To: Audit, Risk and Scrutiny Board
On: 6 November 2023
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Risk Report, November 2023
___________________________________________________________________
1. Summary
1.1 Each year the Board considers and approves the council’s risks.
1.2 This paper sets out the latest position in managing the council’s risks, midway
through the financial year. The appendices attached provide details of:
• 1: longer-term or imminent strategic risks
• 2: longer-term significant corporate risks
• 3: service risks
• 4: assurance levels for business-as-usual risks
________________________________________________________________________________ 
2. Recommendations
2.1 It is recommended that the Board approves the report.
_________________________________________________________
3. Background
3.1 The key areas of risk previously reported to the Audit, Risk & Scrutiny Board in
May 2023 were: 
Strategic Risks:
Very High-Risk Economy  
Very High-Risk Reducing inequalities
High Risk  Climate, sustainability &
adaptability 
Corporate Risks:
Very High-Risk Financial sustainability
Very High-Risk Financial stability 
High-Risk Cyber attack
High Risk Regulatory services/ statutory activities  
High Risk Commercial vehicle & operator’s license 
High Risk Tree Fall and Ash Dieback 
High Risk Asset Management

Page 2

3.2 The strategic and corporate risk profile for the council in terms of its longer-term or
imminent risks was as shown by the matrix below: 
Evaluation: Low Moderate High Very High Total
LT or Imm Strategic Risks: 00 00 01 02 03
LT or Imm Corporate Risks: 00 00 05 02 07 
3.3 Risks are evaluated using the Council’s adopted risk matrix; this involves multiplying
the likelihood of a risk occurring by its potential impact. Risks are then evaluated as
either ‘low’ (green), ‘moderate’ (yellow), ‘high’ (amber) or ‘very high’ (red). 
3.4 It was noted that when service departments had reviewed their top ‘significant’
operational risks (i.e., those evaluated as high or very high) all reported that any
such risks were already captured by some strategic and/ or corporate risks.  In May
however, with the integration of Housing Services into the new ‘Environment,
Housing and Infrastructure’ service department, a commitment was given to do a
deeper dive into the service’s risk profile. This was carried out and has additionally
been extended to other service departments too. There is therefore better visibility
of some service risks emerging and these are being reflected within Appendix 3 of
the attached report. This should be noted however as work in progress. 
3.5 The Corporate Management Team has reviewed the risk profile at the mid-year
point and the updated risk information is now presented to Board, setting out the
key risks as we progress through the 2023-24 financial year. 
3.6 Movement in risk profile since the previous risk report to Board in May 2023: 
• Risks added/ NEW 
Strategic 
o Migration and asylum related impacts – high (SRR.23.02.03, page 14)
The pace at which asylum dispersal and refugee resettlement has taken place
in Renfrewshire since 2022 has been significant; beyond anything previously
experienced. Partnership governance structures have been established to
enable partners to share information and to identify and respond to issues as
these emerge.  In the short term, these are anticipated to be in relation to
potential pressure on local education, health and social care services. There
are significant pressures on, homelessness and housing services, given the
tightness of the current housing market locally and on children’s social work
due to availability of foster care and residential provision. 
o Strategic sustainable planning for people and assets – high  (SRR.23.03.05, page 16)
It is being proposed that the climate, sustainability, and adaptability risk will
focus solely on global environmental sustainability and our route to Net Zero,
and other sustainability aspects (people and place), should be lifted out to
focus on the delivery of sustainable services and longer-term strategic
sustainability and sufficiency of the council’s assets. This would incorporate
strategic decision making regarding the estate, including the learning estate

Page 3

and major capital projects, and ensure new assets are fit for purpose for the
future. Note: the current asset management risk would therefore now primarily
focus on ongoing asset management related matters. 
Corporate 
Delivery of the Dargavel solution – high  (CRR23.04.11, page 22)
If the Learning Estate is not appropriately adapted on time, then there is a risk
of insufficient places to meet pupil numbers associated with the Dargavel
Village development, with consequent impact on families, education
experience and further significant damage to the council’s reputation. 
Organisational learning from Dargavel investigation – high  (CRR23.04.12, page 27)
As reported in a special risk update report to Board on 26 September, this new
risk is being added. The recent Independent Review into Dargavel, and the
council’s response to the Review, highlighted several recommendations and
agreed actions. The council must progress the actions as a matter of urgency
or there is a risk that without sufficient learning, similar errors to those made in
the past could occur again, with further financial implications and significant
reputational damage for the council. 
o National Care Service (governance and financial implications) – moderate  (CRR23.04.14,
page 33)
There has been recent confirmation that for the proposed new National Care
Service, staff will continue to be employed by councils. However, under the
terms of a new partnership arrangement, legal responsibility for the service is
to be ‘shared’ between the health service, councils and Scottish Government,
with councils also responsible for buildings and the delivery of support
services. The council will need to ensure clear governance arrangements are
established otherwise there will be increased risk in terms of liabilities. 
o RAAC and the school estate – moderate  (CRR23.04.16, page 34)
While this report was initially being drafted, RAAC had not been identified as a
local issue for us, albeit of national concern.  Just prior to submitting this report
however, some presence of the material was identified in the gym areas of
one school (at the point of writing). It should be noted that while RAAC has
been detected there are no concerns about its current condition or structural
integrity of the roof. Precautionary assessment continues at other schools, and
this will continue to inform the risk assessment in terms of potential impact on
schools and any remedial costs that might be necessary. The risk is being
added as a new corporate risk, with details provided on page 34 of this paper. 
• Risks remaining, where scoring has  
o Successful cyber attack – high, now to very high  (CRR23.04.08, page 19)
The risk has been updated from cyber attack to risk of a successful cyber
attack as more and more this risk comes closer to home, despite the
sophisticated security protocols and cyber architecture in place, and for those
organisations who have been impacted by successful attacks, we see that the
effects are devastating. It is only right that this risk is now considered to be
one of the greatest threats to the council’s operations.

Page 4

• Risks remaining, where scoring has   (other than de-escalated risk below) 
o Financial stability – very high now to high  (CRR23.04.07, page 19)
The budget set for 2023/24 includes the planned use of reserve balances and
the current year budget monitoring suggests that the level of overspend is
broadly in line with the planned use of reserves, therefore the in-year financial
position appears stable; however the position will be kept under close review. 
• Risks removed or de-escalated to service 
o Tree Fall and Ash Dieback – high, now to moderate
The risk is now moving from a corporate risk back to Environment, Housing &
Infrastructure Services, as a programme of work has commenced to address
the risk. 
• Risks escalated from 'business as usual’ to strategic or corporate 
o Workforce planning, recruitment and retention – high  (CRR23.04.13, page 32)
Staff resourcing is captured by our model for business-as-usual risk under
organisation resilience, however over recent months it has been clear that a
live issue is emerging in relation to recruitment and retention challenges,
particularly for various professional services. There is a national shortage in
the UK labour market.  For Renfrewshire Council that is impacting on certain
specialist recruitment campaigns.  This combined with diminution of salaries,
the reality is that there is a risk the council may lose key personnel, it may be
very difficult to recruit suitably qualified and skilled officers for compliance,
advisory, investigative and assurance work, with significant impact on statutory
responsibilities and slippage in professional activity. Note, the former
corporate risk relating to Regulatory services/ statutory activities is now
reflected within this newly escalated one. 
o Programme and project management – moderate  (CRR23.04.15, page 33)
While so far, Heads of Service undertaking self-assessment in this area of
practice have reported reasonable or substantial assurance, and the
governance arrangements in place to support major projects is sound, there is
a risk that some minor or externally led projects may not benefit from the
council’s established project management controls where they could do so,
but they are not known to the programme management unit. There is therefore
scope to explore how these projects might be captured and so this moderate
risk will feature in the corporate risk register until a review of this is complete. 
• Risks escalated from service/s to strategic or corporate - nil 
• Horizon Scanning and other points of note 
While not necessarily included on risk registers, there are always matters that
the Corporate Management Team will keep a watching brief on. External
sources of rich data include for example the Global Risks Report – the survey
produced annually by the World Economic Forum in partnership with Marsh
McLennan and Zurich Insurance Group.

Page 5

Additionally, there is ongoing consideration internally of other matters that have
been raised with the Corporate Risk Management Group that are kept on the
radar. Recent examples of this include: 
o The Verity House Agreement – Scottish and Local Government have entered
into a new Agreement on how we will work together to 1) tackle poverty, 2)
transform our economy through a just transition to net zero and 3), deliver
sustainable person-centred public services. Risks that already capture these
areas of activity should take account of the Verity Agreement without the need
for a distinct risk. This is being monitored however for any unintended
consequences that may emerge from the Agreement. 
o Terror threat levels – under constant monitoring through various channels but
not thought to require a distinct risk now, however this will be introduced if/
when deemed necessary. 
o Preparedness for another major public health incident – not added at this point
as this sits within our ‘business as usual’ risk for organisation resilience, but
should any intelligence emerge suggesting an increase in threat level, the risk
will be reinstated. 
3.7 With all of 3.6 in mind, the risk strategic and corporate risk profile is therefore now
as follows: 
Evaluation: Low Moderate High Very High Total
LT or Imm Strategic Risks: 00 00 03 02 05
LT or Imm Corporate Risks: 00 03 06 02 11

Page 6

3.8  Appendix 1 provides the detail for 05 longer-term or imminent strategic risks.
Appendix 2 provides the detail for 11 longer-term or imminent corporate risks. 
Appendix 3 provides the detail for 15 longer-term or imminent service risks.
Appendix 4 provides the assurance levels (to date) for business-as-usual risks.
3.9 The strategic and corporate risks are aligned with the council plan themes that were
approved in 2022. 
Strategic
Moderate risk Very high risk
Economy
Reducing inequalities
High risk
Migration and asylum related impacts
Global environmental sustainability and route
to Net Zero
Strategic sustainable planning for people and
assets
CorporateModerate risk
RAAC and the school estate
Programme and project
management (governance)
National Care Service -
governance and financial
implications
Very high risk
Successful Cyber Attack
Financial sustainability
High risk
Asset management - ongoing
Commercial vehicle & operators license
Financial Stability
Delivery of the Dargavel solution
Organisational learning from Dargavel
investigation
Workforce planning, recruitment and retention

Page 7

__________________________________________________________________
Implications of the Report
1. Financial 
Recurring costs associated with the measures in place for each risk are considered
proportionate to the level of risk, and new planned actions are also considered to be
cost effective. 
The financial requirements to support the risks should be met within the budget of
each relevant risk owner, nevertheless, any unplanned and unbudgeted cost
pressures that arise in relation to any of the risks identified will be subject to review
in consultation with the Director of Finance and Resources. 
2. HR & Organisational Development – not relevant to report recommendations 
3. Community/Council Planning – effective risk management supports the delivery
of all community/ council plan outcomes 
4. Legal – not relevant to report recommendations 
5. Property/Assets – not relevant to report recommendations 
6. Information Technology – not relevant to report recommendations 
7. Equality & Human Rights – not relevant to report recommendations 
8. Health & Safety – not relevant to report recommendations 
9. Procurement – not relevant to report recommendations 
10. Risk – as per the subject matter of this report 
11. Privacy Impact – not relevant to report recommendations 
12. Cosla Policy Position – not relevant to report recommendations 
13. Climate Risk – not relevant to report recommendations
_________________________________________________________
Author:          Karen Locke, Risk Manager 
27/10/2023 
Tel: 07506 957 037, Email: Karen.Locke@renfrewshire.gov.uk

