleet & Social Transport,
Neighbourhood Services, Grass, Grounds & Cemeteries
Maintenance, Burials & Country Park Management, Civil
Contingencies and Service Development.
Environment, Housing & Infrastructure is responsible for the provision of every day essential services,
directly to the public of Renfrewshire, to other services within the Council and to community planning
partners.
• Facilities Management & Property Services covers four key service areas: soft facilities, hard facilities, support services and property services.
Soft facilities cover janitorial, cleaning, catering, housekeeping and school crossing patrollers. Hard services cover building services operations,
repairs and maintenance for housing and public buildings and streetlighting maintenance. Support services is responsible for compliance in
schools and public buildings, life cycle maintenance in schools & public buildings, PPP contract management. Property Services is a multi-
disciplinary design consultancy commissioned by Council Departments to deliver projects.
• Housing Services responsibilities include managing and investing in our housing stock of  12,078 properties and providing services to Council
tenants, alongside housing advice and support, assisting homeless people and those threatened with homelessness and ensuring people have
safe and healthy places to live, and supports the council’s response to migration and asylum.

Page 8

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Environment, Housing and infrastructure -Our service

Page 9

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Facts and Figures
The Environment, Housing & Infrastructure Services revenue budget for 2025/26 is approximately £61.925m
(excluding HRA).
Income and expenditure in relation to a local authority's direct provision of housing must be recorded separately
within a Housing Revenue Account (HRA). TheHRA Budget  and Rent Levels was presented to Council on 27 February
2025 with total rental and other income for 2025/26 of£65.492m.
The gross value of the Housing Capital Investment Plan for the 5-year period from 2025/26 to 2029/30 is £292.432m.
We provide Waste and Recycling collection to over 92,000households and businesses.
Supporting more than 862kmof roads and transport infrastructure across the whole of Renfrewshire –and we will 
be investing £90m in this infrastructure over the next ten years.
Environment, Housing and Infrastructure Services deliver universal services for over 186,000Renfrewshire residents,
helping to run our schools and care homes, providing 12,078homes for social rent, protecting and enhancing our
local environment though a wide range of initiatives and work to make Renfrewshire a great place to live and work.
Our services are delivered by a diverse, skilled and committed workforce of around1,800 (FTE)* who deliver
services 24 hours a day, 7 days a week and 365 days a year.
*Please note this doesn’t include casual/sessional staff

Page 10

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Renfrewshire Council’s Service Improvement Context
Reflecting our values
Delivering financially sustainable services
Promoting equality, diversity and inclusion
Delivering Best Value
Aligning to our Council Plan and the Community Plan

Page 11

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Supporting Renfrewshire Council’s objectives
Along with the other Services within the Council, Environment, Housing and Infrastructure will support
continuous improvement through a number ofkey strategic areas detailed in the following slides including -
Transformation–supporting the Reshaping Renfrewshire programme -to ensure the Council continues to
address the ongoing financial challenge but also to ensure the Council continues to respond proactively to
new and emerging opportunities to develop, modernise and change how the Council delivers for
Renfrewshire’s communities
Our workforce –We will build on the work already done across the service to date and use the outputs from
Workforce Survey and the Cultural Assurance Model to inform further improvements during 2025/26.
Data Strategy -Local data strategies will be developed and aligned with the development of the new Digital
Strategy in 2025.
Risk Management –proactively managing our Corporate, Strategic and Service risks to minimise negative
impact on the service and the council.

Page 12

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Transformation
Following on from the Right for Renfrewshire programme the next phase of transformation, to be branded
‘Reshaping Renfrewshire’, will continue to deliver progressive internal transformation, maintaining the long-
term journey to adapt and reshape the organisation and how the Council delivers services.
Environment, Housing and Infrastructure will support the Reshaping Renfrewshire programme, especially within
the following key areas of transformation-
• Digital – we will utilise current and future data and digital technologies, including the Internet of Things,
robotic process automation, artificial intelligence, machine learning and data analysis to transform services.
• Income Generation - growing existing sources of income and generating new income streams, to ensure the
Council continues to secure financial stability.
• Transformation of our Placed Based Assets – which includes the Strategic Property Review and the Strategic
Learning Estate Strategy.
• Transport Infrastructure – including the £90m investment in our roads and footways and implementing the
Local Transport Strategy for Renfrewshire.
• Economic Regeneration – including the work to deliver the housing regeneration investment programme.
• Net Zero - with the focus on ‘Heat and Fleet’ to transform the approach to the provision of clean energy and
sustainable transport in Renfrewshire.

