Page 1

___________________________________________________________________
To: Audit, Risk and Scrutiny Board
On: 22 May 2023
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Risk Report, May 2023
___________________________________________________________________
1. Summary
1.1 Each year the Board considers and approves the council’s risks.
1.2 This paper sets out the latest position in managing the council’s risks, as we have
entered the new financial year. The appendices attached provide details of:
• 1: longer-term or imminent strategic risks (from April 2023)
• 2: longer-term significant corporate risks (from April 2023)
• 3: significant service risks (note nil entry and explanatory note)
• 4: the list of ‘business as usual’ risks (ongoing)
________________________________________________________________________________ 
2. Recommendations
2.1 It is recommended that the Board approves the report, agreeing with the risks
identified.
_________________________________________________________
3. Background
3.1 The key areas of risk previously reported to the Audit, Risk & Scrutiny Board in
November 2022 were: 
Strategic Risks:
Very High-Risk Economy  
Very High-Risk Unemployment 
Very High-Risk Reducing inequalities 
High Risk  Climate, sustainability &
adaptability 
Corporate Risks:
Very High-Risk Financial sustainability
Very High-Risk Financial stability 
High-Risk Cyber attack
High Risk Regulatory services/ statutory activities  
High Risk Commercial vehicle & operator’s license 
High Risk Tree Fall and Ash Dieback 
High Risk Asset Management

Page 2

3.2 The strategic and corporate risk profile for the council in terms of its longer-term or
imminent risks was as shown by the matrix below: 
Evaluation: Low Moderate High Very High Total
LT or Imm Strategic Risks: 00 00 01 03 04
LT or Imm Corporate Risks: 00 00 05 02 07 
3.3 Risks are evaluated using the Council’s adopted risk matrix; this involves multiplying
the likelihood of a risk occurring by its potential impact. Risks are then evaluated as
either ‘low’ (green), ‘moderate’ (yellow), ‘high’ (amber) or ‘very high’ (red). 
3.4 It was noted that when service departments had reviewed their top ‘significant’
operational risks (i.e., those evaluated as high or very high) all reported that any
such risks were already captured by some strategic and/ or corporate risks. 
3.5 The Corporate Risk Management Group has again reviewed the risk profile on
behalf of the Corporate Management Team and the current information is now
presented to Board, setting out the key risks as we have entered the 2023-24
financial year. 
3.6 Movement in risk profile since the previous risk report to Board in November 2022: 
• Risks removed/ de-escalated 
Unemployment – this strategic risk had previously been a very high one for the
council, but with targeted activities (including job creation programmes and
demand led interventions, focus on youth unemployment, working with schools
to better prepare pupils for employment, community benefit clauses embedded
in procurement activities, enhanced and expanded employability services, and
focused partnership working to ensure no-one is left behind), Renfrewshire is
now seeing high levels of employment locally. Acknowledging however that
there is no room for complacency, we ensure that going forward, employment,
unemployment and low-paid employment matters will continue to feature in the
wider ‘economy’ risk. 
• Risks remaining, with scoring/ evaluation changed
Nil report for this section. 
• Risks added/ escalated from service/s to strategic or corporate
Nil report for this section. 
• Risks added/ escalated from 'business as usual’ to strategic or corporate
Nil report for this section. 
3.7 With paragraph 3.6 in mind, the risk profile is therefore now as follows: 
Evaluation: Low Moderate High Very High Total
LT or Imm Strategic Risks: 00 00 01 02 03
LT or Imm Corporate Risks: 00 00 05 02 07

Page 3

3.8 Most services report that any significant service risks are already captured by the
above risks with further (less significant) service risks being embedded in their
service improvement processes. Following the recent organisation structural
changes however, Environment, Housing and Infrastructure Services will be fully
reviewing their risk profile to determine if any new significant risks should be
captured going forward. 
3.9 Horizon Scanning 
While not necessarily included on risk registers, there are always matters that the
Corporate Risk Management Group will keep a watching brief on. Of particular help
in this, is the Global Risks Report – a survey produced annually by the World
Economic Forum in partnership with Marsh McLennan and Zurich Insurance Group.
It is worth noting that the report highlights that the cost-of-living crisis dominates
global risks in the next two years, while climate action failure dominates the next
decade. Both aspects feature in our local risk reporting. 
3.10 Appendix 1 provides the detail for 3 longer-term or imminent strategic risks.
Appendix 2 provides the detail for 7 longer-term or imminent corporate risks. 
Appendix 3 confirms a nil report for significant service risks (over and above
service-led risks already in appendices 1 and 2). 
Appendix 4 outlines our ‘business as usual’ risk areas 1 
3.11 The strategic and corporate risks are now aligned with the council plan themes that
were approved in 2022. 
1 For ‘business as usual’ risks, the council takes a different approach. BAU risks are defined as those not
generally related to corporate priorities or ambitions but rather are inherent by nature of our type of
organisation. Essentially these are risks we have no option but to live with and manage and monitor.
Strategic Risks:
Very High-Risk Economy  
Very High-Risk Reducing inequalities 
High Risk  Climate, sustainability &
adaptability 
Corporate Risks:
Very High-Risk Financial sustainability
Very High-Risk Financial stability 
High-Risk Cyber attack
High Risk Regulatory services/ statutory activities  
High Risk Commercial vehicle & operator’s license 
High Risk Tree Fall and Ash Dieback 
High Risk Asset Management

