OLI Expansion List

Argyll and Bute Council · 10 December 2025
Back to Oban Lorn & The Isles Area Committee — 10 December 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Classification: OFFICIAL#
AREA TOWN/VILLA
GE EXISTING LOCATION COUNCIL
OWNED PROPOSED THEME PRIORITY COMMENTS
OBAN LOCHAVULLIN CAR PARK
Y
1 x FAST
2 2
Population of 5,000 to 10,000 - 50% off-street car parks.
Consideration will need to be given to known flooding at
this site
OBAN
1 x FAST AND
1 x RAPID TWEEDDALE STREET CAR PARK Y
Rapid charger beyond economic life and to be replaced via
CCG to comply with new regulations
OBAN LONGSDALE ROAD CAR PARK Y 1 x FAST 2 2 Population of 5,000 to 10,000 - 50% off-street car parks.
OBAN CORRAN HALLS 1 Y 1 x FAST 2 2 Population of 5,000 to 10,000 - 50% off-street car parks.
OBAN NORTH PIER Y 1 x FAST 2 2 Population of 5,000 to 10,000 - 50% off-street car parks.
OBAN GANAVAN SANDS Y 1 x FAST 2 2 Population of 5,000 to 10,000 - 50% off-street car parks.
TIREE 1 x RAPID FERRY TERMINAL SCARANISH N Chargers beyond economic life and to be replaced via
CCG to comply with new regulations
COLL 1 x RAPID COMMUNITY CENTRE, ARINAGOUR N Chargers beyond economic life and to be replaced via
CCG to comply with new regulations
FIONNPHORT 1 x RAPID COLUMBA CENTRE CAR PARK
Y
Whilst this is an existing site, as part of the Iona Fionnport
marine project we are looking at what electricity upgrades
we can lever in to future proof the site for potential
expansion .  Charger is beyone economic life and to be
replaced via CCG to comply with new regulations
CRAIGNURE
1 x RAPID
AND 1 x FAST CRAIGNURE CAR PARK Y
TOBERMORY 1 x RAPID LEDAIG CAR PARK Y
PORT APPIN FERRY TERMINAL/SLIPWAY Y 1 x RAPID 1 2 Mainland-side ferry
PORT APPIN FERRY TERMINAL/SLIPWAY Y 1 x FAST or
SLOW [TBC] 2 2 Mainland-side ferry
SEIL
[ELLENABEAI
CH] FERRY TERMINAL/SLIPWAY
Y
1 x RAPID 1 2 Mainland-side ferry
OBAN LORN AND THE
ISLES
Key
Chargers beyond economic life and removed from use
Chargers beyond economic life to be replaced via CCG to comply with new regulations
Sites expected to be delivered in 2025
Sites delivered since last update December 2022
Chargers beyond economic life and replaced as part of FASTER Project

Page 2

Classification: OFFICIAL#
SEIL
[ELLENABEAI
CH] FERRY TERMINAL/SLIPWAY
Y 1 x FAST or
SLOW [TBC] 2 2 Mainland-side ferry
CUAN FERRY
[SEIL]
FERRY TERMINAL/SLIPWAY
Y
1 x RAPID 1 2 Mainland-side ferry
CUAN FERRY
[SEIL]
FERRY TERMINAL/SLIPWAY
Y 1 x FAST or
SLOW [TBC] 2 2 Mainland-side ferry
CULLIPOOL FERRY TERMINAL/SLIPWAY N 1 x RAPID 1 3 Island-side ferry
CULLIPOOL FERRY TERMINAL/SLIPWAY N 1 x FAST or
SLOW [TBC] 2 3 island-side ferry
COLL AIRPORT Y 1 x FAST or
SLOW [TBC] 2 4 Island airport
OBAN AIRPORT Y 1 x FAST or
SLOW [TBC] 2 1 Mainland airport
15
ADDITIONAL CHARGERS DELIVERED THROUGH HITRANS FASTER
OBAN, LORN AND
THE ISLES OBAN 2 x RAPID CORRAN HALLS
OBAN LORN AND THE
ISLES
PROJECT AUTUMN/WINTER 2023