Internal Audit Annual Report 2024 - 2025 combined

Renfrewshire Council · 19 May 2025
Back to Audit, Risk and Scrutiny Board — 19 May 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

___________________________________________________________________
To: Audit, Risk and Scrutiny Board
On: 19 May 2025
___________________________________________________________________
Report by: Chief Auditor
___________________________________________________________________
Heading: Internal Audit Annual Report 2024 - 2025
___________________________________________________________________
1. Summary
1.1  The Public Sector Internal Audit Standards require the Chief Auditor to
prepare a report, at least annually, to senior management and the Board on
the internal audit activity’s purpose, authority, and responsibility, as well as
performance relative to its plan. 
1.2  The annual report must also provide an annual audit opinion on the overall
adequacy and effectiveness of the Council’s internal control environment and
include details of any significant risk exposures and control issues, including
fraud risks, governance issues, and other matters that can be used to inform
the governance statement. 
1.3  The Annual Report for 2024-25 is attached and outlines the role of Internal
Audit, the performance of Internal Audit, the strategic and operational issues
which influenced the nature of the work carried out, the key audit findings, and
contains the annual audit assurance statement.
___________________________________________________________________ 
2. Recommendations
2.1 Members are invited to consider and note the contents of the Internal Audit
Annual Report. 
___________________________________________________________________

Page 2

Implications of the Report
1. Financial - None 
2. HR & Organisational Development - None 
3. Community Planning – 
Safer and Stronger - effective internal audit is an important element of good
corporate governance. 
4. Legal - None 
5. Property/Assets - None 
6. Information Technology - None 
7. Equality & Human Rights – None 
8. Health & Safety – None
9. Procurement - None 
10.  Risk - The summary reported relates to the delivery of the risk-based internal audit
plan. 
11. Privacy Impact – None 
12. COSLA Implications – None 
13. Climate Risk – None 
14. Children’s Rights - None 
________________________________________________________________
Author Karen Campbell, Interim Chief Auditor

Page 3

Annual Report 
2024-2025 
Renfrewshire Council
Internal Audit 
May 2025

Page 4

Renfrewshire Council 
Internal Audit Annual Report 2024/2025 
Contents 
Page 
1.    Introduction  1 
2.    Responsibilities of Management and Internal Audit  2 
3. Internal Audit Activity in 2024/25  2 
4.                                                                          Summary of Internal Audit Work    4 
5.  Internal Audit Resources  5 
6.  Review of Internal Audit Activity 
• Table 1 – Analysis by category of audit 
6
7.    Quality Assurance and Improvement Activity 
• Table 2 – Internal Audit Performance 
7
8. Implementation of Audit Recommendations 
• Table 3 – Implementation of Audit Recommendations 
8
9. Performance of Non-Audit Activities
• Table 4 – Corporate Counter Fraud Performance
8
10.  Audit Assurance Statement  10 
Appendix 1 – Summary of Assurances

Page 5

1
Renfrewshire Council 
Internal Audit Annual Report   
1 April 2024 – 31 March 2025 
1. Introduction 
1.1 Internal Audit is an independent and objective assurance and consulting activity
designed to add value and improve the operations of Renfrewshire Council. It
assists Renfrewshire Council in accomplishing its objectives by bringing a
systematic and disciplined approach to evaluate and improve the effectiveness
of the organisation's risk management, control, and governance processes. 
1.2 The Chief Auditor reports functionally to the Audit, Risk and Scrutiny Board and
administratively (i.e. day to day operations) to the Director of Finance and
Resources. In accordance with the principles of good corporate governance,
regular reports on internal audit work and performance are presented to the
Audit, Risk and Scrutiny Board. 
1.3 The purpose, authority and responsibility of the internal audit activity is defined
in the internal audit charter, approved by the Audit, Risk and Scrutiny Board;
and provides that the Chief Auditor has independent responsibility for the
conduct, format and reporting of all internal audit activity and findings. 
1.4 The service operated in accordance with the Public Sector Internal Audit
Standards (PSIAS) for 2024/25. The Standards define the basic principles for
carrying out internal audit. They establish the framework for providing internal
audit services, which add value to the organisation, leading to improved
organisational processes and operations. 
1.5 The Standards require the Chief Auditor to prepare a report, at least annually,
to senior management and the Board on the internal audit activity’s purpose,
authority, and responsibility, as well as performance relative to its plan. The
annual report must also provide an annual audit opinion, on the overall
adequacy and effectiveness of the Council’s internal control environment. It
must include details of any significant risk exposures and control issues,
including fraud risks, governance issues, and other matters that can be used to
inform the governance statement.   
1.6 The aim of this report is to provide an opinion on the overall adequacy and
effectiveness of the council’s framework of governance, risk management and
control and provide a summary of the work undertaken during the year to
support that opinion.  The report also provides details of the performance of the
internal audit service during the past year, and the results of the quality
assurance and improvement programme.
1.7 In addition to the work carried out in relation to council services, we also provide
an internal audit service to the following organisations:
• OneRen

