Page 1

1 
___________________________________________________________________
To: Audit, Risk and Scrutiny Board
On: 14 November 2022
___________________________________________________________________
Report by: Director of Finance and Resources
___________________________________________________________________
Heading: Audit Scotland Report to those charged with governance - 2021/22
Renfrewshire Council Annual Accounts 
___________________________________________________________________
1. Summary
1.1 Each year the Council’s appointed external auditors carry out an audit
of the Council’s financial statements and provide an opinion as to
whether those statements provide a fair and true view of the financial
position of the Council and its income and expenditure for the year;
and also whether they have been prepared in accordance with the
Local Government (Scotland) Act 1973. 
1.2 In accordance with International Auditing Standards (ISA260), Audit
Scotland are obliged to report to those charged with the governance of
the organisation matters which have arisen in the course of the audit. 
1.3 The attached ISA260 reports from Audit Scotland outline their findings
from the audit of the 2021/22 the Renfrewshire Council accounts. 
1.4 Under the Local Authority Accounts (Scotland) Regulations 2014, the
Council must meet to consider the Annual Accounts and aim to
approve those accounts for signature no later than 30 September. For
2021/22, the Local Government Finance Circular 6/2022: Extension to
Accounts Approval and Publication Dates for 2021-22 provided
flexibility to this deadline, extending it to 30 November. 
1.5 Audit Scotland officers will attend the Audit, Risk and Scrutiny Board
meeting to present their reports.

Page 2

2 
___________________________________________________________________
2. Recommendations
2.1 Members are requested to consider the attached report from Audit
Scotland.
___________________________________________________________________
Implications of the Report
1. Financial – The 2021/22 Annual Accounts demonstrate the Council
continues to operate services within the resources available, and in line
with the relevant legislation.
2. HR & Organisational Development – none
3. Community/Council Planning – none
4. Legal – An audit opinion free from qualification demonstrates the
Council’s compliance with the statutory accounting requirements set
out in the Local Government (Scotland) Act 1973 and the Local
Government in Scotland Act 2003.
5. Property/Assets – none
6. Information Technology – none 
7. Equality & Human Rights – The recommendations contained within
this report have been assessed in relation to their impact on equalities
and human rights. No negative impacts on equality groups or potential
for infringement of individuals’ human rights have been identified
arising from the recommendations contained in the report because it is
for noting only.   If required following implementation, the actual impact
of the recommendations and the mitigating actions will be reviewed and
monitored, and the results of the assessment will be published on the
Council’s website.  
8. Health & Safety – none 
9. Procurement – none
10. Risk – none 
11. Privacy Impact – none
12. Cosla Policy Position – none
13. Climate Risk – none 
___________________________________________________________________ 
Author:           Christine McCourt, Head of Finance and Business Services

Page 3

102 West Port
Edinburgh 
EH3 9DN
8 Nelson Mandela Place
Glasgow 
G2 1BT
The Green House
Beechwood Business Park North
Inverness
IV2 3BL
T: 0131 625 1500
E: info@audit-scotland.gov.uk
www.audit-scotland.gov.uk 
Audit, Risk and Scrutiny Board
14 November 2022
Renfrewshire Council
Audit of 2021/22 annual accounts
Independent auditor's report
1.  Our audit work on the 2021/22 annual accounts is now substantially complete. Subject to the
satisfactory conclusion of the outstanding matters referred to later in this letter and receipt of a
revised set of annual accounts for final review, we anticipate being able to issue unqualified
audit opinions in the independent auditor's report on 17 November 2022 (the proposed report is
attached at Appendix A).  
Annual audit report
2.  Under International Standards on Auditing in the UK, we report specific matters arising from
the audit of the financial statements to those charged with governance of a body in sufficient
time to enable appropriate action. We present for the Audit, Risk and Scrutiny Board’s
consideration our draft Annual Audit Report on the 2021/22 audit. The section headed
"Significant findings from the audit in accordance with ISA 260" sets out the issues identified in
respect of the annual accounts.
3.  The report also sets out conclusions from our consideration of the four audit dimensions that
frame the wider scope of public audit as set out in the Code of Audit Practice.
4.  This report will be issued in final form after the annual accounts have been certified.
Unadjusted misstatements
5.  We also report to those charged with governance all unadjusted misstatements which we
have identified during our audit, other than those of a trivial nature and request that these
misstatements be corrected.
6.  There is one unadjusted misstatement within the accounts. The Council uses indexation for
the council house estate to estimate changes in value for years without a full valuation. This has
been applied based on quarter 1 market data (as at 30 June) rather than the quarter 4 market
data (as at 31 March). The impact for the Council accounts is that the value of council dwellings
are overstated by £681,622. This has not been amended in the audited accounts and is not
judged to be a material issue.
Fraud, subsequent events and compliance with laws and regulations
7.  In presenting this report to the Audit, Risk and Scrutiny Board we seek confirmation from
those charged with governance of any instances of any actual, suspected or alleged fraud; any
subsequent events that have occurred since the date of the financial statements; or material

Page 4

non-compliance with laws and regulations affecting the entity that should be brought to our
attention.
Representations from Section 95 Officer
8.  As part of the completion of our audit, we are seeking written representations from the
Director of Finance and Resources, as the Section 95 Officer, on aspects of the annual
accounts, including the judgements and estimates made.
9.  A draft letter of representation is attached at Appendix B. This should be signed and
returned to us by the Director of Finance and Resources with the signed annual accounts prior
to the independent auditor’s report being certified.
Outstanding matters 
10.  There are some areas where we still require additional information, and these are identified
below:
• The Loans fund repayment register for General Services and Housing Revenue
Account, and working papers to support the calculation of the annuity method
• The supporting documentation in relation to the Housing Revenue Account sample
selected for testing.

Page 5

Appendix A:  Proposed Independent Auditor’s Report
Independent auditor’s report to the members of Renfrewshire Council and
the Accounts Commission
Reporting on the audit of the financial statements
Opinion on financial statements
I certify that I have audited the financial statements in the annual accounts of Renfrewshire
Council and its group for the year ended 31 March 2022 under Part VII of the Local Government
(Scotland) Act 1973. The financial statements comprise the Comprehensive Income and
Expenditure Statements, Movement in Reserves Statements, Balance Sheets, and Cash-Flow
Statements, the council-only Housing Revenue Account, the Council Tax Income Account, and
the Non-Domestic Rates Account and notes to the financial statements, including a summary of
significant accounting policies. The financial reporting framework that has been applied in their
preparation is applicable law and UK adopted international accounting standards, as interpreted
and adapted by the Code of Practice on Local Authority Accounting in the United Kingdom
2021/22 (the 2021/22 Code).
In my opinion the accompanying financial statements:
• give a true and fair view in accordance with applicable law and the
2021/22 Code of the state of affairs of the Council and its group as at
31 March 2022 and of the income and expenditure of the Council and
its group for the year then ended;
• have been properly prepared in accordance with UK adopted
international accounting standards, as interpreted and adapted by the
2021/22 Code; and
• have been prepared in accordance with the requirements of the Local
Government (Scotland) Act 1973, the Local Authority Accounts
(Scotland) Regulations 2014, and the Local Government in Scotland
Act 2003. 
Basis for opinion
I conducted my audit in accordance with applicable law and International Standards on Auditing
(UK) (ISAs (UK)), as required by the Code of Audit Practice approved by the Accounts
Commission for Scotland. My responsibilities under those standards are further described in the
auditor’s responsibilities for the audit of the financial statements section of my report. I was
appointed by the Accounts Commission on 26 September 2022. The period of total
uninterrupted appointment is 1 year. I am independent of the Council and its group in
accordance with the ethical requirements that are relevant to my audit of the financial
statements in the UK including the Financial Reporting Council’s Ethical Standard, and I have
fulfilled my other ethical responsibilities in accordance with these requirements. Non-audit
services prohibited by the Ethical Standard were not provided to the Council. I believe that the
audit evidence I have obtained is sufficient and appropriate to provide a basis for my opinion.
Conclusions relating to going concern basis of accounting
I have concluded that the use of the going concern basis of accounting in the preparation of the
financial statements is appropriate.

Page 6

Based on the work I have performed, I have not identified any material uncertainties relating to
events or conditions that, individually or collectively, may cast significant doubt on the ability of
the Council and its group to continue to adopt the going concern basis of accounting for a
period of at least twelve months from when the financial statements are authorised for issue.
These conclusions are not intended to, nor do they, provide assurance on the current or future
financial sustainability of the Council and its group. However, I report on the Council’s
arrangements for financial sustainability in a separate Annual Audit Report available from the
Audit Scotland website.
Risks of material misstatement
I report in my Annual Audit Report the most significant assessed risks of material misstatement
that I identified and my judgements thereon.
Responsibilities of the Director of Finance and Resources and the Audit, Risk and
Scrutiny Board for the financial statements
As explained more fully in the Statement of Responsibilities, the Director of Finance and
Resources is responsible for the preparation of financial statements that give a true and fair
view in accordance with the financial reporting framework, and for such internal control as the
Director of Finance and Resources determines is necessary to enable the preparation of
financial statements that are free from material misstatement, whether due to fraud or error.
In preparing the financial statements, the Director of Finance and Resources is responsible for
assessing the ability of the Council and its group to continue as a going concern, disclosing, as
applicable, matters related to going concern and using the going concern basis of accounting
unless there is an intention to discontinue the operations of the Council and its group.
The Audit, Risk and Scrutiny Board is responsible for overseeing the financial reporting process.
Auditor’s responsibilities for the audit of the financial statements
My objectives are to obtain reasonable assurance about whether the financial statements as a
whole are free from material misstatement, whether due to fraud or error, and to issue an
auditor’s report that includes my opinion. Reasonable assurance is a high level of assurance,
but is not a guarantee that an audit conducted in accordance with ISAs (UK) will always detect a
material misstatement when it exists. Misstatements can arise from fraud or error and are
considered material if, individually or in the aggregate, they could reasonably be expected to
influence the decisions of users taken on the basis of these financial statements.
Irregularities, including fraud, are instances of non-compliance with laws and regulations. I
design procedures in line with my responsibilities outlined above to detect material
misstatements in respect of irregularities, including fraud. Procedures include:
• obtaining an understanding of the applicable legal and regulatory
framework and how the Council and its group is complying with that
framework;
• identifying which laws and regulations are significant in the context of
the Council and its group;
• assessing the susceptibility of the financial statements to material
misstatement, including how fraud might occur; and

Page 7

• considering whether the audit team collectively has the appropriate
competence and capabilities to identify or recognise non-compliance
with laws and regulations.
The extent to which my procedures are capable of detecting irregularities, including fraud, is
affected by the inherent difficulty in detecting irregularities, the effectiveness of the Council’s
controls, and the nature, timing and extent of the audit procedures performed.
Irregularities that result from fraud are inherently more difficult to detect than irregularities that
result from error as fraud may involve collusion, intentional omissions, misrepresentations, or
the override of internal control. The capability of the audit to detect fraud and other irregularities
depends on factors such as the skilfulness of the perpetrator, the frequency and extent of
manipulation, the degree of collusion involved, the relative size of individual amounts
manipulated, and the seniority of those individuals involved.
A further description of the auditor’s responsibilities for the audit of the financial statements is
located on the Financial Reporting Council's website www.frc.org.uk/auditorsresponsibilities.
This description forms part of my auditor’s report.
Reporting on other requirements
Opinion prescribed by the Accounts Commission on the audited part of the
Remuneration Report
I have audited the part of the Remuneration Report described as audited. In my opinion, the
audited part of the Remuneration Report has been properly prepared in accordance with the
Local Authority Accounts (Scotland) Regulations 2014.
Other information
The Director of Finance and Resources is responsible for other information in the annual
accounts. The other information comprises the Management Commentary, Annual Governance
Statement, Statement of Responsibilities and the unaudited part of the Remuneration Report. 
My responsibility is to read all the other information and, in doing so, consider whether the other
information is materially inconsistent with the financial statements or my knowledge obtained in
the course of the audit or otherwise appears to be materially misstated. If I identify such material
inconsistencies or apparent material misstatements, I am required to determine whether this
gives rise to a material misstatement in the financial statements themselves. If, based on the
work I have performed, I conclude that there is a material misstatement of this other information,
I am required to report that fact. I have nothing to report in this regard.
My opinion on the financial statements does not cover the other information and I do not
express any form of assurance conclusion thereon except on the Management Commentary
and Annual Governance Statement to the extent explicitly stated in the following opinions
prescribed by the Accounts Commission.
Opinions prescribed by the Accounts Commission on the Management
Commentary and Annual Governance Statement
In my opinion, based on the work undertaken in the course of the audit:
• the information given in the Management Commentary for the financial
year for which the financial statements are prepared is consistent with