Page 13

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Our Workforce
Our People Strategy has three priorities – improving our employee experience; workforce planning; equality,
diversity and inclusion.  The strategy covers the period 2021-2026 and work will begin this year to develop a
new strategy.
In early 2025, Audit Scotland published the results of their Scotland-wide thematic Best Value review on
workforce innovation.  The report on Renfrewshire Council had many examples of good practice and
presented us with three areas for improvement, which our People and OD will progress in partnership with
other Council services.
Each service will now include some key performance indicators relating to the workplace experience in their
Service Improvement Plans and will agree specific actions on workforce challenges in their service area
which align to the priorities of the People Strategy and the improvement actions from the Best Value review.
For Environment, Housing and Infrastructure (EHI), our focus will be to roll out Personal Development Plan
(PDP) for all EHI employees, to widen our Employee Engagement Forum to provide opportunities for all
employee groups to participate and to improve visibility of Senior Management and Leadership across the
Department.

Page 14

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Data Strategy
• The Council's Digital Strategy includes a Smart Data Workstream tasked with improving the management and
exploitation of data in a consistent way across all our services, leading to the improvement of the Council's
capabilities around data.  EHI are a key part of this work
• As part of the Smart Data Workstream an organisation-wide data governance group has been created which
includes data specialist representatives from all services. Service data strategies are being developed across
Environment, Housing and Infrastructure to address gaps and improve the management and exploitation of
business-critical data.
• Action plans will be developed to progress strategy implementation at a service level and local data strategies will
be aligned with the development of the new Digital Strategy in 2025.

Page 15

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Our risks
RISK MANAGEMENT
- The Council’s risk
management
arrangements are well
established with all
strategic, corporate
and service risks being
reported to the Audit,
Risk and Scrutiny
Board with the last
update being in May
2025. Here is a list of
the Risks sitting within
EHI reported to the
board.
All risks are evaluated using the Council’s adopted risk matrix; this involves multiplying the likelihood of a risk event
occurring by its potential impact. Risks are then evaluated as either ‘low’ (green), ‘moderate’ (yellow), ‘high’ (amber) or
‘very high’ (red).

Page 16

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Key Priorities
Ensure
implementation of 
legislative changes,
with appropriate
strategies and plans
Deliver the agreed
priorities within the
Council’s Costed
Delivery Plans for Net
Zero
Better use of data and
technology to improve
service performance and
delivery
Deliver the 2025/26 capital
investment Asset
Management programmes
across Public Buildings,
Housing, Roads, Fleet and
Open spaces.
Continue to develop our
service models to support
the Council’s ”Reshaping
Renfrewshire”
transformation programme
including financial
sustainability and to
maximise income
Support staff and
apprenticeship 
development to ensure
they have the right skills
and training to meet the
needs of the service,
now and in the future
Deliver the
improvement actions
resulting from the
Improving our
Workplace Employee
Survey and the
Cultural Assurance
Model
Supporting the most
vulnerable members
of our communities,
including people
experiencing and
those threatened by
homelessness

Page 17

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
• We will focus on delivering the improvement actions arising from the Employee Survey Results and the Cultural Assurance Model,
ensuring mandatory training for frontline employees is delivered and working with Soft FM around “job characteristics”.
• Provide a focus on training, absence management, PDP’s/appraisals and workforce planning across EHI.
• Continue to deliver a “right first time” approach across all services, delivering key capital projects and delivering on investment made
as part of the 2025/26 Council budget.
• We will continue to deliver investment in schools and public buildings across Renfrewshire including the new Paisley Grammer School.
• Continuing with housing-led regeneration and housing investment programmes
• Continuing implementation of replacement housing management systems
• We will finalise and implement our new Local Transport Strategy.
• New Sustainability team in place – will drive the focus of “Fleet and Heat” across all areas of the Council.
• Deliver year 1 of the £90m 10 year roads investment strategy.
• We will review and implement a revised waste collection rerouting programme aiming to have full implementation by autumn 2025.
• Expand our workforce training and development and improve our customer correspondence response times to meet targets.
• EHI & Council -We will shape the delivery of our services, in line with the council Net Zero aspirations.
Our focus for 2025-26