Page 6

2
• Renfrewshire Valuation Joint Board
• Scotland Excel
• Renfrewshire Health and Social Care Partnership – Integration Joint
Board 
1.8 The outcome of the audit assignments undertaken for these organisations is
reported separately as part of their annual report which also contains an
assurance statement to their Boards.   
1.9 Summaries of internal audit assignments within partner organisations are also
submitted to members of the Audit, Risk and Scrutiny Board for their
information. 
2. Responsibilities of Management and Internal Audit 
2.1 It is the responsibility of the Council’s managers to ensure that the management
of the areas under their control is adequate and effective and that their services
have a sound system of internal control which facilitates the effective exercise
of the organisation’s functions and which includes arrangements for the
management of risk. 
2.2 Internal audit is not a substitute for effective control exercised by management
as part of their responsibilities. Internal audit’s role is to independently assess
the adequacy of the risk management, internal controls and governance
arrangements put in place by management and to undertake sufficient work to
evaluate and conclude on the adequacy of those controls for the period under
review. 
3. Internal Audit Activity during 2024/2025 
3.1 The internal audit plan for 2024/2025 was approved by the Audit, Risk and
Scrutiny Board on 18 March 2024.   The plan was risk-based and took into
account the outcomes of the service and corporate risk evaluation processes,
any significant changes in council operations over the period, and the impact of
developments in national policy and regulation.  The plan also took into account
key external audit reports including their Annual Audit Report for the council.   
3.2 The audit plan is kept under continuous review throughout the year, to ensure
we are flexible in reacting to changes in the internal and external environment
or to any changing risk profile for the council. The reduction in resource due to
the retiral of the Chief Auditor on 30 June 2024 was partly taken into account
when the audit plan was being finalised.  We also experienced a further
reduction in resource due to unplanned absence.  Although, amendments were
made to the 2024/25 plan there has been a slight delay in the completion of
some audit assignments due to this resource issue and also the level of
investigative/contingency work which has been undertaken.   
3.3 All planned assignments as detailed in the 2024/2025 audit plan have been
undertaken or commenced and those assignments not finalised by 31 March
2025 have been prioritised in the first quarter of the current year.

Page 7

3 
3.4 Set out below are the significant risks which influenced the content of the plan
and the nature of the work undertaken in recognition of these.   
(1) Financial Challenges 
Our organisation faces an ongoing financial challenge to make significant
savings after many years of already delivering substantial efficiencies and
reduction in our spending. Alongside this, our communities continue to
experience  cost-of-living pressures  and the demand for our services continues
to grow. Therefore, the financial outlook continues to be subject to significant
and regular scrutiny. The 2024/25 audit plan included time for reviewing:
• financial planning (nearing completion);
• non-domestic rates ; and 
• payroll. 
(2) Learning from Dargavel   
The Council has been subject to criticism regarding errors made during
planning and delivery of Dargavel Primary School. As a result, there has been
significant scrutiny of our arrangements arising from the independent review
(Bowles Report), from our external auditors and from the Accounts Commission
under s102 (1) of the Local Government (Scotland) Act 1973. The Council has
developed an action plan to address the recommendations made which was
subject to regular reporting to the Audit, Risk and Scrutiny Board. The 2024/25
audit plan included time for reviewing:
• governance of the learning estate development programme (ongoing);
• project and programme management (ongoing); and
• risk management 
As the Risk Manager reports to the Chief Auditor, to ensure the Chief Auditor’s
independence was not impaired, the review of the Council’s Risk Management
processes was undertaken by an External Consultancy firm. 
(3) Tackling Inequalities 
The Council plays a key role in tackling inequalities and providing the best
possible services to our communities, particularly those who are experiencing
the poorest outcomes. The current cost of living crisis impacts
disproportionately on particular groups in society. The Council is committed to
supporting people on low incomes to maximise income and seek advice with
income and debt management. The 2024/25 audit plan included time for
reviewing:
• council tax reduction; and
• community grants

