Page 1

___________________________________________________________________
To:   Communities and Housing Policy Board
On: 20 August 2024
___________________________________________________________________
Report by:  Chief Executive
___________________________________________________________________
Heading: Draft Community Learning and Development Partnership Plan
2024-2027
___________________________________________________________________
1. Summary 
1.1 Local authorities in Scotland have a statutory duty to consult on and publish a
plan every three years setting out how they will co-ordinate the provision of
Community Learning and Development (CLD) activities across their area. 
The next suite of plans are due to be prepared in 2024, and in Renfrewshire
the draft plan must be published before mid September 2024. 
1.2 In May 2024, members received an update on the recent follow up inspection
of community learning and development, with the inspection team making
specific recommendations requiring the Council to strengthen its approach to
developing and implementing the local Community Learning and
Development Plan.  This included the need to review and strengthen
partnership governance arrangements to ensure that the plan was owned by
all partners and that progress was reviewed on a regular basis by all partners. 
1.3 This report provides information on the new governance arrangements
recently established for CLD in Renfrewshire and the partnership work that is
being undertaken to consider local needs and identify shared priorities for
ensuring community learning and development activities achieve the best
possible outcomes in Renfrewshire. This process has informed the
development of an initial draft CLD Partnership Plan for 2024-2027 which is
attached as Appendix 1 to this report.  Given the feedback from the inspection
team it is proposed that we undertake a final stage of consultation to allow for

Page 2

any stakeholders that have a view on the Plan to participate in the final stages
of its development. The consultation period will allow the partnership to gather
final information that must be included within the strategy, including scoping
additional or “unmet” needs and allow partners to consider the
recommendations from the recent national review of community learning and
development, and incorporate actions as appropriate within the plan itself. 
1.4 The finalised strategy will be submitted to the board for approval in October
2024. 
2. Recommendations 
2.1 It is recommended that members of the Communities and Housing Policy
Board: 
• Note the draft plan included at Appendix 1;
• Agree that the draft plan now proceed to the final consultation stage
involving wider stakeholders;
• Note that the final plan will be presented to this Board for approval in
October 2024. 
3. Background 
3.1 Under the Requirements for Community Learning and Development
(Scotland) Regulations 2013, local authorities in Scotland are required to
consult on and publish a plan every three years which sets out how the local
authority will co-ordinate provision of CLD across the area, what will be
provided by the local authority and by partners, and any unmet CLD needs
within the period of the plan.  Each three year plan should be based on an
assessment of need which has included consultation and engagement with
service users and communities as well as analysis of data.   There is an
expectation of regular review of evidence to assess the impact of CLD activity
and inform future planning.
3.2 The requirements also place an obligation on local authorities to ensure that:
communities have access to the CLD support they need; that communities
are enabled to express their needs for CLD provision and; that Community
Planning Partnerships, local authorities and public service providers more
generally respond appropriately to the expectations set out by CLD Strategic
Guidance.
3.3 CLD delivery in Scotland was recently subject to a national review, and
findings published in July 2024.  The review covered the skills and career
pathways of the CLD workforce; the impact of provision on learners; how data

Page 3

is collected and used to ensure the best possible outcomes for learners; the
alignment of CLD with post-16 education and included a three-month period
of consultation with stakeholders. 
3.4 The review makes 20 recommendations for CLD governance and delivery in
Scotland.  A number of these are for the Scottish Government to act upon,
including the recommendations on governance, on the policy narrative around
lifelong learning and on the strategic intent for CLD.   There are potential
implications for local government, including on: 
• Where CLD services sit within local authority structures;
• English for Speakers of Other Languages (ESOL) provision;
• Funding allocations;
• Staff and volunteer membership of the CLD Standards Council;
• A shared framework for tracking performance. 
3.5 Since April 2023, CLD within Renfrewshire Council sits within the Chief
Executive’s service under the Head of Policy and Partnerships.  This has
aligned the Council’s CLD service more closely with Community Planning
Structures and has improved awareness of the council-led elements of
provision across that wider partnership. 
3.6 In February 2024, HM Inspectors undertook a community learning and
development progress visit, as part of a schedule of visits to all Scottish local
authorities.  The visit focused on partnership working in CLD, particularly the
effectiveness of CLD partners to self-evaluation and planning for
improvement, and on progress made against identified priorities in the CLD
Plan.  The findings were reported to this Board in May 2024. 
3.7 The inspection highlighted operational strengths such as the contribution of
Street Stuff to reducing anti-social behaviour; the strong volunteering culture;
effective safeguarding processes; success in removing barriers to
participation in learning through a number of projects; and the role of
Renfrewshire Youth Voice in helping young people have a say in issues
affecting them.  However, inspectors also found that the CLD strategy was
focused on the delivery of council-led activity and needed to be wider in focus
and ambition.  They highlighted that partners were not sufficiently involved in
the development of the strategy and there was no strategic partnership group
in place.  The strategy did not have a performance framework which could be
used to measure progress. 
4. Governance arrangements for Community Learning and Development in
Renfrewshire