Page 8

the financial statements and that report has been prepared in
accordance with statutory guidance issued under the Local Government
in Scotland Act 2003; and
• the information given in the Annual Governance Statement for the
financial year for which the financial statements are prepared is
consistent with the financial statements and that report has been
prepared in accordance with the Delivering Good Governance in Local
Government: Framework (2016).
Matters on which I am required to report by exception
I am required by the Accounts Commission to report to you if, in my opinion:
• adequate accounting records have not been kept; or
• the financial statements and the audited part of the Remuneration
Report are not in agreement with the accounting records; or
• I have not received all the information and explanations I require for my
audit; or
• there has been a failure to achieve a prescribed financial objective.
I have nothing to report in respect of these matters.
Conclusions on wider scope responsibilities
In addition to my responsibilities for the annual accounts, my conclusions on the wider scope
responsibilities specified in the Code of Audit Practice, including those in respect of Best Value,
are set out in my Annual Audit Report.
Use of my report
This report is made solely to the parties to whom it is addressed in accordance with Part VII of
the Local Government (Scotland) Act 1973 and for no other purpose. In accordance with
paragraph 120 of the Code of Audit Practice, I do not undertake to have responsibilities to
members or officers, in their individual capacities, or to third parties.
Pauline Gillen FCPFA
Audit Director
Audit Scotland
4th Floor, The Athenaeum Building
8 Nelson Mandela Place
Glasgow
G2 1BT   
November 2022

Page 9

Prepared for the Members of Renfrewshire Council and the Controller of Audit
November 2022
Renfrewshire
Council
2021/22 Annual Audit Report – PROPOSED

Page 10

Renfrewshire Council 2021/22 Annual Audit Report – PROPOSED | 2
Contents 
Key messages 3
Introduction 6
1. Audit of 2021/22 annual accounts 9
2. Financial management 20
3. Financial sustainability 25
4. Governance and transparency 29
5. Best Value 31
Appendix 1. Action plan 2021/22 36
Appendix 2. Summary of 2021/22 national performance reports and briefing
papers 43

Page 11

Key messages | 3 
Key messages 
2021/22 annual accounts 
1 We recognise that the 2021/22 financial year has continued to be impacted
by the fall out of the Covid-19 pandemic which continues to present additional
challenges for both Council and audit staff alike. Consequently, key dates
within the financial reporting and auditing process have been updated to
reflect the statutory deadline of 30 November 2022 to publish the audited
2021/22 annual accounts. 
2 Our audit identified three significant adjustments that impact on the Council’s
annual accounts, which have been corrected in the financial statements. 
• Property, plant and equipment valued at depreciated replacement cost
which had not been revalued in year was materially misstated. This
adjustment resulted in the carrying amount of property, plant and
equipment increasing by £69.451 million.
• Income and expenditure in the Council’s annual accounts and its group’s
annual accounts were misstated due to errors when eliminating Covid-19
agency transactions. This adjustment resulted in income and expenditure
increasing by £14.106 million in the Council’s annual accounts and income
and net expenditure decreasing by £12.898 million in the group’s annual
accounts. 
• Mandatory guidance for statutory adjustments had not been reflected in the
annual accounts. This adjustment resulted in statutory adjustments
decreasing by £22.299 million in 2020/21 and £25.473 million in 2021/22
respectively, with corresponding increases in adjustments permitted by
accounting standards. 
3 There was no change to the budgetary outturn position, or the level of usable
reserves as a result of the above adjustments. 
4 Following the correction of these adjustments, our audit opinions on the
annual accounts of the Council and its group are unqualified and unmodified
and confirm that the 2021/22 financial statements present a true and fair view
of the financial activities of the Council and its group. Similarly, our audit
opinion on the section 106 charities administered by the Council is also
unqualified and unmodified.

Page 12

Key messages | 4 
Financial management and sustainability 
5 The Council’s financial management is effective, with strong budgeting,
financial monitoring and reporting processes that are aligned to its corporate
priorities. The Council and its wider group financial position is sustainable into
the foreseeable future, although Covid-19 and ongoing global events such as
the war in Ukraine continues to add additional pressure and uncertainty.
6 The Council reported a year-end general fund surplus of £16.209 million for
2021/22, which was largely due to the receipt of additional funding to meet
Covid-19 pressures in future years. This has resulted in an increase in the
Council’s reserves, with £25.488 million earmarked for pandemic recovery. It
is essential that the Council recognises the non-recurring nature of such
reserves and take steps to ensure they are used effectively and in line with
the Council strategy and strategic objectives.
7 Medium-term financial plans are aligned to the Council’s corporate priorities
and clearly demonstrate how the organisation intends to address future
financial challenges with the Council undertaking robust financial modelling. 
8 The Council should develop a revised financial strategy which ensures the
total balances available are used to support the financial sustainability of the
Council over the medium-term. The financial strategy should incorporate a
revised approach to service delivery and new ways of working.
Governance and transparency
9 The Council has appropriate governance arrangements in place and these
operated effectively. Following the local council elections in May, the Scottish
National Party formed a minority administration. In addition, there was a
significant turnover in members. Officers have implemented induction and
support arrangements for new and returning Members. 
10 The Council demonstrates its commitment to conducting its business in an
open and transparent manner through the recording of committee meetings
and availability of information through the council website.
Best Value 
11 The Council has an appropriate and effective Best Value framework in place.
The Council continues to make positive progress addressing the
recommendations contained in our 2016/17 Best Value Assurance Report.
12 The Council has a good understanding of the equality issues affecting its
communities and stakeholders and have implemented policies to tackle
these, including addressing the impact of the pandemic on its communities.
13 The Council’s performance management arrangements remained effective
during the pandemic. The Council was able to maintain service performance

Page 13

Key messages | 5 
levels despite the pandemic and continues to perform well in comparison to
other councils.

Page 14

Introduction | 6 
Introduction 
1.  This report summarises the findings arising from the 2021/22 audit of
Renfrewshire Council (the Council) and its group. 
2.  The scope of the audit was set out in our 2021/22 Annual Audit Plan
presented to the Audit, Risk and Scrutiny Board meeting on 21 March 2022.
This report comprises the findings from:
• an audit of the annual accounts, and 
• consideration of the four audit dimensions that frame the wider scope of
public audit set out in the Code of Audit Practice 2016 namely, financial
management, financial sustainability, governance and transparency and
value for money.
3.  The main elements of our audit work in 2021/22 have been:
• an audit of the Council and its group’s 2021/22 annual accounts and the
statement of accounts of the section 106 charities administered by the
Council, including the issue of independent auditor's reports setting out our
opinions
• a review of the Council's key financial systems that we judged to be
relevant to our audit
• audit work covering the Council's arrangements for securing Best Value
relating to ongoing follow up of the recommendations in the 2016/17 Best
Value Assurance Report (BVAR). We also undertook a review of the
Council’s best value arrangements relating to Fairness and Equality, and 
• consideration of the four audit dimensions.
Adding value through the audit
4.  We add value to the Council through the audit by:
• regularly meeting with management to discuss current issues and share
knowledge and insights from the wider public sector
• sharing learning from our experiences working with other bodies and
agreed a clear, no surprises, approach for the audit of the 2021/22 annual
accounts
• identifying and providing insight on significant risks, and making clear and
relevant recommendations, and

Page 15

Introduction | 7 
• reporting our findings and conclusions in public and sharing intelligence
and good practice through our national reports (Appendix 2) and good
practice guides.
5.  In doing so, we aim to help the Council promote improved standards of
governance, better management and decision making and more effective use of
resources.
Responsibilities and reporting
6.  The Council has primary responsibility for ensuring the proper financial
stewardship of public funds. This includes preparing annual accounts that are in
accordance with proper accounting practices. 
7.  The Council is also responsible for compliance with legislation, and putting
arrangements in place for governance and propriety that enable it to
successfully deliver its objectives.
8.  Our responsibilities as independent auditor appointed by the Accounts
Commission are established by the Local Government in Scotland Act 1973, the
Code of Audit Practice 2016 and supplementary guidance, and International
Standards on Auditing in the UK.
9.  As public sector auditors we give independent opinions on the annual
accounts. Additionally, we conclude on:
• the effectiveness of the Council’s performance management
arrangements
• the suitability and effectiveness of corporate governance arrangements,
and financial position
• the arrangements for securing financial sustainability, and
• Best Value arrangements. 
10.   Further details of the respective responsibilities of management and the
auditor can be found in the Code of Audit Practice 2016 and supplementary
guidance.
11.  This report raises matters from our audit. Weaknesses or risks identified are
only those which have come to our attention during our normal audit work and
may not be all that exist. Communicating these does not absolve management
from its responsibility to address the issues we raise and to maintain adequate
systems of control.
12.  Our Annual Audit Report contains an agreed action plan at Appendix 1
setting out specific recommendations, responsible officers and dates for
implementation. It also includes outstanding actions from last year and the
steps being taken to implement them.

Page 16

Introduction | 8 
Auditor Independence 
13.  Auditors appointed by the Accounts Commission or Auditor General must
comply with the Code of Audit Practice and relevant supporting guidance. When
auditing the financial statements, auditors must comply with professional
standards issued by the Financial Reporting Council and those of the
professional accountancy bodies. We can confirm that we comply with the
Financial Reporting Council’s Ethical Standard. We can also confirm that we
have not undertaken any non-audit related services and therefore the 2021/22
audit fee of £374,330 as set out in our Annual Audit Plan remains unchanged.
We are not aware of any relationships that could compromise our objectivity
and independence.
14.  This report is addressed to both the Council and the Controller of Audit and
will be published on Audit Scotland's website www.audit-scotland.gov.uk in due
course. 
Audit appointment from 2022/23
15.  External auditors are usually appointed for a five-year term either from Audit
Scotland’s Audit Services Group or a private firm of accountants. The current
appointment round was due to end in 2020/21 but this was extended for a year
so that 2021/22 is the last year of the current appointment round.
16.  The procurement process for the new round of audit appointments was
completed in May 2022. From financial year 2022/23 Azets will be the appointed
auditor for Renfrewshire Council. We are working closely with the new auditors
to ensure a well-managed transition.
17.  A new Code of Audit Practice applies to public sector audits for financial
years starting on or after 1 April 2022. It replaces the Code of Audit Practice
2016 which was issued in May 2016.
18.  There are several significant changes introduced by the new Code, namely
the integration of Best Value work into wider scope audit work and the audit of
Best Value across the Integration Joint Boards.
19.  We would like to thank Audit, Risk and Scrutiny Board members, the Chief
Executive, Directors, and other staff, particularly those in finance, for their co-
operation and assistance over the last six years.

