Agenda Document Pack - Audit, Risk and Scrutiny Board - 22/05/2023

Renfrewshire Council · 22 May 2023
Back to Audit, Risk and Scrutiny Board — 22 May 2023 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

Notice of Meeting and Agenda
Audit, Risk and Scrutiny Board 
Date Time  Venue
Monday, 22 May 2023 15:00 Council Chambers (Renfrewshire),
Council Headquarters, Renfrewshire
House, Cotton Street, Paisley, PA1 1AN 
MARK CONAGHAN
Head of Corporate Governance 
Membership 
Councillor Andy Doig (Convener):     Councillor Kevin Montgomery (Depute Convener):    
Councillor Jennifer Adam:  Councillor Chris Gilmour:  Councillor John Gray:  Councillor
Lisa-Marie Hughes:  Councillor Robert Innes:  Councillor James MacLaren:  Councillor
Janis McDonald:   
PLEASE NOTE 
There is a Petitions Board meeting at 2pm in the Council Chamber on 22 May and
the Audit, Risk & Scrutiny Board is at 3pm.  Therefore the Audit meeting will either
commence at 3pm or at the conclusion of the meeting of the Petitions Board,
whichever is the later. 
Further Information 
This is a meeting which is open to members of the public. 
A copy of the agenda and reports for this meeting will be available for inspection prior
to the meeting at the Customer Service Centre, Renfrewshire House, Cotton Street,
Paisley and online
at http://renfrewshire.cmis.uk.com/renfrewshire/CouncilandBoards.aspx
For further information, please email
democratic-services@renfrewshire.gov.uk 
Members of the Press and Public 
Members of the press and public wishing to attend the meeting should report to the
customer service centre where they will be met and directed to the meeting.
Page 1 of 144

Page 2

Hybrid Meeting 
Please note that this meeting is scheduled to be held in the Council
Chambers.  However, it is a hybrid meeting and arrangements have been made for
members to join the meeting remotely should they wish. 
Webcasting of Meeting 
This meeting will be filmed for live or subsequent broadcast via the Council’s internet
site – at the start of the meeting the Convener will confirm if all or part of the meeting
is being filmed.  To find the webcast please navigate to 
https://renfrewshire.public-i.tv/core/portal/home 
Page 2 of 144

Page 3

AUDIT 
Apologies 
Apologies from members. 
Declarations of Interest 
Members are asked to declare an interest in any item(s) on the
agenda and to provide a brief explanation of the nature of the
interest. 
1 Unaudited Annual Governance Statement 2022/23 
Report by Director of Finance & Resources. 
7 - 16 
2 Internal Audit Annual Report 2022/23 
Report by Chief Auditor. 
17 - 36 
3 Summary of Internal Audit Reports for Period 1
January to 31 March 2023 
Report by Chief Auditor. 
37 - 48 
4 Internal Audit - External Quality Assessment 
Report by Chief Auditor. 
49 - 70 
5 Internal Audit Charter 
Report by Chief Auditor. 
71 - 78 
MONITORING & REVIEWING SERVICE DELIVERY PERFORMANCE
POLICIES AND PRACTICE 
6 Risk Management Annual Report 2022/23 
Report by Director of Finance & Resources. 
79 - 88 
7 Risk Report May 2023 
Report by Director of Finance & Resources. 
89 - 108 
8 Local Government Benchmarking Framework 2021/22 
Report by Chief Executive. 
109 - 128
Page 3 of 144

Page 4

9  Absence Statistics for Quarter 4 of 2022/23 
Report by Director of Finance & Resources. 
129 - 136 
ANNUAL PROGRAMME 
10  Charges for Bulk Items Uplift for the Elderly - Lead
Officer John Kilpatrick 
Report by Lead Officer. 
137 - 144 
AUDIT 
Exempt Item 
Exempt documents are no longer available in print format.  You
will require to log in to Audit, Risk & Scrutiny Exempt Items to
access documents.  Please note that access to exempt
documents is now restricted. 
EXCLUSION OF PRESS AND PUBLIC 
The Board may by resolution exclude the press and public
from the meeting during consideration of the following
items of business as it is likely, in view of the nature of the
business to be transacted, that if members of the press and
public are present, there could be disclosure to them of
exempt information as defined in paragraph 12 of Part I of
Schedule 7A  of the Local Government (Scotland) Act, 1973. 
11  Summary of Internal Audit Investigation Reports for
Period 1 January to 31 May 2023 
Report by Chief Auditor. 
Page 4 of 144

Page 5

Page 5 of 144

Page 6

Page 6 of 144

Page 7

___________________________________________________________________
To: Audit, Risk and Scrutiny Board
On: 22 May 2023
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Unaudited Annual Governance Statement 2022 - 2023
___________________________________________________________________
1. Summary
1.1 The Local Authority Accounting Regulations require that an Annual
Governance Statement is prepared and included in the Annual Accounts for the
council. The Annual Governance Statement should be prepared in accordance
with the CIPFA / Solace guidance “Delivering good governance in Local
Government”. 
1.2 The Annual Governance Statement for 2022-23 is attached and has been
prepared in accordance with the relevant regulation and guidance taking
account of the Internal Audit Annual Report and Director’s evaluation of the
operation of the governance arrangements within each service area. 
1.3 The Governance Statement is subject to statutory audit by the Council’s
External Auditors as part of their review of the annual accounts.
___________________________________________________________________ 
2. Recommendations
2.1 Members are invited to note the Annual Governance Statement which will be
included in the Unaudited Accounts for 2022/23.
___________________________________________________________________ 
Item 1
ARS 22/5/23 Page 7 of 144

Page 8

Implications of the Report
1. Financial - None 
2. HR & Organisational Development - None 
3. Community Planning – The application of sound governance
arrangements supports the Council to deliver on its key objectives and
priorities. 
4. Legal - subject to approval by Council, the Accounts will be released
for audit by the statutory deadline of 30 June 2023.   
5. Property/Assets - None 
6. Information Technology - None 
7.  Equality & Human Rights - None 
8. Health & Safety – None
9. Procurement - None 
10.  Risk – Specific risks identified from the Chief Auditor’s Annual Report
and the assessments of service Directors are disclosed in the
statement. 
11. Privacy Impact – None 
12. COSLA Implications – None 
13. Climate Risk - None
________________________________________________________________
Author:          Andrea McMahon
Page 8 of 144

Page 9

Annual Governance Statement 
Scope of responsibility
Renfrewshire Council is responsible for ensuring that its business is conducted in accordance with the law and
proper standards, and that public money is safeguarded, properly accounted for, and used economically,
efficiently and effectively. The Council also has a statutory duty to make arrangements to secure best value
under the Local Government in Scotland Act 2003. In discharging this overall responsibility, the Council’s
members and the corporate management team are responsible for putting in place proper arrangements for its
affairs and facilitating the effective exercise of its functions, which includes arrangements for the management
of risk. 
The Council has approved and adopted a Local Code of Corporate Governance, which is consistent with the
principles of the Chartered Institute of Public Finance and Accountancy (CIPFA) and the Society of Local Authority
Chief Executives (SOLACE) framework; Delivering Good Governance in Local Government. A copy of the Local
Code is available on our website Local Code of Corporate Governance - Renfrewshire Website. 
This statement explains how Renfrewshire Council has complied with the Local Code and also meets the Code
of Practice on Local Authority Accounting in the UK, which details the requirements for an annual Governance
Statement. 
The purpose of the governance framework
The governance framework comprises the systems and processes, and culture and values, by which the Council
is directed and controlled and through which it accounts to, engages with and leads the community. It enables
the Council to monitor the achievement of its strategic objectives set out in the Council plan. 
The system of internal control is a significant part of that framework and is designed to manage risk to a
reasonable level. Internal control cannot eliminate all risk of failure to achieve policies, aims and objectives and
can therefore only provide reasonable and not absolute assurance of effectiveness. The system of internal
control is based on an ongoing process designed to identify and prioritise the risks to the achievement of the
Council’s policies aims and objectives, to evaluate the likelihood of those risks being realised and the impact
should they be realised, and to manage them efficiently, effectively and economically. 
The governance framework
The main features of our governance arrangements are described in the Local Code but are summarised below: 
The overarching strategic priorities and vision of the Council are set out in the Council Plan 2022-2027 and the
Renfrewshire Community Plan 2017-2027. The Council Plan is aligned to the Community Plan and sets out 5
strategic outcomes that the organisation will work to achieve over a 5-year period with specific priorities relating
to tackling inequality, promoting economic and cultural regeneration, attainment and sustainability.
Renfrewshire’s Community Plan (which also acts as Renfrewshire’s Local Outcome Improvement Plan as
required by the Community Empowerment (Scotland) Act 2015) details how community planning partners will
work together to achieve the key priorities identified for Renfrewshire. 
• The key outcomes the Council is committed to delivering with its partners, are set out in the
Community Plan;
• The Council operates within an established governance framework which incorporates a scheme of
delegated functions, financial regulations, standing orders relating to contracts and procedural
standing orders. These elements of the framework are kept under regular review by the Council;
• The Council facilitates policy and decision making through a policy board structure;
• Services are able to demonstrate how their own activities link to the Council’s vision and priorities
through their service improvement plans. Performance management and monitoring of service
delivery is reported through policy boards regularly including six monthly updates to the Leadership
Board on progress against the implementation of the Council Plan;
• The Corporate Management Team has agreed a new refreshed approach to its performance
monitoring and the Council Plan scorecard will be considered alongside other performance
information each quarter and followed up with an in-depth look at performance in one service
particular area of interest at regular intervals.
Page 9 of 144

Page 10

• An annual report on the Local Government Benchmarking Framework, which includes data for over
100 indicators for all 32 local authorities, is provided to the Audit, Risk and Scrutiny Board each year. 
• The Council has adopted a code of conduct for its employees. Elected members adhere to the
nationally prescribed Code of Conduct for Members. In addition, the Council has in place a protocol
for Relationships between Political Groups, Elected Members and Officers;
• The Council’s approach to risk management is set out in the risk management strategy and is well
embedded. Risks are reported regularly to the Audit, Risk and Scrutiny Board. During the year
development work was completed on a new assurance model for managing business as usual risk,
which involves senior managers working through a series of modules to ascertain their levels of
assurance in how these risks are being managed within their services. A further development includes
the Corporate Risk Management Group undertaking “control deep dive” exercises which involves
detailed investigation of specific risk controls known to be in place to ascertain if the risk is over/under
or well controlled;
• The Director of Finance and Resources is the Council’s Senior Information Risk Owner and information
risk is monitored through the Information Management and Governance Group and its sub-groups.
The Managing Solicitor (DPO) is the statutory Data Protection Officer;
• Comprehensive arrangements are in place to ensure members and officers are supported by
appropriate training and development;
• Registers of interests for elected members and senior officers are maintained and published on the
Council’s website;
• The Council complies with the CIPFA Code of Practice on Managing the Risk of Fraud and Corruption
and the Council’s arrangements for fraud prevention, detection and investigation are managed
through the corporate counter fraud service;
• The Council’s approach to ‘whistleblowing’ is outlined in the whistleblowing policy. 
• Cyber-attacks are both increasing and becoming more sophisticated and while no system of internal
control can provide absolute assurance the Council has a range of multi layered Cyber Security
controls are in place and are tested annually to check standards in line with Government guidance.
Industry cyber security standards are followed and explicitly those belonging to Public Sector Network
(PSN), National Cyber Security Centre (NCSC) guidance, Scottish Government Public Sector Cyber
Resilience Plan and Payment Card Industry (PCI) data security standards. The O365 security and
compliance toolset provides a wide range of protection against cyber-attacks including identity theft
and phishing. The Council holds a current Certificate of Compliance for PSN standards. ICT network
and digital services are monitored monthly through our cyber security partner. These are all
monitored and managed through the Cyber Security team which is headed up by a CISM qualified
Cyber Security Architect (Cyber Information Security Manager). Events and alerts are monitored 24 x
7 by our cyber security partner who are authorised to take emergency preventative action where
necessary;
• Clear and independent governance arrangements are in place with One Ren and the Renfrewshire
Health and Social Care Partnership with oversight from the Head of Policy and Commissioning and the
Head of Corporate Governance respectively and the Council’s Leadership Board.
• Seven Local Partnerships have been established and have identified initial local priorities. Decision
making including that relating to relevant grants is delegated to each Local Partnership through a Lead
Officer appointed by the Council. 
This governance framework has been in place at Renfrewshire Council for the year ended 31 March 2023. 
Within the 2021/22 report, Audit Scotland concluded that the Council’s governance arrangements, including
during the COVID-19 pandemic, were “appropriate and operated effectively”. 
The system of internal financial control
The system of internal financial control is based on a framework of regular management information, financial
regulations, administrative procedures (including segregation of duties), management and supervision, and a
system of delegation and accountability. Development and maintenance of the system is undertaken by
managers within the Council. The system includes:
• Guidance on financial management supported by comprehensive financial regulations and codes;
• Comprehensive budgeting systems, and detailed guidance for budget holders;
• Regular reviews of periodic and annual financial reports which indicate financial performance against
the forecasts;
Page 10 of 144

Page 11

• Setting targets to measure financial and other performance;
• The preparation of regular financial reports that indicate actual expenditure against the forecasts;
• Clearly defined capital expenditure guidelines;
• As appropriate, formal project management principles;
• The Chief Finance Officer is the Director of Finance and Resources who complies with the CIPFA
Statement on the Role of The CFO in Public Services. 
The role and responsibilities of the Audit Committee and the Chief Auditor
The role of the audit committee is under the remit of the Audit, Risk and Scrutiny Board which is chaired by an
independent elected member; its role includes: 
• to approve the internal audit charter and annual internal audit plans;
• to review internal and external audit reports and the main issues arising, including those relating to
the annual accounts and seek assurance that action has been taken and make recommendations to
the Council where appropriate;
• to receive and consider the Chief Auditor’s annual report, summarising internal audit activity and the
level of assurance this provides over the arrangements for internal control, risk management and
governance within the Council;
• to monitor the performance of internal audit;
• to consider the annual review of the Local Code of Corporate Governance. 
The internal audit service operates in accordance with the Public Sector Internal Audit Standards and reports to
the Audit, Risk and Scrutiny Board. Internal audit undertakes an annual programme of work, approved by the
Board, based on a strategic risk assessment. The Council’s Chief Auditor provides an independent opinion on the
adequacy and effectiveness of the governance framework, risk management and internal control. The Council
conforms to the requirements of the CIPFA Statement on the Role of the Head of Internal Audit (2019). 
Members and officers of the Council are committed to the concept of sound governance and the effective
delivery of Council services. The Audit, Risk and Scrutiny Committee complies with the CIPFA guidance Audit
Committees: Practical Guidance for Local Authorities and Police. The Council’s Chief Auditor has responsibility
to review independently and report to the Audit, Risk and Scrutiny Board annually, to provide assurance on the
adequacy and effectiveness of the Local Code and the extent of compliance with it. The Audit, Risk and Scrutiny
Board performs a scrutiny role in relation to the application of the Local Code of Corporate Governance and
regularly monitors the performance of the Council’s internal audit service. 
Internal Audit reporting arrangements include communication of finalised audit engagements, monitoring the
progress of agreed management actions and communication of any unacceptable risk identified to the Board. 
Review of effectiveness and continuous improvement
Renfrewshire Council has responsibility for conducting, at least annually, a review of the effectiveness of its
governance framework including the system of internal control. The review of effectiveness of the framework is
informed by the work of the Corporate Management Team who have responsibility for the development and
maintenance of the governance environment, the Chief Auditor’s annual report, and reports from the external
auditors and other review agencies and inspectorates. 
The effectiveness of the governance framework is reviewed annually by the Corporate Management Team,
including the use of an annually updated self-assessment tool covering five key areas of governance, as follows: 
• Business Planning and Performance Management
• Internal Control Environment
• Budgeting, Accounting and Financial Control
• Risk Management and Business Continuity
• Conflicts of Interest, Whistleblowing and Gifts and Hospitality 
This self-assessment indicated the governance framework is being complied with in all material respects. In
addition, the review of the effectiveness of the governance arrangements and the systems of internal control
Page 11 of 144

Page 12

within the group entities places reliance upon the individual bodies’ management assurances in relation
to the
soundness of their systems of internal control. 
The Council’s approach to continuous improvement has a number of strands.  Our Council Plan and
Service Improvement Planning processes drive much of this and allow for elected member scrutiny of
improvement activity.  Services also undertake improvement work linked to their core duties and to
statutory requirements.  Registered services in education, housing, social work and social care regularly
undertake self-assessment activity as part of their regulatory framework and inspection process.  
Services within Environment, Housing and Infrastructure maintain their ISO 9001 accreditation as one
means of demonstrating quality.  The Council has recently developed its own model of corporate self-
assessment based on the Public Service Improvement Framework. 
The Council continues to recognise the need to exercise strong financial management arrangements to
manage the financial pressures common to all local authorities and has robust financial control and
financial planning processes in place. The CIPFA Financial Management (FM) Code was adopted by the
Council in June 2021. An Action Plan has been established following wide engagement with senior
managers, service users and Finance staff. It contains 59 improvement actions with target dates ranging
from 2023 until 2025. Work to refresh the initial engagement will be undertaken over the next 1-2 years to ensure that
improvement work continues to be relevant and effective. 
• In the post-pandemic period, the Council has had a strong focus on recovering from Covid-19
and continuing to mitigate some of the impacts on our communities, including those relating
to rapidly increasing living costs.  As an organisation, the Council has adopted continues to
adopt new ways of working, building on the strong approach developed during the pandemic
in areas such as digital access for customers, and embracing hybrid working.  Whilst this is
still a recovery phase, much of the business-as-usual work has fully resumed, including:   
• the work on social renewal, which began during the pandemic, is now part of the wider Fairer
Renfrewshire programme, which is overseen by a sub-committee of the Leadership Board
services hare returned to the regular programme of reporting performance to elected
members through policy boards, with service improvement plans submitted for approval in
spring 2022 and regular progress updates provided.
• the Right for Renfrewshire programme recommenced over 2022, and the service redesigns
progressed were in those areas where it was anticipated that there would be potentially less
direct impact from the pandemic recovery process and where the greatest opportunity exists
for appropriate management and service capacity to be directed towards the Right for
Renfrewshire agenda; 
• the ongoing impact of the pandemic on service delivery continue to be monitored as part of
service recovery arrangements There have been no significant changes to internal controls
although significant numbers of new and amended processes;
• the Council commenced planning for Brexit during 2019/20 and identified risks have been
incorporated into the Strategic and Corporate Risk Registers. Some of these risks will be
further exacerbated by the ongoing conflict in Ukraine and the associated sanctions on Russia
which will place additional cost and supply pressures on some products and materials that
are likely to increase and continue into 2023/24. 
Audit Scotland have introduced a new approach to auditing Best Value in local government which has
commenced this year as part of the next 5-year Best Value Audit programme. This approach involves
thematic areas of focus each year which will be considered for all local authorities within the same
snapshot in time rather than the previous rolling programme of deep dive audits which inspect each local
authority across a five-year programme. This is significant shift in approach and for year one, will examine
the effectiveness of leadership in developing new local strategic priorities. Audit Scotland have also
indicated they will be looking at Councils’ approaches to climate change, cyber security (both will be looked
at in year one) reducing inequalities and demonstrating improved outcomes for communities (ongoing).
Alongside the ongoing Best Value auditing and this new approach with annual themes, there will also be
a Section 102 Audit carried out and a report produced at some point within the 5-year programme. Unlike
the new annual thematic reviews, this is anticipated to involve a deeper dive across all Best Value themes
Page 12 of 144

Page 13

collated into a lengthier report specifically for Renfrewshire Council. The first year of this will run from
October 2023 to August 2024 and Renfrewshire Council has not been included for this round. Another
change for Renfrewshire Council sees the appointment of a new team of external auditors, Azets. More
information about Azets and the planned audit approach was outlined to the Audit, Risk & Scrutiny Board
in March 2023 in the External Audit Plan 2022/23. 
Audit Scotland provided an unqualified and unmodified audit opinion on the 2021/22 annual accounts. 
An external independent review is ongoing regarding the circumstances which led to an error with the
projected required school roll  of Dargavel Primary School.  Once this external review has reached its
conclusion, the findings from this review will be considered by Council, including any  improvement
actions identified. 
Regular reviews of the Council’s arrangements are undertaken by internal audit, in the 2021/22
governance statement, 2 areas were identified where only limited assurance could be provided. 
• Memorial safety - The inspection process for memorials has progressed significantly and is
currently sitting at 85% complete. The remaining 15% will be completed by the end of June
2023. In addition to the initial inspections being carried out the service is now carrying out
reinspection’s to the headstones that were identified as requiring to be monitored annually
for any deterioration at their initial inspection. 
• Corporate purchase cards – card holders and approvers have been reminded that the
procedures must be complied with, and sample checks are being undertaken by the
Procurement team. Regular internal audit reviews of compliance with the procedures will
continue to be undertaken. 
The programme of work undertaken by internal audit in 2022/2023 identified 6 occasions where a limited
or no assurance level was provided in relation to the internal control, risk management and governance
objectives for the specific areas of each audit review. Of these 4 were specific to individual service areas
and although these areas require to be addressed there is no significant impact on the Council’s overall
system of internal control and action plans are in place to address the risk identified. 
The 2 areas identified as impacting on the overall internal control, risk management and governance
arrangements are: 
• Business continuity plans - Service level Business Continuity Plans require to be improved to
record all the ICT areas referred to in the council’s Business Continuity Plan template for all
service areas. The main areas to be reviewed and updated are service area restoration plans
and plans in the event of ICT system outages.  The Crisis and Resilience Management Team have
overarching responsibility for Business Continuity Plans and recommendations have been made
to address the areas identified and ensure a consistent approach is taken across services. 
• Creditor payments - The audit specifically reviewed the arrangements for compliance with the
purchase to pay procedures, whereby manual payments should only be made in very specific
circumstances. The review identified that current process in place for the passing and payment
of manual invoices fall short in several areas and creates several risks, particularly in relation to
possible breaches of the Council’s Contract Standing Orders. 
Internal audit undertakes an annual exercise to ensure that recommendations arising from internal
audit engagements have been implemented by service management and the results are reported to the
Audit, Risk and Scrutiny Board. This work highlighted that 67% of recommendations were implemented
by the due date. 30% had passed their original due date and revised implementation dates have now
been set and 3% were superseded. Of the 13 recommendations followed up that were deemed to be
critical, 8 have been fully implemented, 3 have been partially implemented and 2 were still to be
implemented. Revised implementation dates have been agreed for each of these recommendations. 
Page 13 of 144

Page 14

It is our view that the Council has in place a sound for governance, risk management and internal control
and that appropriate mechanisms are in place to identify any areas of weakness. This is corroborated
by an Annual Report incorporating the Annual Assurance Statement prepared by the Council’s Chief
Auditor stating that subject to management addressing the critical and important recommendations
made the limited and no assurance reports, it is considered that reasonable assurance can be placed
upon the adequacy and effectiveness of the Council’s internal control, risk management and
governance arrangements. 
Action Plan
Following consideration of the review of adequacy and effectiveness the following action plan has been
agreed to ensure continual improvement of the Council’s governance. 
Agreed action Responsible person Date
All service level business continuity plans are to be
updated to record all the ICT risks referred to in
the council’s business continuity plan template for
all service areas.
Service Directors September 2023
A review of the current manual payment process is
under review with key stakeholders from the
Corporate Procurement Unit and the Finance
Business Partners, this will enable and introduce an
exception policy to support the No Purchase Order
No Payment.  Once the review is conducted the
exception policy will be implemented and the No
Purchase Order No Payment approach will
commence, this is anticipated to take up to 12
Months.  
Procure to Pay (P2P)
Manager
May 2024 
The agreed actions will be subject to review to identify the progress being made in implementing these
actions. 
Update on the 2021/22 Action Plan 
Agreed action Progress Update Responsible person Date
Prepare 3-year
Improvement Plans for
each service
Complete 
All 2022 Service
Improvement Plans were
approved by the relevant
Policy Boards in May/June
2022. 
Service Directors June
2022
Review and refresh
quarterly scorecard of
performance
information
Complete 
The new Council Plan
scorecard was approved by
Leadership Board in
December 2022.  New
approach to Corporate
Management Team (CMT)
scorecard approved by CMT
March 2023. 
Head of Policy and
Commissioning
December 2022 
March 
2023
Establish an action plan
arising from the CIPFA
FM Code
Complete 
The Action Plan was delayed
due to other priorities and
capacity issues in the
Finance team; however, it is
Head   of   Finance and
Procurement
December 2022
Page 14 of 144

Page 15

now complete and was
finalised on 8 March 2023. 
Update on the 2020/21 Action Plan 
The 2020/21 Governance Statement identified areas of continuous improvement activities to be taken
forward to improve the overall governance, risk management and internal control environment.
Progress over the last 12 months against the agreed action plan is detailed below. 
Agreed action Progress Update Responsible person Date
Review and update
where necessary the
policy for expressing
concerns outwith line
management
whistleblowing’ for
approval by Board.
Complete Chief Auditor February 2023
Review and refresh the
Council Plan.
Complete Head of Policy and
Commissioning
September 2022 
Assurance
Subject to the above, and on the basis of the assurances provided, we consider the governance and
internal control environment operating during 2022/23 provides reasonable and objective assurance
that any significant risks impacting on the achievement of our principal objectives will be identified and
actions taken to avoid or mitigate their impact. Systems are in place to continually review and improve
the governance and internal control environment and action plans are in place to address identified
areas for improvement. 
Page 15 of 144

Page 16

Page 16 of 144

Page 17

___________________________________________________________________
To: Audit, Risk and Scrutiny Board
On: 22 May 2023
___________________________________________________________________
Report by: Chief Auditor
___________________________________________________________________
Heading: Internal Audit Annual Report 2022 - 2023
___________________________________________________________________
1. Summary
1.1  The Public Sector Internal Audit Standards require the Chief Auditor to
prepare a report, at least annually, to senior management and the Board on
the internal audit activity’s purpose, authority, and responsibility, as well as
performance relative to its plan. 
1.2  The annual report must also provide an annual audit opinion on the overall
adequacy and effectiveness of the Council’s internal control environment and
include details of any significant risk exposures and control issues, including
fraud risks, governance issues, and other matters that can be used to inform
the governance statement. 
1.3  The Annual Report for 2022-23 is attached and outlines the role of Internal
Audit, the performance of Internal Audit, the strategic and operational issues
which influenced the nature of the work carried out, the key audit findings, and
contains the annual audit assurance statement.
___________________________________________________________________ 
2. Recommendations
2.1 Members are invited to consider and note the contents of the Internal Audit
Annual Report. 
___________________________________________________________________
Item 2
ARS 22/5/23 Page 17 of 144

Page 18

Implications of the Report
1. Financial - None 
2. HR & Organisational Development - None 
3. Community Planning – 
Safer and Stronger - effective internal audit is an important element of good
corporate governance. 
4. Legal - None 
5. Property/Assets - None 
6. Information Technology - None 
7. Equality & Human Rights – None 
8. Health & Safety – None
9. Procurement - None 
10.  Risk - The summary reported relates to the delivery of the risk-based internal audit
plan. 
11. Privacy Impact – None 
12. COSLA Implications – None 
13. Climate Risk - None 
________________________________________________________________
Author Andrea McMahon 
Page 18 of 144

Page 19

Annual Report 
2022-2023 
Renfrewshire Council
Internal Audit 
May 2023
Page 19 of 144

Page 20

Page 20 of 144

Page 21

Renfrewshire Council 
Internal Audit Annual Report 2022/2023 
Contents 
Page 
1.    Introduction  1 
2.    Responsibilities of Management and Internal Audit  2 
3. Internal Audit Activity in 2022/23  2 
4.                                                                          Summary of Internal Audit Work    4 
5.  Internal Audit Resources  4 
6.  Review of Internal Audit Activity 
• Table 1 – Analysis by category of audit 
5
7.    Quality Assurance and Improvement Activity 
• Table 2 – Internal Audit Performance 
6
8. Implementation of Audit Recommendations 
• Table 3 – Implementation of Audit Recommendations 
6
9. Performance of Non-Audit Activities
• Table 4 – Corporate Counter Fraud Performance
7
10.  Audit Assurance Statement  9 
Appendix 1 – Summary of Assurances 
Page 21 of 144

Page 22

Page 22 of 144

Page 23

1
Renfrewshire Council 
Internal Audit Annual Report   
1 April 2022 – 31 March 2023 
1. Introduction 
1.1 Internal Audit is an independent and objective assurance and consulting activity
designed to add value and improve the operations of Renfrewshire Council. It
assists Renfrewshire Council in accomplishing its objectives by bringing a
systematic and disciplined approach to evaluate and improve the effectiveness
of the organisation's risk management, control, and governance processes. 
1.2 The Chief Auditor reports functionally to the Audit, Risk and Scrutiny Board and
administratively (i.e. day to day operations) to the Director of Finance and
Resources. In accordance with the principles of good corporate governance,
regular reports on internal audit work and performance are presented to the
Audit, Risk and Scrutiny Board. 
1.3 The purpose, authority and responsibility of the internal audit activity is defined
in the internal audit charter, approved by the Audit, Risk and Scrutiny Board;
and provides that the Chief Auditor has independent responsibility for the
conduct, format and reporting of all internal audit activity and findings. 
1.4 The service operates in accordance with the Public Sector Internal Audit
Standards (PSIAS). The Standards define the basic principles for carrying out
internal audit. They establish the framework for providing internal audit
services, which add value to the organisation, leading to improved
organisational processes and operations. 
1.5 The Standards require the Chief Auditor to prepare a report, at least annually,
to senior management and the Board on the internal audit activity’s purpose,
authority, and responsibility, as well as performance relative to its plan. The
annual report must also provide an annual audit opinion, on the overall
adequacy and effectiveness of the Council’s internal control environment. It
must include details of any significant risk exposures and control issues,
including fraud risks, governance issues, and other matters that can be used to
inform the governance statement.   
1.6 The aim of this report is to provide an opinion on the overall adequacy and
effectiveness of the council’s framework of governance, risk management and
control and provide a summary of the work undertaken during the year to
support that opinion.  The report also provides details of the performance of the
internal audit service during the past year, and the results of the quality
assurance and improvement programme.
1.7 In addition to the work carried out in relation to council services, we also provide
an internal audit service to the following organisations:
Page 23 of 144