Page 18

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Appendix:
Actions and Performance Indicators relevant to the
remit of the Communities and Housing Policy Board

Page 19

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan -PLACE
When will we
do it by?
What difference will we make?What will we do?
March 2026
There are likely to be new duties on a range of public bodies to ‘ask
and act’ and support homeless prevention. We will be required to
provide support and advice to these public bodies on the steps they
can take.
It is very likely that the new provisions will result in a significant
increase in referrals to Homeless Services.
The new Housing (Scotland) Act will be introduced during 2025/26, and
this will include new duties in relation to homeless prevention.
March 2026
Ensure the Council :
 can meet legal duties towards those who are statutorily
homeless,
 assess housing support needs and ensure those needs are met,
 minimise the use of B&B
This may require additional temporary accommodation.
Continuing to meet the challenges of the local/ national pressures
around homelessness.
April 2026
New charges and recovery procedure will be applied for everyone
provided with temporary accommodation
Implement new rent charging policy for temporary accommodation

Page 20

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan -PLACE
When will
we do it by?
What difference will we make?What will we do?
March 2026Tailored support being provided to those who require assistance to
ensure they can access / sustain settled housing.
Review the findings from independent assessment of MyLA (My Life
Ahead) project, and ensure the lessons learned are incorporated in
the support provided to those whose settled housing may be
affected by drug / alcohol use.
March 2026Ensure those who have nowhere to stay are provided with suitable
temporary accommodation, are provided with the support they
need, and are assisted to transition into settled accommodation –
including the use of Housing First wraparound support and
decommission of Thrushcraigs staffed accommodation.
Deliver the key outputs from the 7th year of Renfrewshire’s Rapid
Rehousing Transition Plan (RRTP) and ensure the supply of
temporary accommodation, provision of support to those in need,
and the number of social rented housing lets meets the homeless
pressures and the Council plays its part in relation the provision of
accommodation in response to changes in national migration and
resettlement policies and programmes.
June 2025An extension of the ways in which tenants can choose to report
Anti-social behaviour, the ‘ASB app’ enables on-line reporting and
is accessible 24 hours a day, 7 days a week.
Further develop training and communications on the ASB App
based on learning from the pilot project and extend use across all
Local Area Housing Teams.

Page 21

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan -PLACE
When will we do
it by?
What difference will we make?What will we do?
The Housing Asset
Management Strategy is
currently being reviewed and
will be brought to a future
meeting of the policy board
for approval.
An effective strategy for managing housing assets will ensure that
decisions relating to management and investment in the housing stock
are based on sound principles which take account of stock condition,
sustainability and value for money.
The revised Housing Asset Management Strategy will be
presented to the Communities and Housing Policy Board this
year.
Review to be completed in
2025. Actions may continue
beyond this timescale.
The review leads to options being presented to EHI Directorate for
consideration.  The self-assessment exercise which is underway will
assist in identifying areas for improvement.  The void review is already
well established with a new single void team being piloted.
Ongoing work on the housing repairs operating model.
March 2026
Investment will ensure that stock continues to meet SHQS and other
legislative or regulatory standards.
Improvements in energy efficiency will contribute to reducing fuel poverty
and tenants’ will be positively impacted by overall improvements to their
living conditions.
Improved stock should lead to a reduction in reactive maintenance.
Investment in current housing stock including for 2025/26
• Kitchen, bathroom, and rewiring replacement – 600
properties
• Window and door improvement programme – 250
properties
• Heating renewals – 750 properties
• External improvements – 500