Page 4

__________________________________________________________________
Implications of the Report
1. Financial 
Recurring costs associated with the measures in place for each risk are considered
proportionate to the level of risk, and new planned actions are also considered to be
cost effective. 
The financial requirements to support the risks should be met within the budget of
each relevant risk owner, nevertheless, any unplanned and unbudgeted cost
pressures that arise in relation to any of the risks identified will be subject to review
in consultation with the Director of Finance and Resources. 
2. HR & Organisational Development – not relevant to report recommendations 
3. Community/Council Planning – effective risk management supports the delivery
of all community/ council plan outcomes 
4. Legal – not relevant to report recommendations 
5. Property/Assets – not relevant to report recommendations 
6. Information Technology – not relevant to report recommendations 
7. Equality & Human Rights – not relevant to report recommendations 
8. Health & Safety – not relevant to report recommendations 
9. Procurement – not relevant to report recommendations 
10. Risk – as per the subject matter of this report 
11. Privacy Impact – not relevant to report recommendations 
12. Cosla Policy Position – not relevant to report recommendations 
13. Climate Risk – not relevant to report recommendations
_________________________________________________________
Author:           Karen Locke, Risk Manager 
Tel: 07506 957 037, Email: Karen.Locke@renfrewshire.gov.uk

Page 5

4 | P a g e
Appendix 1: Strategic Risks, longer-term or imminent 
• ECONOMY – building an inclusive, green and resilient economy 
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
SRR.23.01.01 Economy Even before the COVID-19 crisis,
the Scottish economy was facing
several strategic challenges
including climate change, Brexit and
lower than average productivity.
Likewise, Renfrewshire’s economy
was facing challenges such as:
growing the working age
population; more closely aligning
the education and skills provision
with the needs of local employers;
and achieving a strong and inclusive
economy. 
The risk therefore is that significant
economic improvement and
upskilling of local workforce is
difficult to progress until the
current landscape improves and
our investment programmes are
completed
Head of
Economy and
Development 
Head of
Finance &
Procurement 
Programme
Director – City
Deal &
Infrastructure
(1) Economic Recovery Plan
(2) Capital investment such as
investment in housing and heritage
assets; supporting Scotland’s
prospectus for international
investment by identifying and
developing opportunities such as
AMIDS2 and supporting local
businesses seeking to export to new
markets
(3) Taking forward measures to counter
any education learning loss
(4) Developing skills interventions to
address the risks of unemployment,
in particular those in low-paid
employment, and parents.
(5) Support for local businesses to bid
for council contracts
(6) Support for local businesses to
become more carbon neutral
05 05 25
V.High The coronavirus pandemic has resulted in
significant challenges for economies across the
world. The UK and Scottish Governments invested
billions to support businesses through lockdowns
and furlough in order to keep businesses viable and
retain people in employment.
Renfrewshire’s economy has well established
strengths in transport (including Glasgow Airport),
retail (including Braehead), manufacturing
(including significant international exports) and
construction. All these sectors and their wider
supply chains have been impacted by the lockdown
restrictions which have reduced supply and led to
subdued demand for products and services. The
construction sector is currently experiencing
significant volatility in terms of labour, supply
chains, prices, and construction inflation. This
makes “building our way out of Covid” less
attractive, coupled with a connected surge in
construction claims and disputes.
Action Codes Actions Assigned To Date Status
CESIP22.01.02 Maximise funding for regeneration of Renfrewshire’s places through grant submissions to external sources including UK and
Scottish Governments.
The Regeneration and Place Team have successfully been able to secure and receive funding through various external sources. 
Between 21/22 and 25/26 we have been allocated £4.4m from the Place Based Investment Fund for capital regeneration
projects.
Between 22/23 and 24/25 we have received £1.5m in funding for capital and revenue regeneration spend from the Shared
Prosperity fund. 
Head of
Economy and
Development
31-Mar-
2023 
2 Advanced Manufacturing Innovation District

