Notice of Meeting and Agenda
Audit, Risk and Scrutiny Board 
Date Time  Venue
Monday, 22 January
2024
15:00 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN 
MARK CONAGHAN
Head of Corporate Governance 
Membership 
Councillor Andy Doig (Convener):     Councillor Kevin Montgomery (Depute Convener):    
Councillor Jennifer Adam:  Councillor Chris Gilmour:  Councillor John Gray:  Councillor
Lisa-Marie Hughes:  Councillor Robert Innes:  Councillor James MacLaren:  Councillor
Janis McDonald:   
Hybrid Meeting 
Please note that this meeting is scheduled to be held in the Council
Chambers.  However, it is a hybrid meeting and arrangements have been made for
members to join the meeting remotely should they wish. 
Webcasting of Meeting 
This meeting will be filmed for live or subsequent broadcast via the Council’s internet
site – at the start of the meeting the Convener will confirm if all or part of the meeting
is being filmed.  To find the webcast please navigate to 
https://renfrewshire.public-i.tv/core/portal/home 
Page 1 of 82

Page 2

Further Information 
This is a meeting which is open to members of the public. 
A copy of the agenda and reports for this meeting will be available for inspection prior
to the meeting at the Customer Service Centre, Renfrewshire House, Cotton Street,
Paisley and online
at http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx
For further information, please email
democratic-services@renfrewshire.gov.uk 
Members of the Press and Public 
Members of the press and public wishing to attend the meeting should report to the
customer service centre where they will be met and directed to the meeting.  
Page 2 of 82

Page 3

Apologies 
Apologies from members. 
Declarations of Interest and Transparency Statements 
Members are asked to declare an interest or make a
transparency statement in any item(s) on the agenda and to
provide a brief explanation of the nature of the interest or the
transparency statement. 
AUDIT 
1 Summary of Internal Audit Reports for period 01
October to 31 December 2023 
Report by Chief Auditor. 
5 - 20 
2 Internal Audit and Counter Fraud Progress and
Performance for Period to 31 December 2023 
Report by Chief Auditor. 
21 - 28 
MONITORING & REVIEWING SERVICE DELIVERY PERFORMANCE
POLICIES AND PRACTICE 
3 Dargavel Primary School Independent Review
recommendations – actions monitoring report 
Report by Chief Executive. 
29 - 54 
4 Scottish Information Commissioner – Annual Report 
Report by Director of Finance & Resources. 
55 - 58 
5 Scottish Public Services Ombudsman (SPSO) Annual
Report 2022/23 
Report by Director of Finance & Resources. 
59 - 64
Page 3 of 82

Page 4

6  Commissioner for Ethical Standards in Public Life in
Scotland – Annual Report 2022/23 
Report by Director of Finance & Resources. 
65 - 72 
ANNUAL PROGRAMME 
7 Neighbour Disputes - Lead Officer Roz Smith 
Report by Lead Officer. 
73 - 82 
Page 4 of 82

Page 5

___________________________________________________________________
To: Audit, Risk and Scrutiny Board
On: 22 January 2024
___________________________________________________________________
Report by: Chief Auditor
___________________________________________________________________
Heading: Summary of Internal Audit Reports for period 01 October to 31
December 2023
___________________________________________________________________
1. Summary
1.1 In line with the Public Sector Internal Audit Standards, Internal Audit
must communicate the results of each engagement to the Board. To
comply with this requirement, Internal Audit submits regular reports
on the findings and conclusions of audit engagements to the Audit,
Risk and Scrutiny Board. 
1.2 Appendix 1 provides details those audit engagements completed
during the period 1 October to 31 December 2023 with the overall
assurance rating and the number of recommendations in each risk
category. The committee summary for each report is also attached.
For each audit assignment where recommendations have been
made, the relevant managers have put action plans in place to
address the issues raised. 
1.3 In addition to the reports listed in the Appendix, Internal Audit has an
ongoing commitment to: 
• A range of corporate and service initiatives;
• Progressing of information security matters in partnership with
ICT and Legal Services;
• The regular provision of advice to departmental officers;
• The provision of internal audit services to the associated
bodies for which Renfrewshire Council is the lead authority
and to OneRen and Renfrewshire Health and Social Care
Integrated Joint Board;
Item 1
Page 5 of 82

Page 6

• Co-ordination of the Council’s corporate risk management
activity;
• Management of the counter fraud team;
• Management of the risk management and insurance team.
___________________________________________________________________ 
2. Recommendations
2.1 Members are invited to consider and note the Summary of Internal Audit
Reports finalised during the period from 1 October to 31 December 2023. 
___________________________________________________________________
Implications of the Report
1. Financial - None 
2. HR & Organisational Development - None 
3. Community Planning – 
Safer and Stronger - effective internal audit is an important element of good
corporate governance. 
4. Legal - None 
5. Property/Assets - None 
6. Information Technology - None 
7.  Equality & Human Rights – None 
8. Health & Safety – None
9. Procurement - None 
10.  Risk - The summary reported relates to the delivery of the risk-based internal
audit plan. 
11. Privacy Impact – None 
12. COSLA Implications – None 
13. Climate Risk - None 
________________________________________________________________
Author:           Karen Campbell – 07768354651
Page 6 of 82

Page 7

Appendix 1 
Renfrewshire Council 
Internal Audit Service 
Update for Audit, Risk and Scrutiny Board 
Final Audit Reports issued from 1 October – 31 December 2023 
Category  Service  Engagement  Assurance
Rating
Recommendation Ratings
Critical Important Good
Practice
Service
Improvement
Assurance Finance and
Resources
Variations of Pay Reasonable 0 2 1 0 
Chief Executives Planning Processes Reasonable 0 2 1 0 
Environment,
Housing &
Infrastructure
Housing Assurance
Statement 
Substantial 0 0 0 0  
Roads, Labour and
Plant Contract
Limited  2 3 0 0
Governance Chief Executives Performance
Management
Reasonable 0 0 3 0 
Note  – No assurance rating can be given in respect of investigation assignments                 
Assurance Level 
Substantial Assurance • There is a sound system of internal control designed to achieve the objectives of the area being reviewed. 
• The control processes tested are being consistently applied. 
Reasonable Assurance • The internal control processes are generally satisfactory with some areas of weakness being identified that could
put some objectives of the area being reviewed at risk
• There is evidence that the level of non-compliance with some of the control processes may put some of the
Page 7 of 82

Page 8

objectives of the area being reviewed at risk. 
Limited Assurance • Weaknesses in the system of internal controls are such as to put the objectives of the area being reviewed at risk. 
• The level of non-compliance puts the objectives of the area being reviewed at risk. 
No Assurance • Control processes are generally weak with significant risk to the achievement of the objectives of the area being
reviewed. 
• Significant non-compliance with control processes leaves the processes/systems open to error or abuse. 
Recommendation
Rating 
Service Improvement  Implementation will improve the efficiency / housekeeping of the area under review.
Good Practice  Implementation will contribute to the general effectiveness of control.
Important  Implementation will raise the level of assurance provided by the control system to acceptable levels.
Critical  Addresses a significant risk, impacting on the objectives of the area under review. 
Page 8 of 82

Page 9

Internal Audit Report
Finance & Resources
Payroll Overpayments (A0031/2023/001) 
Date: October 2023 
COMMITTEE SUMMARY 
Audit Objectives
The objectives of the review were to ascertain the main reasons for overpayments
occurring and ensure that;
1. The payroll processes in place to pay employees accurately are adequate and well
communicated to services to minimise the amount of overpayments occurring;
2. Overpayments arising, are recorded and employees are notified timeously;
3. Overpayment reports are regularly sent to senior management and regularly
reviewed;
4. Reasons for overpayments are ascertained by service management and action is
taken to strengthen controls where required;
5. Employees and former employees have been made aware of their responsibilities
and action to be taken in relation to overpayments. 
Audit Scope
1. Interviewed the appropriate staff to understand the systems in place to enable
employees to be paid accurately and minimise the amount of overpayments
occurring.
2. Prepared a series of tests to meet the above objectives. 
Key Audit Assurances
1. The value of payroll overpayments has decreased in recent years although the
number of overpayments has remained relatively static. 
2. Payroll overpayments are being identified and acted upon by Business Services
employees more quickly than in previous years.
3. The Salary Adjustment Policy provides clear guidance as to the responsibilities
and actions to be taken in relation to recovery of payroll overpayments for
employees and former employees. 
Key Audit Risks
1. The risk of avoidable overpayment is increased where clear and accessible
guidance is not made available to services managers to inform them of the correct
procedures and the required payroll deadlines. 
2. Where employees are not informed timeously about payroll overpayments, it can
make them more difficult to recover and there may be reputational damage to the
council. 
Page 9 of 82

Page 10

Internal Audit Report
Finance & Resources
Payroll Overpayments (A0031/2023/001) 
Date: October 2023 
Overall Audit Opinion
Improvements in processes and increased awareness over recent years has resulted in
the value of overpayments being significantly reduced. By far, the main reason for
overpayments occurring is late notification of changes by managers within the employing
service. The auditor has recommended that clear and accessible guidance should be
made available to service management, along with regular communications to ensure that
newer managers are aware of the deadlines and where they can access relevant
guidance. 
Management Commentary
To ensure we receive notification of permanent payroll changes as quickly as possible, we
are on the process of streamlining our leavers and flexible working request forms onto the
Business World system and on completion, the process to be followed will be 
communicated to Managers.  A monitoring process for the recovery of overpayments has
now been put in place. 
Page 10 of 82

Page 11

Internal Audit Report
Chief Executive
Planning Processes (A0053/2023/001) 
Date: October 2023 
COMMITTEE SUMMARY 
Audit Objectives
The objectives of the audit were to ensure that:
1 Adequate documented procedures are in place for administering planning applications
and building warrants and these are available to all relevant officers;
2 All applications received are recorded, processed in accordance with procedures and
timescales and records are accurately updated;
3 All appeals received are recorded, processed in accordance with procedures and
timescales and records are accurately updated;
4 Fees charged for planning applications and building warrants are correctly applied and
paid;
5 Performance indicators are monitored and reported to management. 
Audit Scope
1 Interviewed the appropriate staff to ascertain the processes and controls in place for
administering planning applications and building warrants and assessed them for
adequacy.
2 Prepared and undertook a series of tests based on sampling to confirm the adequacy
and effectiveness of the controls identified. 
Key Audit Assurances
1 Adequate documented procedures from the Scottish Government are in place for
administering planning applications and building warrants and these are available to
all relevant officers.
2 All building warrants and planning applications tested were recorded, processed in
accordance with procedures and records were accurately updated.
3  All appeals received tested were recorded and processed in accordance with
procedures and timescales.
4 Fees charged for building warrants and planning applications tested and were
correctly applied and paid.
5 Performance indicators are monitored and reported to management. 
Key Audit Risks
Where building warrants and planning applications take longer than expected to
complete, this can result in delays and potentially additional costs for clients. 
Page 11 of 82

Page 12

Internal Audit Report
Chief Executive
Planning Processes (A0053/2023/001) 
Date: October 2023 
Overall Audit Opinion
The audit identified that a satisfactory system is in place for administering building
warrants and planning applications. However, the timescales for completing both building
warrants and planning applications are regularly substantially longer than targets, which
can result in delays and potentially additional costs for clients undertaking building
projects. 
Management Commentary
Staff retention and recruitment in this field is challenging and vacancies are being carried
for longer than intended.  These staff resource pressures are having an effect on the
speed of the decision-making process.  Alternative resource options and service process
improvements are being explored and implemented by management where possible ,
including our “grow our own” training scheme. 
Page 12 of 82

Page 13

Internal Audit Report
Environment, Housing & Infrastructure
Housing Assurance Statement (A0116/2024/001) 
Date:October 2023 
COMMITTEE SUMMARY 
Audit Objectives
The objectives of the audit were as follows:
1. Environment, Housing and Infrastructure are complying with the requirements of
the Annual Assurance Statement to the Scottish Housing Regulator.
2. There is sufficient evidence held by the Service to demonstrate compliance with
the requirements of the Annual Assurance Statement. 
Audit Scope
1. Reviewed the Annual Assurance Statement to the Scottish Housing Regulator and
through sample testing, ensured that appropriate evidence was held to confirm that
Environment, Housing and Infrastructure are complying with the requirements of
the Annual Assurance Statement.
2.  Ensured that appropriate evidence was available to support a sample of indicators
and management information outlined in the Social Housing Charter submitted to
the Scottish Housing Regulator. 
Key Audit Assurances
1. Satisfactory evidence was available to demonstrate that Environment, Housing &
Infrastructure are complying with the requirements of the Annual Assurance
Statement.
2. For the sample of outcomes tested, satisfactory evidence was available to support
the actual outturns reported in the Social Housing Charter. 
Key Audit Risks
There were no key risks identified during the audit. 
Overall Audit Opinion
Based on a sample check of the evidence used to demonstrate compliance, we would
confirm that the Council complies with the requirements of the Housing Assurance
Statement. 
Management Commentary
N/A as no key risks were identified.
Page 13 of 82

Page 14

Internal Audit Report
Environment, Housing & Infrastructure
Housing Assurance Statement (A0116/2024/001) 
Date:October 2023 
Page 14 of 82

