Housing Asset and Investment Programme 2025-26 Update - Appendix
Renfrewshire Council · 19 May 2026
Back to Communities and Housing Policy Board — 19 May 2026 and its agenda
Text extracted from the council's PDF. Layout and reading order may differ from the original.
Page 1
MAY 2026 Housing Asset and Investment Programme 2025/26 Update Houston Place, Elderslie
Page 2
Table of Contents 1. External Housing Investment 2025/26 a) Summary Outputs 2025/26 b) 74 Seedhill Road – Regeneration Pilot Project c) Other Regeneration Area Improvements d) Houston Place – Net Zero Pilot Project e) Gallowhill and Glencairn Courts – Ground Source Heating Project 2. Internal Housing Investment Programme 25/26 a) Kitchen/Boilers/Bathroom Installs 3. 2026/27 Investment Programmes and Targets
Page 3
3 1. External Housing Investment 2025/26 The external housing investment programme continues to prioritise improvements in energy efficiency across homes in Renfrewshire through the installation of External Wall Insulation (EWI). This investment reduces heat loss, lowers carbon emissions and supports the Scottish Government’s national Net-Zero ambitions, the Energy Efficiency Standard for Social Housing (EESSH) and Scottish Housing Quality Standard (SHQS). It also aligns with the Council’s wider strategic approach to climate change and sustainability. In addition to energy efficiency improvements, the external housing investment programme delivers essential fabric and renewal works. This may include a combination of roof and gutter replacement, renewal of external render finishes, windows and door renewals, solar PV and improvements to loft insulation. Collectively, these enhancements extend the lifespan of the housing stock, enhance building performance and contribute to improved living conditions for residents. During 2025/26, at total of 781 homes benefitted from a range of external improvement works, with 1132 installations completed. Some properties will have received more that one installation as part of the works – EG a combination of external works, solar PV and new windows. A breakdown of the external works carried out in 2025/26 is set out in the table below: HOUSING ASSET AND INVESTMENT PROGRAMME 2025/26 UPDATE 1 External works Paisley Renfrew Johnstone & Villages Total Number External Wall Insulation Roof Renewal Gutter replacement 92 4 20 116 Render renewal Roof Renewal Gutter replacement 34 0 182 216 Solar Panel Installations 43 3 106 152 Window Renewal 96 8 211 315 Window Renewal (Regeneration areas) 165 86 100 351 Totals 430 101 601 1132 a) External Works Summary Outputs 2025/26
Page 4
3 HOUSING ASSET AND INVESTMENT PROGRAMME 2025/26 UPDATE 2 An example of the works completed as part of the external housing investment programme during 2025/26, is the project at 74 Seedhill Road within the housing regeneration area at Auchentorlie in Paisley. This block along with a further eight blocks in the Auchentorlie and Howard Street areas received significant upgrades including EWI, roof and gutter replacement, windows and door replacement, solar PV, loft insulation. In addition to the regeneration works in Paisley, many villages and towns within Renfrewshire have also received similar enhancements across diverse property types, reflecting the varied nature of the housing stock across the area. MP Group have a cumulative contractor KPI score of 96% against a 90% target. This score is calculated as a weighted average across key performance areas, including timescale delivery, contractor progress reporting, health and safety, recycling performance, application for payment, and community benefits. CONTRACTOR PERFORMANCE Actual Target Overall Score 96% 90% Budget 100% 100% Timescales 84% 100% Contractor’s Report / Health & Safety / Environmental 100% 100%
Page 5
This was the first tenement block to be completed within the Housing Regeneration and Renewal (HRR) areas. The project adopted principles from the EnerPHit standard, a high performance retrofit standard that enables existing buildings to achieve 75% – 90% energy savings alongside enhanced comfort and enhanced structural performance . EnerPHit serves as a practical and deliverable alternative to the full Passivhaus standard (extremely energy-efficient buildings requiring minimal heating or cooling) which is typically applied to new build developments aiming to achieve Net Zero targets. The key elements delivered as part of the pilot were: b) 74 Seedhill Road – Regeneration Pilot Project HOUSING ASSET AND INVESTMENT PROGRAMME 2025/26 UPDATE Improved Insulation: The block has been upgraded with the installation of external wall insulation boards, underfloor insulation and loft insulation to minimise heat loss through the building fabric. Airtightness: The block is as airtight as possible through sealing gaps and cracks in loft and roof space as well as