Page 6

5 | P a g e
Have consistently been successful in RCGF funding applications.  Most recent successful application received £800k in funding for
the PACE theatre project.
Have recently secured £35k funding from Visit Scotland to develop a strategic Tourism Infrastructure Development Plan for Clyde
Muirshiel Regional Park.
Recently the team submitted applications to NLHF and HES in respect of a potential new heritage scheme in Johnstone and
Kilbarchan.
CESDP21 - 01 -
27
Monitor benefits of City Deal Projects, including AMIDS, Clyde Waterfront and Renfrew Riverside and City Region wide
employment programmes.
Community Benefits:
110 of 150 community benefits have been delivered to date. The remainder are on track/have been re-baselined to be
completed as part of the project lifespan.
Project Benefits:
Project is developing at pace with all expected benefits in terms of infrastructure, economy and wider regeneration on track.
Glasgow Airport Investment Area (GAIA)
Community Benefits:
70 out of 70 community benefits have been delivered.
Project Benefits:
Enabling infrastructure benefits of the GAIA project is now complete. The infrastructure in place has allowed the progression of
the AMIDS site to take place with key link road throughout and new connecting bridges opened.
Programme
Director - City
Deal and
Infrastructure
31-Mar-
2023 
CESDP21 - 01 -
13
Deliver on the ambitions of our town centre strategies and specifically working with partners to transform Paisley Town Centre
through the Paisley Town Centre Action Plan 2016-2026.
The transformation of Paisley on the back of the Action Plan has begun.  Goals such creating an international culture and heritage
destination and acting as a stimulus for property investment, development and re-use has already been realised.  There are a
number of significant regeneration projects currently under construction including the restoration of the Museum, Town Hall and
Arts Centre and the creation of a new Culture and Learning Hub in the High Street. 
The recent publication of the Paisley Vision document will also act as a further catalyst to inspire future development in and
around the town centre. 
The team are now looking at delivering refreshed strategies for other major settlements in Renfrewshire.  The first will be in
Johnstone, with further updates for Erskine, Linwood and Renfrew in the pipeline.
Chief
Economic and
Regeneration
Manager
31-Mar-
2023 
CESDP21 - 01 -
26
Work with partners to deliver the Advanced Manufacturing Innovation District – Scotland (AMIDS)
First two centres of employment are significantly progressed with occupation of the 1st now completed in Q4 2022 and the other
due in Q1 2023. Procurement of a joint venture partner for the remaining AMIDS site is nearing completion, with agreement
anticipated May 2023. A strategic Group has been established with key stakeholders informing progression of development. Key
enabling infrastructure is now complete together with new public realm space.
Programme
Director, City
Deal and
Infrastructure
31-Mar-
2023 
CESIP20 - 01 -
07
Participate fully in all aspects of the new National Manufacturing Institute Scotland (NMIS) Governance arrangements and
Medicine Manufacturing Innovation Centre (MMIC) delivery.
RC have strong links with NMIS and MMIC as they are represented on the NMIS One Scotland Collaboration Group and chair the
AMIDS Strategic Advisory Group with both organisations represented. CD&I team members work closely with both organisations
Programme
Director, City
Deal and
Infrastructure
31-Mar-
2023

Page 7

6 | P a g e
daily and continue to assist with the commissioning of their buildings. MMIC building is already operational with NMIS expected
to open in early 2023.
Work has progressed with the Strategic Advisory Group to ensure partnerships are in place and a collaborative approach is
allowing NMIS and MMIC to lead on engaging with sector specific organisation to hopefully progress to further occupation at the
AMIDS site.
A meeting is scheduled at the NMIS building in March to plan through full governance and programme management structures
for how all parties engage with each other.
CESIP22.02.01 Progressing the AMIDS South project to maintain the programme requirements of the UK Government Levelling Up Fund award.
Planning consent obtained (Jan 2023). Liaison with stakeholders and continuing development of detailed designs ongoing in
advance of construction tender issue during 2023. Dialogue with UK Government agencies continuing on all aspects including
delivery programme.
Programme
Director, City
Deal and
Infrastructure
31-Mar-
2023

Page 8

7 | P a g e
• PLACE - working together to enhance wellbeing across communities
• FAIR - nurturing bright, happy and healthy futures for all 
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
SRR.23.02.02 
Reducing inequalities in Renfrewshire
If we don’t have a
coordinated approach
to tackling inequalities
across Renfrewshire
(including for example,
the causes and
consequences of
poverty), this could
jeopardise the effort in
reducing both the
short-term impacts on
households but also
have wider long-term
consequences on
attainment and health
for people living on low
incomes. 
Head of
Policy &
Partnerships
(1) Fairer Renfrewshire Programme
(2) Attainment Challenge
(3) Strong partnership working (e.g.
Community Planning
Partnership (CPP). Advice
Partnership, Empowering
Communities Forum, Improving
Life Chances, CPP Board
(4) CPP have identified priorities
e.g. Alcohol and Drugs, Social
isolation etc.
(5) Social Renewal Plan has been
developed through a
programme of analysis,
research, and engagement.
(6) Neighbourhood hub model in
place to support local needs on
a partnership basis in response
to COVID 
05 05 25
V.High
The Council plays a key role in tackling inequalities and providing the
best possible services to our communities, particularly those who are
experiencing the poorest outcomes. As well as our focus on health and
wellbeing, we are also committed to support vulnerable individuals,
groups or communities through early intervention and prevention,
responding to poverty, supporting routes to employment as well as
dealing with welfare reforms. The impact of COVID-19 is likely to have
exacerbated existing inequalities in terms of for example educational
attainment, health, poverty and mental health. There will be a significant
focus on ensuring that people receive the economic and wellbeing
support that is needed, with a real opportunity to work in a different
way, and to tackle some of the existing inequalities across communities
as we do this. The current cost of living crisis impacts disproportionately
on particular groups in society.  In the short term, significant focus is on
supporting food insecurity and supporting people on low incomes to
maximise income and seek advice with income and debt management.
Action Codes Actions Assigned To Date Status
CESIP22.03.01 Develop the new Fairer Renfrewshire programme. 
The Fairer Renfrewshire Sub-Committee has been meeting since August 22 and a Fairer Renfrewshire Officers Group made up
of officers from across services is meeting monthly. Work with partners to develop the Fairer Renfrewshire Programme is
ongoing. There are four key emerging themes which are shared across all elements of the programme, and these are:
•Improving financial security 
•Advancing equality of opportunity 
•Building community capacity and resilience 
•Listening to lived experience 
Funding has been allocated from the Fairer Renfrewshire budget to a number of projects to support residents with immediate
Cost of Living increases. These include supports around food, fuel and advice. Work is also ongoing around digital access and
supporting residents to get online through the Citizen Voice group, with a new post of Digital Champion in libraries has been
recruited.
Strategic
Partnerships &
Inequalities
Manager
31-Mar-
2025