Page 22

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan -PLACE
When will we do
it by?
What difference will we make?What will we do?
March 2026
Achieve Statutory Approvals ahead of commencement of construction of new
build projects at Gallowhill and Howwood Road.
Commence and progress construction with a view to initial handovers Spring
2026.
Howwood Road (70 units) and Gallowhill (65 units) new
build developments on site and underway
March 2026
The Housing-Led Regeneration and Renewal Programme continues positively
against the approved timeline for acquisition of private properties approved for
demolition, tenant rehousing and phased delivery of demolition across several
regeneration areas as programmed. In terms of the acquisition of the 89 private
properties identified for demolition, 61 have been acquired by the Council to
date, with 12 others agreed and with legal services to conclude.
Demolition is progressing well within the Auchentorlie, Springbank, Thrushcraigs
and Waverley Road areas.
Continue with year 4 of the 10-year Housing-led
regeneration programme.
The Single Voids Team pilot
has been extended until 30
June 2025
We will drive down the number of void properties, the void rent loss and the
average nett number of days taken to re-let.
Officers will work together to review the delivery and
turnaround of void properties across Renfrewshire to
minimise times, wherever possible, to allow properties to
be re-let.
March 2026
This work remains ongoing to review and refresh the approach to tackling dog
fouling.  Officers from relevant service are participating with the review. This
action will be supported by the provision of £30,000 for a dog fouling awareness
campaign through 2025/2026 budget settlement.
Review our current approach to dog fouling enforcement
and use community engagement and data to map out ‘hot
spots’ to target enforcement

Page 23

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan -PLACE
When will we do it by?What difference will we
make?
What will we do?
Ongoing review of council owned lock-up estate to be
completed in 2025. Actions emerging from review may
continue beyond this timescale.
Vacancy levels within lock-ups will be reduced.
Rental charges will reflect the costs of managing
and investing in lock-ups.
Lock-ups will be managed in line with revised
policies and procedures.
A review of Council owned lock ups and associated policy
and procedures is being undertaken
The Participatory Budgeting will be utilised over the next
three years. Details of this initiative are set out in a report
to the May 2025 meeting of the Communities and Housing
Policy Board.
Provide Tenants with opportunity to influence
expenditure for environmental and neighbourhood
projects
Through the HRA, £600k will be used for Participatory
Budgeting for environmental and neighbourhood projects.
This will be split with £150k for each of the local area
housing teams

Page 24

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –PLACE
FrequencyTargetPerformance Indicator
Annual100%Private Water Supplies – 100% of type A supplies risk assessed and sampled
Annual18ug/m3Air Quality - Annual average PM10 value across all continuous monitoring sites
Annual40ug/m3Air Quality - average nitrogen dioxide value of monitoring sites, within AQMA(s) exceeding limits
Annual93%Percentage of reactive repairs carried out in the last year completed right first time (Housing Services)
Quarterly95%Percentage of Overall Repairs Completed Within Target (Housing Services)
Quarterly15 daysAverage length of time taken to complete non-emergency repairs (days) (Housing Services)
Quarterly26 daysAverage time from households presenting themselves as homeless to completion of duty (number of
weeks)

Page 25

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan - ECONOMY
When will
we do it by?
What difference will we make?What will we do?
June 2025
Improved targeting of environmental improvements in areas
surrounding Council Housing
Work in partnership with teams across the Council to expand the
Neighbourhood Environment Trainee Teams  - increasing capacity
from 2 squad to 4.
March 2026
This work remains ongoing and will be carried forward to 2025/26
which will also include proposed new animal licensing
requirements
Complete the review of animal license conditions across all
licences.
March 2026
Implementation date has been moved by law to 1 June 2025 to
allow for a harmonised date across the Four Nations.  Work has
commenced to advise businesses on the incoming legislation,
and Officers have been undertaking training as well as preparing
documentation for the delivery of new powers.
Implement the proposed ban on the sale and supply of single use
nicotine vaping products.