Page 24

2
• OneRen
• Renfrewshire Valuation Joint Board
• Scotland Excel
• Clydeplan
• Renfrewshire Health and Social Care Partnership – Integration Joint
Board 
1.8 The outcome of the audit assignments undertaken for these organisations is
reported separately as part of their annual report which also contains an
assurance statement to their Boards. 
2. Responsibilities of Management and Internal Audit 
2.1 It is the responsibility of the Council’s managers to ensure that the management
of the areas under their control is adequate and effective and that their services
have a sound system of internal control which facilitates the effective exercise
of the organisation’s functions and which includes arrangements for the
management of risk. 
2.2 Internal audit is not a substitute for effective control exercised by management
as part of their responsibilities. Internal audit’s role is to independently assess
the adequacy of the risk management, internal controls and governance
arrangements put in place by management and to undertake sufficient work to
evaluate and conclude on the adequacy of those controls for the period under
review. 
3. Internal Audit Activity during 2022/2023 
3.1 The internal audit plan for 2022/2023 was approved by the Audit, Risk and
Scrutiny Board on 13 June 2022.   The plan was risk-based and took into
account the outcomes of the service and corporate risk evaluation processes,
any significant changes in council operations over the period, and the impact of
developments in national policy and regulation.  The plan also took into account
key external audit reports including their Annual Audit Plan for the council.   
3.2 The audit plan is kept under continuous review throughout the year, to ensure
we are flexible in reacting to the post pandemic work environment or to any
changing risk profile for the council. We also experienced a reduction in
resource for the team for part of the year due to unplanned absence.  The Audit,
Risk and Scrutiny Board approved the following amendments to the plan: 
• Administration of medicines in schools has been deferred until 2023/24. 
• Catering procurement cards, the time on this was utilized to review the
revised processes proposed for catering purchases. 
3.3 All other planned work as detailed in the 2022/2023 audit plan has been
undertaken or commenced and those assignments not finalised by 31 March
2023 have been prioritised in the first quarter of the current year. 
Page 24 of 144

Page 25

3
3.4 Set out below are the significant risks which influenced the content of the plan
and the nature of the work undertaken in recognition of these.   
(1) Financial Sustainability 
The medium to longer term financial sustainability risk remains very high as the
financial outlook is subject to considerable uncertainty as a result of various
factors including future grant levels, pay pressures and the significant cost of
living increases.  Therefore, the financial outlook continues to be subject to
significant and regular scrutiny. The 2022/23 audit plan included time for
reviewing:
• the best value arrangements throughout the Council;
• the control of payroll variations;
• the procurement of goods and services by quick quote processes;
• rental income collection procedures;
• debt management processes and
• care at home processes. 
(2) Economy 
The coronavirus pandemic has resulted in many challenges for economies
across the world, a number of sectors have been impacted by the lockdown
restrictions and some sectors are currently experiencing significant volatility in
terms of labour and supply chains as well as major cost rises as a result of the
rising inflation rates. The 2022/23 audit plan included a review of the
arrangements for processing development planning applications. 
(3) Reducing Equalities in Renfrewshire 
The Council plays a key role in tackling inequalities and providing the best
possible services to our communities.  It is committed to working with and
providing support to communities to assist in the successful delivery of local
priorities. The 2022/23 audit plan included time for reviewing grants provided to
the cultural sector. 
(4) Cyber Attack 
Cyber attacks are becoming more and more frequent and sophisticated and we
have seen attacks on large public organisations which have had a significant
impact on their service provision.  The 2022/23 audit plan included a review of
the controls and protections the council has in place over its cyber environment. 
(5) Climate, Sustainability and Adaptability 
Given the significant rising energy costs consumers are facing, the Council has
a role in promoting and advising its community about energy efficiency as well
as making optimum use of its property estate and reduce overall running costs
and energy consumption levels.  The 2022/23 plan included time for reviewing
the energy management arrangements in operation.   
Page 25 of 144

Page 26

4
2.3 In addition the following reviews included in the 2022/23 plan relate to business
as usual risks inherent by nature of our type of organisation:-
• Supply Teachers Processes
• Disaster Recovery Arrangements
• Review of the Information Asset Register. 
3.5 In line with the council’s procedures, instances of suspected theft, fraud or other
irregularity are reported to internal audit.  Depending on the nature of the
allegations, they are investigated either by the internal audit service or by the
Corporate Counter Fraud service. All referrals were evaluated and investigated
as appropriate.   
3.6  During 2022/23, Internal Audit conducted a number of investigations in relation
to internal control matters which recommended improvements in the
arrangements for processing change requests for both payroll and supplier
bank detail and improvements in the governance arrangements for capital
works within a partner organisation. The remaining unplanned investigations
related to employee conduct and service management has undertaken
disciplinary procedures and strengthened internal controls where necessary. 
3.7 The outcomes of all internal investigation reviews undertaken by internal audit
are reported to the Audit, Risk and Scrutiny Board.  
4. Summary of Internal Audit Work
4.1 The internal audit team has been working on a hybrid basis, mainly from home.
The team also provided advice and support where necessary to council
services. 
4.2 Appendix 1 details the assurances arising from the internal audit work carried
out in line with the 2022/23 audit plan and from those 2021/22 assignments
which were finalised during this year which supports the annual assurance
statement.  These include the conclusions in relation to the overall system of
internal control, risk management and governance arrangements. 
5. Internal Audit Resources 
5.1     For the year to 31 March 2023, the audit plan was based on an establishment
of 6.00 full time equivalent employees plus 80 days to be provided from other
service providers. However, the actual staffing complement was reduced due
to higher than anticipated unplanned absence. Two council and one Integration
Joint Board audit engagements were outsourced as planned. 
5.2 The internal audit team will ensure that independence and objectivity are
maintained in line with the PSIAS including where non-audit work is undertaken.
Internal auditors will have no operational responsibilities. There have been no
impairments impacting on the Chief Auditor’s independence and the team has
been adequately resourced during the year. 
Page 26 of 144

Page 27

5
6. Review of Internal Audit Activity 
6.1     The Audit Plan for 2022/23 set out our risk-based plans across a range of audit
categories, the results of which have been reported quarterly to Audit, Risk and
Scrutiny Board. Table 1 below compares the actual days spent on each
category of audit work against that planned for the year.   
Table 1 
Type of Audit Planned
Days
Actual
Days
Variance
Days %
Governance 112 82 30 27%
Assurance 381 318 63 17%
Contingency 314 371 (57) 18%
Audit Planning & Reporting 134 132 2 1%
Total Operational Days 941 903 38 4%
Training  57 53 4 7%
Strategic Management  20 11 9 45%
Team Administration 96 80 16 17%
Development 79 35 44 56%
Total Non-operational Days 252 179 73 29%     
Gross Available Days 1193 1082  
Operational % 79% 83%  
Non-Audit – Including
Management of Risk
Management and Insurance and
Corporate Counter Fraud
including the co-ordination of
NFI
93 65 28 30% 
6.2 Material differences (over 20% and over 20 days) from the plan are explained
below: 
1) Governance                                                                                                              
The planned review of administration of medicines in schools was deferred until
2023/24 due to the planned implementation of a revised policy. The review of
IJB risk management arrangements commenced at the end of March 2023 and
consequently part of the budgeted days are deferred into 2023/24. 
2) Strategic Management and Development 
Less time than anticipated was spent on preparing for our external quality
assessment and on development of our audit management system. 
Page 27 of 144

Page 28

6
7. Quality Assurance and Improvement Activity 
7.1 Internal audit measures performance against a range of measures set annually
by the Director of Finance and Resources. The Audit, Risk and Scrutiny Board
received quarterly reports on progress and performance during the year. Table
2 shows the actual performance against targeted performance for the year. 
Table 2 
Internal Audit Performance 2022/23 
Performance measure  Target 2022/23 Actual 2022/23
% completion of audit plan for the year* 95% 93%
% engagements completed by target
date
95% 97%
% engagements completed within time
budget
95% 98%
* this measures the completion percentage as at 31 March.  100% of the plan is ultimately delivered through the
finalisation of the outstanding elements in the new financial year.  
7.3 The percentage completion of the audit plan is slightly below the target set for
the year.  This was due to the level of unplanned leave and the additional time
attributed to unplanned work. The actual performance for the year for the two
other indicators, is above the target performance level. 
7.4 The PSIAS require the Chief Auditor to develop and maintain a quality
assurance and improvement programme (QAIP) that covers all aspects of the
internal audit activity. The QAIP must include both periodic internal self-
assessments and five-yearly external assessments, carried out by a qualified,
independent assessor from outwith the organisation. 
7.5 We continued to participate in the Scottish Local Authorities Chief Internal
Auditors’ Group peer review process and our external assessment has recently
been completed by the Chief Internal Auditor from South Ayrshire Council. The
report concluded that the internal audit service fully conforms with the PSIAS.
The report included 7 recommendations for improvement, 3 of which had
already been identified through the internal self-assessment process.  An action
plan has been completed and the report has been submitted to the Audit, Risk
and Scrutiny Board. 
7.6 External Audit’s review of the internal audit service concluded that overall the
service operates in accordance with the PSIAS. 
8.  Implementation of Audit Recommendations 
8.1 During 2022/23, 94 recommendations were followed up, with 67% of all
recommendations being completed. The implementation status of the
recommendations across each service area is detailed in Table 3 below.
Page 28 of 144

Page 29

7 
Table 3 
Implementation of Audit Recommendations 2022/23
Service No.
Followed up
Complete Partially
Complete
(new date)
Not
Implemented
(new date)
Redundant
Adult Services 1 0  1 (100%) 0 0
Chief Executive’s 31 21 (68%) 8 (26%) 2 (6%) 0
Children’s Services 7 7 (100%) 0 0 0
Environment &
Infrastructure 12 10 (84%) 1 (8%) 1 (8%) 0
Finance &
Resources 38 22 (58%) 10 (26%) 4 (11%) 2 (5%)
Communities &
Housing  5 3 (60%) 1 (20%) 0 1 (20%)
Total 94 63 (67%) 21 (23%) 7 (7%) 3 (3%) 
9. Performance of Non-Audit Activities 
9.1 Risk Management 
The responsibility for co-ordinating risk management and insurance activity
across the council lies with internal audit.  Risk management performance is
detailed in the risk management annual report. 
9.2 Corporate Counter Fraud 
The Corporate Counter Fraud Team reports to the Chief Auditor; during the
period 2022/2023, the team has worked on a hybrid basis. 
The Corporate Counter Fraud Team works to raise awareness of fraud, and to
encourage and promote an anti-fraud culture. Where a suspicion of fraud
arises, the team investigate and report their findings to management. Where
appropriate, follow-on action is taken, such as reporting the matter to Police
Scotland for further investigation, or directly to the Procurator Fiscal. 
The team works to protect Council resources, investigating frauds against the
Council, such as: council tax reduction, tenancy, housing application, Scottish
Welfare Fund, school placements, blue badge; and any other potentially
fraudulent matter arising. 
As a result of changes to working practices during the pandemic, some
investigative processes have been streamlined. Where appropriate, customers
are now contacted by telephone or e-mail. This process is convenient for
customers and staff alike, and enables investigations to be conducted quickly
and efficiently. Where necessary, and for more serious cases, visits and
interviews under caution are conducted. 
Page 29 of 144

Page 30

8
The team continue to work with the DWP, undertaking joint investigations,
which can result in the identification of overpayments of Single Person
Discount, Council Tax Reduction, Council Tax Benefit, Housing Benefit,
Universal Credit, Child and Working Tax Credits, and other DWP benefits. 
Counter fraud training sessions were suspended during the pandemic. Revised
working practices mean that many staff are now working from home, and face
to face sessions with staff are no longer practical for many colleagues. 
Counter fraud staff now utilise Microsoft Teams to liaise with colleagues across
Council services; to provide advice, discuss cases, conduct virtual meetings,
and group counter fraud training sessions. 
In addition to this, a Counter Fraud training course has been developed, and
will be available to staff, in the coming weeks. Once available on iLearn, the
training course will be rolled out to staff, and included in future counter fraud
training session packages. 
Table 4 
Corporate Counter Fraud Performance 2022/23
Financial Outcomes 2022/23 (£)
Cash savings directly attributable
to preventative counter fraud
intervention (e.g business grants)
8,674.00 
Cash recoveries in progress
directly attributable to counter
fraud investigations
9,2940.66
Notional savings identified through
counter fraud investigation, (e.g.
housing tenancy and future
council tax)
338,664.05
Housing Benefit Savings identified
through other counter fraud work
or through joint working with the
DWP
65,289.86
Other DWP Benefit or Tax Credit
Savings Savings identified through
other counter fraud work or
through joint working with the
DWP
78,706.73
Non-Financial Outcomes 2022/23 
Housing properties recovered 3
Housing applications
amended/cancelled
4
Blue badge misuse warning letters
issued
21 
Page 30 of 144

Page 31

9
9.3 The National Fraud Initiative 
The National Fraud Initiative (NFI) in Scotland is a counter-fraud exercise led
by Audit Scotland and overseen by the Cabinet Office for the UK. It uses
computerised techniques to compare information about individuals held by
different public bodies, and on different financial systems that might suggest
the existence of fraud or error. 
Internal audit is responsible for the co-ordination of the exercise which is
undertaken every second year. The Council’s data, as required by the NFI, was
submitted in October 2022, the resulting matches were received from January
2023 and investigation of those matches is currently being progressed
throughout this year by Corporate Fraud and Council Services. The final
outcomes arising from the exercise will be subject to a separate report to the
Audit, Risk and Scrutiny Board during 2024/25. 
10. Audit Assurance Statement 
10.1 Internal audit has performed its work in accordance with the role defined in
paragraph 1.4.  The audit work performed has been reported to senior
managers and where areas for improvement in internal control have been
identified appropriate recommendations have been made and accepted for
action by management.   
10.2 In view of the continued challenges common to all local authorities, the Council
recognises the need to exercise very close scrutiny over financial management
and compliance with overarching governance arrangements and will continue
to take appropriate action to further strengthen control in these areas.  
10.3 Internal audit contributes to the promotion of sound corporate governance in
the Council. The scrutiny function within the council performed by the Audit,
Scrutiny and Petitions Board further demonstrates strong commitment in this
area. 
10.4 It is not feasible for the system of internal control in the Council to be without
any weakness.  It is important to balance the risks involved in accepting
systems limitations with the consequences if a problem emerges. Internal audit
recognises this and assesses this in its reporting mechanism.   
10.5 The audit plan is always intended to be flexible and contingency time was
utilised to undertake additional work on areas of emerging risk.   Additionally,
the gross operational days were reduced by 9% due to unplanned absence.
Subject to management addressing the critical and important recommendations
made the limited and no assurance reports, it is considered that reasonable
assurance can be placed upon the adequacy and effectiveness of the Council’s
internal control, risk management and governance arrangements, as evidenced
by:-  
(i) the results of the planned audit work in 2022/23;
Page 31 of 144

Page 32

10
(ii) the results of investigative work in 2022/23;
(iii) management self assessment of internal control, risk management and
governance arrangements;
(iv) management action to respond to audit recommendations to mitigate the
risks areas highlighted in this report;
(v) the regular review of the Local Code of Corporate Governance.   
Signed         
Chief Auditor 
Date          22 May 2023  
Page 32 of 144

Page 33

Appendix 1
1
Audit Engagement Risk Area Assurance Level Conclusion
Winter Maintenance
Procedures
Assurance Reasonable • The audit identified that adequate arrangements were in
place in relation to documented procedures, there were
sufficient specialist vehicles deployed and appropriate
forecasting information was available to support
decision making. Areas identified for improvement
included record keeping, performance monitoring and
stock control. 
Self-Directed Support Assurance Substantial • Satisfactory arrangements are in place to engage with,
assess and provide support and care for eligible clients.
Audit findings identified during this review related to
good practice associated with review dates for
procedures and recording of information.
Housing Safety
Checks
Assurance Substantial • The audit identified that in the main safety checks
across the council's high rise estate were carried out
and any matters escalated appropriately. It was
identified that there is no documentation detailing the
roles and responsibilities regarding the safety checks by
contractors organised by Property Services on Housing
Services behalf.  
Creditors Assurance Reasonable  • The controls in place over the five procurement systems
tested were generally satisfactory. Recommendations
were made in relation to documented procedures for
one system and improvements were recommended in
relation to segregation of duties for another system.
Council Tax Collection Assurance Substantial • Satisfactory arrangements are in place for administering
council tax payments received and following up arrears.
Payments received were correctly and promptly posted
to taxpayers’ accounts. KPI’s were regularly reviewed
and appropriately reported. Improvements were
recommended in relation to the processes for refunds,
write offs and credit balances.
Non-Domestic Rates Assurance Reasonable • Satisfactory controls are in place for the billing and
collection of rates. Improvements were recommended in
Page 33 of 144

Page 34

Appendix 1
2
relation to record keeping for rates relief applications. At
the time of the audit, reviews of Non Domestic Rates
reliefs were not being carried out, as a result of other
priorities during the pandemic, but were planned to
recommence.  
Driver and Vehicle
Checks
Assurance Limited • A number of recommendations for improvement made
in relation to documented procedures, daily record
keeping and compliance and certain safety
arrangements.
Housing Assurance
Framework –
Compliance Checks
Assurance Substantial • Based on a sample check of the evidence used to
demonstrate compliance, we would confirm that the
Council complies with the requirements of the Housing
Assurance Statement.
Stores – Stock Issues Assurance Limited • The audit reviewed the arrangements in place for roads,
lighting and refuse bins stock. Recommendations for
improvement were made to improve records of stock
movements and to ensure that the three sections
reviewed comply with all aspects of the council’s
Instructions for stocktaking and annual reporting
including possible write offs of stock.
Statutory Inspections
– Public Buildings
Assurance Substantial • For those inspections within our audit sample,
arrangements to identify all properties requiring
inspections by Building Services and Contractors were
satisfactory. Some inspections were not carried out
during Covid but the majority of inspections tested were
back on track. All adult care establishment inspections
tested, were back on track.
Procurement – Quick
quote processes
Assurance Substantial • Satisfactory arrangements are in place which ensure
adherence to the quick quote process. The council’s
contracts standing orders were temporarily updated at
the beginning of 2022 with one of the principal changes
being the lower threshold for quick quotes increasing
from £10,000 to £25,000. It was recommended that a
full review of the contract standing orders, including
Page 34 of 144

Page 35

Appendix 1
3
consideration of the increased threshold, should be
completed and presented for approval by the Council.
Business Continuity
Plans 
Assurance Limited • Service level Business Continuity Plans require to be
improved to record all the ICT areas referred to in the
council’s Business Continuity Plan template for all service
areas. The main areas to be reviewed and updated are
service area restoration plans and plans in the event of ICT
system outages.  The Crisis and Resilience Management
Team have overarching responsibility for Business
Continuity Plans and recommendations have been made
to address the areas identified and ensure a consistent
approach is taken across services.
Creditors – Purchase
to pay
Assurance No Assurance • The audit specifically reviewed the arrangements for
compliance with the purchase to pay procedures,
whereby manual payments should only be made in very
specific circumstances. The review identified that
current process in place for the passing and payment of
manual invoices were not sufficient in several areas and
creates several risks, particularly in relation to possible
breaches of the Council’s Contract Standing Orders.
Corporate
Governance
Framework
Governance Substantial • Based a sample check of the evidence used to
demonstrate compliance, it was confirmed that the
Council complies with the requirements of the Local
Code of Corporate Governance.  In addition, it was
evident that the Local Code has been subject to review
and updating in line with developments in best practice
and any revised Council Policies.
Cyber Security Assurance Reasonable • The internal control processes were generally
satisfactory. The audit identified some scope for
improvement in the existing arrangements mainly in
relation to training for staff and updating the incident
response plan to include more detail on decision-
making arrangements.
School Meals Debt Assurance Limited • Documented procedures have been in place since
October 2021.  However, these are only partially
Page 35 of 144

Page 36

Appendix 1
4
implemented at secondary schools thereby allowing
debt to continue to accumulate.  Action is not always
being taken to identify the circumstances contributing to
the school meals debt and whether assistance can be
provided.  Furthermore, invoices are not being issued
when required.  This has resulted in a significant
number of overdrawn school meals accounts on the
ParentPay System.  
Control and
Recording of Assets –
plant and equipment
Assurance Limited • The audit specifically reviewed the compliance with the
inventory procedures in relation to Streetscene plant
and equipment and identified that the controls in place
were inadequate. At the time of the review, some items
could not be located. Significant improvements are
required to ensure compliance with the Council’s
Inventory Procedures. 
Assurance Level 
Substantial Assurance • There is a sound system of internal control designed to achieve the objectives of the area being reviewed. 
• The control processes tested are being consistently applied. 
Reasonable Assurance • The internal control processes are generally satisfactory with some areas of weakness being identified that could
put some objectives of the area being reviewed at risk
• There is evidence that the level of non-compliance with some of the control processes may put some of the
objectives of the area being reviewed at risk. 
Limited Assurance • Weaknesses in the system of internal controls are such as to put the objectives of the area being reviewed at risk. 
• The level of non-compliance puts the objectives of the area being reviewed at risk. 
No Assurance • Control processes are generally weak with significant risk to the achievement of the objectives of the area being
reviewed. 
• Significant non-compliance with control processes leaves the processes/systems open to error or abuse. 
Page 36 of 144

Page 37

___________________________________________________________________
To: Audit, Risk and Scrutiny Board
On: 22 May 2023
___________________________________________________________________
Report by: Chief Auditor
___________________________________________________________________
Heading: Summary of Internal Audit Reports for period 01 January to 31
March 2023
___________________________________________________________________
1. Summary
1.1 In line with the Public Sector Internal Audit Standards, Internal Audit
must communicate the results of each engagement to the Board. To
comply with this requirement, Internal Audit submits regular reports on
the findings and conclusions of audit engagements to the Audit, Risk
and Scrutiny Board.
1.2 Appendix 1 provides details those audit engagements completed
during the period 1 January to 31 March 2023 with the overall
assurance rating and the number of recommendations in each risk
category. The committee summary for each report is also attached.
For each audit assignment where recommendations have been made,
the relevant managers have put action plans in place to address the
issues raised.
1.3 In addition to the reports listed in the Appendix, Internal Audit has an
ongoing commitment to:
• A range of corporate and service initiatives;
• Progressing of information security matters in partnership with
ICT and Legal Services;
• The regular provision of advice to departmental officers;
• The provision of internal audit services to the associated bodies
for which Renfrewshire Council is the lead authority and to
Renfrewshire Leisure Ltd and Renfrewshire Health and Social
Care Integrated Joint Board;
Item 3
ARS 22/5/23 Page 37 of 144

Page 38

• Co-ordination of the Council’s corporate risk management
activity;
• Management of the counter fraud team;
• Management of the risk management and insurance team.
___________________________________________________________________ 
2. Recommendations
2.1 Members are invited to consider and note the Summary of Internal Audit
Reports finalised during the period from 1 January to 31 March 2023. 
___________________________________________________________________
Implications of the Report
1. Financial - None 
2. HR & Organisational Development - None 
3. Community Planning – 
Safer and Stronger - effective internal audit is an important element of good
corporate governance. 
4. Legal - None 
5. Property/Assets - None 
6. Information Technology - None 
7.  Equality & Human Rights – None 
8. Health & Safety – None
9. Procurement - None 
10.  Risk - The summary reported relates to the delivery of the risk-based internal
audit plan. 
11. Privacy Impact – None 
12. COSLA Implications – None 
13. Climate Risk - None 
________________________________________________________________
Author:           Karen Campbell – 07768354651
Page 38 of 144

Page 39

Appendix 1 
Renfrewshire Council 
Internal Audit Service 
Update for Audit, Risk and Scrutiny Board 
Final Audit Reports issued from 1 January – 31 March 2023 
Category  Service  Engagement  Assurance
Rating
Recommendation Ratings
Critical Important Good
Practice
Service
Improvement
Assurance Environment &
Infrastructure
Statutory Inspections –
Public Buildings
Substantial 0 0 0 0 
Chief Executive’s Quick Quote Processes Substantial 0 0 2 0 
Corporate Business Continuity
Plans 
Limited 2 1 2 0 
Chief
Executive’s/Finance
& Resources
Creditors – Purchase to
Pay
No Assurance 1 2 0 0 
Note  – No assurance rating can be given in respect of investigation assignments                 
Assurance Level 
Substantial Assurance • There is a sound system of internal control designed to achieve the objectives of the area being reviewed. 
• The control processes tested are being consistently applied. 
Reasonable Assurance • The internal control processes are generally satisfactory with some areas of weakness being identified that could
put some objectives of the area being reviewed at risk
• There is evidence that the level of non-compliance with some of the control processes may put some of the
objectives of the area being reviewed at risk. 
Limited Assurance • Weaknesses in the system of internal controls are such as to put the objectives of the area being reviewed at risk. 
Page 39 of 144

Page 40

• The level of non-compliance puts the objectives of the area being reviewed at risk. 
No Assurance • Control processes are generally weak with significant risk to the achievement of the objectives of the area being
reviewed. 
• Significant non-compliance with control processes leaves the processes/systems open to error or abuse. 
Recommendation
Rating 
Service Improvement  Implementation will improve the efficiency / housekeeping of the area under review.
Good Practice  Implementation will contribute to the general effectiveness of control.
Important  Implementation will raise the level of assurance provided by the control system to acceptable levels.
Critical  Addresses a significant risk, impacting on the objectives of the area under review. 
Page 40 of 144

Page 41

Internal Audit Report
Environment & Infrastructure
Statutory Inspections – Public Buildings (A0110/2022/001) 
Date: January 2023 
COMMITTEE SUMMARY 
Audit Objectives
The objectives of the audit were to ensure that: -
1. There is an appropriate service level agreement in place with Building Services to
undertake statutory inspections and remedial works;
2. Appropriate arrangements are in place to identify all properties requiring statutory
inspections, including adult care establishments, within the guidance timescales
and log the outcome of these inspections;
3. Appropriate sub contracts are in place for inspections where the inspections are
not undertaken directly by Building Services;
4. Arrangements are in place to undertake resulting remedial works arising from
inspection visits, within the required timescales and log the works as completed;
5. Compliance certificates are appropriately retained;
6. Adequate performance management information is available to senior
management. 
Audit Scope
The following work was carried out:
1.  Interviewed the appropriate staff and ascertained the processes in place for
statutory inspections at Public Buildings.
2.  Prepared a series of tests to enable examination of the areas outlined in the
objectives.
3.  The inspections selected for testing were Gas Safety, Emergency Lighting and
Electrical Routine by Building Services and Lift Maintenance, Fire Alarms and
Smoke Ventilation by external contractors. 
Key Audit Assurances
1. Scheduled inspections by Building Services and Contractors and their frequencies
are set out in a table within the Renfrewshire Council Guidance on Statutory
Inspections and Maintenance, prepared by the Health and Safety team.
2. Appropriate arrangements are in place to identify all properties requiring statutory
inspections and log the outcome of these inspections.
3. Appropriate sub contracts are in place for those inspections which are not 
undertaken directly by Building Services;
4. Appropriate arrangements are in place to undertake remedial work arising from
inspection visits and log the works as completed;
5. Compliance certificates are appropriately retained;
6. Adequate performance management information is available to senior
management. 
Page 41 of 144

Page 42

Internal Audit Report
Environment & Infrastructure
Statutory Inspections – Public Buildings (A0110/2022/001) 
Date: January 2023 
Key Audit Risks
There were no key risks identified during the audit. 
Overall Audit Opinion
For those inspections within our audit sample, arrangements to identify all properties
requiring inspections by Building Services and Contractors were satisfactory. Some
inspections were not carried out during the Covid 19 lockdow but the majority of inspections
tested were back on track. All adult care establishment inspections tested, were back on
track. 
Management Commentary
Not applicable as no key risks were identified. 
Page 42 of 144

Page 43

Internal Audit Report
Chief Executive’s
Quick Quote Processes (A0085/2023/001) 
Date: February 2023 
COMMITTEE SUMMARY 
Audit Objectives
The objectives of the audit were to ensure that: -
1. For contracts with a total value within the quick quote thresholds, quotations are
sought from a minimum of 4 suppliers who have the experience and expertise to
meet the council’s requirements for the goods and services.
2. Where a quote is sought for the same requirement, a different group of potential
suppliers is selected where possible.
3. There is appropriate approval for a non-competitive action in cases where only one
supplier bids for the work.
4. The returned quotes are evaluated against the criteria in the quick quote
specification, the most economically advantageous quote is selected and that
appropriate sign off is received from the Director or authorised representative using
the Contract Authorisation report prior to issuing award letters.
5. The contract award is published on the Public Contracts Scotland website. 
Audit Scope
The following work was carried out:
1. Interviewed the appropriate staff, evaluated the system in place for quick quotes and
identified any possible improvements to the system.
2. Prepared a series of tests to ensure the quick quote process was operating
effectively and as described.
3. It should be noted there were a small number of quick quotes in the financial year
2021/22 and so there were no quotes for the same requirement to test whether or
not a different group of potential suppliers was selected where possible. 
Key Audit Assurances
1. For contracts with a total value between £10,000 and £50,000 (excluding VAT)
before 1/1/2022 and between £25,000 and £50,000 (excluding VAT) after 1/1/2022,
quotations are sought from a minimum of 4 suppliers who have the experience and
expertise to meet the council’s requirements for the goods and services.
2. There is appropriate approval for a non-competitive action in cases where only one
supplier bids for the work.
3. The returned quotes are evaluated against the criteria in the quick quote
specification, the most economically advantageous quote is selected and that
appropriate sign off is received from the Director or authorised representative using
the Contract Authorisation report prior to issuing award letters.
4. The contract award is published on the Public Contracts Scotland website. 
Page 43 of 144