Page 17

1. Audit of 2021/22 annual accounts | 9 
1. Audit of 2021/22 annual
accounts
The principal means of accounting for the stewardship of resources and
performance 
Main judgements
Our audit opinions on the annual accounts of the Council and its group are
unqualified and unmodified and confirm that the 2022/22 financial statements
present a true and fair view of the financial activities of the Council and its group.
Similarly, our audit opinion on the section 106 charities administered by the
Council is also unqualified and unmodified. 
Our audit identified three significant adjustments that impact on the Council’s
annual accounts, which have been corrected in the financial statements. These
are detailed at Exhibit 2.
Our audit opinions on the annual accounts are unmodified 
20.  The annual accounts for Renfrewshire Council and its group for the year
ended 31 March 2022 were approved by the Council on 17 November 2022. As
reported in the independent auditor’s report:
• the financial statements give a true and fair view of the financial position of
the Council and its group and were properly prepared in accordance with
the financial reporting framework, and 
• the audited part of the Remuneration Report, Management Commentary
and the Annual Governance Statement were all consistent with the
financial statements and properly prepared in accordance with the relevant
regulations and guidance.
The annual accounts were signed off in line with the timescales
permitted to reflect Covid-19
21.  Submission dates for the audited annual accounts and the Annual Audit
Report for 2019/20 and 2020/21 were deferred in line with the later dates for
producing the annual accounts because of the impact of Covid-19. Audit
Scotland set target dates for 2021/22 which transition to more regular
timescales. For 2021/22, the target date for the audited annual accounts is 31
October 2022.

Page 18

1. Audit of 2021/22 annual accounts | 10 
22.  The unaudited annual accounts and working papers were received in line
with our agreed audit timetable on 30 June 2022. Finance staff provided good
support to the audit team and all working papers were provided electronically.
Due to capacity issues within the finance team there were delays in receiving
supporting documentation and responses to audit queries. As a result, the
original timetable of reporting on the audit on 24 October was deferred until 14
November 2022 and signed by the statutory deadline of 30 November.
Our audit opinions on Section 106 charities were unmodified
23.  Due to the interaction of section 106 of the Local Government in Scotland
Act 1973 with the charities’ legislation, a separate independent auditor's report
is required for the statement of accounts of each registered charity where
members of Renfrewshire Council are sole trustees, irrespective of the size of
the charity. 
24.  There is one trust fund, Coats’ Observatory Trust, which was set up
“for the upkeep of Coats Observatory equipment”. This purpose was
relevant while there were cash funds available; however, these funds have
been exhausted, and only the property assets remain. 
25.  On 23 August 2022, Office of the Scottish Charity Regulator (OSCR)
confirmed that the three Renfrewshire Common Good Funds have been
removed from the Scottish Charity Register effective from 22 August 2022.
As a result, there is no requirement going forward to prepare accounts for
the Common Good Funds, instead a separate Common Good statement
should be included within the Renfrewshire Council accounts. 
26.  We received the charities’ accounts in line with the agreed timetable and
after completing our audit we reported in the independent auditor’s reports that:
• the financial statements give a true and fair view of the section 106
charity’s financial position and are properly prepared in accordance with
charities legislation, and 
• the trustees' annual report is consistent with the financial statements
and prepared in accordance with proper accounting practices.
27.  These were approved by the Council on 17 November and signed by the
statutory deadline of 30 November.
There were no objections raised to the annual accounts 
28.  The Local Authority Accounts (Scotland) Regulations 2014 require local
government bodies to publish a public notice on its website that includes details
of the period for inspecting and objecting to the accounts. This must remain on
the website throughout the inspection period. The Council complied with the
regulations. There were no objections to the 2021/22 accounts.
Whole of Government Accounts has been delayed at a UK level
29.  Whole of Government Accounts (WGA) is the consolidated financial
statements for all components of government in the UK. Most public bodies are

Page 19

1. Audit of 2021/22 annual accounts | 11 
required to submit returns for the preparation of WGA. The returns are
consolidated into WGA by HM Treasury. WGA is audited at a UK level by the
National Audit Office (NAO), who issue Group Audit Instructions. 
30.  Appointed auditors in Audit Scotland are required by the Code of Audit
Practice, as part of their audit appointment, to examine and report on WGA
returns prepared by Scottish audited bodies. Auditors are required to report the
results of their examination in an Assurance Statement. The examination and
reporting process performed by auditors is therefore described as auditor
assurance.
31.  The process for 2020/21 is running significantly late. HM Treasury issued its
guidance for preparers on 27 April 2022 and the NAO issued its Group Audit
Instructions on 14 July 2022. The OSCAR II system has been open for 2020/21
submissions since April 2022.
32.  HM Treasury and the NAO set a date for certified returns of 31 August 2022
which the Scottish Government agreed to for Scottish bodies. The deadline was
then subsequently moved to 30 September 2022. 
33.  HM Treasury has set an increased threshold for auditor assurance for
bodies in England (£2 billion). Scottish Government has agreed the same
threshold for Scottish bodies. At the time of writing, the Council has still to
submit the Whole of Government Accounts (WGA) 2020/21 consolidation pack.
Overall materiality is £8.7 million
34.  We apply the concept of materiality in both planning and performing the
audit and in evaluating the effect of identified misstatement on the audit and of
uncorrected misstatements, if any, on the financial statements and in forming
the opinion in the auditor’s report. We identify a benchmark on which to base
overall materiality, such as gross expenditure, and apply what we judge to be
the most appropriate percentage level for calculating materiality values. 
35.   The determination of materiality is based on professional judgement and is
informed by our understanding of the entity and what users are likely to be most
concerned about in the annual accounts. In assessing performance materiality,
we have considered factors such as our findings from previous audits, any
changes in business processes and the entity’s control environment including
fraud risks. 
36.  Our initial assessment of materiality for the annual accounts was carried out
during the planning phase of the audit. As detailed within our Annual Audit Plan,
these apply to both the Renfrewshire Council single entity financial statements
and the Renfrewshire Council group financial statements. This was reviewed on
receipt of the unaudited annual accounts and remains unchanged, as
summarised in Exhibit 1.

Page 20

1. Audit of 2021/22 annual accounts | 12 
Exhibit 1
Materiality values 
Materiality level Amount
Overall materiality  £8.7 million
Performance materiality £5.7 million
Reporting threshold £0.250 million
Source: Audit Scotland, Annual Audit Plan 2021/22
We have significant findings to report on the audited annual
accounts
37.  International Standard on Auditing (UK) 260 requires us to communicate
significant findings from the audit to those charged with governance, including
our view about the qualitative aspects of the body’s accounting practices. We
have reported several issues from the work done. These relate to the detail and
documentation included within the valuer’s report and the underlying records
and processes around identifying related parties for disclosure within the annual
accounts. These are included in the action plan at Appendix 1. 
38.  All the significant findings from our audit involved correcting adjustments to
the annual accounts and are summarised in Exhibit 2 below.
Exhibit 2
Significant findings from the audit of financial statements
Issue Resolution 
1. Property, plant and equipment valuations
The Code of Practice on Local Authority
Accounting requires authorities to revalue property,
plant and equipment with sufficient regularity to
ensure the carrying amount does not differ
materially from current value, being the value that
would have been obtained if revalued. 
Property, plant and equipment valuations within the
annual accounts are supported by workings from a
professional valuer, using a rolling programme of
revaluations. The valuation process could be
enhanced through greater documentation of the
annual valuation report and management scrutiny
over the report including: 
• the assets revalued in year and the
methodology applied in the valuation exercise
We recommend that a valuation report
is prepared by the Council’s valuer on
an annual basis outlining the details of
the work undertaken, the impact on the
asset values and the methodology
applied in completing the revaluation
programme. There should be clear
evidence of how management have
challenged and scrutinised the valuation
to ensure the accounts are free from
material misstatement. 
Recommendation 1 
(Refer Appendix 1, action plan point 1)

Page 21

1. Audit of 2021/22 annual accounts | 13 
Issue Resolution 
• the total valuation amount reflected within the
annual accounts.
In addition, there should be clear assurances
around how those assets not subject to revaluation
would not be materially misstated. 
Our audit work and subsequent analysis by the
Council’s valuer and management identified the
carrying value (net book value) of property, plant
and equipment valued at depreciated replacement
cost which was not revalued in year was
understated by £69.451 million. Management
processed an adjustment to correct for the
understatement which resulted in: 
• the deficit on the provision of services
decreasing by £12.704 million
• the revaluation reserve balance increasing by
£56.746 million, and 
• the net book value of property, plant and
equipment increasing by £69.451 million.
This adjustment also impacted on the notes to the
financial statements associated with these areas. 
2. Related parties
As part of our audit work in relation to related
parties we inspected the record of senior officers’
interests and elected members’ interests. We
identified instances where information recorded
could have been enhanced to support
management in identifying any relevant related
party transactions.
While we are satisfied there are no undisclosed
material related party transactions, we also noted
that processes to consider and identify relevant
relationships and transactions that require to be
disclosed within the annual accounts could be
improved.
We recommend that a review of controls
and processes around related parties is
undertaken. This will include the
documentation of member and officer
interests as well as the processes in
place to identify the relevant disclosures
for inclusion in the financial statements.
Recommendation 2
(Refer Appendix 1, action plan point 2)
3. Covid-19 agency income and expenditure 
The Council processes transactions on behalf of
the Scottish Government for support payments
made to businesses and individuals in response to
Covid-19. The Council has no discretion in how the
funding for the support payments is used and
simply processes the payments on behalf of the
Scottish Government. As a result, these
transactions are not recognised in the Council or
Management processed an adjustment
to correct for these errors which resulted
in the Council’s income and expenditure
increasing by £14.106 million and the
group’s income and expenditure
decreasing by £14.106 million. As both
income and expenditure were misstated,
the adjustment to correct these errors
did not have any impact on the outturn

Page 22

1. Audit of 2021/22 annual accounts | 14 
Issue Resolution 
its group’s annual accounts and are instead
reported as agency transactions. 
The Council is still required to maintain records of
Covid-19 agency transactions and uses its ledger
to record these transactions. Adjustments are
processed to exclude these transactions from the
Council and its group’s annual accounts. 
However, errors were made when processing
these adjustments which resulted in an
understatement of £14.106 million of income and
expenditure in the Council’s annual accounts and
an overstatement of £14.106 million of income and
expenditure in the group annual accounts. 
and the deficit on the provision of
services. 
4. Statutory adjustment for the difference
between fair value and historic cost
deprecation 
Statutory adjustments are processed in the annual
accounts due to differences between accounting
requirements and funding requirements. The
Statutory Basis for Accounting for and Disclosing
Reserves in Scottish Local Government Bodies is
mandatory guidance that was issued by LASAAC
in May 2021. This guidance made a change to the
way the statutory adjustment for the difference
between fair value and historic cost depreciation is
processed, and from 2020/21 this was to be
processed from the revaluation reserve to the
general fund instead of the capital adjustment
account. The revised approach was not reflected in
the Council’s annual accounts for either 2020/21 or
2021/22 which resulted in a misstatement of
£22.299 million in the 2020/21 statutory
adjustments and £25.473 million in the 2021/22
statutory adjustments. 
Management processed adjustments to
correct for these errors which resulted in
statutory adjustments decreasing by
£22.299 million and £25.473 million in
2020/21 and 2021/22 respectively, with
corresponding increases in adjustments
permitted by accounting standards. The
adjustment to correct these errors did
not have any impact on the Council’s
reserves balances. 
Source: Audit Scotland
39.  Where we have identified misstatements in the annual accounts, we have
concluded that they arose from issues that have been isolated and identified in
their entirety and do not indicate further systemic error. It is our responsibility to
request that all misstatements, other than those below the reporting threshold
are corrected, although the final decision on making the correction lies with
those charged with governance considering advice from senior officers and
materiality.
40.  The Council uses indexation for the council house estate to estimate
changes in value for years without a full valuation. This has been applied based

Page 23

1. Audit of 2021/22 annual accounts | 15 
on quarter 1 market data (as at 30 June) rather than the quarter 4 market data
(as at 31 March). The impact for the Council accounts is that the value of
council dwellings are overstated by £681,622. This has not been amended in
the audited accounts and is not judged to be a material issue.
41.  We have obtained audit assurances over the identified significant risks of
material misstatement to the financial statements. Exhibit 3 sets out the
significant risks of material misstatement to the financial statements we
identified in our 2021/22 Annual Audit Plan. It summarises the further audit
procedures we performed during the year to obtain assurances over these risks
and the conclusions from the work completed. 
Exhibit 3
Significant risks of material misstatement in the financial statements
Audit risk Assurance procedure Results and conclusions
1. Risk of material
misstatement due to fraud
caused by the management
override of controls
As stated in International
Standard on Auditing (UK)
240, management is in a
unique position to perpetrate
fraud because of
management’s ability to
override controls that
otherwise appear to be
operating effectively.
• Assessed the design and
implementation of controls
over journal entry processing.
• Made inquiries of
individuals involved in the
financial reporting process
about inappropriate or
unusual activity relating to the
processing of journal entries
and other adjustments.
• Tested journals at the
year-end and post-closing
entries and focus on
significant risk areas. 
• Evaluated significant
transactions outside the
normal course of business.
• Assessed the adequacy of
controls in place for
identifying and disclosing
related party relationship and
transactions in the financial
statements. 
• We assessed any changes
to the methods and
underlying assumptions used
to prepare accounting
estimates compared to the
prior year.
• Substantively tested
income and expenditure
transactions around the year-
Results and Significant
Judgements: 
Our audit work did not
highlight any instances of
management override of
controls for the Council or the
charities.
Conclusion: 
Satisfactory.