Page 15

Internal Audit Report
Corporate
Contract Audit - Roads Labour and Plant Contract
(A0014/2024/001)
Date:  December 2023 
COMMITTEE SUMMARY 
Audit Objectives
The objectives of the audit were to ensure that: - 
•  The Contract is being used appropriately and only where necessary. 
•  There are adequate supporting records available to evidence usage of any equipment hired
through the Contract and it is utilised efficiently. 
•  There are robust contract management arrangements in place to monitor and report on supplier
performance. 
•  Financial recording for services provided by the contractor is in line with standard accounting
practice. 
Audit Scope
1.  Interviewed the relevant officers and obtained the required information and documentation
relating to the Vehicle and Plant Hire with Operatives Contract. 
2.  Prepared a series of tests to meet the detailed audit objectives. 
Key Audit Assurances
• Documentation is available to evidence usage of equipment hired through the contract.
• Financial recording for services provided by the contractor is in line with standard
accounting practice. 
Key Risks
• The contract is not being used efficiently as the council is being invoiced for times when the
equipment was no longer required. 
• The contract is not adequately managed by the Corporate Procurement Unit to ensure that the
contractor is performing to expectations.   
Overall Audit Opinion
Issues were identified in relation to the hire of operatives without machinery, paying for hire when the
equipment had been returned and also paying an inflated price for fuel.  Furthermore, concerns were
identified in relation to the lack of contract management.  The Auditor was advised that for a period,
usual practices had been affected by COVID.  For these reasons, assurance within this area was
found to be limited.  Recommendations have been made within the report which will improve controls.  
Page 15 of 82

Page 16

Internal Audit Report
Corporate
Contract Audit - Roads Labour and Plant Contract
(A0014/2024/001)
Date:  December 2023 
Management Commentary
The Corporate Procurement Unit have now schedule quarterly review meetings with the
Contractor, the delivery of the agreed community benefits will form part of these review
meetings. Service management have also worked alongside colleagues from the CPU to
agree contract variations to formalise the current operational arrangements. It should be
noted that the fuel price being paid, included a fuel delivery change and this has now
been split out in the revised contract arrangements. All actions arising from the audit
report have now been completed.
Page 16 of 82

Page 17

Page 17 of 82

Page 18

Internal Audit Report
Chief Executive
Performance Management (B0009/2023/001) 
Date: December 2023 
COMMITTEE SUMMARY 
Audit Objectives
The objectives of the review were to ensure that:
1. There is an adequate system in place to record Performance Indicators.
2. There are appropriately challenging targets set for Performance Indicators which
are reviewed at regular intervals.
3. There are processes in place to review any variances where targets are not being
achieved and that the appropriate action is taken on any adverse results.
4. Performance Indicators are reported both internally and externally to all relevant
stakeholders in an acceptable format and in a timely manner. 
Audit Scope
1. Checked that an adequate system is in place to record the required performance
information for each indicator selected and evaluated for adequacy.
2. Obtained details of targets set for a sample of indicators and through discussion
and comparison determined if they are meaningful and challenging.
3. Obtained a sample of underperforming indicators, ascertained the review process
and check that sufficient action was being taken to address the issues. 
4. Checked that there was adequate management oversight for the selected
Performance Indicators.
5. Ensured that the information is reported within the agreed timescales to all relevant
parties and is in a format that they can engage with. 
Key Audit Assurances
Performance Indicators are reported both internally, through Service Improvement Plans
and externally, through the Local Government Benchmarking Framework (LGBF) and as
part of Public Performance Reporting Arrangements to relevant stakeholders in an
acceptable format and in a timely manner. 
Key Audit Risks
There were no key risks identified during the audit. 
Overall Audit Opinion
LGBF indicators are used to measure performance and are then compared with other local
authorities for benchmarking purposes. They are recorded, along with other performance
indicators, on the Council’s Pentana system. Some issues were noted with some of the
information held on the system. Some of the information held requires to be updated and
also any improvement actions being undertaken requires to be recorded for each
performance indicator to strengthen the performance monitoring arrangements in place. 
Page 18 of 82

Page 19

Internal Audit Report
Chief Executive
Performance Management (B0009/2023/001) 
Date: December 2023 
Management Commentary
Management will implement the three suggested improvements to strengthen existing
practice. 
Page 19 of 82

Page 20

Page 20 of 82

Page 21

___________________________________________________________________
To: Audit, Risk and Scrutiny Board
On: 22 January 2024
___________________________________________________________________
Report by: Chief Auditor
___________________________________________________________________
Heading: Internal Audit and Counter Fraud Progress and Performance for
Period to 31 December 2023
___________________________________________________________________
1. Summary
1.1 The Internal Audit Annual Plan was approved by the Audit, Risk and
Scrutiny Board on 13 March 2023. Internal Audit measures the
progress and performance of the team on a regular basis using a range
of performance indicators.  This report monitors progress from 1 April
2023 to 31 December 2023, in terms of the delivery of the Audit Plan
for the year and compares actual performance against targets set by
the Director of Finance and Resources. 
1.2 In terms of Counter Fraud, no formal performance targets for fraud
investigation have been established for the following reasons.  A major
part of their work involves being the single point of contact (SPOC) for
the Department for Work and Pension’s (DWP) Single Fraud
Investigation Service and the Service Level Agreement for this work
contains time targets for completing this work.  The types of fraud
referrals received to date are wide ranging and the team’s objective is
to concentrate on investigating those referrals considered to contain the
greatest fraud risk.  They are also involved in promoting fraud
awareness and assisting with the implementation of adequate fraud
prevention measures within the Council.  
1.3 All of the Internal Audit Team and Counter Fraud Team are currently
working on a hybrid basis and also undertake home/site visits when the
need arises.  We also provide advice and support where necessary to
council services.
Item 2
Page 21 of 82

Page 22

1.4 The report details progress against local and national initiatives
involving Internal Audit and the Counter Fraud Team from 1 April 2023
to 31 December 2023. 
___________________________________________________________________ 
2. Recommendations
2.1 Members are invited to note the Internal Audit and Counter Fraud
Team progress and performance to 31 December 2023. 
2.2 Members are asked to approve the proposed amendments to the
Annual Internal Audit Plan for 2023/2024. 
_________________________________________________________
3. Background
3.1 The progress and performance of the Internal Audit Team is subject to
regular monitoring using a number of performance measures.  The
Director of Finance and Resources has set annual targets for the team
to demonstrate continuous improvement. In terms of the Counter Fraud
team, there are time targets in place for responding to requests from
the DWP’s Single Fraud Investigation Service.  Due to the diverse
nature of fraud referrals no formal performance targets have been
established and the outcomes from investigations is regularly
monitored by management.  In addition, the Counter Fraud Team are
heavily involved in fraud prevention measures within the Council.
3.2 Internal Audit and the Counter Fraud Team support a variety of local
and national initiatives through participation in professional practitioner
groups and co-ordination of national initiatives such as the National
Fraud Initiative.
3.3 This report measures the progress and performance of both the
Internal Audit and Counter Fraud Team for the period from 1 April 2023
to 31 December 2023.
4.                 Internal Audit Team Performance
(a) Percentage of audit plan completed as at 31 December 2023 
This measures the degree to which the Audit Plan has been
completed.   
Page 22 of 82

Page 23

Actual 2022/23 Annual Target
2023/24
Audit Plan
Completion
Target to 31
December
2023
Audit Plan
Completion
Actual to 31
December
2023
93.2% 95.0% 66.5% 64.2% 
The audit plan completion indicator is slightly below target.  The main
reason for this is a long term absence in the team and also staff tend to
take any remaining leave they have in December.  In addition,
unplanned  training opportunities have arisen which the team have
participated in.  Management will monitor this indicator closely in the
last quarter of the year and explore all possible opportunities to improve
this indicator.  
(b) Percentage of assignments complete by target date 
This measures the degree with which target dates for audit work have
been met.
Target 2023/24 Actual to 31 December 2023
95.0% 100%           
Actual performance is ahead of the target set for the year.  
(c) Percentage of audit assignments completed within time budget 
This measures how well the time budget for individual assignments has
been adhered to. 
Target 2023/24 Actual to 31 December 2023  
95.0% 96.9%
Actual performance is slightly ahead of the target set for the year,
although this is likely to reduce over the remainder of the year.   
(d) Percentage of audit reports issued within 6 weeks of completion
of audit field work 
This measures how quickly draft audit reports are issued after the audit
fieldwork has been completed.
Target 2023/24 Actual to 31 December 2023
95.0% 100% 
Actual performance is ahead of the target set for the year, although this
is likely to reduce over the remainder of the year.   
Page 23 of 82

Page 24

5. Review of the 2023/24 Internal Audit Plan 
5.1 Our 2023/24 Audit Plan is subject to ongoing review in light of any
organisational risks arising, and also to determine whether any
assignments will have to be amended or cancelled as result of us being
unable, for any reason, to undertake the work planned. At this stage we
are not recommending any further amendments to the plan. 
5.2 However, we do have a long term absence within the team and this
may result in assignments being completed later than planned. The
Internal Audit Plan progress will continue to be closely scrutinised by
management. We have now completed a 6 monthly review with each of
the service senior management teams and there appears to be no
issues in undertaking the remaining audit plan assignments, although
we have been asked to delay the commencement of a couple of
assignments and this has been accommodated.
5.3 It should be noted that our staff training budget has now exceeded the
planned time set aside. The main reasons for this are that the Chief
Auditor is participating in the Leadership Management Programme
which was instigated during this year and the Audit Staff have had the
opportunity to participate in audit training events being run by other
Local Authorities.   As these opportunities were not planned in the
current audit plan, this may have an effect of the completion of our
operational time percentage but we are managing this carefully and at
this stage, we are forecasting that there will be underspends in other
areas of non-operational time which will compensate for this.
5.4 Any further proposed amendments to the audit plan will be brought to
this Board for approval.
6   Counter Fraud Team Progress and Performance
6.1 In line with the Service Level Agreement, the Counter Fraud Team act
as the Single Point of Contact (SPOC) to route potential housing
benefit fraud referrals to the DWP, liaise with the Council’s Housing
Benefit Team and DWP Fraud Officers and retrieve the necessary
evidence for the DWP Fraud Officers from the Housing Benefit System. 
Where a suspicion of fraud arises, the team investigate and report their
findings to management. Where appropriate, follow-on action is taken,
such as reporting the matter to Police Scotland for further investigation,
or directly to the Procurator Fiscal. In addition, they also work jointly
work with DWP Fraud Officers on criminal fraud investigations which
focuses on the investigation and prosecution of the Local Authority
administered Council Tax Reduction Scheme and Social Security
benefit fraud. In addition to investigation work the team also undertake
fraud prevention work.
6.2 During this quarter, we have been working on the various fraud
referrals received and continue to complete investigations into matches
received in January 2023 from the National Fraud Initiative,
Page 24 of 82

Page 25

administered by Audit Scotland.  As part of our fraud prevention work,
we are continuing to validate the numerous bank account or remittance
contact changes received from the Council’s suppliers and contractors
and the details supplied by new Housing Applicants. 
6.3 The financial and non-financial results for the period (April 2023 to
December 2023) are noted in the table below. 
Financial Outcomes Period to 31 December
2023 (£)
Cash savings directly attributable to
preventative counter fraud intervention
4,364
Cash recoveries in progress directly
attributable to counter fraud investigations
66,190 
Housing Benefit Savings Attributable to
Joint Working by Counter Fraud and
DWP Counter Fraud Officers
12,684
Notional savings identified through
counter fraud investigation, (e.g. housing
tenancy and future council tax)
212,357
Non-Financial Outcomes Period to 31 December
2023  
Housing properties recovered 2
Housing applications amended/cancelled 6
Housing Allocation Priority Changed 1
Blue badge misuse warning letters issued 16
Blue Badges Cancelled 2
Supplier/Contractor Checks Undertaken 231  
6.4 Our notional savings are based on the methodology prepared by the
Cabinet Office and this has been revised from April 2023. 
7.  Local and National Initiatives   
Scottish Local Authorities Chief Internal Auditors Group 
7.1 The Local Authorities Chief Internal Auditors Group met in December
and received updates from the Chairs of the various specialised audit
focused topic groups including risk and data analytics which have been
established.  The Computer Audit Sub-Group also met and the focus of
this meeting was artificial intelligence. 
Page 25 of 82

Page 26

Scottish Local Authorities Investigation Sub-Group 
7.2 The Local Authorities Investigation Sub-Group also met in December
and received useful presentations from the HM Revenue and Customs
Intelligence Bureau regarding the type of data intelligence which should
be sent to them and LoCTA which is the Local Authority data hub
established to assist authorities in tracing debtors and tackling fraud.   
External Quality Assessment 
7.3 We are continuing to progress the agreed action plan arising from our
second external assessment reviewing how our service undertakes
some of its functions to ensure the actions are completed by the agreed
timescale. 
7.4 We have also completed the external quality assessment of Inverclyde
Council and the findings will be reported to their management shortly. 
Revised CIPFA Guidance – Audit Committees 
7.5 We have completed a self-assessment workshop with the members of
the Renfrewshire Integration Joint Board Audit  Risk and Scrutiny                 
Board to identify any actions required to comply with this guidance and
a similar exercise will be undertaken with the members of this Board in
the next quarter. 
National Fraud Initiative 
7.6 To date, £48,583 of savings have been recorded on the Portal by
Council Staff involved in the exercise and are currently in the process
of being recovered. In addition. £315,625 of notional savings have also
been identified.  This includes the cancellation of 149 blue badges as
the holder is deceased, future council tax reduction savings and
amendments to the housing waiting list.   This work is still ongoing. 
7.7 A new suite of specialist matches have been received matching
property ownership, earnings and capital and household composition
data to HM Revenue and Customs data has been received this quarter
and the Counter Fraud Officers are currently working on a sample of
these to determine the likelihood of outcomes from these matches. 
Counter Fraud Training 
7.8 We continue to promote our counter fraud e-learning course throughout
the Council and we have received some requests for some bespoke
training which will be delivered in early 2024.   
_________________________________________________________
Page 26 of 82