Page 44

Internal Audit Report
Chief Executive’s
Quick Quote Processes (A0085/2023/001) 
Date: February 2023 
Key Audit Risks
There were no key risks identified during the audit. 
Overall Audit Opinion
The audit identified that satisfactory arrangements are in place which ensure adherence to
the quick quote process.  The council’s contracts standing orders were temporarily updated
at the beginning of 2022 with one of the principal changes being the lower threshold for
quick quotes increasing from £10,000 to £25,000. We have recommended that a timescale
should be agreed for when the full review of the contract standing orders, including
consideration of the increased threshold, will be completed and presented for approval by
the Council. 
Management Commentary
Not applicable as no key risks identified. 
Page 44 of 144

Page 45

Internal Audit Report
Corporate
Business Continuity Plans for ICT Systems (A0034/2022/001) 
Date: January 2023 
COMMITTEE SUMMARY 
Audit Objectives
The objectives of the audit were to ensure that: -
1. Services have undertaken Business Impact Assessments which have been
documented and risk assessed. 
2. Services have prepared Business Continuity Plans which specifically address
recovery arrangements of their business critical ICT systems including prioritising
which systems to recover and in what order. 
3. Services’ Business Continuity Plans are clear regarding roles, responsibilities and
decision making arrangements for activation of the business continuity plans. 
4. Services’ Business Continuity Plans have considered the optimum way to gather
data during an outage in such a way that it facilitates updating the source system
on resolution of the outage. 
5. Services and ICT (or external supplier) Business Continuity Plans are appropriately
aligned in terms of expectations, response times and resources required.
6.  Services Business Continuity Plans are tested on a regular basis.   
Audit Scope         
The following work was carried out:
1. We reviewed 5 service level Business Continuity Plans that referred to many
service areas.
2. Met with relevant officers to obtain background information on processes followed
for Business Continuity Plans.
3. Prepared and undertook a series of tests designed to meet the audit objectives. 
Key Audit Assurances
1. Roles, responsibilities, and decision making arrangements for activation of Service
Business Continuity Plans are clear. 
Key Audit Risks
1. Where Service Business Continuity Plans do not include restoration documents for
all service areas, those areas may not have up to date arrangements for continuing
to deliver critical service provision.
2. Where Business Continuity Plans do not refer to arrangements for providing
services in the event that ICT system outages cannot be reinstated in the preferred
timescales, recovery from outages may not be adequately planned for. 
Page 45 of 144

Page 46

Internal Audit Report
Corporate
Business Continuity Plans for ICT Systems (A0034/2022/001) 
Date: January 2023 
Overall Audit Opinion
Service level Business Continuity Plans require to be improved to record all the ICT areas
referred to in the council’s Business Continuity Plan template for all service areas. The main
areas to be reviewed and updated are service area restoration plans and plans in the event
of ICT system outages.  The Crisis and Resilience Management Team have overarching
responsibility for Business Continuity Plans and recommendations have been made within
the report to address the areas identified and ensure a consistent approach is taken across
services. 
Management Commentary
We are currently progressing the audit recommendations.  The Civil Contingencies Service,
in conjunction with the Council Resilience Management Team (CRMT), are liaising with all
Business Continuity Co-ordinators to carry out a programme of Business Continuity
workshops working with all the relevant service areas (with one of the outcomes being to
ensure that the updated business continuity documentation takes proper cognisance of the
arrangements to be put in place due to a loss of systems) 
Oversight of this process will be through a series of special CRMT meetings. 
Page 46 of 144

Page 47

Internal Audit Report
Chief Executives and Finance & Resources 
Creditors – Purchase to Pay (A0083/2022/001) 
Date: March 2023 
COMMITTEE SUMMARY 
Audit Objectives
The objectives of the audit were to ensure that: -
1. Manual payments are only processed for valid suppliers/providers listed on the
Exception List and are supported by the appropriate documentation.
2. There are monitoring processes in place to ensure that manual creditor payments
made to suppliers/providers are reported to the relevant Service.
3. Services take appropriate action to investigate reasons for manual payments being
made and where necessary ensure that any future payments are made in line with
correct council approved payment methods.
4. The absence of recorded commitment information, as a result of manual payments,
is not impacting budgets.
5. Manual creditor payments have not led to Contract Standing Orders being
breached. 
Audit Scope
The following work was carried out:
1. Interviewed the appropriate officers to obtain background information regarding
processes and documentation in relation to manual creditor payments.
2. Prepared a series of tests to meet the audit objectives. 
Key Audit Assurances
No assurances can be given in relation to the procedures for making manual creditor
payments. 
Key Audit Risks
1. Due to the large number of manual invoices being processed, no checks in relation
to purchase orders, exemption list codes or invoice values are being carried out.
2. Services are not taking appropriate action to investigate reasons for manual
payments being made or ensuring that any future payments are made in line with
correct council approved payment methods.
3. The lack of committed expenditure information available through Business World, in
addition to the large number of manual payments being made, could potentially
result in budgetary overspends.
4. The manual process bypasses Procurement and, as no value checks are being
carried out by them, this creates a risk of the Council’s Contract Standing Orders
being breached.
Page 47 of 144

Page 48

Internal Audit Report
Chief Executives and Finance & Resources 
Creditors – Purchase to Pay (A0083/2022/001) 
Date: March 2023 
Overall Audit Opinion
The current process in place for the passing and payment of manual invoices are not
sufficient in several areas and creates several risks, particularly in relation to possible
breaches of the Council’s Contract Standing Orders.
The auditor has made recommendations to address these issues. Mainly, that council
management should should set a date to implement a ‘No Purchase Order, No Payment’
policy to ensure that the only manual payment invoices administered by the Purchase to
Pay team are those with valid exemption codes. This will reduce the numbers of manual
payment being processed, allow more checks to be carried out, and mitigate the risks
associated with manual creditor payments. This will also provide the required time to reduce
the number of manual payments being made and to notify all suppliers and staff of the
change in policy.
Due to covid other resourcing pressures, management have not sought corporate approval
and support to implement this approach. Procurement staff and Business World staff have
put procedures in place over the last 10 years to encourage budget holders to raise orders
through the council’s approved purchasing system, with a valid Purchase Order number.
However, budget holders are still allowed to raise large numbers of manual creditor
payments, resulting in an increased workload for Purchase to Pay staff to process them. 
Management Commentary
Recommendations are being progressed.  Implementation of new Purchase 2 Pay system
and processes and a no Purchase Order, no Pay policy have been prioritised as a project
through the Digital Strategy. The Corporate Management Team endorsed this project in
late April 2023 and agreed this was to be prioritised. 
Page 48 of 144

Page 49

___________________________________________________________________
To: Audit, Risk and Scrutiny Board
On: 22 May 2022
___________________________________________________________________
Report by: Chief Auditor
___________________________________________________________________
Heading: Internal Audit – External Quality Assessment 
___________________________________________________________________
1. Summary
1.1 The Public Sector Internal Audit Standards (PSIAS) are a mandatory set of
standards applying to all internal audit service providers in the public sector. 
1.2  The PSIAS require the Chief Auditor to develop and maintain a quality
assurance and improvement programme (QAIP) that covers all aspects of the
internal audit activity. The QAIP must include both periodic internal self-
assessments and five-yearly external assessments, carried out by a qualified,
independent assessor from outwith the organisation. 
1.3 The external assessment of Renfrewshire Council’s Internal Audit Service has
been carried out by South Ayrshire’s Council’s Internal Audit and Corporate
Fraud service utilising this framework. The review concluded that the Internal
Audit service fully conforms with the PSIAS, although there are some
recommendations to be addressed, the report is attached at Appendix 1.
___________________________________________________________________
2. Recommendations
2.1  Members are asked to note the external assessors report on Internal Audit’s
comformance with the Public Sector Internal Audit Standards. 
2.2  Members are asked to note the actions to be taken to implement the
recommendations made. 
___________________________________________________________________
Item 4
ARS 22/5/23 Page 49 of 144

Page 50

3.   Background 
3.1  To assist its members to meet the five-yearly external assessment requirement,
the Scottish Local Authorities Chief Internal Auditors’ Group (SLACIAG)
established a collaborative system of formal peer reviews.  To support the peer
review process, SLACIAG developed a comprehensive External Quality
Assessment (EQA) framework, including an EQA Checklist and stakeholder
questionnaire proforma, for assessing conformance with the PSIAS and the
Local Government Application Note. 
3.2 Prior to the external assessment being undertaken the Chief Auditor self-
assessed Internal Audit’s comformance against the EQA Checklist and
submitted relevant evidence to the external assessor. This assessment noted
3 areas for improvement and the external assessment included those along
with a further 4 recommendations. 
___________________________________________________________________
Implications of the Report
1. Financial - None 
2. HR & Organisational Development – None 
3. Community Planning – Safer and Stronger - effective internal audit
is an important element of good corporate governance. 
4. Legal - None 
5. Property/Assets - None 
6. Information Technology - None 
7.  Equality & Human Rights - None 
8. Health & Safety – None
9. Procurement - None 
10.  Risk - Conformance with the PSIAS mitigates the risk of the Internal
Audit Service being ineffective. 
11. Privacy Impact – None 
12. COSLA Implications – None 
13. Climate Risk - None 
Page 50 of 144

Page 51

________________________________________________________________
Author:           Andrea McMahon 
Page 51 of 144

Page 52

April 2023 Page 1 
EXTERNAL QUALITY
ASSESSMENT 2
OF 
RENFREWSHIRE COUNCIL 
INTERNAL AUDIT SERVICE 
Report Recipients: 
Alan Russell, Chief Executive
Alastair MacArthur, Director of Finance and Resources
Andrea McMahon, Chief Audit Executive
Cllr Andrew Doig, Chair of the Audit, Risk and Scrutiny 
Page 52 of 144

Page 53

EXECUTIVE SUMMARY 
2
1.  INTRODUCTION 
1.1 The mandatory Public Sector Internal Audit Standards (PSIAS), published initially in
April 2013 and updated most recently in March 2017, apply to all internal audit service
providers in the UK public sector, whether in-house, provided via a shared service
arrangement or outsourced. To supplement the PSIAS and provide specific guidance
surrounding its application within a local government setting, the Chartered Institute of
Public Finance and Accountancy (CIPFA) compiled a Local Government Application
Note, which was last updated in 2019. 
1.2 The objectives of the PSIAS are to define the nature of internal auditing within the UK
public sector; set a basic principles for carrying out internal audit; establish a framework
for providing internal audit services, which add value to the organisation, leading to
improved organisational processes and operations; establish the basis for the evaluation
of internal audit performance and drive improvement planning. 
1.3 The PSIAS require the Chief Audit Executive (the Chief Auditor in Renfrewshire Council)
to develop and maintain a quality assurance and improvement programme (QAIP) that
covers all aspects of the internal audit activity. The QAIP must include both periodic
internal self-assessments and five-yearly external assessments, carried out by a
qualified, independent assessor from outwith the organisation, and enable evaluation of
the internal audit activity’s (Internal Audit Service in Renfrewshire Council) conformance
with the PSIAS, including the Mission of Internal Audit, Definition of Internal Auditing and
Code of Ethics. In addition, the QAIP should also assess the efficiency and effectiveness
of the internal audit activity and identify opportunities for improvement. 
1.4 To assist its members to meet the five-yearly external assessment requirement, the
Scottish Local Authorities Chief Internal Auditors’ Group (SLACIAG) established a
collaborative system of formal peer reviews.  This approach not only assists with
ensuring that independent assessors, and their teams, have appropriate knowledge and
experience of the local government internal audit environment but also removes the
financial burden from councils, associated with procuring these services externally.  The
allocation of assessors / assessment teams to councils participating in the peer review
process was undertaken autonomously, ensuring that, amongst other governing
principles, local authorities with perceived / known conflicts of interest could not review
one another.  At the outset, assessors were required to formally declare any interests
so that these could be appropriately addressed during the allocation process.  South
Ayrshire Council was selected to carry out the external assessment in Renfrewshire
Council.   
1.5 To support the peer review process, SLACIAG developed a comprehensive External
Quality Assessment (EQA) framework, including an EQA Checklist for Assessing
Conformance with the PSIAS and the Local Government Application Note (EQA
Checklist) and a key Stakeholder Questionnaire proforma. The external assessment of
Renfrewshire Council’s Internal Audit Service has been carried out by South Ayrshire’s
Council’s Internal Audit and Corporate Fraud service utilising this framework.   
1.6 This report provides a high level summary of requirements for each standard per the
PSIAS and CIPFA Local Government Application Note and sets out the findings,
conclusions and recommendations from the external assessment, which involved
discussions with key members of staff, including the Chief Audit Executive, review of the
most recent self-assessment carried out utilising the EQA Checklist and consideration
of other relevant supporting documentation / information (Evidence Pack) including
working paper files and completed stakeholder questionnaires. A comprehensive list of
supporting documentation / information and completed stakeholder questionnaires
considered as part of the assessment can be found at appendices B and C respectively.
Page 53 of 144

Page 54

3 
2.  OVERALL CONCLUSION
2.1 The overall conclusion of the external assessment is that Renfrewshire Council’s Internal
Audit Service fully conforms with the PSIAS.  There were some components within
standards 1100 – Independence and Objectivity and 1200 – Proficiency and Due
Professional Care assessed as “generally conforms”. We have highlighted
improvements in these areas in 2.2 below. It should be noted that four areas for
improvement were identified by the Chief Auditor during their self-assessment but have
been included here for completeness. A full summary of assessment, per assessment
area, can be found at Appendix A.  A summary of totals is as follows:     
Fully
Conforms     
Generally
Conforms     
Partially
Conforms     
Does Not
Conform   
TOTALS 12 2 0 0 
2.2 The main areas for improvement highlighted in the report are as follows: 
• Updating the Internal Audit Charter to include the definition of consulting services.
The updated Charter should be shared with Senior Management.
• Completing the performance appraisal process for the Chief Auditor (Identified during
self-assessment)
• Including confirmation within the Annual Assurance statement that there are no
significant threats to the independence of the Internal Audit activity.
• Completing the Competency Framework exercise for the Internal Audit team. (Identified
during self-assessment)
• Commencing the six monthly update meetings with senior management. (Identified
during self-assessment)
• Updating engagement plans to include risks relevant to the audit assignment.
• Completing a data cleansing exercise for audit files held on Galileo (Identified during self-
assessment)
2.3 Full details of the assessment recommendations and management responses can be
found in the Action Plan at Appendix D. 
Page 54 of 144

Page 55

4 
3.  SECTION A – MISSION OF INTERNAL AUDIT AND CORE PRINCIPLES 
The PSIAS state that the Mission of Internal Audit articulates what internal audit aspires
to accomplish within an organisation, which is ‘to enhance and protect organisational
value by providing risk-based and objective assurance, advice and insight’.   
Taken as a whole, the Core Principles for the Professional Practice of Internal Auditing,
as set out in the PSIAS, articulate internal audit effectiveness.  For an internal audit
Service to be considered effective, all Core Principles should be present and operating
effectively.  Failure to achieve any of the Core Principles would imply that an internal
audit activity was not as effective as it could be in achieving the Mission of Internal Audit. 
3.1 Evidence obtained from assessing conformance with other standards in the PSIAS has
been used, along with specific consideration surrounding the achievement of the Core
Principles, to conclude that the Internal Audit Service at Renfrewshire Council fully
conforms with accomplishing the Mission of Internal Audit as detailed above. 
4. SECTION B – DEFINITION OF INTERNAL AUDITING 
The PSIAS state that internal auditing is an independent, objective assurance and
consulting activity designed to add value and improve an organisation’s operations. It
helps an organisation accomplish its objectives by bringing a systematic, disciplined
approach to evaluate and improve the effectiveness of risk management, control and
governance processes. 
4.1 Evidence obtained from assessing conformance with other standards in the PSIAS has
been used to conclude that the Internal Audit Service at Renfrewshire Council fully
conforms with the definition of Internal Auditing as detailed above.  The main reason
for this assessment is that across all the standards a high level of compliance was noted
with the Internal Audit function operating in line with expectations overall. This was
evidenced through a variety of means including the Internal Audit Charter, Financial
Codes and audit manual, examination of audit documents and consideration of the
regular reporting of Internal Audit progress and performance to key stakeholders.
Stakeholder Questionnaires support this conclusion. 
5.  SECTION C – CODE OF ETHICS 
The PSIAS state that the purpose of the Institute of Internal Auditor’s Code of Ethics is
to promote an ethical culture in the profession of internal auditing. A code of ethics is
necessary and appropriate for the profession of internal auditing, founded as it is on the
trust placed in its objective assurance about risk management, control and governance. 
Internal auditors in UK public sector organisations must conform to the Code of Ethics
as set out in the PSIAS. If individual internal auditors have membership of another
professional body then he or she must also comply with the relevant requirements of
that organisation. 
5.1 Evidence obtained from assessing conformance with other standards in the PSIAS, in
particular the Attribute Standards 1000 – Purpose Authority and Responsibility, 1100 –
Independence and Objectivity, 1200 – Proficiency and Due Professional Care and
Professional Standards 2000 – Managing the Internal Audit Activity and 2300 –
Performing the Engagement, has been used to conclude that Renfrewshire Council’s 
Internal Audit Service fully conforms with the requirement to comply with the Code of
Ethics.   Stakeholder Questionnaires support this conclusion. There is scope to further
improve existing arrangements in this area through implementation of the actions
included within the action plan at Appendix D. 
Page 55 of 144

Page 56

5 
6. SECTION D – ATTRIBUTE STANDARDS 
Attribute Standards apply to organisations and individual internal auditors
providing the internal audit services in a local authority. 
6.1 1000 - Purpose, Authority, and Responsibility 
The PSIAS state that the purpose, authority and responsibility of the internal audit
activity must be formally defined in an Internal Audit Charter, consistent with the Mission
of Internal Audit and the mandatory elements of the International Professional Practices
Framework.  The chief audit executive must periodically review the internal audit charter
and present it to senior management and the board for approval.  The internal audit
charter must also: 
• define the terms ‘board’ and ‘senior management’ for the purposes of internal audit
activity;
• cover the arrangements for appropriate resourcing; 
• define the role of internal audit in any fraud-related work; and 
• describe safeguards to limit impairments of independence or objectivity if internal
audit or the chief audit executive undertakes non-audit activities. 
6.1.1 The current Renfrewshire Council’s Internal Audit Charter was last approved by the
Audit, Risk and Scrutiny Board on 23 August 2021. The Internal Audit Charter is
periodically reviewed with the most recent review taking place in September 2022. There
were no changes made to the Charter following this review which was reported to the
Audit, Risk and Scrutiny Board on 14 November 2022. The Chief Auditor advised that,
given the climate at the time when the Internal Audit Charter was last approved (August
2021) and the minimal changes made to it at that point, it was not communicated
separately to the Corporate Management Team. 
6.1.2 The Internal Audit Charter sets out the purpose, authority and responsibility of the
Internal Audit service in Renfrewshire Council. It also defines the nature of assurance
services, internal audits’ position in the organisation and information in relation to the
relationship between the Chief Auditor and the Audit, Risk and Scrutiny Board. However
it does not include a definition of consulting activities.   
6.1.3 It is recommended that the Internal Audit Charter is updated to include the definition of
consulting activities and, once approved by the Audit, Risk and Scrutiny Board, the
updated Charter should be shared with the Corporate Management Team. (Action 1) 
6.1.4 Having considered the findings above, it has been concluded that the Internal Audit
Service at Renfrewshire Council fully conforms with Standard 1000 on Purpose,
Authority and Responsibility. 
6.2 1100 - Independence and Objectivity 
The internal audit activity must be independent and internal auditors must be objective
in performing their work.  Various aspects of independence and objectivity are covered
in this standard as well as 1200, including reporting functional lines of the CAE, the
relationship between the CAE and the board and any impairment to individual internal
auditors’ objectivity or independence. Reporting and management arrangements must
be put in place that preserve the CAE’s independence and objectivity, in particular with
regard to the principle that the CAE must be independent of the audited activities. 
6.2.1 The Internal Audit Service reports functionally to the Audit, Risk and Scrutiny Board and
administratively to the Director of Finance and Resources, who is a member of the
Council’s Corporate Management Team.  The Chief Auditor has direct and unrestricted
access and the Chair of the Audit, Risk and Scrutiny Board and the Chief Executive
regarding any matters of concern that could place the Council in a position where the
risks it faces are unacceptable and this has been confirmed through the completed
Page 56 of 144

Page 57

6 
Stakeholder Questionnaires.  These reporting / access arrangements are clearly defined
in the Internal Audit Charter as are safeguards to limit impairment of independence or
objectivity.   
6.2.2 It was confirmed that the Chief Internal Auditor’s independence is supported by Council
arrangements to prevent inappropriate influence by those subject to audit including; a
Recruitment Policy, Employee Code of Conduct, Disciplinary Procedures and a
Performance Appraisal processes.  However it was established that the performance
appraisal for the Chief Auditor has not been completed since pre Covid (March 2020). 
6.2.3 In support of organisational independence, the Chief Auditor attends the Audit, Risk and
Scrutiny Board meetings to present all internal audit reports to Elected Members.  The
reports are all submitted in the Chief Auditor’s name.  Within the stakeholder
questionnaires, both the Chief Executive and the Director of Finance and Resources
stated Internal Audit was only partly considered to be a key strategic partner with a high
profile with the organisation. However the Director of Finance and Resources also noted
that they will be aiming to support the team in this over the coming months. 
6.2.4 The Chief Auditor has operational responsibility for Risk Management.  The Internal
Audit Charter states “Where the Chief Auditor has responsibility for operational activities
the periodic review of these activities will be conducted by parties independent of the
Internal Audit function”. The Risk Management Service was last reviewed in 2018 and
evidence was provided that a third party completed this audit. 
6.2.5 Although the Internal Audit Charter sets out the arrangements for independence, it was
found that neither the Internal Audit Annual Report or the progress and performance
reports to the Audit, Risk and Scrutiny Board, provide additional ongoing and explicit
confirmation that there have been no significant threats to the independence of the
internal audit activity, such as inappropriate scope or resource limitations. The Chief
Auditor advised that threats to the independence of the internal audit activity is reported
through the quarterly progress and performance reports to the Audit, Risk and Scrutiny
Board.  There were no such threats noted during the period of the assessment. 
6.2.6 It was noted that within Renfrewshire Council the Chief Auditor is required to confirm
any interests on an annual basis and this is recorded in a Register of Interests.  All other
employees within the Internal Audit service are required to comply with the Code of
Conduct.  The Internal Audit Manual states all staff must adhere to Renfrewshire
Council’s Employee Code of Conduct which details the process to be followed if a
potential conflict of interest arises.   
6.2.7 It is recommended that; 
• A performance appraisal is completed for the Chief Auditor. The appraisal should
include feedback from at least the Chief Executive and the Chair of the Audit, Risk
and Scrutiny Board and should be countersigned by an independent party.  (Action
2)
• The Internal Audit Annual report should include explicit confirmation that there have
been no significant threats to the independence of the internal audit activity, such
as inappropriate scope or resource limitations.. (Action 3) 
6.2.8 Renfrewshire Council’s Internal Audit Service generally conforms with Standard 1100
on Independence and Objectivity. 
6.3 1200 - Proficiency and Due Professional Care 
The CAE must be professionally qualified, suitably experienced and responsible, in
accordance with the organisation’s human resources processes, for recruiting
appropriate staff.  He or she is responsible for ensuring that up-to-date job descriptions
exist, reflecting roles and responsibilities, and that person specifications define the
required qualifications, competencies, skills, experience and personal attributes.
Page 57 of 144

Page 58

7 
The CAE should periodically assess individual auditors’ skills and competencies against
those set out in the relevant job descriptions and person specifications. Any training or
development needs identified should be included in an appropriate ongoing
development programme that is recorded and regularly reviewed and monitored. In
addition, all internal auditors have a personal responsibility to undertake a programme
of continuing professional development (CPD) to maintain and develop their
competence. This may be fulfilled through requirements set by professional bodies or
through the organisation’s own appraisal and development programme. Auditors should
maintain a record of such professional training and development activities. 
The internal audit activity should be appropriately resourced to meet its objectives. It
should have appropriate numbers of staff in terms of grades, qualifications, personal
attributes and experience or have access to appropriate resources in order to meet its
objectives and to comply with these standards. The PSIAS states that the CAE must
obtain competent advice and assistance if the activity is unable to perform all or part of
an engagement. 
6.3.1 The Chief Auditor holds a relevant professional qualification and is suitably experienced,
with over 20 years internal audit experience within a Scottish local government
environment.  The Chief Auditor is a member of SLACIAG and regularly attends and
contributes to meetings.  Renfrewshire Council’s Internal Audit Service is represented
on both SLACIAG Sub-groups, the Computer Audit Sub-Group (CASG) and the Scottish
Local Authorities Investigators Group (SLAIG),. 
6.3.2 To support the Chief Auditor in Renfrewshire Council’s Internal Audit Service there is
one Assistant Chief Auditor and 2 Senior Auditors these posts require to be CCAB or IIA
qualified.  There are a total of 6 members of staff in the Internal Audit Service, including
the Assistant Chief Auditor and the 2 Senior Auditors.  The Internal Audit Service delivers
internal audit services to the Renfrewshire Integration Joint Board, the Renfrewshire
Valuation Joint Board and to One ren. There are 3 dedicated Corporate Counter Fraud
Officer within the service and where the service does not have the specialist skills for
ICT audits a budget is available to the Chief Auditor to use external providers to
undertake the assignments. 
6.3.3 The Internal Audit Service has a competency framework in place which should be
completed every two years.  Supplementary questions have been added to the
framework dependent on the employee’s role with the audit team.  The process results
in a personal development plan for each member of staff.  However we were advised
that completion of this process was delayed due to Covid working restrictions as the
refresher training which was identified through the competency framework could not be
delivered. This training has now been delivered. The Chief Auditor advised that it is
intended to issue competency frameworks to all Internal Audit Staff for completion in
2023/24 which will result in new personal development plans being prepared. 
6.3.4 The Internal Audit Service is represented on a number of corporate groups, including
the Corporate Risk Management Group, the Information Management Governance
Group and the Prevent Sub-group. 
6.3.5 Renfrewshire Council is an accredited employer for the professional accountancy bodies 
and all members of the Internal Audit Service who are members of a professional
accountancy body have specific CPD requirements to adhere to. 
6.3.6 It is recommended that the competency framework is reissued to the audit team in
2023/24 and every two years thereafter. (Action 4)   
6.3.8 The Stakeholder Questionnaires confirmed that the Chief Auditor demonstrates
sufficient knowledge and experience and that all members of the Internal Audit Service
exercise due professional care.  
Page 58 of 144

Page 59

8 
6.3.9 Renfrewshire Council’s Internal Audit Service generally conforms with standard 1200
on Proficiency and Due Professional Care. 
6.4 1300 - Quality Assurance and Improvement Programme 
The PSIAS state that the Chief Audit Executive must develop and maintain a quality
assurance and improvement programme (QAIP) that covers all aspects of the internal
audit activity. 
The QAIP must include both periodic internal self-assessments and five-yearly external
assessments, carried out by a qualified, independent assessor from outside the
organisation, and enable evaluation of the internal audit activity’s conformance with the
PSIAS, including the Definition of Internal Auditing and Code of Ethics. In addition, the
QAIP should also assess the efficiency and effectiveness of the internal audit activity
and identify opportunities for improvement. 
The public sector requirement in the PSIAS states that results of the QAIP and progress
against any improvement plans must be reported in the annual report. 
6.4.1 Internal audit reports are reviewed by the Chief Auditor or Assistant Chief Auditor prior
to issue and working papers are, in general, reviewed by one of the Senior Internal
Auditors.  Where the assignment is carried out by the Senior Internal Auditor, the
Assistant Chief Auditor will review the working paper file.   
6.4.2 Client feedback on the Internal Audit is actively pursued by the Internal Audit Service at
audit planning meeting.  In addition, the Chief Auditor advised that this will also be
included in discussions with senior management during the six monthly meetings
planned to commence in 2023. 
6.4.3 A suite of KPIs are prepared and reported to the Director of Finance and Resources and
the Audit, Risk and Scrutiny Board.   The KPIs are designed to measure performance in
the delivery of the assignments within audit plan and progress of the overall plan. 
6.4.4 A self-assessment against the PSIAS was carried out by the Chief Auditor, utilising the
EQA checklist in October 2022. The results of the self-assessment will be reported to
the Audit, Risk and Scrutiny Board along with the EQA2 external assessment results. 
6.4.5 Renfrewshire Council’s Internal Audit Service fully conforms with Standard 1300 on
Quality Assurance and Improvement Programme. 
7. SECTION E – PERFORMANCE STANDARDS 
Performance Standards describe the nature of the internal audit services being
provided and provide criteria against which the performance of an internal audit
function can be measured. 
7.1 2000 - Managing the Internal Audit Activity 
The chief audit executive must effectively manage the internal audit activity to ensure it
adds value to the organisation.  The internal audit activity is effectively managed when
it achieves the purpose and responsibility included in the internal audit charter, it
conforms with the PSIAS, its individual members conform with the Code of Ethics and
the PSIAS and it considers trends and emerging issues that could impact the
organisation.  The internal audit activity adds value to the organisation and its
stakeholders when it considers strategies, objectives and risks; strives to offer ways to
enhance governance, risk management, and control processes; and objectively
provides relevant assurance. 
Page 59 of 144

