Page 1

___________________________________________________________________
To: Audit, Risk and Scrutiny Board
On: 13 June 2022
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Unaudited Annual Governance Statement 2021 - 2022
___________________________________________________________________
1. Summary
1.1 The Local Authority Accounting Regulations require that an Annual
Governance Statement is prepared and included in the Annual Accounts for the
council. The Annual Governance Statement should be prepared in accordance
with the CIPFA / Solace guidance “Delivering good governance in Local
Government”. 
1.2 The Annual Governance Statement for 2021-22 is attached and has been
prepared in accordance with the relevant regulation and guidance taking
account of the Internal Audit Annual Report and Director’s evaluation of the
operation of the governance arrangements within each service area. 
1.3 The Governance Statement is subject to statutory audit by the Council’s
External Auditors as part of their review of the annual accounts.
___________________________________________________________________ 
2. Recommendations
2.1 Members are invited to note the Annual Governance Statement will be
included in the Unaudited Accounts for 2021/22.
___________________________________________________________________

Page 2

Implications of the Report
1. Financial - None 
2. HR & Organisational Development - None 
3. Community Planning – The application of sound governance
arrangements supports the Council to deliver on its key objectives and
priorities. 
4. Legal - subject to approval by Council, the Accounts will be released
for audit by the statutory deadline of 30 June 2021.   
5. Property/Assets - None 
6. Information Technology - None 
7.  Equality & Human Rights - None 
8. Health & Safety – None
9. Procurement - None 
10.  Risk – Specific risks identified from the Chief Auditor’s Annual Report
and the assessments of service Directors are disclosed in the
statement. 
11. Privacy Impact – None 
12. COSLA Implications – None 
13. Climate Risk - None
________________________________________________________________
Author:           Karen Campbell – 07768354651

Page 3

Annual Governance Statement 
Scope of responsibility 
Renfrewshire Council is responsible for ensuring that its business is conducted in accordance with the law and
proper standards, and that public money is safeguarded, properly accounted for, and used economically,
efficiently and effectively. The Council also has a statutory duty to make arrangements to secure best value
under the Local Government in Scotland Act 2003. In discharging this overall responsibility, the Council’s
members and the corporate management team are responsible for putting in place proper arrangements for its
affairs and facilitating the effective exercise of its functions, which includes arrangements for the management
of risk. 
The Council has approved and adopted a Local Code of Corporate Governance, which is consistent with the
principles of the Chartered Institute of Public Finance and Accountancy (CIPFA) and the Society of Local Authority
Chief Executives (SOLACE) framework; Delivering Good Governance in Local Government. A copy of the Local
Code is available on our website www.renfrewshire.gov.uk. 
This statement explains how Renfrewshire Council has complied with the Local Code and also meets the Code
of Practice on Local Authority Accounting in the UK, which details the requirements for an annual Governance
Statement. 
The purpose of the governance framework 
The governance framework comprises the systems and processes, and culture and values, by which the Council
is directed and controlled and through which it accounts to, engages with and leads the community. It enables
the Council to monitor the achievement of its strategic objectives set out in the Council plan. 
The system of internal control is a significant part of that framework and is designed to manage risk to a
reasonable level. Internal control cannot eliminate all risk of failure to achieve policies, aims and objectives and
can therefore only provide reasonable and not absolute assurance of effectiveness. The system of internal
control is based on an ongoing process designed to identify and prioritise the risks to the achievement of the
Council’s policies aims and objectives, to evaluate the likelihood of those risks being realised and the impact
should they be realised, and to manage them efficiently, effectively and economically. 
The governance framework 
The main features of our governance arrangements are described in the Local Code but are summarised below: 
The overarching strategic priorities and vision of the Council are set out in the Council Plan 2017-2022 and the
Renfrewshire Community Plan 2017-2027. The Council Plan is aligned to the Community Plan and sets out 5
strategic outcomes that the organisation will work to achieve over a 5-year period with specific priorities relating
to tackling inequality, promoting economic and cultural regeneration, attainment and sustainability.
Renfrewshire’s Community Plan (which also acts as Renfrewshire’s Local Outcome Improvement Plan as
required by the Community Empowerment (Scotland) Act 2015) details how community planning partners will
work together to achieve the key priorities identified for Renfrewshire. 
• The key outcomes the Council is committed to delivering with its partners, are set out in the
Community Plan; 
• The Council operates within an established governance framework which incorporates a scheme of
delegated functions, financial regulations, standing orders relating to contracts and procedural
standing orders. These elements of the framework are kept under regular review by the Council; 
• The Council facilitates policy and decision making through a policy board structure; 
• Services are able to demonstrate how their own activities link to the Council’s vision and priorities
through their service improvement plans. Performance management and monitoring of service
delivery is reported through policy boards regularly including six monthly updates to the Leadership
Board on progress against the implementation of the Council Plan; 
•Prior to COVID-19, the Corporate Management Team monitored a quarterly scorecard of performance
information which is now being refreshed to ensure this is fit for purpose. The Council regularly
publishes information about its performance, e.g. “It’s all about you”, a publication outlining the

