Democracy Spraffa

Annual IA Plan complete

Renfrewshire Council · 17 March 2025
Back to Audit, Risk and Scrutiny Board — 17 March 2025 and its agenda

Text extracted from the council's PDF. Layout and reading order may differ from the original.

Original council PDF · Download plain text

Page 1

___________________________________________________________________
To: Audit, Risk and Scrutiny Board
On: 17 March 2025
___________________________________________________________________
Report by: Chief Auditor
___________________________________________________________________
Heading: Annual Internal Audit Plan 2025/2026
___________________________________________________________________
1. Summary
1.1 In line with the requirements of the Global Internal Audit Standards in the Public
Sector, a risk based internal audit plan for 2025/26 has been developed. The
audit plan takes into account the outcomes of internal corporate and service
risk identification and evaluation processes, and the current business
environment. In addition to undertaking work which will provide assurance on
the robustness of key internal controls, the plan seeks to reflect the key
priorities and challenges for the council. 
1.2 A number of methods have been employed to facilitate production of the risk
based audit plan for 2025/26:
• Consultation with all Directors and their Senior Management Teams. 
• Consultation with senior management from the associate bodies.
• Benchmarking with other Local Authorities.
• Review of strategic, corporate and service risk registers.
• Cumulative audit knowledge and experience.
• Review of key external audit and inspection reports.  
1.3 The total available resource is 1100 days, the operational audit time available
for 2025/26 has been identified as 869 days (79%). The remaining 231 days
(21%) relates to training, service development, administration and
management. Coverage of the plan is achieved through the use of in-house
staff and where relevant, commissions from other providers.

Page 2

1.5 Operational and non-operational time has been calculated in accordance with
CIPFA benchmarking criteria. Non-operational time includes provision for
training, performance management and service development. In addition to the
internal audit assurance function the Interim Chief Auditor has managerial
responsibility for risk management, insurance and corporate counter fraud
which are excluded from the calculation of available operational audit
resources. 
1.6  Delivery of the risk based annual audit plan supports effective member scrutiny
of the council’s internal financial and other control mechanisms.
___________________________________________________________________ 
2. Recommendations
2.1 Members are asked to approve the content of the risk based audit plan for
2025/26. 
2.2 Members are asked to note that the progress of the 2025/26 annual audit plan
and summaries of the findings from each audit assignment will be reported to
the Board on a quarterly basis. 
___________________________________________________________________
Implications of the Report
1. Financial - None 
2. HR & Organisational Development - None 
3. Community Planning – 
Safer and Stronger - effective internal audit is an important element of
good corporate governance. 
4. Legal - None 
5. Property/Assets - None 
6. Information Technology - None 
7.  Equality & Human Rights - None 
8. Health & Safety – None
9. Procurement - None 
10.  Risk - The subject matter of this report is the risk based Internal Audit
Plan for 2025 –2026

Page 3

11. Privacy Impact – None 
12. COSLA Implications – None 
13. Climate Risk – None 
14. Children’s Rights - None 
________________________________________________________________
Author : Karen Campbell, Interim Chief Auditor – 0141 487 0678

Page 4

Date                  March 2025 
Annual Internal Audit Plan 
2025/26 
Finance & Resources
Internal Audit

Page 5

Page 2 of 14

Page 6

Page 3 of 14 
Renfrewshire Council 
Annual Internal Audit Plan 2025/26 
Contents 
Page 
Audit Plan Overview       4 - 9 
Supporting Appendices 
1 Annual Council Internal Audit Plan 2025/26            10 – 11 
2 Annual Other Bodies Internal Audit Plan 2025/26           12 
3 Analysis of plan by service              13 
4 Annual Audit Plan 2025/26 – Integration Joint Board          14