Page 8

7 | P a g e
Appendix 1: Strategic Risks, longer-term or imminent 
• ECONOMY – building an inclusive, green and resilient economy
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
SRR.23.01.01 Economy Even before the COVID-19 crisis, the
Scottish economy was facing several
strategic challenges including climate
change, Brexit and lower than average
productivity. Likewise, Renfrewshire’s
economy was facing challenges such
as: growing the working age
population; more closely aligning the
education and skills provision with the
needs of local employers; and
achieving a strong and inclusive
economy. 
The risk therefore is that significant
economic improvement and upskilling
of local workforce is difficult to
progress until the current landscape
improves and our investment
programmes are completed
Head of
Economy and
Development 
Head of
Finance &
Procurement 
Programme
Director – City
Deal &
Infrastructure
(1) Economic Recovery Plan
(2) Capital investment such as
investment in housing and heritage
assets; supporting Scotland’s 
(3) 
(4) investment by identifying and
developing opportunities such as
AMIDS1 and supporting local
businesses seeking to export to new
markets
(5) Taking forward measures to counter
any education learning loss
(6) Developing skills interventions to
address the risks of unemployment,
in particular those in low-paid
employment, and parents.
(7) Support for local businesses to bid
for council contracts
(8) Support for local businesses to
become more carbon neutral
05 05 25
V.High The coronavirus pandemic has resulted in
significant challenges for economies across the
world. The UK and Scottish Governments
invested billions to support businesses through
lockdowns and furlough in order to keep
businesses viable and retain people in
employment.   Subsequently, the cost-of-living
crisis and supply chain issues have meant that
economic conditions remain challenging. 
Renfrewshire’s economy has well established
strengths in transport (including Glasgow
Airport), retail (including Braehead),
manufacturing (including significant
international exports) and construction and
major initiatives such as AMIDs are key to future
growth.  There is a risk that failure to support
economic growth will have a negative impact on
residents, businesses, and public services.
Action Codes Actions Assigned To Date Status
CESIP22.01.02 Maximise funding for regeneration of Renfrewshire’s places through grant submissions to external sources including UK and
Scottish Governments.
The Regeneration and Place Team have successfully been able to secure and receive funding through various external sources. 
Between 21/22 and 25/26 we have been allocated £4.4m from the Place Based Investment Fund for capital regeneration projects.
Between 22/23 and 24/25 we have received £1.5m in funding for capital and revenue regeneration spend from the Shared
Prosperity fund.   We have consistently been successful in RCGF funding applications.  Most recent successful application received
£800k in funding for the PACE theatre project.  Four applications have been submitted this year for the 24/25 allocation.  We have
now been invited to Stage 2 for two of these applications.  Stage 2 applications will be submitted in November, with decisions
expected in the new year. 
Head of
Economy and
Development
31-Mar-
2026 
1 Advanced Manufacturing Innovation District

Page 9

8 | P a g e
An application was also submitted this year to the Scottish Governments Vacant and Derelict Land Investment Programme (VDLIP). 
Again have been successful in progressing to Stage 2, with a further application to be submitted in November. 
Funding worth £85k has been secured from SEPA to investigate the potential deculverting and environmental enhancement of the
Candren Burn in Ferguslie.  We have recently secured £35k funding from Visit Scotland to develop a strategic Tourism
Infrastructure Development Plan for Clyde Muirshiel Regional Park.  Will be looking to make further applications to the Rural
Tourism Infrastructure fund in the near future.   The Regeneration team will continue to explore external funding opportunities to
help deliver our place shaping agenda 
CESDP21 - 01 -
27
Monitor benefits of City Deal Projects, including AMIDS, Clyde Waterfront and Renfrew Riverside and City Region wide employment
programmes.
Clyde Waterfront & Renfrew Riverside:  All required community benefits have been delivered to date, with the rest remaining on
track during the project lifespan. Project is advancing with the completion of a new culvert and foundations of bridge structure in
place. Fabrication of bridge components is progressing with these due to arrive on site in early 2024.
Glasgow Airport Investment Area project is now complete which is enabling the development of AMIDS 
Programme
Director - City
Deal and
Infrastructure
31-Mar-
2025 
CESDP21 - 01 -
13
The transformation of Paisley on the back of the Action Plan is advancing at pace. Goals such as creating an international culture
and heritage destination and acting as a stimulus for property investment, development and re-use has already been realised. 
There are a number of significant regeneration projects currently under construction nearing completion including the restoration
of the Museum, Town Hall and Arts Centre and the creation of a new Culture and Learning Hub in the High Street.
The publication of the Paisley Vision document will also act as a further catalyst to inspire future development in and around the
town centre. The Liberal Club, which was identified as a key building in the Vision, is currently under restoration, securing its long-
term status.
The Regeneration Team will be looking to refresh our town centre strategies to reflect changes that have taken place in a post
pandemic environment.  These Strategies will align with the guidance and principles outlined in NPF4.  We await the publication of
applicable supplementary guidance.  In the meantime, work has been ongoing in respect of outlining potential regeneration
priorities and projects.  This includes commissioning visioning work in Johnstone, a review of potential projects in Erskine and the
submission last year of a bid to the Levelling Up Fund in respect of a project in Renfrew.  The team will continue to bring forward
regeneration proposals across our town centres.  This action carries forward into the new Service Improvement Plan but has been
widened in scope.
Chief
Economic and
Regeneration
Manager
31-Mar-
2026 
CESIP23 - 01 -
02
Work with the development partner and stakeholders to maximise the potential of AMIDS for Renfrewshire
Development partner (Buccleuch) now in place with contracts being signed. Work has already commenced to secure new leads to
AMIDS with phase 1 which will deliver the next building on site, beginning the design process.
Programme
Director, City
Deal and
Infrastructure
31-Mar-
26 
CP.22.02.01 Develop an Investment Proposition for Renfrewshire that is clear on our economic ambitions for place
Two reports have been commissioned to analyse Renfrewshire’s Growth Sectors.  The first highlighted that there are several
opportunities which Renfrewshire needs to capitalise on to support the growth of its economy further.  The second report aims to
reconcile existing priorities, team capacity and skills engaged in the economic development and regeneration functions of the Chief
Executive’s Department, with the future opportunities and challenges outlined in the first report and the Council’s Economic
Head of
Economy and
Development
31-Mar-
25

Page 10

9 | P a g e
Strategy.  This report highlights that there is a requirement to grow and increase visibility of Renfrewshire’s inward investment
proposition to drive future economic growth and development.  The development of a web site which signposts the area’s
investment portfolio is recommended.  Officers are now looking to progress this action in conjunction with the
Marketing/Communications team . 
CP.22.02.07 Develop a Community Wealth Building Plan for Renfrewshire
Community Wealth Building [CWB] is at the heart of the council’s approach to inclusive economic growth and aims to support a
wellbeing economy in Renfrewshire. A new Community Wealth Building Act is expected next year and a council framework/plan is
currently being prepared. Key actions to report are:  i)Ensuring the Council CWB plan is aligned to a regional approach with
Glasgow City Region; ii)  Reporting quarterly to the Scottish Governments Community Wealth Building Policy Manager and liaising
directly with colleagues in the SG CWB policy team; iii)Contributing to Economic Development Association Scotland (EDAS) and
Centre for Local Economic Strategies [CLES] workshops.
As part of a Scottish Government pilot, Renfrewshire Council (Economic Development and Procurement) were one of four local
authorities to participate in a CWB project delivered by Scotland Excel. The project involved data analysis of local spend, practice
sharing workshops and a Spotlight on Community Wealth Building from the Scottish Government’s Heads of Procurement.
Economic Development are working on a draft paper which will provide an overview of CWB practice within the Council and will
outline the Council’s key objectives and levers to maximise the impact of CWB at a local level. In order to ensure the paper is
aligned to national policy, the draft paper will be revised to reflect the proposed new CWB Bill due to be put forward during the
current parliamentary term.
Head of Policy
and
Partnerships
31-Mar-
24 
CESDP21 - 01 -
03
Support and grow supply chain management and knowledge exchange among manufacturing SMEs to supply Scottish / UK
businesses and global supply chain
A key aim of the recent Growth Sectors report is for the Council to identify opportunities for local supply chain growth and
development.  For the past 18 months the Economic Development and Procurement teams in the council have been developing
and delivering a wide range of new supports to local businesses to encourage them to bid for public sector contracts. This builds on
existing work with the Supplier Development Programme and Business Gateway support. The main driver of this is work around
the Community Wealth Building agenda and the aim of increasing and sustaining local economic growth and also increasing
council, and other public sector spend, in the local area. Further opportunities for local growth and development are also being
explored. 
31-Dec-
2023

Page 11

10 | P a g e
• PLACE - working together to enhance wellbeing across communities
• FAIR - nurturing bright, happy and healthy futures for all 
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
SRR.23.02.02 
Reducing inequalities in Renfrewshire
If we don’t have a
coordinated approach
to tackling inequalities
across Renfrewshire
(including for example,
the causes and
consequences of
poverty), this could
jeopardise the effort in
reducing both the
short-term impacts on
households but also
have wider long-term
consequences on
attainment and health
for people living on low
incomes. 
Head of
Policy &
Partnerships
(1) Fairer Renfrewshire Programme
(2) Attainment Challenge and Pupil
Equity Funding
(3) Strong partnership working (e.g.
Community Planning
Partnership (CPP). Advice
Partnership, Empowering
Communities Forum, Improving
Life Chances, CPP Board
(4) Community Plan identifies ‘Fair’
priorities with associated actions
relating to cost of living crisis,
addressing the impact of alcohol
and drugs, and a just transition to
Net Zero. Social Renewal Plan
has been developed through a
programme of analysis,
research, and engagement. 
05 05 25
V.High
The Council plays a key role in tackling inequalities and providing the
best possible services to our communities, particularly those who are
experiencing the poorest outcomes. As well as our focus on health and
wellbeing, we are also committed to support vulnerable individuals,
groups or communities through early intervention and prevention,
responding to poverty, supporting routes to employment as well as
dealing with welfare reforms. The impact of COVID-19 is likely to have
exacerbated existing inequalities in terms of for example educational
attainment, health, poverty and mental health. There will be a significant
focus on ensuring that people receive the economic and wellbeing
support that is needed, with a real opportunity to work in a different
way, and to tackle some of the existing inequalities across communities
as we do this. The current cost of living crisis impacts disproportionately
on particular groups in society.  In the short term, significant focus is on
supporting food insecurity and supporting people on low incomes to
maximise income and seek advice with income and debt management.
Action Codes Actions Assigned To Date Status
CESIP22.03.01 Develop the new Fairer Renfrewshire programme.
The Fairer Renfrewshire Sub-Committee has been meeting since August 22 and a Fairer Renfrewshire Officers Group
made up of officers from across services is meeting monthly. Work with partners to develop the Fairer Renfrewshire
Programme is ongoing. There are four key emerging themes which are shared across all elements of the programme, and
these are:
•Improving financial security 
•Advancing equality of opportunity 
•Building community capacity and resilience 
•Listening to lived experience 
Funding has been allocated from the Fairer Renfrewshire budget to a number of projects to support residents with
immediate Cost of Living increases. These include supports around food, fuel and advice. Work is also ongoing around
digital access and supporting residents to get online through the Citizen Voice group, with a new post of Digital Champion
in libraries has been recruited.
Our Winter Connections programme was set up to support residents over the Winter 22/23 period, and has provided
grants to a number of organisations to run activities.  The development of a panel of people with lived experience of
Strategic Partnerships
& Inequalities Manager
31-Mar-
2025