Page 4

4.1 In order to strengthen partnership working across CLD provision, we have
established two new governance groups. The CLD Partnership Executive
Group provides collective strategic leadership and is co-chaired by the Chief
Executive of Engage Renfrewshire and Community Development Manager
within the Council.  This group had its first meeting in May 2024 and will work
on establishing arrangements for representing learner and citizen voice within
our governance, on enhancing our information sharing and maximising
opportunities for joint working.  The Executive Group has met three times so
far. 
4.2 A Partnership Forum has also been established.  This group has a larger
membership drawn from a range of public and third sector organisations.  It is
intended that this group will do much to facilitate the joint working and
information sharing that is so important for service delivery.  It will also act as
a sounding board for new ideas, and feedback from this group is relayed to
the Partnership Executive.  As the governance arrangements embed, we will
consider how best to formalise the link between the two groups.  The
Partnership Forum has met twice so far, with the next meeting scheduled for
the end of August. 
5. Draft Community Learning and Development Plan 2024-2027 
5.1 An initial draft of the Community Learning and Development Plan for 2024-
2027 is included as Appendix 1 to this report.  The Strategy is aligned to the
themes set out in Renfrewshire’s Community Plan:  thriving, well, fair, and
safe.  Both the Partnership Executive Group and the Partnership Forum have
been engaged during the development of the priorities and the plan. 
5.2 In developing the priorities, publicly available data was used to supplement
locally gathered information to inform needs.    Engagement with people who
take part in CLD activity highlighted what is important to them.  For adults,
personal and social development, health and wellbeing and being active in the
community were priorities.  For young people, climate change, mental health,
poverty and personal safety were priorities. 
5.3 The Fairer Renfrewshire programme recognises the significant inequalities
that exist across Renfrewshire’s communities.  The CLD Partnership Plan
needs to recognise these priorities, and partners agreed that there was a
requirement to target specific groups that face wider barriers to engagement
and participation. There is also a need for the plan to be flexible and to
respond to emerging needs as our communities evolve, and the consultation
will allow us to gain further views on how best to achieve this.

Page 5

5.4 We recognise the importance of the voice of partners, learners and service
users in identifying local needs and priorities, and informing the shape of local
provision.  It is also important that regular and meaningful engagement with
our stakeholders takes place on an ongoing basis. 
5.5 Based on engagement activity and on consideration of data about
Renfrewshire undertaken to date, 12 initial priorities have been identified,
aligned to the four Community Plan themes. 
5.6 Our CLD Thriving priorities are:
• Supporting communities to engage and participate in community
regeneration;
• Helping citizens develop skills for work and life;
• Contributing to Community Wealth Building in Renfrewshire;
• Providing opportunities for volunteering. 
5.7 Our CLD Well priorities are:
• Create and support opportunities for citizens to make positive connections
within and across communities;
• Help build cultural capacity by facilitating and increasing access to arts
and cultural opportunities;
• Promote and facilitate access to nature, green spaces and outdoor
activities. 
5.8 Our CLD Fair priorities are:
• Promoting equity and equality in access to learning opportunities;
• Providing mechanisms for citizens to contribute to decision-making;
• Delivering targeted support to address disadvantage in our communities. 
5.9 Our CLD Safe priorities are:
• Providing safe spaces for the delivery of CLD activity;
• Giving people the skills to help them make safe and informed choices. 
5.10 The plan has a fifth theme, which is about Strengthening our Partnership. 
This allows us to identify how we will develop our governance arrangements,
how we will monitor delivery of the strategy, and how we will support and
develop our workforce. 
6. Next Steps 
6.1 It is intended that the draft Partnership Plan at Appendix 1 be issued for
consultation with the CLD community, to include our service users.  That
exercise will then inform the final version, which will be brought to this board