Page 26

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Deliveringthe Council Plan -FAIR
When will we
do it by?
What difference will we make?What will we do?
March 2026 and on-going
Compliance with resettlement programmes, refugees provided with the
support they need, with a strong focus on integration, and a new range
of health and wellbeing measures / events / activities.
Ensure effective participation and support for all refugee
programmes.
March 2026
Care Inspectorate registration completed, and service being provided
will meet the Health & Social Care Standards
Obtain Care Inspectorate registration for Refugee Resettlement
team
March 2026
Keep sheltered tenants informed, enhance the methods used to advise
and assist tenants and their families on the services available.
Pilot the installation of ‘digital noticeboards’ at the reception areas of
sheltered complexes and obtain feedback from tenants.
March 2026
Entitlement to benefits and other financial / household assistance
schemes is maximised.
Work with Advice Services to maximise opportunities for Council
tenants to access specialist income advice.
March 2026Tenants feel supported through changes and potential loss of housing
cost contributions is prevented as far as possible.
Work with relevant stakeholders and Council Tenants scheduled to
migration to Universal Credit to mitigate against avoidable delays
and loss of housing cost contributions.
The strategy will be
complete by Dec 2027
Maximise consultation and participation.  Provide opportunities for
consultation that suits tenants.
Deliver the Action Plan outcomes outlined in the Tenant
Participation Strategy 2022‐2027

Page 27

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan - FAIR
When will we do it by?What difference will we make?What will we do?
Phase 1 May 2026
Phase 2 and 3 to be complete by 2027.
Stock condition survey information will ensure that decisions on
future investment are based on accurate and up to date information
on stock.
Continue with next phase of stock condition
survey.
The SHIP is a rolling programme that covers a five-
year period and is refreshed annually. This annual
review takes account of Scottish Government funding
availability and progress in delivering existing
affordable housing sites and  provides an opportunity
to add new sites in order to meet the housing needs of
Renfrewshire’s residents.
Each year a draft SHIP is prepared and submitted to
the Communities and Housing Policy Board in August
for approval for public consultation. The final SHIP is
presented back to Board in October for approval 
before being submitted to the Scottish Government.
The SHIP supports the delivery of new build affordable homes,
predominantly for social rent across Renfrewshire. These homes
are owned and managed by registered social landlords such as
the Council or its housing association partners.
New homes delivered through the SHIP will add to the affordable
housing supply and provide high quality energy efficient homes
that meet people’s current and future housing needs.
Over the last 5 years (2019/20 to 2023/24), 1,054 new affordable
homes were delivered through the SHIP which includes 315 new
council homes.
Update the SHIP to set out Renfrewshire’s
new build affordable housing investment
priorities utilising grant funding made
available from the Scottish Government’s
Affordable Housing Supply Programme’

Page 28

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan -FAIR
When will we
do it by?
What difference will we make?What will we do?
Phase 1 May 2026
The current Housing Management system has reached end of life, the replacement NEC
Housing System will be cloud based. Once fully implemented NEC Housing will replace
the repairs and maintenance system, AVD, Prevent 1 and the Asset Management
System (APEX).
• The solution will be fully integrated and provide resident information to staff from
wherever they are working. This will enable a more personalised service for
demographic groups and individuals. The Council’s aim is to deliver a more
proactive service that costs less and yields higher resident satisfaction.
Implement NEC Housing Management System as part
of the Housing Innovations Project in 2 phases – which
will incorporate Rents, Repairs, Service Charges,
Allocations, Tenancy Management, ASB, Customer
Relationship Management, Customer Services, Property
Lifecycle, Homelessness and Support Services
modules.
Phase 1 will comprise of Rents, Service Charges,
Allocations, Tenancy Management, ASB, Customer
Relationship Management, Customer Services, Property
Lifecycle, Servicing and Support Services modules.
Phase 2 July 2027
The current Housing Management system has reached end of life, the replacement
NEC Housing System will be cloud based. Once fully implemented NEC Housing will
replace the repairs and maintenance system, AVD, Prevent 1 and the Asset
Management System (APEX).
• The solution will be fully integrated and provide resident information to staff from
wherever they are working. This will enable a more personalised service for
demographic groups and individuals. The Council’s aim is to deliver a more
proactive service that costs less and yields higher resident satisfaction.
We will implement Phase 2 of the NEC Housing
Management System.