Page 12

11 | P a g e
poverty to inform the Council’s policy and practice is ongoing. A diverse panel has been recruited and have met formally
six times, with test of change being evaluated by Poverty Alliance.
In addition, officers are undertaking a ‘deep dive’ child poverty data exercise, to support the Local Child Poverty Action
Plan as well as the wider Fairer Renfrewshire programme
CESIP22.03.02  Develop the Trauma Informed and Responsive Renfrewshire Programme 
A coordinator post has been created to lead this programme of work going forward, with the coordinator starting in late
October 2022. Further engagement with the Improvement Service and other local authorities has taken place through national
networks for trauma champions and trauma leads, and the steering group reconvened in March 2023 to further explore the
draft plan for the Programme. Leadership training for the Corporate Management Team was also undertaken in March 2023.
Head of Policy &
Partnerships
31-Mar-
2024 
CESIP22.03.03 Deliver the Stigma/Language Matters project.
The work of the Alcohol and Drugs Commission identified the need for partners to act robustly to eradicate stigma and
promote positive conversations around recovery. Although the initial focus for this initiative was focused on alcohol and
drug stigma, there is the opportunity to widen its scope to include other existing and emerging priorities, such as The
Promise, Tackling Poverty, Trauma Informed and Responsive Renfrewshire and Our Values for example. High level themes
and initial actions have been identified, including supporting staff to understand the power of language, be confident in
their use of language, and to challenge stigma by speaking up when people make negative or wrong comments; and
supporting national campaigns to help people in Renfrewshire understand the power and impact of language. A review of
the resources required to deliver this project is currently underway.
Head of Policy &
Partnerships
31-Mar
2024 
CESIP22.03.09 Carry out an evaluation of the Tackling Poverty programme and develop a transition plan for mainstreaming this work.
Work commenced in Q2 and initial projects identified for evaluation. This work is ongoing with Programme Management
Unit support.
Strategic Partnerships
& Inequalities Manager
30-Sep-
2023 
CP.22.01.09 Develop new options for services and partners to work together more closely across localities to provide advice and
support to local people and develop community capacity.
We are progressing new connected communities approach - considering how we develop our ‘front door’ services for
people accessing advice and support; exploring family advice services; and developing options for locality working.
Head of Policy &
Partnerships
31 Dec
25 
CESIP23 - 01 -
01
Deliver a participatory budgeting framework for the Council
This year £1.2M was allocated by Environment & Infrastructure through their #Youdecide programme. The project
delivery is well underway, and an evaluation report is being finalised. The updated CONSUL site for Renfrewshire is now
ready to be put into use. Arrangements are being put in place for the Data Analytics teams to manage the site in the
interim while a permanent host is agreed. A range of services have undertaken training in CONSUL to enable potential
future PB projects to take place within their services. The planning of the £25k PB project for Johnstone Christmas event
is ongoing with a steering group including residents being formed and the group are currently planning the initial
engagement work.  
Strategic Partnerships &
Inequalities Manager 
31-Mar-
24 
CP.22.03.08 Take forward the recommendations of the Alcohol and Drugs Commission
Services across the Council continue to support and implement work to address the recommendations of the Alcohol and
Drugs Commission Report. MyLA (My Life Ahead) launched last year, which provides holistic wraparound support, using
Head of Policy &
Partnerships 
31-Mar-
25

Page 13

12 | P a g e
many of the elements of the Housing First approach and is delivered by Housing Services, working with Turning Point
Scotland. The project has now provided meaningful support for 39 individuals - which exceeds the target number - and
there have been very positive indicators emerging in terms of: reduction in alcohol/drug use; people being supported to
successfully access the specialist services they require; and, those with a history of non-engagement now working
positively with the MyLA team.  Children’s Services, in partnership with I Am Me Scotland, have developed a digital,
interactive and progressive curricular programme in substance use for early years to senior phase aligned to the
principles of Curriculum for Excellence, and reflecting the context of drug use within Renfrewshire. Children and young
people have led the design and development of the materials, with significant involvement from partners, as well as
young people and adults with lived experience, from a variety of different backgrounds. Since its launch in August 2022,
the programme has been accessed by 414 Renfrewshire teachers. In the new academic session (23/24), additional
training sessions will be offered to ensure that the programme is embedded across all establishments. There has been
much interest in our programme from across Scotland. As such, every local authority and a total of 982 teachers have
accessed the platform.  In addition, there have been access requests from Police Scotland (394), HSCP (18) and others
(91) including elected members, Education Scotland, youth groups, disability groups, Crown Office and Procurator Fiscal
Service, Public Health Scotland and Respect Me. The programme was put forward by Council for a COSLA award under
Category 3:  Tackling Inequalities and Improving Health and Wellbeing
CP.22.03.02 Work with partners to support Renfrewshire residents through the cost-of-living crisis 
The Community Food Fund has supported community food provision across Renfrewshire and a further allocation of funding
was agreed at the June 23 Leadership Board. Three allocations of funding have been made to the Fuel Insecurity Pilot which
continues to support fuel vouchers augmented with energy advice and the increase in payment amount and continuation of the
Financial Insecurity Winter Payment supports households who are struggling to purchase essentials like food and fuel. In
addition the Tackling Poverty programme continues to support an Energy Adviser in the Energy Management Unit.  Council
Officers have worked with Engage Renfrewshire to produce information on Cost of Living supports held in one easy to access
place, with leaflets printed and distributed to help dissemination of this information.  The School Support service in all
secondary schools commences in August 23, with RCAB providing advice, while Advice Works are providing support to early
years and primary locations.
Strategic Partnerships &
Inequalities Manager 
31-Dec-
23 
CESIP22.03.07 Develop mechanisms for supporting individuals with lived experience of poverty to influence policy in this area 
The development of a panel of people with lived experience of poverty to inform the Council’s policy and practice is ongoing
with Poverty Alliance and STAR Project being contracted to organise, chair facilitate and support the panel. A diverse panel of 15
people has been recruited and have met formally six times, as well as meeting in-between panel meetings to debrief and
develop the work alongside a community artist to create a record of their experience. Initial meetings with Officers and Elected
members have been held to commence the panel’s input to policy.  Work is also underway to plan an event which will bring the
Panel together with the Fairer Renfrewshire Sub-Committee to discuss the Panel’s deliberations and recommendations.  An
Strategic Partnerships &
Inequalities Manager 
31-Mar-
24

Page 14

13 | P a g e
evaluation of the process has also been carried out by Poverty Alliance to explore how these types of participation processes
can inform work going forward, and to inform the development of the model moving forward. Officers are currently
undertaking contract arrangements to extend the existing panel arrangements for a further year. 
CESIP23.03.02 Develop the Fair Food Renfrewshire strategy.
The Head of Policy and Partnerships has assumed role as officer Food Champion.  The first development session of local food
partnerships was held on 24 October 2022, with input from Nourish Scotland/Glasgow City Food Partnership and Renfrewshire
HSCP Health Improvement Teams.  A local partnership will be formed to develop the strategy. Discussions were held with
Nourish Scotland and a second Fair Food Renfrewshire event was held in May 2023.  The purpose of this event was to further
engage with a wider stakeholder group and help shape the Vision, Charter and the work priorities of Fair Food Renfrewshire as
suggested by the Sustainable Food Places toolkit. 
Strategic Partnerships &
Inequalities Manager 
31-Mar-
24 
CESIP23.03.01 Deliver targeted programmes of community-based adult literacy and numeracy, ESOL, digital, personal and social development,
and family learning activities in response to identified need and as set out in Renfrewshire’s CLD Strategy 2021-24 (CF) 
Q1 delivered 52 adult & family learning courses and 8 one-off learning events across Renfrewshire:  Adult Literacies 5 x weekly
sessions plus 5 short numeracy courses delivered as part of the Multiply initiative ESOL 10 x weekly sessions plus 2 ESL in the
Community groups under the Supporting New Scots initiative.  Digital beginners and work clubs 12 x weekly sessions  Personal
development groups x 16 weekly sessions  Family Numeracy 2 x weekly sessions delivered as part of the Multiply initiative.  One-
off learning events include family learning days during school in-service days and activities delivered in partnership with OneRen
and CAB.  
Community
Development Manager
31-Mar-
26 
CESIP23.03.03 Continue to deliver new approaches to Building Communities and identify further new opportunities for locality area-based
support which builds community capacity.
“Take the Lead” was launched in May 2023 to promote responsible dog walking behaviours, primarily to reduce instances of dog
fouling within communities.  Dog owners who sign the Pledge agree to adhere to good practices such as picking up after their
dog.  Signatories receive a free lead, mobile dog fouling dispenser, (bags included) and bandana promoting the Campaign.  The
Green Spaces, Play Parks and Villages Investment Fund has supported 104 community projects since its launch in 2018.  In 2023,
16 projects have been supported including gala days, community gardening projects and community murals.  Feedback from
communities demonstrates the Team’s support is appreciated and the funds bring neighbourhoods together, as well as deliver
physical improvements.
Community
Development Manager
31-Mar-
26

Page 15

14 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
SRR.23.02.03
Migration and asylum related service
pressures
The pace at which asylum dispersal
and refugee resettlement has taken
place in Renfrewshire since 2022 has
been significant, and beyond
anything previously experienced. 
Partnership governance structures
have been established to enable
partners to share information and to
identify and respond to issues as
these emerge.  In the short term,
these are anticipated to be in relation
to potential pressure on local
education, health and social care
services.  There are significant
pressure on, homelessness and
housing services, given the tightness
of the current housing market locally
and on children’s social work due to
availability of foster care and
residential provision.
Head of Child
Care & Criminal
Justice  
Head of Policy
and Partnerships
(1) The Migration and Resettlement
Strategic Group meets regularly to review
and discuss developments across all
migration and resettlement programmes.
This group is comprised of senior officers
from across appropriate council services.
(2) Asylum Dispersal meetings are held once
every two weeks with senior council
officers and representatives from the UK
Government Home Office and their agent
Mears.
(3) The Renfrewshire Community Protection
Chief Officer Group receives regular
updates on migration and asylum issues
and any emerging issues.
(4) The Renfrewshire Community Protection
Member Officer Group receives regular
updates on migration and asylum issues
and any emerging issues.
(5) Updates are provided, as required, to the
Leadership Board of the council.
04 04 16
High
Migration/ Ukraine/ Asylum programmes - this
is an area which is developing and could be a
potential major issue moving forward.
The impact of the conflict in Ukraine is
reflected within the Financial Sustainability
Risk, but only in relation to pricing volatility
and global supply issues. 
The risk here is wider ranging and includes: 
- Ukrainian Displaced Persons
- Home Office Asylum dispersal programme
– use of hotel accommodation in
Renfrewshire 
- Unaccompanied Asylum-Seeking Children –
new requirement from UK Government for
Renfrewshire to provide for children and
young people under the National Transfer
Scheme 
- Syrian/ Afghan resettlement programme
- Support to ensure effective resettlement
to New Scots
Action Codes Actions Assigned To Date Status  
Ongoing Monitoring