in individual properties to prevent unwanted draughts. This helps maintain a stable indoor temperature and reduces the need for excessive heating or cooling. Underfloor insulation is also installed in ground floor properties where possible. High-Performance Windows and Doors: Installing triple-glazed windows and well-insulated internal and external doors to flats as well as the installation of a high spec common close door greatly improves the building’s energy efficiency by reducing heat loss and preventing cold spots. This has also been applied to common windows and doors of the block. Maintaining minimum temperatures throughout the building will help to eradicate condensation/dampness. Mechanical Ventilation with Heat Recovery (MVHR): An MVHR system is used in all homes within the block to provide fresh air while recovering heat from outgoing air. This helps maintain good indoor air quality without losing valuable warmth. Every room in each of the flats has had ventilation units installed. Minimising Thermal Bridges: Energy-efficient renovations focus on reducing thermal bridges—areas where heat can escape easily - such as around windows and at junctions between walls and floors. Various measures including taping and foaming gaps around windows and doors play a vital role in minimising thermal bridges and maintaining a continuous insulating barrier thus helping to reduce heat loss. 1 2 3 4 5 3
Page 6
HOUSING ASSET AND INVESTMENT PROGRAMME 2025/26 UPDATE 4 This pilot retrofit project was undertaken to demonstrate and evaluate the benefits of delivering high-performance energy efficiency measures in an existing residential block. Internal enhancements were also delivered, including new kitchens, bathrooms and boilers. As external works were completed in early 2026, the project will now undertake a period of post completion evaluation through temperature and humidity monitoring using in home sensors. The retrofit of 74 Seedhill Road was intentionally delivered as a small-scale pilot, that would help assess the future feasibility of such an intrusive approach to retrofitting older property. Before
Page 7
45
Page 8
After 6 After
Page 9
Adjacent to 74 Seedhill Road , eight other fully Council owned blocks in Auchentorlie also received external upgrades. An architectural design was produced in the early stages of the project to capture the look and feel of an energy enhanced version of the blocks at Auchentorlie. The final design was delivered bringing the original concept to life. c) Other Regeneration Area Improvements HOUSING ASSET AND INVESTMENT PROGRAMME 2025/26 UPDATE Concept Result 7
Page 10
8 Before After
Page 11
Houston Place in Elderslie was the first terraced Council block to replace gas central heating with clean heating. Air Source Heat Pumps (ASHP) have been installed to provide highly efficient, renewable heating and domestic hot water by extracting heat from the outside air into each property. Complete in October 2025, this project demonstrated a whole house retrofit approach to eight terraced homes and was supported by grant funding of £254,000 from the Scottish Government to deliver this Net Zero pilot project. As well as the air source heating system, further property enhancements including solar PV, EWI, Mechanical Ventilation with Heat Recovery (MVHR) designed to provide continuous fresh, filtered air while retaining up to 95% of heat from extracted air have been utilised. The properties also benefitted from internal improvements including new kitchens and new radiators. Further energy efficient enhancements have been introduced - double glazing replaced with triple glazing, replacement of external doors (including new porch) loft insulation top-up and thorough air tightness measures to alleviate tenant fuel costs and provide comfortable, high performing energy efficient homes. d) Houston Place – Net Zero Pilot Project HOUSING ASSET AND INVESTMENT PROGRAMME 2025/26 UPDATE 9
Page 12
After Before 10
Page 13
n progress 11
Page 14
After 12
Page 15
13
Page 16
e) Gallowhill and Glencairn Courts – Ground Source Heating Project HOUSING ASSET AND INVESTMENT PROGRAMME 2025/26 UPDATE 14
Page 17