Page 8

4
(4) Public Protection 
Public protection is a wide-ranging agenda relating to the protection of
vulnerable people, communities, businesses and organisations. The 2024/25
audit plan included time for reviewing:
• child protection (nearing completion);
• housing adaptations (Ongoing);
• fostering and adoption; and
• Eclipse system. 
3.5 There are a number of significant risks, arising from the external and internal
environment, which could impact on the council’s ability to achieve its
objectives. The most significant risks and the risk control measures to manage
these risks, are identified through the council’s corporate risk management
process. Subject to the overall flexibility of the Audit Plan, priority will be given
to audit engagements which impact on the council’s strategic and corporate
risks. 
3.6 In line with the council’s procedures, instances of suspected theft, fraud or other
irregularity are reported to internal audit.  Depending on the nature of the
allegations, they are investigated either by the internal audit service or by the
Corporate Counter Fraud service. All referrals were evaluated and investigated
as appropriate.   
3.7  During 2024/25, Internal Audit conducted a number of investigations mainly in
relation to employee conduct and service management has undertaken
disciplinary procedures and strengthened internal controls where necessary. 
3.8 The outcomes of all internal investigation reviews undertaken by internal audit
are reported to the Audit, Risk and Scrutiny Board after any disciplinary action
has been completed.  
4. Summary of Internal Audit Work
4.1 The internal audit team has been working on a hybrid basis. The team also
provided advice and support where necessary to council services. 
4.2 Appendix 1 details the assurances arising from the internal audit work carried
out in line with the 2024/25 audit plan and from those 2023/24 assignments
which were finalised during this year which supports the annual assurance
statement.  These include the conclusions in relation to the overall system of
internal control, risk management and governance arrangements. 
5. Internal Audit Resources 
5.1     For the year to 31 March 2025, the audit plan was based on 856 operational
days. However, the actual staffing complement was slightly reduced due to the
retiral of the Chief Auditor and higher than anticipated unplanned absence in
both Internal Audit and Counter Fraud.

Page 9

5 
5.2 The internal audit team will ensure that independence and objectivity are
maintained in line with the PSIAS including where non-audit work is
undertaken. Internal auditors will have no operational responsibilities. There
have been no impairments impacting on the Interim Chief Auditor’s
independence and the team has been sufficiently resourced during the year to
undertake operational work. 
5.3 Since the retiral of the Chief Auditor, the Asst Chief Auditor has been covering
this post on an interim basis.  Given that it was recognised that there may be
resilience issues regarding internal audit and counter fraud staff in the future,
discussions were undertaken with the Chief Financial Officers of two
neighbouring councils which resulted in a considerable piece of work being
undertaken during the year to explore a potential shared delivery model.  It
should be noted that the delivery of financial savings was not an objective of
this exercise, and Renfrewshire Council’s Chief Financial Officer was
committed to maintaining the current level of resource.
5.4 This work has been completed and it was concluded that it would not represent
value for money to progress with the shared service proposal at this point due
to the complexities of servicing a number of public bodies (Councils, Partners
and Associated Bodies) under a single operational management structure with
different systems, processes and working practices in place. This decision was
agreed by members of the Finance, Resources and Customer Services Policy
Board on 3 April 2025.   The exercise has however been useful in reaching a
shared understanding of the challenges each audit team faces; and there is
the potential for a more informal resource sharing arrangement being put in
place. 
5.5 Further service changes were also approved in the Finance, Resources and
Customer Services Policy Board with regard to Risk Management.  The
responsibility for the management of the corporate risk function is transferring
to come under the wider business services management arrangements with
the Chief Auditor role being focussed on delivery of internal audit and fraud
services for the Council and associated bodies. The two functions would
however continue to work closely together through their governance and
reporting arrangements to the Audit, Risk and Scrutiny Board. 
5.6 The revised operating and management arrangements outlined above in the
coming months, including formal job evaluation of new or revised roles will take
place in the coming months. This will allow the Council to then progress to
recruit a Chief Auditor on a permanent basis. 
6. Review of Internal Audit Activity 
6.1     The Audit Plan for 2024/25 set out our risk-based plans across a range of audit
categories, the results of which have been reported quarterly to Audit, Risk and
Scrutiny Board. Table 1 below compares the actual days spent on each
category of audit work against that planned for the year.

