Democracy Spraffa

Social Housing Charter Performance 2025-26 and 2026 Engagement Plan - Appendix

Renfrewshire Council · 19 May 2026
Back to Communities and Housing Policy Board — 19 May 2026 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

PUBLIC 
Scottish Social Housing Charter 
Outturn Report 2025/2026

Page 2

PUBLIC 
Table of Contents
1. Outturn Report .......................................................................................... 3
1.1 Overall Satisfaction ....................................................................... 3
1.2 The Customer Landlord Relationship ........................................... 3
1.3 Housing Quality and Maintenance ................................................ 4
1.4 Neighbourhood and Community ................................................... 5
1.5 Access to Housing and Support .................................................... 5
1.6 Getting Good Value from Rents and Service Charges .................. 6
1.7 Other Customers; Gypsies/ Travellers ......................................... 7
1.8 Tenant and resident Safety………………………………………………….7
2. Core Contextual Indicators ..................................................................... 10
3. Management Information ........................................................................ 11

Page 3

PUBLIC
Outturn Report
1.1 Overall Satisfaction
No. Indicator 23/24 24/25 25/26 3-year
average Notes
1
Percentage of tenants satisfied with
the overall service provided by their
landlord.
72% 72% 72% 72%
The most recent data relates
to the survey conducted in
23/24. 
Source: 2024 Tenant Satisfaction Survey
1.2 The Customer Landlord Relationship
Communication
No. Indicator 23/24 24/25 25/26 3-year
average Notes
2
Percentage of tenants who feel
their landlord is good at
keeping them informed about
their services and decisions.
75.1% 75.1% 75.1% 75.1%
The most recent data
relates to the survey
conducted in 23/24. 
Source: 2024 Tenant Satisfaction Survey 
Complaints
No. Indicator 23/24 24/25 25/26 3-year
average Notes
3/4
The percentage of all
complaints
responded to in full at
Stage 1
93.1% 90.0% 95.7% 93.2% There were 1313 Stage 1 complaints
received and carried forward. 1256 were
responded to in full, in an average of 14.3
days. Last year there were 1,236 stage 1
complaints.
The average time in
working days for a full
response at Stage 1
7.6
days
14.4
days
14.3
days 12.5 days
The percentage of all
complaints
responded to in full at
Stage 2.
71.7% 88.0% 95.2% 89.2%
There were 186 stage 2 complaints
received and carried forward. 177 were
responded to in full, in an average of 17.6
days.  Last year there were 142 stage 2
complaints.  The average time in
working days for a full
response at Stage 2.
18.9
days
28.9
days
17.6
days 21.9 days 
Participation
No. Indicator 23/24 24/25 25/26 3-year
average Notes
5
Percentage of tenants satisfied with
the opportunities given to them to
participate in their landlord’s
decision-making processes.
83.6% 83.6% 83.6% 91.3%
The most recent data
relates to the survey
conducted in 23/24.

Page 4

PUBLIC
Source: 2024 Tenant Satisfaction Survey
1.3 Housing Quality and Maintenance
Housing Quality
No. Indicator 23/24 24/25 25/26 3-year average Notes
6
Percentage of stock
meeting the Scottish
Housing Quality
Standard (SHQS).
68.6% 79.9% 80.9% 76.4%
The percentage of stock
meeting SHQS has
increased slightly to 80.9%. 
Excluding EICR and smoke
detector failures we would
be 86% compliant with
SHQS
7
Percentage of tenants
satisfied with the
quality of their home.
71.6% 71.6% 71.6% 71.6%
The most recent data
relates to the survey
conducted in 23/24. 
(7) Source: 2024 Tenant Satisfaction Survey 
Repairs, Maintenance and Improvements
No. Indicator 23/24 24/25 25/26 3-year
average Notes
8
Average length of time taken to
complete emergency repairs
(hours).
5.6
hours
5.2
hours
4.9
hours
5.3
hours
This year just over 14,500
emergency repairs were completed
in 2025/26.  The average time to
complete continues to improve
from 5.2 hours to 4.9 hours.   
9
Average length of time taken to
complete non- emergency
repairs (days).
7.9  
days
6.9
days
5.5
days 7.3 days
This year just under 28,000 non-
emergency repairs were completed
in an average of 5.5 days. This is an
improvement in the average time
from last year (6.9 days).  
10
Percentage of reactive repairs
carried out in the last year
completed right first time.
87.3% 90.1% 91.1% 89.6%
Of the 27,956 reactive repairs
carried out in 25/26, 25,460 were
completed right first time. This is a
1% improvement compared to last
year.
12
Percentage of tenants who have
had repairs or maintenance
carried out in last 12 months
satisfied with the repairs and
maintenance service.
76.7% 77.2% 78.8% 77.7%
3430 tenants responded to the
satisfaction survey. Of those, 2703
said they were satisfied or very
satisfied.
(12) Source: Point of service survey