Page 16

15 | P a g e
• GREEN – leading Renfrewshire to Net Zero
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
SRR.23.03.04
Global environmental sustainability and
route to Net Zero
(Renamed from Climate, Sustainability risk)
The climate emergency brings
a risk to Council and its
communities in relation to
increased extreme weather as
well as food insecurity. We
need to focus on mitigation
and adaptation and ensure a
just transition so no one is left
behind and none is
disadvantaged in the
transition to net zero. The
Council would need to take
action and support those most
disadvantaged. A key risk is
that the Council is not in
control of all of the levers, and
cannot deliver everything
required in isolation, so there
is a risk that others do not
contribute towards the 2030
target. 
Head of
Climate, Public
Protection and
Roads 
Climate
Change
Working
Group
(1) The Council has used the Climate Change Assessment
Tool – helps public sector organisations in Scotland
self-evaluate their performance under the public
sector duties of the Climate Change (Scotland) Act
2009 
(2) Renfrewshire’s Plan for Net Zero has specific
objectives to reduce emissions, and these are
included in other key documents such as the Council
Plan 
(3) Governance through the Planning & Climate Change
Policy Board
(4) Launch of the Climate change action fund – to
support a range of initiatives/feasibility to test new
ways of working and to be ready to lever external
funding
(5) Climate Panel / Partnership Forum to support
engagement and ensure all voices are heard,
including traditionally underrepresented groups 
(6) Community Climate Fund – fund for community
organisations to enable behaviour change and local
green projects to make our communities more
resilient
04 04 16
High
Renfrewshire Council declared a Climate
Emergency on 27 June 2019 and
established a Climate Change Sub-
Committee, now the Planning and Climate
Change Policy Board to lead on this work. 
The actions required are potentially
complex and multi-faceted and need to be
supported by organisations across all
sectors, and in partnership with local
communities. Actions include: pledging to
work proactively with others towards a net
zero Renfrewshire by 2030, taking into
account both production and consumption
emissions; and assisting communities to
become more resilient to the impacts of
global warming, particularly to flooding
and to drought.
Action Codes New Actions Assigned To Date Status
CESIP22.04.01 Complete the District Heating Network at AMIDS, with supplies to NMIS and MMIC.
The district heating network is now complete and operational.
Programme Director, City Deal
and Infrastructure
31-Mar-
23 
CESIP22.04.02 Develop the first stage of Renfrewshire’s Plan for Net Zero 
The Plan for Net Zero was developed in partnership with other services, stakeholders and our citizens through
Renfrewshire’s Climate Panel. The Plan was approved by the Planning and Climate Change Policy Board on 23rd
August.
Strategy, Policy & Insight
Manager
31-Dec-
22 
Forward action linked to Net Zero plan: Climate change action to make Renfrewshire net zero - Renfrewshire Website

Page 17

16 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
SRR.23.03.05
Strategic sustainable planning for people and assets
There is a risk that
decisions could be
made in the short
term, for example
to address
financial
pressures, which
may then impact
adversely on
sustainability
goals for the
longer term
impacting on our
communities and
organisation.
CMT (1) Learning Estate Programme Board established
(2) Implementation of the Corporate Asset Management
Strategy ensures that property assets are managed
effectively and efficiently through the provision of
relevant management and performance information 
(3) The Energy Management Team: ensure energy
management initiatives are aligned to the capital
investment programme and corporate asset strategy to
optimise use of property estate and reduce overall
running costs and energy consumption levels. Promote
reductions in energy usage and advise employees and
residents about energy efficiency 
(4) Through the Procurement Unit, sustainability and
community benefits are considered in the development
of all contract strategies
04 04 16
High
- Deliver sustainable person-centred public services (the
Verity Agreement) and an engaged sustainable workforce
- Ensure infrastructure future-proofing, with investment in
solar and wind farms, electric charging networks and
public transport, showing that taking the right risks right
now, can transform communities
- For capital projects, ensure new assets are fit for purpose
for the future and have sustainable maintenance and
repairs strategies
- Strategic decision making regarding the estate, including
the condition and sufficiency of the learning estate
Action Codes Linked Actions Latest Note Assigned Date Status
It is recognised that Dargavel Village has a significant amount of housing development yet to be delivered (circa 2000 housing units over a 10-year
period) and therefore many of the associated risks that existed at the beginning of the development continue to exist today albeit there is live data to
inform future projections from the first circa 2,300 units that have been delivered. 
The Council therefore continues to face risk and uncertainty in relation to accurately projecting the scale and timing of future education demand which
will continue to have inherent uncertainty and risk. In recognition of this the Council will continue to progress the following actions to manage and
mitigate this risk:     
SRR.23.03.05a  Securing robust long term demand projections which provide both a core projection, potential upper scenario
and a long-term view of the potential scale and timing of short-term peak demand to inform decisions on
capacity provision.
Completed Director of
Children’s
Services
30-Sep-
2023 
SRR.23.03.05a  Identify now a range of flexible options that are and will remain available to in future years to deliver, if
required additional capacity (both temporary capacity and permanent long-term capacity) to ensure the Council
can be reassured o of being able to respond appropriately to the potential for  upper end demand scenarios
and or temporary demand peaks to emerge. 
Further updates will
be completed in this
respect for updated
datasets available
from November
registration data and
recently released NRS
Census data
Director of
Children’s
Services
31-Jan-
2024 
SRR.23.03.05a  Establish process and arrangements to support and provide detailed monitoring and updates to projections for
updates to actual data sets to facilitate a continual re-assessment of longer-term trend and likely requirements/
decision point required in relation to deployment of potential additional interventions.
Director of
Children’s
Services
31-Jan-
2024 
Further action TBC

Page 18

17 | P a g e
Appendix 2: Corporate Risks, longer-term or imminent 
• LIVING our VALUES – making a difference together
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR23.04.06
Financial Sustainability
If significant
cost pressures
are not
successfully
planned for and
managed
effectively over
the medium to
longer term,
this could
jeopardise the
financial
sustainability of
the council and
result in a
significant
impact on
availability and
quality of front-
line services and
capital
investment
resources.
Decisions will
then be
required on the
continuity or
scope of some
services
currently
offered.
Head of
Finance &
Procurement
(1) Revised medium- to long-term Financial Outlook reassessed the various
risks to the Council’s short, medium- and longer-term financial
sustainability. Refreshed report to Council on 28 September  2023 outlined
the immediate financial concerns and plans to address these, including R4R
savings (see 3 below), financial sustainability workstreams, and utilising
flexibilities agreed by the Scottish Government; however, as the position
continues to develop and evolve, close monitoring will be required to
ensure that the Council manages costs in the short term and fully
appreciates the longer term consequences of actions taken to address
short-term risks.  Committee reports of this nature cover a wide range of
current and future financial and economic factors e.g., Strategic Economic
and National Policy Context, Cost Pressures, Pressures on Income and
Mitigation Strategies to deal with such uncertainties.
(2) A well-developed and embedded budget planning, budget setting and
budgetary control system is in place throughout the organisation, and this
informs members and officers regarding financial performance and
stability. This facilitates robust and transparent decision making and
incorporates an escalation process with regards budget management
issues which may arise. 
(3) In conjunction with the medium to longer term financial outlook and the
Council’s continued “Right for Renfrewshire (R4R) Programme”,
Renfrewshire Council has been pro-active in planning for the future by
identifying and agreeing a planned release of resources. This is required to
meet emerging budget pressures and has been run in conjunction with the
Council’s long-term debt smoothing strategy to support the release of
planned savings over a number of years; however, the pandemic
interrupted the planned delivery of savings under RFR, so the full
programme has been reviewed. It remains the case that savings will
continue to require be generated at scale in order to ensure the ongoing
financial sustainability of the Council.
(4) The Council approved a number of Financial Sustainability Workstreams in
June 2022. These are led by Directors and look to progress recurring
revenue savings.
05 05 25
V.High
Financial recovery from global
events 
- Anticipated reduced income from
NDR/CT over the medium term as
full economic implications of the
pandemic and cost-of-living crisis
hit local businesses and
communities
- Pricing volatility and global supply
issues leading to shortage of
labour and materials following
Brexit and the outbreak of the
Ukraine war
Best value report
- Recommendation in Best Value
report to prioritise how services
need to be provided in future to
be funded from within available
resources.
Cost and Income pressures
- Future grant settlements and the
level of funding available.
- Implications of national economic
policy choices to protect certain
services from real-terms
reductions in funding such as the
Police and NHS
- Future Local Government pay
settlements, and non-payroll
inflation
- Demographics and demand
pressures, such as an ageing

Page 19

18 | P a g e
population with increased
associated service demands, and
increases in demand for children’s
social care
- Implications of welfare policies
and poverty levels, exacerbated by
cost-of-living crisis.
- Reductions in income from fee-
generating services such as car
parking; implications of the
national economic recovery and
associated risks/uncertainty in
economic factors e.g., interest
rates and inflation.
- Implications of third party
provider financial stability, such as
childcare providers in current
economic climate
- Liability for predecessor
organisations, in light of the
removal of the limitation period
for historic child abuse claims
(5) There is close financial monitoring of the agreed savings to ensure that
they are delivered within the agreed timescales or where this is not
possible, to understand and reschedule planned delivery to achieve the
associated objectives. Monitoring is undertaken via a combination of
financial and operational measures, actions and related update reports.
(6) Regular updates and bespoke reports are provided to CMT and the Council
with regards the national fiscal position, likely developments and the
impact on the council through close liaison with national groups e.g., CIPFA
DoFs, COSLA and the Scottish Government. This liaison remains critical in
ensuring the Council is aware of potential financial developments and is in
a position to influence these.
(7) Levels of and use of reserves has been a key tool in addressing the costs of
the pandemic, therefore the planned use of reserves in the medium term,
and the Council’s Capital Investment and Treasury Management Strategy,
are key to ensuring ongoing financial sustainability.
(8) Reports and publications from Audit Scotland in relation to the Local
Government financial outlook, financial planning and related
developments and improvements are supplemented with a Renfrewshire
context report, with both reports being submitted to the Council's Audit
Risk and Scrutiny Board. 
(9) Energy consumption data and condition surveys are used to identify 
priority areas for investment in the Council’s estate,  support informed
investment decisions and formulate the Council’s Capital and Revenue
budgets.
Action Codes Linked Actions Latest Note Assigned To Due Status
CRR22.05.05a  Strategic Property Review and new ways of
working / Review of local policy positions
Work on all of the financial sustainability
workstreams is being progressed with updates
regularly to Council. Agreed budget changes will
then be incorporated into the General Fund
base budget in future years to capture the
recurring savings. 
Due dates extended from original.
Director of Environment, Housing and
Infrastructure
31-Mar-
2023 
CRR22.05.05b  Charging, fees and commercialisation / review
of Council risk
Director of Finance and Resources 31-Mar-
2023 
CRR22.05.05c  Strategic review of procurement  Head of Finance & Procurement 31-Mar-
2023 
CRR22.05.05d  Connected Communities Chief Executive (Head of Policy and
Partnerships)
31-Mar-
2023 
CRR22.05.05e  Digital Strategy Director of Finance and Resources 31-Mar-
2023 
CRR22.05.05f  Council Tax and Tax Policy Director of Finance and Resources 31-Mar-
2023