Page 4

performance of the Council published annually. An annual benchmarking report on the performance
of the Council is submitted to the Audit, Risk and Scrutiny Board; 
• The Council has adopted a code of conduct for its employees. Elected members adhere to the
nationally prescribed Code of Conduct for Members. In addition, the Council has in place a protocol
for Relationships between Political Groups, Elected Members and Officers; 
• The Council’s approach to risk management is set out in the risk management strategy and is well
embedded. Risks are reported regularly to the Audit, Risk and Scrutiny Board; 
• The Director of Finance and Resources is the Council’s Senior Information Risk Owner and information
risk is monitored through the Information Management and Governance Group and its sub-groups.
The Managing Solicitor, Information Governance is the statutory Data Protection Officer; 
• Comprehensive arrangements are in place to ensure members and officers are supported by
appropriate training and development; 
• Registers of interests for elected members and senior officers are maintained and published on the
Council’s website; 
• The Council complies with the CIPFA Code of Practice on Managing the Risk of Fraud and Corruption
and the Council’s arrangements for fraud prevention, detection and investigation are managed
through the corporate counter fraud service; 
• The Council’s approach to ‘whistleblowing’ is outlined in the policy for expressing concerns outwith
line management; 
• A range of multi layered Cyber Security controls are in place and are tested annually to check
standards in line with Government guidance.  Industry cyber security standards are followed and
explicitly those belonging to Public Sector Network (PSN), National Cyber Security Centre (NCSC)
guidance, Scottish Government Public Sector Cyber Resilience Plan and Payment Card Industry (PCI)
data security standards.  The O365 security and compliance toolset provides a wide range of
protection against cyber-attacks including identity theft and phishing.  The Council holds a current
Certificate of Compliance for PSN standards.  ICT network and digital services are monitored monthly
through our cyber security partner.  These are all monitored and managed through the Cyber Security
team which is headed up by a CISM qualified Cyber Security Architect (Cyber Information Security
Manager)
• Clear and independent governance arrangements are in place with One Ren and the Renfrewshire
Health and Social Care Partnership with oversight from the Head of Policy and Commissioning
(Council’s Designated Monitoring Officer) and the Council’s Leadership Board. 
• Seven Local Partnerships have been established and have identified initial local priorities. Decision
making including that relating to relevant grants is delegated to each Local Partnership through a Lead
Officer appointed by the Council. 
This governance framework has been in place at Renfrewshire Council for the year ended 31 March 2022, subject
to the impact of the COVID-19 pandemic as disclosed in the section on review of effectiveness and continuous
improvement below. 
Within the 2020/21 report, Audit Scotland concluded that “The Council has appropriate governance
arrangements in place. We recognise that in responding to the COVID-19 pandemic the Council revised its 
governance arrangements. The new arrangements are appropriate and support good governance and
accountability. There is effective scrutiny, challenge and informed decision making.” 
The system of internal financial control 
The system of internal financial control is based on a framework of regular management information, financial
regulations, administrative procedures (including segregation of duties), management and supervision, and a
system of delegation and accountability. Development and maintenance of the system is undertaken by
managers within the Council. The system includes: 
• Guidance on financial management supported by comprehensive financial regulations and codes; 
• Comprehensive budgeting systems, and detailed guidance for budget holders; 
• Regular reviews of periodic and annual financial reports which indicate financial performance against
the forecasts; 
• Setting targets to measure financial and other performance; 
• The preparation of regular financial reports that indicate actual expenditure against the forecasts;

