Page 1

Page 1 of 13 
___________________________________________________________________
To: Audit, Risk & Scrutiny Board
On: 22 August 2022
___________________________________________________________________
Report by: Lead Officer
___________________________________________________________________
Heading: Linking the National Cycle Route 7 with Howwood Review
1 Summary
1.1 At its meeting on 15 November 2021, members of the Audit, Risk
and Scrutiny Board agreed to a request to include a review which
would look into linking the National Cycle Route 7 to Howwood was
included in the annual programme of activity for the Board for
2021/2022. 
1.2 At its meeting on 24 January 2022, members of the Audit, Risk and
Scrutiny Board agreed the purpose, scope and timescales of this
review.
1.3 At its meeting on 21 March 2022, members of the Audit, Risk and
Scrutiny Board noted the update report outlining progress of the
review since the previous board meeting on 24 January 2022. This
included updates on;
• Contact made with Elected Members and stakeholders
including Council officers;
• A site visit; and
• Other complementary reports and studies relating to the
subject of this review. 
2 Recommendations
2.1 The Board is asked to:

Page 2

Page 2 of 13
• Note the key findings and accept the recommendations noted in
section 5 of this report;
• Approve the report for submission to the Council meeting to be
held on 29 September 2022; and
• Notes that the Lead Officer is grateful to all stakeholders who
participated in the review.
_________________________________________________________
3 Background
3.1 National Cycle Network Route 7 connects Balloch on the southern
banks of Loch Lomond with Aberfoyle, Strathyre, Callander,
Lochearnhead and Killin. It forms the southern section of the long-
distance Lochs and Glens Way route.
3.2 The route is described by Sustrans as having a mixture of traffic-free
paths and quiet road sections and being reachable throughout the
route via traffic-free paths and also by regular train connections.
3.3 From Lochwinnoch it is accessible from an on-road route (not part of
the National Cycle Network) from the Main Street (via Church Street
/ Lochhead Avenue) on the east and also from a mixture of traffic-
free route and on road route (not part of the National Cycle Network)
from Lochwinnoch Train Station on the west.

Page 3

Page 3 of 13 
3.4 In the request for this review into linking the National Cycle Route 7
to Howwood, it was noted that it could also facilitate access to The
Whithorn Way; a newly mapped 143-mile walking and cycling route,
which follows much of the westerly pilgrimage route to Whithorn,
which was travelled by pilgrims over centuries. 
3.5 The route follows established paths and cycleways where possible,
including extensive use of the National Cycle & Path Route 7.
3.6 To aid users, the route is split into several sections in available
guides. Lochwinnoch connects two sections; Paisley to Lochwinnoch
and Lochwinnoch to Kilwinning.
3.7 There are currently no published dedicated active travel (pedestrian
and cycling) routes from Howwood to Lochwinnoch.
4 Update on the Review
4.1 As set out in the Scoping paper (which was approved by the Board
on 24 January 2022), the scope of the review into linking walking
and cycling from the National Cycle Route 7 at Lochwinnoch to and
from Howwood was to:
• understand the demand;
• set out the current provision; and
• identify any other mitigations.
4.2 Progress on the review since the last report to Board includes;

Page 4

Page 4 of 13
• Contacted all current elected members from affected ward
(Ward 9) and adjacent ward (Ward 8) and Howwood
Community Council to make them aware of the review
and to ask for any additional information that could be
considered as part of the review.
• Ongoing discussions with officers from relevant services
across the Council to ascertain current and planned
provisions to help inform the review.
• Further site visit with stakeholders to the National Cycle
Route 7 at the locale, the existing core path connecting
Station Road to the NCR 7 and the route into Howwood
from Station Road. Photographs were also taken at this
site visit.
4.3 These early discussions have proved valuable and inform
recommendations in this review. The Lead Officer also liaised with
relevant officers and services responsible for other works / reviews
to ensure that the scope of this review was considered in other items
of work to maximise outputs for the relevant review, including this
review whilst also minimising duplicate work and costs. These
include; 
• Awareness that the new Core Paths Plan was approved
at Board in January and identifies an aspirational route
between NCR7 and Howwood (HOW16).
• Awareness that a feasibility study was commissioned to
investigate options for possible Traffic Calming in
Kilbarchan, Howwood and Houston which includes
recommendations for traffic calming measures in
Howwood and a gateway feature within the proposed link
from Howwood to NCR7. See paragraph 4.4.11 to 4.4.15
in Key Findings section below.
• Council officers have aspirations to make a funding
application for a feasibility study for walking and cycling
from the National Cycle Route 7 at Lochwinnoch to and
from Howwood. See paragraph 4.4.16 in Key Findings
section below.
4.4 Key findings;