Page 6

in October 2024 for approval.  As part of the process, we will also develop an
action plan to provide more detail of delivery, and a performance scorecard to
support the tracking of progress. 
__________________________________________________________________ 
Implications of the Report 
1. Financial – none, though the recent national review includes
recommendations relating to CLD funding. 
2. HR & Organisational Development – the draft plan includes activity relating
to staff development; the national review referred to in the report makes a
recommendation about staff and volunteers and their registration with the CLD
Standards Council. 
3. Community/Council Planning – the priorities identified in the draft plan are
aligned to the four Community Plan themes and will support delivery of the
Community Plan. 
4. Legal – the report sets out how the Council is complying with its statutory
duties in relation to CLD provision. 
5. Property/Assets – none 
6. Information Technology – none, though digital skills remain an important
element of CLD provision. 
7. Equality & Human Rights – an EQIA is being developed as part of the
development of the Partnership Plan. 
8. Health & Safety – none 
9. Procurement – none 
10. Risk – any CLD activity arising from the draft strategy will be appropriately
risk assessed. 
11. Privacy Impact – none 
12. COSLA Policy Position – n/a 
13. Climate Risk-  the draft strategy includes activity intended to mitigate climate
impacts and raise awareness of climate change and the importance of
biodiversity.

Page 7

14.  Children’s Rights: CLD activity in Renfrewshire supports and promotes the
participation of children in decision-making and takes a rights-based
approach.
_______________________________________________________
List of Background Papers:  none

Page 8

COMMUNITY LEARNING AND
DEVELOPMENT IN RENFREWSHIRE 
2024-2027 PLAN 
“Working together to ensure our communities, people and families living in Renfrewshire
have the capacity, support, resilience and opportunities they need to thrive”

Page 9

What is Community Learning and Development? 
Community Learning and Development (CLD) is an approach to lifelong learning with an
aim of empowering people and communities to take part in, and help shape, their own
learning and development at all stages of life and in ways that suit a person’s needs.  The
identification of local priorities and the delivery of activity to meet those priorities should
be an inclusive and collaborative process involving stakeholders including learners, young
people, community members, community volunteers, local authorities, voluntary and
charity sector organisations, educational institutions, and other organisations across the
public and third sectors. 
The key principles of Community Learning and Development practice are:
• Inclusion and equality
• Empowerment
• Partnership and collaboration
• Lifelong learning
• Participation and engagement
• Inclusive learning
• Assets-based approach 
Under the Requirements for Community Learning and Development (Scotland)
Regulations 2013, local authorities in Scotland are required to consult on and publish a
plan every three years which sets out how the local authority will co-ordinate provision of
CLD across the area, what will be provided by the local authority and by partners, and any
unmet CLD needs within the period of the plan.  Each three year plan should be based on
an assessment of need which has included consultation and engagement with service
users and communities as well as analysis of data.   There is an expectation of regular
review of evidence to assess the impact of CLD activity and inform future planning, 
The requirements also place an obligation on local authorities to ensure that:
communities have access to the CLD support they need; that communities are enabled to
express their needs for CLD provision and; that Community Planning Partnerships, local
authorities and public service providers more generally respond appropriately to the
expectations set out by CLD Strategic Guidance.
HM Inspectors conducted an inspection visit in Renfrewshire during February 2024 with a
strong focus on leadership, governance, performance and outcomes.  Whilst the
inspection team highlighted positive areas of practice in terms of delivery, a number of
recommendations were made in relation to partnership working, governance
arrangements and planning.  The refreshed CLD Plan for 2024-2027 seeks to respond

Page 10

positively to these recommendations, with the plan being developed jointly with local
partners.  It is also recognised in our shared priorities and action plan, that we will
continue to build and strengthen this work as we go forward.
CLD delivery in Scotland was recently subject to a national review, commissioned by the
Minister for Further and Higher Education and Veterans in 2023 and published in July 2024. 
This is part of a programme of reviews across education and skills provision.  The review
will cover the skills and career pathways of the CLD workforce; the impact of provision on
learners; how data is collected and used to ensure the best possible outcomes for learners;
the alignment of CLD with post-16 education.  An online consultation ran between January
and March 2024 and is being supplemented with face-to-face consultation and evidence
gathering with learners, potential learners, partners and other key stakeholders.   
The review makes 20 recommendations for CLD governance and delivery in Scotland.  A
number of these are for the Scottish Government to act upon, including the
recommendations on governance, on the policy narrative around lifelong learning and on
the strategic intent for CLD.