Page 10

6 
Table 1 
Type of Audit Planned
Days
Actual
Days
Variance
Days %
Governance 51 45 (6) 12%
Assurance 374 320 (54) 14%
Contingency 293 295 2 1%
Audit Planning & Reporting 138 140 2 1%
Total Operational Days 856 800 (56) 7%
Training  56 41 (15) 26%
Strategic Management  16 16 (0) 0%
Team Administration 89 88 (1) 1%
Development 69 43 (26) 37%
Total Non-operational Days 230 188 (42) 18%     
Gross Available Days 1086 988  
Operational % 79% 81%  
Non-Audit – Including
Management of Risk
Management and Insurance and
Corporate Counter Fraud
including the co-ordination of
NFI
71 74 3 4% 
6.2 Material differences (over 20% and over 20 days) from the plan are explained
below: 
1) Assurance                                                                                                              
Due to unplanned absence and the amount of time spent on investigative work,
completion of some of the assurance work has been delayed and consequently
a number of the budgeted days have been deferred into 2025/26. 
2) Training 
As a result of the unplanned absences, some of the Counter Fraud work,
including coordination of the National Fraud Initiative data collection exercise
had to be transferred to a member of Internal Audit Staff.   In addition to this,
the Internal Audit staff’s main priority was to focus on operational work and
therefore the training budget was under utilised for this year. 
3) Development   
Development time was planned to look at alternative system options and also
to encompass the new Global Internal Audit Standards into our working

Page 11

7
practices.  In 2023/24, our Audit Management System supplier informed us they
were unlikely to continue to support this system but this decision has since been
withdrawn.  In addition CIPFA, (Public Sector Accounting Body) have stated
that it is acceptable to amend working practices to ensure compliance with the
Global Internal Standards during 2025/26.  Therefore, as a result of the reasons
detailed above this work has been delayed but is a priority for 2025/26. 
7. Quality Assurance and Improvement Activity 
7.1 Internal audit measures performance against a range of measures set annually
by the Director of Finance and Resources. The Audit, Risk and Scrutiny Board
received quarterly reports on progress and performance during the year. Table
2 shows the actual performance against targeted performance for the year. 
Table 2 
Internal Audit Performance 2024/25 
Performance measure  Target 2024/25 Actual 2024/25
% completion of audit plan for the year* 90% 93.6%
% engagements completed by target
date
95% 96.7%
% engagements completed within time
budget
95% 98.4%
* this measures the completion percentage as at 31 March.  100% of the plan is ultimately delivered through the
finalisation of the outstanding elements in the new financial year.  
7.2 The percentage completion of the audit plan is ahead of the target set for the
year.  In addition, the actual performance for the year for the two other
indicators, is above the target performance level. 
7.3 The PSIAS require the Chief Auditor to develop and maintain a quality
assurance and improvement programme (QAIP) that covers all aspects of the
internal audit activity. The QAIP must include both periodic internal self-
assessments and five-yearly external assessments, carried out by a qualified,
independent assessor from outwith the organisation. 
7.4 We continued to participate in the Scottish Local Authorities Chief Internal
Auditors’ Group peer review process. Our most recent external assessment
was reported to the Audit, Risk and Scrutiny Board in May 2023 and included 7
recommendations for improvement, all recommendations have now been
completed. The annual internal self-assessment process has concluded that
the internal audit service fully complies with the PSIAS during 2024/25. 
7.5 We have commenced a self assessment exercise against the new Global
Internal Audit Standards.  Any actions identified will be implemented to ensure
compliance.