Page 27

Implications of the Report
1. Financial - The Council has in place arrangements to recover the any
overpayments identified from the work of the Counter Fraud Team and
the National Fraud Initiative. 
2. HR & Organisational Development - None 
3. Community Planning – 
Safer and Stronger - effective internal audit is an important element of
good corporate governance. 
4. Legal - None 
5. Property/Assets - None 
6. Information Technology - None 
7.  Equality & Human Rights - None 
8. Health & Safety – None
9. Procurement - None 
10.  Risk - The progress and performance reported relates to the delivery of
the risk-based internal audit plan and the mitigation of the risk of fraud
and error. 
11. Privacy Impact – None 
12. COSLA Implications – None 
13. Climate Risk - None 
________________________________________________________________
Author:           Karen Campbell – 07768354651
Page 27 of 82

Page 28

Page 28 of 82

Page 29

___________________________________________________________________
To: Audit, Risk and Scrutiny Board
On: 22nd January 2024
___________________________________________________________________
Report by: Chief Executive
___________________________________________________________________
Heading: Dargavel Primary School Independent Review recommendations –
actions monitoring report
___________________________________________________________________
1. Summary
1.1 The findings of an independent review into the circumstances of the
errors in planning and delivery of primary school provision in the
Dargavel area were reported to Council in June 2023. At the same
meeting, a further report was presented outlining the initial high level
Council response to recommendations of the independent review. 
1.2 A detailed action plan was provided to the previous meeting of the Board;
with a commitment that updates would be provided to future Board
meetings. In this regard, this report provides an update and further detail
on the actions the Council has taken, and plans to take, in addressing
the recommendations within the independent review. A total of 24
actions are complete with 12 on track to be completed.  3 have not yet
commenced.   
1.3 The Council has been advised that the Controller of Audit has decided
to use the reporting powers available to her under s102 (1) of the Local
Government (Scotland) Act 1973 to bring this issue, and the action the
Council is now taking in response to the Bowles report, to the attention
of the Accounts Commission. The report was published on the Accounts
Commission website on 4 January in advance of the Commission
meeting on 11 January, where the report was considered. 
Item 3
Page 29 of 82

Page 30

The Commission will inform the Council in due course of any findings it
has made in relation to the report. As at the point of drafting of this report,
the Council has had no notification of any findings. 
 
2. Recommendations
2.1 Note and consider the update provided in Appendix 1 in relation to the
Council’s response actions.
___________________________________________________________________
Implications of the Report
1. Financial – whilst there will be significant capital and revenue
implications for the Council in resolving the Dargavel issue, there are no
financial implications for the Council as a result of this update report. 
2. HR & Organisational Development – the report outlines a leadership
development programme with a focus on key issues raised in the
independent review around governance, risk management, corporate
working and culture. 
3. Community/Council Planning – the report outlines ongoing action
being taken to develop an engagement and ongoing communication
process with affected communities.  
4. Legal – none 
5. Property/Assets – none 
6. Information Technology – n/a 
7. Equality & Human Rights - The Recommendations contained within
this report have been assessed in relation to their impact on equalities
and human rights. No negative impacts on equality groups or potential
for infringement of individuals’ human rights have been identified arising
from the recommendations contained in the report as it is for noting only.  
If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the
Council’s website.  
Page 30 of 82

Page 31

8. Health & Safety – n/a
9. Procurement – n/a
10. Risk – the report outlines the action being taken in relation to risk
management. 
11. Privacy Impact – n/a 
12. Cosla Policy Position – n/a
13. Climate Risk – n/a 
___________________________________________________________________ 
Author:           Alan Russell, Chief Executive 
Page 31 of 82

Page 32

Dargavel Independent Review 
Action Plan Response Monitoring – December 2023 update  
 
Action 
  Target 
Completion 
Responsible 
Officer 
RAG Status  Update 
Bowles Report Recommendation 1
Build a more robust model of primary school need for Dargavel - the Council should continue to refine its pupil forecast model for Dargavel.
 
 
Response Objectives 
 
Deliver robust projection modelling for Dargavel and PMHS which: ‐ 
 
 considers live information arising from NHS, pupil & ELC registrations, the pace of development to date, certainty over development size and likely 
pace of future build out rate, 
 
 utilises external data analytics and projection expertise to augment and enhance the Council’s in‐house forecasting approach to ensure modelling is 
robust, underpinned by external challenge and specialist input reflecting the complexity and significant portion of Dargavel that has yet to be 
developed out over a circa 10 year period, 
 
 provides modelling output which considers potential future upper scenarios reflecting the high yield factors reflected in the 2023/24 P1 intake to 
inform immediate decisions on scale of capacity to be delivered as well as planning for potential additional interventions at a future time,  
 
 delivers modelling output which provides a long‐term view beyond the anticipated completion timeline for Dargavel to ensure the long term impact of 
Dargavel is modelled and understood, 
 
 provides modelling output over the long term which indicates both the scale, timing and shape of an anticipated peak in demand that will accompany 
a development of this scale and nature. This will provide visibility of the anticipated short‐lived peak in demand and long term settled demand to 
ensure this is appropriately reflected in estate/capacity decisions and in particular to mitigate against delivery of excessive long term / permanent 
increase in capacity that would result in excess unused surplus capacity over the long term. 
 Provides modelling that can be tested and revised as necessary as new key data becomes available such as P1 and S1 registrations, actual scale and pace of the
development and any new developments, which will continue to inform decisions on any future estate interventions if required. 
Page 32 of 82

Page 33

Dargavel Independent Review 
Action Plan Response Monitoring – December 2023 update  
Action 
  Target 
Completion 
Responsible 
Officer 
RAG Status  Update 
Complete Council modelling through to the anticipated end 
date for the housing development (2033/34) based on 
assumed 4,300 units and available live data. 
 
 
October 
2022 
Director of 
Children’s 
Services 
Complete  Completed October 2022 
Engage and appoint Edge Analytics to deliver enhanced 
modelling approach for both Dargavel primary requirements 
as well as PMHS out to 2033/34 and updated live datasets. 
 
February  
2023 
Director of 
Children’s 
Services 
Complete  Completed February 2023 including additional 
upper forecast scenarios for Dargavel non‐
denominational requirements to support 
management of risk associated with long term 
yield remaining at similar level to 2023/24. 
Informed reports to Education and Children’s 
Services Board in March and May 2023 
 
 
Extend Edge engagement to deliver an enhanced model 
projecting out to 2038 to provide longer term forecast to 
assess the full impact on the secondary sector and allow 
identification of likely timing and scale of peak demand 
encapsulating any relevant updates to live datasets. 
 
September 
2023 
Director of 
Children’s 
Services 
Complete  Modelling completed which has identified an 
anticipated peak period in both primary and 
secondary sectors and will be reported to 
Education and Children’s Services Board in 
November 2023. 
 
Provide update to November Education & Children’s Service 
Policy Board. 
 
November 
2023 
Director of 
Children’s 
Services 
 
Complete 
  Two update reports were taken to the November 
ECSPB: 
1. Learning Estate 
2. Dargavel Housing Development – Impact 
on Denominational Education Provision 
Link 
 
Update Edge Analytics modelling for newly released national 
Census data and expand across the whole school estate and 
establish modelling dashboard to support ease of updating 
and rapid re‐assessment of revised projection that will be 
utilised on an ongoing basis over future years, both for 
January 
2023 
Director of 
Children’s 
Services 
 
This piece of work has been commissioned with 
expected completion, end January 2024. 
 
Page 33 of 82

Page 34

Dargavel Independent Review 
Action Plan Response Monitoring – December 2023 update  
Action 
  Target 
Completion 
Responsible 
Officer 
RAG Status  Update 
Dargavel / PMHS but also as part of the strategic Learning 
Estate programme. 
 
 
Bowles Report Recommendation 2 
Use of Bishopton Primary - in its future plans the Council should reconsider how surplus capacity at Bishopton can be used effectively.
 
Response Objectives 
 
Consider and assess how existing capacity within Bishopton Primary School may be best utilised to support the Dargavel catchment over the immediate term 
and potentially over the longer term, taking into consideration the uncertainty and risk over the long‐term demand levels that will ultimately emerge for 
primary education from Dargavel as well as the expectation of a temporary peak period of demand.  
Provide a report to Education and Children’s Services Board setting out a clear overview as to how Bishopton PS capacity will be utilised to support temporarily 
over the short term period and how it may be considered amongst other options for use to support Dargavel in the longer term (noting that any such longer 
term use will be subject to detailed consideration and decision at an appropriate point in future years). 
 
 
Complete assessment of anticipated P1 intake from Dargavel 
catchment and assess against revised DPS capacity 
availability, establish planned P1 intake capacity cap and 
anticipated P1 intake requiring accommodation at Bishopton 
Primary School. 
 
August 
2023 
Director of 
Children’s 
Services 
Complete  Planned use of Bishopton Primary School along 
with planned capped entry levels to Dargavel 
Primary School reported an approved at 
Education and Children’s Services Policy Board in 
August 2023. There will be a requirement to 
annually monitor anticipated and actual P1 
intakes carefully to assess adequacy of short term 
capacity provision across both Dargavel and 
Bishopton Primary Schools to meet demand 
pending the second primary school in Dargavel 
coming on stream. 
 
 
 
Page 34 of 82

Page 35

Dargavel Independent Review 
Action Plan Response Monitoring – December 2023 update  
Action 
  Target 
Completion 
Responsible 
Officer 
RAG Status  Update 
Complete an exercise to assess the timing, scale and range 
of potential demand level scenarios, in particular 
understanding the scale and timing of the peak demand and 
likely settled long term demand. This information will be 
used to inform the assessment of how Bishopton Primary 
School could, if required, be potentially be utilised as an 
option in the longer term. 
 
January 
2024 
Director of 
Children’s 
Services 
 
 
Completion of the updated work with Edge 
Analytics has provided a view of the likely timing 
and length of the peak demand period – with 
peak primary demand being forecast in 2033/34 
which will fall over the second half of the 2030s to 
a more settled level. Further work is being 
progressed to update this information for the 
recently released 2023 census information and 
November registration data to inform an overall 
assessment. 
 
Complete financial analysis to understand the potential 
financial context of utilising Bishopton Primary School 
Capacity  
May 
2023 
Director of 
Finance and 
Resources 
Complete  Bishopton PS is a predominantly 1960s 
construction and is more than 60 years old. This 
building will, along with the whole school estate, 
undergo an updated condition survey over 
coming months. Notwithstanding, given the 
underlying age of the building it will inevitably 
have a limited remaining lifespan before being 
considered for replacement.  
 
Existing surplus capacity if used permanently to 
reduce the required size of a second Dargavel 
primary school, will require to be replaced as part 
of a renewal programme. The determination of 
the timing of that will be subject to work 
progressed as part of the strategic learning estate 
programme.  
 
Consequently, it has been assessed that any 
financial advantage from utilising Bishopton PS 
will be restricted to a temporary time value of 
Page 35 of 82

Page 36

Dargavel Independent Review 
Action Plan Response Monitoring – December 2023 update  
Action 
  Target 
Completion 
Responsible 
Officer 
RAG Status  Update 
money benefit and consequently will be relatively 
limited.  
 
In addition, there is also a risk that utilising 
Bishopton PS permanently removes its availability 
to provide supporting capacity to manage both a 
temporary peak that may arise from upper end 
educational demand scenarios and longer term 
upper end demand. There could be the risk that in 
such circumstances if Bishopton capacity was no 
longer available this would lead to higher overall 
costs over the longer term for the Council. 
 
 
The financial considerations and risks will be 
incorporated into the overall assessment 
scheduled to be reported as part of the Education 
& Children’s Services Board report in January. 
 
Set out overview in a report to the Education and Children’s 
Services Policy Board in respect to the potential long‐term 
utilisation of Bishopton Primary School which will be subject 
to detailed consideration at an appropriate point in future 
years as actual long term demand trends increasingly 
emerge. 
January 
2024 
Director of 
Children’s 
Services 
 
Work to allow appropriate recommendation to be 
made is progressing in line with plans and 
scheduled to be reported to Board in January 
2024  
 
 
 
 
 
 
 
 
Page 36 of 82

Page 37

Dargavel Independent Review 
Action Plan Response Monitoring – December 2023 update  
Action 
  Target 
Completion 
Responsible 
Officer 
RAG Status  Update 
Bowles Report Recommendation 3 
As the Council progresses its plans to issue supplementary guidance on developer contributions for education it should seek to learn from other Councils in Scotland. 
A development the size of Dargavel is exceptional and would need its own modelling techniques. However, for smaller developments the Council should create an evidence base to calculate specific yield
factors derived from recent developments in Renfrewshire. Such robust data will ease future negotiations.
Undertake a desk top review of other local authorities across 
Scotland and identify key best practice councils to engage. 
 