Page 9

8 | P a g e
Our Winter Connections programme was set up to support residents over the Winter 22/23 period, and has provided grants to
a number of organisations to run activities.  The development of a panel of people with lived experience of poverty to inform
the Council’s policy and practice is ongoing. A diverse panel has been recruited and have met formally six times, with test of
change being evaluated by Poverty Alliance.
In addition, officers are undertaking a ‘deep dive’ child poverty data exercise, to support the Local Child Poverty Action Plan as
well as the wider Fairer Renfrewshire programme
CESIP22.03.02 Develop and implement the action plan for the Trauma-Informed and Responsive Renfrewshire Programme.
A coordinator post has been created to lead this programme of work going forward, with the coordinator starting in late
October 2022. Further engagement with the Improvement Service and other local authorities has taken place through national
networks for trauma champions and trauma leads, and the steering group reconvened in March 2023 to further explore the
draft plan for the Programme. Leadership training for the Corporate Management Team was also undertaken in March 2023.
Head of Policy &
Partnerships
31-Mar-
2024 
CESIP22.03.03 Deliver the Stigma/Language Matters project.
The work of the Alcohol and Drugs Commission identified the need for partners to act robustly to eradicate stigma and
promote positive conversations around recovery. Although the initial focus for this initiative was focused on alcohol and drug
stigma, there is the opportunity to widen its scope to include other existing and emerging priorities, such as The Promise,
Tackling Poverty, Trauma Informed and Responsive Renfrewshire and Our Values for example. High level themes and initial
actions have been identified, including supporting staff to understand the power of language, be confident in their use of
language, and to challenge stigma by speaking up when people make negative or wrong comments; and supporting national
campaigns to help people in Renfrewshire understand the power and impact of language. A review of the resources required to
deliver this project is currently underway.
Head of Policy &
Partnerships
31-Mar
2024 
CESIP22.03.06 Develop and implement targeted interventions to supporting communities through the cost-of-living crisis, with a particular
focus on food and fuel insecurity 
The Community Food Fund has supported community food provision across Renfrewshire. Three allocations of funding have
been made to the Fuel Insecurity Pilot which continues to support fuel vouchers augmented with energy advice and the
increase in payment amount and continuation of the Financial Insecurity Winter Payment supports households who are
struggling to purchase essentials like food and fuel. In addition the Tackling Poverty programme continues to support an Energy
Adviser in the Energy Management Unit.
Strategic
Partnerships &
Inequalities
Manager
31-Mar-
2023 
CESIP22.03.09 Carry out an evaluation of the Tackling Poverty programme and develop a transition plan for mainstreaming this work.
Work commenced in Q2 and initial projects identified for evaluation. This work is ongoing with Programme Management Unit
support.
Strategic
Partnerships &
Inequalities
Manager
30-Sep-
2023

Page 10

9 | P a g e
• GREEN – leading Renfrewshire to Net Zero
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
SRR.23.03.03 
Climate, Sustainability &
Adaptability
The climate emergency
brings a risk to Council
and its communities in
relation to increased
extreme weather as well
as food insecurity. We
need to focus on
mitigation and
adaptation and ensure a
just transition so no one
is left behind and none is
disadvantaged in the
transition to net zero.
The Council would need
to take action and
support those most
disadvantaged. A key risk
is that the Council is not
in control of all of the
levers, and cannot
deliver everything
required in isolation, so
there is a risk that others
do not contribute
towards the 2030 target. 
Head of
Policy &
Partnerships 
Head of
Climate,
Public
Protection
and Roads 
Climate
Change
Working
Group
(1) The Council has used the Climate Change Assessment Tool – helps
public sector organisations in Scotland self-evaluate their performance
under the public sector duties of the Climate Change (Scotland) Act
2009 
(2) Renfrewshire’s Plan for Net Zero has specific objectives to reduce
emissions, and these are included in other key documents such as the
Council Plan 
(3) Implementation of the Corporate Asset Management Strategy ensures
that property assets are managed effectively and efficiently through
the provision of relevant management and performance information 
(4) The Energy Management Team: ensure energy management initiatives
are aligned to the capital investment programme and corporate asset
strategy to optimise use of property estate and reduce overall running
costs and energy consumption levels. Promote reductions in energy
usage and advise employees and residents about energy efficiency 
(5) Through the Procurement Unit, sustainability and community benefits
are considered in the development of all contract strategies
(6) Governance through the Planning & Climate Change Policy Board
(7) Launch of the Climate change action fund – to support a range of
initiatives/feasibility to test new ways of working and to be ready to
lever external funding
(8) Climate Panel / Partnership Forum to support engagement and ensure
all voices are heard, including traditionally underrepresented groups 
(9) Community Climate Fund – fund for community organisations to
enable behaviour change and local green projects to make our
communities more resilient
04 04 16
High
Renfrewshire Council declared a
Climate Emergency on 27 June
2019 and established a Climate
Change Sub-Committee, now
the Planning and Climate
Change Policy Board to lead on
this work.  The actions required
are potentially complex and
multi-faceted and need to be
supported by organisations
across all sectors, and in
partnership with local
communities. Actions include:
pledging to work proactively
with others towards a net zero
Renfrewshire by 2030, taking
into account both production
and consumption emissions;
and assisting communities to
become more resilient to the
impacts of global warming,
particularly to flooding and to
drought.
Action Codes New Actions Assigned To Date Status
CESIP22.04.01 Complete the District Heating Network at AMIDS, with supplies to NMIS and MMIC.
The district heating network is now complete and operational.
Programme Director, City Deal
and Infrastructure
31-Mar-
23 
CESIP22.04.02 Develop the first stage of Renfrewshire’s Plan for Net Zero 
The Plan for Net Zero was developed in partnership with other services, stakeholders and our citizens through
Renfrewshire’s Climate Panel. The Plan was approved by the Planning and Climate Change Policy Board on 23rd
August.
Strategy, Policy & Insight
Manager
31-Dec-
22 
Forward action linked to Net Zero plan: Climate change action to make Renfrewshire net zero - Renfrewshire Website