Page 60

9 
7.1.1 An annual Internal Audit Plan is compiled by the Chief Auditor outlining the planned
programme of work to be undertaken.  A Planning Protocol is in place to help guide the
development of the annual plan. The protocol details the pre-plan preparation which
includes review of the audit entities and audit universe and scrutiny of the strategic and
corporate risk registers, other key Council documents e.g. the Council Plan, external
audit and other assurance body reports and other Local Authority Internal Audit Plans. 
It also details the parties to be consulted on the plan which include the Chief Executive,
the Corporate Management Team, external audit, Senior Managers for associated
bodies and Audit, Risk and Scrutiny Board Members.     
7.1.2 The Chief Auditor and Assistant Chief Auditor meets with service Senior Management
Team prior to preparation of the annual plan. 
7.1.3 The draft plan is shared with the Chief Executive and the Corporate Management Team
for comment prior to being submitted for approval to the Audit, Risk and Scrutiny Board.
Reports detailing progress towards completion of the Internal Audit plan are presented
to the Audit, Risk and Scrutiny Board on a quarterly basis. 
7.1.4 It was noted that it was the intention of the Chief Auditor to also have six monthly meeting
with services Senior Management Team to discuss the progress against the plan.
However due to Covid working restrictions and long term absences within the Internal
Audit Service these meetings have not yet commenced. 
7.1.5 Completed stakeholder questionnaires from the Chief Executive, the Director of Finance
and Resources and the Chair and Vice Chair of Audit, Risk and Scrutiny Board confirm
that they consider that the Internal Audit function adds value and that they are given
appropriate opportunity to feed into the audit planning process. 
7.1.6 It is recommended that the six monthly update meetings with services Senior Managers
commence in 2023 as planned. (Action 5) 
7.1.7 Renfrewshire Council’s Internal Audit Service fully conforms with Standard 2000 on
Managing the Internal Audit Activity. 
7.2 2100 - Nature of Work 
The internal audit activity must evaluate and contribute to the improvement of the
organisation’s governance, risk management, and control processes using a systematic,
disciplined, and risk-based approach. Internal audit credibility and value are enhanced
when auditors are proactive and their evaluations offer new insights and consider future
impact. 
More specifically, the internal audit activity must assess and make appropriate
recommendations to improve the organisation’s governance processes, evaluate the
effectiveness and contribute to the improvement of risk management processes and
assist the organisation in maintaining effective controls by evaluating their efficiency and
effectiveness and promoting continuous improvement. 
7.2.1 The Internal Audit Charter, Audit Manual and annual plan set out how the internal audit
function will evaluate the adequacy and effectiveness of controls and delivery of the plan
via individual audit reports and the annual assurance report confirms this approach is
delivered in practice.  The Council’s Risk Manager reports to Chief Auditor who is a
member of the Corporate Risk Management Group.   
7.2.3 Renfrewshire Council’s Internal Audit Service fully conforms with Standard 2100 on
Nature of Work. 
7.3 2200 - Engagement Planning 
Internal auditors must develop and document a plan for each engagement, including the
Page 60 of 144

Page 61

10 
engagement’s objectives, scope, timing and resource allocations. The plan must
consider the organisation’s strategies, objectives and risks relevant to the engagement. 
The CIPFA Local Government Application note states that for each engagement, a brief
should be prepared, discussed and agreed with relevant managers. The brief should
establish the objectives, scope and timing for the assignment and its resource and
reporting requirements. Audit work should be undertaken using a risk-based audit
approach. 
7.3.1 An Engagement Plan is prepared and issued for each audit contained within the Annual
Audit Plan. This sets out the objectives, scope, timetable and resources allocated for the
assignment. The client service is provided with an opportunity to comment on the
proposed brief prior to the start of the audit.   
7.3.2 An audit management system, Galileo, is used to by Renfrewshire Council’s Internal
Audit Service. The system is used to create risk matrices for each assignment which
details the risks, controls and test programme for each assignment.  The auditors record
the findings of the tests into Galileo and attach all relevant documentation.     
7.3.3 A review of the documentation provided during this assessment confirmed this process.   
7.3.4 PSIAS requires the engagement plan to consider the organisation’s strategies,
objectives and risks relevant to the engagement.    Links to the organisations strategies
are included within the annual plan, however, although risks are recorded within the
assignment risk matrix within Galileo, they are not included within the engagement plan. 
7.3.5 It is recommended that consideration is given to including the risks relevant to the audit
assignment within the engagement plans. (Action 6) 
7.3.6 Renfrewshire Council’s Internal Audit Service Fully conforms with Standard 2200 on
Engagement Planning. 
7.4 2300 - Performing the Engagement 
Internal auditors must identify, analyse, evaluate and document sufficient information to
achieve the engagement’s objectives. 
At each stage of the audit, auditors should consider what specific work needs to be
conducted and evidence needs to be gathered to achieve the engagement objectives
and support an independent and objective audit opinion.  Systems should be in place to
ensure that auditors obtain and record, within the working papers, sufficient evidence to
support their conclusions, professional judgements and recommendations.  Working
papers should always be sufficiently complete and detailed to enable an experienced
internal auditor with no previous connection with the audit to ascertain what work was
performed, re-perform it if necessary and support the conclusions reached.  The CAE
should also specify how long all audit documentation should be retained, whether held
on paper or electronically.  All audit work should be subject to an appropriate internal
quality review process. 
Internal auditors must be alert to the possibility of intentional wrongdoing, errors and
omissions, poor value for money, failure to comply with management policy and conflicts
of interest when performing their individual audits. They must also have sufficient
knowledge to identify indicators that fraud or corruption may have been committed. 
7.4.1 The Internal Audit Manual, October 2021, sets out the procedure in relation to
undertaking a planned audit, including preparing working papers and setting up working
paper files.  The manual also included details for dealing with other types of work
including investigations and consultancy assignments.   
7.4.2 Standard electronic working papers are used and are held together with supporting
information in the audit management system Galileo. 
Page 61 of 144

Page 62

11 
7.4.3 Through examination of documentation provided during this assessment it was
confirmed that there are adequate arrangements for performing and supervising audit
work are in place. Audit files are reviewed by Senior Auditors and a final review is carried
out by either the Chief Auditor or the Assistant Chief Auditor prior to issue of the draft
report. 
7.4.4 A Council Wide Records Management Policy and an Internal Audit Retention Schedule
is in place.  The Chief Auditor advised that files stored on the Internal Audit network drive
have been deleted in line with the Retention Schedule but that no records have been
deleted from the Galileo system as yet.  The Chief Auditor advised that further
investigation regarding archiving the files held on Galileo is required. 
7.4.5 It is recommended that a data cleansing exercise is undertaken on the files within Galileo
to ensure the Internal Audit service is complying with the Council’s Records
Management Policy and the Internal Audit Retention Schedule. (Action 7) 
7.4.6 Renfrewshire Council’s Internal Audit Service fully conforms with Standard 2300 on
Performing the Engagement. 
7.5 2400 - Communicating Results 
The basic aims of every internal audit report should be to: 
• give an opinion on the risk and controls of the area under review, building up to the
annual opinion on the overall adequacy and effectiveness of the organisation’s
framework of governance, risk management and control;
• prompt management to implement the agreed actions for change leading to
improvement in the control environment and performance; and
• provide a formal record of points arising from the audit and, where appropriate, of
agreements reached with management, together with appropriate timescales. 
Each report should include the scope and purpose of the audit to help the reader to
understand the extent, or limitations, of the assurance(s) provided by the report.  During
the course of the audit, key issues should be brought to the attention of the relevant
manager to enable them to take corrective action and to avoid surprises at the closure
stage.  Before issuing the final report, the internal auditor should normally discuss the
contents with the appropriate levels of management to confirm the factual accuracy, to
seek comments and to confirm the agreed management actions. A draft report is useful
for this purpose.  Recommendations should be prioritised according to risk. The
recommendations and the resultant management action plans should be agreed prior to
the issue of the final report.  Any areas of disagreement between the internal auditor and
management that cannot be resolved by discussion should be recorded in the action
plan and the residual risk highlighted.  Those weaknesses giving rise to significant risks
that are not agreed should be brought to the attention of a more senior level of
management and the board. 
As set out in the PSIAS, the CAE must deliver an annual internal audit opinion and report
that can be used by the organisation to inform its annual governance statement. This
must include the annual internal audit opinion concluding on the overall adequacy and
effectiveness of the organisation’s governance, risk and control framework, a summary
of the audit work from which the opinion is derived (including reliance placed on work by
other assurance bodies); and a statement of conformance with the PSIAS and the
results of the internal audit QAIP. 
7.5.1 The Internal Audit service prepares draft reports which include details of the objectives
and scope of the audit, an audit opinion, recommendations which include a risk rating
against each recommendation. Reports are reviewed by either the Chief Auditor or the
Assistant Chief Auditor before being issued. 
Page 62 of 144

Page 63

12 
7.5.2 Prior to the issue of the draft report, exit meetings are held with operational staff within
the service to confirm the factual accuracy of the findings and to ensure
recommendations made are feasible.  Draft reports are the issued to the client service
management who are given one month to respond to confirm the factual accuracy,
provide any comments on the report and provide management responses including
responsible officers and implementation dates for agreed actions. Final reports are
issued to the appropriate service Director and Head of Service, and other relevant
officers are required. A Report Issue Process is in place which lists the relevant officers
who should receive copies of final reports. A Summary of Internal Audit Reports issued
is submitted to the Audit, Risk and Scrutiny Board on a quarterly basis. This report
provides Members with a summary of the findings and conclusions of completed audit
engagements.  The report includes a Committee Summary for each assignment which
details the audit objectives and scope, the key audit assurances and risks, the overall
audit opinion and the management commentary. 
7.5.3 An Internal Audit Annual Report including the Annual Assurance Statement is presented
to the Audit, Risk and Scrutiny Board and includes details of the individual audit
assignments undertaken during the year which contributes to the opinion presented in
the report. 
7.5.4 All Stakeholder’s who complete a questionnaire agreed that Internal Audit findings and
recommendations were valued by stakeholders and helped the Council achieve its
objectives. 
7.5.5 Renfrewshire Council’s Internal Audit Service fully conforms with Standard 2400 on
Communicating Results. 
7.6 2500 - Monitoring Progress 
The PSIAS place responsibility for monitoring progress with the CAE to ensure that
management actions have been effectively implemented or, if not, that senior
management have accepted the risk of not taking action.  The CAE must, therefore,
implement a follow-up process for ensuring the effective implementation of audit results
or ensuring senior management are aware of the consequences of not implementing an
action point and are prepared to accept the risk of such consequences occurring. The
results of this process should be communicated to the board.  The CAE should develop
escalation procedures for cases where agreed actions have not been effectively
implemented by the date agreed. These procedures should ensure that the risks of not
taking action have been understood and accepted at a sufficiently senior management
level. The effective involvement of the board in the follow-up process is critical to
ensuring that it works. The CAE should consider revising the internal audit opinion in
light of findings from the follow-up process.  The findings of follow-up reviews should
inform the planning of future audit work. 
7.6.1 The process for monitoring progress of internal audit recommendations is detailed within
the Internal Audit Manual. All recommendations are recorded in the Internal Audit
management system, Galileo and an annual exercise is undertaken to identify the 
actions status.  The results of this exercise and details of recommendations not yet
implemented are communicated to service Directors. The overall results of the exercise
along with the details of the critical recommendations not implemented by the due date
are reported to the Corporate Management Team and Members of the Audit, Risk and
Scrutiny Board by the Chief Auditor. 
7.6.2 The 2022-23 Annual Internal Audit Plan included an allocation of time for follow up
engagements. 
7.6.4 Renfrewshire Council’s Internal Audit Service fully conforms with Standard 2500 on
Monitoring Progress. 
Page 63 of 144

Page 64

13 
7.7 2600 - Communicating the Acceptance of Risks 
When the chief audit executive concludes that management has accepted a level of risk
that may be unacceptable to the organisation, they must discuss the matter with senior
management. If the chief audit executive determines that the matter has not been
resolved, they must communicate the matter to the board. It is not the responsibility of
the chief audit executive to resolve the risk. 
7.7.1 As detailed in the Audit Manual the Chief Auditor or Assistant Chief Auditor should be
notified by the Senior Auditor where management are willing to accept a level of risk. If
the Chief Auditor is of the opinion that this may be unacceptable to the organisation,
they will discuss the matter with the appropriate Service Director and any other
appropriate member of the Corporate Management Team.  If the Chief Auditor
determines the matter has not been resolved, the Chief Auditor will communicate the
matter to the Audit, Risk and Scrutiny Board. 
7.7.2 Renfrewshire Council’s Internal Audit Service fully conforms to the Standard on
Communicating the Acceptance of Risk. 
Cecilia McGhee 
Chief Internal Auditor
South Ayrshire Council 
April 2023
Page 64 of 144

Page 65

14 
APPENDIX A – SUMMARY OF ASSESSMENT 
REF PAGE
No. ASSESSMENT AREA
Fully
Conforms 
Generally
Conforms 
Partially
Conforms 
Does Not
Conform 
Section A  Mission of Internal Audit and Core Principles ✓   
Section B  Definition of Internal Auditing ✓   
Section C  Code of Ethics ✓   
Section D  ATTRIBUTE STANDARDS 
1000  Purpose, Authority and Responsibility ✓   
1100  Independence and Objectivity  ✓  
1200  Proficiency and Due Professional Care  ✓   
1300  Quality Assurance and Improvement Programme ✓   
Section E  PERFORMANCE STANDARDS 
2000  Managing the internal Audit Activity ✓   
2100  Nature of Work ✓   
2200  Engagement Planning ✓   
2300  Performing the Engagement ✓   
2400  Communicating Results ✓   
2500  Monitoring Progress ✓   
2600  Communicating the Acceptance of Risks ✓   
TOTALS   ☐ 
Page 65 of 144

Page 66

15 
APPENDIX B – EVIDENCE PACK
• The Internal Audit Charter 2021
• Internal Audit Manual
• Annual Internal Audit Plan 2022 -23
• Internal Audit Annual Report 2021-22
• Report Issue Protocol
• Annual Governance Statement
• Scheme of delegated functions
• Financial Regulations
• Financial Codes November 2018
• Defalcation Procedures
• Disciplinary Procedures
• Code of Conduct for all Renfrewshire Employees 2018
• Code of Conduct for Officers on acceptance of gifts and hospitality
• Data protection policy
• Information security policy
• Counter Fraud and Corruption Policy
• Expressing Concerns outwith line management (Whistleblowing)
• Board Report Guidance
• Audit, Risk and Scrutiny Board Agendas and Minutes and Internal Audit progress/update
board reports
• Recruitment policy
• Audit staff job descriptions and person specifications
• Other information reviewed included; standard templates used throughout the audit
process, audit working papers, reports and correspondence with audit clients in relation to
audit assignments. 
Page 66 of 144

Page 67

16 
APPENDIX C – STAKEHOLDER QUESTIONNAIRES
Stakeholder questionnaires were completed by the following key members of staff and Elected
Members:
• Alan Russell, Chief Executive
• Alastair Macarthur, Director of Finance and Resources
• Councillor Andrew Doig, Chair of Audit, Risk and Scrutiny Board 
• Councillor Kevin Montgomery, Vice Chair of Audit, Risk and Scrutiny Board 
Page 67 of 144

Page 68

17 
APPENDIX D – ACTION PLAN
No.  Para  Recommendation  Management Response  Responsible
Officer / Agreed
Completion Date 
1 6.1.3
The Internal Audit Charter should be updated to include
the definition of consulting activities and, once
approved by the Audit, Risk and Scrutiny Board, the
updated Charter should be shared with the Corporate
Management Team.
The Internal Audit Charter has now been updated to
include the definition of consulting activities. The
updated charter will be presented to the CMT on 2 May
2023 and to the ARSB on 22 May 2023.
Chief Auditor 
May 2023
2 6.2.7
A performance appraisal is completed for the Chief
Auditor. The appraisal should include feedback from at
least the Chief Executive and the Chair of the Audit,
Risk and Scrutiny Board and should be countersigned
by an independent party.  
The corporate framework for performance appraisal is
currently being reviewed and future appraisals will be
conducted following any revised methodology. In the
meantime, a review of the current objectives and
personal development plan will be undertaken by the
Director of Finance and Resources and feedback will be
sought from the Chief Executive and the Chair of the
ARSB.
Chief Auditor and
Director of Finance
& Resources 
March 2024
3 6.2.7
The Internal Audit Annual report should include explicit
confirmation that there have been no significant threats
to the independence of the internal audit activity, such
as inappropriate scope or resource limitations.. 
The Annual Report for 2022/23 includes a statement that
there have been no threats to the independence of
Internal Audit and that the section has been adequately
resourced. The Annual Report will be presented to the
CMT on 2 May 2023 and to the ARSB on 22 May 2023.
Chief Auditor 
May 2023
4 6.3.6
The competency framework should be reissued to the
audit team in 2023/24 and every two years thereafter.
Further risk based auditing training is planned for the
forthcoming months, thereafter, the competency
framework will be issued to the team for completion and
individual personal development plans will follow. This
process will resume to be completed every two years
Assistant Chief
Auditor 
March 2024
5 7.1.6
Six monthly update meetings with services Senior
Managers should commence in 2023 as planned.
Meetings will be arranged with all Senior Management
Teams on a 6 monthly basis. It is planned that the
meetings will be August and February each year.
Chief Auditor 
August 2023 
Page 68 of 144

Page 69

18 
6 7.3.5
Consideration should be given to including the risks
relevant to the audit assignment within the engagement
plans.
As stated previously further risk based auditing training
is planned and thereafter risks will be included on
engagement plans.
Chief Auditor 
March 2024
7 7.4.5
A data cleansing exercise on the files within Galileo
should be undertaken to ensure the Internal Audit
service is complying with the Council’s Records
Management Policy and the Internal Audit Retention
Schedule
A data cleansing exercise will be undertaken to ensure
that Internal Audit complies with the Council and Section
Retention Schedules.
Chief Auditor 
December 2023 
Critical 
Significant 
Routine 
Page 69 of 144

Page 70

Page 70 of 144

Page 71

___________________________________________________________________
To: Audit, Risk and Scrutiny Board
On: 22 May 2022
___________________________________________________________________
Report by: Chief Auditor
___________________________________________________________________
Heading: Internal Audit Charter
___________________________________________________________________
1. Summary
1.1 The Internal Audit Charter was last updated in August 2021.   
1.2 This report presents a revised Internal Audit Charter (Appendix 1) that has been
updated to take account of the recommendation arising from our External
Quality Assessment to include the definition of consulting activities. 
1.3 The revised reporting arrangements agreed with Scotland Excel, whereby
Internal Audit now reports to the Executive Sub-Committee rather than the Joint
Board has also been reflected. 
1.3 No other changes are required to the Internal Audit Charter at this time. 
___________________________________________________________________ 
2. Recommendations
2.1 Members are asked to approve the revised Internal Audit Charter. 
___________________________________________________________________
Implications of the Report
1. Financial - None 
2. HR & Organisational Development – None
Item 5
ARS 22/5/23 Page 71 of 144

Page 72

3. Community Planning – Safer and Stronger - effective internal audit
is an important element of good corporate governance. 
4. Legal - None 
5. Property/Assets - None 
6. Information Technology - None 
7.  Equality & Human Rights - None 
8. Health & Safety – None
9. Procurement - None 
10.  Risk - Conformance with the PSIAS mitigates the risk of the Internal
Audit Service being ineffective. 
11. Privacy Impact – None 
12. COSLA Implications – None 
13. Climate Risk - None 
________________________________________________________________
Author:           Andrea McMahon 
Page 72 of 144

Page 73

INTERNAL AUDIT CHARTER 
1
INTRODUCTION:
Internal Audit is an independent and objective assurance and consulting activity designed to add
value and improve the operations of Renfrewshire Council. It assists Renfrewshire Council in
accomplishing its objectives by bringing a systematic and disciplined approach to evaluate and
improve the effectiveness of the organisation's risk management, control, and governance
processes. 
MISSION:
To enhance and protect organisational value by providing risk-based and objective assurance,
advice and insight. 
DEFINITION OF ROLES:
The Public Sector Internal Audit Standards require that the Internal Audit Charter defines the
terms ‘board’, ‘senior management’ and ‘Chief Audit Executive’ in relation to the work of Internal
Audit. For the purposes of the Internal Audit work function at Renfrewshire Council: 
• the ‘board’ refers to the Audit, Risk and Scrutiny Board which has delegated responsibility
for overseeing the work of Internal Audit; 
• ‘senior management’ is defined as the Council’s Corporate Management Team, all audit
reports are issued to a member of the CMT; and 
• ‘Chief Audit Executive’ refers to the Chief Auditor. 
PROFESSIONALISM:
Renfrewshire Council’s Internal Audit service will comply with the PSIAS which encompasses
the mandatory elements of the Institute of Internal Auditors (IIA) International Professional
Practices Framework (IPPF), including the Definition of Internal Auditing, the Core Principles for
the Professional Practice of Internal Audit, the Code of Ethics, and the International Standards
for the Professional Practice of Internal Auditing (Standards). This mandatory guidance
constitutes the principles of the fundamental requirements for the professional practice of
internal auditing in the public sector and for evaluating the effectiveness of the internal audit
activity’s performance. 
The internal audit service will adhere to Renfrewshire Council’s relevant policies and procedures
and the internal audit manual which sets out the internal audit activity’s standard operating
procedures. 
Page 73 of 144

Page 74

2 
A programme of Continuous Professional Development (CPD) is maintained for all staff working
on audit engagements to ensure that auditors maintain and enhance their knowledge, skills and
audit competencies. 
AUTHORITY:
The authority of Internal Audit is set out in the Council’s Financial Regulations and Codes.
Internal Audit will safeguard all information obtained in the carrying out of its duties and will only
use it for the purposes of an audit, investigation, or consultancy work. Internal Audit has
authorised full, free, and unrestricted access to any and all of Renfrewshire Council’s records,
physical properties, and personnel pertinent to carrying out any engagement. Internal Audit will
make no disclosure of any information held unless this is authorised or there is a legal or
professional requirement to do so. All employees are requested to assist the internal audit
activity in fulfilling its roles and responsibilities. The internal audit activity will also have free and
unrestricted access to the Board. 
ORGANISATION:
The Chief Auditor will report functionally to the Board and administratively (i.e. day to day
operations) to the Director of Finance and Resources. The Chief Auditor will communicate and
interact directly with the Board, including in Board meetings and between Board meetings as
appropriate. The Chief Auditor may report direct to the Chief Executive, Board members or the
Council regarding any matters of concern that could place the Council in a position where the
risks it faces are unacceptable or the independence of Internal Audit is under threat. 
INDEPENDENCE AND OBJECTIVITY:
Internal Audit is an independent review activity. In conducting its activities, Internal Audit activity
will remain free from any undue influence or other pressure affecting its actions and reporting.
This includes matters of audit selection, scope, procedures, frequency, timing, or report content. 
Internal Audit is not a substitute for effective control exercised by management as part of their
responsibilities. It is the responsibility of the Council’s managers to ensure that the management
of the areas under their control is adequate and effective and that their services have a sound
system of internal control which facilitates the effective exercise of the organisation’s functions
and which includes arrangements for the management of risk.   
Internal auditors will have no direct operational responsibility or authority over any of the activities
audited. Where the Chief Auditor has responsibility for operational activities the periodic review
of these activities will be conducted by parties independent of the Internal Audit function. 
Internal auditors must exhibit the highest level of professional objectivity in gathering, evaluating,
and communicating information about the activity or process being examined. Internal auditors
must make a balanced assessment of all the relevant circumstances and not be unduly
influenced by their own interests or by others in forming judgments. 
The Chief Auditor will confirm to the board, at least annually, the organisational independence
of the internal audit activity. 
Page 74 of 144

Page 75

3 
RESPONSIBILITY:
The Council’s Internal Audit Service adds value to the Council by providing objective and
relevant assurance, and contributing to the effectiveness and efficiency of governance, risk
management and control processes. 
The scope of internal auditing encompasses, but is not limited to, the examination and evaluation
of the adequacy and effectiveness of the organisation's governance, risk management, and
internal control processes as well as the quality of performance in carrying out assigned
responsibilities to achieve the organisation’s stated goals and objectives. This includes:
• Independent review and appraisal of the control environment throughout the organisation.
• Providing assurance to management and the Board that the established systems ensure
compliance with those policies, plans, procedures, laws, and regulations which could
have a significant impact on the organisation. 
• Evaluating the means of safeguarding assets and, as appropriate, verifying the existence
of such assets. 
• Evaluating the effectiveness and efficiency with which resources are employed. 
• Evaluating operations or projects to ascertain whether results are consistent with
established objectives and goals and whether the operations or projects are being carried
out as planned. 
• Evaluating the reliability and integrity of information and the means used to identify,
measure, classify, and report such information. 
• Supporting the Council to improve its internal control, governance and risk management
processes.
• Evaluating the extent to which risks have been identified and managed to achieve the
Council’s objectives.
• Working in partnership with external auditors and other review bodies to coordinate
activities with internal audit to avoid duplication and seek to rely on the work of these
other assurance providers where professional standards and the nature and quality of the
work they have undertaken would make it appropriate to do so.
• Undertaking consulting and advisory services related to governance, risk management
and control as appropriate for the organisation.
• Supporting the Chief Executive (Head of Paid Services), the Director of Finance and
Resources (Chief Financial Officer) and the Head of Corporate Governance (Monitoring
Officer) in the discharge of their statutory duties; 
• Encouraging a culture of personal and corporate responsibility and accountability through
the promotion of anti-fraud and corruption and ethical values. 
Page 75 of 144

Page 76

4 
• Having the right of access to examine the accounts and other financial records and data
of external organisations as set out in the conditions of funding or other agreement. 
• Investigating any suspicion of fraud, irregularity or corrupt practice in accordance with the
Council’s Defalcation procedures.
CONSULTANCY SERVICES 
The PSIAS defines consulting services as ‘Advisory and client related service activities, the
nature and scope of which are agreed with the client, are intended to add value and improve an
organisation’s governance, risk management and control processes without the internal auditor
assuming management responsibility. Examples include counsel, advice, facilitation and
training’. 
• Consultancy and advice services, may be undertaken from time to time at the request of
senior management. A provision is included in the annual audit plan for this type of work;
• when undertaking such work auditors will maintain their independence and objectivity and
will not take on management responsibility for the project; and 
• any significant consultancy assignments will be reported separately to the audit
committee. Any significant consulting exercise, not included in the annual audit plan, will
be approved by the Audit, Risk and Scrutiny Board. Significant is defined as any single
assignment equivalent to 5% of annual planned days.
INTERNAL AUDIT PLAN:
The authority for the production and execution of the audit plan rests with the Chief Auditor.  The
internal audit plan will be developed based on a prioritisation of the audit universe using a risk-
based methodology, including input of senior management and the Board. At least annually, the
Chief Auditor will submit to senior management and the Board an internal audit plan for review
and approval. The internal audit plan will consist of a work schedule as well as resource
requirements for the next financial year. 
The Chief Auditor will communicate the impact of any resource limitations and any significant
deviation from the approved internal audit plan will be communicated to senior management and
the Board through periodic performance reports. 
REPORTING AND MONITORING:
A written report will be prepared and issued by the Chief Auditor or designee following the
conclusion of each internal audit engagement and will be distributed as appropriate. The results
of each internal audit engagement will also be communicated to senior management and the
Board. 
The internal audit report may include management’s response and corrective action taken or to
be taken in regard to the specific findings and recommendations. Management's response,
whether included within the original audit report or provided thereafter by management of the
audited area should include a timetable for anticipated completion of action to be taken and an
explanation for any corrective action that will not be implemented. 
Page 76 of 144

Page 77

5 
The internal audit activity will be responsible for appropriate follow-up on engagement findings
and recommendations. 
PERIODIC ASSESSMENT:
The Chief Auditor will at least annually, report to senior management and the Board on the
internal audit activity’s purpose, authority, and responsibility, as well as performance relative to
its plan. Annual reporting will also provide an annual audit opinion on the overall adequacy and
effectiveness of the Council’s internal control environment, and include details of any significant
risk exposures and control issues, including fraud risks, governance issues, and other matters
needed or requested by senior management and the Board. 
In addition, the Chief Auditor will communicate to senior management and the Board on the
internal audit activity’s quality assurance and improvement programme, including results of
internal assessments and external assessments conducted at least every five years. 
PROVISION OF SERVICES TO ASSOCIATE/OTHER BODIES:
The Chief Auditor provides internal audit services to various associate bodies and the principles
of this Audit Charter apply to those associate bodies by means of a service level agreement
between the Council and the body: 
Associate Body Defined ‘Board’ Defined “Senior Management”
Renfrewshire Valuation
Joint Board
Joint Board Assessor and Electoral
Registration Officer
Renfrewshire Leisure Ltd Board of Directors Chief Executive
Scotland Excel Executive Sub-
Committee
Director
Glasgow and Clyde Valley
Strategic Development
Planning Authority
Joint Committee Strategic Development Plan
Manager 
The Chief Auditor is the appointed internal auditor for the Renfrewshire Health and Social Care
Integration Joint Board. Services are provided under the Internal Audit Charter for that Board. 
The Chief Auditor may provide internal audit services to other organisations, on a commercial
basis, if this is in the interests of Renfrewshire Council. 
APPROVAL 
The Internal Audit Charter will be approved by the Board and shall be subject to regular review
by the Chief Auditor in consultation with senior management. 
Effective date 22 May 2023 
Page 77 of 144

Page 78

Page 78 of 144

Page 79

Page 2 of 3 
___________________________________________________________________ 
To:  Audit, Risk and Scrutiny Board  
On: 22 May 2023
___________________________________________________________________ 
Report by: Director of Finance and Resources
___________________________________________________________________ 
Heading: Risk Management Annual Report 2022/2023
___________________________________________________________________ 
1. Summary 
1.1 
1.2 
1.3 
This paper presents the Risk Management Annual Report for
2022/2023 (Appendix 1). The Report describes the corporate risk
management activity that has taken place during 2022/2023 in relation
to the council’s risk management arrangements and strategic risk
management objectives.  It is not the purpose of this paper to report on
the management of specific risks as such information is already
provided separately to the Board in the Risk Report, May 2023 paper. 
In exceptionally challenging times and with diminishing resources, the
council continues to apply an appropriate level of risk management to
prevent or mitigate the effects of loss or harm. In doing so, we
recognise that good risk management contributes to the delivery of
better financial outcomes, business objectives, better project success
rates, achievement of targets and fewer unexpected problems. 
We purposefully promote an environment that is risk ‘aware’ rather than
risk ‘averse’ and strive to place risk management information at the
heart of the key decisions that we make. This means that we can take
an effective approach to managing risk in a way that both addresses
our significant challenges and enables innovation.
___________________________________________________________________ 
2. Recommendations 
2.1  It is recommended that the Board considers the content of the Annual
Report and notes the significant contribution that it makes with regards
to the council’s corporate governance arrangements. 
___________________________________________________________________
Item 6
ARS 22/5/23 Page 79 of 144