Page 7

Page 4 of 14 
Audit Plan Overview 
1. Introduction 
1.1 In line with the requirements of the Global Internal Audit Standards in the Public Sector and
the Internal Audit Charter, a risk based internal audit plan for 2025/26 has been developed.
In formulating the audit plan a risk assessment has been undertaken, giving consideration to
the following sources of information: 
Risk
assessment
(1) Risk assessment and prioritisation of all auditable activities
(audit universe).
(2) Strategic and Corporate Risk Register.
Consultation (3) The Interim Chief Auditor has met with each member of the
CMT and their senior management teams to ascertain any
changes to operational practice and national policy and to
determine their priorities and risks.
(4) Senior Management from the Associate Bodies and One
Ren have been consulted to ascertain their priorities and risks.
(5) The Chief Executive has been consulted on what he sees
as the council’s priority and risk areas for the forthcoming year.
(6) Feedback from, and the expectations of, the Audit, Risk
and Scrutiny Board are identified through the regular meetings
with the members of the board.
(7) The Interim Chief Auditor has met with the local External
Audit team to ascertain their approach to the statutory audit where
assurance on key internal controls could be provided to avoid any
duplication of effort. 
Benchmarking (8) Other Local Authority internal audit plans.
(9) Discussion with other Chief Auditors through the Scottish
Local Authority Chief Auditors Group.
Review of key
internal reports
(10) Renfrewshire’s Council Plan 2022 -2027
(11) The results of internal audit work in 2024/25 and in
previous years.
(12) Review of the results of the Business as Usual risk
assurance modules.
Review of key
external reports
(13) External Audit’s - Report to Members and the Controller of
Audit on the 2024/25 Audit.
(14) Audit Scotland: Best Value reports issued during 2024/25
(15) Review of other relevant Reports issued by External
Inspection Agencies during 2024/25 . 
1.2 On the basis of the above, the audit engagements planned for 2025/26 are set out in Appendix
1, 2 and 4, for the Council, Associate Bodies and the Integration Joint Board in the following
categories of audit activity:
• Assurance
• Governance
• Contingency
• Planning and Reporting 
1.3 It is the responsibility of management to ensure that they have good governance, risk
management and internal control arrangements over the functions they are responsible for. It
is internal audit’s role to provide an independent, objective assurance and consulting activity.
The scope of the internal audit plan encompasses, but is not limited to, the examination and
evaluation of the adequacy and effectiveness of the organisation's governance, risk
management, and internal control processes; as well as the quality of performance in carrying
out assigned responsibilities to achieve the organisation’s stated goals and objectives.

Page 8

Page 5 of 14 
1.4 Internal Audit has authorised full, free unrestricted access to any and all of Renfrewshire
Council’s records, physical properties, systems and personnel pertinent to carrying out any
audit engagement. 
1.5 Delivery of the internal audit plan supports the requirement for the Chief Auditor to provide an
annual opinion which is used to inform the annual governance statement. 
1.6 The Chief Auditor shares information and coordinates activities with other internal and
external providers of assurance and consulting services, as appropriate, to ensure proper
coverage and minimise duplication of effort. Internal audit may place reliance on the work of
other providers of assurance and the ability to do so will be considered during each audit
engagement. 
1.7 The plan also includes provision for managing and developing the internal audit activity
including audit planning, reporting, periodic quality assessments and for following up on
previous recommendations and reactive investigative work. The plan includes contingency
time to allow for completion of work carried forward from 2024/25 and provides for consultancy
engagements to be undertaken where these can improve the council’s operations, add value
and improve the management of risks. Contingency time also provides for sufficient flexibility
to accommodate changing risks and priorities during the course of the year. More detail on
each of these elements is set out in sections 4 to 7 of this plan.   
1.8 The internal audit service is delivered and developed in accordance with its purpose which,
as set out in the Internal Audit Charter, is to provide assurance by independently reviewing
the council’s risk management, control and governance processes. 
2.  The current business environment and key risk areas 
2.1 The audit plan detailed in Appendix 1 has been development to support the achievement of
the council’s objectives and the challenges we face in achieving those objectives. The key
challenges included in the planned audit work are detailed below. 
(1) Asset Management 
Effective governance and management of the council’s property assets is essential,
otherwise there is a significant risk of harm to employees and citizens and financial loss,
and service disruption  within the Council.  The 2025/26 audit plan includes time for:- 
• Reviewing the adequacy of the arrangements for securing our buildings including empty
properties.
• Conducting a compliance check on the evidence being submitted to the Housing
Regulator to support the Housing Assurance Statement. 
• Reviewing the processes in place for obtaining vehicle road fund licences to ensure they
are adequate and adhere to the regulations of the scheme. 
(2) Financial Challenges 
Our organisation continues to face a significant financial challenge to make significant savings
after many years of already delivering substantial efficiencies and reduction in our spending.
Alongside this, our communities are experiencing a cost-of-living crisis and the demand for
our services is higher than ever before. Therefore, the financial outlook continues to be subject
to significant and regular scrutiny. The 2025/26 audit plan includes time for compliance
reviews of : 
• Non-domestic rates processes to ensure they are adequate.
• The procedures in place for allocating school transport to ensure they are in line with
Council guidance and, in order to ensure best value is being achieved for the Council in
terms of financial and staff resource, whilst adhering to the procurement regulations.