Page 24

1. Audit of 2021/22 annual accounts | 16 
Audit risk Assurance procedure Results and conclusions
end to confirm they are
accounted for in the correct
financial year.
• Focussed testing of
accounting accruals and
prepayments.
Other areas of audit focus
42.  We identified in our 2021/22 Annual Audit Plan areas where we considered
there to be other risks of material misstatement to the financial statements.
Based on our assessment of the likelihood and magnitude of the risks, we did
not consider these to represent significant risks. The areas of specific audit
focus were:
• Valuation and measurement of property, plant and equipment: At 31
March 2021, the Council held property, plant and equipment with a value
of £1,484.243 million. This included Land and Buildings with a net book
value of £876.278 million. There is a significant degree of subjectivity in
the valuation of land and buildings. Valuations are based on specialist and
management assumptions and estimates, and changes in these can result
in material changes to valuations.
• Measurement and judgements applied to the valuation of pension
liabilities: As at 31 March 2021, the Council recognised a net liability of
£221.534 million relating to its share of the Strathclyde Pension Fund
liability. There is a significant degree of subjectivity in the measurement
and valuation of the pension fund liability. The valuation is based on
specialist assumptions and estimates.
43.  We kept these areas of audit focus under review throughout our audit. We
reviewed our audit approach prior to the financial statements audit. We
considered the movements in market and construction price indices and the
impact this could have on property, plant and equipment valued at depreciated
replacement cost which had not been subject to the revaluation exercise in
year. On this basis, we re-assessed the risk of material misstatement on the
valuation and measurement of buildings not revalued in year to be a significant
risk of material misstatement. In Exhibit 4 below we have outlined the planned
audit procedures and the outcome of these. 
Exhibit 4
Significant risks of material misstatement in the financial statements
Audit risk Assurance procedure Results and conclusions
2. Risk of material
misstatement on the
valuation and measurement
of assets valued at
• Make inquiries of
management around how
they are satisfied that assets
not subject to revaluation in
Results and Significant
Judgements: As outlined in
Exhibit 2, we found the
carrying value of property,

Page 25

1. Audit of 2021/22 annual accounts | 17 
Audit risk Assurance procedure Results and conclusions
depreciated replacement
cost not revalued in year 
Market and construction price
indices have been rising due
to current market conditions,
including rising inflation. The
carrying value of property,
plant and equipment valued
at depreciated replacement
cost which have not been
revalued in year could be
materially misstated.
year are free from material
misstatement;
• Review management /
valuer’s assessment of
assets not subject to
revaluation to determine if
this is consistent with auditor
knowledge or other similar
property valuation
movements.
• Consider the sufficiency of
Management’s assessment
of assets not subject to
revaluation in year and the
extent to which this has
considered independent
valuation advice and market
movements.  
plant and equipment valued
at depreciated replacement
cost which was not revalued
in year was understated by
£69.451 million and an
adjustment was processed by
management to correct this
misstatement. 
Conclusion: 
Satisfactory after the
correcting adjustment was
processed. 
(Refer Appendix 1, action
plan point 1 and see
paragraphs 44 – 47)
The Council revaluation programme has not yet been updated
to ensure coverage of each class of assets annually
44.  In last year’s Annual Audit Report we noted that the Council revalues
elements of its property, plant and equipment over a 5-year rolling programme,
with different classes of property, plant and equipment being revalued each
year. This can lead to significant movements in value, particularly if a large
class of property, plant and equipment is due for revaluation in a particular year. 
45.  We recommended that management should consider a valuation
methodology whereby 20 per cent of each class of property, plant and
equipment is revalued each year, with all assets still being revalued once over a
five year period. This would reduce the likelihood of uneven valuation
movements arising as a result of the specific class of property, plant and
equipment due for revaluation in a given year. This had still to be adopted for
the 2021/22 annual accounts.
46.  As referenced in Exhibit 4, price and construction indices have been rising
significantly. The potential impact on the valuation of property, plant and
equipment valued at depreciated replacement cost has resulted in a significant
risk of material misstatement. Management requested the Council’s internal
valuer to undertake a valuation estimation exercise to review the school estate
and leisure centres not valued in year. 
47.  This was not a formal valuation of these assets but applied percentage
movements based on data about property, plant and equipment revalued over
the previous five years to those not formally valued in 2021/22. Management
has undertaken a review of this valuation exercise and have confirmed they are
satisfied that the principles applied are a reasonable basis to estimate the
movement in the value of property, plant and equipment not formally valued in

Page 26

1. Audit of 2021/22 annual accounts | 18 
year. We have reviewed the valuation exercise and management’s assessment
of the valuation exercise and concluded that the principles applied to estimate
the movement in property, plant and equipment not valued in year were
reasonable and has been correctly reflected in the annual accounts. Details on
the resulting adjustment can be seen in Exhibit 2. 
Statutory override adopted for the disclosure of infrastructure
assets 
48.  Across the UK, a technical accounting issue has been identified covering
infrastructure assets, which we have considered as part of our audit this year.  
49.  Infrastructure assets typically include highways, footpaths, bridges and
culverts and are included at historical cost in the accounts (£376 million gross).
A replaced component of an asset has to be de-recognised and at some
councils the records of additions were not detailed enough to comply with
accounting code requirements. A failure to de-recognise assets correctly would
have resulted in double-counting and an overstatement of the gross book value;
accumulated depreciation and potentially the net book value of the assets. 
50.  CIPFA/LASAAC considered the matter and proposed amendments to the
2021/22 accounting code to allow a reasonable assumption that the net book
value of replaced parts of infrastructure assets are nil and a temporary
adaptation to remove the requirement to disclose gross book value and
accumulated depreciation in the financial statements. The Scottish Government
has issued Finance Circular 9/2022 to implement these changes.  
51.  Management considered the detailed records available to support
infrastructure additions since 2010 and concluded that the above statutory
overrides were required and have amended the infrastructure disclosures in the
audited accounts, this is explained at Note 10. 
Identified misstatements of £6.018 million were adjusted in the
financial statements
52.  In addition to the significant misstatements outlined in Exhibit 2, other
misstatements of £6.018 million were identified in the annual accounts as
outlined below:
• Guaranteed Minimum Pension (GMP) – an adjustment of £4.178 million
was processed to recognise the estimated impact of GMP indexation
changes on the pension fund liability. This should also have been
reflected in the prior year financial statements, but we did not require an
adjustment to the 2020/21 comparatives as this was not material.
• Capital addition overstatement – an adjustment of £0.781 million was
processed to derecognise a capital addition which had been incorrectly
recognised in 2021/22. 
• Housing Revenue Account (HRA) understatement of impairment of
debtors – an adjustment of £0.442 million was processed to increase

Page 27

1. Audit of 2021/22 annual accounts | 19 
the impairment of HRA debtors which had been understated due to an
error in its calculation. 
• Group accounts accrual reversal – an adjustment of £0.601 million was
processed to income and expenditure in the group Comprehensive
Income and Expenditure Statement which had been understated due to
a 2020/21 accrual not being reversed.  
53.  Adjustments have processed to the annual accounts for all these
misstatements. While these adjustments were individually below our
performance materiality, collectively they breached it and we assessed if any
further audit procedures were required. We concluded that further audit
procedures were not required as the misstatements arose from issues that have
been isolated and identified in their entirety and do not indicate further systemic
error. 
Progress was made on prior year recommendations 
54.  The Council has made good progress in implementing our prior year audit
recommendations. For actions not yet implemented, revised responses and
timescales have been agreed with management, and are set out in Appendix 1.

Page 28

2. Financial management | 20 
2. Financial management
Financial management is about financial capacity, sound budgetary
processes and whether the control environment and internal controls
are operating effectively.
Main judgements
The Council’s financial management is effective with strong budgeting, financial
monitoring and reporting processes that are aligned to its corporate priorities. 
The Council reported a year-end general fund surplus of £16.209 million for
2021/22, which was largely due to the receipt of additional funding to meet Covid-
19 pressures in future years. This has resulted in an increase in the Council’s
reserves with £25.488 million earmarked for pandemic recovery. It is essential that
the Council recognises the non-recurring nature of such reserves and take steps
to ensure they are used effectively and in line with the Council strategy and
strategic objectives.
The Council reported a surplus, but the Covid-19 pandemic
continued to impact on the 2021/22 financial year
55.  Public finances continue to be impacted by the Covid-19 pandemic during
2021/22 with the Scottish and UK governments continuing to provide substantial
additional funding for public services as well as support for individuals,
businesses and the economy. It is likely that further financial measures will be
needed and that the effects will be felt well into the future.
56.   The Council’s budget is aligned to its strategic priorities. To inform the
budget each directorate produces income and expenditure estimates
based on the Service Improvement Plans (SIPs). SIPs outline the activities
of each directorate and how these support the delivery of the Council Plan.
57.  These three-year plans outline upcoming improvement activity and detail
how progress will be assessed through action planning and performance
targets. The latest SIPs cover the period 2022/23 to 2024/25 and were
approved by the relevant Policy Boards in June 2022. Each service will report
on progress in the autumn and again at the end of the financial year. The mid-
year reports will also reflect any changed priorities identified in the new Council
and Community Plans.
58.  The Covid-19 pandemic continued to impact on the Council’s 2021/22
budget with both additional costs and income losses arising from the start of the
year. As the year progressed the initial estimates of expenditure and income
were revised and managed through the Council’s financial management

Page 29

2. Financial management | 21 
process and from additional financial support provided by the Scottish
Government. 
59.  The Council approved its 2021/22 budget in March 2021. Budgeted
net expenditure was £449.822 million and estimated total income was
£449.130 million, resulting in a projected budget deficit of £1.692 million.
The Revenue Budget and Council Tax 2021/22 noted that financial
flexibilities available to the Council may be required to provide temporary
support to balance annual revenue.
60.  The Council continued to revise its financial position with the final budget
forecasting net expenditure of £460.906 million and estimated total income was
£477.194 million, resulting in a projected budget surplus of £16.288 million. The
Council reported a final general fund surplus of £16.209 million.
61.  Over the course of the year additional revenue support of £40 million was
provided to the Council by the Scottish Government to address service
pressures over the course of 2021/22. Additional Covid-19 related funding
received from Scottish Government resulted in council reserves increasing by
£20.364 million in 2021/22.
62.  There were additional cost pressures in-year as a consequence of the
Covid-19 pandemic. The Council spent £7.6 million during the year on Covid-19
related costs. These included staff costs and other measures to address the
Covid-19 pandemic which were funded by the Scottish Government.
63.  In addition, the Council administered the distribution of £24 million of Covid-
19 support grants to local businesses and residents. These included business
support grants, self-isolation support and low-income pandemic payments.
There was an agency arrangement between the council and Scottish
Government in the administration of these grants.
64.  As expected, the main reasons for variances against the approved
budget in March 2021 related to recovery actions for Covid-19. The most
significant variance was a reduction in Non-Domestic Rates income from
the Scottish Government from £102.8 million to £81.7 million to mitigate
the impact of the Covid-19 pandemic on businesses.
The level of general fund reserves has increased because of
Covid-19 funding received for future periods
65.  One of the key measures of the financial health of a local authority is
the level of reserves held. The Council has increased its useable reserves
steadily since 2013/14 and has historically had a high level of reserves in
comparison to many other councils in Scotland. The majority of reserves
are statutory or ring-fenced and aligned to future spending plans and
strategic objectives.
66.  The overall level of usable reserves held by the Council increased by
£20.364 million from £194.093 million in 2020/21 to £214.457 million in
2021/22. A table showing all reserves movements is included in Exhibit 5.