Page 80

Page 3 of 3 
3.  Background 
3.1  In keeping with the ‘Scheme of Delegated Functions’ a Risk
Management Annual Report is provided to the Audit, Risk and Scrutiny
Board each year for consideration.  The report supports the council’s
code of corporate governance and seeks to provide assurance to
stakeholders (internal and external) concerning the risk management
arrangements applied during 2022/2023.
_________________________________________________________________ __ 
Implications of the report
1. Financial – not relevant to report recommendations 
2. HR & Organisational Development – not relevant to report recommendations 
3. Community/Council Planning – effective risk management supports the delivery of all
community/ council plan outcomes 
4. Legal – not relevant to report recommendations 
5. Property/Assets – not relevant to report recommendations 
6. Information Technology – not relevant to report recommendations 
7. Equality & Human Rights – not relevant to report recommendations 
8. Health & Safety – not relevant to report recommendations 
9. Procurement – not relevant to report recommendations 
10. Risk – as per the subject matter of this report 
11. Privacy Impact – not relevant to report recommendations 
12. Cosla Policy Position – not relevant to report recommendations 
13. Climate Risk – not relevant to report recommendations 
___________________________________________________________________ 
List of Background Papers 
(a) Non applicable – reports provided on a year-by-year basis 
___________________________________________________________________ 
Author:           Karen Locke  
Risk Manager  
07506 957 037  
Karen.Locke@renfrewshire.gov.uk 
Page 80 of 144

Page 81

Document Title: Risk Management Annual Report 2022/2023
Service: N/A Lead Author Risk Manager and the Corporate Risk Management Group
Date Effective: 22 May 2023 Review Dates: Not applicable 
Appendix 1 
Risk Management Annual Report 
2022 - 2023 

Page 81 of 144

Page 82

Document Title: Risk Management Annual Report 2022/2023
Service: N/A Lead Author Risk Manager and the Corporate Risk Management Group
Date Effective: 22 May 2023 Review Dates: Not applicable 
CONTENT   
1. Introduction ........................................................................................................................................... 1
2. Risk Management Framework 2022/23: Overview ............................................................................... 1
3. Risk Management Infrastructure/ Enablers ........................................................................................... 2
4. Risk Management Process ..................................................................................................................... 3
5. Risk Management Application/ Results ................................................................................................. 4
6. Reporting and Monitoring ..................................................................................................................... 4
7. Risk Management Function/ Training and Development ...................................................................... 5
8. Conclusion ............................................................................................................................................. 5   
Page 82 of 144

Page 83

1
Document Title: Risk Management Annual Report 2022/2023
Service: N/A Lead Author Risk Manager and the Corporate Risk Management Group
Date Effective: 22 May 2023 Review Dates: Not applicable 
1. Introduction 
1.1 The Risk Management Annual Report is provided to the Audit, Risk and Scrutiny Board each year in keeping with its
delegated function of considering the corporate risk management annual report. The Report describes the corporate-
led risk management activity that has taken place during 2022/23 in relation to the council’s risk management
arrangements and strategic risk management objectives.  The Report does not cover the management of specific risks
as such information is already provided separately to the Board in the Risk Report, April 2023 paper. 
1.2 In exceptionally challenging times and with diminishing resources, the council continues to apply an appropriate level
of risk management to prevent or mitigate the effects of loss or harm. In doing so, we recognise that good risk
management contributes to the delivery of better financial outcomes, business objectives, better project success
rates, achievement of targets and fewer unexpected problems. 
1.3 We purposefully promote an environment that is risk ‘aware’ rather than risk ‘averse’ and strive to place risk
management information at the heart of the key decisions that we make. This means that we can take an effective
approach to managing risk in a way that both addresses our significant challenges and enables innovation. 
1.4 This annual report supports the council’s corporate governance arrangements and seeks to provide assurance to
stakeholders (internal and external) concerning the organisational risk management arrangements applied during
2022/23. 
2. Risk Management Framework 2022/23: Overview 
2.1 Below is an overview of the key components of the council’s risk management framework.  Thereafter sections 3 to
7 of this report expand on each component and highlight specific points relevant to 2022/23 developments. 
(1) Infrastructure/ enablers
At the heart of the council’s risk management arrangements are the strategic risk management objectives, the risk
management policy and strategy and the strategic risk management development plan. Also embedded within the
infrastructure are the communications systems in use for risk management information, the Intranet and the key
policy boards and groups such as the Corporate Management Team and Corporate Risk Management Group that
have a specific role in risk management.
(2) Process 
A cyclical process for risk assessment, treatment, communication, monitoring and review of risk using a standardised
risk matrix.  The process and supporting matrix continue to enable a consistent approach to risk management
throughout the council, set within the context of the council’s capacity and tolerance for risk, sometimes also
referred to as ‘risk appetite.’
(3) Application/ results
Risk management is not viewed as an isolated function or practice but is applied to other key business processes of
the council, including service planning, financial planning, performance management, procurement, project
management and partnerships. Applying risk management at the right time and in the right way is key to risk
management adding value to the organisation and delivering tangible results.
(4) Reporting and monitoring
Reporting and monitoring arrangements, including individual and group roles and responsibilities for risk
management, are defined in such a way as to ensure a suitable flow of risk management information throughout the
council and an appropriate level of monitoring and scrutiny relating to the effectiveness of the risk management
arrangements in place and progress being made in relation to activity linked to strategic and corporate risk registers
and service risk management plans.
(5) Risk management function
For the risk management framework to be effective, it must be underpinned by training, guidance and ongoing
development activity which raise awareness of how to implement good risk management practice across the council.
This aspect of the framework informs the workplan of the corporate risk management function under the
responsibility of the Director of Finance and Resources.
Page 83 of 144

Page 84

2
Document Title: Risk Management Annual Report 2022/2023
Service: N/A Lead Author Risk Manager and the Corporate Risk Management Group
Date Effective: 22 May 2023 Review Dates: Not applicable 
3. Risk Management Infrastructure/ Enablers 
3.1 Risk Management Policy and Strategy 
In March 2021 ‘Risk Matters – the next level,’ the combined risk management policy and strategy was revised and
approved by the Audit, Risk and Scrutiny Board1.   
There have been no changes to the policy or strategy over the past year as our corporate risk management activity
has been focused on the development work required to implement and embed the various changes agreed by the
Board when approving Risk Matters in 2021. 
Risk Matters is due to come back to Board for formal approval again in November 2023. 
Strategic Risk Management Objectives 
The council bases its strategic risk
management objectives around the
former National Risk Management
Performance Assessment Model
developed by ALARM2. 
The strategic risk management objectives
remain relevant and continue to form the
basis of our Strategic Risk Management
Development Plan. 
3.2 Strategic Risk Management Development
Plan 
To support the implementation of “Risk
Matters – the next level” and the ongoing
development of risk management
practice within the council, a Strategic
Risk Management Development Plan (the Plan), is in place, outlining key actions that require to be completed over
the life cycle of Risk Matters. The Plan is accessible to all Corporate Risk Management Group members via the
Group’s MS Teams channel. 
As reported to Board in May 2021, the creation of the 2021 Plan was paused for several reasons including, but not
limited to, the significant tender exercise in 2021 to put in place all the council’s insurance policies. A new Plan was
therefore to be created for 2022/2024. 
The Group is pleased to report to Board on the progress of the two-year Plan as follows: 
YEAR 1, 2022-23 Key performance figure (year-end) - 100%, (30 of 30 actions) for 2022/23 complete (against an
85% in-year target) 
YEARS 1 and 2 combined, 2022-24 Key performance figure (2-yr end) - 79%, 30 of 38 actions for 2022/24
complete (against an 85% full plan target) 
Year 2, 2023/24, there are no current concerns regarding capacity to deliver on the planned actions. 
1 Risk Matters is reviewed formally every two years by Board with an interim annual review conducted by the Corporate Risk
Management Group.
2 ‘ALARM’ is the public sector risk management association. The council’s Risk Manager is a Board Director of ALARM.
Page 84 of 144

Page 85

3
Document Title: Risk Management Annual Report 2022/2023
Service: N/A Lead Author Risk Manager and the Corporate Risk Management Group
Date Effective: 22 May 2023 Review Dates: Not applicable 
3.3 The Corporate Risk Management Group
The revised Risk Matters approved by Board in March 2021 brought in a new and refreshed role for the Corporate
Risk Management Group from April 2021 onwards. Making better use of technologies available, the Group’s
activities are now not so much driven by meeting schedules but rather, use MS Teams ‘channels’ more effectively,
enabling more dynamic conversations and activities in relation to risk management. Meetings do take place to check
that risk owners are updating their risks and key milestones are met, such as reporting to Board, and where joint
discussion and debate is required on corporate initiatives or on activities to support the Strategic Risk Management
Development Plan. 
New in 2022/23: The Corporate Risk Management Group has undertaken its first ‘control deep dive.’ Control
deep dive is a valuable exercise which involves detailed investigation of specific risk controls known to be in
place. The purpose of the deep dive exercise is to form a view on whether the risk is under controlled, well
controlled, or over controlled. The exercise undertaken in March focused on the council’s cyber security
arrangements (both technical and non-technical controls). The outputs have been finalised with a report going
to the Corporate Management Team in April 2023 with appropriate recommendations. 
3.4 The Intranet
The intranet continues to be a key tool for communicating and providing risk management information and guidance
to all staff with access to it. The Intranet risk management pages provide access to ‘Risk Matters’ and a range of
supporting guidance documents and templates and contact details for the risk management and insurance service. 
4. Risk Management Process 
4.1 The standardised process for risk management within the council remains fit for purpose. The table below
summarises the guidance which accompanies the process. Applying this process in all aspects of business helps
officers to manage their activities and pursue opportunities in a way that helps achieve objectives and prevent loss or
harm. 
Establish the
context
Services consider risk in terms of context such as key themes and objectives, service priorities,
operational activities or projects, longer-term or shorter-term objectives.
Identify risk  Services carefully define their risks in such a way as to be clear about the situation presented
(opportunity, activity, service change, problem or challenge) and the consequences that may flow
from it. We use risk ‘bowtie’ analysis which employees are finding very visual and helpful in
understanding risk.
Analyse risk  Services analyse risk in terms of likelihood of occurrence and should it occur, its potential impact
using the standardised risk matrix.
Evaluate risk  Services evaluate risk in terms of significance, being either ‘low’, ‘moderate’, ‘high’ or ‘very high’ and
compare this with the council’s capacity and tolerance for risk.
Treat risk  Services consider a range of options when deciding on the most appropriate way to address their
risks, either through measures to terminate; transfer elsewhere (such as through insurance); tolerate
as it is; or, treat with cost effective measures to reduce it to a level where the exposure is acceptable
or tolerable for the council in keeping with its capacity and tolerance for risk.
Note: in the case of opportunities, services may ‘take’ an informed risk in terms of tolerating it if an
opportunity is judged to be (1) worthwhile pursuing and (2) the service is confident in its ability to
achieve the benefits and justify the risk.
Monitor and
review risk
Services are aware that once a risk assessment has been undertaken it is necessary to continue to
monitor and review the risk for changes in context or the measures that are in place to control it.
Communicate
and consult
Services are aware that it is good practice for at least two officers with relevant subject knowledge to
undertake risk assessment (in consultation with other officers if necessary) with the key outcomes of
the risk assessment process communicated to relevant persons (such as using the risk implications
section on Board papers). 
4.2 A major achievement in 2022/23 relates to the new risk assurance model which saw ‘business as usual’ risks lifted out
of the risk management process above, with an alternative focus on risk assurance developed. (More on that at 5.5)
Page 85 of 144

Page 86

4
Document Title: Risk Management Annual Report 2022/2023
Service: N/A Lead Author Risk Manager and the Corporate Risk Management Group
Date Effective: 22 May 2023 Review Dates: Not applicable 
5. Risk Management Application/ Results
5.1 For risk management to truly add value for the organisation, it needs to be applied across the range of business
processes in operation throughout the council and all its service departments. This section provides an outline of
how this happens in practice across a range of business practices.
5.2 Risk management continued to be a key component of the council's programme and project management
arrangements meaning that if risks are proactively addressed through each stage of a project, the outcomes are
more likely to be achieved on time and within the planned budget.
5.3 Each service continues to monitor their risks and refresh them annually, taking account of the service priorities and
service improvement plans. This means that risks relating to the service priorities are proactively addressed and
services are more likely to achieve their priorities and outcomes as planned.
5.4 Each year, services bring to the attention of the Director of Finance and Resources any areas of unavoidable cost
pressures they are experiencing. During this process services can highlight instances where cost pressures relate to
risks, and this supports effective decisions to be made in financial planning. 
New in 2022/23: The Corporate Risk Management Group (in partnership with ICT and Business Analysis
colleagues and subject matter experts for ‘business as usual’ risks), completed the development work to support
better assurance around how these risks are handled. Short life working groups developed practical assurance
question sets for each area of risk, and the new model, now live, requires all Heads of Services to complete all 12
modules over the course of 2023/24. This means that audit and risk colleagues and subject matter experts will
be able to have a corporate view on the levels of assurance for each aspect of risk and this will be reported to
Board in due course. 
6. Reporting and Monitoring
6.1 The governance arrangements in place during 2022/23 have continued to ensure clear lines of accountability for risk
management and continue to enable a suitable flow of risk information throughout the council.  The Audit, Risk &
Scrutiny Board previously received a progress report on risk in November 2022.
6.2 Each service has a representative on the Corporate Risk Management Group (the Group).  The Group has overseen
the 2022/23 strategic and corporate risks, monitoring progress.  Services have taken ownership of their risks with
processes being followed for reporting, and where necessary ‘escalation’ of significant risks to the Group. All service
departments submitted their risk data on time for the progress reports to the Audit, Risk and Scrutiny Board as
planned.
6.3 The Corporate Risk Management Group has now updated how and when it meets and monitors risk in a way that is
more dynamic. 
▪ Risk pulse: 6-weekly MS Teams calls, touching base with each other and reporting in any important matters of
mutual interest and flagging any perceived emerging risk.
▪ Risk dives: twice yearly 'in person' half days (as per control deep dives described earlier at 3.3).
▪ Risk bites: meetings arranged on an ad hoc basis to check progress on aspects of risk management development
work.
6.4 In terms of monitoring performance in risk management the council historically participated in the ALARM/ CIPFA3
benchmarking club, using ALARM’s National Risk Management Performance Assessment Model. Although the
benchmarking club no longer exists the risk maturity model attached to it still does, describing maturity as:
▪ Level 1
Awareness
▪ Level 2
Happening
▪ Level 3
Working 
▪ Level 4
Embedded and integrated
▪ Level 5
Driving
The council aims for and is performing at level 4.
6.5 In relation to Key Performance Indicators for risk management, the set previously in place have now been set aside
on the basis that they have been superseded by the development work of the previous 2 years. New indicators will
require to be established towards the end of 2023/24 for implementation in 2024/25. 
3 Chartered Institute for Public Finance and Accountancy.
Page 86 of 144

Page 87

5
Document Title: Risk Management Annual Report 2022/2023
Service: N/A Lead Author Risk Manager and the Corporate Risk Management Group
Date Effective: 22 May 2023 Review Dates: Not applicable 
7. Risk Management Function/ Training and Development 
7.1 The council’s Risk Management Training Strategy ensures we are clear about the council’s expectations as to the
degree of risk management knowledge required across a range of roles within the council, and the risk management
training and development solutions that are available and should be accessed through the council to enable
competence and capacity to manage risk within those roles. Post covid, more training is delivered now online, either
via narrated slides or iLearn, which anyone can access at a time convenient to their own situation/ workloads, or even
bespoke sessions developed for colleagues interested in a specific aspect of risk.
7.2 Over the course of 2022/23 the following bespoke presentations, workshops or training-related activities were
delivered:
▪ Risk and contingency event for the local government election
▪ Health and social care integration: risk practitioner perspective
▪ Risk session for health and social care partnership ‘leadership network’
▪ Contract risk and insurance training for Scotland Excel
▪ Risk management workshop for Renfrewshire Valuation Joint Board
▪ Risk management training for OneRen directors x 2 sessions
▪ Risk management training for council employees doing their university business management courses x 2 sessions
▪ Risk management training for Audit, Risk and Scrutiny Board members
▪ Risk ‘deep dive’ method development and facilitation
7.3 Ad hoc support, advice or training requests continue to be met so far as reasonably practical.
7.4 To continue to provide evidenced based training, development and advice for the council, the council’s Risk Manager
maintains continued professional development in her field and is qualified to Masters Level (MSc in Risk Management
awarded by Glasgow Caledonian University).
7.5 Through membership of a number of groups that include ALARM (the Public Risk Management Association), and the
ALARM Scotland Group, the Risk Manager keeps abreast of risk management developments and best practice in
other public-sector organisations and local authority areas. The Risk Manager now sits on the ALARM Board and is
presently serving as President-Elect (shadowing the President for 2 years). This role means greater development
opportunities that in turn serve the council well.
7.6 Through the council’s contracts with Insurers and Insurance Brokers, the Risk and Insurance Team keep up to date
with developments in the insurance sector in order to ensure that the council’s insurance interests and liabilities are
protected so far as possible. 
8. Conclusion
8.1 This Report has provided an overview of risk management arrangements and activity relating to 2022/23 in regard to
the council’s corporate-led risk management approach.  It is intended that the report provides assurance to the
Board. 
Page 87 of 144

Page 88

Page 88 of 144

Page 89

___________________________________________________________________
To: Audit, Risk and Scrutiny Board
On: 22 May 2023
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Risk Report, May 2023
___________________________________________________________________
1. Summary
1.1 Each year the Board considers and approves the council’s risks.
1.2 This paper sets out the latest position in managing the council’s risks, as we have
entered the new financial year. The appendices attached provide details of:
• 1: longer-term or imminent strategic risks (from April 2023)
• 2: longer-term significant corporate risks (from April 2023)
• 3: significant service risks (note nil entry and explanatory note)
• 4: the list of ‘business as usual’ risks (ongoing)
________________________________________________________________________________ 
2. Recommendations
2.1 It is recommended that the Board approves the report, agreeing with the risks
identified.
_________________________________________________________
3. Background
3.1 The key areas of risk previously reported to the Audit, Risk & Scrutiny Board in
November 2022 were: 
Strategic Risks:
Very High-Risk Economy  
Very High-Risk Unemployment 
Very High-Risk Reducing inequalities 
High Risk  Climate, sustainability &
adaptability 
Corporate Risks:
Very High-Risk Financial sustainability
Very High-Risk Financial stability 
High-Risk Cyber attack
High Risk Regulatory services/ statutory activities  
High Risk Commercial vehicle & operator’s license 
High Risk Tree Fall and Ash Dieback 
High Risk Asset Management    
Item 7
ARS 22/5/23 Page 89 of 144

Page 90

3.2 The strategic and corporate risk profile for the council in terms of its longer-term or
imminent risks was as shown by the matrix below: 
Evaluation: Low Moderate High Very High Total
LT or Imm Strategic Risks: 00 00 01 03 04
LT or Imm Corporate Risks: 00 00 05 02 07 
3.3 Risks are evaluated using the Council’s adopted risk matrix; this involves multiplying
the likelihood of a risk occurring by its potential impact. Risks are then evaluated as
either ‘low’ (green), ‘moderate’ (yellow), ‘high’ (amber) or ‘very high’ (red). 
3.4 It was noted that when service departments had reviewed their top ‘significant’
operational risks (i.e., those evaluated as high or very high) all reported that any
such risks were already captured by some strategic and/ or corporate risks. 
3.5 The Corporate Risk Management Group has again reviewed the risk profile on
behalf of the Corporate Management Team and the current information is now
presented to Board, setting out the key risks as we have entered the 2023-24
financial year. 
3.6 Movement in risk profile since the previous risk report to Board in November 2022: 
• Risks removed/ de-escalated 
Unemployment – this strategic risk had previously been a very high one for the
council, but with targeted activities (including job creation programmes and
demand led interventions, focus on youth unemployment, working with schools
to better prepare pupils for employment, community benefit clauses embedded
in procurement activities, enhanced and expanded employability services, and
focused partnership working to ensure no-one is left behind), Renfrewshire is
now seeing high levels of employment locally. Acknowledging however that
there is no room for complacency, we ensure that going forward, employment,
unemployment and low-paid employment matters will continue to feature in the
wider ‘economy’ risk. 
• Risks remaining, with scoring/ evaluation changed
Nil report for this section. 
• Risks added/ escalated from service/s to strategic or corporate
Nil report for this section. 
• Risks added/ escalated from 'business as usual’ to strategic or corporate
Nil report for this section. 
3.7 With paragraph 3.6 in mind, the risk profile is therefore now as follows: 
Evaluation: Low Moderate High Very High Total
LT or Imm Strategic Risks: 00 00 01 02 03
LT or Imm Corporate Risks: 00 00 05 02 07  
Page 90 of 144

Page 91

3.8 Most services report that any significant service risks are already captured by the
above risks with further (less significant) service risks being embedded in their
service improvement processes. Following the recent organisation structural
changes however, Environment, Housing and Infrastructure Services will be fully
reviewing their risk profile to determine if any new significant risks should be
captured going forward. 
3.9 Horizon Scanning 
While not necessarily included on risk registers, there are always matters that the
Corporate Risk Management Group will keep a watching brief on. Of particular help
in this, is the Global Risks Report – a survey produced annually by the World
Economic Forum in partnership with Marsh McLennan and Zurich Insurance Group.
It is worth noting that the report highlights that the cost-of-living crisis dominates
global risks in the next two years, while climate action failure dominates the next
decade. Both aspects feature in our local risk reporting. 
3.10 Appendix 1 provides the detail for 3 longer-term or imminent strategic risks.
Appendix 2 provides the detail for 7 longer-term or imminent corporate risks. 
Appendix 3 confirms a nil report for significant service risks (over and above
service-led risks already in appendices 1 and 2). 
Appendix 4 outlines our ‘business as usual’ risk areas 1 
3.11 The strategic and corporate risks are now aligned with the council plan themes that
were approved in 2022. 
1 For ‘business as usual’ risks, the council takes a different approach. BAU risks are defined as those not
generally related to corporate priorities or ambitions but rather are inherent by nature of our type of
organisation. Essentially these are risks we have no option but to live with and manage and monitor.
Strategic Risks:
Very High-Risk Economy  
Very High-Risk Reducing inequalities 
High Risk  Climate, sustainability &
adaptability 
Corporate Risks:
Very High-Risk Financial sustainability
Very High-Risk Financial stability 
High-Risk Cyber attack
High Risk Regulatory services/ statutory activities  
High Risk Commercial vehicle & operator’s license 
High Risk Tree Fall and Ash Dieback 
High Risk Asset Management    
Page 91 of 144

Page 92

__________________________________________________________________
Implications of the Report
1. Financial 
Recurring costs associated with the measures in place for each risk are considered
proportionate to the level of risk, and new planned actions are also considered to be
cost effective. 
The financial requirements to support the risks should be met within the budget of
each relevant risk owner, nevertheless, any unplanned and unbudgeted cost
pressures that arise in relation to any of the risks identified will be subject to review
in consultation with the Director of Finance and Resources. 
2. HR & Organisational Development – not relevant to report recommendations 
3. Community/Council Planning – effective risk management supports the delivery
of all community/ council plan outcomes 
4. Legal – not relevant to report recommendations 
5. Property/Assets – not relevant to report recommendations 
6. Information Technology – not relevant to report recommendations 
7. Equality & Human Rights – not relevant to report recommendations 
8. Health & Safety – not relevant to report recommendations 
9. Procurement – not relevant to report recommendations 
10. Risk – as per the subject matter of this report 
11. Privacy Impact – not relevant to report recommendations 
12. Cosla Policy Position – not relevant to report recommendations 
13. Climate Risk – not relevant to report recommendations
_________________________________________________________
Author:           Karen Locke, Risk Manager 
Tel: 07506 957 037, Email: Karen.Locke@renfrewshire.gov.uk 
Page 92 of 144

Page 93

4 | P a g e
Appendix 1: Strategic Risks, longer-term or imminent 
• ECONOMY – building an inclusive, green and resilient economy 
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
SRR.23.01.01 Economy Even before the COVID-19 crisis,
the Scottish economy was facing
several strategic challenges
including climate change, Brexit and
lower than average productivity.
Likewise, Renfrewshire’s economy
was facing challenges such as:
growing the working age
population; more closely aligning
the education and skills provision
with the needs of local employers;
and achieving a strong and inclusive
economy. 
The risk therefore is that significant
economic improvement and
upskilling of local workforce is
difficult to progress until the
current landscape improves and
our investment programmes are
completed
Head of
Economy and
Development 
Head of
Finance &
Procurement 
Programme
Director – City
Deal &
Infrastructure
(1) Economic Recovery Plan
(2) Capital investment such as
investment in housing and heritage
assets; supporting Scotland’s
prospectus for international
investment by identifying and
developing opportunities such as
AMIDS2 and supporting local
businesses seeking to export to new
markets
(3) Taking forward measures to counter
any education learning loss
(4) Developing skills interventions to
address the risks of unemployment,
in particular those in low-paid
employment, and parents.
(5) Support for local businesses to bid
for council contracts
(6) Support for local businesses to
become more carbon neutral
05 05 25
V.High The coronavirus pandemic has resulted in
significant challenges for economies across the
world. The UK and Scottish Governments invested
billions to support businesses through lockdowns
and furlough in order to keep businesses viable and
retain people in employment.
Renfrewshire’s economy has well established
strengths in transport (including Glasgow Airport),
retail (including Braehead), manufacturing
(including significant international exports) and
construction. All these sectors and their wider
supply chains have been impacted by the lockdown
restrictions which have reduced supply and led to
subdued demand for products and services. The
construction sector is currently experiencing
significant volatility in terms of labour, supply
chains, prices, and construction inflation. This
makes “building our way out of Covid” less
attractive, coupled with a connected surge in
construction claims and disputes.
Action Codes Actions Assigned To Date Status
CESIP22.01.02 Maximise funding for regeneration of Renfrewshire’s places through grant submissions to external sources including UK and
Scottish Governments.
The Regeneration and Place Team have successfully been able to secure and receive funding through various external sources. 
Between 21/22 and 25/26 we have been allocated £4.4m from the Place Based Investment Fund for capital regeneration
projects.
Between 22/23 and 24/25 we have received £1.5m in funding for capital and revenue regeneration spend from the Shared
Prosperity fund. 
Head of
Economy and
Development
31-Mar-
2023 
2 Advanced Manufacturing Innovation District
Page 93 of 144

Page 94

5 | P a g e
Have consistently been successful in RCGF funding applications.  Most recent successful application received £800k in funding for
the PACE theatre project.
Have recently secured £35k funding from Visit Scotland to develop a strategic Tourism Infrastructure Development Plan for Clyde
Muirshiel Regional Park.
Recently the team submitted applications to NLHF and HES in respect of a potential new heritage scheme in Johnstone and
Kilbarchan.
CESDP21 - 01 -
27
Monitor benefits of City Deal Projects, including AMIDS, Clyde Waterfront and Renfrew Riverside and City Region wide
employment programmes.
Community Benefits:
110 of 150 community benefits have been delivered to date. The remainder are on track/have been re-baselined to be
completed as part of the project lifespan.
Project Benefits:
Project is developing at pace with all expected benefits in terms of infrastructure, economy and wider regeneration on track.
Glasgow Airport Investment Area (GAIA)
Community Benefits:
70 out of 70 community benefits have been delivered.
Project Benefits:
Enabling infrastructure benefits of the GAIA project is now complete. The infrastructure in place has allowed the progression of
the AMIDS site to take place with key link road throughout and new connecting bridges opened.
Programme
Director - City
Deal and
Infrastructure
31-Mar-
2023 
CESDP21 - 01 -
13
Deliver on the ambitions of our town centre strategies and specifically working with partners to transform Paisley Town Centre
through the Paisley Town Centre Action Plan 2016-2026.
The transformation of Paisley on the back of the Action Plan has begun.  Goals such creating an international culture and heritage
destination and acting as a stimulus for property investment, development and re-use has already been realised.  There are a
number of significant regeneration projects currently under construction including the restoration of the Museum, Town Hall and
Arts Centre and the creation of a new Culture and Learning Hub in the High Street. 
The recent publication of the Paisley Vision document will also act as a further catalyst to inspire future development in and
around the town centre. 
The team are now looking at delivering refreshed strategies for other major settlements in Renfrewshire.  The first will be in
Johnstone, with further updates for Erskine, Linwood and Renfrew in the pipeline.
Chief
Economic and
Regeneration
Manager
31-Mar-
2023 
CESDP21 - 01 -
26
Work with partners to deliver the Advanced Manufacturing Innovation District – Scotland (AMIDS)
First two centres of employment are significantly progressed with occupation of the 1st now completed in Q4 2022 and the other
due in Q1 2023. Procurement of a joint venture partner for the remaining AMIDS site is nearing completion, with agreement
anticipated May 2023. A strategic Group has been established with key stakeholders informing progression of development. Key
enabling infrastructure is now complete together with new public realm space.
Programme
Director, City
Deal and
Infrastructure
31-Mar-
2023 
CESIP20 - 01 -
07
Participate fully in all aspects of the new National Manufacturing Institute Scotland (NMIS) Governance arrangements and
Medicine Manufacturing Innovation Centre (MMIC) delivery.
RC have strong links with NMIS and MMIC as they are represented on the NMIS One Scotland Collaboration Group and chair the
AMIDS Strategic Advisory Group with both organisations represented. CD&I team members work closely with both organisations
Programme
Director, City
Deal and
Infrastructure
31-Mar-
2023 
Page 94 of 144