June 2023  Head of 
Economy and 
Development 
Complete   
Complete detailed engagement with identified best practice 
councils arising from desk top research 
Summer 
2023 
Head of 
Economy and 
Development 
Complete  Detailed engagement completed with Fife, Falkirk 
and West Lothian councils. 
Complete data analysis exercise of a range of datasets of 
mixed historic sites across Renfrewshire to provide empirical 
evidence to support actual pupil yields to inform 
establishment of appropriate yield factors to be used in 
future contribution policy. 
 Refresh % capacity of all schools (vs school rolls) 
 Sample research of Pupil Product Ratio (PPR) for developed housing 
sites (< 10 units) [min 10 site sample] 
 Sample research of PPR for developed housing sites (> 100 units)[min 
10 site sample] 
 Sample research of PPR for established / mature housing development 
to provide longer term perspective (eg. 15 years old) (> 100 units)[min 
4 site sample] 
 Identify individual schools where pupil capacity is above notional 
threshold (85%)  
 Identify all known undeveloped housing sites in individual school 
catchments 
 [Subset of 5] identify all housing sites with current "live" planning 
application 
 Identify schools where it is anticipated intervention would be required 
to increase capacity based on potential future housing to be delivered 
over next 10 years to inform likely future developer discussions. 
October 
2023 
 
 
 
 
 
Head of 
Economy and 
Development 
 
Updated datasets (e.g. census data released by 
NRS) now available to allow detailed data analysis 
to be completed. Work is almost complete. 
Transposing housing number on to school 
capacities currently underway. First seven bullet 
points now complete 
Page 37 of 82

Page 38

Dargavel Independent Review 
Action Plan Response Monitoring – December 2023 update  
Action 
  Target 
Completion 
Responsible 
Officer 
RAG Status  Update 
Incorporate into the development of the draft contributions 
policy targeted to be presented to the Planning and Climate 
Change Policy Board in January 2024. 
 
January 
2024 
Head of 
Economy and 
Development 
This remains the targeted date but it will be 
informed by complexity of any additional work 
that may be identified from the data analytics 
workstream. 
 
 
Bowles Report Recommendation 4 
Council needs to work co-operatively with BAE. Unless the Council and BAE can work together to resolve the current problems, BAE may face accusations, whether founded or not and regardless of
Council incompetence, that it has increased its profits at the expense of Council taxpayers.
 
Response Objectives 
 
Secure legal ownership of suitable land to facilitate delivery of a second school within Dargavel Village as well as additional land next to existing school site to 
provide increased flexibility to meet potential future extension of the school and or establishment of greater outdoor space. 
 
Secure legal commitment from BAE to provide land remediation and associated infrastructure requirements as part of legal agreement at nil cost to the 
Council. 
 
Secure as part of the legal agreement certainty on consented planning numbers and any associated adjustments to s.75 agreement to reflect revised 
agreement. 
 
 
Secure with BAE agreement on Heads of Terms for allow for 
mutual governance approval from each organisation to 
inform detailed legal agreement drafting and final sign off  
As soon as 
possible 
was 
targeted.  
 
Chief 
Executive 
Complete  This was completed and approved by ILE Board 
end of August 
Secure completed and signed legal missives to deliver in full 
the objectives outlined above to provide certainty and 
timing of availability of remediated and infrastructure 
proofed land to support wider school delivery planning and 
August 
2023 
Chief 
Executive 
Complete  Legal missives concluded mid‐September 
Page 38 of 82

Page 39

Dargavel Independent Review 
Action Plan Response Monitoring – December 2023 update  
Action 
  Target 
Completion 
Responsible 
Officer 
RAG Status  Update 
consultation arrangements that will be progressed by the 
Council team.   
 
Proposed revisions to S.75 negotiated with BAE Systems 
were approved by ILE. Revised S.75 signed off by both the 
Council and BAE Systems to legally conclude matters. 
 
August 
2023 
Head of 
Economy & 
Development  
 
Complete  Approved by planning and Climate Change Board 
end of August 
Bowles Report Recommendation 5 
Corporate working and organisational culture - although I understand that the Council has sought to improve and strengthen corporate working in recent years, the evidence would suggest there is a
long way to go; simply establishing corporate working groups is insufficient if staff are in a mindset of ‘not my problem’. 
The failure of management oversight, if symptomatic of the Council as a whole, would be deeply disturbing. The Council needs to consider a significant change programme, not just on the of issue of
corporate working and personal responsibility, but also its organisational culture and values. It needs plans to build a stronger organisation where constructive challenge is welcomed and there is a
clarity of what is expected of all of those in a leadership role.
 
Response Objectives 
 
Provide assurance that established programme governance framework and operations of governance for other major capital investment programmes and 
specifically that the Bowles findings on the historic failings on the handling of Dargavel by officers are not representative of the Council’s current culture and 
approach to the management and delivery of major programmes. 
 
The Council is committed to living its values as a learning and collaborative organisation and post COVID was already in the process of re‐establishing an 
Leadership Development programme for senior leadership teams and managers across the Council in recognition that this required to be reinvigorated post 
COVID and that there has been significant turnover in management and senior positions over the past three years and this would support growing and 
maturing the current culture and collaborative connections across the organisation.  
 
In response to the Bowles recommendations, the objective is to ensure the new Leadership Development programme is appropriately cognisant and reflective 
of the key learning points from the Bowles report and takes the opportunity to ensure its coverage seeks to re‐enforce the development of skills related to 
governance, risk management, commercial risk, corporate working and culture etc and effectively utilises failures referenced in the Bowles report as key 
examples for learning throughout the programme. Collective reflection and learning of such significant failures – albeit historical – is recognised as an 
important element of building an effective future culture and ways of working across the organisation. 
 
Page 39 of 82

Page 40

Dargavel Independent Review 
Action Plan Response Monitoring – December 2023 update  
Action 
  Target 
Completion 
Responsible 
Officer 
RAG Status  Update 
Undertake a health check assessment on major capital 
programmes to provide reassurance in respect to all aspects 
of governance, control, reporting and management of 
programmes. 
 
 
October 
2023 
Chief 
Executive 
supported by 
CMT 
 
 
 
Complete   City Deal and Infrastructure Health Check report 
was submitted to CMT on 21 November 2023. 
Put in place arrangements to deliver a comprehensive 
Leadership Development Programme (circa 12 months + 
programme) for chief officers and senior managers which 
amongst other things will cover and key areas referenced in 
the Bowles report in respect to governance, accountability, 
risk management, collaborative working, member officer 
relations etc. 
 
 
Commence 
programme 
by 
September 
2023 
Director of 
Finance & 
Resources 
and Head of 
HR & OD 
 
Contract engagement in place and resources 
secured from SOLACE Enterprises to support co‐
designed and co‐delivered programme. 
 
 
Initial Chief Officer programme launch event 
occurred on 3rd October with focusing on personal 
resilience. 
 
 
The 2nd programme was run on 24th October 2023 
which focussed on Effective Communications and 
Elected Member Relations 
 
 
There have been some slight amendments to the 
programme and the 3rd programme will run on 1st 
December focussing on Programme Management, 
Leading and Navigating Strategic Change, along 
with our SOLACE facilitator, an external Local 
Authority Project Management subject matter 
experts will also be in attendance supported by 
our own internal Project Management lead. 
 
 
The Risk Management and Governance workshop 
was delivered on 12th December 2023. 
 
 
Page 40 of 82

Page 41

Dargavel Independent Review 
Action Plan Response Monitoring – December 2023 update  
Action 
  Target 
Completion 
Responsible 
Officer 
RAG Status  Update 
The programmes into next year as planned as 
below. 
 
 
January – Transformational Leadership 
February – Delivering Corporate/Team Values and 
Vision 
 
 
There has been excellent attendance at all the 
sessions so far.  Planning for the 
Management/Leadership cohort will start in 
December 2023, with an objective to commence 
this programme early 2024.  
 
 
Design and undertake an evaluation process of the 
Leadership Development Programme for Chief Officer 
cohort to inform required changes / adjustments to 
programme delivery for next management cohort. 
 
March 2024  
 
  Head of HR 
and OD 
Not 
commenced 
 
Bowles Report Recommendation 6 
Risk management 
From documents I have seen the Council was unaware of the scale of risk it was taking in the calculation of pupil numbers.  The identified risk in Council documents related to providing the school on
time, not that the size of the school may prove to be inadequate.  The failure to identify that risk has had two consequences; first the Council has been slow to react to the increase in pupil numbers and
second the Council did not negotiate with BAE with that risk in mind. 
The Council needs to review how it both identifies risk and manages it.
 
Response Objectives 
 
Progress actions to provide reassurance in relation to the Council’s current risk management approach, in particular how this is approached, deployed and 
managed as part of major projects as well as considering and assessing the seniority / appropriateness of officer involvement and related skills across officers 
involved in the process.  
Page 41 of 82

Page 42

Dargavel Independent Review 
Action Plan Response Monitoring – December 2023 update  
Action 
  Target 
Completion 
Responsible 
Officer 
RAG Status  Update 
A review of risk profiles across all service departments to 
ensure visibility of all risks and confirmation of where certain 
risks are being monitored if outwith the standard Risk 
Reports to the Audit, Risk and Scrutiny Board (i.e., Health 
and Safety Planning Groups, Service Improvement Plans etc) 
 
October 
2023 
Director of 
Finance and 
Resources 
Complete  Risk report submitted to Audit, Risk & Scrutiny 
Board as planned on 6 November 2023. 
A review of the ‘service risk representative’ roles in each 
service department to ensure the representatives who sit on 
the Corporate Risk Management Group are sufficiently 
involved in risk matters within the service, to feed this into 
the Corporate Risk Management Group and that they also 
have authority within the service to provide challenge as a 
‘critical friend.’ 
 
October 
2023 
Director of 
Finance and 
Resources 
Complete  Action completed.  CMT agreed (10 October), that 
each Director will nominate a Head of Service and 
one other colleague to support the Head of 
Service in the role going forward. 
Delivery of a project risk management workshop specific to 
the planned new primary school in Dargavel (complete) 
 
August 
2023 
Director of 
Finance and 
Resources 
 
Complete  Workshop delivered covering nature of project 
risks, risk changes over lifecycle of the project; 
reminder of Council PM framework and PMU 
support; key issues re good governance 
 
Delivery of project risk management training with all PMU 
colleagues (in a train the trainer format) so colleagues are 
delivering this as part of project kick‐offs to support a more 
risk focussed culture in the organisation. 
 
September 
2023 
Director of 
Finance and 
Resources 
Complete  This was completed on 12/10/2023.  PMU staff 
received a ‘train the trainer’ session to enable 
them to cover running risk awareness sessions at 
project kick‐offs to support a more risk focussed 
culture in the organisation. 
 
Undertaking a ‘health check’ of project management 
arrangements across the council to ensure governance, 
management, reporting and risk management is appropriate 
to the scale of the project. 
 
November 
2023 
Director of 
Finance and 
Resources 
Complete  Compliance review of all PMU supported projects 
complete.  All projects demonstrated a 
satisfactory level of risk governance and 
management. 
Page 42 of 82

Page 43

Dargavel Independent Review 
Action Plan Response Monitoring – December 2023 update  
Action 
  Target 
Completion 
Responsible 
Officer 
RAG Status  Update 
An update to the risk management course on iLearn and 
consideration of whether it should be a mandatory course. 
 
December 
2023  
 
Director of 
Finance and 
Resources 
 
Work underway (drafted and submitted to 
corporate training colleagues), decision on 
mandatory status to be confirmed by CMT. 
Embed and deliver risk management training into the new 
leadership development programme that is currently under 
development, particularly in relation to commercial risk 
 
December 
2023 
 
Director of 
Finance and 
Resources 
 
Session was initially scheduled for 8 November, 
but the delivery organisation required the date to 
be altered. 
Reviewing governance documents to ensure delegations in 
relation to liability caps are clear and unambiguous. 
 
December 
2023 
Director of 
Finance and 
Resources 
 
Complete  Consultation with Head of Corporate Governance 
concluded that governance documents do not 
require amendment, but rather, more training 
would be required on what was expected within 
existing delegations.  The training was delivered 
to CMT on 28 November 2023. 
Deliver a targeted risk management development day for 
Chief Officers:‐ 
 
 
 Project risk management (and risk simulation exercise)  
 
 Risk horizon scanning and sustainability (the Global Risk 
Report)  
 
 Liability caps and their implications 
 
December 
2023 
Director of 
Finance and 
Resources 
Complete  The training session has been prepared and was 
delivered to CMT on 28 November 2023. 
 
It is recognised that Dargavel Village has a significant 
amount of housing development yet to be delivered (circa 
2000 housing units over a 10 year period) and therefore 
many of the associated risk that existed at the beginning of 
the development continue to exist today albeit there is live 
data to inform future projections from the first circa 2,300 
 
 
 
 
 
  
 
 
Director of 
Children’s 
Services 
 
 
  
 
 
 
 
 
 
  
 
 
 
 
Page 43 of 82

Page 44

Dargavel Independent Review 
Action Plan Response Monitoring – December 2023 update  
Action 
  Target 
Completion 
Responsible 
Officer 
RAG Status  Update 
units that have been delivered. Manage ongoing education 
demand risk relating to Dargavel through: 
The Council therefore continues to face risk and uncertainty 
in relation to accurately projecting the scale and timing of 
future education demand which will continue to have 
inherent uncertainty and risk. In recognition of this the 
Council will continue to progress the following actions to 
manage and mitigate this risk:‐   
 
 
Securing robust long term demand projections which 
provide both a core projection, potential upper scenario and 
a long term view of the potential scale and timing of short 
term peak demand to inform decisions on capacity 
provision. 
 
Identify now a range of flexible options that are and will 
remain available to in future years to deliver, if required 
additional capacity (both temporary capacity and permanent 
long term capacity) to ensure the Council can be reassured o 
of being able to respond appropriately to the potential for  
upper end demand scenarios and or temporary demand 
peaks to emerge.  
 
Establish process and arrangements to support and provide 
detailed monitoring and updates to projections for updates 
to actual data sets to facilitate a continual re‐assessment of 
longer term trend and likely requirements / decision point 
required in relation to deployment of potential additional 
interventions. 
 