Page 12

8 
8.  Implementation of Audit Recommendations 
8.1 During 2024/25, 106 recommendations were followed up, with 76% of all
recommendations being completed. The implementation status of the
recommendations across each service area is detailed in Table 3 below. 
Table 3 
Implementation of Audit Recommendations 2024/25
Service No.
Followed up
Complete Partially
Complete
(new date)
Not
Implemented
(new date)
Redundant
Adult Services 1 1 (100%) 0 0 0
Chief Executive’s 14 12 (86%) 1 (7%) 1 (7%) 0
Children’s Services 8 3 (38%) 0 2 (25%) 3 (38%)
Environment,
Housing &
Infrastructure
21 14(67%) 4 (19%) 3 (14%) 0
Finance &
Resources 62 51 (82%) 8 (13%) 2 (3%) 1 (2%)
Total 106 81 (76%) 13 (12%) 8 (8%) 4 (4%) 
9. Performance of Non-Audit Activities 
9.1 Risk Management 
The responsibility for co-ordinating risk management and insurance activity
across the council was with internal audit during 2024/25.  Risk management
performance is detailed in the risk management annual report. 
9.2 Corporate Counter Fraud 
The Corporate Counter Fraud Team reports to the Chief Auditor; during the
period 2024/2025, the team has worked on a hybrid basis. 
The Corporate Counter Fraud Team works to raise awareness of fraud, and to
encourage and promote an anti-fraud culture. Where a suspicion of fraud
arises, the team investigate and report their findings to management. Where
appropriate, follow-on action is taken, such as reporting the matter to Police
Scotland for further investigation, or directly to the Procurator Fiscal. 
The team works to protect Council resources, investigating frauds against the
Council, such as: council tax reduction, tenancy, housing application, Scottish
Welfare Fund, school placements, blue badge; and any other potentially
fraudulent matter arising. 
Where appropriate, customers are contacted by telephone or e-mail. This
process is convenient for customers and staff alike and enables investigations

Page 13

9
to be conducted quickly and efficiently. Where necessary, and for more serious
cases, visits and interviews under caution are conducted. 
The team continue to work with the DWP, undertaking joint investigations,
which can result in the identification of overpayments of Single Person
Discount, Council Tax Reduction, Council Tax Benefit, Housing Benefit,
Universal Credit, Child and Working Tax Credits, and other DWP benefits. 
A Counter Fraud training course has been developed and is available to staff
on iLearn and is promoted across the Council. 
Table 4 
Corporate Counter Fraud Performance 2024/25
Financial Outcomes 2024/25 (£)
Cash savings directly attributable
to preventative counter fraud
intervention (e.g business grants)                           
2,719 
Cash recoveries in progress
directly attributable to counter
fraud investigations                        
83,037 
Notional savings identified through
counter fraud investigation, (e.g.
housing tenancy and future
council tax)                      
474,955 
Housing Benefit Savings identified
through other counter fraud work
or through joint working with the
DWP
68,002
Other DWP Benefit or Tax Credit
Savings Savings identified through
other counter fraud work or
through joint working with the
DWP
63,385 
Non-Financial Outcomes 2024/25 
Housing properties recovered 5
Housing applications
amended/cancelled
8
Housing Allocation Priority
Changed
1
Blue badge misuse warning letters
issued
32
Blue Badges Cancelled 5
Supplier/Contractor Checks
Undertaken
226 
9.3 The National Fraud Initiative