Page 11

10 | P a g e
Appendix 2: Corporate Risks, longer-term or imminent 
• LIVING our VALUES – making a difference together
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR23.04.04 
Financial Sustainability
If significant cost
pressures are not
successfully
planned for and
managed
effectively over the
medium to longer
term, this could
jeopardise the
financial
sustainability of the
council and result in
a significant impact
on availability and
quality of front-line
services and capital
investment
resources.
Decisions will then
be required on the
continuity or scope
of some services
currently offered.
Head of
Finance &
Procurement
(1) Revised medium- to long-term Financial Outlook reassessed the
various risks to the Council’s short, medium- and longer-term
financial sustainability. Refreshed report to Council on 2 March
2023 outlined the immediate financial concerns and plans to
address these, including R4R savings (see 3 below), financial
sustainability workstreams, and utilising flexibilities agreed by the
Scottish Government; however, as the position continues to
develop and evolve, close monitoring will be required to ensure
that the Council manages costs in the short term and fully
appreciates the longer term consequences of actions taken to
address short-term risks.  Committee reports of this nature cover a
wide range of current and future financial and economic factors
e.g., Strategic Economic and National Policy Context, Cost
Pressures, Pressures on Income and Mitigation Strategies to deal
with such uncertainties.
(2) A well-developed and embedded budget planning, budget setting
and budgetary control system is in place throughout the
organisation, and this informs members and officers regarding
financial performance and stability. This facilitates robust and
transparent decision making and incorporates an escalation process
with regards budget management issues which may arise. 
(3) In conjunction with the medium to longer term financial outlook
and the Council’s continued “Right for Renfrewshire (R4R)
Programme”, Renfrewshire Council has been pro-active in planning
for the future by identifying and agreeing a planned release of
resources. This is required to meet emerging budget pressures and
has been run in conjunction with the Council’s long-term debt
smoothing strategy to support the release of planned savings over a
number of years; however, the pandemic interrupted the planned
delivery of savings under RFR, so the full programme has been
reviewed. It remains the case that savings will continue to require
be generated at scale in order to ensure the ongoing financial
sustainability of the Council.
05 05 25
V.High
Financial recovery from global events 
- Rebuilding of financial resilience
following unprecedented costs and
loss of income incurred in responding
to the COVID-19 pandemic
- Anticipated reduced income from
NDR/CT over the medium term as full
economic implications of the
pandemic and cost-of-living crisis hit
local businesses and communities
- Pricing volatility and global supply
issues leading to shortage of labour
and materials following Brexit and the
outbreak of the Ukraine war
Best value report
- Recommendation in Best Value report
to prioritise how services need to be
provided in future to be funded from
within available resources.
Cost and Income pressures
- Future grant settlements and the
level of funding available.
- Implications of national economic
policy choices to protect certain
services from real-terms reductions in
funding such as the Police and NHS
- Future Local Government pay
settlements, and non-payroll inflation
- Demographics and demand
pressures, such as an ageing
population with increased associated