Page 20

19 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR23.04.07
Financial Stability
If significant short-
term costs and
income losses are not
closely monitored
and understood, this
could destabilise the
finances of the
Council to an extent
beyond the financial
resilience of the
Council, resulting in a
need for immediate
cost control
measures, or short-
term savings which
have an immediate
impact on service
delivery.
Head of
Finance and
Procurement
(1) Revenue budget monitoring reports to Policy Boards focus on the forecast year-
end outturn position rather than the historic periodic position, so that significant
variances are reported early, and any mitigating steps can be taken. This is
already highlighting severe price pressures (such as contractual inflation) across
different services. The impact of pay inflation is also highlighted through this
reporting mechanism.
(2) Review of all Right for Renfrewshire programmes has been undertaken in order
to recalculate potential cost savings in-year and to reprofile agreed savings, the
delivery of which was interrupted by the pandemic
(3) Review of Financial Sustainability workstreams following approval of the
2023/24 Revenue Budget to ensure targets remain achievable
(4) Clear analysis of the Council’s reserves position and potential for reprioritisation
or redirection; including the development of plans to rebuild financial resilience
of the Council in the medium term
(5) Ongoing discussion with directors to understand the financial consequences of
the current economic climate for each service and how these will be managed; 
(6) Review of capital plan and ongoing projects to ensure clear understanding of
phasing of potential spend.
03 05 15
High
Context: 
Imminent
shorter-term risk
for financial
stability,
recognising the
immediate
financial situation
of the Council
(note: the
medium to
longer-term
financial position
is captured under
financial
‘sustainability’)
Action Codes Linked Actions Latest Note Assigned Due Date Status
CRR22.05.07a  Investigate potential of Service
Concession Flexibility allowed by
Scottish Government 
This exercise has now been completed and approved by Council through the
Revenue Estimates 2023/24 where annual recurring savings of £1.4m were
identified.
Head of
Finance and
Procurement
31-Oct-
2022 
CRR22.05.07b  Report to Council the financial impact
of utilising the service concession
flexibility
Complete – reported to Council in Financial Outlook in December 2022 and Revenue
Estimates report in March 2023
Director of
Finance and
Resources
31-Dec-
2022 
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR23.04.08
Successful Cyber Attack
Regardless of the Council’s
technical preparedness for a cyber
attack, the threat remains acute
and present, as evidenced by
successful attacks on partner
bodies, with the risk of significant
impact on council operations. 
CMT For security
reasons, technical
security controls
are not published in
the public domain. 
04 05 20
V.High
Context: 
The risk has been updated from cyber attack to risk of a successful cyber
attack as more and more this risk comes closer to home, despite the
sophisticated technical security protocols and cyber architecture in
place, and for those organisations who have been impacted by
successful attacks, we see that the effects are devastating.

Page 21

20 | P a g e
No matter what technology is deployed, the risk is materially impacted
by individual employee behaviours – i.e. learning how to recognise a
cyber attack and keeping that knowledge up to date by reading cyber
updates and doing mandatory cyber training, being alert to phishing
attacks and understanding the need for rapid escalation should an error
inadvertently be made and criticality of urgently reporting when they
have reacted to a phishing email and explaining all actions taken.
Action Codes Linked Actions Latest Note Assigned Due Date Status
As agreed by the Corporate Management Team   
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR23.04.09
Commercial vehicle and
operator licence
compliance 
Renfrewshire
Council requires
its fleet of
vehicles to be
effectively
managed,
otherwise there
could be
sustained impact
in several areas
including
community care,
housing
maintenance and
repairs,
streetscene
operations and
waste collection. 
Head of
Operations
and 
Service
Development
Governance
(1) Compliance and Business Lead Officer in post monitoring compliance
performance and performing vehicle spot audits to make sure compliance is
adhered too.   
(2) Vehicles services and Maintained within the DVSA roadworthiness guidelines.
Tachograph analysis system ensuring monitoring and compliance of driving
staff. 
(3) Operator Licencing Awareness Training (OLAT) conducted for all operational
service managers
(4) Vehicle Tracking system monitoring vehicle performance and vehicle utilisation
for all services. Driver CPC training to enhance driving knowledge for all HGV
fleet drivers.  
(5) Quarterly attendance at Logistics UK (formerly FTA) and APSE Transport boards
Operational
(6) Reduction in average age of Council Fleet
(7) Workshop equipment and tooling improvements
(8) Vehicle User group created with all fleet users to improve operational
performance.
(9) New Requirement for Fleet Management system – Fit for purpose conducted
with IT. (Digital working requirement to improve service for operational
departments.)
03 05 15
High
Context:  
The council’s vehicle fleet,
managed by Environment &
Infrastructure Services,
comprises around 500
vehicles including heavy and
large goods vehicles, light
vans and cars.  The council
implements a range of
measures to ensure ongoing
vehicle operator licence
compliance. 
Action Codes Linked Actions  Latest Note Assigned Date Status   
Updating the fleet management system, to create a digital working environment within Fleet Operations for all service users.

Page 22

21 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR23.04.10
Asset Management - Ongoing
Effective
governance and
management of the
council’s property
assets is essential,
otherwise there is a
significant risk of
harm, financial loss,
service disruption,
non-compliances,
fines, rising energy
costs and inability
to recover losses via
insurance proceeds
Director of
Environment,
Housing & Infra-
structure. 
Head of
Economy &
Development
Services
Corporately:
Key responsibilities with regards
to the Estate span 2 specific
service departments, but they
come together through a CAMIS
Development Group (Corporate
Asset Management Information
System) which is taking forward a
workplan to more effectively
consolidate and oversee asset
management risk
Heads of Service:
Effective asset management in
practice on the frontline is
included within the new Risk
Assurance model which went live
on 1 April 2023.
03 05 15
High
Context:
GOVERNANCE – roles and responsibilities
- Estates (Leases – by and from the council, and on behalf of
HSCP)
- Facilities management (security, housekeeping, statutory
duties/ inspection, maintenance, repair, building fire risk
assessment)
- Property services (capital works, and CAMIS development)
- All services (inspection inventories and response, people
elements of fire risk assessment)
OTHER MATTERS IN SCOPE
- RAAC – see risk CRR23.04.16 on page 34
- Fluorescent Lights – requiring LED replacement
- Action in relation to Unwanted Fire Alarm Signalling and
upgrade costs
Action
Codes
Linked Actions  Latest Note Assigned To Due Status
CRR22.0
5.10a
New CAMIS Development Group to
appoint Joint Chairs/ Heads of Service
Head of Property Services and Head of Facilities Management Services have
agreed to co-chair the group
CAMIS Development
Group
30-Sep-
2022 
CRR22.0
5.10b
Agree Terms of Reference for the
CAMIS Development Group
The Terms of Reference have been finalised. CAMIS Development
Group
15-Nov-
2022 
CRR22.0
5.10c
Undertake gap analysis to ascertain if
any responsibilities in terms of
governance are missing or unclear
Organisational changes agreed by Council have streamlined some governance
arrangements – specifically that Property Services are now part of the
Facilities & Property Services function in Environment, Housing &
Infrastructure Services. There is less scope therefore for unclear
responsibilities.
CAMIS Development
Group
19-Dec-
2022 
CRR22.0
5.10f
Develop a workplan for the group
and prioritise areas of initial focus
Leads for initial priority activities have been agreed and a workplan is
progressing in line with the Group’s terms of reference. 
CAMIS Development
Group
28-Feb-
2023 
CRR22.0
5.10g
Agree the workplan for 2023/24 Workplan and meeting schedules are in place, aligned to the Group’s terms of
reference
CAMIS Development
Group
31-Mar-
2023 
CRR22.0
5.10d
Undertake gap analysis to identify
activities that take place outside of
the CAMIS environment and consider
if these can be brought into CAMIS by
way of system development
Due to competing demands, development work on CAMIS has moved to
virtual environment and slower than initially planned. Work still being
undertaken to assess what sits outside CAMIS and what can be brought in.
Discussions with other Local Authorities that use CAMIS to see what can be
added with Health and Safety module being reviewed.
Due date therefore amended to June 2024
CAMIS Development
Group
30-Jun-
2024

Page 23

22 | P a g e
CRR22.0
5.10e
Explore data and status monitoring Whilst CAMIS is noted to be a good repository for data, development work is
required to improve the data and how it can be easily accessed. Due to
resource requirements elsewhere in the Council, this has been delayed.
However, conversations continue virtually to assess what can be done to
improve CAMIS for users to ensure robust, up to date data is stored within the
application.
Due date therefore amended to June 2024
CAMIS Development
Group
30-Jun-
2024 
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR23.04.11
Delivery of the Dargavel solution
If the Learning Estate
is not appropriately
adapted in time, then
there is a risk of
insufficient places to
meet pupil numbers
associated with the
Dargavel Village
development, with
consequent impact on
families, education
experience and
further significant
damage to the
council’s reputation
Director of
Children’s
Services
(1) Effective programme and
project governance
established
(2) Project risk management
workshop delivered to the
project management team
03 05 15
High
The newbuild Dargavel Primary school was delivered under a Section
75 agreement with the development company building a substantial
housing development at Dargavel Village. The capacity of the new
school was, and is, not sufficient for accommodating forecasted pupil
numbers. The council needs to expand the learning estate in this area
to ensure sufficient capacity for local education. The Independent
Review into Dargavel resulted in 4 specific recommendations to be
addressed to deliver the solution.
▪ Recommendation 1 - Build a more robust model of primary school
need for Dargavel
▪ Recommendation 2 - Reconsider catchment areas 
▪ Recommendation 3 - Produce robust supplementary guidance on
developer contributions 
▪ Recommendation 4 - Seek to work cooperatively with BAE
Action Codes Linked Actions  Latest Note Assigned To Date Status
For Rec 1    
CRR23.04.11-1a  Complete Council modelling through to the
anticipated end date for the housing development
(2033/34) based on assumed 4,300 units and
available live data. 
Completed October 2022 Director of
Children’s
Services
31-Oct-
2023 
CRR23.04.11-1b  Engage and appoint Edge Analytics to deliver
enhanced modelling approach for both Dargavel
primary requirements as well as PMHS out to
2033/34 and updated live datasets.
Completed February 2022 including additional upper forecast
scenarios for Dargavel non-denominational requirements to
support management of risk associated with long term yield
remaining at similar level to 2023/24. Informed reports to
Education and Children’s Services Board in March and May 2023
Director of
Children’s
Services
28-Feb-
2023