Page 9

Page 6 of 14 
• Service processes for arranging contracts for goods and services below the £24999.99
threshold. 
• The procuring of ICT Systems. 
(3) Governance Arrangements   
The Council governance framework ensures that its business is conducted in accordance
with the law and proper standards, and that public money is safeguarded. It comprises the
systems and processes, and culture and values, by which the Council is directed and
controlled. These arrangements should be subject to regular review whilst undertaking
transformation change programmes.  During 2025/26 Internal Audit will undertake the
following engagements:- 
• A compliance review of the Local Code of Corporate Governance to ensure there is
adequate supporting evidence to support the code elements.
• An operational review of the process in place for authorising transactions to ensure they
are efficient and effective. 
(4) Fraud and Error 
Attempts at undertaking fraudulent activity against individuals and organisations are rapidly
increasing.  The Council is committed to minimising the risk of fraud and error occurring within 
the operation of its services by internal and external parties.  .  To assist in achieving this aim,
it is important that that the Council review the adequacy of the internal controls in any areas
where  fraudulent activity has occurred in other organisations.  The 2025/26 Audit Plan
includes time for :  
• Reviewing the adequacy of the Council Tax Refund Processes.
• Undertaking a Compliance Review of the key internal controls within our main financial
systems. 
(5) Tackling Inequalities 
The Council plays a key role in tackling inequalities and providing the best possible services 
to our communities, particularly those who are experiencing the poorest outcomes. The 
current cost of living crisis impacts disproportionately on particular groups in society. The 
Council is committed to supporting people by assisting those on low incomes and increasing
employment opportunities. The 2025/26 audit plan includes time for reviewing: 
• Scottish Welfare Fund payments to ensure the fund allocation is utilised in a fair and
consistent manner.
• The Employability Programme within the Council to ensure the processes in operation
are adequate and meet the requirements of the funding allocation. 
(6) Public Protection 
Public protection is a wide-ranging agenda relating to the protection of vulnerable people,
communities, businesses and organisations. During 2025/26, internal audit will review: 
• The arrangements for handling and the security of paper documentation containing
personal information when working in a hybrid basis and undertaking client visits. 
• The procedures in place for vehicle inspections to ensure they are adequate. 
(7) Strategic Sustainable Planning for People and Assets