Page 12

11 | P a g e
service demands, and increases in
demand for children’s social care
- Implications of welfare reform and
poverty levels, exacerbated by cost-
of-living crisis.
- Reductions in income from fee-
generating services such as car
parking; implications of the national
economic recovery and associated
risks/uncertainty in economic factors
e.g., interest rates and inflation.
- Implications of third party provider
financial stability, such as childcare
providers in current economic climate
- Liability for predecessor
organisations, in light of the removal
of the limitation period for historic
child abuse claims
(4) The Council approved a number of Financial Sustainability
Workstreams in June 2022. These are led by Directors and look to
progress recurring revenue savings.
(5) There is close financial monitoring of the agreed savings to ensure
that they are delivered within the agreed timescales or where this is
not possible, to understand and reschedule planned delivery to
achieve the associated objectives. Monitoring is undertaken via a
combination of financial and operational measures, actions and
related update reports.
(6) Regular updates and bespoke reports are provided to CMT and the
Council with regards the national fiscal position, likely
developments and the impact on the council through close liaison
with national groups e.g., CIPFA DoFs, COSLA and the Scottish
Government. This liaison remains critical in ensuring the Council is
aware of potential financial developments and is in a position to
influence these.
(7) Levels of and use of reserves has been a key tool in addressing the
costs of the pandemic, therefore the planned use of and rebuilding
of reserves in the medium term, and the Council’s Capital
Investment and Treasury Management Strategy, are key to ensuring
ongoing financial sustainability.
Other controls
(8) Reports and publications from Audit Scotland in relation to the
Local Government financial outlook, financial planning and related
developments and improvements are supplemented with a
Renfrewshire context report, with both reports being submitted to
the Council's Audit Risk and Scrutiny Board. 
(9) Utilisation and energy consumption has clarified priority areas for
investment in the Council’s estate and this has supported and
informed investment decisions and the formulation of the Council’s
Capital and Revenue budgets.
Action Codes Linked Actions Latest Note Assigned To Due Date Status
CRR22.05.05a  Strategic Property Review and new ways of working /
Review of local policy positions
Work on all of the financial sustainability
workstreams is being progressed with
updates regularly to Council. Agreed
budget changes will then be incorporated
into the General Fund base budget in
Director of Environment,
Housing and Infrastructure
30-Sep-2023 
CRR22.05.05b  Charging, fees and commercialisation / review of
Council risk
Director of Finance and
Resources
30-Sep-2023 
CRR22.05.05c  Strategic review of procurement  Chief Executive (Head of
Policy and Partnerships)
30-Sep-2023

Page 13

12 | P a g e
CRR22.05.05d  Connected Communities / Review of Management
grades and structures
future years to capture the recurring
savings. 
Due dates amended to 30 Sep 2023.
Chief Executive (Head of
Policy and Partnerships)
30-Sep-2023 
CRR22.05.05e  Digital Strategy Director of Finance and
Resources
30-Sep-2023 
CRR22.05.05f  Council Tax and Tax Policy Director of Finance and
Resources
30-Sep-2023 
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR23.04.05 
Financial Stability
If significant short-term
costs and income losses
are not closely
monitored and
understood, this could
destabilise the finances
of the Council to an
extent beyond the
financial resilience of the
Council, resulting in a
need for immediate cost
control measures, or
short-term savings which
have an immediate
impact on service
delivery.
Head of
Finance and
Procurement
(1) Revenue budget monitoring reports to Policy Boards focus on the forecast
year-end outturn position rather than the historic periodic position, so that
significant variances are reported early, and any mitigating steps can be
taken. This is already highlighting severe price pressures (such as energy
costs) across different services. The impact of pay inflation is also highlighted
through this reporting mechanism.
(2) Review of all Right for Renfrewshire programmes has been undertaken in
order to recalculate potential cost savings in-year and to reprofile agreed
savings, the delivery of which was interrupted by the pandemic
(3) Review of Financial Sustainability workstreams following approval of the
2023/24 Revenue Budget to ensure targets remain achievable
(4) Clear analysis of the Council’s reserves position and potential for
reprioritisation or redirection; including the development of plans to rebuild
financial resilience of the Council in the medium term
(5) Ongoing discussion with directors to understand the financial consequences
of the current economic climate for each service and how these will be
managed; 
(6) Review of capital plan and ongoing projects to ensure clear understanding of
phasing of potential spend.
05 05 25
V.High
Context: 
Imminent shorter-
term risk for
financial stability,
recognising the
immediate financial
situation of the
Council (note: the
medium to longer-
term financial
position is captured
under financial
‘sustainability’)
Action Codes Linked Actions Latest Note Assigned Due Date Status
CRR22.05.07a  Investigate potential of Service
Concession Flexibility allowed by
Scottish Government 
This exercise has now been completed and approved by Council through the
Revenue Estimates 2023/24 where annual recurring savings of £1.4m were
identified.
Head of
Finance and
Procurement
31-Oct-
2022 
CRR22.05.07b  Report to Council the financial impact
of utilising the service concession
flexibility
Complete – reported to Council in Financial Outlook in December 2022 and
Revenue Estimates report in March 2023
Director of
Finance and
Resources
31-Dec-
2022