Page 24

23 | P a g e
CRR23.04.11-1c  Extend Edge engagement to deliver an enhanced
model projecting out to 2038 to provide longer
term forecast to assess the full impact on the
secondary sector and allow identification of likely
timing and scale of peak demand encapsulating any
relevant updates to live datasets.
Modelling completed which has identified an anticipated peak
period in both primary and secondary sectors and will be
reported to Education and Children’s Services Board in November
2023.
Director of
Children’s
Services
30-Sep-
2023 
CRR23.04.11-1d  Provide update to November Education &
Children’s Service Policy Board. 
Director of
Children’s
Services
30-Nov-
2023 
CRR23.04.11-1e  Update Edge Analytics modelling for newly released
national Census data and expand across the whole
school estate and establish modelling dashboard to
support ease of updating and rapid re-assessment
of revised projection that will be utilised on an
ongoing basis over future years, both for Dargavel /
PMHS but also as part of the strategic Learning
Estate programme. 
Director of
Children’s
Services
31-Jan-
2024 
For Rec 2    
CRR23.04.11-2a  Complete assessment of anticipated P1 intake from
Dargavel catchment and assess against revised DPS
capacity availability, establish planned P1 intake
capacity cap and anticipated P1 intake requiring
accommodation at Bishopton Primary School. 
Planned use of Bishopton Primary School along with planned
capped entry levels to Dargavel Primary School reported an
approved at Education and Children’s Services Policy Board in
August 2023. There will be a requirement to annually monitor
anticipated and actual P1 intakes carefully to assess adequacy of
short-term capacity provision across both Dargavel and
Bishopton Primary Schools to meet demand pending the second
primary school in Dargavel coming on stream. 
Director of
Children’s
Services
31-Aug-
2023 
CRR23.04.11-2b  Complete an exercise to assess the timing, scale and
range of potential demand level scenarios, in
particular understanding the scale and timing of the
peak demand and likely settled long term demand.
This information will be used to inform the
assessment of how Bishopton Primary School could,
if required, potentially be utilised as an option in
the longer term. 
Completion of the updated work with Edge Analytics has
provided a view of the likely timing and length of the peak
demand period – with peak primary demand being forecast in
2033/34 which will fall over the second half of the 2030s to a
more settled level. Further work is being progressed to update
this information for the recently released 2023 census
information and November registration data to inform an overall
assessment.
Director of
Children’s
Services 
31-Jan-
2024

Page 25

24 | P a g e
CRR23.04.11-2c  Complete financial analysis to understand the
potential financial context of utilising Bishopton
Primary School Capacity 
Bishopton PS is a predominantly 1960s construction and is more
than 60 years old. This building will, along with the whole school
estate, undergo an updated condition survey over coming
months. Notwithstanding, given the underlying age of the
building it will inevitably have a limited remaining lifespan before
being considered for replacement. 
Existing surplus capacity if used permanently to reduce the
required size of a second Dargavel primary school, will require to
be replaced as part of a renewal programme. The determination
of the timing of that will be subject to work progressed as part of
the strategic learning estate programme. 
Consequently, it has been assessed that any financial advantage
from utilising Bishopton PS will be restricted to a temporary time
value of money benefit and consequently will be relatively
limited. 
In addition, there is also a risk that utilising Bishopton PS
permanently removes its availability to provide supporting
capacity to manage both a temporary peak that may arise from
upper end educational demand scenarios and longer-term upper
end demand. There could be the risk that in such circumstances if
Bishopton capacity was no longer available this would lead to
higher overall costs over the longer term for the Council.
The financial considerations and risks will be incorporated into
the overall assessment scheduled to be reported as part of the
Education & Children’s Services Board report in January.
Director of
Finance and
Resources
31-May-
2023 
CRR23.04.11-2d  Set out overview in a report to the Education and
Children’s Services Policy Board in respect to the
potential long-term utilisation of Bishopton Primary
School which will be subject to detailed
consideration at an appropriate point in future
years as actual long term demand trends
increasingly emerge. 
Work to allow appropriate recommendation to be made is
progressing in line with plans and scheduled to be reported to
Board in January 2024 
Director of
Children’s
Services
31-Jan-
2024

Page 26

25 | P a g e
For Rec 3    
CRR23.04.11-3a  Undertake a desk top review of other local
authorities across Scotland and identify key best
practice councils to engage. 
Head of
Economy and
Development
30-Jun-
2023 
CRR23.04.11-3b  Complete detailed engagement with identified best
practice councils arising from desk top research
Detailed engagement completed with Fife, Falkirk and West
Lothian councils.
Head of
Economy and
Development
31-Aug-
2023 
CRR23.04.11-3c  Complete data analysis exercise of a range of
datasets of mixed historic sites across Renfrewshire
to provide empirical evidence to support actual
pupil yields to inform establishment of appropriate
yield factors to be used in future contribution
policy.
• Refresh % capacity of all schools (vs school rolls)
• Sample research of Pupil Product Ratio (PPR) for
developed housing sites (< 10 units) [min 10 site
sample]
• Sample research of PPR for developed housing
sites (> 100 units) [min 10 site sample]
• Sample research of PPR for established / mature
housing development to provide longer term
perspective (e.g. 15 years old) (> 100 units) [min
4 site sample]
• Identify individual schools where pupil capacity
is above notional threshold (85%) 
• Identify all known undeveloped housing sites in
individual school catchments
• [Subset of 5] identify all housing sites with
current "live" planning application
Identify schools where it is anticipated intervention
would be required to increase capacity based on
potential future housing to be delivered over next
10 years to inform likely future developer
discussions.
Updated datasets (e.g. census data released by NRS) now
available to allow detailed data analysis to be completed.
Resource challenges have slowed the pace of some of this
workstream but prioritisation expected to still allow for this to be
completed during October. 
Head of
Economy and
Development
31-Oct-
2023

Page 27

26 | P a g e
CRR23.04.11-3d  Incorporate into the development of the draft
contributions policy targeted to be presented to the
Planning and Climate Change Policy Board in
January 2024. 
This remains the targeted date but it will be informed by
complexity of any additional work that may be identified from
the data analytics workstream. 
Head of
Economy and
Development
31-Jan-
2024 
For Rec 4    
CRR23.04.11-4a  Secure with BAE agreement on Heads of Terms for
allow for mutual governance approval from each
organisation to inform detailed legal agreement
drafting and final sign off 
This was completed and approved by ILE Board end of August Chief
Executive
31-Aug-
2023 
CRR23.04.11-4b  Secure completed and signed legal missives to
deliver in full the objectives outlined above to
provide certainty and timing of availability of
remediated and infrastructure proofed land to
support wider school delivery planning and
consultation arrangements that will be progressed
by the Council team.   
Legal missives concluded mid-September Chief
Executive
31-Aug-
2023 
CRR23.04.11-4c  Proposed revisions to S.75 negotiated with BAE
Systems were approved by ILE. Revised S.75 signed
off by both the Council and BAE Systems to legally
conclude matters. 
Approved by planning and Climate Change Board end of August Head of
Economy &
Development 
31-Aug-
2023

Page 28

27 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR23.04.12
Organisational learning from Dargavel
investigation
The council must progress the
actions as a matter of urgency
or there is a risk that without
sufficient learning, similar
errors to those made in the
past could occur again, with
further financial implications
and significant reputational
damage for the council
CMT (1) Corporate leads identified to
ensure recommendations are
taken forward.
02 05 10
High
The recent Independent Review into Dargavel, and
the council’s response to the review, highlighted
several recommendations and agreed actions. The
first 4 recommendations related to the delivery of
the solution for Dargavel specifically and the other 
▪ Recommendation 5 - Corporate working and
organisational culture
▪ Recommendation 6 - Risk management
▪ Recommendation 7 - Role of members
▪ Recommendation 8 - Public confidence
Action Codes Linked Actions  Latest Note Assigned To Date Status
For Rec 5    
CRR23.04.12-5a  Undertake a health check assessment on major
capital programmes to provide reassurance in
respect to all aspects of governance, control,
reporting and management of programmes.
Health check will be completed by end of October with any
identified improvement actions considered by CMT.
Chief
Executive
supported
by CMT
31-Oct-2023 
CRR23.04.12-5b  Put in place arrangements to deliver a
comprehensive Leadership Development
Programme (circa 12 months + programme) for
chief officers and senior managers which
amongst other things will cover any key areas
referenced in the Bowles report in respect to
governance, accountability, risk management,
collaborative working, member officer relations
etc.
Contract engagement in place and resources secured from SOLACE
Enterprises to support co-designed and co-delivered programme.
Initial Chief Officer programme launch event occurred on 3rd
October with focusing on personal resilience with the following
Learning Development events scheduled: -
October – Effective Communications and Elected Member
Relations
November - Governance and Risk Management
December – Programme Management, Leading and Navigating
Strategic Change
January – Transformational Leadership
February – Delivering Corporate/Team Values and Vision
Delivery of wider tier of management / leadership cohort to
commence early 2024.
Director of
Finance &
Resources
and Head of
HR & OD
30-Sep-2023 
CRR23.04.12-5c  Design and undertake an evaluation process of
the Leadership Development Programme for
Chief Officer cohort to inform required changes 
Head of HR
and OD
31-Mar-2024

Page 29

28 | P a g e
/ adjustments to programme delivery for next
management cohort.
For Rec 6    
CRR23.04.12-6a A review of risk profiles across all service
departments to ensure visibility of all risks and
confirmation of where certain risks are being
monitored if outwith the standard Risk Reports
to the Audit, Risk and Scrutiny Board (i.e.,
Health and Safety Planning Groups, Service
Improvement Plans etc)
Initial report to CMT w/c 9/10/23 to update on progress, with
planned final report to ARSB on 6/11/23
Director of
Finance and
Resources
31-Oct- 2023 
CRR23.04.12-6b A review of the ‘service risk representative’
roles in each service department to ensure the
representatives who sit on the Corporate Risk
Management Group are sufficiently involved in
risk matters within the service, to feed this into
the Corporate Risk Management Group and
that they also have authority within the service
to provide challenge as a ‘critical friend.’
New update – action completed. CMT agreed (10 Oct), that each
Director will nominate a Head of Service and one other colleague
to support the Head of Service in the role going forward.
Director of
Finance and
Resources
31-Oct- 2023 
CRR23.04.12-6c Delivery of a project risk management
workshop specific to the planned new primary
school in Dargavel (complete)
Workshop delivered covering nature of project risks, risk changes
over lifecycle of the project; reminder of Council PM framework
and PMU support; key issues re good governance
Director of
Finance and
Resources
31-Aug-2023 
CRR23.04.12-6d Delivery of project risk management training
with all PMU colleagues (in a train the trainer
format) so colleagues are delivering this as part
of project kick-offs to support a more risk
focused culture in the organisation.
Training delivered Director of
Finance and
Resources
30-Sep-2023 
CRR23.04.12-6e Undertaking a ‘health check’ of project
management arrangements across the council
to ensure governance, management, reporting
and risk management is appropriate to the
scale of the project.
Compliance review of all PMU supported projects underway with
aim to complete by end November; model and approach to be
more widely applied to other significant Council projects
Director of
Finance and
Resources
30-Nov-2023 
CRR23.04.12-6f An update to the risk management course on
iLearn and consideration of whether it should
be a mandatory course.
Work underway, decision on mandatory nature tbc by CMT Director of
Finance and
Resources
30-Nov-2023