This pioneering project will see the replacement of the gas infrastructure in two high-rise blocks in Gallowhill, Paisley, with sustainable, clean heating for residents. In April 2025, the Council obtained grant funding of £1.8m from the Scottish Government to support a project to provide 180 homes with sustainable and clean heating by taking heat from the ground to replace fossil fuelled boilers. This project represents the first time a local authority in Scotland has deployed a ground source heat pump system of this nature and scale, placing Renfrewshire Council at the forefront of clean heating innovation in Scotland. On-site pre-enabling works commenced in August 2025 followed by a borehole network drilling exercise to enable the extraction of renewable heat energy from the earth, which will be delivered to each flat via individual ground source heat pumps - discreet units designed to fit inside a cupboard that deliver high-efficiency heating and hot water. Drilling of the borehole network was successfully completed in December 2025, followed by significant groundworks which were completed in May 2026. The next phase of works includes the riser installation which will carry the ground sourced heat into all 180 homes. Following this, each flat will have new heat pumps and radiators installed and the existing gas heating system removed, with the new system expected to be fully operational by the end of this year. HOUSING ASSET AND INVESTMENT PROGRAMME 2025/26 UPDATE 15
Page 18
101316
Page 19
1015 HOUSING ASSET AND INVESTMENT PROGRAMME 2025/26 UPDATE 2. Internal Housing Investment Programme 2025/26 10 Internal investment in Renfrewshire’s housing stock continues with improvement works delivered to over 1000 homes in the last year. The table below provides details of the combination of measures that were completed during 2025/26, with both building services and the Council’s appointed contractors delivering internal improvement works in both tenanted and void properties. Despite experiencing some initial challenges in the early phases of this year’s internal investment programme, a high standard of quality of work has been maintained across the kitchen, bathroom and rewire installations. Tenant feedback has been positive, particularly in relation to workmanship, communication and displays of professionalism reflecting the customer focused approach taken for these works. A contract was awarded in January 2026 which will see over 3000 properties benefitting from kitchen, bathroom and electrical rewiring works over the next four years. 17 Internal Works Paisley Renfrew Johnstone & Villages Total Number Kitchen, Bathroom & Rewire 29 6 9 44 Kitchen and Bathroom 4 0 7 11 Kitchen and rewire 18 2 8 28 Kitchen only 66 100 36 202 Bathroom only 3 3 2 8 Full GCH system 157 65 87 309 Gas Boiler only 134 328 24 486 Totals 413 504 171 1088 a) Table 2.1: Kitchen/Boilers/Bathroom Installs
Page 20
Building Services have a cumulative contractor KPI score of 96%. This score is calculated as a weighted average across key performance areas, including timescale delivery, quality, contractor’s report, health and safety, environmental performance, CONTRACTOR PERFORMANCE Actual Target Overall Score 95% 85% Quality 97% 90% Timescales 99% 80% Contractor’s Report / Health & Safety / Environmental 100% 100%
Page 21
101510 18
Page 22
101519
Page 23
1420
Page 24
The Housing Asset & Investment Team, in conjunction with the Council’s procurement teams, continue to monitor the performance of all contractors delivering investment projects. A range of key performance indicators around timescale delivery, health & safety, customer satisfaction and community benefits are monitored on a monthly basis and reported regularly to the internal programme boards which have been established to provide oversight and governance of all housing investment projects. 3. Contractor Performance 21 HOUSING ASSET AND INVESTMENT PROGRAMME 2025/26 UPDATE The table below outlines the key targets for 2026/27 : 4. 2026/27 Investment Programmes and Targets Project / Type of Works Target number of installs Target Completion Date Ground Source Heat Pump Transition 180 December 2026 Kitchen, Bathroom and Electrical Rewire 600 March 2027 Heating 750 March 2027 External Investment – Regeneration Areas 160 March 2027 External Investment – Non-Regeneration Areas 200 March 2027 Window Replacement 500 March 2027 A contract for heating installations will be awarded in 2026/27, with plans to replace heating in over 4000 Council homes over the next four years. A contract to continue window and door replacement programmes across our housing stock will also be awarded in 2026/27. Investment plans for multi storey blocks will be developed following completion of all single building assessments (SBAs).
Page 25
Investment works in the housing regeneration areas will see over 100 Council properties benefitting from external works in the Waverley Road, Foxbar and Howwood Road, Johnstone areas. A window replacement programme is currently ongoing in advance of the external works. Programmes of external wall insulation will continue in approximately 300 non-traditional crosswall properties within the Foxbar, Gallowhill and Hunterhill areas of Paisley. Standard render and roof replacement projects will continue to progress, with council properties benefiting from upgrades within Foxbar, Johnstone Castle, Lochwinnoch and Kirklandneuk (Renfrew) areas throughout 2026/27. HOUSING ASSET AND INVESTMENT PROGRAMME 2025/26 UPDATE Waverley Road Concept 22