 
 
 
 
 
 
 
 
 
 
September 
2023 
 
 
 
 
January 
2024 
 
 
 
 
 
 
January 
2024 
 
 
 
 
 
 
 
 
 
 
 
Complete 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 Further updates will be completed in this respect 
for updated datasets available from November 
registration data and recently released NRS 
Census data 
Page 44 of 82

Page 45

Dargavel Independent Review 
Action Plan Response Monitoring – December 2023 update  
Action 
  Target 
Completion 
Responsible 
Officer 
RAG Status  Update 
Bowles Report Recommendation 7 
Whilst protecting the integrity of the planning process, the Council needs to ensure the appropriate involvement of members in such developments. 
Additional Council Motion
Council agrees that in light of the Independent External Review of Dargavel that there is a requirement to convene a cross party body to discuss and review existing governance arrangements of
Renfrewshire Council.
 
Response Objectives 
 
Assess the extent to which major investment projects have provided sufficient engagement with elected members through both formal governance routes as 
well as through briefing sessions, engagement sessions, group presentations, site tours etc. Identify any adjustments or improvements required moving 
forward. 
 
Provide officer support to a cross party group to of elected members to agree the remit and progress a discussion and review of the Council’s formal 
governance arrangements in line with the motion approved. 
 
Carry out an assessment of the Audit Risk and Scrutiny Board against CIPFA’s published good practice guide for audit committees. 
 
Undertake a health check assessment on major capital 
programmes to provide reassurance in respect to extent to 
which elected member involvement has been appropriately 
secured through formal governance reporting as well as via 
other appropriate informal engagement routes. 
 
 
October 
2023 
Chief 
Executive 
supported by 
CMT 
 
 
 
Complete  City Deal and Infrastructure Health Check report 
was submitted to CMT on 21 November 2023. 
Other programmes to be reported to CMT. 
Support Council Leader and other nominated elected 
members to determine a review remit, progress the review 
and develop suitable recommendations. 
 
March 2024 
  Head of 
Corporate 
Governance 
 
 
The Cross Party Working Group has been 
established and met four times, with a further 
meeting being scheduled. A report to Council will 
be submitted setting out the findings of the 
review in due course (it is anticipated this will be 
to the 29 February meeting) 
Page 45 of 82

Page 46

Dargavel Independent Review 
Action Plan Response Monitoring – December 2023 update  
Action 
  Target 
Completion 
Responsible 
Officer 
RAG Status  Update 
Carry out an assessment of the Audit Risk and Scrutiny Board 
against CIPFA’s published good practice guide for audit 
committees and identify any recommendations for change in 
remit or operational arrangements. 
 
December 
2023 
Director of 
Finance and 
Resources 
 
An initial assessment against the CIPFA guidance 
has been undertaken by the Chief Auditor and a 
draft training needs analysis has been prepared. A 
meeting has been scheduled for 21 December 
with the Chief Auditor, Head of Corporate 
Governance and Director of Finance and 
Resources to discuss the draft assessment and the 
format for the members development session.  
The development session will be arranged with 
members of the Board early in the new year. 
 
Bowles Report Recommendation 8 
Public confidence 
These recent events and the matters described in this report will dent public confidence in the Council.  The Council should work in an open and transparent manner in the resolution of these issues and
particularly with the residents of Dargavel, who have legitimate concerns about the implications for their children during both their primary and secondary education.
 
Response Objectives 
 
The key aim has been to provide straightforward messaging and up to date sitreps to ensure publics (and council representatives) have the most up‐to‐date 
position and the complexity of the issue is explained in a simple and honest way and that parental/carer concerns in respect to the school and educational 
environment are able to be appropriately discussed through structured engagement arrangements with the parent councils with appropriate agreed actions 
taken forward. 
 
The strategy has been designed to:  
 
‐ Improve the flow and regularity of information to parents and carers and the wider Dargavel community, so they are first to hear about decisions 
impacting their community. 
 
‐ Ensure parents and carers have access to all projection data available to the council.  
 
Page 46 of 82

Page 47

Dargavel Independent Review 
Action Plan Response Monitoring – December 2023 update  
Action 
  Target 
Completion 
Responsible 
Officer 
RAG Status  Update 
‐ Introduce direct communication channels with Dargavel residents, enabling all sections of the community to engage on matters that are important to 
them and making sure the latest information is accessible and easy to find.  
 
‐ Provide residents with a feedback loop to enable them to ask questions of the council in relation to the development and have questions answered 
quickly.  
 
‐ Include the community in formal planning and design of a new primary school and high school extension.  
 
It is recognised that effective communication and engagement is important to building a new relationship between the Council and the Dargavel community, 
but ultimately it will take the delivery of the solution and investment in long term engagement to reduce local anxiety and fully rebuild trust and confidence in 
the Council. 
 
 
Target 
Completion 
Date 
Responsible 
Officer 
RAG Status  Update 
Develop communication plan to drive tactical engagement, 
ensuring the Dargavel community and specifically parents 
and carers kept updated on progress and the decisions being 
made by Council Boards.  
 
November 
2022  
 
Head of 
Marketing 
and Comms 
Complete  The strategy has directed media and stakeholder 
engagement in relation to council decisions 
pertaining to Dargavel, the initial announcement 
and short‐term mitigation arrangements, and the 
publication of the Independent external review by 
David Bowles. The specific activities delivered 
include:  
 Arranging and hosting two parent and carer 
meetings, attended by council officers and 
more than 220 parents or carers. 
 Attending several parent council meetings 
with all primary schools and PMHS to support 
direct engagement, discussion on key 
activities, immediate estate decisions in 
respect to deployment of modular classrooms 
and post occupancy adjustments at Dargavel 
Page 47 of 82

Page 48

Dargavel Independent Review 
Action Plan Response Monitoring – December 2023 update  
Action 
  Target 
Completion 
Responsible 
Officer 
RAG Status  Update 
Primary, sharing and discussion of revised 
projection data and modelling, key council 
decision points, independent review 
outcomes. 
 Attending several community meetings from 
community council, Community Liaison Group 
as well as supporting coordination and 
delivery of wider community representative 
round table session to maintain ongoing 
engagement, sharing of information and data 
sharing. 
 Updating parents and carers at Dargavel 
Primary on progress and all reports to Council 
Boards and decision making in relation to 
immediate solutions to address capacity 
issues at Dargavel/ 
 Updating Bishopton Community Council on 
progress above. 
 Responding to media enquiries, requests for 
interview and ensuring the media were 
proactively updated on progress.  
 Ensuring the wider area stakeholders were 
kept up to date on progress – this includes 
community representatives, wider Parent 
Council groups and local and national 
politicians.  
 Maintaining updated information on the 
council website 
 Delivered a creative partnership with Glasgow 
School of Art and Dargavel Primary School to 
Page 48 of 82

Page 49

Dargavel Independent Review 
Action Plan Response Monitoring – December 2023 update  
Action 
  Target 
Completion 
Responsible 
Officer 
RAG Status  Update 
support pupils design the interiors of the new 
modular classroom block. 
 
 
Deliver a revised comms and engagement strategy to 
coincide with the return to school period along with timing 
of key milestone points in relation to post independent 
review and moving towards confirmation of progress with 
BAE systems and moving more significantly into a delivery 
phase. This will ensure long term engagement process 
continues to build pro‐active and positive engagement to 
continue to re‐establish trust and confidence across the 
Dargavel community. 
 
August 
2023 
Head of 
Marketing 
and Comms 
Complete  The Dargavel communication and engagement 
strategy was reviewed following the publication 
of the Bowles Report. The strategy covers the 
development of long‐term solutions to increase 
primary and secondary capacity. The key aim has 
been to provide straightforward messaging and 
up to date sitreps to ensure publics (and council 
representatives) have the most up‐to‐date 
position and the complexity of the issue is 
explained in a simple and honest way. We 
committed from the outset to ensure those 
members of the community directly impacted 
(and their representatives) are first to hear about 
the steps being taken to deliver a solution and the 
decision‐making process involved. The strategy 
has been designed to:  
 Improve the flow and regularity of 
information to parents and carers and the 
wider Dargavel community, so they are first 
to hear about decisions impacting their 
community. Ensure parents and carers have 
access to all projection data available to the 
council. 
 Introduce direct communication channels 
with Dargavel residents, enabling all sections 
of the community to engage on matters that 
are important to them and making sure the 
Page 49 of 82

Page 50

Dargavel Independent Review 
Action Plan Response Monitoring – December 2023 update  
Action 
  Target 
Completion 
Responsible 
Officer 
RAG Status  Update 
latest information is accessible and easy to 
find. 
 Provide residents with a feedback loop to 
enable them to ask questions of the council in 
relation to the development and have 
questions answered quickly. 
 Include the community in formal planning and 
design of a new primary school and high 
school extension. 
 
Activity delivered from October 2022 to present 
includes:  
 Planned and hosted 2 public meetings 
 Monthly updates to the council website 
 13 update letters issued to parents and 
carers at Dargavel Primary School and 
shared with community stakeholders. 
 3 proactive media updates and the 
handing of almost 50 media enquiries to 
ensure the council’s right of reply ‐ 
including arrangements for broadcast 
interviews.  
 Ongoing Elected Member briefings and 
MP/MSP briefings to ensure all political 
representatives are kept up to date on 
matters relating to the Dargavel 
Community. 
 Following publication of the Review, 
individual meetings took place with four 
local community representatives who 
Page 50 of 82

Page 51

Dargavel Independent Review 
Action Plan Response Monitoring – December 2023 update  
Action 
  Target 
Completion 
Responsible 
Officer 
RAG Status  Update 
were interviewed for the Review to 
include next steps. Ongoing engagement 
continues with two representatives to 
provide a sounding board for 
communication and engagement. 
 August 4, the council’s senior team 
attended a Round Table Meeting with 
Bishopton Community to discuss 
education provision and leisure and 
recreation provision. 
 From August, introduced a new opt‐in 
community newsletter, promoted locally 
to encourage resident sign up. 
 Established the Park Mains Liaison Group, 
attended by the Parent Council Chairs of 
all Park Mains catchment primary schools, 
to ensure we can collectively plan the 
high school extension and effectively 
engage with the wider school. 
 Space Planning Activity for Dargavel 
Primary School 
 Preparation of communications plan to 
encourage community engagement 
(those directly impacted and those 
affected) with the forthcoming statutory 
consultation, to be launched in January. 
 
Establish a new parent council liaison group to provide a 
single PC forum (at the request of PC chairs) to provide a 
August 
2023 
Head of 
Education  
Complete  Group has been established and has met 
following school summer break with positive 
Page 51 of 82

Page 52

Dargavel Independent Review 
Action Plan Response Monitoring – December 2023 update  
Action 
  Target 
Completion 
Responsible 
Officer 
RAG Status  Update 
streamlined opportunity for consistent engagement and 
communication with the whole PC community for all schools 
associated with Dargavel / Bishopton and PMHS and all 
feeder primaries. 
 
feedback from Parent Council Chairs with 
engagement to date. 
Establish regular opt‐in digital community newsletter to 
facilitate regular communication updates direct to 
interested members of the community. 
 
August 
2023 
Head of 
Marketing 
and Comms 
Complete  Take up of opt‐in digital channel newsletter is 
currently sitting at almost 400 and it is expected 
that this will continue to grow in the coming 
months as school delivery and design 
engagement commences more significantly.  
 
 
Establish and track key indicators of community sentiment. 
 
 
 
  Ongoing  Head of 
Marketing 
and Comms 
Ongoing  Assessment of the range of indicators and metrics 
suggest an ongoing interest in Dargavel, albeit 
across the wider community this is settling 
through formalised engagement routes with 
constructive and positive discussion, focusing 
increasingly on the range of solutions proposed 
for delivery by the Council. There remain some 
ongoing aspects of concern expressed from some 
community representatives, and this will be 
addressed and supported through ongoing 
engagement and future consultation 
arrangements.  
 
Develop, deploy (at appropriate key points post formal 
consultation period) and evaluate a community pulse survey 
to assess and track community sentiment and view of 
ongoing handling and satisfaction with delivery of key 
interventions within the community. 
 
Expected 
April/May 
2024 
Head of 
Marketing 
and comms 
N/A at this 
stage 
Will be delivered following the statutory 
consultation in 2024. 
 