Page 5

• Clearly defined capital expenditure guidelines; 
• As appropriate, formal project management principles; 
• The Chief Finance Officer is the Director of Finance and Resources who complies with the CIPFA
Statement on the Role of The CFO in Public Services. 
The role and responsibilities of the Audit Committee and the Chief Auditor 
The role of the audit committee is under the remit of the Audit, Risk and Scrutiny Board which is chaired by a
member of the opposition; its role includes: 
• to approve the internal audit charter and annual internal audit plans; 
• to review internal and external audit reports and the main issues arising, including those relating to
the annual accounts and seek assurance that action has been taken and make recommendations to
the Council where appropriate; 
• to receive and consider the Chief Auditor’s annual report, summarising internal audit activity and the
level of assurance this provides over the arrangements for internal control, risk management and
governance within the Council; 
• to monitor the performance of internal audit; 
• to consider the annual review of the Local Code of Corporate Governance. 
The internal audit service operates in accordance with the Public Sector Internal Audit Standards and reports to
the Audit, Risk and Scrutiny Board. Internal audit undertakes an annual programme of work, approved by the
Board, based on a strategic risk assessment. The Council’s Chief Auditor provides an independent opinion on the
adequacy and effectiveness of the governance framework, risk management and internal control. The Council
conforms to the requirements of the CIPFA Statement on the Role of the Head of Internal Audit (2019). 
Members and officers of the Council are committed to the concept of sound governance and the effective
delivery of Council services. The Audit, Risk and Scrutiny Committee complies with the CIPFA guidance Audit
Committees: Practical Guidance for Local Authorities and Police. The Council’s Chief Auditor has responsibility
to review independently and report to the Audit, Risk and Scrutiny Board annually, to provide assurance on the
adequacy and effectiveness of the Local Code and the extent of compliance with it. The Audit, Risk and Scrutiny
Board performs a scrutiny role in relation to the application of the Local Code of Corporate Governance and
regularly monitors the performance of the Council’s internal audit service. 
Internal Audit reporting arrangements include communication of finalised audit engagements, monitoring the
progress of agreed management actions and communication of any unacceptable risk identified to the Board. 
Review of effectiveness and continuous improvement 
Renfrewshire Council has responsibility for conducting, at least annually, a review of the effectiveness of its
governance framework including the system of internal control. The review of effectiveness of the framework is
informed by the work of the Corporate Management Team who have responsibility for the development and
maintenance of the governance environment, the Chief Auditor’s annual report, and reports from the external
auditors and other review agencies and inspectorates. 
The effectiveness of the governance framework is reviewed annually by the Corporate Management Team,
including the use of an annually updated self-assessment tool covering six key areas of governance (including
the impact on governance of the coronavirus pandemic), as follows: 
• Business Planning and Performance Management 
• Internal Control Environment 
• Budgeting, Accounting and Financial Control 
• Risk Management and Business Continuity 
• Conflicts of Interest, Whistleblowing and Gifts and Hospitality 
• Impact of coronavirus (COVID-19). 
This self-assessment indicated the governance framework is being complied with in all material respects. In
addition, the review of the effectiveness of the governance arrangements and the systems of internal control