Page 5

PUBLIC
1.4 Neighbourhood and Community
Estate Management, Anti-Social Behaviour, Neighbour Nuisance and Tenancy Disputes
No. Indicator 23/24 24/25 25/26 3-year
average Notes 
13
Percentage of tenants satisfied with the
landlord’s contribution to the management
of the neighbourhood they live in.
75.1% 75.1% 75.1% 75.1%
The most recent data
relates to the survey
conducted in 23/24. 
14
Percentage of anti-social behaviour cases
reported in the last year which were
resolved.
99.3% 96.8% 99.5% 98.2% 401 of the 403 cases
were resolved.
(13) Source: 2024 Tenant Satisfaction Survey
1.5 Access to Housing and Support
Tenancy Sustainment and Tenancy Turnover
No. Indicator 23/24 24/25 25/26 3-year
average Notes
15
Percentage of new tenancies sustained for more
than a year, by source of let.
These figures relate to tenancies which
commenced between April 2024 and March
2025.   Overall sustainment has improved
over this period. There is also a positive
increaser in the number of homeless
applicants sustaining for more than a year. In
numerical terms the number of homeless
applicants sustaining their tenancy increase
to 938 from 334 for the previous reporting
year.   
Existing tenants 94.1% 95.6% 94.3% 94.7%
Homeless
applicants 86.5% 85.4% 88.4% 86.9%
Housing List
applicants 91.8% 91.6% 94.7% 92.6%
Other 89.4% 0.0% 90.9% 89.6%
Overall 90.5% 90.3% 91.9% 90.9%
16
Percentage of
lettable houses
that became
vacant in the last
year.
7.8% 7.0% 6.8% 7.2%
The number of lettable houses that became
vacant in the year reduced to 768 compared
to 793 last year.
17
Percentage of
rent due lost
through
properties being
empty during the
last year.
1.45% 1.30% 0.87% 1.2% This indicator continues to improve.

Page 6

PUBLIC
Housing Options and Access to Housing
No. Indicator 23/24 24/25 25/26 3-year
average Notes
18
Number of households
currently waiting for
adaptations to their home
58 27 19 35
During 2025/26 the Service completed
283 adaptations. At the end of March
2024/25 there were 19 households
waiting for an adaptation compared to 27
in the previous year. 
19 Average time to complete
adaptations 50.4 43.0 19.4 37.9
The average time to complete
adaptations significantly improved to 19.4
days from 43 days.  
20
Percentage of the court
actions initiated which
resulted in eviction and the
reasons for eviction.
35.5% 23.5% 25.2% 28.4%
In the last year 111 court actions were
initiated.  From these 27 properties were
recovered due to non-payment of rent
and 1 recovered due to anti-social
behaviour.
Non-payment of rent 34.0% 21.3% 24.2% 26.8%
Anti-social behaviour 1.4% 2.2% 0.9% 1.6%
Other 0.0% 0.0% 0.0% 0.0%
1.6 Getting Good Value from Rents and Service Charges
Value for Money
No. Indicator 23/24 24/25 25/26 3-year
average Notes
21
Percentage of tenants who
feel that the rent for their
property represents good
value for money.
70.3% 70.3% 70.3% 70.3%
The most recent data
relates to the survey
conducted in 23/24. 
Source: 2024 Tenant Satisfaction Survey