Page 30

2. Financial management | 22 
Exhibit 5
Movements in useable reserves in 2021/22 
Opening Used Added Closing  
£m £m £m £m
General Fund
(Unallocated) 10.887 (0.099) - 10.788
General Fund (Ring-
fenced) 77.571 (32.416) 48.724 93.879
Housing Revenue Account 6.497 - - 6.497
Revenue Statutory Funds 2.864 - 0.110 2.974
Capital Receipt Reserve 8.638 (1.829) 0.785 7.594
Capital Statutory Funds 87.636 (0.904) 5.993 92.725
Total 194.093 35.248 55.612 214.457
Source: Audited annual accounts 2021/22
67.  The general fund reserve is the largest reserve, with a balance of
£104.667 million. Although the general fund reserve has no restrictions on
its use, £93.879 million has been ring-fenced for future expenditure plans
including £25.488 million specifically for Covid-19 recovery which arose
due to additional funding from Scottish Government.
68.  The Council reviews the level of its unallocated reserves when setting
the budget each year. As part of the 2020/21 budget setting process the
Council agreed to increase the unallocated revenue balances to a
minimum of £10 million to address financial risks in the short and medium-
term. This represents 2.5 per cent of budgeted net expenditure held as
unallocated General Fund reserves. At the end of 2021/22 the Council’s
unallocated reserves were £10.788 million.
Capital expenditure reduced in 2021/22 as the Council paused
its capital investment projects
69.  Plans for capital expenditure are approved by the Council as part of the
budget setting process each year. In March 2021, the Council approved a
capital budget of £141.2 million for 2021/22 (including £25.6 million of spend on
housing related projects). A table setting out capital budget and spend is
included in Exhibit 6.

Page 31

2. Financial management | 23 
Exhibit 6
Analysis of capital spend in 2017/18 to 2021/22 
Year  Approved
Capital
Spend*
(£ millions)
Capital
Spend
Relating to
Plans
Approved in
Prior Years 
(£ millions) 
Capital
Spend
Relating to
Current
Year Plan   
(£ millions)
Total in
Year Capital
Spend      
(£ millions)  
2017/18  £104.4 £19.2  £48.3 £67.5  
2018/19  £88.0 £21.5  £43.2 £64.7  
2019/20  £99.9 £7.8  £77.5 £85.3  
2020/21  £127.4 £2.1  £51.6 £53.7  
2021/22  £141.2 £10.3  £71.8 £82.1
*Includes spend approved by committee during the year
70.  The Council’s total spending on capital projects was £82.1 million
(£53.749 million in 2020/21), with non-housing capital expenditure of £61.5
million and housing capital expenditure of £20.6 million. Capital receipts of
£1.829 million (£1.273 million in 2020/21) were used to fund spending on
capital projects. 
71.  The Council continues to adjust future years capital programmes to
reflect the rephasing of projects. As at 31 March 2022, the Council had
commitments on capital contracts for non-housing projects of £58.987
million (£140.251 million in 2020/21) and for housing projects of £25.933
million (£35.263 million in 2020/21).
72.  In March 2021 the Council agreed the capital investment plans for non-
housing covering the period 2021/22 to 2025/26 with budgeted investment
totalling £443.5 million. In addition, the Council agreed capital investment for
housing for the 3-year period 2021/22 to 2023/24 of almost £113 million. The
Council has planned total capital expenditure of £159.9 million for 2022/23 with
£132.8 million allocated to non-housing and £27.1 million to housing.
73.  As a result of the ongoing challenges the Council will need to ensure it
continues to review progress of the existing capital programme. This will include
rescheduling and the reprioritisation of projects until there is greater certainty
over the achievement of projects in the short and medium-term.

Page 32

2. Financial management | 24 
Housing revenue account incurred an overspend in line with
forecast
74.  The Council is required by legislation to maintain a separate housing
revenue account (HRA) and to ensure that rents are set a level which will at
least cover the costs of its social housing provision. 
75.  The HRA recorded expenditure in 2021/22 of £61.711 million (£54.970
million in 2020/21). Overall, the HRA recorded an overspend of £8.655 million in
line with forecast figure for the year and reflects the net effect of variances in
employee costs and repairs costs. 
76.  An overspend in depreciation and impairment relates to the increased
capital contributions made as part of the HRA Business Plan Strategy to utilise
in year underspends to mitigate the impact of future capital borrowing costs
arising from the investment in housing stock. 
77.  Unallocated HRA reserves have remained stable at £6.497 million. The
Council believes this represents a prudent level of unallocated reserves for the
HRA to mitigate any continuing impact of Covid-19 and any other unforeseen
risks.
Financial systems of internal control operated effectively 
78.  As part of our audit we identified and assessed the key internal
controls in those accounting systems which we regard as significant to
produce the financial statements. This provided the assurance that the
Council has systems of recording and processing transactions which
provide a sound basis for the preparation of the financial statements.
Arrangements for the prevention and detection of fraud and
error were appropriate
79.   The Council is responsible for establishing arrangements for the prevention
and detection of fraud, error and irregularities, bribery and corruption.
Furthermore, it is responsible for ensuring that its affairs are managed in
accordance with proper standards of conduct by putting effective arrangements
in place. 
80.  The risk profile of public bodies during 2021/22 continues to be affected by
the Covid-19 pandemic. This has increased the risk of fraud and error as control
environments and internal controls changed to allow for services to operate
effectively and respond to issues in a timely manner. We have reviewed the
arrangements put in place by the Council to address any heightened risks and
concluded that there are appropriate arrangements for the prevention and
detection of fraud, error and irregularities.

Page 33

3. Financial sustainability | 25 
3. Financial sustainability
Financial sustainability looks forward to the medium and long term to
consider whether the council is planning effectively to continue to
deliver its services or the way in which they should be delivered
Main judgements
Medium-term financial plans are aligned to the Council’s corporate priorities and
clearly demonstrate how the organisation intends to address future financial
challenges with the Council undertaking robust financial modelling. 
The Council should develop a revised financial strategy which ensures the total
balances available are used to support the financial sustainability of the Council
over the medium-term. The financial strategy should incorporate a revised
approach to service delivery and new ways of working. 
We have obtained audit assurances over the wider audit
dimension risks relating to financial sustainability identified in
our 2021/22 Annual Audit Plan 
81.  Exhibit 7 sets out the significant risks of material misstatement we identified
in our 2021/22 audit plan, our assurance procedures and the results and
conclusions from our work. These risks influenced our overall audit strategy, the
allocation of staff resources to the audit and informed where the efforts of the
team were directed.
Exhibit 7
Risks identified from the auditor’s wider responsibility under the Code of Audit Practice
Audit risk Assurance procedure Results and conclusions
Financial sustainability
While the Council’s financial
stability remains secure in the
short-term, the Council has
reported an unaddressed structural
budget deficit estimated to be
between £4 - £5 million as it
moves into the 2022/23 financial
year. 
The Council forecasts that in the
period to 2025, in gross terms,
• Reviewed the
Council’s annual
budget setting
arrangements.  
• Assessed of the
Council’s medium to
long term financial
strategy.  
• Reviewed and
assessed the budget
monitoring
arrangements with a
The Council continues to
forecast a challenging
medium to long-term
financial position.
We confirmed assumptions
and judgements used by the
Council in its forecasting are
reasonable. 
The Covid-19 pandemic
adds additional pressure
and uncertainty.

Page 34

3. Financial sustainability | 26 
Audit risk Assurance procedure Results and conclusions
before any adjustment for council
tax rises, a saving of
approximately £25 million will be
required to address the forecast
structural budget deficit and
therefore providing no capacity for
reinvestment in service or capital
investment priorities. Building in an
indicative council tax rise each
year of three per cent would
reduce the saving requirement to
approximately £17 million. 
focus on reports to
senior officers and
members on financial
position.  
• Reviewed the
Council’s financial
position and delivery of
planned savings.
We recommend the Council
updates its medium-term
financial plan as soon as
more clarity on the financial
impacts of Covid-19 is
obtained.
The ongoing financial impact of the Covid-19 pandemic will be
significant
82.  The financial impact of the pandemic on the Council is likely to extend
across several years and could include a reduction in income from business
rates and council tax non-payments as well as a reduction in fees and charges
from, for example, leisure and parking. The Council may also face increased
costs such as staff costs to cover the delivery of services.
83.  Financial management across the Council has remained strong, with
additional reporting put in place to clearly distinguish Covid-19 related costs and
income losses from core operating costs. 
84.  A balanced budget position moving into 2022/23 was agreed by the Council
on 4 March 2021, building on the previous budget decisions taken by the
Council towards addressing the medium-term savings requirement. 
85.  Minimal savings decisions were included in the agreed budget for 2022/23,
reflecting the decision to temporarily pause the Council’s Right for Renfrewshire
programme in 2021/22. Temporary investment in measures to assist
Renfrewshire’s communities recover from the pandemic were agreed, including
a freeze in council tax which formed part of the conditional grant offer from the
Scottish Government.
Transformational planning has been significantly disrupted by
the pandemic
86.  The Council’s main transformation programme –Right for Renfrewshire
(RFR) was temporarily suspended during 2020/21 in order for the Council to
focus resources on the Covid-19 response and recovery. The longer term
impact of this decision is that the Council’s anticipated savings are insufficient to
secure overall financial sustainability. At the Council meeting in June 2022, a
revised savings target of £15 million was set for the remaining phases of the
existing medium term transformation programme, and the programme revised
to more clearly align with the financial sustainability portfolio.