Page 11

Our Policy Context 
In developing this plan, we have aligned it to the legislative requirements governing CLD
and to national and local strategies which have similar or complementary aims.  The
diagram below sets out some of the key policies we have aligned to. 
Legislative      
Community Empowerment (Scotland) Act
2015  UNCRC (Incorporation) (Scotland) Act 2024      
Requirements for Community Learning and
Development (Scotland) Regulations 2013  Fairer Scotland Duty      
National      
National Youth Work Strategy 2023-2028  The Case for Change: Adult Learning Strategy
2022-2027      
National Improvement Framework  Community Wealth Building      
Local      
Renfrewshire Community Plan 2017-2027  Renfrewshire Children's Services Partnership
Plan 2023-2026      
Renfrewshire Council Council Plan 2022-2027  Renfrewshire's Plan for Net Zero      
Shaping our Future: Renfrewshire Health and Social Care Partnership Strategic Plan 2022-2025

Page 12

CLD in Renfrewshire: an overview 
Community Learning and Development activity across Renfrewshire broadly falls into
three categories – youth services, adult and family learning, and building community
capacity.   
Renfrewshire Council allocates a budget each year for the direct delivery of CLD activity; in
2024/25 this budget is just over £1.6m.   Additional funding supports community
empowerment and community capacity building, such as the work undertaken by Engage
Renfrewshire (the local third sector interface), the funding for Local Partnerships, our
Sustainable Communities Fund and our participatory budgeting programmes You Decide
and Celebrating Renfrewshire.     
Youth Services: targeted and universal services
•community-based youth work
•youth voice
•accredited programmes
•volunteering opportunities
•tackling poverty
Adult and Family Learning: working with adults, families, schools
and communities
•digital learning
•personal development
•skills for work
•family learning
•adult literacy and numeracy
•English for Speakers of Other Languages
Building Community Capacity: supporting thriving and cohesive
communities
•supporting communities to act together on local priorities
•accessing green spaces
•participatory budgeting
•working with Local Area Partnerships

Page 13

The Council also commissions or funds projects which directly deliver on CLD priorities,
such as the long-running Street Stuff initiative delivered by St Mirren Football Club; and
the work to tackle disability-related hate crime led by I Am Me.  The Council’s Fairer
Renfrewshire programme and Future Paisley programmes have funded a number of third
sector projects which contribute to the delivery of CLD priorities.   
Other funding sources include the UK Government, the Scottish Refugee Council, and the
Scottish Funding Council.   
Key successes in local delivery include work done to improve youth voice, helping adult
learners with numeracy and digital skills, work to support jobseekers, ESOL provision,
participatory budgeting, and our Environmental Taskforce.   
Case Study: Caroline’s Adult Learning Journey 
Caroline has been taking part in Adult Learning groups for over 10 years.  She originally
sought out support with her literacies so she could help her grandchildren with their
learning. Overtime with support from her tutor her goals have shifted and expanded. 
Caroline has said that thanks to coming to the group she has done things that she
“never thought she would be able to learn or do.” For example, driving theory and
negative numbers. 
Through attending the adult literacies group Caroline has built her confidence and has
sought out other learning opportunities both within Adult Learning and beyond. She
has joined the Talking Heads group in Southend, participated in various college course,
including: Understanding Mental Health, Sewing and Knitting. She is now starting a
psychology course with the Open University. When asked if the group has been
beneficial for her wellbeing, Caroline said it had. 
Case Study: The Promise Arts and Culture Programme 
The Promise Arts and Culture Programme (PACP) aims to build social and cultural
capital amongst Renfrewshire’s Care Experience young people and Young Carers,
ultimately improving outcomes for these disadvantaged and marginalised groups in the
short and longer-term.