Page 14

13 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR23.04.06 
Cyber Attack
While the council’s cyber
protections are robust, cyber-
attacks are becoming more and
more frequent and sophisticated,
and the council could be subject
to an attack such as that on SEPA,
with the risk of significant impact
on council service provision.
CMT For security reasons, controls are not
published in the public domain 
Note, this risk has been subject to a deep dive
exercise in March 2023. Recommendations are
with the CMT for approval.
04 04 16
High
Context: 
▪ Review of the council’s cyber
environment
▪ Ever increasing criminal cyber activity
▪ Increasing reliance on electronic
systems
Action Codes Linked Actions Latest Note Assigned To Due Date Status
As agreed by the Corporate Management Team   
Context  Risk Statement  Owned by  Current Controls  Likelihood  Impact  Evaluation 
CRR23.04.07
Impact on Regulatory
Services due to Covid-
19 and EU withdrawal. 
There is a risk,
due to the shifting
legislative
landscape and
rapidly increasing
demands on
Regulatory staff
arising from
COVID-19 and the
EU Exit on 1
January 2021 that
statutory duties
may not be able
to be fully met. 
Regulatory
Services continue
to function within
a post-pandemic
recovery phase. 
Head of
Climate,
Public
Protection
& Roads 
(1) Bedding in the new “grow your own” structure, to ensure a strong and
resilient workforce moving forward. This will also support the retention
of skilled and qualified employees within the service.  
(2) Working with REHIS, Society of Chief Environmental Health Officers for
Scotland and University West of Scotland, Renfrewshire Council been
mentoring a student from September 2021 as part of the first cohort of
new trainees under a new Environmental Health course. This will lead to
a larger number of EHOs to come through and replace an ageing
workforce.
(3) Three Fair Trading & Licensing Officers are passed Stage 1 of the Trading
Standards qualification process and are undergoing Stage 2.  This is a
long process, which takes a significant amount of staff resource to
support but can be undertaken in small, incremental stages, to ensure
service delivery as a priority.
(4) Wider staff being trained in functions to release EHO/TSO to focus on EU
withdrawal work at Glasgow Airport. 
(5) Discussions with Glasgow Airport to understand impacts of changes at
Glasgow Airport from EU withdrawal. 
(6) Discussions with DEFRA & Food Standards Scotland on Import/Exports
duties 
(7) Regular meetings with other appropriate bodies to understand
landscape for EU withdrawal and impacts on Renfrewshire.
03  05  15 
High 
Context:  
Increased demands
have been placed on
Regulatory Services
(Environmental Health
and Trading Standards)
due recovery post-
pandemic and EU
withdrawal. 
Resource and funding
will be required to
meet the current
demands and ensure
that statutory duties
are not impacted.
Action Codes Linked Actions Latest Note Assigned To Due Date Status
Ongoing monitoring

Page 15

14 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR23.04.08
Commercial vehicle and operator
licence compliance 
Renfrewshire Council
requires its fleet of
vehicles to be
effectively managed,
otherwise there could
be sustained impact in
several areas including
community care,
housing maintenance
and repairs, streetscene
operations and waste
collection. 
Head of
Operations
and 
Service
Development
Governance
(1) Training and Compliance Officer in post monitoring
compliance performance and linking to inspection activity 
(2) Monitoring and tracking of vehicle servicing
(3) Tachograph analysis system ensuring monitoring and
compliance of driving staff 
(4) Operator Licencing Awareness Training (OLAT) conducted
for all operational service managers
(5) Full compliance audit report focusing on Operator Licence
and Compliance completed in 2019 by Freight Transport
Association (FTA)
(6) Regular monitoring of Driver and Vehicle Standards
Agency (DVSA) updates and controls
(7) Quarterly attendance at Logistics UK (formerly FTA) and
APSE Transport boards
Operational
(8) Reduction in average age of Council Fleet
(9) Workshop equipment and tooling improvements
03 05 15
High
Context:  
The council’s vehicle fleet, managed
by Environment & Infrastructure
Services, comprises around 500
vehicles including heavy and large
goods vehicles, light vans and
cars.  The council implements a
range of measures to ensure
ongoing vehicle operator licence
compliance. 
Action Codes Linked Actions  Latest Note Assigned To Date Status
(Presently monitoring compliance until such times as the risk can be reduced.  We are currently recruiting for two compliance posts within the service)

Page 16

15 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR23.04.09
Asset Management
Effective governance
and management of
the council’s property
assets is essential,
otherwise there is a
significant risk of
harm, financial loss,
service disruption,
non-compliances,
fines, rising energy
costs and inability to
recover losses via
insurance proceeds
Director of
Environment,
Housing &
Infrastructure;
Director of
Finance &
Resources;
Head of
Economy &
Development
Services
Corporately:
Key responsibilities with regards to the
Estate span 2 specific service departments,
but they come together through a CAMIS
Development Group (Corporate Asset
Management Information System) which is
taking forward a workplan to more
effectively consolidate and oversee asset
management risk
Heads of Service:
Effective asset management in practice on
the frontline is included within the new Risk
Assurance model which went live on 1 April
2023.
03 05 15
High
Context:
GOVERNANCE – roles and responsibilities
- Estates (Leases – by and from the council, and
on behalf of HSCP)
- Facilities management (security, housekeeping,
statutory duties/ inspection, maintenance,
repair, building fire risk assessment)
- Property services (capital works, and CAMIS
development)
- All services (inspection inventories and
response, people elements of fire risk
assessment)
Action Codes Linked Actions  Latest Note Assigned To Due Status
CRR22.05.10a New CAMIS Development Group
to appoint Joint Chairs/ Heads of
Service
Head of Property Services and Head of Facilities Management Services have
agreed to co-chair the group
CAMIS Development
Group
30-Sep-
2022 
CRR22.05.10b Agree Terms of Reference for the
CAMIS Development Group
The Terms of Reference have been finalised. CAMIS Development
Group
15-Nov-
2022 
CRR22.05.10c Undertake gap analysis to
ascertain if any responsibilities in
terms of governance are missing
or unclear
Organisational changes agreed by Council have streamlined some
governance arrangements – specifically that Property Services are now part
of the Facilities & Property Services function in Environment, Housing &
Infrastructure Services. There is less scope therefore for unclear
responsibilities.
CAMIS Development
Group
19-Dec-
2022 
CRR22.05.10f Develop a workplan for the group
and prioritise areas of initial focus
Leads for initial priority activities have been agreed and a workplan is
progressing in line with the Group’s terms of reference. 
CAMIS Development
Group
28-Feb-
2023 
CRR22.05.10g Agree the workplan for 2023/24 Workplan and meeting schedules are in place, aligned to the Group’s terms
of reference
CAMIS Development
Group
31-Mar-
2023 
CRR22.05.10d Undertake gap analysis to identify
activities that take place outside
of the CAMIS environment and
consider if these can be brought
into CAMIS by way of system
development
Making good progress but more involved than initially thought. Issues
include future reference/ amendment to Scheme of Delegated Functions:
Delegations to Officers – Due date therefore amended to June 2023
CAMIS Development
Group
30-Jun-
2023 
CRR22.05.10e Explore data and status
monitoring
Making good progress but more involved than initially thought – Due date
therefore amended to June 2023
CAMIS Development
Group
30-Jun-
2023