Page 10

Page 7 of 14 
When major transformation is ongoing to deliver the best services possible, it is inevitable that
job roles and service processes will change throughout the Council.  This plan includes time
for operational reviews of: 
• The Job Evaluation Scheme to ensure it is fit for purpose and applied in a consistent
manner.
• Customer Service Processes to ensure there are adequate internal controls in place and
they meet customer requirements.                   
2.2 There are a number of significant risks, arising from the external and internal environment,
which could impact on the council’s ability to achieve its objectives. The most significant risks
and the risk control measures to manage these risks, are identified through the council’s
corporate risk management process. Subject to the overall flexibility of the Audit Plan, priority
will be given to audit engagements which impact on the council’s strategic and corporate risks. 
3. Allocation of Resources 
3.1    In addition to the internal audit assurance function the Chief Auditor has managerial
responsibility for risk management, insurance and counter fraud which are excluded from the
calculation of available operational audit resources. 
3.2 The Internal Audit Service is a small team with a permanent establishment  of 6 Full Time
Equivalents and is considered to be appropriately resourced.   It was recognised that Internal
Audit teams across many councils carry resilience risks owing to their small size, composition
and difficulty recruiting experienced staff.  On the retiral of the Chief Auditor during 2024/25,
a decision was taken to conduct a review with neighbouring councils with regards to improving
resilience within internal audit and counter fraud services.  This review is nearing completion
and the outcomes will be reported in the near future to the Finance, Resources and Customer
Services Policy Board.  This post is currently being covered by the Assistant Chief Auditor on
an interim basis and the team has operated with a vacant position. 
3.3 Operational and non-operational time has been calculated in accordance with CIPFA
benchmarking criteria. The calculation of operational staff time has been based on the
permanent establishment of 6 full time equivalent employees (4 qualified and 2 non-qualified)
and with a vacancy factor built into the calculation.   
3.4 The vacancy is a qualified post but resources from any unfilled elements of posts and other
available audit resource will be used flexibly to ensure that the audit plan commitments are
met, through the engagement of temporary staff and other audit service providers where
appropriate. Currently 40 days are planned to be provided from other service providers. The
Interim Chief Auditor is responsible for managing the Internal Audit budget.   
3.5 Non-operational time includes provision for training, performance management and service
development. Where engagements are undertaken by the other audit service providers, these
can provide an opportunity for benchmarking, training and development. Sufficient resources
are available to engage specialist contractors where necessary to address any specific risks
faced by the council. 
3.6 The total available resource is 1100 days; the operational audit time available for 2025/26 has
been identified as 869 days (79%). The remaining 231 days (21%)  relates to training, service
development, administration and management. Resources are assessed as being sufficient
to provide an evidenced based opinion. 
3.7 The following paragraphs provide an overview of how the audit time has been allocated to
audit categories for the Council and the Associated Bodies we provide services to. A summary
of the operational time by audit category is detailed in table 1 below. The analysis of non-
operational audit activity is detailed in the table 2 below.  The planned operational/non-
operational time for 2024/25 is given for comparative purposes.

Page 11

Page 8 of 14 
2024/25 2025/26
Category of audit
Planned
Days
% of
Operational
Time
Planned
Days
% of
Operational
Time
GOVERNANCE 51 6% 76 9%
ASSURANCE 374 44% 360 41%
CONTINGENCY note 1 293 34% 295 34%
AUDIT PLANNING / REPORTING 138 16% 138 16%
TOTAL OPERATIONAL TIME 856 100% 869 100%          
Table 1           
Notes
1. This category includes time for the finalisation of the previous year’s audits, corporate exercises and groups, investigations,
significant project consultancy activities and emerging priorities. 
2024/25 2025/26
Activity 
Planned
Days
% of Non -
operational
Time
Planned
Days
% of Non -
operational
Time
TRAINING 56 24% 51 22%
STRATEGIC MANAGEMENT 16 7% 16 7%
TEAM ADMINISTRATION 89 39% 91 39%
DEVELOPMENT note 1 69 30% 73 32% 
TOTAL NON-OPERATIONAL TIME 230 100% 231 100% 
Table 2 
Notes
1. This category includes time allocated to development activities to support continuous improvement activities. 
4.      Governance (9% of operational time) 
4.1 Internal Audit must evaluate the risk exposures relating to the council’s and associate bodies
governance arrangements. The engagements within this category form the basis for the Chief
Auditor’s annual audit opinions and support the annual governance statements. 
4.2 The results of the risk assessment are detailed at Appendix 1 and 2, Part A in respect of the
current year, with a total of 76 days being allocated to these engagements for 2025/26. 
5.    Assurance (41% of operational time) 
5.1 A risk based assessment has been undertaken of all auditable areas taking into account the
risk management framework and the expectation of senior management and the Audit, Risk
and Scrutiny Board. The engagements within this category also form the basis for the Chief
Auditor’s annual opinions and support the annual governance statements. For each
engagement internal audit will consider whether there are any available external sources of
assurance that can be relied upon to deliver the plan. Time is also allocated to following up
on the implementation of prior years audit recommendations.