Page 14

Since it’s beginning in March 2022, the Promise arts and Culture programme has
brought Care Experience young people from across Renfrewshire to work with artists
from different disciplines such as Film Making, Animation, Graffiti and Street Art, Design,
Photography and Fashion and Textiles in order to create dynamic creative environments
within which Care Experienced could explore their creative voices. 
The success in engaging Care Experienced young people and Young Carers across
Renfrewshire in diverse creative projects has already resulted these young people
moving onto the Youth Services project Art Boss. Here these young people will continue
to have creative and artistic experiences that respond directly to their needs. 
Case Study: Friends of Howwood Park 
After the installation of a new park in Howwood, the Friends of Howwood Park group
was set up hoping to make the park more relevant to village life.  The group have
organised regular fitness classes, an Easter Egg hunt, outdoor bingo, a mini library, a
Halloween Scavenger Hunt and a Christmas Tinsel Walk.  The group have also taken on
ownership of the Pavilion within the park and use it to host a breakfast club, a children’s
library, and provide changing facilities and storage for football and other events in the
park. 
Through the Green Spaces, Parks and Villages Investment Fund, the group secured
£21,000 to create a large shelter in the park, which now provides a space for park users
to meet and socialise regardless of the weather.  The group has also received funding for
tools which help them keep the park clean and tidy. 
The Chair of the Friends of Howwood Park said: 
“The Parks and Villages Investment Fund really has changed the landscape of Howwood
Park, offering an exciting experience for users of all ages.  Footfall has without a doubt
increased; we are all so proud of what we have collectively achieved, especially with the
new group looking specifically after the interests of the Park!  With our new shelter, and
new seating and benches in the village, the Green Spaces and Village Investment Fund
has been a great catalyst for bringing our communities together.”

Page 15

In Renfrewshire, the Council is leading on the Connected Communities programme.  The
aim of the programme is to strengthen partnership working with communities and the
third sector, to have a locality model where services are closer to their community and are
more joined-up.    This programme is in its early stages and our CLD plan will be reviewed
regularly to ensure it aligns with new approaches.

Page 16

Understanding our communities 
Our changing population 
Renfrewshire is home to almost 184,000 people, mainly in urban areas but with a number
of semi-rural villages too.  Our population is projected to keep growing in the next 10
years, particularly those aged 60 and over. We also expect the number of households to
increase to over 90,000 by 2028, predominantly driven by an increasing number of single
adult or two-adult households without children. Renfrewshire is a place of growing ethnic
diversity.  We have growing African, Asian and Polish communities in particular.  Through
national refugee resettlement programmes, we have welcomed new Scots from Syria,
Afghanistan and Ukraine amongst other countries.  The widening of asylum dispersal
across the UK and steady pressures in relation to support for unaccompanied asylum
seeking children have also contributed to changes in our local population and its needs. 
Renfrewshire has areas of high relative deprivation and areas of relative affluence. 
According to the most recent Scottish Index of Multiple Deprivation (SIMD) data (from
2020), 10 areas of Renfrewshire are in the top 5% for income deprivation; 5 of these areas
are within Ferguslie, and the others are in Gallowhill and Hillington, Linwood South,
Paisley North East, Johnstone South East and Renfrew West.  The SIMD data measures
domains other than income, and indicated that the main deprivation issues in
Renfrewshire at that time were health, employment and housing. 
Poverty and the cost of living 
Child poverty remains a concern in Renfrewshire, with 20.4% of children in households
with relatively low income in 2022/23. The most recently published figures on child
poverty show that in Renfrewshire the rate of child poverty after housing costs is 20.4%, an
increase of 2.4% since 2019/20. This figure is slightly less than the Scottish average of
21.3%. The figure is not consistent across Wards, however, with Renfrew South and
Gallowhill having the highest rate at 36.4.% and Bishopton, Bridge of Weir and Langbank
the lowest at 9%.  There have been particularly sharp increases in some areas; Gallowhill’s
child poverty rate had been 26.8% in 2021 whilst in Paisley Northwest the rate rose from
22.9% in 2021 to 33.5% in 2023 and in Johnstone South and Elderslie it rose from 14.5% in
2021 to 21.6% in 2023. 
There continues to be a poverty-related gap in terms of attainment in literacy and
numeracy.   The gap is measured in terms of the percentage of pupils meeting specified
levels at key stages – P1, P4, P7 and S3 - or on the highest level of attainment at the point
of leaving school.  In Renfrewshire, the literacy gap in 2022/23 got wider as pupils