Page 52 of 82

Page 53

Dargavel Independent Review 
Action Plan Response Monitoring – December 2023 update  
 
Page 53 of 82

Page 54

Page 54 of 82

Page 55

1 
___________________________________________________________________
To: Audit, Risk and Scrutiny Board
On: 22 January 2024
___________________________________________________________________
Report by: Director of Finance & Resources
___________________________________________________________________
Heading: Scottish Information Commissioner – Annual Report 
___________________________________________________________________
1. Summary 
1.1 The purpose of this Report is to advise the Board on the Scottish
Information Commissioner’s Annual Report 2022/23, FOI: Building a
resilient future. The full report can be found here:- 
2022-23AnnualReportandAccounts.pdf (itspublicknowledge.info) 
___________________________________________________________________ 
2. Recommendations
2.1  It is recommended that the Board note: 
• the contents of the Annual Report. 
• the information on the numbers of FOI requests, reviews and
appeals involving the Council in paragraph 3 of the report.
___________________________________________________________________
3.  Background  
3.1 The Freedom of Information (Scotland) Act 2002 (“FOISA”) came into
force on 1 January 2005 and created a general right to obtain
information from any designated Scottish public authority subject to
limited exemptions. Very few exemptions are absolute. Most
exemptions are only available if the request fails the “public interest”
test. In other words, information must still be released if it is of greater
benefit to the public to release the information than withhold it.
Item 4
Page 55 of 82

Page 56

2 
3.2 The Annual Report for 2022/23 refers to the increase in requests
following the pandemic and concludes that one key impact for his own
office is the challenge of a high caseload carried forward from 2021-22
coinciding with a reduction in staff resource. 
3.3 Key highlights include:
• OSIC received 527 appeals this year. 
• 72% of appeals came from members of the public and 79 new
appeals related to the EIRs, compared with 98 the previous year. 
• 23% of appeals related to an authority’s failure to respond. 
• Only 0.6% of requests received by Scottish Public Authorities
resulted in appeals to OSIC. 
• OSIC carried out 229 interventions to support improvements in
public authority FOI practice. While most were relatively
straightforward ‘non-compliance’ notifications, they also carried
out 21 interventions at level one and above – a 54% decrease
on 2021-22 interventions. 
• In 71% of decisions the Commissioner found wholly or partly in
favour of the requester. An increase on 55% in 2021-22. 
3.4 Since 2014 the Commissioner has maintained a ‘Statistics Portal’.
Public authorities, including Renfrewshire Council, upload data on FOI
and EIR (Environmental Information Regulations) requests to this
portal. Data uploaded includes the number of FOI requests and
requirements for review received, which exemptions and exceptions
have been applied and whether statutory timescales have been met.
This information is collated and published quarterly. 
• In total there have been 83,918 FOI requests in Scotland in
2022/23, an increase from 73,983 last year. 
• Renfrewshire Council received 1,495 FOI requests in 2022/23,
an increase of 19% from last year’s total of 1258. This placed the
Council 4thout of the 32 Local Authorities for number received,
compared to 5th in 2021/22. 
• The Council received16 requirements for review in 2022/23
compared to 25 the previous financial year. There were no
particular trends emerging from those reviews highlighting
reasons for the larger number last year. 
• Across Scotland, 2,421 of requests resulted in a requirement for
review. 
Page 56 of 82

Page 57

3
• 1% of requests received by the Council resulted in a requirement
for review and 0.07% of requests resulted in appeal to the
Commissioner.
3.5                 There has been only one valid appeal involving the Council for
2022/23.  A decision from the Commissioner on this appeal is still
awaited. The outcome of both will be reported in next year’s Board
report. The decisions for the two valid appeals (from a single applicant)
received in 2021/22 were issued by the Commissioner in March 2023.
Both were decided in favour of the Council.
3.6 The low level of requirements for review compared to the high volume
of requests processed by the Council, together with the small number
of appeals to OSIC during 2022/23 indicates that the Council continues
to manage its responsibilities well.
___________________________________________________________________
Implications of the Report
1. Financial – none
2. HR & Organisational Development – none
3. Community Planning – none
4. Legal – the Council continues to ensure compliance with its statutory
responsibilities under the Freedom of Information (Scotland) Act 2002
and the Environmental Information (Scotland) Regulations
5. Property/Assets – none
6. Information Technology – none
7. Equality & Human Rights – The Recommendations contained within
this report have been assessed in relation to their impact on equalities
and human rights. No negative impacts on equality groups or potential
for infringement of individuals’ human rights have been identified
arising from the recommendations contained in the report. Continued
FOISA compliance ensures that people’s information rights are
respected.
8. Health & Safety – none
9. Procurement – none
10. Risk – none
11. Privacy Impact – none
12. Cosla Policy Position – none
13. Climate Risk - none
___________________________________________________________________
Author:         Allison Black
Managing Solicitor (DPO)
Alison.Black@renfrewshire.gov.uk
Page 57 of 82

Page 58

Page 58 of 82

Page 59

To:
On: 
Audit, Risk and Scrutiny Board
22 January 2024
Report by: Director of Finance & Resources
Heading: Scottish Public Services Ombudsman (SPSO) Annual Report 2022/23
1 Summary
1.1 Rosemary Agnew, the Scottish Public Services Ombudsman (SPSO) has issued her
2022/23 annual report. The report is available on the SPSO’s website at
https://www.spso.org.uk/sites/spso/files/communications_material/annual_report/A
nnual%20Report%20and%20Financial%20Statements%202022-23.pdf
1.2 The SPSO is the final stage for complaints about councils, the National Health
Service, housing associations, colleges and universities, prisons, most water
providers, the Scottish Government and its agencies and departments and most
Scottish authorities. 
1.3 The report advised that Public Service cases received in 2022/23 decreased in
comparison to 2021/22.
1.4 It was noted that the health sector was the sector about which the SPSO received
most complaints, with local authority cases receiving the second highest number. 
Nearly two-thirds of cases received were about health and local authorities. 
1.5 The statutory functions of the Ombudsman, together with the complaints process
and a look forward to the coming year are set out within the SPSO’s report.
2 Recommendations
2.1 That the SPSO’s 2022/23 Annual Report be noted; and
2.2 That it be noted of the 35 complaints against Renfrewshire Council determined by
the SPSO in 2022/23 none went to public investigation.
Item 5
Page 59 of 82

Page 60

3 Background
3.1 SPSO Role and Function
The SPSO has a wide remit which covers a variety of functions and services. 
There are four distinct statutory functions:
• the final stage for complaints about most devolved public services in Scotland;
• powers and responsibilities to publish complaints handling procedures and
monitoring and supporting best practice in complaints handling;
• independent review service for the Scottish Welfare Fund with the power to
overturn and substitute decisions made by councils on Community Care and
Crisis Grant applications; and
• Independent National Whistleblowing Officer for the NHS in Scotland; the final
stage for complaints about how the NHS considers whistleblowing concerns
and the treatment of individuals concerned.
4 Complaints Overview
4.1 The report advised that case numbers received in 2022/23 reduced slightly in
comparison to the previous year. The slight fall in cases received this year meant
that complaint numbers were at pre-pandemic levels.
Public Service Complaints received and carried forward
2022-23 2022-22 2020-21                  
Complaints received Complaints carried forward from previous year
4.2 The report noted that nationally, in 2022/23 the SPSO received 3,527 complaints
and enquiries (4,522 in total when including complaints carried over from last year)
compared with 3,665 complaints received in 2021/22 and 3,1830 in 2020/21.
4.3 Of the 3,527 complaints handled, 192 went to full investigation compared to 284 in
2021/22.  A breakdown of Public Service complaints which were closed at
assessment and after investigation is outlined in table below:
Page 60 of 82

Page 61

4.4 Cases closed overall rose by a 9.7% following on from a 10% rise in 2021/22. This
was despite the challenges faced and it also reflected the impact of additional
temporary staffing resources and changes to their processes to improve efficiency.
5 Public Service Complaints Received
5.1 The table below shows the breakdown of public service complaints by sector and
remains generally consistent with previous years. Once again, health is the highest
subject of complaint followed by local authorities. Nearly two-thirds of cases
received were about health and local authorities. 
Cases determined by sector
Authority Sector Complaint Enquiry Total
Colleges 24 0 24
Health 1,322 5 1,327
Housing Associations 355 2 357
Joint Health and Social Care 171 0 171
Local Authority 1,151 2 1,153
Other 54 1,034 1,088
Prisons 273 1 274
Scottish Government & Devolved Administration 192 0 192
Universities 209 1 210
Water 78 1 79
Total 3,829 1,046 4,875
5.2 Of the investigations completed in Scotland as a whole, two cases were reported
in full as public investigation reports (down from seven the previous year). These
are cases where they decide to publish the investigation in full because there is
evidence of significant personal injustice or hardship, systemic failure, significant
complaints handling failures, or it is a test/precedent case.  Neither of these cases
involved Renfrewshire Council.
5.3 Cases that are not published in full as public investigation reports are usually
published as decision summaries. Public reports and decision summaries can be
found in the 'Our findings' section of their website.
Type 2022-23 2021-22 % change 2020-21
Total cases closed after investigation 192 284 -32.4% 420
Upheld in full 77 102 -24.5% 145
Upheld in part 42 71 -40.8% 101
Not upheld 61 100 -39% 157
Not duly made, or withdrawn 6 7 -14.3% 12
Outcome unachievable 0 1 -100% 0
Resolved 6 3 100% 5
Total number of cases closed
(at assessment and after investigation) 3,829 3,492 9.7% 3 ,176
Page 61 of 82

Page 62

6
6.1
7
7.1
7.2
Premature Public Service Complaints Rate
A premature complaint is one that has not been considered by the public body first.
There was a significant reduction in premature public service complaints this year.
The actual number of premature complaints received decreased by 41% (460 in
2022/23 compared to 783 in 2021/22).  This reflected the work that had been done
during the year to develop their online complaint form as it provided complainants
with greater assistance in assessing when their complaint was ready to be sent.
Complaints in relation to Renfrewshire Council 2022/23
No complaint details for specific organisations are included in the report. However,
information received separately from the SPSO, indicated that the number of
complaints received by the SPSO relative to Renfrewshire was 35 compared
with 43 in 2021/22 and 31 in 2020/21. Of the 35 cases 22 were completed at the
early resolution stage and 13 reached the advice stage
Complaints Determined in relation to Renfrewshire Council 2021/22
Stage Outcome Group
Renfrewshire
Council
Advice A&G - Complaint submissions - mature 2
A&G - Complaint submissions - premature 5
A&G - Enquiries 6
Organisation not in jurisdiction 0
Unable to proceed 0
Total 13
Early
Resolution
Cause and impact test not met (s 5 (3)) 0
Discretion –  Insufficient benefit would be achieved by
investigation 4
Discretion – alternative action proposed 3
Discretion – Alternative route used or available 0
Discretion - Good complaint handling 7
Discretion – referred back 3
Discretion - Resolved - both parties satisfied with proposed
outcome 1
Member of the public test not met (s 5 (6)) 0
Organisation not in jurisdiction 0
Premature 0
Right of appeal to court/tribunal/Scottish ministers (s 7 (8)) 0
Subject matter not in jurisdiction 0
Time limit (s 10) 1
Unable to proceed 3
Total 22
Investigation Fully upheld 0
Not duly made or withdrawn 0
Not upheld 0
Resolved 0
Some upheld 0
Total 0
Total 35
Page 62 of 82

Page 63

7.3
7.4
8
8.1
Of the 35 cases in 2022/23 relative to Renfrewshire, the main subjects of these
are as follows, with 2021/22 figures in brackets. The subjects are the SPSO’s and
may not relate directly to the way Renfrewshire Council services are organised:
Education 5 (4); Environmental Health & Cleansing 6 (6); Finance 3 (4); Housing
7 (9); Legal & Admin 2 (2); Personnel 0 (0); Planning 3 (3); Roads & Transport 0
(1); Social Work 7 (4); Subject Unknown/Out of Jurisdiction 2 (1); and Welfare
Fund – Community Care Grants 0 ( 0).
The SPSO will not generally consider a complaint unless the complainer has gone
through the Council’s complaints procedure fully.  In 2022/23 the Council received
9,155 complaints, compared with 9,193 in 2021/22.  The annual report on the
Council’s complaints was considered at the meeting of this Board held on 22
August 2023.
Looking Forward
The SPSO recognise they still have much to do and will be focusing on
o continuing to reduce the time taken to allocate and investigate complaints;
o building on their stakeholder engagement to drive up complaint handling
standards and improve the complaint journey for complainants;
o developing people-centered and rights-based complaint handling, that  focuses
on outcomes and resolution;
o developing to equip themselves with skills to both deliver and develop their
service; and
o improving accessibility to justice through complaints, especially for people
who do not currently have access  to their services.
Page 63 of 82

Page 64

Implications of the Report 
Financial – None 
HR & Organisational Development – None 
Community Planning – None 
Legal – None 
Property/Assets – None 
Information Technology – None 
Equality & Human Rights – The recommendations contained within this report have been
assessed in relation to their impact on equalities and human rights. No negative impacts
on equality groups or potential for infringement of individuals’ human rights have been
identified arising from the recommendations contained in the report. If required following
implementation, the actual impact of the recommendations and the mitigating actions will
be reviewed and monitored, and the results of the assessment will be published on the
Council’s website. 
Health & Safety – None 
Procurement – None 
Risk - None. 
Privacy Impact – None 
COSLA Implications – None 
Climate Risk - None 
Author: Carol MacDonald, Senior Committee Services Officer
Email: carol.macdonald@renfrerwshire.gov.uk 
Page 64 of 82

Page 65

To: Audit, Risk and Scrutiny Board
On: 22 January 2024
Report by: Director of Finance & Resources
Heading: Commissioner for Ethical Standards in Public Life in
Scotland – Annual Report 2022/23
1 Summary
1.1 The Commissioner for Ethical Standards in Public Life in Scotland has issued his
2022/23 annual report. The report is available on the Commissioner’s website at 
https://www.ethicalstandards.org.uk/sites/default/files/publications/ESC%20Annual
%20Report%202022-2023_1.pdf
1.2 The report provided details of investigation of complaints about the conduct of
councillors, members of devolved public bodies and MSPs and scrutiny of Scotland’s
Ministerial public appointments process. Where there has been contravention of the
relevant Code, the Commissioner reports this, in the case of councillors and members
of public bodies, to the Standards Commission for Scotland and in the case of MSPs
and in relation to lobbying complaints, to the Scottish Parliament.
1.2 The report advises of revised governance arrangements, reinstated transparency
reporting and a new rolling biennial business covering all office functions.
2 Recommendations
2.1 That the 2022/23 Annual Report by the Commissioner for Ethical Standards in
Public Life in Scotland be noted; and
2.2 That the actions taken in Renfrewshire in relation to the Code of Conduct
development as detailed in paragraph 11.2 of the report be noted.
Item 6
Page 65 of 82