Page 29

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan -GREEN
When
will we
do it by?
What difference will we make?What will we do?
31 March 2026
This action will continue into 2025/26 with renewed focus on enforcement activity to support the work of
the Team Up to Clean Up team.
Deliver a programme of enhanced operational
environmental and community support activities for
environment and place.
March 2026Increased recycling tonnages leading to reduction in emissions and cost savings for the Council as well
as behaviour change and leading by example in the workplace
Implement full recycling facilities within
Renfrewshire House
March 2026Expansion of renewables will deliver reduction in the Councils emissionsExploring expansion of solar PV and other
renewables on council buildings including schools.
Summer 2025Investment Grade Business Cases will identify the optimum technical solution to deliver low carbon heat,
as well as the preferred delivery model, including collaboration and partnership working opportunities to
deliver large-scale heat networks to provide low carbon heat and cost saving and revenue generation
opportunities for the Council.
Development of investment grade business cases
for 2 potential district heating networks. 1 Paisley
central, 1 expansion of AMIDS.
March 2026Drive efficiencies within utility usage and therefore have a positive impact on the Councils carbon
emissions
Looking to expand Building Management Systems
to reduce energy use and water use.
March 2026
Adaptation Plan - will help to respond to and address the local impacts of climate change and prepare
for future climate risks across Renfrewshire area
Circular Economy Strategy – will set out a transformational approach to accelerate more sustainable
use of resources across the waste hierarchy to reduce emissions associated with resources and waste,
and identifying and optimising associated opportunities.
Carbon Management Plan - a strategic document outlining RCs approach to reducing carbon emissions.
The decisions within the plan will have a significant impact on our ability to meet stated reduction targets
and working towards net zero.
Develop the following strategies and plans -
• Renfrewshire’s Adaptation Plan
• Renfrewshire’s Circular Economy Strategy
• Renfrewshire Council’s Carbon Management
Plan
March 2026
A support tool to provide value in determining how decision making will impact emissions, the
main climate impacts and benefits of any given decision and measure how these decisions align
with our net zero commitment principles in practice and the impact on our targets and progress.
Develop Climate Change Impact Assessments
process across appropriate projects.

Page 30

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –GREEN
FrequencyTargetPerformance Indicator
Annual100%Percentage of Council housing stock which meets the Scottish Housing Quality Standard.

Page 31

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –LIVING OUR VALUES
When will
we do it by?
What difference will we make?What will we do?
March 2026
The Service Development Team will support EHI services through:
 A focus on mandatory training for frontline employees through
“toolbox talks”
 A focus on mandatory training for those accessing the network
learning platform i-learning
 Working with Soft FM to develop the pilot project around “job
characteristics” to identify training needs within the service
We will continue to develop and support our workforce
through training and development demonstrating our value
as a learning organisation.
March 2026
 Work, as directed by the Director and Heads of Service, to deliver the
improvement actions resulting from the Employee Survey 2024.
 Lead wider work and promote health and wellbeing across EHI though
the Health & Wellbeing Group
We will support wider employee health and wellbeing across
Environment, Housing, Infrastructure.
March 2026
 Conduct a thorough review and revision of the EHI Quality, Health and
Safety manual and all related documentation to ensure continued
alignment with current standards.
 Roll out a training programme for IOSH Managing Safely to key
managers, supervisors and employees across EHI.
 Conduct six quality, health and safety Internal Audits across Operations
and Service Development.
We recognise that Health & Safety is an integral part of our
business.  We will deliver our actions outlined in the
Environment, Housing & Infrastructure (EHI) Health & Safety
Plan 2025 – 2028.