Page 17

progressed through primary school so that by P7,60.3% of pupils in the most deprived
20% of areas met the required literacy standard compared with 86.7% in the least deprived
20% of areas.  The gap did reduce by S3 but widens again by the time pupils leave school. 
The gap for numeracy is smaller than for literacy until pupils reach S3.  This persists into
senior phase; with stay-on rates lower for pupils from more deprived areas, there are fewer
sitting exams at Levels 5 and 6. 
Food prices rose by 23.9% between March 2022 and March 2024. The rising cost of
essentials has been cited as the main reason for accessing food vouchers from
Renfrewshire Foodbank in 2023/24.  At the same time, private rental prices in Renfrewshire
have risen, with the average private rent in March 2024 being £742 per month, up 10.9%
from £669 in March 2023. The number of people accessing Advice Works for support
increased by 7.8% to just over 10,700.   
In common with many areas across Scotland, there are growing numbers of people
presenting as homeless, and challenges in having enough suitable housing stock to meet
the rising level of demand.  In the period February to April 2024, homeless applications in
Renfrewshire included 17 from young people aged 16-18, and 44 households with
children. 
Our local economy 
The latest Renfrewshire Economic Profile notes that Renfrewshire is performing well when
compared to regional and  national data on some key economic indicators including
employment, qualifications and earnings.  The average weekly income for Renfrewshire
residents rose to £715.70 in 2022/23.   This is higher than the Scottish average but slightly
lower than the average for Glasgow City Region.   However, the average weekly wage for
people who work in Renfrewshire is £645.70, around 10% lower. 
Renfrewshire has a higher than average proportion of workers in low-paid sectors – 34.9%
of workers are in these industries, compared with 29.2% in Scotland as a whole.  The three
largest employment sectors are retail, business administration and manufacturing.   
Data for 2023/24 from NOMIS indicated that there were 26,200 economically inactive
people in Renfrewshire.  Within that group, 6,200 (23.7%) were retired, 6,100 (23.3%) were
students and 8,300 (30.9%) had a long term illness. 
NOMIS data shows that Renfrewshire’s benefits claimants includes 1,100 lone parents,
1,980 carers and 1,280 people with a disability; all groups who face additional barriers to
accessing economic activity and other opportunities.

Page 18

Health and Wellbeing 
The 2022/23 Adult Health and Wellbeing Survey carried out by NHS Greater Glasgow and
Clyde provides a wealth of data on physical, mental and social needs of people in
Renfrewshire.  The survey found a sharp increase in the number of people who had a
limiting condition or illness – 33% of those surveyed, up from 19% when the survey was
last carried out in 2017/18. 
The proportion of people reporting feeling lonely or isolated also rose sharply since the
previous survey, with 18% reporting that they felt isolated from family and friends,
compared with 7% in the 2017/18 survey.  The figure rises to 24% in the most deprived
communities.  There is no particular age group more affected than others, but people with
a limiting condition or illness were more likely to feel isolated.  Across Renfrewshire, one in
six people live alone, but this rises with age; 28% of people aged 65-74 and 48% of people
aged 75 and over live alone. 
The survey asked people about their community – whether they felt it was a place where
people supported each other, whether they felt they could generally trust people, and
whether there was someone they felt they could count on for help if needed.  There were
clear differences in views in more deprived areas; whilst 79% of respondents overall felt
that their neighbourhood was a place where people looked out for one another, this fell to
58% in the most deprived areas.  The level of formal volunteering is on a par with the
Scottish average, with 22% of Renfrewshire respondents saying that had done some
formal volunteering in the past 12 months. 
The survey found that 24% of respondents did not think their income was adequate, with
this being more pronounced for people aged 45-54% (36%), people with a limiting
condition (35%) and people in the 15% most deprived areas (38%).  This was a position
that had worsened since the previous survey in 2017/18, when 15.9% did not feel their
income was adequate.  Respondents were also asked about whether they often or
occasionally had difficulty meeting specific expenses; 36% of people had some difficulty in
meeting the cost of food and/or energy at some time.  Again, this was more pronounced
for people aged 45-54 (45%), people with a limiting condition (55%) and people living in
the 15% most deprived areas (50%). 
Renfrewshire has a higher than average number of carers; an estimated 24% of residents
have a regular caring commitment.  The 55-64 age group are most likely to have caring
responsibilities, and women are more likely than men to be carers.