Page 30

29 | P a g e
CRR23.04.12-6g Embed and deliver risk management training
into the new leadership development
programme that is currently under
development, particularly in relation to
commercial risk
Risk management session programmed for delivery 8/11/23,
including internal and external subject matter experts
Director of
Finance and
Resources
30-Nov-2023 
CRR23.04.12-6h Reviewing governance documents to ensure
delegations in relation to liability caps are clear
and unambiguous.
Potential minor additions/revisions to the council’s scheme of
delegation and contract standing orders being considered, with
formal approval by Council in due course
Director of
Finance and
Resources
31-Dec-3023 
CRR23.04.12-6i Deliver a targeted risk management
development day for Chief Officers
• Project risk management (and risk
simulation exercise) 
• Risk horizon scanning and sustainability
(the Global Risk Report) 
• Liability caps and their implications
Programme being developed delivered by internal leads with
support from appropriate external experts, with delivery planned
early December
Director of
Finance and
Resources
31-Dec-2023 
For Rec 7    
CRR23.04.12-7a Undertake a health check assessment on major
capital programmes to provide reassurance in
respect to extent to which elected member
involvement has been appropriately secured
through formal governance reporting as well as
via other appropriate informal engagement
routes.
Health check will be completed by end of October with any
identified improvement actions considered by CMT.
Chief
Executive
supported
by CMT 
31-Oct-2023 
CRR23.04.12-7b Support Council Leader and other nominated
elected members to determine a review remit,
progress the review and develop suitable
recommendations.
TBC pending initial meeting  Head of
Corporate
Governance
--- ---
CRR23.04.12-7c Carry out an assessment of the Audit Risk and
Scrutiny Board against CIPFA’s published good
practice guide for audit committees and
identify any recommendations for change in
remit or operational arrangements.
Report outlining proposed approach to self assessment and wider
full ARSB development day to be discussed at ARSB 6/11/23.
Timescales for any revisions to ARSB remit or approach tbc
depending on self-assessment outcomes.
Director of
Finance and
Resources
31-Dec-2023 
For Rec 8    
CRR23.04.12-8a Develop a communication and engagement
strategy to meet the following objectives:  
This plan supported and guided all initial comms and engagement
in the initial months of the issue being reported and has guided the
following key activities:
Head of
Marketing
and Comms
30-Nov-2023

Page 31

30 | P a g e
• Improve the flow and regularity of
information to parents and carers and the
wider Dargavel community, so they are first
to hear about decisions impacting their
community.
• Ensure parents and carers have access to all
projection data available to the council. 
• Introduce direct communication channels
with Dargavel residents, enabling all sections
of the community to engage on matters that
are important to them and making sure the
latest information is accessible and easy to
find.
• Provide residents with a feedback loop to
enable them to ask questions of the council
in relation to the development and have
questions answered quickly.
• Include the community in formal planning
and design of a new primary school and high
school extension. 
Hosting two parent and carer meetings, attended by council
officers and more than 220 parents or carers,
Establishing a dedicated enquiries email inbox and encouraged
residents to contact us with any questions and concerns,
Attending several parent council meetings with all primary schools
and PMHS to support direct engagement, discussion on key
activities, immediate estate decisions in respect to deployment of
modular classrooms and post occupancy adjustments at Dargavel
Primary, sharing and discussion of revised projection data and
modelling, key council decision points, independent review
outcomes etc
Attending several community meetings from community council,
Community Liaison Group as well as supporting coordination and
delivery of wider community representative round table session to
maintain ongoing engagement, sharing of information and data
sharing etc.
Issuing 12 letters/updates to impacted parents and carers at
Dargavel Primary School
Issuing 9 updates to Bishopton Community Council
Issuing 3 media releases or proactive statements and responding
to almost 50 media enquiries 
Issuing 11 elected member briefings and 8 MP/MSP briefings to
support members in their engagement with local families.  
Monthly updates to the council website
CRR23.04.12-8b Post Review, deliver a revised comms and
engagement strategy to re-establish trust and
confidence across the Dargavel community.
Complete. As above.  Head of
Marketing
and Comms
31-Aug-2023 
CRR23.04.12-8c Establish a new parent council liaison group to
provide a single PC forum (at the request of PC
chairs) to provide a streamlined opportunity
for consistent engagement and communication
with the whole PC community for all schools
associated with Dargavel / Bishopton and
PMHS and all feeder primaries. 
Group has been established and has met following school summer
break with positive feedback from Parent Council Chairs with
engagement to date.
Head of
Education 
31-Aug-2023 
CRR23.04.12-8d Establish regular opt-in digital community
newsletter to facilitate regular communication
Take up of opt-in digital channel newsletter is currently sitting at
309 users and it is expected that this will continue to grow in the
Head of
Marketing
and Comms
31-Aug-2023

Page 32

31 | P a g e
updates direct to interested members of the
community. 
coming months as school delivery and design engagement
commences more significantly. 
CRR23.04.12-8e Establish and track key indicators of
community sentiment. 
We track public feedback, website traffic, social media
commentary, engagement and sentiment, media OTSH and the
volume of media enquiries and FOI enquiries.  
Assessment of the metrics suggest an ongoing interest in Dargavel
albeit across the wider community this beginning to settle into the
formalised engagement routes focusing increasingly on the range
of solutions identified for delivery by the Council. There remain
some ongoing aspects of concern expressed from some community
representatives in relation to the new school and planned
expansion to PMHS which may continue to be an issue raised
through ongoing engagement and future consultation
arrangements.
Head of
Marketing
and Comms
Ongoing 
CRR23.04.12-8f Develop, deploy (at appropriate key points post
formal consultation period) and evaluate a
community survey to understand the impact of
engagement with the community. 
Head of
Marketing
and comms
Expected
April/May
2024

Page 33

32 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR23.04.13
Workforce planning, recruitment and
retention
There is a national shortage in the UK
labour market.  For Renfrewshire Council
that is impacting on certain specialist
recruitment campaigns.  This combined
with diminution of salaries, the reality is
that there is a risk the council may lose
key personnel, it may be very difficult to
recruit suitably qualified and skilled
officers for compliance, advisory,
investigative and assurance work, with
significant impact on statutory
responsibilities and slippage in
professional activity.
Director of
Finance &
Resources
(1) Data analytics to look at areas of risk,
trends both recruitment and attrition.
(2) Ensuring we hire the right people in
the first place by having solid
recruitment methods
(3) Offering workplace flexibility which
can help enhance work life balance,
and burnout
(4) Creating opportunities for to
development 
(5) Partnering with employability,
community, and further education
programmes to support the Council as
an employer of choice
04 04 16
High
Workforce planning risk is captured by our
model for business-as-usual risk, however
over recent months it has been clear that a
live issue is emerging in relation to
recruitment and retention challenges,
particularly for various professional services.
Note, the former corporate risk relating to
Regulatory services/ statutory activities is now
reflected within this newly escalated one.
Action Codes Actions Assigned To Date Status
CRR23.04.13a  Agreed to introduce a working group focussed on workforce planning, the purpose of this is to look at new and innovation ways
to support the recruitment, retention and upskilling of the Councils workforce.
Head of People
and OD
31-Oct-
2023 
CRR23.04.13b Review our recruitment training for managers with a focus on supporting onboarding, induction, and development support. Head of People
and OD
31-Dec-
2023 
CRR23.04.13c Develop a Equality, Diversity and Inclusion strategy, this aim of this is to enable colleagues to have equity of opportunity within
the council during the whole employee lifecycle
Head of People
and OD
31-Dec-
2023 
CRR23.04.13d Introduce a programme that enables our colleagues voice and provides platform for recognition  Head of People
and OD
31-Mar-
2024 
CRR23.04.13e Continue the roll out of our Health & Wellbeing strategy, ensuring colleagues can have the best experience at work  Head of People
and OD
31-Dec-
2024

Page 34

33 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR23.04.14
National Care Service – governance and financial
implications
The council will need to ensure
clear governance arrangements are
established otherwise there will be
increased risk in terms of liabilities,
with financial impacts
Director of
Finance &
Resources
(1) Maintaining a watching brief
through various professional
networks
03 03 09
Moderate
There has been recent confirmation that for the
proposed new National Care Service, staff will
continue to be employed by councils. However,
under the terms of a new partnership
arrangement, legal responsibility for the service is
to be ‘shared’ between the health service, councils
and Scottish government, with councils also
responsible for buildings and the delivery of
services.
Action Codes Actions Assigned To Date Status     
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR23.04.15
Programme and project management
Where some projects might sit
outside of the programme
management unit’s knowledge/
awareness, there is a risk that those
projects fail either in timescales,
quality, or costs or even if
successfully concluded, do not
deliver the intended outcomes.
Director of
Finance and
Resources
(1) Self-referral approach currently in
place where advice and professional
support from project management
professionals can be requested.
(2) Portfolio management approach
adopted by the CMT for key
priorities and projects meaning
these are identified and monitored
03 03 09
Moderate
Some minor or externally led projects may not
benefit from the council’s established project
management controls where they could do so, but
they are not known to the programme
management unit. There is scope to explore how
these projects might be captured and so this
moderate risk will feature in the corporate risk
register until a review of this is complete.
Action Codes Actions Assigned To Date Status
CRR23.04.15a  Explore a number of ideas, within the resources available, for corporate identification, triage and monitoring of projects that
might not otherwise be visible corporately.
Strategic
Change
Manager
31-Mar-
2024