Page 32

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –LIVING OUR VALUES
FrequencyTargetPerformance Indicator
QuarterlyTBCAverage number of workdays lost through sickness absence per employee (FTE) (cumulative)
Quarterly85%% of Members enquiries completed within timescale
Quarterly85%% of frontline resolutions dealt with within timescale
Quarterly85%% of complaint investigation completed within timescale
Quarterly100%% of FOI request completed within timescale
Quarterly100%Training – Percentage of staff training undertaken in relation to qualifications (Public Protection)
Quarterly7.5%Gross rent arrears (all tenants) as at 31 March each year as a percentage of rent due for the reporting year
Quarterly98%Rent collected as percentage of total rent due in the reporting year
Quarterly45 daysAverage length of time taken to re-let properties in the last year (in days)
Quarterly1.5%Percentage of rent loss due to voids

Page 33

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –LIVING OUR VALUES
FrequencyTargetPerformance Indicator
Annual *see note below % of corporate induction completed within 30 days of starting employment with the Council *
Annual *see note below % of mandatory training courses for frontline employees completed *
Annual *see note below % of mandatory training courses for employees with access to the Council’s network completed *
Annual *see note below % of Personal Development Plans completed *
* These are four new indicators. Evaluation of progress will take place midway through 2025/26and this will help inform the creation of targets/ timescales across the whole
service. Progress will be reported annually.

Page 34

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Data Strategy: Priority Activities
When will we
do it by?
What difference will we make?What will we do?
March 2026
Senior Management visibility ensures data activities will
be prioritised.
Strategic: We will align service data activities with the Digital Strategy for
Renfrewshire objective: Data is a critical asset.  Ensure visibility of data activities at
Directorate (Director & Head of Service Level)
March 2026
Ensure the workforce has appropriate capabilities to
improve the effectiveness of our data.
Skills: We will identify skills gaps (eg data input, data analysis) and training needs
across EHI and address through our Workforce Development plan in line with the
Renfrewshire Council People Strategy.
December 2025
Increase in data accuracy and improved data available to
support services to make data driven decisions.
Data Quality: We will review data quality in key business systems and processes
and develop an improvement plan.
December 2025
Improve how data is presented to decision makers.Analysis: We will further define analysis requirements to improve decision-making
and build capabilities locally within services where required.
March 2026
Improve access to data within the ERP.ERP: We will work with Corporate Teams to promote and increase the use of
standard dashboards as business as usual.
March 2026
Our representation at the DAG will ensure data is used
collaboratively across services to support the Council’s
strategic outcomes.
Ensure consistency of approach to data improvement
activities.
Data Advisory Group (DAG): We will ensure EHI representation at the DAG to
ensure our data activities align with the Data Strategy Framework; cross-service
data sharing opportunities are identified and that data improvement activities are
carried out in a consistent manner across the organisation.

Page 35

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level
• Fifth level
Delivering the Council Plan –Cross cutting theme
When will
we do it
by?
What difference will we make?What will we
do?
31 March 2026
 We along with our partners will continue to work towards Housing pathways for Care Experienced young people that
will include a range of affordable options that are specifically tailored to their needs and preferences. Our overall aim
is that all youth homelessness will be eradicated.
 As a service we will continue to support the work of Renfrewshire’s Promise, the work of Renfrewshire’s Promise
Team, Renfrewshire’s Promise Oversight Group and provide active representation on appropriate groups and
workstreams.
 We are committed to raise awareness of ‘The Promise’ within the homeless service and across our teams.
 Across EHI we will raise awareness and promote Renfrewshire’s “Promise Keeper Network”, “Renfrewshire’s
Language Policy”, and encourage our team members to complete “The Promise i-learn” module.
 As part of our ongoing commitment to continuous improvement we will review our arrangements and practices to
ensure we are informed by the needs of our Care Experienced Community
 We will create opportunities to obtain feedback on our services from existing service users who are Care
Experienced.
 We will support, where applicable, council initiatives around the recruitment of Care Experienced young people into
our service.
EHI will work towards
Keeping The Promise
and support our Care
Experienced
Community.
IMPROVING OUTCOMES FOR CHILDREN AND FAMILIES
‘Across all of our work and all of our efforts, we hope for loving and happy lives for Renfrewshire’s children – working together to get it right for children, families and
communities – protecting, learning, achieving and nurturing. Every priority of this Council Plan will contribute to improving the lives of Renfrewshire’s children and
their families. It is our fundamental duty as an organisation and our shared responsibility as citizens of this place to ensure that our children inherit a Renfrewshire
where their wellbeing is nurtured, their futures are bright, and their environment is safe and healthy.’

Page 36

Title can go here
• Click to edit Master text styles
• Second level
• Third level
• Fourth level