Page 12

Page 9 of 14 
5.2 The results of the risk assessment are detailed at Appendix 1 and 2, Part B in respect of the
current year, with a total of 360 days being allocated to these engagements for 2025/26. 
6.    Contingency (34% of operational time) 
6.1 This category includes time allocations for finalisation of the 2024/25 audit plan, undertaking
reactive investigations of theft, fraud or other malpractice and provides for post-report work
which includes attending disciplinary or appeal hearings, employment tribunals and court, as
required. 
6.2  The allocation of time for this category is an estimate based on prior experience and available
resources. However, this will be monitored during the course of the year to ensure that internal
audit continue to be in a position to respond to other priority areas which emerge during the
course of the year, and, if necessary, revise the audit plan accordingly. Appendix 1 and 2,
Part C details the indicative time of 295 days allocated across the contingency heading. 
6.3 Should more time be available this will be added to the contingency budget and will be used
to deliver audit reviews from the reserve list detailed on Appendix 1, Part E. 
7. Audit Planning / Reporting (16% of operational time) 
7.1 This category includes annual planning activity and reporting arrangements to the Corporate
Management Team and the Audit, Risk and Scrutiny Board, the Integration Joint Board Audit,
Risk and Scrutiny Board and the Boards of the other bodies we provide internal audit services
to under a service level agreement.  Appendix 1 and 2, Part D details the time of 138 days
allocated to planning and reporting activities. 
8. Analysis of Plan by Service 
8.1  Appendix 3 shows the amount of operational audit time allocated to individual services in
2025/26 and compares it to the planned days for 2024/25. 
8.2 The planned days allocated to all services relates to work which is cross-cutting rather than
service specific as well as time which is allocated out to services as the year progresses, such
as contingency and investigations.   
9. Conclusion 
9.1  The annual internal audit plan for 2025/26, based on the strategic risk assessment, reflects
the current priorities and challenges for the council, and demonstrates that the internal audit
service continues to deliver added value while continuing to improve the service in line with
best practice. 
9.2 The allocation of internal audit resources is sufficient to allow for flexibility to deal with
emerging priorities and provide adequate coverage of governance, risk management and
internal control to inform the annual assurance statement. 
9.3 In order to continue to focus on areas of greatest priority or emerging risks and other
unforeseen circumstances, the plan will be subject to regular review during the course of the
year.  The Audit, Risk and Scrutiny Board will be requested to approve any necessary
changes. 
Interim Chief Auditor
March 2025

Page 13

Page 10 of 14 
Appendix 1
Renfrewshire Council Internal Audit Annual Plan 2025/26 
Entity Engagement Title Service Days
Allocated
Risk Category Council Plan Theme
Part A – Governance  71  
Corporate Governance Corporate Governance Framework Corporate - All Services 6 N/A Living Our Values 
Information Governance Security of Paper Documentation Adult Services 20 Strategic/BAU Fair
Authorisation Controls Authorisation Controls Review Corporate – All Services 25 Strategic/BAU Living Our Values
Policies & Procedures Job Evaluation Corporate – All Services 20 Strategic Fair
Part B – Assurance  277  
Follow Up Follow Up Corporate - All Services 39 N/A N/A
Procurement Purchase of ICT Systems Corporate – All Services 20 Strategic/BAU Living Our Values
Procurement Procurement Processes  Corporate – All Services 20 Strategic/BAU Living Our Values
Regeneration & Investment Employability Partnerships Chief Executive’s 20 Strategic Place
Education Support Services   School Transport Children’s Services 20  Living Our Values
Building Security General Security including Empty Buildings
Environment, Housing &
Infrastructure 20
Strategic Place
Transportation & Fleet Vehicle Testing Processes
Environment, Housing &
Infrastructure 20
Service Living Our Values
Transportation & Fleet Roads Fund Licence Renewal Environment, Housing &
Infrastructure
20 Service Living Our Values
Housing Assurance Statement Housing Assurance Statement Environment, Housing &
Infrastructure
8  Place
Customer Services Customer Services Operations Finance & Resources 20 N/A Living Our Values
Scottish Welfare Fund Scottish Welfare Fund Finance & Resources 20 Strategic Fair
Council Tax Council Tax Refunds Finance & Resources 15 Strategic Living Our Values
Internal Compliance Main Financial Systems – Key Controls Finance & Resources 20 BAU Living Our Values
Non-Domestic Rates Non-Domestic Rates Finance & Resources 15  N/A
Part C – Contingency   288  
Contingency Contingency Corporate - All Services 116