Page 95

6 | P a g e
daily and continue to assist with the commissioning of their buildings. MMIC building is already operational with NMIS expected
to open in early 2023.
Work has progressed with the Strategic Advisory Group to ensure partnerships are in place and a collaborative approach is
allowing NMIS and MMIC to lead on engaging with sector specific organisation to hopefully progress to further occupation at the
AMIDS site.
A meeting is scheduled at the NMIS building in March to plan through full governance and programme management structures
for how all parties engage with each other.
CESIP22.02.01 Progressing the AMIDS South project to maintain the programme requirements of the UK Government Levelling Up Fund award.
Planning consent obtained (Jan 2023). Liaison with stakeholders and continuing development of detailed designs ongoing in
advance of construction tender issue during 2023. Dialogue with UK Government agencies continuing on all aspects including
delivery programme.
Programme
Director, City
Deal and
Infrastructure
31-Mar-
2023 
Page 95 of 144

Page 96

7 | P a g e
• PLACE - working together to enhance wellbeing across communities
• FAIR - nurturing bright, happy and healthy futures for all 
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
SRR.23.02.02 
Reducing inequalities in Renfrewshire
If we don’t have a
coordinated approach
to tackling inequalities
across Renfrewshire
(including for example,
the causes and
consequences of
poverty), this could
jeopardise the effort in
reducing both the
short-term impacts on
households but also
have wider long-term
consequences on
attainment and health
for people living on low
incomes. 
Head of
Policy &
Partnerships
(1) Fairer Renfrewshire Programme
(2) Attainment Challenge
(3) Strong partnership working (e.g.
Community Planning
Partnership (CPP). Advice
Partnership, Empowering
Communities Forum, Improving
Life Chances, CPP Board
(4) CPP have identified priorities
e.g. Alcohol and Drugs, Social
isolation etc.
(5) Social Renewal Plan has been
developed through a
programme of analysis,
research, and engagement.
(6) Neighbourhood hub model in
place to support local needs on
a partnership basis in response
to COVID 
05 05 25
V.High
The Council plays a key role in tackling inequalities and providing the
best possible services to our communities, particularly those who are
experiencing the poorest outcomes. As well as our focus on health and
wellbeing, we are also committed to support vulnerable individuals,
groups or communities through early intervention and prevention,
responding to poverty, supporting routes to employment as well as
dealing with welfare reforms. The impact of COVID-19 is likely to have
exacerbated existing inequalities in terms of for example educational
attainment, health, poverty and mental health. There will be a significant
focus on ensuring that people receive the economic and wellbeing
support that is needed, with a real opportunity to work in a different
way, and to tackle some of the existing inequalities across communities
as we do this. The current cost of living crisis impacts disproportionately
on particular groups in society.  In the short term, significant focus is on
supporting food insecurity and supporting people on low incomes to
maximise income and seek advice with income and debt management.
Action Codes Actions Assigned To Date Status
CESIP22.03.01 Develop the new Fairer Renfrewshire programme. 
The Fairer Renfrewshire Sub-Committee has been meeting since August 22 and a Fairer Renfrewshire Officers Group made up
of officers from across services is meeting monthly. Work with partners to develop the Fairer Renfrewshire Programme is
ongoing. There are four key emerging themes which are shared across all elements of the programme, and these are:
•Improving financial security 
•Advancing equality of opportunity 
•Building community capacity and resilience 
•Listening to lived experience 
Funding has been allocated from the Fairer Renfrewshire budget to a number of projects to support residents with immediate
Cost of Living increases. These include supports around food, fuel and advice. Work is also ongoing around digital access and
supporting residents to get online through the Citizen Voice group, with a new post of Digital Champion in libraries has been
recruited.
Strategic
Partnerships &
Inequalities
Manager
31-Mar-
2025 
Page 96 of 144

Page 97

8 | P a g e
Our Winter Connections programme was set up to support residents over the Winter 22/23 period, and has provided grants to
a number of organisations to run activities.  The development of a panel of people with lived experience of poverty to inform
the Council’s policy and practice is ongoing. A diverse panel has been recruited and have met formally six times, with test of
change being evaluated by Poverty Alliance.
In addition, officers are undertaking a ‘deep dive’ child poverty data exercise, to support the Local Child Poverty Action Plan as
well as the wider Fairer Renfrewshire programme
CESIP22.03.02 Develop and implement the action plan for the Trauma-Informed and Responsive Renfrewshire Programme.
A coordinator post has been created to lead this programme of work going forward, with the coordinator starting in late
October 2022. Further engagement with the Improvement Service and other local authorities has taken place through national
networks for trauma champions and trauma leads, and the steering group reconvened in March 2023 to further explore the
draft plan for the Programme. Leadership training for the Corporate Management Team was also undertaken in March 2023.
Head of Policy &
Partnerships
31-Mar-
2024 
CESIP22.03.03 Deliver the Stigma/Language Matters project.
The work of the Alcohol and Drugs Commission identified the need for partners to act robustly to eradicate stigma and
promote positive conversations around recovery. Although the initial focus for this initiative was focused on alcohol and drug
stigma, there is the opportunity to widen its scope to include other existing and emerging priorities, such as The Promise,
Tackling Poverty, Trauma Informed and Responsive Renfrewshire and Our Values for example. High level themes and initial
actions have been identified, including supporting staff to understand the power of language, be confident in their use of
language, and to challenge stigma by speaking up when people make negative or wrong comments; and supporting national
campaigns to help people in Renfrewshire understand the power and impact of language. A review of the resources required to
deliver this project is currently underway.
Head of Policy &
Partnerships
31-Mar
2024 
CESIP22.03.06 Develop and implement targeted interventions to supporting communities through the cost-of-living crisis, with a particular
focus on food and fuel insecurity 
The Community Food Fund has supported community food provision across Renfrewshire. Three allocations of funding have
been made to the Fuel Insecurity Pilot which continues to support fuel vouchers augmented with energy advice and the
increase in payment amount and continuation of the Financial Insecurity Winter Payment supports households who are
struggling to purchase essentials like food and fuel. In addition the Tackling Poverty programme continues to support an Energy
Adviser in the Energy Management Unit.
Strategic
Partnerships &
Inequalities
Manager
31-Mar-
2023 
CESIP22.03.09 Carry out an evaluation of the Tackling Poverty programme and develop a transition plan for mainstreaming this work.
Work commenced in Q2 and initial projects identified for evaluation. This work is ongoing with Programme Management Unit
support.
Strategic
Partnerships &
Inequalities
Manager
30-Sep-
2023 
Page 97 of 144

Page 98

9 | P a g e
• GREEN – leading Renfrewshire to Net Zero
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
SRR.23.03.03 
Climate, Sustainability &
Adaptability
The climate emergency
brings a risk to Council
and its communities in
relation to increased
extreme weather as well
as food insecurity. We
need to focus on
mitigation and
adaptation and ensure a
just transition so no one
is left behind and none is
disadvantaged in the
transition to net zero.
The Council would need
to take action and
support those most
disadvantaged. A key risk
is that the Council is not
in control of all of the
levers, and cannot
deliver everything
required in isolation, so
there is a risk that others
do not contribute
towards the 2030 target. 
Head of
Policy &
Partnerships 
Head of
Climate,
Public
Protection
and Roads 
Climate
Change
Working
Group
(1) The Council has used the Climate Change Assessment Tool – helps
public sector organisations in Scotland self-evaluate their performance
under the public sector duties of the Climate Change (Scotland) Act
2009 
(2) Renfrewshire’s Plan for Net Zero has specific objectives to reduce
emissions, and these are included in other key documents such as the
Council Plan 
(3) Implementation of the Corporate Asset Management Strategy ensures
that property assets are managed effectively and efficiently through
the provision of relevant management and performance information 
(4) The Energy Management Team: ensure energy management initiatives
are aligned to the capital investment programme and corporate asset
strategy to optimise use of property estate and reduce overall running
costs and energy consumption levels. Promote reductions in energy
usage and advise employees and residents about energy efficiency 
(5) Through the Procurement Unit, sustainability and community benefits
are considered in the development of all contract strategies
(6) Governance through the Planning & Climate Change Policy Board
(7) Launch of the Climate change action fund – to support a range of
initiatives/feasibility to test new ways of working and to be ready to
lever external funding
(8) Climate Panel / Partnership Forum to support engagement and ensure
all voices are heard, including traditionally underrepresented groups 
(9) Community Climate Fund – fund for community organisations to
enable behaviour change and local green projects to make our
communities more resilient
04 04 16
High
Renfrewshire Council declared a
Climate Emergency on 27 June
2019 and established a Climate
Change Sub-Committee, now
the Planning and Climate
Change Policy Board to lead on
this work.  The actions required
are potentially complex and
multi-faceted and need to be
supported by organisations
across all sectors, and in
partnership with local
communities. Actions include:
pledging to work proactively
with others towards a net zero
Renfrewshire by 2030, taking
into account both production
and consumption emissions;
and assisting communities to
become more resilient to the
impacts of global warming,
particularly to flooding and to
drought.
Action Codes New Actions Assigned To Date Status
CESIP22.04.01 Complete the District Heating Network at AMIDS, with supplies to NMIS and MMIC.
The district heating network is now complete and operational.
Programme Director, City Deal
and Infrastructure
31-Mar-
23 
CESIP22.04.02 Develop the first stage of Renfrewshire’s Plan for Net Zero 
The Plan for Net Zero was developed in partnership with other services, stakeholders and our citizens through
Renfrewshire’s Climate Panel. The Plan was approved by the Planning and Climate Change Policy Board on 23rd
August.
Strategy, Policy & Insight
Manager
31-Dec-
22 
Forward action linked to Net Zero plan: Climate change action to make Renfrewshire net zero - Renfrewshire Website   
Page 98 of 144

Page 99

10 | P a g e
Appendix 2: Corporate Risks, longer-term or imminent 
• LIVING our VALUES – making a difference together
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR23.04.04 
Financial Sustainability
If significant cost
pressures are not
successfully
planned for and
managed
effectively over the
medium to longer
term, this could
jeopardise the
financial
sustainability of the
council and result in
a significant impact
on availability and
quality of front-line
services and capital
investment
resources.
Decisions will then
be required on the
continuity or scope
of some services
currently offered.
Head of
Finance &
Procurement
(1) Revised medium- to long-term Financial Outlook reassessed the
various risks to the Council’s short, medium- and longer-term
financial sustainability. Refreshed report to Council on 2 March
2023 outlined the immediate financial concerns and plans to
address these, including R4R savings (see 3 below), financial
sustainability workstreams, and utilising flexibilities agreed by the
Scottish Government; however, as the position continues to
develop and evolve, close monitoring will be required to ensure
that the Council manages costs in the short term and fully
appreciates the longer term consequences of actions taken to
address short-term risks.  Committee reports of this nature cover a
wide range of current and future financial and economic factors
e.g., Strategic Economic and National Policy Context, Cost
Pressures, Pressures on Income and Mitigation Strategies to deal
with such uncertainties.
(2) A well-developed and embedded budget planning, budget setting
and budgetary control system is in place throughout the
organisation, and this informs members and officers regarding
financial performance and stability. This facilitates robust and
transparent decision making and incorporates an escalation process
with regards budget management issues which may arise. 
(3) In conjunction with the medium to longer term financial outlook
and the Council’s continued “Right for Renfrewshire (R4R)
Programme”, Renfrewshire Council has been pro-active in planning
for the future by identifying and agreeing a planned release of
resources. This is required to meet emerging budget pressures and
has been run in conjunction with the Council’s long-term debt
smoothing strategy to support the release of planned savings over a
number of years; however, the pandemic interrupted the planned
delivery of savings under RFR, so the full programme has been
reviewed. It remains the case that savings will continue to require
be generated at scale in order to ensure the ongoing financial
sustainability of the Council.
05 05 25
V.High
Financial recovery from global events 
- Rebuilding of financial resilience
following unprecedented costs and
loss of income incurred in responding
to the COVID-19 pandemic
- Anticipated reduced income from
NDR/CT over the medium term as full
economic implications of the
pandemic and cost-of-living crisis hit
local businesses and communities
- Pricing volatility and global supply
issues leading to shortage of labour
and materials following Brexit and the
outbreak of the Ukraine war
Best value report
- Recommendation in Best Value report
to prioritise how services need to be
provided in future to be funded from
within available resources.
Cost and Income pressures
- Future grant settlements and the
level of funding available.
- Implications of national economic
policy choices to protect certain
services from real-terms reductions in
funding such as the Police and NHS
- Future Local Government pay
settlements, and non-payroll inflation
- Demographics and demand
pressures, such as an ageing
population with increased associated
Page 99 of 144

Page 100

11 | P a g e
service demands, and increases in
demand for children’s social care
- Implications of welfare reform and
poverty levels, exacerbated by cost-
of-living crisis.
- Reductions in income from fee-
generating services such as car
parking; implications of the national
economic recovery and associated
risks/uncertainty in economic factors
e.g., interest rates and inflation.
- Implications of third party provider
financial stability, such as childcare
providers in current economic climate
- Liability for predecessor
organisations, in light of the removal
of the limitation period for historic
child abuse claims
(4) The Council approved a number of Financial Sustainability
Workstreams in June 2022. These are led by Directors and look to
progress recurring revenue savings.
(5) There is close financial monitoring of the agreed savings to ensure
that they are delivered within the agreed timescales or where this is
not possible, to understand and reschedule planned delivery to
achieve the associated objectives. Monitoring is undertaken via a
combination of financial and operational measures, actions and
related update reports.
(6) Regular updates and bespoke reports are provided to CMT and the
Council with regards the national fiscal position, likely
developments and the impact on the council through close liaison
with national groups e.g., CIPFA DoFs, COSLA and the Scottish
Government. This liaison remains critical in ensuring the Council is
aware of potential financial developments and is in a position to
influence these.
(7) Levels of and use of reserves has been a key tool in addressing the
costs of the pandemic, therefore the planned use of and rebuilding
of reserves in the medium term, and the Council’s Capital
Investment and Treasury Management Strategy, are key to ensuring
ongoing financial sustainability.
Other controls
(8) Reports and publications from Audit Scotland in relation to the
Local Government financial outlook, financial planning and related
developments and improvements are supplemented with a
Renfrewshire context report, with both reports being submitted to
the Council's Audit Risk and Scrutiny Board. 
(9) Utilisation and energy consumption has clarified priority areas for
investment in the Council’s estate and this has supported and
informed investment decisions and the formulation of the Council’s
Capital and Revenue budgets.
Action Codes Linked Actions Latest Note Assigned To Due Date Status
CRR22.05.05a  Strategic Property Review and new ways of working /
Review of local policy positions
Work on all of the financial sustainability
workstreams is being progressed with
updates regularly to Council. Agreed
budget changes will then be incorporated
into the General Fund base budget in
Director of Environment,
Housing and Infrastructure
30-Sep-2023 
CRR22.05.05b  Charging, fees and commercialisation / review of
Council risk
Director of Finance and
Resources
30-Sep-2023 
CRR22.05.05c  Strategic review of procurement  Chief Executive (Head of
Policy and Partnerships)
30-Sep-2023 
Page 100 of 144

Page 101

12 | P a g e
CRR22.05.05d  Connected Communities / Review of Management
grades and structures
future years to capture the recurring
savings. 
Due dates amended to 30 Sep 2023.
Chief Executive (Head of
Policy and Partnerships)
30-Sep-2023 
CRR22.05.05e  Digital Strategy Director of Finance and
Resources
30-Sep-2023 
CRR22.05.05f  Council Tax and Tax Policy Director of Finance and
Resources
30-Sep-2023 
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR23.04.05 
Financial Stability
If significant short-term
costs and income losses
are not closely
monitored and
understood, this could
destabilise the finances
of the Council to an
extent beyond the
financial resilience of the
Council, resulting in a
need for immediate cost
control measures, or
short-term savings which
have an immediate
impact on service
delivery.
Head of
Finance and
Procurement
(1) Revenue budget monitoring reports to Policy Boards focus on the forecast
year-end outturn position rather than the historic periodic position, so that
significant variances are reported early, and any mitigating steps can be
taken. This is already highlighting severe price pressures (such as energy
costs) across different services. The impact of pay inflation is also highlighted
through this reporting mechanism.
(2) Review of all Right for Renfrewshire programmes has been undertaken in
order to recalculate potential cost savings in-year and to reprofile agreed
savings, the delivery of which was interrupted by the pandemic
(3) Review of Financial Sustainability workstreams following approval of the
2023/24 Revenue Budget to ensure targets remain achievable
(4) Clear analysis of the Council’s reserves position and potential for
reprioritisation or redirection; including the development of plans to rebuild
financial resilience of the Council in the medium term
(5) Ongoing discussion with directors to understand the financial consequences
of the current economic climate for each service and how these will be
managed; 
(6) Review of capital plan and ongoing projects to ensure clear understanding of
phasing of potential spend.
05 05 25
V.High
Context: 
Imminent shorter-
term risk for
financial stability,
recognising the
immediate financial
situation of the
Council (note: the
medium to longer-
term financial
position is captured
under financial
‘sustainability’)
Action Codes Linked Actions Latest Note Assigned Due Date Status
CRR22.05.07a  Investigate potential of Service
Concession Flexibility allowed by
Scottish Government 
This exercise has now been completed and approved by Council through the
Revenue Estimates 2023/24 where annual recurring savings of £1.4m were
identified.
Head of
Finance and
Procurement
31-Oct-
2022 
CRR22.05.07b  Report to Council the financial impact
of utilising the service concession
flexibility
Complete – reported to Council in Financial Outlook in December 2022 and
Revenue Estimates report in March 2023
Director of
Finance and
Resources
31-Dec-
2022 
Page 101 of 144

Page 102

13 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR23.04.06 
Cyber Attack
While the council’s cyber
protections are robust, cyber-
attacks are becoming more and
more frequent and sophisticated,
and the council could be subject
to an attack such as that on SEPA,
with the risk of significant impact
on council service provision.
CMT For security reasons, controls are not
published in the public domain 
Note, this risk has been subject to a deep dive
exercise in March 2023. Recommendations are
with the CMT for approval.
04 04 16
High
Context: 
▪ Review of the council’s cyber
environment
▪ Ever increasing criminal cyber activity
▪ Increasing reliance on electronic
systems
Action Codes Linked Actions Latest Note Assigned To Due Date Status
As agreed by the Corporate Management Team   
Context  Risk Statement  Owned by  Current Controls  Likelihood  Impact  Evaluation 
CRR23.04.07
Impact on Regulatory
Services due to Covid-
19 and EU withdrawal. 
There is a risk,
due to the shifting
legislative
landscape and
rapidly increasing
demands on
Regulatory staff
arising from
COVID-19 and the
EU Exit on 1
January 2021 that
statutory duties
may not be able
to be fully met. 
Regulatory
Services continue
to function within
a post-pandemic
recovery phase. 
Head of
Climate,
Public
Protection
& Roads 
(1) Bedding in the new “grow your own” structure, to ensure a strong and
resilient workforce moving forward. This will also support the retention
of skilled and qualified employees within the service.  
(2) Working with REHIS, Society of Chief Environmental Health Officers for
Scotland and University West of Scotland, Renfrewshire Council been
mentoring a student from September 2021 as part of the first cohort of
new trainees under a new Environmental Health course. This will lead to
a larger number of EHOs to come through and replace an ageing
workforce.
(3) Three Fair Trading & Licensing Officers are passed Stage 1 of the Trading
Standards qualification process and are undergoing Stage 2.  This is a
long process, which takes a significant amount of staff resource to
support but can be undertaken in small, incremental stages, to ensure
service delivery as a priority.
(4) Wider staff being trained in functions to release EHO/TSO to focus on EU
withdrawal work at Glasgow Airport. 
(5) Discussions with Glasgow Airport to understand impacts of changes at
Glasgow Airport from EU withdrawal. 
(6) Discussions with DEFRA & Food Standards Scotland on Import/Exports
duties 
(7) Regular meetings with other appropriate bodies to understand
landscape for EU withdrawal and impacts on Renfrewshire.
03  05  15 
High 
Context:  
Increased demands
have been placed on
Regulatory Services
(Environmental Health
and Trading Standards)
due recovery post-
pandemic and EU
withdrawal. 
Resource and funding
will be required to
meet the current
demands and ensure
that statutory duties
are not impacted.
Action Codes Linked Actions Latest Note Assigned To Due Date Status
Ongoing monitoring   
Page 102 of 144

Page 103

14 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR23.04.08
Commercial vehicle and operator
licence compliance 
Renfrewshire Council
requires its fleet of
vehicles to be
effectively managed,
otherwise there could
be sustained impact in
several areas including
community care,
housing maintenance
and repairs, streetscene
operations and waste
collection. 
Head of
Operations
and 
Service
Development
Governance
(1) Training and Compliance Officer in post monitoring
compliance performance and linking to inspection activity 
(2) Monitoring and tracking of vehicle servicing
(3) Tachograph analysis system ensuring monitoring and
compliance of driving staff 
(4) Operator Licencing Awareness Training (OLAT) conducted
for all operational service managers
(5) Full compliance audit report focusing on Operator Licence
and Compliance completed in 2019 by Freight Transport
Association (FTA)
(6) Regular monitoring of Driver and Vehicle Standards
Agency (DVSA) updates and controls
(7) Quarterly attendance at Logistics UK (formerly FTA) and
APSE Transport boards
Operational
(8) Reduction in average age of Council Fleet
(9) Workshop equipment and tooling improvements
03 05 15
High
Context:  
The council’s vehicle fleet, managed
by Environment & Infrastructure
Services, comprises around 500
vehicles including heavy and large
goods vehicles, light vans and
cars.  The council implements a
range of measures to ensure
ongoing vehicle operator licence
compliance. 
Action Codes Linked Actions  Latest Note Assigned To Date Status
(Presently monitoring compliance until such times as the risk can be reduced.  We are currently recruiting for two compliance posts within the service) 
Page 103 of 144

Page 104

15 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR23.04.09
Asset Management
Effective governance
and management of
the council’s property
assets is essential,
otherwise there is a
significant risk of
harm, financial loss,
service disruption,
non-compliances,
fines, rising energy
costs and inability to
recover losses via
insurance proceeds
Director of
Environment,
Housing &
Infrastructure;
Director of
Finance &
Resources;
Head of
Economy &
Development
Services
Corporately:
Key responsibilities with regards to the
Estate span 2 specific service departments,
but they come together through a CAMIS
Development Group (Corporate Asset
Management Information System) which is
taking forward a workplan to more
effectively consolidate and oversee asset
management risk
Heads of Service:
Effective asset management in practice on
the frontline is included within the new Risk
Assurance model which went live on 1 April
2023.
03 05 15
High
Context:
GOVERNANCE – roles and responsibilities
- Estates (Leases – by and from the council, and
on behalf of HSCP)
- Facilities management (security, housekeeping,
statutory duties/ inspection, maintenance,
repair, building fire risk assessment)
- Property services (capital works, and CAMIS
development)
- All services (inspection inventories and
response, people elements of fire risk
assessment)
Action Codes Linked Actions  Latest Note Assigned To Due Status
CRR22.05.10a New CAMIS Development Group
to appoint Joint Chairs/ Heads of
Service
Head of Property Services and Head of Facilities Management Services have
agreed to co-chair the group
CAMIS Development
Group
30-Sep-
2022 
CRR22.05.10b Agree Terms of Reference for the
CAMIS Development Group
The Terms of Reference have been finalised. CAMIS Development
Group
15-Nov-
2022 
CRR22.05.10c Undertake gap analysis to
ascertain if any responsibilities in
terms of governance are missing
or unclear
Organisational changes agreed by Council have streamlined some
governance arrangements – specifically that Property Services are now part
of the Facilities & Property Services function in Environment, Housing &
Infrastructure Services. There is less scope therefore for unclear
responsibilities.
CAMIS Development
Group
19-Dec-
2022 
CRR22.05.10f Develop a workplan for the group
and prioritise areas of initial focus
Leads for initial priority activities have been agreed and a workplan is
progressing in line with the Group’s terms of reference. 
CAMIS Development
Group
28-Feb-
2023 
CRR22.05.10g Agree the workplan for 2023/24 Workplan and meeting schedules are in place, aligned to the Group’s terms
of reference
CAMIS Development
Group
31-Mar-
2023 
CRR22.05.10d Undertake gap analysis to identify
activities that take place outside
of the CAMIS environment and
consider if these can be brought
into CAMIS by way of system
development
Making good progress but more involved than initially thought. Issues
include future reference/ amendment to Scheme of Delegated Functions:
Delegations to Officers – Due date therefore amended to June 2023
CAMIS Development
Group
30-Jun-
2023 
CRR22.05.10e Explore data and status
monitoring
Making good progress but more involved than initially thought – Due date
therefore amended to June 2023
CAMIS Development
Group
30-Jun-
2023 
Page 104 of 144

Page 105

16 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR23.04.10
Tree Fall and Ash Die Back &
Larch Infection
Tree management in Renfrewshire has
historically been based around risk-based
response to any reporting of concerns,
however with the emergence of Ash Die
back in the UK there is now an increased
potential for:
- public injury and property damage;
- awards against the Council; and,
- reputational damage.
- Statutory notices
Head of Operations
and 
Service
Development
Responses to customer / public
complaints and enquiries
Reactive surveys 
Visual inspections
Statutory notices served –
(Forestry Scotland)
05 03 15
High
Context:
The main trigger for this risk a
significant outbreak of Ash
Dieback in the UK which will
results in a significant number
of trees within Renfrewshire
having to be felled
Action Codes Linked Actions Latest Note Assigned To Date Status
CRR22.05.11a Tree & woodland area formal
inspections 
Officers are undertaking a table-top Google assessment of Ash dieback -
this is still ongoing. Due date amended to 30 June 2023
Tree &
Woodland
Officer
30-June-
2023 
CRR22.05.11b Produce, disseminate and promote a
formalised Ash Dieback Action Plan
Looking to adapt Tree Council for Scotland’s Ash Die back plan.  This will
follow on from the desktop survey. Due date amended to 31 Dec 2023 
Tree &
Woodland
Officer
31-Dec-
2023 
CRR22.05.11c Further identify areas of larch trees and
schedule removal
2 Larch Infections fully dealt with felling circa 1300 trees.  Legal notice
received requiring a further felling of trees and due date amended
accordingly to 31 August 2023. 
Tree &
Woodland
Officer
31-Aug-
2023 
CRR22.05.11d Accurately record findings and seek
funding for replanting projects
Working with Clyde Climate Forrest and Trees for Cities.  In terms of
Larch Infections we have commenced some replating using resources
available. Due date amended to 31 Dec 2023 
Tree &
Woodland
Officer
31-Dec-
2023 
Page 105 of 144

Page 106

17 | P a g e
Appendix 3: Significant Service Risks 
Nil return, HOWEVER: 
Following the recent organisation structural changes, Environment, Housing and Infrastructure Services will be fully reviewing their risk profile to
determine if any new significant risks should be recorded in this section going forward. 
Page 106 of 144

Page 107

18 | P a g e
Appendix 4: Business-as-Usual Risks
The council has 12 areas of risk that it considers to be business-as-usual risk; those not generally related to
corporate priorities or ambitions but rather they are inherent by nature of our type of organisation and services
we deliver. The table below sets out what our business-as-usual risk areas are (in no specific order), and what
they cover.
BAU RISK AREA ENCOMPASSING BAU RISK AREA ENCOMPASSING      
1. Community &
public safety
Child and adult protection
Serious and organised crime
(external)
2. Asset
management
Statutory compliance
Arrangements for void properties
Fleet and other infrastructure
ICT hardware and software assets
and responsibilities
3. People
wellbeing &
development
Staff health and wellbeing
Training and development
Corporate and local induction
4. Information
handling
GDPR compliance
Information asset management
Information security
Records management
5. Health, safety &
managing
adverse events
Staff incident recording
RIDDOR arrangements
Incident monitoring and trends
analysis
6. Programme
and project
management
Governance
Compliance with industry
standards/ adopted methods
7. Organisation
resilience
Business continuity:
- Staffing resource
- ICT and/ or power outages
- Facility issue
- Cyber security
8. Partnership
management
Partnership registers
Agreements
Liabilities
9. Financial
control and
governance
Authorities and delegation
Budgeting and accounting
Conflict and whistleblowing
Insider threat and crime
Counter fraud
10. Service
performance
monitoring
Trends analysis
Links to risk management and
service improvement
11. Procurement
and contract
management
Standing orders
Roles and responsibilities
Monitoring & Performance Mgt
12. Complaints,
comments and
claims
handling
Compliance
Trends analysis
Links to service improvement 
The new risk assurance model in place for the above risks has gone live on 1 April. With the new ICT solution
developed in-house to track these risks, Audit and Risk officers can see on a monthly basis, how Heads of Service
and direct reports to Directors are responding to the question sets for each area of risk. In November 2023,
members will receive the mid-year report that will give a first insight to how the new model is working.
Page 107 of 144

Page 108

Page 108 of 144

Page 109

To:  Audit, Risk and Scrutiny Board 
On: 22 May 2023
_______________________________________________________________________ 
Report by:  Chief Executive
_______________________________________________________________________ 
Heading:  Local Government Benchmarking Framework 2021/22
_______________________________________________________________________ 
1. Summary 
1.1 In March 2023, the Improvement Service published the 2021/22 Local Government
Benchmarking Framework (LGBF) performance data for all Scottish local
authorities. The Framework is a high-level benchmarking tool which allows local
authorities to compare their performance across a wide range of key service areas
such as education, housing, and adult social care.   
1.2 Renfrewshire Council has participated in the development of the LGBF since its
inception in 2010 and the framework has expanded to comprise 105 indicators. The
purpose of the Framework is to support evidence-based comparisons and
encourage shared learning and improvement.   
1.3 This report provides an overview of Renfrewshire’s performance in relation to the
LGBF for 2021/22, as well as outlining the wider context and trends for local
authorities across Scotland.  Last year’s overview report to this Board noted the
impact of the pandemic on performance, and that impact continues to be reflected
in the 2021/22 data, which evidences both the recovery work undertaken by
councils and the challenges they continue to face.  Appendix 1 shows
Renfrewshire’s performance across all indicators and provides a comparison with
last year. 
1.4 Within the LGBF, councils are ranked against each other to show relative
performance but the rankings should be considered in context.  It is possible for
performance to improve in real terms but for this not to be reflected in rankings
because other councils have also improved. 
Item 8
ARS 22/5/23 Page 109 of 144

