Page 1

PUBLIC 
___________________________________________________________________
To: Communities and Housing Policy Board
On:  19 May 2026 
___________________________________________________________________
Report by: Director of Environment, Housing and Infrastructure
___________________________________________________________________
Heading: Conclusion of Single Voids Team Pilot
___________________________________________________________________
1. Summary 
1.1 The purpose of this report is to provide the Policy Board with a final report on
the work of the Single Voids Team, which was implementing a series of specific
improvement measures. This builds on the interim updates provided to the
Policy Board at its meetings of 29 October 2024 and 19 August 2025.
___________________________________________________________________ 
2. Recommendations 
It is recommended that the Communities and Housing Policy Board: 
2.1 Note the impact of the Single Voids Team pilot in reducing void numbers, void
rent loss and Average Re-let Times. 
2.2 Note the targets that have been set for 2026–2027.   
2.3 Note the actions taken to make the working practices developed during the pilot
“business-as-usual”.
_________________________________________________________
3. Background 
3.1 During the pandemic the number of void properties increased significantly as a
result of the restrictions in place at the time which effectively stopped repair
works and the letting of homes. The resulting challenges were exacerbated by
a shortage of resources across the construction sector and difficulties in dealing
with utilities suppliers.

Page 2

PUBLIC
3.2 The Council carried out an end-to-end review of void processes and officers
have since been working to implement a series of specific measures to improve
void performance, through the establishment of a Single Voids Team pilot,
bringing together officers from both Housing Services and Building Services. 
3.3 Key actions and outcomes from the work of the Single Voids Team included:
earlier selection of new tenants based on estimated completion dates for void
works; the introduction of 360o virtual tours of void properties, so that potential
tenants can accept or refuse them more quickly; and a review of the ready-to-
let standard including reducing the extent of decoration work and the provision
of décor packs to incoming tenants to enhance tenant choice in relation to home
décor. 
3.4 A series of performance measures were established for: 
 The numbers of voids; 
 Void rent loss; and
 Average Re-let Time.
Performance is set out in section 4 of this report.
3.5 It was previously agreed that the pilot should continue throughout 2024–2025
and 2025–2026. This report provides an update on void property performance
at the conclusion of the pilot period and sets out how the working practices
developed during the pilot will now be embedded in “business as usual.” 
4. Performance Measures 
4.1  Specific metrics were established and progress was measured on a weekly
basis. They were as follows: 
4.1.1 The number of voids
At 2 April 2024 we had 517 void properties and the outcome at the end of the
second year was 301. As can be seen from Graph 1 below, there was a
significant reduction in the number of Management voids in the first sixth
months of the pilot and a significant reduction in Operational voids in the second
sixth months, allowing an aggregate reduction of 183 in the first year alone. The
reduction in void numbers continued in the second year but was more modest,
at 33. This may be because we have returned to a more normal level of void
numbers. It should be noted, however, that the reduction in average re-let time
– which was the main objective of the Single Voids Team pilot – was even more
marked in the second year than in the first (see 4.1.3 below). 
4.1.2 Void rent loss
In 2023–2024 the void rent loss was 4.45%. and the outcome at the end of the
second year was 2.89%. The long-term planning assumption for 2025–2026
allows for combined void rent loss of 3.35%, reducing to 3.00% in 2026–2027,
and current performance indicates that the service remains on track to deliver
within the assumptions agreed through the long-term HRA budget and
business-planning process.

