PERFORMANCE MONITORING REPORT 
HOUSING LANDLORD COMPLIANCE 
APRIL 2025 – MARCH 2026

Page 2

P a g e | 2
PUBLIC
Contents
1. Position summary for year 2025 - 2026. .......................................................................................................................................3
2. GAS ..............................................................................................................................................................................................4
3. ELECTRICAL ................................................................................................................................................................................5
4. ASBESTOS ...................................................................................................................................................................................7
5. FIRE ..............................................................................................................................................................................................8
6. WATER .........................................................................................................................................................................................9
7. LIFTS .......................................................................................................................................................................................... 10

Page 3

P a g e | 3
PUBLIC 
1. Position summary for year 2025 - 2026 
Category
Total
Number
of KPI’s
Gas 3 3 0 0
Electrical 8 6 2 0
Asbestos 2 0 1 1
Fire 4 4 0 0
Water 4 4 0 0
Lifts 5 5 0 0 
26 22 3 1 
99-100% Pass rate
85-98% Pass rate
<85% Pass rate
Current information being gathered

Page 4

P a g e | 4
PUBLIC
2. GAS 
Cat Indicator Q1 Q2 Q3 Q4 25/26      24/25 Notes
KPI
G.01 
Number of times in current reporting year
Housing failed to meet statutory obligation to
complete a Gas Safety Check within 12 months
of a gas appliance being fitted or last checked 
(Charter Indicator 11) 
0 5 2 4 11
(99.9%) 
5 All services are now
complete         
KPI
G.02
Landlord’s Gas Installations with a valid LGSR
(CP12) within its due date in the last 12 months
as a % of Total Landlord Requirement 
100%  99.81%  99.92%  99.85%  99.9% 99.9% 
KPI
G.03
Number of Communal / District Boilers with valid
certification as a % of Total Landlord Requirement 
100% 100% 100% 100% 100% 100% Serviced monthly and
annually as part of
Term Maintenance
Contract.

Page 5

P a g e | 5
PUBLIC
3. ELECTRICAL 
Indicator Q1 Q2 Q3 Q4 25/26 24/25 Notes
KPI
E.01
Domestic properties with a satisfactory EICR
within its due date as % of total dwellings
requiring an EICR.
80%  95%  96%  95%  95% 92% Forced access
process ongoing.
This figure includes
199 void properties
due for demolition. If
these are excluded
the figure is 99%. 
KPI
E.02
Non-domestic properties (including Common
Areas) with a satisfactory EICR within its due
date as % of total non-Dwellings requiring an
EICR
29%  44%  70%  99%  100% 21% Programme
commenced Nov
2024. All completed
31st March 2026. 
KPI
E.03
Percentage of domestic properties with No
outstanding C1, C2, F1 works. 
0% 95% 99% 99% 99%   80% 262 currently in
progress 
KPI
E.04
Percentage of non-domestic properties with No
outstanding C1, C2, F1 works 
100%  100%  100%  100%  100%  100%  Sheltered Housing,
High Rise and
launderettes 
KPI
E.05
Percentage of Sites with Portable Appliance
Tests (PAT) completed.
100% 100% 100% 100% 100%  100%  Covers Housing
owned appliances in
Sheltered Housing &
High Rise

Page 6

P a g e | 6
PUBLIC
KPI
E.06
Percentage of properties with Lightning
Protection Systems (LPS) inspected and tested. 
100% 100% 100% 100% 100%  100% 
KPI
E.07
Percentage of properties with automated doors,
gates, and barriers with a valid Risk
Assessment. 
100% 100% 100% 100% 100%  82.14%  Fire Risk Assessment
takes account of
equipment         
KPI
E.08
Percentage of properties with automated doors,
gates, and barriers where Maintenance visits
have been completed.
96%  96%  96%  96%  96%  96%  One domestic
property outstanding
– tenant engagement
ongoing. It had been
isolated and currently
operates as a
standard door.