Page 66

3 Background
3.1 The annual report indicated that from the start of the financial year until the end of
February 2023, Ian Bruce continued to fulfil the role of Acting Ethical Standards
Commissioner for Scotland, following his temporary appointment by the Scottish
Parliamentary Corporate Body (SPCB) on 20 April 2021. The Commissioner was on
an extended period of leave from early March 2021 and resigned with effect from 30
April 2022. Following a recommendation from the SPCB, Ian Bruce was appointed
by the Scottish Parliament as Commissioner for a six-year period from 1 March 2023.
3.2 Section 22 Report
The last Ethical Standards Commission (ESC) annual report made reference to a
Section 22 Report laid by the Auditor General for Scotland into the work of their office.
Audit Scotland laid a further section 22 report in January 2023 which followed up on
their office’s progress in the usual way. It reflected positively on the work done to
rebuild the office and the services they provide, and to restore confidence in the
ethical standards framework. However, it also made it clear that more work had to be
done to embed the good practices adopted since the prior section 22 report was laid
by the Auditor General.
3.3 Through the last financial year, the public appointments section faced significant
challenges with staff resourcing which led to a large backlog.  However, all
appointments have now been made permanent and has provided the service with
much needed capacity and support.
4 Complaint Volumes In 2022/23
4.1 Nationally, during 2022/23 the Commissioner received a total of 156 complaints,
compared with 330 in 2021/22 and 238 in 2020/21.
4.2 The report advised that at the start of 2022/23, there were a large number of
complaints and cases already open as a result of the backlog of cases that had built
up in the previous year.  Over the course of the year, the Standards Team completed
a total of 127 cases, an increase of 44% from the previous year.
Complaint volumes during 2022/23 and previous two years
2022/23 2021/22 2020/21
Already open at 1 April (beginning of financial year) 1501 24 63
Received 156 330 238
Active during year 306 354 301
Completed 218 208 277
Cases remaining open at 31 March, (end of financial year) 88 146 24
1. There are minor differences in the carry forward totals from 2021/22 to 2022/23. This is due to a small number of cases
either being re-opened or additional complaints being added to existing cases during the 2022/23 financial year.
Page 66 of 82

Page 67

Case Volumes during 2022/23 and previous years
2022/23 2021/22 2020/21
Already open at 1 April (beginning of financial year) 861 8 35
Received 109 164 130
Active during year 195 172 165
Completed 127 88 157
Cases remaining open at 31 March, (end of financial year) 68 84 8
1. There are minor differences in the carry forward totals from 2021/22 to 2022/23. This is due to a small number of cases
either being re-opened or additional complaints being added to existing cases during the 2022/23 financial year.
5 Categories of Complaints Received
5.1 The categories of complaints received, and the number of complaints received
for 2022/23 are indicated below with disrespect towards employees and the public
being the most common type of complaint received.  This remains unchanged
from previous years. Taking together cases in relation to disrespect towards both
councillors/members, employees and the public accounted for 40% of the total
complaints received during 2022/23.
Complaints Received During 2022/23 (Total 156)
Breach of key principles 
Failure to register an interest 
Breach of confidentiality 
Failure to declare an interest 
Quasi‐judicial or regulatory applications 
Other 
Disrespect towards other Councillors/members 
Outwith jurisdication 
Disrespect towards employees/public 
0  10  20  30  40  50  60 
NOTE: Outwith jurisdiction complaints are complaints which are about conduct which, following assessment, does not fall with in the remit of the Code. They are
distinct from complaints which we cannot accept as they are outwith the jurisdiction of the Commissioner’s office, such as a complaint about a Councillor in
England
Page 67 of 82

Page 68

6 Origin of Complaints
6.1 The pie chart provides details of who made
complaints to the Commission in 2022/23.
Complaints from members of the public accounted for
almost 80% of the total number of complaints
received     during 2022/23 and this figure is similar to
previous years.
7 Complaints About Conduct of Councillors
7.1 The Commission saw a reduction in the number of new complaints received
during the year and this allowed them to dedicate more staff time to reducing their
backlog. The report advised that the backlog had significantly reduced such that
it was now taking up to four months, instead of the previous wait of 11 months,
for an initial complaint to be assessed.  In the interests of transparency, their
website now has a banner and a supporting page which sets out waiting times
and investigation times for all complaints.
7.2 The report noted that when several complaints were received about the same or
closely related issues, they combined these complaints together and assessed
and/or investigated them as a single case. 
7.3 The Standards Commission for Scotland (SCS) Direction of March 2021 requires
the Commission to investigate all complaints received about councillors or
members, except in fairly narrow circumstances. In essence, any conduct which
has happened in the 12 months prior to the complaint being made and where, on
the face of it, a breach of the applicable code has taken place must be
investigated. This Direction was renewed for a five-month period in March 2023.
The SCS agreed not to renew the Direction beyond August 2023 following
agreement from the Ethical Standards Commissioner that the Commissioner
would include wording from it on the face of the ESC Investigations Manual.  The
Commission continues to investigate all complaints that could, on their face,
represent a breach of the Code. This has increased the number of complaints
being investigated since the start of 2021/22.
8 Outcome of Complaints Nationally
8.1 Nationally a total of 45 cases (79 complaints) progressed to full investigation and
were reported on and finalised during the year, with 17 being breach reports
(regarding 9 cases) which were heard by the Standards Commission, and 62 being
reported on as non-breach (regarding 36 cases).
Member of the public  Councillor/member  Council officer  Other 
Page 68 of 82

Page 69

Outcome from complaints completed in 2022/23 and previous two years
Outcome from cases completed in 2022/23 and previous two years
9 Outcome of Complaints relating to Renfrewshire Council
9.1 Information has been received separately from the Commissioner that, during the
period covered by the report, five complaints were received regarding Renfrewshire
Council in 2022/2023. Two of these related to disrespect towards the public/council
employees, one related to disrespect towards other councillors and two other
complaints related to general disrespect and a conflict of interest. 
9.2 Two of the complaints were dismissed at the admissibility stage and did not progress
to investigation. Two of the complaints progressed to investigation where the
Commissioner found the Councillor had not breached the Code of Conduct. The
fifth is still under an open investigation.
10 Hearings
10.1 Under current Directions, the Commissioner reports the outcome of all
investigations to the Standards Commission for Scotland (SCS). They may hold a
hearing, direct the Commissioner to conduct further investigation or do neither.  If
the SCS concludes at a hearing that a breach of the Code has occurred, they must
impose a sanction. 
10.2 Nationally, 36 reports where the Commissioner found there was no breach were
submitted to the SCS. There were a further 9 reports which were referred to the
SCS where the Commissioner found that a breach had occurred.  Renfrewshire
Council were not involved in any reports referred to SCS. 
2022/23 2021/22 2020/21
Initial Assessment 121 56%
Full Investigation 79 36%
Breach 17 8%
No Breach 62 28%
Withdrawn 18 8%
125 60%
75 36%
6 3%
69 33%
8 4%
227 82%
49 18%
39 14%
10 4%
1 0%
Total completed 218 208 277
2022/23 2021/22 2020/21
Initial Assessment 69 54% 56 64% 132 84%
Full Investigation 45 36% 26 29% 24 15%
Breach 9 7% 5 6% 17 11%
No Breach 36 28% 21 23% 7 4%
Withdrawn 13 10% 6 7% 1 1%
Total completed 127 88 157
Page 69 of 82

Page 70

11 Code of Conduct
11.1 On 16 August 2023, as part of the programme of events and development
opportunities for Councillors, the Head of Corporate Governance provided an
annual update to Members on the Code of Conduct/Standards Commission.
11.2 The Council’s Head of Corporate Governance is available for members should they
wish to seek advice on the Code of Conduct generally and specifically in relation to
the registration and declaration of interests.
12 Public Appointments
12.1 The Commission regulates how Scottish Ministers make appointments to the
boards of public bodies that are within their remit.
12.2 The ESC report recognised that further improvements could be made in order to
achieve effective boards that were reflective of the communities that they served.
The revised Code of Practice for Ministerial Appointments came into effect October
2022 and was making a difference to practices. 
12.3 Training was now obligatory for selection panel chairs and for independent panel
members and the ESC were happy to assist the Scottish Government in the design
of that training programme and it had been received well. The respective roles and
responsibilities of everyone engaged in the appointments process was clearer, with
considerably more responsibility vested in the panel chair, who fulfils that role on
behalf of the appointing minister.  There were signs that the new process was
reducing bureaucracy, which was one of the intentions, but also that panel chairs
were taking considerably more ownership of the appointment process. They were
required to report on reasons for the success or failure of the appointment rounds
for which they have responsibility.
13 Future Plans
13.1 Having reviewed and completely revised their governance arrangements during the
course of the prior year, the ESC are now in a period of relative stability and are
operating to a revised strategic plan for 2021-24 and a new rolling biennial business
plan covering all office functions. 
13.2 The business plan continues to demonstrate progress against each of the external
and internal auditors’ recommendations and they have drafted a new strategic plan
to run from 2024-28.
Implications of the Report
1 Financial - None
2 HR & Organisational Development - None
Page 70 of 82

Page 71

3 Community Planning – None
4 Legal - None
5 Property/Assets – None
6 Information Technology - None
7 Equality & Human Rights – The Recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights. No
negative impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations contained in
the report. If required following implementation, the actual impact of the
recommendations and the mitigating actions will be reviewed and monitored, and
the results of the assessment will be published on the Council’s website.
8 Health & Safety – None
9 Procurement - None
10 Risk – None.
11 Privacy Impact – None
12 COSLA Implications – None
13 Climate Risk - None
Author:  Carol MacDonald, Senior Committee Services Officer
Email: carol.macdonald@renfrewshire.gov.uk
Page 71 of 82

Page 72

Page 72 of 82

Page 73

___________________________________________________________________
To:  Audit, Risk and Scrutiny Board 
On:  22 January 2024
___________________________________________________________________
Report by: Lead Officer
___________________________________________________________________
Heading: Neighbour Disputes
___________________________________________________________________    
1. Summary 
1.1 At the meeting on 22nd August 2022, members of the Audit, Risk and Scrutiny
Board agreed an annual programme of activity for the Board for 2022/23. This
included an investigation into neighbour disputes in Renfrewshire. 
1.2 Following the Board in March 2023 there has been a change in Lead Officer.
This has brought about a change in timescales due to handover. An updated
timescale is included in Section 4 within the report for approval. 
1.3 This report considers the current arrangements and approaches the Council
and other stakeholders have for responding to neighbour disputes and
reviews the current disposals/actions that are available to the Council and
others to resolve neighbour disputes.
___________________________________________________________________
2.  Recommendations 
The Board is asked to:
• note the progress contained within the report; and
• approve the updated timescale as outlined in Section 4 of this report.
___________________________________________________________________    
3.  Background 
3.1 At the Audit, Risk and Scrutiny Board in August 2022 it was agreed that the
review of Neighbour Disputes be looked at in the widest sense and should
also include anti-social behaviour. It was agreed that the purpose of the
investigation into neighbour disputes would be fourfold: 
1. Try to establish the scale and nature of neighbour disputes in
Renfrewshire,
Item 7
Page 73 of 82

Page 74

2. Set out the current arrangements and approach the Council and
other stakeholders have for responding to neighbour disputes,
3. Review the current disposals/actions that are available to the
Council and others to resolve neighbour disputes, and
4. Identify any other approaches, policy changes or mitigating actions
that could be available to the Council within existing resources. 
3.2 Since the previous report on Neighbour Disputes was brought to Board in
March 2023, there has been a change in Lead Officer due to the previous
Lead Officer taking up a new post outwith the Council. 
3.3 The previous Lead Officer had completed point 1 of the investigation (the
scale and nature of neighbour disputes in Renfrewshire) and it had been
agreed to move to the next stage of the review. 
3.4 This change in Lead Officer has impacted on the original timescales of the
investigation and an updated timetable is included in Section 4 for
consideration. 
4.  Updated Timetable for Neighbour Disputes Investigation 
4.1 The scoping of the investigation was agreed at Board in January 2023, with a
paper on the scale and nature of neighbour disputes being brought in March
2023. With the change in Lead Officer for this investigation, an updated
timetable is proposed below: 
Date of Board Meeting  Stage of Investigation 
23rd January 2023  Scoping paper to initiate investigation - Complete 
13th March 2023  Continuation of investigation - Complete 
22nd January 2024 - Revised  Continuation of investigation – Point 2 
18th March 2024 - Revised 
Continuation of investigation – Point 3, including input
from those with Lived Experience and regulatory
disposals 
20th May 2024 - Revised  Draft Final Report to Board 
27th June 2024 - Revised  Final Report to Full Council 
5.  Progress Update 
5.1 Following the change in Lead Officer, and time taken to familiarise with the
investigation and progress to date, the review has been progressing well.
Research has been undertaken with a particular focus on point 2 of the
original aims to ’set out the current arrangements and approach the Council
and other stakeholders have for responding to neighbour disputes’. This work
also ties in with point 3, to review the current disposals/actions that are
available to the Council and others to resolve neighbour disputes. 
Page 74 of 82