Page 110

1.5 In 2021/22, Renfrewshire has performed as follows in terms of the LGBF:
o 47 indicators have improved performance;
o 43 indicators have falling performance;
o 1 indicator had no change
o 14 indicators do not yet have updated data available;
o 38 indicators have improved their ranking;
o 41 indicators have fallen in the rankings;
o 12 indicators have a ranking which is unchanged;
o 30 indicators are ranked in the top 8 best performing councils for that measure;
o 14 indicators are ranked in the 8 lowest performing councils for that measure. 
1.6 Renfrewshire Council actively contributes to national discussions and learning on
the Local Government Benchmarking Framework and uses it to identify
opportunities to explore areas of challenge and of best practice. 
2. Recommendations 
2.1 It is recommended that the Audit, Risk and Scrutiny Board notes the contents of the
report. 
3. Background 
3.1 All Scottish local authorities participate in the Local Government Benchmarking
Framework (LGBF), which allows councils to compare their performance across a
suite of indicators, including costs and performance of key council services, and
levels of public satisfaction. Whilst there are always different views on the nature
and calculation of specific indicators, the framework provides a tool for the Council
to consider its performance in relation to delivering Best Value, as well as a platform
for learning and sharing good practice. It is used in conjunction with other
benchmarking tools, data and information that Council services use to assess
performance, such as service key performance indicators, service improvement
outturn reports, national and local surveys, inspections, and audits. 
3.2 There are currently 105 indicators in the Framework, which cover the majority of
council services across ten categories:
• Children’s services;
• Corporate services;
• Adult social care;
• Culture and leisure services;
• Environmental services;
• Housing services;
• Corporate asset management;
• Economic development;
• Financial sustainability;
• Tackling climate change. 
Page 110 of 144

Page 111

3.3  There are four new indicators included in the dataset this year, all of them under the
heading of Corporate Services. These new indicators can be seen as proxy
measures for the impact of the current cost of living crisis and the ongoing hardship
which the pandemic caused for many households.  The new measures are: 
• CORP9: Percentage of Crisis Grant decisions within 1 day
• CORP10:  Percentage of Community Care Grant decisions within 15 days
• CORP11:  The proportion of the Scottish Welfare Fund budget spent
• CORP12:  The proportion of Discretionary Housing Payment funding spent 
3.4 The LGBF provides a useful means of comparing relative performance across all
Scottish councils but like all performance information, it should be used with caution,
with due consideration given to local priorities and investment decisions, and
differences in council structures. The dataset for 2021/22 is an opportunity to
compare the second year of the pandemic with the first, and reflect on the work done
across all councils to support recovery.  It does not represent the full range of council
service delivery and does not measure some of the pandemic-specific activity
councils have undertaken. 
3.5 The data is collated, verified, and published for all Scottish councils by the
Improvement Service. The final data for 2021/22 was published on 13 March 2023. 
The data can be accessed through the Council’s Public Performance Report as well
as on the Improvement Service website.  The Improvement Service will revise the
publication throughout the year as additional data becomes available. 
4. National Context 
4.1 Alongside the performance data, the Improvement Service publishes a national
overview report each year, highlighting key trends across Scotland and considering
local variation.  The 2021/22 report notes that the data is “from a period when
communities and council services were still managing the significant ongoing impact
of Covid, while new challenges were emerging in the shape of soaring inflationary
pressures and a ‘cost of living crisis’, the effects of which are likely to cause a new
economic and public health emergency.”   
4.2 The national report identifies funding as “more challenging than ever” for local
government noting increased demand, growing needs and an increase in ring-fenced
funding which it calculates results in a 1.2% reduction in the revenue funding
available for locally-identified priorities. 
4.3 A further area of challenge identified by the Improvement Service are workforce
pressures which have been exacerbated by the pandemic.  This not only relates to
staff absence but to skills shortages they attribute to both the pandemic and to Brexit;
alongside more people opting for early retirement during the pandemic (particularly
from senior roles), fewer people are coming to the UK for work.  Pay competition from
other sectors is also a factor.
Page 111 of 144

Page 112

4.4 Social care and the growing demand which arises from an ageing population has
been an issue for a number of years and whilst councils have protected social care
funding, the Improvement Service do not consider that funding (even where there
has been an increase) is able to keep pace with demand. 
4.5 In reporting on the second year of the pandemic, the Improvement Service do note
some early signs of recovery, particularly in relation to those services which impact
children.  They note the work done by local authorities to provide nurturing
environments, to provide whole family support and to work effectively in partnership
with others to deal with mental health challenges. 
5. Overview of Renfrewshire’s Performance 
5.1 This section provides an overview of Renfrewshire’s LGBF performance in relation to
our Council Plan themes, and by theme, with a focus on pandemic recovery and on
cost measures.  Appendix 1 provides the Council’s data, ranked position, the Scottish
average, and the family group range for all the indicators.   
5.2 As noted in 1.5 above, Renfrewshire Council ranked in the top eight performing
councils for 30 indicators.  This includes five cost indicators and nine measures of
pupil attainment.  Strong performance is also indicated in terms of sound financial
management, economic development, roads maintenance and social care support as
it relates to preventing hospital readmissions and delayed discharges. 
Council Plan Themes: Place 
5.3 Renfrewshire Council’s proportion of procurement spend with local businesses fell
slightly between 2020/21 and 2021/22.  In the period 2021-2022 Renfrewshire Council
recorded direct spend of £36.5 million with businesses based directly in
Renfrewshire.  This accounted for 18.8% of our total spend.  A further 26.5% of our
spend was with businesses located in bordering local authorities (Glasgow, Inverclyde,
North Ayrshire, East Renfrewshire and West Dunbartonshire), therefore 45% of the
council’s total spend of approx. £196m is spent within Renfrewshire and the
neighbouring council areas.  Increasing direct spend with local businesses is a key
element of Community Wealth Building and the corporate procurement team are
working closely with Economic Development to identify ways to support local
businesses with tendering for council contracts.  An event was held in Johnstone Town
Hall on 29 November 2022 - “Doing Business with Renfrewshire Council” - and over 70
attendees representing 58 Renfrewshire businesses attended this event.  All of those
who responded to the post event evaluation survey said they were likely or very likely to
take action as a result and all would want to attend future events.  Further events will
take place this year, starting in March.  These events will offer support to local
businesses to enable them to bid for contracts with the council and the wider public
sector.  Due to the time lag in the publication of LGBF data, this work is not yet reflected
in the figures. 
Page 112 of 144

Page 113

5.4 The average time taken to process business and industry planning applications
reduced from 9.9 weeks last year to 8.9 weeks in 2021/22.  There were fewer complex
applications received during the year.  Planning authorities have a legal obligation to
wait for consultation responses from external stakeholders such as the Scottish
Environment Protection Agency SEPA and Transport Scotland.  Renfrewshire’s
performance has been above average for several years. 
Council Plan Themes: Economy 
5.5 The rate of business start-ups in the population is showing clear signs of recovery
following a significant drop during the pandemic, when council services were focused
on employability and on supporting existing businesses to remain viable.  The rate has
increased from 4.91 per 10,000 population in 2020/21 to 14.89 in 2021/22 so is almost
at pre-pandemic levels. 
5.6 Employability programmes were very successful in 2021/22, with 40% of people taking
part in a council programme moving into paid employment.  This is more than double
the Scottish average. 
5.7 Town vacancy rates remained relatively stable during the pandemic.  Renfrewshire’s
rate has increased considerably in 2021/22 from 11.75% of commercial units vacant to
17.7%, with much of the rise attributable to the decision not to re-let units in the Paisley
Centre ahead of its redevelopment.  This resulted in Renfrewshire moving from 17th to
28th in the ranking. 
Council Plan Themes: Fair 
5.8 Renfrewshire Council dealt with more than 9,000 crisis grant applications in 2021/22,
and 88.5% of these had a decision within one day.  This is a fall on the previous year’s
figure.  The cost of living crisis has increased the volume of applications; by February
2023, applications had exceeded 9500 for the year.  The service’s own target for
processing crisis grants is 2 days but as the figure shows, the majority are dealt with in
one day, and staff prioritise this work in order to respond as quickly as possible.  A
recent review of work allocation processes has resulted in changes which should speed
up the processing of Crisis Grants. The effect will start to be evidenced in the 2022/23
data but will have a greater impact in 2023/24 figures.   
5.9 The LGBF data for 2021/22 reports that 25.9% of carers surveyed in Renfrewshire felt
supported to continue in their caring role.  Across Scotland, the number of carers
reporting that they feel supported to continue in their caring role has been falling
steadily.  The impact of Covid-19 was felt severely by this group, and increasing
numbers of carers are becoming known to Renfrewshire Carers’ Centre and
Renfrewshire Health and Social Care Partnership.  In 2021/22, 2815 unpaid carers
received some form of support and that figure includes 963 carers previously not known
to services.  The data for this indicator is taken from the Health and Care Experience
Survey undertaken through GP practices, so not all carers completing it may be aware
Page 113 of 144

Page 114

of the range of services and supports available.   A key strand of the HSCP’s new
Unpaid Carers Strategy is the identification of carers; internal surveys carried out
indicate that once carers access local services, there is a positive impact on their ability
to manage their caring role. 
5.10 Two of the indicators are taken from a subset the Health and Care Experience Survey,
and are based on a survey of people who use social care services and whose care is
funded by the local authority or the Health Board.    Councils do not have access to this
specific data, only to the overall results by local authority area.  Renfrewshire’s
performance in terms of individuals saying they had a say in their care and support has
improved slightly from 73.1% to 73.2% but as the national picture is broadly one of
decline, Renfrewshire’s ranked position has moved from 25th to 13th and performance is
above the national average.  By contrast, the percentage who felt that services and
supports were improving or maintaining their quality of life followed the national trend
and fell from 81.83% to 75.81%, resulting in the ranked position moving from 13th to
23rd.  Without the specific data and context, it is difficult to provide analysis of these
figures.  Comparisons between years should be treated with caution as it is likely that
different individuals complete the survey each year. 
Council Plan Themes: Green 
5.11 Recycling rates were adversely affected across the country during the first phase of the
pandemic, and this was evidenced in the LGBF data for 2020/21.  Renfrewshire’s
recycling rate has shown steady progress in recent years, and is one of only nine
councils where more than half of household waste is recycled.  In 2021/22, 51.7% of
Renfrewshire’s household waste was recycled and more recent local data indicates that
the proportion is continuing to grow. 
Council Plan Themes: Values 
5.12 Renfrewshire’s performance in relation to non-teaching staff absence has declined, with
the average days lost rising from 11.89 days in 2020/21 to 13.19 days in 2021/22.  This
does appear to be a trend across the country, and due to the position in other councils
worsening at a faster rate, Renfrewshire’s ranked position did improve from 31st to 22nd. 
There continues to be a strategic and operational drive within the Council focused on
both short- and long-term interventions.  The period covered by this data is the second
year of the pandemic and higher absence rates were noted across most councils. 
5.13 The gender pay gap in Renfrewshire Council narrowed in 2021/22, reducing from
3.67% to 2.29%.  This is a continuation of the trend of recent years.  The introduction of
the living wage and recent pay awards have contributed to this narrowing, as they affect
the lower paid grades where women make up the majority of staff. 
5.14 Performance remains strong in relation to hospital readmissions and delayed
discharges.  This results from having good services which support people to remain in
the community and prevent hospital admission, as well as on joint working which leads
Page 114 of 144

Page 115

to good discharge planning and minimises delays once an individual is ready to be
discharged from hospital care. 
Council Plan Themes: Improving Outcomes for Children and Young People 
5.15 Renfrewshire continues to be one of the strongest performing council areas in relation
to educational attainment.  Because of changes to assessment methods in both 2020
and 2021, data is not directly comparable with earlier years.  Nonetheless,
Renfrewshire’s performance relative to other councils and to the Scottish average is
positive in relation to attainment at SCQF Levels 5 and 6 (an example of An SCQF level
5 qualification would be national 5 and SCQF level 6 would be a Higher).  The poverty
related attainment gap for numeracy and literacy in primary schools narrowed in
2021/22. 
5.16 Exclusion data is published with a considerable time lag and the information in this
year’s LGBF release relates to 2020/21.  Renfrewshire’s exclusion rate in that year was
20.88 exclusions per 1000 pupils, compared with a Scottish average of 11.87.  For
children who were looked after in the period, it was 165.71 per 1000 pupils, compared
with a Scottish average of 78.00.  All Renfrewshire learning establishments are
prioritising approaches which work to prevent exclusion and early internal data
suggests that the number of exclusions is decreasing.  One of the key components of
The Promise is to reduce exclusions for care-experienced children and young people to
zero, and Children’s Services will be relaunching their Standard Circular 8 to keep the
focus on this important pledge.  Reducing exclusions will be a continuing priority within
the service’s inclusion portfolio. 
Responding to and recovering from the pandemic 
5.17 The latest LGBF data covers the second year of the pandemic, and the early stages of
recovery are evident in some of the figures.  Recovery remains an important focus for
the Council but it is recognised that there will be a medium- to long-term impact on
services arising from the public health restrictions for some time. 
5.18 Indicators relating to housing stock demonstrate this impact; periodic restrictions which
prevented tradespeople entering properties to undertake non-emergency work affected
the average completion time for repairs, which rose to 14.57 days.  Restrictions also
severely affected the re-letting of void properties, resulting in an increase in the amount
of potential rents lost (up from 1.52%in 2019/20 before the pandemic to 2.03% in
2021/22).  All but three councils in Scotland saw the percentage of housing stock
meeting Scottish Housing Quality Standards fall considerably in 2021/22, when two
new elements of compliance (on smoke and heat detectors) were introduced.  The
effect of Covid on the construction industry meant upgrades could not be completed by
March 2022.  The upgrading work is ongoing and a substantial uplift in properties
passing SQHS will be evident in the 2022/23 data. 
Page 115 of 144

Page 116

5.19 A combination of full closures followed by repurposing of some buildings as vaccination
centres had resulted in very high cost per attendance at sports facilities in 2020/21. 
The end of some restrictions allowed facilities to increase capacity and therefore reduce
the average cost from £35.25 in 2020/21 to £5.72 in 2021/22.  In common with all other
Scottish council areas, the costs have yet to recover to pre-pandemic levels.  OneRen,
who provide sports and leisure facilities on behalf of Renfrewshire Council, have
experienced an increase in the running costs of services arising from higher inflation,
increased utility costs and supply chain challenges. This is being experienced by
organisations and households across the country and may remain a challenge for some
time. 
Understanding Cost Indicators and Performance 
5.20 The approach taken in relation to LGBF rankings on cost measures (of which there
are 19) is to consider ‘cheapest’ as ‘best performing’.  As such, any consideration of
relative and absolute performance must take account of local policy decisions which
target investment in priority areas.  In Renfrewshire, current examples would be the
investment in roads and waste.  Similarly, differences in the structure of every council
can also account for variation; an example of this would be indicator CORP1 which
shows support services as a percentage of expenditure.  In Renfrewshire, the model
of centralised support means that more staffing costs are captured in that figure than
in councils where each operational service has its own support staff. 
5.21 Investment in roads has been a priority for the Council in recent years with £16.6m of
capital investment allocated to roads over the last three years. The measures of road
conditions look at the proportion requiring maintenance treatment and Renfrewshire
out-performs the Scottish average for all four classes of road as well as having
improved on previous performance.   
5.22 There has been a significant change in the cost indicator relating to environmental
health and trading standards.  This is due to a change in which staff are included in that
grouping for accounting purposes, with Renfrewshire now including additional roles. 
Comparisons with previous years’ data is therefore not appropriate. 
5.23 The cost of library visits has fallen considerably, with Renfrewshire now one of the
cheapest per visit.   This is the first year that Renfrewshire has included digital visits in
the data submission; given the uptake in digital visits during the pandemic, which has
been sustained, this has resulted in many more visits being included and resulted in
lower costs per visit.  It is not clear whether all councils have revised their submission to
take account of the change in measurement, which might explain the higher cost in
some areas. 
5.24 It should also be noted that cost measures only present part of a story and alone,
they should not be perceived to equate to quality.   
Page 116 of 144

Page 117

6. Monitoring and reporting of LGBF 
6.1 The performance of the LGBF indicators will continue to be monitored by the
Corporate Management Team, through service improvement planning processes and
through further benchmarking activities to develop and share best practice. A report
on the LGBF will continue to be submitted to the Audit, Risk and Scrutiny Board
annually to review performance and monitor progress.   
6.2 Renfrewshire Council publishes its statutory Public Performance Reporting document
on the Council’s website in March each year. Relevant performance information
gathered through the LGBF is included as part of the report.   This year’s data is
available online here. 
Implications of this report 
1.  Financial – n/a 
2.  HR and Organisational Development – n/a 
3. Community/Council Planning – n/a 
4.  Legal – n/a 
5.  Property/Assets – n/a 
6.  Information Technology – n/a 
7.  Equality & Human Rights – The recommendations contained within this report
have been assessed in relation to their impact on equalities and human rights. No
negative impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations contained in
the report because it is for noting only. 
8. Health and Safety – n/a 
9. Procurement – n/a 
10. Risk – n/a 
11. Privacy Impact – n/a 
12. 
13.
Cosla Policy Position – the LGBF framework represents a joint commitment by
SOLACE (Scotland) and COSLA to develop better measurement and comparable
data to target resources and drive improvements. 
Climate Risk – n/a 
List of Background Papers: 
Page 117 of 144

Page 118

None 
Author: Lisa Fingland, Service Planning and Policy Development Manager,
lisa.fingland@renfrewshire.gov.uk 
Page 118 of 144

Page 119

Appendix 1:  Renfrewshire’s 2021/22 data for all LGBF indicators
Family Groups allow comparisons and encourage discussions between similar councils. Renfrewshire is currently in the following family groups: 
• Family Group 3 for population type, which includes Children Services, Adult Social Care and Housing Services – Clackmannanshire,
Dumfries & Galloway, Falkirk, Fife, Renfrewshire, South Ayrshire, South Lanarkshire, and West Lothian. 
• Family Group 3 for area, which includes Corporate Services, Culture and Leisure, Environmental Services, Corporate Assets, Economic
Development, Financial Sustainability, Tackling Climate Change – Angus, Clackmannanshire, East Renfrewshire, Inverclyde, Midlothian,
Renfrewshire, South Lanarkshire and West Lothian. 
Children’s Services
There are 32 indicators in this category.  In 2021/22 there are 11 ranked in the top quarter.  Data is not yet available for 12 indicators. 
Indicator Ranked Position Family Group
Ranked
Data Scottish
Average Family Group Range 2020/21 2021/22 2020/21 2021/22
CHN1 Cost Per Primary School Pupil 12 8 2 £5,960 £6,059 £6,325 £6,003 (Falkirk) to £6,631
(Clackmannanshire)
CHN2 Cost per Secondary School Pupil 2 1 1 £7,010 £7,040 £7,898 £7,040 (Renfrewshire) to
£8,408 (Clackmannanshire)
CHN3 Cost per Pre-School Education
Registration 8 9 4 £8,230 £9,578 £10,283
£7,979 (Dumfries and
Galloway) to £11,967
(Falkirk)
CHN4 % of Pupils Gaining 5+ Awards at Level 5 8 6 2 72% 74% 69% 78 (West Lothian) to 62
(Clackmannanshire)
CHN5 % of Pupils Gaining 5+ Awards at Level 6 7 5 2 45% 44% 40% 54 (West Lothian) to 32
(Clackmannanshire)
CHN6 % of Pupils from Deprived Areas Gaining
5+ Awards at Level 5 (SIMD) 12 6 2 50% 57% 52% 62 (West Lothian) to 44 (Fife)
CHN7 % of Pupils from Deprived Areas Gaining
5+ Awards at Level 6 (SIMD) 13 5 2 21% 27% 23% 37 (West Lothian) to 16
(Clackmannanshire and Fife)
Page 119 of 144

Page 120

CHN8a The Gross Cost of "Children Looked
After" in Residential Based Services per Child
per Week
23 n/a n/a £4,916 n/a n/a New data not available
CHN8b The Gross Cost of "Children Looked
After" in a Community Setting per Child per
Week
20 n/a n/a £388.51 n/a n/a New data not available
CHN9 % of children being looked after in the
community 8 n/a n/a 92.5% n/a n/a New data not available
CHN10 % of Adults Satisfied with Local Schools1 21 17 2 71.37% 76.37% 74.5% 82.10 (South Ayrshire) to
68.13 (Fife)
CHN11 Proportion of Pupils Entering Positive
Destinations 7 8 2 96.52% 96.65% 95.73% 98.56 (South Ayrshire) to
94.25 (Falkirk)
CHN12a Overall Average Total Tariff 7 9 3 1058 1037 981 1074 (Falkirk) to 891
(Clackmannanshire)
CHN12b Average Total Tariff SIMD quintile 1 9 7 2 700 743 702 754 (West Lothian) to 609
(Clackmannanshire)
CHN12c Average total tariff SIMD quintile 2 10 12 4 898 870 827 942 (South Ayrshire) to 735
(Dumfries and Galloway)
CHN12d Average total tariff SIMD quintile 3 6 6 1 1070 1055 965 1055 (Renfrewshire) to 891
(Fife)
CHN12e Average total tariff SIMD quintile 4 4 7 3 1311 1206 1113 1336 (Falkirk) to 1020
(Clackmannanshire)
CHN12f Average total tariff SIMD quintile 5 6 4 2 1390 1391 1316 1418 (Falkirk) to 1154
(Dumfries and Galloway)
CHN13a % of P1, P4 and P7 pupils combined
achieving expected CFE Level in Literacy 9 11 3 70% 72% 71% 79% (West Lothian) to 62%
(Dumfries and Galloway)
CHN13b % of P1, P4 and P7 pupils combined
achieving expected CFE Level in Numeracy 5 7 2 80% 81% 78% 84% (West Lothian) to 72%
(Clackmannanshire)
CHN14a Literacy Attainment Gap (P1,4,7
Combined) - percentage point gap between the
least deprived and most deprived pupils
21 12 4 29 21 21 10 (Dumfries and Galloway)
to 27 (Falkirk)
CHN14b Numeracy Attainment Gap (P1,4,7
Combined) - percentage point gap between the
least deprived and most deprived pupils
17 17 6 23 19 18 13 (Dumfries and Galloway)
to 22 (Falkirk)
CHN17 % of children meeting developmental
milestones 27 n/a n/a 80.51% n/a n/a New data not available 
1 Satisfaction data is based on a three-year average and the 2021/22 data relates to the period 2018-2021.
Page 120 of 144

Page 121

CHN18 % of funded early years provision which
is graded good/better  7 15 4 95.45% 90.28% 89.4%
97.92 (South Ayrshire) to
86.25 (Dumfries and
Galloway)
CHN19a School attendance rate 20 n/a n/a 91.9% n/a n/a Time lag in publication; new
data not available
CHN19b School attendance rate (Looked After
Children) 24 n/a n/a 86.51% n/a n/a Time lag in publication; new
data not available
CHN20a School exclusion rate (per 1,000 pupils) 29 n/a n/a 20.88 n/a n/a Time lag in publication; new
data not available
CHN20b School exclusion rate (per 1,000
'looked after pupils') 25 n/a n/a 165.71 n/a n/a Time lag in publication; new
data not available
CHN21 Participation rate for 16-19 year olds 14 16 4 93.00 93.25 92.35 93.67 (South Ayrshire) to
90.72 (Clackmannanshire)
CHN22 % of child protection re-registrations
within 18 months 28 n/a n/a 11.71% n/a n/a Time lag in publication; new
data not available
CHN23 % LAC with more than 1 placement in
the last year (Aug-July) 10 n/a n/a 15.84% n/a n/a Time lag in publication; new
data not available
CHN24 % of children living in poverty (After
Housing Costs) 14 n/a n/a 19.5% n/a n/a Time lag in publication; new
data not available 
Corporate Services
There are twelve indicators in the Corporate category, including four which are new for 2021/22; these relate to crisis grants, community care
grants, Social Welfare Fund and Discretionary Housing Payments. There are two indicators ranked in the top quarter and two in the bottom
quarter. 
Indicator Ranked Position Family Group
Ranking
Data Scottish
Average
Family Group Range
2020/21 2021/22 2020/21 2021/22
CORP 1 Support services as a % of total gross
expenditure 29 29 7 5.6 5.68 4.07 2.88 (West Lothian) to 5.73
(Clackmannanshire)
CORP 3b % of the highest paid 5% employees
who are women 16 17 6 57.11 58.15 58.96 62.96 (Angus) to 55.02
(Midlothian)
CORP 3c The gender pay gap (%) 17 13 4 3.67 2.29 3.54 -1.85 (Angus) to 6.60
(Inverclyde)
CORP 4 The cost per dwelling of collecting
council tax 25 21 5 £9.30 £8.03 £6.59 £2.01 (West Lothian) to £17.87
(East Renfrewshire)
Page 121 of 144

Page 122

CORP 6a Sickness absence days per teacher  30 19 6 5.7 5.9 5.83 4.14 (East Renfrewshire) to
8.74 (Clackmannanshire)
CORP 6b Sickness absence days per employee
(non-teacher) 31 22 6 11.89 13.19 12.19 8.80 (Inverclyde) to 14.93
(Clackmannanshire)
CORP 7 % of income due from council tax
received by the end of the year 20 21 7 95.03 95.48 95.73 97.19 (Angus) to 94.18
(Midlothian)
CORP 8 % of invoices sampled that were paid
within 30 days 1 5 1 97.25 95.5 92.2 95.5 (Renfrewshire) to 86.64
(East Renfrewshire)
CORP 9 % of Crisis Grant decisions within 1 day  28 27 6 92.5 88.5 93.25 99.75 (Inverclyde) to 64.5
(West Lothian)
CORP 10 % of CCG Grant decisions within 15
days 18 18 5 93.75 91.75 85.75 99.75 (Midlothian) to 77.5
(West Lothian)
CORP 11 The proportion of SWF Budget Spent  17 17 5 79.73 100.81 115.15 197.72 (West Lothian) to 70.12
(Angus)
CORP 12 Proportion of DHP Funding spent  8 7 3 105.02 101.73 95.99 102.34 (West Lothian) to 76.79
(Angus) 
Adult Social Care
There are eleven indicators in this category.  There are six ranked in the top quarter and one in the bottom quarter. 
Indicator
Ranked Position Family Group
Ranking
Data Scottish
Average
Family Group Range
2020/21 2021/22 2020/21 2021/22
SW1 Home care costs per hour for people
aged 65 or over 12 12 3 £26.38 £25.67 £28.59 £16.16 (Clackmannanshire)
to £34.98 (Falkirk)
SW2 Self Directed Support (Direct Payments
+ Managed Personalised Budgets) spend on
adults 18+ as a % of total social work spend
on adults 18+
19 18 3  
4.47%   4.77%   8.2%
7.9% (West Lothian) to 2.5%
(Clackmannanshire)
Page 122 of 144

Page 123

SW3a % of people aged 65 and over with
long-term care needs who receiving
personal care at home
30 20 2 53.51% 60.88% 61.89% 72.3 (Clackmannanshire) to
58.9 (South Ayrshire)
SW4b % of adults supported at home who
agree that their services and support had an
impact in improving or maintaining their
quality of life
13 23 5  
81.83%   75.81%
78.12 85.7 (Clackmannanshire) to
70.4 (Falkirk)
SW4c Percentage of adults supported at
home who agree that they are supported to
live as independently as possible
19 23 5 80.26% 75.22% 78.82% 82.2 (South Lanarkshire) to
70.4 (West Lothian)
SW4d Percentage of adults supported at
home who agree that they had a say in how
their help, care or support was provided
25 13 4 73.13% 73.24% 70.59% 80.6 (West Lothian) to 63.9
(Falkirk)
SW4e Percentage of carers who feel
supported to continue in their caring role 23 29 6 32.9% 25.9% 29.69% 33.8 (South Ayrshire) to 23.8
(Clackmannanshire)
SW5 Residential costs per week per resident
for people aged 65 or over 5 6 3 £464 £470 £649.00 £260 (Dumfries and
Galloway) to £943 (Fife)
SW6 Rate of readmission to hospital within
28 days per 1,000 discharges 7 6 1 100.1 86.7 109.6 86.7 (Renfrewshire) to 146.2
(Falkirk)
SW7 Proportion of care services graded
'good' (4) or better in Care Inspectorate
inspections
15 8 2 85.5 81.46 75.8 91.7 (Clackmannanshire) to
73.3 (Fife)
SW8 Number of days people spend in
hospital when they are ready to be
discharged, per 1,000 population (75+)
16 5 1 368.24 295.92 747.92 295.92 (Renfrewshire) to
1365.13 (South Ayrshire) 
Page 123 of 144

Page 124

Culture and Leisure 
There are eight indicators in the Culture and Leisure category; data is currently not available for one of them. There is one ranked in the top
quarter and one ranked in the bottom quarter. 
Indicator Ranked Position Family Group
Ranking
Data Scottish
Average
Family Group Range
2020/21 2021/22 2020/21 2021/22
C&L1 Cost per attendance at sports facilities 18 16 4 £35.25 £5.72 £6.43 £2.08 (West Lothian) to
£19.40 (Midlothian)
C&L2 Cost per library visit 18 3 1 £5.35 £1.55 £2.90 £1.55 (Renfrewshire) to
£11.89 (East Renfrewshire)
C&L3 Cost per visit to Museums & Galleries n/a n/a n/a n/a n/a £4.75 £0.21 (West Lothian) to
£47.29 (Angus)
C&L4 Cost of parks & open spaces per 1,000
population 27 29 8 £28,982 £32,162 £20,315 £5,8572 (Midlothian) to
£32,162 (Renfrewshire)
C&L5a % of adults satisfied with libraries2 18 24 5 73.73 69.07 74.37 77.63 (East Renfrewshire) to
64.07 (Midlothian)
C&L5b % of adults satisfied with parks and
open spaces 18 13 3 83.77 87.77 85.5 93.87 (East Renfrewshire) to
79.43 (South Lanarkshire)
C&L5c % of adults satisfied with museums
and galleries  10 18 2 69.33 63.67 71.3 64.7 (South Lanarkshire)
48.07 (Clackmannanshire)
C&L5d % of adults satisfied with leisure
facilities 7 13 3 75.8 74.47 71.77 78.67 (Inverclyde) to 57.67
(Clackmannanshire) 
Environment
There are 15 indicators in the Environment category. There are four ranked in the top quarter and seven in the bottom quarter.  
Indicator Ranked Position Family Group
Ranking
Data Scottish
Average
Family Group Range
2020/21 2021/22 2020/21 2021/22 
2 Satisfaction data is based on a three-year average and the 2021/22 data for C&L5a, C&L5b, C&L5c and C&L5d relates to the period 2018-2021.
Page 124 of 144