Page 6

within the group entities places reliance upon the individual bodies’ management assurances in relation to the
soundness of their systems of internal control. 
The Council has a well embedded approach to continuous improvement through self-assessment. Registered
services within education, social care and housing undertake regular self-assessment as part of the delivery of
their services, including aspects such as multi agency file reading and practice and improvement groups in place.
Staff from across services are also invited to participate in improvement sessions linked to the service
improvement plans on an annual basis, or in relation to specific exercises such as the “Our Values” staff
engagement process in 2019. The Council previously utilised the Public Services Improvement Framework and
is considering options for a future self -assessment activity. 
The Council continues to recognise the need to exercise strong financial management arrangements to manage
the financial pressures common to all local authorities, and has robust financial control and financial planning
processes in place. The CIPFA Financial Management (FM) Code was adopted in June 2021 and work is underway
to disseminate the results and establish an action plan to address any required improvements. 
Throughout this year, there continued to be unprecedented challenges facing the Council in responding to the
ongoing COVID-19 pandemic which significantly altered the way in which the organisation operates and
significantly changed the delivery of services. Reduced capacity and competing priorities as well as an upturn in
demand in some areas due to the easing of restrictions continue to be actively managed on a daily basis. The
following should be specifically noted: 
• emergency governance arrangements remained in operation throughout 2021/22 and amended
regularly to take account of the prevailing COVID-19 regulations.  These amendments were approved
by Council. A protocol was established during the year to facilitate the conduct of hybrid meetings
which were broadcast live with the option available to the Convenor of each Board to hold the
meeting remotely by teams if they wish and this protocol continues to be in operation; 
• the Council are progressing with their economic and social renewal and recovery plans in recent
months, along with partners in response to the COVID-19 pandemic over the short to medium term. 
The Corporate Management Team continue to have a specific focus on recovery from the COVID-19
pandemic; 
• regular performance reports have been prepared for policy boards throughout the period of the
pandemic in the form of service update reports.  Each service has developed a Service Delivery Plan
for 2021/22 in place of the usual service improvement plans, in order to focus on activities linked to
recovery over this year in particular.  Services are currently preparing 3 year Service Improvement
Plans for approval by policy boards prior to Summer 2022; 
• tranche 2 of the Right for Renfrewshire programme was commenced over the second half of 2021. 
This was on a smaller scale than originally planned and the service redesigns progressed were in those
areas where it was anticipated that there would be potentially less direct impact from the pandemic
recovery process and where the greatest opportunity exists for appropriate management and service
capacity to be directed towards the Right for Renfrewshire agenda;
• financial management across the Council has remained strong, with continued additional reporting in
place to clearly distinguish COVID-19 related costs and income losses from core operating costs. Over
the course of the year significant amounts of additional non-recurring income has been secured from
the Scottish Government in order to ensure local government continues to provide support to local
communities and businesses. Funding has been provided both to support Council expenditure, but
also on an “agency” basis whereby the Council administers grant schemes designed by the Scottish
Government. Ensuring compliance with the various grant conditions has entailed considerable work
by Council officers throughout 2021/22.  Any potential fraudulent grant applications were referred to
the Council’s Corporate Fraud Team for investigation and referral on to the Procurator Fiscal or Police,
as appropriate; 
• all essential services have continued to be delivered throughout the pandemic and business continuity
arrangements are in place and operating highly effectively. Some areas of service activity were
stopped or deferred; others were delivered through different processes. There have been no
significant changes to internal controls although significant numbers of new and amended processes