Page 14

10
The National Fraud Initiative (NFI) in Scotland is a counter-fraud exercise led
by Audit Scotland and overseen by the Cabinet Office for the UK. It uses data
matching techniques to compare information about individuals held by different
public bodies, and on different financial systems that might suggest the
existence of fraud or error. 
Internal audit is responsible for the co-ordination of the exercise which is
undertaken every second year. The Council’s data, as required by the NFI, was
submitted in October 2024, the resulting matches were received from
December 2024 and investigation of those matches is ongoing. The final
outcomes arising from the exercise will be subject to a separate report to the
Audit, Risk and Scrutiny Board during 2025/26. 
9.4 Whistleblowing Policy 
Under the Council’s Whistleblowing Policy, the Chief Auditor should be
informed of all whistleblowing referrals so they can be recorded.  During this
year 7 referrals were received and 6 were referred directly to the responsible
service to review as they were management issues.  The remaining referral was
investigated by Internal Audit and the findings will be reported to the Audit, Risk
and Scrutiny Board Members on completion of any disciplinary process which
may be instigated. 
10. Audit Assurance Statement 
10.1 Internal audit has performed its work in accordance with the role defined in
paragraph 1.4.  The audit work performed has been reported to senior
managers and where areas for improvement in internal control have been
identified appropriate recommendations have been made and accepted for
action by management.   
10.2 In view of the continued challenges common to all local authorities, the Council
recognises the need to exercise very close scrutiny over financial management
and compliance with overarching governance arrangements and will continue
to take appropriate action to further strengthen control in these areas.  
10.3 Internal audit contributes to the promotion of sound corporate governance in
the Council. The scrutiny function within the council performed by the Audit,
Risk and Scrutiny Board further demonstrates strong commitment in this area. 
10.4 It is important to balance the risks involved in accepting systems limitations with
the consequences if a problem emerges. Internal audit recognises this and
assesses this in its reporting mechanism.  It is not realistic for the system of
internal control in the Council to be without any weakness. 
10.5 The Council’s governance arrangements have been substantially reviewed
during the year, including fully implementing the comprehensive assessment of
the Audit, Risk and Scrutiny Board arrangements against the CIPFA practical
guidance for Audit Committees which has made a positive impact on scrutiny
arrangements. In addition the recommendation arising from the Council’s

Page 15

11
comprehensive review of its governance arrangements by the member led
cross party working group, which were reported to and approved by the Council
on 29 February 2024 have been actioned.  
10.6 Following the successful roll out of the bespoke Leadership Development
Programme to the Chief Officers group, this was extended to the 3rd tier level
and this has now been completed. This includes a governance module. 
10.7 The 12 modules of the business as usual risk management assurance
framework were completed by Heads of Service’s/Relevant Senior Managers
during the year to self-assess their own levels of assurance against those risk
areas. The 2024/25 outturn compares favourably with 2023/24, with all modules
showing an improved position 
10.8 The programme of work undertaken by internal audit in 2024/2025 identified 3
occasions where a limited assurance level was provided in relation to the
internal control, risk management and governance objectives for the specific
areas of each audit review which is an improved position from last year.  76%
of all internal audit recommendations followed up during the year have been
implemented by the due date. 
10.9 Therefore, subject to management addressing the critical and important
recommendations made and the limited assurance report findings, it is
considered that reasonable assurance can be placed upon the adequacy and
effectiveness of the Council’s internal control, risk management and
governance arrangements as evidenced by:  
(i) the results of the planned audit work in 2024/25;
(ii) the results of investigative work in 2024/25;
(iii) management self-assessment business as usual risks;
(iv) management action to respond to audit recommendations to mitigate the
risks areas highlighted in this report;
(v) the regular review of the Local Code of Corporate Governance.     
Signed         
Interim Chief Auditor 
Date          19 May 2025