Page 35

3. Financial sustainability | 27 
Medium and longer-term financial plans are in place and have
been updated to reflect the impact of the pandemic 
87.  It is important that long-term financial strategies (typically covering five to
ten years) are in place which link spending to the Council's strategies. Although
Councillors only approve the budget for a single year, this should be supported
by indicative future spending plans that forecast the impact of relevant
pressures on the Council.
88.  While the Council’s financial stability remains secure in the short-term, the
medium-term financial outlook continues to be challenging, with future
government grant and the scale of future pay pressures the most significant
areas of uncertainty. 
89.  In September 2022, the Council’s Financial Sustainability and General
Fund Financial Outlook, forecast that over the next three-year period the
Council would require to deliver savings within a range of £29 million –
£61 million, with a forecast deficit of £44 million over this period, before
any decisions on council tax. Assuming a 3 per cent council tax increase in
each year, this central deficit forecast would reduce to £35 million.
90.  To address the medium and longer-term challenges, the Council has
continued to invest in a range of measures. The Council has agreed a capital
programme of £160 million in 2022/23 across public infrastructure, schools,
nurseries, public buildings and council housing. These will run alongside the
Glasgow City Region City Deal programme.
91.  As part of the budget planning for 2023/24, the Council intends to take
advantage of the financial flexibility arrangements approved by the Council in
September 2020 to secure financial stability in the short-term and help address
the forecast medium-term structural budget deficit.
92.  The Council has also developed economic and social renewal and recovery
plans, which set out how the Council will work with partners to respond to the
Covid-19 pandemic over the short to medium-term.
93.  The Financial Outlook report further noted that the combined
measures from accounting flexibilities and transformation (as detailed
below) are insufficient to close the forecast financial gap the Council is
facing. A range of other financial sustainability measures require to be
explored and the Council has agreed to develop a portfolio of additional
measures to address these including:
• a Strategic Property Review including estate consolidation and
rationalisation. Further work is ongoing in relation to the
management and maintenance of property assets, including
charging proposals
• charging, fees and commercialisation. Work to assess and
benchmark the current level of fees and charges relative to peer
councils and the cost of service delivery

Page 36

3. Financial sustainability | 28 
• a strategic review of procurement to explore optimal use of national
contracts.
94.  As the Council has not yet concluded the various reviews, it is not
possible to determine whether the £20 million savings target (over and
above the £15 million targeted from the transformation programme) will be
fully achieved, or in what timescale.
95.  The Council may therefore need to utilise reserve balances in the near
term to temporarily provide financial support to manage this shortfall.
96.  It is likely that further decisions and announcements by the UK and
Scottish Governments will impact and influence the Council’s financial
outlook, both in the short, medium and longer-term. 
Recommendation 3
Develop a revised financial strategy which ensures the total balances available
are used to support the financial sustainability of the Council over the medium-
term. The financial strategy should incorporate a revised approach to service
delivery and new ways of working. 
To address the financial challenge the Council will need to actively engage with
local and national partners to deliver the required level of efficiencies and savings. 
City Deals
97.  The £1.13 billion Glasgow City Region City Deal is an agreement
between the UK Government, the Scottish Government and eight local
authorities across the Glasgow City Region. Renfrewshire Council is the
lead authority on two City Deal infrastructure projects with funding of
£148.8 million.
• The Glasgow Airport Investment Area Project (GAIA - £43.1
million) is delivering the enabling infrastructure and utility
connections into Netherton Campus, a 52-hectare Renfrewshire
Council-owned site next to Glasgow Airport. Work on this project
has been delayed due to the Covid-19 lockdown, and is due to
complete in 2023/24, with capital expenditure of £6.425 million to 31
March 2022.
• The Clyde Waterfront and Renfrew Riverside Project (CWRR -
£105.7 million) includes the construction of a new opening bridge
across the River Clyde, and the construction of the Renfrew North
Development Road. Work on this project is due to complete in
2024/25. Capital expenditure to 31 March 2022 was £6.032 million.

Page 37

4. Governance and transparency | 29 
4. Governance and
transparency
The effectiveness of scrutiny and oversight and transparent reporting of
information 
Main Judgements
The Council has appropriate governance arrangements in place and these
operated effectively. Following the local council elections in May, the Scottish
National Party formed a minority administration. In addition, there was a significant
turnover in members. Officers have implemented induction and support
arrangements for new and returning Members. 
The Council demonstrates its commitment to conducting its business in an open
and transparent manner through the recording of committee meetings and
availability of information through the council website. 
Governance arrangements operating throughout the Covid-19
pandemic have been appropriate and operated effectively
98.  During 2021 the Council completed the installation of the Public-i system
created the opportunity for the Council to hold hybrid Board meetings in
Renfrewshire House. 
99.  This meant that the system was available for its use to begin at formal
Board meetings in August 2021. All of the Council’s Policy Boards, the Audit,
Risk and Scrutiny Board and the Leadership Board have taken place using the
Public-i system. In all cases, these have been hybrid meetings with some
members present in the Chamber while others accessed the meeting remotely. 
100.  It is proposed the Council continues with the current arrangements for
Board meetings which allows for hybrid meetings, with the option available to
the Convener of each Board to hold the meeting remotely by Teams. It is
proposed the Council extends the use of the Public-i system for meetings of the
Regulatory Functions Board starting with the meeting on 27 October 2022.
101.  Overall, the Council has appropriate governance arrangements in place
which support effective scrutiny, challenge and decision making.

Page 38

4. Governance and transparency | 30 
New administration
102.  In May 2022 the Scottish Local Authority elections were held. Forty-three
councillors were elected and a new administration was formed with the Scottish
National Party (SNP). There was a significant turnover in members.  
103.  Following the elections in May an induction programme for newly elected
members was established. The new administration and committee membership
is still new and evolving and it is too early to comment on the effectiveness of
arrangements.
Openness and transparency 
104.  There continues to be an increasing focus on demonstrating the best use
of public money. Openness and transparency in how a body operates and
makes decisions is key to supporting understanding and scrutiny. Transparency
means that the public has access to understandable, relevant and timely
information about how the body is taking decisions and using resources.
105.  There is evidence from several sources which demonstrate the Council's
commitment to transparency. Members of the public can attend meetings of the
full Council and other Boards. Minutes of these Board meetings and supporting
papers are available on the Council’s website. Most items on Board agendas
are covered in open session at meetings rather than in private. 
106.  The Council webcasts its main Council and Policy Board meetings and all
agenda papers and minutes, including the annual accounts, are on the
Council’s website. 
107.  The Council’s website allows the public to access a wide range of
information including the register of members’ interests, current consultations
and surveys and how to make a complaint. In addition, the website encourages
the public to sign up for e-alerts to get news they are interested in delivered
straight to their inbox. 
108.  The Management Commentary that accompanies the financial statements
clearly explains to readers how the Council has performed against its revenue
and capital budgets and how this is reconciled to the financial statements. 
109.  The Council conducts its business in an open and transparent manner.

Page 39

5. Best Value | 31 
5. Best Value 
Using resources effectively and continually improving services.
Main judgements
The Council has an appropriate and effective Best Value framework in place. The
Council continues to make positive progress addressing the recommendations
contained in our 2016/17 Best Value Assurance Report. 
The Council has a good understanding of the equality issues affecting its
communities and stakeholders and have implemented policies to tackle these,
including addressing the impact of the pandemic on its communities. 
The Council’s performance management arrangements remained effective during
the pandemic. The Council was able to maintain service performance levels
despite the pandemic and continues to perform well in comparison to other
councils.
The Council is making good progress in securing Best Value
110.  Best Value is assessed over the audit appointment, as part of the
annual audit work. In addition, a Best Value Assurance Report (BVAR) for
each council will be considered by the Accounts Commission at least once
in this period. The BVAR report for the Council was published in August
2017.
111.  The BVAR concluded that the Council has a clear and ambitious
vision for Renfrewshire to revitalise the area’s economy and address
poverty and inequality. This vision is supported by the Council’s partners
and the Council Plan; management structures and performance
management processes are also well aligned to the vision.
112.  We also highlighted key areas where the Council should focus its
improvement activities going forward. The report made seven
recommendations relating to areas for further development including cross
party working, community engagement, partnership working, financial
sustainability, workforce planning and governance arrangements.
113.  Progress in implementing the recommendations continues to be
monitored by the Corporate Management Team on an annual basis, with
the next update scheduled for December 2022.

Page 40

5. Best Value | 32 
The Council has a good understanding of the equality issues
affecting its communities 
114.  The Public Sector Equality Duty as required of public sector bodies is set
out in the following guide as ensuring that, "those carrying out a public function
consider how they can positively contribute to a more equal society through
advancing equality and good relations in their day-to-day business". It requires
equality to be considered in all functions of public authorities, including decision-
making, design of policies and delivery of services. This is required by the
Equality Act 2010. The specific duties in relation to the duty came into effect in
2012 and were amended by subsequent Equality Act 2010 (Specific Duties)
(Scotland) Amendment Regulations (in 2015 and 2016).
115.  The best value audit work carried out this year focussed on the Council's
arrangements for demonstrating best value relating to the theme of Fairness
and Equality. Areas considered were as follows:
• how committed is the Council to equal opportunities (EO) and
fairness?
• to what extent is EO and fairness embedded in service delivery?
• to what extent does the council promote EO and fairness in the
community?
116.  We reviewed the Equality Impact Assessment (EQIA) area of the Council
website which provides information on how the Council assess decisions
against equality and human right outcomes. This sets out the approach to
EQIAs as a two stage-process involving initial screening and a full EQIA (if
required). The website also provides information on why EQIAs are undertaken
and covers areas such as policy development, budget setting and procurement.
117.  As a schedule A listed authority, the Council is required to report on areas
such as:
• information on recruitment, development, retention and protected
characteristics; gender pay gap information and equal pay. As the
Council employs more than 150 staff, all equal pay statements
should report on sex, race and disability. The latest Equality
Progress Report (for the period 2021-2025) includes all of the above
requirements and was considered at the Council meeting in March
2021.
118.  In addition to the above the Council has also undertaken work to consider:
• how fairness is embedded on service delivery. The Equality
Outcomes and Progress report for the period 2021-2025 includes
details on national research and issues affecting Renfrewshire. This
covers areas, including: supporting employment and improving
economic prospects for women, BAME people and disabled people;
improving routes to employment and training for young people; black
history and culture being fully incorporated into cultural and

Page 41

5. Best Value | 33 
educational activities and doing more to address social isolation in
older people and disabled people
• the extent to which the Council promotes EO and fairness in the
community. This includes the Community Impact Assessment
undertaken in September 2020. The findings confirmed a number of
key priorities which partners and communities should address
jointly. These have been used to inform the development of a Social
Renewal Plan for Renfrewshire. In addition, the Council has
engaged with the Public Services Panel via a survey in Spring 2022,
works with third sector partners (e.g., with the Poverty Alliance on
their "get heard" programme); participates in the Alcohol and Drug
Change Programme and has developed a Renfrewshire Climate
Panel where local citizens have been recruited to help make
decisions to ensure that actions taken are right for local
communities.
119.  The Council has a good understanding of the equality issues affecting its
communities and stakeholders and have implemented policies to attempt to
tackle these, including addressing the impact of the pandemic on its
communities. It is important that the Council continues to work with its partners
and communities on these priorities, and that people most impacted are able to
shape the actions that are taken to address the issues being experienced.
Performance management arrangements are being refreshed
120.  The Council reports its progress against the Council Plan to the
Leadership Board every six months. 
121.  There are Service Improvement Plans (SIPs) for all key service
areas. They contain detailed action plans which link to the priorities in the
Council Plan. They are also closely linked to other relevant plans,
including Renfrewshire's Community Plan and Local Outcome
Improvement Plan. Progress against SIP indicators is reported to relevant
Policy Boards every six months. These are the forums where Councillors
can challenge how services are performing.
122.  Performance information is also accessible through the Council’s
“Our Current Performance” webpage. This includes performance progress
updates on SIPs and the Council Plan. The webpage also links to the
Council’s annual report, It’s all about you. This reports performance
against indicators that the public have told the Council they are most
interested in. The presentation of the report has been refreshed to take
account of public requests to have a more accessible and easier to read
format. 
123.  The Council is currently reviewing and refreshing its quarterly scorecard of
performance information. Policy teams are engaging with each of their service
Directorates to review performance indicators and to identify new measures for
inclusion in the Council Plan scorecard and the new Corporate Management
Team scorecard. The Council is also undertaking a wider audit of performance
measures and are considering options for performance management software –