Page 3

PUBLIC
As can be seen from Graph 2 below, reductions in void rent loss on a week-to-
week basis mirror the reduction in void numbers. The year-to-date figure
reduced steadily throughout the first year and in the second year it has
remained below 3.00%. The figure for void rent loss reported to the Scottish
Housing Regulator – which is related to (but not identical to) the figure for
Operational voids – was 1.30% for the first year and 0.87% for the second year. 
4.1.3 Average re-let time 
Our average re-let time as reported to the Scottish Housing Regulator last
year and in each of the previous five financial years is shown below:
Year Average re-let time (calendar days)
2020–2021 85.7
2021–2022 66.0
2022–2023 60.6
2023–2024 50.4
2024–2025 37.3
2025–2026 28.6 
There were improvements each year from 2020 to 2024 as we emerged from
the pandemic. In both years of the Single Voids Team pilot there have been
further significant improvements in the turnaround time to 37.3 and 28.6  days
respectively, the best performance achieved by Renfrewshire since the current
reporting regime was introduced.   
4.2  We have now set specific targets for 2026–2027. The table below compares
figures achieved in 2023–2024 (prior to the Single Voids Team pilot), 2024–
2025 and 2025–2026 with the targets for the end of 2026–2027:  
Metric 31.03.24
actual
31.03.25
actual
31.03.26
actual
31.03.27
target
Number of voids 517 334 301 288
Void rent loss 4.45% 3.48% 2.89% 2.70%
Average re-let time (days) 50.4 37.3 28.6 35.0 
4.2.1 The number of voids – we aim to reduce overall void numbers to a maximum
of 2.50% of lettable units by the end of the year, which based on current
numbers is 288. This aligns with the target for void rent loss. 
4.2.2 Void rent loss – the target is a maximum of 2.70% for the whole year. This is
10% more ambitious than the Business Plan, which allows for 3.00%. 
4.2.3 Average re-let time – the target is 35.0 calendar days. In the coming year, with
the emphasis on Management voids (see below), it is likely that many properties
will be re-let after a very long void period. While welcome, this drives up the
turnaround time as these periods are only counted when the property is let, not
while it remains void. Consequently, the figure of 28.6 calendar days achieved
in 2025–2026 will be difficult to achieve in the coming year.

Page 4

PUBLIC
Graph 1 – void numbers 
0
100
200
300
400
500
600
02/04/2024
16/04/2024
30/04/2024
14/05/2024
28/05/2024
11/06/2024
25/06/2024
09/07/2024
23/07/2024
06/08/2024
20/08/2024
03/09/2024
17/09/2024
01/10/2024
15/10/2024
29/10/2024
12/11/2024
26/11/2024
10/12/2024
24/12/2024
07/01/2025
21/01/2025
04/02/2025
18/02/2025
04/03/2025
18/03/2025
01/04/2025
15/04/2025
29/04/2025
13/05/2025
27/05/2025
10/06/2025
24/06/2025
08/07/2025
22/07/2025
05/08/2025
19/08/2025
02/09/2025
16/09/2025
30/09/2025
14/10/2025
28/10/2025
11/11/2025
25/11/2025
09/12/2025
23/12/2025
06/01/2026
20/01/2026
03/02/2026
17/02/2026
03/03/2026
17/03/2026
31/03/2026
Operational Management Total

Page 5

PUBLIC
Graph 2 – void rent loss 
-£10,000
£0
£10,000
£20,000
£30,000
£40,000
£50,000
£60,000
08/04/2024
22/04/2024
06/05/2024
20/05/2024
03/06/2024
17/06/2024
01/07/2024
15/07/2024
29/07/2024
12/08/2024
26/08/2024
09/09/2024
23/09/2024
07/10/2024
21/10/2024
04/11/2024
18/11/2024
02/12/2024
16/12/2024
30/12/2024
13/01/2025
27/01/2025
10/02/2025
24/02/2025
10/03/2025
24/03/2025
07/04/2025
21/04/2025
05/05/2025
19/05/2025
02/06/2025
16/06/2025
30/06/2025
14/07/2025
28/07/2025
11/08/2025
25/08/2025
08/09/2025
22/09/2025
06/10/2025
20/10/2025
03/11/2025
17/11/2025
01/12/2025
15/12/2025
29/12/2025
12/01/2026
26/01/2026
09/02/2026
23/02/2026
09/03/2026
23/03/2026
Actual rent lost (Operational, not including Homeless Persons' Unit voids) Actual rent lost (Management voids)