Page 5

Page 5 of 13
4.4.1 Active travel, including walking and cycling, is widely acknowledged
to help improve health and wellbeing1.
4.4.2 The footway currently terminates on the way out of Howwood on
Station Road at the bridge over the A737 meaning that there is
currently no dedicated and segregated route for safe walking and
cycling between Howwood and the National Cycle Route 7 via the
most direct route (Station Road). See Figure 3 at Appendix 2.
4.4.3 The lack of footway, together with a National Speed limit in this area,
make it unattractive for active travel including pedestrians in
particular.
4.4.4 There appears to be demand for a pedestrian route with desire lines2
being evident on the roadside verges along this route. See Figure 3
at Appendix 2.
4.4.5 There is an existing core path (LOCH/1 and LOCH/2) some 300m
from Howwood Train Station. The section of Station Road which
links with the Core Paths has limited pedestrian facilities with no
footway in part. The existing core path provides access to the
National Cycle Route 7. See Figure 4 and Figure 5 at Appendix 2.
4.4.6 The core path (LOCH/1 and LOCH/2) is primarily a leisure orientated
route and a track made up of predominantly unbound surface and
contains steep incline / declines making it unsuitable for pushchairs
and wheelchairs. It has also been suggested that it is known to flood.
4.4.7 Whilst this core path is a well-used existing route for pedestrians,
with access to the Kenmure Hill Temple and links to the National
Cycle Route 7, at approximately 2.5km in length, with uneven
surfaces and inclines, it is more circuitous at approximately 1.8km
longer than the more direct route along Station Road. 
1 https://www.sustrans.org.uk/our-blog/research/all-themes/all/active-travel-toolkit-the-role-of-active-travel-
in-improving-health
2 A desire lines describes a path created as a consequence of erosion caused by human or animal traffic. The
path usually represents the shortest or most easily navigated route between an origin and destination.

Page 6

Page 6 of 13
4.4.8 There has been a long-term aspiration for a more direct active travel
route which would connect Howwood to the National Cycle Route 7
via Station Road, utilising existing road infrastructure. A route
(HOW/16), has been identified as an Aspirational Core Path in the
Core Path Plan since 2009 and remains within ‘Renfrewshire Core
Paths Plan 2022’ which was approved by Council in 20223. It is
however recognised that land ownership and technical matters
would require to be considered in detail to facilitate any future route.
4.4.9 The Core Paths Plan, which included significant public consultation,
demonstrates public and policy support for this aspiration Core Path.
4.4.10 A more direct active travel route from Howwood to NCR7, using
station road, would also benefit and provide improved access to
other existing routes including the Semple Trail4 and The Whithorn
Way5. In addition to the well-publicised benefits of active travel
routes, discussions with representatives from The Whithorn Way
suggested the following additional benefits from improved access to
and from these mapped routes, including;
• Additional footfall and spend in the Community,
particularly in accommodation and hospitality;
• Opportunities to grow accommodation offer due to
growing demand from users;
• Interactions between the Community and users of the
routes;
4.4.11 Howwood is also particularly appealing to users of these routes due
to the presence of the Train Station which allows users to start
and/or finish their walk / cycle at Howwood then use the train for their
onward journey.
4.4.12 Renfrewshire Council commissioned consultants to review the
feasibility and options for introducing traffic calming measures in
Renfrewshire villages including Howwood. 
4.4.13 At the time of writing, the outputs from this traffic calming review
were still being finalised and will require consultation with
Community Councils, Ward Councillors and other relevant
stakeholders for review/consultation before final plans are designed. 
3 www.renfrewshire.gov.uk/corepaths
4 clydemuirshiel.co.uk/visit/things-to-do/walking/routes/semple-trail/
5 www.whithorn.com/walk-the-whithorn-way/