Page 42

5. Best Value | 34 
124.  The Council has an established performance management
framework that managers and Councillors clearly understand, which
provides a sound base for ongoing and continuous improvement. 
Statutory performance indicators (SPIs) are being monitored
125.  The Accounts Commission has a statutory responsibility to define the
performance information that councils must publish. In turn, councils have their
own responsibility, under their Best Value duty, to report performance to the
public. The commission does not prescribe how councils should report this
information but expects them to provide the public with fair, balanced and
engaging performance information.
126.  The Accounts Commission issued a revised 2018 Statutory Performance
Information Direction in December 2018 which requires a council to report: 
• its performance in improving local public services provided by the
council (on its own and with its partners and communities), and
progress against agreed desired outcomes
• its own assessment and independent audit assessments of how it is
performing against its duty of Best Value, and how it plans to
improve these assessments and how it (with its partners where
appropriate) has engaged with and responded to its diverse
communities.
127.  We have evaluated the Council’s arrangements for fulfilling the above
requirements and concluded that it complies with requirements. 
The Council was able to maintain service performance levels
despite the pandemic
128.  The fallout from the pandemic continues to impact on performance
measures, particularly for services which were temporarily suspended, or
operated at a reduced level or have had to adapt to new ways of working. The
Council has continued to monitor key performance targets throughout the year
with performance being regularly reported to the Audit, Risk and Scrutiny Board. 
129.  The Council has highlighted areas where performance has been
challenging and this has been detailed in recent reports to the respective Policy
Boards. This is most acute in areas where activity had to stop as a result of the
pandemic, such as non-essential housing repairs, where there is now a
significant increase in demand that is being managed as the Council moves
forward to address the backlog. 
The Council continues to perform well in comparison to other
councils
130.  The Council participates in the Local Government Benchmarking
Framework (LGBF). The framework aims to bring together a wide range of
information about how all Scottish Councils perform in delivering better services

Page 43

5. Best Value | 35 
to local communities, including the cost of services and how satisfied citizens
are with them.
131.  The annual performance report to the Audit, Risk and Scrutiny Board was
presented on 21 March 2022. This provided the Board and the public with a full
assessment of all 101 indicators in the LGBF for 2020/21, highlighting those
indicators in the top and bottom quartile, trend data and ranked position over
the two years, Scottish average and the family group range for all indicators.  
132.   The Council continues to perform well in comparison to other councils,
with 24 indicators are in the top quartile (ranked 1st to 8th) (26 indicators in
2021), however 11 indicators are in the bottom quartile (ranked 25th to 32nd)
(12 indicators in 2021). 
133.  These represent the first full pandemic data and will compare favourably to
the position in 2019/20. The 2021/22 data will be published in 2023. 
National performance audit reports
134.  Audit Scotland carries out a national performance audit programme on
behalf of the Accounts Commission and the Auditor General for Scotland.
During 2021/22, Audit Scotland published a number of reports were issued
which may be of interest to the body. These are outlined in Appendix 2.

Page 44

Appendix 1. Action plan 2021/22 | 36 
Appendix 1. Action plan
2021/22 
2021/22 recommendations
Issue/risk Recommendation  Agreed management
action/timing
1. Property, plant and
equipment valuations
The Code of Practice on
Local Authority Accounting
requires authorities to revalue
property, plant and
equipment with sufficient
regularity to ensure the
carrying amount does not
differ materially from current
value, being the value that
would have been obtained if
revalued. Property, plant and
equipment valuations within
the annual accounts is
supported by workings from
valuers, using a rolling
programme of revaluations. 
The valuation process could
be enhanced through greater
documentation of the annual
valuation report and
management scrutiny over
the report including: 
• The assets revalued in
year and the methodology
applied in the valuation
exercise;
• Key assumptions and
estimates made in the
valuation;
• The total valuation amount
reflected within the annual
accounts; and
We recommend that a
valuation report is prepared
by the council’s valuer on an
annual basis outlining the
details of the work
undertaken, the impact on the
asset values and the
methodology applied in
completing the revaluation
programme. There should be
clear evidence of how officers
have challenged and
scrutinised the valuation to
ensure the accounts are free
from material misstatement. 
Exhibit 2, Recommendation 1 
Agreed action: 
The valuation programme
and terms of engagement
with valuers will be reviewed
before the end of the financial
year. As a minimum it is
expected that all assets
valued on a Depreciated
Replacement Cost will be
reviewed in 2022/23.
Responsible officer: 
Head of Finance and
Business Services and Head
of Economy and
Development
Agreed date: 
31 March 2023

Page 45

Appendix 1. Action plan 2021/22 | 37 
Issue/risk Recommendation  Agreed management
action/timing
• Details of compliance with
industry standards
In addition, there should be
clear assurances around how
those assets not subject to
revaluation would not be
materially understated. 
Risk: There is a risk that the
documentation to support the
valuation exercise lacks detail
and results in additional audit
work being required to ensure
appropriate assurances are
obtained to support the
valuations within the annual
accounts. 
2. Related party
disclosures
The information held relating
to member and officer
interests could be enhanced
to ensure that all relevant
information is recorded to
support the governance and
financial reporting
requirements around the
disclosure of related parties.
Processes and controls to
consider and identify relevant
relationships and transactions
that require to be disclosed
within the annual accounts
should be reviewed for
appropriateness.
Risk: There is a risk that the
council fail to identify related
parties due to underlying
documentation lacking
sufficient detail.
We recommend that a review
of controls and processes
around related parties is
undertaken.  This will include
the documentation of
member and officer interests
as well as the processes in
place to identify the relevant
disclosures for inclusion in
the financial statements.
Exhibit 2 Recommendation 2 
Agreed action: 
Work is already underway to
take account of best practice
and IAS24 requirements in
the Related Party disclosure.
This note will be fully
reviewed and updated for
2022/23.
Responsible officer: 
Head of Finance and
Business Services
Agreed date: 
31 March 2023
3. Financial strategy to
support financial
sustainability
Develop a revised financial
strategy incorporating new or
temporary financial
flexibilities and assess how
the total balances available
are best utilised to support
Agreed action: 
The Council’s Financial
Outlook is being continually
reviewed in light of changing
economic climate and regular
reports to Council will take

Page 46

Appendix 1. Action plan 2021/22 | 38 
Issue/risk Recommendation  Agreed management
action/timing
The council face continuing
financial challenges and
significant uncertainty
It is anticipated that new
financial flexibilities may
become available and the
impact of these should be
assessed within the scope of
the wider financial strategy.
Risk: There is a risk that
decisions around financial
flexibilities, transformation
and redesign of savings are
made without detailed
financial impacts being
available to support the
decision-making process.
the financial sustainability of
the council over the medium
term.
The council will need to
actively engage with local
and national partners to
deliver the required level of
efficiencies and savings.
Paragraph 99 
place over the coming
months. As reported to
Council in June 2022, a
number of workstreams are
underway to identify financial
savings over and above
those covered by the Right
for Renfrewshire
transformation programme. A
further report to Council in
December 2022 will detail the
flexibilities being utilised to
support the strategy.
Responsible officer:
Director of Finance and
Resources
Agreed date: 
31 March 2023   
Follow-up of prior year recommendations 2020/21
Issue/risk Recommendation  Agreed management
action/timing
1. Improvement in Council
House Valuation Process
To ensure the accuracy of
land and property valuations
within the annual accounts,
management obtain expert
advice from appropriately
qualified staff within the
council’s property services
department. 
Risk: There has been a
significant turnover in staff
and adequate records have
not been maintained to
support council house
valuations.
The Council should formalise
the internal process for the
request and provision of land
and property valuations. In
addition, appropriate staffing
and resource should be
deployed to improve the
valuation arrangements
within the Council. 
Discussions between Finance
and Property officers will take
place to agree what
supporting information will be
provided and when.
Responsible officers: Head of
Finance and Head of
Economy & Development
Agreed date: 31 March 2022
2. Ensuring effective use of
temporary reserves arising
The Council will need to
continue to assess the
adequacy and use of
These funds are earmarked
in specific Covid-19 reserves
and their future use will be

Page 47

Appendix 1. Action plan 2021/22 | 39 
to fund the Council’s
pandemic response
The Council’s earmarked
reserves relating to the
pandemic response totalled
£17.296 as at 31 March
2021. 
Risk: There is a risk that this
temporary funding is not used
effectively.
ringfenced balances as it
reviews its financial strategy;
and to ensure that funding
specifically allocated for the
Covid-19 response is utilised
in accordance with grant
conditions. 
appropriate and relevant in
line with the Council’s
recovery plans and financial
strategy.
Responsible officer: Director
of Finance and Resources
Agreed date: 31 March 2022
3. Land and buildings
valuation.
The Council revalue elements
of its fixed assets over a five-
year rolling programme, with
different classes of asset
being revalued each year.
Risk: There is a risk of large
valuation movements
between each year’s annual
accounts.
Management should consider
a valuation methodology
whereby 20 per cent of each
class of asset is revalued
each year, with all assets still
being revalued once over a 5-
year period. 
The valuation programme is
kept under review and
consideration will be given to
this recommendation in
advance of the next year-end. 
Responsible officers: Head of
Finance and Head of
Economy & Development
Agreed date: 31 March 2022
4. Heritage assets
The last valuation external
valuation was in 2013.
Risk: There is a risk the
value of heritage assets is not
accurately reflected within the
financial statements.
The Council should
undertake a systematic
valuation of heritage assets.
This should be aligned with
the transfer of records onto
the new electronic
management system. 
Due to ongoing construction
work in the museum service,
access to these assets is
limited in the short-term. This
action is likely to require a
longer timeline.
Responsible officer: Head of
Finance
Agreed date: 31 March 2023
5. Financial sustainability
The impact of the pandemic
continues to present financial
challenges, with a projected
deficit of up to £25 million.
Risk: The Council may not
be able to deal with future
financial challenges and
deliver required savings
without adversely impacting
service delivery.
The Council should develop a
revised financial strategy
which ensures the total
balances available are used
to support the financial
sustainability of the Council
over the medium-term. The
financial strategy will require
to incorporate a revised
approach to service delivery
and new ways of working.
To address the financial
challenge, the Council will
need to actively engage with
local and national partners to
The Council will be setting its
2022/23 budget in March
2022 which will include plans
for the available balances
and an updated indication of
the medium-term financial
outlook. The financial
strategy will continue to be
regularly updated to highlight
any funding gap faced by the
Council and outline action
required to address this.
Responsible officer: Director
of Finance and Resources

Page 48

Appendix 1. Action plan 2021/22 | 40 
deliver the required level of
efficiencies and savings.
Paragraph 88 
Agreed date: 30 September
2022
6. Community Impact
Assessment
The findings from the
community impact
assessment confirm a
number of key priorities.
Risk: There is a risk that
priorities are not taken
forward by the Council and its
partners.
It is important that partners
and communities continue to
work together on these
priorities, and that people
most impacted are able to
shape the actions that are
taken to address the issues
being experienced.
Paragraph 116
A lead officer has been
appointed to implement the
Council’s/partner’s Social
Renewal Plan. Progress will
be regularly reviewed by the
Community Planning
Partnership and reported to
Leadership Board. Key
priorities within the Social
Renewal and Economic
Recovery Plans will be
embedded within the next
Council Plan in 2022 and
through a review of the Local
Outcome Improvement Plan. 
Responsible officer: Head of
Policy and Commissioning
Agreed date: August 2022
Follow-up of prior year recommendations 2019/20
Issue/risk Recommendation  Agreed management
action/timing
8. Process for Identification
of Internal Recharges 
We noted that there is scope
for improvement in the
Council’s process to identify
internal recharge transactions
accurately and efficiently. 
A review of the processes for
internal recharging will be
undertaken by Finance staff
with a view to eliminating
unnecessary charges. 
Development of the system
will be undertaken to better
identify internal transactions. 
A new journal type has been
introduced into the Financial
Management System to
make identification of internal
recharges easier. In addition,
work is ongoing to review all
internal recharges by
department, with a view to
better understanding, re-
thinking and improvement of
processes where appropriate.
This is now part of a wider
review of processes in
Finance that is still ongoing.
Responsible officer: Head of
Finance
Revised date: 31 December
2022