Page 75

5.2 This report provides a summary and highlights findings from the research into
the tools that different organisations use in the first instance, with the
disposals and actions (including legislation and regulatory powers) being dealt
with in a future paper in response to point 3. Research to date has involved
communications with a number of other Scottish Local Authorities; Local
Housing Associations; Police Scotland; and key internal stakeholders.   
5.3 Contact was made via email to the other 31 Scottish Local Authorities and a
range of local Housing Associations, with questions on 5 areas of neighbour
disputes and anti-social behaviour. This was made up of direct emails (where
names of relevant Officers were known in other local authorities) or contacting
via generic email addresses on the Local Authority/Housing Association
website. From this initial contact, 16 local authorities responded (52%) and 3
local housing associations have also made contact. 
5.4 In some cases, Officers responded to the questions via email. But a number
of local authorities and housing associations also agreed to set up a phone
interview in order to talk through the various approaches taken across a range
of issues. All internal Officers agreed to meet in person, or held interviews
over Teams. These interviews have also now been completed, along with a
phone interview with Police Scotland. 
General Neighbour Disputes and Anti-Social Behaviour
5.5 There are differences across the 32 local authorities in how neighbour
disputes and antisocial behaviour are dealt with. Some local authorities will
support and respond to all tenures; others would support and respond to
Council Housing tenants only (where they have Housing stock) and signpost
other tenures to alternative organisations; and others support and respond to
all social housing tenants only. Renfrewshire Council support and respond to
all tenures. 
5.6 For low level neighbour disputes where a private rented property is causing
the issue, a number of local authorities would refer the complainer to the
landlord in the first instance due to responsibilities under their landlord
registration licence. This was often the case with Registered Social Landlord
tenants also, with complainers being encouraged to contact the RSL in the
first instance to try and resolve, with the local authorities stepping in if
required.   
5.7 Processes across all local authorities generally differ slightly dependent on
tenure due to the range of levers available, and the issue being reported.
Internally within local authorities it is often different teams that deal with
different aspects of neighbour dispute and antisocial behaviour dependent on
the legislation it falls under and/or potential actions – between Housing,
Community Safety and/or Environmental Health teams. This is true within
Renfrewshire Council, with close working between departments on cases. 
5.8 It was noted by all organisations that reports can come in via a variety of
sources – including via Housing Officers, the Community Safety Team,
Environmental Health, Elected Members, Police Scotland, online reporting
forms and phone calls to generic Customer Service lines. The importance of
ensuring that information for members of the public on who to contact is easily
Page 75 of 82

Page 76

accessible to all was highlighted, to ensure the appropriate response as
quickly as possible to resolve issues. The importance of being clear on when
local authorities can intervene as well as what the limitations are (and why)
was also raised by a number of local authorities in order to manage
expectations and ensure cases are signposted to the best source of
assistance as quickly as possible and minimise being passed between
organisations/departments. 
5.9 The most common sources of neighbour disputes were similar across all local
authorities and housing associations – the most common relating to noise and
waste (misuse of bins, including not putting out for collection, using bins
belonging to others and placement of bins when out for collection) as well as
parking and issues relating to communal spaces. In all cases, when a report
comes in it would be investigated by relevant Officers who would contact the
complainer, including home visits where appropriate, and would then identify
the relevant course of action and next steps. 
5.10 The majority of local authorities had seen changes in levels of disputes as
well as reasons for disputes. This was generally found to be initially due to the
pandemic and lockdown, with people being at home more. This also links with
a clash of lifestyles, which was reported as a major factor in neighbour
disputes and noise complaints. This includes situations such as different
working patterns, where one party may leave early for work, or return late at
night. Many local authorities also acknowledged mental health being impacted
by the pandemic and further exacerbated by the cost of living crisis. They are
also often seeing a rise in complex cases particularly in relation to mental
health and addiction. Cross-agency working is pivotal in ensuring access to
services and support, and prevent people from falling through the gaps in
services. 
5.11 A resource that was highlighted was the Anti-Social Behaviour Officers’
Forum (ASBOF). The Forum was found to be an important source of
information with knowledge sharing on best practice and effective responses
between local authorities as well as opportunities to raise any new issues or
patterns that are arising to see how others have approached these. 
5.12 It was acknowledged that early intervention is key to resolve issues and
prevent potential future escalation. This includes a need for cases to be
reported as early as possible and communication to members of the public
around how to report issues, with the pathways and options available to
different tenures believed to be critical. 
Mediation and Conflict Resolution Services
5.13 Mediation is a recognised early intervention tool to help neighbours to resolve
their difficulties. Figures provided via the Antisocial Behaviour Officers’ Forum
(ASBOF) indicated around 90% success rate for sustainable outcomes – i.e.
those who engaged with mediation services did not have to contact the local
authorities again. In most cases, including in Renfrewshire, specially trained
mediators are used who would not have taken part in any previous part of the
process (e.g. investigation) and so are completely impartial. 
Page 76 of 82

Page 77

5.14 Mediation requires both parties to be willing to take part and find a solution but
can take 2 different forms: joint mediation and shuttle mediation. Renfrewshire
Council uses both forms:
- Joint Mediation: the Mediation Officer will meet both parties in a
neutral venue, often a community space to discuss the issues together
and hopefully reach a resolution. 
- Shuttle Mediation: an alternative option whereby the Mediation
Officer goes between the two parties, exchanging information without
the need to meet in the same space and communicates on behalf of
each party to help to resolve the situation. 
5.15 There are a range of reasons why one or both parties are not willing to enter
into mediation, with the most common reason being that the situation had
escalated too far by the time it was reported. But in instances where
mediation was used, local authorities overwhelmingly found it to be a positive
and vital tool to resolving issues and preventing escalation. Resolutions
ranged from neighbours just agreeing not to speak to each other/stay out of
each other’s road to one party offering the other party a lift home at the end of
the session. 
5.16 Again, there were differences in provision of service – some Local Authorities
(including Renfrewshire Council) provide mediation free of charge to all
tenures. Others would charge for non-Council Housing tenants, including
charging Registered Social Landlords who refer to the service. The remainder
either provided no service or would signpost all residents to mediation
services offered by SACRO (a Scottish community justice organisation) at
their own cost. 
5.17 All organisations who responded had access to interpretation services where
language may be a barrier to communication, but there was a gap with
regards to assisting deaf and hearing impaired people (BSL interpreters). The
same is true of communicating information to those who may want to report
issues, including deaf and hearing impaired people and blind and visually
impaired people. 
5.18 Being a victim of neighbour nuisance or anti-social behaviour can have a
huge impact on people’s lives and affect mental health and wellbeing. It can
also contribute to people feeling unsafe and/or anxious in their home and it is
key to ensure that support is available for those suffering from unreasonable
behaviour. The need to support those who may be perpetrating anti-social to
change behaviour was also raised. And the reasons behind the behaviour can
be complex – the behaviour can be driven by trauma as well as triggering a
trauma response in those that it is affecting. 
5.19 Renfrewshire Council have recognised the importance of trauma informed 
and responsive services, and training is being rolled out across Housing and
Community teams due to the front-facing nature of their roles. Other local
authorities also provide trauma informed training to assist officers in carrying
out their duties, whilst some of those who didn’t currently were interested in
the approach or are considering it. 
Page 77 of 82

Page 78

5.20 Some local authorities use voluntary tools such as Acceptable Behaviour
Contracts (or Acceptable Behaviour Agreements) in a range of circumstances
to encourage and support perpetrators to take responsibility and change their
behaviour. Unlike Anti-Social Behaviour Orders (ASBOs), Acceptable
Behaviour Contracts are not legally binding but outline a range of acceptable
and unacceptable behaviours to allow individuals to recognise and take
responsibility for their behaviours. These Acceptable Behaviour Contracts are
not designed to replace Anti-Social Behaviour Orders but are seen as an early
intervention tool to prevent the need for legal action. If the behaviour remains
persistent, then further legal action will also be considered, but it is an
approach designed to be used for anyone who is willing to work together with
agencies to change their behaviour. 
Noise Monitoring
5.21 Noise nuisance was commonly reported as one of the top complaints with
regards to neighbour disputes and/or anti-social behaviour across local
authorities and housing associations. 
5.22 Noise nuisance is identified where something is unreasonable to the average
person, taking into account factors such as locality, impact, time, frequency,
duration, convention and avoidability. It was acknowledged that people who
are causing noise disturbance may not always be aware. Issues can be
exacerbated by poor sound-proofing and circumstances such as houses
having no curtains, poor quality or no underlay and in some cases no carpets.
If the person feels safe to do so, generally they are encouraged to approach
their neighbour in the first instance in case they are unaware they are causing
an issue. 
5.23 When the noise issue is persistent over time, residents are encouraged to
keep a diary of dates and times of noise disturbance. Local authorities
generally then use the MATRON (or similar) noise recording system in order
to gain corroboration for difficult to prove noise nuisance cases, e.g. instances
where there aren’t any witnesses/corroboration due to time of night or location
of properties. In these cases, the system is installed in the house of the
complainer in order to monitor noise levels over a period of time and this is
then analysed and used to take further action against perpetrators. 
5.24 Before the noise recording system is installed in a property, surrounding
properties are all notified that at some point over the next few weeks there will
be a recording system installed and it was found that this notification alone
can often stop problems in blocks of flats. 
5.25 In addition to formal noise recording systems, a number of local authorities
use a ‘noise app’. Renfrewshire Council are exploring this option also. This
enables a resident to submit noise complaints via their mobile device, so that
they can be submitted at the time it is happening without the need for a formal
recording system to be installed in the property. Local authorities reported the
app as being useful in a number of ways:
- access to formal MATRON systems can lead to delays in assessing
issues if the system is being used in another property 
- it enables Officers to identify areas of need for MATRON system to be
installed
Page 78 of 82

Page 79

- residents can submit any time of day or night as and when the noise
is happening, without needing to wait for a Warden/Officer to attend for
corroboration. 
5.26 Local authorities who use the noise app also reported that it was not found to
increase Officer workload (i.e. it was not leading to increased levels of noise
complaints being received) but they believed it was leading to higher quality of
reporting from residents. It was acknowledged, however, that not all residents
would have access to an app and that the diary sheets were important to
retain. Formal recording systems are also required in the case of any formal
court action as the noise app would not be submissible in Court. 
Multi-Agency Meetings
5.27 Partnership working is key to tackling anti-social behaviour and the
importance of cross-agency collaboration in understanding and responding to
incidents of anti-social behaviour was highlighted by all interviewees – across
local authorities, housing associations and Police Scotland.   
5.28 All local authorities who responded hold multi-agency meetings – with key
organisations including Police Scotland, Scottish Fire and Rescue Service,
Housing Associations and other local partners such as those involved in
mental health support services and addition services. The aim of these
meetings is to ensure early intervention and a coordinated partnership
approach to ensure solutions are delivered effectively and efficiently and with
knowledge sharing and input across organisations. 
5.29 Across local authorities, multi-agency meetings were generally scheduled on
a set frequency to discuss general anti-social problems and decide actions. In
instances where there was a specific case requiring a cross-organisation
approach, a special meeting would be held to focus more on outcomes. The
frequency of these scheduled multi-agency meetings varies across local
authorities. Renfrewshire’s model involves daily tasking meetings, whereas
some local authorities met with partner agencies every other day, or every 3
days. 
5.30 Renfrewshire has established a Community Safety Partnership Hub
consisting of statutory, voluntary and community organisations based on the
MARAC model (multi-agency risk assessment conference). This approach
has been recognised as best practice and includes the CCTV Operations.
There is no single pathway for a referral into the Hub - any of the services can
bring cases/information to the table and have signed up to the information
sharing protocol. 
5.31 In addition to the noise monitoring and mediation discussed earlier, the range
of resources and good working practices utilised by the Renfrewshire
Community Partnership include:
• multi-agency daily tasking meetings
• multi-agency ‘hot spot’ and escalation through monthly tasking (tackling
specific cases about individuals or by location)
• Youth Officers – officers with a particular focus on early intervention and joint
working with schools and youth organisations
Page 79 of 82

Page 80

• A Police Scotland Local Authority Liaison Officer (LALO) at multi-agency
meetings to coordinate multi-agency responses to community problems
• Senior Community Support Officers
• Public Space CCTV operators
• Victim support for persons affected by anti-social behaviour 
5.32 This approach combines this broad range of services to support communities
across Renfrewshire, through targeting anti-social behaviour, its causes and
effects and ensures a robust approach to tackling public protection issues
affecting residents in Renfrewshire. 
6.  Next Steps
6.1 The next stage of the review will focus on the current disposals/actions that
are available to the Council and others to resolve neighbour disputes
(including legislation and regulatory powers). 
6.2 To ensure the broadest review of the process, this will include speaking to key
community organisations, such as Citizens Advice Bureau and Victim
Support, as well as speaking to residents with lived experience of neighbour
disputes and anti-social behaviour. This will help to identify any potential gaps
in service provision or areas in the process where improvements could be
made from a service user point of view through embedding learning from
those who have been through the process.
Page 80 of 82

Page 81

Implications of the Report 
1. Financial - None directly arising from this report.  
2. HR & Organisational Development - None directly arising from this report. 
3. Community/Council Planning - None directly arising from this report.   
4. Legal - None directly arising from this report. 
5. Property/Assets – No current implications. 
6. Information Technology – No current implications. 
7. Equality and Human Rights - The Recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights. No
negative impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations contained in the
report because relates to carrying out an investigation on behalf of the Board. If
required following implementation, the actual impact of the recommendations and the
mitigating actions will be reviewed and monitored, and the results of the assessment
will be published on the Council’s website.     
8. Health and Safety - No current implications. 
9.  Procurement - No current implications. 
10. Risk - No current implications. 
11.  Privacy Impact - No current implications. 
12. COSLA Policy Position - No current implications. 
13. Climate Risk - No current implications.
___________________________________________________________________ 
List of Background Papers: 
Audit, Risk and Scrutiny Board Annual Programme
Neighbour Disputes Paper - Audit, Risk and Scrutiny Board, January 2023
Neighbour Disputes Paper - Audit, Risk and Scrutiny Board, March 2023 
Author:   Roz Smith, Climate Emergency Lead Officer, Chief Executive’s Service 
Page 81 of 82

Page 82

Page 82 of 82