Page 7

PUBLIC
Rents and Service Charges
No Indicator 23/24 24/25 25/26 3-year
average Notes
22
Rent collected as
percentage of total
rent due in the
reporting year.
100.4% 100.7% 100.5% 100.6%
Last year £57,798,776 rent was
collected which was more than the
amount due (£54,161,465). 
23
Gross rent arrears
(all tenants) as at
31 March each year
as a percentage of
rent due for the
reporting year.
8.3% 7.1% 6.2% 7.1%
There has been a reduction in the
level of gross rent arrears over the
past year. 
24
Average annual
management fee
per factored
property.
£108 £108 £108 £108 The Annual management fee
remained the same as last year.
25
Percentage of
factored owners
satisfied with the
factoring service
they receive.
72.8% 63.8% 59.8% 62.3%
82 owners responded to our annual
survey, 49 were either satisfied or
very satisfied with the service they
received.
26
Average length of
time taken to re-let
properties in the
last year. (days)
50.4 37.3 28.6 39
There were 811 re-lets in 2025/26. 
There has been improvement in the
average re-let times.  Our void
turnaround times and processes
remain an area of primary focus for
the service, and we will continue to
look for improved ways of working.
(25) Source: Annual owners services survey
1.7 Other Customers: Gypsies/Travellers
No. Indicator 23/24 24/25 25/26
27 Gypsies/travellers – Average weekly rent per pitch.
Currently there are no gypsy/traveller
sites in Renfrewshire. 28
For those who provide sites – percentage of
gypsies/travellers satisfied with the landlord’s
management of the site. 
1.8 Tenant and Resident Safety
No Indicator 23/24 24/25 25/26 3-year
average Notes
11
How many times in the
reporting year did you not
meet your statutory
obligations to complete a
gas safety check within 12
months of a gas appliance
11 5 11  N/A 
Renfrewshire Council has always followed
the Scottish Government guidance and the
more detailed guidance from Gas Safe and
HSE. All these services have been
completed and there are no outstanding
gas services.

Page 8

PUBLIC
No Indicator 23/24 24/25 25/26 3-year
average Notes
being fitted or its last
check?
29
How many times in the
reporting year did you not
meet the requirement to
complete an electrical
installation report (EICR)
within the last five years of
the last EICR? 
New Indicator
N/A N/A 611 N/A
Last year, a total of 3,495 EICRs were
completed. This is higher than a standard
annual cycle (30% of stock), with 611
occasions where the test was not complete
before the due date. There are currently 50
tenanted properties with EICRs overdue. 15
of these are in progress with appointments
being arranged.  35 are being monitored
due to on-going issues, environmental and
no access. The compliance team are
engaging with colleagues across housing
services and other service areas to support
tenants to ensure the EICR can be
completed as quickly as possible.  
30
Number of homes that do
not have ‘satisfactory
equipment for detecting
fire and giving warning in
the event of fire or
suspected fire’ installed at
the year end.
New Indicator 
N/A N/A 633 N/A
The fire detection figures are largely driven
by the verification of documentation rather
than by issues with fire detection provision
on site. A more detailed review process is
now in place to ensure that records are
complete and accurate. 
31
Average length of time (days) taken to resolve cases of damp and/or mould by cause
New Indicator
Condensation N/A N/A 24 N/A There were 176 cases relating to
condensation
Structural issues N/A N/A 33.6 N/A There were 115 cases relating to structural
issues
Other N/A N/A 30.7 N/A There were 70 cases relating to other issues
Overall N/A N/A 28.4 N/A In total there were 361 cases of damp and
mould
32
Percentage of cases of damp and/or mould resolved during the reporting year that were reopened
by cause.
New Indicator
Condensation N/A N/A 7.9% N/A 14 cases were re-opened from a total of 176
cases
Structural issues N/A N/A 6.9% N/A 8 cases were re-opened from a total of 115
cases
Other N/A N/A 8.6% N/A 6 cases were re-opened from a total of 70
cases

Page 9

PUBLIC
No Indicator 23/24 24/25 25/26 3-year
average Notes
Overall N/A N/A 7.8% N/A 28 cases were re-opened from a total of 361
cases
33
Number of open damp
and/or mould cases at the
year end
New Indicator
N/A N/A 69 N/A