Page 35

34 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR23.04.16
RAAC and the school estate
The detection of
RAAC material in
the school estate
may lead to a risk
of disruption to
school operations
with financial
impact to resolve.
Director of
Children’s
Services;
Director of
Environment,
Housing &
Infrastructure
(1) We have a matrix that details all
school estate buildings built within
the 1930 to 1990 timeframe, and
information on the assessment/
inspections undertaken at each. 
(2) The methodology used by the
council [for the 2021 RAAC
investigation], aligns with that
outlined by the Institute of
Structural Engineers and was agreed
by the Scottish Heads of Property
Services. It also enabled the council
to respond directly to the
requirements of Scottish
Government. This is being validated
by external consultants.
(3) Although there are no concerns
about the current condition of the
roof structure at Castlehead High
School (as confirmed by
independent engineers), the gym
has been closed for remedial works.
(4) The council’s general school
property condition assessments are
underway and will continue to will
further assess the condition of the
school and early learning estate. 
03 03 09
Moderate
The Council’s RAAC assessment involved checking the construction of
schools and early learning and childcare facilities built between 1950 and
1980, which was then extended to schools built between 1930 and 1990
by Scottish Government. This was carried out in 2021 by structural
engineers and covered 43 schools. The construction of all schools and
childcare and early learning centres within this timeline was
examined.  23 schools were assessed using available information and
data on construction techniques and materials. Where additional
information was required, physical and intrusive inspections took place
(21 schools).  At the conclusion of this exercise, no RAAC was identified. 
Follow-up precautionary checks commenced (and are ongoing) to
provide additional validation of initial assessments and inspections.
External structural engineers were appointed to carry out independent
checks of schools that were part of the initial desk top assessments and
physical inspections. 
During the check at Castlehead High School, structural engineers
identified the presence of RAAC limited to the school gym halls. The
inspection concluded that our analysis of the construction materials of
the main school building was correct, but that different material, RAAC,
had been used in the construction of the gym halls. 
It should be noted that while RAAC has been detected there are no
concerns about its current  condition.
It should also be noted that in other follow-up checks conducted to date
[27 Oct], no RAAC has been identified.
Action Codes Actions Assigned Date Status
CRR23.04.16a  Further checks of gym/ assembly hall building roof structures at some primary schools are
underway as a precautionary measure. This will supplement desktop analysis and
inspections already completed. This is for reassurance purposes only, given our experience
at Castlehead High School. 
Head of Facilities and Property Management 15-Nov-
2023

Page 36

35 | P a g e
Appendix 3: Service Risks 
Risk 
(Cause and effect)
Risk Capture
 Service RR
 Project RR
Evaluation
 Low
 Moderate
 High
 Very High
Means of Monitoring
 Board Risk-Reporting
 SIP
 Project Board
 H&S Planning Group
Notes
Chief Executive’s Service    
(1) Discontinuation of Shared Prosperity Fund
If there is a change in government and the SPF ceases,
funding for current economic development and place-
based initiatives would be reduced by £5-6m. 
Service RR  Moderate  Board Risk-Reporting  
(2) AMIDS does not achieve Investment Zone status
Would dampen placeshaping ambitions and weaken
local economy 
Project RR  Moderate  Board Risk-Reporting 
Children’s Services    
(3) Portfolio Management
Unintended delays in progress in each of the three
portfolios listed below will impact on our ability to
ensure that children and young people thrive, learning
and achieve: 
1. Curriculum, learning, teaching and assessment;
2. Inclusion; and 
3. Families and Communities
Project RR Moderate Project Board Effective governance arrangements are in place with
oversight, leadership and direction being provided by the
Portfolio Governance Board which meets on a monthly
basis. The three portfolio groups provide updates to the
Board.
(4) Availability of Alternative Care Placement 
(Foster Care and Residential Care)
This could result in a higher level of risk being managed
within the community. 
Service RR Moderate Board/Committee Risk
-Reporting
Case managed by Social Work Management Teams with
contingency plans in place.
Environment, Housing and Infrastructure Services    
(5) Review of electric vehicle (fleet) infrastructure
Risks associated with the installation of charging
facilities were managed during the related installation
projects.  There is however a need to review any
residual risks that remain in relation to the siting,
inspection, and maintenance of the facilities, to further
reduce any risks to people or property within their
vicinity.
Service RR High Board Risk-Reporting Electric Vehicle fleet comprises around 116 vehicles.  The
council implements a range of measures to ensure vehicles
are roadworthy and serviced accordingly. The EV Charging
Infrastructure is electrically tested at final commissioning
stage by a competent EV contractor.   EV Chargers are
serviced annually as part of warranty/ maintenance
contract.  Chargers are also monitored remotely by
ChargePlace Scotland for any faults and site attended by
contractor if fault is not able to be fixed by back-office
support.

Page 37

36 | P a g e
Risk 
(Cause and effect)
Risk Capture
 Service RR
 Project RR
Evaluation
 Low
 Moderate
 High
 Very High
Means of Monitoring
 Board Risk-Reporting
 SIP
 Project Board
 H&S Planning Group
Notes
(6) Tree Fall and Ash Die Back & Larch Infection
With the emergence of Ash Die back in the UK there is
now an increased potential for public injury and
property damage, awards against the Council,
reputational damage and statutory notices
Service RR High Board Risk-Reporting The main trigger for this risk was a significant outbreak of
Ash Dieback in the UK which is resulting in a significant
number of trees within Renfrewshire having to be felled.
Work is underway.
(7) Housing Regeneration and Renewal Programme
Risks associated with delivering £100m regeneration
and renewal programme.
Project RR High Project Board Risk registers are produced for each project to identify and
manage known risks associated with the programme.
(8) Last in Block Properties
Initial discussions have commenced with Scottish
Government officials on the feasibility of ‘last in the
block’ properties being repaired and used for the
resettlement of UDP’s, and a further report will be
submitted to the Communities and Housing Policy
Board providing an update on progress.
Project RR High Board Report Risk register has been produced and shared with Scottish
Government 
(9) Housing IT System Replacement Programme
Ensuring replacement system procured fulfils all
requirements and is delivered within target.
Project RR High Project Board Renewal of main system dealing with Housing Services,
Housing Asset Management and Homeless Services.
(10) Housing Investment Programme
Risk of delivering approved capital investment
programmes and ensuring stock complies with
statutory and regulatory standards.
Project RR High Project Board  As part of governance arrangements, a new project board
is being established. Risk registers will be produced for
each programme.
(11) Delivering Homeless duties
The risk is of breaching a statutory duty to provide
accommodation and would be likely to lead to an
increase in rough-sleeping and reputational harm.
Project RR High Board Report We are at risk of being unable to provide temporary/
settled accommodation for the increased number of
homeless applicants, Ukraine and Afghan resettlement
programmes, and those asylum seekers living in
Renfrewshire receiving positive decisions.  
(12) Disposal of Coal Tar 
Coal tar is now classed as hazardous waste material.
There is consequently a knock-on risk to the council’s
resurfacing scheme with some moderate delays in only
a few locations as alternative solutions are developed.
Service RR Moderate Board Reporting Officers have engaged with the commercial market and
have identified the use of an innovative solution to recycle
the material on site whilst ensuring the road surface
received treatment to address the road defects present.
(13) Change to the Antisocial Behaviour etc. (Scotland)
Act 2004, Part 7 (S68 1a)
Service RR Moderate SIP The change has come into force in September 2023 and
discussions and advice is taking place with legal services
and licencing in relation to enforcement processes etc.

Page 38

37 | P a g e
Risk 
(Cause and effect)
Risk Capture
 Service RR
 Project RR
Evaluation
 Low
 Moderate
 High
 Very High
Means of Monitoring
 Board Risk-Reporting
 SIP
 Project Board
 H&S Planning Group
Notes
The change now means that the scope of the
legislation extends to holiday let notices with a risk of
increased demand on service as it will be responsible
for enforcing notices.
(14) Development of Local Heat and Energy Efficiency
Strategy
Key risk is reputational damage if the Council does not
publish their first Local Heat and Energy Efficiency
Strategy and Local Heat and Energy Efficiency Delivery
Plan on or before 31 December 2023.
Project RR Moderate Board Reporting The Scottish Parliament passed the Local Heat and Energy
Efficiency Strategies (Scotland) Order in May 2022. The
LHEES Order places a duty on local authorities to prepare,
publish and update a Local Heat and Energy Efficiency
Strategy and Delivery Plan.
Finance and Resources Services    
(15) PCI certification
Certification is required for taking credit and debit card
payments.  If certification is not consistently achieved,
there is a risk of significant financial penalties applied
by our Acquiring Bank and/ or removal of our ability to
accept credit & debit cards completely.  This would
have a significant impact on Customers, Council
income and the Council’s digital aspirations.
Service RR High Board Risk-Reporting To accept credit and debit card payments the Council is
contractually obligated to comply with the Payment Card
Industry Data Security Standards (PCI).  This must be
proven by submitting annual Self-Assessment.
Questionnaires that match payment forms taken. Security
& Compliance Mgr responsible for PCI compliance across
Council. Internal procedures for applying compliance
standards to card payment services. Annual independent
audit of card payment procedures against PCI standards.
PCI Governance Group to be established consisting of
representatives from all Services who deliver ‘pay for’
services in the community. Training for staff handling card
payments

Page 39

38 | P a g e
Appendix 4: Business-as-Usual Risks
The council has 12 areas of risk that it now monitors via the new risk assurance model introduced in April 2023. Each Head of Service (and two other officers who report
directly to a Service Director), must undertake self-assessment against a set of questions for each risk and indicate what level of assurance they are able to provide in
relation to how they and their teams perform in these areas.  This is only the midpoint of year one, so the dashboard below needs to be viewed in that context. However,
it is hoped that elected members will find this new approach helpful. Some early feedback from people using the model is that it has been helpful in generating good
discussion on topics and highlighting opportunities to take simple but effective action quickly.
Interpreting the pictograph
Deep green = Substantial assurance
Pale green  = Reasonable assurance
Amber  = Limited assurance
Red  = No assurance 
The digit in the lower left section of
the boxes show how many Heads of
Service and direct reports have
completed each module with a
specific level of assurance to date. 
Taking Health & Safety, Adverse
Events as an example, a total of 6
Heads of Service have completed this
module to date: 1 self-assessing with
limited assurance, 3 with reasonable
assurance and 2 with substantial
assurance. 
If a module is completed by
everyone, the total number for each
module would be 16. 
The Chief Auditor and the Risk Manager are monitoring engagement with the model on an ongoing basis, to support Directors on having a sound evidence base to
underpin their annual assurance statements.
A reminder of what each model covers is on the following page.

Page 40

39 | P a g e
While these are the council’s business-as-usual risks, where there is recognised need for specific corporate action in any of these aspects of risk, these are escalated from
time to time to the corporate risk register. An example of this is nos. 2 and 6 and below. Aspects of these risks are reflected not only within the risk assurance model but
are also escalated to the corporate risk register.
BAU RISK AREA ENCOMPASSING BAU RISK AREA ENCOMPASSING      
1. Community & public
safety
Child and adult protection
Serious and organised crime (external)
2. Asset management Statutory compliance
Arrangements for void properties
Fleet and other infrastructure
ICT hardware and software assets and responsibilities
3. People wellbeing &
development
Staff health and wellbeing
Training and development
Corporate and local induction
4. Information handling GDPR compliance
Information asset management
Information security
Records management
5. Health, safety &
managing adverse
events
Staff incident recording
RIDDOR arrangements
Incident monitoring and trends analysis
6. Programme and project
management
Governance
Compliance with industry standards/ adopted methods
7. Organisation resilience Business continuity:
- Staffing resource
- ICT and/ or power outages
- Facility issue
- Cyber security
8. Partnership management Partnership registers
Agreements
Liabilities
9. Financial control and
governance
Authorities and delegation
Budgeting and accounting
Conflict and whistleblowing
Insider threat and crime
Counter fraud
10. Service performance
monitoring
Trends analysis
Links to risk management and service improvement
11. Procurement and
contract management
Standing orders
Roles and responsibilities
Monitoring & Performance Mgt
12. Complaints, comments and
claims handling
Compliance
Trends analysis
Links to service improvement 
[Item 10 End]