Page 7

Page 7 of 13
4.4.14 The interim outputs recommend gateway features at village entry
points (including Howwood). Whilst these have not been defined at
this point, they usually consist of a combination of signage, change
of road markings, physical changes (traffic buildouts or rumble strips)
with an aim to reduce the speed of vehicle traffic through villages by
building traffic calming measures in the road. See Figure 6 at
Appendix 2.
4.4.15 The consultant carrying out the traffic calming review carried out a
high-level review of a possible connection to NCR7 from Howwood.
This included a potential route which indicated a segregated active
travel route could be possible. To be explored in further detail, a
feasibility study would be required. Council officers have indicated
aspirations to apply to Sustrans ‘Places for Everyone’ for funding to
allow this feasibility study to be commissioned.
4.4.16 The aim of Sustran’s ‘Places for Everyone’ is to create safe,
attractive, healthier places by increasing the number of trips made by
walking, wheeling and cycling for everyday journeys. The scheme is
funded by the Scottish Government through Transport Scotland and
is administered by Sustrans.
4.4.17 Places for Everyone contributes to the Scottish Government’s aim
for a healthier, environmentally sustainable nation with a strong
economy and communities, as laid out in the National Performance
Framework.
4.4.18 Sustran’s Places for Everyone programme opened to new
applications at Stage 0-2 on 25th July 2022, with the deadline for
submissions being 23 August 2022. The Decision Making Panel will
be held on 31 October 2022 with the aim to make awards within 4
weeks of this date. We are advise that colleagues within
Environment & Infrastructure are submitting an application to
Sustrans to meet these deadlines.
5 Recommendations
5.1 There is evidence of demand and policy support for a safe active
travel link between the village of Howwood and the National Cycle
Route 7.

Page 8

Page 8 of 13
It is proposed that opportunities to fund a feasibility study to
investigate options for implementing this link should be explored
including Sustran’s ‘Places for Everyone’ funding as outlined in
paragraphs 4.4.16 to 4.4.18, noting the timescales and deadlines
involved (which precede the date of this board meeting).
5.2 The feasibility study should take cognisance of the requirement for
land acquisition, road safety concerns at the narrow Black Cart
Water bridge and other existing information including, but not limited
to, ‘Renfrewshire Core Paths Plan 2022’, ‘Villages – Traffic Calming
Measures’ report and outcomes.
5.3 If the funding application is successful, the outcomes from the
feasibility study would be consulted with the public including local
communities as well as Community Councils and Elected Members. 
The next phase after feasibility study is detailed design and this
would require a further application to secure funding support.
___________________________________________________________________
Implications of the Report
1. Financial      - none 
2. HR & Organisational Development  - none 
3. Community Planning    - none  
4. Legal       - none 
5. Property/Assets     - none 
6. Information Technology    - none 
7. Equality & Human Rights   - none 
(a) The Recommendations contained within this report have been assessed
in relation to their impact on equalities and human rights. No negative
impacts on equality groups or potential for infringement of individuals’
human rights have been identified arising from the recommendations
contained in the report. If required following implementation, the actual
impact of the recommendations and the mitigating actions will be
reviewed and monitored, and the results of the assessment will be
published on the Council’s website. 
8. Health & Safety     - none 
9. Procurement     - none

Page 9

Page 9 of 13
10. Risk      - none 
11. Privacy Impact     - none 
12. COSLA Policy Position    - not applicable 
13. Climate Risk
Supporting and enhancing opportunities for active travel is an area being
explored as part of Renfrewshire’s planning for net zero. 
_________________________________________________________
List of Background Papers 
(a) Audit, Risk and Scrutiny Board Annual Programme approved 23/08/2021
The foregoing background papers will be retained within Finance and
Resources for inspection by the public for the prescribed period of four years
from the date of the meeting.
______________________________________________________________ 
Author:  Kevin Waters  
Programme Manager (City Deal & Infrastructure)     
Left Council on 14/07/22
Catriona Halliday (Technical Manager – City Deal & Infrastructure) will present the
paper.

Page 10

Page 10 of 13
Appendix 1 
Timetable for Linking the National Cycle Route 7 with Howwood Review 
Date of Board Meeting Stage of Review
Monday 24 January 2022 Commencement of review - Complete
Monday 21 March 2022 Continuation of review – Complete
Monday 13 May 2022 No update presented
Monday 22 August 2022 Continuation of review
Tuesday 27 September 2022 Draft report to Board
Thursday 29 September 2022 Final report to Council

Page 11

Page 11 of 13
Appendix 2 – Photographs 
NCR7 Entrance
Station Road
Figure 1 - Approximate Route of direct link from Howwood to NCR7
Figure 3 - Current provision on route out of Howwood
Figure 4 - Entrance to core path (LOCH/1 and LOCH/2) at
Howwood end.
Figure 2 - Current provision at NCR7 entrance
Figure 5 - Entrance to core path (LOCH/1 and LOCH/2) at
NCr7 end.

Page 12

Page 12 of 13 
Figure 6 - Proposed location of 'Gateway' traffic calming
features from draft ‘Villages – Traffic Calming’ report.