Page 125

ENV1a Net cost of waste collection per
premise 15 26 8 £68.42 £83.01 £70.08 £50.50 (Clackmannanshire)
to £83.01 (Renfrewshire)
ENV2a Net cost of waste disposal per
premise 12 17 5 £103.23 £101.81 £100.23 £53.53 (Midlothian) to
£122.97 (West Lothian)
ENV3a Net cost of street cleaning per 1,000
population 2 2 1 £6,642 £7,191   £14,848 
£7,191 (Renfrewshire) to
£21,078(Inverclyde)
ENV3c Street Cleanliness Score 13 18 6 93.59 89.6 89.7 97.00 (Angus) to 85.10
(Inverclyde)
ENV4a Cost of Roads per kilometre 25 28 6 £16,278 £20,856 £11,117 £8,815 (Midlothian) to
£28,578 (East Renfrewshire)
ENV4b % of A Class roads that should be
considered for maintenance treatment3 4 5 2 19.4 17.29 27.6 16.70 (Inverclyde) to 26.91
(Clackmannanshire)
ENV4c % of B Class roads that should be
considered for maintenance treatment 7 7 2 23.7 21.24 33.61 19.00 (Clackmannanshire) to
37.46 (Angus)
ENV4d % of C Class roads that should be
considered for maintenance treatment 19 18 4 33.5 30.55 33.24 27.02 (Clackmannanshire) to
38.97 (West Lothian)
ENV4e % of U Class roads that should be
considered for maintenance treatment 11 9 3 34.3 30.99 36.65 29.57 (West Lothian to
42.33 (East Renfrewshire)
ENV5 Cost of Trading Standards and
environmental health per 1,000 population 18 28 8 £19,869 £32,462 £20,947 £12,272 (Clackmannanshire)
to £32,462 (Renfrewshire)
ENV5a Cost of Trading Standards per 1000 30 30 8 £13,032 £12,536 £6,088 £1,314 (Clackmannanshire)
to £12,536 (Renfrewshire)
ENV5b Cost of environmental health per
1,000 population 1 26 7 £6,837 £20,257 £15,019 £8,432 (East Renfrewshire)
to £23,293 (Inverclyde)
ENV6 % of total household waste arising
that is recycled  11 8 3 49.11 51.7 42.7 58.10 (East Renfrewshire)
40.40 (South Lanarkshire)
ENV7a % of adults satisfied with refuse
collection 4 24 28 7 70.63 66.3 75.3 88.40 (Inverclyde) to 64.33
(Clackmannanshire)
ENV7b % of adults satisfied with street
cleaning 31 32 8 52.77 47.77 59.97 69.63 (Angus) to 47.77
(Renfrewshire) 
3 The maintenance indicators data is based on a two-year average and the 2021/22 data for ENV4b, ENV4c, ENV4d and ENV4e relates to the period 2020-2022.
4 Satisfaction data is based on a three-year average and the 2021/22 data relates to the period 2018-2021.
Page 125 of 144

Page 126

Housing
There are five indicators in the Housing category. 
Indicator Ranked Position Family Group
Ranking
Data Scottish
Average
Family Group Range
2020/21 2021/22 2020/21 2021/22
HSN1b Gross rent arrears (all tenants) as at
31 March each year as a percentage of rent
due for the reporting year
7 9 3 6.42 7.99 8.67 3.92 (South Ayrshire) to
11.32 (Falkirk)
HSN2 % of rent due in the year that was lost
due to voids 18 20 6 1.58 2.03 1.63 0.6 (South Lanarkshire) 2.26
(Falkirk)
HSN3 % of council dwellings meeting
Scottish Housing Standards 13 20 7 91.65 57.11 69.7 89.84 (West Lothian) to
57.11 (Renfrewshire)
HSN4b Average number of days taken to
complete non-emergency repairs 17 24 6 10.71 14.57 9.19 4.90 (Clackmannanshire) to
16.99 (Falkirk)
HSN5a % of council dwellings that are
energy efficient 14 20 6 86.63 78.37  87.78
98.64 (South Lanarkshire) to
62.30 (Clackmannanshire)  
Corporate Asset 
There are 2 indicators in the Corporate Asset category.   
Indicator Ranked Position Family Group
Ranking
Data Scottish
Average
Family Group Range
2020/21 2021/22 2020/21 2021/22
CORP-ASSET1 Proportion of operational
buildings that are suitable for their current
use
8 9 5 92.11 91.39 85.26 96.65 (West Lothian) to
67.86 (Midlothian)
CORP-ASSET2 Proportion of internal floor
area of operational buildings in satisfactory
condition
9 11 4 95.12 94.49 90.12 97.5 (Clackmannanshire) to
85.82 (Midlothian) 
Page 126 of 144

Page 127

Economic Development 
There are thirteen indicators in the Economic Development category.  There are four ranked in the top quarter and one in the bottom quarter. 
Indicator Ranked Position Family Group
Ranking
Data Scottish
Average
Family Group Range
2020/21 2021/22 2020/21 2021/22
ECON1 % of unemployed people assisted
into work from council operated / funded
employability programmes
2 5 1 17.85 40.24 19.57 40.24 (Renfrewshire) to 5.35
(Angus)
ECON2 Cost of Planning & Building
Standards per planning application 17 11 3  £5,417  £4,106  £4,337
£3,359 (Clackmannanshire)
to £6535 (Inverclyde)
ECON3 Average time per business and
industry planning application (weeks) 15 7 4 9.88  8.93  11.71
6.75 (Midlothian) to 20.59
(South Lanarkshire)
ECON4 % of procurement spend spent on
local enterprises 25 25 5 19.3 18.87 29.88 42.89 (Angus) to 13.72 (East
Renfrewshire)
ECON5 No of business gateway start-ups per
10,000 population 30 20 7 4.91 14.89 14.41 29.6 (Inverclyde) to 13.10
(Midlothian)
ECON6 Investment in Economic
Development & Tourism per 1,000
Population
9 9 1  £112.422  £140,676  £119,388
£140,676 (Renfrewshire)
£29,775 (East Renfrewshire)
ECON7 Proportion of people earning less
than the real living wage 19 19 4 21.6 19.8 14.4 12.5 (South Lanarkshire) to
22.3 (Angus)
ECON8 Proportion of properties receiving
superfast broadband 10 8 2 96.5 98 94.1
98.2 (Clackmannanshire and
West Lothian) to 87.7
(Angus)
ECON9 Town Vacancy Rates 17 28 7 11.75 17.7 11.4 4.47 (East Renfrewshire) to
18.57 (Clackmannanshire)
ECON10 Immediately available employment
land as a % of total land allocated for
employment purposes in the local
development plan
1 3 2 98.05 98.05 27.19 100.00 (East Renfrewshire)
to 12.73 (South Lanarkshire)
ECON11 Gross Value Added (GVA) per
capita 11 13 2 £24,880 £22,002 £24,721 £25,514 (West Lothian) to
£10,421 (East Renfrewshire)
ECON12a Claimant Count as % of Working
Age Population 22 20 5 6.3 3.6 3.7 2.00 (East Renfrewshire) to
4.40 (Inverclyde)
Page 127 of 144

Page 128

ECON12b Claimant Count as % of 16-24
Population 20 16 3 7.77 3.48 3.68 1.70 (East Renfrewshire) to
5.08 (Inverclyde) 
Financial Sustainability 
There are five indicators in the Financial Sustainability category. Three are ranked in the top quarter and one is in the bottom quarter.
Indicator Ranked Position Family Group
Ranking
Data Scottish
Average
Family Group Range
2020/21 2021/22 2020/21 2021/22
FINSUS1 Total useable reserves as a % of
council annual budgeted revenue 4 3 1 43.29 46.23 24.44 46.23 (Renfrewshire) to
14.74 (South Lanarkshire)
FINSUS2 Uncommitted General Fund
Balance as a % of council annual budgeted
net revenue
19 20 4 2.51 2.4 3.48 4.40 (East Renfrewshire) to
0.44 (West Lothian)
FINSUS3 Ratio of Financing Costs to Net
Revenue Stream – General Fund 9 4 2 4.7 3.11 5.89 1.08 (Midlothian) to 10.16
(Inverclyde)
FINSUS4 Ratio of Financing Costs to Net
Revenue Stream – Housing Revenue
Account
26 25 7 51.4 40.64 22.12 7.32 (Clackmannanshire) to
40.64 (Renfrewshire)
FINSUS5 Actual outturn as a percentage of
budgeted expenditure 15 8 2 98.85 100.02 98.25 100.19 (West Lothian) to
93.04 (Clackmannanshire) 
Tackling Climate Change 
There are two indicators in the Tackling Climate Change category, but data is not yet available for 2021/22. 
Indicator Ranked Position Family Group
Ranking
Data Scottish
Average
Family Group Range
2020/21 2021/22 2020/21 2021/22
CLIM1 CO2 emissions area wide per capita 14 n/a n/a 4.07 n/a n/a New data not available
CLIM2 CO2 emissions are wide: emissions
within scope of LA per capita 8 n/a n/a 3.61 n/a n/a New data not available 
Page 128 of 144

Page 129

1 
___________________________________________________________________
To:  Audit, Risk and Scrutiny Board
On:  22 May 2023
________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Absence Statistics – Quarter 4 of 22/23.
___________________________________________________________________
1. Summary
1.1 The purpose of this report is to provide the Audit, Risk and Scrutiny Board with the
absence information for the period 1 January to 31 March 2023. 
1.2 During the period, Short- and Long-term absences continue to be exacerbated due to
lengthier NHS treatment and medical intervention waiting times. 
1.3 The report details the absence statistics by service and by category of staff. The
report provides information in relation to absence targets and how services have
performed against them. An analysis of the reasons for absence has also been
compiled and details are included within the report. 
2. Recommendations 
2.1 It is recommended that the Board notes the content of this report. 
_______________________________________________________________ 
3. Background 
3.1 The Audit Risk and Scrutiny Board agreed that absence levels will be reported on a
quarterly basis. It was agreed that the report will include the following information 
relating to supporting attendance: - 
 Absence statistics broken down by service and category of staff.
 Reasons for absence broken down by service and category of staff.
 Progress made by services in relation to their supporting attendance action plans. 
Item 9
ARS 22/5/23 Page 129 of 144

Page 130

2 
4. Sickness absence statistics for quarter 4 - 1 January to 31 March 2023. 
4.1 A comparison of the council overall absence performance for the quarter (Q4) with the
same quarter in 2022 is detailed in table 1. Table 2 details services performance. In
line with the reporting requirements for Scottish Councils, absence is expressed as a
number of workdays lost per full time equivalent (FTE) employee.            
Table 1 Council performance – Q4 
4.2 Table 2 Service performance - Q4 
5. Sickness absence targets analysis for Quarter 4. 
5.1  The local government employee absence level of 4.16 days lost per FTE employee is
1.56 days above the council target of 2.60 days. 
5.2 In addition, the teacher absence level of 2.72 days lost per FTE employee is                                     
1.18 days above the council target of 1.54 days. 
5.3 The council has recorded an overall absence rate of 3.79 days lost per FTE
employee, which is 1.19 days above the council target of 2.60 days. 
Employee Group  Quarter Ending 
March 2022
Quarter Ending 
March 2023
Variance
+/- year
on year
Local Government 3.63 4.16 +0.53
Teachers 2.15 2.72 +0.57
Council Overall 3.24 3.79 +0.55      
Service Quarter Ending
March 2022
Quarter Ending 
March 2023
Variance
+/- year
on year
Chief Executives 1.97 0.97 - 1.0
Childrens Services 3.12 3.89 +0.77
Communities and
Housing Services
3.20 3.90 +0.70
Environment and
Infrastructure
3.50 3.80 +0.30
Finance & Resource
Services
2.24 2.38 +0.14
Renfrewshire Health
and Social Care
Partnership
4.69 5.47 +0.78
Council Overall 3.24 3.79 +0.55
Council Overall
Target
2.60 2.60    n/a
Page 130 of 144

Page 131

3 
6. Sickness absence reasons and related support measures during Quarter 4. 
6.1 The main sickness absence reasons, and their total of the overall absences
expressed as a percentage, across the council, during this quarter were:
• Psychological   29.5%
• Respiratory      18.9%
• Muscoskeletal  17.6%
• Stomach/bowel/blood and metabolic disorders 15%                                    
6.2 To support employees with psychological absences, the council provides a range of
support services that employees can be referred to at an early stage for assistance,
such as the council’s Occupational Health Service and the Time for Talking employee
counselling service. 
6.3 The Time for Talking (TFT) counselling service provides 24-hour confidential support
to employees with a range of personal health and well-being issues. It operates a
flexible approach to appointments offering consultations in the early mornings or
evenings as well as throughout the day. 22.9% of the sessions were face to face,
25.7 % were by secure video call and 51.4% were by telephone. 
6.4 326 sessions were offered by TFT during quarter 4 of which 83% were attended.
82% of the staff attending felt significantly better after their sessions. The main
presenting issues are detailed below: 
Personal 
Stress/anxiety/depression 
Family Relationships  
Change 
Work & Personal 
Stress/anxiety  
Demands 
Work related 
Change  
Demands  
Roll 
6.5 Stress risk assessments are undertaken to support employees who have identified
stress as having an impact on their wellbeing. An action plan is agreed and undertaken
at a local level with the specialist support from HR and OD. 
6.6 HR and OD work in collaboration with NHS colleagues, to offer safeTalk and ASIST
courses on suicide awareness and prevention as well as anxiety awareness courses.
We also promote the “Doing Well” service which supports employees with depression
and low moods. 
6.7 HR and OD have been working with the mental health first aiders (MHFAs) across
the council. A forum has been set up and further training is in the process of being
organised. MHFAs can play a significant part by supporting or sign posting an
individual who may be experiencing mental ill health.
Page 131 of 144

Page 132

4 
6.8 The Physiotherapy service supports employees with Muscoskeletal and Joint
Disorder conditions through the council’s Occupational Health Service. The service
has continued to be provided throughout the quarter using secure face to face
appointments, video conferencing and telephone consultations. Employees will
receive an appointment within 10 days, following a referral. 
6.9 The council’s usage of the Occupational Health Service (OHS) for Q4 was 1025
appointments. OHS provides advice and guidance on the impact of ill health on work
and what steps the council and/or the employee may make to secure a return to
work. 
Appointment referral type Number Main types of issues
Wellbeing 354 CBT/DBT/Physiotherapy
Management 506 Various health issues
Health surveillance 165 Audio/ Hand arm vibration 
7. Measures to support attendance at work 
7.1 A number of measures continue to be progressed to support attendance at work,
including the following: - 
• HR and Organisational Development (OD) continue to develop a health and well-
being strategy that will be launched later this year. 
• HR and OD have been working with service management teams to focus upon the
absence data and look at interventions to support their staff. The biggest focus has
been on the reduction of longer-term cases. 
• HR and OD have been promoting the employee benefits scheme, which includes
cycle to work. This may encourage employees to become active and healthier, which
may help reduce spells of absence. 
• HR and OD have been working with the corporate procurement team to change the
current employee counselling contract into an employee assistance scheme. This will
allow for other types of support and therapies to be made available to those suffering
from mental ill health. 
• We continue to actively manage our OH provision. We will ensure that we continue to
fully utilise all the available resource to support our staff who are off sick as well as
those who are returning to the workplace either with an ongoing condition or are in
recovery. 
• The council offered the flu vaccine out to all staff not covered under the criteria for an
inoculation from the NHS. We worked with our OH provider from October 2022 and
the last of the sessions were delivered in January 2023. We offered vouchers for
those who could not attend in person. As part of this programme, we collaborated
Page 132 of 144

Page 133

5 
closely with our partner organisations (One Ren, RVJB and Scotland Excel) to offer
to their staff too. 
• As part of the council’s health and safety management system, occupations which
include manual handling activities as part of the role, require task risk assessments.
These risk assessments are reviewed on an ongoing basis to ensure that safe
working practices are maintained. 
• We continue to review our statutory and mandatory training courses. Included in the
review is the suitability of the moving and handling training courses for people
movement and manual handling training for objects.
__________________________________________________________ 
Implications of this Report 
1 Financial Implications - Improvement in attendance impacts on the financial costs of
absence. 
2 HR and Organisational Development Implications - HR and Organisational
Development Practitioners will continue to work with service managers and consult
with the Trade Unions, on the implementation of the Supporting Attendance at Work
Policy and Guidance and initiatives detailed in this report. 
3 Community Planning 
Children and Young People - none.  
Jobs and the Economy - none. 
Community care, health, and wellbeing - provides for continuous improvement in
health and attendance. 
Safer and Stronger - provides for improved service performance across the Council. 
Greener - none. 
Empowering our communities - none. 
4 Legal Implications - none. 
5 Property/Asset Implications - none. 
6  Information Technology Implications - none. 
7 Equality and Human Rights Implications - none. 
8   Health and Safety Implications - it is integral to the Council’s aim of securing the
health and well-being of employees. 
9 Procurement Implications - none. 
Page 133 of 144

Page 134

6 
10 Risk Implications - Without continued effective supporting attendance focus, there
is a risk that sickness absence levels will adversely impact on the Council both
financially and in terms of service delivery. Consequently, supporting attendance
activities are monitored via the Corporate Risk Register.
11 Privacy Impact Implications - none.
12. Cosla Policy Position – none
13. Climate Risk - none
_________________________________________________________________________
List of Background Papers - none.
The contact officer within the service is Steven Fanning, Principal HR and OD Adviser,
telephone 0141 618 7284, e-mail steven.fanning@renfrewshire.gov.uk 
Author:      Steven Fanning, Principal HR, and OD Adviser,                  
Finance and Resources, 
telephone 0141 618 7284,  
e-mail steven.fanning@renfrewshire.gov.uk
Page 134 of 144

Page 135

1 
Page 135 of 144

Page 136

Page 136 of 144

Page 137

To: Audit, Risk & Scrutiny Board
On: 22 May 2023 
Report by:  Lead Officer
Heading:  Charges for Bulk Items Uplift for the Elderly 
1. Summary
1.1. At its meeting on 22 August 2022, members of the Audit, Risk and Scrutiny
Board agreed an annual programme of activity for the Board for 2022/23. This
included a review of charges for bulk items uplifts for the elderly as part of the
programme of activity. 
2. Recommendations
The Board is asked to:
2.1. Note the progress contained within the report. 
3. Background
3.1. Residents of Renfrewshire can request special uplifts if they need any bulky
general waste collected from their home. This can be for between 1 and 20
items but cannot include hazardous, clinical, or toxic waste. Loose waste must
be bagged or tied in manageable bundles where necessary. In addition,
appliances such as washing machines, freezers, cookers etc are all charged
individually and cannot form part of the 1 to 20 items.
3.2. Ground clearances are when residents have more than 20 items and the charge
quoted is for a maximum of one hour’s work. However, if officers visit and
assess that it will take longer than this, they will contact the resident about the
additional costs before commencing any work. Again, domestic appliances are
charged individually and do not form part of a ground clearance.
3.3. Renfrewshire Council aims to collect item(s) as soon as possible within 14 days.
Residents must ensure any white goods have their doors removed or place in
Item 10
ARS 22/5/23 Page 137 of 144

Page 138

a position where no one can access it. Special uplift requests for white goods
and general goods can be made at the same time, however white goods are
charged separately.
3.4. The charges for 2023/24 are £37.15 for a domestic uplift (1-20 items) and
£37.15 for each domestic white good. The ground clearance charges are
£88.00 covering a driver, a waste collector, and a vehicle, for a maximum of
one hour’s work. 
3.5. Residents who are council tenants are entitled to two special uplifts per year as
part of their rent charge, this is paid for from within the overall Housing Revenue
Account (HRA). This is achieved by providing their rent reference number when
making their booking.
3.6. The current scheme provides no free, discounted or exemptions for this service
for any other residents.
3.7. The board approved, the age of 65 to be assumed in relation to the term elderly
for the duration of this review where this is practical. If an exception to this age
is used, it will be clearly noted within the review. 
4. Purpose of the Review
4.1. The key purpose of this review will be to:
1. Set out the current position in relation to bulk uplifts within Renfrewshire
Council;
2. Consider the impact of offering a free bulk uplift service for the elderly; and
3. Identify any other mitigations that could be recommended for the elderly
that the council could pursue within available resources. 
5. Scope of the Review and Timescales
5.1. In relation to 4.1(1) above, the focus of the review will be on research into
demographics within Renfrewshire; in particular, the elderly population and
current trends for existing service demand.
5.2. In relation to 4.1(2) above, the focus of the review will be on assessing the
financial and non-financial implications in relation to the provision of free bulk
uplifts for the elderly.
5.3. In relation to 4.1(3) above, the focus on the review will be exploring existing or
potential options available to the elderly within Renfrewshire through partner
organisations such as the third sector.
5.4. In relation to 4.1(3) above, consideration will be given to the existing services
provided within neighbouring local authorities in relation to free bulk uplifts for
the elderly to consider any benefits for Renfrewshire.
Page 138 of 144

Page 139

5.5. For clarity, the level of charges applied to bulk uplifts within Renfrewshire is
outwith the scope of this review.
5.6. It is proposed that the review is progressed through 2023, with a conclusive
report being submitted for approval to the Audit, Risk and Scrutiny Board on 18
September 2023, and a final report to Council 14 December 2023. The table
below provides an outline of the proposed timetable.
Timetable for Bulk Uplift for the Elderly Review
Date of Board Meeting Stage of Review
23 January 2023 - Complete Commencement of review
18 March 2023 - Complete Continuation of review
22 May 2023 - Current Continuation of review
21 August 2023 Continuation of review
18 September 2023 Report to Board
14 December 2023 Final Report to Council  
6. Progress Update
6.1. The review has been progressing well and research has continued across all
areas within scope. This section will provide an update on the findings since the
18 March 2023 report that have reached a conclusion or a relevant point of
interest to the review, with particular focus on the objectives within 5.2.
6.2. In this report, we explore financial and non-financial implications in relation to
the provision of free bulk uplifts for the elderly within Renfrewshire; this is in
relation to scope objective 5.2.
6.2.1  This section looks at the trends in income for special uplifts from 2020/21 to
2022/23. The information has been analysed by recharges to the HRA and for
charges direct to Renfrewshire residents.  
Financial Year HRA Tenants Residents Total
2020/2021 £159,440.30 £55,866.00 £215,306.30
2021/2022 £111,655.35 £62,308.80 £173,964.15
2022/2023 £109,928.10 £71,079.98 £181,008.08
Average £127,007.92 £63,084.93 £190,092.84  
The service is managed through the deployment of a driver, waste collector and
a specialised vehicle. The demand fluctuates within the table, and a major
influence on this was due to COVID-19 and the post-pandemic recovery. 
Page 139 of 144

Page 140

6.2.2 In order to assess the current demand for the service, a sample analysis of 12
weeks of requests from the period 9 January 2023 to 2 April 2023 has been
reviewed. The analysis below shows that based on total orders we are
averaging 15.3 orders daily and 74.5 items per day.  
Week Special
Uplifts
Ground
Clears
Total
Uplifts
Daily
Average
Uplifts
Total
Items
Daily
Average
Items
1 98 13 111 15.9 544 77.7
2 85 11 96 13.7 407 58.1
3 88 9 97 13.9 472 67.4
4 85 8 93 13.3 425 60.7
5 84 5 89 12.7 479 68.4
6 107 13 120 17.1 520 74.3
7 114 7 121 17.3 692 98.9
8 123 18 141 20.1 637 91.0
9 113 14 127 18.1 656 93.7
10 77 6 83 11.9 418 59.7
11 102 17 119 17.0 551 78.7
12 81 3 84 12.0 455 65.0
Total 1,157 124 1,281 15.3 6,256 74.5 
Operational managers have confirmed that any significant recurring increase in
demand due to a free or discounted service could not be managed without
either an additional team or by using an external partner to manage the
increased demand.
6.2.3 The impact of creating a free bulk uplift service for the Elderly is likely to
increase demand. This increase could be managed in two ways: by increasing
capacity either internally or externally, both of which bring additional costs.
6.2.4 If we assume that demand increases beyond the current levels and an
additional team consisting of a driver, waste collector, and specialised vehicle
is required, then an additional cost of around £116,500 per year is estimated.
This equates to around £320 per day in extra costs for Renfrewshire Council.
In the past, external contractors have been used to aid in reducing the post-
pandemic backlog, and this was at a cost of around £40 per uplift; however,
costs are likely to have increased since then due to inflation. 
6.2.5 If a policy of free uplifts for the Elderly was introduced, what sort of impact could
this have based on demand levels, and how would this impact the service?
Currently, we do not require the age of the requestor; therefore, we do not hold
this information to analyse our existing data. Therefore, to gauge current
demand, if we utilise the age profile we have already identified in the report
dated 13 March 2023, and assume that 19.22% of our current demand is for
the Elderly, then we can assume a drop in income of £34,789.75 before any
demand increases or further assumptions are made, as detailed in the table
below.
Page 140 of 144

Page 141

Impact on income
2022/23 levels HRA Tenants Residents Total
2022/23 Near Actual £109,928.10 £71,079.98 £181,008.08
19.22% Reduction £21,128.18 £13,661.57 £34,789.75
2022/23 Revised £88,799.92 £57,418.41 £146,218.33   
It is, however, possible that the actual percentage of current service recipients
could be higher than the demographic average due to the type of service
provided and that this loss could be higher.
6.2.6 In summary, the impact of introducing a policy for free bulk uplifts for the Elderly
could result in a reduction in income (minimum £0.035m) and an increased
demand for the service resulting in a requirement to increase capacity at an
additional cost (which could rise initially to £0.117m), bringing the total
additional annual cost to potentially £0.152m
6.3 Although not within the initial scope of this review it was identified, during the
investigation, that two Scottish Local Authorities provide a discounted Bulk
Uplift service. This is not just for the Elderly but for any resident who is in receipt
of Housing benefit or Council Tax Reduction. 
6.3.1 In order to assess the potential impact of a similar policy in Renfrewshire the
latest Council Tax Reduction (CTR) information has been analysed for
Renfrewshire, split between HRA and other residents who are in receipt of any
amount of CTR. The table below shows that the percentage of HRA tenants
claiming CTR is 51.55% and 12.31% of other tenancies. 
CTR Analysis HRA Tenants Residents Total
Number of Claims 6,297 9,671 15,968
Stock Number 12,216 78,566 90,782
% CTR 51.55% 12.31% 17.59% 
6.3.2 The table below outlines a high-level assumption on the potential cost of
implementing this type of policy. This is based purely on the CTR data from
above and assumes only a potential loss of income of 51.55% for HRA tenants
and 12.31% for other residents of Renfrewshire. This has been modelled on
both 50% and 60% reductions, in line with the two schemes identified nationally. 
Impact on income
2022/23 levels HRA Tenants Residents Total
No discount 100% charge £109,928.10 £71,079.98 £181,008.08
50% discount on CTR% £28,332.40 £4,374.76 £32,707.16
60% discount on CTR% £33,998.88 £5,249.71 £39,248.59 
The table shows a potential loss of income of £32,707.16 to £39,248.59
assuming existing income levels and no change to demand assumptions for
Page 141 of 144

Page 142

uplifts. If this policy was implemented and demand exceeded the current
operational capacity, then additional costs as highlighted in 6.2.5 could similarly
be expected.
6.3.3 In summary the impact of introducing a policy for discounted bulk uplifts for CTR
eligible could result in a reduction in income (minimum £0.033m) and an
increased demand for the service resulting in a requirement to increase
capacity at an additional cost (rising to £0.117m), bringing the total additional
annual cost to potentially £0.150m.
6.4 The next report to Board will focus Scope 5.3 above, reviewing existing, or
potential options available to the Elderly within Renfrewshire through partner
organisations such as the third sector.
___________________________________________________________________ 
Implications of this report 
1.  Financial - The outcome of this review could result in additional costs and
loss of income to Renfrewshire Council as outlined in section 6. 
2.  HR and Organisational Development - None directly arising from this
report. 
3. Community/Council Planning - None directly arising from this report. 
4.  Legal - None directly arising from this report. 
5.  Property/Assets - None directly arising from this report. 
6.  Information Technology - None directly arising from this report. 
7.  Equality and Human Rights - The Recommendations contained within this
report have not yet been assessed in relation to their impact on equalities
and human rights because the paper sets out the scope for a review process
rather than proposing any changes to services. Impact assessments will be
undertaken as part of the review, and the results of the assessment will be
published on the Council’s website. Any policy changes arising from the
review will also be fully assessed. 
8. Health and Safety - None directly arising from this report. 
9. Procurement - None directly arising from this report. 
Page 142 of 144

Page 143

10. Risk - The potential risk that the Council will overspend its approved budgets
for the year will be managed at a Council-wide level by the Chief Executive
and Directors. 
11. Privacy Impact - None directly arising from this report. 
12. 
13.
Cosla Policy Position - Not applicable. 
Climate Risk - None directly arising from this report.
__________________________________________________________________ 
List of Background Papers 
Audit, Risk and Scrutiny Board Annual Programme approved 22 August 2022.
Audit, Risk and Scrutiny Board Charges for Bulk Items Uplift for the Elderly 23 January
2023.
Audit, Risk and Scrutiny Board Charges for Bulk Items Uplift for the Elderly 13 March
2023. 
The foregoing background papers will be retained within Finance and Resources for
inspection by the public for the prescribed period of four years from the date of the
meeting. The contact officer within the service is Finance Business Partner John
Kilpatrick who can be contacted at john.kilpatrick@renfrewshire.gov.uk  
__________________________________________________________________
Author: John Kilpatrick, Finance Business Partner 
Page 143 of 144

Page 144

Page 144 of 144