Page 16

Appendix 1
1
Audit Engagement Risk Area Assurance Level Conclusion
Non-domestic Rates Assurance Reasonable • The audit identified that satisfactory controls are in place
for the billing and collection of NDR. Reviews of NDR
reliefs, granted on the basis of a prior year's
applications, have not been carried during 2023/24
because management needed to consider the impact of
changes in legislation, specifically related to reliefs,
which superseded the normal review process. Evidence
for current year reliefs and refunds were available for the
samples tested. However, some actions that
management stated would be put in place after previous
audit recommendations are not fully implemented. It
was noted that staff changes have resulted in income
and refund reconciliations not being carried out
regularly.  Also, a significant number of historic credit
balances were found to still exist on the NDR system,
for which no actions had been taken to identify if these
should be cleared or result in refunds to customers.
Corporate
Governance
Framework
Governance  Substantial • Based a sample check of the evidence used to
demonstrate compliance, it was confirmed that the
Council complies with the requirements of the Local
Code of Corporate Governance.  In addition, it was
evident that the Local Code has been subject to review
and updating in line with developments in best practice
and any revised Council Policies.
Corporate Risk
Management
Assurance Reasonable • Renfrewshire Council has a well-established approach
to risk management with many positive features,
especially in terms of strong governance and a positive
cultural attitude towards risk management at a
corporate level. The overall risk maturity score was
identified as 3.2 against a score of 4 which  in the
external consultant’s opinion would, in general, be the
maximum realistic level we would expect to see for an

Page 17

Appendix 1
2
organisation in the Council’s sector except in
exceptional circumstances. The BAURAM (Business-
as-usual risk assurance model © Renfrewshire Council)
is an innovative and powerful approach which was been
designed well and, like many other elements of
Renfrewshire Council’s risk approach, is evidently
subject to continuous improvement. To continue to grow
risk management maturity, some opportunities were
identified for further development and Renfrewshire
Council may wish to focus on ensuring sufficient
resources – both in terms of personnel and systems -
are available to ensure risks are identified promptly,
recorded consistently and therefore managed
appropriately.
Housing Assurance
Statement
Assurance Substantial
Assurance
• Based on a sample check of the evidence used to
demonstrate compliance, we confirmed that the
Council complies with the requirements of the Housing
Assurance Statement.
Payroll Assurance Reasonable  • Payroll Run Processing procedures set out each stage
of payroll process to be carried out by Payroll team
members.  However, we identified a lack of evidence
of some payroll checks and incomplete control account
reconciliations which required management action.
Fostering
Arrangements - Short
term and Permanency
planning
Assurance Reasonable • The aim of this review was to assess progress in
implementing areas for improvement set out in the Care
Inspectorate Inspection of Renfrewshire’s Fostering
Service March 2023 report. The audit identified that
foster children’s reviews and other monitoring
interventions are held regularly and include an in-depth
evaluation of their care plan and so demonstrate
advocacy.  However, audit testing identified some
carers who had not completed their required core
training. Whilst there can be valid reasons for this, no
reasons were recorded. Therefore, Children’s Services
staff should further develop systems to demonstrate that

Page 18

Appendix 1
3
tracking of completion of foster carers core training is
adequate.
Adult Services -
Eclipse Application
Review
Assurance Substantial • The audit has identified that there is appropriate
guidance for user administrators, administrator access
is restricted to Quality and Assurance team members,
password controls are adequate, user access is suitable
for job roles and there are adequate audit trails of user
access. We made recommendations to enhance
completeness of training records and strengthen
controls regarding user accounts that have not been
logged into recently.
Council Tax
Reductions
Assurance Substantial  • The audit has identified that satisfactory arrangements
are in place for administering the Council Tax
Reduction (CTR) scheme. For the sample of Council
Tax Reduction applications tested, reductions were
only applied to eligible individuals and there was
evidence of appropriate checks on each application by
a Benefits Assessor. However, management action is
required as cyclical reviews of Council Tax Reduction
only cases are not undertaken to ensure the amount of
CTR remains valid.             
Greenspaces &
Villages Investment
Fund Grants
Assurance Limited  • The audit identified that there are appropriate criteria for
determining eligibility for grant assistance for
Greenspaces Funding and the Villages Investment
Fund. All applications are approved by an authorised
officer or Board after acceptance of grant conditions by
the applicants. Grant payments are made before
expenditure is incurred.  There was a lack of appropriate
budget monitoring resulting in delays in identifying
overspends. In regard to the supporting documentation
provided by grant applicants the supporting
documentation was not always held in a single location
and on some occasions part of this documentation could
not be located.