Page 19

Our adult learners 
The findings of the latest Adult and Family Learning Survey, carried out at the start of 2024
by Renfrewshire Council, provided insight into what would interest current and potential
learners, and what barriers to accessing adult and family learning may be.    Almost half of
respondents were interested in personal and social development, with health and
wellbeing activity, confidence building, creative activities and being active in the
community all featuring strongly. 
Our learners identified these as their top three areas of interest for each of our areas of
work: 
Our young people 
Consultation with young people is a key part of the work that the Council’s Youth Services
team do,  and views have been gathered multiple times over the past year including
through Welcome to Your Vote, Celebrating Renfrewshire and work in schools.  This
engagement work has highlighted climate change, the cost of living, poverty and mental
health as priorities for young people.  Topics relating to personal safety were also raised;
this included concerns about drug and alcohol use, vaping, and gender based violence.  
Not feeling safe in the community was also highlighted more generally and this covered
issues such as younger children being afraid of large groups of young people congregating
in public places, bullying and sexual harassment, and a perception that streetlighting and
CCTV could be improved. 
Personal and Social Development
• Health and wellbeing
• Arts, crafts and upcycling
• Confidence building
Adult Literacies
• Helping children with homework
• Driving Theory Test
• Writing
Digital Skills
• Using the internet safely
• Social media
• Job seeking

Page 20

Youth Survey 2024:  Top 5 activities requested by respondents 
Our new partnership and governance arrangements, which are set out later in this plan,
will help further develop our approach to ongoing assessment of need through
strengthened sharing of information.  We will be creating capacity within the Council, as
part of our Connected Communities service, to co-ordinate this. 
Renfrewshire is committed to keeping The Promise and listen to the voices and needs of
our care-experienced community.   Community Learning and Development have
established mechanisms for ensuring that their voice is heard. Scotland has entered year 4
of this 10-year programme of change with strong evidence of activity across Renfrewshire
to #KeepThePromise with significant developments underway and more planned.  The
delivery of The Promise in Renfrewshire requires a strongly committed multi-agency
partnership working approach and demonstration of a collective understanding,
commitment, and activity in relation to The Promise across all the partners. Community
Learning and Development recognises our key role to deliver on The Promise and are a
key active partner in Keeping The Promise in Renfrewshire.
Delivering The Promise in Renfrewshire is part of a wider vision on improving outcomes
for Children and Young People who are more likely to face poorer outcomes because of
experience of child poverty, other inequalities, trauma and adversity. The Promise
approach in Renfrewshire is clearly aligned with significant other policy areas and part of a
wider ambition that Renfrewshire’s children and young people are happy, healthy, safe
and thriving. The Promise aligned policy areas include United Nations Convention on the
Rights of the Child, Getting it right for every child, National Trauma Transformation
Programme and wider equalities strategies and legislation.    
We make every effort as Community Learning and Development professionals to adopt a
loving, nurturing approach that encourages a culture where our service users are
empowered to ask us about any aspect of our services. Central to our approach to The
Promise and our wider policy development work is actively listening to our Children,
Young People and Families. 
In all our Community Learning and Development activity we are ambitious for our Care
Experienced children and The Promise is a key priority for us to ensure children who are
Care Experienced have all they need to thrive, while recognising that they may experience
unique challenges. 
Sports
Activities
Trips and
Experiences
Outdoor
Activities
Youth
Groups
Arts and
Creative
Activity

Page 21

No embedded text on this page.

Page 22

Our shared priorities 
Our shared priorities are aligned on Renfrewshire’s four Community Planning themes –
Fair, Well, Thriving and Safe and on the three focus areas identified within that Community
Plan   Below, we set out what these mean in relation to CLD and what our focus will be in
the next three years. 
Renfrewshire is Thriving 
In our Community Plan, Thriving is about inclusive and sustainable growth.   For CLD then,
thriving is about skills for life and work, supporting activity that is linked to community
wealth building and sustainability, and promoting community regeneration. 
We also know there are people in our communities who face barriers to economic activity,
whether that’s because they are caring for children or another adult, because of their own
health needs, or because they feel they don’t have the right mix of skills for the work they
would be interested in. 
Our learners have told us that they are interested in personal and social development, and
want to be active in their communities.  We know that more than one in five people in
Renfrewshire have undertaken some volunteering in the past.   We also know that there
are examples across Renfrewshire of people coming together and working to make their
community a great place to live.