Page 7

and services have been put in place to allow the Council to appropriately respond to the impact of
the pandemic and to support local communities and businesses. The Council has now developed
service recovery programmes to reopen services and catch up on deferred work, moving towards
more normal levels of service activity and service priority. This is a process and programme of work 
that is likely to continue into 2022/23 and beyond;
• although the Council’s cyber security arrangements are considered to be robust and are regularly
tested, recognition of the ever increasing criminal cyber activity and the recognition that cyber-
attacks are becoming more and more frequent and sophisticated and that there is an increased
reliance on electronic systems resulted in a focused review of the Council’s cyber environment being
undertaken.  This led to the decision that the cyber -related elements within the Organisation
Resilience risk would benefit from being a separate corporate risk for a period of time, with the further
scrutiny that this affords;
• the Council commenced planning for Brexit during 2019/20 and identified risks have been
incorporated into the Strategic and Corporate Risk Registers. A number of significant areas of risk
remain for the organisation and for communities that have been deferred due to a combination of
COVID-19 impacts, particularly in relation to employment constraints related to closure of hospitality
and retail establishments masking the impact of the end of freedom of movement and the deferral of
the introduction of required import checks and restrictions which when introduced will lead to
increased restrictions, delays and cost increases on products and services from the European Union
and a significant and ongoing regulatory burden for Environmental Health Officers and Trading
Standards Officers. Some of these risks will be further exacerbated by the ongoing conflict in Ukraine
and the associated sanctions on Russia which will place additional cost and supply pressures on some
products and materials that are likely to increase and continue into 2022/23.   
Regular reviews of the Council’s arrangements are undertaken by internal audit and overall, the Council’s
internal financial control arrangements are considered to be sound. 
As part of the ongoing relationship which is in place under the new best value methodology, Audit Scotland
continuously engage with the Council in relation to the improvement plan, regularly attending Council and board
meetings and reviewing information provided. Each year Audit Scotland provide an assessment of the ongoing
position in relation to best value, within the Annual Audit Report. The Annual Audit Report for 2020/21 was
published in November 2021 noted that the Council continues to make positive progress addressing the
recommendations contained in our 2016/17 Best Value Assurance Report.   
Audit Scotland provided an unqualified and unmodified audit opinion on the 2020/21 annual accounts.   
The programme of work undertaken by internal audit identified 2 occasions where a limited assurance level was
given in relation to the internal control, risk management and governance objectives for the specific areas of
each audit review. The following areas are those identified as requiring improvement: 
• A review of the procedures in place for identifying and dealing with unsafe memorials in cemeteries
was undertaken and it was identified that insufficient progress had been made in this area due to
capacity issues, mainly as a result of the service having other priorities arising from the pandemic. 
Management agreed to allocate additional resource to this area and progress will be monitored
through the internal audit follow-up process. Although this area requires to be addressed there is no
significant impact on the Council’s overall system of internal control. 
• The operation of Purchase Cards was reviewed to ensure that the correct procedures were being
followed during the pandemic and whilst there were adequate procedures in place covering the
purchase of goods with Purchase Cards, issues were identified regarding compliance and the
timeliness of approval of transactions. Management agreed to implement the improvement actions
required and progress will be monitored through the internal audit follow-up process. 
Internal audit undertakes an annual exercise to ensure that recommendations arising from internal audit
engagements have been implemented by service management and the results are reported to the Audit, Risk
and Scrutiny Board (ARSB). This work highlighted that 82% of recommendations were implemented by the due

Page 8

date. 17% had passed their original due date and revised implementation dates have now been set and 1% were
superseded. Of the 21 recommendations followed up that were deemed to be critical, 18 have been fully
implemented and 3 have been partially implemented. Revised implementation dates have been agreed for each
of these recommendations. 
It is our view that the Council has in place a sound system of governance, risk management and internal control
and that appropriate mechanisms are in place to identify any areas of weakness. This is corroborated by an
Annual Assurance Statement prepared by the Council’s Chief Auditor stating that reasonable assurance can be
placed upon the adequacy and effectiveness of the Council’s governance, risk management and internal control
framework. 
Action Plan
Following consideration of the review of adequacy and effectiveness the following action plan has been agreed
to ensure continual improvement of the Council’s governance. 
Agreed action Responsible person Date
Prepare 3-year Improvement Plans for each
service 
Service Director August 2022
Review and refresh quarterly scorecard of
performance information 
Head of Policy and
Commissioning
September 2022
Establish an action plan arising from the CIPFA
FM Code
Head of Finance and
Business Services
31 December 2022 
The agreed actions will be subject to review to identify the progress being made in implementing these actions.
Update on the 2020/21 Action Plan 
The 2020/21 Governance Statement identified areas of continuous improvement activities to be taken forward
to improve the overall governance, risk management and internal control environment. Progress over the last
12 months against the agreed action plan is detailed below.
Agreed action Progress Update Responsible
person
Date Revised Date
Ongoing Actions    
Review and update where
necessary the policy for
expressing concerns
outwith line management
‘whistleblowing’ for
approval by Board.
The update was delayed
due to other priorities,
but the policy is now in
its final draft and has
been submitted for
consultation to senior
management and other 
appropriate parties,
prior to being submitted
to Board for approval
Chief Auditor September
2021
August 2022
Review and refresh the
Council Plan.
The work on the new
Council Plan has
commenced
Head of Policy
and
Commissioning
September
2022
N/A 
Assurance
Subject to the above, and on the basis of the assurances provided, we consider the governance and internal
control environment operating during 2021/22 provides reasonable and objective assurance that any significant
risks impacting on the achievement of our principal objectives will be identified and actions taken to avoid or
mitigate their impact. Systems are in place to continually review and improve the governance and internal
control environment and action plans are in place to address identified areas for improvement.