Page 14

Page 11 of 14 
Entity Engagement Title Service Days
Allocated
Risk Category Council Plan Theme
Contingency Corporate Groups Corporate - All Services 27  
Contingency Investigations Corporate - All Services 145  
Part D – Planning &
Reporting   115  
Planning & Reporting Planning & Reporting Corporate - All Services 115  
Part E – Prioritised
Reserve List   120  
Regeneration & Investment Levelling Up Fund Chief Executive’s 20 Strategic Place
Business Continuity Schools Digital Readiness Children’s Services 20 Service Fair
Pupil Registration System SEEMIS Children’s Services 20 N/A Living Our Values
Parking Charges & Penalties Parking Income Processes
Environment, Housing &
Infrastructure 20
Strategic Living Our Values
Homeless Services Homeless Service Processes
Environment, Housing &
Infrastructure 20
Strategic Living Our Values
Common Good Fund Common Good Fund Governance Finance & Resources 15 N/A Living Our Values

Page 15

Page 12 of 14 
Appendix 2 
Other Bodies Internal Audit Annual Plan 2025/26 
Entity Engagement Title Service Days Allocated
Part A – Governance  5
Integration Joint Board – Governance Arrangements Corporate Governance Framework Integration Joint Board 5
Part B – Assurance  83
SE – Other Systems Delivering Value Scotland Excel 20
OneRen – Other Systems Spot Checks / Regularity Checks OneRen 15
OneRen – Other Systems Debt Management Arrangements OneRen 8
IJB – Strategic Planning Review of Strategic Plan Process Integration Joint Board 20
RVJB – Valuation System Purchasing Processes RVJB 20
Part C – Contingency   7
Contingency Contingency All Associate Bodies 7
Part D – Planning & Reporting   23
Planning & Reporting Planning & Reporting All Associate Bodies  23

Page 16

Page 13 of 14 
2024/25 2025/26
Service Planned
Days
% of
Operation
al Time
Planned
Days
% of
Operational
Time
All Services note 1 465 54% 535 62%
Chief Executive’s Service 20 2% 20 2%
Finance & Resources 100 12% 90 10%
Children’s Services 60 7% 20 2%
Adult Services 20 2% 20 2%
Environment, Housing & Infrastructure 73 9% 68 8%
COUNCIL TOTAL 738 86% 753 87%
Scotland Excel 25 3% 25 3%
Clydeplan 2 0% 0 0%
Renfrewshire Valuation Joint Board 25 3% 25 3%
Renfrewshire Health & Social Care
Integration Joint Board (Appendix 4)  40  5%  40  4%
OneRen 26 3% 26 3%
TOTAL  856 100% 869 100% 
Notes
1 Planned time includes, Follow up Audit, Contingency, Planning and Reporting and an element of Cross cutting Assurance
and Governance Audits and is allocated against services during the course of the year   
Appendix 3 
Analysis by Service

Page 17

Page 14 of 14 
Audit
Category 
Engagement
Title
No. of
days
Detailed work
Governance Local Code of
Corporate
Governance
5 Annual review of the adequacy and
compliance with the Local Code of
Corporate Governance to inform the
governance statement.
Assurance Strategic Planning 20 The purpose of the audit is to provide
assurance over the  arrangements in
place for updating the Strategic Plan. This
key document is also utilised to evidence 
actions taken or planned to mitigate
several risks recorded in the IJB’s Risk
Register.
Planning &
Reporting
Annual Plan,
Annual Report and
Audit Committee
annual
assessment,
reporting &
Training
12 The Chief Internal Auditor is required to
prepare an annual plan and annual report
for the Audit Committee, summarising the
work undertaken by Internal Audit during
the year and using this to form an opinion
on the adequacy of the control
environment of the IJB. Time is also
available to assist in the annual
assessment against the CIPFA position
statement on Audit Committees.
Contingency  Ad-hoc advice and
Consultancy 
3 Time for advice and consultancy on
relevant priorities and risks or change
related projects and following up on the
implementation of internal audit
recommendations. 
Appendix 4 
Annual Audit Plan 2025/26 – Integration Joint Board