Page 23

Our CLD Thriving priorities are:
• Supporting communities to engage and participate in community regeneration
• Helping citizens develop skills for work and life, enhancing employability for all
ages
• Contributing to Community Wealth Building in Renfrewshire
• Providing opportunities for volunteering 
Renfrewshire is Well 
In our Community Plan, Well is about supporting the wellness and resilience of our citizens
and communities.  For CLD, it is about supporting communities to be well through offering
opportunities to connect with others and to engage in activities which contribute to
positive health and wellbeing.   
We know the damaging impact on health and wellbeing of isolation and loneliness.  We
also know there are physical and mental benefits from being outside, from enjoying green
spaces, and from taking part in creative activities.   
Our CLD Well priorities are:
• Create and support opportunities for citizens to make positive connections within
and across communities;
• Help build cultural capacity by facilitating and increasing access to arts and
cultural opportunities;
• Promote and facilitate access to nature, green spaces and outdoor activities. 
Renfrewshire is Fair 
In our Community Plan, Fair is about addressing the inequalities which limit life chances.
For CLD, this is about working with citizens and communities to try and deliver equity and
equality in accessing opportunities to learn, strengthening citizen voice by empowering
and enabling people to contribute to decision-making, and providing targeted support
where needed to support those who experience inequality and disadvantage. 
We know that poverty still impacts educational attainment, and that this can impact on
opportunities throughout life.   We know that some groups face greater barriers in
accessing learning and other opportunities, and this could be about health needs, about
poverty, about being care-experienced, or about being perceived by others as different.  In
recent years, we have welcomed growing numbers of New Scots to Renfrewshire, and
recognise the challenges that come with moving to a new country.

Page 24

Our CLD Fair priorities are: 
• Promoting equity and equality by removing barriers to accessing learning
opportunities, including for care experienced people, people with a disability,
people with a hearing impairment and New Scots;
• Providing mechanisms for citizens to contribute to decision-making;
• Delivering targeted support to address disadvantage in our communities;
• Involving and empowering our local communities to help shape and develop our
CLD priorities and activities. 
Renfrewshire is Safe 
In our Community Plan, Safe is about protecting vulnerable people, and working together
to minimise the risk of harm.  For CLD, it is about ensuring our spaces feel safe and
welcoming in terms of our physical spaces but also in terms of our culture and ethos.  It is
also about equipping people with the skills that will support them to make safe and
informed choices whether that is about online safety, sharing public protection messages
or interventions relating to anti-social behaviour. 
We know there are groups of people who can find it more challenging to access learning,
family activities and community activism because of their own past experiences, their
current needs or concerns about how others may treat them.  We want the spaces we use
for CLD activity to be open, accessible and welcoming to all.   
People have told us that they don’t always feel safe in their community, and we will
continue to work with partners to tackle this, whether through practical efforts or by
challenging negative perceptions about some of our communities.  We also know that
communities can include online communities, and we want to give people the tools to feel
safe in that environment too. 
We also know that young people in Renfrewshire have concerns about their own personal
safety, and that this is about feeling safe in the community as well as understanding the
consequences and risks of alcohol, drugs, vaping and other behaviours.   
Our CLD Safe priorities are:
• Providing safe, welcoming spaces for the delivery of CLD activity, making them
accessible, stigma-free and trauma-informed;
• Giving people the skills to help them make safe and informed choices;
• Exploring options for outreach work that engages with young people who may

Page 25

become involved in high-risk behaviors. 
Strengthening our partnership 
As well as our four Community Plan themes, we have added a fifth theme which is about
strengthening our partnership working in relation to Community Learning and
Development.  Stronger partnerships will allow us to maximise opportunities to make a
difference, to enhance our information sharing, reduce duplication and help us make the
best use of our resources.  It will help with identifying unmet need and gaps in provision
and target resources in a joined-up way.   
We have recently established a CLD Partnership Executive Group to provide collective
strategic leadership, and a Partnership Forum to facilitate information sharing and
delivery of joint priorities.    As these are new governance structures, there will be a strong
focus in Year 1 of this plan in developing these groups and ensuring that the right
mechanisms are in place to deliver community learning and development activity as a true
partnership.   This will include agreeing how we represent learner and citizen voice within
our governance structures, and how our third sector and community partners are best
represented on the Executive Group.  We will also agree a communications approach and
establish arrangements for enhanced information sharing and joint working.
We consider workforce development to be a key component in strong partnership
working.  As we embed our governance arrangements, we will look for opportunities to
share learning and development opportunities.  By amplifying the voices of partners,
learners and citizens within our governance structures, we will also create development
opportunities for staff and volunteers looking to work in different ways.

Page 26

Monitoring this Plan 
The Plan will be monitored by the Partnership Executive Group.  The Partnership Executive
will consider progress on a quarterly basis, and updates will be provided to Renfrewshire
Council’s Communities and Housing Policy Board every six months.  These updates will
contain both progress on actions within the plan’s delivery plan and the latest available
data for the agreed performance indicators.