Page 10

PUBLIC 
Section 2 Core Contextual Indicators
2.1 For local authorities the Scottish Housing Regulator increased the number of contextual
indicators from 6 to 9, these relate to the stock and profile of our service users.
No. Indicator 23/24 24/25 25/26
C2
Number of lets during the reporting year, by source of let 
Existing tenants 215 247 173 
Housing List applicants 297 324 245 
Mutual Exchanges 0 0 0 
Other sources 46 11 0 
Homeless applicants 391 450 393 
Total number excluding exchanges       949      1,032 811
C3 Abandoned homes 114 93 122
C4 Rent increase 6.0% 7.5% 7.5%
C5
Number of households for which landlords are
paid housing costs 7,119 7,204 7,209
Value of direct housing cost payments received
during the year £29,505,217 £32,626,787 £35,072,618 
C6
Total value of former tenant arrears at year end £2,107,430 £2,089,186 £1,758,195
Total value of former tenant arrears written off at
year end £568,896 £848,228 £416,311
Percentage of former tenant rent arrears written
off at the year end 26.99% 40.6% 23.7%
C7
Scottish Housing Quality Standard (SHQS) – Stock condition survey information 
The date your organisation's stock was last
surveyed or assessed for compliance with the
SHQS 
03/2022 03/2025 03/2026
What percentage of stock did your organisation
fully assess for compliance in the last five years?  60% 77% 88%
The date of your next scheduled stock condition
survey or assessment 04/2024 05/2025 05/2026
What percentage of your organisation's stock will
be fully assessed in the next survey for SHQS
compliance 
33% 20% 20%
C8
Total self-contained stock  12,305 12,078 11,942
Self-contained stock exempt from SHQS  0 0 83
Self-contained stock in abeyance from SHQS  546 302 38
Self-contained stock failing SHQS for one criterion  2,592 1,662 1,908
Self-contained stock failing SHQS for two or more
criteria  732 449 257
Total self-contained stock failing SHQS  3,324 2,111 2,286
Stock meeting the SHQS  8,435 9,665 9,656
C9
Total self-contained properties void at the year
end  546 346 314
Total self-contained properties void for more than
six months at the year end  146 104 79

Page 11

PUBLIC
Section 3 Management Information
Allocations and Managing Tenancy Change 
In 2025/26, just over 5,500 were on the
waiting list for council housing, slightly
more than last year. 
Graph1 
The origin of applications remained
broadly unchanged, with similar
proportions applying from homelessness,
the private sector, other social landlords,
and existing Council tenants. 
Graph 2
The Council let 813 (including 2
acquisitions) properties during the year.
The majority (84%) were allocated through
the group system, which is around the
same as last year (85%). 
Graph 3 
Within the group system, 56% of all lets
were made to Group 1 (Homeless)
applicants, which is an increase from last
year (52%) demonstrating continued
prioritisation of statutory homelessness
duties.
581
5565
0 1000 2000 3000 4000 5000 6000
Housing List
Number of applicants on housing list - at 31st
March 2026
Of which number who have their application
on hold
375
722
3401
606
461
Source of allocation
Statutory Homeless
Mobility
General Applicants (not landlord’s own
tenant)
Transfer Applicants (with housing need)
Transfer Applicants (no housing need)
684
129
0 200 400 600 800
Lets
Lets outwith group system
Lets through group system

Page 12

PUBLIC 
Graph 4 
Lets by property type remained stable
year-on-year, with tenement flats
accounting for around 50% of all Council
lets. 
Graph 5 
56.4%
15.8%
19.7%
7.9%
0.2%
55%
10%
24%
10%
1%
0.0% 20.0% 40.0% 60.0%
Statutory Homeless
Mobility
General Applicants
(not landlord’s own
tenant)
Transfer Applicants
(with housing need)
Transfer Applicants
(no housing need)
Lets and targets
Targets 25/26 %
386
154
68
75
130
Lets by property type
Tenement Flat Own Door Flat
Multi-storey Flat House
Other