Page 49

Appendix 1. Action plan 2021/22 | 41 
9. Budgetary process 
Budget reports are
considered by Policy Boards
throughout the year;
however, the budget setting
and monitoring arrangements
could be more transparent. 
The Council has made a
number of improvements in
this area:
• a year-end budget report
was submitted alongside the
unaudited annual accounts in
June 2020.
• budget monitoring reports
now clearly outline changes
from the originally approved
budget.
There remains an opportunity
to further improve
transparency through the
timely publication of an
amended budget to reflect
decisions made by members
during budget approval.
Budget monitoring reporting
arrangements are subject to
continuous review and
development with a view to
standardisation and
improving transparency and
ease of use. The format of
the approved budget will be
considered for the 2021/22
Estimates. 
Responsible officer: Director
of Finance and Resources
Revised date: 31 March 2022
In the 2021/22 estimates,
budget motions were all to be
funded from carried forward
reserves, and Council Tax did
not increase, meaning no
substantive changes to the
published Approved Revenue
Estimates. A second report, if
appropriate, will be
considered for the 2022/23
Estimates.
10. Community
Engagement 
The locality plan identifies
broad outcomes for
improvement, but it does not
refer to localities where action
will be focused nor are clear
timescales for achieving
these set out. 
Risk: There is a risk that
outcomes do not focus on the
correct localities. 
The Council should clarify
within the locality plans the
localities where outcomes for
improvement will be focused
and specify the timescales for
achieving these. 
Local plans are being
developed by each of the
Local Partnerships, and initial
priorities identified during
2019. Due to the pandemic
the Local Partnerships were
paused and this work did not
progress at the original pace
intended. Sessions are being
planned for January 2021 to
resume locality level
discussions on local priorities
in light of Covid-19.
Responsible officer: Head of
Policy and Commissioning
Revised date: 30 June 2021
Work has been undertaken
through the Developing
Communities workstream to
review Local Partnership
arrangements, and to
consider how to strengthen
these going forward in
recognition of learning we

Page 50

Appendix 1. Action plan 2021/22 | 42 
have gained during Covid-19
in relation to community
relationships, capacity and
empowerment. 
Resources are being
identified to support the
further development of the
Local Partnerships, with
colleagues from community
learning and developing
supporting work on the
development of the local
plans and priorities during
2022. This will be a key
element of local work in
relation to Covid-19 recovery.

Page 51

Appendix 2. Summary of 2021/22 national performance reports and briefing papers | 43 
Appendix 2. Summary of
2021/22 national performance
reports and briefing papers 
May
Local government in Scotland Overview 2021
June
Covid 19: Personal protective equipment
July
Community justice: Sustainable alternatives to custody
September
Covid 19: Vaccination programme
January
Planning for skills
Social care briefing
February
NHS in Scotland 2021
March
Local government in Scotland: Financial Overview 20/21
Drug and alcohol: An update
Scotland’s economy: Supporting businesses through the Covid 19 pandemic

Page 52

Appendix 2. Summary of 2021/22 national performance reports and briefing papers | 44  
Renfrewshire Council
2021/22 Annual Audit Report: Proposed
Audit Scotland’s published material is available for download 
on the website in a number of formats. For information on our 
accessibility principles, please visit:
www.audit-scotland.gov.uk/accessibility
For the latest news follow us on social media or
subscribe to our email alerts. 
Audit Scotland, 4th Floor, 102 West Port, Edinburgh EH3 9DN
Phone: 0131 625 1500 Email: info@audit-scotland.gov.uk
www.audit-scotland.gov.uk
AS.4.0

Page 53

My Ref: 
Contact: 
Telephone Number: 
Email:  
Date: 
AR/CB
Alastair MacArthur
0141-618-7364
Alastair.macarthur@renfrewshire.gov.uk
14 November 2022 
Finance and Resources
Director: Alastair MacArthur
Renfrewshire House, Cotton Street, Paisley PA1 1TT
www.renfrewshire.gov.uk 
Pauline Gillen
Audit Director
Audit Scotland
4th Floor
8 Nelson Mandela Place
Glasgow 
G2 1BT 
Dear Pauline
Renfrewshire Council
Annual Accounts 2021/22
Letter of Representation (ISA 580) 
1.  This representation letter is provided about your audit of the annual accounts of Renfrewshire
Council for the year ended 31 March 2022 for the purpose of expressing an opinion as to
whether the financial statements give a true and fair view in accordance with the financial
reporting framework, and for expressing other opinions on the Remuneration Report,
Management Commentary and Annual Governance Statement.
2.  I confirm to the best of my knowledge and belief and having made appropriate enquiries of
the Chief Executive and Corporate Management Team, the following representations given to
you in connection with your audit of Renfrewshire Council's annual accounts for the year ended
31 March 2022.
General
3.  Renfrewshire Council and I have fulfilled our statutory responsibilities for the preparation of
the 2021/22 annual accounts. All the accounting records, documentation and other matters
which I am aware are relevant to the preparation of the annual accounts have been made
available to you for the purposes of your audit. All transactions undertaken by Renfrewshire
Council have been recorded in the accounting records and are properly reflected in the financial
statements.  
4.  I confirm that the effects of uncorrected misstatements are immaterial, individually and in
aggregate, to the financial statements as a whole. I am not aware of any uncorrected
misstatements other than those reported by you. 
Financial Reporting Framework
5.  The annual accounts have been prepared in accordance with the Code of Practice on Local
Authority Accounting in the United Kingdom 2021/22 (2021/22 accounting code), and in

Page 54

accordance with the requirements of the Local Government (Scotland) Act 1973, the Local
Government in Scotland Act 2003 and The Local Authority Accounts (Scotland) Regulations
2014.
6.  In accordance with the 2014 regulations, I have ensured that the financial statements give a
true and fair view of the financial position of the Renfrewshire Council at 31 March 2022 and the
transactions for 2021/22. 
Accounting Policies & Estimates
7.  All significant accounting policies applied are as shown in the notes to the financial
statements. The accounting policies are determined by the 2021/22 accounting code where
applicable. Where the code does not specifically apply, I have used judgement in developing
and applying an accounting policy that results in information that is relevant and reliable. All
accounting policies applied are appropriate to Renfrewshire Council circumstances and have
been consistently applied.
8.  The significant assumptions used in making accounting estimates are reasonable and
properly reflected in the financial statements. Judgements used in making estimates have been
based on the latest available, reliable information. Estimates have been revised where there are
changes in the circumstances on which the original estimate was based or as a result of new
information or experience.
Going Concern Basis of Accounting
9.  I have assessed Renfrewshire Council’s ability to continue to use the going concern basis of
accounting and have concluded that it is appropriate. I am not aware of any material
uncertainties that may cast significant doubt on Renfrewshire Council’s ability to continue as a
going concern. 
Assets
10.  Where a rolling programme of asset valuations has been used, I have obtained further
assurance  that the carrying amount of assets at 31 March 2022 does not differ materially from
that which would be determined if a revaluation had been carried out at that date. I have
adjusted the accounts for any subsequent misstatement.
11.  I carried out an assessment at 31 March 2022 as to whether there is any indication that an
asset may be impaired and have recognised any impairment losses identified.
12.  I have provided you with all information of which I am aware regarding any valuation
exercises carried out after 31 March 2022. 
13.  There are no plans or intentions that are likely to affect the carrying value or classification of
the assets recognised within the financial statements.
14.  Owned assets are free from any lien, encumbrance or charge except as disclosed in the
financial statements. 
Liabilities
15.  All liabilities at 31 March 2022 of which I am aware have been recognised in the annual
accounts.
16.  Provisions have been recognised in the financial statements for all liabilities of uncertain
timing or amount at 31 March 2022 of which I am aware where the conditions specified in the
2021/22 accounting code have been met. The amount recognised as a provision is the best
estimate of the expenditure likely to be required to settle the obligation at 31 March 2022.

Page 55

Where the effect of the time value of money is material, the amount of the provision has been
discounted to the present value of the expected payments.
17. Provisions recognised in previous years have been reviewed and adjusted, where
appropriate, to reflect the best estimate at 31 March 2022 or to reflect material changes in the
assumptions underlying the calculations of the cash flows.
18. The accrual recognised in the financial statements for holiday untaken by 31 March 2022
has been estimated on a reasonable basis.
19. The pension assumptions made by the actuary in the IAS 19 report for Renfrewshire
Council have been considered and I confirm that they are consistent with management's own
view.
20. There are no plans or intentions that are likely to affect the carrying value or classification of
the liabilities recognised in the financial statements.
Contingent liabilities
21. There are no significant contingent liabilities, other than those disclosed in Note 30 to the
financial statements, arising either under formal agreement or through formal undertakings
requiring disclosure in the accounts. All known contingent liabilities have been fully and properly
disclosed, including any outstanding legal claims which have not been provided under the Code
of Practice on Local Authority Accounting in the United Kingdom 2021/22 and IAS 37.
Fraud
22. I have provided you with all information in relation to:
• my assessment of the risk that the financial statements may be materially misstated
because of fraud
• any allegations of fraud or suspected fraud affecting the financial statements
• fraud or suspected fraud that I am aware of involving management, employees who
have a significant role in internal control, or others that could have a material effect on
the financial statements.
Laws and Regulations
23. I have disclosed to you all known instances of non-compliance or suspected non-
compliance with laws and regulations whose effects should be considered when preparing
financial statements.
Related Party Transactions
24. All material transactions with related parties have been appropriately accounted for and
disclosed in the financial statements in accordance with the 2021/22 accounting code. I have
made available to you the identity of all the Renfrewshire Council's related parties and all the
related party relationships and transactions of which I am aware.
Remuneration Report
25. The Remuneration Report has been prepared in accordance with the Local Authority
Accounts (Scotland) Amendment Regulations 2014, and all required information of which I am
aware has been provided to you.

Page 56

Management commentary
26.  I confirm that the Management Commentary has been prepared in accordance with the
statutory guidance and the information is consistent with the financial statements. 
Corporate Governance
27.  I confirm that Renfrewshire Council has undertaken a review of the system of internal
control during 2021/22 to establish the extent to which it complies with proper practices set out
in the Delivering Good Governance in Local Government: Framework 2016. I have disclosed to
you all deficiencies in internal control identified from this review or of which I am otherwise
aware.
28.  I confirm that the Annual Governance Statement has been prepared in accordance with the
Delivering Good Governance in Local Government: Framework 2016 and the information is
consistent with the financial statements. There have been no changes in the corporate
governance arrangements or issues identified, since 31 March 2022, which require to be
reflected. 
Group Accounts
29.  I have identified all the other entities in which Renfrewshire Council has a material interest
and have classified and accounted for them in accordance with the 2021/22 accounting code.
Any significant issues with the financial statements of group entities, including any qualified
audit opinions, have been advised to you.
Common Good Fund
30.  I confirm, to the best of my ability, that all material common good assets have been
identified and correctly accounted for within the common good financial statements. Where
appropriate those common good assets used operationally by the Council are recognised as
finance leases. 
Events Subsequent to the Date of the Balance Sheet
31.  All events subsequent to 31 March 2022 for which the 2021/22 accounting code requires
adjustment or disclosure have been adjusted or disclosed. 
Yours sincerely 
Alastair MacArthur
Section 95 Officer
Director of Finance and Resources
Renfrewshire Council