Page 19

Appendix 1
4
Management of
Allergens in Schools
Assurance Limited  • Although there are procedures and guidelines available
regarding food allergies and food safety, improvements
could be made regarding implementation of these. 
Furthermore, the uptake of training relating to food
allergies and food safety is unsatisfactory among
employees who undertake catering roles.  
ERP Utilisation  Assurance Reasonable  • There has been a gradual increase in service
departments using Business World to record overtime
and expenses, planned leave and unplanned leave
including Return to Work interviews and Formal
meetings on Business World. The Project Manager, for
the project to improve self-service for unplanned leave,
has met with relevant service supervisors/ managers
during 2024 and reported improvements.  Although the
ERP System is a Corporate Resource, and in our
opinion, a system which all services are responsible for
embedding into their operations, our review indicated
that this view was not always concurred with within parts
of services. We have therefore recommended that
People and OD Management, as owners of the
Managing Absence Policy, should continue to liaise with
the Project Team, ERP team as well as services
management to decide if the current processes in place
as an alternative to self-serving in Business World
(proxy users) for unplanned leave are the best work
around options to enable the tasks to be undertaken. It
is recognised that the additional work as a result of the
Business World projects will require resources from
People and OD and therefore will have to prioritised and
built into their staff workplans.
Waste Management Assurance Limited Assurance • Although roles and responsibilities relating to the
provision of the commercial waste service are clearly
defined and processes are in place in relation to
providing this service, issues were identified in relation
to the invoicing of customers for the uplift of commercial

Page 20

Appendix 1
5
waste.  Furthermore, concerns were identified in relation
to the level of outstanding debts for the uplift of
commercial waste.  Although work has commenced by
the Waste Service to determine the information
available on clients not paying their invoices, there was
no formal policy in place for staff to follow regarding the
continued provision of the service for clients with
outstanding debts and this needs to be addressed as
soon as possible.
Treasury
Management 
Assurance Reasonable  • Discussions are ongoing between Treasury supervisors
and Purchase to Pay supervisors as to payment
categories that would be more suitable for the Purchase
to Pay team to administer instead of the Treasury team
and it was recognised that these should be transferred
across as soon as possible.  In addition, a lack of
segregation of duties was identified in that all users with
Corporate Administrator and single authorisation
access can currently request a payment and also
authorise that payment themselves which required to be
addressed. Other recommendations in relation to the
authorisation of payments were made.
Programme
Management - Project
Health Checks
Assurance Substantial
Assurance
• The health check assessments carried out on the City
Deal & Infrastructure and the Housing Led
Regeneration & Renewal Programmes were found to be
robust with actions arising from the presentations to the
Corporate Management Team being addressed.  
Unpaid work  Assurance Reasonable • The sample testing undertaken indicates that unpaid
work orders are adequately monitored. The courts are
notified on completion of unpaid work orders or in cases
on non – compliance. There are still some ongoing
issues with recording unpaid work orders and other
community service order information on the Eclipse
system and work was ongoing with the developer to fix
these. This has resulted in manual processes and

Page 21

Appendix 1
6
spreadsheets being prepared to meet operational
needs. 
Recruitment  Assurance Reasonable • Audit testing in the areas of the recruitment process
after a preferred candidate has been chosen noted that
generally target timescales were met for each part of the
process and that where targets had not been met, these
were followed up through management checking
processes.  It was also noted that although there are
good monitoring and oversight arrangements in place,
these could be improved by establishing Key
Performance Indicators that could be reported at a
higher level than the current processes dictate.   
Assurance Level 
Substantial Assurance • There is a sound system of internal control designed to achieve the objectives of the area being reviewed. 
• The control processes tested are being consistently applied. 
Reasonable Assurance • The internal control processes are generally satisfactory with some areas of weakness being identified that could
put some objectives of the area being reviewed at risk
• There is evidence that the level of non-compliance with some of the control processes may put some of the
objectives of the area being reviewed at risk. 
Limited Assurance • Weaknesses in the system of internal controls are such as to put the objectives of the area being reviewed at risk. 
• The level of non-compliance puts the objectives of the area being reviewed at risk. 
No Assurance • Control processes are generally weak with significant risk to the achievement of the objectives of the area being
reviewed. 
• Significant non-compliance with control processes leaves the processes/systems open to error or abuse.