Page 7

P a g e | 7
PUBLIC
4. ASBESTOS 
Cat Indicator Q1 Q2 Q3 Q4 25/26 24/25 Notes
KPI
A.01
Non-Dwellings (common areas) with a valid
asbestos survey and re-inspections of all ACMs
(where required) within its due date as a % of
non-Dwellings requiring one. 
0%  0%  0%  0%  0% 
All sites have been
surveyed with 1350
requiring reinspection.
PIN notice issued by
procurement and
contractor meetings
arranged. 
KPI
A.02
Number of safety occurrences - including any 
reported asbestos related occurrence reporting
(e.g., to the HSE or Regulator) during the
reporting period. 
N/A  0  0  1        1  0
HSE informed of
release or escape of
substances liable to
harm

Page 8

P a g e | 8
PUBLIC
5. FIRE 
Cat Indicator Q1 Q2 Q3 Q4 25/26 24/25 
KPI
F.01
% Of Properties with a Completed and In Date
Fire Risk Assessment (FRA) where required.   
100%  100%  100%  100%  100%  100%
All High flats,
Sheltered, HMOs are
completed and
reviews ongoing.         
KPI
F.02
Total No. of Fire Risk Assessment Actions
Outstanding (but In Date) and total number of
actions overdue  2  1  1  8  8  252 
Q1, Q2 and Q3
actions all complete.
Currently 6
outstanding for Q4 -
awaiting materials. 
KPI
F.03
% Of Buildings with Fire Safety
Systems/Equipment present where all
Systems/Equipment has been Tested/Maintained
in accordance with Policy 
100% 100% 100% 100% 100%           
KPI
F.04
Number of Notices received from the Fire and
Rescue Services with actions required
Number of outstanding 
3  
1
2
3
2
0
2
2
9
2
10 All outstanding works
now completed

Page 9

P a g e | 9
PUBLIC 
6. WATER 
Cat Indicator Q1 Q2 Q3 Q4 25/26 24/25 
KPI
W.01
% of Priority Scheme Properties (against the
stated Total Landlord Requirement) with a valid
Legionella Risk Assessment 
100%  100%  100%  100%  100% 100% 
KPI
W.02
% of General Needs Properties (against the
stated Total Landlord Requirement) with a valid
desktop Risk Assessment. 
100% 100% 100% 100% 100% 100% Procurement process
for domestic LRA’s
underway 
KPI
W.03
% of Properties (against the stated Total
Landlord Requirement) with a valid Written
Scheme where a requirement has been
identified. 
100% 100% 100% 100% 100% 100% 
KPI
W.04
% of Properties (against the stated Total
Landlord Requirement) within a Legionella
Maintenance Regime 
100%  100%  100%  100%  100% 100%

Page 10

P a g e | 10
PUBLIC
7. LIFTS 
The following Key Performance Indicators (KPIs) will be reported: 
Cat Indicator Q1 Q2 Q3 Q4 25/26 24/25 
KPI
L.01
Assets with a Passenger Lift having valid
Thorough Examination within its Due Date as a
% of total assets with a Passenger Lift 
100%  100%  100%  100%  100% 100% 
KPI
L.02
Assets with a Passenger Lift where all
Maintenance and Inspection activity is within its
Due Date as a % of total assets where a
Passenger Lift is present 
100%  100%  100%  100%  100% 100% 
KPI
L.03
Assets with Vertical Through Floor Lifts that
have valid Thorough Examination within its Due
Date as a % of total assets with other Lifts 
100% 100% 100% 100% 100% 100% 
KPI
L.04
Assets with Vertical Through Floor Lifts where
all Maintenance and Inspection activity is within
its Due Date as a % of total assets where other
Lifts are present 
100% 100% 100% 100% 100%  100% 
KPI
L.05
Assets with Actions arising from Thorough
Examinations, Inspection or Maintenance
activity that are Overdue as a % of total assets
where a Lift is present 
100%  100%  100%  86%  100%  94% There are 6 repairs in
progress with our
contractor following
HSB inspection

Page 11