Page 17

16 | P a g e
Context Risk Statement Owned by Current Controls Likelihood Impact Evaluation
CRR23.04.10
Tree Fall and Ash Die Back &
Larch Infection
Tree management in Renfrewshire has
historically been based around risk-based
response to any reporting of concerns,
however with the emergence of Ash Die
back in the UK there is now an increased
potential for:
- public injury and property damage;
- awards against the Council; and,
- reputational damage.
- Statutory notices
Head of Operations
and 
Service
Development
Responses to customer / public
complaints and enquiries
Reactive surveys 
Visual inspections
Statutory notices served –
(Forestry Scotland)
05 03 15
High
Context:
The main trigger for this risk a
significant outbreak of Ash
Dieback in the UK which will
results in a significant number
of trees within Renfrewshire
having to be felled
Action Codes Linked Actions Latest Note Assigned To Date Status
CRR22.05.11a Tree & woodland area formal
inspections 
Officers are undertaking a table-top Google assessment of Ash dieback -
this is still ongoing. Due date amended to 30 June 2023
Tree &
Woodland
Officer
30-June-
2023 
CRR22.05.11b Produce, disseminate and promote a
formalised Ash Dieback Action Plan
Looking to adapt Tree Council for Scotland’s Ash Die back plan.  This will
follow on from the desktop survey. Due date amended to 31 Dec 2023 
Tree &
Woodland
Officer
31-Dec-
2023 
CRR22.05.11c Further identify areas of larch trees and
schedule removal
2 Larch Infections fully dealt with felling circa 1300 trees.  Legal notice
received requiring a further felling of trees and due date amended
accordingly to 31 August 2023. 
Tree &
Woodland
Officer
31-Aug-
2023 
CRR22.05.11d Accurately record findings and seek
funding for replanting projects
Working with Clyde Climate Forrest and Trees for Cities.  In terms of
Larch Infections we have commenced some replating using resources
available. Due date amended to 31 Dec 2023 
Tree &
Woodland
Officer
31-Dec-
2023

Page 18

17 | P a g e
Appendix 3: Significant Service Risks 
Nil return, HOWEVER: 
Following the recent organisation structural changes, Environment, Housing and Infrastructure Services will be fully reviewing their risk profile to
determine if any new significant risks should be recorded in this section going forward.

Page 19

18 | P a g e
Appendix 4: Business-as-Usual Risks
The council has 12 areas of risk that it considers to be business-as-usual risk; those not generally related to
corporate priorities or ambitions but rather they are inherent by nature of our type of organisation and services
we deliver. The table below sets out what our business-as-usual risk areas are (in no specific order), and what
they cover.
BAU RISK AREA ENCOMPASSING BAU RISK AREA ENCOMPASSING      
1. Community &
public safety
Child and adult protection
Serious and organised crime
(external)
2. Asset
management
Statutory compliance
Arrangements for void properties
Fleet and other infrastructure
ICT hardware and software assets
and responsibilities
3. People
wellbeing &
development
Staff health and wellbeing
Training and development
Corporate and local induction
4. Information
handling
GDPR compliance
Information asset management
Information security
Records management
5. Health, safety &
managing
adverse events
Staff incident recording
RIDDOR arrangements
Incident monitoring and trends
analysis
6. Programme
and project
management
Governance
Compliance with industry
standards/ adopted methods
7. Organisation
resilience
Business continuity:
- Staffing resource
- ICT and/ or power outages
- Facility issue
- Cyber security
8. Partnership
management
Partnership registers
Agreements
Liabilities
9. Financial
control and
governance
Authorities and delegation
Budgeting and accounting
Conflict and whistleblowing
Insider threat and crime
Counter fraud
10. Service
performance
monitoring
Trends analysis
Links to risk management and
service improvement
11. Procurement
and contract
management
Standing orders
Roles and responsibilities
Monitoring & Performance Mgt
12. Complaints,
comments and
claims
handling
Compliance
Trends analysis
Links to service improvement 
The new risk assurance model in place for the above risks has gone live on 1 April. With the new ICT solution
developed in-house to track these risks, Audit and Risk officers can see on a monthly basis, how Heads of Service
and direct reports to Directors are responding to the question sets for each area of risk. In November 2023,
members will receive the mid-year report that will give a first insight to how the new model is working.