Page 6

PUBLIC
5. Next steps 
5.1 The pilot has been successful in reducing void numbers, void rent loss and
(crucially) Average Re-let Time. Arrangements are now being made to embed
the model within the staffing establishment to ensure performance
improvements are maintained and to continue to drive further efficiencies in the
void process. A new post of Empty Homes Team Manager will lead the team
and will develop and implement a new action plan to drive continued
improvements across the void property process. 
5.2 A key area of focus for future improvements is that of Management voids –
those that cannot immediately be made ready-to-let. The number of
management voids was reduced from 328 on 16 April 2024 to 224 at the end
of the pilot. In order to reduce overall void numbers as planned, it will be
necessary to make further inroads. Officers will finalise and implement an action
plan to drive down the number, including specifically carrying out a value-for-
money exercise in respect of voids in closes which have an unusual
configuration, have structural problems, are in a poor state of repair and/or are
low demand. This exercise will be led by the Empty Homes Team Manager. 
5.3 Updates on void property performance will continue to be provided to the Policy
Board each year.
__________________________________________________________________ 
Implications of the Report 
1. Financial – the creation of an Empty Homes Team represents additional
staffing costs within the Housing Revenue Account. For 2026–2027, it is
proposed that these costs are managed through realignment of the existing void
repairs budget, recognising that this may create pressure if offsetting savings
are not fully realised. As part of the 2027–2028 HRA Business Plan refresh, the
ongoing revenue impact of these posts, alongside the benefits delivered
through improved void performance and reduced rent loss, will be fully
assessed to inform longer-term funding arrangements and ensure alignment
with HRA sustainability. 
2. HR & Organisational Development – a Scheme of Delegation has been
approved and new posts advertised and by the time of the Board meeting
candidates will have been interviewed. 
3. Community/Council Planning –  
• Working together to improve outcomes – the Single Voids Team brings
together and co-locates key personnel from Housing Services and Building
Services so that they can work closely together to improve performance on
void rent loss, void numbers and void turnaround time. 
4. Legal – none. 
5. Property/Assets – none.

Page 7

PUBLIC
6. Information Technology – none. 
7. Equality & Human Rights – the Recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights.
No negative impacts on equality groups or potential for infringement of
individuals’ human rights have been identified arising from the
recommendations contained in the report because it is for noting only. If
required following implementation, the actual impact of the recommendations
and the mitigating actions will be reviewed and monitored, and the results of
the assessment will be published on the Council’s website.   
8. Health & Safety – none. 
9. Procurement – all procurements including the proposed contract to carry out
works to bring houses to the Scottish Housing Quality Standard and the use of
the Scotland Excel Framework for Construction Materials “Sub-Lot 4.3 – Paint
& Paint Sundries ONLY – Paint Voucher Scheme and Paint Disposal”
Reference 1422 for the supply of “Décor Packs” to new tenants have been done
in conjunction with Procurement colleagues. The appointments of a supplier of
360o virtual tours were for amounts not exceeding £25,000 were carried out by
the Single Voids Team following a competitive process. In all cases officers
have ensured that the Council meets its statutory requirements, its Standing
Orders Relating to Contracts 1 January 2024, The Procurement (Scotland)
Regulations 2016, The Public Contracts (Scotland) Regulation 2015 and the
Council’s Financial Regulations. 
10. Risk – none. 
11. Privacy Impact – none. 
12. Climate Risk – not applicable. 
13. Children’s Rights – not applicable. 
14. Cosla Policy Position – not applicable.
_______________________________________________________
List of Background Papers
Background Paper 1 – Service Update Report to the Communities and Housing Policy
Board of 16 January 2024.
Background Paper 2 – Single Voids Team Update Report to the Communities and
Housing Policy Board of 29 October 2024.
Background Paper 3 – Single Voids Team Update Report to the Communities and
Housing Policy Board pf 19 August 2025.

Page 8

PUBLIC
The foregoing background papers will be retained within the Housing Service for
inspection by the public for the prescribed period of four years from the date of the
meeting. The contact officer within the service is Ray Walkinshaw, Housing
Regeneration and Development Manager, telephone 0141-487 2189 or 07483 146814
and e-mail ray.walkinshaw@renfrewshire.gov.uk.
___________________________________________________________________ 
Author: Ray Walkinshaw
ray.walkinshaw@renfrewshire.gov.uk