Page 13

PUBLIC
Repairs and Maintenance
In 2025/26 just over 45,400 repairs were
carried out and 95.4% were completed
within the target timescale (Graph 6).  This
is more than 2024/25 where over 43,500
repairs were complete with 93.6%
completed within the target timescale. 
Graph 6 
Graph 7 provides information on Customer
Contact Centre performance in relation to
housing repairs calls.  This shows the
volume of calls in 2025/26 and the
outcomes for calls received.  Just over
60,000 calls were made to report repairs
and 97% of these were answered, which is
an improvement on last year of 4
percentage points.   67% of all attempted
calls were answered within the 40 second
target (Graph 8), which is 9 percentage
points better than last year. 
Graph 7 
Graph 8 
98.0%
95.4%
92.9%
88.0%
90.0%
92.0%
94.0%
96.0%
98.0%
100.0%
25/26
% Repairs completed
within target
Emergency Completed
Total Repairs Completed
Routine Completed
60,179 58,390
1,463
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
Contact Centre Calls
Total calls attempted Calls answered
Calls abandoned
2%
67% 65%
97%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
25/26
Calls answered/abandoned
Abandonment Level
% answered calls answered within 40 sec
target
% of all attempted calls answered within 40
sec target (service level)
% Calls Answered

Page 14

PUBLIC
Homelessness & Housing Advice
2025/26 saw increases in all aspects of
people presenting as homeless that
require assessment, whilst there was an
increase in the number threatened with
homelessness and a similar rise in the
number of applications where the Council
has a statutory duty to re-house. This is
symptomatic of the pressures faced with e
service and reflected nationally.  The
proportion of assessments completed
within 28 days remains high at 96.4%,
slightly down from last year (97.8%) (Graph
9). 
Graph 9 
Satisfaction with the quality of advice
(90.9%), the quality of temporary
accommodation (92.5%) and the overall
quality of service received (90.9%) remains
high. (Graph 10). 
Graph 10 
1133
2659
965
0 1000 2000 3000
Number of homeless
applications requiring
assessment
Total number of service
users –those who were
homeless, threatened
with homelessness, or
requiring housing
options advice.
Number of applications
assessed as ‘homeless
or threatened with
homelessness’ (i.e.,
the Council had a duty
to rehouse)
Application and Decision
Making
90.91% 90.91%
92.50%
90.00%
90.50%
91.00%
91.50%
92.00%
92.50%
93.00%
Service and Temporary
Accomodation
Satisfaction
% pleased with the quality of advice and
information they were given
% pleased with the overall quality of the
service they received.
% Satisfied with temporary accommodation

Page 15

PUBLIC
Rent and Arrears 
Arrears performance has continued to
improve, the annual rental income due to
be collected is over £57.4 million.  At the
end of March 2026, just under £1.8 million
was owed in arrears which is slightly more
than of £1.7million, but at 3.13% is around
the same as last year. 
Graph 11 provides a profile of arrears by
value.  There has been a slight increase in
arrears across all bandings with the
exception of those who owe £1,000+ where
the actual figure is reducing. 
Graph 11 
Graph 12 shows the amount owed by
tenants by age profile.  Despite having the
largest proportion of arrears, the age
banding of 25 to 49 has seen a reduction in
the amount owed compared to last year.
Graph 12 
Graph 13 shows the recovery action taken,
last year saw a small decrease in the
number of notices called to court and a in
the number of evictions.   
Graph 13 
Average re-call times to court have
decreased by one week, Graph 14
£131,167
£183,703
£309,
£1,174,033
Value of rent debt
Under £250 Between £250 & £500
Between £500 & £1,000 Over £1,000
£175,337
£1,150,931 £305,105
£166,649
Profile of Arrears by Age
Under 25 years Between 25 & 49 years
Between 50 & 60 years Over 60
596
111
42
5
0 200 400 600 800
NPRP issued
All Cases calling at Court
Decrees Granted
Evictions enforced
S/Officer
Recovery Action

Page 16

PUBLIC 
Graph 14 
Graph 15 highlights the status of debt from
post and pre court.  The amount of debt
pre court  and post court has increased
slightly from last year. 
Graph 15 
Graph 16 provides summary information
on benefit levels.  Benefit uptake remains
high with 76% of our tenants in receipt of
some form of benefit. 
Graph 16  
10.9
5.8
0.0
2.0
4.0
6.0
8.0
10.0
12.0
Recovery Action Court Time
Average time first calling (weeks)
Average time recalled at court…
£1,130,99
£488,579
£178,449
Status of Rent Debt
Arrears Pre-Court Arrears Post Court
Arrears Rent Direct
8,378
2,633
Housing Benefit
Tenants with benefit
Tenants without benefit

Page 17

PUBLIC   
Environment, Housing and Infrastructure
Renfrewshire Council
Renfrewshire House
Cotton Street
Paisley
PA1 1BR